*CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 8 TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JANUARY 1, 2006- DECEMBER 30, 2008 *You may access this report on this website http://www.gppb.gov.ph

CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

*CIAP-PDCB CONSOLIDATED CONSTRUCTORS

PERFORMANCE SUMMARY REPORT (CPES REPORTS)

8TH RELEASE

(ON-GOING/COMPLETED PROJECTS) FROM JANUARY 1, 2006- DECEMBER 30, 2008

*You may access this report on this website http://www.gppb.gov.ph

Page 2: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

1

BACKGROUND: This report is prepared in connection with the

implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION:

The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.

Information on contractors CPES ratings shall be used for

the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and in adopting measure to further improve performance of contractors in the prosecution of government projects.

REPORT COVERAGE:

This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.

REPORT CONTENTS:

Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: 1) Constructor General Information; 2) Project Data; and 3) CPES Rating.

Part 1 of the report includes the name of constructor/s and

PCAB License Number.

Information contained in Part 2 pertains to the project name, Implementing Agency, contract amount, and status of project (on-going or completed).

CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)

5/F Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati ave. Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791

CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT

CPES Reports - On-going and Completed Projects from Jan. 1, 2006-Dec. 30, 2008

Page 3: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

2

Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.

SOURCES OF INFORMATION

Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and

Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Pasig River Rehabilitation Commission (PRRC), Bases Conversion Development Authority (BCDA), Polytechnic University of the Philippines (PUP), Development Bank of the Philippines (DBP) and Philippine Tourism Authority (PTA) covering the period January 1, 2006 – December 30, 2008

As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter

may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.

For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned

implementing agencies listed below:

Melrose Pailma (DPWH) Wilfredo C. Borbor (DOTC) Arnaldo C. Reyes (DOST) Tess Pantalla (NIA)

Tel No. 304-3511 Tel No. 726-3508 Tel No. 837-2071 loc: 2120 Tel No. 927-0923

Ma. Otelia F. Eclavea (NHA) Arnold Villegas (PPA) Amy Gamay (PRRC) Bong Fortunado (BCDA) Tel No. 928-4561 Tel No. 527-8356 loc: 356 Tel No. 433-3444 Tel No. 816-6666 Angela Israel (PUP) Marie Cielo Veran (DBP) Aniversario Partolan (PTA) Tel No. 713-1488 Tel No. 818-9511 loc: 2632 Tel Nos: 523-5667 ; 525-3769

For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.

Page 4: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

3

CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES

I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood

Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.

2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing

Office reported 100% completion.

II. CRITERIA FOR EVALUATION

Amended Guidelines as Approved by NEDA InfraCom 27 August 2008

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00

Page 5: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

4

As approved by NEDA InfraCom 19 May 2005

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00

As approved by NEDA InfraCom

30 January 1998

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety

and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00

Page 6: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

5

III. CPES RATING & ITS QUALITATIVE DESCRIPTION

CPES Implementing Guidelines as Approved on 27 August 2008

As Approved on May 2005 and 30 January 1998

*CPES RATING Ranges Rating Qualitative Description

>96% Outstanding

>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor

*CPES RATING Ranges Rating Qualitative Description

>90% Outstanding

>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor

Page 7: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

6

*CAUSES OF DELAY

CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS

C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds

C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation

of utilities, (i.e. PLDT, MERALCO posts and other similar cases)

Page 8: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

7

*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)

Page 9: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

121 Construction 21686 Const. of Cemented Footbridge, Sapang Bayan III 0.946 C 0.304 0.285 0.300 - - - 88.90 91.06%

Outstanding

121 Construction 21686 Const. of MPB @ Bulacan State University Compound III 0.945 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 -

121 Construction Corporation (Formerly: 121

Construction)21686 Const. of MPB NCR 3.341 C 0.393 0.149 0.300 - - - 84.20 *84.20%

V. Satisfactory

121 Construction Corporation (Formerly: 121

Construction)21686 Const. of MPB NCR 3.821 C 0.280 0.200 0.300 - - - 78.00 *78.00%

Satisfactory

121 Construction Corporation (Formerly: 121

Construction)21686 Impvt. of MPB at Sta. Maria Agro-

Industrial High School III 1.717 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding

2H2L Construction 16293 Conc. of Road @ Package 3-2 XI 0.565 C 0.343 0.300 0.300 - - - 94.30 *94.30% Oustanding

2H2L Construction 16293 Const. (Completion) of Sch. Bldg. @ dela Paz E/S IV-A 0.791 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

2H2L Construction 16293 Const. of MPB @ Jacinto St. XI 0.471 C 0.365 0.300 0.300 - - - 96.50 *96.50% Oustanding

2H2L Construction 16293 Widening of Antipolo-Teresa Road IV-A 19.224 C 0.261 0.300 0.300 - - - 86.10 80.34%

V. Satisfactory

2-R Construction & Supply 15304 Impvt./Rehab. of PMA Road, PMA Cut=off Road 1&2 CAR 4.811 C 0.260 0.200 0.300 - - - 76.00 *76.00%

Satisfactory

2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road I 2.410 C 0.338 0.200 0.300 - - - 83.80 *83.80%

V. Satisfactory

310 Construction Specialist Corporation 4875 Asphalt Overlay of Tigaon-Goa-

Lagonoy Road V 47.945 C 0.450 - 0.500 - - - 95.00 95.12% Outstanding

310 Construction Specialist Corporation 4875 Const. of Tumana Bridge (Phase

III) NCR 26.854 C 0.221 0.190 0.300 - - - 71.10 79.38% Satisfactory

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 1

Page 10: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

310 Construction Specialist Corporation 4875

Estrella-Pantaleon Bridge Approaches (Across Pasig

River)NCR 38.627 C 0.376 0.200 0.300 - - - 87.60 83.22%

V. Satisfactory

3E Construction 19588Completion of Multi-Purpose

Bldg., (Water District, Phase IV) Tankulan

X 2.365 C 0.335 0.136 0.000 - - - 47.10 71.44% Satisfactory

3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S II 0.410 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

3K Builders 27277 Const. of Curifang FMR II 0.277 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding

3K Builders 27277 Const. of FMR @ Brgy. Bobonan I 0.478 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

3K Builders 27277 Const. of Multi-Purpose Building I 0.480 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

3K Rock Engineering 27908 Completion of Multi-Purpose Building (Gymnasium) II 1.194 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

3K Rock Engineering 27908 Completion of Multi-Purpose Building @ MIT II 0.478 C 0.297 0.300 0.300 - - - 89.70 *89.70%

V. Satisfactory

3K Rock Engineering 27908 Completion of One (1) CL, Secondary School Building II 0.182 C 0.349 - 0.500 - - - 84.90 *84.90%

V. Satisfactory

3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS II 0.954 C 0.233 0.200 0.300 - - - 73.30 81.14%

V. Satisfactory

3K Rock Engineering 27908 Const. of Flood Control, Sangbay II 0.954 C 0.321 0.204 0.300 - - - 82.50 *82.50%

V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School II 0.578 C 0.375 0.218 0.300 - - - 89.30 *89.30%

V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S II 1.622 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 2

Page 11: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

3K Rock Engineering 27908 Const./Impvt. of Nat'l Road along Echague-Jones Maddela Road II 2.722 C 0.319 0.200 0.300 - - - 81.90 *81.90%

V. Satisfactory

3-L Construction 16745 Concreting of Barangay Road V 0.550 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -

3-L Construction 16745 Const. of Multi-Purpose Hall, Lupi H/S V 0.469 C 0.393 0.182 0.300 - - - 87.50 *87.50%

V. Satisfactory

3RB Construction & Supply 19541 Const. of Almine-Bagacay Road, Almine Section V 4.625 O 0.184 0.059 0.100 0.015 0.027 0.100 48.50 -

3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System IV-A 1.921 C 0.288 0.200 0.300 - - - 78.80 73.94%

Satisfactory

3RB Construction & Supply 19541Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam.

Sur Bdry., Tiwi-Tabaco SectionV 19.233 O 0.382 0.203 0.100 0.020 0.019 0.067 79.10 -

3RB Construction and Supply 19541 Const. of Municipal High School

Building IV-A 9.130 C 0.382 0.183 0.300 - - - 86.50 84.82% V. Satisfactory

3RB Construction and Supply 19541 Rehabilitation of Canal Network

(phase 1) NIA-V 11.008 O 0.276 0.200 0.100 0.018 0.033 0.200 82.70 -

3RB Construction and Supply 19541 Rehabilitation of Canal Network

(phase 2) NIA-V 8.856 O 0.291 0.200 0.100 0.018 0.033 0.200 84.20 -

3S Builders 18009 Completion of Drainage System VII 0.634 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding

4 A's Construction 9446 Conc. of Road II 1.926 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory

4 A's Construction 9446 Const. of 2 Storey 4 Classroom School Bldg. @ Gosi E/S II 1.077 C 0.312 0.258 0.300 - - - 87.00 *87.00%

V. Satisfactory

4 A's Construction 9446 Repair/Rehab. of Saint Paul Vocational H/S II 0.189 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 3

Page 12: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

4B Construction Corporation 23445 Upgrading and Concreting of

Subic-Philseco Road III 41.616 O 0.366 0.256 0.070 0.030 0.061 0.033 81.60 -

4B Construction and Corporation 23445 Rehab. of Olongapo-Bugallon

Road, San Marcelino Section III 4.675 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

525 Construction 28532 Repair & Impvt. of Daang Maharlika Road III 14.801 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

525 Construction 28532 Road Conc., Taal Bocaue III 1.899 C 0.357 0.289 0.300 - - - 94.60 *94.60% Outstanding

525 Construction 28532 Road Rehabilitation at Mapulang Lupa III 0.944 C 0.382 0.300 0.300 - - - 98.20 *98.20%

Outstanding

558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur

Coastal Road (Taluya Section) XII 9.435 C 0.346 0.300 0.000 - - - 64.60 67.68% Fair

558 Builders & Construction Supply 25751 Const. of FMR Lower Mainit XII 0.465 C 0.160 0.300 0.300 - - - 76.00 63.74%

Fair

558 Builders & Construction Supply 25751 Const. of Maligang River Flood

Control XII 2.217 C 0.278 0.300 0.000 - - - 57.80 61.28% Fair

558 Builders & Construction Supply 25751 Const. of MPB (Mini Gym) @

Padada Central E/S XI 1.420 C 0.387 0.260 0.300 - - - 94.70 82.66% V. Satisfactory

558 Builders & Construction Supply 25751 Const. of Public Market @

Poblacion Alabel XII 2.818 O 0.333 0.159 0.050 0.030 0.037 0.100 70.90 -

722 Construction 21923 Conc. of Road @ at Brgy. Palo Alto IV-A 2.400 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V. Satisfactory

722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S III 2.290 O 0.342 0.300 0.100 0.030 0.019 0.100 89.10 -

722 Construction 21923 Const. of Water System @ Northville II NCR 1.424 C 0.278 0.177 0.300 - - - 75.50 *75.50%

Satisfactory

722 Construction 21923Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada

Section III 3.807 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 4

Page 13: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

722 Construction 21923Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos

Road (Barihan Section)III 4.957 C 0.361 0.200 0.300 - - - 86.10 *86.10%

V. Satisfactory

722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez III 0.618 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

739 Builders 31174 Completion of MPB, Brgy. Capangpangan I 1.518 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

739 Builders 31174 Conc. of Caparacadan Road I 0.189 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory

739 Builders 31174 Const. of MPB @ Brgy. Sabang I 4.750 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory

739 Builders 31174 Const. of MPB @ San Lorenzo Village I 1.087 C 0.261 0.200 0.300 - - - 76.10 *76.10%

Satisfactory

739 Builders 31174 Const. of Repair of Villamar Bridge I 0.474 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

739 Builders 31174 Repair of Bantay West E/S I 0.380 C 0.240 0.300 0.300 - - - 84.00 *83.90% V. Satisfactory

747 Builders & Trader 16892 Conc./Impvt. of Manila East Road IV-A 6.236 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory

747 Builders & Trader 16892 Impvt. of Roads with Drainage System along Dalaging Bukid St. NCR 14.255 C 0.276 0.200 0.300 - - - 77.60 *77.60%

Satisfactory

747 Builders & Trader 16892Impvt./Dredging/Rehab. of

Baybay Sapa (along Lopezville Subd.)

IV-A 4.797 C 0.250 0.300 0.300 - - - 85.00 80.26% V. Satisfactory

747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank IV-A 14.367 O 0.378 0.180 0.100 0.008 0.037 0.100 80.30 -

747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank IV-A 14.368 O 0.321 0.300 0.100 0.030 0.037 0.100 88.80 -

747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. NCR 9.589 C 0.355 0.200 0.300 - - - 85.50 78.96%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 5

Page 14: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

8 R's Construction 22997 Barangay Hulo Linear Park Project (EPA - LPP - 19) PRRC 22.542 O 0.311 0.270 0.100 0.015 0.042 0.100 83.80 -

811 Trading & Construction 21215Const. of MPB at Sitio

Simbahan, Brgy. Bagong Bayan II

IV-B 0.477 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory

811 Trading & Construction 21215

Const. of Two (2) Storey Bldg. Six (6) Classroom Sch. Bldg. @ Dona Asuncion Reyes Memorial

E/S

IV-B 0.948 C 0.304 0.300 0.300 - - - 90.40 91.73% Outstanding

811 Trading & Construction 21215 Rehab. & Impvt. Along CSR, km. 132+347-km. 140+536 IV-B 4.709 C 0.342 0.300 0.300 - - - 94.20 *94.20%

Outstanding

811 Trading & Construction 21215 Rehab. of Mansalay-Bulalacao Road IV-B 1.408 O 0.328 0.276 0.100 0.022 0.016 0.100 84.20 *84.20%

V.Satisfactory

811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section IV-B 4.710 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V. Satisfactory

888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road, Calatrava-San Agustin Road (Intermittent Section)

IV-B 9.999 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

A. Ballesta Construction 8446 Const. of One (1) Cl School Building VIII 0.360 C 0.442 - 0.500 - - - 94.20 61.02%

Fair

A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. VIII 14.393 C 0.242 0.200 0.300 - - - 74.20 61.12%

Fair

A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road II 9.648 C 0.344 0.200 0.300 - - - 84.40 82.84%

V. Satisfactory

A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 O 0.158 0.120 0.100 0.015 0.035 0.100 52.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 6

Page 15: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 O 0.326 0.240 0.070 0.015 0.049 0.067 76.70 -

A. De Guia Construction 18228Const. of Naguilian-San

Marcelino Road (Sitio Kasisiitan-Alibadabab E/S Sect.)

II 10.031 C 0.281 0.300 0.300 - - - 88.10 85.16% V. Satisfactory

A. De Guia Construction 18228 Improvement of Buluan-Daga Road CAR 7.519 C 0.179 0.300 0.000 - - - 47.90 34.28%

Poor

A. De Guia Construction 18228 Regravelling of Various FMR II 0.919 C 0.258 0.200 0.300 - - - 75.80 *75.80% Satisfactory

A. De Guia Construction 18228 Widening of Ballacayu-Simanu Road II 2.751 C 0.270 0.200 0.300 - - - 77.00 75.71%

Satisfactory

A. Munas Integrals Builders & Trading 32003 Const./Rehab. of MPB @ Block

4, Kaingin 1 NCR 3.803 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

A. Seva Construction 20124 Const. of Building at San Fernando H/S V 0.468 C 0.358 0.200 0.300 - - - 85.80 83.91%

V. Satisfactory

A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater PUP 1.389 O 0.340 0.240 0.100 0.030 0.029 0.100 83.90 -

A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater PUP 1.389 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 O 0.400 0.300 0.100 0.015 0.025 0.100 94.00 -

A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 O 0.397 0.289 0.100 0.030 0.032 0.100 94.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 7

Page 16: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. VII 0.415 C 0.382 0.100 0.300 - - - 78.20 85.69% V. Satisfactory

A.A. De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S VII 4.175 C 0.367 0.300 0.300 - - - 96.70 94.18%

Outstanding

A.A. De Vera Construction 6191 Const. of Loon South CES-SPED Center Bldg. VII 2.780 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer

and Drainage System at Northwing and Eastwing

PUP 1.241 O 0.400 0.300 0.100 0.030 0.019 0.100 94.90 -

A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer

and Drainage System at Northwing and Eastwing

PUP 1.241 O 0.385 0.300 0.100 0.030 0.038 0.100 95.30 -

A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer

and Drainage System at Northwing and Eastwing

PUP 1.241 C 0.400 0.300 0.300 - - - 100.00 100.00% Outstanding

A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 O 0.395 0.285 0.070 0.020 0.022 0.067 85.90 -

A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 O 0.386 0.300 0.100 0.015 0.044 0.100 94.50 -

A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.C. Rivero Construction & Dev't. Corporation 5122 Const. of Candaguit Bridge VI 9.922 C 0.347 0.200 0.300 - - - 84.70 88.89%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 8

Page 17: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.C. Rivero Construction & Dev't. Corporation 5122

Const./Replacement of Caliban Bridge (Phase 2) along Bacolod-

Murcia-D.S. Benedicto-San Carlos City National Road

VI 7.289 C 0.379 0.300 0.300 - - - 97.90 90.22% Outstanding

A.C. Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I VI 7.946 C 0.323 0.200 0.300 - - - 82.30 81.31%

V. Satisfactory

A.D. Construction 6946 Const. of MPB IV-A 0.944 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory

A.D. Construction 6946 Const. of Sch. Bldg. at Nato E/S V 0.372 C 0.372 0.171 0.300 - - - 84.30 *84.30% V. Satisfactory

A.D. Construction 6946 Rehab. of Panganiban Drainage V 4.212 C 0.288 0.300 0.300 - - - 88.80 77.82% Satisfactory

A.D. Gonzales Jr. Construction and Trading

Company Inc.10012 Const. of BGHMC Acute

Psychiatric Unit Bldg. CAR 21.206 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -

A.D. Gonzales Jr. Construction and Trading

Company Inc.10012 Impv't./Rehab. of San Ahustin-

San Joaquin Road III 4.752 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -

A.D.L. Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School IV-B 0.481 C 0.360 0.200 0.300 - - - 86.00 84.11%

V. Satisfactory

A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road VI 18.918 C 0.228 0.300 0.300 - - - 82.80 82.80% V. Satisfactory

A.D.P. Const. & Supply 3466Const. of Bugasong-Valderrama Road, Liaures Section (Alternate

Route)VI 14.426 C 0.335 0.087 0.300 - - - 72.20 81.05%

V. Satisfactory

A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) VI 10.561 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -

A.D.P. Const. & Supply 3466 Reconst. of Dumaguete North Road VII 18.881 O 0.338 0.238 0.070 0.030 0.032 0.033 74.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 9

Page 18: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.743 O 0.328 0.300 0.100 0.024 0.035 0.100 88.70 -

A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.922 O 0.325 0.240 0.070 0.023 0.032 0.067 75.70 -

A.D.S. San Juan Construction 12853 Const. of St. Benedict MPB NCR 1.721 C 0.280 0.300 0.300 - - - 88.00 *88.00%

V. Satisfactory

A.E. Belleza Builders 22646 Const. of Day Care Center, Phase I V 0.379 C 0.415 - 0.500 - - - 91.50 84.78%

V. SatisfactoryA.F.G. Construction and

Construction Supply 17161 Conc. of Road @ Brgy. Mansilingan VI 1.861 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

A.F.G. Construction and Construction Supply 17161

Const. of Diversion/By Pass Road along Kalibo-Iloilo Highway, Banga Section

VI 14.461 C 0.351 0.300 0.300 - - - 95.10 90.90% Outstanding

A.F.G. Construction and Construction Supply 17161 Rehab. of Dumaguete North

Road VII 4.894 C 0.324 0.200 0.300 - - - 82.40 73.10% Satisfactory

A.J. Lava Builders 22265 Const. of the Makinabang Baliuag FMR III 4.769 C 0.296 0.300 0.300 - - - 89.60 *89.60%

V. Satisfactory

A.J. Lava Builders 22265 Rehab. of Road @ Brgy. San Isidro IV-A 1.922 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

A.J. Lava Builders 22265Repair & Rehab. of Daang

Maharlika Road (Guiguinto & Plaridel Section)

III 9.930 C 0.257 0.211 0.300 - - - 76.80 *76.80% Satisfactory

A.J. Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway III 9.927 C 0.255 0.300 0.300 - - - 85.50 *85.50%

V. Satisfactory

A.J. Taylan Const. Corp./BSP & Co., Inc. (J.V.) JV-020104 Const. of Gasgas Bridge under

JICA Bridge Projects along Rural I 63.299 O 0.343 0.275 0.050 0.030 0.055 0.067 82.00 -

A.J. Taylan Construction Corporation 2336 Const. of San Mateo Bridge I 16.502 C 0.236 0.269 0.300 - - - 80.50 *80.50%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 10

Page 19: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.J. Taylan Construction Corporation 2336 Const. of Seawall II 14.173 C 0.323 0.226 0.000 - - - 54.90 74.58%

Satisfactory

A.J. Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga

Apayao Road I 19.283 C 0.215 0.200 0.300 - - - 71.50 77.80% Satisfactory

A.L. Dare Construction 11932Const./Rehab./Replacement/ Completion/ and Repair of

Plaridel E/SNCR 1.718 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -

A.L. Dare Construction 11932 Impv't. of Balaybay Farm-to-Market Road Brgy. Balaybay III 0.930 O 0.288 0.225 0.100 0.015 0.032 0.067 72.70 -

A.L. Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores III 4.753 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

A.L. Gantuangco Construction 30872 Benolho CIS NIA 3.720 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

A.L. Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido

National Road IV-B 28.821 C 0.300 0.300 0.300 - - - 90.00 *90.00% V. Satisfactory

A.L. Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong

Bukawe, Phase II IV-A 14.346 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

A.L. Salazar Construction, Inc. 3899 Rehab./Const. of Port Barton-

Kemdeng Road IV-B 9.122 O 0.322 0.045 0.100 0.030 0.033 0.067 59.70 -

A.L.R. Construction 24110 Const. of 2 CL S/B @ Dungon E/S IV-B 0.852 O 0.329 0.236 0.100 0.015 0.032 0.100 81.20 81.20%

V.Satisfactory

A.L.R. Construction 24110Const. of Schl. Bldg. 2 Storey, 4 CL @ Gulod NHS, Brgy. Gulod

Phase I) IV-A 0.960 C 0.254 0.200 0.300 - - - 75.40 *75.40%

Satisfactory

A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass

along Calamba-Sto. Tomas IV-A 9.601 C 0.352 0.200 0.300 - - - 85.20 83.22% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 11

Page 20: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.M. Ayunan Construction 13983 Const. of MPB at Datu Usman E/S XII 1.908 C 0.319 0.182 0.300 - - - 80.10 65.40%

Fair

A.M. Donceras Construction 30528

Const. of Arteche-Lapinig Road, Sta.960-160-Sta.961-260 with

exceptionsVIII 8.008 C 0.247 - 0.000 - - - 24.70 48.28%

Poor

A.M. Oreta & Co. Inc. / IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge &

Approaches VI 138.616 C 0.370 0.278 0.000 - - - 64.80 78.74% Satisfactory

A.M. Robles Construction 28056 Conc. of FMR, Brgy. Colo I 1.926 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

A.M. Robles Construction 28056 Const. of Multi-Purpose Bldg. @ Brgy. Minuyan III 2.850 O 0.356 0.248 0.100 0.030 0.035 0.100 86.90 -

A.M.P. Construction 16574 Const. of 2 Cl , CLSU III 0.657 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Lomboy E/S III 0.637 C 0.363 0.178 0.300 - - - 84.10 *84.10%

V. Satisfactory

A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Talavera CES III 0.640 C 0.316 0.255 0.300 - - - 87.10 *87.10%

V. Satisfactory

A.M.P. Construction 16574 Const. of 2-Cl S/B @ Tabacao H/S III 0.737 C 0.403 - 0.500 - - - 90.30 90.30%

Outstanding

A.M.P. Construction 16574 Const. of Multi-Purpose Bldg. @ Zaragosa Nat'l. H/S III 2.807 C 0.295 0.217 0.300 - - - 81.20 66.71%

Fair

A.M.P. Construction 16574 Const. of Multi-Purpose Building at Poblacion Sison I 1.349 C 0.297 0.235 0.300 - - - 83.20 *83.20%

V. Satisfactory

A.P. Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road III 2.170 C 0.347 0.206 0.300 - - - 85.30 *85.30%

V. Satisfactory

A.P. Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose III 0.702 C 0.316 0.300 0.300 - - - 91.60 *92.50%

Outstanding

A.P. Palacios Construction 29021 Concreting of Provincial Road, Brgy. Matawe III 3.239 C 0.286 0.300 0.300 - - - 88.60 *88.60%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 12

Page 21: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.P. Palacios Construction 29021 Concreting of Road III 0.935 C 0.425 - 0.500 - - - 92.50 *92.50% Outstanding

A.P. Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) III 0.934 C 0.284 0.274 0.300 - - - 85.80 *85.80%

V. Satisfactory

A.P. Palacios Construction 29021 Const. of Flood Control (Gabion Type) @ Brgy. Caragsacan III 0.930 C 0.340 0.200 0.300 - - - 84.00 *88.20%

V. Satisfactory

A.P.B. Construction 17055 Conc. of Kisad Road (km. 249+303 - km. 249+399) CAR 2.807 C 0.313 0.224 0.300 - - - 83.70 *83.70%

V. Satisfactory

A.P.B. Construction 17055 Road Opening at Middle Quirino Hill Brgy. CAR 0.953 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

A.P.O. General Construction 7010 Completion of School Bldg.,

Happy Hollow E/S CAR 0.638 O 0.373 0.240 0.100 0.023 0.018 0.100 85.40 -

A.Q. Dominguez Construction & Supply 19843 Con. of Casanicolan-Sn.

Marcelino Road I 0.964 O 0.318 0.180 0.100 0.023 0.041 0.100 76.20 -

A.R. & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES X 0.495 C 0.236 0.300 0.300 - - - 83.60 *83.60%

V. Satisfactory

A.R. Cruz Construction, Inc. (Formerly: AR Cruz Const.) 12157 Concreting of Callaguip

Barangay Road I 0.707 C 0.264 - 0.500 - - - 76.40 *76.40% Satisfactory

A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-

Canigaran Road IV-B 9.697 O 0.383 0.240 0.100 0.030 0.045 0.100 89.80 -

A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-

Canigaran Road IV-B 9.697 C 0.332 0.300 0.300 - - - 93.20 91.16% Outstanding

A.R. Lustre Jr. Construction 7680 Completion of 2-Storey Building

@ BSU Matungao Branch III 1.403 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 13

Page 22: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.R. Lustre Jr. Construction 7680

Concreting of Puerto Princesa Sabang Rd., (Underground

River)IV-B 9.468 C 0.372 0.300 0.300 - - - 97.20 93.96%

Outstanding

A.R. Lustre Jr. Construction 7680 Const. of Bobosawen-Apurawan

FMR IV-B 46.650 O 0.353 0.249 0.100 0.030 0.070 0.100 90.20 -

A.R. Lustre Jr. Construction 7680 Const. of Culasian Bridge IV-B 10.076 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

A.R. Lustre Jr. Construction 7680

Const. of Std. 2-Cl School Bldg. @ Santor E/S & Rehab. of Sch.

Bldg. @ Mambog E/SIII 1.119 C 0.318 0.300 0.300 - - - 91.80 *91.80%

Outstanding

A.R. Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge,

PPSR IV-B 20.378 C 0.374 0.200 0.300 - - - 87.40 85.06% V. Satisfactory

A.R. Lustre Jr. Construction 7680

Const./Rehab. of Iwahig-Tacduan Diversion Road

National Highway IV-B 11.430 C 0.289 0.239 0.300 - - - 82.80 82.80%

V. Satisfactory

A.R.L. Construction 27645 Conc. of Brgy. Road Caniogan III 0.956 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

A.R.L. Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion III 0.500 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

A.R.L. Construction 27645 Repair/Rehabilitation of Tatalon Street, Brgy. Ugong NCR 2.312 C 0.389 - 0.500 - - - 88.90 *88.90%

V. Satisfactory

A.R.L. Construction 27645 Riprapping of Access Road @ Poblacion III 0.477 C 0.240 0.300 0.300 - - - 84.00 *84.00%

V. Satisfactory

A.R.L. Construction 27645 Upgrading of A.T. Santiago Brgy. Viente Reales NCR 0.897 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

A.R.L. Construction 27645 Upgrading of Sapang Bakaw Road, Brgy. Lawang Bato NCR 1.881 C 0.333 0.300 0.300 - - - 93.30 88.80%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 14

Page 23: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

A.S. Obquia Construction 19844 Completion of MPB VII 0.175 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding

A.S.V. Construction Supply and Services 13490 Const. of Daang Liputan FMR III 0.471 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

A.V. Construction Supply 13202 Const. of 4-Cl, 2-Storey School Building IV-A 2.617 C 0.354 0.200 0.300 - - - 85.40 *85.40%

V. SatisfactoryA.Y.U. Engineering and

Construction 25632 Conc. of Road at Brgy. Dumoy XI 9.435 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

A.Y.U. Engineering and Construction 25632 Const. of 1 Cl 1 Storey Sch.

Bldg. @ Gasco E/S XI 0.434 C 0.375 0.157 0.300 - - - 83.20 *83.20% V. Satisfactory

A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building XI 0.657 C 0.415 - 0.500 - - - 91.50 87.51%

V. Satisfactory

A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building

@ Purok Rivera XI 0.472 C 0.325 - 0.500 - - - 82.50 83.69% V. Satisfactory

AAA Structures & Builders, Inc. 30935 Conc./Impv't. of Magsaysay

Brgy. Road II 0.878 C 0.270 - 0.500 - - - 77.00 *77.00% Satisfactory

AB Vision Engineering Construction 19845 Const. of MPB XI 1.607 C 0.393 0.300 0.300 - - - 99.30 * 99.30%

Outstanding

Aboitiz Construction Group, Inc. 2608 C.P. PY-D Structural Overlay of

Patnongon-Nabas Road ADB 166.347 C 0.323 0.200 0.000 - - - 54.80 71.86% Satisfactory

Aboitiz Construction Group, Inc/Kumagai Gumi

Co. Ltd. (J.V.)

SLI-SN-003884

Cebu South Road Improvement Project CP-1 (Talisay-Jct. Toledo

Sect.)VII 513.289 O 0.332 0.300 0.000 0.030 0.065 0.100 82.70 -

Abu Construction 22313 Const. of Tantangan RCDG Bridge XII 3.858 C 0.323 0.237 0.300 - - - 86.00 83.48%

V. Satisfactory

Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia XII 0.873 C 0.338 0.300 0.300 - - - 93.80 87.57%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 15

Page 24: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Abulug Construction 5593 Construction of Canal and Canal Structures (LMC-ARIP-10-06) II 4.877 C 0.400 0.300 - - - - 70.00 70.00%

Fair

Abulug Construction Co., Inc. 5593 Matuno-Sto. Domingo CIS NIA 3.126 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -

Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao

Road II 8.199 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory

Abulug Construction Company, Inc. 5593 Conc. of Jct. Claveria-Dibalio-

Luzon Road II 9.648 O 0.352 0.240 0.100 0.030 0.033 0.100 85.50 -

Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road,

Tuguegarao City & Penablanca II 13.884 C 0.358 0.200 0.300 - - - 85.80 84.30% V. Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Colony Road II 2.894 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

Abulug Construction Company, Inc. 5593 Const. of Dagupan MPB CAR 0.442 C 0.226 0.184 0.300 - - - 71.00 *71.00%

SatisfactoryAbulug Construction

Company, Inc. 5593 Const. of Public Market (Phase II) II 1.446 O 0.356 0.240 0.100 0.030 0.033 0.100 85.90 -

Abulug Construction Company, Inc. 5593 Const. of Punta Seawall II 0.298 C 0.310 0.200 0.300 - - - 81.00 79.26%

SatisfactoryAbulug Construction

Company, Inc. 5593 Const./Completion of Cabaruan Bridge II 0.383 C 0.178 0.271 0.300 - - - 74.90 *74.90%

Satisfactory

Abulug Construction Company, Inc. 5593 Lucban River Control Project II 3.858 O 0.371 0.240 0.100 0.022 0.023 0.100 85.60 -

Abulug Construction Company, Inc. 5593 Lucban River Control Project II 3.858 O 0.333 0.160 0.100 0.030 0.033 0.133 78.90 -

Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS NIA 3.126 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -

Abulug Construction Company, Inc. 5593 Reblocking along MNR II 19.296 C 0.295 0.215 0.300 - - - 81.00 82.08%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 16

Page 25: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Abulug Construction Company, Inc. 5593 Regravelling of Allasitan-

Biduang-Nagattatan Road II 1.923 C 0.300 0.200 0.300 - - - 80.00 78.38% Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Abra-Kalinga Road.

Km. 423+500-Km. 426+500 CAR 1.878 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Drainage Canal

Bangued-Pidigan Section CAR 2.385 C 0.288 0.300 0.300 - - - 88.80 68.82% Fair

Abulug Construction Company, Inc. 5593 Rehab. of Multi-Purpose Hall CAR 0.944 O 0.246 0.184 0.300 - - - *73.00 -

Abulug Construction Company, Inc. 5593 Repair of Cristina H/S and

Rehab. of Bucay C/S CAR 0.474 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -

Abulug Construction Company, Inc. 5593 Repair/Impv't. of Calog-Luna-

Pudtol Road II 1.180 C 0.293 0.218 0.300 - - - 81.10 81.16% V. Satisfactory

Abulug Construction Company, Inc. 5593 Replacement of Langagan

Bridge along MNR II 4.814 C 0.370 0.201 0.300 - - - 87.10 86.20% V. Satisfactory

Abulug Construction Company, Inc. 5593

Restoration of Damaged Roadways along BAMR (Sinking

Pavement @ Logac Section)II 1.392 C 0.316 - 0.500 - - - 81.60 *81.60%

V. Satisfactory

Abulug Developers and Builders Co., Inc.

(Formerly: F. Vargas Construction)

2366 Retrofitting of Pamplona Bridge, Manila North Road II 10.291 O 0.320 0.240 0.100 0.030 0.033 0.067 79.00 -

Aca Construction & Supply 10784 Conc. of Esperanza Road I 0.382 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory

Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River,

Brgy. Sta. Lucia I 4.485 C 0.400 - 0.500 - - - 90.00 * 90.00% V. Satisfactory

ACJ Construction Resources 10635

Conc. of Paco-Roxas-Arakan Valley National Road, (Luhong-

Kiyaab Section)XII 12.751 C 0.365 0.102 0.300 - - - 76.70 *76.70%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 17

Page 26: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

ACJ Construction Resources 10635

Const. of Malaang PSG Bridge inc. Conc. Paving of Bridsge

Approaches along Davao-Cotabato Road

XII 42.684 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory

ACJ Construction Resources 10635 Const. of Mayor Ricardo L. Ipong

Memorial National H/S XII 4.634 C 0.355 0.300 0.300 - - - 95.50 86.19% V. Satisfactory

ACJ Construction Resources 10635 Const. of MPB XII 9.634 C 0.335 0.270 0.300 - - - 90.50 83.22%

V. Satisfactory

ACJ Construction Resources 10635

Const. of Saguing Bridge along Davao-Cotabato Rd., Including Approaches and Gap Section

XII 9.328 C 0.283 0.297 0.300 - - - 88.00 90.16% Outstanding

ACJ Construction Resources 10635 Const./Impvt of Jct. Meocad-

Salasang-Katipunan Road XII 28.842 C 0.337 0.300 0.300 - - - 93.70 94.18% Outstanding

ACJ Construction Resources 10635 Rechanneling of Malamote River XII 1.443 C 0.375 0.188 0.300 - - - 86.30 *86.30%

V. Satisfactory

Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River VIII 9.635 C 0.312 0.200 0.300 - - - 81.20 *81.20%

V. Satisfactory

Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 O 0.352 0.300 0.100 0.022 0.045 0.100 91.90 -

Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 O 0.394 0.261 0.000 0.022 0.038 0.100 81.50 -

Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.383 O 0.323 0.196 0.100 0.030 0.050 0.100 79.90 -

Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.384 O 0.389 0.225 0.100 0.030 0.043 0.067 85.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 18

Page 27: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road VI 33.372 C 0.267 0.200 0.300 - - - 76.70 78.59%

Satisfactory

Acme Builders Corporation 6442 Rehab. of Mahayahay Creek VIII 6.709 O 0.360 0.160 0.100 0.020 0.023 0.200 86.30 -

Acme Builders Corporation/B. Vicencio

Const. (JV)JV-07-067

Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion) Section

VIII 59.291 C 0.338 0.300 0.300 - - - 93.80 93.02% Outstanding

Acme Builders Corporation/B. Vicencio

Const. (JV)JV-07-067

Const. of Palo East By-Pass Road (Const. of Bernard Reed II

Bridge) VIII 57.823 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -

ACO Construction 13105Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay

Rd. Ph. IIX 14.306 O 0.362 0.240 0.100 0.030 0.035 0.100 86.70 -

ACO Construction 13105 Repair of OB-Gyne Zamboanga City Medical Center IX 5.704 C 0.121 0.200 0.300 - - - 62.10 *62.10%

Fair

Adelfa & Charlie Enterprises 11569

Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise Steel Bridge along

Sambolawan-Calaguise-Calubian Road

VIII 34.810 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory

Adelfa & Charlie Enterprises 11569 Conc. of Sambulawan-Calaguise-

Calubian Road VIII 4.744 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

Adelfa & Charlie Enterprises 11569 Const. of Buho II Bridge VIII 5.597 C 0.384 0.300 0.300 - - - 98.40 93.42%

Outstanding

Adelfa & Charlie Enterprises 11569 Const. of Imbornal Bridge VIII 4.239 C 0.371 0.300 0.300 - - - 97.10 *97.10%

OutstandingAdelfa & Charlie

Enterprises 11569 Const. of Palid Bridge VIII 5.281 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 19

Page 28: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Adelfa & Charlie Enterprises 11569 Mapuyo CIS NIA 1.485 C 0.375 0.180 0.300 - - - 85.50 85.50%

V.SatisfactoryAdelfa & Charlie

Enterprises 11569 Rehab. of Palompon-Villaba Road VIII 9.490 C 0.383 0.220 0.300 - - - 90.30 87.24%

V. Satisfactory

Adelfa & Charlie Enterprises 11569

Repair of Roads along Tabango-Villaba-Palompon Road & Sto.

Rosario-Villaba RoadVIII 9.641 C 0.336 0.200 0.300 - - - 83.60 87.60%

V. Satisfactory

Adfil / RIDCorporation Joint Venture

SL1-SN-004956

Repair/Rehab. of Patin-ay Bridge along Agusan-Davao Road XIII 24.375 O 0.373 0.300 0.030 0.030 0.059 0.100 89.20 -

Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches XIII 26.210 O 0.375 0.240 0.100 0.030 0.059 0.100 90.40 -

Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches XIII 26.210 C 0.348 0.200 0.300 - - - 84.80 88.70%

V. Satisfactory

Adfil Corporation 14437 Conc. of Agusan-Surigao Road (Ampayon Section) XIII 4.691 C 0.367 0.300 0.300 - - - 96.70 94.96%

Outstanding

Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road XIII 4.012 C 0.323 0.200 0.300 - - - 82.30 *82.30%

V. Satisfactory

Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road XIII 28.452 O 0.373 0.205 0.100 0.030 0.065 0.100 87.30 -

Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road XIII 4.791 C 0.367 0.200 0.300 - - - 86.70 81.12%

V. Satisfactory

Adfil Corporation 14437 Const. of Cabadbaran River Dike (Downstream) XIII 9.413 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) XIII 9.548 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 20

Page 29: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) XIII 22.141 C 0.360 0.300 0.300 - - - 96.00 96.00%

Outstanding

Adfil Corporation 14437 Const. of Taguibo Flood Control XIII 14.413 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

Adfil Corporation 14437 Const. of Waloe Bridge XIII 9.199 C 0.339 0.200 0.300 - - - 83.90 90.92% Outstanding

Adfil Corporation 14437 Improvement of Masao River Flood Control, Phase III XIII 4.590 C 0.500 0.567 - - - - 106.70 94.70%

Outstanding

Adfil Corporation 14437 Impvt. of Agusan-Surigao Road (Ampayon Section) XIII 9.290 C 0.354 0.200 0.300 - - - 85.40 *85.40%

V. Satisfactory

Adfil Corporation 14437Impvt. of Lake Mainit

Circumferential Road, Brgy. Colorado Section

XIII 9.525 C 0.172 0.233 0.300 - - - 70.50 *70.50% Satisfactory

Adfil Corporation 14437 Rehab. of Camagong Flood Control XIII 9.440 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

Adfil Corporation 14437 Rehab./Impvt. of Sagal-ang Manubiray FMR X 13.894 C 0.358 0.278 0.300 - - - 93.60 73.32%

Satisfactory

Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along

Agusan-Misamis RoadXIII 9.634 O 0.307 0.234 0.100 0.030 0.065 0.100 83.60 -

Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along

Agusan-Surigao RoadXIII 9.635 O 0.358 0.200 0.100 0.030 0.065 0.100 85.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 21

Page 30: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Adfil Corporation 14437

Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road

(Agusan-Misamis Oriental Road) inc. Bridge

XIII 19.198 O 0.379 0.240 0.100 0.030 0.065 0.100 91.40 -

Adfil Corporation 14437

Repair/Reconst. Of Butuan City-Cagayan de Oro-Iligan Road

(Agusan-Misamis Oriental Road) inc. Bridge

XIII 19.198 O 0.370 0.220 0.100 0.030 0.032 0.100 85.20 -

Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road XIII 9.633 O 0.357 0.200 0.100 0.030 0.043 0.100 83.00 -

Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032

DPWH Component Project under the HELP for Catubig

Agricultural Project (HCAAP)VIII 448.581 O 0.392 0.300 0.050 0.030 0.055 0.100 92.70 -

Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032

DPWH Component Project under the HELP for Catubig

Agricultural Project (HCAAP)VIII 448.581 O 0.367 0.300 0.050 0.030 0.051 0.100 89.80 -

Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under

the HELP for Catubig Agricultural Project (HCAAP)

VIII 448.581 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under

the HELP for Catubig Agricultural Project (HCAAP)

VIII 519.663 O 0.350 0.299 0.100 0.030 0.060 0.067 90.60 -

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) III 1.907 C 0.334 0.200 0.300 - - - 83.40 83.61%

V. Satisfactory

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) III 1.907 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 22

Page 31: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Adimre Construction 25534Const. of Std. 1-Cl School Bldg.

@ N. Clemena E/S, Bulihan & Bagbaguin E/S

III 0.868 C 0.318 0.300 0.300 - - - 91.80 82.63% V. Satisfactory

ADL General Construction 30604 Conc. of San Antonio Palpaltogan CAR 0.285 C 0.303 0.000 0.300 - - - 60.30 *60.30%

Fair

Adroit Construction 11169 Const. of 1 CL @ San Pascual E/S III 0.475 C 0.299 0.245 0.300 - - - 84.40 *84.40%

V. Satisfactory

Adroit Construction 11169 Const. of 2 CL @ Cumabol E/S III 0.749 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

Adroit Construction 11169 Const. of 4 CL, Central Luzon State University III 1.800 C 0.319 0.300 0.300 - - - 91.90 *91.90%

Outstanding

Advanced Foundation Construction Systems

Corp.15449

Const. of Baguio Flyover & Approaches (Phase V), BGH-

Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road

Jct.

CAR 61.894 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding

Advanced Foundation Construction Systems

Corp.15449

Const. of Subic-Cawag Bridge I, along Subic-Cawag-Balaybay

RoadIII 47.952 O 0.331 0.300 0.100 0.030 0.040 0.100 90.10 -

AG Construction 7921 Conc. of Wright Park Grounds CAR 0.936 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory

Agafer Construction 7912 Conc. of Centro 2 II 0.963 C 0.284 0.204 0.300 - - - 78.80 *78.80% Satisfactory

Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.334 0.160 0.100 0.022 0.028 0.200 84.40 -

Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB

(Phase III) VIII 1.896 C 0.373 0.187 0.300 - - - 86.00 79.07% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 23

Page 32: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of

Engineering Campus V 16.149 O 0.380 0.263 0.100 0.030 0.023 0.100 89.60 -

Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of

Engineering Campus V 16.149 O 0.375 0.279 0.100 0.030 0.023 0.100 90.70 -

AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc XII 22.822 C 0.279 0.200 0.300 - - - 77.90 81.22%

V. Satisfactory

AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) XII 2.874 C 0.266 0.300 0.300 - - - 86.60 82.22%

V. Satisfactory

AJYSC Marketing 26924Const./Widening of Matin-ao

Bridge & Widening of Approaches

XII 3.848 C 0.351 0.115 0.300 - - - 76.60 81.82% V. Satisfactory

AJYSC Marketing 26924 Impvt. of Highway Jct. Malandag-Allae FMR, Malungon ARC XII 18.364 C 0.330 0.300 0.300 - - - 93.00 80.16%

V. Satisfactory

AJYSC Marketing 26924 Matin-ao Bridge along Marbel-Tupi-Makar Road XII 7.513 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

AJYSC Marketing 26924Road Upgrading (Gravel to

concrete) along Surallah-Lake Sebu-Maitum Road

XII 16.035 O 0.295 0.245 0.100 0.030 0.038 0.100 80.80 -

AJYSC Marketing 26924Road Upgrading (Gravel to

concrete) along Surallah-Lake Sebu-Maitum Road

XII 16.034 O 0.305 0.300 0.100 0.030 0.056 0.100 89.10 -

AJYSC Marketing 26924Road Upgrading (Gravel to

concrete) along Surallah-Lake Sebu-Maitum Road

XII 16.034 O 0.388 0.300 0.000 0.030 0.038 0.100 85.60 -

AJYSC Marketing 26924Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel

RoadXII 11.332 C 0.352 0.200 0.300 - - - 85.20 84.90%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 24

Page 33: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Akela Builders 26444 Const./Rehab. of MPB @ Novaliches Proper NCR 1.335 C 0.386 0.291 0.300 - - - 97.70 *97.70%

Outstanding

AKH Construction and Trading Corporation 20759 Const. of MPB @ Brgy. 177 NCR 4.745 C 0.399 0.300 0.300 - - - 99.90 *99.90%

Outstanding

AKH Construction and Trading Corporation 20759 Proposed Rehab./Repair of

Drainage System NCR 1.915 C 0.242 0.200 0.300 - - - 74.20 *74.20% Satisfactory

AKH Construction and Trading Corporation 20759 Rehab. of Taft Ave. NCR 1.915 C 0.316 0.300 0.300 - - - 91.60 *91.60%

Outstanding

AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged

Pavement of Legarda St. NCR 6.713 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory

AKN Construction Corp. (Formerly: AKN Const.) 11845 Concreting of Quirino Avenue,

Brgy. La Huerta San Isidro NCR 4.766 O 0.339 0.300 0.300 - - - 93.90 -

AKN Construction Corporation (Formerly:

AKN Const.)11845

Proposed Impvt. of Road inc. Drainage System along

Magallanes St., Brgy. TunasanNCR 19.089 O 0.391 0.180 0.100 0.030 0.047 0.100 84.80 -

Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) VII 4.536 C 0.352 0.300 0.000 - - - 65.20 58.48%

Poor

Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) VII 4.492 C 0.316 0.042 0.000 - - - 35.80 55.18%

Poor

Al Chris Construction 12406 Conc. of Maribojoc-Antequera Road VII 9.142 C 0.337 0.100 0.300 - - - 73.70 71.24%

Satisfactory

Al Chris Construction 12406 Const. of 1-Cl School Bldg., Ipo, Anda, Bohol VII 0.435 C 0.439 - 0.000 - - - 43.90 71.62%

Satisfactory

Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S VII 0.841 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 25

Page 34: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

AL Chris Construction 12406 Tagbilaran Airport Development Project NIA 5.756 C 0.390 0.200 0.300 - - - 89.00 89.00%

Satisfactory

Al Fahdel Construction & Engineering 17953

Concreting of Iligan-Bukidnon Road Bonbonan Digkilaan &

Rogongon Sections,X 2.238 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -

Al Hussein Construction 18438Cluster III-Const. of Various

Projects in Salvador Inasagan & Sudlon

X 4.242 C 0.297 0.300 0.300 - - - 89.70 81.44% V. Satisfactory

Al Hussein Construction 18438 Completion of Malaapo Bridge & Approaches X 5.380 C 0.325 0.300 0.300 - - - 92.50 82.12%

V. Satisfactory

Al Hussein Construction 18438 Const. of Cagascas Bridge and Approaches X 11.983 C 0.380 0.300 0.300 - - - 98.00 98.00%

Outstanding

Al Hussein Construction 18438Const. of Kapatagan Drainage

System along Iligan-Aurora Road

X 3.682 C 0.285 0.200 0.300 - - - 78.50 79.28% Satisfactory

Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section X 4.525 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

Al Niño Construction Supply 18378 Construction of Diversion Work NIA 4.048 C 0.381 0.124 0.100 0.018 0.029 0.200 85.20 85.20%

V.Satisfactory

Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.)

Phase I IX 4.595 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory

Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio

NHS IX 0.481 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory

Alajeño Construction and Supplies 28713 Const. of Spring Development IX 1.208 C 0.394 0.016 0.300 - - - 71.00 *71.00%

Satisfactory

Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road V 0.956 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 26

Page 35: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alberto Uy Construction & Development 20924 Const. of 1 CL @ Labasan NHS IV-B 0.437 C 0.348 0.143 0.300 - - - 79.10 79.31%

Satisfactory

Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @

Carmundo NHS IV-B 0.470 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding

Alberto Uy Construction & Development 20924 Const. of Bongabong River

Front (Phase II) IV-B 4.707 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory

Alberto Uy Construction & Development 20924 Const. of Drainage Canal IV-B 1.889 C 0.358 0.200 0.300 - - - 85.80 89.40%

V. Satisfactory

Alberto Uy Construction & Development 20924 Const. of Protection Dike at

Mapang IV-B 0.471 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Albeva Konstrukt & Development Corporation 25480 Const. of NIA Central office

Covered Court NIA 6.660 O 0.274 0.300 0.100 0.030 0.038 0.100 84.20 -

Alcel Construction 15129 Asphalt Overlay along Pangasinan-Zambales Road I 9.497 C 0.215 0.300 0.300 - - - 81.50 76.76%

Satisfactory

Alcel Construction 15129 Completion of MPB, PSU Bamban I 0.474 C 0.292 0.200 0.300 - - - 79.20 *79.20%

Satisfactory

Alcel Construction 15129 Conc. of FMR, Brgy. Licsi I 0.568 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

Alcel Construction 15129 Const. of MPB, Phase VI I 0.812 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory

Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road I 27.954 C 0.266 0.300 0.300 - - - 86.60 *86.60%

V. Satisfactory

Alcel Construction and Supply 15129

Asphalt Overlay along Manila North Road Km. 299+100 to Km. 299+300 with exception and San Fernando access road to Poro Pt. Km. 269+715-Km. 270+042

I 0.947 C 0.304 0.200 0.300 - - - 80.40 74.34% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 27

Page 36: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alcel Construction and Supply 15129 Const. of Multi-Purpose Building

@ Poblacion I 0.948 C 0.386 0.200 0.300 - - - 88.60 87.62% V. Satisfactory

Aldana Construction 21736 Const. of 1 Unit 3 CL School Building at SEPNAS I 1.135 C 0.357 0.300 0.300 - - - 95.70 84.50%

V. Satisfactory

Aldana Construction 21736 Const. of 4-Cl Sta. Ana Elementary School Building I 2.892 C 0.376 - 0.500 - - - 87.60 *87.60%

V. Satisfactory

ALE Builders Construction and Development Corp. 5180 Const. of MPB at Brgy. 34 & 35 NCR 4.666 C 0.325 0.122 0.300 - - - 74.70 81.35%

V. Satisfactory

ALE Builders Construction and Development Corp. 5180

Proposed Repair/Rehab. of Epifanio Delo Santos Elem.

SchoolNCR 1.444 C 0.375 0.300 0.300 - - - 97.50 *97.50%

Outstanding

Alebon Genuine Merchandising 26300

Conc. of By-Pass Road & Lined Canal w/ spillway along By Pass

RoadX 4.089 C 0.170 0.300 0.000 - - - 47.00 67.16%

Fair

Alex V. Pamatong Trading & Construction 13290

Cagayan De Oro Convention Center Access Road Brgy.

IndahagX 7.434 C 0.274 0.284 0.300 - - - 85.80 67.46%

Fair

Al-Fahdel Construction & Engineering 17953

Conc. of Iligan-Bukidnon Road, Sta. Felomina-Bobonon-

Digkilaan-Rogongon, Lambaguhon Sect.

X 9.027 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at

Kulasihan Primary School X 0.417 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Al-Fahdel Construction & Engineering 17953 Const. of Tugar Bridge X 4.678 C 0.314 0.300 0.300 - - - 91.40 83.39%

V. Satisfactory

Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga

Road, Maigo Section X 13.491 O 0.358 0.240 0.100 0.030 0.032 0.100 86.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 28

Page 37: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alfalfa Construction 29712

Conc./Widening of Banaue-Mayoyao-Aguinaldo-A. Lista Bdry. Road (Ibayong-Guihob

Section)

CAR 1.901 C 0.310 0.000 0.300 - - - 61.00 *61.00% Fair

Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road CAR 7.590 O 0.335 0.240 0.100 0.010 0.020 0.067 77.20 -

Alfalfa Construction 29712 Repair/Rehab. of Poblacion-Boliwong Road CAR 0.378 C 0.397 0.071 0.300 - - - 76.80 *76.80%

Satisfactory

Alfalfa Construction 29712Restoration of Road along

Banaue-Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road

CAR 4.277 O 0.398 0.290 0.070 0.030 0.030 0.100 91.80 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162Completion of Binalbagan

Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road

VI 44.631 O 0.328 0.240 0.100 0.030 0.040 0.100 83.80 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162Completion of Binalbagan

Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road

VI 44.631 O 0.333 0.240 0.100 0.030 0.045 0.100 84.80 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162Completion of Binalbagan

Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road

VI 44.631 O 0.378 0.220 0.100 0.010 0.038 0.067 81.30 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162 Completion of Isio Bridge VI 46.478 O 0.397 0.300 0.100 0.023 0.059 0.100 97.90 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162Conc. of Road at Bacolod-Murcia-D.S. Benedicto-San Carlos Road,

D.S. Benedicto VI 11.986 C 0.329 0.300 0.300 - - - 92.90 *92.90%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 29

Page 38: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162 Concreting of Bacolod-Murcia-D.S. Benedicto Road VI 4.644 C 0.300 0.289 0.300 - - - 88.90 66.34%

Fair

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162 Const. of Libas-Panaquiao Bridge VI 25.628 C 0.311 0.300 0.300 - - - 91.10 90.47%

Outstanding

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)

17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road VI 64.700 O 0.319 0.300 0.100 0.015 0.032 0.067 83.30 -

Alfie's Construction 17162 Const. and Improvement of Taloc Main Drainage NIA 5.289 C 0.350 0.161 0.300 - - - 81.05 81.05%

Unsatisfactory

Alfrego Builders & Supply 19284 Conc. of Road at Alambre XI 0.933 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory

Alfrego Builders & Supply 19284 Conc. of Road at Mercedes XI 0.935 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding

Alfrego Builders & Supply 19284

Conc. of Road from Davao-Agusan National Road Jct.

passing through Iliong up to Purok Communal

XI 1.882 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. XIII 1.848 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Algimar Construction 15232 Conc. of Lubi-Binoog Road IV-B 9.398 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Algimar Construction 15232 Concreting of Moyot Street V 4.624 C 0.362 - 0.500 - - - 86.20 78.28% Satisfactory

Algimar Construction 15232 Const. of 1-Unit Classroom Modified School Building V 0.367 O 0.325 0.300 0.100 0.030 0.022 0.100 87.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 30

Page 39: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod V 9.597 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

Algimar Construction 15232Const. of Lined Canal with Cover

from Quezon St. infornt of MNCHS, JZES and Jollibee Store

V 3.798 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory

Algimar Construction 15232 Const. of MPB at DECS Compound V 1.918 C 0.373 0.200 0.300 - - - 87.30 *86.08%

V. Satisfactory

Algimar Construction 15232 Const. of Multi-Purpose Building (Phase II) V 4.626 O 0.334 0.300 0.100 0.030 0.035 0.100 89.90 -

Algimar Construction 15232 Const. of Multi-Purpose Building @ DECS Compound V 4.790 O 0.396 0.225 0.100 0.030 0.041 0.100 89.20 -

Algimar Construction 15232 Const. of Sta. Cruz NHS V 0.441 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

Algimar Construction 15232 Gravelling of San Fernando South Road V 1.841 C 0.220 0.200 0.300 - - - 72.00 *72.00%

Satisfactory

Algimar Construction 15232 Rehab. of Sitio Calumpang-Malinta Road V 0.955 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

Algimar Construction 15232 Rehabilitation of San Fernando North Road V 1.859 C 0.442 - 0.500 - - - 94.20 *94.20%

Outstanding

Algimar Construction 15232 Repair of Calapi Bridge V 1.898 C 0.381 0.100 0.300 - - - 78.10 79.84% Satisfactory

Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-

Cotabato By Pass Road XI 12.771 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 31

Page 40: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Algon Engineering Construction Corporation 270

Const. of Hulid Bridge & Approaches along-Cateel-

Compostela Secondary Nat'l Rd.XI 11.798 O 0.320 0.256 0.100 0.030 0.048 0.100 85.40 -

Algon Engineering Construction Corporation 270

CP 5: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Caraga-Baganga Section

XI 172.481 O 0.380 0.239 0.100 0.030 0.055 0.100 90.40 -

Algon Engineering Construction Corporation 270

Impv't./Conc. of La Fortuna Tagum Terminal-Capitol,

Canocotan RoadXI 34.314 C 0.303 0.300 0.300 - - - 90.30 88.56%

V. Satisfactory

Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-

Bayabas-Eden Road XI 4.816 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding

Allen Construction 12584 Conc. of Agbanawag-Cabucbucan Road III 1.885 C 0.290 0.300 0.300 - - - 89.00 *89.00%

V. Satisfactory

Allen Construction 12584 Conc. of Estrella-Cabubucan Road III 1.885 C 0.371 0.200 0.300 - - - 87.10 *87.10

V. Satisfactory

Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. III 0.751 C 0.352 0.300 0.300 - - - 95.20 *95.20%

Outstanding

Allen Construction 12584 Const. of School Building @ CLSU (Mini Amphi-Theatre) III 0.937 O 0.385 0.212 0.100 0.015 0.032 0.100 84.40 -

Allencon Development Corporation 12302 Asphalt Overlay of Janiuay-

Lambunao Nat'l. Road VI 1.918 C 0.421 - 0.500 - - - 92.10 92.10% Outstanding

Allencon Development Corporation 12302

Asphalt Pavement along Guimaras Circumferential Road, Brgy. East Valencia-Brgy. Lebas

VI 4.604 C 0.310 0.100 0.300 - - - 71.00 *71.00% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 32

Page 41: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Allencon Development Corporation 12302

Asphalt Pavement along Guimaras Circumferential Road,

Brgy. M. Chavez Sect., San Lorenzo Sect.

VI 4.604 C 0.353 0.300 0.300 - - - 95.30 *95.30% Outstanding

Allencon Development Corporation 12302 Asphalting of Magamay-

Napandong Road VI 2.825 C 0.249 0.300 0.300 - - - 84.90 *84.90% V. Satisfactory

Allencon Development Corporation 12302

Asphalting of Priority Road Section, San Antonio-Calaya

RoadVI 3.547 C 0.318 0.300 0.300 - - - 91.80 *91.80%

Outstanding

Alleyway Construction 15310 Conc. With Drainage Impvt. Along F. Cayco St. & vicinity NCR 5.646 C 0.265 0.200 0.300 - - - 76.50 79.02%

Satisfactory

Alleyway Construction 15310 Const. of MPB @ So. Cabading IV-A 1.437 C 0.346 0.213 0.300 - - - 85.90 *85.90% V. Satisfactory

Alleyway Construction 15310 Const. of School Building in Tondo, Manila, Centex E/S NCR 1.859 C 0.272 0.300 0.300 - - - 87.20 89.72%

V. Satisfactory

Alleyway Construction 15310 Rehab./Impvt. of Antipolo Circumferential Road "A" IV-A 9.994 C 0.313 0.300 0.300 - - - 91.30 *91.30%

Outstanding

Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy.

Ising XI 2.356 C 0.301 0.233 0.300 - - - 83.40 87.53% V. Satisfactory

Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at

Gahak Marulas E/S IV-A 0.669 C 0.344 0.300 - - - - 64.40 *64.40% Fair

Almakar Builders & Metal Works 21929

Const. of 2 Storey 4 Classroom School Bldg., @ Jimenez E/S

Wawa IIV-A 2.891 C 0.166 0.229 0.300 - - - 69.50 *69.50%

Fair

Almakar Builders & Metal Works 21929 Const. of Concrete Pathway IV-A 0.258 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 33

Page 42: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alnino Construction & Supply 18378

Const. of Access Road to RORO Terminal, Guiron-San Antonio

SectionV 4.750 C 0.201 0.200 0.300 - - - 70.10 *70.10%

Satisfactory

Alnino Construction & Supply 18378 Const. of Buenavista Seawall V 4.751 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Alnino Construction & Supply 18378 Const. of Multi-Purpose Building V 0.960 C 0.296 0.200 0.300 - - - 79.60 *79.60%

Satisfactory

Alnino Construction & Supply 18378 Const. of River Bank Protection

at Brgy. Macawayan V 2.400 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

Alnino Construction & Supply 18378 Repair of FMR at Brgy.

Cabiguhan V 0.960 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

Alnino Construction & Supply 18378 Repair of Gabaldon Bldg. @ San

Roque E/S V 0.190 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory

Alnino Construction & Supply 18378 Repair of Patag FMR V 2.400 C 0.291 0.186 0.300 - - - 77.70 *77.70%

SatisfactoryAlnor Construction &

Const. Supplies 26705 Completion of MPB at Brgy. Cagdianao XIII 0.463 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Alnor Construction & Const. Supplies 26705 Completion of PNP Bldg. XIII 1.853 C 0.367 0.200 0.300 - - - 86.70 75.25%

Satisfactory

Alnor Construction & Const. Supplies 26705 Const. of 2 Cl Magpayang NHS XIII 0.801 C 0.235 0.194 0.300 - - - 72.90 83.19%

V. SatisfactoryAlnor Construction & Construction Supplies 26705 Completion of PNP Bldg. XIII 1.852 O 0.354 0.240 0.100 0.030 0.015 0.100 83.90 -

Alnor Construction & Construction Supplies 26705

Conc. of Kinalablaban Bridge Approaches and Road, Surigao-

Davao Coastal RoadXIII 7.643 C 0.236 0.300 0.300 - - - 83.60 *83.60%

V. Satisfactory

Alnor Construction & Construction Supplies 26705 Const. of MPB @ Brgy.

Binocaran XIII 0.926 C 0.377 0.200 0.300 - - - 87.70 87.67% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 34

Page 43: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alnor Construction & Construction Supplies 26705 Const. of School Building XIII 0.458 O 0.350 0.250 0.030 0.022 0.027 0.100 77.90 -

Alnor Construction & Construction Supplies 26705 Const./Widening of Dinagat-

Loreto Road (Tag-abaca Sect.) XIII 14.390 C 0.375 0.300 0.000 - - - 67.50 61.74% Fair

Alnor Construction & Construction Supplies 26705 Reconst./Widening of Dinagat-

Loreto Road (Tag-abaca Sect.) XIII 14.390 O 0.306 0.146 0.000 0.030 0.030 0.067 57.90 -

Alpha Ryder Construction & Supplies 12197 Concreting of Salvacion-Carjela

Road V 0.569 C 0.299 - 0.500 - - - 79.90 *79.90% Satisfactory

Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan

Road V 4.682 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

Alpha Ryder Construction and Supplies 12197 Const. of Dancalan Bridge &

Approaches V 11.709 C 0.361 0.200 0.300 - - - 86.10 85.08% V. Satisfactory

Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road VII 0.915 C 0.376 0.300 0.300 - - - 97.60 *97.60%

Outstanding

Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road VII 0.915 C 0.366 0.300 0.300 - - - 96.60 *96.60%

Outstanding

Alpha Tech Builders 26072 Conc. of Taloot RORO Road VII 4.628 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding

Alpha Tech Builders 26072 Const. of Philippine Science High School Dormitory Ph 1 VII 4.625 C 0.310 0.300 0.300 - - - 91.00 84.56%

V. Satisfactory

Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) I 0.289 C 0.335 0.200 0.300 - - - 83.50 *83.50%

V. Satisfactory

Alphin Trading & Construction 26260

Conc./Impvt. of Sta. Barbara-Malasiqui-Bayambang Road,

Sapanga SectionI 4.694 C 0.298 0.300 0.300 - - - 89.80 *89.80%

V. Satisfactory

Alphin Trading & Construction 26260 Const. of Ventinilla MPB I 1.034 C 0.357 0.300 0.300 - - - 95.70 *95.70%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 35

Page 44: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alphin Trading & Construction 26260 Rehab. of Barangobong Bridge II I 1.068 C 0.295 0.300 0.300 - - - 89.50 86.02%

V. Satisfactory

Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-

Calasiao Road I 2.891 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding

Alphin Trading and Construction 26260 Const. of 1-Unit 1Cl Bldg. @

Nagsaling E/S I 0.385 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory

Alphin Trading and Construction 26260 Const. of Multi-Purpose Bldg. @

Tuliao E/S I 0.963 C 0.388 0.300 0.300 - - - 98.80 96.42% Outstanding

Alraf Construction & Enterprises 17297

Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment II Manguso-

Mulawin Section

IX 36.137 C 0.365 0.200 0.300 - - - 86.50 88.27% V. Satisfactory

Alraf Construction & Enterprises 17297

Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan

SectionIX 7.605 C 0.219 0.300 0.300 - - - 81.90 80.61%

V. Satisfactory

Alraf Construction & Enterprises 17297 Impvt./Widening of Sangali Nat'l

Road IX 6.592 C 0.243 0.300 0.300 - - - 84.30 *84.30% V. Satisfactory

Alro Construction & Development Corp. 18361

Conc. of Bulusan Lake Road with Drainage & Slope

ProtectionV 9.504 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge V 13.202 C 0.400 0.200 0.300 - - - 90.00 87.90%

V. Satisfactory

Alro Construction & Development Corp. 18361 Rehabilitation of Barangay

Coguit-San Isidro Brgy. Road V 3.706 C 0.406 - 0.500 - - - 90.60 *90.60% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 36

Page 45: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Al's Enterprise and Construction 9721

Const. of All Weather FMR along Cabay-Caisawan Road (Sta.3+000-Sta.1+600)

VIII 4.512 C 0.220 - 0.500 - - - 72.00 *72.00% Satisfactory

Al's Enterprise and Construction 9721 Const. of MPB @ Brgy. Sabang

South VIII 1.431 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory

Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe

Abrigo Memorial Hospital) VIII 4.775 O 0.354 0.240 0.000 0.022 0.019 0.067 70.20 -

Al's Enterprise and Construction 9721

Rehab./Impvt. of Asphalt Pav't. along San Julian-Borongan

Road SectionVIII 9.530 C 0.233 0.200 0.300 - - - 73.30 *73.30%

Satisfactory

Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section V 4.754 C 0.251 0.200 0.300 - - - 75.10 *75.10%

Satisfactory

Alt Construction 32365Const. of Sorsogon State

College Flood Control/Drainage System

V 4.800 C 0.375 0.177 0.300 - - - 85.20 *85.20% V. Satisfactory

Alt Construction 32365Rehab. of Malusak Bridge & Approaches along Talaba-

Summit-Panaon National RoadIVA 1.726 C 0.294 0.231 0.300 - - - 82.50 *82.50%

V. Satisfactory

Alzam Enterprises 19113Conc. of Additional 2 Lanes

along Quimpo Boulevard ABS-CBN to Ecoland

XI 7.001 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

Alzam Enterprises 19113Const. of River Dike along Talomo River from Purok 9

going downstreamXI 4.704 O 0.390 0.160 0.100 0.020 0.043 0.200 91.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 37

Page 46: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alzam Enterprises 19113

Demolition/Reconst. of Approaches & Dranaige incl.

Bridge Protection Works, Reconst. of Gov. Generoso

(Bankerohan) Br.

XI 30.557 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory

Alzam Enterprises 19113 Impv't/Conc. of Biao Guianga-Biao Escuela Road XI 4.799 C 0.339 0.300 0.300 - - - 93.90 91.86%

Outstanding

Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road XI 19.280 O 0.338 0.288 0.100 0.008 0.050 0.067 85.10 -

Alzam Enterprises 19113Road Impvt./Conc. of Additional

Two Lanes along Maa Rd. Section

XI 18.870 C 0.329 0.300 0.300 - - - 92.90 87.14% V. Satisfactory

Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section XI 28.921 O 0.374 0.300 0.100 0.030 0.060 0.067 93.10 -

Alzam Enterprises 19113Widening/ Impvt. of Davao-

Agusan Road, Ilang Tibungco Section

XI 9.420 C 0.347 0.300 0.300 - - - 94.70 94.64% Outstanding

Alzen Engineering & Construction Supplies 13911

Conc. of Kidapawan-Calunasan-M'lang National Road inc. ROW

Acquisition (Magsaysay-Kalaisan Section)

XII 7.314 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis

Tourist Road (Mua-an Section) XII 5.760 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory

Alzen Engineering & Construction Supplies 13911

Conc. of Kidapawan-Magpet-Pangao-An Road (Sumawan-

Gubatan Section)XII 11.338 C 0.270 0.287 0.300 - - - 85.70 85.58%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 38

Page 47: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Alzen Engineering & Construction Supplies 13911 Const. of Drainage Canal along

Cotabato-Davao Road Old XII 2.412 C 0.375 - 0.500 - - - 87.50 82.22% V. Satisfactory

Alzen Engineering & Construction Supplies 13911 Const./Impvt. of Binoongan-

Napaliko-Katipunan Road XII 24.050 C 0.322 0.300 0.300 - - - 92.20 92.98% Outstanding

AMA Construction 10015 Const. of MPB, Brgy. Victoria XIII 0.737 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory

Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road V 0.944 C 0.307 0.200 0.300 - - - 80.70 *80.70%

V. SatisfactoryAmeg Construction &

Supply 21556 Repair/Impvt. of DPWH Bldg. V 1.910 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory

AMJC Construction 21002 Const. of 3-CL School Building @ Ilocos Norte NHS I 1.044 C 0.367 0.100 0.000 - - - 46.70 66.51%

Fair

Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road,

KPES-UCCP Section both sides XII 9.398 C 0.291 0.100 0.000 - - - 39.10 57.76% Poor

Amopia Construction and Supplies 27511 Conc. of FMR at Purok 4 XII 0.457 C 0.392 0.200 0.300 - - - 89.20 *89.20%

V. Satisfactory

Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis

Tourist Road XII 8.079 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -

Angel & Sam Construction 19968 Const. of PSHS CVC ACA Bldg I and Dorm Bldg I Phase I DOST 5.544 C 0.347 0.289 0 - - - 76.34 76.34%

Satisfactory

Angel & Sam Construction & General Merchandise 19968

Cluster I-Const. of Various School Buildings @ Cagayan de

Oro City NHSX 2.673 C 0.370 0.300 0.000 - - - 67.00 79.74%

Satisfactory

Angel & Sam Construction & General Merchandise 19968

Conc. of Cadre Rd. Camp Evangelista Main Road going to

Hospital SectionX 9.548 C 0.305 0.200 0.300 - - - 80.50 87.04%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 39

Page 48: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Angel & Sam Construction & General Merchandise 19968 Const. of 4 Cl School Bldg. @

Kauswagan E/S X 1.682 C 0.362 0.200 0.300 - - - 86.20 86.37% V. Satisfactory

Angel & Sam Construction & General Merchandise 19968 Const. of School Bldg. @

Minadanao Polytechnic College X 0.929 C 0.362 0.200 0.300 - - - 86.20 64.57% Fair

Angel & Sam Construction & General Merchandise 19968 Provision of Concrete Line Canal X 0.768 C 0.333 - 0.500 - - - 83.30 86.69%

V. Satisfactory

Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS IV-B 0.568 O 0.280 0.240 0.070 0.030 0.043 0.100 76.30 -

Anilos Trading & Construction 31557 Const. of 3 units 3 CL Sch. Bldg.

w/ CR, Palawan Natl. H/S IV-B 1.293 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory

Anilos Trading & Construction 31557 Const. of MPB (H.E.) in ASMES

Brgy. 1 IV-B 0.651 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory

Anilos Trading & Construction 31557 Const. of MPB @ Poblacion IV-B 1.919 C 0.330 0.300 0.300 - - - 93.00 *93.00%

Outstanding

Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot

E/S IV-B 1.540 C 0.393 0.200 0.300 - - - 89.30 82.93% V. Satisfactory

Anilos Trading & Construction 31557 Const. of MPB (Phase II) Brgy.

Inagawan IV-B 0.934 C 0.315 0.161 0.300 - - - 77.60 *77.60% Satisfactory

Anilos Trading & Construction 31557 Const./Impvt. of Multi-Purpose

Buidling, Phase 1, 2-CL IV-B 1.897 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Annasor Construction & Trading 30825 Const. of MPB III 1.909 C 0.391 0.300 0.000 - - - 69.10 58.18%

Poor

Annasor Construction & Trading 30825 Impvt./Rehab. of Porac District

Hospital III 1.898 C 0.220 0.249 0.300 - - - 76.90 *76.90% Satisfactory

Anrol Construction 10136 Const. of Storey 2 CL School Building @ Dulong Bayan E/S IV-A 6.014 O 0.361 0.227 0.100 0.030 0.011 0.100 82.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 40

Page 49: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road IV-A 9.587 C 0.265 0.284 0.300 - - - 84.90 *84.90%

V. SatisfactoryAntonio V. Nidea

Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road V 9.430 C 0.323 0.221 0.300 - - - 84.40 80.86%

V. SatisfactoryAntonio V. Nidea

Construction 6382 Opening/Const. of Banao-Calpi Road V 19.176 C 0.397 0.294 0.300 - - - 99.10 *99.10%

OutstandingAntonio V. Nidea

Construction 6382 Repair/Rehab. of Sala-Cagbulacao Road V 4.675 C 0.332 0.300 0.300 - - - 93.20 87.44%

V. Satisfactory

Antonio V. Nidea Construction 6382 Repair/Restoration of Awang

River Control, Awang River V 9.499 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-

Sabang Road V 14.358 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory

AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR VIII 9.437 C 0.303 0.200 0.300 - - - 80.30 83.30%

V. Satisfactory

AOG Construction 29758 Conc. Paving of Dongon-Laboon Road VIII 14.176 C 0.244 0.300 0.300 - - - 84.40 *84.40%

V. Satisfactory

AOG Construction 29758 Const. of Amambahag Bridge VIII 7.596 C 0.363 0.300 0.300 - - - 96.30 78.06% Satisfactory

AOG Construction 29758 Const. of Basak II UK Bridge VIII 3.342 C 0.385 0.200 0.300 - - - 88.50 82.08% V. Satisfactory

AOG Construction 29758 Const./Impvt. of Rizal-Matin-ao FMR (Basak-Matin-ao Phase IV) VIII 11.276 C 0.296 0.200 0.300 - - - 79.60 82.60%

V. Satisfactory

AP Mercado Trading and Construction 25269 Rehabilitation of Lateral D (Sta.

0+000-4+666) NIA-I 7.483 C 0.250 0.300 0.300 - - - 85.00 85.09% V.Satisfactory

AP Mercado Trading and Construction 25269 Road Surfacing along Lat D (Sta.

12+957-17+068) NIA-I 1.502 C 0.240 0.300 0.300 - - - 84.00 84.00% V.Satisfactory

APB Construction 17055 Completion of MPB CAR 1.908 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 41

Page 50: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

APD Construction 17467 Addalam River Irrigation Project NIA 7.466 O 0.3369 0.1871 0.03 0.03 0.041 0.2 82.48 -

APD Construction 17467Conc. of Cordon-Aurora Bdry. National Road (Maddela Jct.-

Dumabato Sect.)II 4.774 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

APD Construction 17467Conc. of Ilagan-Delfin-Albano-Mallig National Road, Olango

SectionII 7.719 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

APD Construction 17467Conc. of Ilagan-Delfin-Albano-

Mallig National Road, Villa Cacho Section

II 11.868 C 0.335 0.300 0.300 - - - 93.50 89.78% V. Satisfactory

APD Construction 17467Conc. of Naguilian-San

Marcelino Road (Alibadbad Section)

II 9.648 C 0.376 0.202 0.300 - - - 87.80 *87.80% V. Satisfactory

APD Construction 17467 Conc. of Villa Sur Brgy. Road II 2.720 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding

APD Construction 17467Concrete Reblocking along

Cabatuan-Enrile Road (MBC) Km. 406+00-Km. 407+500

II 1.566 C 0.284 0.300 0.300 - - - 88.40 85.10% V. Satisfactory

APD Construction 17467 Const. of MPB at San Mateo (Phase VI) II 1.891 C 0.392 0.208 0.300 - - - 90.00 *90.00%

V. Satisfactory

APD Construction 17467 Const. of Pigalo Bridge (Phase II) II 2.820 C 0.362 0.200 0.300 - - - 86.20 86.95%

V. Satisfactory

APD Construction 17467Const./Impvt. (Reblocking) along

Santiago City-Baluarte Isabela/Quirino Bdry.

II 6.531 C 0.335 0.300 0.300 - - - 93.50 93.86% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 42

Page 51: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

APD Construction 17467

Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA)

Road & ist related Roads & Bridges (Cab-Diffun Section)

Cualo Blvd Road

II 0.959 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-04-06) NIA-II 5.490 C 0.400 0.300 0.000 - - - 70.00 *70.00%

Fair

APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-06-06) NIA-II 2.529 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

APD Construction 17467

Impvt. of Cordon-Diffun-Maddela-Aurora (CDMA) Bdry. Road & its related Roads & Bridges (Rehab.

Of Ramos Bridge Phase II)

II 2.604 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding

APD Construction 17467Impvt./Conc. of Cordon-Aurora

Bdry. Road (Maddela Jct.-Dumabato Section)

II 13.274 C 0.366 0.262 0.300 - - - 92.80 *92.80% Outstanding

APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. II 9.576 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

APO General Construction 7010 Completion of School Bldg., Happy Hollow E/S CAR 0.638 O 0.307 0.262 0.300 - - - 86.90 -

Aqualine Construction 11555 Allen CIS (Irrigation) NIA 2.547 C 0.353 0.176 0.300 - - - 82.90 *82.90% V.Satisfactory

Aqualine Construction 11555 Const. of Limopoca CIP NIA-VII 3.232 C 0.321 0.300 0.300 - - - 92.10 92.10%

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 43

Page 52: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Aquino-Dela Cruz Engineering & Construction 16751

Conc./Impvt. of San Carlos-Calasiao Road (Bolingit-Cruz

Section)I 9.162 C 0.285 0.300 0.300 - - - 88.50 *88.50%

V. Satisfactory

Aquino-Dela Cruz Engineering & Construction 16751 Const. of 1 Cl Sch. Bldg. @ Matic-

Matic E/S I 0.386 C 0.384 0.300 0.300 - - - 98.40 *98.40% Outstanding

AR Adlawan Construction 13108Asphalting along Cebu Toledo

Wharf Road, Km.28+180-Km.28+460

VII 1.067 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory

AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road VII 34.318 C 0.322 0.300 0.300 - - - 92.20 85.14%

V. Satisfactory

AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS VII 34.320 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

AR Adlawan Construction 13108 Const. of Lower Calajo-an Pakigne Bridge VII 0.949 C 0.302 0.300 0.300 - - - 90.20 *90.20%

Outstanding

Arcinue Commercial 6746 Const. of Modified Conventional Type Single Storey S/B I 0.703 C 0.356 0.300 0.300 - - - 95.60 85.45%

V. Satisfactory

Arcinue Commercial 6746Const. of Modified Conventional

Type Single Storey S/B at Tagudtud NHS

I 0.827 C 0.292 0.300 0.300 - - - 89.20 *89.20% V. Satisfactory

Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS I 0.899 C 0.373 0.207 0.300 - - - 88.00 83.73%

V. Satisfactory

Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S I 0.764 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V. Satisfactory

Arcinue Commercial 6746Const. of Mangato Bridge under Austrian Assisted DPWH Const.

ProjectI 27.553 O 0.323 0.289 0.000 0.030 0.033 0.067 74.20 -

Arcinue Commercial 6746Const. of MangatoBridge under Austrian Assisted DPWH Const.

ProjectI 27.553 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -

Arcinue Commercial 6746 Const. of Maypalic Bridge I 12.048 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 44

Page 53: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Arcinue Commercial 6746Const. of Modified Conventional Type Single Storey Sch. Bldg. @

Bail E/SI 0.607 C 0.396 0.100 0.300 - - - 79.60 *79.60%

Satisfactory

Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.990 C 0.286 - 0.500 - - - 78.60 85.88%

V. Satisfactory

Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.656 C 0.310 - 0.500 - - - 81.00 69.24%

Fair

Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road, Brgy. Paoay Section I 31.831 O 0.331 0.293 0.100 0.024 0.037 0.100 88.50 -

Arcinue Commercial 6746 Impvt./Conc. Paving of Lingayen-Binmaley By-Pass Road I 14.434 O 0.287 0.205 0.100 0.030 0.037 0.100 75.90 -

Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road I 9.468 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan I 0.478 C 0.386 0.289 0.300 - - - 97.50 *97.50%

Outstanding

Arcinue Commercial 6746Rehab. & Impvt. of Cabaroan Bridge along San Juan-San

Gabriel RoadI 1.897 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

Arcinue Commercial 6746Rehab./Reconst. of Damaged

Nat'l Road, San Fernando-Bagulin Road

I 19.219 C 0.363 0.200 0.300 - - - 86.30 83.96% V. Satisfactory

Arcinue Commercial 6746 Replacement of Cuenca NHS I 0.899 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Arellano General Construction 31694 Const. of Multi-Purpose Building IV-A 2.120 C 0.356 0.300 0.300 - - - 95.60 79.22%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 45

Page 54: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Argealis Construction 16122Construction of Fence for the San Fernando Runway Strip

(Western Portion)BCDA 3.747 C 0.310 0.300 0.300 - - - 91.02 *91.02%

V.Satisfactory

Argealis Construction 16122 Construction of PPMC Motorpool Shed PPA 1.200 C 0.342 0.300 0.300 - - - 94.19 94.19%

Outstanding

Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road V 0.467 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Arky Construction and Supply 32692 Const. of Circ. Road, Brgy.

Ibinigay-Bagumbayan V 4.750 C 0.325 0.200 0.300 - - - 82.50 82.38% V. Satisfactory

Arky Construction and Supply 32692 Repair & Rehab. of Revetment

(Flood Control) V 0.475 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Arky Construction and Supply 32692 Repair & Rehab. of Revetment

(Flood Control) V 0.948 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Armando U. Khong General Contractor 16163 Proposed Completion of Malibay

Bridge along EDSA (Phase I) NCR 14.169 C 0.339 0.300 0.300 - - - 93.90 83.46% V. Satisfactory

Armando U. Khong General Contractor 16163 Proposed Repair/Rehab. of

Araulio High School NCR 14.384 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding

Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage

Impvt. of M. dela Fuente St. NCR 15.936 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding

ARN Builders 18930 Conc. of Altavas Diversion Road VI 16.521 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory

ARN Builders 18930 Const. of Banica Bridge VI 12.540 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -

ARN Builders 18930 Const. of Dumalag Bridge VI 16.494 C 0.341 0.114 0.300 - - - 75.50 81.70% V. Satisfactory

ARN Builders 18930CP 5: Impvt./Conc. of Kapalong-

Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño Phase II

XI 172.550 O 0.400 0.300 0.100 0.024 0.055 0.067 94.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 46

Page 55: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

ARN Builders 18930

CP 8: Const. of Six (6) Bridges inc. Approaches along Kapalong-

Talaingod-Valencia Bukidnon Road

XI 123.199 O 0.384 0.282 0.100 0.030 0.055 0.100 95.10 -

ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 O 0.330 0.240 0.100 0.030 0.055 0.100 85.50 -

ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -

Arrowhead Construction 22697 Concreting of Road & Const. of Drainage at Liyang III 2.837 C 0.385 0.300 0.300 - - - 98.50 85.12%

V. Satisfactory

Arsvi Construction 23518 Construction of Multi-Purpose Bldg. IV-A 4.821 C 0.387 0.240 0.300 - - - 92.70 88.29%

V. SatisfactoryArt Star Construction and

Enterprises 18416 Const. of Water System Project @ Brgy. Bungro I 2.243 C 0.304 0.300 0.300 - - - 90.40 78.94%

Satisfactory

Art-Star Construction & Enterprises 18416 Const. of Multi-Purpose Bldg.

(Phase II) I 6.109 C 0.278 - 0.500 - - - 77.80 *77.80% Satisfactory

Art-Star Construction & Enterprises 18416 Rehab. of Multi-Purpose

Building I 1.430 C 0.367 0.143 0.300 - - - 81.00 81.84% V. Satisfactory

Asanco General Merchandising &

Construction30517 Const. of Multi-Purpose

Building, Poblacion IV-B 0.465 C 0.390 0.221 0.300 - - - 91.10 83.61% V. Satisfactory

ASC Construction 26788 Construction of Canal and Canal Structures (LMC-ARIP-08-06) NIA-II 3.448 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

ASC Construction and Concrete Products 26788 Addalam River Irrigation Project NIA 5.013 C 0.308 0.240 0.300 84.77 *84.77%

V. Satisfactory

ASC Construction and Concrete Products 26788

Const. of (9) Nine Units Academic School Building @

Libertad NHSII 0.384 C 0.286 0.300 0.300 - - - 88.60 88.18%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 47

Page 56: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building

@ Enrile Vocational H/S II 1.449 C 0.271 0.058 0.300 - - - 62.90 70.01% Satisfactory

ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building

@ Lemu H/S II 0.963 O 0.337 0.000 0.100 0.000 0.027 0.067 53.10 -

ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building

@ Lemu H/S II 0.963 O 0.345 0.258 0.100 0.030 0.038 0.100 87.10 -

ASC Construction and Concrete Products 26788 Const. of Multi-Purpose

Building, Cagumitan E/S II 0.943 C 0.444 - 0.500 - - - 94.40 84.42% V. Satisfactory

ASC Construction and Concrete Products 26788 Const./Completion of Secondary

Sch. Bldg. @ Cagayan NHS II 0.784 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -

ASC Construction and Concrete Products 26788 Const./Completion of Secondary

Sch. Bldg. @ Cagayan NHS II 0.784 O 0.372 0.184 0.100 0.015 0.018 0.100 78.90 -

ASC Construction and Concrete Products 26788

Reha./Impvt. of National Road along Cagayan-Apayao Road,

Solana SectionII 1.896 O 0.315 0.212 0.100 0.030 0.028 0.100 78.50 -

ASC Construction and Concrete Products 26788

Reha./Impvt. of National Road along Cagayan-Apayao Road,

Solana SectionII 1.896 O 0.283 0.300 0.000 0.023 0.028 0.067 70.10 -

ASC Construction and Concrete Products 26788 Rehab. of Manila North Road

(MNR) II 4.821 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao

Road I 11.226 C 0.340 0.200 0.300 - - - 84.00 85.20% V. Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059

Const. of First Floor of the Proposed Three (3) Storey Bldg.,

Ilocos Norte NHSI 8.356 C 0.334 0.200 0.000 - - - 53.40 74.22%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 48

Page 57: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Asian Pearl Construction & Dev't. Corp. 9059 Const. of Gabaldon Bldg. &

Grounds @ Ilocos Norte NHS I 7.594 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -

Asian Pearl Construction & Dev't. Corp. 9059 Impvt./Rehab. of Paoay Flood

Control I 1.422 C 0.238 0.300 0.300 - - - 83.80 80.98% V. Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Rehab. of Gabaldon Bldg. at

Ilocos Norte NHS I 7.596 C 0.355 0.278 0.300 - - - 93.30 *93.30% Outstanding

Asian Pearl Construction & Dev't. Corp. (Formerly:

Asian Pearl Enterprises)9059 Const. of Gabaldon Bldg. &

Grounds @ Ilocos Norte NHS I 7.594 C 0.322 0.300 0.300 - - - 92.20 92.66% Outstanding

Asian Pearl Enterprises 9059 Concreting of Magnuang Barangay Road I 1.424 C 0.320 - 0.500 - - - 82.00 *82.00%

V. Satisfactory

Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II IX 2.300 C 0.355 0.133 0.300 - - - 78.80 *78.80%

Satisfactory

Atlanta Construction Company, Inc. 31290

Const./Rehab./Replacement/ Completion/ and Repair of Elem.

And Secondary Sch. Bldg.at Sugod P/S

X 5.214 C 0.373 0.200 0.300 - - - 87.30 84.01% V. Satisfactory

Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S II 0.473 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan II 0.421 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Atlantic Construction 24232 Const. of Sta. Maria MPB II 3.816 O 0.308 0.240 0.100 0.030 0.037 0.067 78.20 -

Atlantic Construction 24232Rehab./Impvt. of Road Jct.

Santiago-Tuguegarao to Sta. Maria Town Proper

II 4.765 O 0.349 0.240 0.100 0.030 0.033 0.067 81.90 -

Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) II 0.743 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 49

Page 58: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Atlantic Construction 24232 Repair/Rehab. of Sta. Maria E/S II 0.380 C 0.347 0.116 0.300 - - - 76.30 *76.30% Satisfactory

Atlantic Construction 24232Road Concreting of Brgys.

Quibal, San Andres, Visitacion, San Roque and San Juan

II 4.772 O 0.339 0.240 0.100 0.030 0.033 0.067 80.90 -

Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari II 2.865 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

Atlantic Erectors Builders Inc. / Brostan Construction

& Development

JV-99-167 / 12360

Construction of Diversion Dam & Intake Barrel NIA-II 232.105 C 0.381 0.300 0.000 - - - 68.10 69.20%

Fair

Atlantic Erectors Builders Inc. / Brostan Construction

& Development

JV-99-167 / 12360

Construction of Main Canal, Laterals & Appurtenant NIA-II 73.392 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -

ATR Construction 15968 Conc. of Roads at Quirino District XI 1.884 C 0.195 0.300 0.300 - - - 79.50 *79.50%

Satisfactory

ATR Construction 15968 Const. of Drainage along Digos-Makar Road XI 4.701 C 0.393 0.200 0.300 - - - 89.30 90.68%

Outstanding

Avatar Constructions Company 31455 Completion of Brgy. Aurelio

MPB XIII 2.892 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory

Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road

(San Jose-Mahayahay Section) XIII 10.411 C 0.374 0.200 0.300 - - - 87.40 76.48% Satisfactory

Avatar Constructions Company 31455 Conc. of Mahayahay-Glenville

Road XIII 4.578 C 0.373 0.200 0.300 - - - *87.30 *87.30% V. Satisfactory

Avatar Constructions Company 31455 Const. of Aurelio-Mahayhay

Road XIII 3.153 C 0.369 0.247 0.300 - - - 91.60 85.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 50

Page 59: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Avatar Constructions Company 31455 Const./Conc. of Don Ruben-Sta.

Cruz XIII 1.087 C 0.379 0.244 0.300 - - - 92.30 *92.30% Outstanding

Avatar Constructions Company 31455 Const./Conc. of San Juan Road XIII 2.596 C 0.283 0.300 0.300 - - - 88.30 *88.30%

V. Satisfactory

Avatar Constructions Company 31455

Rehab./Reconst. of Damaged Paved National Road along

Dinagat-Loreto Road (San Jose Section)

XIII 5.717 O 0.377 0.141 0.070 0.030 0.032 0.067 71.70 -

Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S &

GSIS E/S NCR 3.818 C 0.228 0.300 0.300 - - - 82.80 *82.80% V. Satisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan

H/S NCR 0.710 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

Azul Builders 21870 Conc. of Roads at Brgy. Sta. Cruz III 0.948 C 0.373 0.300 0.300 - - - 97.30 *97.30%

Outstanding

Azul Builders 21870Const. of Multi-Purpose Bldg., Sapang Palay NHS (Phase II)

Sapang Palay CityIII 3.035 C 0.353 0.300 0.300 - - - 95.30 *95.30%

Outstanding

Azul Builders 21870Package 4: Concreting of Road,

G4 Between Citrus & Lawang Pare

III 0.473 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road III 9.566 O 0.349 0.300 0.070 0.030 0.032 0.067 84.80 -

B. Bernardo Construction 6196 Impvt./Rehab. of Sta. Maria-Norzagaray Road III 14.198 O 0.391 0.225 0.100 0.030 0.035 0.100 88.10 -

B. Bernardo Construction 6196 Rehab. of Amang Rodriguez Ave. NCR 14.343 C 0.319 0.277 0.300 - - - 89.60 *89.60% V. Satisfactory

B. Bernardo Construction 6196 Rehab. of Sumulong Highway NCR 19.220 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 51

Page 60: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

B. Valencerina Trading & Construction 22147 Completion of MPB NCR 1.903 C 0.375 0.252 0.300 - - - 92.70 *92.70%

Outstanding

B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro I 1.637 C 0.243 0.200 0.300 - - - 74.30 *74.30%

Satisfactory

B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Bldg., @

Brgy. Tañong NCR 1.431 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding

B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose bldg., @

Tayabas West E/S IV-A 0.476 O 0.400 0.240 0.100 0.020 0.009 0.067 83.60 -

B. Valencerina Trading & Construction 22147 Rehab. of Road @ Brgy. Ampid I IVA 0.957 C 0.293 0.200 0.300 - - - 79.30 *79.30%

Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin

at Brgy. San Isidro IVA 0.957 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy.

San Rafael IV-A 0.960 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory

B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 0+000-Sta. 0+500 VIII 11.132 C 0.380 0.300 0.000 - - - 68.00 82.76%

V. Satisfactory

B. Vicencio Construction 9687Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta.

15+257.96VIII 18.795 O 0.317 0.232 0.100 0.030 0.028 0.100 80.70 -

B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.340 0.238 0.100 0.030 0.037 0.100 84.50 -

B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.308 0.236 0.100 0.030 0.038 0.100 81.20 -

B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.344 0.145 0.100 0.030 0.042 0.100 76.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 52

Page 61: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang

Yuta Section)VIII 18.920 O 0.313 0.300 0.100 0.030 0.037 0.100 88.00 -

B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang

Yuta Section)VIII 18.920 O 0.352 0.196 0.100 0.010 0.054 0.100 81.20 -

B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang

Yuta Section)VIII 18.920 O 0.344 0.229 0.100 0.023 0.047 0.100 84.30 -

B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall VIII 3.809 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -

B. Vicencio Construction 9687Const. of Tagbilaran City-San

Jose St. Drainage Project (Outfall)

VII 14.174 C 0.294 0.300 0.300 - - - 89.40 89.34% V. Satisfactory

B. Vicencio Construction 9687Const./Opening of Calbayog

Diversion Road, Monbon-Naga Road Section

VIII 13.715 C 0.400 0.236 0.395 - - - 103.10 93.92% Outstanding

B. Vicencio Construction 9687 Const./Replacement of Tabugon Bridge VIII 9.439 C 0.394 0.240 0.300 - - - 93.40 *93.40%

Outstanding

B. Vicencio Construction 9687 Rechanneling of Subang Daku River VIII 4.718 C 0.250 - 0.500 - - - 75.00 82.98%

V. Satisfactory

B. Vicencio Construction 9687Rehab. of Daang Maharlika Highway, Calbayog-Allen

SectionVIII 19.150 C 0.193 0.200 0.300 - - - 69.30 82.53%

V. Satisfactory

B. Vicencio Construction 9687

Rehab. of Sambulawan-Calaguise-Calubian Road, (Conc. of Calaguise Section) Tigbauan

Sect.

VIII 17.942 O 0.344 0.240 0.100 0.030 0.042 0.100 85.60 -

B. Vicencio Construction 9687 Rehab./Repair of Liloan Steel Bridge VIII 15.838 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 53

Page 62: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

B. Vicencio Construction 9687Rehab.Impvt. of Calbayog-Catarman Road, Calbayog-

Sinidman Sect. VIII 9.330 C 0.368 0.200 0.300 - - - 86.80 82.78%

V. Satisfactory

B.A. Lagazo Builders 22056 Concrete Paving of Belado St. (Phase II) II 0.951 C 0.263 0.300 0.300 - - - 86.30 82.76%

V. Satisfactory

B.C.T. Trading and Construction 15199 Conc. of PPNR (Sandoval-Iraan

Section) IV-B 28.841 C 0.277 0.300 0.300 - - - 87.70 86.36% V. Satisfactory

B.C.T. Trading and Construction 15199 Improvement/Concreting of

Puerto Princesa South Road IV-B 4.729 C 0.338 0.200 0.300 - - - 83.80 80.98% V. Satisfactory

B.C.T. Trading and Construction 15199

Replacement of Solomon Bridge along Puerto Princesa South

RoadIV-B 12.529 C 0.328 0.200 0.300 - - - 82.80 83.10%

V. Satisfactory

B.C.T. Trading and Construction 15199 Replacement of Umalad Bridge

along Langogan-Roxas Road IV-B 28.813 C 0.337 0.300 0.000 - - - 63.70 71.50% Satisfactory

B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section VI 8.819 C 0.014 0.100 0.300 - - - 41.40 58.77%

Poor

B.E. Construction 2730 Conc. of Concepcion-Ajuy Road VI 4.761 C 0.252 0.100 0.300 - - - 65.20 74.18% Satisfactory

B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.087 O 0.370 0.225 0.100 0.015 0.040 0.100 85.00 -

B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.667 O 0.250 0.240 0.100 0.022 0.056 0.100 76.80 -

B.E. Construction 2730 Const. of Iloilo City Technical Vocational Colleges VI 4.821 C 0.354 0.069 0.300 - - - 72.30 81.89%

V. Satisfactory

B.E. Construction 2730 Const. of Lanag River Control VI 14.450 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 54

Page 63: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

B.E. Construction 2730 Const. of Leonora Salapandan NHS Phase II VI 0.948 C 0.400 0.100 0.300 - - - 80.00 60.96%

Fair

B.E. Construction 2730 Const. of MPB at UP Visayas Gender Studies Center Bldg. VI 11.446 C 0.388 0.200 0.000 - - - 58.80 75.25%

Satisfactory

B.E. Construction 2730 Const. of MPB Phase II @ Leganes E/S VI 0.950 C 0.373 0.248 0.300 - - - 92.10 68.37%

Fair

B.E. Construction 2730 Const. of Multi-Purpose Building, Leon National H/S VI 1.901 C 0.311 0.126 0.300 - - - 73.70 75.10%

Satisfactory

B.E. Construction 2730 Const. of Multi-Purpose Workshop @ Balantang E/S VI 0.625 C 0.425 - 0.000 - - - 42.50 64.20%

Fair

B.E. Construction 2730 Const. of Sch. Bldg. @ Melchor L. Nava NHS VI 1.753 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

B.E. Construction 2730Impv't. of Metro Iloilo

Circumferential Road, Zarraga Section

VI 3.853 C 0.350 - 0.500 - - - 85.00 80.02% V. Satisfactory

B.F.T. Construction 14424 Const. of 2-Cl @ Magpapalayok H/S III 0.559 C 0.445 - 0.500 - - - 94.50 84.00%

V. Satisfactory

B.G. Giron Construction & Supply 15197 Const. of 1 CL Sch. Bldg. at Sto.

Cristo Primary School III 0.426 C 0.385 0.153 0.300 - - - 83.80 *83.80% V. Satisfactory

B.G. Giron Construction & Supply 15197 Const. of FMR @ Brgy. Malupa III 1.421 C 0.280 0.300 0.300 - - - 88.00 79.90%

Satisfactory

B.G. Giron Construction & Supply 15197 Const. of MPB & other Facilities

@ Brgy. Rizal III 1.422 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding

B.Q. Construction & Supply 10217 Const. of Urdaneta Flood Control Drainage, Phase I I 11.773 C 0.333 0.300 0.300 - - - 93.30 93.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 55

Page 64: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

B.R.G. Construction 21931Const. of Two (2) Units, Storey Multi-Purpose Building with 12 stalls each (Phase I) @ NVAT

II 4.174 O 0.305 0.250 0.100 0.030 0.027 0.100 81.20 -

B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk XIII 1.912 C 0.364 0.204 0.300 - - - 86.80 84.94% V. Satisfactory

B.S.U. Construction, Inc. 8457Impvt. of Tandawan Road Sect. along Surigao-Davao Coastal

RoadXIII 9.550 C 0.358 0.200 0.300 - - - 85.80 87.24%

V. Satisfactory

B.S.U. Construction, Inc. 8457Rehab./Reconst. of Damaged

Pavement along Surigao-Davao Coastal Road, Lingig Section

XIII 4.798 C 0.364 0.199 0.300 - - - 86.30 86.36% V. Satisfactory

B.S.U. Construction, Incorporated 8457 Conc./Reblocking along JNR-

Barobo-Agusan sur Boundary XIII 9.594 C 0.287 0.300 0.300 - - - 88.70 92.78% Outstanding

B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.

Pandan III 0.934 C 0.308 0.285 0.300 - - - 89.30 *89.30% V. Satisfactory

B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.

Pulong Maragul III 0.941 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

Baby E Construction 19773 Repair/Rehab. of Drainage Canal III 2.857 C 0.253 0.200 0.300 - - - 75.30 *75.30% Satisfactory

Baby Santiago Construction & Supply 31662 Const. of Multi-Purpose Building IV-A 1.925 C 0.274 0.300 0.000 - - - 57.40 42.42%

Poor

Bacho Construction & Design Engineering 15945 Const. of MPB IX 0.187 C 0.391 0.263 0.300 - - - 95.40 *95.40%

Outstanding

Badoc Builders 31564 Concreting of Badio Norte Barangay Road I 0.747 C 0.333 - 0.500 - - - 83.30 *83.30%

V. Satisfactory

Badoc Builders & Supply (Formerly: Badoc Builders) 31564 Conc. of FMR, Brgy. Tartarabang I 1.444 C 0.283 0.200 0.300 - - - 78.30 *78.30%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 56

Page 65: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Baicamar Construction and Supplies 19248 Repair/Impvt. of Bonbon Road XIII 4.458 C 0.246 0.204 0.300 - - - 75.00 *75.00%

Satisfactory

Bap Construction 16215 Asphalt Overlay of Brgy. Mabini Road (Intermittent Section) IV-A 1.927 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Bap Construction 16215 Conc. of Road at Brgy. Luta Sur IV-A 0.482 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory

Bap Construction 16215 Conc. of San Juan-San Andres Road IV-A 1.927 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

BAQUE Corporation 15235 Construction of Ramps/Approaches in Tarlac BCDA 103.233 O 0.365 0.300 0.000 - - - 66.54 80.35%

V.Satisfactory

Barillo Construction & Enterprises 23836 Conc. of Lower Taway Road IX 0.951 C 0.279 0.221 0.300 - - - 80.00 *80.00%

Satisfactory

Barillo Construction & Enterprises 23836 Const. of MPB at Brgy. Suclema IX 0.375 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

Barillo Construction & Enterprises 23836 Repair/Concreting of Roads at

Malvar Street IX 0.706 O 0.394 0.300 0.100 0.030 0.035 0.100 95.90 -

Barillo Construction & Enterprises 23836 Repair/Rehab./Impvt. of Dagohoy

St. IX 0.759 C 0.312 0.230 0.300 - - - 84.20 *84.20% V. Satisfactory

Barit Builders and Construction 30095 Const./Completion of MPB @

Isabela National H/S II 0.936 C 0.317 - 0.500 - - - 81.70 82.05% V. Satisfactory

Barman Construction Corp. 7974Const. of Abaton-Bridge and Approaches (Phase II) Brgy.

ParangIV-B 11.745 O 0.314 0.300 0.100 0.030 0.037 0.100 88.10 -

Barman Construction Corp. 7974 Const. of Abaton-Maidlang II Bridge IVB 9.615 O 0.313 0.300 0.100 0.023 0.042 0.100 87.80 -

Barman Construction Corp. 7974Const./Rehab. of Mahabang

Parang FMR, Mahabang Parang ARC

IV-B 17.832 C 0.310 0.300 0.300 - - - 91.00 88.78% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 57

Page 66: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Barman Construction Corporation 7974

Conc. of East Coast Road, Calapan-Mansalay Section,

Mabaho Section IV-B 28.868 O 0.357 0.293 0.050 0.030 0.033 0.067 83.00 -

Bascon Bros & Dev. Corp. 31387 Rehab. of Poblacion Water System II 1.927 C 0.382 0.200 0.300 - - - 88.20 85.82%

V. Satisfactory

Batch 81 Engineering & Construction 31311 Completion of MPB, Brgy.

Nansuagao I 0.950 C 0.308 0.200 0.300 - - - 80.80 *80.08% V. Satisfactory

Batch 81 Engineering & Construction 31311 Const. of 2 CL Bldg. at

Banaoang PS I 0.832 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Completion of Matabao Bridge XIII 9.243 C 0.394 0.200 0.300 - - - 89.40 88.14%

V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Completion of Ngilan Bridge

along Agusan-Surigao Road XIII 8.545 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510

Const. of Drainage Facilities alogn Agusan-Misamis Oriental

Road, XIII 3.628 C 0.372 - 0.500 - - - 87.20 *87.20%

V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Const. of MPB XIII 2.787 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Const. of MPB (covered court) XIII 1.875 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510

Rehab. of Ngilan Bridge along Daang Maharlika Highway (Agusan-Surigao Section)

XIII 9.104 C 0.337 0.300 0.300 - - - 93.70 87.82% V. Satisfactory

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Replacement of Matabao Bridge XIII 9.468 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 58

Page 67: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

BBC Construction (Formerly: BBC Sand &

Gravel)16510 Replacement of Matabao Bridge XIII 9.468 O 0.387 0.272 0.000 0.030 0.030 0.067 78.60 -

BCT Trading & Const./F. Alarcon Const. Corp/ JV 17612 San Vicente Airport

Development Project DOTC 81.790 C 0.424 0.200 0.300 - - - 92.40 92.40% Very Satisfactory

BCT Trading and Construction 15199

Const./ Completion of San Miguel NHS 5 CL (Two storey 6

CL) IV-B 2.952 C 0.446 0.500 94.60 83.54%

V. Satisfactory

BCT Trading and Construction 15199

Improvement of Plaridel-Sitio Apis Road, Plaridel-Jose Rizal

ARCIV-B 20.211 C 0.144 0.195 0.300 - - - 63.90 78.42%

Fair

BCT Trading and Construction 15199 San Vicente Airport

Development Project DOTC 48.138 C 0.451 0.200 0.300 - - - 95.10 95.10% Very Satisfactory

BDL Santos Construction and Supply 17535

Repair/Rehab. of Damaged River Control (Cadacan River), Anog-

Sangkayan SectionV 4.728 C 0.210 0.064 0.300 - - - 57.40 *57.40%

Poor

Bedun Construction 15130Const./Impv't. of Batangas-Lobo Road, Malapad na Parang-San

Miguel Section IV-A 9.497 C 0.315 0.200 0.300 - - - 81.50 75.32%

Satisfactory

Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.337 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.377 C 0.338 0.200 0.300 - - - 83.80 81.56%

V. Satisfactory

Bell Construction 27851 Completion of MPB Arcillana Compound NCR 0.931 C 0.389 0.107 0.300 - - - 79.60 *79.60%

Satisfactory

Belvic Enterprises & Construction 25337 Const. of Drainage System @

Poblacion IX 0.485 C 0.186 0.218 0.300 - - - 70.40 *70.40% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 59

Page 68: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Bendimil Construction and Development Corp. 6135 Const. of Pedestrian Overpass IX 4.603 C 0.346 0.260 0.000 - - - 60.60 78.60%

Satisfactory

Bendimil Construction and Development Corp. 6135 Impvt./Gravelling of Siocon-

Sirawai Road (Sirawai Side) IX 47.894 O 0.158 0.225 0.000 0.030 0.033 0.067 51.30 -

Benny's Trading & Construction 8762 Conc. of Irawan-Tagburos Road IV-B 5.245 C 0.366 0.300 0.300 - - - 96.60 58.74%

Poor

Benny's Trading & Construction 8762 Const. of 2 CL Sta. Monica E/S IV-B 0.698 C 0.437 - 0.500 - - - 93.70 83.06%

V. Satisfactory

Benny's Trading & Construction 8762 Const. of Sidewalk Pavement IV-B 0.329 C 0.336 0.000 0.300 - - - 63.60 *63.60%

Fair

Berson's Construction & Trading 31181 Impvt./Concrete Paving of Brgy.

Road, Sitio Sipitan-Bocboc East I 9.615 C 0.236 0.200 0.300 - - - 73.60 80.86% V. Satisfactory

Berson's Construction & Trading 31181

Impvt./Concrete Paving of Camiling-Wawa Road & Drainage

StructuresI 9.641 C 0.288 0.276 0.300 - - - 86.40 85.98%

V. Satisfactory

Bestech Construction & Development Corporation 17725

Emergency Repair of Tigaon-Goa-San Jose-Lagonoy via San

Vicente Rd.V 1.316 O 0.344 0.158 0.100 0.020 0.023 0.133 77.80 -

Bet Construction & Supply 31764Impvt./Conc. of Pangasinan-

Tarlac Road (Socony Jct.-Lingayen Section)

I 9.453 C 0.294 0.200 0.300 - - - 79.40 80.12% V. Satisfactory

Bet Construction of Supply 31764 Concreting of Marcos Highway Road I 0.749 C 0.332 0.222 0.300 - - - 85.40 *85.40%

V. Satisfactory

Beta Construction 9829 Conc. of Brgy. Road @ Balogo V 0.800 C 0.244 0.189 0.300 - - - 73.30 *73.30% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 60

Page 69: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Beta Construction 9829 Conc. of Brgy. Road @ LRV Site Road V 0.480 C 0.345 0.183 0.300 - - - 82.80 *82.80%

V. Satisfactory

Beta Construction 9829 Conc. of Tarusanan Road V 1.880 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

Beta Construction 9829 Road Concreting of Dominorog Road V 1.405 C 0.269 0.300 0.300 - - - 86.90 *86.90%

V. Satisfactory

Better Work Construction 24432Completion of Multi-Purpose

Bldg., DENR Regional office XII Brgy. Zone IV

XII 1.428 C 0.368 0.225 0.300 - - - 89.30 92.24% Outstanding

Bevel Construction 16423 Improvement/Concreting of Cantaan Barangay Road X 0.920 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -

Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-

Baras Section V 4.769 O 0.399 0.293 0.100 0.018 0.015 0.067 89.20 -

Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-

Baras Section V 4.769 O 0.354 0.244 0.100 0.020 0.023 0.067 80.80 -

Bicol Goldrock Construction Corporation 32376 Const. of Bagamanoc Seawall V 4.800 C 0.293 0.200 0.300 - - - 79.30 76.54%

Satisfactory

Bicol Goldrock Construction Corporation 32376 Road Conc. At San Jose Road V 1.891 C 0.271 0.300 0.300 - - - 87.10 *87.10%

V. Satisfactory

Bien Marian Construction Corporation 21871 Construction of 2 Storey 4 CL @

Sitio Tapayan E/S IV-A 4.180 C 0.283 0.298 0.300 - - - 88.10 83.76% V. Satisfactory

Bigfoot Construction and Supply 24769 Conc. of Bais-Kabankalan Road

km. 83+000 - km. 85+000 VII 2.254 C 0.336 0.200 0.300 - - - 83.60 *83.60% V. Satisfactory

Bigfoot Construction and Supply 24769 Conc. of Basak-Nasig-id FMR VII 0.903 C 0.190 0.300 0.300 - - - 79.00 *79.00%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 61

Page 70: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Bigfoot Construction and Supply 24769 Conc. of Calayugan Brgy. Road VII 0.426 C 0.330 0.300 0.300 - - - 93.00 *93.00%

Outstanding

Bigfoot Construction and Supply 24769 Const. of Drainage along DSR VII 4.684 C 0.380 0.190 0.300 - - - 87.00 84.72%

V. Satisfactory

Bigfoot Construction and Supply 24769 Const. of Mantiquil-Tamlang

Road VII 4.708 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory

Bigfoot Construction and Supply 24769 Const. of River Control Dike

along Canaway River VII 4.680 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory

Bigfoot Construction and Supply 24769

Const./Installation of Water System a)Deepwell, Brgy.

Palanas, Tanjay City b)Water Supply, Brgy. Penabonan,

Mabinay

VII 0.996 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

Bill Hill Construction and Supply 18046 Completion of Roofing of Multi

Purpose Hall @ Brgy. Mabini XIII 0.182 C 0.400 0.240 0.300 - - - 94.00 *94.00% Outstanding

Bill Hill Construction and Supply 18046 Conc. of Brgy. Villafranca XIII 5.731 C 0.332 0.300 0.300 - - - 93.20 88.49%

V. SatisfactoryBill Hill Construction and

Supply 18046 Conc. of Capalayan-Mapawa-Quezon Road (Phase 38) XIII 11.814 O 0.359 0.300 0.030 0.030 0.035 0.067 82.10 -

Bill Hill Construction and Supply 18046

Conc. of Lake Mainit Circ. Road, Phase 14, Mainit to Matin-ao

SectionXIII 9.261 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

Bill Hill Construction and Supply 18046 Conc. of Magsaysay Road XIII 0.916 C 0.290 0.170 0.300 - - - 76.00 83.86%

V. Satisfactory

Billco Construction 18191 Conc. Reblocking along Surigao-Agusan Road XIII 0.955 C 0.354 0.200 0.300 - - - 85.40 80.24%

V. Satisfactory

Billco Construction 18191 Const. of Don Ruben Seawall (Phase III) XIII 2.690 C 0.370 0.300 0.000 - - - 67.00 79.24%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 62

Page 71: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Bimbo Construction & Supply (Formerly: Bimbo

Const.)25022 Repair/Improvement of Milaor

Revetment V 2.837 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding

Blimex Construction & Supply 27259 Const. of 4 Cl School Bldg. @

Patalinhug E/S XII 1.659 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding

Blue Dragon Construction 11524 Const. of Candon Flood Control, MNR I 8.248 C 0.341 0.200 0.300 - - - 84.10 82.78%

V. Satisfactory

BMJ Construction 14571

Completion of Sto. Tomas-Cabagan Overflow Bridge

(Phase V), Cansan-Bagutari Overflow Bridge

II 14.394 C 0.267 0.300 0.300 - - - 86.70 91.56% Outstanding

BMJ Construction 14571

Completion of Sto. Tomas-Cabagan Overflow Bridge

(Phase IV), Cansan-Bagutari Overflow Bridge

II 9.092 C 0.267 0.300 0.300 - - - 86.70 86.34% V. Satisfactory

BMJ Construction 14571Conc. of Ilagan-Bagao-Palanan

National Road (Fuyo-Rang-ayan-Ayan Gap)

II 9.360 C 0.345 0.292 0.300 - - - 93.70 *93.70% Outstanding

BMJ Construction 14571Conc. of Ilagan-Delfin Albano-Mallig National Road (Pilitan-

Paragu Sect.)II 9.649 C 0.282 0.200 0.300 - - - 78.20 *78.20%

Satisfactory

BMJ Construction 14571 Concreting of Sto. Tomas-D. Albano Road (Gap Section) II 9.649 C 0.261 - 0.500 - - - 76.10 79.25%

Satisfactory

BMJ Construction 14571 Const. of 2-CL School Building @ Magassi High School II 0.632 C 0.291 0.300 0.300 - - - 89.10 89.45%

V. Satisfactory

BMJ Construction 14571 Rehab. of Cansan-Cabagan-Sto. Tomas Road II 4.674 C 0.307 0.200 0.300 - - - 80.70 79.56%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 63

Page 72: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

BMJ Construction 14571Rehab. of Pinacanauan Br. App.

"A" & River Bank Protection works

II 11.699 C 0.363 0.300 0.300 - - - 96.30 88.24% V. Satisfactory

BMJ Construction 14571 Rehab. of Sto. Tomas-Delfin Albano Road II 4.679 C 0.020 0.300 0.000 - - - 32.00 63.80%

Fair

BMJ Construction 14571 Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road II 14.366 C 0.268 0.300 0.300 - - - 86.80 86.80%

V. Satisfactory

BMJ Construction 14571 Road Concreting of Garita Brgy. Road (Phase II) II 0.472 C 0.321 0.300 0.300 - - - 92.10 89.04%

V. Satisfactory

BMK Construction 8292 Const. of Mitura Bridge along Urdaneta-Manaoag Road I 24.737 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -

BMK Construction 8292Impvt./Rehab. of Urdaneta Jct,-

Dagupan-Lingayen Road via Zambales, Tapuac Section

I 19.259 C 0.350 0.200 0.300 - - - 85.00 85.30% V. Satisfactory

BMK Construction 8292Rehab./Reconst. of Damaged

National Road, Alaminos-Lucap Road

I 7.599 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

BMK Construction 8292

Repair/Rehabilitation of Drainage System along old

Judge de Venecia Sr. Ave., 3 Rows Cross Drainage along

Calasiao Road

I 4.821 C 0.351 - 0.500 - - - 85.10 85.19% V. Satisfactory

BN Builders & Construction Supply 28232 Concreting of Purok 3, Patin-ay XIII 2.825 C 0.203 0.200 0.300 - - - 70.30 83.62%

V. Satisfactory

BN Builders & Construction Supply 28232 Const. of Two (2) Storey MPB

(Completion) XIII 0.948 C 0.353 - 0.500 - - - 85.30 *85.30% V. Satisfactory

BNG Construction and General Services 18503 Completion of Brgy. Oslao MPB XIII 1.485 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 64

Page 73: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

BNG Construction and General Services 18503 Conc. of Caglanipa Brgy. Road XIII 1.900 C 0.337 0.209 0.300 - - - 84.60 *84.60%

V. Satisfactory

BNG Construction and General Services 18503 Concreting of San Francisco-

Malimono Road Phase XXIV XIII 4.455 C 0.390 0.200 0.300 - - - 89.00 83.48% V. Satisfactory

BNG Construction and General Services 18503 Const. of MPB @ Brgy. 7 XIII 0.939 C 0.276 0.000 0.300 - - - 57.60 *57.60%

PoorBNG Construction and

General Services 26705 Const. of Surigao Del Norte National High School XIII 0.371 C 0.369 0.116 0.300 - - - 78.50 85.43%

V. Satisfactory

BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.

Siana XIII 0.916 C 0.379 0.244 0.300 - - - 92.30 74.17% Satisfactory

BNR Construction & Development Corporation 12903

Completion of Putat Bridge I (Phase IV) along Toledo-Tabuel San Remigio Road Km.103.503

(approach)

VII 3.092 C 0.350 0.290 0.300 - - - 94.00 *94.00% Outstanding

BNR Construction & Development Corporation 12903 Concreting of Farm-to-Market

Road VII 0.949 C 0.372 - 0.500 - - - 87.20 79.82% Satisfactory

BNR Construction and Development Corporation 12903 Conc. Cebu-Toledo Wharf Road

(Nautical Highway) VII 27.753 C 0.363 0.200 0.300 - - - 86.30 87.35% V. Satisfactory

BNR Construction and Development Corporation 12903

Const. of Drainage Facilities with Cub and Gutter at Open-Airport

Road (Realigned to Const. of Drainage Facilities at Open-

Airport Road)

VII 1.845 C 0.386 0.300 0.300 - - - 98.60 92.06% Outstanding

BNR Construction and Development Corporation 12903 Const. of Pedestrian Overpass at

Talamban VII 4.295 O 0.353 0.300 0.100 0.030 0.060 0.100 94.30 -

BNYU Enterprises & Construction 27725 Completion of Multi-Purpose

Building VII 0.942 C 0.384 0.100 0.300 - - - 78.40 82.74% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 65

Page 74: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

BNYU Enterprises & Construction 27725 Completion of Multi-Purpose

Building (Cultural Center) VII 0.927 C 0.206 0.200 0.300 - - - 70.60 70.46% Satisfactory

BNYU Enterprises & Construction 27725

Concrete Paving of Cortes-Balilihan-Macaas Road (Broken

Section)VII 7.425 C 0.343 0.300 0.000 - - - 64.30 76.15%

Satisfactory

BNYU Enterprises & Construction 27725 Concreting of Maribojoc-

Antequera Road VII 4.770 O 0.346 0.034 0.100 0.023 0.025 0.100 62.80 -

BNYU Enterprises & Construction 27725 Concreting of Maribojoc-

Antequera Road VII 4.770 O 0.307 0.191 0.100 0.023 0.025 0.100 74.60 -

BNYU Enterprises & Construction 27725

Impvt. (Conc.) of Catigbian-Balilihan-Tagbilaran Road

(Broken Section)VII 7.426 C 0.361 0.300 0.000 - - - 66.10 *66.10%

Fair

BNYU Enterprises & Construction 27725 Repair/Improvement of Multi-

Purpose Building VII 0.933 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory

BNYU Enterprises and Construction 27725 Talibon Small Reservoir

Irrigation Project NIA 4.990 O 0.328 0.173 0.100 0.030 0.047 0.200 87.80 -

Bonibal Construction 9371 Asphalt Overlay of Mariveles Talaga Bay Road III 6.944 C 0.314 0.200 0.300 - - - 81.40 *81.40%

V. Satisfactory

Bonibal Construction 9371 Impv't. of Daan Pare Road III 1.870 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding

Bonifacio M. Carlos Construction 3303

Completion of Multi-Purpose Bldg., Purok Matahimik Brgy.

San PedroIV-B 0.326 C 0.443 - 0.500 - - - 94.30 94.30%

Outstanding

Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South

Road IV-B 13.698 C 0.298 0.300 0.300 - - - 89.80 91.60% Outstanding

Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South

Road, Calategas Section IV-B 5.671 C 0.346 0.300 0.300 - - - 94.60 88.84% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 66

Page 75: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Bonimar Construction Enterprises 23760 Const. of 1 CL Sch. Bldg. @

Bolaen E/S I 0.493 C 0.336 0.251 0.300 - - - 88.70 *88.70% V. Satisfactory

Bonimar Construction Enterprises 23760 Const. of 1 CL Standard Sch.

Bldg. @ Salomague NHS I 0.493 C 0.320 0.278 0.300 - - - 89.80 *89.80% V. Satisfactory

Bonimar Construction Enterprises 23760 Const. of 1 CL Std. Sch. Bldg. @

Binmaley School of Fisheries I 0.507 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory

Borderline Construction and Supply 24433

Conc. of Dualing-New-Panay-Midsayap Road (Sta. Cruz-

Katalicanan Section)XII 4.779 C 0.358 0.126 0.300 - - - 78.40 79.42%

Satisfactory

Borderline Construction and Supply 24433 Const. of MPB XII 0.287 C 0.334 0.239 0.300 - - - 87.30 *87.30%

V. Satisfactory

Borderline Construction and Supply 24433 Const. of Water System XII 0.467 C 0.385 0.215 0.300 - - - 90.00 *90.00%

V. Satisfactory

Borderline Construction and Supply 24433

Rehab./Impvt. of Bukidnon-Cotabato Road, Poblacion

SectionXII 4.653 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

BPDG Construction & Trading 16167 Const. of MPB at Brgy. San Jose

Proper III 3.612 C 0.357 0.300 0.300 - - - 95.70 *95.70% Outstanding

BRG Construction 21931 PSHS CVC Academic Bldg. Phase III DOST 6.482 C 0.375 0.300 0.300 - - - 97.50 97.50%

Outstanding

Brillantes Construction 26447 Const. of Multi-Purpose Building (Phase I) X 0.940 C 0.400 0.209 0.690 - - - 97.63 97.63%

Outstanding

Brillantes Construction 26447Provision of Line Canal at

Nabangunan Section along Jct. Dologan-Busco-Quezon Road

X 0.275 C 0.354 0.300 0.300 - - - 95.40 88.50% V. Satisfactory

Brillantes Construction 26447Provision of Lined Canal along

Jct. Dologan-Busco-Quezon Road, Nabanganan Section

X 0.462 C 0.381 0.200 0.300 - - - 88.10 86.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 67

Page 76: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Brima Construction and Enterprises 8746 Rehab./Impvt./Conc. of Tubod-

Ganassi National Road X 9.142 C 0.287 0.300 0.300 - - - 88.70 86.06% V. Satisfactory

Bros Construction and Supply 10507 Conc. of Surigao-Davao Coastal

Road (Bad-as SDN Section) XIII 6.509 C 0.320 0.215 0.300 - - - 83.50 79.72% Satisfactory

Bros Construction and Supply 10507 Concreting of NRJ Osmeña-

Magkiangkan Road XIII 0.943 C 0.430 - 0.500 - - - 93.00 90.78% Outstanding

Bros Construction and Supply 10507 Concreting of San Jose-Trento

Road Section XIII 8.078 C 0.347 0.200 0.300 - - - 84.70 83.89% V. Satisfactory

Bros Construction and Supply 10507 Const./Rehabilitation of San

Francisco By-Pass Road XIII 0.886 O 0.400 0.173 0.100 0.018 0.023 0.100 81.40 -

Bros Construction and Supply 10507 Rehab. of Balingasag By-Pass

Road X 4.640 C 0.314 0.200 0.300 - - - 81.40 81.22% V. Satisfactory

Bros Construction and Supply 10507

Repair/Rehab. of Damaged Slope Protection Structure due to

Erosion along Roadside of ICBRX 2.593 C 0.331 0.200 0.300 - - - 83.10 *83.10%

V. Satisfactory

Bros Construction and Supply 10507 Repair/Rehab. of del Monte

PSCG Bridge XIII 1.635 C 0.152 0.300 0.000 - - - 45.20 58.91% Poor

Brostan Consruction & Development 12360 Completion/Extension of Multi-

Purpose Building II 0.652 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Brostan Construction & Development 12360 Conc. of Pila-Poblacion Road IV-A 9.630 C 0.298 0.215 0.300 - - - 81.30 *81.30%

V. Satisfactory

Brostan Construction & Development 12360 Conc. of Road II 2.885 C 0.268 0.300 0.300 - - - 86.80 87.88%

V. Satisfactory

Brostan Construction & Development 12360 Conc. of Road, Leading to Eco-

Tourism Project (Caliraya Lake) IVA 19.298 C 0.291 0.300 0.300 - - - 89.10 93.96% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 68

Page 77: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Brostan Construction & Development 12360 Const. of MPB (Phase I),

Cagayan State University II 9.640 O 0.304 0.240 0.070 0.024 0.033 0.100 77.10 -

Brostan Construction & Development 12360 Const. of MPB (Phase I),

Cagayan State University II 9.640 O 0.316 0.240 0.100 0.030 0.037 0.100 82.30 -

Brostan Construction & Development 12360 Const. of MPB, Isabela State

University II 0.756 C 0.341 - 0.000 - - - 34.10 48.45% Poor

Brostan Construction & Development 12360 Const. of Multi-Purpose Bldg. @

Victoria, Alicia, Isabela II 0.691 C 0.302 - 0.500 - - - 80.20 88.78% V. Satisfactory

Brostan Construction & Development 12360 Impvt./Rehab. of Jct. Dumabato-

Baligui Road II 19.280 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Burgos-Aurora FMR II 3.365 C 0.400 0.225 0.300 - - - 92.50 *92.50%

Outstanding

Brostan Construction & Development 12360 Rehab. of Calapan South Road &

East Coastal Road IVB 0.952 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

Brostan Construction & Development 12360 Rehab. of Farm to Market Road II 0.657 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

Brostan Construction & Development 12360 Rehab. of FMR II 1.438 C 0.240 0.300 0.300 - - - 84.00 *84.00%

V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Nat'l Road along Jct.

Oscariz-Ramon Putia Section II 9.629 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Roads along Gamu-

Roxas Road II 11.564 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

Brostan Construction & Development 12360

Rehab. of Roads along Santiago-Tuguegarao Road (Conc.

Reblocking)II 19.274 C 0.357 0.200 0.000 - - - 55.70 72.32%

Satisfactory

Brostan Construction & Development 12360 Rehab. of Sibunag Bridge along

Guimaras Circumferential Road VI 2.178 C 0.389 0.100 0.300 - - - 78.90 *78.90% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 69

Page 78: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Brostan Construction & Development 12360 Rehab./Impv't. of Sotero Nuesa-

Simimbaan Road II 4.699 C 0.312 - 0.500 - - - 81.20 85.88% V. Satisfactory

Brostan Construction & Development 12360 Rehab./Reconst. of Damaged

Nat'l Road II 15.235 C 0.341 0.275 0.000 - - - 61.60 78.40% Satisfactory

Brostan Construction & Development 12360

Rehab./Replacement of Damaged Bridges along CDMA

Road, Pinaripad BridgeII 13.472 C 0.400 0.300 0.000 - - - 70.00 71.44%

Satisfactory

Brostan Construction & Development 12360

Repair/Rehab. of Farm to Market Road, Brgy. San Leonardo-

PinaripadII 4.054 C 0.363 0.300 0.300 - - - 96.30 96.30%

Outstanding

Brostan Construction & Development 12360

Replacement of Laoag Bridge along Jct. Ipil-Quirino Bdry.

RoadII 4.792 C 0.338 0.200 0.300 - - - 83.80 85.36%

V. Satisfactory

BS Chang Builders 22745 DBM South Linear Park PRRC 7.088 C 0.46 0.0815 0.300 - - - 84.15 *84.15% V. Satisfactory

BS Chang Builders 22745 DBM South Linear Park III PRRC 2.235 C 0.42 0.200 0.300 - - - 92.00 *92.00% Outstanding

Busilac Builders Inc. 7701 ACA Bldg. 2 DOST 9.651 C 0.389 0.300 0.300 - - - 98.90 98.90% Outstanding

Busilac Builders, Incorporated 7701 Conc. of Batac-Pinili Road,

Batac Section I 21.291 O 0.327 0.240 0.100 0.018 0.047 0.067 79.90 -

Busilac Builders, Incorporated 7701 Concreting of Various Roads

(Sulquiano & Purungganan) I 0.939 O 0.360 0.246 0.100 0.030 0.035 0.100 87.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 70

Page 79: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Busilac Builders, Incorporated 7701 Const. of Drainage along MNR,

San Nicolas-Nangalisan Section I 6.641 C 0.239 0.300 0.300 - - - 83.90 80.84% V. Satisfactory

BYA Builders and Construction Supply 24158 Const. of One (1) Cl Schl. Bldg.

@ Ipil NHS VIII 0.442 C 0.363 0.297 0.300 - - - 96.00 *96.00% Outstanding

BYA Builders and Construction Supply 24158

Impvt./Rehab. of Nat'l Road along Tacloban-Baybay South

RoadVIII 0.940 C 0.355 0.200 0.300 - - - 85.50 *85.50%

V. Satisfactory

C & F Construction & Development Corporation 3509

Rehab. of Sandiat Bridge & Approaches along Santiago-

Tuguegarao RoadII 3.779 C 0.271 0.205 0.300 - - - 77.60 *77.60%

Satisfactory

C & F Construction & Development Corporation 3509 Repair/Rehab. of Bocaue-San

Jose Road III 9.860 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

C & F Construction & Development Corporation 3509 Widening & Impvt. of Quirino

Highway III 4.749 C 0.246 0.245 0.300 - - - 79.10 *79.10% Satisfactory

C & F Construction & Development Corporation 3509

Widening/Rehab. of Quirino Highway, Gumaoc-Tungkong-Mangga, San Jose Del Monte

City.

III 9.433 C 0.456 - 0.500 - - - 95.60 87.62% V. Satisfactory

C D U Construction 13915 Conc. of Laoang-Calomotan Road VIII 19.065 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -

C D U Construction 13915 Conc. of Pangpang-Palapag-Mapanas-Gamay-Lapinig Road VIII 9.517 C 0.331 0.200 0.300 - - - 83.10 *83.10%

V. Satisfactory

C D U Construction 13915Repair/Rehab. of Ferry Terminal-

Allen Road (Roadslip) Daang Maharlika

VIII 3.835 C 0.282 0.200 0.300 - - - 78.20 84.26% V. Satisfactory

C D U Construction 13915Repair/Rehab. of Laoang-

Calomotan (Road Slip) Km. 790+800 to Km. 797+013

VIII 4.719 C 0.366 0.300 0.300 - - - 96.60 92.34% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 71

Page 80: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C E K Construction and Water Supply 13713 Completion of School Bldg. at

Binwang E/S XII 0.274 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory

C E K Construction and Water Supply 13713 Const. of MPB at Paligue XI 0.953 C 0.368 0.223 0.300 - - - 89.10 *89.10%

V. Satisfactory

C E K Construction and Water Supply 13713 Const. of MPB, Brgy. Lamlahak XII 0.668 O 0.297 0.240 0.100 0.030 0.028 0.067 76.20 -

C. Brotonel Construction 9727Completion of the Const. of Taal Lake Circ. Road (Talisay-Laurel-

Agoncillo Section)IV-A 9.644 O 0.308 0.300 0.100 0.030 0.033 0.100 87.10 -

C. Brotonel Construction 9727 Impvt. of MPB IV-A 0.192 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding

C. Dy Builders and General Merchandise (Formerly: CD

Construction)17003 Const. of 10 units CL, Mancahan

NHS X 4.670 O 0.326 0.271 0.100 0.030 0.047 0.067 84.10 -

C. E. Padilla Construction 11278Partial Const. of 3-Storey

Medical and Parking Bldg. with Roofdeck

PRRC 94.626 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

C. Lara Construction 17304 Const. of 1 Storey 2 CL Modified SB at Ajong NHS VII 0.871 C 0.282 0.300 0.300 - - - 88.20 86.38%

V. Satisfactory

C.A. Betalac Construction & Gen. Mdse. 28222

Partial Const. of Academic Classroom at Ma. Z. Bayya

Memorial E/SXII 0.480 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

C.B. Tampengco Construction & Supply 18505 Const. of Multi-Purpose at Brgy.

80, Zone 7 NCR 2.136 O 0.366 0.250 0.100 0.023 0.041 0.100 88.00 -

C.B. Tampengco Construction and Supply 18505 Completion of MPB at Brgy.

Marulas NCR 1.044 C 0.369 0.231 0.300 - - - 90.00 *90.00% V. Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. (Partial) of MPB IV-A 4.800 C 0.385 0.265 0.300 - - - 95.00 *95.00%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 72

Page 81: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.B. Tampengco Construction and Supply 18505 Const. of 2 Cl Sch. Bldg. @ San

Mateo H/S IV-A 0.962 O 0.286 0.267 0.100 0.030 0.032 0.100 81.50 -

C.B. Tampengco Construction and Supply 18505 Const. of Conc. Pathwalk in Sch.

Grounds of Caruhatan West E/S NCR 0.949 C 0.205 0.248 0.300 - - - 75.30 *75.30% Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. of Health Center at Brgy.

Canlalay IV-A 0.960 C 0.312 0.231 0.300 - - - 84.30 75.83% Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. of MPB (Public Market) @

Brgy 186 NCR 4.682 C 0.280 0.200 0.300 - - - 78.00 88.29% V. Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. of Multi-Purpose at Brgy.

NBBS, Navotas, Metro Manila NCR 2.836 C 0.342 0.300 0.300 94.20 90.70% Outstanding

C.B. Tampengco Construction and Supply 18505 Const. of Two (2) CL Sch. Bldg.

@ Mariveles H/S III 0.877 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory

C.B. Tampengco Construction and Supply 18505 Impvt. of V. Ilustre St., Brgy. Don

Manuel NCR 1.878 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

C.C.M. Construction 11043 Completion of Cogon Night High School Building VII 1.112 O 0.343 0.221 0.100 0.010 0.029 0.100 80.30 -

C.C.M. Construction 11043 Completion of Cogon Night School Building VII 1.112 O 0.378 0.240 0.100 0.010 0.029 0.100 85.70 -

C.C.M. Construction 11043Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon)

RoadVII 13.714 O 0.346 0.225 0.100 0.030 0.043 0.100 84.40 -

C.C.M. Construction 11043Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon)

RoadVII 13.714 O 0.336 0.247 0.100 0.030 0.054 0.100 86.70 -

C.C.M. Construction 11043Conc. Paving of Jct. (TNR)

Maribojoc-Antequera-Catagbacan (Loon) Road

VII 4.485 C 0.371 0.000 0.300 - - - 67.10 78.32% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 73

Page 82: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.C.M. Construction 11043 Const. Brgy. Lumangog Road VII 2.806 O 0.283 0.225 0.100 0.030 0.038 0.100 77.60 -

C.C.M. Construction 11043

Rehab. of Settled Approaches of Damaiao and Taguimtim Bridges

along Bohol Circumferential Road

VII 2.842 C 0.391 0.200 0.300 - - - 89.10 81.72% V. Satisfactory

C.D. Valbuena Construction 26794 Const. of Foot Bridge, Brgy. Malinao Ilaya IV-A 0.142 C 0.305 0.263 0.300 - - - 86.80 *86.80%

V. Satisfactory

C.D. Valbuena Construction 26794 Const. of Water Supply System at Brgy. Bagong Anyo IV-A 0.574 C 0.377 0.300 0.300 - - - 97.70 *97.70%

Outstanding

C.E. Padilla Construction 11278 PUP Linear Park Project PRRC 19.989 C 0.311 0.270 0.100 - - - 68.10 68.10% Fair

C.F. Trinidad / 2H2L Construction Joint Venture JV-07-059 Widening of Taytay Diversion

Road IVA 19.223 C 0.341 0.300 0.300 - - - 94.10 85.16% V. Satisfactory

C.F. Trinidad Construction 9199 Const. of Box Culvert at P. Gomez Extension IV-A 1.050 C 0.363 0.200 0.300 - - - 86.30 *86.30%

V.Satisfactory

C.F. Trinidad Construction 9199 Dredging/Riprapping of Angono River IV-A 2.882 C 0.368 0.268 0.300 - - - 93.60 *93.20%

Outstanding

C.F. Trinidad Construction 9199 Riprapping of Creek, beside Ferretville Subdivision IV-A 3.840 C 0.218 0.300 0.300 - - - 81.80 77.72%

Satisfactory

C.G.I. Construction 10606 Conc. of FMR @ Brgy. Daang Bago III 0.470 C 0.297 0.300 0.300 - - - 89.70 *89.70%

V. Satisfactory

C.G.I. Construction 10606 Const. of Road @ General Luna III 0.475 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

C.J. Maramat Construction 6007Completion of SLU-SVP Brgy.

Bakakeng Multi-Purpose Building

CAR 1.427 C 0.368 0.300 0.300 - - - 96.80 85.32% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 74

Page 83: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.J. Maramat Construction 6007 Const. of Multi-Purpose Building at BGH Compound Brgy. CAR 1.414 C 0.372 0.300 0.300 - - - 97.20 91.88%

Outstanding

C.J. Maramat Construction 6007Const. of Two (2) Storey

Reinforce Concrete Municipal Bldg.

I 11.288 O 0.295 0.269 0.100 0.015 0.035 0.100 81.40 -

C.L. Carandang Enterprises 29494 Conc. of Masbate-Milagros Road V 13.855 C 0.260 0.300 0.300 - - - 86.00 76.768% Satisfactory

C.L. Carandang Enterprises 29494 Concreting of Jct. Mandaon-Mandaon Road V 9.590 O 0.339 0.300 0.100 0.008 0.028 0.067 84.20 -

C.L. Carandang Enterprises 29494 Const. of Flood Control Project @ Tugbo V 0.939 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

C.L. Carandang Enterprises 29494 Const. of MPB at DILG Compound V 0.379 C 0.369 0.200 0.300 - - - 86.90 *86.90%

V. Satisfactory

C.L. Carandang Enterprises 29494 Rehab. of Dayao-Bugtong FTMR V 4.791 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

C.L. Carandang Enterprises 29494 Rehab. of Jct., Crossing-Mandaon Road V 18.810 C 0.277 0.200 0.300 - - - 77.70 *77.70%

Satisfactory

C.L. Carandang Enterprises 29494 Rehab./Impvt./Const. of DEO V 2.886 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

C.L. Carandang Enterprises 29494Replacement/Reblocking of Concrete Pavement along Masbate-Cataingan Road

V 9.488 C 0.298 0.300 0.300 - - - 89.80 82.48% V. Satisfactory

C.M. Dancel Const. & Supply / FRD Const. (JV) JV-03-106 Const. of Tulnagan Bridge I 19.981 C 0.326 0.300 0.300 - - - 92.60 84.08%

V. Satisfactory

C.M. Dancel Construction & Supply 12640 Const. of Drainage along MNR,

Nangalisan Section I 2.742 C 0.372 0.200 0.300 - - - 87.20 84.62% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 75

Page 84: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.M. Dancel Construction & Supply 12640 Impvt. of Pasuquin-Sapat Air

Station Road I 19.284 C 0.248 0.187 0.300 - - - 73.50 76.08% Satisfactory

C.M. Dancel Construction & Supply 12640 ReConst. of River Control

Protection I 4.725 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory

C.M. Dancel Construction & Supply 12640

Rehab./Reconst. of Damaged Nat'l Road, MNR, Maoini-

Baduang Road I 18.963 O 0.400 0.300 0.100 0.015 0.020 0.100 93.50 -

C.M. De Villa Construction & Supply (Formerly: C.M.

De Villa Const.)22778 Conc. of Roads in Sitio Kay

Reyna IV-A 0.471 C 0.304 0.221 0.300 - - - 82.50 *82.50% V. Satisfactory

C.M. Pancho Construction Incorporated 183

Bohol Circumferential Road Improvement Project, CP-2,

Candijay-Jagna-Valencia Sect.Sat. 169+240-Sta. 221+040

PJHL 856.115 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding

C.M. Pancho Construction Incorporated 183 Bridge Replacement Sixth Road

Project Bridge Component CP-M I 86.581 C 0.341 0.200 0.300 - - - 84.10 81.46% V. Satisfactory

C.M. Pancho Construction Incorporated 183 Const. of Aloragat Bridge &

Approaches I 51.651 O 0.389 0.300 0.100 0.030 0.061 0.100 98.00 -

C.M. Pancho Construction Incorporated 183

Const. of Daang Hari Extension Aguinaldo-Highway-Coastal

RoadIVA 9.568 C 0.314 0.300 0.300 - - - 91.40 *91.40%

Outstanding

C.M. Pancho Construction Incorporated 183

Rehab. of Surigao-Davao Coastal Road, Jct. Bacuag-

Claver SectionXIII 661.069 O 0.351 0.300 0.100 0.030 0.060 0.100 94.10 -

C.M. Pancho Construction Incorporated 183

Rehab. of Surigao-Davao Coastal Road, Jct. Bacuag-

Claver SectionXIII 661.069 O 0.338 0.300 0.070 0.030 0.070 0.100 90.80 -

C.R. Domingo Construction 2992 Conc. of Naguilian-San Mariano Road (Binatug Section) II 9.646 C 0.333 0.200 0.300 - - - 83.30 82.16%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 76

Page 85: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.S. Garcia Construction 1901 Const./Rehab. of Sch. Bldg. F. De Mesa E/S NCR 1.427 C 0.386 0.300 0.300 - - - 98.60 *98.60%

Outstanding

C.S. Garcia Construction 1901 Rehab. of Sagbat-Pililla Diversion Road IV-A 9.598 C 0.364 0.286 0.300 - - - 95.00 *95.00%

Outstanding

C.S. Rayos Construction & General Services 9790 Completion of Ternate-Nasugbu

Road, Calayo-Looc Section IV-A 23.966 C 0.370 0.290 0.300 - - - 96.00 85.56% V. Satisfactory

C.S. Rayos Construction & General Services 9790

Const. (Concreting) of Ternate-Nasugbu Road, Ternate-

Kaybiang SectionIV-A 28.934 C 0.321 0.300 0.300 - - - 92.10 85.56%

V. Satisfactory

C.S. Rayos Construction & General Services 9790 Const./Impvt. of Bauan-Mabini

Circ. Road IV-A 9.496 C 0.220 0.195 0.300 - - - 71.50 *71.50% Satisfactory

C.V. Construction & Development 8334 Conc. of Road @ Sampaguita

East St. Purok NHA 2 XI 0.564 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

C.V. Construction & Development 8334 Const. of 1 Cl 1 Storey Sch.

Bldg. @ Saloy H/S XI 0.433 C 0.329 0.247 0.300 - - - 87.60 *87.60% V. Satisfactory

C.V. Construction & Development 8334 Const./Completion of Doña

Helene Bridge 1 & Approaches XIII 7.007 O 0.317 0.156 0.070 0.015 0.032 0.067 65.70 -

C.V. Construction & Development 8334 Const./Completion of Doña

Helene Bridge 1 & Approaches XIII 7.007 O 0.353 0.300 0.000 0.030 0.050 0.067 80.00 -

C.V. Construction & Development 8334

Impv't/Conc. of Additional Two (2) Lanes along Davao City

Diversion Road (Airport Section)XI 15.407 O 0.387 0.240 0.100 0.024 0.048 0.100 89.90 -

C.V. Construction & Development 8334

Impv't/Conc. of Additional Two (2) Lanes along Davao City

Diversion Road (Airport Section)XI 15.407 O 0.387 0.300 0.100 0.030 0.047 0.100 96.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 77

Page 86: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

C.V. Construction & Development 8334

Impv't/Conc. of Additional Two (2) Lanes along Davao City

Diversion Road (Airport Section)XI 15.407 C 0.345 0.200 0.300 - - - 84.50 89.69%

V. Satisfactory

C.V. Construction & Development 8334

Replacement of Sayug Bailey Bridge to RCBC (Jct. del Carmen-

Sta. Monica-San Isidro Road)XIII 9.548 C 0.353 0.212 0.000 - - - 56.50 62.98%

Fair

CA Miguel Construction, Incorporated 10221 Conc. of Brgy. Roads IVA 1.917 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

CA Miguel Construction, Incorporated (Formerly:

C.A. Miguel Const.)10221 Const. of MPB @ J.E. Pama St. NCR 0.373 C 0.326 0.200 0.300 - - - 82.60 *82.60%

V. Satisfactory

Caana Construction 12905 Repair/Rehab. of Manila High Sch. NCR 0.962 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Cager Construction & Supply 21743

Site Development Const. of Standard Day Care Center KV1

(Package 8)PRRC 2.116 O 0.378 0.300 0.100 0.023 0.028 0.100 92.90 -

Camia Construction 20506 Completion of Matuyem Bridge (Phase II) II 4.695 C 0.373 0.215 0.000 - - - 58.80 71.34%

Satisfactory

Camia Construction 20506 Completion of Public Market II 1.096 C 0.328 0.239 0.300 - - - 86.70 78.65% Satisfactory

Camia Construction 20506 Conc. of Dugo-San Vicente Road with Drainage II 5.630 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -

Camia Construction 20506 Conc. of Simpatuyo Brgy. Road II 0.942 C 0.281 0.187 0.300 - - - 76.80 *76.80% Satisfactory

Camia Construction 20506 Const. of Balluyan Bridge, Phase II CAR 2.830 C 0.330 0.214 0.300 - - - 84.40 88.42%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 78

Page 87: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Camia Construction 20506 Const. of Caglayan Flood Control Phase II CAR 2.360 C 0.316 0.195 0.300 - - - 81.10 80.80%

V.Satisfactory

Camia Construction 20506 Const. of Conner National High School CAR 0.473 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V.Satisfactory

Camia Construction 20506

Maint./Rehab. & Impvt. of Nat'l Arterial Sec. Roads Public

Infratructure along Cagayan-Apayao Road, Tuao Pob. Sect.

II 4.998 C 0.324 0.195 0.300 - - - 81.90 *81.90% V.Satisfactory

Camia Construction 20506 Maint./Rehab. Along Apayao (Calanasan-Ilocos Norte Road) CAR 4.588 O 0.325 0.240 0.100 0.030 0.040 0.067 80.20 -

Camia Construction 20506 Repair/Rehab of Priority FMR (Municipal Wide) CAR 1.856 C 0.217 0.200 0.300 - - - 71.70 *71.70%

Satisfactory

Camia Construction 20506 Replacement/Const. of Malabanig Bridge CAR 15.218 C 0.385 0.200 0.300 - - - 88.50 87.12%

V.Satisfactory

Candace Construction 12084Const. & Repair/Rehab. of

Various School Bldgs. (Clustered-1) 1st Batch CY 2004

IX 0.359 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding

Carlo Joseph Construction 21017 Const. of 1 unit 1Cl Sch. Bldg. @ Lubao Vocational School III 0.285 C 0.324 0.195 0.300 - - - 81.90 *81.90%

V. Satisfactory

Carlo Joseph Construction 21017 Const. of Lined Canal, San Vicente (Part of Package 17) III 2.090 C 0.398 0.204 0.300 - - - 90.20 *90.20%

V. Satisfactory

Carlo Joseph Construction 21017 Improvement of Public Market (Porac Mall) III 2.366 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Carlyz Construction 19776 Const./Repair of DepEd Division Office Phase II CAR 0.946 C 0.205 0.200 0.300 - - - 70.50 *70.50%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 79

Page 88: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Carlyz Construction 19776Widening/Conc. of Banaue-

Mayoyao Alfonso Lista-Isabela Boundary Road, Kinakin Section

CAR 1.895 C 0.378 0.200 0.300 - - - 87.80 88.20% V. Satisfactory

Carrascal Integrated Enterprises 4764 Completion of Carrascal MPB XIII 1.844 C 0.394 0.200 0.300 - - - 89.40 *89.40%

V. Satisfactory

Carrascal Integrated Enterprises 4764 Completion of Madrid District

Hospital (Phase III) XIII 3.629 C 0.357 0.254 0.300 - - - 91.10 86.20% V. Satisfactory

Carrascal Integrated Enterprises 4764 Completion of MPB XIII 3.635 C 0.366 0.200 0.300 - - - 86.60 93.11%

OutstandingCarrascal Integrated

Enterprises 4764 Completion of Public Market XIII 1.844 C 0.393 0.200 0.300 - - - 89.30 87.55% V. Satisfactory

Carrascal Integrated Enterprises 4764 Conc.of Sibahay-Nurcia Section

(SDCR) XIII 19.285 O 0.355 0.200 0.100 0.030 0.054 0.100 83.90 -

Carrascal Integrated Enterprises 4764 Const. of Abacahan Bridge XIII 10.214 C 0.324 0.200 0.300 - - - 82.40 84.08%

V. Satisfactory

Carrascal Integrated Enterprises 4764 Const. of Adlay Bridge and

Approaches XIII 23.683 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding

Carrascal Integrated Enterprises 4764 Const. of Kayawyawan and

Approaches Bridge 1 XIII 13.806 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

Carrascal Integrated Enterprises 4764 Improvement of Coastal Road

Lanuza XIII 4.551 C 0.370 0.201 0.300 - - - 87.10 85.96% V. Satisfactory

Carry-on Construction 8014 Const. of MPB at Brgy. NBBS NCR 2.850 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

Carry-on Construction 8014 Const./Impvt. of MPB NCR 1.916 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 80

Page 89: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Carlyz Construction 19776Widening/Conc. of Banaue-

Mayoyao Alfonso Lista-Isabela Boundary Road, Kinakin Section

CAR 1.895 O 0.400 0.300 0.100 0.000 0.019 0.050 86.90 -

Casigayan Construction 26796 Const. of MPB, KASC (Phase I) CAR 0.945 C 0.316 0.195 0.300 - - - 81.10 *81.10% V. Satisfactory

Cauayan United Enterprises and Builders 8816 Construction of Canal and Canal

Structures (LMC-ARIP-09-06) NIA-II 1.983 C 0.329 0.133 0.000 0.015 0.028 0.200 70.50 70.51% Satisfactory

Cauayan United Enterprises and Const.

Builders/Brostan Const. & Dev. (JV)

JV-07-168Conc. of Ilagan-Delfin Albano-Mallig National Road (Manano

Section)II 19.290 O 0.372 0.225 0.100 0.010 0.047 0.100 85.40 -

Cauayan United Enterprises and

Construction Builders8816 Conc. of Ilagan-Delfin Albano-

Mallig Road (Olango Section) II 9.648 C 0.335 0.196 0.300 - - - 83.10 *83.10% V. Satisfactory

Cauayan United Enterprises and

Construction Builders8816 Const. of 1 Cl Sch. Bldg. @

Daramuangan E/S II 0.319 C 0.366 0.174 0.300 - - - 84.00 *84.00% V. Satisfactory

Cauayan United Enterprises and

Construction Builders8816 Const. of 5-Units Deep Well

(Light Duty Type), Minate I II 0.184 C 0.260 0.200 0.300 - - - 76.00 *76.00% Satisfactory

Cauayan United Enterprises and

Construction Builders8816 Const. of Flood Control Project II 4.821 O 0.360 0.160 0.100 0.010 0.047 0.200 87.70 -

Cauayan United Enterprises and

Construction Builders8816 Impvt./Rehab. Along Cabatuan-

Enrile Road II 6.717 C 0.286 0.262 0.300 - - - 84.80 *84.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 81

Page 90: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cauayan United Enterprises and

Construction Builders8816

Impvt./Rehab. Along Cauayan-Cabatuan Road, Cauayan-Luna-

CabatuanII 14.346 C 0.390 0.225 0.300 - - - 91.50 *91.50%

Outstanding

Cauayan United Enterprises and

Construction Builders8816 Impvt./Rehab. Along Gamu-

Roxas Road II 9.646 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

Cauayan United Enterprises and

Construction Builders8816 Impvt./Rehab. of Baguio Country

Club Km. 252+768-Km. 254+155 CAR 6.844 C 0.385 0.200 0.300 - - - 89.50 *88.50% V.Satisfactory

Cauayan United Enterprises and

Construction Builders8816 Impvt./Rehab. of Cauayan-

Cabatuan Road II 0.947 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Cauayan United Enterprises and

Construction Builders8816 Rehab. of FMR at Muñoz West-

Sinamar Road II 0.944 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

Cauayan United Enterprises and

Construction Builders8816

Repair/Rehab. of Alaminos-Bolinao Road, Km. 321+204 -

Km. 323+000I 9.647 C 0.307 0.200 0.300 - - - 80.70 *80.70%

V. Satisfactory

Cavacon Corporation (Formerly: Cagayan Valley

Const. Corp.)2622

Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo

Highway Jct., Imus Section

IV-A 28.895 O 0.327 0.300 0.050 0.030 0.055 0.067 82.90 -

Cavacon Corporation (Formerly: Cagayan Valley

Const. Corp.)2622

Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo

Highway Jct., Imus Section

IV-A 31.784 C 0.325 0.300 0.300 - - - 92.50 87.07% V. Satisfactory

Cavacon Corporation (Formerly: Cagayan Valley

Const. Corp.)2622 Const. of Ditale Bridge and

Approaches, Brgy. Ditale III 50.474 O 0.338 0.300 0.100 0.024 0.054 0.100 92.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 82

Page 91: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cavacon Corporation (Formerly: Cagayan Valley

Const. Corp.)2622 Const. of Ditale Bridge and

Approaches, Brgy. Ditale III 50.474 O 0.353 0.269 0.070 0.030 0.059 0.067 84.80 -

Cavacon Corporation (Formerly: Cagayan Valley

Const. Corp.)2622 Rehabilitation/ Widening

(Concreting) of Paliparan Road IV-A 21.226 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -

Cavat Capitol Merchandising &

Construction3112 Conc. of Cagayan-Apayao

National Road, Tuao-Rizal Sect. II 11.859 O 0.356 0.292 0.000 0.030 0.033 0.100 81.10 -

Cavat Capitol Merchandising &

Construction3112 Conc. of Cagayan-Apayao

National Road, Tuao-Rizal Sect. II 11.859 O 0.287 0.240 0.050 0.030 0.033 0.067 70.70 -

Cavat Capitol Merchandising &

Construction3112 Conc. of Naruangan-Culong

Road II 6.266 O 0.319 0.240 0.050 0.030 0.033 0.067 73.90 -

Cavite Ideal International Const. & Development

Corp.5599

Contract Package I, Baguio-Pangawan, Kayapa Section

under Cordillera Road Improvement Project (Baguio-

Aritao Road Improvement Project)

PJHL 1,562.663 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -

Cavite Ideal International Const. & Development

Corp.5599

Contract Package I, Baguio-Pangawan, Kayapa Section

under Cordillera Road Improvement Project (Baguio-

Aritao Road Improvement Project)

PJHL 1,562.663 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -

Cavite Ideal International Const. & Development

Corp.5599

CP II, Abuyog-Silago Sect. Under the Arterial Road Links Dev't. Proj., Phase IV (Himayangan-

Silago-Abuyog Road and Liloan-San Ricardo Road Projects)

PJHL 942.477 C 0.353 0.300 0.300 - - - 95.30 94.66% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 83

Page 92: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cavite Ideal International Const. & Development

Corp.5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &

West Service Roads and Pasong Tamo Ext.

URPO 524.467 O 0.367 0.300 0.100 0.030 0.060 0.100 95.70 -

Cavite Ideal International Const. & Development

Corp.5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &

West Service Roads and Pasong Tamo Ext.

URPO 629.011 O 0.345 0.300 0.100 0.030 0.047 0.100 92.20 -

Cavite Ideal International Const. & Development

Corp.5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &

West Service Roads and Pasong Tamo Ext.

URPO 629.011 O 0.360 0.300 0.100 0.030 0.042 0.100 93.20 -

Cavite Ideal International Const. & Development

Corp.5599 Naga-Toledo Road Project

ARLDP Phase IV PJHL 802.856 C 0.378 0.300 0.300 - - - 97.80 97.02% Outstanding

CBN Construction & Supply 16851 Const. and Improvement of

Sibud Main Drainage NIA 6.299 O 0.369 0.216 0.150 0.030 0.064 0.050 87.86 -

CBN Construction & Supply 16851 Conc. of Jct. San Enrique-

Pontevedra By-Pass Road VI 9.245 C 0.367 0.200 0.300 - - - 86.70 85.59% V. Satisfactory

CBN Construction & Supply 16851

Replacement of Dilapidated Concrete/Concrete Paving of Jct. Dan Enriave-Pontevedra By Pass

Rd.

VI 4.542 C 0.371 0.300 0.300 - - - 97.10 90.92% Outstanding

CBN Construction & Supply 16851 Road Upgrading, Jct. Palencia-

Ara Al Campsite Road VI 6.510 C 0.319 0.214 0.300 - - - 83.30 84.62% V. Satisfactory

CBN Construction and Supply 16851

Replacement of Dilapidated Concrete/Concrete Paving of

Bago-Mailum-Mambucal-Canla-on Road

VI 6.141 C 0.301 0.100 0.300 - - - 70.10 80.42% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 84

Page 93: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

CCM Construction 11043 Tagbilaran Airport Development Project DOTC 6.704 C 0.456 0.200 0.300 - - - 95.60 95.60%

Very Satisfactory

CDC Construction and Supplies 28275 Completion of MPB @

Pamatawan III 0.470 C 0.294 0.194 0.300 - - - 78.80 *78.88% Satisfactory

CDC Construction and Supplies 28275 Const. of 1 Cl 1 Storey Sch.

Bldg. @ Manggahan E/S (Partial) III 0.492 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding

CDC Construction and Supplies 28275 Const. of 3 CL 1 Storey Sch.

Bldg. @ Balaybay E/S (Partial) III 1.319 C 0.346 0.290 0.300 - - - 93.60 *93.60% Outstanding

CDC Construction and Supplies 28275 Const. of 3 CL Sch. Bldg. @ San

Rafael E/S III 1.721 C 0.359 0.276 0.300 - - - 93.50 81.88% V. Satisfactory

CDC Construction and Supplies 28275 Const. of Box Culvert at Tambac-

Viga I 1.140 C 0.260 0.300 0.300 - - - 86.00 *86.00% V. Satisfactory

CDC Construction and Supplies 28275 Const. of MPB (Phase I) III 1.317 C 0.303 0.197 0.300 - - - 80.00 *80.00%

Satisfactory

CDC Construction and Supplies 28275 Const. of Multi-Purpose Bld., @

RMTI, RMTI Compound III 4.658 C 0.241 0.300 0.300 - - - 84.10 72.20% Satisfactory

CDC Construction and Supplies 28275 Const. of Multi-Purpose Building

(Phase I) I 0.948 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

CDC Construction and Supplies 28275 Const. of Sch. Bldg. @

Candelaria Sch. Of Fisheries III 0.490 C 0.306 0.300 0.300 - - - 90.60 *90.60% Outstanding

CDC Construction and Supplies 28275 Construction of Multi-Purpose

Building National High School III 1.853 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

CDC Construction and Supplies 28275 Repair/Rehab. Along Olongapo-

Bugallon Road III 9.800 C 0.304 0.000 0.300 - - - 60.40 *60.40% Fair

CDC Contruction and Supplies 28275 Const. of Multi-Purpose Bldg.

Ramon Magsaysay Tech. Inst. III 4.658 O 0.193 0.180 0.100 0.030 0.020 0.100 62.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 85

Page 94: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

CDC Contruction and Supplies 28275 Const. of Multi-Purpose Building I 0.949 C 0.352 - 0.500 - - - 85.20 *85.20%

V. Satisfactory

CDU Construction 13915 Const. of One CL School Building, Tarangnan NHS VIII 0.382 C 0.385 0.100 0.300 - - - 78.50 *78.50%

Satisfactory

C.E. Padilla Construction 11278 Guadalupe Viejo Linear Park cum Revetment Wall Project PRRC 49.604 O 0.390 0.297 0.100 0.030 0.049 0.100 96.60 -

Cebu 7H Technochem Industries, Inc. 31578 Impvt./Rehab. Along JCT. (TER)

Loay Interior Road VII 8.806 C 0.180 0.300 0.300 - - - 78.00 *78.00% Satisfactory

Cebu 7H Technochem Industries, Inc. 31578 Rehab. of Loay Interior Road/

Loboc-Bilar-Carmen Section VII 9.640 C 0.386 - 0.500 - - - 88.60 89.74% V. Satisfactory

Cebu Haydter Construction 31630Const. of Drainage System @ Brgys. San Nicolas and Basak

PardoVII 0.958 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

Cebu Young Construction 3195 Const. of Multi-Purpose Building @ Inayawan E/S VII 0.956 C 0.383 0.300 0.300 - - - 98.30 92.56%

Outstanding

Cedan Construction 10172 Asphalt Overlay along Olongapo-Bugallon Road Iba Section, Iba III 9.498 C 0.398 0.300 0.300 - - - 99.80 *99.80%

Outstanding

Cedan Construction 10172 Const. of Magsaysay Bridge I 4.799 C 0.365 0.300 0.300 - - - 96.50 79.16% Satisfactory

Cedan Construction 10172 Rehab. of La Paz Multi-Purpose Building III 1.408 C 0.427 - 0.500 - - - 92.70 *92.70%

Outstanding

Cedan Construction 10172 Rehab./Impvt. of Mogpog-Sta. Cruz Road (Phase I) IV-B 14.243 C 0.265 0.200 0.300 - - - 76.50 *76.50%

Satisfactory

Cedan Construction 10172

Rehab./Reconst. of Damaged National Road, Pangasinan-

Zambales Road (Sual & Infanta Sect.)

I 21.229 C 0.212 0.201 0.300 - - - 71.30 *71.30% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 86

Page 95: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cedan Construction 10172 Repair of Dikes along Alusiis Creek III 28.517 C 0.213 0.300 0.300 - - - 81.30 80.34%

V. Satisfactory

Cedar Construction 24865 Const. of Multi-Purpose Building III 0.948 C 0.317 0.300 0.300 - - - 91.70 85.40% V. Satisfactory

Cedar Construction 24865 Impvt. of Angeles-Porac-Dinalupihan Road III 9.601 C 0.236 0.300 0.300 - - - 83.60 90.26%

Outstanding

Cedar Construction 24865Impvt./Rehab. of Brgy. Roads at

Quebiawan, San Agustin & Dolores

III 6.656 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Cedar Construction 24865 Impvt./Rehab. of Cabalantian Road III 6.674 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Cedar Construction 24865Repair/Rehab. of Jose Abad

Santos Ave. (Formerly Gapan-Olongapo Road)

III 4.728 C 0.341 0.225 0.300 - - - 86.60 *86.60% V. Satisfactory

Cedar Construction 24865

Repair/Rehab. of Jose Abad Santos Ave. (Formerly Gapan-

Olongapo Road) Bacolor to City of San Fernando

III 4.771 C 0.346 0.226 0.300 - - - 87.20 *87.20% V. Satisfactory

Celso C. Ferrer Contractor 10643Conc. of Bambang-Kasibu-Quezon-Solano Road (San

Fernando Sect.)II 47.758 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -

Celso C. Ferrer Contractor 10643 Impvt./Conc. of Baler-Casiguran Road (Lobbot-Gupa Section) III 47.860 C 0.314 0.300 0.300 - - - 91.40 93.92 %

Outstanding

Central Mindanao Const. Multi-Purpose Cooperative 23697 Completion of 1-Unit PWSP XII 1.862 C 0.440 - 0.500 - - - 94.00 87.10%

V. Satisfactory

Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Footbridge XII 0.231 C 0.394 - 0.500 - - - 89.40 86.64%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 87

Page 96: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Kisante CES Multi

Purpose Bldg. XII 0.238 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial

Science and Technology H/S XII 1.907 O 0.211 0.300 0.100 0.030 0.016 0.067 72.40 -

Central Mindanao Const. Multi-Purpose Cooperative 23697

Slope Protection along Marbol River (Marbol Bridge),

Kidapawan Magpet-Pangao-an Road

XII 1.149 C 0.200 0.300 0.300 - - - 80.00 * 80.00% Satisfactory

Cesar T. Carpio Construction 20833 Const. of Two (2) CL School

Building @ Cawayan E/S VIII 0.861 C 0.349 0.200 0.300 - - - 84.90 77.97% Satisfactory

Cesar T. Carpio Construction 20833

Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-

Canjumadal Road

VIII 9.295 O 0.240 0.225 0.100 0.030 0.037 0.100 73.20 -

Cesar T. Carpio Construction 20833

Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-

Canjumadal Road

VIII 9.295 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -

Cesar T. Carpio Construction 20833 Reflectorized Road Pavement

Markings & Road Signs VIII 0.957 C 0.400 0.000 0.300 - - - 70.00 *70.00% Fair

Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-

Calbayog Road VIII 9.594 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -

CGGA Builders & Enterprises 23762 Completion of Multi-Purpose

Building VIII 0.232 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

CGGA Builders & Enterprises 23762 Conc. of Shoulder at Manlurip

Arthur Park Road VIII 1.897 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding

CGGA Builders & Enterprises 23762 Const. of Cabibihan Bridge VIII 4.960 C 0.245 0.200 0.300 - - - 74.50 72.10%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 88

Page 97: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

CGGA Builders & Enterprises 23762

Rehab. of Layog Bridge Approach along Maharlika

HighwayVIII 4.603 C 0.334 0.223 0.300 - - - 85.70 *85.70%

V. Satisfactory

CGI Construction 11346

Improvement of CICs in the Municipality of Ocampo,

Camarines Sur, namely; Gatibo, Hibago & San Antonio

NIA-V 2.362 C 0.400 0.300 0.000 - - - 70.00 *70.00% Fair

Cha Construction and Supply 28420 Const. of 2-CL School Bldg. V 0.923 C 0.444 - 0.500 - - - 94.40 78.34%

Satisfactory

Cha Construction and Supply 28420 Const. of 2-Rooms School Bldg. V 0.468 C 0.402 - 0.500 - - - 90.20 *90.20%

Outstanding

Cha Construction and Supply 28420 Const. of Multi-Purpose Building

at Camarines Sur H/S V 2.080 C 0.396 0.120 0.300 - - - 81.60 *81.60% V. Satisfactory

Cha Construction and Supply 28420 Repair of One CL Sch. Bldg., La

Purisima E/S V 0.283 C 0.387 0.200 0.300 - - - 88.70 *88.70% V. Satisfactory

Cha Construction and Supply 28420 Road Concreting at San Lucas-

Poro Access Road V 1.405 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding

Cha Construction and Supply 28420 Road Concreting at Talidtid-Sta.

Cruz V 1.891 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

Cha Construction and Supply 28420 Road Concreting of Bonot-Sta.

Rosa Road V 1.891 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory

Charlmelday Construction Supply & Services 32181 Rehabilitation of Sta. Cruz RIS NIA 4.531 C 0.364 0.18 0.300 - - - 84.40 84.40%

V. Satisfactory

Charlz Construction 8709 Completion of Brgy. Azucena MPB XIII 0.961 C 0.328 0.200 0.000 - - - 52.80 71.91%

Satisfactory

Charlz Construction 8709 Completion of MPB @ Brgy. 18 X 0.456 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 89

Page 98: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Charlz Construction 8709Conc. of N.G. Escario Extension

(from Gorordo Ave. to Arch. Reyes Ave.)

VII 7.715 O 0.309 0.300 0.100 0.030 0.040 0.100 87.90 -

Charlz Construction 8709Conc. of N.G. Escario Extension

(from Gorordo Ave. to Arch. Reyes Ave.)

VII 7.715 O 0.330 0.200 0.100 0.023 0.033 0.100 78.60 -

Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. VII 13.360 O 0.365 0.225 0.100 0.030 0.045 0.100 86.50 -

Charlz Construction 8709 Const. of 2-Cl Building @ Taglimao ES X 0.849 O 0.400 0.300 0.100 0.030 0.026 0.100 95.60 -

Charlz Construction 8709 Const. of 3 CL for the Camaman-an NHS X 1.402 C 0.348 0.184 0.300 - - - 83.20 *83.20%

V. Satisfactory

Charlz Construction 8709Const. of 3 Storey, 9 Cl

Secondary Sch. Bldg. @ Adlaon NHS

VII 5.711 C 0.364 0.300 0.300 - - - 96.40 88.35% V. Satisfactory

Charlz Construction 8709Const. of Covered Canal,

Misamis Oriental-Bukidnon-Agusan Road

X 4.729 C 0.290 0.200 0.300 - - - 79.00 81.64% V. Satisfactory

Charlz Construction 8709Const. of MPB Manolo Fortich

Municipal Hall Phase X, Calanawan

X 4.728 C 0.363 0.200 0.300 - - - 86.30 83.13% V. Satisfactory

Charlz Construction 8709

Const. of Pedestrian Overpass (Skywalk) across Imus St., near

Sikatuna St. Jct., Brgy. Zapatera-T. Padilla

VII 4.695 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Charlz Construction 8709 Const. of Tertiary Sch. Bldg. (NBCC Phase II) X 2.360 C 0.262 0.157 0.300 - - - 71.90 73.44%

Satisfactory

Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang

RoadX 22.146 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 90

Page 99: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang

RoadX 22.155 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -

Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building X 2.888 O 0.323 0.300 0.100 0.030 0.018 0.067 83.80 -

Charlz Construction 8709 Const. of Two-Storey DPWH Office Bldg. X 2.878 C 0.393 0.200 0.300 - - - 89.30 84.19%

V. Satisfactory

Charlz Construction 8709 Rehab./ Impv't. of DPWH 3rd DEO Bldg., Dicklum X 0.789 C 0.373 0.300 0.300 - - - 97.30 93.10%

Outstanding

Charlz Construction 8709

Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-

Binuangan Sect.)

X 38.539 O 0.243 0.300 0.050 0.030 0.047 0.033 70.30 -

Charlz Construction 8709

Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-

Binuangan Sect.)

X 38.539 O 0.263 0.300 0.100 0.030 0.050 0.100 84.30 -

Charlz Construction 8709

Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-

Binuangan Sect.)

X 38.527 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -

Charlz Construction 8709Replacement of Datu Bailey

Bridge to RCBC (Jct. Osmeña-Pilar Road)

XIII 11.567 C 0.328 0.300 0.000 - - - 62.80 69.70% Fair

Chedmaryl Construction & Supplies 27073 Const./Repair of MPB VI 1.903 C 0.289 0.000 0.300 - - - 58.90 76.75%

Satisfactory

Che-Riss Constructon & Trading 26557 Riprapping of Creek IVA 1.918 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 91

Page 100: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Chiara Construction 8736Const. of 18 lm. RCDG Bridge at

San Fernando City By Pass Road

I 9.409 O 0.333 0.266 0.100 0.030 0.025 0.067 82.10 -

Chiara Construction 8736Const. of 18 lm. RCDG Bridge at

San Fernando City By Pass Road

I 9.408 O 0.306 0.240 0.100 0.030 0.047 0.100 82.30 -

Chiara Construction 8736Const. of 18 lm. RCDG Bridge at

San Fernando City By Pass Road

I 9.399 O 0.289 0.215 0.100 0.022 0.027 0.100 75.30 -

Chiara Construction 8736Const. of Two (2) Storey

Building / Library at Tarlac State University, Lucinda Campus

III 14.416 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -

Chiara Construction 8736 Retrofitting of Kalibo Bridge Phase III VI 9.013 C 0.313 0.300 0.300 - - - 91.30 *91.30%

Outstanding

Chief Construct Trading & Supplies, Inc. 30094

Road Conc. of Provincial Road Cacarong Matanda-Pandi &

Daungan, Guiguinto, Bagong Silang

III 0.952 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory

China Geo-Engineering (Phil.) Corporation

SL2-SN-00054

Casecnan Multi-Purpose Irrigation & Power Project NIA 1,108.222 O 0.342 0.175 0.100 0.030 0.056 0.200 90.30 -

China Geo-Engineering (Phil.) Corporation

SL2-SN-00054

Const. of Super Diversion Canal(Sta. 19+200 to Sta.

26+600)NIA-III 1215.409 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -

China Geo-Engineering (Phils.) Corp. FC-03-020

Baguio-Aritao Road Impvt. Project CP II, Pangawan-Aritao-

Kayapa SectionPJHL 858.809 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

China Geo-Engineering (Phils.) Corporation FC-03-021 Casecnan Multi-purpose

Irrigation & Power Project-IC NIA 1.242 C 0.340 0.300 0.300 - - - 93.96 93.96% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 92

Page 101: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

China Geo-Engineering (Phils.) Corporation

SL2-SN-000459

MWCR-CP VI, Mamburao-Abra De Ilog Section PJHL 858.783 C 0.316 0.300 0.300 - - - 91.60 95.38%

Outstanding

China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-

Abatan, Phase V PJHL 682.000 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -

China International Water & Electric Company

SL1-SN-004851

Bago River Irrigation System Rehabilitation & Improvement

Project (Rehabilitation, Improvement and Cons. Of BRIS

Facilities)

NIA-VI 731.862 O 0.317 0.244 0.050 0.024 0.033 0.033 70.00 -

China International Water & Electric Corp.

FC-05-0003

IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &

Upper Ignore CreekMFCP-I 556.925 O 0.368 0.200 0.100 0.030 0.065 0.200 96.30 -

China International Water & Electric Corp. FC-03-028

IFCP Phase II, Package II, Impvt. of Jaro Mouth, Iloilo River &

Upper Ingore CreekMFCP-I 507.803 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -

China International Water & Electric Corp.

FC-05-0003

IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &

Upper Ingore CreekMFCP-I 549.395 O 0.383 0.200 0.100 0.030 0.061 0.200 97.40 -

China International Water & Electric Corp. FC-03-028

Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan

River Impv't. (East Bank) & Cut-off Channel

NIA 889.009 C 0.392 0.288 0.300 - - - 98.00 98.63% Outstanding

China International Water & Electric Corp. FC-03-028 Rehab. of Malalag-Malita-Jose

Abad Santos Road IBRD 533.694 C 0.393 0.300 0.300 - - - 99.30 97.53% Outstanding

China International Water & Electric Corporation

SL1-SN-004851

Bago River Irrigation System Rehabilitation & Improvement

ProjectNIA 820.162 O 0.345 0.247 0.100 0.030 0.028 0.067 81.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 93

Page 102: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

China International Water & Electric Corporation

SLI-SN-004852

Casecnan Multi-purpose Irrigation & Power Project NIA 476.722 C 0.376 0.300 0.300 - - - 93.05 93.05%

Outstanding

China International Water and Electric Company

FC-06-004 FC-05-003

Bago River Irrigation System Rehabilitation & Improvement

ProjectNIA 731.861 O 0.317 0.244 0.05 0.024 0.033 0.033 70.10 -

China International Water and Electric Corporation

SL1-SN-004851

Bago River Irrigation System Rehabilitation Project NIA 7.037 O 0.349 0.153 0.000 0.024 0.033 0.133 69.20 69.20%

Fair

China National Constructional and

Agricultural Machinery Import and Export

Corporation (CAMC)

NO LICENSE

Banaoang Pump Irrigation Project NIA USD 38.475

M O 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -

China Road & Bridge Construction

SL2-SN-000479

CP 1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) PJHL 952.564 O 0.386 0.300 0.100 0.030 0.035 0.100 95.10 -

China Road & Bridge Corporation

SL2-SN-000479

Const./Impv't. of CP VIII, Bayawan-Kalumboyan Road

Project, Sta. 0+000-Sta.17+369.88RRNDP 211.007 C 0.368 0.300 0.300 - - - 96.80 94.22%

Outstanding

China Road & Bridge Corporation

SL-I-SN-004585/FC-

03-029

Contract Package I, Himayangan Silago Sect., Arterial road links

Dev't. Project, Phase IVPJHL 914.127 C 0.346 0.300 0.300 - - - 0.95 94.60%

Outstanding

China Road & Bridge Corporation

SL-2-SN-000631

Contract Package III, Calbayog-Gatanguit Road Sect., Arterial

road links Dev't. Project, Phase VI

PJHL 1,397.424 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 94

Page 103: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

China Road & Bridge Corporation

SL-2-SN-000631

Contract Package III, Calbayog-Gatanguit Road Sect., Arterial

road links Dev't. Project, Phase VI

PJHL 1,397.424 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -

China Road & Bridge Corporation

SL2-SN-000479

CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)

Km.175+423-Km.204+609/Km.0+000-

Km.50+537

PJHL 952.564 O 0.373 0.300 0.100 0.030 0.057 0.100 96.00 -

China Road & Bridge Corporation

SL2-SN-000479

CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)

Km.175+423-Km.204+609/Km.0+000-

Km.50+537

PJHL 1,135.918 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -

China Road & Bridge Corporation

SL2-SN-000479

CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)

Km.175+423-Km.204+609/Km.0+000-

Km.50+537

PJHL 1,135.918 O 0.349 0.300 0.100 0.030 0.070 0.100 94.90 -

China State (Phils.) Construction Eng'g. Corp. FC-02-072

CP 2, Catarman-Calbayog via Lope de Vega Road under the

Arterial Road Links Development Project, Phase V

PJHL 643.720 C 0.349 0.300 0.300 - - - 94.90 92.07% Outstanding

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project

(MMURTRIP), NLEX Junction to North Fairview

URPO 486.343 O 0.271 0.250 0.100 0.020 0.060 0.100 80.10 -

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project

(MMURTRIP), NLEX Junction to North Fairview

URPO 486.343 O 0.360 0.243 0.100 0.030 0.047 0.100 88.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 95

Page 104: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project

(MMURTRIP), NLEX Junction to North Fairview

URPO 606.345 O 0.340 0.300 0.050 0.030 0.056 0.067 84.30 -

China State (Phils.) Construction Eng'g. Corp. FC-98-270 Const. of Package 6PY-1 ADB 706.209 C 0.466 - 0.500 - - - 96.60 92.04%

Outstanding

China State (Phils.) Construction Engineering

Corp.

SL1-SN-004314/FC-

02-072

CP 2, Catarman-Calbayog via Lope de Vega Road under the

Arterial Road Links Development Project, Phase V

PJHL 621.279 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -

China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)

SL1-SN-004611/FC-

03-045

Metro Manila Urban Transport Integration Project (MMURTRIP),

Phase I, Package 3: Marikina Bridge and Access Road

URPO 1,178.833 C 0.387 0.300 0.300 - - - 98.70 94.56% Outstanding

China State Construction Engineering Corporation FC-02-039 Casecnan Multi-purpose

Irrigation & Power ProjectCasecnan

MIPP 562.647 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding

China State Construction Engineering Corporation FC-02-039

CP 1, Alegria-Santiago Sect. Under the PJHL, Mindanao Sect.

Rehab. Project, Phase IIPJHL 540.791 C 0.384 0.300 0.300 - - - 98.40 96.56%

Outstanding

Chivas Construction 28316 Rehabilitation of Abra-Kalinga Road, Km.434+960-Km.435+260 CAR 1.872 O 0.371 - 0.500 - - - 87.10 -

CHL Construction and Development Enterprises,

Inc.15001

Conc./Widening of Marbel-Tupi-Makar Road (Glamang-Silway 8

Section)XII 8.674 C 0.385 0.214 0.300 - - - 89.90 88.22%

V. Satisfactory

CHL Construction and Development Enterprises,

Inc.15001 Const. of Circumferential Road

(Western Section) XII 3.822 C 0.328 0.285 0.300 - - - 91.30 *91.30% Outstanding

Cholo Construction & Trading 32138 Const./Conc./Rehab./Completion

of San Miguel Brgy. Road III 0.472 C 0.328 0.200 0.300 - - - 82.80 81.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 96

Page 105: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cholo Construction & Trading 32138 Const./Repair/Completion of San

Juan FMR III 0.952 C 0.298 0.300 0.300 - - - 89.80 *89.80% V. Satisfactory

Cholo Construction & Trading 32138 Const./Repair/Completion of San

Vicente Brgy. Road III 0.380 C 0.339 0.300 0.300 - - - 93.90 *93.90% Outstanding

Chris-James Construction 11202Conc. Reblocking along Ferry Terminal-San Juan Section,

Ferry Terminal-Caglanipao Rd. VIII 6.921 C 0.165 0.300 0.300 - - - 76.50 60.60%

Fair

Chris-James Construction 11202 Repair/Rehab. of Roadslip along Maharlika Highway VIII 4.678 O 0.267 0.145 0.100 0.015 0.013 0.100 64.00 -

Christian Ian Construction Corporation 8191 Completion of Sports Complex

@ North Cental E/S III 52.383 O 0.399 0.300 0.100 0.030 0.040 0.100 96.90 -

Christian Ian Construction Corporation 8191

Impvt./Widening of McArthur Highway Phase III, Package IV, Replacement of Tiaong Bridge

III 38.596 C 0.240 0.180 0.300 - - - 72.00 *72.00% Satisfactory

Christian Ian Construction Corporation 8191

Rehab./Replacement of San Luis Bridge and Approaches along San Luis-Sto. Domingo Road

III 113.144 O 0.382 0.201 0.100 0.030 0.037 0.100 85.00 -

Cielito A. Bay-ag Construction 19032

Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road,

Tadji-Runruno Section, Km. 312+300-Km.312+380

II 0.954 C 0.339 0.300 0.300 - - - 93.90 86.76% V. Satisfactory

Cielito A. Bay-ag Construction 19032 Const. of FMR @ Brgy. Yaway II 0.282 C 0.309 0.200 0.300 - - - 80.90 *80.90%

V. Satisfactory

Cielito A. Bay-ag Construction 19032 Const./Completion of Multi-

Purpose Bldg. at Kayapa H/S II 0.909 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano

Road (SA #1)II 234.155 O 0.400 0.296 0.100 0.030 0.060 0.100 98.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 97

Page 106: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano

Road (SA #1)II 198.304 O 0.350 0.263 0.100 0.030 0.032 0.100 87.50 -

Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano

Road (SA #2)II 234.155 O 0.391 0.300 0.100 0.030 0.061 0.067 94.90 -

Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfina Albano

RoadII 198.304 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -

Ciriaco Corporation 6932Const. of Domalandan Bridge, Lingayen-Labrador Road (SA

#4 & #5)I 216.544 C 0.383 0.300 0.300 - - - 98.30 97.16%

Outstanding

Ciriaco Corporation 6932Const. of Domalandan Bridge, Lingayen-Labrador Road (SA

#4)I 77.193 C 0.354 0.300 0.300 - - - 95.40 93.72%

Outstanding

Ciriaco Corporation 6932

Reconstruction of Governor Generoso I (Bankerohan) Bridge over Davao River along Davao-

Cotabato Road McArthur Highway

XI 206.649 C 0.376 0.300 0.300 - - - 97.60 94.66% Outstanding

Clifford Construction Corporation 3724 Completion of Janipaan Bridge,

Phase II VI 12.494 C 0.365 0.300 0.300 - - - 96.50 96.11% Outstanding

Clifford Construction Corporation 3724 Completion of Pasanghilan

Bridge VI 6.431 C 0.348 0.300 0.000 - - - 64.80 70.50% Satisfactory

Clifford Construction Corporation 3724 Conc. of Iloilo East-West Road,

San Rafael-Passi Section VI 19.094 C 0.364 0.200 0.300 - - - 86.40 85.20% V. Satisfactory

Clifford Construction Corporation 3724

Conc. of Jct. Bancal-Leon-Antique Bdry. Road, Alimodian-

Leon SectionVI 4.833 C 0.294 0.226 0.300 - - - 82.00 85.30%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 98

Page 107: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Clifford Construction Corporation 3724 Const. of Altavas Bridge VI 15.755 C 0.349 0.230 0.000 - - - 57.90 69.92%

Fair

Clifford Construction Corporation 3724 Const. of Dumga Bridge VI 13.932 C 0.311 0.200 0.300 - - - 81.10 84.73%

V. Satisfactory

Clifford Construction Corporation 3724 Const. of Padanghilan Bridge

(Phase I) VI 4.868 C 0.333 0.300 0.300 - - - 93.30 87.14% V. Satisfactory

Clifford Construction Corporation 3724 Retrofitting/Underpinning of

Kalibo Bridge (Phase I) VI 4.801 C 0.356 0.300 0.300 - - - 95.60 92.72% Outstanding

CLTG Builders 16852 Concrete Revetment of Sasa Creek along Davao-Agusan Road XI 3.770 C 0.214 0.300 0.300 - - - 81.40 80.32%

V. Satisfactory

CLTG Builders 16852 Concreting of Road @ Purok Sagrada Familia, Brgy. Indangan XI 1.413 C 0.299 - 0.500 - - - 79.90 87.58%

V. Satisfactory

CLTG Builders 16852 Impv't/Conc. of Toril-Bayabas-Eden Road XI 2.788 C 0.340 0.300 0.300 - - - 94.00 92.80%

Outstanding

CLV Enterprises 18512 Completion of MPB (Phase III) X 0.267 C 0.367 0.231 0.300 - - - 89.80 *89.80% V. Satisfactory

CLV Enterprises 18512 Const. MPB (Phase II) @ Mabuhay X 0.942 O 0.328 0.300 0.100 0.015 0.032 0.067 84.20 -

CM Tan Construction (Formerly: CM Tan Const.

Supplies)28087 Const. of Bayan-Cabahian Farm-

to-Market Road XIII 13.790 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -

CM Tan Construction (Formerly: CM Tan Const.

Supplies)28087 Const./Widening of Dinagat-

Loreto Road (Busay-Pangi Sect.) XIII 2.500 C 0.320 0.300 0.000 - - - 62.00 67.88% Faiir

CM Tan Construction (Formerly: CM Tan Const.

Supplies)28087 Upgrading of Kong Street XIII 3.954 C 0.364 - 0.500 - - - 86.40 *86.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 99

Page 108: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Coastland Construction and Development Corp. 11487 Conc. of Bilawan Road XI 0.945 C 0.262 0.300 0.300 - - - 86.20 83.68%

V. Satisfactory

Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road

(Tawas-Taguibo Section) XI 14.021 O 0.287 0.289 0.100 0.030 0.060 0.100 86.60 -

Coastland Construction and Development Corp. 11487 Concreting of Magsaysay Road XI 1.130 O 0.361 0.240 0.100 0.020 0.051 0.100 87.20 -

Coastland Construction and Development Corp. 11487

Const./Impvt. of Poblacion-Pintatagan Section along Mati-

Tagum RoadXI 9.441 C 0.274 0.285 0.300 - - - 85.90 84.10%

V. Satisfactory

Coastland Construction and Development Corp. 11487 Impvt. of Manikling-Sigaboy

Road (Talisay-Launion Section) XI 6.931 C 0.256 0.277 0.300 - - - 83.30 90.44% Outstanding

Coastland Construction and Development Corp. 11487

Maint./Rehab. & Impv't. of National Roads of Davao

Oriental-Surigao del Sur Road, Piso Sect.

XI 9.784 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory

Cofejok Construction and Supply 27493 Competion of Multi-Purpose

Bldg., Lamba XII 1.036 C 0.360 0.300 0.300 - - - 96.00 90.19% Outstanding

Cofejok Construction and Supply 27493 Completion of MPB at Brgy.

Estrella XII 1.190 C 0.33 0.261 0.300 - - - 89.10 *89.10% V. Satisfactory

Cofejok Construction and Supply 27493

Completion of Multi-Purpose Building (Mini Gym) @ Tres de

MayoXII 1.420 O 0.331 0.227 0.100 0.020 0.040 0.100 81.80 -

Cofejok Construction and Supply 27493 Completion of Multi-Purpose

Building @ Pamantingan XII 0.289 C 0.315 0.300 0.300 - - - 91.50 *91.50% Outstanding

Cofejok Construction and Supply 27493 Const. of 1 CL Sch. Bldg. at San

Emmanuel NHS XII 0.492 C 0.399 0.131 0.300 - - - 83.00 *83.00% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of 2-Cl, Academic Bldg.

@ Davao del Sur NHS XI 0.658 C 0.393 - 0.500 - - - 89.30 90.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 100

Page 109: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Cofejok Construction and Supply 27493

Const. of 2-Storey Academic Bldg. @ Sta. Cruz NHS, Package

IR-XI 1.468 C 0.309 - 0.500 - - - 80.90 82.72%

V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB XI 1.714 C 0.332 0.200 0.300 - - - 83.20 88.03%

V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB @ Esperanza

NHS XII 0.922 C 0.33 0.257 0.300 - - - 88.70 86.04% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB @ New Panay

NHS XII 0.920 C 0.365 0.267 0.300 - - - 93.20 82.00% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB at Bayya E/S XII 0.481 C 0.374 0.072 0.300 - - - 74.60 81.46%

V. Satisfactory

Cofejok Construction and Supply 27493 Const. of Sch. Bldg. at Brgy.

Biwang E/S XII 0.461 C 0.281 0.072 0.300 - - - 65.30 *65.30% Fair

Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion XII 1.881 O 0.310 0.240 0.070 0.030 0.032 0.100 78.20 -

Cofejok Construction and Supply 27493 Renovation of Multi-Purpose

Bldg., Brgy. Poblacion CES XII 1.283 C 0.371 0.152 0.300 - - - 82.30 82.30% V. Satisfactory

Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial

Court Poblacion XII 0.288 O 0.351 0.240 0.100 0.030 0.021 0.100 84.20 -

Colina Construction 18841 Const. of 1 unit School Building V 0.461 C 0.286 0.200 0.300 - - - 78.60 *78.60% Satisfactory

Collera's Construction 13246 Conc. of Sta. Fe-San Isidro-Pulak Road VIII 4.748 O 0.310 0.272 0.100 0.030 0.033 0.100 84.50 -

Collera's Construction 13246 Concrete Paving of Sta. Fe-San Isidro-Pulak Road VIII 4.748 C 0.333 0.300 0.300 - - - 93.30 88.02%

V. Satisfactory

Collera's Construction 13246 Concreting of Critical Portion of National Circumferential Road VIII 3.832 C 0.418 - 0.500 - - - 91.80 61.32%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 101

Page 110: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Collera's Construction 13246Const. of Multi-Purpose Building

(ABC Hall) @ Palo Municipal Compound

VIII 1.446 C 0.388 0.300 0.300 - - - 98.80 *98.80% Outstanding

Collera's Construction 13246 Const. of Multi-Purpose Building (Inner Court) VIII 1.900 C 0.347 0.300 0.300 - - - 94.70 89.24%

V. Satisfactory

Collera's Construction 13246 Rehab. of Government Center Road Network VIII 9.640 C 0.370 0.200 0.300 - - - 87.00 86.76%

V. Satisfactory

Compass Rose Builders 27024 Conc. of Bua FMR CAR 0.189 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory

Compass Rose Builders 27024 Const. of Poblacion Water System Phase II CAR 0.939 C 0.365 0.000 0.300 - - - 66.50 *66.50%

Fair

Compass Rose Builders 27024Repair/Rehab. of Flood Control

along Kennon-Agat-National Road

CAR 4.619 C 0.244 0.235 0.300 - - - 77.90 *77.90% Satisfactory

Compass Rose Builders 27024 Repair/Rehab. of Pacalso E/S CAR 0.286 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge X 16.558 C 0.368 0.300 0.300 - - - 96.80 87.50%

V. Satisfactory

Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge

Approaches and Access Road X 29.128 C 0.356 0.252 0.300 - - - 90.80 88.82% V. Satisfactory

Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge XIII 28.876 C 0.286 0.300 0.300 - - - 88.60 90.61%

Outstanding

Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along

Surigao-Davao Coastal Road XIII 81.615 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -

Concepcion Basic Builders, Incorporated 5255 Const. of Tago-La Paz Bridge

along SDCR (Alternate Route) XIII 106.050 O 0.276 0.300 0.070 0.030 0.059 0.100 83.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 102

Page 111: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Concepcion Basic Builders, Incorporated 5255 Repair/Rehab. of Patin-ay Bridge

2, Agusan-Davao Road XIII 10.468 C 0.370 0.293 0.300 - - - 96.30 94.53% Outstanding

Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase I II 0.961 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase II II 0.770 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

Congimar Mechanical Services 31490 Repair/Rehab. of District

Hospital @ Bayambang I 0.373 C 0.287 0.300 0.300 - - - 88.70 89.61% V. Satisfactory

Constructicons, Inc. 31632 Conc. of Unisan-Panaon-Talaba-Summit Road IV-A 5.106 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

Constructicons, Inc. 31632 Rehab./Const. (Conc.) of Talaba-Summit-Panaon National Road IV-A 3.855 C 0.280 0.300 0.300 - - - 88.00 *88.00%

V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538

Conc. of Bual Bridge Approaches including Slope Protection along Makilala Jct.

National Road

XII 7.625 C 0.347 0.200 0.300 - - - 84.70 85.42% V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538

Const. of 1 unit 1 CL Modified Sch. Bldg., @ Ray Buenaventura

Sabulao Memorial E/SXII 0.515 C 0.374 0.233 0.300 - - - 90.70 *90.70%

Outstanding

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Access Road Dep-Ed XII 0.433 C 0.323 0.249 0.300 - - - 87.20 *87.20%

V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.070 0.030 0.028 0.133 86.10 -

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.015 0.023 0.000 63.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 103

Page 112: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.030 0.027 0.133 79.00 -

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Gabaldon Bldg. at

M'lang Pilot Central School XII 0.463 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538 Const. of MPB @ DTI Training

Center XII 0.477 C 0.378 0.300 0.300 - - - 97.80 *97.80% Outstanding

Constructor's Development Multi-Purpose Cooperative 31538

Const./ Completion of Multi-Purpose Bldg., at Senior Citizens

KinsanteXII 0.228 C 0.350 0.300 0.300 - - - 95.00 *95.00%

Outstanding

Constructor's Development Multi-Purpose Cooperative 31538

Const./Completion of Multi-Purpose Pavement Kampo Uno,

SaguingXII 0.159 C 0.371 0.300 0.300 - - - 97.10 *97.10%

Outstanding

Constructor's Development Multi-Purpose Cooperative 31538

Const./Completion of Multi-Purpose School Building (2-

Span Covered Court), Phase IIXII 0.466 C 0.369 0.300 0.300 - - - 96.90 *96.90%

Outstanding

Constructor's Development Multi-Purpose Cooperative 31538 Const./Completion of PWSP @

Purok 6 (Calzado) XII 0.528 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Crazy Cut Construction 18324 Completion of Baguio Health Center CAR 1.905 C 0.378 0.300 0.300 - - - 97.80 92.76%

Outstanding

Crazy Cut Construction 18324 Conc. of Outlook Drive, km. 254+887-Km. 254.987 CAR 2.892 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V.Satisfactory

Crazy Cut Construction 18324 Const. of Wanga FMR, Tetep-an CAR 4.786 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 104

Page 113: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Crazy Cut Construction 18324

Rehab. of Drainage Chanum Street & Lake Drive of Balili River Control along Manuel

Roxas St. & Flood Control along Brgy. Amparo Heights Camp 7

CAR 0.311 C 0.311 0.271 0.300 - - - 88.20 *88.20% V. Satisfactory

Crazy Cut Construction 18324 Repair of Maba-ay NHS Bldg. CAR 0.738 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory

CRDC Construction 29738 Repair/Rehab. of Various Sch. Bldgs., Tabiawan E/S IX 0.027 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -

Crest Construction 15240 Const. of San Pedro Bridge (Phase 1) II 4.782 C 0.343 0.300 0.300 - - - 94.30 94.72%

Outstanding

Crest Construction 15240 Const. of San Pedro Bridge (Phase II) II 14.322 C 0.371 0.200 0.300 - - - 87.10 87.55%

V. Satisfactory

Crishelle Construction 17108 Completion of Multi-Purpose Building IV-B 0.369 C 0.396 0.238 0.300 - - - 93.40 *93.04%

Outstanding

Crishelle Construction 17108 Concreting of Brgy Roads @ Brgy. Pancol IV-B 0.458 C 0.386 0.200 0.300 - - - 88.60 *88.60%

V. Satisfactory

Crishelle Construction 17108 Concreting of Palawan South Road with Exception IV-B 4.371 C 0.258 0.200 0.300 - - - 75.80 77.00%

Satisfactory

Crishelle Construction 17108 Const. of Line Canal IV-B 0.185 C 0.380 0.500 88.00 88.00% V. Satisfactory

Crishelle Construction 17108 Const. of Puerto Princesa Pilot E/S Phase II IV-B 1.077 C 0.397 0.200 0.300 - - - 89.70 *89.70%

V. Satisfactory

Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road IV-B 18.990 O 0.280 0.167 0.100 0.030 0.033 0.100 71.00 -

Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road IV-B 18.990 O 0.226 0.231 0.100 0.030 0.027 0.100 71.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 105

Page 114: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Crishelle Construction 17108

Repair of Slip & Installation of Slope Protection, Roxas-Taytay National Road Km. 174+885 &

Km. 174+895 & Km. 175+365-Km. 1755+385

IV-B 2.128 O 0.360 0.300 0.100 0.030 0.023 0.100 91.30 -

Crishelle Construction 17108Strengthening of General Luna Bridge along Puerto Princesa

South Road (PPSR)IV-B 4.792 C 0.285 0.200 0.300 - - - 78.50 78.50%

Satisfactory

CS Construction and Supply (Formerly: CS

Construction)24237 Const. of 1 unit 2 Cl Sch. Bldg.

@ Kawag III E/S XII 0.939 C 0.381 0.100 0.300 - - - 78.10 *78.10% Satisfactory

CS Construction and Supply (Formerly: CS

Construction)24237 Const. of 1 unit Sch. Bldg. @

Madanding NHS XII 0.462 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory

CS Construction and Supply (Formerly: CS

Construction)24237 Const. of MPB XII 2.892 C 0.315 0.264 0.300 - - - 87.90 *87.90%

V. Satisfactory

CS Construction and Supply (Formerly: CS

Construction)24237 Const. of MPB @ Brgy. Makat XII 0.463 C 0.385 0.300 0.300 - - - 98.50 *98.50%

Outstanding

CS Construction and Supply (Formerly: CS

Construction)24237 Road Upgrading, Panyalam

Section XII 14.306 O 0.186 0.300 0.100 0.030 0.027 0.100 74.30 -

CSR Construction and Supply (Formerly: CSR

Const.)14427 Const. of Rizal Flood Control IV-B 0.278 C 0.293 0.298 0.300 - - - 89.10 *89.10%

V.Satisfactory

CSR Construction and Supply ( Formerly: CSR

Const.)14427 Const. of Agnipa Multi-Purpose

Building IV-B 1.807 C 0.384 0.200 0.300 - - - 88.40 79.37% Satisfactory

CSR Construction and Supply ( Formerly: CSR

Const.)14427 Const. of Macario Molino

National High School IV-B 0.673 C 0.389 0.000 0.300 - - - 68.90 66.24% Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 106

Page 115: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

CTC Builder and Supplies Inc./Sunwest Const. & Dev.

Corp. (JV)JV-06-070 Const. of Dancalan Bridge V 57.031 O 0.367 0.240 0.050 0.020 0.019 0.067 76.30 -

CTC Builder and Supplies Inc./Sunwest Const. & Dev.

Corp. (JV)JV-06-070 Const. of Dancalan Bridge V 57.031 O 0.400 0.240 0.100 0.020 0.023 0.033 81.60 -

CTC Builder and Supplies Incorporated 12088

Asphalt Overlay of Daan Maharlika, Abuyog, Sorsogon

City-CasiguranV 22.210 C 0.367 0.200 0.300 - - - 86.70 80.40%

V. Satisfactory

CTC Builder and Supplies Incorporated 12088 Const. of Bucalbucalan Seawall V 0.941 C 0.275 0.200 0.300 - - - 77.50 *77.50%

Satisfactory

CTC Builder and Supplies Incorporated 12088 Rehab. of Buhatan Bridge,

Sorsogon-Casiguran Road V 9.403 C 0.264 0.200 0.300 - - - 76.40 81.68% V. Satisfactory

Culasi Gen. Mdsg. And Construction Services 22157 Const. of 2-CL Building at San

Roque E/S VI 0.735 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory

Currimao Integrated Builders Corporation 8738 Concreting of Sta. Cruz Road I 3.339 C 0.332 0.297 0.300 - - - 92.90 *92.90%

Outstanding

CVAP Construction 20410 Const. of Lined Canal V 0.139 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

CVAP Construction 20410 Repair/Repainting of Bicol Medical Center V 0.716 C 0.395 0.200 0.300 - - - 89.50 *89.50%

V. Satisfactory

D. Morales Engineering Works 8531 Const. of Multi-Purpose

Pavement VIII 0.473 C 0.368 0.221 0.300 - - - 88.90 *88.90% V. Satisfactory

D. Morales Engineering Works 8531 Construction of Multi-Purpose

Pavement VIII 0.473 C 0.307 0.144 0.300 - - - 75.10 *75.10% Satisfactory

D.C.E. Construction 29347 Const. of 3CL School Building @ Amulung H/S, Bayabat II 1.060 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 107

Page 116: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

D.C.E. Construction 29347 Const. of Conner Public Market CAR 4.611 C 0.375 0.290 0.300 - - - 96.50 87.14% V. Satisfactory

D.C.E. Construction 29347 Const. of Dagupan Flood Control CAR 4.766 C 0.398 0.200 0.300 - - - 89.80 86.62% V. Satisfactory

D.C.E. Construction 29347Implementation of Various

Projects under Package 9, Conc. of Gen. Luna-Mayangao Streets

CAR 1.888 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

D.C.E. Construction 29347Impv't. Concreting of Tabuk-

Tinglayan Road Bantay-Pinagan Section

CAR 4.763 O 0.325 0.240 0.070 0.023 0.037 0.067 76.20 -

D.C.E. Construction 29347Impv't. Concreting of Tabuk-

Tinglayan Road Bantay-Pinagan Section

CAR 4.763 O 0.319 0.289 0.050 0.015 0.038 0.033 74.40 -

D.C.M. Construction 5641Const. of Agus III Bridge

(Pumping Bridge) & Approaches, Phase III

X 19.418 O 0.351 0.300 0.100 0.030 0.016 0.100 89.70 -

D.C.M. Construction 5641Const. of Agus III Bridge

(Pumping Bridge) & Approaches, Phase III

X 19.418 O 0.358 0.300 0.100 0.015 0.018 0.100 89.10 -

D.G. Chico Trading & Construction Corporation 8748 Const. of MPB NCR 4.769 C 0.348 0.225 0.300 - - - 87.30 86.25%

V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of Maligaya NHS III 0.855 C 0.353 0.214 0.300 - - - 86.70 *86.70%

V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. Camp

Tinio III 2.574 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. San

Gregorio III 1.390 C 0.317 0.282 0.300 - - - 89.90 *89.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 108

Page 117: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

D.G. Sarmenta Construction 13024 Const. of MPB at Old Capital III 1.892 C 0.306 0.200 0.300 - - - 80.60 *80.60%

V. Satisfactory

D.G. Sarmenta Construction 13024

Const. of Multi-Purpose Bldg., (Gymnasium) Brgy. Bakod

BayanIII 1.655 C 0.373 0.300 0.300 - - - 97.30 *97.30%

Outstanding

D.G. Sarmenta Construction 13024 Rehab. of Peñaranda Flood

Control along Peñaranda River III 3.276 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory

D.G. Sarmenta Construction 13024 Rehab. of Tambo-Magpapalayok

Road III 7.398 C 0.293 0.300 0.300 - - - 89.30 *89.30% V. Satisfactory

D.G.O. Construction 6788 Completion of MPB @ Sto. Niño Brgy. CAR 0.938 C 0.308 0.206 0.300 - - - 81.40 *81.40%

V. Satisfactory

D.J.D. Construction 32217 Conc. of Enrile St. II 0.937 C 0.342 0.286 0.300 - - - 92.80 92.80% Outstanding

D.J.D. Construction 32217 Installation of two (2) lines RCCP, Magapit Mission Road II 0.348 C 0.400 0.100 0.300 - - - 80.00 * 80.00%

Satisfactory

D.K. Jocson Construction 6896Const. of Flood Control Project,

Approach "A" of Malabong Bridge

VI 8.455 C 0.343 0.200 0.300 - - - 84.30 82.20% V. Satisfactory

D.K. Jocson Construction 6896 Const. of One (1) Unit 3-CL SB @ Ramon Torres NHS VI 0.988 C 0.386 0.300 0.300 - - - 98.60 85.58%

V. Satisfactory

D.K. Jocson Construction 6896 Rehab./Conc. of Isabela-Guihulngan Road VI 14.306 C 0.283 0.200 0.300 - - - 78.30 80.34%

V. Satisfactory

D.L. Aureo Construction 24894 Const. of Multi-Purpose Building VIII 0.207 C 0.359 0.277 0.300 - - - 93.60 *93.60% Outstanding

D.L. Aureo Construction 24894 Const. of Seawall Barugo Boulevard VIII 0.376 C 0.292 0.200 0.300 - - - 79.20 *79.20%

Satisfactory

D.L. Aureo Construction 24894 Repair/Rehab. of 3 Cl Elem. Sch. Bldg. @ Panalaron C/S VIII 0.897 C 0.392 0.183 0.300 - - - 87.50 *87.50%

V. Satisfactory

D.M. Catignas Enterprises 20149 Asphalt Overlay of Road Zone III, IV, VI, VII IVA 1.911 C 0.294 0.300 0.300 - - - 89.40 *89.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 109

Page 118: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

D.M. Catignas Enterprises 20149 Const. of MPB at Brgy. San Isidro IVA 0.478 C 0.391 0.200 0.300 - - - 89.10 *89.10%

V. Satisfactory

D.M. Catignas Enterprises 20149 Const./Rehab. of Drainage System along CSCF Jct. IVA 1.504 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V.Satisfactory

D.M. House Const. Inc. 25810Asphalt Overlay along Gapan-San Fernando-Olongapo Road,

San Benito SectionIII 4.801 C 0.287 0.207 0.300 - - - 79.40 *79.40%

Satisfactory

D.M. House Const. Inc. 25810 Const. of Road III 2.340 C 0.227 0.300 0.300 - - - 82.70 *82.70% V.Satisfactory

D.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S III 0.940 C 0.339 0.173 0.300 - - - 81.20 *81.20% V.Satisfactory

D.M. House Const. Inc. 25810 Impvt./Rehab. of Roman Expressway III 72.568 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

D.M. House Const. Inc. 25810Rehab. & Impv't. of Angeles-

Porac-Floridablanca-Dinalupihan Road

III 14.925 C 0.215 0.293 0.300 - - - 80.80 *80.80% V.Satisfactory

D.M. House Const. Inc. 25810Repair/Rehab. of Slope

Protection along along Tenejero River Control

III 1.494 C 0.357 0.137 0.300 - - - 79.40 *79.40% Satisfactory

D.M. House Const. Inc. 25810Repair/Rehab. of Slope

Protection along Pentor-Balsik River Sta. Isabel Section)

III 1.417 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

D.M. Wenceslao & Associates, Inc. 150

Widening of R-10 Road Project Marala Bridge and its

ApproachesNCR 68.073 C 0.153 0.200 0.000 - - - 35.30 64.66%

Fair

D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Montalban Heights NHS IVA 5.000 C 0.377 0.200 0.300 - - - 87.70 *87.70%

V. Satisfactory

D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Morong NHS IVA 5.000 C 0.372 0.280 0.300 - - - 95.20 90.09%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 110

Page 119: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

D.R. Robles Construction 28559 Const. of River Control @ Brgy. J.P. Rizal IV-A 2.866 C 0.267 0.200 0.300 - - - 76.70 77.54%

Satisfactory

D.R. Robles Construction 28559 Rehab. of Assencion, Zarzuela, Sagada Sts. & Various Roads NCR 9.548 C 0.228 0.300 0.300 - - - 82.80 *82.80%

V. Satisfactory

D.R. Robles Construction 28559 Rehab. of San Jose-Rodriguez-Quezon City Road IV-A 9.582 C 0.328 0.200 0.300 - - - 82.80 *82.80%

V.Satisfactory

D.R. Robles Construction 28559 Repair and Maintenance of Sagbat-Pililia Diversion Road IV-A 1.705 C 0.373 0.300 0.300 - - - 97.30 87.10%

V. Satisfactory

D.R. Robles Construction 28559 Riprapping of Angono River (Phase IV) IV-A 2.881 C 0.293 0.300 0.300 - - - 89.30 *89.30%

V. Satisfactory

D.S.B. Construction and Supply 16126 Rehabilitation/Renovation of

Multi-Purpose Building NCR 3.772 C 0.388 0.300 0.300 - - - 98.80 84.45% V. Satisfactory

D.V. Salud Construction 6564 Construction of a 3-storey School Building SLB-LPO 18.889 C 0.387 0.300 0.300 - - - 98.70 98.70%

Outstanding

D.W. G & A Developers 27573 Const. of Flood Control @ Hibalyo VII 0.906 O 0.213 - 0.200 0.000 0.031 0.250 69.40 -

D.W. G & A Developers 27573 Const. of Seawall VII 0.458 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

D.W. G & A Developers 27573 Const./Repair of Seawall at Guihulngan VII 0.365 C 0.307 0.300 0.300 - - - 90.70 *90.70%

Outstanding

Dadoy Freight Services Construction & Supply 28465 Conc. of San Andres-Calatrava

Road (Agpudlos Section) IV-B 0.914 O 0.341 0.135 0.100 0.030 0.022 0.100 72.80 -

Dadoy Freight Services Construction & Supply 28465 Const. of RSC Alumni Library

Building IV-B 0.571 C 0.309 0.278 0.300 - - - 88.70 * 88.70% V. Satisfactory

Dadoy Freight Services Construction & Supply 28465

Repair & Rehab. of access roads to Tugdan Airport to Poblacion

AlcantaraIV-B 9.998 C 0.353 0.300 0.300 - - - 95.30 *95.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 111

Page 120: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Daewoo Engineering & Construction Company,

Ltd.FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,

Phase II

NIA 1,156.435 O 0.367 0.195 0.100 0.030 0.065 0.200 95.70 -

Daewoo Engineering & Construction Company,

Ltd.FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,

Phase II

NIA 1,156.435 O 0.364 0.200 0.100 0.030 0.065 0.200 95.90 -

Daewoo Engineering & Construction Company,

Ltd.FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,

Phase II

NIA 1,480.299 O 0.365 0.200 0.100 0.030 0.070 0.200 96.50 -

Daewoo Engineering & Construction Company,

Ltd.

FC-03-047/SL2-

SN-000411

CP II, Phil-Japan Friendship Highway Mindanao Section

Rehab. Project, Phase II, (Km.130+100-Km.1376+805.34

PJHL 1,559.690 O 0.350 0.300 0.050 0.030 0.048 0.100 87.80 -

Daewoo Engineering & Construction Company,

Ltd.

SL2-SN-000543/FC-

98-113

Metro Manila Flood Control Project-West of Mangahan

Floodway, CP1NIA 740.742 O 0.316 0.200 0.100 0.024 0.061 0.200 90.10 -

Daewoo Engineering & Construction Company,

Ltd.

FC-98-113/SL2-

SN-000543

Metro Manila Flood Control Project-West of Mangahan

Floodway, CP1, MFCP I 725.017 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -

Daewoo Engineering & Construction Company,

Ltd.

SL2-SN-000544/FC-

01-047

Philippine-Japn Friendship Highway Mindanao Section,

Rehabilitation Project, Phase II, CP-II, Km.130+000-

Km.1376+805.34

PJHL 1,559.690 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 112

Page 121: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Daewoo Engineering & Construction Company,

Ltd.FC-03-047

Philippine-Japn Friendship Highway Mindanao Section,

Rehabilitation Project, Phase II, CP-II, Km.130+000-

Km.1376+805.34

XIII 1,559.690 O 0.393 0.295 0.050 0.030 0.070 0.067 90.50 -

Daewoo Engineering & Construction Company,

Ltd.FC-03-047

Philippine-Japn Friendship Highway Mindanao Section,

Rehabilitation Project, Phase II, CP-II, Km.130+000-

Km.1376+805.34

PJHL 1,586.357 O 0.350 0.300 0.100 0.030 0.056 0.100 93.60 -

Daewoo Engineering & Construction, Ltd. FC-03-047

Philippine-Japn Friendship Highway Mindanao Section,

Rehabilitation Project, Phase II, CP-II, Km.130+000-

Km.1376+805.34

PJHL 1,586.357 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -

Dahl Construction 8931 Completion of Concepcion Elementary School NCR 3.813 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

Dahl Construction 8931Const./Completion of MPB in

Brgy. Paso de Blas, Bagbaguin and Mapulang Lupa

NCR 1.507 C 0.304 0.200 0.300 - - - 80.40 *80.40% V.Satisfactory

Dahl Construction 8931 Rehab./Impvt. of Taytay Diversion Road IV-A 14.403 O 0.345 0.300 0.100 0.030 0.040 0.100 91.50 -

Dahl Construction 8931 Repair/Rehab. of C-3 Road inc. Drainage NCR 14.239 C 0.071 0.300 0.300 - - - 67.10 *67.10%

Fair

Dakay Construction & Development Corporation 8838 Dapitan Port Development

Project PPA 222.922 C 0.39 0.300 0.300 - - - 98.67 98.67% Outstanding

Dalanon Construction Refregiration Supply &

Service11205

Conc./Widening of Dulawan-Marbel Road (New Carmen Sect.

with Bridge Exception)XII 9.583 C 0.336 0.285 0.300 - - - 92.10 *92.10%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 113

Page 122: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Dalanon Construction Refregiration Supply &

Service11205 Road Upgrading along Sewod-

Bunay Section XII 18.937 O 0.344 0.300 0.100 0.030 0.032 0.100 90.60 -

Dalebo Construction & General Merchandise 32699 Const. of Drainage System at

San Rafael III IVA 0.239 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory

Damico Buildes & Supplies 30355 Const. of one (1) CL Sch. Bldg. at Aranguren E/S III 0.438 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

Damico Buildes & Supplies 30355 Const. of Water System at Brgy. Sta. Juliana III 0.472 C 0.309 0.300 0.300 - - - 90.90 89.64%

V. Satisfactory

Damico Buildes & Supplies 30355 Const./Completion/Repair and Rehab. Of MPB at PNRC III 0.904 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

Danfran Construction 28088Const. of MPB (for Police

Station) and other impvt. Within the area

NCR 1.190 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding

Danimerh Construction and Supply 17376 Const. of MPB (Block Tienda),

Poblacion Montevista XI 1.701 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

Danvic Construction 24439 Conc. of Additional 2 lanes along Davao City Diversion Road XI 3.516 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

Danvic Construction 24439 Const. of MPP for Package 1-D (Brgy. Dumoy & Brgy. Ballok) XI 0.753 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

Danvic Construction 24439 Const./Rehab. of School Bldg. @ Bucana E/S XI 1.408 C 0.383 0.300 0.300 - - - 98.30 *98.30%

Outstanding

Danvic Construction 24439Rehab./Impvt. of DPWH Davao

City 1st DEO Bldg. inc. Employees Quarters

XI 7.544 O 0.393 0.300 0.100 0.030 0.058 0.100 98.10 -

Darynn Construction & Supply 22322 Const. of 2 Cl Academic Sch.

Bldg. @ Dongan Pekong E/S XI 0.704 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 114

Page 123: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Darynn Construction & Supply 22322 Const. of MPB at Bitaug XI 1.714 O 0.257 0.296 0.100 0.030 0.045 0.100 82.80 -

Darynn Construction & Supply 22322 Const. of MPB at Brgy. 76-A XI 0.752 C 0.356 0.240 0.300 - - - 89.60 *89.60%

V. Satisfactory

Davao Concrete Products 12090Conc. of Additional 2 lanes along

F. Torres Jct. Bajada DCNHS Section

XI 4.621 C 0.270 0.300 0.300 - - - 87.00 92.28% Outstanding

Davao Concrete Products 12090 Conc. of Additional 2 lanes along Surigao-Davao Coastal Road XI 9.819 C 0.276 0.300 0.300 - - - 87.60 87.60%

V.Satisfactory

Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road XI 14.165 C 0.318 0.225 0.300 - - - 84.30 *84.30%

V. Satisfactory

Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road, Kaputian Sect. XI 19.287 C 0.346 0.300 0.300 - - - 94.60 87.58%

V. Satisfactory

Davao Concrete Products 12090 Const. of 3 Cl Academic @ Digos City NHS XI 1.247 C 0.369 0.300 0.300 - - - 96.90 *96.90%

Outstanding

Davao Concrete Products 12090 Const. of Flood Control Moralizon High School XI 4.245 C 0.240 0.300 0.300 - - - 84.00 84.48%

V. Satisfactory

Davao Concrete Products 12090 Const. of Hagonoy National High School (Padada Annex) XI 1.271 C 0.247 0.200 0.300 - - - 74.70 *74.70%

Satisfactory

Davao Concrete Products 12090 Impvt./Conc. Inawayan-Baracatan Road, Toril District XI 14.922 O 0.315 0.300 0.100 0.010 0.040 0.100 86.50 -

Davao Concrete Products 12090 Impvt./Rehab. of Agusan River Channel XI 14.448 C 0.345 0.300 0.300 - - - 94.50 88.98%

V. Satisfactory

Davao Concrete Products 12090Protection Works @ Pier 1& Pier 2 of Lasang Bridge along Davao

Road (Daang Maharlika)XI 8.489 C 0.294 0.300 0.300 - - - 89.40 88.74%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 115

Page 124: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A XI 18.880 O 0.383 0.300 0.100 0.030 0.052 0.100 96.50 -

Davao Concrete Products 12090 Repair/Rehab. of MPB Bldg. (DAPECOL Hospital) XI 4.151 O 0.396 0.287 0.100 0.030 0.038 0.100 95.10 -

Davao Concrete Products 12090Widening of Cotabato-Davao

National Road, Pob. Pagalungan Section

XII 5.436 C 0.323 0.300 0.000 - - - 62.30 54.71% Poor

Davao Contractors Development Cooperative

(DACODECO)28542 Conc. of Bucac Road Section

along Bucac-Marcelina Road XIII 2.810 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

Davao Contractors Development Cooperative

(DACODECO)28542 Conc. of Road at Brgy. Subasta XI 0.944 C 0.395 0.300 0.300 - - - 99.50 *99.50%

Outstanding

Davao Contractors Development Cooperative

(DACODECO)28542

Const. of 2 CL Mod. Single Storey School Bldg., At Manat

NHS Kao AnnexXI 0.802 C 0.351 0.200 0.300 - - - 85.10 62.70%

Fair

Davao Contractors Development Cooperative

(DACODECO)28542 Const. of Lined Canal XII 0.468 C 0.390 0.300 0.300 - - - 99.00 *99.00%

Outstanding

Davao Contractors Development Cooperative

(DACODECO)28542 Const. of MPB (Phase II) XIII 0.552 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Davao Contractors Development Cooperative

(DACODECO)28542 Const. of MPB, Brgy. Mabini XII 0.667 O 0.306 0.240 0.100 0.030 0.028 0.100 80.40 -

Davao Contractors Development Cooperative

(DACODECO)28542 Const. of N.N.C.H.S. Bldg.

(Phase V) XI 2.828 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 116

Page 125: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Davao Contractors Development Cooperative

(DACODECO)28542

Const. of one (1) unit concrete Multi-Purpose/Workshop Bldg.

@ Guadalupe CESXIII 1.514 C 0.368 0.300 0.000 - - - 66.80 *66.80%

Fair

Davao Contractors Development Cooperative

(DACODECO)28542 Const./Rehab. of Health Center

Building @ Brgy. Magupising XI 0.610 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding

Davao Contractors Development Cooperative

(DACODECO)28542 Impvt. of Riverbank Protection of

Hanipaan Bridge (Box Culvert) XIII 4.785 C 0.360 0.300 0.000 - - - 66.00 66.90% Fair

Davao Contractors Development Cooperative

(DACODECO)28542

Rehab. of San Benito-Sta. Monica Road Section, along

Dapa-Del Carmen-San Benito-Sta. Monica-Burgos-San Isidro

Road

XIII 4.815 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory

Davao Contractors Development Cooperative

(DACODECO)28542

Rehab./Impvt. of DPWH Davao del Norte DEO Bldg. inc.

Employees QuartersXI 9.642 O 0.382 0.249 0.100 0.030 0.035 0.100 89.60 -

Davao Contractors Development Cooperative

(DACODECO)28542

Repair/Rehab. Damaged Roadway Nabunturan-Mainit

Park RoadXI 2.408 C 0.304 0.232 0.300 - - - 83.60 84.98%

V. Satisfactory

Davao Contractors Development Cooperative

(DACODECO)28542 Repair/Rehab. of Tugpan PSCG

Bridge XIII 3.810 C 0.369 0.200 0.000 - - - 56.90 66.62% Fair

Davao Engineers Contractors Cooperative

(DECK)30944 Const. of 1 CL 1 Storey Bldg. @

Quezon E/S XI 0.465 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

Davao Engineers Contractors Cooperative

(DECK)30944 Const. of MPB at Brgy. Ma-a XI 0.375 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

Davao L.A. Parts & Hardware Corporation 27208 Conc. Reblocking of Digos

Diversion Road XI 4.821 C 0.360 0.300 0.300 - - - 96.00 95.34% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 117

Page 126: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Davao L.A. Parts & Hardware Corporation 27208 Const./Rehab. of FMR XI 2.824 C 0.301 0.219 0.300 - - - 82.00 *82.00%

V. Satisfactory

Davhez Trading and Construction 9833 Const./Completion of Las Pinas

Nat'l High School (Main) NCR 0.709 C 0.317 0.200 0.300 - - - 81.70 *81.70% V. Satisfactory

Davhez Trading and Construction 9833 Repair/Rehab. of School Bldg. at

Moonwalk E/S Phase 5 NCR 2.946 C 0.268 0.200 0.300 - - - 76.80 *76.80% Satisfactory

Daybreak Enterprises Engineering & Construction 30174

Package II-Const. of Multi-Purpose Building on Various

LocationVIII 1.275 O 0.269 0.225 0.100 0.020 0.032 0.100 74.60 -

Deabsres Construction & Supply 10392 Const. of 1 unit 7m x 9m Sch.

Bldg. @ Umingan NHS I 0.491 C 0.348 0.200 0.300 - - - 84.80 *84.80% V. Satisfactory

Deabsres Construction & Supply 10392 Const. of 6 Units S/B @ San

Vicente E/S I 0.428 C 0.369 0.256 0.300 - - - 92.50 83.89% V. Satisfactory

Decks Construction, Inc. 25860 Const. of MPB at Apitong IV-B 0.668 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Dela Cruz Construction and Supply 20775 Const. of Two (2) Cl, Bldg., San

Jose Pili H/S V 0.962 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Design Setter Construction Corporation 32136 Const. of Overpass in Agusan

NHS, Agusan Phase I X 0.280 C 0.287 0.200 0.300 - - - 78.70 85.42% V. Satisfactory

Dhayang Construction Firm 12805 Const. of MPB, Brgy. Lanzuran IX 2.333 C 0.312 0.176 0.300 - - - 78.80 *78.80% Satisfactory

Digos Tesston Construction & Supplies 8921 Const. of FMR @ Baracata-Atan-

Awe-Sebulan Road XI 4.710 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -

Digos Tesston Construction & Supplies 8921 Impv't/Conc. of Lacson-Lamanan

Road XI 3.850 O 0.368 0.300 0.100 0.030 0.058 0.100 95.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 118

Page 127: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Digos Tesston Construction & Supplies

(Formerly: ACT Construction)

8921

Conc. of Additional 2-Lanes along Davao-Cotabato Road,

Talomo Intersection and Talomo Bridge Section

XI 5.394 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding

Digos Tesston Construction & Supplies

(Formerly: ACT Construction)

8921 Const./Completion of DPWH-DCSDEO Bldg., Tugbok District XI 9.635 O 0.376 0.279 0.100 0.030 0.047 0.050 88.20 -

Digos Tesston Construction & Supplies

(Formerly: ACT Construction)

8921 Impv't/Conc. of Lacson-Lamanan Road XI 3.850 C 0.355 0.300 0.300 - - - 95.50 95.50%

Outstanding

Dimson (Manila), Inc. 112 Const. of Jones 2 Bridge and Approaches II 111.929 C 0.354 0.300 0.300 - - - 95.40 86.02%

V. Satisfactory

Dimson (Manila), Inc. 112 Improvement/Widening of MNR Package I, Meycauayan III 88.097 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -

Diplahan Commercial & Construction 32037 Conc. of Tinungtungan along

Kauswagan-Lindag Road IX 0.953 C 0.272 0.300 0.300 - - - 87.20 90.86% Outstanding

Diplahan Commercial & Construction 32037 Const. of MPB (Covered Court) IX 0.931 C 0.302 0.300 0.300 - - - 90.20 61.50%

Fair

Diplahan Commercial & Construction 32037 Const. of MPB @ Poblacion

Malangas IX 0.128 C 0.343 0.162 0.300 - - - 80.50 *80.50% V. Satisfactory

Dipolog Top Construction and Devt. Corp. 6678 Const. of MPB IX 0.425 C 0.349 0.200 0.300 - - - 84.90 76.92%

Satisfactory

Dipolog Top Construction and Devt. Corp. 6678

Road Upgrading of Dipolog-Punta Dansullan-Sergio Osmeña

RoadIX 9.438 C 0.351 0.300 0.300 - - - 95.10 *95.10%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 119

Page 128: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

DL Enterprises 18155 Conc. of Ozamis City-Oroquieta City Road, Sinacaban Section X 19.014 O 0.275 0.300 0.000 0.030 0.047 0.100 75.20 -

DL Enterprises 18155 Conc. of Tudela Road (Municipal Ground) X 0.952 C 0.327 0.200 0.300 - - - 82.70 86.18%

V. Satisfactory

DL Enterprises 18155 Conc./Rehab. of FMR @ Sta. Cruz, Boniao & Maguiles Road IX 9.127 C 0.318 0.184 0.300 - - - 80.20 80.44%

V. Satisfactory

DL Enterprises 18155 Concreting of Roads at Brgy. Kinuman Sur X 0.952 C 0.329 0.282 0.300 - - - 91.10 87.92%

V. Satisfactory

DL Enterprises 18155

Const. of Classrooms @ Northern Mindanao State

College of Science & Technology

X 1.906 C 0.305 0.300 0.300 - - - 90.50 79.02% Satisfactory

DL Enterprises 18155 Const. of Road X 1.906 O 0.200 0.300 0.070 0.030 0.047 0.067 71.40 -

DL Enterprises 18155 Const. of Road X 1.906 O 0.267 0.240 0.100 0.015 0.040 0.067 72.90 -

DL Enterprises 18155 Const. of Tangub City-Don Victoriano Road X 22.914 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -

DL Enterprises 18155 Resurfacing of Unpaved Shoulder X 1.121 C 0.320 0.300 0.300 - - - 92.00 72.26%

Satisfactory

DMJ Construction & Supply 17211Asphalt Overlay along Amungan-

Palauig-Banlog Road, Iba Section

III 9.553 C 0.354 0.300 0.300 - - - 95.40 *95.40% Outstanding

DMJ Construction & Supply 17211 Asphalt Overlay along Olongapo-Bugallon Road III 13.576 C 0.355 0.194 0.300 - - - 84.90 *84.90%

V. Satisfactory

DMJ Construction & Supply 17211 Asphalt Overlay of Cabangan-Dolores Section III 9.554 C 0.364 0.207 0.300 - - - 87.10 *87.10%

V. Satisfactory

DMJ Construction & Supply 17211 Completion of RMTU Admin. Bldg. III 1.911 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 120

Page 129: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

DMJ Construction & Supply 17211

Completion/ Continuation of Unfinshed On-going Bridge

Matain Bridge along Olongapo-Bugallom Road-Phase II, Matain

III 10.706 C 0.301 0.261 0.300 - - - 86.20 89.08% V. Satisfactory

DMJ Construction & Supply 17211 Const. of 6 CL @ Uacon E/S III 4.243 C 0.330 0.290 0.300 - - - 92.00 *92.00% Outstanding

DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.366 0.273 0.100 0.030 0.039 0.067 87.50 -

DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.346 0.200 0.100 0.030 0.032 0.100 80.80 -

DMJ Construction & Supply 17211 Impvt./Conc. of Dingalan National Road III 18.803 C 0.355 0.194 0.300 - - - 84.90 *84.90%

V. Satisfactory

DMJ Construction & Supply 17211 Rehab. of Amungan-Palauig-Banlog Rd., Palauig Section III 19.011 C 0.317 0.300 0.300 - - - 91.70 *91.70%

Outstanding

DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.817 C 0.302 0.201 0.300 - - - 80.30 *80.60%

V. Satisfactory

DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.815 C 0.311 0.022 0.300 - - - 63.30 *63.30%

FairDMM Construction

Indsutries 31136 Const. of 6 Cl Sch. Bldg., Sta. Paz E/S (Pinamudlan E/S) VIII 2.283 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. SatisfactoryDMM Construction

Indsutries 31136 Redecking of Divisoria Bridge VIII 3.763 C 0.354 0.200 0.300 - - - 85.40 *85.40% V.Satisfactory

Dofel Construction 16333 Const. of FMR @ Lantian IX 1.861 C 0.310 0.265 0.300 - - - 87.50 67.76% Fair

Dofel Construction 16333 Const. of Molave Vocational Technical School Building IX 0.371 O 0.347 0.300 0.100 0.030 0.041 0.100 91.80 -

Domarax Construction and Development 5502 Const. of 1 Cl @ Claudia P.

Pimentel Memorial E/S XIII 0.443 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 121

Page 130: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Domarax Construction and Development 5502

Impvt. of Road Slip and other related activities, (Gamut-San

Miguel Sect.)XIII 3.850 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

Domvee Construction Corporation 19872

Rehab./Completion of CCR, Guinsiliban Sagay Road Section along Camiguin Circumferential

Road

X 1.850 C 0.320 0.300 0.000 - - - 62.00 53.81% Poor

Donber Construction & Supply 15334 Improvement of MASSBA PIS V 1.191 C 0.359 0.180 0.300 - - - 83.90 *83.87%

V. Satisfactory

Double L Construction & Development Enterprises 9834 Completion of MPB VII 1.282 C 0.270 0.241 0.300 - - - 81.10 *81.10%

V. Satisfactory

Double L Construction & Development Enterprises 9834

Conc. of Brgy. Roads a)Brgy. Cangmating, Sibulan b)Brgy.

Naiba, San JoseVII 0.944 C 0.254 0.300 0.300 - - - 85.40 *85.40%

V. Satisfactory

Double L Construction & Development Enterprises 9834 Conc. of Multi-Purpose

Pavement at Brgy. Poblacion VII 0.475 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding

Double L Construction & Development Enterprises 9834 Const. of Flood Control @

Maragondong VII 0.445 C 0.362 0.100 0.300 - - - 76.20 *76.20% Satisfactory

Double L Construction & Development Enterprises 9834 Const. of River Control, Brgy.

Tandayag VII 0.473 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Double L Construction & Development Enterprises 9834 Const. of Water System (Phase I) VII 9.497 C 0.307 0.300 0.300 - - - 90.70 93.04%

Outstanding

Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport

Road (Intermittent Section) VII 10.385 O 0.332 0.241 0.070 0.015 0.043 0.100 80.10 -

Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport

Road (Intermittent Section) VII 10.395 O 0.362 0.236 0.000 0.022 0.048 0.067 73.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 122

Page 131: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Double L Construction & Development Enterprises 9834 Widening of Dumaguete North

Road at Intermittent Section VII 21.558 C 0.306 0.284 0.300 - - - 89.00 *89.00% V. Satisfactory

Double L Construction and Development Enterprises 9834 Concreting of Bunga Brgy. Road VII 0.827 O 0.306 0.300 0.100 0.030 0.040 0.100 87.60 -

Double L Construction and Development Enterprises 9834

Const. of Ayuquitan Bridge & Approaches, Km.13.922 along

Dumaguete North RoadVII 10.417 C 0.242 0.300 0.000 - - - 54.20 72.24%

Satisfactory

Double R Double M Construction 25385 Const. of Cagayan River Control

@ Catayauan II 9.640 C 0.400 0.200 0.300 - - - 90.00 72.48% Satisfactory

Double R Double M Construction 25385

Reblocking of Road & Const. of Shoulder & Drainage with

SidewalkII 0.938 C 0.374 0.099 0.300 - - - 77.30 *77.30%

Satisfactory

Doulos Construction 30759Road Upgrading along Kalinga-Cagayan Road, Calanan-Enrile

SectionCAR 3.664 O 0.257 0.196 0.100 0.008 0.030 0.067 65.80 -

DQT Builders 7950 Conc. of Boac-Mogpog Nat'l Road (Bantauyan Section) IV-B 4.272 C 0.292 0.300 0.300 - - - 89.20 *89.20%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Infanta-Marikina Road,

Km. 130+843-Km. 130+078 IV-A 14.467 C 0.337 0.300 0.300 - - - 93.70 91.72% Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Kay Duke FMR IV-B 0.380 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Const./Repair of Mabuhay MPB IV-B 0.380 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950

Impvt. of Lucena Bdry.-Tayabas-Lucban-Sampaloc-Mauban Road

(Sampaloc Side)IV-A 19.199 O 0.269 0.300 0.100 0.030 0.030 0.100 82.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 123

Page 132: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

DQT Builders Corporation (Formerly:DQT Builders) 7950

Rehab. of Balagasan Bridge & App. Along Talaba-Summit-

Panaon National RoadIV-A 2.305 C 0.379 0.200 0.300 - - - 87.90 *87.90%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impv't of Infanta-

Dinahican Road IV-A 14.468 C 0.324 0.200 0.300 - - - 82.40 82.40% V.Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impvt. of MSR-Diversion

Road IV-A 18.216 C 0.381 0.300 0.300 - - - 98.10 93.96% Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950

Rehab./Reconstruction and Concrete Paving of Catanauan-Buenavista Nat'l Road Phase I-

Buenavista Sect.

IV-A 14.460 C 0.347 0.300 0.300 - - - 94.70 93.50% Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950 Widening/Asphalting of Luyang-

Poo-Lazi National Road VII 6.473 C 0.359 0.300 0.000 - - - 65.90 75.53% Satisfactory

DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 O 0.325 0.236 0.100 0.020 0.023 0.100 80.40 -

DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 O 0.318 0.240 0.070 0.030 0.028 0.067 75.30 -

DSB Construction and Supply 16126 Conc. of Mt. Mayon Park Road V 4.721 C 0.293 0.300 0.300 - - - 89.30 *89.30%

V. Satisfactory

DSB Construction and Supply 16126 Const. of San Lorenzo Lined

Canal V 0.375 C 0.345 0.100 0.300 - - - 74.50 *74.50% Satisfactory

DSB Construction and Supply 16126 Const. of Virac Seawall V 8.645 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

DSB Construction and Supply 16126 Repair/Rehab. of Virac Seawall V 4.736 C 0.370 0.200 0.300 - - - 87.00 79.74%

Satisfactory

DSB Construction and Supply 16126 Repair/Restoration of Concrete

Dike at Bulawan River V 14.260 C 0.340 0.200 0.300 - - - 84.00 84.00% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 124

Page 133: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

DSB Construction and Supply 16126 Repair/Restoration of Concrete

Revetment of Baclayon V 9.500 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding

DSB Construction and Supply 16126 Road Opening of Tanawan-

Cumagingking Falls V 28.505 C 0.372 0.286 0.300 - - - 95.80 93.52% Outstanding

DSB Construction and Supply, Inc. (Formerly: DSB

Const. & Supply)16126 Const. of Multi-Purpose Center,

Tabaco NHS V 5.786 O 0.310 0.240 0.100 0.030 0.022 0.100 80.20 -

DSB Construction and Supply, Inc. (Formerly: DSB

Const. & Supply)16126 Const. of Multi-Purpose Center,

Tabaco NHS V 5.787 C 0.369 0.200 0.300 - - - 86.90 82.21% V. Satisfactory

DSO Enterprises 10733 Completion of School Bldg. IV-A 0.955 C 0.322 0.227 0.300 - - - 84.90 *84.90% V. Satisfactory

DSO Enterprises 10733 Conc. of CSCF Jct. Road, Pagsanjan Section IV-A 5.254 C 0.357 0.200 0.300 - - - 85.70 89.18%

V. Satisfactory

DSO Enterprises 10733 Const. of FMR @ Sitio Tanliwan IV-A 0.955 C 0.268 0.300 0.300 - - - 86.80 *86.80% V. Satisfactory

DSO Enterprises 10733 Const. of FMR at Sitio Bunliw IV-A 0.477 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory

Dungan Constructors & Trading 19301 Conc. of FMR @ Brgy. Buhilit III 0.611 C 0.341 0.196 0.300 - - - 83.70 *83.70%

V. Satisfactory

Duragold Trading & Const. -CDO Branch 31929 Const. of One (1) Storey Multi-

Purpose Bldg. X 0.471 C 0.392 0.300 0.300 - - - 99.20 92.13% Outstanding

Duros Development Corp. 22729

Impvt./Asphalting and Widening of Cebu-Toledo Wharf Road (Central Nautical Highway), Tabunok-Lagtang Section

VII 19.575 C 0.218 0.300 0.300 - - - 81.80 79.64% Satisfactory

Duros Development Corp. 22729 Repair/Rehab. & Widening of Cansaga Bridge VII 11.388 C 0.400 0.100 0.300 - - - 80.00 86.54%

V. Satisfactory

DVB Construction 23769 Const. of Drainage Canal @ Brgy. Manloy VIII 0.188 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 125

Page 134: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Impv't./Widening of Bacolod South Kabankalan Road,

Km.4+953 - Km.5+420VI 17.790 C 0.276 0.300 0.000 - - - 57.60 78.04%

Satisfactory

Dynamic Builders & Construction Co., (Phil.),

Inc.24712 Reblocking of Bacolod

Circumferential Road VI 19.046 C 0.249 0.200 0.300 - - - 74.90 79.72% Satisfactory

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Repair & Maintenance Road, Highways & Bridges at Bacolod

Circumferential Rd. VI 19.040 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Widening/Impvt. of Bacolod South Kabankalan Road,

Km.5+200 - Km.5+775.5 with exception

VI 9.538 C 0.370 0.290 0.300 - - - 96.00 96.56% Outstanding

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Widening/Impvt. of Bacolod South Kabankalan Road,Tangub

Section, Km.5+775.5- Km.5+937.5 with exception

VI 9.384 O 0.390 0.225 0.100 0.023 0.047 0.067 85.20 -

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Widening/Impvt. of Bacolod South Kabankalan Road,Tangub

Section, Km.5+775.5- Km.5+937.5 with exception

VI 9.384 O 0.385 0.248 0.100 0.030 0.050 0.100 91.30 -

Dynamic Builders & Construction Co., (Phil.),

Inc.24712

Widening/Impvt. of Bacolod South Kabankalan Road,Tangub

Section, Km.5+775.5- Km.5+937.5 with exception

VI 9.476 O 0.288 0.225 0.100 0.015 0.047 0.050 72.50 -

E & D Construction 32064Conc. Widening of Cotabato-Alla-

Marbel-General Santos Road, Malagapas Section

XII 4.824 C 0.345 0.300 0.000 - - - 64.50 73.23% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 126

Page 135: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E & L Reyes Construction 15338 Conc. of Brgy. II Municipal Road VII 0.932 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

E & L Reyes Construction 15338 Conc. of Maya-Daanbantayan Road, Agujo Section VII 3.779 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

E & L Reyes Construction 15338 Const. of 1-unit 2 Cl High Sch. Bldg. at Samboan NHS VII 0.826 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

E & L Reyes Construction 15338 Const. of Getafe Public Market VII 1.895 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -

E & L Reyes Construction 15338 Const. of President C.P. Garcia H/S VII 0.452 C 0.334 0.300 0.300 - - - 93.40 85.00%

V. Satisfactory

E & L Reyes Construction 15338 Rehab. (Conc.) of Maria Antonia Village Road VII 0.740 C 0.313 0.300 0.300 - - - 91.30 *91.30%

Outstanding

E and D Construction 32064Conc. Widening of Cotabato-Alla-

Marbel-General Santos Road, Malagapas Section

XII 4.784 O 0.327 0.221 0.100 0.010 0.023 0.100 78.10 -

E and D Construction 32064Conc. Widening of Cotabato-Alla-

Marbel-General Santos Road, Malagapas Section

XII 4.784 O 0.346 0.240 0.100 0.022 0.025 0.067 80.00 -

E and D Construction 32064 Const. of MPB (DENR Building) XII 0.939 O 0.311 0.231 0.100 0.023 0.029 0.067 76.10 -

E and D Construction 32064 Const./Conc. of Lagundungan-Buaya-Buaya Road XII 4.815 C 0.343 0.200 0.300 - - - 84.30 79.92%

Satisfactory

E E I Corporation 333

NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St. Viaduct

and Ramp Structure (MSE Retaining Wall)

URPO 368.005 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -

E M L Construction & Trading 10151 Const. of Jetty Protection Walls

at the Mouth of Kalaklan River III 19.107 C 0.267 0.300 0.300 - - - 86.70 80.04% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 127

Page 136: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E M L Construction & Trading 10151 Impvt. of San Antonio-

Floridablanca Road III 4.758 C 0.371 0.300 0.300 - - - 97.10 *97.1% Outstanding

E M L Construction & Trading 10151 Rehab./Impvt./Asphalt Overlay of

Angeles-Magalang Road III 9.478 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

E M L Construction & Trading 10151 Repair/Rehab. of Porac Public

Market III 2.402 C 0.302 0.291 0.300 - - - 89.30 *89.30% V. Satisfactory

E S De Guzman Construction 17494 Const. of NVSU Multi-Purpose

Bldg., Phase III II 0.369 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

E S De Guzman Construction 17494 Const. of Pob. South MPB II 0.277 C 0.228 0.200 0.300 - - - 72.80 72.73%

SatisfactoryE S De Guzman

Construction 17494 Const. of Quirino MPB II 0.464 C 0.386 0.238 0.300 - - - 92.40 *92.40% Outstanding

E S De Guzman Construction 17494 Replacement of Oriwong Bridge

and Approaches II 7.123 C 0.398 0.300 0.000 - - - 69.80 80.18% V. Satisfactory

E. Cañeda Construction 22168 Conc. of Bogo-Polambato Wharf Road VII 9.313 C 0.296 0.110 0.300 - - - 70.60 *70.60%

Satisfactory

E. Cañeda Construction 22168 Road Conc. of Danglag-Garing Road VII 0.458 C 0.282 0.200 0.300 - - - 78.20 *78.20%

Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sipocot-Cabusao Road V 8.555 C 0.376 0.190 0.300 - - - 86.60 89.00%

V. Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of MPB @ Bonot V 0.948 C 0.389 0.138 0.300 - - - 82.70 85.85%

V. Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of Water System V 2.808 C 0.391 0.300 0.300 - - - 99.10 94.90%

Outstanding

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Reblocking of Road to Libmanan

form Daang Maharlika V 9.498 C 0.309 0.233 0.300 - - - 84.20 84.92% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 128

Page 137: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E. Gardiola Construction 17542

Asphalt Overlay/Rehab. of Manila-Batangas Rd., Malvar

Section, Brgy. San Fernando & Santiago Phase II

IVA 19.290 C 0.246 0.287 0.300 - - - 83.30 *83.30% V. Satisfactory

E. Gardiola Construction 17542 Const. of C-5 Ext. Proj., from SLEX to Sucat Road NCR 95.556 C 0.295 0.300 0.300 - - - 89.50 86.26%

V. Satisfactory

E. Gardiola Construction 17542 Impv't. of Road at Nangkaan-Ki Santol Road Phase II IVA 9.644 C 0.276 0.200 0.300 - - - 77.60 80.12%

V. Satisfactory

E. Gardiola Construction 17542Impvt./Rehab. Along San

Celestino-San Francisco-Sto. Toribio Rd.

IVA 9.642 C 0.362 0.254 0.300 - - - 91.60 *91.60% Outstanding

E. Gardiola Construction 17542 Impvt./Rehab. of Batangas-Quezon Road IVA 19.236 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Carmen Road III 9.553 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V.Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Circumferential Road III 9.553 C 0.293 0.300 0.300 - - - 89.30 *89.30%

V.Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Aplaya Sect. IVA 19.293 O 0.283 0.300 0.100 0.030 0.033 0.100 84.60 -

E. Garcia Construction and E. Garcia Gravel and Sand 7243 Naga Airport Development

Project PMS 43.333 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -

E. Guadiz Construction 27172Const. of 2-CL at Guilermo A.

Barsatan School of Arts & Trades

CAR 0.558 C 0.361 0.300 0.000 - - - 66.10 76.04% Satisfactory

E. Guadiz Construction 27172Const. of Marag Valley

Agricultural and Trade High School

CAR 0.559 C 0.344 0.300 0.000 - - - 64.40 81.34% V. Satisfactory

E. Lapus Enterprises 10813 Const. of Balangkas Road NCR 3.514 C 0.330 0.200 0.300 83.00 87.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 129

Page 138: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E. Lapuz Enterprises 10813 Const. of MP Building @ Sto. Tomas E/S III 3.029 C 0.385 0.176 0.300 - - - 86.10 *86.10%

V. Satisfactory

E. Lapuz Enterprises 10813

Impvt./Rehab. of Roads in Western Samar, Oquendo-Pilar Road, Sta. 00+000-Sta. 05+405

with exceptions

VIII 2.865 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

E. R. Venzon Construction 19013 PSHS BRC ACA I & DORM I PSHS 8.413 O 0.3994 0.233 0.100 0.020 0.030 0.070 85.24 -

E. Simba Marketing and Construction Supply 16398 Completion of MPB at Brgy. 36-D XI 0.939 C 0.345 0.268 0.300 - - - 91.30 *91.30%

Outstanding

E. Simba Marketing and Construction Supply 16398

Conc. of Sarangani-Davao del Sur Coastal Road (Kalatungan

Sect.)XII 5.645 C 0.311 0.300 0.000 - - - 61.10 60.30%

Fair

E.A. Igno Construction & Trading 32517 Construction of Classroom @

De Ocampo Elementary School IV-A 0.382 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory

E.A. Igno Construction & Trading 32517 Impvt. of MPB IV-A 0.478 C 0.374 0.291 0.300 - - - 96.50 *96.50%

Outstanding

E.A. Sancho Construction 5648 Const. of Adiangao Bridge # 1 and Approaches (Phase I) V 5.536 O 0.323 0.273 0.100 0.020 0.023 0.100 83.90 -

E.A. Sancho Construction 5648 Impvt.(Conc.) of Bolao-Balite-Cawaynan-Canayuman Road V 4.145 C 0.350 0.200 0.300 - - - 85.00 83.38%

V. Satisfactory

E.A. Sancho Construction 5648Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-

Salvacion RoadV 3.791 O 0.314 0.238 0.100 0.020 0.028 0.100 80.00 -

E.B.J.R. Construction 19780 Const. of 15 units Multi-Purpose Pavements (Ripang MPP) CAR 0.093 C 0.333 0.000 0.300 - - - 63.30 76.20%

Satisfactory

E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR CAR 0.458 C 0.377 0.240 0.300 - - - 91.70 *91.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 130

Page 139: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906

CP III, Iloilo East Coast-Capiz Road Improvement Project

Phase V, Estancia-Ajuy SectionPJHL 381.914 O 0.376 0.296 0.050 0.030 0.056 0.033 84.10 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906

CP III, Iloilo East Coast-Capiz Road Improvement Project

Phase V, Estancia-Ajuy SectionPJHL 496.473 O 0.252 0.300 0.100 0.030 0.046 0.100 82.80 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906

CP III, Iloilo East Coast-Capiz Road Improvement Project,

Estancia-Ajuy SectionPJHL 530.586 O 0.337 0.300 0.100 0.030 0.051 0.100 91.80 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906

CP III, Iloilo East Coast-Capiz Road Improvement Project,

Estancia-Ajuy SectionPJHL 530.586 O 0.377 0.300 0.100 0.030 0.056 0.100 96.30 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906 CP IV, Gatanguit-Calbiga Road

Sect. Phase IV PJHL 1,458.041 O 0.367 0.300 0.100 0.030 0.051 0.100 94.80 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906 CP IV, Gatanguit-Calbiga Road

Sect. Phase VI PJHL 1,458.041 O 0.372 0.300 0.100 0.018 0.065 0.100 95.50 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906 CP IV, Gatanguit-Calbiga Road

Sect. Phase VI PJHL 1,466.751 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna

Const.)11906 Road Leading to Subic Public

Market III 14.028 C 0.231 0.200 0.300 - - - 73.10 *73.10% Satisfactory

E.C. Samonte Construction 31019 Conc. of Sirawal Boulevard IX 1.846 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory

E.C. Samonte Construction 31019 Const. of MPB (Gymnasium) Phase III IX 0.944 C 0.370 0.274 0.300 - - - 94.40 *94.40%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 131

Page 140: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.C. Samonte Construction 31019 Impv't./Conc. Along Liloy-Labason Road (Lopoc Sect.) IX 2.771 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

E.C. Samonte Construction 31019Repair (w/ Const.) of Sitio

Binculan Road to Poblacion via Lumay

IX 0.926 C 0.306 0.024 0.300 - - - 63.00 78.78% Satisfactory

E.C. Timbancaya Enterprises 15244 Const. of 1 Cl @ Montevista E/S IV-B 0.367 C 0.348 0.300 0.300 - - - 94.80 *94.80%

OutstandingE.C. Timbancaya

Enterprises 15244 Const. of 1 Cl at Alimanguan NHS IV-B 0.368 C 0.354 0.133 0.300 - - - 78.70 *78.70%

Satisfactory

E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.297 0.200 0.100 0.023 0.033 0.200 85.30 -

E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.201 0.163 0.100 0.020 0.022 0.200 70.60 -

E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.217 0.120 0.030 0.020 0.032 0.067 48.60 -

E.D. Angas Construction 32106 Const./Impvt. of Multi Purpose Center VII 0.944 C 0.302 0.282 0.300 - - - 88.40 *88.40%

V. Satisfactory

E.D. Angas Construction 32106 Const./Repair of School Bldg. @ Campalanas H/S VII 0.469 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -

E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-

Egana-Sibalom Road VI 4.137 O 0.257 0.189 0.100 0.030 0.020 0.100 69.60 -

E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-

Egana-Sibalom Road VI 4.137 O 0.259 0.221 0.100 0.030 0.041 0.100 75.10 -

E.D. Denosta Construction & Supply 28355 Const. of 2 CL Tigbalua E/S VI 0.889 C 0.275 0.200 0.300 - - - 77.50 *77.50%

Satisfactory

E.D. Solano Construction & Engineering Services 14758 Const. of MPB (Brgy. Hall) Phase

2 @ Brgy. Pogo Grande I 0.668 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 132

Page 141: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.D. Tabangay Consruction 31978Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo

SectionIV-B 9.100 C 0.295 0.264 0.300 - - - 85.90 *85.90%

V. Satisfactory

E.D. Tabangay Consruction 31978 Const. of 1 Cl @Panitian National High School IV-B 0.424 C 0.370 0.300 0.300 - - - 97.00 *97.00%

Outstanding

E.D. Tabangay Consruction 31978 Const. of MPB Candawaga IV-B 0.408 C 0.318 0.268 0.300 - - - 88.60 *88.60% V. Satisfactory

E.D. Tabangay Consruction 31978 Const. of San Juan High School IV-B 0.424 C 0.379 0.300 0.300 - - - 97.90 72.00% Satisfactory

E.D. Tabangay Consruction 31978

Const./Repair of CY Dep-Ed Sch. Bldg. Projects, Various

Municipalities in Southern Palawan (Const of 1 CL S/B,

Narra NHS)

IV-B 0.549 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding

E.D. Tabangay Consruction 31978 Rehab. of Cross-Country Road IV-B 1.866 C 0.240 0.300 0.300 - - - 84.00 87.48% Satisfactory

E.D. Tabangay Const. / Bonifacio M. Carlos Const.

(JV)JV-07-099 Impvt. of Quezon-Punta Baja

Road IVB 18.950 O 0.320 0.150 0.100 0.030 0.033 0.100 73.30 -

E.D. Tabangay Const. / Bonifacio M. Carlos Const.

(JV)JV-07-099 Impvt. of Quezon-Punta Baja

Road IVB 18.950 O 0.265 0.231 0.100 0.030 0.038 0.100 76.40 -

E.G. Canabe Construction 27358 Const. of 1-CL Sch. Bldg. at A.S. Melgar NHS VIII 0.499 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

E.G. Canabe Construction 27358Const. of One (1) Storey 4-CL

H/S Bldg. Carigara NHS (Jugaban Annex),

VIII 1.888 C 0.375 0.221 0.300 - - - 89.60 *89.60% V. Satisfactory

E.H. Mantuhac Construction 21334

Const. of 1 unit 1 CL Modified Standard Sch. Bldg., Madugo

E/SVII 0.440 C 0.281 0.147 0.300 - - - 72.80 *72.80%

Satisfactory

E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Sch. Bldg.

@ Sinsing NHS VII 0.482 C 0.245 0.200 0.000 - - - 44.50 *44.50% Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 133

Page 142: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.H. Mantuhac Construction 21334

Const./Rehab./Replacement / Completion & Repair of Elem. &

Secondary SB, Matabang HSVII 0.488 C 0.187 0.300 0.300 - - - 78.70 *78.70%

Satisfactory

E.I. Templonuevo & Asso. Inc. 1090 Const. of Brgy Laguinbanwa

Road VI 2.409 C 0.301 0.286 0.300 - - - 88.70 86.06% V. Satisfactory

E.K.C. Construction & Aggregates 14833

Const. of Galap Bridge I and its Approaches Gurel-Bokod-

Kabayan-Abatan Road, LooCAR 13.979 C 0.378 0.300 0.300 - - - 97.80 90.60%

Outstanding

E.K.C. Construction & Aggregates 14833 Impvt. of Baguio-Bontoc-Banaue

Road CAR 13.750 O 0.329 0.240 0.000 0.020 0.035 0.033 65.70 -

E.K.C. Construction & Aggregates 14833 Repair/Rehab. Along Abatan-

Mankayan Road CAR 0.337 C 0.386 0.000 0.300 - - - 68.60 *68.60% Fair

E.L. Gomez Construction 31522 Rehab. of MPB @ Brgy. Lourdes Northwest III 0.189 C 0.387 0.145 0.300 - - - 83.20 *83.20%

V. Satisfactory

E.L. Torres Construction and Trading 31406 Completion of MPB along Zone

15 NCR 0.949 O 0.315 0.300 0.100 0.023 0.018 0.067 82.30 -

E.L. Torres Construction and Trading 31406 Repair of Roads & Drainage

along P. Jacinto St. NCR 0.555 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

E.L.R. Everybody's Construction 6336

Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, Lipa City

Section

IV-A 9.644 C 0.340 0.270 0.300 - - - 91.00 *91.00% Outstanding

E.M. Angeles Enterprises 10150 Const. of MPB at Brgy. Talon 2 NCR 1.912 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory

E.M. Aragon Enterprises 3314 Conc./Widening of Manila-Cavite Road IV-A 9.580 C 0.381 0.200 0.300 - - - 88.10 88.10%

V.Satisfactory

E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of

Governor's Drive, Dasmariñas-Carmona Road

IV-A 35.578 O 0.269 0.288 0.050 0.030 0.042 0.100 77.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 134

Page 143: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of

Governor's Drive, Dasmariñas-Carmona Road

IV-A 35.578 O 0.331 0.300 0.050 0.030 0.042 0.100 85.30 -

E.M. Bayatan Construction 21332 Const. of MPB Phase III @ NVPH II 1.745 C 0.312 0.200 0.300 - - - 81.20 *81.20% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Pawak P/S, 1 CL Sch. Bldg. II 0.406 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Phil. Science High Sch. Bldg. II 1.877 C 0.308 0.239 0.300 - - - 84.70 84.70%

V.Satisfactory

E.M. Bayatan Construction 21332 Const. of Quirino MPB II 0.470 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Solano MPB II 0.939 C 0.371 0.200 0.300 - - - 87.10 85.98% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Sta. Rosa MPB II 0.470 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory

E.M. Cuerpo 30963 San Joaquin Ferry Station and Linear Park Project PRRC 22.333 O 0.378 0.231 0.100 0.010 0.025 0.100 84.40 -

E.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project PRRC 11.379 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -

E.M. Palomares Construction 23471 Const. of Multi-Purpose Building I 0.950 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

E.M. Palomares Construction 23471

Impvt. of Gangal-Bazar-Sallapadan Bo. FMR Sallapadan

ARCCAR 12.255 C 0.286 0.300 0.300 - - - 88.60 80.04%

V. Satisfactory

E.P. Manantan Construction and

Development Corp.6457 Conc./Reblocking of Agusan-

Davao Road XI 9.949 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 135

Page 144: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.P. Manantan Construction and

Development Corp.6457

Const./Rehab./Replacement/Completion and Repair of Elem. Sch.

Bldg. at Luis Lina PSXI 2.035 C 0.322 0.273 0.300 - - - 89.50 *89.50%

V. Satisfactory

E.P. Manantan Construction and

Development Corp.6457 Impvt./Conc. of 4 lanes at

Tuganay Bridge & Approaches XI 7.699 C 0.336 0.200 0.300 - - - 83.60 83.60% V.Satisfactory

E.P. Manantan Construction and

Development Corp.6457

Rehab./Impv't. (Conc.) of La Fortuna-Tagum Terminal-Capitol-

Canocotan-Laureta Sect. XI 14.975 C 0.297 0.300 0.300 - - - 89.70 87.12%

V. Satisfactory

E.P.L. General Construction 15559 Conc. of Road, Zone 6, New San Roque V 0.937 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

E.P.L. General Construction 15559 Const. of 1Cl Sch. Bldg. @ Calabanga H/S V 0.439 C 0.335 0.237 0.300 - - - 87.20 *87.20%

V. Satisfactory

E.P.L. General Construction 15559

Const. of 2 Storey Sch. Bldg. with CR, roof Deck Complete

Electrical Fixtures and Paintings, Bell-San Francisco E/S

V 3.327 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

E.P.M. Construction 13307 Const. of 1 Storey 2 Cl Sch. Bldg. @ Luck E/S IV-A 0.858 C 0.334 0.300 0.300 - - - 93.40 *93.40%

Outstanding

E.R. Dela Cruz Construction & Supply 32158 Const. of Classroom @ Sto.

Rosario E/S III 0.951 C 0.337 0.168 0.300 - - - 80.50 * 80.50% V. Satisfactory

E.R. Dela Cruz Construction Supply 32158 Conc. of Brgy. Malabago Road III 0.944 C 0.286 0.200 0.300 - - - 78.60 *78.60%

Satisfactory

E.S.L. Builders and Parts Supply 9014 Const. of MPB @ Brgy. Camilmil IV-B 0.668 C 0.345 0.300 0.300 - - - 94.50 86.10%

V. Satisfactory

E.S.R. Construction and Supplies 10451 Gadakinsur CIP MOPIO 10.740 O 0.360 0.160 0.100 0.020 0.040 0.200 88.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 136

Page 145: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

E.S.R. Construction and Supplies 10451 Gadakinsur Communal Irrigation

Project, Package II MOPIO 13.049 O 0.371 0.160 0.050 0.010 0.050 0.200 84.11 -

E.T. Latawan Construction 13919 Const. of Tigil-Betwagan FMR CAR 4.765 C 0.361 0.254 0.300 - - - 91.50 93.00% Outstanding

E.T. Latawan Construction 13919 Impvt. of Mt. Data Bridge along Baguio-Bontoc CAR 9.263 C 0.371 0.100 0.300 - - - 77.10 74.72%

Satisfactory

E.T.V.R. Trading and Construction 14581

Conc. of CNR, San Teodoro-Puerto Galera Road, Hasmin

SectionIV-B 16.260 C 0.360 0.200 0.300 - - - 86.00 90.02%

Outstanding

E.T.V.R. Trading and Construction 14581 Rehab./Impvt. of DPWH Office

Bldg., Regional Office XI 19.250 O 0.389 0.300 0.100 0.030 0.058 0.100 97.70 -

E.U. Jingco Construction 31486 Proposed Access Road-PUP Main SPO 2.487 O 0.399 0.154 0.070 0.023 0.023 0.033 70.20 -

E.U. Jingco Construction 31486 Proposed Access Road-PUP Main SPO 2.487 C 0.400 0.241 0.300 - - - 94.10 94.10%

V. Satisfactory

EA-EC Constuction 15737 Completion of MPB V 0.376 C 0.340 0.200 0.300 - - - 84.00 81.48% V. Satisfactory

EA-EC Constuction 15737 Const. of 1 CL Rm. Modified Sch. Bldg. V 0.531 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

EA-EC Constuction 15737 Const. of Flood Control V 2.088 C 0.307 0.100 0.300 - - - 70.70 *70.70% Satisfactory

Earl Construction 8461 Const. of 2 Storey MPB @ Block 38 Brgy. Addition Hills NCR 19.096 C 0.361 0.300 0.300 - - - 96.10 85.95%

V. Satisfactory

Eastern Construction Company, Inc. 2225 Completion of MPB @ Cainta

Green Park IVA 2.395 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 137

Page 146: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

EBJR Construction 19780 Const. of Baluan-Mawigui-Allanguigan Road CAR 1.413 C 0.280 0.300 0.300 - - - 88.00 91.18%

Outstanding

EC Samonte Construction 31019 Conc. of Sirawai Boulevard (Phase II) IX 1.908 C 0.298 0.052 0.300 - - - 65.00 75.02%

Satisfactory

EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc IX 28.654 O 0.304 0.238 0.100 0.030 0.025 0.067 76.40 -

ECDA Construction 7013 Channeling Works @ Sta. Lucia Creek III 0.473 C 0.298 0.257 0.300 - - - 85.50 *85.50%

V.Satisfactory

ECDA Construction 7013 Rehab. of Road Network Poblacion Floridablanca III 0.474 C 0.313 0.100 0.300 - - - 71.30 *71.30%

Satisfactory

Ecpiatos Construction and Supply 31540 Const. of Caramcam Bridge XIII 3.693 C 0.213 0.300 0.300 - - - 81.30 76.47%

Satisfactory

Ed Fabro Construction 18726Rehab. of Damaged Cover & Sidewalk of North & South

Central Sch.I 0.760 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Ed Fabro Construction 18726Rehab. of Multi-Purpose Pavement @ PNR, Biday-

Mameltac and BangbangolanI 1.882 O 0.376 0.200 0.100 0.030 0.022 0.100 82.80 -

Ed Ting Builders and Construction Supply 26199 Const. of San Jose-Trento Road

Boundary XIII 9.180 C 0.186 0.300 0.000 - - - 48.60 65.13% Fair

Eddie G. Guillen Builders 14174 Conc. of Appari Airport Road II 2.150 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

Eddie G. Guillen Builders 14174 Conc. of Dugo-San Vicente Road with Drainage II 13.174 C 0.355 0.200 0.300 - - - 85.50 87.72%

V. Satisfactory

Eddie G. Guillen Builders 14174 Conc. of M. Antiporda Road, Municipal St. II 0.945 C 0.249 0.168 0.300 - - - 71.70 *71.70%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 138

Page 147: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Eddie G. Guillen Builders 14174Conc. Paving of Jct. Dibalio-

Calanasan Road, Phase VI, San Antonio Section

II 4.512 C 0.297 0.300 0.300 - - - 89.70 87.66% V. Satisfactory

Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road II 14.215 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -

Eddie G. Guillen Builders 14174 Concreting of Road Leading to Cagayan State University II 2.849 C 0.321 0.210 0.300 - - - 83.10 82.08%

V. Satisfactory

Eddie G. Guillen Builders 14174 Const. of Tupang River Control II 4.699 C 0.373 0.300 0.300 - - - 97.30 75.10% Satisfactory

Eddmari Construction and Trading 20301 Sct. Ranger Housing Project,

Phase IV NHA 46.983 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -

Eddmari Construction and Trading 20301

Asphalting of Arayat-Apalit-Masantol Setback Levee

(Candaba-San Luis-Apalit-San Simon-Macabebe & Masantol

Section

III 9.510 C 0.309 0.200 0.300 - - - 80.90 *80.90% V. Satisfactory

Eddmari Construction and Trading 20301 Concreting of Laon FMR IV-B 0.239 C 0.444 - 0.500 - - - 94.40 *94.40%

Outstanding

Eddmari Construction and Trading 20301 Concreting of Road, Brgy.

Minuyan 4 III 0.473 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

Eddmari Construction and Trading 20301 Concreting of San Matias Brgy.

Road III 0.475 C 0.324 0.184 0.300 - - - 80.80 *80.80% V. Satisfactory

Eddmari Construction and Trading 20301 Const./Repair/Rehab. of Sta. Rita

Brgy. Road III 0.381 C 0.258 0.230 0.300 - - - 78.80 *78.80% Satisfactory

Eddmari Construction and Trading 20301

Maintenance/Rehab. & Impv't. of Nat'l Arterial Secondary Roads, Apalit-Macabebe-Masantol Road

III 0.951 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 139

Page 148: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Eddmari Construction and Trading 20301 Repair of Slope Protection of

San Miguel Bridge III 9.534 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory

Edelcriz Construction 30864 Conc. of Road @ Brgy. Bagong Buhay 1 III 0.954 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Edelcriz Construction 30864 Conc. of Road @ Brgy. Sapang Palay, Proper Sitio Lote III 0.446 C 0.253 0.300 0.300 - - - 85.30 *85.30%

V. Satisfactory

Edelsons Builders, Inc. 24826 Rehab. of Road at Brgy. San Isidro IV-A 0.956 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V. Satisfactory

Edison Lumber and Construction 31333 Const. of 1-Classroom School

Building I 0.480 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory

Edriel Enterprises 32500 Const. of Bislig Flood Control V 1.915 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory

EDT Construction 10225 Maintenance/Rehab. & Impv't. of GSO Road III 0.980 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

Edward Lui Construction 8459 Completion of MPB at Brgy. Sawang Calero VII 0.959 O 0.383 0.300 0.100 0.030 0.027 0.100 94.00 -

E E I Corporation 333

NAIA Expressway and its Related Roads Project, Phase I,

CP-II, Skyway Interchange Ramps 1 & 4

URPO 601.681 C 0.328 0.300 0.300 - - - 92.80 91.71% Outstanding

EFC Enterprises 11795Completion of Pieta Bridge along Dasmariñas-Carmona

RoadIVA 11.093 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

EFC Enterprises 11795 Conc. Blocking of EDSA (Northbound) NCR 8.876 C 0.149 0.200 0.300 - - - 64.90 *64.90%

Fair

EFC Enterprises 11795 Conc. of A. P. Reyes Ave. NCR 9.539 C 0.310 0.300 0.300 - - - 91.00 *91.00% Oustanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 140

Page 149: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

EFC Enterprises 11795Const. of Las Piñas-Muntinlupa-

San Pedro Road (Including Drainage System) Phase VI

NCR 13.571 C 0.355 0.200 0.300 - - - 85.50 89.94% V. Satisfactory

EFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente IVA 1.921 C 0.349 0.200 0.300 - - - 84.90 85.32%

V. Satisfactory

EFC Enterprises 11795 Const. of Quirino Ave. near Don Galo La Huerta Bridge NCR 9.617 C 0.270 0.290 0.300 - - - 86.00 92.54%

Outstanding

EFC Enterprises 11795 Maeztranza Linear Park Project PRRC 22.850 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -

EG & I Construction Corporation 16225 Const. of Argao River Control VII 0.185 C 0.334 0.300 0.300 - - - 93.40 *93.40%

Outstanding

EG & I Construction Corporation 16225 Impvt./Rehab. of Argao-Moalboal

Road (Taloot-Anahaw Sect.) VII 4.694 C 0.309 0.300 0.300 - - - 90.90 *90.90% Outstanding

EG & I Construction Corporation 16225 Impvt./Rehab. of Various Sts. At

Lamacan VII 4.782 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding

EG & I Construction Corporation 16225

Rehab./Reconst. of Damaged National Roads Generated from

Pavement Management Sys., along Bacalso Ave. (NBA-Cebu

South Rd.)

VII 15.873 C 0.367 0.211 0.300 - - - 87.80 *87.80% V. Satisfactory

EG & I Construction Corporation 16225 Const. of Access Road to RORO

Port (Phase I) VII 4.742 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding

EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road II 13.098 C 0.306 0.294 0.300 - - - 90.00 88.68%

V. Satisfactory

EGB Construction 13722 Conc./Impvt. of Cabannungan 1st Brgy. Road II 0.942 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 141

Page 150: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

EGB Construction 13722Concrete Paving of Ilagan-Delfin Albano-Mallig Road, Sta. Isabel

Norte SectionII 1.852 O 0.312 0.284 0.300 - - - 89.60 -

EGB Construction 13722 Const. of MPB II 1.923 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory

EGB Construction 13722 Const. of MPB II 1.926 C 0.385 0.200 0.300 - - - 88.50 87.63% V. Satisfactory

EGB Construction 13722Const. of School Building

(Clustered 15 Units) 1-CL@ Bimonton E/S

II 0.384 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -

EGB Construction 13722Const. of Various School Bldg., 3CL Sch. Bldg. Cabagan Pilot

School II 0.790 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

EGB Construction 13722Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road, Ilagan-

Delfin Albano II 9.439 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

EGB Construction 13722 Rehab./Reconst. of Damaged National Roads II 19.132 O 0.365 0.300 0.050 0.030 0.033 0.100 87.80 -

EGB Construction 13722 Rehab./Reconst. of Damaged National Roads II 19.132 O 0.366 0.240 0.000 0.030 0.033 0.067 73.60 -

EGB Construction 13722 Road Conc. of Cabisera II 3.815 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

EGB Construction 13722 Road Concreting of Bliss to Namnama II 1.925 C 0.316 0.300 0.300 - - - 91.60 *91.60%

Outstanding

EJR Builders and Construction Supply 24255 Completion of Multi-Purpose

Building I 1.424 C 0.376 0.100 0.300 - - - 77.60 83.20% V. Satisfactory

EJR Builders and Construction Supply 24255 Conc. of Road @ Nayom I 0.475 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 142

Page 151: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

El Nido Construction & Trading 25814 Const. of 1Cl Dumarao BHS IVB 0.378 O 0.286 0.300 0.100 0.020 0.035 0.100 84.10 -

El Nido Construction & Trading 25814 Const. of Pinagupitan-Daungan

FMR IVB 1.860 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory

El Nido Construction & Trading 25814

Repair/Restoration of Tabuan Road Sect. & Inst. of Box Culvert

& Slope Protection IVB 6.413 C 0.303 0.300 0.300 - - - 90.30 *90.30%

Outstanding

Eleazar V. Adlawan Construction 576 Conc. of Panglao National Road VII 19.049 C 0.337 0.200 0.300 - - - 83.70 89.04%

V. Satisfactory

Eleazar V. Adlawan Construction 576 Const. of Seawall, Brgy. South

Poblacion VII 4.778 C 0.211 0.300 0.300 - - - 81.10 79.06% Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of Barangay Road, Sogod-

Sto. Domingo V 0.458 C 0.281 0.226 0.300 - - - 80.70 *80.70% V. Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of Drainage System along

Inascan-Paulog Road V 9.576 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of Multi-Purpose Building V 0.280 C 0.394 0.200 0.300 - - - 89.40 *89.40%

V. Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of P. Basas Elem. School

Building V 0.453 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Elkan Konstrak & Aggregates 26220 Seal/Widening/Rehab./Impv't. of

Road Shoulder along MSR V 0.230 C 0.364 0.200 0.300 - - - 86.40 86.40% V.Satisfactory

EM Paule Construction and Trading 19006 Const. of 1-unit 1 CL Sch. Bldg.

@ Maydolong NHS VIII 0.373 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory

EMMROS Construction 27065Resurfacing of MWCR,

Pagbahan-Talabaan Section, Km.391+134-Km.392+500

IV-B 0.573 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding

EMQ Designs and Construction 16128 Concreting/Improvement of

Binocot FMR Bunsuran IV-B 0.446 C 0.278 0.284 0.300 - - - 86.20 *86.20% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 143

Page 152: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

EMS Sarmiento Construction 29097

Const. of Caban 1 Bridge and its Approaches along Danao-Getafe

Rd.VII 4.265 C 0.306 0.300 0.300 - - - 90.60 91.68%

Outstanding

EMS Sarmiento Construction 29097 Impvt. (Conc. Paving) of Danao-

Getafe Road VII 9.470 C 0.359 0.300 0.300 - - - 95.90 94.64% Outstanding

EMS Sarmiento Construction 29097 Talibon Small Reservoir

Irrigation Project NIA 5.170 O 0.385 0.176 0.030 0.030 0.047 0.200 86.80 -

ENC Enterprises 29819 Const. of Multi-Purpose Bldg., Sta. Clara Sur IV-A 0.477 O 0.398 0.300 0.100 0.030 0.011 0.067 90.60 -

Enrique A. Flores Jr. Contractor 2421 Rehab./Conc. of Roads @ Irisan

Brgy. CAR 2.863 C 0.221 0.200 0.300 - - - 72.10 *72.10% Satisfactory

EP Manantan Construction & Development Corp. 6457 Conc./Reblocking of Agusan-

Davao Road XI 9.949 O 0.338 0.000 0.100 0.008 0.043 0.100 58.90 -

EPN Builders and Developers 30341 Const. MPB @ Roxas East C/S

(Phase II) II 1.926 C 0.392 0.200 0.300 - - - 89.20 84.72% V. Satisfactory

EPN Builders and Developers 30341 Const. of MPB ( Phase I) @

Andres Bonifacio II 0.566 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

EPN Builders and Developers 30341 Const. of MPB (Community

Center) II 0.189 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

EPN Builders and Developers 30341

Const. of One Unit Classroom School Building @ San

Leonardo E/SII 0.416 C 0.379 0.228 0.300 - - - 90.70 84.89%

V. Satisfactory

EPN Builders and Developers 30341 Const. of School Bldg. @ San

Leonardo E/S II 0.527 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 144

Page 153: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

EPN Builders and Developers 30341 Const. of School Bldg. at

Bannawag II 0.476 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

EPN Builders and Developers 30341

Repair/Rehab. of Eroded Embankment & Damaged Slope Protection @ Babanuang Bridge

along Santiago-Tuguegarao Road

II 0.964 C 0.280 0.200 0.300 - - - 78.00 81..84% V. Satisfactory

EPN Builders and Developers 30341

Repair/Rehab. of Tungcab Bridge Approach "B" along Cordon-Aurora Bdry. Road

II 0.964 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

Equi-Parco Construction Co. 14332 Asphalt Overlay along Butuan

City-Cagayan de Oro-Iligan Road XIII 14.450 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Equi-Parco Construction Co. 14332

Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-

Puting Bato Section)XIII 95.698 O 0.393 0.272 0.100 0.030 0.050 0.100 94.50 -

Equi-Parco Construction Co. 14332 Conc. of Agusan-Bukidnon

National Road XIII 15.034 O 0.376 0.225 0.100 0.030 0.048 0.100 87.90 -

Equi-Parco Construction Co. 14332 Conc. of Kinabjangan By-Pass

National Secondary Road XIII 13.876 O 0.331 0.225 0.100 0.030 0.048 0.100 83.40 -

Equi-Parco Construction Co. 14332 Const. of Jagupit Flood Control

& Highway Restoration XIII 14.317 C 0.325 0.020 0.300 - - - 64.50 83.22% V. Satisfactory

Equi-Parco Construction Co. 14332

Const. of Palapay Bridge and Approaches, Gingoog Claveria

RoadX 21.713 C 0.359 0.300 0.300 - - - 95.90 92.84%

Outstanding

Equi-Parco Construction Co. 14332

Impvt. of JSH-Bagontaas-Lurogan-MVC-Lilingayeon Road,

MVC SectionX 24.697 C 0.370 0.230 0.300 - - - 90.00 85.44%

V. Satisfactory

Equi-Parco Construction Co. 14332

Impvt./Conc. of Aglayan-Zamboanguita Road, Managoc

SectionX 66.953 C 0.361 0.300 0.300 - - - 96.10 91.00%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 145

Page 154: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Equi-Parco Construction Co. 14332 Impvt./Conc. of Gingoog-

Claveria-Villanueva Road X 19.064 C 0.383 0.300 0.300 - - - 98.30 *98.30% Outstanding

Equi-Parco Construction Co. 14332 Nasipit Port Expansion Project PPA 215.144 O 0.3984 0.3 0.1 0.03 0.07 0.1 99.84 -

Equi-Parco Construction Co. 14332 Rechannelization of Mamkas

River XIII 14.455 C 0.213 0.022 0.300 - - - 53.50 73.84% Satisfactory

Equi-Parco Construction Co. 14332 Rehab. of Puyo River Flood

Control (Downstream) XIII 14.303 C 0.469 - 0.500 - - - 96.90 *96.90% Outstanding

Equi-Parco Construction Co. 14332 Rehab./Reconst. Of Butuan City-

Masao Port Road XIII 19.276 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory

Equi-Parco Construction Co. 14332

Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road

(Agusan-Misamis Oriental Road)XIII 14.457 C 0.343 0.300 0.300 - - - 94.30 94.42%

Outstanding

Equi-Parco Construction Co. 14332

Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road (Sta. 1240+746-Sta. 1241+276

with exceptions)

XIII 14.454 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Equi-Parco Construction Co. 14332

Road Upgrading (Gravel to concrete) Jct., SH Bangcud-Mailag By Pass Road (Mailag

Section)

X 12.329 C 0.372 0.300 0.300 - - - 97.20 93.48% Outstanding

Equi-Parco Construction Company 14332 Const. of Amontay Flood Control XIII 9.317 O 0.398 0.200 0.100 0.030 0.051 0.200 97.90 -

Equi-Parco Construction Company 14332 Improvement of Butuan City-

Masao Port Road XIII 4.674 C 0.295 0.284 0.300 - - - 87.90 93.18% Outstanding

Equi-Parco Construction Company 14332 Masao Flood Control XIII 14.451 C 0.472 - 0.500 - - - 97.20 *97.20%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 146

Page 155: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Equi-Parco Construction Company 14332 Nasipit Port Expansion Project FCMD 217.925 C 0.400 0.300 0.300 - - - 99.44 99.44%

Outstanding

Eric Van P. Sesbreno Construction 26243 Conc. of Tactac-Atbu Road II 0.479 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Eric Van P. Sesbreno Construction 26243 Const. of Aritao NHS, 2-Storey

Bldg., 8-CL School Building II 4.817 C 0.363 0.200 0.300 - - - 86.30 75.28% Satisfactory

Eric Van P. Sesbreno Construction 26243 Const. of Imugan MPB

(Gymnasium) II 0.902 C 0.222 0.300 0.300 - - - 82.20 *82.20% V. Satisfactory

Eric Van P. Sesbreno Construction 26243 Const. of MPB at Villaflores II 0.286 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

Ermy Construction 15741 Concreting of Brgy. Road at Brgy. Sindalan City III 0.478 C 0.360 0.221 0.300 - - - 88.10 *88.10%

V. Satisfactory

Ermy Construction 15741 Const. of 3 CL at San Isidro E/S III 1.136 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding

Ermy Construction 15741 Impvt./Rehab. of Cabetican Road III 1.906 C 0.291 0.300 0.300 - - - 89.10 *89.10% V. Satisfactory

Ermy Construction and Trading (Formerly:Ermy

Construction)15741 Rehab. of Brgy. Road at St. Niño III 0.956 C 0.312 0.300 0.300 - - - 91.20 *91.20%

Outstanding

ESD Cruz Construction & Supply 32368 Const. of Conc. Drainage @

Brgy. Sto. Niño VIII 0.241 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

ESD Cruz Construction & Supply 32368 Repair of Secondary Sch. Bldg.,

Rawis NHS VIII 0.648 C 0.379 0.100 0.300 - - - 77.90 *77.90% Satisfactory

ESD Cruz Construction & Supply 32368

Repair/Rehab. of National Road (Pangpang-Mapanas-Gamay-

Lapinig RoadVIII 9.789 O 0.320 0.240 0.100 0.015 0.030 0.100 80.50 -

ESEK Construction Corporation 12871 Completion of Malanday E/S NCR 4.772 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -

Eser Enterprises-Burot 23902 Const. of 1 Cl Sch. Bldg. @ Capas East CES III 0.424 C 0.362 0.275 0.300 - - - 93.70 *93.70%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 147

Page 156: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Eser Enterprises-Burot 23902 Const. of MPB at Sitio Tarvet III 0.564 C 0.234 0.200 0.300 - - - 73.40 *73.40% Satisfactory

ESN Construction and Trading 32720 Impvt. of Roads (Tibagan) III 0.475 C 0.277 0.200 0.300 - - - 77.70 *77.70%

SatisfactoryESN Construction and

Trading 32720 Impvt. of Roads (Tilapayong) III 0.477 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

ESR Construction and Supplies 10451 Conc. of Mahayag-Dumingag

Road (Kaangayan Section) IX 13.931 C 0.270 0.257 0.300 - - - 82.70 85.84% V. Satisfactory

ESR Construction and Supplies 10451 Concreting of Roads at Brgy.

Canicapan X 0.949 C 0.331 0.280 0.300 - - - 91.10 88.52% V. Satisfactory

ESR Construction and Supplies 10451 Construction of 109 Duplex

Housing Units

NHA-Cagayan De Oro

25.295 O 0.390 0.171 0.100 0.024 0.030 0.100 81.44 -

ESR Construction and Supplies 10451 Siloy ARC (Rehab. of Purok 1, 2,

3, 4, 5 Circumferntial) X 8.341 C 0.329 0.200 0.300 - - - 82.90 *82.90% V.Satisfactory

ETM Construction 16285 Conc. of Brgy. Road, Purok 1 Brgy. San Jose III 0.437 C 0.363 0.108 0.300 - - - 77.10 *77.10%

Satisfactory

Euluz Construction and Supply 32080

Const./Rehab. of Drainage System and Gutter along KG and

K-9thNCR 1.433 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Sstisfactory

Euluz Construction and Supply 32080 Const./Rehab. of MPB NCR 2.254 C 0.318 0.251 0.300 - - - 86.90 *86.90%

V. Sstisfactory

Express Construction 29649 Conc./Impvt. of Sto. Tomas Ext. NCR 1.456 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

F & A Construction and Supplies 29524 Completion of MPB XIII 4.547 C 0.359 0.300 0.300 - - - 95.90 67.34%

Fair

F & A Construction and Supplies 29524

Impvt. of Road Slip and other related activities, Cortes-Igang

Sect.XIII 2.885 C 0.231 0.265 0.300 - - - 79.60 *79.60%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 148

Page 157: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

F & J General Construction and Supply Corporation 31963

Repair/Rehab./Impvt. of Roadways (Inst. Of Road Traffic

Safety Devices), Nueva Ecija-Aurora Road (Dimani to

Dimabayo Sect.)

III 4.625 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory

F. Gurrea Construction 6995 Sibunag Port Improvement Project FCMD 101.207 C 0.397 0.300 0.300 - - - 99.70 99.65%

Outstanding

F. Gurrea Construction, Inc. 6995Bago River Irrigation System Rehabilitation & Improvement

ProjectNIA 12.603 C 0.258 0.300 0.300 - - - 85.80 85.80%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995

Asphalt Overlay along Guimaras Central Road Brgy. Bugnay-San

Miguel SectionVI 5.715 C 0.380 0.200 0.300 - - - 88.00 88.30%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-

Pototan Road VI 9.540 O 0.364 0.225 0.100 0.022 0.059 0.100 87.00 -

F. Gurrea Construction, Incorporated 6995 Completion of Anahawon VI 9.423 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -

F. Gurrea Construction, Incorporated 6995

Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San

Miguel Road leading to International Airport

VI 57.850 O 0.291 0.212 0.100 0.023 0.048 0.100 77.40 -

F. Gurrea Construction, Incorporated 6995 Const. of Diclum Bridge VI 13.665 C 0.387 0.200 0.300 - - - 88.70 86.99%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge VI 12.443 C 0.289 0.300 0.000 - - - 58.90 71.11%

Satisfactory

F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 349.995 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 149

Page 158: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 289.732 O 0.363 0.300 0.000 0.030 0.065 0.100 85.80 -

F. S. Sugay Construction & Supplies 28489 Const. of MPB at Poblacion IV-B 2.005 C 0.381 0.200 0.300 - - - 88.10 85.30%

V. Satisfactory

F. Vargas Construction 2366Cagayan River Basin Bank

Protection Works, San Vicente Section

II 13.722 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

F. Vargas Construction 2366 Const. of Bunot Bridge and its Approaches CAR 12.586 C 0.364 0.200 0.300 - - - 86.40 92.10%

Outstanding

F. Vargas Construction 2366 Const. of Cadondongan Bridge II 6.754 C 0.346 0.200 0.300 - - - 84.60 86.64% V. Satisfactory

F. Vargas Construction 2366 Const. of Guising Bridge & Approaches II 18.407 C 0.361 0.200 0.300 - - - 86.10 86.31%

V. Satisfactory

F. Vargas Construction 2366

Const. of Permanent Bridge Support & Rehab. of Existing

Pony Truss of Magapit Suspension Bridge

II 13.168 C 0.400 0.200 0.300 - - - 90.00 84.18% V. Satisfactory

F. Vargas Construction 2366 Const. of Tupang Bridge & Approaches II 15.951 C 0.356 0.200 0.000 - - - 55.60 72.28%

Satisfactory

F.A. Construction 9837 Const. of 1 CL Bldg. @ Sta.Lucia and Dapdap E/S III 0.840 C 0.347 0.265 0.300 - - - 91.20 *91.20%

Outstanding

F.A. Construction 9837 Const. of MPB (Covered Court) III 1.886 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding

F.C. Martinez Construction 31243 Const. of 1 CL, Murcon E/S III 0.410 C 0.352 0.164 0.300 - - - 81.60 *81.60% V. Satisfactory

F.C. Martinez Construction 31243 Const. of Four (4) Classroom, San Felipe H/S III 1.331 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 150

Page 159: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

F.F. Cruz and Company, Incorporated 123 Construction of Magsaysay

Viaduct CARBDP 496.818 C 0.387 0.300 0.300 - - - 98.70 98.47% Outstanding

F.F. Cruz and Company, Incorporated 123 San Juan Port Development

Project PPA 45.336 O 0.397 0.300 0.000 0.030 0.065 0.033 82.50 -

F.F. Galang Construction 26801 Const. of Multi-Purpose Building IV-B 0.745 C 0.395 0.206 0.300 - - - 90.10 85.34% V. Satisfactory

F.F. Galang Construction 26801 Const. of Multi-Purpose Building (Bleacher), Brgy. Punta Baja IV-B 0.279 C 0.328 0.200 0.300 - - - 82.80 79.93%

Satisfactory

F.F. Rosales Construction 8814 Const. of Eco-Tourism Road IV-A 8.908 C 0.332 0.200 0.300 - - - 83.20 83.68% V. Satisfactory

F. Gurrea Construction, Inc 6995 Sibunag Port Improvement Project PPA 92.203 O 0.352 0.300 0.070 0.030 0.065 0.067 88.42 -

F.L. Reguyal Construction 3315 Completion of Along-Along Bridge, Phase IV III 2.848 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -

F.L. Reguyal Construction 3315 Const. of 2-CL @ Eastern Cabu E/S III 0.614 C 0.359 0.300 0.300 - - - 95.90 *95.90%

Outstanding

F.L. Reguyal Construction 3315 Const. of MPB Brgy. San Mariano III 1.872 C 0.349 0.289 0.300 - - - 93.80 *93.80%

Outstanding

F.L. Reguyal Construction 3315Const. of Single Barrel Box

Culvert along Sta. Rosa-Tarlac Road

III 0.951 C 0.400 0.200 0.300 - - - 90.00 88.20% V. Satisfactory

F.L. Reguyal Construction 3315Repair/Rehab. of Gapan-

Peñaranda-Fort Magsaysay Road

III 7.303 C 0.301 0.200 0.300 - - - 80.10 *80.10% V. Satisfactory

F.P. De Guzman Construction, Inc. 10296

Concreting of Pathways @ Brgy. 391, Brgy. 392, Soler St. &

VicinityNCR 3.713 C 0.285 0.200 0.300 78.50 74.78%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 151

Page 160: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

F.P. De Guzman Construction, Inc. 10296

Const. of School Bldg. @ Smokey Mountain Resettlement

AreaNCR 13.999 C 0.369 0.200 0.300 - - - 86.90 83.66%

V. Satisfactory

F.P. De Guzman Construction, Inc. 10296 Rehab. of MPB @ Brgy. 393,

Zone 40 NCR 1.709 C 0.343 0.300 0.300 - - - 94.30 88.56% V. Satisfactory

F.V. Chua Construction and Supply 27267 Const. of MP Building at Brgy.

Tiaong III 0.237 C 0.390 0.138 0.300 - - - 82.80 *82.80% V. Satisfactory

F.V. Chua Construction and Supply 27267

Road Conc. At Camachilihan & Tumana-Talampas, Bustos,

Banga 1st & Tabang III 1.520 C 0.280 0.300 0.300 - - - 88.00 *88.00%

V. Satisfactory

Fairchild Builders & Developers Inc. (Formerly:

Fairchild Marketing & Const.)

10024 Concreting of Tabango & Liling Bridge Approaches VIII 4.766 C 0.379 0.300 0.300 - - - 97.90 93.64%

Outstanding

Fairchild Builders & Developers, Inc. 10024 Const. of River Bank Protection

at San Joaquin VIII 1.928 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Fairchild Builders & Developers, Inc. 10024 Const. of Tabunok II Bridge @

Brgy. Tabunok VIII 4.071 C 0.267 0.300 0.300 - - - 86.70 84.24% V. Satisfactory

Fairchild Builders & Developers, Inc. 10024 Const./Impvt. Of Malitbog (MPB)

Livelihood Center VIII 6.673 C 0.398 0.200 0.300 - - - 89.80 84.41% V. Satisfactory

Fairchild Builders & Developers, Inc. 10024 Const./Rehab./Impvt. Of

Drainage System @ Brgy. 87 VIII 1.899 C 0.358 0.200 0.300 - - - 85.80 *85.80% V. Satisfactory

Fatima Builders 27939Const. & Repair of School Building @ Lazi National

Agricultural SchoolVII 0.944 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

Fatima Builders 27939 Repair of Municipal Water System VII 0.940 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Fatima Builders 27939 Repair/Rehab. of FMR at Pisong A VII 0.463 C 0.328 0.261 0.300 - - - 88.90 *88.90%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 152

Page 161: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

FEAJ Construction and General Services 13609 Completion of MPB IV-B 0.954 C 0.349 0.200 0.300 - - - 84.90 *84.90%

V. Satisfactory

FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-

2 IV-B 1.899 O 0.235 0.300 0.100 0.022 0.035 0.100 79.20 -

FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-

2 IV-B 1.899 C 0.304 0.200 0.300 - - - 80.40 79.68% Satisfactory

Feldan Construcion & Enterprises 30572

Const. of 1 CL Sch. Bldg. at Mansilingan Agro Industrial

SchoolVI 0.500 C 0.325 0.117 0.300 - - - 74.20 72.80%

Satisfactory

Feldan Construcion & Enterprises 30572

Const. of 1 CL Sch. Bldg. at MansilinganAgro Industrial

SchoolVI 0.500 O 0.345 0.106 0.100 0.020 0.051 0.100 72.20 -

Ferdstar Builders Contractors 4965

Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.) (Isumbo

Section)IV-B 18.228 C 0.319 0.293 0.300 - - - 91.20 88.98%

V. Satisfactory

Ferdstar Builders Contractors 4965 Const. Brgy. Roads @ Brgys,

Capaya & Pulung Maragul III 0.469 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding

Ferdstar Builders Contractors 4965 Const. of Anao Bridge along San

Jose Malino-Anao Road III 19.015 C 0.350 0.300 0.300 - - - 95.00 83.72% V. Satisfactory

Ferdstar Builders Contractors 4965 Const. of Brgy. Road @ Brgy.

Cutcut III 1.884 C 0.313 0.285 0.300 - - - 89.80 *89.80% V.Satisfactory

Ferdstar Builders Contractors 4965 Const. of Kipot Bridge VI 8.141 C 0.346 0.300 0.000 - - - 64.60 73.90%

Satisfactory

Ferdstar Builders Contractors 4965 Impvt./Rehab. of Brgy. Roads at

Calulut & Baliti III 4.757 C 0.318 0.219 0.300 - - - 83.70 *83.70% V. Satisfactory

Fernz Construction Corporation 28238 Const. of Farm to Market Road X 2.830 C 0.266 0.200 0.300 - - - 76.60 78.04%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 153

Page 162: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Fernz Construction Corporation 28238 Const. of MPB, Relocation Site X 1.401 C 0.357 0.195 0.300 - - - 85.20 *85.20%

V. Satisfactory

Fernz Construction Corporation 28238 Impvt. of FMR, Brgy. Lumbia to

Brgy. Taglimao X 2.794 C 0.303 0.200 0.000 - - - 50.30 70.34% Satisfactory

Ferreze Const. Supply & Manufacturing 26968

Impvt./Conc. Paving of Isabela-Maluso Nat'l Road @ Maluso

Proper SectionIX 1.682 C 0.336 0.299 0.000 - - - 63.50 70.40%

Satisfactory

Ferreze Const. Supply & Manufacturing 26968 Rehab. of Brgy. Mercedes Road IX 4.733 O 0.380 0.200 0.100 0.030 0.025 0.100 83.50 -

FFJJ Construction 16712Conc. of Davao del Sur-

Sarangani Coastal Road, Kitayo-Balangonan Section

XI 28.900 O 0.274 0.241 0.100 0.022 0.035 0.067 73.90 -

FFJJ Construction 16712 Const. of 2-CL School Building @ Molopolo Annex XI 0.721 O 0.315 0.240 0.100 0.020 0.041 0.100 81.60 -

FFJJ Construction 16712

Const. of Kiblis Bridge with Bridge and Approaches,

Sarangani-Sultan Kudarat Coastal Road

XII 21.574 O 0.392 0.300 0.070 0.030 0.032 0.067 89.10 -

FFJJ Construction 16712

Const. of Kiblis Bridge with Bridge and Approaches,

Sarangani-Sultan Kudarat Coastal Road

XII 21.574 O 0.342 0.273 0.000 0.030 0.028 0.067 74.00 -

FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 O 0.300 0.300 0.100 0.015 0.035 0.100 85.00 -

FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 O 0.304 0.240 0.070 0.015 0.035 0.100 76.40 -

FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 O 0.280 0.240 0.070 0.012 0.025 0.100 72.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 154

Page 163: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 O 0.307 0.151 0.100 0.030 0.030 0.067 68.50 -

FFJJ Construction 16712 Const. og Kinangan Bridge and Approaches XI 12.593 O 0.292 0.300 0.100 0.022 0.030 0.100 84.40 -

FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -

FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 O 0.335 0.285 0.100 0.030 0.023 0.100 87.30 -

FFJJ Construction 16712Impvt./Conc. of Jct. Mana-

Ticulon-Lagumi-Little Baguio Road

XI 19.250 O 0.335 0.300 0.050 0.030 0.023 0.067 80.50 -

FFJJ Construction 16712 Repair of Jones Timbol CES XI 0.150 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding

FGM Builders Resources & Development Corp. 31807 Completion of Daniel Aguinaldo

NHS XI 0.474 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory

FGM Builders Resources & Development Corp. 31807 Rehab. of MPB at R.O. Quimpo

E/S XI 0.465 C 0.287 0.212 0.300 - - - 79.90 *79.90% Satisfactory

FH Gopiteo Construction & Supply 21336 Const. of Lined Canal @ Brgy.

Kalkam XII 0.882 C 0.388 0.300 0.300 - - - 98.80 91.48% Outstanding

Fiat Construction Services 5463

Cluster A-2004: Const. of Various School Building under

the 2nd Congressional District of Oriental

X 8.449 C 0.293 0.300 0.000 - - - 59.30 65.58% Fair

Fiat Construction Services 5463Conc. of SDCR: Cortes-Tandag-Marihatag Road, (Unaban-Sumo-

sumo)XIII 130.968 O 0.293 0.215 0.100 0.030 0.032 0.100 77.00 -

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with

Roof Deck for DBM Building Sp. Bldgs. 224.176 O 0.264 0.243 0.100 0.030 0.070 0.067 77.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 155

Page 164: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with

Roof Deck for DBM Building Sp. Bldgs. 229.100 O 0.335 0.270 0.100 0.030 0.038 0.100 87.30 -

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with

Roof Deck for DBM Building Sp. Bldgs. 445.429 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -

Filipinas Construction Supply 11644 Repair/Rehab. of Bukal Sur E/S IV-A 0.335 C 0.248 0.271 0.300 - - - 81.90 81.06%

V. Satisfactory

First Northway Development and

Construction Corporation11645 Conc. of Tablac Road I 1.609 C 0.208 0.300 0.300 - - - 80.80 *80.80%

V. Satisfactory

First Northway Development and

Construction Corporation11645 Const. of Banayoyo Road I 0.934 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

First Northway Development and

Construction Corporation11645

Repair and Maintenance of Candon-Salcedo Road, Various

SectionsI 0.983 C 0.264 0.300 0.300 - - - 86.40 *86.40%

V. Satisfactory

First Northway Development and

Construction Corporation11645 Sulvec Port Road I 6.358 O 0.320 0.240 0.100 0.022 0.027 0.100 80.90 -

Flordes Construction & Trading 16916 Conc. of Brgy. Road, Mulawin F.

Homes III 1.334 C 0.370 0.200 0.300 - - - 87.00 *87.00% V. Satisfactory

Flordes Construction & Trading 16916 Conc. of Sta. Trinidad St., Old

Panaderos NCR 0.945 C 0.351 0.300 0.300 - - - 95.10 *95.10% Outstanding

Flordes Construction & Trading 16916 Conc. with Drainage Impvt.

Along Juan Luna St. NCR 4.744 C 0.370 0.146 0.300 - - - 81.60 83.94% V. Satisfactory

Flordes Construction & Trading 16916 Conc./Reblocking of G. Tuazon

St. NCR 4.696 C 0.353 0.200 0.300 - - - 85.30 82.66% V. Satisfactory

Flordes Construction & Trading 16916 Const. of MPB, Brgy. Maharlika III 2.381 C 0.364 0.300 0.300 - - - 96.40 *96.40%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 156

Page 165: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Flordes Construction & Trading 16916 Const. of Sch. Bldg. (9 CL)

Carlos P. Garcia High School NCR 7.192 C 0.288 0.300 0.300 - - - 88.80 *88.80% V. Satisfactory

Flordes Construction & Trading 16916 Drainage Improvement with

Concreting/Upgrading NCR 2.303 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding

Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of Jose

Vicencio Health Center NCR 1.929 C 0.343 0.253 0.300 - - - 89.60 *89.60% V. Satisfactory

Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of

Roads & Alleys in Manila NCR 1.435 C 0.270 0.257 0.300 - - - 82.70 *82.70% V. Satisfactory

Flordes Construction & Trading 16916 Proposed Road Rehab. along

Pandacan & Sta. Mesa NCR 4.719 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding

Flordes Construction & Trading 16916 Repair/Rehab. of

Roofing/Renovation of MPB NCR 1.420 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding

Flordes Construction & Trading 16916

Repair/Rehab. of Roofing/Renovation of Stage and Repair of Toilet @ Pio del

Pilar E/S

NCR 2.150 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding

Flordes Construction & Trading 16916 Road & Drainage Rehab. @

Brgy. 599, Narra St. NCR 1.895 O 0.350 0.240 0.100 0.023 0.035 0.100 84.80 -

Floriane Construction and Supply 12261 Completion of MPB, Brgy.

Maanas X 0.755 C 0.338 0.100 0.300 - - - 73.80 *73.80% Satisfactory

Floriane Construction and Supply 12261 Conc. of Multi-Purpose

Pavement X 0.936 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Floriane Construction and Supply 12261 Const. of FMR at Kitambis-

Valdeconcha Road X 0.940 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory

Floriane Construction and Supply 12261 Const. of River Control at

Mambayaan (Phase 2) X 4.644 C 0.339 0.200 0.300 - - - 83.90 82.04% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 157

Page 166: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Floriane Construction and Supply 12261 Const./Impvt./Completion of

MPB X 0.324 C 0.358 0.300 0.300 - - - 95.80 *95.80% Oustanding

Floriane Construction and Supply 12261 Const./Rehab. of Roads,

Kitambis-Mimbuwahan X 0.939 C 0.207 0.300 0.300 - - - 80.70 *80.70% V. Satisfactory

Floriane Construction and Supply 12261

Rehab. of Butuan-Cagayan de Oro-City-Iligan Road,

Lagonglong By Pass RoadX 9.535 C 0.361 0.251 0.300 - - - 91.20 82.83%

V. Satisfactory

FM2 Trading & Enterprises 19044 Conc. of FMR, Brgy. Luna St. I 0.960 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

FM2 Trading & Enterprises 19044 Const. of Drainage System @ Brgy. Caranglaan I 0.767 C 0.306 0.221 0.300 - - - 82.70 *82.70%

V. Satisfactory

FNR Construction 7051 Restoration of Multi-Purpose Building I 5.601 C 0.385 0.100 0.000 - - - 48.50 55.43%

Poor

Fojas Builders Enterprises 31869 Const. of 2 CL Sch. Bldg., San Antonio E/S IV-A 0.955 C 0.346 0.300 0.000 - - - 64.60 83.29%

V. Satisfactory

Footprints Construction 16713 Const. of Pedestrian Overpass @ Palomoc Titay IX 2.856 C 0.176 0.200 0.300 - - - 67.60 72.52%

Satisfactory

Foremost Builders 23774Const. / Rehab. / Replacement /

Completion & Repair of Sch. Bldg. @ Ma-a NHS

XI 0.440 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding

Fortrica Builders 24220 Concreting of FMR @ Brgy. Calingcuan III 0.625 C 0.287 0.300 0.300 - - - 88.70 *88.70%

V. Satisfactory

Fortstone Construction Enterprises 31668 Const. of 6 CL 2 Storey Bldg. at

Mariano Peralta H/S XI 3.727 C 0.252 0.200 0.000 - - - 45.20 70.68% Satisfactory

Fortstone Construction Enterprises 31668 Const. of Multi-Purpose Bldg. At

DPWH-Region XII XII 1.832 O 0.361 0.300 0.100 0.015 0.007 0.067 85.00 -

Fortstone Construction Enterprises 31668 Const. of Nueva Villa Flood

Control XI 3.872 C 0.353 0.172 0.300 - - - 82.50 80.79% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 158

Page 167: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Fortstone Construction Enterprises 31668 Rehab. of MPB (City Jail) XII 0.960 C 0.323 0.200 0.300 - - - 82.30 *82.30%

V. Satisfactory

Fortunato T. Sanchez 407 Asphalt Overlay (Pier to City Hall) XIII 4.729 C 0.275 0.200 0.300 - - - 77.50 78.58%

Satisfactory

Fortunato T. Sanchez 407 Asphalt Overlay along Surigao Wharf Road XIII 3.640 C 0.323 0.281 0.300 - - - 90.40 91.60%

Outstanding

Fortunato T. Sanchez 407 Concreting of Road XIII 5.770 C 0.330 0.200 0.300 - - - 83.00 82.72% V. Satisfactory

Four Brothers Construction 31614 Const. of MPB, Brgy. West Buyagan CAR 0.476 C 0.285 0.200 0.300 - - - 78.50 *78.50%

Satisfactory

Four J Construction 15104 Conc. of Road @ So. Nazareneville IV-A 1.918 C 0.297 0.244 0.300 - - - 84.10 *84.10%

V. Satisfactory

Four J Construction 15104 Const. of Box Culvert @ Brgy. Dalig IVA 0.956 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Four J Construction 15104 Const. of MPB @ UPS V Area I NCR 0.476 C 0.340 0.200 0.300 - - - 84.00 83.30% V. Satisfactory

Four J Construction 15104 Const. of Multi-Purpose Building at Emilio Jacinto E/S NCR 2.976 C 0.292 0.300 0.300 - - - 89.20 83.67%

V. Satisfactory

Four J Construction 15104 Impvt. of Cainta River IV-A 3.836 C 0.339 0.269 0.300 - - - 90.80 85.52% V. Satisfactory

Four J Construction 15104 Impvt. of Valenzuela General Hospital Bldg. NCR 0.937 C 0.372 0.300 0.300 - - - 97.20 94.89%

Outstanding

Four J Construction 15104 Repair & Impvt. of McArthur Highway NCR 9.387 C 0.334 0.300 0.300 - - - 93.40 91.72%

Outstanding

Four J Construction 15104 Widening of Quezon Avenue NCR 21.722 O 0.376 0.240 0.100 0.018 0.042 0.100 87.60 -

Four Side Construction and Supply 24446

Rep./Maint/of Looc Ferrol Road Km. 103+500 (Tuburan Sect. Box

Culvert)IV-B 0.516 C 0.388 0.000 0.300 - - - 68.80 *68.80%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 159

Page 168: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Foz Designs, Builds and Supplies 32814 Const. of 1 unit Classroom Sch.

Bldg. V 0.482 C 0.246 0.200 0.300 - - - 74.60 *74.60% Satisfactory

Foz Designs, Builds and Supplies 32814 Const. of Sorsogon 2nd DEO V 0.960 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

Framecon Builders 22482 Const. of Drainage Canal at Brgy. Mangino III 0.475 C 0.250 0.200 0.300 - - - 75.00 *75.00%

Satisfactory

Framecon Builders 22482 Repair/Impvt. of Mallorca-Tabuating Road III 1.853 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -

FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Marlinao HS VIII 0.496 O 0.369 0.240 0.000 0.020 0.016 0.067 71.20 -

FRD Construction 10227 Const. of 1 Unit 1 CL School Bldg. @ Dao E/S VIII 0.498 C 0.383 0.106 0.300 - - - 78.90 *78.90%

Satisfactory

FRD Construction 10227 Reconst. of Soom Bridge along Tagbilaran East Road VII 13.241 C 0.237 0.300 0.300 - - - 83.70 81.06%

V. Satisfactory

FRD Construction 10227 Rehab./Impvt. of Laoang-Calomotan Rd. VIII 9.315 C 0.318 0.300 0.300 - - - 91.80 87.18%

V. Satisfactory

FRD Construction 10227 Repair/Rehab. of Lilo-an-Sogod Bdry. Mahaplag Road VIII 9.343 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road VIII 33.774 O 0.347 0.237 0.100 0.030 0.027 0.100 84.10 -

Freden Construction 22665 Const. of Lined Canal XII 1.865 O 0.284 0.200 0.100 0.030 0.032 0.200 84.60 -

Freden Construction 22665 Const. of Lined Drainage along Makar-Kiamba Road XII 1.900 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Freden Construction 22665Const. of Makar Drainage

Protecting Makar Port (Labangal Section)

XII 1.422 C 0.300 0.300 0.300 - - - 90.00 88.38% V. Satisfactory

Full Blast Trading and Construction 29548 Const./Rehab. of Multi-Purpose

Building @ Brgy. Poblacion III 0.944 C 0.397 0.300 0.300 - - - 99.70 *99.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 160

Page 169: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Fullido's Construction and Enterprises 20347 Const. of 1 CL Sch. Bldg. (7m x

9m) Corella H/S VII 0.410 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

Fullido's Construction and Enterprises 20347 Const. of CVSCAFT School

Building VII 0.929 C 0.388 0.100 0.300 - - - 78.80 84.89% V. Satisfactory

FVCS Construction & Supply 32518 Repair/Maintenance of Panacan

Revetment IV-B 0.645 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

G & P Builders, Incorporated 3960

Construction of CDO 3rd Bridge & Access Road Phase I,

KauswaganX 35.267 C 0.295 0.300 0.300 - - - 89.50 80.47%

V. Satisfactory

G. Uymatiao Jr. Construction 6663 Conc. of Brgy. Daro Road VII 0.474 C 0.357 0.000 0.300 - - - 65.70 78.72%

Satisfactory

G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-

Cantupa Sect. (DNR) VII 18.296 O 0.260 0.230 0.100 0.030 0.052 0.100 77.20 -

G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-

Cantupa Sect. (DNR) VII 18.296 O 0.356 0.226 0.100 0.030 0.038 0.067 81.70 -

G. Uymatiao Jr. Construction 6663 Const./Widening of Box Culvert VII 1.382 C 0.363 0.200 0.300 - - - 86.30 *86.30%

V. Satisfactory

G.C.I. Construction 11346 Conc. of Brgy. Bagadion Danawan-San Vicente FMR V 2.852 C 0.250 0.300 0.300 - - - 85.00 73.30%

Satisfactory

G.C.I. Construction 11346 Conc. of Baras-Gigmoto Road (San Vicente Section) V 9.628 O 0.362 0.231 0.100 0.030 0.030 0.100 85.30 -

G.C.I. Construction 11346 Conc. of Cagmanaba Road V 1.911 C 0.301 0.279 0.300 - - - 88.00 *88.00% V. Satisfactory

G.C.I. Construction 11346 Conc. of Nabua-Balatan Road (Tapayas-Cabanban Sect.) V 9.357 C 0.318 0.200 0.300 - - - 81.80 82.67%

V. Satisfactory

G.C.I. Construction 11346 Conc. of Roads at San Jose Road V 1.911 C 0.274 0.300 0.300 - - - 87.40 *87.40%

V. Satisfactory

G.C.I. Construction 11346 Conc. of San Isidro V 9.454 C 0.319 0.218 0.300 - - - 83.70 *83.70% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 161

Page 170: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

G.C.I. Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 C 0.292 0.100 0.300 - - - 69.20 75.68%

Satisfactory

G.C.I. Construction 11346 Const. of Buhi-Lidong Road V 28.220 C 0.261 0.200 0.300 - - - 76.10 83.30% V. Satisfactory

G.C.I. Construction 11346 Const. of MPB (Executive Building) V 2.837 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

G.C.I. Construction 11346 Const. of Road @ Tagbong-Binobong Road V 4.777 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon

to Brgy. CalzadaV 19.160 O 0.332 0.232 0.100 0.020 0.023 0.100 80.70 -

G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon

to Brgy. CalzadaV 19.160 O 0.352 0.238 0.100 0.030 0.028 0.100 84.80 -

G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon

to Brgy. CalzadaV 19.160 O 0.314 0.286 0.100 0.020 0.019 0.100 83.90 -

G.C.I. Construction 11346 Const. of San Vicente Drainage System V 2.362 C 0.308 0.200 0.300 - - - 80.80 *80.80%

V.Satisfactory

G.C.I. Construction 11346Const./Rehab. of San Vicente-Gutan-Lubac-Angub Rd. Phase

IVII 48.192 C 0.342 0.201 0.300 - - - 84.30 83.46%

V. Satisfactory

G.C.I. Construction 11346Const./Road Opening of San Vicente-Gutan-Luban-Aguib

Road (P III)II 28.095 C 0.289 0.228 0.300 - - - 81.70 75.76%

Satisfactory

G.C.I. Construction 11346 Impvt./Conc. of Goa-Tinambac Road V 9.553 C 0.245 0.279 0.300 - - - 82.40 82.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 162

Page 171: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

G.C.I. Construction 11346Installation of Sheet Piles & Conc. of Training Levee inc.

Earthdike, Traversia RevetmentV 39.000 C 0.351 0.200 0.300 - - - 85.10 79.67%

Satisfactory

G.C.I. Construction 11346Libmanan-Cabusao

Embankment (Poblacion Revetment)

V 10.523 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -

G.C.I. Construction 11346 Rehab./Impvt. of Nabua-Balatan Road Cabanban Section V 0.468 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

G.C.I. Construction 11346 Repair/Rehab. of National Road, San Andres-Caramoan Section V 28.326 C 0.346 0.300 0.300 - - - 94.60 91.72%

Outstanding

G.C.I. Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. V 14.385 O 0.384 0.200 0.000 0.030 0.032 0.133 77.90 -

G.C.I. Construction 11346Repair/Restoration of Damaged

Rd. Pavement along Balogo-Nasisi

V 28.860 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory

G.C.I. Construction 11346 Road Conc. at Palestina Road V 1.891 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory

G.D.L. Construction / E.C. de Luna Construction

Corporation Joint VentureJV-07-094

Rehab./Reconst. of Damaged Paved Nat'l Road at Gen. Alejo

Santos Highway III 150.985 O 0.312 0.300 0.100 0.030 0.050 0.067 85.90 -

G.F. Falcis Construction & Supply 26147 Const. of Brgy. 9 River Control VI 0.945 O 0.387 0.200 0.100 0.030 0.052 0.200 96.90 -

G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.850 O 0.225 0.240 0.100 0.023 0.013 0.100 70.10 -

G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.848 O 0.348 0.170 0.100 0.030 0.035 0.100 78.30 -

G.F. Rovero Merchandising 27268 Conc. of Altavas-Jamindan Road VI 0.961 C 0.381 0.116 0.300 - - - 79.70 *79.70% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 163

Page 172: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

G.F. Rovero Merchandising 27268 Const./Impvt. of Multi Purpose Pavement @ Poblacion VI 4.817 C 0.232 0.200 0.300 - - - 73.20 80.16%

V. Satisfactory

G.F. Rovero Merchandising 27268 Rehab. of New Buswang Prov'l. Road at New Buswang VI 0.988 C 0.316 0.300 0.300 - - - 91.60 *91.60%

Outstanding

G.F. Rovero Merchandising 27268 Repair/Rehab. of Quarters/Office Building VI 6.645 C 0.278 0.300 0.300 - - - 87.80 89.83%

V. Satisfactory

G.G. Uy Construction 32319 Rehabilitation of Main Canal (Sta. 13+150-Sta. 16+600 I 12.410 C 0.250 0.300 0.300 - - - 85.00 84.84%

V.Satisfactory

G.O. Marron General Contractor 6844 Completion of MPB @ Balaoan I 1.881 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

G.O. Marron General Contractor 6844 Conc. Paving of Sitio

Nagbayugan Feeder Road I 1.881 C 0.383 0.260 0.300 - - - 94.30 71.68% Satisfactory

G.O. Marron General Contractor 6844 Const. of MPB, Brgy. Central

East I I 0.940 C 0.272 0.300 0.300 - - - 87.20 75.65% Satisfactory

G.O. Marron General Contractor 6844 Const. of Multi-Purpose Bulding

at Bacsil I 0.936 O 0.367 0.221 0.100 0.030 0.047 0.067 83.20 -

G.O. Marron General Contractor 6844 Const./Rehab. of MPB I 4.674 C 0.333 0.300 0.300 - - - 93.30 79.60%

Satisfactory

G.R. Quirong Construction 9019 Const. of MPB at Brgy. Rizal VIII 0.470 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory

G.V. Burton Builders 21700 Const. of MPB (Phase I) @ Tidang Village II 0.286 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

Gacutan Construction 10789 Alibadabad CPIP II 2.560 C 0.272 0.159 0.300 - - - 73.10 73.10% Satisfactory

Gacutan Construction 10789 Conc. of Ilocos Norte-Abra Road I 11.649 C 0.339 0.200 0.300 - - - 83.90 83.42% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 164

Page 173: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gacutan Construction 10789 Conc. of Tandang Sora St. II 9.564 C 0.329 0.202 0.300 - - - 83.10 *83.10% V. Satisfactory

Galeno Construction, Inc. 3427Completion of Camindangan

Bridge along Candoni-Sipalay Road

VI 11.899 O 0.294 0.300 0.100 0.030 0.059 0.100 88.30 -

Galeno Construction, Inc. 3427Completion of Camindangan

Bridge along Candoni-Sipalay Road

VI 11.899 O 0.319 0.240 0.100 0.023 0.051 0.100 83.30 -

Galeno Construction, Inc. 3427Completion of Camindangan

Bridge along Candoni-Sipalay Road

VI 11.954 O 0.307 0.300 0.100 0.023 0.040 0.067 83.70 -

Galeno Construction, Inc. 3427 Const. of Magballo Bridge (Phase I) VI 7.547 T 0.333 0.300 0.000 - - - 63.30 69.24%

Fair

Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II VI 6.838 C 0.259 0.256 0.000 - - - 51.50 58.58%

Poor

Gampik Construction & Development Inc. 8019 Asphalt Overlay along Carmen-

Patag-Bulua Road X 14.462 C 0.259 0.286 0.300 - - - 84.50 *84.50% V. Satisfactory

Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre

Highway Alae-Kisolon Road X 9.644 O 0.370 0.240 0.070 0.030 0.045 0.067 82.20 -

Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre

Highway Alae-Kisolon Road X 9.644 O 0.377 0.300 0.000 0.030 0.045 0.067 81.90 -

Gampik Construction & Development Inc. 8019

Const. of Babak-Samal-Kaputian Road, IGACOS, Island Garden

City of SamalXI 9.392 C 0.350 0.300 0.300 - - - 95.00 85.34%

V. Satisfactory

Gampik Construction & Development Inc. 8019

Impvt./Rehab of Marbel-Allah-Valley-Cotabato Road,

Ampatuan-Talayan SectionXII 14.372 C 0.371 0.300 0.300 - - - 97.10 92.78%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 165

Page 174: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay

of Initao-Naawan Road Sect. X 14.462 C 0.384 0.300 0.000 - - - 68.40 71.34% Satisfactory

Gampik Construction & Development Inc. 8019

Provision of Slope Protection @ Sinuda Slip and Repair of

Bituminous PavementX 2.027 C 0.377 0.300 0.300 - - - 97.70 78.53%

Satisfactory

Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road XI 14.130 C 0.343 0.272 0.300 - - - 91.50 84.27%

V. Satisfactory

Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road,

Tuganay-Sto. Niño Sect. XI 9.984 C 0.307 0.300 0.300 - - - 90.70 85.18% V.Satisfactory

Garnic Construction 22861Package 3: Const. of MP

Building (2nd Floor Only) @ Brgy. Bulac

III 0.756 C 0.359 0.253 0.300 - - - 91.20 *91.20% Outstanding

Gaver General Merchandising 24186

Rehab. of Multi-Purpose Pavement in Pastrana Park

(Phase III)VI 4.819 C 0.394 0.278 0.300 - - - 97.20 97.20%

Outstanding

Gawanato Construction 28687 Const. of Line Canal @ Talaga IV-A 0.191 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

GCI Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -

GCI Construction 11346 Repair/Rehab of LCPIS V 11.652 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90% Satisfactory

GCMG Construction 9743 Completion of Sagay Public Market X 1.845 C 0.375 0.300 0.300 - - - 97.50 90.85%

Outstanding

GCMG Construction 9743 Const./Conc. of Manduao Road X 0.930 C 0.334 0.200 0.300 - - - 83.40 78.90% Satisfactory

G-Cube Construction 17219 Concrete Reblocking of Del Monte Avenue, Quezon City NCR 4.891 C 0.294 0.300 0.300 - - - 89.40 *89.40%

V. Satisfactory

GED Construction 13614 Const. of Road @ San Antonio I 0.475 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 166

Page 175: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

GED Construction 13614 Const. of Secondary Sch. Bldg. @ Cato MNHS I 0.485 C 0.273 0.200 0.300 - - - 77.30 * 77.30%

Satisfactory

Geed Construction 10823 Impvt. of Surigao-Davao Coastal Road along Cabanahan XIII 12.464 C 0.320 0.200 0.300 - - - 82.00 77.08%

Satisfactory

Geety Realty & Dev. Corporation 30447

Asphalt Overlay of Imus Road (Sta.1+606 - Sta.2+523 w/

exception) VII 9.647 C 0.330 0.250 0.300 - - - 88.00 *88.00%

V. Satisfactory

Geety Realty & Dev. Corporation 30447 Const. of River Control

(Revetment) Candulawan VII 4.446 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

Geety Realty & Development Corporation 30447 Rehabilitation of Canlumampao VII 9.598 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -

Gem Construction & Supply 29732 Const. of Brgy. Road @ Brgy.

Manggas IV-A 0.964 C 0.339 0.200 0.300 - - - 83.90 * 83.90% V. Satisfactory

Gemma Construction Supply 5044

Cluster I - Const. of Various School Bldg., Project CY 2003

Oringo E/S, Brgy. Dadiagas Heights

XII 0.686 C 0.361 0.254 0.300 - - - 91.50 87.51% V. Satisfactory

Gemma Construction Supply 5044 Const. of Bridge XII 3.687 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -

Gemma Construction Supply 5044 Const. of Drainage Canal from

Poblacion to San Pablo XII 0.950 C 0.267 0.300 0.300 - - - 86.70 81.60% V. Satisfactory

Gemma Construction Supply 5044 Const. of MPB (Phase I) XII 4.767 O 0.347 0.240 0.100 0.030 0.044 0.067 82.80 -

Gemma Construction Supply 5044

Const. of Multi-Purpose Building @ Purok Marcos, Sta. Cruz

Tampakan realigned to Const. of Multi-Purpose Building

XII 0.903 O 0.397 0.300 0.100 0.030 0.018 0.100 94.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 167

Page 176: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gemma Construction Supply 5044

Const. of Sinawal Flood Control Protecting Makar-Tupi-Marbel

RoadXII 1.390 C 0.305 0.300 0.300 - - - 90.50 88.22%

V. Satisfactory

Gemma Construction Supply 5044 Const./Renovation/Completion

of DPWH Regional Office XII XII 4.998 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Gemma Construction Supply 5044 Repair/Rehab. Along Dulawan-

Marbel Road XII 9.620 C 0.262 0.237 0.300 - - - 79.90 *79.90% Satisfactory

Gemma Construction Supply 5044

Widening/Conc. of Calean Bridge along Dulawan-Marbel

RoadXII 9.497 C 0.369 0.200 0.300 - - - 86.90 86.90%

V.Satisfactory

Geneson Construction & Supply 13728

Rehab. w/ Asphalt Overlay, Crack & Joint Sealing @ Onyx

St.NCR 1.887 C 0.366 0.300 0.300 - - - 96.60 *96.60%

Outstanding

Geneson Construction & Supply 13728 Repair/Rehab. of Road and

Drainage Improvement NCR 2.373 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

Genetian Builders 18052 Const. of 1 Cl Sch. Bldg. @ Pioneer NHS San Pedro Annex IX 0.500 C 0.178 0.138 0.300 - - - 61.60 *61.60%

Fair

Geovan Marketing 10824 Const. of Agbalili River Control VI 4.815 C 0.277 0.300 0.300 - - - 87.70 83.38% V. Satisfactory

Gerezsons Resources Corporation 20699 Const. of 1 CL Sch. Bldg. Tolosa

NHS VIII 0.519 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Gerezsons Resources Corporation 20699 Const. of Drainage Canal @ Pob.

1 VIII 0.275 C 0.336 0.200 0.300 - - - 83.60 *83.60% V. Satisfactory

Gerezsons Resources Corporation 20699 Const. of Inopacan Seawall VIII 9.297 C 0.133 0.300 0.300 - - - 73.30 *73.30%

Satisfactory

Gershli Construction & Supply 28480 Conc. of Road @ Brgy. Sico IV-A 0.189 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Gershli Construction & Supply 28480 Const. of FMR at Brgy. Santor IV-A 1.926 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V . Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 168

Page 177: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gershli Construction & Supply 28480 Const. of MPB at Brgy. Wawa IV-A 3.372 C 0.310 0.286 0.300 - - - 89.60 *89.60%

V. Satisfactory

Gershli Construction & Supply 28480

Const. of Multi Purpose Building/Structure in Brgy.

BilaranIV-A 0.479 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

Gershli Construction & Supply 28480 Impvt. of MPB, Cuenca C/S IV-A 0.289 C 0.345 0.277 0.300 - - - 92.20 *92.20%

Outstanding

Gershli Construction and Supply 28480 Const. of Multi-Purpose Bldg., @

(Talipapa) Brgy. 2-A IV-A 0.478 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

Gershli Construction and Supply 28480 Const. of Reinforced Concrete

Box Culvert IV-A 0.191 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

GES Construction 30299 PICAS-San Vicente CIS, Phase 7, Contingency PIO 531.923 C 0.349 0.219 0.300 - - - 86.80 86.80%

V.Satisfactory

GES Construction 30299 Taripa CIS PIO 1.012 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -

Geto Construction 17689 Concreting of Interior Roads IV-A 1.910 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

Gicar Construction 12624Conc. of Line Canal along Surigao-Wharf Road km.

1122+270 to km. 1122+560XIII 0.962 C 0.311 0.300 0.300 - - - 91.10 89.90%

V. Satisfactory

Gicar Construction 12624Conc. of Line Canal with Slope

Protection along Surigao-Agusan Road

XIII 1.927 C 0.388 0.166 0.300 - - - 85.40 84.38% V. Satisfactory

Gicar Construction 12624 Conc. of Surigao City-San Juan Coastal Road XIII 28.595 O 0.322 0.300 0.100 0.030 0.065 0.100 91.70 -

Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I XIII 10.274 C 0.376 0.205 0.300 - - - 88.10 86.93%

V. Satisfactory

Gicar Construction 12624 Const. of Navarro Bridge & Approaches XIII 8.029 C 0.363 0.176 0.300 - - - 83.90 79.64%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 169

Page 178: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gicar Construction 12624Const./Widening of Dinagat-

Loreto Road (Sto. Niño-Diegas Section)

XIII 14.424 C 0.358 0.300 0.000 - - - 65.80 70.60% Satisfactory

Gicar Construction 12624 Impvt./Conc. of Lantay-Maraboc-Pangantucan Road X 14.274 C 0.345 0.119 0.300 - - - 76.40 74.36%

Satisfactory

Gicar Construction 12624 Replacement of San Isidro Bridge XIII 14.151 C 0.300 0.300 0.300 - - - 90.00 90.00%

OutstandingGilbert D. Lim "GDL" Enterprise & Services 25499 Conc. of Bolod-Bolod-Catmon

Road VIII 4.650 C 0.210 0.200 0.300 - - - 71.00 *71.00% Satisfactory

Gind Construction and Enterprises 18679 Repair of Multi-Purpose Building

@ Poblacion Este I 0.567 C 0.363 0.200 0.300 - - - 86.30 87.56% V. Satisfactory

Giovanni Construction 12168 Conc. of Jct. Agusan-Misamis Nat'l Highway XIII 9.193 C 0.354 0.200 0.300 - - - 85.40 88.28%

V. Satisfactory

GJD Construction & Supply 25866 Const. of 2 CL Sch. Bldg. @ Titay NHS Malagandis Annex IX 0.871 C 0.332 0.230 0.300 - - - 86.20 68.91%

Fair

GJD Construction & Supply 25866 Const. of MPB @ Poblacion IX 0.475 C 0.372 0.181 0.300 - - - 85.30 *85.30% V. Satisfactory

GJD Construction & Supply 25866 Const. of Pedestrian Overpass @ Tigbungabong IX 2.859 C 0.175 0.300 0.300 - - - 77.50 65.14%

Fair

GJE Builders 18286 Conc. of Coral-San Francisco Road w/ Box Culvert III 4.709 C 0.283 0.300 0.300 - - - 88.30 87.76%

V. Satisfactory

GJE Builders 18286 Conc. of FMR @ Brgy. Bawa III 0.614 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory

GJE Builders 18286 Conc. of Purok 5 Road III 1.675 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory

GJE Builders 18286 Const. of 1 CL Sch. Bldg. at San Juan de Valdez E/S III 0.423 C 0.290 0.257 0.300 - - - 84.70 *84.70%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 170

Page 179: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

GJE Builders 18286 Paving/Upgrading of Romulo Highway, Sta. Ignacia Section III 2.737 C 0.318 0.291 0.300 - - - 90.90 *90.90%

Outstanding

GLCT Construction 30657Completion/Continuation of

Unfinished Matain Bridge along Olongapo-Bugallon Road

III 5.519 C 0.328 0.149 0.300 - - - 77.70 78.66% Satisfactory

GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge III 13.950 C 0.364 0.300 0.300 - - - 96.40 96.40% Outstanding

Global V Builders / HITRI Construction joint venture 29763

Boracay Environmental Infrastucture Project Drainage

SystemPTA 94.176 S 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -

GNE Construction 21764

Conc. of Liloy-Labason Road (Osukan Sect.) Realigned to

Labason-Gutalac, Zamboanga del Norte

IX 4.631 C 0.395 0.291 0.300 - - - 98.60 94.22% \Outstanding

GNE Construction 21764 Const. of Modified 2 CL Sch. Bldg. E/S IX 0.765 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

GNE Construction 21764 Const. of MPB, Poblacion IX 0.935 C 0.373 0.147 0.300 - - - 82.00 *82.00% V. Satisfactory

GNGC Enterprises 29124

Conc. of Armstrong Ave. & Conc. & Drainage Impvt. of

Sunset St. (Package II) @ Brgy. Moonwalk & Brgy. San Antonio

NCR 3.305 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory

Go Solid Builders, Inc. 32885Const. of 2 CL Secondary Sch. Bldg. @ Tacloban City National

High Sch.VIII 0.949 C 0.352 0.200 0.300 - - - 85.20 *85.20%

V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold

Rich Const.)16489 Const. of Classrooms at City

High School Annex CAR 7.531 C 0.390 0.130 0.300 - - - 82.00 *82.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 171

Page 180: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gold Rich Construction &Trading (Formerly: Gold

Rich Const.)16489 Const. of MPB @ Brgy. Gabriela

Silang CAR 1.909 C 0.396 0.195 0.300 - - - 89.10 *89.10% V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold

Rich Const.)16489 Rehab./Impvt. of Ferguson Road CAR 6.626 C 0.396 0.109 0.300 - - - 80.50 *80.50%

V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold

Rich Const.)16489 Rehab./Impvt. of Kennon Drive,

Kennon Road CAR 6.626 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold

Rich Const.)16489 Rehab./Impvt. of Outlook Drive CAR 6.626 C 0.391 0.107 0.300 - - - 79.80 *79.80%

Satisfactory

Goldbern Construction 28509Repair / Rehabilitation of

Buildings 9 & 10 @ Bagong Lipunan Condominium (BLC)

NCR 1.690 C 0.393 0.300 0.300 99.30 *99.30% Outstanding

Golden Ridge Enterprises 29946 Masao Port Expantion Project PPA 91.102 C 27.982 30.000 30.000 - - - 86.61 86.61% V.Satisfactory

Goldfin Construction 21343 Completion of Multi-Purpose Building VII 1.324 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -

Goldfin Construction 21343Const. Additional Floor and

Repair/Repair of existing MPB (TESDA)

IX 4.718 C 0.385 0.257 0.300 - - - 94.20 81.57% V. Satisfactory

Goldfin Construction 21343 Const. of 1 unit, 4 Storey, 20 CL Tisa II E/S Bldg. VII 13.363 C 0.370 0.248 0.300 - - - 91.80 84.17%

V. Satisfactory

Goldfin Construction 21343 Const. of Camp Lapu-Lapu E/S VII 2.938 C 0.362 0.300 0.300 - - - 96.20 85.77% V. Satisfactory

Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project PPA 16.879 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -

Goldrich Construction and Trading 16489 Const. of MPB @ Brgy. Gabriela

Silang CAR 1.909 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 172

Page 181: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Goldrich Construction and Trading 16489

Impvt. of Bontoc-Tinglayan Road (Package 2), km. 396+500-km.

398+400CAR 12.407 C 0.338 0.200 0.300 - - - 83.80 78.52%

Satisfactory

Goldrich Construction and Trading 16489 Impvt. of Pico-Lamtang Road CAR 5.742 C 0.330 0.292 0.300 - - - 92.20 92.20%

Outstanding

Goldrich Construction and Trading (Formerly: Goldrich Const.)

16489Rehab. of Kennon Road, Km.

242+966-Km. 243+066 and Km. 245+268-Km. 245+563

CAR 9.361 C 0.322 0.265 0.300 - - - 88.70 *88.70% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Const. of Ilog-ilog Bridge, Rizal-

Panalingaan Road IV-B 15.616 C 0.291 0.279 0.300 - - - 87.00 83.04% V. Satisfactory

Goldrock Construction & Development Corp. 5389

Rehab. of El Nido-Taytay Road (Brgy. Mabini-Brgy. Sandoval

Section)IV-B 14.155 C 0.372 0.200 0.300 - - - 87.20 86.42%

V. Satisfactory

Goldrock Construction & Development Corp. 5389 Rehab. of Taytay Road (Sitio

Igang-Brgy. Pamantolon Sect.) IV-B 14.157 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Rehab./Impvt. of Quezon-Punta

Baja Road IV-B 14.229 O 0.317 0.159 0.100 0.030 0.033 0.100 73.90 -

Goldrock Construction & Development Corp. 5389 Rehab./Impvt. Of Quezon-Punta

Baja Road IV-B 14.229 O 0.299 0.234 0.100 0.030 0.043 0.100 80.60 -

Gonzalo Construction 1826Impvt. along Acop-Kapangan-

Kibungan-Bakun Road, km 290+100 - Km. 294+700 (VS)

CAR 19.130 C 0.314 0.200 0.300 - - - 81.40 76.24% Satisfactory

Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.364 0.300 0.100 0.030 0.021 0.100 91.50 -

Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.337 0.289 0.030 0.030 0.056 0.067 80.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 173

Page 182: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Gonzalo Construction 1826 Replacement/ Const. of Man-asok Bridge & Approaches CAR 9.305 C 0.355 0.000 0.300 - - - 65.50 80.14%

V. Satisfactory

Gonzalodo Enterprises 30681Conc. of Bogo-Curva-Madellin-Daanbantayan Road, Antipolo

SectionVII 7.600 C 0.309 0.200 0.300 - - - 80.90 *80.90%

V. Satisfactory

Gonzalodo Enterprises 30681 Impvt. of MPB VII 1.885 C 0.349 0.200 0.300 - - - 84.90 72.09% Satisfactory

Gonzalodo Enterprises 30681 Impvt. of MPB, Lapu-lapu Central School VII 0.921 C 0.314 0.200 0.300 - - - 81.40 *81.40%

V. Satisfactory

Good Fortune International, Inc. 9246 Const. of Arevalo-Sooc Bridge &

Approaches VI 7.237 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -

Good Fortune International, Inc. 9246 Improvement of Mandurriao-San

Miguel-Alimodin-Maasim Road VI 11.564 O 0.313 0.231 0.050 0.023 0.035 0.067 71.90 -

Good Fortune International, Inc. 9246 Improvement of Mandurriao-San

Miguel-Alimodin-Maasin Road VI 11.564 O 0.304 0.237 0.100 0.030 0.028 0.100 79.90 -

Good Fortune International, Incorporated 9246 Const. of Arevalo-Sooc Bridge &

Approaches VI 7.237 C 0.281 0.300 0.300 - - - 88.10 87.62% V. Satisfactory

Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge VI 17.477 O 0.257 0.233 0.100 0.030 0.060 0.100 78.00 -

Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge VI 17.477 O 0.339 0.300 0.100 0.030 0.065 0.067 90.10 -

Good Fortune International, Incorporated 9246 Const. of Odol Bridge VI 12.223 C 0.383 0.300 0.000 - - - 68.30 77.11%

Satisfactory

Good Medal Construction and Supplies 19309 Const. of Drainage System @

San Isidro V 0.143 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 174

Page 183: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Good Speed Construction & Services 20572 Asphalt Overlay at Brgy. Halang

going to Brgy. Real IV-A 1.921 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

Goodvibe Builders, Inc. 32686 Conc. of FMR @ Nancayasan I 0.475 C 0.223 0.300 0.300 - - - 82.30 *82.30% V. Satisfactory

Gospa Construction 15353 Impvt./Rehab. of MPB NCR 0.480 C 0.349 0.257 0.300 - - - 90.60 *90.60% Outstanding

Gowil Builders 18733 Conc. of FMR @ Brgy. Awihao VII 0.953 C 0.324 0.175 0.300 - - - 79.90 81.46% V. Satisfactory

Gowil Builders 18733 Const. of MPB, Bry. Cabitoonan VII 1.429 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

Gowil Builders 18733 Repair/Rehab. of Roads at N. Bacalso Ave. VII 4.795 C 0.276 0.300 0.300 - - - 87.60 *87.60%

V. Satisfactory

GP Construction 18653 Const. of MPB V 1.872 C 0.390 0.200 0.300 - - - 89.00 85.92% V. Satisfactory

GP Construction 18653 Const. of Spillway V 0.378 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

GPJ Construction 10613 Conc. of Makati Ave. (Phase III) NCR 0.712 C 0.398 0.300 0.300 - - - 99.80 *99.80% Outstanding

Grace Construction Corporation 3771 Asphalt Overlay along Ozamis-

Oroquieta Road X 9.634 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory

Grace Construction Corporation 3771

Completion of Tagoloan Parallel Bridge & Approaches along Butuan-Cagyan de Oro-Iligan

Road (SA #3)

X 54.184 O 0.396 0.300 0.100 0.030 0.055 0.100 98.10 -

Grace Construction Corporation 3771 Conc. of Oroquieta-Calamba Mt.

Road X 2.863 C 0.294 0.300 0.300 - - - 89.40 85.02% V. Satisfactory

Grace Construction Corporation 3771

Const. of 108 m Steel Truss Bridge with one Pier Steel

ComponentsIX 62.851 O 0.331 0.291 0.100 0.022 0.033 0.100 87.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 175

Page 184: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Grace Construction Corporation 3771

Const. of Cagayan de Oro City 3rd Bridge & Approaches Phase

VX 16.854 C 0.395 0.300 0.300 - - - 99.50 86.56%

V. Satisfactory

Grace Construction Corporation 3771 Const. of Cagayan de Oro Third

Bridge & Access Road Phase VI X 72.905 O 0.365 0.251 0.050 0.030 0.045 0.067 80.80 -

Grace Construction Corporation 3771 Const. of Cagayan de Oro Third

Bridge & Access Road Phase VI X 72.905 O 0.365 0.300 0.100 0.030 0.035 0.100 93.00 -

Grace Construction Corporation 3771 Const. of Kipit II Bridge and

Approaches IX 69.136 O 0.338 0.300 0.100 0.030 0.043 0.067 87.80 -

Grace Construction Corporation 3771 Const. of Kipit II Bridge and

Approaches IX 69.136 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -

Grace Construction Corporation 3771 Const. of Kipit II Bridge and

Approaches IX 69.136 O 0.284 0.293 0.000 0.030 0.042 0.100 74.90 -

Grace Construction Corporation 3771 Const. of Limpapa Bridge &

Approaches IX 60.097 O 0.226 0.240 0.100 0.030 0.047 0.100 74.30 -

Grace Construction Corporation 3771 Const. of Opao Bridge &

Approaches IX 71.415 O 0.361 0.203 0.100 0.030 0.035 0.100 82.90 -

Grace Construction Corporation 3771 Const. of Tagoloan Bridge &

Approaches X 38.345 O 0.340 0.300 0.100 0.030 0.045 0.100 91.50 -

Grace Construction Corporation 3771 Const. of Tagoloan Bridge &

Approaches X 38.345 O 0.353 0.162 0.100 0.030 0.035 0.100 78.00 -

Grace Construction Corporation 3771 Const. of Upper Makar Bridge I XII 8.582 C 0.392 0.200 0.300 - - - 89.20 *89.20%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 176

Page 185: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Grace Construction Corporation 3771

Const./Impv't. (PCCP) of CP-D: Sect. A-Monte Alegre Jct.-Aurora Road Sect. B-Monte Alegre Jct.-

Molave Road

KFAED 310.371 C 0.378 0.300 0.000 - - - 67.80 81.29% V. Satisfactory

Grace Construction Corporation 3771

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Manay-Caraga Section, Phase I

XI 192.466 O 0.347 0.300 0.100 0.030 0.037 0.100 91.40 -

Grace Construction Corporation 3771

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Manay-Caraga Section, Phase I

XI 192.466 O 0.367 0.300 0.100 0.030 0.030 0.100 92.70 -

Grace Construction Corporation 3771

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Manay-Caraga Section, Phase I

XI 192.466 O 0.246 0.300 0.100 0.030 0.060 0.100 83.60 -

Grace Construction Corporation 3771

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Manay-Caraga Section, Phase II

XI 178.716 O 0.324 0.300 0.100 0.030 0.060 0.100 91.40 -

Grace Construction Corporation 3771

Impvt./Conc. Paving of Dapitan City-Dakak Road, along Dapitan City-Dakak Coastal Loop Road

Phase II

IX 18.631 C 0.367 0.200 0.300 - - - 86.70 77.64% Satisfactory

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan

City-Dakak Road, Phase I IX 48.030 O 0.400 0.300 0.100 0.018 0.051 0.100 96.90 -

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan

City-Dakak Road, Phase I IX 48.038 O 0.329 0.229 0.100 0.030 0.038 0.100 82.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 177

Page 186: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan

City-Dakak Road, Phase I IX 48.038 O 0.360 0.270 0.100 0.030 0.042 0.100 90.20 -

Grace Construction Corporation 3771

Impvt./Rehab. of Butuan-Cagayan de Oro-Iligan Road,

Salay-Dampil, Lagonglong Section, Looc

X 9.592 C 0.242 0.237 0.300 - - - 77.90 *77.90% Satisfactory

Grace Construction Corporation 3771

Maint./Rehab. & Imp. of National Arterial & Secondary Rd.,

Oroquieta-Plaridel-Calamba-Sapang Dalaga Rd.

X 4.780 C 0.301 0.300 0.300 - - - 90.10 88.54% V. Satisfactory

Grace Construction Corporation 3771

Rehab./Impvt. of Sayre Highway, PCC to Damulog Section

(Selective Section)X 18.538 C 0.383 0.200 0.300 - - - 88.30 81.10%

V. Satisfactory

Grace Construction Corporation/Ulticon Builders, Inc. (JV)

JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches

XI 226.982 O 0.354 0.300 0.050 0.030 0.060 0.067 86.10 -

Grace Construction Corporation/Ulticon Builders, Inc. (JV)

JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches

XI 226.982 O 0.373 0.300 0.050 0.030 0.065 0.067 88.50 -

Grace Construction Corporation/Ulticon Builders, Inc. (JV)

JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches

XI 226.982 O 0.356 0.300 0.070 0.030 0.037 0.067 86.00 -

Grace Llan Const. & General Mdse. 1847 Const. of 2 Storey 8 Cl Sch.

Bldg. @ BNHS IV-A 14.247 C 0.389 0.231 0.300 - - - 92.00 79.40% Satisfactory

Graia Const. & Supply (Formerly: Graia Const. &

Supplies30826

Impvt./Rehab. of Mc-Donald Junction-Aguinaldo via Talaba

RoadIV-A 14.449 C 0.344 0.300 0.300 - - - 94.40 *94.40%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 178

Page 187: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Granby Trading & Construction 27554 Conc. of Bayanan-Tiguihan Pola

Port Access Road IVB 4.748 O 0.235 0.240 0.100 0.030 0.032 0.100 73.70 -

Granby Trading & Construction 27554 Concreting of Brgy. Road @

Brgy. Sabang IV-A 1.917 C 0.386 0.200 0.300 - - - 88.60 88.55% V. Satisfactory

Granby Trading & Construction 27554 Const. of Malvar Public Market IV-A 3.855 C 0.347 0.200 0.300 - - - 84.70 88.55%

V. Satisfactory

Grand Builders 6845 Conc. of Tubod-Ganassi Road X 10.832 C 0.300 0.300 0.000 - - - 60.00 76.92% Satisfactory

Grand Builders 6845 Rehab. of Linamon-Zamboanga Road, Tubod Section X 9.057 C 0.306 0.300 0.000 - - - 60.60 75.60%

Satisfactory

Grand Tower Engineering Technology 31946

Const. of Library & Multi-Purpose HE Type Building (P-I)

BNHS AnnexX 0.471 C 0.343 0.300 0.300 - - - 94.30 83.59%

V. Satisfactory

Grand Tower Engineering Technology 31946 Const. of MPB @ Nabag-o X 0.471 C 0.346 0.300 0.300 - - - 94.60 66.46%

Fair

Great Lakes Enterprises 31429 Const. of Melgar Seawall IV-B 4.775 C 0.267 0.200 0.300 - - - 76.70 81.14% V. Satisfactory

Greco Construction and Supply 21884 Rehab./Asphalting along MSDR

West Service Road NCR 4.825 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory

Green Horizons Landscapers and Developers, Inc.

18802Conc. of Calapan South Road

(Conc./Impvt. of Pasi II & Happy Valley Section)

IV-B 28.906 C 0.205 0.287 0.300 - - - 79.20 82.86% V. Satisfactory

Green Horizons Landscapers and Developers, Inc.

18802Conc. of CNR San Teodoro-

Puerto Galera Road, Tamaraw Section

IV-B 19.165 C 0.363 0.300 0.300 - - - 96.30 91.02% Outstanding

Green Horizons Landscapers and Developers, Inc.

18802 Const. of MPB @ Sitio IV Agua IV-B 1.899 C 0.351 0.200 0.300 - - - 85.10 85.10% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 179

Page 188: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Greenwall Construction 14457 Repair/Impvt./Rehab. of San Luis-Ma. Aurora-Catañeda Road III 4.624 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Greg Construction and Trading 19455 Const. of Classrooms at Dr.

Arcadio NHS NCR 4.770 C 0.253 0.200 0.300 - - - 75.30 78.31% Satisfactory

Greyrock Construction 9296 Reconst. of Zamboanga City-Labuan-Limpapa Road IX 12.273 O 0.369 0.240 0.100 0.030 0.045 0.100 88.40 -

Guinhalinan Construction & Concrete Aggregates

Supplies28965 Completion of Baywalk XIII 1.910 C 0.320 0.300 0.300 - - - 92.00 92.00%

Outstanding

Guinhalinan Construction & Concrete Aggregates

Supplies28965 Const. of Flood Control

Structures along Shoreline XIII 1.920 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

Guinhalinan Construction & Concrete Aggregates

Supplies28965 Rehab. of Tabon-Labisma-

Lawigan Road XIII 3.745 C 0.332 0.200 0.300 - - - 83.20 84.10% V. Satisfactory

Guinhalinan Construction & Concrete Aggregates

Supplies28965 Completion of Baywalk XIII 1.913 O 0.271 0.300 0.100 0.030 0.070 0.067 83.80 -

GVN Builders 29577 Rehab. of MPB @ Cupang West III 1.410 C 0.320 0.153 0.300 - - - 77.30 *77.30% Satisfactory

GVR Construction & Supply 31603 Const. of MPB (Atty. G.R.

Banaag RCYDC) XIII 0.959 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

H R B Construction 10528 Const./Impvt. of Multi-Purpose Bldg. @ Gubat V 0.141 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

H R B Construction 10528 Opening of Salvacion-Del Rosario Road V 4.703 C 0.267 0.300 0.300 - - - 86.70 79.20%

Satisfactory

H.G. Lopez Construction 17691 Const. of Dagupan MPB CAR 0.466 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 180

Page 189: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

H.G. Lopez Construction 17691 Const. of Multi-Purpose Building (Phse II) Town Proper I 2.817 C 0.396 0.300 0.300 - - - 99.60 86.86%

V. Satisfactory

H.G. Lopez Construction 17691Const. of Road Leading to Christ the Redeemer, Brgy.1 (Lubrins

Hts.) I 1.099 O 0.328 0.238 0.100 0.022 0.018 0.100 80.60 -

H.G. Lopez Construction 17691 Const. of TESDA MPB CAR 1.906 C 0.350 0.200 0.300 - - - 85.00 88.15% V. Satisfactory

H.L.J. Construction & Enterprises 18080 Completion of Road Cementing

and Drainage Canal VII 0.474 C 0.328 0.200 0.300 - - - 82.80 83.04% V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Balasan-Carles Road,

Guinticgan-Abong Sction VI 15.755 C 0.226 0.285 0.300 - - - 81.10 85.80% V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-

Lapus, Fairways Sect.) VI 17.915 O 0.259 0.253 0.100 0.015 0.016 0.067 71.00 -

H.L.J. Construction & Enterprises 18080 Conc. of Datag-Kamulayan FMR VII 1.267 C 0.291 0.300 0.300 - - - 89.10 *89.10%

V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Iloilo-Capiz Road (New

Route) VI 18.190 C 0.348 0.300 0.300 - - - 94.80 91.04% Outstanding

H.L.J. Construction & Enterprises 18080

Conc. of Jct. Bearins along Tapi-Magballo Road (Bantayan Section) at Brgy. Bantayan

VI 4.743 C 0.247 0.300 0.000 - - - 54.70 71.32% Satisfactory

H.L.J. Construction & Enterprises 18080

Conc. of Jct. Bearins-Salong Tapi-Magballo Road (Magballo

Section) at Brgy. MagballoVI 4.662 C 0.268 0.300 0.000 - - - 56.80 72.16%

Satisfactory

H.L.J. Construction & Enterprises 18080

Conc. Paving of National Road along Dancalan-Candoni Road,

Brgy. DancalanVI 2.957 O 0.329 0.300 0.100 0.015 0.022 0.067 83.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 181

Page 190: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

H.L.J. Construction & Enterprises 18080

Conc. Paving of National Road along Dancalan-Candoni Road,

km. 105+447 - km. 105+777VI 3.047 O 0.336 0.213 0.100 0.008 0.022 0.067 74.60 -

H.L.J. Construction & Enterprises 18080

Concrete Paving of Brgy. Carol-an-Ayungon Farm-to-Market

RoadVI 1.518 C 0.228 0.200 0.300 - - - 72.80 77.12%

Satisfactory

H.L.J. Construction & Enterprises 18080

Const. of 1 CL @ @ Hermenegilda F. Gloria Memorial

H/SVII 0.432 C 0.301 0.300 0.300 - - - 90.10 90.45%

Outstanding

H.L.J. Construction & Enterprises 18080 Const. of 1 Unit 1 CL School

Bldg. @ Daan Banua E/S VI 0.378 C 0.380 0.245 0.300 - - - 92.50 91.59% Outstanding

H.L.J. Construction & Enterprises 18080 Const. of Naiba-Maningcao Road VII 0.940 O 0.308 0.234 0.100 0.008 0.025 0.100 77.50 -

H.L.J. Construction & Enterprises 18080 Const. of Pedestrian Overpass VII 4.522 C 0.398 0.300 0.300 - - - 99.80 94.25%

Outstanding

H.L.J. Construction & Enterprises 18080 Const. of Sac-sac Road Lined

Canal VII 1.373 C 0.300 0.300 0.300 - - - 90.00 *90.00% Outstanding

H.L.J. Construction & Enterprises 18080 Const. of San Jose (Canaway)

River Control Project VII 4.666 C 0.330 0.200 0.300 - - - 83.00 79.88% Satisfactory

H.L.J. Construction & Enterprises 18080

Impvt. of Roads leading to the Twin Springs Project, Brgy. Bunga to Brgy. Baslay Road

VII 9.311 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -

H.P.L. General Construction 22289 Concreting of Various Municipal

and Barangya Roads II 1.708 O 0.329 0.240 0.100 0.022 0.030 0.100 82.10 -

H.S. Oaminal Construction & General Merchandise 10578 Completion of Dormitory Bldg. I

Phase I DOST 5.829 O 0.320 0.300 0.128 0.017 0.043 0.023 83.10 -

H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road II 14.459 O 0.302 0.231 0.100 0.030 0.033 0.067 76.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 182

Page 191: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

H.T.L. Construction 3962 Redecking of Ipil Bridge along Daang Maharlika II 11.560 O 0.361 0.240 0.070 0.010 0.028 0.067 77.60 -

Haidee Construction and Development Corp./Al-B

Const. (JV)

SL2-SN-00774 / JV-

06-078

Impvt./Widening of Mc Arthur Highway, Phase III (Package III),

Replacement of Labangan Bridge No. 7

III 115.799 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

Haidee Construction and Development Corporation 10365 Completion of Friendship Bridge

& Approaches, Phase V III 23.917 O 0.303 0.300 0.100 0.030 0.040 0.100 87.30 -

Haidee Construction and Development Corporation 10365 Const. of Friendship Bridge &

Approaches, Phase III III 23.478 O 0.274 0.204 0.100 0.030 0.054 0.100 76.20 -

Halrey Construction, Inc. 2267 Const. (Conc.) of Marikina-Infanta Rd. P-II, Rizal Side IV-A 43.396 C 0.347 0.200 0.300 - - - 84.70 84.70%

V.Satisfactory

Halrey Construction, Inc. 2267Geometric

Improvement/Rehab./Reblocking of Portions of EDSA Q.C.

NCR 9.530 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

Halrey Construction, Inc. 2267

Impvt./Conc. Blocking of Katipunan Ave. & E. Rodriguez Jr. C-5 (Shuster St. to Ortigas

Ave.)

NCR 14.314 C 0.329 0.300 0.300 - - - 92.90 95.48% Outstanding

Halrey Construction, Inc. 2267Rehab. (Concrete Blocking) of

EDSA from Quezon Ave. to Annapolis (South Bound)

NCR 9.554 C 0.382 0.300 0.300 - - - 98.20 96.88% Outstanding

Halrey Construction, Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct.-Caylabne Road IV-A 28.922 O 0.328 0.300 0.100 0.030 0.028 0.100 88.60 -

Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329

Const./Impv't. (PCCP) of C.P.A. Sect. A-Tukuran Rd., Dobliston

Jct. & Sect. B-Kapatagan-Dobliston Jct. Road

KFAED 633.001 C 0.304 0.300 0.300 - - - 90.40 89.65% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 183

Page 192: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329

CP-A: Const./Impvt. of Kapatagan-Dobliston Jct. Road

(Addendum)KFAED 1,305.817 O 0.396 0.300 0.100 0.030 0.056 0.100 98.20 -

Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329

CP-A: Const./Impvt. of Kapatagan-Dobliston Jct. Road

(Addendum)KFAED 202.745 O 0.341 0.300 0.100 0.030 0.060 0.100 93.10 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of

Tigum & Aganan RiverMFCP I 1,194.106 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of

Tigum & Aganan RiverMFCP I 1,194.106 O 0.400 0.300 0.100 0.030 0.047 0.100 97.70 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of

Tigum & Aganan RiverMFCP I 1,305.817 O 0.360 0.200 0.100 0.030 0.065 0.200 95.50 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of

Tigum & Aganan RiverMFCP I 1,305.817 O 0.355 0.200 0.100 0.030 0.070 0.200 95.50 -

Hanjin Heavy Industries & Construction Co. Ltd.

SL2-SN-000445

Bohol Cicumferential Road Impv't. Project CP-1, Valencia-

Tagbilaran-Calape SectionPJHL 1,000.084 C 0.382 0.300 0.300 - - - 98.20 97.60%

Outstanding

Hanjin Heavy Industries & Construction Co. Ltd.

SLN-SN-000452

Bohol Irrigation Project, Stage 2 (BHIP2-C-2) BHIP 608.709 C 0.331 0.300 0.300 - - - 93.10 93.10%

Outstanding

Hanjin Heavy Industries & Construction Co. Ltd. FC-98-216 CP MN-A: Iligan-Aurora Road 6th

Road Project ADB 714.824 C 0.385 0.300 0.300 - - - 98.50 96.85% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 184

Page 193: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of

Tukuran-Dobliston Road KFAED 577.304 O 0.368 0.297 0.050 0.030 0.042 0.100 88.70 -

Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of

Tukuran-Dobliston Road KFAED 577.304 O 0.330 0.300 0.100 0.030 0.054 0.100 91.40 -

Hanjin Heavy Industries & Construction Co. Ltd.

SL2-SN-00556

CP-III, Reconst. of Four (4) Bridges along Arterial Roads

Project, Phase IV (Baroro Bridge)

PJHL 128.692 O 0.363 0.300 0.070 0.030 0.050 0.067 88.00 -

Hanjin/Kurimoto JV SL2-SN-000452 Bohol Irrigation Project, Stage 2 NIA-IV 1561.392 C 0.380 0.300 0.300 - - - 98.00 98.00%

Outstanding

Hausland Construction 32378 Const. of MPB at Minuyan Proper Towerville E/S III 1.422 C 0.232 0.300 0.300 - - - 83.20 *83.20%

V. Satisfactory

Hazama/ Taisei/ Nippon Steel HTN JV

S-05-09-001

Subic-Clark-Tarlac Expressway Project BCDA 9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.335 0.295 0.070 0.030 0.051 0.033 81.49 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 185

Page 194: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.385 0.289 0.070 0.018 0.051 0.067 88.08 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.373 0.275 0.070 0.030 0.047 0.033 82.79 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.378 0.298 0.050 0.030 0.047 0.033 83.62 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.365 0.296 0.050 0.012 0.051 0.033 80.69 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.362 0.299 0.050 0.023 0.056 0.067 85.58 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.362 0.295 0.050 0.030 0.047 0.033 81.69 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway

Project-Package 2 BCDA-III 9,097.880 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -

Hazama-Taisei-Nippon Steel (HTN JOINT

VENTURE)FC-04-025

Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and

Interchange

JBIC 596.889 O 0.348 0.300 0.050 0.030 0.038 0.067 83.25 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 186

Page 195: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hazama-Taisei-Nippon Steel (HTN JOINT

VENTURE)FC-04-025

Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and

Interchange

BCDA 596.889 O 0.385 0.297 0.050 0.030 0.061 0.067 88.95 -

HCM Construction Corporation 19382 Const. of Las Piñas-Muntinlupa-

San Pedro Link Road NCR 9.519 C 0.369 0.300 0.300 - - - 96.90 *96.90% Outstanding

HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -

HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -

HCM Construction Corporation 19382 Slope Protection of Creek @

Brgy. Pulang Lupa & Manuyo NCR 9.600 C 0.376 0.300 0.300 - - - 97.60 94.84% Outstanding

Henry S. Oaminal Const. & General Merchandise 10578 Conc. of Jct. (LIR) Carmen-

Sagbayan-Bacane Road VII 22.646 O 0.293 0.222 0.000 0.020 0.032 0.100 66.70 -

Herbert Malmis General Merchandise & Contractor,

Inc.4593 Concrete Paving of Tagbilaran-

Sikatuna Road VII 6.495 C 0.359 0.300 0.300 - - - 95.90 86.60% V. Satisfactory

Herefold Builders Construction and Supply 20789 Conc. of Road at Sinala-Gulibay IV-A 3.059 C 0.324 0.189 0.300 - - - 81.30 *81.30%

V. Satisfactory

Herefold Builders Construction and Supply 20789 Impvt. of MPB IV-A 0.099 O 0.335 0.300 0.100 0.030 0.023 0.067 85.50 -

HG III Construction & Dev't. Corp. 947 NBP Resettlement Project,

Phase III NHA 155.483 O 0.16 0.24 0.1 0.02 0.018 0.1 63.75 -

HG III Construction and Dev't Corp. 947 Sct. Ranger Housing Project,

Phase III NHA 49.688 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -

HGG Builders and Supply 17824 Completion of Academic Bldg. Phase 3 DOST 13.127 C 0.374 0.299 0.300 - - - 97.32 97.32%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 187

Page 196: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

HGG Builders and Supply 17824 Completion of Dormitory Bldg. Phase 3 DOST 17.342 O 0.362 0.226 0.030 0.030 0.040 0.067 75.50

HGG Builders and Supply 17824 Conc. of Brgy. Road, Andaya Highway Jct. to Municipal Hall V 0.926 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

HGG Builders and Supply 17824 Const. of Conc. Drainage Canal, Brgy. Bigajo Norte V 0.946 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

HGG Builders and Supply 17824 Const. of Multi-Purpose Building V 1.929 C 0.400 0.249 0.300 - - - 94.90 89.93% V. Satisfactory

HGG Builders and Supply 17824 Const. of Public Market, Brgy. Barcelona V 1.891 C 0.359 0.200 0.300 - - - 85.90 *85.90%

V. Satisfactory

HG-III Construction and Dev't. Corp. 8431 Land Development of Scout

Ranger Housing Project, Ph. 3 NHA 49.597 C 0.385 0.299 0.300 - - - 98.40 98.40% Outstanding

Hibiscus Trading and Construction Services 28280

Completion of Pedestrian Overpass Across

Commonwealth Ave.NCR 1.873 C 0.267 0.300 0.300 - - - 86.70 85.98%

V. Satisfactory

Hibiscus Trading and Construction Services 28280

Package 8: a) Renovation/Improvement of Multi-Purpose Bldg. Brgy.

Socorro: b) Completion of Multi-Purpose Bldg. Brgy. Masagana

NCR 1.590 C 0.282 0.277 0.300 - - - 85.90 86.32% V. Satisfactory

Hibiscus Trading and Construction Services 28280 Repair/Rehab. of Multi-Purpose

Building NCR 2.687 C 0.294 0.300 0.300 - - - 89.40 88.14% V. Satisfactory

Hilmarc's Construction Corporation 2748 Rehab. of Rizal MPB, Sports

Center (Phase II) NCR 38.595 C 0.314 0.300 0.300 - - - 91.40 91.40% Outstanding

Hi-point Construction Corporation 30744 Rehab./Conc. of Roads VIII 4.563 C 0.125 0.200 0.300 - - - 62.50 *62.50%

Fair

Hi-point Construction Corporation 30744

Repair/Rehab. of Catarman-Mondragon Road along

Catarman BridgeVIII 9.600 O 0.364 0.240 0.100 0.030 0.029 0.067 83.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 188

Page 197: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hi-point Construction Corporation 30744

Repair/Rehab. of Catarman-Mondragon Road along

Catarman BridgeVIII 9.600 O 0.247 0.240 0.100 0.030 0.030 0.100 74.70 -

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Completion of Tokyo Bridge along Catanduanes Circ. Road V 14.379 O 0.400 0.298 0.100 0.020 0.019 0.100 93.70 -

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Const. of MPB BUPC Admin. Center (Phase II) V 15.759 C 0.367 0.200 0.300 - - - 86.70 88.66%

V. Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Const. of Sabang MPB V 9.556 O 0.400 0.225 0.100 0.030 0.030 0.100 88.50 -

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Const. of Sabang MPB V 9.556 O 0.400 0.240 0.100 0.020 0.016 0.067 77.60

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Const./Widening of Washington Drive to Lakandul Drive V 9.550 C 0.372 0.101 0.300 - - - 77.30 *77.30%

Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Dredging of Panganiran River V 19.188 C 0.388 - 0.500 - - - 88.80 *88.80% V. Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.

Supply)

23385 Opening/Const. of Tagoytoy-Taladong Road (Phase I) V 14.249 C 0.363 0.262 0.300 - - - 92.50 91.84%

Outstanding

Hi-Tri Development Corporation 1758 Impvt. of Masbate-Malinta &

Masbate-Mobo Road V 10.387 C 0.188 0.135 0.300 - - - 62.30 *62.30% Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 189

Page 198: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Hi-Tri Development Corporation 1758

Rehab./Impvt. Along Pili-Tigaon-Albay Bdry. Road, km. 472+080

to km. 480+000V 4.680 C 0.221 0.300 0.300 - - - 82.10 *82.10%

V. Satisfactory

HLC Construction and Development Corporation 8775 Rehab./Impvt. of Panabo Coastal

Road, Arieta Section XI 11.096 O 0.375 0.300 0.070 0.030 0.065 0.067 90.70 -

HLJ Construction & Enterprises 18080 Concreting of Roads VI 0.892 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

HLJ Construction & Enterprises 18080 Const. of Pedestrian Bridge @

Hibbard Avenue VII 4.472 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -

Hoger Construction 24128 Repair/Rehab. of Jct. Buenavista-Lawaan Rd. VIII 3.342 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Homeworld Engineering 14725

Rehab./Reconst. of Damaged Paved Nat'l Roads Generated

from PMS/HDM-4, Sum-ag-Abunan Road

VI 30.687 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -

Hony Trading and Construction 26898

Const., Rehab., Replacement, Completion & Repair of

Elementary & Secondary Sch. Bldg. at CP Teresa E/S

NCR 2.384 C 0.376 0.183 0.300 - - - 85.90 *85.90% V. Satisfactory

Horamabi Builders 24129Asphalt Overlay of Jct. Layac-Balanga-Mariveles Port Road

(Orion Section)III 1.924 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

Horamabi Builders 24129 Const. of MPB @ Bataan NHS III 1.881 C 0.253 0.300 0.300 - - - 85.30 77.53% Satisfactory

Horamabi Builders 24129Const. of One (1) CL School

Building @ Balanga Integrated Sch.

III 0.422 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory

Horamabi Builders 24129 Const. of One (1) CL School Building @ Marina Bay E/S III 0.472 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 190

Page 199: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Horamabi Builders 24129Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe

National HSIII 0.887 O 0.366 0.300 0.100 0.030 0.019 0.100 91.50 -

Horamabi Builders 24129 Rehab. of Sch. Bldg. at Pablo Roman High School III 0.754 C 0.323 0.300 0.300 - - - 92.30 *92.30%

Outstanding

Horamabi Builders 24129Repair & Rehab. of Gov. J.J. Linao Road, Balanga City to

Bagac SectionIII 9.446 C 0.273 0.205 0.300 - - - 77.80 *77.80%

Satisfactory

Houserock Builders and Trading 18822 Rehab./Impvt. Along A.H. Lacson

Ave. NCR 0.933 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

HPL General Construction 22289 Completion of DPWH-NVSDEO Bldg. II 2.700 C 0.363 0.200 0.300 - - - 86.30 86.30%

V. Satisfactory

HPL General Construction 22289 Completion of Multi-Purpose Building II 0.426 C 0.327 0.250 0.300 - - - 87.70 82.38%

V. Satisfactory

HPL General Construction 22289 Concreting of Various Municipal and Brgy. Roads II 1.708 C 0.323 0.300 0.300 - - 92.30 89.48%

V. Satisfactory

HPL General Construction 22289 Const. of Tupang River Control II 1.871 C 0.373 0.300 0.300 - - - 97.30 71.92% Satisfactory

HPL General Construction 22289Const./Replacement of

Camanauan Bridge, along Dugo-San Vicente Road (DVSR)

II 4.240 O 0.396 0.217 0.100 0.030 0.028 0.067 83.80 -

HPL General Construction 22289Const./Replacement of

Camanauan Bridge, along Dugo-San Vicente Road (DVSR)

II 4.240 O 0.380 0.210 0.030 0.022 0.023 0.067 73.20 -

HRB Construction 10528 Road Concreting of Sta. Cruz-Ratay (CSSAC School Campus) V 0.620 C 0.357 0.300 0.300 - - - 95.70 *95.70%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 191

Page 200: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

HVC Sagittarius Commercial and

Construction12954 Completion of Multi-Purpose

Bldg., XII 2.751 C 0.375 0.292 0.300 - - - 96.70 86.31% V. Satisfactory

HVC Sagittarius Commercial and

Construction12954

Conc. of Sarangani Davao del Sur Coastal Road, Kalatungan-

Punsad SectionXII 9.429 O 0.316 0.277 0.100 0.030 0.043 0.067 83.30 -

HVC Sagittarius Commercial and

Construction12954 Const. of MPB @ Brgy. Sinolon XII 0.759 C 0.281 0.300 0.300 - - - 88.10 84.74%

V. Satisfactory

Hypro Construction and Development Corporation 32745 Const. of Mompong Flood

Control IV-B 4.825 C 0.284 0.300 0.300 - - - 88.40 *88.40% V. Satisfactory

I & E Construction 10410 Improvement/Rehab. of city Streets (Rueda & Navarro Sts.) VIII 1.908 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 O 0.361 0.225 0.070 0.003 0.028 0.100 78.70 -

I & E Construction 10410 Impvt./Conc. of Marikina-Infanta Road (marcos Hi-way) P-III IV-A 14.354 C 0.347 0.200 0.300 - - - *84.70 84.70%

V. Satisfactory

I & E Construction 10410 Impv't./Rehab. of Roadside Lopez-Buenavista Road IV-A 4.728 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

I & E Construction 10410

Repair/Rehab./Impvt. of Nat'l Roads along Bagahupi-

Babatngon Road, Tanauan-Dagami Road, Mainit-San Miguel

Santoil Road

VIII 24.097 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding

I M B Construction 13259 Conc. Paving of Brgy. Catmon-Daan VII 0.926 C 0.316 0.300 0.300 - - - 91.60 *91.60%

Outstanding

I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 C 0.336 0.200 0.300 - - - 83.60 80.66% V. Satisfactory

I & E Construction 10410 Impvt. of Drainage along Maharlika Highway VIII 3.779 C 0.379 0.200 0.300 - - - 87.90 87.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 192

Page 201: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

I & E Construction 10410 Impvt./Rehab. of Dr. Damian Reyes Road-Boac Side (Phase I) IV-B 14.239 C 0.299 0.200 0.300 - - - 79.90 *79.90%

Satisfactory

I & E Construction 10410Impvt./Rehab. of Tanauan-

Dagami-Burauen Road, San Miguel- Barugo Road

VIII 19.296 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

I & E Construction 10410 Rehab./Impvt. of Old Road MSR , Brgy. San Antonio IV-A 19.204 C 0.287 0.200 0.300 - - - 78.70 *78.70%

Satisfactory

I.F. Blanco's Construction 25350 Conc. of Lumangbayan-Pili Road IV-B 9.410 C 0.361 0.300 0.300 - - - 96.10 87.64% V. Satisfactory

I.F. Blanco's Construction 25350 Conc. of Zone 1, Marfrancisco Road IV-B 9.485 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

I.F. Blanco's Construction 25350 Const. of 1 CL Sch. Bldg. @ Sinampad P/S IV-B 0.479 C 0.384 0.200 0.300 - - - 88.40 82.24%

V. Satisfactory

I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road IV-B 4.710 C 0.298 0.230 0.300 - - - 82.80 86.80%

V. Satisfactory

I.F. Blanco's Construction 25350 Const. of Orconuma River Control (Gabion Type) IV-B 4.714 C 0.287 0.257 0.300 - - - 84.40 *84.40%

V. Satisfactory

I.M. Construction Corporation 20074 Concrete Reblocking along Gov.

A. Pascual St. NCR 4.744 O 0.336 0.300 0.100 0.030 0.047 0.100 91.30 -

IBC International Builders Corporation 8576

Asphalt Overlay along Mambusao-Imbug Road, Km.

97+200-Km. 98+000VI 9.941 C 0.332 0.200 0.300 - - - 83.20 *83.20%

V. Satisfactory

IBC International Builders Corporation 8576 Asphalt Overlay at Iloilo-Capiz

Road (New Route) VI 11.400 C 0.345 0.276 0.300 - - - 92.10 *92.10% Outstanding

IBC International Builders Corporation 8576

Asphalt Overlay of Barotac Nuevo-Dumangas-Dacutan

Coastal RoadVI 9.310 C 0.326 0.233 0.300 - - - 85.90 87.64%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 193

Page 202: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

IBC International Builders Corporation 8576

Asphalting of Priority Gravel Road Gap along Guimaras

Circumferential RoadVI 2.722 C 0.355 0.200 0.300 - - - 85.50 *85.50%

V. Satisfactory

IBC International Builders Corporation 8576 Completion of Cabano Bridge

(Final) VI 4.776 C 0.355 0.253 0.300 - - - 90.80 *90.80% Outstanding

IBC International Builders Corporation 8576 Conc. of Iloilo-Capiz Road (Old

Route) VI 28.319 O 0.367 0.225 0.030 0.023 0.045 0.067 75.70 -

IBC International Builders Corporation 8576 Conc. of Mandurriao-Pacquiad

Road VI 4.811 C 0.315 0.300 0.300 - - - 91.50 91.50% Outstanding

IBC International Builders Corporation 8576 Conc. of Oton-Pakiad Road VI 9.176 C 0.343 0.066 0.300 - - - 70.90 74.98%

Satisfactory

IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -

IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -

IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.030 0.030 0.043 0.067 87.00 -

IBC International Builders Corporation 8576 Rehab. of Batiano Bridge @

Molo Blvd. VI 4.375 C 0.286 0.300 0.300 - - - 88.60 86.56% V. Satisfactory

IBC International Builders Corporation (Formerly: IBC

Iloilo Builders Corp.)8576 Asphalt Overlay of M. Laserma

Street-C. Laserma Street VI 2.404 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

IBC International Builders Corporation (Formerly: IBC

Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras

Circumferential Road VI 6.258 O 0.273 0.268 0.100 0.030 0.040 0.100 81.10 -

IBC International Builders Corporation (Formerly: IBC

Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras

Circumferential Road VI 6.258 O 0.274 0.300 0.100 0.030 0.037 0.100 84.10 -

IBC International Builders Corporation (Formerly: IBC

Iloilo Builders Corp.)8576 Const. of Cuartero Bridge

(Phase I) VI 9.661 C 0.290 0.240 0.300 - - - 83.00 *83.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 194

Page 203: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

IBC International Builders Corporation (Formerly: IBC

Iloilo Builders Corp.)8576 Const. of Two (2) Storey Iloilo

Hall of Justice Building VI 12.629 C 0.368 0.191 0.300 - - - 85.90 87.41% V. Satisfactory

Icalina Builders and Construction Supply 26889 Const. of Multi-Purpose

Pavement Zone II X 0.932 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

Icalina Builders and Construction Supply 26889

Const. of Slope Protection along Misamis Oriental-Ma. Cristina Bdry. Road, Nunucan Section

X 4.234 C 0.309 0.200 0.300 - - - 80.90 82.34% V. Satisfactory

Icalina Builders and Construction Supply 26889 Rehab./Impvt./Conc. of Tubod

Ganassi National Road X 4.574 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding

IDI Trading & Contractor 29006 Completion of Multi-Purpose Building III 0.762 C 0.377 0.279 0.300 - - - 95.60 *95.60%

OutstandingIKM Builders &

Construction Supply 30252 Const. of 2 Storey Extension Bldg. (RHUI) IV-A 4.812 C 0.292 0.255 0.300 - - - 84.70 *84.70%

V. Satisfactory

IKM Builders & Construction Supply 30252

Rehab./Reconst. of Damaged National Road, Batangas-Lobo Road, Dagatan-Laurel Section

IV-A 9.647 C 0.255 0.300 0.300 - - - 85.50 *85.50% V. Satisfactory

ILG Enterprises 31985 Conc. of Public Market Road and Parking along Brgy. Biñan IV-A 0.955 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V. Satisfactory

ILG Enterprises 31985 Const. of FMR at Sitio III (Balugbog) IV-A 2.873 C 0.361 0.300 0.300 - - - 96.10 *96.10%

Outstanding

ILG Enterprises 31985Const./Rehab. of Drainage

System along CSCF Jct. Paete Section

IV-A 2.434 C 0.320 0.300 0.300 - - - 92.00 85.10% V. Satisfactory

IM Construction Corporation 20074 Conc. Blocking of Susano Road NCR 2.873 C 0.367 0.300 0.300 - - - 96.70 *96.70%

Outstanding

IM Construction Corporation 20074 Conc./Impvt. of Road along MH

del Pilar St. NCR 9.480 C 0.361 0.300 0.300 - - - 96.10 *96.10% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 195

Page 204: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

IM Construction Corporation 20074 Concrete Reblocking along Gov.

A. Pascual St. NCR 4.744 C 0.347 0.300 0.300 - - - 94.70 92.66% Outstanding

IM Construction Corporation 20074 Const. of Pedestrian Overpass at

IBP Road NCR 2.866 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory

IM Construction Corporation 20074

Impvt. of Roads with Drainage System along Dalagang Bukid

St. NCR 14.259 C 0.208 0.200 0.300 - - - 70.80 *70.80%

Satisfactory

IM Construction Corporation 20074

Impvt./Widening (Conc.) of Boni Serrano Ave., Marikina Side to

Quezon City SideNCR 13.637 C 0.364 0.300 0.300 - - - 96.40 91.33%

Outstanding

IM Construction Corporation 20074 Rehab./Impvt. of Kalayaan Ave.

District II NCR 9.545 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding

IM Construction Corporation 20074 Rehab./Reblocking of General

Luis St. NCR 2.862 C 0.317 0.300 0.300 - - - 91.70 *91.70% Outstanding

IM Construction Corporation 20074 Widening of North Avenue NCR 8.605 C 0.329 0.300 0.300 - - - 92.90 *92.90%

Outstanding

IMB Construction 13259 Const. of Multi-Purpose Building VII 0.938 C 0.306 0.200 0.300 - - - 80.60 *80.60%

V. Satisfactory

Interchain Builders 28734 Const. of FMR @ Brgy. Magallanes-Brgy. Pating V 0.931 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

Interior-Philworks Const. Joint Venture JV-04-014

CP1, Ligao-Pio Duran Setion, Arterial Road Links Devt. (Phase

V)V 328.190 C 0.231 0.300 0.300 - - - 83.10 84.28%

V. Satisfactory

International Builders Corporation (IBC) 8576 Fort San Pedro Improvement

Project PPA 181.489 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -

Irving Doyle T. Paras Construction 27362 Conc. of Caraycaray-Cabungan-

Libtong FMR VIII 0.944 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

Irving Doyle T. Paras Construction 27362 Const. of River Control VIII 4.339 C 0.267 0.300 0.300 - - - *86.70 86.70%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 196

Page 205: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Isaga Builders 8652 Const. of Conner Central National High School CAR 0.864 C 0.326 0.265 0.300 - - - 89.10 84.97%

V. Satisfactory

Isaga Builders 8652 Const. of Sta. Marcela MPB CAR 1.439 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory

Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road CAR 9.344 O 0.341 0.240 0.100 0.008 0.040 0.100 72.90 -

Isaga Builders 8652Repair & Maintenance of Nat'l

Road & Bridges, Abbut-Conner-Kabugao Road

CAR 4.711 C 0.323 0.261 0.300 - - - 88.40 82.40% V. Satisfactory

Isaga Builders 8652 Repair/Rehab. of Calafug-Lipay-Masico FMR CAR 0.470 C 0.373 0.275 0.300 - - - 94.80 93.36%

Outstanding

Isaga Builders 8652 Repair/Rehab. of Priority FMR (Municipal wide) CAR 1.394 C 0.178 0.225 0.300 - - - 70.30 *70.30%

Satisfactory

ISH Construction Inc. 30407 Const. of one unit 3-Storey Elementary School Bldg., Pkg. 2 SLB 16.059 C 0.330 0.300 0.000 - - - 63.00 63.00%

Fair

ISH Construction Inc. 30407Construction of one(1) unit 3-

storey Elementary School Building, Package 2

NHA 16.059 O 0.22 0.25 0.05 0.015 0.017 0.067 61.90 -

ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) SLB 17.201 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -

ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building NHA 16.404 O 0.338 0.138 0.100 0.030 0.070 0.100 77.52 -

ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building NHA 17.762 C 0.394 0.295 0.300 - - - 98.94 83.95%

V.Satisfactory

ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Elementary School Bldg. SLB-LPO 18.839 C 0.298 0.293 0.300 - - - 89.10 89.10%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 197

Page 206: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Italian-Thai Development Public Company Limited FC-03-043

CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project (Himayangan-

Silago-Abuyog Road & Liloan-San Ricardo Road Project)

Phase IV

PJHL 1,010.701 C 0.374 0.300 0.300 - - - 97.40 93.74% Outstanding

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of

ARLDP, Phase V PJHL 1,164.620 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of

ARLDP, Phase V PJHL 1,164.622 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of

ARLDP, Phase V PJHL 1,164.622 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of

ARLDP, Phase V PJHL 1,164.622 O 0.369 0.300 0.100 0.030 0.070 0.100 96.90 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of

ARLDP, Phase V PJHL 1,164.622 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 18.300 C 0.400 0.300 0.300 100.00 100%

Outstanding

ITP Construction, Inc. 9392 Sct. Ranger Housing Project, Phase I NHA 51.850 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 O 0.378 0.262 0.070 0.020 0.053 0.067 84.93 -

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -

ITP Construction, Inc. 9392 Sct. Ranger Housing Village Project. Phase I NCL 51.777 C 0.261 0.300 0.300 - - - 86.10 86.10%

V.Satisfactory

Ivahrick Contractors 13688 Const. of Flood Control NCR 2.857 O 0.280 0.119 0.100 0.030 0.005 0.200 73.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 198

Page 207: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ivy Michelle Trading & Construction 24093

Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.),

Marangas-Bonobono SectionIV-B 22.097 C 0.294 0.300 0.300 - - - 89.40 *89.40%

V. Satisfactory

Ivy Michelle Trading & Construction 24093

Conc. of El Nido-Bataraza Road (PPC-Narra-Aboabo Sect.), San

Isidro/Calategas SectionIV-B 23.990 C 0.185 0.293 0.300 - - - 77.80 84.52%

V. Satisfactory

Ivy Michelle Trading & Construction 24093

Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo

SectionIV-B 11.395 C 0.226 0.299 0.300 - - - 82.50 *82.50%

V. Satisfactory

Ivy Michelle Trading & Construction 24093 Conc. of Quezon-Aramaywan

Road (Tabon Section) IV-B 24.965 O 0.344 0.236 0.100 0.030 0.048 0.100 85.80 -

Ivy Michelle Trading & Construction 24093 Concreting of PPNR Roxas

Taytay-El Nido National Road IV-B 3.508 C 0.233 0.300 0.300 - - - 83.30 87.02% V. Satisfactory

Ivy Michelle Trading & Construction 24093 Const. of 1 Cl Sch. Bldg. @

Narra NHS IV-B 0.435 C 0.335 0.118 0.300 - - - 75.30 *75.30% Satisfactory

Ivy Michelle Trading & Construction 24093

Const. of 1-CL, New Barbacan E/S, Roxas North (part of CY 2004 DepEd School Building

Program Clustered)

IV-B 0.381 C 0.390 0.285 0.300 - - - 97.50 83.92% V. Satisfactory

Ivy Michelle Trading & Construction 24093 Const. of Aramaywan-Berong-

Puerto Princesa Road IV-B 19.097 C 0.339 0.200 0.300 - - - 83.90 79.40% Satisfactory

J & A Pimentel Construction 7953 Completion of MPB Tago (Phase

V) XIII 9.231 C 0.319 0.200 0.300 - - - 81.90 80.75% V. Satisfactory

J & A Pimentel Construction 7953 Completion of MPB Tandag

(Phase V) XIII 9.387 C 0.338 0.200 0.300 - - - 83.80 85.55% V. Satisfactory

J & A Pimentel Construction 7953 Conc. of Junction Cortes-Nurcia

Section (SDCR) XIII 19.280 O 0.307 0.224 0.070 0.030 0.027 0.100 75.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 199

Page 208: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J & A Pimentel Construction 7953 Const. of Balibadon 4 Bridge XIII 18.988 O 0.377 0.240 0.100 0.030 0.022 0.100 86.90 -

J & A Pimentel Construction 7953 Const. of Balibadon I Bridge XIII 5.785 C 0.223 0.200 0.300 - - - 72.30 81.36%

V. Satisfactory

J & A Pimentel Construction 7953 Const. of Bocawe Bridge &

Approaches XIII 11.180 C 0.266 0.200 0.300 - - - 76.60 80.20% V. Satisfactory

J & A Pimentel Construction 7953 Const. of Cagmino Bridge &

Approaches XIII 11.830 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

J & A Pimentel Construction 7953

Impvt. of Bank Protection of Anibongan Bailey Bridge along

SCDRXIII 5.174 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

J & A Pimentel Construction and Supply 7953 Const. of Banahaw Bridge Phase

VI XIII 19.263 O 0.343 0.300 0.050 0.022 0.032 0.067 81.40 -

J & A Pimentel Construction and Supply 7953 Const. of Multi-Purpose Building

Phase III XIII 4.522 C 0.362 0.300 0.300 - - - 96.20 81.15% V. Satisfactory

J & A Pimentel Construction and Supply 7953 Const. of Tandag Multi-Purpose

Bldg. Phase II XIII 4.546 C 0.131 0.300 0.300 - - - 73.10 75.41% Satisfactory

J & S Escuadra Construction & Supply 20077 Const. of 2 units CL @ Hagonoy

NHS Annex XI 0.952 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

J D E Construction 19173 Const. of Two (2) unit CL @ West City Central School X 0.932 C 0.371 0.200 0.300 - - - 87.10 82.62%

V. Satisfactory

J D E Construction 19173 Impvt. of Waterways, Sapang Creek along ICBR X 4.667 C 0.354 0.200 0.300 - - - 85.40 83.72%

V. Satisfactory

J L A Construction & Supplies 24503 Const. of MPB at Almendras E/S XI 1.710 C 0.353 0.300 0.300 - - - 95.30 91.03%

Outstanding

J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 45.895 O 0.336 0.291 0.000 0.030 0.042 0.033 73.20 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 200

Page 209: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 44.812 O 0.315 0.287 0.000 0.030 0.042 0.067 74.10 74.10%

Satisfactory

J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Balbalan-

Pinukpuk Road CAR 26.052 O 0.323 0.234 0.100 0.020 0.030 0.067 77.40 -

J. C. Baac Construction Corporation 25974

Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Road (Gongon

Sect.)CAR 13.257 C 0.370 0.300 0.300 - - - 97.00 78.40%

Satisfactory

J. C. Baac Construction Corporation 25974 Replacement/Const. of Langso

Bridge CAR 7.699 C 0.291 0.200 0.000 - - - 49.10 67.97% Fair

J. Custorio Construction 16237Rehab./Conc. Paving along

Bantayan-Malobago-Pagsang-an-Genagdanan Road

VIII 0.477 C 0.247 0.200 0.300 - - - 74.70 *74.70% Satisfactory

J. Custorio Construction 16237 Rehab./Impv't. of DPWH-Northern Samar 2nd DEO VIII 0.246 C 0.396 0.158 0.300 - - - 85.40 *85.40%

V. Satisfactory

J.B. Alarcon Enterprises 18849 Completion of Approaches and Revetment of Gen. Luna Bridge IVA 3.105 C 0.340 0.200 0.300 - - - 84.00 87.42%

V. Satisfactory

J.B. Alarcon Enterprises 18849 Const. of 2 CL Sch. Bldg. @ Cavinti E/S IVA 0.681 C 0.370 0.200 0.300 - - - 87.00 86.72%

V. Satisfactory

J.B. De Jesus Builders and Design Services 22867 Const. of FMR at Brgy. San

Agustin III 4.693 C 0.318 0.204 0.300 - - - 82.20 *82.20% V. Satisfactory

J.D. Legaspi Construction 9608 Baseco Linear/Community Park cum Revetment Wall PRRC 139.778 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -

J.D. Legaspi Construction 9608

CP 7: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Baganga Section Phase II

XI 191.035 O 0.211 0.300 0.100 0.030 0.060 0.100 80.10 -

J.D. Legaspi Construction 9608 Pasig River Ferry Service Station PRRC 7.303 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 201

Page 210: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J.E. Arradaza Construction & Supply 25353 Const. of Duguan Communal

Irrigation Project NIA-II 2.338 C 0.326 0.300 0.300 - - - 92.60 92.60% Outstanding

J.E. Arradaza Construction & Supply 25353 Const. of Public Market-Building

Phase II VIII 1.421 C 0.375 0.212 0.300 - - - 88.70 *88.70% V. Satisfactory

J.E. Arradaza Construction & Supply 25353 Const. of Multi Purpose

Pavement at Brgy. Banilad VII 0.478 C 0.336 0.217 0.300 - - - 85.30 *85.30% V. Satisfactory

J.E. Manalo & Company, Inc. 422 Zamboanga Port Expansion

Project PPA 282.050 O 0.400 0.300 0.100 0.030 0.059 0.100 98.92 -

J.G. & P Enterprises 5090 Const. of Pedestrian Foot Bridge along Gov. Drive (FCIE) IV-A 3.823 C 0.302 0.200 0.300 - - - 80.20 *80.20%

V. Satisfactory

J.G. & P Enterprises 5090Rehab. And Impvt. Along Kawit-Noveleta Diversion Road, Kawit

SectionIV-A 10.345 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V. Satisfactory

J.G. & P Enterprises 5090 Ripraping of Imus River Brgy. Salinas IV-A 0.961 C 0.279 0.300 0.300 - - - 87.90 *87.90%

V. Satisfactory

J.G. Garcia Construction 21054 Construction of Multi-Purpos Bldg. @ Maasin E/S I 0.772 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &

Approaches (Phase I)Sp.

Bridges 174.420 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &

Approaches (Phase I)Sp.

Bridges 174.420 O 0.332 0.269 0.000 0.030 0.061 0.067 75.90 -

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &

Approaches (Phase I)Sp.

Bridges 174.420 O 0.344 0.240 0.100 0.030 0.061 0.067 84.20 -

J.H. Pajara Construction Corp. 1890 Const. of Dalibubon Bridge,

along Ipil-Jones-San Agustin II 239.834 C 0.393 0.284 0.000 - - - 67.70 79.96% Satisfactory

J.H. Pajara Construction Corp. 1890

CP 6, Restoration of Patapat Viaduct under the Arterial Road

Links Dev. Project, Phase VPJHL 187.597 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 202

Page 211: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J.H. Pajara Construction Corp. 1890

NAIA Expressway & its Related Road Projects Phase I Package-

IVA Sales St. Viaduct Ramp Structure (M & E Retaining Wall)

URPO 348.561 C 0.302 0.300 0.000 - - - 60.20 68.66% Fair

J.I. Etac Construction & Supply 32722

Reconst. of Daang Maharlika (SM) San Isidro-San Juan

SectionVIII 9.606 C 0.343 0.200 0.300 - - - 84.30 68.76%

Fair

J.I. Viacrusis Construction 14382 Completion of 4CL, Storey School Building Balic-balic E/S III 0.889 C 0.378 0.242 0.300 - - - 92.00 84.51%

V. Satisfactory

J.I.L. Trading & Construction Co. 14634 Const. of Brgy Road @ Brgy.

Kayumanggi IVA 1.921 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory

J.M. Luciano Const., Inc./Dimson (Manila), Inc.

(JV)

JV-03-023/SLN-004452

Phil-Japan Friendship Highway Mindanao Section Rehabiltation

Project, Phase 1 (Contract Package 7 & 8)

PJHL 754.879 C 0.265 0.300 0.300 - - - 86.50 87.01% V. Satisfactory

J.M. Luciano Construction Inc. (Formerly: J.M. Luciano

Const.)2083

Impvt./Conc. of SCDR Cortes-Tandag-Marihatag Road, Tandag-

Marihatag SectionXIII 77.202 C 0.318 0.300 0.300 - - - 91.80 90.12%

Outstanding

J.M. Maligaya Construction & Construction Supply 15018 Asphalt Overlay of Pob. 3 IV-A 0.285 C 0.270 0.300 0.300 - - - 87.00 *87.00%

V. Satisfactory

J.M. Maligaya Construction & Construction Supply 15018

Concreting of Farm-to-Market Road @ Brgy. Asis II (Sitio

Magsili)IV-A 0.380 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

J.M. Morales Construction & Supply (Formerly: J.M.

Morales Const.)15574 Impvt. of MPB III 5.780 C 0.387 0.270 0.300 - - - 95.70 70.64%

Satisfactory

J.M. Morales Construction & Supply (Formerly: J.M.

Morales Const.)15574 Upgrading/Rehab. of Lubao

Diversion Road III 4.777 C 0.369 0.183 0.300 - - - 85.20 *85.20% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 203

Page 212: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J.N. Dela Torre Construction 24978 Const. of Canangcaan Road

(ARISP), Phase II, Sofronio IV-B 6.219 C 0.376 0.200 0.300 - - - 87.60 86.40% V. Satisfactory

J.N. Dela Torre Construction 24978 Const. of Multi-Purpose Building

(PNP), Brgy. Poblacion IV-B 0.466 C 0.361 0.200 0.300 - - - 86.10 83.86% V. Satisfactory

J.N. Dela Torre Construction 24978

Const. of PPSR, Narra-Aboabo Road Balitien Bridge I & II

ApproachIV-B 5.553 C 0.297 0.292 0.300 - - - 88.90 88.90%

V.Satisfactory

J.N. Dela Torre Construction 24978 Impvt. of MPB @ Pinaglabanan IV-B 0.365 C 0.282 0.218 0.300 - - - 80.00 *80.00%

SatisfactoryJ.P. Aquino & Bros.

(Engineers, Developers, Architects, Builders)

13231 Const. of 1 CL Sch. Bldg. at Bamban Gabaldon Elem. Sch. III 0.426 C 0.344 0.232 0.300 - - - 87.60 *87.60%

V. Satisfactory

J.Q.G. Construction 10530 Conc. of Maluid-San Andres Road (Sitio Malinis) III 1.660 C 0.293 0.210 0.300 - - - 80.30 *80.30%

V. Satisfactory

J.Q.G. Construction 10530 Conc. of San Isidro-Penal Colony-Jct. Yapang Road IV-B 23.812 C 0.355 0.300 0.300 - - - 95.50 82.03%

V. Satisfactory

J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S III 1.091 C 0.313 0.300 0.300 - - - 91.30 81.99% V. Satisfactory

J.Q.G. Construction 10530

Traffic Management along Manila North Road (MNR) Package I along MNR from

Meycauayan to Malolos

III 46.677 C 0.337 0.300 0.300 - - - 93.70 93.70% Outstanding

J.R.C.F. Construction 31641 Const. of Multi-Purpose Building @ Various Sts. Brgy. Roxas NCR 0.662 C 0.396 0.300 0.300 - - - 99.60 *99.60%

Outstanding

J.S. General Contractor 15258 Const. of MPB, Brgy. 7 IV-A 0.476 C 0.356 0.267 0.300 - - - 92.30 *92.30% Outstanding

J.S. General Contractor 15258 Const. of Multi-Purpose Bldg. @ Brgy. Maranan I IV-A 0.475 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -

J.S. General Contractor 15258 Const. of Water Supply System @ Pantihan 1,2, & 3 IV-A 0.575 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 204

Page 213: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J.S. General Contractor 15258 Drainage Impvt. Along Banaba Cerca IV-A 1.905 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

J.S. General Contractor 15258 Improvement of School Building at Cavite State University IV-A 0.950 O 0.353 0.240 0.100 0.030 0.047 0.100 87.00 -

J.S. General Contractor 15258 Rehab. of Sch. Bldg., Cavite State University Gabaldon Bldg. IV-A 1.431 C 0.347 0.200 0.300 - - - 84.70 85.05%

V. Satisfactory

J.S. Layson & Co., Inc. (Formerly: J.S. Layson

Construction)2653

Reconstruction of Nanga Bridge, Km. 25+500 along Iloilo-Antique

RoadVI 19.050 C 0.361 0.200 0.300 - - - 86.10 77.22%

Satisfactory

J.T. Gamolo Construction 15759Cementing of Road from Mountain View College to

Bagontaas X 0.916 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

J.T. Gamolo Construction 15759 Completion of Quezon NHS X 2.790 C 0.397 0.300 0.300 - - - 99.70 95.82% Outstanding

J.T. Gamolo Construction 15759 Concreting of Dologon Busco-Quezon Road (Maramag Sect.) X 4.688 C 0.335 0.300 0.300 - - - 93.50 94.40%

Outstanding

J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) X 14.008 C 0.244 0.300 0.300 - - - 84.40 83.89%

V. Satisfactory

J.T. Gamolo Construction 15759

CP A, Provision of Slope Protection, Const./Installation of Gabions & Const. of Retaining

Wall along Sayre Highway Alae-Kisolon Road

X 9.339 C 0.386 0.300 0.300 - - - 98.60 91.14% Outstanding

J.V. Lagon Construction Corporation 11561 Widening of Kapingkong Bridge

Bo. 2, XII 13.377 C 0.287 0.179 0.000 - - - 46.60 65.68% Fair

J.V. Loreto Const. & Dev't. Corp. 13120 Conc. of Villaba-Leyte Road,

Leyte III VIII 28.880 C 0.174 0.200 0.300 - - - 67.40 76.06% Satisfactory

J.V. Loreto Const. & Dev't. Corp. 13120 Const. of Marcasa Bridge VIII 9.370 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 205

Page 214: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

J.V. Loreto Const. & Dev't. Corp. 13120 Construction of PMO-Tacloban

Port Operation Bldg. PPA 79.644 O 0.3999 0.299 0.03 0.03 0.053 0.067 87.81 -

J.V. Loreto Const. & Dev't. Corp. 13120 Rehab. Along Daang Maharlika

Road VIII 50.156 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

J.V. Loreto Const. & Dev't. Corp. 13120 Rehab./Repair of Bernard Reed

Bridge VIII 9.404 C 0.381 0.023 0.300 - - - 70.40 *70.40% Satisfactory

Jadestress Builders 9753 Impvt. of Talobatibe-Jose Panganiban Road V 9.390 O 0.322 0.283 0.100 0.030 0.033 0.100 86.80 -

Jager Construction & Supply 13619 Const. of Multi Purpose Building

@ San Pablo III 0.467 C 0.363 0.300 0.300 - - - 96.30 82.79% V. Satisfactory

Jagon Builders 24748 Const. of Academic Classroom at Plainview E/S NCR 1.702 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

Jagon Builders 24748 Const./Completion of MPB @ Eshudama Sub. NCR 1.423 C 0.340 0.150 0.300 - - - 79.00 *79.00%

Satisfactory

Jagon Builders 24748

Partial Completion of School Bldg. and Const. of Sch.

Facilities @ Garbriela Silang Annex I

NCR 7.510 C 0.315 0.288 0.300 - - - 90.30 76.65% Satisfactory

Jagon Builders 24748Upgrading/Conc. of Road with

Drainage Impvt. Along Lapu-lapu Ave.

NCR 9.495 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory

Jag-Vail Construction & Supply 24055 Const. of Potenciano Gregorio

Multi-Purpose Building V 1.156 C 0.390 0.300 0.300 - - - 99.00 *99.00% Outstanding

Jag-Vail Construction & Supply 24055

Seal Widening/Conc. of Shoulder along Daang Maharlika, Oas

Diversion RoadV 0.438 C 0.331 0.106 0.300 - - - 73.70 *73.70%

Satisfactory

Jaime B. Ching Enterprises 4256Completion of Guintubhan

(Bagroy) Bridge along Binalbagan-Isabel Road

VI 19.164 O 0.389 0.240 0.100 0.030 0.045 0.067 87.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 206

Page 215: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jaime B. Ching Enterprises 4256Completion of Guintubhan

(Bagroy) Bridge along Binalbagan-Isabel Road

VI 19.164 O 0.215 0.240 0.100 0.030 0.042 0.100 72.70 -

Jaime B. Ching Enterprises 4256 Const. (Conc.) of Marikina-Infanta Rd. P-II, Laguna Side IV-A 48.422 C 0.384 0.200 0.300 - - - 88.40 89.72%

V. Satisfactory

Jaime B. Ching Enterprises 4256 Const. and Improvement of Taloc Main Drainage NIA 5.013 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -

Jalse Construction 13839 Const. of FMR , Lumbia-Canitoan Road X 1.889 O 0.359 0.300 0.100 0.030 0.048 0.100 93.70 -

Jameetrix Construction 19176Conc. of Additional 2-lanes along Davao City Diversion

Road, Buhangin-Maa SectionXI 9.236 C 0.350 0.300 0.300 - - - 95.00 95.00%

Outstanding

Jameetrix Construction 19176 Conc. of Road at Brgy. Magtuod, Matina-Biao Road XI 9.435 C 0.350 0.300 0.300 - - - 95.00 *95.00%

Outstanding

Jan Sha Construction & Supply 19462 Rehabilitation of Mataoroc CIS,

Taisan CIS & Tariric CIS NIA-V 1.763 C 0.323 0.244 0.300 - - - 86.70 *86.70% V.Satisfactory

Jann-Norris Construction and Supplies 31814 Const. of Banganan Flood

Control II 2.884 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory

Jann-Norris Construction and Supplies 31814

Rehab./Impvt. of Road protection along Daang Maharlika, Bonfal-

Solano Sect.II 4.644 C 0.323 0.200 0.300 - - - 82.30 *82.30%

V. Satisfactory

Japuz-Jansol Enterprises 22869 Completion of Maac North Poblacion National Road X 4.822 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., X 3.257 C 0.360 0.300 0.300 - - - 96.00 88.09%

V. Satisfactory

Japuz-Jansol Enterprises 22869 Const. of Agoho MPB X 1.861 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 207

Page 216: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Japuz-Jansol Enterprises 22869Const. of Lined Canal along National Road (Poblacion

Letecia & Poblacion San Roque)X 2.106 C 0.244 0.300 0.300 - - - 84.40 *84.40%

V. Satisfactory

Japuz-Jansol Enterprises 22869 Const./Impv't. of Yumbing Multi-Purpose Building X 1.395 C 0.311 0.300 0.300 - - - 91.10 *91.10%

Outstanding

Japuz-Jansol Enterprises 22869 Const./Rehab. of San Roque-Mahinog NHA Water System X 9.541 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

Jargon Construction & Supply 23474 Completion of MPB at Brgy.

Kernam (Brgy. Hall) XII 0.480 O 0.305 0.300 0.100 0.030 0.013 0.100 84.80 -

Jargon Construction & Supply 23474 Completion of MPB, Brgy.

Mapantig XII 1.248 C 0.399 0.199 0.300 - - - 89.80 *89.80% V. Satisfactory

Jargon Construction & Supply 23474

Conc. of Sarangani-Davao del Sur Coastal Road, Punsad

Section.XII 5.658 C 0.392 0.300 0.000 - - - 69.20 70.94%

Satisfactory

Jargon Construction & Supply 23474

Conc. of Sarangani-Davao del Sur Coastal Road, Taluya-

Gumasa SectionXII 14.145 O 0.398 0.238 0.100 0.030 0.043 0.100 90.90 -

Jargon Construction & Supply 23474 Const. of 1 unit Sch. Bldg. at

Kalawag II XII 0.372 C 0.372 0.075 0.300 - - - 74.70 *74.70% Satisfactory

Jargon Construction & Supply 23474 Const. of MPB (Brgy. Stage) at

Brgy. Baluntay XII 0.193 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory

Jargon Construction & Supply 23474 Const. of Valdez Street XII 0.939 C 0.311 0.200 0.300 - - - 81.10 88.42%

V. Satisfactory

Jargon Construction & Supply 23474 Molo Flood Control XII 1.888 C 0.326 0.300 0.300 - - - 92.60 91.70%

Oustanding

Jargon Construction & Supply 23474

Rehab. of Sarangani-Sultan Kudarat Coastal Road (Malisbong Section)

XII 4.746 O 0.267 0.300 0.100 0.015 0.021 0.100 80.30 -

Jargon Construction & Supply 23474 Rehab. of Sitio Niño-Sitio

Taclobo @ Brgy. Upper Mainit XII 3.660 C 0.000 0.000 0.300 - - - 30.00 38.64% Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 208

Page 217: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jaro Builders and Construction Supply 25560 Const. of MPB @ San Vicente

East IV-B 0.474 C 0.343 0.300 0.300 - - - 94.30 *94.30% Oustanding

Jaro Builders and Construction Supply 25560

Replacement of Slope Protection along National Rd., Minas-

Macatoc Sect.IV-B 1.566 C 0.217 0.000 0.300 - - - 51.70 *51.70%

Poor

Jasa Builders 31330 Conc. of Road at Sitio Camambugan I 0.473 C 0.266 0.300 0.300 - - - 86.60 *86.60%

V. Satisfactory

Jasa Builders 31330 Const. of 1 Cl Sch. Bldg. @ Magalong NHS I 0.436 C 0.279 0.173 0.300 - - - 75.20 *75.20%

Satisfactory

Jasa Builders 31330 Const. of MPB @ Agno C/S I 0.758 C 0.238 0.200 0.300 - - - 73.80 *73.80% Satisfactory

Jasa Builders/Alcel Construction (JV) JV-07-071

Rehab./Reconst. of Damaged Paved Nat'l Roads, Bani-Agno

RoadI 18.998 C 0.247 0.109 0.300 - - - 65.60 78.17%

Satisfactory

Jasmarc Builders and Construction Supply, Co. 31801 Const. of MPB @ Brgy. Mahayag XI 1.177 O 0.316 0.300 0.100 0.020 0.053 0.100 88.90 -

Jasmig Construction Supply 26069

Conc. of Road, Brgy. Dayap to Brgy. Butucan & Brgy. Bulihan

to Brgy. LoocIV-A 4.774 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

Jasmig Construction Supply 26069 Const. of 2 Storey 6 CL RGR

Type S/B @ Bonifacio E/S IV-A 8.547 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

Jasmig Construction Supply 26069 Const. of Brgy. MPB @ San

Fernando IV-A 0.287 C 0.293 0.300 0.300 - - - 89.30 * 89.30% V. Satisfactory

Jasmig Construction Supply 26069 Const. of MPB (PICPA Bldg.) IV-A 0.474 C 0.371 0.200 0.300 - - - 87.10 * 87.10%

V. SatisfactoryJasmig Construction

Supply 26069 Const. of Open Canal @ Brgy. Coliat IV-A 0.964 C 0.312 0.200 0.300 - - - 81.20 *81.20%

V.Satisfactory

Jasmig Construction Supply 26069 Impvt./Rehab. of Catandala Road

and Dumantay-Mahacot Road IV-A 9.648 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding

Jasmin Construction 9561 Rehab. of Quezon-Carangonhan Road V 2.371 O 0.350 0.240 0.100 0.020 0.023 0.100 83.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 209

Page 218: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jaykris Enterprises 30906 Conc. of Datu Panas St. IX 0.960 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory

Jaykris Enterprises 30906 Const. of Road at Lanote St. IX 0.932 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Jaykris Enterprises 30906 Rehab. of Road (Installation of Street Light) IX 0.275 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Jay-mar Builder 7900 Const. of MPB @ SAV 12 Brgy. San Isidro NCR 1.426 C 0.348 0.300 0.300 - - - 94.80 *94.80%

Outstanding

Jay-mar Builder 7900 Const. of Two (2) Storey Sch. Bldg., Tambo E/S, Brgy. Tambo NCR 1.906 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

Jay-mar Builder 7900 Repair of Sidewalk/Roads of San Nicolas St. NCR 1.424 O 0.333 0.000 0.100 0.030 0.032 0.100 59.50 -

JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-03-06) NIA-II 4.919 C 0.360 0.200 0.000 0.020 0.060 0.200 84.00 84.15%

V.Satisfactory

JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-07-06) NIA-II 4.684 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

JBRC Construction 26019 Impvt. of Bago-Manarang Road I 1.896 C 0.394 0.295 0.300 - - - 98.90 *98.90% Outstanding

JCA Builders & Supply 20358 Rehab. of FMR, Little Panay-Kasilak Road XI 2.864 C 0.200 0.300 0.300 - - - 80.00 68.72%

Fair

JCA Builders & Supply 20358Repair/Rehab. of Road @

Package 2, 02634 (A) Brgy. Cabantian

XI 2.359 O 0.211 0.225 0.000 0.030 0.025 0.000 49.10 -

JCW Construction 32161 Const./Impvt. of Silago Terminal Bldg. Complex VIII 0.469 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

JDC Builders 32048 Rehab./Impvt. of MPB (Covered Court) Phase II VIII 1.918 C 0.373 0.300 0.300 - - - 97.30 *97.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 210

Page 219: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JDC Builders - Branch 32048 Const. of Multi-Purpose Pavement at Brgy. Monte Alegre VIII 0.473 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

Jeada Construction 17869 Conc. of Sorsogon Diversion Road V 5.988 C 0.222 0.200 0.300 - - - 72.20 *72.20%

Satisfactory

Jeada Construction 17869Improvement/Rehabilitation of

Shore Protection alongside NHA, Sea Breeze Homes

V 6.745 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -

Jecel Construction Supply 21956Const. / Rehab. / Replacement /

Completion & Repair of E/S Bldg. @ Sixto Babao E/S

XI 0.833 C 0.276 0.300 0.300 - - - 87.60 84.38% V. Satisfactory

Jecel Construction Supply 21956 Const. of MPB @ San Miguel XI 0.952 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Jecel Construction Supply 21956 Const. of MPB @ Upper Limonzo XI 0.952 C 0.371 0.220 0.300 - - - 89.10 86.23% V. Satisfactory

Jeff Construction 14774Conc. of Bagong Silang-

Capalonga National Secondary Rd.

V 9.450 O 0.330 0.240 0.100 0.023 0.045 0.100 83.80 -

Jeff Construction 14774 Const. of Naboongan Bridge, Approaches & Detour V 15.665 O 0.329 0.300 0.070 0.030 0.028 0.067 82.40 -

Jegma Construction & Dev't. Corporation 14775 Conc. of Liloy, Zamboanga del

Norte-Ipil Zamboanga, Sibugay IX 14.314 O 0.358 0.240 0.070 0.030 0.030 0.033 76.10

Jegma Construction & Dev't. Corporation 14775

Rehab./Reconst. of Damaged Paved Nat'l Roads, Camp Lapu-

lapu RoadVII 14.318 C 0.346 0.200 0.300 - - - 84.60 86.70%

V. Satisfactory

Jegma Construction & Dev't. Corporation 14775 Repair/Rehab. of Natalio Bacalso

Ave. VII 9.950 C 0.292 0.210 0.300 - - - 80.20 *80.20% V. Satisfactory

Jegma Construction and Development Corporation 14775 Repair/Maintenace of

Trancentral Highway VII 19.096 O 0.363 0.300 0.100 0.030 0.070 0.100 96.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 211

Page 220: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jejor's Construction Corporation 5143 Rehab./ Impv't. of CCR, MAAC-

Kalipagas Section X 8.994 C 0.272 0.200 0.300 - - - 77.20 82.78% V. Satisfactory

Jejor's Construction Corporation 5143 Rehab./Impvt. Of Camiguin Circ.

Road, Tangub Sect. X 9.554 C 0.400 0.300 0.300 - - - 100.00 94.90% Outstanding

Jejor's Construction/Allado Construction-JV JV-06-052 Proposed Reclamation of Back-

up Area PPA 31.729 O 35.156 25.758 0.070 0.030 0.040 0.100 84.91 -

Jemak Construction & Supply 32056 Conc. of Eco-Tourism @ Brgy.

Guisguis IV-A 8.878 C 0.368 0.200 0.300 - - - 86.80 83.68% V. Satisfactory

Jemak Construction & Supply 32056

Conc. of Mauban-Sampaloc-Lucban-Tayabas Circ. Road,

Phase IXIV-A 33.748 C 0.303 0.300 0.300 - - - 90.30 *90.30%

Outstanding

Jemak Construction & Supply 32056 Const. of MPB at Callejon NHS IV-A 1.341 C 0.392 0.227 0.300 - - - 91.90 83.99%

V. Satisfactory

Jemak Construction & Supply 32056 Rehab./Impvt. of MSR-Jct.

Tiaong-Dolores Road IV-A 14.389 C 0.366 0.300 0.300 - - - 96.60 87.78% V. Satisfactory

Jemak Construction & Supply 32056

Rehab./Reconst. and Conc. Paving of Catanauan-Buenavista

National Road (Phase II-Buenavista Sect.)

IV-A 14.456 C 0.335 0.300 0.300 - - - 93.50 88.40% V. Satisfactory

Jenzab Construction & Design 30654 Completion of MPB VII 0.883 C 0.282 0.200 0.300 - - - 78.20 *78.20%

SatisfactoryJenzab Construction &

Design 30654 Completion of various MPB @ Catmon-daan VII 1.326 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. SatisfactoryJenzab Construction &

Design 30654 Const. of 1 Cl Sch. Bldg @ Simeon Ayuda E/S VII 0.386 C 0.265 0.300 0.300 - - - 86.50 83.77%

V. SatisfactoryJenzab Construction &

Design 30654 Road Conc. At Brgy. Can-Ibuang VII 1.328 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

Jenzab Construction & Design 30654 Road Conc. At Brgy. Sta.

Catalina, Bagong Daan VII 0.741 C 0.168 0.300 0.300 - - - 76.80 *76.80% Satisfactory

Jepa Construction and Supplies 30375

Const. of One (1) CL Sch. Bldg. @ R.E. Cayetano MES, Brgy.

Malaya BEPZIII 0.485 C 0.297 0.087 0.300 - - - 68.40 *68.40%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 212

Page 221: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jepa Construction and Supplies 30375 Repair/Rehab. of Multi-Purpose

Pavement III 0.456 C 0.332 0.209 0.300 - - - 84.10 *84.10% V. Satisfactory

Jerber Trading and Construction 19713 Conct. of One (1) CL S/B at

Magpapalayok E/S III 0.468 C 0.317 0.200 0.300 - - - 81.70 *81.70% V. Satisfactory

Jerber Trading and Construction 19713

Const. of Multi-Purpose Building/ Structure @ Brgy. Valle

CruzIII 0.468 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

Jerber Trading and Construction 19713 Rehab. of Gapan-Peñafrancia-

Fort Magsaysay Road III 4.727 C 0.307 0.207 0.300 - - - 81.40 *81.40% V. Satisfactory

Jerry R. Santiago Construction 18453 Const. of MPB at NEUST,

Sumacab Campus III 3.783 C 0.283 0.200 0.300 - - - 78.30 *78.30% Satisfactory

Jervie Const. & Supply Corp. 7022 Completion of MPB @ Brgy.

Bulwang VI 0.959 C 0.375 0.240 0.000 - - - 61.50 75.78% Satisfactory

Jessie Construction Services 29878 Const. of Atok MPB CAR 0.480 C 0.351 0.147 0.300 - - - 79.80 79.80%

Satisfactory

Jet Construction Supply 7063 Concreting of Ajuy-Concepcion Road VI 9.626 C 0.345 0.200 0.300 - - - 84.50 74.48%

Satisfactory

Jetver Trading & Construction 25501 Const. of MPB @ Brgy.

Poblacion IV-B 0.479 C 0.359 0.200 0.300 - - - 85.90 82.89% V. Satisfactory

Jetver Trading & Construction 25501 Const. of Sch. Bldg., Tagusao

NHS (1 CL) IV-B 0.947 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

JFAP Construction 21706 Const./Rehab. of Ormoc-Margen-Sitio Palimpinon Box Culvert VIII 0.381 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

JFAP Construction 21706

Const./Rehab./Impv't. of Multi-Purpose Bldg. Ormoc City

Center for Sports & Development

VIII 0.480 C 0.374 0.241 0.300 - - - 91.50 *91.50% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 213

Page 222: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jhall Marketing & Services 15760 Conc. of Carles-Balasan Road, Guinticgan Section VI 5.099 C 0.280 0.211 0.300 - - - 79.10 *79.10%

Satisfactory

Jhall Marketing & Services 15760 Const. of MPB in Sto. Rosario VI 1.369 C 0.279 0.300 0.300 - - - 87.90 86.36% V. Satisfactory

Jhall Marketing & Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road VI 9.545 O 0.362 0.222 0.100 0.022 0.043 0.100 84.90 -

JHI Construction & Supply 19317 Const. of MPB (Phase V) I 0.948 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory

JHI Construction & Supply 19317 Impvt. of Viray-Depalo River Control Project I 4.823 C 0.367 - 0.500 - - - 86.70 *86.70%

V. Satisfactory

JHJ Construction 3781 Completion of Codingle Bridge VI 4.452 C 0.200 0.200 0.300 - - - 70.00 75.64% Satisfactory

JHJ Construction 3781Const. of Capiz State University

Auditorium, Capiz State University Main Campus

VI 5.708 C 0.348 0.300 0.300 - - - 94.80 85.21% V. Satisfactory

JHJ Construction 3781 Const. of Maragubdob Bridge VI 7.999 C 0.400 0.200 0.300 - - - 90.00 86.10% V. Satisfactory

JHJ Construction 3781Const./Completion of DepEd

Bldg. (Roof Deck Roofing) Phase I

VI 0.949 C 0.364 0.100 0.300 - - - 76.40 *76.4% Satisfactory

Jim-Jake Const. & Supply 23377 Conc. of Legazpi Road I 0.288 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Jireh Construction & Supply 8240 Const. of Libtong-Mobo Bridge,

Phase XVI @ Estancia-Mobo VI 4.906 C 0.362 0.293 0.300 - - - 95.50 *95.50% Outstanding

Jireh Construction & Supply 8240

Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili

ARCIV-B 17.443 C 0.232 0.267 0.000 - - - 49.90 70.48%

Satisfactory

Jirk Construction 29918 Const. of Cagayan River Control II 9.469 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 214

Page 223: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jirk Construction 29918 Const. of Drainage Canal II 1.412 C 0.211 0.200 0.300 - - - 71.10 *71.10% Satisfactory

Jirk Construction 29918 Const. of Drainage Canal @ Bagumbayan and Tucalana II 0.435 C 0.260 0.104 0.300 - - - 66.40 *66.40%

Fair

JJ & J Construction & General Supply 3023 Rehabilitation of Owak Isidro

Communal Irrigation System NIA-VII 2.377 O 0.342 0.300 0.300 - - - 94.20 -

JJ & J Construction and General Supply 30231 Const. of MPB at Brgy. Bacayan VII 0.479 C 0.300 0.000 0.300 - - - 60.00 *60.00%

PoorJJ & J Construction and

General Supply 30231 Const. of Multi-Purpose Building @ Brgy. Dumlog VII 1.138 C 0.366 0.300 0.300 - - - 96.60 91.46%

Outstanding

JJ & J Construction and General Supply 30231 Const. of Triple Box Culvert VII 2.874 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

JJ & J Construction and General Supply 30231 Const./Conc. of 2 lanes Access

Road to New City Hall (Phase I) VII 4.748 C 0.329 0.300 0.300 - - - 92.90 84.50% V. Satisfactory

JJ & J Construction and General Supply 30231 Const./Conc. of 4 lanes Access

Road to New Toledo City Hall VII 4.748 O 0.312 0.300 0.030 0.030 0.035 0.067 77.40 -

JJ & J Construction and General Supply 30231 Impvt. of Sapangdaku Riverwall VII 1.898 C 0.311 0.300 0.300 - - - 91.10 *91.10%

Outstanding

JJA Construction and Supply 22676 Conc. of Calanan Jct.-Pinukpuk

Jct. Road CAR 4.599 C 0.341 0.013 0.300 - - - 65.40 81.24% V. Satisfactory

JJA Construction and Supply 22676 Const. of Dapasen Community

Erosion Control CAR 0.192 C 0.147 0.300 0.300 - - - 74.70 *74.70% Satisfactory

JJA Construction and Supply 22676 Impvt./Conc. of Mapaway-Appas

via Ipil Road CAR 1.107 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

JL Construction 31720 Impvt. of MPB and Drainage System CAR 0.953 C 0.308 0.200 0.300 - - - 80.80 *80.80%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 215

Page 224: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JLP Construction & Supply (Formerly: JLP Construction)

26983Rehab. of 4 Cl Sch.Bldg.

(Gabaldon Type) @ Solsona South E/S

I 2.842 C 0.345 0.300 0.300 - - - 94.50 86.73% V. Satisfactory

JLP Construction Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) DOST 3.960 C 0.308 0.234 0.300 - - - 84.20 84.20%

Very Satisfactory

JLV Construction & Supply 9953 Const. of Multi-Purpose Building IV-A 0.960 C 0.259 0.300 0.300 - - - 85.90 84.36% V. Satisfactory

JLV Construction & Supply 9953 Const. of School and MPB @ Batuan CENTEX IV-A 1.430 C 0.262 0.268 0.300 - - - 83.00 *83.00%

V. Satisfactory

JLV Construction & Supply 9953 Const. of Taliba-Tejero FMR IV-A 0.949 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory

JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.306 0.210 0.300 - - - 81.60 *81.60% V. Satisfactory

JLV Construction & Supply 9953Impvt./Rehab. of Multi-Purpose

Building @ Brgy. Pantay Matanda

IV-A 3.858 C 0.294 0.217 0.300 - - - 81.10 84.67% V. Satisfactory

J-Marbela Construction and Supply 24268 Const. of 3 Cl Sch. Bldg. @ San

Roque E/S V 1.146 C 0.334 0.120 0.300 - - - 75.40 *75.40% Satisfactory

J-Marbela Construction and Supply 24268 Land Dev't. of Calabanga

Resettlement Project NIA-V 9.977 O 0.267 0.289 0.000 0.030 0.020 0.000 60.60 -

J-Marbela Construction and Supply 24268 Opening/Impvt. of San Roque-

Carangonhan Brgy. Road V 9.623 C 0.361 0.265 0.300 - - - 92.60 *92.60% Outstanding

JMLD Construction 22679 Conc. of Road at Zone 6, Grijalvo V 0.279 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

JMT Construction 14186 Conc. of Dapa-Cancohoy del Carmen Road (Sta. Fe Sect.) XIII 7.638 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 216

Page 225: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JMT Construction 14186 Const. of Jagupit-Lilang FMR XIII 4.563 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory

JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road XIII 9.522 C 0.365 0.300 0.000 - - - 66.50 73.48%

Satisfactory

JMT Construction 14186 Replacement of San Isidro Bridge (Phase II) XIII 19.280 C 0.371 0.200 0.300 - - - 87.10 82.18%

V. Satisfactory

JMU Construction 6877 Const. of MPB (Gym Phase I) II 4.822 C 0.260 0.200 0.300 - - - 76.00 76.00% Satisfactory

JMU Construction 6877 Const. of MPB (Muicipal Hall / Annex Bldg.) II 0.482 C 0.359 0.200 0.300 - - - 85.90 *85.90%

V. Satisfactory

JMU Construction 6877 Const. of Multi-Purpose Building (Gymnasium) II 1.888 O 0.317 0.300 0.070 0.015 0.027 0.050 77.90 -

JMU Construction 6877Construction of 1 CL Std. Sch.

Building @ San Juan Integrated School

II 0.483 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory

JNA Construction 10615 Const. of FMR Cluster 1, Brgy. Poblacion III III 0.773 C 0.315 0.300 0.300 - - - 91.50 *91.50%

Outstanding

J'ner Cepada Construction 30212 Concrete Paving of Barangay Cambooc Road VIII 0.471 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

J'ner Cepada Construction 30212 Const. of Libas MPB VIII 0.995 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory

J'ner Cepada Construction 30212Repair/Impvt. of National Road

along Ilag-Liloan Section, Libagon-Liloan Road Section

VIII 4.761 C 0.346 0.242 0.300 - - - 88.80 *88.80% V. Satisfactory

Jobel Enterprises 19799 Const. of Drainage System IV-A 0.476 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Jobel Enterprises 19799 Const. of MPB IV-A 0.477 C 0.270 0.226 0.300 - - - 79.60 *79.60% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 217

Page 226: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jobel Enterprises 19799 Const. of One (1) CL School Building @ Coralan E/S IV-A 0.466 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

Jobel Enterprises 19799 Impvt./Rehab. of Bridge Approaches, CSCF Jct. IV-A 2.887 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

John Arne Construction 24621 Const. of Pinamungajan Public Market, Cebu (Phase VII) VII 2.089 C 0.284 0.178 0.300 - - - 76.20 76.78%

Satisfactory

John Dee B. Bustamante Construction 30458 Conc. of Ipil-ipil St. III 0.743 C 0.239 0.300 0.300 - - - 83.90 *83.90%

V. Satisfactory

John Dee B. Bustamante Construction 30458 Conct. of 2 CL School Bldg.

Carmen T. Valenzuela E/S III 0.801 C 0.346 0.186 0.300 - - - 83.20 *83.20% V. Satisfactory

John Dee B. Bustamante Construction 30458

Const. of Drainage System along Burgos Ext. (Gloria St. to

Baclaran)III 0.473 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

John Ray Developer & Supplies 20795 Conc. of Kidapawan-Magpet-

Pangao-an Road, Mateo Section XII 5.607 C 0.353 0.277 0.300 - - - 93.00 *93.00% Outstanding

John Ray Developer & Supplies 20795

Const. of Drainage Canal along Cotabato-Davao Road (Central

Marketing/Metro Bank Side)XII 4.508 C 0.351 0.300 0.300 - - - 95.10 89.70%

V. Satisfactory

John Ray Developer & Supplies 20795

Const./Completion (Repair/Rehab.) of MPB @ BPI

BalindogXII 0.466 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -

John Ray Developer & Supplies 20795 Rehab./Impv't. of Cotabato 1st

District Engineering office Bldg., XII 0.964 C 0.390 0.265 0.300 - - - 95.50 *95.50% Outstanding

Jojo Construction & Dev't. Corp. (Formerly: Jojo

Const.)13174

Impvt. of Flood Control &Drainage along MSR-Tiaong

Section IV-A 2.381 C 0.394 0.200 0.300 - - - 89.40 86.16%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 218

Page 227: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jomar Builders & Supply 9138 Conc. of Municipal Streets, Brgy. 1, 2, 3, & 4 V 0.941 C 0.298 0.200 0.300 - - - 79.80 *79.80%

Satisfactory

Jomar Builders & Supply 9138 Const. of Multi-Purpose Building V 0.953 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory

Jomar Builders & Supply 9138 Const. of Multi-Purpose Building @ Brgy. Bagumbayan V 0.469 C 0.286 0.100 0.300 - - - 68.60 77.63%

Satisfactory

Jomar Builders & Supply 9138 Rehab./Impvt. of DPWH Camarines Norte DEO V 1.885 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Jomarcann General Construction 30599 Const. Flood Control along

Ambalanga River CAR 4.763 C 0.305 0.300 0.300 - - - 90.50 88.04% V. Satisfactory

Jomarcann General Construction 30599

Const. of Flood Control along Balili River, Km. 253+000 - Km.

255+000CAR 9.623 C 0.230 0.200 0.300 - - - 73.00 *73.00%

Satisfactory

Jomarcann General Construction 30599

Repair & Maintenance of Laoag-Sarrat-Piddig-Solsona Road, km.

493+000-km. 501+000, Sarrat Sect.

I 4.646 C 0.344 0.200 0.300 - - - 84.40 75.73% Satisfactory

Jometron Engineering & Construction 23147 Conc. of Donsol-Banuang Road V 6.465 C 0.333 0.194 0.300 - - - 82.70 82.70%

V.Satisfactory

Jometron Engineering & Construction 23147 Const. of Castilla Flood Control V 4.778 C 0.373 0.200 0.300 - - - 87.30 84.36%

V. Satisfactory

Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence DOST 7.049 C 0.307 0.287 0.300 - - - 89.40 89.40%

Very Satisfactory

Joni Construction 26023 Const. of 1 CL Secondary Sch. Bldg. at Babatngon NHS VIII 0.503 C 0.334 0.200 0.300 - - - 83.40 *83.40%

V. Satisfactory

Joni Construction 26023 Repair/Maintenance of Burayan Revetment VIII 1.190 C 0.280 0.200 0.300 - - - 78.00 *78.00%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 219

Page 228: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Jorvivs Construction 6527 Const. of 2 Storey 6 CL Malaybalay City Central School X 4.242 C 0.393 0.226 0.000 - - - 61.90 72.15%

Satisfactory

Jorvivs Construction 6527

Const. of Tertiary School Bldg. Northern Bukidnon Community

College (Const. of 3-Storey Bldg. Phase I)

X 4.744 C 0.372 0.300 0.000 - - - 67.20 80.06% V. Satisfactory

Joselle Construction 16243 Conc. of Brgy. 2 @ Osmeña Ave. XIII 2.350 C 0.342 0.200 0.300 - - - 84.20 83.54% V. Satisfactory

Joselle Construction 16243 Const./Completion of Multi-Purpose Building XIII 0.914 C 0.388 0.300 0.300 - - - 98.80 *98.80%

Outstanding

Joy Construction 14386 Const of 1-Unit, 1-CL School Building IX 0.362 C 0.385 0.257 0.300 - - - 94.20 82.09%

V. Satisfactory

Joy Construction 14386Const. & Repair/Rehab. of

Various School Bldg. (Clustered-2) 2nd Batch CY 2004

IX 0.657 C 0.378 0.000 0.300 - - - 67.80 82.22% V. Satisfactory

Joy Construction 14386 Const. of 1 unit 2 Cl at Port Holand E/S IX 0.675 C 0.277 0.188 0.000 - - - 46.50 54.27%

Poor

Joy Construction 14386 Const. of 1-Unit 1-CL School Building @ Tumahubong CES IX 0.366 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

Joy Construction 14386 Impvt./Conc. of Isabela -Maluso National Road, Batungal Section IX 7.590 C 0.233 0.300 0.300 - - - 83.30 79.22%

Satisfactory

Joy-Ann Construction and Supplies 23148 Const. of MPB at Aduana St. City

Proper VI 2.887 C 0.333 0.284 0.000 - - - 61.70 59.88% Poor

JQD Construction and General Services 18852 Const. of Maasin City MPB

(Training Center) VIII 7.189 C 0.337 0.200 0.300 - - - 83.70 83.03% V. Satisfactory

JR Contractor 9638 Const. of Drainage System, V 0.951 C 0.267 0.200 0.300 - - - 76.70 78.44% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 220

Page 229: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JR Contractor 9638 Const./Rehab. of Water Supply V 1.664 O 0.393 0.200 0.100 0.015 0.018 0.100 82.60 -

JRPF Construction & Trading 31899 Const. of MPB @ Telabastagan

E/S III 0.836 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

JRPF Construction & Trading 31899 Const. of Pandacaqui

Resettlement E/S III 1.901 O 0.243 0.252 0.100 0.023 0.038 0.100 76.00 *76.00% Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Argao-Moalboal

Road, Intermittent Section VII 9.601 C 0.338 0.300 0.300 - - - 93.80 *93.80% Outstanding

JSG Construction Company, Inc. 9350

Impvt./Rehab. of Bangad-Fort Magsaysay Road, Cabanatuan

City & Sta. RosaIII 19.143 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Lipa-Mataas na

Kahoy Road, Lipa Section IVA 14.458 C 0.289 0.208 0.300 - - - 79.70 83.54% V. Satisfactory

JSG Construction Company, Inc. 9350

Impvt./Rehab. of Natalio Bacalso Ave. Dalaguete-Boljo-on Section

(Phase 2)VII 9.600 C 0.231 0.300 0.300 - - - 83.10 *83.10%

V. Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Roads at Brgy.

San Isidro IVA 19.280 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

JSG Construction Company, Inc. 9350

Impvt./Rehab. of Tanauan-Dagami Road, Cansamada -

District IV Sect. with exceptions VIII 19.296 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

JSG Construction Company, Inc. 9350

Rehab./Impvt. Along Calubian-San Isidro-Tabango-Villaba-

Palompon Road, Km. 1005+346 - Km. 1028+355with exceptions

VIII 19.288 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 221

Page 230: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JSG Construction Company, Inc. 9350

Rehab./Impvt. Along Lemon-Leyte-Biliran Road, Km.

0997+000 - Km. 1004+778 with exceptions

VIII 19.288 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

JSG Construction Company, Inc. 9350

Rehab./Impvt. Along St. Rosario-Villaba Road, Km. 1003+370 -

Km. 1014+196 with exceptionsVIII 19.288 C 0.391 0.200 0.300 - - - 89.10 *89.10%

V. Satisfactory

JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads,

Maasin-Malitbog Road VIII 14.399 C 0.355 0.142 0.300 - - - 79.70 *79.70% Satisfactory

JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads,

Malitbog-Bontoc Road VIII 14.394 C 0.376 0.125 0.300 - - - 80.10 *80.10% V. Satisfactory

JUF Construction 17987 Const. of Brgy. Road @ Brgy. San Rufino VIII 0.952 C 0.365 0.262 0.300 - - - 92.70 *92.70%

Outstanding

JUF Construction 17987

Impvt. Along Nabang-Bagaho Road Section, Calbayog-

Catarman via Lope de Vega Road

VIII 4.819 C 0.205 0.290 0.300 - - - 79.50 *79.50% Satisfactory

JUF Construction 17987

Rehab. of Damaged Portion of Cagmanipis Bridge along

Maharlika Highway, Calbayog-Allen Road Section

VIII 4.820 C 0.314 0.200 0.300 - - - 81.40 *81.40% V. Satisfactory

JUF Construction 17987

Repair/Rehab. of Caglanipao Bridge, Daang Maharlika,

Calbayog-Allen Road, Brgy. Caglanipao Tinambacan District

VIII 9.645 C 0.369 0.100 0.300 - - - 76.90 *76.90% Satisfactory

JUF Construction 17987Repair/Rehab. of Calbayog-

Catarman Road (Km. 784+739 to Km. 809+270)

VIII 9.643 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 222

Page 231: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Juldan Builders 22810 Conc. of San Leonardo-Peñaranda-Gen. Tinio Road III 7.458 C 0.315 0.200 0.300 - - - 81.50 81.50%

V.Satisfactory

Julita Builders 13936

Conc. Paving of Critical Portion of National Circ. Rd., Culaba-

Caibiran Rd. (Maurang-Manlabang Rd. Sect.)

VIII 4.761 C 0.242 0.200 0.300 - - - 74.20 79.18% Satisfactory

Julita Builders 13936 Const. of Multi-Purpose Building @ Brgy. Parasan VIII 0.289 C 0.368 0.300 0.300 - - - 96.80 *96.80%

Outstanding

Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 1.928 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 0.949 C 0.366 0.055 0.300 - - - 72.10 82.25%

V. Satisfactory

Juncynth Construction General Services 18385 Const. of MPB @ Brgy.

Anahawan (Phase I) VIII 0.469 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

Juncynth Construction General Services 18385 Const. of Bontoc MPB VIII 0.950 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

Jupa Construction 23577Lined Canal along Allen-

Catarman Road (Lavezares-Enriquita Section)

VIII 1.444 C 0.233 0.300 0.300 - - - 83.30 *83.30% V. Satisfactory

JV Lagon Construction Corporation 11561

Conc. of Sarangani Davao del Sur Coastal Road, Pangyan-

Dungon SectionXII 9.424 O 0.363 0.237 0.030 0.030 0.038 0.067 76.50 -

JV Lagon Construction Corporation 11561

Concreting of Chua Sect. along Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino-

Lebak Road

XII 10.267 O 0.358 0.300 0.050 0.030 0.023 0.067 82.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 223

Page 232: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

JV Lagon Construction Corporation 11561

Const. of Approach & Riverbed Protection of Sinawal Bridge II

along GSC Circumferential RoadXII 2.518 C 0.353 0.300 0.000 - - - 65.30 70.79%

Satisfactory

JV Lagon Construction Corporation 11561 Widening of Kapingkong Bridge XII 13.377 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -

JYP General Construction 32985 Const./Rehab. of Pongo-Mangga Small Scale Mining FMR CAR 0.312 C 0.218 0.200 0.300 - - - 71.80 *71.80%

Satisfactory

K.D.C.M. Construction 29023 Conc. of Abra-Kalinga Road (Cagaluan-Ableg Sect.) CAR 8.952 C 0.377 0.200 0.300 - - - 87.70 88.00%

V. Satisfactory

K.D.C.M. Construction 29023 Const. of Binwaan Bridge (Phase II) CAR 5.961 C 0.328 0.300 0.300 - - - 92.80 *92.80%

Outstanding

K.D.C.M. Construction 29023Const. of Flood Control

Structures along Chico River from Calanan to Cabaruan

CAR 4.816 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Kajima Corporation SL2-SN-000286

Lower Agusan Dev't. Project, Stage 1, Phase II, Package IV

Masao River Improvements and Const. of Urban Drainage

System

CARBDP 912.171 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -

Kajima Corporation SL2-SN-000286

Masao River Improvement & Const. of Urban Drainage

System CP IV (Lower Agusan Development Project - Stage I,

Phase II)

CARBDP 1,083.477 C 0.382 0.300 0.300 - - - 98.20 99.00% Outstanding

Kajima Corporation FC-04-023

Const. of Cebu South Coastal Road Project, Segment 3B-2,

MCDP III, Subway Tunnel Section

MCDP III 1,264.367 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 224

Page 233: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Kajima Corporation FC-04-023

Const. of Cebu South Coastal Road Project, Segment 3B-2,

MCDP III, Subway Tunnel Section

MCDP III 1,264.367 O 0.356 0.300 0.100 0.030 0.070 0.100 96.00 -

Kajima Corporation FC-04-023

Const. of Cebu South Coastal Road Project, Segment 3B-2,

MCDP III, Subway Tunnel Section

CSCRP-MCDP 1,264.367 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -

Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV FC-04-023 Subic-Clark-Tarlac Expressway

Project-Package 1 BCDA-III 13968.698 C 0.384 0.300 0.070 0.030 0.065 0.067 91.55 83.27% V.Satisfactory

Kalantas Construction & Development Corporation 23915 Conc. of Kinalablaban Bridge

Approaches XIII 17.074 C 0.217 0.200 0.300 - - - 71.70 72.78% Satisfactory

Kalantas Construction & Development Corporation 23915 Rehabilitation of Dughan-Gamut

FMR XIII 1.733 C 0.000 0.073 0.300 - - - 37.30 66.40% Fair

Kamagong Builders & Developers Corporation 1720 Const. of Molino Blvd. By Pass

(Inc. RROW Acquisition) IV-A 20.032 C 0.353 0.200 0.300 - - - 85.30 84.46% V. Satisfactory

Kamagong Builders & Developers Corporation 1720 Rehab. of Kawit-Noveleta

Diversion Road IV-A 14.448 C 0.308 0.300 0.300 - - - 90.80 83.48% V. Satisfactory

Kane Construction, Inc. 2888 Completion of 2 Storey 2 CL SB @ BCNHS-Main CAR 1.442 C 0.373 0.249 0.300 - - - 92.20 91.43%

Outstanding

Karangyan Builders & Traders 22622

Const. of 2-Classroom Building @ Polytechnic College of

CalapanIV-B 0.951 C 0.366 0.300 0.300 - - - 96.60 81.34%

V. Satisfactory

Karpa Builders and Trading 33003 Const. of MPB Town Plaza III 0.476 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory

Kasanga Construction 17024 Const. of MPB at Caagutayan IV-B 0.666 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

Kasanga Construction 17024 Const. of MPB at Panggalaan IV-B 0.668 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 225

Page 234: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Kawi Construction 25844 Completion of Lengey MPB (Phase IV) CAR 2.389 C 0.336 0.200 0.000 - - - 53.60 67.11%

Fair

Kawi Construction 25844 Completion of MPB Phase III CAR 0.960 C 0.244 0.080 0.000 - - - 32.40 71.74% Satisfactory

KCS Construction & Supply 19641 Conc. of Cemetery Road, Brgy. Catabangan Proper V 0.460 C 0.323 0.119 0.300 - - - 74.20 *74.20%

Satisfactory

KCS Construction & Supply 19641 Conc. of Road at Cabuyao Road V 1.912 C 0.272 0.300 0.300 - - - 87.20 *87.20% V. Satisfactory

Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) XIII 5.732 O 0.233 0.200 0.050 0.030 0.032 0.067 61.20 -

Kent Construction 8655 Const. of MPB (Phase 2) XIII 0.480 C 0.374 0.200 0.000 - - - 57.40 71.82% Satisfactory

Kent Construction 8655 Jct. Osmeña-Pilar Road XIII 5.787 O 0.239 0.230 0.070 0.030 0.032 0.067 66.80 -

Kenwood Construction Enterprises 22186 Conc. of FMR at Brgy. Tarece I 0.471 C 0.256 0.300 0.300 - - - 85.60 82.48%

V. Satisfactory

Kenwood Construction Enterprises 22186 Const. of 12 Cl Building with CR I 4.816 C 0.310 0.200 0.300 - - - 81.00 81.00%

V.Satisfactory

Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Covered

Court @ Lomboy E/S I 2.357 C 0.332 0.300 0.300 - - - 93.20 87.55% V. Satisfactory

Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Gym

(Phase 1) I 2.892 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding

Kenwood Construction Enterprises 22186 Const. of Water System @ Brgy.

Leet I 2.411 O 0.333 0.225 0.100 0.010 0.037 0.067 77.20 -

Kenwood Construction Enterprises 22186 Rehab. of Acop-San Angel-

Salvacion Road I 9.637 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of Flood

Control/Concrete Canal X 0.800 C 0.391 0.300 0.300 - - - *99.10 99.10% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 226

Page 235: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB X 0.913 O 0.311 0.240 0.100 0.030 0.028 0.100 80.90 -

Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB X 0.913 C 0.264 0.300 0.300 - - - 86.40 82.55%

V. Satisfactory

KGD Builders 21960 Const. of 2-CL Lanton E/S XII 0.796 C 0.384 0.178 0.300 - - - 86.20 *86.20% V. Satisfactory

KGD Builders 21960 Const. of Water System @ Purok Pag-asa 2 XII 0.752 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

KGD Builders 21960 Drilling and Const. of Deepwell (Rotary Drilling) XII 1.124 C 0.385 0.200 0.300 - - - 88.50 85.98%

V. Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Conc. of Access Road (Jct.

Agusan-Davao Road) XI 4.245 C 0.331 0.200 0.300 - - - 83.10 87.84% V. Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Brgy. San Isidro-Brgy.

Mabini FMR XI 1.882 O 0.218 0.247 0.100 0.008 0.048 0.100 72.10 -

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Highway Jct.-Lantog

Bandera Road XI 4.712 O 0.227 0.300 0.100 0.008 0.048 0.100 78.30 -

Kim Harold Trading Manufacturing and Const. 28019 Conc. of PPNR, Taytay El Nido

Rd. (Canduyog-Bato Section) IV-B 14.097 O 0.338 0.240 0.100 0.030 0.056 0.067 83.10 -

Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL in Central Taytay

Naional High School IV-B 0.369 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL Roxas North

Central Sch. IV-B 0.376 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 227

Page 236: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Kim Harold Trading Manufacturing and Const. 28019 Repair/Maintenance of

Kaylubong I River Waterways IV-B 0.431 C 0.320 0.000 0.300 - - - 62.00 *62.00% Fair

Kim Harold Trading Manufacturing and

Const./Orani Builders & Suuply (JV)

28019 Conc. of PPNR, Taytay El Nido Rd. (Canduyog-Bato Section) IV-B 14.097 C 0.270 0.300 0.300 - - - 87.00 84.66%

V. Satisfactory

Kim-Harold Trading, Manufacturing &

Construction28019 Rehab. of Roxas-Taytay-El Nido

Rd., PPNR IV-B 1.828 C 0.309 0.144 0.300 - - - 75.30 77.94% Satisfactory

Kimphil Construction 21890 Const. of Calapan South Road, Banti Section IV-B 1.408 C 0.375 0.300 0.300 - - - 97.50 *97.50%

Outstanding

Kimphil Construction 21890 Const. of Calapan South Road, Himpararay Section IV-B 2.351 O 0.348 0.300 0.100 0.007 0.028 0.100 88.30 -

King's Builders & Development Corporation 29199 Const. of 1-CL @ Vicente Ylagan

National High School IV-B 0.764 C 0.287 0.244 0.300 - - - 83.10 *83.10% V. Satisfactory

King's Builders & Development Corporation 29199 Const. of Calapan South Road

(San Francisco Sect.) IV-B 1.409 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory

King's Builders & Development Corporation 29199 Const. of Hospital Building at

Poblacion IV-B 2.836 C 0.311 0.200 0.300 - - - 81.10 81.31% V. Satisfactory

King's Builders & Development Corporation 29199 Const. of Line Canal at Brgy.

Sta. Teresita IV-B 0.941 C 0.279 0.229 0.300 - - - 80.80 77.26% Satisfactory

King's Builders & Development Corporation 29199 Const. of Orcunoma River

Control IV-B 9.413 C 0.296 0.269 0.300 - - - 86.50 85.00% V. Satisfactory

King's Builders & Development Corporation 29199 Improvement of Sta. Teresita

Section Road IV-B 0.937 C 0.458 - 0.500 - - - 95.80 92.56% Outstanding

King's Builders & Devt. Corp. / Orient Star Const.

(J.V.)29199 Impvt./Repair of Orconuma Dike IV-B 4.729 C 0.312 0.200 0.300 - - - 81.20 81.20%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 228

Page 237: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Kirskat Venture 32042 Completion of Multi Purpose Gymnasium DOST 61.723 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -

Kirskat Venture 32042 Completion of Multi-Purpose Gynasium DOST 61.723 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -

Kirskat Venture 32042 Completion of PSHS WVC Gynasium DOST 8.544 C 0.392 0.300 0.300 - - - 99.16 99.16%

Outstanding

Kirskat Venture 32042 Const. of Lupgupan Bridge along Iloilo-Capiz Road VI 9.631 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

Kirskat Venture 32042 Const. of Maayon River Control VI 3.197 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Kirskat Venture 32042Const. of Panay River Control, Brgy. Punta Tabuc-Roxas City, Iloilo-Capiz Road (New Route)

VI 3.656 C 0.345 0.200 0.300 - - - 84.50 87.14% V. Satisfactory

Kirskat Venture 32042 Const. of Side Slope Protection along Iloilo-Capiz (Old Route) VI 4.815 C 0.288 0.200 0.300 - - - 78.80 86.00%

V. Satisfactory

KLDS Trading and Construction 28091

Const. of 2 Storey 2 Classroom Schoolbuilding w/ CR @ Amuyong Elem. School

IV-A 1.333 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory

KLDS Trading and Construction 28091 Const. of 2 Storey MPB IV-A 0.478 C 0.375 0.257 0.300 - - - 93.20 *93.20%

Outstanding

KLDS Trading and Construction 28091 Drainage Impvt. Along Brgy.

Alulod IV-A 5.281 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

KLDS Trading and Construction 28091 Rehab./Impvt. of Drainage Canal

along Silang By-Pass Road IV-A 0.803 C 0.360 0.300 0.300 - - - 96.00 85.32% V. Satisfactory

Kobey Construction/B.E. Construction (JV) JV-06-065

Const. of Slope Protection of PalaypayBridge along Bugasong-

Valderrama RoadVI 4.782 O 0.340 0.160 0.100 0.022 0.048 0.200 87.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 229

Page 238: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Krenz Construction & Trading 19907 Const. of MPB @ Pamantasan ng

Lungsod ng Maynila NCR 7.460 C 0.393 0.300 0.300 - - - 99.30 89.36% V. Satisfactory

Krisjohn Construction and Supply Corporation 31901 Repair/Rehab. of San Francisco

River Control V 0.905 C 0.400 0.200 0.300 - - - 90.00 87.84% V. Satisfactory

Kuntel Construction 10234 Concreting of Road along Magsunday Bridge III VI 0.956 C 0.287 0.185 0.300 - - - 77.20 82.30%

V. Satisfactory

Kuntel Construction 10234 Rehab./Conc. of Himamaylan Road Section VI 8.040 C 0.323 0.200 0.300 - - - 82.30 84.82%

V. Satisfactory

Kuntel Construction 10234Widening/Impvt. Of Bacolod

South Kabankalan Road (Bacolod City Sect.)

VI 7.874 C 0.299 0.200 0.300 - - - 79.90 77.18% Satisfactory

KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS NIA-V 3.189 C 0.371 0.180 0.300 - - - 85.10 *85.14%

V. Satisfactory

KV Construction and Supply 17509 Const. of Sahing Flood Control

along MWCR IVB 12.012 C 0.240 0.200 0.300 - - - 74.00 75.92% Satisfactory

KV Construction and Supply 17509

Rehab. of Galocan Bridge along Manila South Road, Malangad-

BasudV 11.441 C 0.400 0.154 0.300 - - - 85.40 *85.40%

V. Satisfactory

KVC Construction 28959Conc. of Baguio-Bontoc- Mt. Data Road (Bun-ayan-Pakya

Sect.)CAR 9.783 C 0.234 0.200 0.000 - - - 43.40 54.58%

Poor

KVC Construction 28959 Conc. of Baguio-Itogon Road CAR 13.008 O 0.340 0.211 0.100 0.020 0.025 0.067 76.30 -

KVC Construction 28959 Const. of Tocucan Bridge CAR 4.041 C 0.359 0.200 0.300 - - - 85.90 77.74% Satisfactory

KVC Construction 28959Impvt. Along Acop-Kapangan-Kibungan Road (km. 278+300 -

km. 280+760)CAR 6.704 C 0.347 0.000 0.300 - - - 64.70 64.70%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 230

Page 239: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

KVC Construction 28959 Rehab. Along Acop-Kapangan-Kibungan Road CAR 9.565 C 0.368 0.200 0.300 - - - 86.80 80.08%

V. Satisfactory

KVC Construction 28959 Rehab. Along Kennon Road CAR 8.412 C 0.372 0.192 0.300 - - - 86.40 78.54% Satisfactory

KVC Construction 28959 Repair/Rehab. Along Alapang-Labueg Road CAR 0.284 C 0.276 0.300 0.300 - - - 87.60 *87.60%

V. Satisfactory

KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road VIII 1.906 O 0.332 0.236 0.100 0.023 0.035 0.100 82.60 -

Kwikbuilt Construction 24577Const. of Std. 1 unit 1Cl Sch. Bldg. @ Paglaum NHS NOSof

Ext. VI 3.181 C 0.335 0.300 0.300 - - - 93.50 *93.50%

Outstanding

Kyro Builders 19567 Conc. of Roads at Sta. Cruz III 0.936 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

Kyro Builders 19567 Const. of Multi-Purpose Building/Health Center III 7.488 C 0.348 0.200 0.300 - - - 84.80 75.21%

Satisfactory

L & L Construction 15108 Const. of MPB, Brgy. Luyong Bonbon X 0.964 C 0.388 0.226 0.300 - - - 91.40 *91.40%

Outstanding

L & L Construction 15108 Conc. of Initao Road X 0.960 C 0.325 0.300 0.000 - - - 62.50 *62.50% Fair

L. Baltonado Construction & Development Corporation 25250 Conc. of Tabing-Kawayan-

Sta.Rosa-Lawis-Tabango Road VIII 4.738 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory

L. Baltonado Construction & Development Corporation 25250 Conc. Paving of San Isidro-

Tabango Road VIII 2.846 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory

L. Baltonado Construction & Development Corporation 25250 Const. of Multi-Purpose Building

(Bleacher & Gym) VIII 1.444 C 0.343 0.276 0.300 - - - 91.90 *91.90% Outstanding

L. P. O. Enterprises 20730 Const, of River Control in Brgy, Dela Paz IV-A 0.477 O 0.264 0.240 0.100 0.030 0.016 0.100 75.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 231

Page 240: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.A. Arizola Construction & Supply 31060 Conc. of Fatima-Malabog Road XI 2.694 C 0.306 0.300 0.300 - - - 90.60 90.60%

Outstanding

L.A. Arizola Construction & Supply 31060 Conc. of Road @ Brgy. Maa XI 9.441 C 0.346 0.300 0.300 - - - 94.60 *94.60%

Outstanding

L.A. Arizola Construction & Supply 31060 Const. of 1 Cl 1 Storey Sch.

Bldg. @ Mulig NHS XI 0.452 C 0.275 0.300 0.300 - - - 87.50 *87.50% V. Satisfactory

L.A. Arizola Construction & Supply 31060

Impvt./Conc. of Additional 2 lanes from Church of Later Day

Saints up to CarmenXI 4.129 C 0.277 0.300 0.300 - - - 87.70 87.70%

V. Satisfactory

L.A. Arizola Construction & Supply 31060 Road Conc. @ Sitio Tamayong XI 0.914 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

L.A. Clamor Construction 26413 Const. of 2 CL Sch. Bldg. at Canda NHS IV-A 2.013 C 0.392 0.200 0.300 - - - 89.20 *89.20%

V. Satisfactory

L.A. Clamor Construction 26413 Const. of MPB @ Brgy. Buenavista West IV-A 0.669 C 0.389 0.300 0.300 - - - 98.90 *98.90%

Outstanding

L.C. Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. IX 0.490 C 0.356 0.156 0.300 - - - 81.20 *81.20%

V. Satisfactory

L.C. Ting Construction 23666Conc. of Additional Lane along Iligan-Cagayan de Oro-Butuan City Libertad-Bancasi Section

XIII 9.466 C 0.297 0.300 0.300 - - - 89.70 79.20% Satisfactory

L.C. Ting Construction 23666 Conc. of Lake Mainit Circumferential Road XIII 9.618 O 0.331 0.200 0.100 0.030 0.059 0.100 82.00 -

L.C. Ting Construction 23666

Conc. of Surigao-Davao Coastal Road Hinatuan-Bislig (Tagasaka

Section) (Sta.1438+673.577-Sta.1439+415.61)

XIII 9.365 C 0.254 0.300 0.300 - - - 85.40 89.12% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 232

Page 241: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.C. Ting Construction 23666Const. of Damaged Flood Control Structure along

Napaliran RiverX 9.033 C 0.304 0.300 0.300 - - - 90.40 80.95%

V. Satisfactory

L.C. Ting Construction 23666 Const. of Matho Bridge and Approaches XIII 14.368 C 0.330 0.300 0.000 - - - 63.00 70.86%

Satisfactory

L.C. Ting Construction 23666 Const. of MAT-I Bridge and Approaches XIII 11.822 O 0.342 0.300 0.100 0.030 0.038 0.100 91.00 -

L.C. Ting Construction 23666 Const. of Olave Bridge and Approaches XIII 18.338 O 0.314 0.284 0.050 0.030 0.038 0.100 81.60 -

L.C. Ting Construction 23666 Rehab. of Amontay Bailey Bridge XIII 5.765 C 0.225 0.300 0.300 - - - 82.50 *82.50%

V. Satisfactory

L.C. Ting Construction 23666Rehab. of Libertad Bridge along

Butuan City-Misamis Oriental Rd.

XIII 10.856 C 0.323 0.300 0.300 - - - 92.30 91.16% Outstanding

L.C. Ting Construction 23666Rehab./Const.of Mamkas River

Control @ Sitio Siringan Kitcharao

XIII 9.534 C 0.345 0.300 0.300 - - - 94.50 80.16% V. Satisfactory

L.C. Ting Construction / Davao L.A. Parts &

Hardware Corporation Joint Venture

JV-07-102Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Manay SectionXI 47.225 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -

L.D. Barcelona Construction and Supply 20963 Road Concreting at E.B.

Magalona VI 0.906 C 0.328 0.196 0.300 - - - 82.40 82.64% V. Satisfactory

L.G. Lasacar Construction 11960 Const. of Cross-Country Road at Catarman-Mambajao Section X 9.293 C 0.280 0.300 0.300 - - - 88.00 72.22%

Satisfactory

L.G. Lasacar Construction 11960Const./Improvement of Cross

Country Road, Catarman-Mambajao Section

X 4.368 C 0.349 0.008 0.300 - - - 65.70 84.24% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 233

Page 242: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.G. Lasacar Construction 11960 Rehab./Conc. of Upper Tupsan Brgy. Road X 0.920 C 0.353 0.300 0.300 - - - 95.30 *95.30%

Outstanding

L.L.A. Builders 15075 Const. of MPB IV-A 1.154 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding

L.M.G. Construction 5719 Daang Maharlika (LZ) III 18.916 O 0.334 0.180 0.100 0.020 0.028 0.100 76.20 -

L.M.G. Construction 5719

Repair/Rehab./Impvt. of Roadways (Inst. of Road Traffic Safety Devices), SLMAC Road

(So. Dimotol-By PassRd..)

III 4.624 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory

L.M.G. Construction 5719 Repair/Rehab./Impvt. of San Jose-Lupao Road III 7.023 C 0.229 0.300 0.300 - - - 82.90 *82.90%

V. Satisfactory

L.N. Salvador Construction 16661 Completion of MPB at Pola Central E/S IV-B 4.803 C 0.361 0.200 0.300 - - - 86.10 85.12%

V. Satisfactory

L.N. Salvador Construction 16661 Const. of Drainage System at Malayas-Poblacion IV-B 4.642 C 0.337 0.221 0.300 - - - 85.80 86.13%

V. Satisfactory

L.P.O. Enterprises 20730 Consst. of MPB at Market Area IV-A 1.920 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory

L.P.O. Enterprises 20730

Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (4) Classroom Sch.

Bldg. at San Mateo E/S

IV-A 4.647 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Don Jose IV-A 4.045 C 0.364 0.200 0.300 - - - 86.40 83.32%

V. Satisfactory

L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Pedro Guevarra MNHS IV-A 3.632 C 0.365 0.279 0.300 - - - 94.40 *94.40%

Outstanding

L.P.O. Enterprises 20730 Const. of 2 Storey 4 Cl Sch. Bldg. @ San Isidro NHS IV-A 5.549 O 0.356 0.297 0.100 0.030 0.027 0.100 *91.00 -

L.P.O. Enterprises 20730 Const. of FMR @ Brgy. Gatid IV-A 0.955 C 0.361 0.295 0.300 - - - 95.60 *95.60% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 234

Page 243: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.P.O. Enterprises 20730 Const. of River Control in Brgy. Dela Paz IV-A 0.477 O 264.000 240.000 0.100 0.030 0.016 0.100 75.00 -

L.P.O. Enterprises 20730 Const./Rehab. of School Bldg. @ Los Banos Community NHS IV-A 1.915 O 0.300 0.300 0.100 0.030 0.027 0.100 85.70 -

L.R. Tiqui Builders, Inc. 13810

Impv't. / Widening of Manila North Road (MNR) Package III

Km.44+00-Km.51+330 with exception,

III 91.249 C 0.397 0.300 0.300 - - - 99.70 96.85% Outstanding

L.R. Tiqui Builders, Inc. 13810 Conc. of Goa-Digdigon-San Isidro Road V 14.041 C 0.211 0.200 0.300 - - - 71.10 78.12%

Satisfactory

L.R. Tiqui Builders, Inc. 13810

Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)

Meycauayan to Mabalacat, Pampanga (Phase IV) Package 1

III 188.051 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -

L.R. Tiqui Builders, Inc. 13810

Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)

Meycauayan to Mabalacat, Pampanga (Phase IV) Package II

III 70.394 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -

L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo

Highway and other related road Phase II

IV-A 60.022 O 0.336 0.240 0.100 0.024 0.028 0.100 82.80 -

L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo

Highway and other related road Phase II

IV-A 60.022 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -

L.R. Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo

Dam Road inc. Replacement of Kay Tialo Bridge

III 47.641 O 0.358 0.300 0.100 0.030 0.048 0.100 93.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 235

Page 244: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.R. Tiqui Builders, Inc. 13810

Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near

NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.

NCR 27.065 O 0.314 0.216 0.100 0.030 0.030 0.100 79.00 -

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders13810 Const .of Palilihan Bridge No. 1

and Approaches III 46.781 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders13810 Const. (Conc.) of Marikina-

Infanta Rd. P-III, Laguna Side IV-A 53.040 C 0.296 0.200 0.300 - - - 79.60 85.90% V. Satisfactory

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders13810 Const. of Plaridel By Pass

including connecting Roads III 28.425 C 0.284 0.300 0.300 - - - 88.40 88.28% V. Satisfactory

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders13810

Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near

NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.

NCR 27.066 O 0.368 0.240 0.100 0.030 0.033 0.067 83.80 -

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders13810 Roads and Drainage Impvt.

Along T. Santiago St. NCR 9.428 C 0.241 0.200 0.300 - - - 74.10 *74.10% Satisfactory

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui

Builders)13810

Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near

NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.

NCR 27.066 O 0.367 0.240 0.100 0.018 0.051 0.100 *87.60 -

L.S. Abelar Construction 31560 Const. of 2 CL School Bldg. @ Wakas Elem. Sch. IV-A 1.083 C 0.359 0.250 0.300 - - - 90.90 *90.90%

Outstanding

L.S. Abelar Construction 31560 Const. of Footbridge @ Brgy. Tanauan IV-A 0.237 C 0.276 0.300 0.300 - - - 87.60 *87.60%

V. Satisfactory

L.S. Abelar Construction 31560 Impvt. of Drainage Canal IV-A 0.096 C 0.250 0.200 0.300 - - - 75.00 * 75.00% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 236

Page 245: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

L.S. Visorde Construction & Trading 32026 Completion of MPB @ Brgy.

Tignoan IV-A 0.481 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory

L.S.D. Construction & Supplies 8980 Asphalt Overlay of Manila North

Road (Bamban & Capas Section) III 9.489 C 0.296 0.295 0.300 - - - 89.10 *89.10% V.Satisfactory

L.S.D. Construction & Supplies 8980 Conc. of San Miguel-Cadre Road III 7.577 C 0.308 0.290 0.300 - - - 89.80 *89.80%

V.Satisfactory

L.S.D. Construction & Supplies 8980 Conc. of Sta. Cruz Road III 2.891 C 0.354 0.194 0.300 - - - 84.80 78.68%

Satisfactory

L.S.D. Construction & Supplies 8980 Const. of 1 Cl Sch. Bldg @

Balibago II E/S III 0.377 O 0.320 0.254 0.100 0.030 0.029 0.100 83.30 -

L.S.D. Construction & Supplies 8980 Const. of 2 CL Sch. Bldg. @

Maliwalo H/S (Annex) III 0.811 C 0.386 0.150 0.300 - - - 83.60 *83.60% V.Satisfactory

L.V. Capule Construction 15578 Completion of Conc. of Road & Drainage @ Fausta III 2.838 C 0.366 0.300 0.300 - - - 96.60 92.46%

Outstanding

La Greta Construction 33080 Impvt.of MPB at Brgy. Progreso IV-A 0.142 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding

LA Milagrosa Enterprises 17404 Conc. of Cabu-an Brgy. Road X 1.850 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

LA Milagrosa Enterprises 17404 Conc. of Yumbing Road X 0.926 C 0.288 0.217 0.300 - - - 80.50 *80.50% V. Satisfactory

LA Milagrosa Enterprises 17404 Rehab./Conc. of Balite Brgy. Road X 0.755 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

Labb Construction 13524Conc. Paving of Jct. Dat-an,

Carmen-Sierra Bullones-Pilar-Alicia Road

VII 9.113 C 0.382 0.200 0.300 - - - 88.20 74.82% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 237

Page 246: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Labb Construction 13524Const. of Bridges along

Concepcion-Danao-Buenavista Carmen Road

VII 9.564 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -

Labb Construction 13524 Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road VII 8.760 C 0.317 0.300 0.300 - - - 91.70 88.16%

V. Satisfactory

Labb Construction 13524 Reconst. of Napo Bridge along Dauis-Panglao Road VII 6.502 C 0.361 0.300 0.300 - - - 96.10 86.50%

V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Brgy. Road VIII 0.467 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Lanao Brgy. Road VIII 1.889 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Maria Socorro Bridge VIII 0.944 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Tomas Oppus MPB VIII 2.823 C 0.378 0.200 0.300 - - - 87.80 87.17%

V. Satisfactory

Lady of Assumption Enterprises 25360 Const./Impvt. of Canturing River

Control VIII 0.472 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory

Lady of Assumption Enterprises 25360 Rehab./Impvt. of Bato-Bontoc

Road VIII 3.781 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory

Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.

Sanito IX 9.495 O 0.171 0.192 0.000 0.030 0.037 0.067 49.70 -

Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.

Sanito IX 9.495 O 0.280 0.146 0.030 0.023 0.030 0.133 64.20 -

Lambayong Construction and Supply 20800 Rehabilitation of Manin Canal

(Sta. 16+626-21+714) NIA-I 12.594 C 0.250 0.300 0.300 - - - 85.00 84.87% V.Satisfactory

Lanao Builder & Enterprises 15982

Construction of PSHS-CVC Academic Bldg. I and Dormitory

Bldg. I Phase IDOST 9.59 O 0.3455 0.300 0.05 0.02 0.030 0.100 84.55 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 238

Page 247: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lanao Builder & Enterprises 15982 PSHS CVC Academic Bldg. 1

Dormitory Bldg. 1 Ph. 1 DOST 9.59 O 0.68 0.300 - - - - 98.00 -

Lanao Builder and Enterprises 15982 Conc. of Bacolod-Pagayawan-

Munai-Tangkal Road X 4.645 C 0.280 0.200 0.300 - - - 78.00 82.98% V. Satisfactory

Lanao Builder and Enterprises 15982 Conc. of Bito Abaga National

Road X 9.551 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

Lanao Builder and Enterprises 15982

Conc. of Iligan-Bukidnon Road, Sta. Filomena-Bonbonon,

Digkilaan-RogongonX 27.643 C 0.365 0.200 0.300 - - - 86.50 88.80%

V. Satisfactory

Lanao Builder and Enterprises 15982 Conc. of San Manuel Road X 0.139 C 0.367 0.300 0.300 - - - 96.70 *96.70%

Outstanding

Lanao Builder and Enterprises 15982 Conc./Impvt. of Tubod-Ganassi

Road X 13.785 C 0.299 0.300 0.300 - - - 89.90 87.74% V. Satisfactory

Lanao Builder and Enterprises 15982 Const. of MPB @ Brgy. Lower

Sta. Cruz X 0.189 C 0.369 0.300 0.300 - - - 96.90 *96.90% Outstanding

Lanao Builder and Enterprises 15982

Const./Impv't. of Bacolod-Pagayawan-Munai-Tangkad

RoadX 11.988 C 0.361 0.300 0.300 - - - 96.10 86.14%

V. Satisfactory

Lanao Builder and Enterprises 15982

Impvt. of Iligan-Aurora Road (Raw-an-Magpaytao-Lanipao-

Abaga Sect.)X 9.386 C 0.387 0.300 0.300 - - - 98.70 90.60%

Outstanding

Lanao Builder and Enterprises 15982 Impvt./Const. of Maranding

Drainage along Nat'l Highway X 4.692 C 0.362 0.200 0.300 - - - 86.20 85.54% V. Satisfactory

Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga

Roads, Kauswagan Section X 9.053 O 0.333 0.240 0.100 0.030 0.032 0.100 83.50 -

Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga

Roads, Linamon Section X 4.517 C 0.358 0.300 0.300 - - - 95.80 86.98% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 239

Page 248: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lanao Builder and Enterprises 15982

Rehab./Reconst. of Damaged National Road along Linamon-Zamboanga Road, Donggo-an

Section

X 17.145 O 0.381 0.240 0.100 0.030 0.038 0.100 88.90 -

Lanao Builder and Enterprises 15982

Widening of Kapatagan Road along Linamon-Zamboanga

National RoadX 7.429 O 0.378 0.240 0.100 0.030 0.038 0.100 88.60 -

Lanao Builder and Enterprises 15982

Widening of Kapatagan Road along Linamon-Zamboanga

National RoadX 7.429 O 0.353 0.240 0.100 0.024 0.045 0.100 86.20 -

Lanao Builders and Enterprises 15982 Completion of ACA Bldg. I

(Phase 3) DOST 11.364 O 0.382 0.300 0.000 0.030 0.063 0.050 82.50 -

Lanao Builders and Enterprises 15982 Completion of ACA Bldg., I

Phase (Construction) DOST 11.364 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -

Landmark Builders 7400 Completion of MPB (OPD, DOPH XI 0.472 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding

Landmark Builders 7400 Completion of MPB @ Brgy. Matiao (GSP) XI 1.132 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

Landmark Builders 7400 Concreting of Madang Road XI 9.446 C 0.356 0.200 0.300 - - - 85.60 87.49% V. Satisfactory

Landmark Builders 7400 Const. of MPB (Gymnasium) XI 2.800 O 0.317 0.244 0.000 0.015 0.023 0.067 66.60 -

Landmark Builders 7400Const./Completion of Manolo

Fortich Municipal Hall Bldg. (P-IX)

X 7.590 C 0.380 0.300 0.300 - - - 98.00 93.73% Outstanding

Landmark Builders 7400 Package 11, Const. of Multi-Purpose Bldg. (Gymnasium) XI 3.766 C 0.361 0.241 0.300 - - - 90.20 73.68%

Satisfactory

Landmark Builders 7400 Repair/Const. of Don Mariano E/S (H.E.) Bldg. XI 0.289 C 0.358 0.067 0.300 - - - 72.50 86.22%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 240

Page 249: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 O 0.287 0.195 0.100 0.020 0.058 0.100 76.00 -

Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 O 0.388 0.300 0.000 0.030 0.047 0.067 83.20 -

Langit Construction 23462Construction of Two (2) Storey, Four (4) CL S/B @ Paliparan III

E/SIV-A 1.694 C 0.308 0.200 0.300 - - - 80.80 77.37%

Satisfactory

Larsen-Dutcher Constractor 29172 Rehab. of Roads, Brgy. Viente

Reales NCR 1.884 C 0.278 0.200 0.300 - - - 77.80 *77.80% Satisfactory

Larsen-Dutcher Constractor 29172 Repair of MPB NCR 0.470 C 0.315 0.200 0.300 - - - 81.50 *81.50%

V. Satisfactory

LB Builders Center 14115 Conc. Paving of Calubian-San Isidro Road VIII 2.844 C 0.365 0.200 0.300 - - - 86.50 86.50%

V.Satisfactory

LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Cagnocot E/S VIII 0.469 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Villanueva E/S VIII 0.469 C 0.299 0.200 0.300 - - - 79.90 *79.90%

Satisfactory

Leadtek Construction Inc. 25978Const. of (1) Classroom (1) Unit School Building D. Moises E/S,

MalingawanXII 0.382 C 0.361 0.000 0.300 - - - 66.10 66.10%

Poor

Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS X 0.595 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -

Leadway Construction & Development Corp. (LCDC) 4378 Const. of MPB (Covered Court) III 1.871 C 0.253 0.293 0.300 - - - 84.60 *84.60%

V. Satisfactory

Leda Construction Incorporated (Formerly:

Leda Const.)12229 Conc. of Jaro-Dagami-Burauen-

La Paz Road VIII 18.890 C 0.284 0.199 0.300 - - - 78.30 83.04% V. Satisfactory

Leda Construction Incorporated (Formerly:

Leda Const.)12229 Conc. of Jaro-Dagami-Burauen-

La Paz Road, Jaro Section VIII 12.280 C 0.317 0.200 0.300 - - - 81.70 83.92% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 241

Page 250: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Leda Construction Incorporated (Formerly:

Leda Const.)12229 Conc. of Sta. Fe-Magtangtang to

Francisco Dagohoy Caves VII 4.740 C 0.288 0.300 0.300 - - - 88.80 88.47% V. Satisfactory

Leda Construction Incorporated (Formerly:

Leda Const.)12229 Rehab. of Palo-Carigara-Ormoc

Road VIII 18.889 O 0.381 0.239 0.100 0.015 0.020 0.100 85.50 -

Leda Construction Incorporated (Formerly:

Leda Const.)12229

Rehab./Impvt. of Palo-Carigara-Ormoc-Baybay-Maasin Road, Palo-Carigara-Ormoc-Baybay-

Maasin Road Section

VIII 11.338 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

Leda Construction Incorporated (Formerly:

Leda Const.)12229 Rehab./Impvt. of Seawall VII 10.881 O 0.384 0.103 0.100 0.030 0.027 0.200 84.40 -

Legacy Construction 22465 Const. and Improvement of Punta Taytay Main Drainage NIA 5.936 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -

Legacy Construction 22465Widening/Impvt. of Bacolod

South Kabankalan Road (Tangub Sect.)

VI 7.870 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -

Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches

along Viga-Panganiban Road V 17.346 O 0.381 0.200 0.000 0.008 0.023 0.100 71.20 -

Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches

along Viga-Panganiban Road V 17.346 O 0.354 0.300 0.100 0.020 0.023 0.100 89.70 -

Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches

along Viga-Panganiban Road V 17.346 O 0.200 0.300 0.100 0.023 0.019 0.100 74.20 -

Legazpi Premium Development Corporation 20701 Channelization of Lower Mabini

River V 13.377 C 0.389 - 0.500 - - - 88.90 *88.90% V. Satisfactory

Legazpi Premium Development Corporation 20701 Completion of Tokyo Bridge and

Approaches V 32.570 C 0.356 0.092 0.300 - - - 74.80 72.40% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 242

Page 251: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Legazpi Premium Development Corporation 20701 Const. of Tilod Bridge

Approaches & Detour V 15.684 C 0.388 0.235 0.300 - - - 92.30 86.84% V. Satisfactory

Legazpi Premium Development Corporation 20701 Dredging of Hicming River

(Downstream) V 19.177 C 0.375 - 0.500 - - - 87.50 89.72% V. Satisfactory

Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-

Caguiba Road (Phase II) V 14.250 O 0.352 0.263 0.100 0.022 0.033 0.100 87.00 -

Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-

Caguiba Road (Phase II) V 14.250 O 0.369 0.086 0.100 0.020 0.033 0.067 67.50 -

Legazpi Premium Development Corporation 20701 Road Conc./Impvt. of Magallang-

Mararag Road V 14.387 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Legazpi Premium Development Corporation 20701

Vconst. of Viga-Piot Bridge & Approaches along Viga-

Panganiban RoadV 17.346 O 0.300 0.240 0.100 0.015 0.035 0.100 79.00 -

Lehci Construction 24196 Conc. Paving of Tigbao-Sta. Fe-San Miguel Rd. VIII 8.548 C 0.317 0.200 0.300 - - - 81.70 82.72%

V. Satisfactory

Lehci Construction 24196Const. of MPB at Eastern

Visayas State University, Phase III

VIII 3.374 C 0.370 0.100 0.300 - - - 77.00 *77.00% Satisfactory

Lehci Construction 24196 Const. of Seawall at Cogon VIII 0.962 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory

Lehci Construction 24196 Repair/Rehab. of Mahayahay Creek VIII 4.747 C 0.288 0.200 0.300 - - - 78.80 79.88%

Satisfactory

Lenvoisa Construction 216721

Financing and Development of the Fifty (50) Hectares Reserved

Area for Socialized Housing under a Joint Venture arrangement (Phase II)

NHA 154.223 O 0.382 0.300 0.100 0.024 0.042 0.100 94.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 243

Page 252: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lenvoisa Construction, Incorporated 216721

Financing and Dev't. of the fifty(50) hectares reserved area

for socialized housing under joint venture arrangement,

Phase II

NHA 154.223 O 0.39 0.3 0.1 0.03 0.06 0.1 98.00 -

Lenvoisa Construction, Incorporated 216721 NBP Resettlement Project,

Phase II NHA 154.223 O 0.382 0.3 0.1 0.024 0.042 0.1 94.80 -

Leo-J Construction Services 27248 Const. of Slope Protection along

Maculcol River Downstream III 4.753 C 0.373 0.120 0.300 - - - 79.30 *79.30% Satisfactory

Leymarc Construction 22094 Completion of Zamboanguita Shoreline Protection VII 0.889 C 0.252 0.300 0.300 - - - 85.20 *85.20%

V. Satisfactory

Leymarc Construction 22094 Conc. of Roads (Brgy. Cansaging) VII 0.414 C 0.351 0.300 0.300 - - - 95.10 *95.10%

Outstanding

Leymarc Construction 22094 Const. of 1 unit 1 Cl Sch. Bldg. @ Sta. Catalina North C/S VII 0.701 C 0.386 0.100 0.300 - - - 78.60 *78.60%

Satisfactory

Leymarc Construction 22094 Const. of Dumaguete Flood Control, Dumaguete North Road VII 4.717 C 0.293 0.184 0.300 - - - 77.70 79.74%

Satisfactory

Leza Construction and Supply 25565 Const. of 1 CL School Bldg. @

Buenlag NHS I 0.494 C 0.334 0.200 0.300 - - - 83.40 87.74% V. Satisfactory

Leza Construction and Supply 25565 Const. of Drainage Canal System

at Tuliao I 4.822 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -

Leza Construction and Supply 25565 Const. of MPB at Turac E/S I 1.928 C 0.273 0.300 0.300 - - - 87.30 *87.30%

V. Satisfactory

Leza Construction and Supply 25565

Repair and Rehab. of Pagal Bridge along Carmen Jct.-

Bayambang-San Carlos-Manat Road

I 0.481 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding

LGC Trucking and Construction 14464 Const. of Andanan Flood Control

Phase II XIII 9.374 O 0.350 0.200 0.100 0.030 0.043 0.200 92.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 244

Page 253: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

LGC Trucking and Construction 14464 Const. of Lugom Bridge along

Circumferential Road XIII 9.223 C 0.231 0.199 0.300 - - - 73.00 73.48% Satisfactory

LGC Trucking and Construction 14464 Impvt. of Bank Protection of

Mapaga RCDG Bridge XIII 6.591 C 0.320 0.200 0.300 - - - 82.00 85.06% V. Satisfactory

Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau

of Immigration Main Bldg. Sp. Bldgs 30.029 O 0.337 0.239 0.100 0.023 0.045 0.100 84.40 -

Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau

of Immigration Main Bldg. Sp. Bldgs 30.029 O 0.392 0.300 0.070 0.030 0.027 0.067 88.60 -

Librius Construction and Suppply Corporation 23580

Const. of 2 Storey RGR Type School Building @ Batangas

NHS IV-A 8.596 C 0.385 0.200 0.300 - - - 88.50 86.05%

V. Satisfactory

Ligao Sto. Niño 9279 Rehabilitation of Canal Network (package 1) NIA-V 10.323 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -

Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao

Resettlement Project NHA 9.974 O 0.299 0.262 0.1 0.03 0.019 0.1 81.00 -

Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao

Resettlement Project V 9.969 C 0.330 0.300 0.300 - - - 93.00 93.00% V.Satisfactory

Lim General Contractor 8482 Conc. of Buenavista-Cawayan Road (Cawayan Side) V 28.798 C 0.336 0.239 0.300 - - - 87.50 77.54%

Satisfactory

Lim General Contractor 8482 Conc. of Masbate-Cataingan Road, Balatucan-Uson Sect. V 9.498 C 0.288 0.200 0.300 - - - 78.80 77.72%

Satisfactory

Lim General Contractor 8482 Const. of Bagumbayan Bridge, Approaches, and Detour V 15.940 C 0.241 0.200 0.300 - - - 74.10 76.20%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 245

Page 254: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour V 19.200 C 0.199 0.123 0.300 - - - 62.20 70.87%

Satisfactory

Lim General Contractor 8482Const. of Jct. Guinhayan-Malbog-

Sta. Fe Road (leading to San Jose Island)

IV-B 18.798 C 0.317 0.200 0.300 - - - 81.70 83.86% V. Satisfactory

Lim General Contractor 8482 Const. of Luya Bridge V 15.827 C 0.341 0.300 0.300 - - - 94.10 89.18% V. Satisfactory

Lim General Contractor 8482 Const. of San Fernando North Road, San Fernando Section V 11.000 C 0.235 0.135 0.300 - - - 67.00 73.42%

Satisfactory

Lim General Contractor 8482 Const. of San Fernando South Road, Batuan Section V 11.250 C 0.195 0.109 0.300 - - - 60.40 71.68%

Satisfactory

Lim General Contractor 8482 Preventive Maintenance of Masbate-Cataingan Road V 9.496 C 0.377 0.100 0.300 - - - 77.70 81.18%

V. Satisfactory

Lim General Contractor 8482

Rehab./Reconst. of Damaged National Road along San

Fernando North Rd., San Jacinto Section

V 18.898 O 0.270 0.236 0.000 0.030 0.022 0.067 62.50 -

Lim General Contractor 8482 Rehab./Reconst. of Tablas Circ. Road, Alcantara-Looc Section IV-B 18.798 O 0.307 0.240 0.100 0.030 0.038 0.100 81.50 -

Lim General Contractor 8482 Replacement of Damaged Bridge V 14.100 C 0.342 0.200 0.300 - - - 84.20 78.26% Satisfactory

Limar Construction 10203 Const. of Manlumay Bridge VIII 3.807 C 0.300 0.300 0.300 - - - 90.00 89.76% V. Satisfactory

Limestone Construction and Development

Corporation4453

Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-

San Bernabe Sect.

II 8.200 C 0.256 0.300 0.300 - - - 85.60 82.54% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 246

Page 255: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Limokun Builders & Supply 30997 Impvt./Rehab. of Porac-Guagua Road III 4.771 C 0.355 0.115 0.300 - - - 77.00 *77.00%

Satisfactory

Linear Construction Corporation 3575 NBP Resettlement Project,

Phase IV NHA 148.89 O 0.392 0.232 0.1 0.024 0.04 0.1 88.80 -

Liong-Co Construction & Construction Supply 28361

Completion of Miputak-Turno By Pass Road with Drainage

ComponentsIX 4.716 O 0.256 0.156 0.100 0.030 0.037 0.200 77.90 -

Liong-Co Construction & Construction Supply 28361 Conc. of FMR at Purok Gampis IX 0.951 C 0.344 0.285 0.300 - - - 92.90 *92.90%

Outstanding

Liong-Co Construction & Construction Supply 28361 Const. of MPB (Covered Court)

at Sicayab E/S IX 2.268 C 0.392 0.200 0.300 - - - 89.20 89.20% V.Satisfactory

Liong-Co Construction & Construction Supply 28361 Const. of Multi Purpose Day

Care IX 0.550 C 0.304 0.300 0.300 - - - *90.40 90.40% Outstanding

Liong-Co Construction & Construction Supply 28361

Const./Completion of Multi-Purpose Building (Perimeter

Fence)IX 0.089 C 0.302 0.300 0.300 - - - 90.20 *90.20%

Outstanding

Liong-Co Construction & Construction Supply 28361 Const./Rehab. of Various School

Building Project (Clustered) IX 0.277 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory

Lisa Construction 24134Asphalt Overlay along

Cabanatuan Circumferential Road

III 0.952 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding

Lisa Construction 24134 Const. of Flood Control at San Vicente III 2.835 C 0.369 0.300 0.300 - - - 96.90 *96.90%

Outstanding

LJPM Builders & Construction Supply 29981

Rehab./Impvt. of National Road along Amaga-Liloan Road

SectionVIII 3.735 O 0.378 0.242 0.070 0.020 0.032 0.067 80.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 247

Page 256: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

LJPM Builders & Construction Supply 29981

Rehab./Impvt. of National Road along Amaga-Liloan Road

SectionVIII 3.735 O 0.380 0.240 0.100 0.020 0.037 0.100 87.70 -

LJPM Builders & Construction Supply 29981 Repair of Abuyog District

Hospital VIII 0.470 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory

LJPM Builders & Construction Supply 29981 Repair of Multi-Purpose

Building, DTI Compound VIII 0.961 C 0.377 0.200 0.300 - - - 87.70 88.47% V. Satisfactory

Llaban Construction & Trucking 29504

Conc. of Dualing-New Panay-Midsayap Road, (Lawili-Arizona

Section) XII 9.523 C 0.355 0.119 0.300 - - - 77.40 77.70%

Satisfactory

Llaban Construction & Trucking 29504 Const. of 1 Cl Bldg., San Pedro

E/S XII 0.476 C 0.309 0.300 0.300 - - - 90.90 *90.90% Outstanding

Llaban Construction & Trucking 29504 Const. of Hanging Bridge XII 1.309 C 0.340 0.300 0.300 - - - 94.00 79.12%

SatisfactoryLlaban Construction &

Trucking 29504 Const. of MPB @ Brgy. Upper Glad 1 XII 0.286 C 0.369 0.300 0.300 - - - 96.90 *96.90%

Outstanding

LLM Concrete Products 14235 Completion of MPB at Brgy. Magugpo West XI 1.884 C 0.336 0.056 0.300 - - - 69.20 79.14%

Satisfactory

LLM Concrete Products 14235 Const. of 1 CL Academic Bldg. @ Kapoc XI 0.322 C 0.332 0.300 0.300 - - - 93.20 93.34%

Outstanding

LLM Concrete Products 14235 Const. of Matanao National High School XI 0.865 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V. Satisfactory

LLM Concrete Products 14235 Const. of MPB @ Goma, Digos City realigned to Conc. of FMR XI 0.944 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

LLM Concrete Products 14235 Const. of MPB @ Poblacion XI 1.885 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory

LLM Concrete Products 14235 Const. of Multi-Purpose (Brgy Hall) Bato XI 0.755 C 0.378 0.300 0.300 - - - 97.80 92.90%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 248

Page 257: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

LLM Concrete Products 14235Const. of Slope Protection along

Buclad-Poblacion-Asuncion Sect.

XI 3.845 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory

LLM Concrete Products 14235 Const. of Tagum Drainage along Agusan-Davao Road XI 2.830 C 0.230 0.300 0.300 - - - 83.00 *83.00%

V. Satisfactory

LLM Concrete Products 14235 Const./Rehab.of MPB @ Brgy. Ising XI 2.453 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

LM Construction and General Marketing 9213 Const. of CY 2004 School

Building Projects XIII 0.818 O 0.373 0.244 0.100 0.020 0.013 0.100 85.00 -

LM Construction and General Marketing 9213 Const. of CY 2004 School

Building Projects XIII 0.818 O 0.350 0.200 0.100 0.030 0.041 0.100 82.10 -

LMD Construction 9410 Const./Impvt. MPB (Municipal Hall) @ Poblacion San Miguel IX 4.595 C 0.348 0.247 0.300 - - - 89.50 86.07%

V. Satisfactory

LMD Construction 9410Impvt./Conc. Paving of

Kagawasan-Pitogo Road (Kagawasan Section)

IX 4.595 C 0.353 0.300 0.300 - - - 95.30 71.36% Satisfactory

Lo Tone Construction & Supply 23385 Land Development of Anislag

Resettlement Project (Phase II) NHA-V 39.895 O 0.326 0.261 0.050 0.023 0.028 0.033 72.10 -

Lo Tone Construction & Supply 23385 Land Development of Tagaytay

Resettlement Project NHA 49.924 O 0.376 0.249 0.1 0.018 0.033 0.1 87.60 -

Longwide Builders 20196 Const. of Public Market @ Brgy. Sumo-Sumo XIII 0.549 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

Lorgen Construction 20197 Conc./Impvt. of F.P. Felix Ave. (formerly Imelda Ave.) IV-A 6.255 C 0.289 0.200 0.300 - - - 78.90 85.38%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 249

Page 258: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lo Tone Construction 23385 Land Dev't. of Anislag Resettlement Project, Phase II NHA 39.894 C 0.356 0.300 0.000 - - - 65.60 65.60%

Fair

Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin.

Center (Phase 1) V 9.505 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory

Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin.

Center (Phase II) V 15.759 O 0.399 0.239 0.100 0.030 0.027 0.100 89.50 -

Lo Tone Construction & Supply 23385 Const. of Multi-Purpose Hall-

Phase II V 1.851 C 0.346 0.300 0.300 - - - 94.60 85.92% V. Satisfactory

Lo Tone Construction & Supply 23385 Dredging of Bato River

(Katipunan-Kilikilihan) V 19.180 C 0.492 - 0.500 - - - 99.20 65.60% Fair

Lo Tone Construction & Supply 23385 Impvt. of Pag-asa Drainage

System V 4.762 C 0.333 0.200 0.300 - - - 83.30 84.32% V. Satisfactory

Lo Tone Construction & Supply 23385

Rehab. Works Including Removal of Slides along

Catanduanes Circumferential Road

V 12.167 C 0.378 0.288 0.300 - - - 96.60 93.30% Outstanding

Lo Tone Construction & Supply 23385 Rehab./Impv't. of Calayucay-Sula

Road V 3.840 C 0.385 0.272 0.300 - - - 95.70 *95.70% Outstanding

Lo Tone Construction & Supply 23385 Rehab./Impvt. of Hinipaan-Cahan

Road V 19.260 C 0.390 0.293 0.300 - - - 98.30 *98.30% Outstanding

Lo Tone Construction & Supply 23385 Road Impv't./Widening of

Integrated Bus Terminal IX 4.640 C 0.232 0.000 0.300 - - - 53.20 78.76% Satisfactory

Lo Tone Construction & Supply 23385 Road Opening of Damacan-

Cagbulacao Road V 28.493 O 0.400 0.293 0.100 0.020 0.023 0.100 93.60 -

Lo Tone Construction & Supply 23385

Road Rehab./Impv't. of Bato, Bula, Minabalac (Excl.

acquisition of Roads/Traffic Signs & Safety Devices

V 9.407 C 0.258 0.300 0.300 - - - 85.80 86.64% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 250

Page 259: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lo Tone Construction & Supply 23385 Widening/Impvt. of Catanduanes

Circ. Road (Codon Section) V 14.375 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Lo Tone Construction & Supply 23385

Widening/Impvt. of Catanduanes Circ. Road (Tibang-Puting

Baybay Section)V 28.495 C 0.393 0.293 0.300 - - - 98.60 90.14%

Outstanding

Lotrim Construction Inc. 12273 Const. of Banaybanay Public Market XI 2.504 C 0.372 0.300 0.300 - - - 97.20 92.93%

Outstanding

Lotrim Construction Inc. 12273 Const. of MPB @ Flores Subd. XI 0.752 C 0.379 0.226 0.300 - - - 90.50 *90.50% Outstanding

Lotrim Construction Inc. 12273 Const. of MPB @ Rizal E/S XI 0.657 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding

Lotrim Construction Inc. 12273 Rehab. of MPB XI 4.715 C 0.361 0.200 0.300 - - - 86.10 *86.10% V.Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Six CL @ Maragusan

NHS XI 6.560 C 0.337 0.300 0.300 - - - 93.70 89.01% V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Three (3) Storey DBM

Regional Office Bldg. XIII 18.638 C 0.397 0.200 0.300 - - - 89.70 88.53% V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const./Impvt. of Drainage at J.P.

Laurel St. to Davao Beach Club XI 4.717 C 0.344 0.200 0.300 - - - 84.40 86.74% V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Impvt./Conc. if Calinan-Bagiuo-

Cadalian Road XI 18.801 O 0.263 0.300 0.100 0.030 0.048 0.100 84.10 -

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab. of Davao-Cotabato Road

Kinuskusan Section XI 19.279 O 0.220 0.300 0.100 0.020 0.050 0.100 79.00 -

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab./Impvt. of DPWH Davao

del Sur 2nd DEO Bldg. XI 9.449 O 0.317 0.240 0.100 0.030 0.029 0.050 76.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 251

Page 260: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Lubo Construction & Development 30508 Const. of MPB @ Calamagui 1st II 0.921 O 0.356 0.214 0.100 0.022 0.035 0.100 82.70 -

Lubo Construction & Development 30508 Const./Rehab. of Ilagan North

Central School II 1.192 C 0.336 0.200 0.300 - - - 83.64 78.21% Satisfactory

Lucban Builders and Construction Supply

Incorporated31336 Completion of MPB @ Paaralang

Elementarya ng Lucban IV-A 3.370 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair

Lucban Builders and Construction Supply

Incorporated31336 Const. of Daungan River Control IV-A 3.371 C 0.320 0.200 0.300 - - - 82.00 81.82%

V. Satisfactory

Lucky Armn's Construction & Enterprises 23434 Conc. of Shoulder at Picas San

Jose DZR Airport Road VIII 1.898 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Lug Square Construction 26623Conc. of Nueva Vizcaya-Ifugao-Mt. Province Bdry. Rd. (Hingyon

Section)CAR 2.846 C 0.362 0.217 0.300 - - - 87.90 *87.90%

V. Satisfactory

Lug Square Construction 26623 Widening/Conc. Along Banaue-Mayoyao Road (Tulaed Section) CAR 1.888 O 0.345 0.239 0.050 0.015 0.025 0.033 70.70 -

Lumel Glenn Construction 26817 Conc. of Sitio Tabtabong Road IV-B 1.413 C 0.209 0.300 0.300 - - - 80.90 *80.90% V. Satisfactory

Lumel Glenn Construction 26817 Const. of Drainage Canal @ Don Pedro IV-B 1.875 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -

Lumel Glenn Construction 26817 Rehab. of Calapan South Road IV-B 3.782 C 0.358 0.200 0.300 - - - 85.80 87.48% V. Satisfactory

LUYM Construction and Development Corporation 24098

Const. of San Jose St. Drainage System-Outfall 1 of the Drainage

Facility of the Bohol Circ. Rd along C.P. Garcia Ave.

VII 14.038 C 0.307 0.189 0.300 - - - 79.60 77.86% Satisfactory

LVRO Construction & Supply 18116 Concreting of Brgy. 3, Bliss

Road XIII 2.786 C 0.384 0.300 0.000 - - - 68.40 80.76% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 252

Page 261: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

LVRO Construction and Supply 18116 Conc. of Bay-ang-Calamba

Provincial Road XIII 2.893 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory

LVRO Construction and Supply 18116 Conc. of Brgy. Sangay-

Provincial Road XIII 1.927 C 0.302 0.200 0.300 - - - 80.20 *80.20% V. Satisfactory

LVRO Construction and Supply 18116 Const. of 1 Cl Sch. Bldg. @

Tinago E/S XIII 0.385 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

LVRO Construction and Supply 18116 Const. of Concepcion-Mt. Zion

FMR XIII 4.553 C 0.389 0.295 0.300 - - - 98.40 74.70% Satisfactory

LVRO Construction and Supply 18116 Const. of Culit Integrated School XIII 0.486 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

LVRO Construction and Supply 18116

Const. of Jct. Bolod-Bolod-Albor Road (Albor-San Antonio

Section)XIII 6.620 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V. Satisfactory

LVRO Construction and Supply 18116 Const./Rehab. of Cabadbaran

River Dike XIII 2.841 C 0.248 0.200 0.300 - - - 74.80 *74.80% Satisfactory

LVRO Construction and Supply 18116 Impvt./Conc. of New Public

Market XIII 0.950 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

LVRO Construction and Supply 18116

Reconst. of Quezon-Mapawa-Capalyan-Espina-Navarro Road-

Arellano DistrictXIII 4.100 C 0.321 0.200 0.300 - - - 82.10 82.10%

V. Satisfactory

LVRO Construction and Supply 18116 Repair/Rehab. Along Dinagat-

Loreto Road XIII 9.649 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -

LVRO Construction and Supply 18116 Surigao-Davao Coastal Road,

Panhutungan Section XIII 4.300 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory

LXS Builders & Supplies 25172 Const. of 1 CL School Bldg. @ Hermosa E/S I 0.493 C 0.323 0.200 0.300 - - - 82.30 87.90%

V. Satisfactory

LXS Builders & Supplies 25172 Const. of Drainage System at Mariposa Creek I 0.668 C 0.260 0.300 0.300 - - - 86.00 *86.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 253

Page 262: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M A M Construction & Trading (Formerly: MAM

Construction)19915 Const. of St. Tomas NHS III 0.901 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

M A M Construction & Trading (Formerly: MAM

Construction)19915 Repair and Rehab. of San Pablo

ES III 0.191 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding

M F Construction 22192 Completion of Multi-Purpose Building @ Tigbawan, Phase 2 VII 1.882 C 0.267 0.300 0.300 - - - 86.70 87.54%

V. Satisfactory

M M Construction 12012Conc. of Bambang-Kasibu-

Quezon-Solano Road (Labni Section)

II 14.225 O 0.370 0.240 0.100 0.030 0.033 0.067 84.00 -

M M Construction 12012

Rehab./Reconst. of Damaged National Roads, Daang

Maharlika, Poblacion Villaflores Section

II 14.468 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -

M. Montesclaros Enterprises, Inc. 6506

Asphalt Overlay/Patching of Bituminous Pavement @ Sayre

HighwayX 9.338 C 0.387 0.200 0.300 - - - 88.70 84.80%

V. Satisfactory

M. Montesclaros Enterprises, Inc. 6506 Conc. of Bukidnon-Davao Road

(Dologon-Busco-Quezon Sect.) X 67.179 C 0.360 0.200 0.300 - - - 86.00 86.00% V. Satisfactory

M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at

Kipolot-Palacapao Section X 14.111 O 0.400 0.294 0.100 0.030 0.038 0.100 96.20 -

M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at

Kipolot-Palacapao Section X 14.101 O 0.383 0.300 0.100 0.030 0.045 0.100 95.80 -

M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -

M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 254

Page 263: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M. Montesclaros Enterprises, Inc. 6506 Const. of Sayre National

Highway X 33.060 C 0.293 0.300 0.300 - - - 89.30 90.23% Outstanding

M. Montesclaros Enterprises, Inc. 6506

Patching/Asphalt Overlay along Bukidnon-Davao City Road,

Camp I- Kiuntod SectionX 4.689 C 0.380 0.300 0.300 - - - 98.00 *98.00%

Outstanding

M. Montesclaros Enterprises, Inc. 6506

Repair/Rehab. of Proposed Development of DPWH Ver

Overview Bldg.X 9.375 C 0.399 0.300 0.300 - - - 99.90 93.85%

Outstanding

M. Montesclaros Enterprises, Inc. 6506

Road Upgrading (Gravel to Concrete) based on GTRSTB

(HDM4 Analysis) along Kibawe-Kadingilan-Kalilangan Road

X 4.823 O 0.300 0.240 0.100 0.030 0.035 0.100 80.50 -

M. Montesclaros Enterprises, Inc. 6506

Road Upgrading (Gravel to Concrete) ct. SH Impasugong-

Patulangan By-Pass Road (Patulangan Section)

X 18.991 O 0.337 0.259 0.100 0.030 0.055 0.100 88.10 -

M.B. Ang Construction and Supply 25001

Conc. of Caibiran-Cabucgayan National Circ. Road (Uson-

Gamay Section)VIII 3.725 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -

M.C. Torio Construction 10534 Alibadabad CPIP NIA-II 2.193 C 0.300 0.296 0.300 - - - 89.60 85.47% V. Satisfactory

M.C. Torio Construction 10534 Const. of MPB (Community Center) II 0.283 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project NIA-II 8.706 C 0.298 0.240 0.300 - - - 83.80 82.3%

V.Satisfactory

M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Brgy.

Calangain III 0.948 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding

M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Poblacion III 2.845 C 0.380 0.279 0.300 - - - 95.90 *95.90%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 255

Page 264: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M.C.B. Zamora Construction & Supplies 32006 Impvt./Rehab. of Pathwalk along

Porac River III 2.846 C 0.275 0.245 0.300 - - - 82.00 *82.00% V. Satisfactory

M.C.B. Zamora Construction & Supplies 32006 Rehab. of Pasbul-San Nicolas

2nd Road III 4.743 C 0.361 0.224 0.300 - - - 88.50 *88.50% V. Satisfactory

M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building (Learning Center) II 0.750 C 0.382 0.280 0.300 - - - 96.20 75.06%

Satisfactory

M.G. Salazar Const. Corp./Candace Const. (JV) JV-03-064

Impv't./Conc. Paving of Basilan Circumferential Rd., Isabela-

Maluso Rd.IX 36.385 O 0.296 0.300 0.050 0.030 0.051 0.100 82.70 -

M.G. Samidan Construction 16779 Const. of Bolinawen Flood Control CAR 1.051 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

M.G. Samidan Construction 16779 Const. of Kin-iway-Tambo-an Tribal ARC, FMR CAR 21.993 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

M.G. Samidan Construction 16779Improvement of Access Road to

Tourism Hubs & Spokes as defined by DOT

CAR 12.222 O 0.298 0.298 0.300 - - - 89.60 -

M.G. Samidan Construction 16779

Improvement of Benguet-Bontoc (Mt. Province)-Tinglayan

(Kalinga) Road Mt. Data Bontoc Section

CAR 8.188 C 0.384 0.300 0.300 - - - 98.40 89.10% V. Satisfactory

M.G. Samidan Construction 16779Impvt. of Baguio-Bontoc-Banaue Road, Conc. of Mt. Data-Bontoc Road, Km. 352+980-Km. 355+621

CAR 18.506 C 0.348 0.100 0.300 - - - 74.80 81.58% V. Satisfactory

M.G. Samidan Construction 16779

Impvt. of Benguet-Bontoc (Mr. Prov.)-Tinglayan-Lubuagan (Kalinga) Road At-Ato-Circle

Section

CAR 7.286 C 0.374 0.300 0.300 - - - 97.40 92.33% Outstanding

M.G. Samidan Construction 16779

Widening/Conc. of Mt. Data-Bontoc Road, Lukib-Sadsadan

Section, Km. 349+210 - Km. 350+243

CAR 13.139 C 0.369 0.200 0.300 - - - 86.90 80.96% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 256

Page 265: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M.G.G. Construction & Supply 31228 Const. of MPB (Hall) III 1.233 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V.Satisfactory

M.H. Southern Construction 5841 Const. of Dungon Seawall XII 4.653 C 0.261 0.288 0.000 - - - 54.90 75.90% Satisfactory

M.H. Southern Construction 5841 Const. of Multi-Purpose Building XII 0.370 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding

M.H. Southern Construction 5841 Const. of Public Market @ Pob. Malungon XII 9.102 C 0.370 0.224 0.300 - - - 89.40 71.96%

Satisfactory

M.J. Apin Builders 12179 Const. of 1-Cl School Building @ Bacolod National High School V 0.378 C 0.300 0.000 0.300 - - - 60.00 56.01%

Poor

M.J. Apin Builders 12179 Const. of Sch. Bldg. Patong E/S V 0.468 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory

M.P. Villegas Construction 16683 Const. of DOST Reg. IV-A Food and Safety & Quality DOST 9.379 O 0.358 0.062 0.150 0.030 0.054 0.050 70.40 -

M.P. Villegas Construction 16683 Const. of DOST Reg. IV-A Food and Safety & Quality DOST 9.379 O 0.352 0.286 0.150 0.030 0.057 0.050 92.49 -

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of Critical Portion of FTMR IV-A 0.470 C 0.245 0.300 0.300 - - - 84.50 *84.50%

V. Satisfactory

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of FMR, Brgy. Sapaan to

San Andres-Labak IV-A 0.383 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Const. of MPB, Gumaca MAPC

MPCI IV-A 0.946 C 0.181 0.300 0.300 - - - 78.10 *78.10% Satisfactory

M.R. Santiago Construction 27329 Conc. of Road, Brgy. Maguinao III 0.947 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 257

Page 266: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M.R. Santiago Construction 27329 Const. of MPB @ San Roque E/S III 0.950 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

M.R. Santiago Construction 27329 Rehab. of Camias-Sibut Road III 5.709 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding

M.R. Vargas Construction 8215 M'lang Airport Development Project DOTC 13.458 O 0.360 0.293 0.150 0.023 0.050 0.033 90.90 -

M.R.C. Bechaida Construction & Supply 32821 Conc. of Masagongsong Bridge

Approaches VIII 1.867 O 0.370 0.232 0.100 0.015 0.037 0.100 85.40 -

M.S. Ramos Construction 31684Const. of two (2) Storey, 4CL

School Bldg., @ Heritage Homes Brgy. Loma de Gato

III 3.283 C 0.378 0.200 0.300 - - - 87.80 85.77% V. Satisfactory

M.S. Ramos Construction 31684 Const./Rehab. of FMR at Brgy. Ligas III 0.380 C 0.355 0.200 0.300 - - - 85.50 *85.50%

V. Satisfactory

M.S. Ramos Construction 31684 Impvt./Rehab of Mac Arthur Highway including drainage NCR 9.425 C 0.300 0.200 0.300 - - - 80.00 85.40%

V. Satisfactory

M.S. Ramos Construction 31684 Impvt./Rehab. of Roads Brgy. Pulong Buhangin III 2.857 C 0.353 0.200 0.300 - - - 85.30 85.30%

V. Satisfactory

M.S. Ramos Construction 31684 Rehab. of Rizal-Bulacan Boundary-Bigte Road III 5.038 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

M.V. Caldo Engineering Construction and Supplies 16938 Concreting with Drainage

Improvement of Hondradez St. NCR 1.781 C 0.371 - 0.500 - - - 87.10 87.10% V. Satisfacroty

M.V. Caldo Engineering Construction and Supplies 16938

Const. / Rehab. / Replacement / Completion and Repair of

Plaridel E/SNCR 0.959 C 0.327 0.300 0.300 92.70 *92.70%

Outstanding

M.V. Caldo Engineering Construction and Supplies 16938 Const. of MPB, Brgy. 385 NCR 0.576 C 0.345 0.200 0.300 84.50 *84.50%

V. Satisfactory

M.V. Caldo Engineering Construction and Supplies 16938 Const.Rehab. of Shallow

Well/Artesian Well @ Zone 13-24 NCR 0.932 C 0.222 0.300 0.300 82.20 81.84% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 258

Page 267: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M.V. Confirm Construction & Development Inc. 32469 Const. of Six (6) Cl @ Santor E/S IVA 2.892 C 0.345 0.103 0.300 - - - 74.80 *74.80%

Satisfactory

M.V. Sabalburo Construction and Supply 32561 Completion of Antero P.

Hermosa E/S I 0.388 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding

M.V. Sabalburo Construction and Supply 32561 Repair of Cabusligan School

Bldg., Cabusligan E/S I 0.949 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covered

Court NHA 4.698 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -

M.Y. Reyes Builders & Development Corporation 26386 Construction of One Unit 3-

Storey School Building NHA 17.198 O 0.353 0.300 0.100 0.020 0.018 0.100 89.00 -

M.Y. Reyes Builders & Dev't. Corporation 26386 Construction of a 3-storey

School Building NCL 17.363 C 0.397 0.300 0.300 - - - 99.7 99.70% Outstanding

M2R Construction 13431Asphalt Overlay along Olongapo-Bugallon Road, Phase 3, Panan

SectionIII 0.979 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

M2R Construction 13431 Const. of Multi-Purpose Building @ Palauig C/S III 1.061 C 0.481 - 0.500 - - - 98.10 88.23%

V. Satisfactory

M2R Construction 13431 Const. of Slope Protection East Dirita Bridge III 4.753 C 0.284 0.158 0.300 - - - 74.20 *74.20%

Satisfactory

M2R Construction 13431 Genaro Magsaysay Bldg., Batonlapoc E/S III 1.140 C 0.367 0.071 0.300 - - - 73.80 81.43%

V. Satisfactory

M2R Construction 13431 Improvement/Rehab. of Water Supply III 0.935 O 0.400 0.022 0.100 0.020 0.025 0.100 66.70 -

M2R Construction 13431 Various Water System III 1.955 C 0.302 - 0.500 - - - 80.20 80.20% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 259

Page 268: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

M3A Construction 32123 Const. of Roads V 4.776 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

M3A Construction 32123 Road Concreting of Bagong Sirang V 14.469 C 0.299 0.200 0.300 - - - 79.90 * 79.90%

Satisfactory

Ma. Gina M. Pador Construction 25600 Conc. of Concepcion Sur Nat'l

Road IV-B 0.933 C 0.256 0.300 0.300 - - - 85.60 *85.60% V. Satisfactory

Ma. Gina M. Pador Construction 25600

Repair/Maint. of Ferrol-Odiongan Road (Tubigon Section) Km.

120+800IV-B 0.139 C 0.337 0.200 0.300 - - - 83.70 85.20%

V. Satisfactory

Ma-an Construction Corporation 28751 Rehab./Impvt. of DPWH Leyte

2nd DEO VIII 4.746 O 0.379 0.197 0.100 0.010 0.020 0.100 80.60 -

Ma-an Construction Corporation 28751 Repair/Rehab. of Wright-Taft

Road VIII 2.614 C 0.375 - 0.500 - - - 87.50 *87.50% V. Satisfactory

Mac Builders 7249Conc. of Calubian-San Isidro-

Tabango-Villaba Road (Tabango-Tabing Sect.)

VIII 17.943 O 0.352 0.238 0.100 0.030 0.042 0.100 86.20 -

MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge

(Completion) VIII 58.313 O 0.293 0.300 0.100 0.030 0.030 0.067 82.00 -

MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge

(Completion) VIII 58.313 O 0.372 0.300 0.030 0.022 0.055 0.033 81.20 -

MAC Builders / Ubas Construction (JV) JV-05-021

Impvt. of Allen-Malaga Section along Maharlika Highway, Ferry

Terminal-AllenVIII 46.652 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -

Mac-Morales General Merchandise &

Construction Supply2287 Conc. of FMR in Brgy. San Isidro

Ibaba IV-A 0.471 C 0.296 0.218 0.300 - - - 81.40 *81.40% V. Satisfactory

Madyaw Construction & Dev't. Corp. 29598

Completion of Azpetia Bridge along NRJ-Awa-Prosperidad-

Lianga RoadXIII 6.724 O 0.279 0.280 0.100 0.030 0.043 0.100 83.20 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 260

Page 269: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Madyaw Construction & Dev't. Corp. 29598 Completion of San Luis

Footbridge, Old Poblacion XIII 5.722 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -

Madyaw Construction & Dev't. Corp. 29598 Conc. of Bayugan-San Luis-

Talacogon Circ. Road XIII 9.456 C 0.310 0.046 0.300 - - - 65.60 70.82% Satisfactory

Madyaw Construction & Dev't. Corp. 29598 Const. of Phil. Normal University

MPB XIII 2.353 C 0.322 0.200 0.300 - - - 82.20 86.77% V. Satisfactory

Madyaw Construction & Dev't. Corp. 29598 Const. of San-Isidro-

Hinimbangan FMR XIII 19.235 C 0.293 0.300 0.300 - - - 89.30 89.30% V. Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Mapantad-Licop Road XI 0.943 C 0.350 0.200 0.300 - - - 85.00 87.16%

V. Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Poblacion Road at

Brgy. Central XI 0.943 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding

Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road

(Checote-Monserat Sect.) XI 19.283 C 0.092 0.200 0.300 - - - 59.20 79.36% Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road

(Lilisan Sect.) XI 19.282 O 0.316 0.300 0.100 0.030 0.045 0.100 89.10 -

Maer Summit Konstruck Co. 25262 Conc. of Tua-tua Road XI 1.415 C 0.359 0.200 0.300 - - - 85.90 87.46%

V. Satisfactory

Maer Summit Konstruck Co. 25262 Const. of MPB (Legislative Bldg.,

Phase II) XI 1.887 C 0.388 0.300 0.300 - - - 98.80 94.53% Outstanding

Maer Summit Konstruck Co. 25262

Impvt. of Davao Oriental-Surigao Sur Coastal Road (Banaybanay

Section)XI 10.324 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

Maer Summit Konstruck Co. 25262 Impvt. of Lanca-Luban Road XI 2.830 C 0.217 0.200 0.300 - - - 71.70 *71.70%

Satisfactory

Maer Summit Konstruck Co. 25262 Impvt. of Lavigan-Impog Road XI 1.884 C 0.279 0.200 0.300 - - - 77.90 *77.90%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 261

Page 270: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Maer Summit Konstruck Co. 25262 Impvt. of Manikling-Lavugan

Road (Lavigan-Talisay Sect.) XI 14.464 C 0.347 0.200 0.300 - - - 84.70 82.12% V. Satisfactory

Maer Summit Konstruck Co. 25262

Rehab. of Davao or.-Surigao Coastal Road, Banaybanay-Mati

Section (Phase I)XI 19.289 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit

Konstrukt)25262 Const. of DOSCST Nursing

Blsg., Guang-Guang XI 2.359 C 0.386 0.200 0.300 - - - 88.60 87.97% V. Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit

Konstrukt)25262 Const. of MPB (Covered Court) XI 1.251 O 0.294 0.250 0.100 0.015 0.023 0.100 78.20 -

Maer Summit Konstrukt Co. (Formerly: Summit

Konstrukt)25262 Improvement of CDC - Poblacion

FMR (ARSIP II) XI 11.869 C 0.310 0.011 0.300 - - - 62.10 74.97% Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit

Konstrukt)25262 Impv't./Rehab. of Don Enrique

Lopez-Don Salvador Lopez FMR XI 7.364 C 0.384 - 0.500 - - - 88.40 88.40% V. Satisfactory

Mafil Enterprises 27226 Provision of Line Canal @ Km. 1546, 450-Km.1546.73 X 0.280 C 0.411 - 0.500 - - - 91.10 91.10%

Outstanding

Mafil Enterprises 27226Provision of Line Canal along Jct. Dologon-Busco-Quezon

Road Buni-Buni SectionX 0.278 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

Maghuyop Construction 21641 Conc. of FMR VII 1.925 C 0.343 0.300 0.300 - - - 94.30 86.98% V. Satisfactory

Maghuyop Construction 21641 Concreting of Road VII 2.784 C 0.345 0.222 0.300 - - - 86.70 83.88% V. Satisfactory

Maghuyop Construction 21641 Const. of 2 CL Sch. Bldg. w/o CR Guinacot H/S VII 0.853 C 0.352 0.256 0.300 - - - 90.80 88.98%

V. Satisfactory

Maghuyop Construction 21641 Const. of 4 Cl Sch. Bldg. at Pondol E/S VII 1.435 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 262

Page 271: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Maghuyop Construction 21641 Reconstruction of Balilihan Central Elem. School VII 3.525 O 0.358 0.300 0.100 0.030 0.070 0.100 95.80 -

Maghuyop Construction 21641 Renovation of Multi Purpose Pavement VII 0.093 C 0.364 0.000 0.300 - - - 66.40 *66.40%

Fair

Magna Rich Trading & Construction 29108 Const. of FMR Brgy. San

Antonio IV-A 0.955 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Magscon Construction 25362 Const. of Multi-Purpose Building @ Brgy. Padu Grande I 0.189 C 0.368 0.300 0.300 - - - 96.80 *96.80%

Outstanding

Mainbest Enterprise 26127 Completion of Multi-Purpose Building (Gymnasium), Gamis II 1.283 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

Makapa Corporation 30029 Const. of Multi-Purpose Building V 1.380 C 0.391 0.300 0.300 - - - 99.10 83.77% V. Satisfactory

Makapa Corporation 30029 Const. of Sampaloc Seawall @ Sitio Little Mahingan V 3.803 C 0.400 0.000 0.300 - - - 70.00 78.50%

Satisfactory

Makapa Corporation 30029 Const./Impvt. of Cawayan River Control V 9.452 C 0.365 0.195 0.300 - - - 86.00 84.14%

V. Satisfactory

Makapa Corporation 30029 Rehab./Impvt. of Cawayan River Control V 4.728 C 0.306 0.300 0.300 - - - 90.60 *90.60%

Outstanding

Makapa Corporation 30029 Rehab./Retrofitting of Cawayan Bridge along Maharlika Highway V 19.016 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Makapa Corporation 30029 Repair/Rehab. of Cawayan River Control V 9.497 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

Makati Development Corporation 2313 Const. of 10th & 11th Aveneus of

Bonifacio Triangle Project BCDA 52.800 O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 -

Makati Development Corporation 2313 Const. of 10th and 11th Avenues

of Bonifacio Triangle BCDA 52.800 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 263

Page 272: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Makati Development Corporation 2313

Const. of 34.5 KVA UPDS along 26th St., 32nd St. & McKinley

Parkway, Phase 3BCDA 12.084 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -

Mak-Well Enterprises 25003 Const. of MPB at Brgy. Pansol IV-A 2.674 C 0.423 - 0.500 - - - 92.30 92.30% Outstanding

Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. @ Los Banos Park IV-A 1.049 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. Barangay Batong Malake IV-A 0.955 C 0.433 - 0.500 - - - 93.30 *93.30%

Outstanding

Mak-Well Enterprises 25003 Const./Repair/Rehab. of MPB at Brgy. Tadlac IV-A 2.880 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

Malihan Enterprises 6963 Concreting of Road, Brgy. San Antonio IV-A 0.954 C 0.467 - 0.500 - - - 96.70 *96.70%

Outstanding

MAM Construction & Trading 19915 Const. of Three 3-CL Building @

Bucanan Elem. School III 1.410 O 0.400 0.300 0.100 0.020 0.018 0.100 93.80 -

MAM Construction & Trading (Formerly: MAM

Construction)19915 Conc./Upgrading of Angeles-

Porac-Dinalupihan Road III 5.689 C 0.282 0.272 0.300 - - - 85.40 *85.40% V. Satisfactory

MAM Construction & Trading (Formerly: MAM

Construction)19915 Const. of 2CL Sch. Bldg. at Sta.

Rita E/S III 0.765 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory

MAM Construction & Trading (Formerly: MAM

Construction)19915 Const. of Elem. School Bldg. at

Sta. Cruz ES III 0.786 C 0.383 0.276 0.300 - - - 95.90 *95.90% Outstanding

MAM Construction & Trading (Formerly: MAM

Construction)19915 Repair and Rehab. of San Pedro

ES III 0.384 C 0.338 0.300 0.300 - - - 93.80 *93.80% Outstanding

Mamsar Enterprises Agro-Industrial Corporation 15885

Cluster B 2004: Const. of Various 2004 School Bldg. (Opol

NSTS.)under the 2nd Congressional District, Misamis

Oriental

X 9.049 O 0.308 0.300 0.100 0.030 0.032 0.100 87.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 264

Page 273: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &

Approaches X 16.484 C 0.380 0.300 0.300 - - - 98.00 86.64% V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885

Completion of Mandulog Bridge I along Ma. Cristina-Misamis

Oriental Rd., Brgy. San Roque-Hinaplanon

X 13.667 C 0.317 0.300 0.300 - - - 91.70 94.08% Outstanding

Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Nunucan Bridge

Phase III, Brgy. Suarez X 7.608 C 0.425 - 0.500 - - - 92.50 88.96% V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885 Const. of Mambu-ao Bridge &

Approaches X 22.223 C 0.353 0.293 0.300 - - - 94.60 89.66% V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885 Const./Impvt. of Water Supply

Projects XIII 10.392 C 0.311 0.200 0.300 - - - 81.10 87.28% V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885 Const.of Iligan-Bukidnon Road

(Digkila-an-Rogongon Sect.) X 7.769 C 0.276 - 0.500 - - - 77.60 77.48% Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885 Iligan-Bukidnon Road

Brgy. San Roque X 8.037 C 0.444 - 0.500 - - - 94.40 93.86% Outstanding

Maningo Enterprises 13330 Const. of 2 Storey 6 CL E/S Bldg. VII 4.767 C 0.227 0.200 0.300 - - - 72.70 *72.70% Satisfactory

Maningo Enterprises 13330 Const. of 4-Cl, 2-Storey S/B @ Bangkal NHS VII 1.962 C 0.218 0.230 0.300 - - - 74.80 74.80%

Satisfactory

Maningo Enterprises 13330 Road Asphalting/Conc. @ Brgy. Malubog VII 0.478 C 0.307 0.300 0.300 - - - 90.70 *90.70%

Oustanding

Manuel A. Dela Torre Jr. Builders 31024 Conc. of Fatima V III 0.949 C 0.344 0.300 0.300 - - - 94.40 *94.40%

Outstanding

Manuel A. Dela Torre Jr. Builders 31024 Conc. of Road, Brgy Maasin III 0.379 C 0.380 0.286 0.300 - - - 96.70 *96.70%

Outstanding

Map Alviola Construction 31951 Const. of Flood Control (Seawall) VII 0.943 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

Map Alviola Construction 31951 Const. of Water System VII 0.165 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 265

Page 274: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mar Castillo Const. Supply Gravel & Sand 21073 Const. of Lined Canal @ Sta.

Maria IV-A 0.283 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding

Marbel Dynamic Builders 6150 Const. of 2 Cl @ Marianito Villegas E/S XII 0.680 C 0.381 0.300 0.300 - - - 98.10 *98.10%

Outstanding

Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS XII 0.783 C 0.381 0.300 0.300 - - - *98.10 98.10% Outstanding

Marbel Dynamic Builders 6150 Const. of Koronadal NCHS Annex, Bacongco Campus XII 1.734 O 0.329 0.240 0.100 0.030 0.035 0.067 80.10 -

Marbel Dynamic Builders 6150Const. of Ladol flood Control

Protecting Sarangani-Davao del Sur Coastal Road

XII 1.234 O 0.323 0.200 0.000 0.010 0.021 0.133 68.70 -

Marbel Dynamic Builders 6150 Const. of MPB @ Brgy. Assumption XII 0.190 C 0.360 0.200 0.300 - - - 86.00 * 86.00%

V. Satisfactory

Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg. @ Brgy. Liberty XII 0.759 C 0.276 0.216 0.300 - - - 79.20 *79.20%

Satisfactory

Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg., Brgy. Lake Seloton XII 0.760 C 0.330 0.200 0.300 - - - 83.00 84.19%

V. Satisfactory

Marbel Dynamic Builders 6150 Impvt. of MPB at Poblacion XII 0.961 C 0.275 0.200 0.300 - - - 77.50 *77.50% Satisfactory

Marcbilt Construction, Inc. 21844 Rehab./Reconst. (Conc.) of Dasmariñas-Carmona Road IV-A 28.920 O 0.341 0.202 0.100 0.030 0.037 0.100 81.00 -

Marcons Builder 8044 Const. of DPWH Building CAR (Phase IV) CAR 8.553 O 0.363 0.240 0.100 0.030 0.051 0.100 88.40 -

Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) CAR 24.059 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -

Marcons Builder 8044 Const. of U.P. College Baguio Multi-Purpose Bldg. CAR 1.448 C 0.350 - 0.500 - - - 85.00 65.61%

Fair

Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road CAR 12.707 C 0.318 0.100 0.000 - - - 41.80 58.56%

Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 266

Page 275: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Marcons Builder 8044 Rehab./Impvt./Const. of DPWH Building (Phase III) CAR 14.475 C 0.357 0.267 0.300 - - - 92.40 92.05%

Outstanding

Marcphil Construction 10949 Conc. of Dangay Port Road IV-B 0.937 C 0.417 - 0.500 - - - 91.70 84.38% V. Satisfactory

Marcphil Construction 10949 Conc. of Port Road, Proper Bansud IV-B 1.889 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

Marcphil Construction 10949 Conceting of San Jose-Kaligtasan Road IV-B 0.945 C 0.398 - 0.500 - - - 89.80 89.80%

V. Satisfactory

Marcphil Construction 10949 Impvt./Repair of San Mariano-Tauga Road IV-B 1.860 C 0.170 0.276 0.300 - - - 74.60 *74.60%

Satisfactory

Marcris Enterprises 32820

Repair and Rehab. of Ilang Bridge along Carmen Jct.-

Bayambang San Carlos-Manat Road

I 0.963 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding

Marcus Construction 12601 Conc. of Midsayap-Makar Road, Salunayan-Tumbras Section XII 19.109 C 0.368 0.300 0.300 - - - 96.80 *96.80%

Outstanding

Marcus Construction 12601Const. of Drainage Canal from Buluan Bridge II to Libungan

River, Phase I, II & IIIXII 14.285 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V.Satisfactory

Marcus Construction 12601 Const. of Multi-Purpose Bldg. (ABC Hall) Phase I XII 0.932 C 0.470 - 0.500 - - - 97.00 76.49%

Satisfactory

Marcus Construction 12601Const. of Multi-Purpose Bldg.,

(DSWD Crisis Intervention Bldg.) Brgy. Pob. (Realigned to Singao)

XII 0.909 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding

Marcus Construction 12601 Const. of Multi-Purpose Building @ Brgy. Capiton XII 1.906 C 0.350 0.300 0.300 - - - 95.00 83.24%

V. Satisfactory

Marcus Construction 12601Proposed Conc. of Liloy-Siocon

Road, Imelda-San Roque-Gutalac Sect.

IX 19.128 O 0.327 0.223 0.100 0.012 0.029 0.100 79.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 267

Page 276: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Marcus Construction 12601Proposed Conc. of Liloy-Siocon

Road, Imelda-San Roque-Gutalac Sect.

IX 19.128 O 0.293 0.222 0.100 0.030 0.047 0.100 79.20 -

Marcus Construction 12601Proposed Impv't./Conc. of

Labason-Gutalac Nat'l. Rd., Antonio-Labason River Sect.

IX 3.913 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding

Marcus Construction 12601Reblocking/Conc. Along

Cotabato-Davao Road, Sadaan Sect.

XII 4.625 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -

Marcus Construction 12601

Rehab./Impvt. of Banisilan-Guiling-Alamada-Libungan Road, (Kapayawe-Grebona

Section)

XII 4.742 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

Marcus Construction 12601

Repair/Maintenance of Libungan Flood Control (Slope Protection

Upstream of Approach "B" of Libungan Bridge) Phase II

XII 1.315 C 0.325 0.300 0.300 - - - 92.50 *92.50% Outstanding

Mar-Deb Construciton & Development 6715 Completion of 2-Storey Multi-

Purpose Building (Phase IV) II 0.936 C 0.306 0.300 0.300 - - - 90.60 86.12% V. Satisfactory

Mar-Deb Construciton & Development 6715 Concreting of PNP Regional

Training Center Road, Minante I II 0.561 C 0.341 - 0.500 - - - 84.10 84.10% V. Satisfactory

Mar-Deb Construciton & Development 6715 Const. of Angad Bridge &

Approaches Angad II 7.906 C 0.459 - 0.500 - - - 95.90 86.72% V. Satisfactory

Mar-Deb Construciton & Development 6715 Gravelling of FMR II 0.470 C 0.354 - 0.500 - - - 85.40 85.40%

V. Satisfactory

Mar-Deb Construciton & Development 6715

Impv't./Gravelling/Concreting along CDMA Boundary and its

related RoadsII 3.396 C 0.312 - 0.500 - - - 81.20 71.42%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 268

Page 277: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mar-Deb Construciton & Development 6715

Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-

Km.372+649)II 9.573 O 0.366 0.295 0.100 0.030 0.035 0.100 92.60 -

Mar-Deb Construciton & Development 6715 Widening/Regravelling of FMR

Munoz East II 0.940 C 0.367 - 0.500 - - - 86.70 84.60% V. Satisfactory

Mar-deb Construction & Development 6715 Cagayan River Basin Protection

Works, Macate Section II 19.269 C 0.259 0.300 0.300 - - - 85.90 *85.90% V. Satisfactory

Mar-deb Construction & Development 6715

Completion of Turod-Banquero Concrete Overflow Bridge

PhaseIIIII 9.879 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -

Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan

National Road, Cabatuan Section II 9.412 C 0.342 0.200 0.300 - - - 84.20 87.02% V. Satisfactory

Mar-deb Construction & Development 6715 Conc. of Jct. Ipil-Quirino Bdry.

Road II 27.182 C 0.354 0.200 0.300 - - - 85.40 87.38% V. Satisfactory

Mar-deb Construction & Development 6715

Const. of 2 Cl Sch. Bldg. @ Reina Mercedes Vocational

SchoolII 0.817 C 0.390 0.178 0.300 - - - 86.80 *86.80%

V. Satisfactory

Mar-Deb Construction & Development 6715 Const. of Bank Protection

Works, Phase III II 16.225 C 0.375 - 0.500 - - - 87.50 91.10% Oustanding

Mar-deb Construction & Development 6715 Const. of Bintacan Bridge &

Approaches II 24.964 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -

Mar-Deb Construction & Development 6715 Const. of Centro Multi-Purpose

Building II 0.090 C 0.321 0.236 0.300 - - - 85.70 *85.70% V. Satisfactory

Mar-deb Construction & Development 6715 Const. of MPB (Phase II) @

Cauayan City C/S II 0.941 C 0.331 0.074 0.300 - - - 70.50 66.23% Fair

Mar-deb Construction & Development 6715 Const./Completion of MPB @

San Mateo II 0.953 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

Mar-deb Construction & Development 6715 Construction of Bintacan Bridge

& Approaches II 24.964 O 0.348 0.300 0.000 0.023 0.051 0.067 78.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 269

Page 278: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mar-deb Construction & Development 6715 Construction of Bintacan Bridge

& Approaches II 24.964 C 0.393 0.300 0.000 - - - 69.30 77.32% Satisfactory

Mar-deb Construction & Development 6715 Impvt./Rehab. of Cauayan-

Cabatuan Road II 9.559 C 0.292 0.200 0.300 - - - 79.20 82.44% V. Satisfactory

Mar-deb Construction & Development 6715 Impvt./Rehab. of Daang

Maharlika Road (Widening) II 4.778 C 0.298 0.300 0.300 - - - 89.80 88.90% V. Satisfactory

Mar-Deb Construction & Development 6715

Reblocking of Concrete Pavement along Jct. Cauayan-Cabatuan Road (Intermittent

Section)

II 0.623 C 0.317 - 0.500 - - - 81.70 *81.70% V. Satisfactory

Mar-deb Construction & Development 6715

Reblocking of Concrete Pavement along Santiago-

Tuguegarao Rd.II 4.741 C 0.328 0.200 0.300 - - - 82.80 *82.80%

V. Satisfactory

Mar-deb Construction & Development 6715 Rehab./Reconst. of Santiago-

Tuguegarao Road II 11.473 O 0.392 0.240 0.100 0.030 0.047 0.100 90.90 -

Mar-deb Construction & Development 6715 Repair/Rehab.of Pigalo Bridge

(Phase III) II 4.790 C 0.319 0.200 0.300 - - - 81.90 84.12% V. Satisfactory

Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan

Road (Luna Section) II 3.344 O 0.394 0.240 0.100 0.030 0.042 0.100 90.60 -

Margarita Construction 20201 Asphalt Overlay @ Brgy. Sucol IV-A 0.480 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

Margarita Construction 20201 Const. of 3-Cl School Building (FFHNAS) III 1.415 C 0.479 - 0.500 - - - 97.90 94.68%

Outstanding

Margarita Construction 20201 Rehab. of Norzagaray-Bigte Road III 5.709 C 0.257 0.300 0.300 - - - 85.70 *85.70%

V. Satisfactory

Margarita Construction 20201 Upgrading of Banga Road III 2.838 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding

Marier Construction & Supply 22878 Const. of One Unit 2 CL Sch.

Bldg. at Siare Jhon HRN NHS IX 0.948 C 0.335 0.287 0.300 - - - 92.20 *92.20% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 270

Page 279: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Marigold Development Corporation 4707 Const. of Multi-Purpose Building

@ Brgy. New Era NCR 1.432 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding

Marigold Development Corporation 4707 Construction of Multi-Purpose

Building @ Brgy. Baesa NCR 1.145 C 0.319 0.202 0.300 - - - 82.10 *82.10% V. Satisfactory

Marilag Construction 22813 Const. of Multi-Purpose @ Talangka E/S IV-A 0.240 C 0.339 0.300 0.300 - - - 93.90 *93.90%

Outstanding

Marilag Construction 22813 Const. of Multi-Purpose Bldg., (Senior Citizen) IV-A 0.478 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfactory

Marilag Construction 22813 Const. of Multi-Purpose Bldg., @ San Jose IV-A 0.287 C 0.398 0.224 0.300 - - - 92.20 *92.20%

Outstanding

Marknest Construction 16818 Concreting of Barangay Road III 0.475 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory

Marknest Construction 16818 Const. of 2-Storey Bldg. with 12 Rooms Sindalan E/S III 1.418 C 0.427 - 0.500 - - - 92.70 87.94%

V. Satisfactory

Marknest Construction 16818 Const. of MPB @ Bo. Obrero E/S NCR 4.755 C 0.387 0.174 0.300 - - - 86.10 *86.10% V. Satisfactory

Marknest Construction 16818 Const./Repair/Completion of Water Supply III 0.954 C 0.381 0.258 0.300 - - - 93.90 *93.90%

Outstanding

Marknest Construction and Trading (Formerly:

Marknest Construction)16818 Const. of MPB at Nueva Victoria III 0.952 C 0.315 0.200 0.300 - - - 81.50 *81.50%

V. Satisfactory

Marquin Construction 13332 Conc. of Roads at Brgy. Cogon VII 0.882 C 0.314 0.184 0.300 - - - 79.80 *79.80% Satisfactory

Marquin Construction 13332 Const. of 3 CL SB @ Guinsay NHS VII 1.825 C 0.310 0.262 0.300 - - - 87.20 75.37%

Satisfactory

Marquin Construction 13332 Const. Rehab. of SB at Ramon Durano Sr. Science & Tech. VII 0.894 C 0.361 0.300 0.300 - - - 96.10 *96.10%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 271

Page 280: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Marquin Construction 13332 Proposed Const. of Line Canal VII 0.963 O 0.316 0.200 0.100 0.022 0.025 0.200 86.30 -

Marquin Construction 13332 Road Conc. @ St. James Poblacion VII 0.461 C 0.390 0.100 0.300 - - - 79.00 *79.00%

Satisfactory

Martha Construction Supply & General

Merchandise25827 Repair of Unpaved Shoulder II 0.418 C 0.326 0.200 0.300 - - - 82.60 *82.60%

V. Satisfactory

Mar-Vel Construction 23722 Completion of Multi-Purpose Building (LSPC) IV-A 0.475 C 0.383 0.150 0.300 - - - 83.30 *83.30%

V. Satisfactory

Mar-vel Construction 23722 Conc. of Drainage System along MSR Daang Maharlika Road IV-A 0.960 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

Mar-vel Construction 23722 Conc. of Road @ Brgy. Real IV-A 0.289 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

Mar-vel Construction 23722 Conc. of Road @ Brgy. Uno going to Brgy. Rizal IV-A 4.801 C 0.298 0.200 0.300 - - - 79.80 *79.80%

Satisfactory

Mar-Vel Construction 23722 Conc./Rehab. of Barangay Road IV-A 3.848 C 0.194 - 0.500 - - - 69.40 *69.40% Fair

Mar-vel Construction 23722 Const. Impv't. of Water Supply System IV-A 2.464 C 0.386 0.283 0.300 - - - 96.90 *96.90%

Outstanding

Mar-vel Construction 23722Const. of Flood Control

System/Riprapping @ Brgy. Estrella

IV-A 2.880 C 0.225 0.300 0.300 - - - 82.50 *82.50% V. Satisfactory

Mar-vel Construction 23722 Const. of MPB @ Brgy. Puypuy IV-A 0.480 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Mar-vel Construction 23722 Const. of Roads at Brgy. Bucal IV-A 0.334 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory

Mar-vel Construction 23722Const./Impvt. of Flood Control

and Drainage @ Brgy. Tulo-Makiling Maharlika Highway

IV-A 0.286 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 272

Page 281: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mar-vel Construction 23722 Impv't. of Calauan-Nagcarlan Road IV-A 4.674 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfactory

Mar-vel Construction 23722 Impvt./Rehab. of Flood Control IV-A 0.959 C 0.176 0.300 0.300 - - - 77.60 76.22% Satisfactory

Masbate-Iloilo Const. & Trading Corporation 26579 Const. of Multi-Purposee

Building @ Cabatuan H/S VI 1.446 C 0.398 0.200 0.300 - - - *89.80 89.80% V. Satisfactory

Mash Construction 20806 Const. of 1 CL at Plaridel Elem. School IV-A 0.333 C 0.459 - 0.500 - - - 95.90 95.90%

Outstanding

Mash Construction 20806 Const. of MPB at Brgy. Mabini IV-A 1.444 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Masulot Construction 10716 Widening of Cotabato-Allah-Gen. Santos Road including sidewalk XII 3.107 C 0.395 - 0.500 - - - 89.50 81.88%

V. Satisfactory

Matco Builders 12929Const./Repair/Rehab. of Brgy.

Rds. @ Brgy. Balibago & Ninoy Package II

III 3.768 C 0.411 - 0.500 - - - 91.10 91.10% Outstanding

Maverick & Wee Eng Joint Venture JV-07-105

CP 8: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Baganga-Cateel

Section

XI 191.290 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -

Maverick Builders 14466 Impv't/Conc. of Compostela-Cateel Road XI 66.371 C 0.365 0.300 0.300 - - - 96.50 97.10%

Outstanding

Maverick Builders Incorporated (Formerly:

Maverick Builders)14466

Rehab. of Davao-Or.-Surigao Coastal Road Banaybanay-Mati

Section (Phase II)XI 19.290 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

Mayhaligue Cosntruction & Supply 29586 Const. of Dapdap MPB II 0.470 C 0.398 0.200 0.300 - - - 89.80 *89.80%

V. Satisfactory

Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 O 0.400 0.060 0.070 0.030 0.000 0.000 56.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 273

Page 282: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 O 0.397 0.131 0.050 0.015 0.016 0.033 64.20 -

Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 C 0.400 0.284 0.300 - - - 98.40 98.40%

Outstanding

MBB Construction 11363 Concreting of Manila North Road Km. 343+000 - Km.344+000 I 9.597 C 0.371 0.200 0.300 - - - 87.10 83.26%

V. Satisfactory

MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 O 0.261 0.240 0.100 0.030 0.037 0.100 76.80 -

MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 O 0.251 0.115 0.030 0.022 0.025 0.067 51.00 -

MBB Construction 11363 Const. of MPB I 9.460 C 0.298 0.250 0.300 - - - 84.80 70.80% Satisfactory

MBB Construction 11363 Const. of Santa Seawall I 19.211 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

MBB Construction 11363 Const. of Victory Bridge I 9.357 C 0.303 - 0.500 - - - 80.30 75.92% Satisfactory

MBB Construction 11363 Impv't. of Vigan-Sta. Catalina Road I 19.298 C 0.315 0.200 0.300 - - - 81.50 83.39%

V. Satisfactory

MBB Construction 11363 MNR, Candon-Santiago Section I 18.920 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -

MBB Construction 11363 Package III-Completion of Multi-Purpose Bldg., @ ISPSC I 0.946 C 0.352 - 0.500 - - - 85.20 85.20%

V. Satisfactory

MBB Construction 11363 Rehab. of Conc. Pavement along MNR, Candon Section I 9.449 C 0.221 0.300 0.300 - - - 82.10 83.66%

V. Satisfactory

MBB Construction 11363 Rehab./Reconst. of Vigan Airport Road I 19.014 C 0.037 0.200 0.300 - - - 53.70 83.52%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 274

Page 283: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MBB Construction 11363Rehab./Reconst.of Damaged Nat'l Road, Candon-Salcedo

RoadI 18.990 O 0.305 0.160 0.100 0.008 0.022 0.067 66.20 -

MBB Construction 11363 Renovation of Narvacan Municipal Bldg. I 0.946 C 0.450 - 0.500 - - - 95.00 95.00%

Outstanding

MBB Construction 11363 Sta. Maria-Burgos Road I 1.698 O 0.277 0.240 0.100 0.022 0.027 0.067 73.30 -

MBD General Const./Duragold Trading &

Const. (JV)JV-05-014 Const. of Sagayon Bridge &

Approaches X 23.811 C 0.396 0.300 0.300 - - - 99.60 89.88% V. Satisfactory

MBD General Construction 9991 Conc. of Calamba-Baliangao Road X 16.180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -

MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road X 7.146 O 0.258 0.085 0.100 0.023 0.025 0.100 59.10 -

MBD General Construction 9991Const. /Cementing of

Circumferential Rd., from Purok Brgy. Mobod to Brgy. Villaflor

X 0.811 C 0.294 0.300 0.300 - - - 89.40 85.38% V. Satisfactory

MBD General Construction 9991Const. of Dalacon Bridge &

Approaches along Oroquieta-Calamba Mt. Rd.

X 15.545 C 0.279 0.138 0.300 - - - 71.70 81.30% V. Satisfactory

MBF Construction 9803 Concreting of Municipal Street, Siaton, Negros Oriental VII 2.027 C 0.299 - 0.500 - - - 79.90 73.12%

Satisfactory

MBF Construction 9803 Repair/Rehab./Impv't. of FMR, Licoan VII 0.486 C 0.450 - 0.500 - - - 95.00 95.00%

Outstanding

MC Torio Construction 10534 Construction of Canal and Canal Structures (LMC-ARIP-01-06) NIA-II 4.070 C 0.400 0.300 - - - - 70.00 *70.00%

Fair

MCB Construction & Supply 12128 Conc. of FMR @ Doyong I 4.723 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 275

Page 284: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MCB Construction & Supply 12128 Const. of Water System @ Brgy.

Doyong Nagsaing & Ambuetel I 4.820 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory

MCGR Engineering Services 22202 Concreting of Various Roads VIII 0.965 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

MCGR Engineering Services 22202 Repair/Rehab. of Rizal Avenue

Extension VIII 2.846 C 0.283 0.200 0.300 - - - 78.30 84.48% V. Satisfactory

Mcguire Industrial Development Co. 31302 Concreting of FMR IV-A 0.467 C 0.355 0.200 0.300 - - - 85.50 *85.50%

V. Satisfactory

MCL Construction / RND Const. (JV) JV-03-116 Impv't./Conc. of Sitio Malasin

FMR San Macario Sur ARC I 7.749 C 0.284 - 0.500 - - - 78.40 72.58% Satisfactory

ME3 Construction 31364 Asphalting of Daang Maharlika (Surigao-Agusan Road Section) XIII 4.813 C 0.384 0.205 0.300 - - - 88.90 *88.90%

V. Satisfactory

ME3 Construction 31364 Impvt./Rehab. of Butuan-Malaybalay Road XIII 4.804 C 0.280 0.300 0.300 - - - 88.00 *88.00%

V. Satisfactory

Meditech Trade & Development 16545

Const./Rehab. of Multi-Purpose Pavement along McArthur

Highway, Mabini, Gacutan and Plaza del Rosario St.

III 2.809 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

Meditech Trade & Development 16545 Impvt. Along Ipil-Quirino Bdry.

Road, Jones-San Agustin II 9.590 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

Meditech Trade & Development 16545 Impvt. of Macalelon-Gen Luna

Road IV-A 19.282 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

Meditech Trade & Development 16545 Impvt. of Quezon-Guimba Road,

Manacsac Section III 14.044 C 0.293 0.200 0.300 - - - 79.30 *79.30% Satisfactory

Meditech Trade & Development 16545 Impvt./Rehab. Along Gamu-

Roxas Road II 9.566 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Meditech Trade & Development 16545 Impv't./Rehab./Const. of MSR-

Pagbilao Sect. IV-A 4.728 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 276

Page 285: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Meditech Trade & Development 16545 Reblocking/Impvt. of Roman

Expressway, Batangas II Section III 18.899 C 0.387 0.277 0.300 - - - 96.40 *96.40% Outstanding

Meditech Trade & Development 16545

Rehab. of Catanauan-Lopez Road (Additional Safety Warning

Device) km. 252+000 - km. 255+000

III 4.820 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Meditech Trade & Development 16545

Repair/Rehab. & Installation of Reflectorized Pavm't Stud along

Malicboy-P. Burgos-Unisan-Pototanin Rd. & Mulanay San

Narciso Rd.

IV-A 9.643 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding

Meditech Trade & Development 16545 Repair/Rehab. of Dinagat-Loreto

Road XIII 4.489 C 0.331 - 0.500 - - - 83.10 *83.10% V. Satisfactory

Meditech Trade & Development 16545 Repair/Rehab. of Road leading to

Mt. Samat Shrine IV-A 9.254 C 0.279 0.300 0.300 - - - 87.90 *87.90% V. Satisfactory

Mega Builders Corporation (Formerly: Gem Const. &

Supply)29732

Repair/Rehab. of Multi-Purpose/Academic Bldg., Batangas State University

IV-A 1.319 O 0.357 0.278 0.100 0.030 0.031 0.100 89.60 -

Mega M Builders 20515 Conc. of Line Canal, Brgy. Sta. Ana IV-A 4.823 C 0.257 0.300 0.300 - - - 85.70 *85.70%

V.Satisfactory

Mega M Builders 20515 Const. of Farm-to-Market Road IV-A 0.373 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding

Mega M Builders 20515 Const. of Multi-Purpose Hall @ Del Remedio (DPWH-Compound) IV-A 0.704 C 0.439 - 0.500 - - - 93.90 84.59%

V. Satisfactory

Mega M Builders 20515 Const./Rehab. of Road, Brgy. Sta. Ana IV-A 4.823 C 0.337 0.300 0.300 - - - 93.70 *93.70%

Outstanding

Mega M Builders 20515 Impvt. of FMR at Brgy. San Gregorio IV-A 0.335 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 277

Page 286: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mega Plus Construction 28322 Const. of Multi-Purpose Building @ Brgy. Quiot VII 0.958 C 0.358 0.300 0.300 - - - 95.80 85.65%

V. Satisfactory

Mega Plus Construction 28322 Rehab./ of Multi-Purpose Bldg., @ Sitio Opra, Brgy. Kalunasan VII 0.767 C 0.403 - 0.500 - - - 90.30 90.30%

Outstanding

Megashine Builders Corporation (Formerly: Gem Const. & Supply)

29732Repair/Rehab. of Multi-

Purpose/Academic Bldg., Batangas State University

IV-A 1.319 C 0.361 0.246 0.300 - - - 90.70 89.93% V. Satisfactory

Megila Const. & Development Supply 19262 Completion of Catalunan

Pequeno E/S XI 0.471 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory

Megila Const. & Development Supply 19262 Completion of MPB at Brgy. 18-B XI 0.468 C 0.390 0.146 0.300 - - - 83.60 *83.60%

V. Satisfactory

Megila Const. & Development Supply 19262

Const / Rehab. / Replacement / Completion & Repair of E/S

Bldg. @ Kapitan Tomas Monteverde E/S

XI 0.883 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding

Megila Const. & Development Supply 19262 Const. of 2CL, 2 Storey Bldg., @

Matina Aplaya E/S, Matina XI 1.440 O 0.382 0.300 0.100 0.030 0.064 0.100 97.60 -

Megila Construction and Development Supply 19262 Const. of MPB @ Leon Garcia

NHS XI 1.406 C 0.348 0.300 0.300 - - - 94.80 87.10% V. Satisfactory

Megila Construction and Development Supply 19262 PSHS SMC Perimeter Fence DOST 975.931 C 0.371 0.300 0.000 - - - 67.10 67.10%

Fair

Mel-Jean Const. Corp./ C.S. Rayos Const. & General

ServicesJV-04-004

Const. impv't. of Ternate-Nasugbu Road, Papaya-Hamilo

SectionIV-A 28.923 C 0.381 0.200 0.300 - - - 88.10 88.40%

V. Satisfactory

Mel-Jean Construction Corp. (Formerly: Mel-Jean

Enterprises)16344 Const. of Balintawak Barangay

Hall IVA 1.432 C 0.435 - 0.500 - - - 93.50 *93.50% Outstanding

Mel-Jean Construction Corporation 16344 Conc. & Const. of Bridge at So.

Matuod-Inilahan Road IV-A 9.638 C 0.336 0.200 0.300 - - - 83.60 76.40% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 278

Page 287: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mel-Jean Construction Corporation 16344

Const. of 2 Storey RGR Type School Bldg., @ Don Juan

Pastor Memorial National H/S, Brgy. Talaibon

IV-A 8.596 O 0.356 0.205 0.100 0.030 0.023 0.067 78.10 -

Mel-Jean Construction Corporation 16344

Const. of 2 Storey RGR Type School Bldg., @ Don Leon

Memorial National H/S, Brgy. Mabalanoy

IV-A 8.506 O 0.364 0.235 0.100 0.030 0.023 0.067 81.90 -

Mel-Jean Construction Corporation 16344

Impvt./Upgrading of Sablayan-Penal Colony Road, Tabtaban

SectionIVB 9.630 O 0.284 0.239 0.100 0.030 0.043 0.067 76.30 -

Mel-Jean Construction Corporation 16344 Rehab. of Rosario-San Juan

Road IV-A 9.618 C 0.279 0.200 0.300 - - - 77.90 80.84% V. Satisfactory

Mel-Jean Construction Corporation 16344

Rehab./Reconst. of Damaged National Roads, Batangas-Lobo

Road, Bacao SectionIV-A 19.298 O 0.303 0.300 0.100 0.030 0.028 0.100 86.10 -

Melrobe Builders & Const. Supplies 29752

Const. of 1 Cl. Mod. FFCCCII Type Bldg. SB-06 Banaybanay,

Dinagsaan E/SXI 0.385 C 0.378 0.300 0.300 - - - 97.80 *97.80%

Outstanding

Melrobe Builders & Const. Supplies 29752 Const. of MPB @ Brgy.

Pintatagan XI 1.416 C 0.308 0.200 0.300 - - - 80.80 88.50% V. Satisfactory

Melrobe Builders & Const. Supplies 29752 Const. of MPB CES and Sigaboy

AVHS, Brgy. Poblacion Sigaboy XI 1.813 C 0.368 0.100 0.300 - - - 76.80 79.04% Satisfactory

Melrobe Builders & Const. Supplies 29752 Const. of MPB CES under

Package 1A, Brgy. Central XI 2.143 O 0.396 0.098 0.100 0.030 0.023 0.050 69.70 -

Melrobe Builders & Const. Supplies 29752 Const. of San Isidro MPB (Phase

II) XI 1.889 O 0.337 0.240 0.100 0.020 0.038 0.100 83.50 -

Melrobe Builders & Const. Supply 29752 Package IV, Const. of MPB,

Brgy. Corporacion XI 2.786 C 0.396 0.231 0.300 - - - 92.70 85.49% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 279

Page 288: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Melrobe Builders & Const. Supply 29752 Const. of Caganganan Multi-

Purpose Building XI 1.605 C 0.375 0.300 0.300 - - - 97.50 94.35% Outstanding

Mel's Construction and Concrete Products 32212 Rehab. of Gonzalo St. CAR 0.273 C 0.295 0.200 0.300 - - - 79.50 *79.50%

Satisfactory

Meltech Construction 14551 Const. of Two (2) Storey, 2 CL Sch. Bldg. III 1.896 C 0.287 0.200 0.300 - - - 78.70 *78.70%

Satisfactory

Menjer Construction 22815 Construction of Perimeter Fence DOST 8.853 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -

MEP Construction 18759 Completion of Baguio Health Center CAR 1.904 C 0.472 - 0.500 - - - 97.20 *97.20%

OutstandingMercado Concrete

Products 4898 Asphalting of Road @ Brgy. Ermita VII 1.156 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. SatisfactoryMercado Concrete

Products 4898 Const. of Lilingayon Elementary School X 0.422 C 0.377 0.235 0.300 - - - 91.20 *91.20%

Outstanding

Mercado Concrete Products 4898 Const. of Multi-Purpose Building X 0.471 C 0.355 - 0.500 - - - 85.50 *85.50%

V. Satisfactory

Mercedita Benasas General Mdse. 31745

Completion/Conc. of Capt. Cario Road with Slope Protection &

Lined CanalIV-B 0.956 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Mercedita Benasas General Mdse. 31745

Conc. of Sablayan-Sta. Cruz Road, Cabacungan-Pag-asa

SectionIV-B 9.554 C 0.358 0.200 0.300 - - - 85.80 63.42%

Fair

Mercedita Benasas General Mdse. 31745 Concreting Brgy. Crlo Brgy.

Road IV-B 1.862 O 0.344 0.200 0.100 0.030 0.022 0.100 79.60 -

Mercedita Benasas General Mdse. 31745 Repair / Reconst. of Pinamanaan

Flood Control IV-B 7.719 C 0.288 0.285 0.300 - - - 87.30 82.38% V. Satisfactory

Mesgo Construction 30677 Const. of Flood Control & Access Road Land Fill X 0.944 C 0.341 0.300 0.300 - - - 94.10 88.82%

V. Satisfactory

Mesgo Construction 30677 Repair of MPB VII 0.479 C 0.229 0.300 0.300 - - - 82.90 *82.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 280

Page 289: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Meta Construction 28882 Repair/Rehab. of Ipil Bridge @ Daang Maharlika II 0.725 C 0.284 0.123 0.300 - - - 70.70 *70.70%

Satisfactory

Meta Construction 28882Repair/Rehab. of Lined Canal along Jct. Ipil-Quirino Bdry.

RoadII 0.501 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

Meta Construction 28882 Repair/Rehab. of Sch. Bldg. @ Baptists E/S II 0.287 C 0.265 0.200 0.300 - - - 76.50 *76.50%

Satisfactory

Meta Construction 28882Repair/Rehab. of Scoured

Shoulders along Jct.Ipil-Panang-Quirino Bdry. Road, Dappig

II 0.257 C 0.214 0.223 0.300 - - - 73.70 *73.70% Satisfactory

Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. NCR 4.789 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. @

San Vicente E/S NCR 3.829 C 0.276 0.200 0.300 - - - 77.60 *77.60% Satisfactory

MGBJ Rising Construction & Land Developer 18656 Conc. of Brgy. Road @ Brgy.

Poblacion XII 1.228 C 0.308 0.190 0.300 - - - 79.80 *79.80% Satisfactory

MGBJ Rising Construction & Land Developer 18656 Conc. of Road Network at PNP

Office 12 Command XII 2.376 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

MGBJ Rising Construction & Land Developer 18656

Concreting of Additional 2 Lanes along Marbel-Tupi-Makar Rd.

Upper Tupi Sect.XII 2.320 C 0.452 - 0.500 - - - 95.20 95.20%

Outstanding

MGBJ Rising Construction & Land Developer 18656 Const. of Lined Canal Bololmala XII 0.912 C 0.473 - 0.500 - - - 97.30 47.30%

Poor

MGBJ Rising Construction & Land Developer 18656 Impv't. of Drainage along Digos-

Makar Road, Lagao Section XII 0.695 C 0.313 0.207 0.300 - - - 82.00 84.94% V. Satisfactory

MGDJ Construction 29352 Const. of MPB @ Brgy. Quezon IV-A 1.444 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 281

Page 290: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MGDJ Construction 29352 Const. of MPB @ Brgy. Rizal IV-A 1.433 C 0.361 0.203 0.300 - - - 86.40 *86.40% V. Satisfactory

MGDJ Construction 29352 Const. of Multi-Purpose Bldg. At Brgy. 1 IV-A 0.957 C 0.451 - 0.500 - - - 95.10 95.10%

Outstanding

MGDJ Construction 29352 Const. of Multi-Purpose Building IV-A 1.340 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory

MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 IV-A 0.191 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding

MGDJ Construction 29352 Impvt. of MPB, Tanauan School of Fisheries IV-A 0.192 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

MGDJ Construction 29352 Rehab. of Batangas-Lobo Road (Revetment) IV-A 0.964 C 0.257 0.296 0.300 - - - 85.30 86.68%

V. Satisfactory

Micah Construction and Supply 26625 Const. of Multi-Purpose Bldg., at

Brgy. Sasa XI 0.942 C 0.393 - 0.500 - - - 89.30 89.34% V. Satisfactory

Micah Construction and Supply 26625 Package IV-Const. of 2-Cl, 2-Cl

SB @ Tugbok SPED XI 0.617 O 0.381 0.253 0.100 0.030 0.042 0.100 90.60 -

Michelle Const. Corp. 22204 Bobon, Seawall VIII 0.609 C 0.333 - 0.500 - - - 83.30 83.30% V. Satisfactory

Midnorth Luzon Construction and

Development Corp.31783 Const. of 2 Cl @ Maba-ay NHS

Bldg. (Lesseb Annex) CAR 0.716 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

Milestone 888 Construction, Inc. 31224 Conc. of Domingo Municipal St. II 0.472 C 0.293 0.218 0.300 - - - 81.10 76.18%

Satisfactory

Min Construction 14656 Conc. Const. of Gil Sanchez Lumbuyan FMR IX 1.854 C 0.354 - 0.500 - - - 85.40 75.44%

Satisfactory

Min Construction 14656Conc. of Liloy-Siocon Road (Labason Proper-Osukan

Section)IX 19.130 C 0.375 0.191 0.300 - - - 86.60 84.74%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 282

Page 291: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Min Construction 14656 Conc. of Liloy-Siocon Road with RCBC, Patawag Section IX 11.456 C 0.357 0.137 0.300 - - - 79.40 82.40%

V. Satisfactory

Min Construction 14656Const. of Drainage System along

Labason Seawall including Impv't. of existing Canal

IX 0.776 C 0.402 - 0.500 - - - 90.20 89.30% V. Satisfactory

Min Construction 14656Const. of Liloy-Siocon Road inc.

RCBC Dansalan-Labason Poblacion By-Pass Road

IX 19.130 O 0.251 0.238 0.100 0.030 0.025 0.067 71.10 -

Min Construction 14656 Const. of MPB (Tribal Hall) IX 0.925 C 0.268 0.182 0.300 - - - 75.00 80.46% V.Satisfactory

Min Construction 14656 Const. of Tribal Hall at Poblacion IX 0.943 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road IX 9.628 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Min Construction 14656Impvt./Conc. Paving of Imelda-

Alicia Road (Phase III) Guintolan-Lutiman Section

IX 34.360 O 0.344 0.217 0.100 0.030 0.050 0.100 84.10 -

Min Construction 14656Impvt./Conc. Paving of Imelda-

Alicia Road (Phase III) Guintolan-Lutiman Section

IX 33.460 O 0.326 0.055 0.100 0.030 0.048 0.067 62.60 -

Min Construction 14656Impvt./Conc. Paving of Imelda-

Alicia Road (Phase III) Guintolan-Lutiman Section

IX 33.460 O 0.308 0.240 0.100 0.030 0.042 0.100 82.00 -

Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section IX 17.000 O 0.400 0.300 0.070 0.030 0.037 0.100 93.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 283

Page 292: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Min Construction 14656Impvt./Conc. Paving of Siocon-

Sirawai Road, Brilliantes-Pangian Section

IX 23.971 C 0.320 0.119 0.300 - - - 73.90 81.16% V. Satisfactory

Min Construction 14656Proposed Conc. of Liloy,

Zamboanga del Norte-Ipil, Phase II

IX 14.309 O 0.359 0.240 0.070 0.030 0.035 0.067 80.10 -

Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -

Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -

Min Construction 14656Proposed Concreting of Liloy-Labason Road (Malintuboan

Section)IX 4.631 C 0.481 - 0.500 - - - 98.10 89.58%

V. Satisfactory

Mindanao Rock 23479 Completion of Farmers Training Center (ABC Gym Phase X) X 0.959 C 0.408 - 0.500 - - - 90.80 91.64%

Outstanding

Mindanao Rock 23479 Const. of Flood Control Taguima X 0.479 C 0.404 - 0.500 - - - 90.40 89.50% V. Satisfactory

Mindanao Rock 23479 Const. of Migpangi Road (Extension) X 1.048 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

Mindanao Rock 23479Const. of Multi-Purpose Hall

(Jimenez Socio-Cultural Auditorium, Phase XII)

X 1.873 C 0.333 - 0.500 - - - 83.30 76.65% Satisfactory

Mindanao Rock 23479 Const. of Phase III Multi-Purpose Building X 1.423 C 0.286 0.300 0.000 - - - 58.60 75.54%

Satisfactory

Mindanao Rock 23479Impvt. of Ozamis-Oroquieta

Road, Lapasan-Clarin-Tudela Section

X 2.892 O 0.327 0.240 0.100 0.030 0.030 0.100 82.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 284

Page 293: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Mindanao Rock 23479 Rehab. of Slip Section along CDO-Airport Road X 7.473 C 0.334 0.300 0.300 - - - 93.40 89.32%

V. Satisfactory

Minrock Multi-Builders 15845 Conc. of Road at Bishop Smith Ave., Rosary Heights 11 XII 0.940 C 0.307 0.200 0.300 - - - 80.70 *80.70%

V. Satisfactory

Minrock Multi-Builders 15845Const. of College School

Building Cotabato City State Polytechnic College (CCSPC)

XII 1.904 C 0.313 0.274 0.300 - - - 88.70 85.55% V. Satisfactory

Minrock Multi-Builders 15845 Const. of MPB @ Kimpo E/S, Rosary Heights 13 XII 1.896 C 0.362 0.181 0.300 - - - 84.30 79.05%

Satisfactory

Miracle Builders 28502

Impvt./Rehab. of Daang Maharlika along Calbayog-Allen Road, km. 723+700 - km. 729+700

with exceptions

VIII 4.823 C 0.361 0.200 0.300 - - - 86.10 *86.10% V. Satisfactory

Miracle Builders 28502 Rehab. of Road @ Patiis Brgy. Malanday IV-A 1.922 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Miracle Builders 28502Repair/Rehab. of H.E. Bldg. &

Comfort Room @ E. Rodriguez E/S

NCR 0.475 C 0.330 0.235 0.300 - - - 86.50 *86.50% V. Satisfactory

Mivico Builders and Developers 20551 Const. of Gymnasium (Multi-

Purpose Hall) III 1.058 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding

MJB Const. & Trading Corp. 15059 Const. of Drainage System Brgy.

Ninoy Aquino III 1.652 C 0.390 - 0.500 - - - 89.00 89.00% V. Satisfactory

MJB Const. & Trading Corp. 15059

CP-II Const./Repair/Rehab. of Brgy. Road @ Various Brgy. In

San FranciscoIII 0.473 C 0.388 - 0.500 - - - 88.80 88.80%

V. Satisfactory

MJF Neulid Enterprises 29107 Concreting of Shoulder, Manlurip-McArthur Road VIII 1.771 C 0.455 - 0.500 - - - 95.50 95.50%

Outstanding

MJR Construction 18794 Const. of Road, Barangay Poblacion II 0.948 C 0.347 0.300 0.300 - - - 94.70 88.10%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 285

Page 294: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MKM Marketing 15586 Impvt. of Viray-Depalo River Control Project I 2.893 C 0.367 - 0.500 - - - 86.70 *86.70%

V.Satisfactory

ML Patawaran Trading & Const. 28869 Rehab. of Barangay Road III 0.475 C 0.385 - 0.500 - - - 88.50 88.50%

V. Satisfactory

MN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao IX 0.947 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding

MN Revelo Construction 24789

Impvt./Conc. Paving of Usugan Bridge Approach along

Zamboanga City-Pagadian-Misamis Occidental Road

IX 1.858 C 0.268 0.205 0.300 - - - 77.30 85.10% V. Satisfactory

MN Revelo Construction 24789 Rehab. of Roads (5 Clustered Roads) IX 4.099 O 0.400 0.300 0.100 0.022 0.037 0.100 95.90 -

MNG Builders & Dev't. Corporation (Formerly MNG

Builders)16098 Const. of Doña Carmen Denia

NHS Multi-Purpose Hall XI 2.023 C 0.394 - 0.500 - - - 89.40 89.96% V. Satisfactory

Molina's General Builder 14845 Const. of FMR Brgy. Pook-Linga Road IV-A 0.477 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

Molte Aries Construction & Industries 3684 Const. of 2Cl School Building I 0.671 C 0.341 - 0.500 - - - 84.10 *84.10%

V. Satisfactory

Molte Aries Construction & Industries 3684 Const. of Multi-Purpose Building

at Barangay Sevilla I 1.316 O 0.379 0.285 0.100 0.030 0.029 0.100 92.30 -

Molte Aries Construction & Industries 3684

Impvt. (Conc.) of San Fernando-Bagulin Road (Francisco L.

Ortega Highway) I 26.453 C 0.296 0.300 0.300 - - - 89.60 80.26%

V. Satisfactory

Molte Aries Construction & Industries 3684

Upgrading (Conc. Paving) of San Fernando By-Pass Road

ExtensionI 18.821 C 0.307 0.200 0.300 - - - 80.70 83.76%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 286

Page 295: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Monolithic Const. & Concrete Products, Inc. 5733

Construction of Diversion Work including Supply, Delivery,

Installation and Comissioning of Rubber Dam (Cabilogan-San

Juan CIP)

NIA 46.981 C 0.390 0.180 0.300 - - - 87.00 *87.00% V.Satisfactory

Monolithic Const. & Concrete Products, Inc. 5733

Construction of Diversion Work including Supply, Delivery,

Installation and Comissioning of Rubber Dam (South Quinale CIS)

NIA 68.027 - 0.389 0.200 0.070 0.030 0.047 0.067 80.30 80.30% V.Satisfactory

Monolithic Const. & Concrete Products, Inc. 5733 South Quinale Communal

Irrigation System NIA-V 68.027 C 0.375 0.263 0.300 - - - 93.80 85.71% V.Satisfactory

Monolithic Construction and Concrete Products, Inc. 5733 Talibon Small Reservoir

Irrigation Project NIA 49.099 O 0.367 0.175 0.100 0.030 0.042 0.200 91.40 -

Monro Construction & Supply Corp. 14084

Conc. Paving of Shoulder along National Rd., @ Brgy.

GuilijunganVI 0.915 C 0.444 - 0.500 - - - 94.40 91.16%

Outstanding

Montaño Construction & Development Corporation 19473 Completion of Multi-Purpose

Building (Phase V) IX 3.734 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding

Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes

Road (Lebagon Section) IX 16.712 O 0.352 0.300 0.100 0.030 0.043 0.100 92.50 -

Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes

Road (Lebagon Section) IX 16.712 O 0.298 0.240 0.100 0.030 0.037 0.100 80.50 -

Montaño Construction & Development Corporation 19473

Const. of De Venta Perla Bridge & App. (Phase I) along Dipolog-Sergio Osmeña-Pagadian City

Road

IX 28.395 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 287

Page 296: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Montaño Construction & Development Corporation 19473 Const. of Dilawa Bridge &

Approaches IX 17.394 C 0.293 0.283 0.300 - - - 87.60 85.47% V. Satisfactory

Montaño Construction & Development Corporation 19473

Impv't. & Const. of Roadside Protection Structure along Dipolog-Punta-Dansullan

IX 3.945 C 0.369 - 0.500 - - - 86.90 83.00% V. Satisfactory

Montaño Construction & Development Corporation 19473

Impvt./Conc. Paving of Dipolog-Punta-Dansullan Sergio Osmeña

Nat'l Road (Macleodes-Dilawa Sect.)

IX 18.788 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding

Monte Construction & Supply 19474

Conc. of Danguilan St., @ Brgy. Osmeña Solano, Nueva Vizcaya

Brgy. OsmeñaII 0.270 C 0.459 - 0.500 - - - 95.90 95.90%

Outstanding

Monte Construction & Supply 19474 Const. of Calitlitan MPB II 0.284 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V. Satisfactory

Monte Construction & Supply 19474

Rehab. of Maddiangat Bridge Piers and Bank Protection, along

Bambang-Kasibu-Quezon-Solano Road

II 4.765 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory

Monte Construction & Supply 19474

Rehab. of Papaya-Malabing-Wangal-Binugawan-Tadji-

Runruno Road (Kinalabasa Section)

II 1.755 C 0.321 0.200 0.300 - - - 82.10 *82.10% V. Satisfactory

Monterey Builders 11103 Const. of Seawall with Wave Deflector, Brgy. Melgar A IV-B 0.948 C 0.333 - 0.500 - - - 83.30 74.72%

Satisfactory

Montphil Construction Corporation 24285

Conc. of Marleodes-Dilawa Section along Dipolog Punta-

Dansullan Sergio Osmeña National Road

IX 3.806 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 288

Page 297: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Montphil Construction Corporation 24285

Concrete Paving of Dipolog-Polanco-Macleodes National

RoadIX 0.915 C 0.381 0.300 0.300 - - - 98.10 *98.10%

Outstanding

Montphil Construction Corporation 24285 Concreting of Brgy. Dionum

FMR IX 0.458 C 0.433 - 0.500 - - - 93.30 93.30% Outstanding

Montphil Construction Corporation 24285 Const. of MPB @ Brgy. Silano IX 0.070 C 0.270 0.201 0.300 - - - 77.10 *77.10%

Satisfactory

Montphil Construction Corporation 24285

Const. of One (1) Unit 1 CL Modified Sch. Bldg. @ San Pedro

E/SIX 0.433 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Montphil Construction Corporation 24285

Const. of Slope Protection Structure along Dipolog-Potanco-

Pinan Jct. Oroquieta Road (Guinles Section)

IX 0.940 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding

Montphil Construction Corporation 24285

Const./Completion of Multi-Purpose Bldg., (Mun. Hall Phase

III)IX 0.973 C 0.479 - 0.500 - - - 97.90 92.79%

Outstanding

Montphil Construction Corporation 24285 Const./Extension of MPB

(Municipal Bldg.) IX 0.279 C 0.356 0.145 0.300 - - - 80.10 *80.10% V. Satisfactory

Montphil Construction Corporation 24285

Impvt./Conc. Paving of Dipolog-Punta-Dansullan-Sergio Osmeña

Nat'l Road (Brgy. Dansullan-Macleodes Sect.)

IX 2.788 C 0.366 0.163 0.300 - - - 82.90 83.08% V. Satisfactory

Morning Coffee Builders 29027Const. of Multi-Purpose Building

covered Court Lian Central School

IV-A 0.948 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding

Morning Steel Construction 30698 Completion of Multi-Purpose Bldg., Sitio Diaboyo III 0.281 C 0.290 0.300 0.300 - - - 89.00 *89.00%

V. Satisfactory

Morning Steel Construction 30698 Const. of Flood Control III 0.846 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 289

Page 298: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Morning Steel Construction 30698 Impvt./Conc. of Baler-Casiguran Road, Dibutunan-Ditale Section III 4.660 C 0.325 0.200 0.300 - - - 82.50 84.39%

V. Satisfactory

Mountaineers Engineering & Const. Services 6154 Completion of DPWH Resthouse

(Rehab. of DPWH Field Office) CAR 8.196 O 0.236 0.240 0.100 0.030 0.029 0.100 73.50 -

Mountaineers Engineering & Const. Services 6154 Const. of Benguet NHS-Lubas

Extension CAR 3.606 C 0.344 0.129 0.300 - - - 77.30 81.26% V. Satisfactory

Mountaineers Engineering & Const. Services 6154 Const. of Benguet SPED Center

La Trinidad, Benguet CAR 0.522 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory

Mountaineers Engineering & Const. Services 6154 Const. of BSU Multi-Purpose

Building (IPA Building) CAR 0.949 C 0.354 - 0.500 - - - 85.40 *85.40% V. Satisfactory

Mountaineers Engineering & Const. Services 6154 Const. of Maslog-Kabilisan FMR CAR 1.972 C 0.174 - 0.500 - - - 67.40 67.40%

Fair

Mountaineers Engineering & Const. Services 6154 Const. of Various School

Building (Labino-Aquiso E/S) CAR 0.671 C 0.324 - 0.500 - - - 82.40 82.89% V. Satisfactory

MP Villegas Construction 16683 Administration Bldg. DOST 6.975 C 0.351 0.275 0.300 - - - 92.60 92.60% Outstanding

MR. Santiago Constraction 27239 Rehabilitation of Lateral G Canal (Sta. 2+380-6+637) NIA-I 5.617 C 0.250 0.300 0.300 - - - 85.00 85.19%

V.Satisfactory

MRB Construction and Supply 17701 Jagna Port Expansion Project PPA 55.085 C 0.400 0.300 0.300 - - - 98.78 98.78%

Outstanding

MRP Merchandising 13656 Concreting of Barangay Road V 0.459 C 0.378 - 0.500 - - - 87.80 *87.80% V. Satisfactory

MRP Merchandising 13656 Concreting of Brgy. Road at Calagbangan to Bocol, Sipocot V 0.917 C 0.382 - 0.500 - - - 88.20 85.14%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 290

Page 299: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MRP Merchandising 13656 Const. of MPB at Zone II Brgy. Tara V 0.281 C 0.352 0.184 0.300 - - - 83.60 *83.60%

V. Satisfactory

MSF Construction 25307 Concreting of Various Barangay Road I 0.471 C 0.333 - 0.500 - - - 83.30 *83.30%

V. Satisfactory

MSF Construction 25307 Const. of Multi-Purpose Building Phase I I 2.385 C 0.308 0.200 0.300 - - - 80.80 82.76%

V. Satisfactory

MSF Construction 25307 Impvt./Rehab. of Farm to Market Road @ Brgy. Suba & Monte I 0.940 C 0.325 0.300 0.300 - - - 92.50 *92.50%

Outstanding

Mt. Guiting-Guiting Construction 17412 Repair/Maintenance of Agnipa

River Control IV-B 0.277 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Muaña Construction 9354 Const. of 1 unit, 4 Storey, 20 CL Mambaling E/S Bldg. VII 13.360 C 0.370 0.216 0.000 - - - 58.60 72.18%

Satisfactory

Muaña Construction 9354 Const. of Multi-Purpose Bldg., U.P.-Cebu High School Dept. VII 1.904 C 0.447 - 0.500 - - - 94.70 87.63%

V. Satisfactory

Mulaña Construction 30708Conc. of Toledo-Tabuelan-San

Remegio Road (Antonio Y De Pio Highway)

VII 7.606 C 0.323 0.169 0.300 - - - 79.20 *79.20% Satisfactory

Mulaña Construction 30708 Const. of Foot Bridge @ Sitio Napo, Sapangdaku VII 0.956 C 0.410 - 0.500 - - - 91.00 83.62%

V. Satisfactory

Mulaña Construction 30708 Const. of Multi-Purpose Bldg. @ Poblacion VII 0.472 C 0.293 0.300 0.300 - - - 89.30 84.19%

V. Satisfactory

Mulaña Construction 30708 Const. of Multi-Purpose Bldg., Labangon-Bliss VII 0.669 C 0.316 - 0.500 - - - 81.60 79.08%

Satisfactory

Must Enterprises 13336 Const. of MPB at Brgy. Rajahmuda XII 0.285 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V.Satisfactory

Must Enterprises 13336Const. of Slope Protection

Works along Dualing-New Panay-Midsayap Road, Arizona Section

XII 3.303 C 0.377 0.200 0.300 - - - 87.70 87.28% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 291

Page 300: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

MV Confirm Construction & Development, Inc. 32469 Const. of MPB IV-A 3.858 C 0.364 0.256 0.300 - - - 92.00 84.65%

V. Satisfactory

MVVK Construction and Trading 25721 Const. of Multi-Purpose Bldg.

Brgy. Tuyom VI 0.470 C 0.395 - 0.500 - - - 89.50 89.50% V. Satisfactory

MWJ Construction 14882 Conc. of La Paz, Javier-Bito Road VIII 9.445 C 0.325 0.173 0.300 - - - 79.80 83.58%

V. Satisfactory

MWJ Construction 14882 Concrete Paving of La-Paz-Burauen Rd., Brgy. Sta. Elena VIII 2.848 C 0.415 - 0.500 - - - 91.50 87.00%

V. Satisfactory

MWJ Construction 14882 Const. of Guingauan Flood Control VIII 0.960 C 0.347 0.200 0.300 - - - 84.70 88.18%

V. Satisfactory

MWJ Construction 14882 Rehab./Impvt. of National Arterial & Secondary Roads Public Infra VIII 0.979 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

MWJ Construction 14882 Road Concreting at Brgy. San Isidro VIII 0.188 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

MWJ Construction 14882 Road Concreting of Burauen-La Paz Road VIII 0.939 C 0.308 0.300 0.300 - - - 90.80 *90.80%

Outstanding

MY Builders and Construction 22687 Const. of Multi-Purpose Bldg., @

Canaoay Community School I 0.939 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory

N & N Construction Corporation 30716

Const. of Geotextile Soil Reinforcement and

Repair/RehabIV-A 6.450 C 0.384 - 0.500 - - - 88.40 88.40%

V. Satisfactory

N & N Construction Corporation 30716

Impvt. of Catbalogan Drainage inc. Estero & Portion of Antiao

RiverVIII 8.822 O 0.335 0.160 0.100 0.020 0.040 0.200 85.50 -

N.B. Avila Construction 13751Concreting of Pantihan Rd., &

Const. of Multi-Purpose Pavement

IV-A 2.293 C 0.404 - 0.500 - - - 90.40 90.40% Outstanding

N.B. Avila Construction 13751 Const. of Macanda Bridge, Brgy. Kaytapos IV-A 0.477 C 0.258 0.300 0.300 - - - 85.80 *85.80%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 292

Page 301: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

N.B. Avila Construction 13751 Const. of MPB IV-A 1.236 C 0.370 0.263 0.300 - - - 93.30 *93.30% Outstanding

N.B. Avila Construction 13751 Const. of One Classroom School Building, Bulihan E/S IV-A 0.475 C 0.396 - 0.500 - - - 89.60 *89.60%

V. Satisfactory

N.B. Avila Construction 13751 Const. of Secondary Sch. Bldg., Malabang NHS IV-A 1.283 C 0.338 0.250 0.300 - - - 88.80 *88.80%

V. Satisfactory

N.B. Avila Construction 13751 Riprapping of Kay Alaman River @ Brgy. Gomez-Zamora IV-A 0.855 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

N.B. Garcia Construction 30983 Concreting of Poblacion Magsaysay FMR IV-B 0.478 C 0.414 - 0.500 - - - 91.40 91.40%

Outstanding

N.B. Garcia Construction 30983 Const. of 2 CL S/B Victoria NHS, Selina Annex IV-B 0.980 C 0.302 0.200 0.300 - - - 80.20 81.74%

V. Satisfactory

N.B. Garcia Construction 30983 Const. of San Jose National High School IV-B 0.952 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

N.B. Garcia Construction 30983Rehab. of Various Brgy. Rd., San Jose Area, Package IV (Conc. of

Baula Brgy. Rd.) Pag-asaIV-B 0.283 C 0.347 0.300 0.300 - - - 94.70 84.98%

V. Satisfactory

N.B. Salbo Construction 6091 Const. of MPB @ Cristino M. Paragas E/S IX 2.341 C 0.306 0.300 0.300 - - - 90.60 60.64%

Fair

N.B. Salbo Construction 6091 Const. of Poblacion El Salvador Flood Control X 9.462 C 0.384 0.300 0.000 - - - 68.40 73.44%

Satisfactory

N.B. Salbo Construction 6091

Rehab. / Reconst. of Damaged Road Sections along Linamon-

Zamboanga Road (Taguitic Section)

X 19.212 O 0.251 0.300 0.100 0.024 0.045 0.100 82.00 -

N.B. Salbo Construction 6091 Conc. of Golden Shower St. X 0.942 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 293

Page 302: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 O 0.337 0.200 0.000 0.030 0.038 0.133 73.80 -

N.F. Yamat Construction 5401 Rehab. of MPB @ Brgy. 72, Zone 6 NCR 0.420 C 0.299 0.300 0.300 - - - 89.90 80.73%

V. Satisfactory

N.K. Enterprise 29292Concreting of Various Road Segments along Anini-y-T

Fornier-Hamtic Road SectionVI 0.964 C 0.293 0.132 0.300 - - - 72.50 74.36%

Satisfactory

N.M. Parafina Builders Inc., (Formerly N.M. Parafina

Builders)11505 Const. of 1 Cl @ Pamantasang

Bayan, PUP IV-A 0.383 C 0.342 0.268 0.300 - - - 91.00 *91.00% Outstanding

N.M. Parafina Builders Inc., (Formerly N.M. Parafina

Builders)11505 Const. of One (1) Classroom

School Bldg. Atimonan Nat'l, H/S IV-A 0.377 C 0.448 - 0.500 - - - 94.80 94.80% Outstanding

N.M. Parafina Builders Inc., (Formerly N.M. Parafina

Builders)11505 Const./Impv't. of FTMR, Brgy.

Duhat IV-A 0.941 C 0.362 - 0.500 - - - 86.20 *86.20% V. Satisfactory

N.M. Parafina Builders Inc., (Formerly N.M. Parafina

Builders)11505

Repair/Const. of Multi-Purpose Pavemnet @ Purok Ilaya Brgy.

TagbakinIV-A 0.940 C 0.386 0.200 0.300 - - - 88.60 *88.60%

V. Satisfactory

N.M.E. Construction 22984a)Rep./Rehab. of H.E.Bldg. @

E.Delos Santos E/S b) Const. of Add'l. CL @ AA Quezon E/S

NCR 2.419 C 0.375 - 0.500 - - - 87.50 77.04% Satisfactory

N.M.E. Construction 22984 Completion of MPB @ Brgy. 589 NCR 1.443 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

N.M.E. Construction 22984 Const. of Multi-Purpose Gymnasium IV-A 2.387 C 0.452 - 0.500 - - - 95.20 95.20%

Outstanding

N.M.E. Construction 22984 Proposed Const. of MPB at Brgy. 838 NCR 0.767 C 0.365 0.200 0.300 - - - 86.50 *86.50%

V. Satisfactory

N.M.E. Construction 22984 Proposed Rehab. of Syquia St. District VI NCR 9.584 C 0.257 0.300 0.300 - - - 85.70 *85.70%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 294

Page 303: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

N.M.E. Construction 22984Proposed Repair/Rehab. of

Roads & Alleys and vicinities @ Brgy. 818

NCR 0.962 C 0.279 0.200 0.300 - - - 77.90 *77.90% Satisfactory

N.M.E. Construction 22984 Rehab. of Jct. Layac-Balanga-Mariveles Port Road (Pilar Sect.) III 2.880 C 0.329 0.211 0.300 - - - 84.00 *84.00%

V. Satisfactory

N.M.E. Construction 22984 Repair/Rehab. Along Railroad Street (Phase II) NCR 2.881 C 0.181 0.300 0.300 - - - 78.10 *78.10%

Satisfactory

N.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 NCR 1.419 C 0.323 0.200 0.300 - - - 82.30 87.20%

V. Satisfactory

N.M.E. Construction 22984Renovation of Hostel Main

Lobby and Addition of Waiting Lounge

PUP 2.296 C 0.385 0.300 0.300 - - - 98.50 98.50% Outstanding

N.P. Uy Builders 16551 Const. of Malajog Shoreline Protection (Phase I) Bry. Malajog VIII 1.420 C 0.395 - 0.500 - - - 89.50 89.50%

V. Satisfactory

N.S. Construction and Supply 23203 Const. of Slope Protection along

Naguilian Bridge, Dallipaoen I 1.927 C 0.274 0.226 0.300 - - - 80.00 71.63% Satisfactory

N.T. Tulabut Construction and Supply 15846 Const. of MPB III 1.902 C 0.379 0.200 0.300 - - - 87.90 *87.90%

V.Staisfactory

N.T. Tulabut Construction and Supply 15846

Const. of MPB @ Brgy. San Vicente, Pilot Sch. For Phil.

Craftsment, Bulaon Resettlement

III 3.611 C 0.257 0.200 0.300 - - - 75.70 *75.70% Satisfactory

N.V. Balbuena Construction 12055 Const. of Gabon-Hacienda FMR III 2.805 C 0.330 - 0.500 - - - 83.00 61.10% Fair

N.V. Balbuena Construction 12055 Const. of One (1) Classroom School Marina Bay E/S III 0.438 C 0.350 0.240 0.300 - - - 89.00 *89.00%

V.Staisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 295

Page 304: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

N.V. Balbuena Construction 12055 Repair of Gapan-San Fernando-Olongapo Road III 0.961 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V.Staisfactory

N-22 Construction & Trading 25254 Const. of Drainage Canal at San

Vicente III 0.477 C 0.350 0.200 0.300 - - - 85.00 *85.00% V.Staisfactory

N-22 Construction & Trading 25254 Const./Conc./Repair/Completion

of San Nicolas Brgy. Road III 0.474 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Staisfactory

N-22 Construction & Trading 25254 Const./Conc./Repair/Completion

of Sapa Brgy. Road III 2.567 C 0.346 0.300 0.300 - - - 94.60 *94.60% Outstanding

N-22 Construction & Trading 25254 Const./Impv't. of Amedo Dike

Slope Protection San Simon III 0.950 C 0.477 0.500 - - - 97.70 97.70% Outstanding

N-22 Construction & Trading 25254 Const./Rehab./Completion of

Sampaloc Brgy. Road III 0.477 C 0.348 - 0.500 - - - 84.80 84.80% V. Satisfactory

N-22 Construction & Trading 25254 Impvt. of Minalin-Sto. Tomas

Road III 4.744 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding

Naga E.S. Construction and Supply 6593 Const. of Multi-Purpose Building V 0.938 C 0.362 0.300 0.300 - - - 96.20 93.61%

Outstanding

Naga E.S. Construction and Supply 6593 Road Concreting at Camanaba

Road V 1.891 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory

Nale Construction 18552 Const. of Elementary Sch. Bldgs. At Pio Macahig ME/S VII 0.750 C 0.319 0.254 0.300 - - - 87.30 87.09%

V.Satisfactory

Nale Construction 18552 Repair/Rehab./Widening/Regravelling of FMR, Cantabon-Luzong VII 0.697 C 0.400 0.100 0.300 - - - 80.00 85.88%

V.Satisfactory

NBL Construction 30396 Asphalt Overlay of Bauan-Mabini Road, Bagalangit Solo Sect. IV-A 9.996 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V. Satisfactory

NBL Construction 30396 Conc. of FMR @ Brgy. Dao IV-A 1.888 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

NBL Construction 30396 Conc. of Palico-Cadre Road IV-A 7.497 C 0.308 0.290 0.300 - - - 89.80 *89.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 296

Page 305: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

NBL Construction 30396Conc./Const./Rehab. of Bauan-Mabini Circ. Road, Malimotoc I

SectionIV-A 19.295 O 0.292 0.300 0.100 0.030 0.030 0.100 85.20 -

NBL Construction 30396 Const. of Bauan-Mabini Circ. Road IV-A 11.571 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

NBL Construction 30396 Const. of Gasang Seawall, Phase II IV-A 3.134 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

NBL Construction 30396Widening/Conc. of BauanMabini Circ. Road, San Teodoro-Mainit

Section, Phase IIV-A 19.289 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

Nescon Builders 24751 Const. of Multi-Purpose Building (Const. of Veterans Bldg.) VI 1.443 C 0.308 0.279 0.000 - - - 58.70 67.38%

Fair

Nessan Builders 25142 Const. of 2 Cl Bldg. @ Navaling P/S III 0.536 C 0.282 0.300 0.300 - - - 88.20 *88.20%

V. Satisfactory

Nessan Builders 25142 Const./Repair/Rehab/ of Brgy/ Roads, Brgy. Dau III 1.877 C 0.456 - 0.500 - - - 95.60 95.60%

Outstanding

Nessan Builders 25142 Package XIV-Const.of Multi-Purpose Covered Court III 1.403 C 0.222 - 0.500 - - - 72.20 72.20%

Satisfactory

Nes-san Builders 25142 Asphalt Overlay along Arayat-Magalang-Mabalacat Road III 4.763 C 0.366 0.300 0.300 - - - 96.60 *96.60%

Outstanding

Nes-San Builders 25142Constn. of Drainage System

Along Don Juico & Don Meliton Aves.

III 9.770 O 0.349 0.300 0.300 - - - 94.91 93.38% Outstanding

Nestor D. Mercado Construction 18658 Conc./Repair Calanipawan Rd. VIII 1.873 C 0.350 - 0.500 - - - 85.00 85.00%

V. Satisfactory

New Arcond Builders Inc. 9614 Const. of UP National Institute of Physics Bldg. NCR 4.716 C 0.353 0.200 0.300 - - - 85.30 84.74%

V.Statisfactory

New Arcond Builders Inc. 9614 Impvt./Conc. Blocking along C.P. Garcia St. NCR 14.234 C 0.357 0.300 0.300 - - - 95.70 92.25%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 297

Page 306: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

New Arcond Builders Inc. (Formerly Arcond Builders) 9614

Concrete Blocking along Edsa, Quezon City (Km. 10+687-Km.

16+417)NCR 9.555 C 0.403 - 0.500 - - - 90.30 *90.30%

Outstanding

New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Impv't./Rehab. of Quezon

Avenue NCR 4.642 C 0.356 - 0.500 - - - 85.60 85.60% V. Statisfactory

New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Proposed Pedestrian Overpass

Crossing Roxas Blvd. NCR 8.437 C 0.382 0.300 0.300 - - - 98.20 81.79% V.Statisfactory

New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Rehab./Improvement of Reparo

Road NCR 9.434 C 0.350 0.300 0.300 - - - 95.00 94.10% Outstanding

New Big Four J Construction Inc. (Formerly: Four J

Construction)

15104 Widening of Quezon Avenue NCR 21.719 C 0.361 0.200 0.300 - - - 86.10 88.26% V. Satisfactory

New Kanlaon Const., Inc/Markbilt Const./JV 896 Water Impounding/Earth Dam

with Spillway (Dauin Dam) NIA 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -

New Kanlaon Construction, Inc. 896 Site Dev't and Construction of 2-

Units 2-Storey School Building PRRC 25.777 O 0.378 0.29 0 0.03 0.062 0.1 86.00 -

New Mindoreños Lumber, Hardware and General

Merchandise (Formerly: Mercedita Benasas General

Merchandise)

31745 Const. of Banus Bridge with Detour Bridge IV-B 9.554 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

New Mindoreños Lumber, Hardware and General

Merchandise (Formerly: Mercedita Benasas General

Merchandise)

31745 Const. of Casague MPB IV-B 0.864 O 0.329 0.240 0.100 0.030 0.027 0.100 82.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 298

Page 307: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

New Mindoreños Lumber, Hardware and General

Merchandise (Formerly: Mercedita Benasas General

Merchandise)

31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin IV-B 4.807 O 0.256 0.200 0.100 0.024 0.042 0.200 82.20 -

New Mindoreños Lumber, Hardware and General

Merchandise (Formerly: Mercedita Benasas General

Merchandise)

31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin IV-B 4.807 C 0.322 0.200 0.300 - - - 82.20 82.20%

V.Satisfactory

New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Concreting of Road @ Brgy.

Bubukal IV-A 0.475 C 0.382 - 0.500 - - - 88.20 88.20% V. Satisfactory

New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Const. of MPB (Annex) IV-A 0.475 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V.Satisfactory

New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Impvt. of FMR at Brgy. Banca-

Banca IV-A 0.480 C 0.347 0.200 0.300 - - - 84.70 *84.70% V.Satisfactory

New San Fabian Builders & Supplies 16348 Const. of 2 CL Sch. Bldg.,

Galintuja P/S III 0.954 C 0.364 0.265 0.300 - - - 92.90 *92.90% Outstanding

New San Fabian Builders & Supplies 16348 Const. of Multi-Purpose Bldg.,

Brgy. Dianawan III 0.663 C 0.396 0.250 0.300 - - - 94.60 *94.60% Outstanding

New TBP Construction & Development Corp. 29155 Const. of Cross Drainage

Structures along MNR I 4.417 O 0.344 0.120 0.100 0.020 0.042 0.133 75.90 -

New TBP Construction & Development Corp. 29155

Const. of Multi-Purpose Building (Covered Court @ Haven for

Woman) Phase INCR 11.546 C 0.352 0.300 0.300 - - - 95.20 91.42%

Outstanding

Newadis Construction 23806 Completion of Lumang Bayan Water System IV-B 0.955 O 0.353 0.300 0.100 0.020 0.013 0.100 88.60 -

Newadis Construction 23806 Completion of the Conc. of Magsaysay-San Jose Road IV-B 9.619 C 0.294 0.300 0.300 - - - 89.40 81.66%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 299

Page 308: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Newadis Construction 23806 Const. of 2 CL Abra de Ilog NHS IV-B 0.954 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory

Newadis Construction 23806 Const. of Mamburao Seawall, Brgy. 7 IV-B 2.683 O 0.349 0.160 0.100 0.030 0.032 0.200 87.10 -

Newadis Construction 23806 Const. of Pagbahan Flood Control (Phase II) IV-B 2.294 C 0.298 0.300 0.300 - - - 89.80 89.50%

V. Satisfactory

NFH Construction & Supply 16055 Const. of Adiangao Bridge # 2 & Approaches (Phase 1), V 8.396 C 0.392 0.300 0.000 - - - 69.20 76.82%

Satisfactory

NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) V 23.780 O 0.367 0.240 0.100 0.030 0.023 0.100 86.00 -

NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.339 0.300 0.070 0.020 0.023 0.067 81.90 -

NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -

NFH Construction & Supply 16055 Const. of Nagas Bridge & Approaches V 15.512 C 0.353 0.200 0.300 - - - 85.30 77.83%

Satisfactory

NFL Builders 12524 Const. of Drainage Canal @ Barangay 17 X 0.474 O 0.253 0.200 0.100 0.015 0.000 0.200 76.80 -

N-Four General Contractor and Supply 19475 Concreting of San Isidro-Iraya

Brgy. Road V 0.275 C 0.394 - 0.500 - - - 89.40 *89.40% V. Satisfactory

N-Four General Contractor and Supply 19475 Const. of 2Cl School Bldg. @

Tanagan E/S V 0.945 C 0.307 0.259 0.300 - - - 86.60 *86.60% V. Satisfactory

N-Four General Contractor and Supply 19475 Impv't./Rehab. of Tanawan River

Control (Part of Cluster I) V 0.459 O 0.233 0.287 0.100 0.015 0.028 0.100 76.30 -

Nippon Steel Corp./Toa Corp. (JV)

SL2-SN/000598

/FC-04-001

Second Magsaysay Bridge & Butuan City By Pass Road PJHL 2,158.802 C 0.366 0.300 0.300 - - - 96.60 94.86%

Outstanding

Nirvana Construction and Supplies 18691 Const. of 2 Cl @ KNCHS XII 0.694 O 0.382 0.180 0.100 0.030 0.038 0.100 83.00 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 300

Page 309: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Nirvana Construction and Supplies 18691 Const. of 3 CL at Colon NHS

(Ireneo Lopez Annex) XII 1.301 C 0.305 0.248 0.000 - - - 55.30 *55.30% Poor

Nirvana Construction and Supplies 18691 Const. of MPB, Brgy. Zone 4 XII 1.429 O 0.335 0.240 0.100 0.030 0.021 0.100 82.60 -

Nirvana Construction and Supplies 18691 Impvt. of Lake Sebu-Maitum

Road Phase I, Brgy. Takunel XII 14.463 C 0.282 0.300 0.000 - - - 58.20 71.34% Satisfactory

Nishimatsu Construction Company Limited

SLN-SN-000579/FC-

02-036

KAMANAVA Area Flood Control & Drainage System Improvement

ProjectNIA 3,441.588 C 0.332 0.300 0.300 - - - 93.20 92.01%

Outstanding

NMJ Construction & Trading 31017 Const./Impvt. of FMR IX 0.465 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfctory

NMJ Construction & Trading 31017 Const./Impvt. of FMR, Canacan-

Sininan IX 0.464 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfctory

NMJ Construction & Trading 31017 Gravelling of Brgy. Del Pilar

Road IX 0.285 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding

Norm Construction 13784 Conc. of Road Brgy. Poblacion DOS VII 0.933 C 0.350 0.300 0.300 - - - 95.00 *95.00%

Outstanding

Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,

Bantayan Elem. Sch. VIII 0.239 C 0.323 0.100 0.300 - - - 72.30 *72.30% Satisfactory

Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,

Pambujan Elem. Sch. VIII 0.655 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory

Norsatek Engineering and Construction Supply 26627 Multi-Purpose Pavement under

Cluster CARP-04-D2-01 VIII 0.093 C 0.356 0.244 0.300 - - - 90.00 *90.00% V. Satisfactory

Northern Builders 8789Completion of Ternate-Nasugbu

Road, Looc-Pingkian-Papaya-Hamilo Section

IV-A 24.124 C 0.296 0.300 0.300 - - - 89.60 89.78% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 301

Page 310: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Northern Builders 8789 Const. (Widening) of Calamba Bridge IVA 63.341 C 0.366 0.300 0.300 - - - 96.60 *96.60%

Outstanding

Northern Builders 8789 Const. of 6-Cl (2-Storey Bldg.) @ Sta. Maria E/S III 3.525 C 0.444 - 0.500 - - - 94.40 85.65%

V. Satisfactory

Northern Builders 8789 Const. of Water Supply System III 9.335 C 0.489 - 0.500 - - - 98.90 94.35% Outstanding

Northern Builders 8789 Const./Repair/Rehab. of Brgy. Road Brgy. Ninoy Aquino III 1.880 C 0.433 - 0.500 - - - 93.30 93.30%

Outstanding

Northern Builders 8789

Impv't./Widening of Manila North Road (MNR) Package V,

Km.118+700 to Km.119+338.40; Km.124+680 to Km.124+940; Km.129+390 to Km.132+500;

(Tarlac Section)

III 47.288 C 0.386 0.300 0.300 - - - 98.60 89.54% V. Satisfactory

Northern Builders 8789 Impvt./Widening of Manila North Road, Phase III III 93.589 C 0.295 0.300 0.300 - - - 89.50 82.66%

V. Satisfactory

Northern Builders 8789 Pangasinan-Nueva Vizcaya Rd. I 31.182 C 0.445 - 0.500 - - - 94.50 94.50% Outstanding

Northern Builders 8789 Rehab. of San Marcelino-San Narciso Rd. III 47.529 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

Northern Builders 8789 Rehab./Impvt. of MNR & Camp Dau Road III 14.197 C 0.314 0.205 0.300 - - - 81.90 *81.60%

V. Satisfactory

Northern Builders 8789 Rehab./Reconst. of Villa Cerveza Flood Mitigation Project IV-B 55.231 O 0.328 0.160 0.100 0.030 0.032 0.200 85.00 -

Northern Builders 8789 Repair of Angeles-Dinalupihan Road III 6.591 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

Northern Builders 8789 Repair/Rehab. Along Romulo Highway III 9.320 C 0.378 0.205 0.300 - - - 88.30 *88.30%

V. Satisfactory

Northern Builders 8789 Repair/Strengthening of Insular Bilibid Prison Bridge NCR 6.049 C 0.171 0.300 0.300 - - - 77.10 *77.10%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 302

Page 311: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Northern Builders / ZM Const. (JV) JV-07-685

Impvt./Upgrading/Widening of Jct. Layac-Balanga-Mariveles

Port Rd.III 105.650 O 0.361 0.300 0.100 0.030 0.047 0.100 93.80 -

Northern Builders/DMJ Construction & Supply (JV) JV-06-076

Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Tarlac City-

Sta. Rosa-Fort Magsaysay-Palayan City-Laur-Gabaldon

Road, Section 4, Sta. Rosa Fort Magsaysay

III 128.482 C 0.345 0.300 0.300 - - - 94.50 91.92% Outstanding

Northern Builders/Hanjin (JV) FC-06-007

Completion/Const. of Subic-Cawag-Balaybay Road, Phase II

(Segment 4)III 119.113 C 0.211 0.200 0.300 - - - 71.10 *71.10%

Satisfactory

Northern Cotabato Construction and Supply 15515

Conc. of Banisilan-Guiling-Alamada-Libungan Road (Camansi-Nicaan Section)

XII 4.785 C 0.357 0.200 0.300 - - - 85.70 81.86% V. Satisfactory

Northern Cotabato Construction and Supply 15515

Conc. of Kidapawan-Calunasan-M'lang Road Magsaysay-

Maligaya Sect.XII 5.290 C 0.454 - 0.500 - - - 95.40 92.88%

Outstanding

Northern Cotabato Construction and Supply 15515

Rehabilitation of Grebona Bridge along Banisilan-Guiling-Alamada-

Libungan RoadXII 13.633 C 0.386 0.300 0.300 - - - 98.60 88.34%

V. Satisfactory

Northern Negros Construction & Dev't. 17962 Concreting of Leon Kilat Street VII 1.484 C 0.370 - 0.500 - - - 87.00 67.44%

Fair

Northern Negros Construction & Dev't. 17962 Const. of Calo River Control VII 0.876 C 0.397 - 0.500 - - - 89.70 88.74%

V. Satisfactory

Northpoint Development Corp. 29573 Const. of Footbridge with

Drainage System VII 1.490 C 0.372 - 0.500 - - - 87.20 85.46% V. Satisfactory

Novanne Ventures Construction 22107 Const. of FMR Brgy. Lumpatan-

Lapak-Sumaray Rd. VI 2.886 C 0.378 - 0.500 - - - 87.80 87.80% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 303

Page 312: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Novanne Ventures Construction 22107 Cont. of MPB at Brgy. Singcang VI 2.794 C 0.396 0.124 0.300 - - - 82.00 85.57%

V. Satisfactory

Nueva Ecija Construction Company, Inc. 135 Const. of School Building,

Cavite State University IV-A 1.914 C 0.416 - 0.500 - - - 91.60 91.74% Outstanding

Nukaza Trading and Construction 32067

Impvt. of Road with Lined Canal at Summitville Subd., Putatan

ItaasNCR 2.379 C 0.303 0.236 0.300 - - - 83.90 *83.90%

V. Satisfactory

Nulas Builders 32172 Const. of 1 CL Bldg. @ Pulong Bulo PS III 0.379 C 0.331 0.300 0.300 - - - 93.10 89.60%

V. Satisfactory

NVF Construction 13941 Const. of Ponong River Wharf V 0.655 C 0.392 0.165 0.300 - - - 85.70 *85.70% V. Satisfactory

O R C Construction & Supply 17337

Rehab./Impvt. of Road Protection along Daang

Maharlika (Bontal Section)II 0.932 C 0.239 0.225 0.300 - - - 76.40 *76.40%

Satisfactory

O.G. Santos Construction 2050 Conc. of Aurora-Dipolog City Road, Josefina Section IX 13.353 C 0.251 0.201 0.300 - - - 75.20 74.87%

Satisfactory

O.G. Santos Construction 2050

Const. of Line Ext. Canal & Spillway at Various sections of

Newly completed Rehab. of Malalag-Malita-JAS Road

XI 2.878 C 0.274 0.300 0.300 - - - 87.40 87.34% V. Satisfactory

O.G. Santos Construction 2050Impvt./Conc. of By-Pass Road

connecting Panabo Wharf Road and Panabo Coastal Road

XI 13.203 C 0.302 0.200 0.300 - - - 80.20 76.94% Satisfactory

O.L. De Leon Construction 16194 Conc. of Bagong Silang-Capalonga Road V 14.188 C 0.370 0.200 0.300 - - - 87.00 88.62%

V. Satisfactory

O.L. De Leon Construction 16194 Conc. of Talobatib-Jose Pang. Road V 1.881 C 0.234 0.200 0.300 - - - 73.40 80.12%

V. Satisfactory

O.L. De Leon Construction 16194 Concreting of Daet-Mercedes Road V 0.942 C 0.354 - 0.500 - - - 85.40 86.24%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 304

Page 313: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

O.L. De Leon Construction 16194 Const. of 2 CL S/B P. Ponayo H/S Brgy. Mambelite V 0.719 C 0.351 - 0.500 - - - 85.10 85.10%

V. Satisfactory

O.L. De Leon Construction 16194 Road Opening of Matango-Singi Barangay Road V 4.604 O 0.323 0.230 0.100 0.010 0.028 0.100 79.10 -

O.R. Sarmiento Construction 1411 Conc. of Danao-Getafe Road VII 9.472 C 0.256 0.300 0.300 - - - 85.60 87.92%

V. SatisfactoryO.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-

Sierra-Bullones Road VII 81.102 O 0.387 0.169 0.070 0.030 0.056 0.100 81.20 -

O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-

Sierra-Bullones Road VII 81.102 O 0.337 0.223 0.000 0.030 0.059 0.100 74.90 -

O.R. Sarmiento Construction 1411

Const. of Spillway - Phase I, Talibon Small Reservoir

Irrigation ProjectNIA-II 8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 86.50%

V. Satisfactory

O.R. Sarmiento Construction 1411

Const./Impvt. (Conc. Paving) of Concepcion, Danao-Buenavista-

Carmen RoadVII 9.592 O 0.355 0.271 0.100 0.030 0.038 0.100 89.40 -

O.R. Sarmiento Construction 1411 Naga-Toledo Road Project; Jct.

Pajo to Brgy. Ibo to Boundary R-VII 18.733 C 0.394 - 0.500 - - - 89.40 88.14% V. Satisfactory

O.R. Sarmiento Construction 1411 Talibon Small Reservoir

Irrigation Project NIA 11.574 O 0.350 0.157 0.100 0.030 0.047 0.200 88.40 -

Octant Builders & Development Corp. 23668 Const. of Health Center at

Saniboy Health Center NCR 0.959 C 0.327 - 0.500 - - - 82.70 82.70% V. Satisfactory

OIC Construction & Supply 23727 Const. of Water Works System IV-A 2.406 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory

OIC Construction & Supply 23727 Road Conc. @ Brgy. San Juan, Alitagtag and Brgy. San Isidro IV-A 0.291 C 0.277 0.300 0.300 - - - 87.70 *87.70%

V. Satisfactory

OIC Construction & Supply 23727 Waterworks Project (Level I) IV-A 2.468 C 0.389 0.200 0.300 - - - 88.90 86.50% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 305

Page 314: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Omengan Construction and Development Corporation 5119 Const. of Bagu Bridge &

Approaches CAR 6.938 C 0.348 0.134 0.300 - - - 78.20 82.94% V. Satisfactory

Omengan Construction and Development Corporation 5119 Const. of Saltan Bridge &

Approaches CAR 76.227 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -

Omengan Construction and Development Corporation 5119 Const. of Tuga Bridge & its

Approaches CAR 12.262 C 0.327 0.035 0.300 - - - 66.20 71.84% Satisfactory

Omengan Construction and Development Corporation 5119

Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase

VI, Mamaga Bridge-Basao Bridge, Km. 420+970-

Km.429+940

CAR 83.149 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -

Omengan Construction and Development Corporation 5119

Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road,

Tinglayan Bdry.-Lubuagan-Tabuk Sect. II Km. 472+500-

Km.495+500

CAR 14.465 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding

Omengan Construction and Development Corporation 5119

Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan

Road, Pingaan-Dalimuno SectionCAR 14.329 C 0.266 0.016 0.300 - - - 58.20 72.90%

Satisfactory

Omicron Construction 9575Const. of Multi-Purpose Bldg. at San Matias Realigned to Const.

of MPB at San JoseIII 0.949 C 0.457 - 0.500 - - - 95.70 95.70%

Outstanding

Omicron Construction 9575 Repair/Rehab. of Dike/Banks Clearing Sapang Maragul III 9.490 C 0.357 - 0.500 - - - 85.70 85.70%

V. Satisfactory

Omnicon Builders 22816Concreting of Brgy Roads at

Habay I, Molino I Proj. 18 & Niog II

IV-A 0.959 C 0.267 - 0.500 - - - 76.70 76.70% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 306

Page 315: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Omnicon Builders 22816 Const. of 2 Cl Sch. Bldg. @ Pinagturilan NHS IV-B 1.339 C 0.257 0.300 0.300 - - - 85.70 70.51%

Satisfactory

Omnicon Builders 22816 Partial Const. of 2CL S/B at Julian Felipe E/S IV-A 0.767 C 0.447 - 0.500 - - - 94.70 94.70%

Outstanding

Omnicon Builders 22816 Rehab./Impvt. of Punta-Looc-Odiongan-Anahao Road IV-B 9.577 C 0.179 0.200 0.300 - - - 67.90 74.50%

Satisfactory

On Top Construction 32696 Const. of Salingao Flood Control CAR 0.238 C 0.355 0.200 0.300 - - - 85.50 *85.50% V.Satisfactory

On Top Construction 32696 Const./Conc. of Singi FMR CAR 0.238 C 0.317 0.200 0.300 - - - 81.70 *81.70% V.Satisfactory

OP Reyes Builders & Supply 32271 Conc. of Road in Brgy.

Malaruhatan IVA 0.470 C 0.292 0.216 0.300 - - - 80.80 *80.80% V. Satisfactory

OQC Construction 22690 Completion of Multi-Purpose Building @ San Andres E/S II 0.522 C 0.322 0.300 0.300 - - - 92.20 91.64%

Outstanding

OQC Construction 22690 Const of San Vicente FMR II 2.863 C 0.236 0.239 0.300 - - - 77.50 77.50% Satisfactory

OQC Construction 22690 Const. of MPB (Phase II) @ Cagayan NHS II 4.749 C 0.350 0.000 0.000 - - - 35.00 *35.00%

Poor

OQC Construction 22690 Const. of MPB @ Brgy. 9 II 1.924 C 0.388 0.200 0.300 - - - 88.80 81.87% V. Satisfactory

OQC Construction 22690 Const. of MPB @ I.S.U. II 1.895 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

OQC Construction 22690 Const. of Multi-Purpose Building (Gymnasium) II 4.821 O 0.304 0.300 0.100 0.015 0.035 0.100 85.40 -

OQC Construction 22690 Const. of Multi-Purpose Building @ Cagayan National High School II 4.821 O 0.389 0.236 0.050 0.030 0.030 0.067 80.20 -

OQC Construction 22690Seal Widening along Daang

Maharlika km. 324+000-Km.327+700

II 9.543 C 0.294 0.000 0.300 - - - 59.40 76.64% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 307

Page 316: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

OQC Construction 22690Seal Widening of intersection at

Daang Maharlika & Jct. Ipil-Panang-Quirino Bdry Road

II 4.775 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory

Orani Builders Supply 5349 Cluster CY 2004 DepEd School Building Program III 4.560 C 0.478 - 0.500 - - - 97.80 95.00%

Outstanding

Orani Builders Supply 5349 Const. of MPB @ Brgy. Camachile III 0.660 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

Orani Builders Supply 5349 Const. of Multi-Purpose Building San Vicente III 2.814 C 0.456 - 0.500 - - - 95.60 89.02%

V. Satisfactory

Orani Builders Supply 5349 Impvt. of Pentor-Balsik River Control, Sta. Isabel Section III 4.767 C 0.264 0.300 0.300 - - - 86.40 *86.40%

V. Satisfactory

Orani Builders Supply 5349 Repair/Rehab. of Multi-Purpose Building VII 0.472 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -

Orguer Trading & Construction 17111 Concreting of Road at Brgy.

Concepcion IV-A 0.286 C 0.346 - 0.500 - - - 84.60 84.60% V. Satisfactory

Orguer Trading & Construction 17111 Const. of Multi-Purpose Building

@ Brgy. Poblacion IV-A 0.477 C 0.289 0.300 0.300 - - - 88.90 *88.90% V.Satisfactory

Orguer Trading & Construction 17111 Repair of Hanging Bridge IV-A 0.190 C 0.083 - 0.500 - - - 58.30 *58.30%

Poor

Orient Star Construction 7183 Const./Impvt. of Paclasan Seawall IV-B 1.881 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V.Satisfactory

Orient Star Construction 7183 Rehab. of CSR Bansud Section IV-B 4.710 C 0.301 0.300 0.300 - - - 90.10 *90.10% Outstanding

Orient Star Construction 7183 Repair/Maintenance of Cagancan River Control IV-B 1.887 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V.Satisfactory

Oriental Sales Center & Contractor 3816

Conc. of Abra-Cervantes Road (km. 431+589 to Km. 432+185),

Lagangilang SectionCAR 4.730 C 0.293 0.186 0.300 - - - 77.90 51.14%

Poor

Oriental Sales Center & Contractor 3816 Const. of Bridge (Phase I) I 0.958 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 308

Page 317: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Oriental Sales Center & Contractor 3816 Const. of MPB at Sabangan E/S,

Bonuan-Guesset (Phase I) I 1.431 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding

Oriental Sales Center & Contractor 3816

Repair/Maint. of National Roads (Package), Abra-Ilocos Sur Road

and Abra-Kalinga RoadCAR 9.521 C 0.228 0.190 0.300 - - - 71.80 *71.80%

Satisfactory

Orientech Construction & Development Corporation 8874

Const./Widening & Conc. of Dinagat-Loreto Road (Sta. Cruz-

Wilson Road)XIII 14.472 C 0.350 0.200 0.000 - - - 55.00 64.00%

Fair

Orzan Builders Enterprises 13382 Concreting of Ariman-Bulusan Lake Road V 2.750 C 0.321 - 0.500 - - - 82.10 89.66%

V. Satisfactory

Orzan Builders Enterprises 13382 Repair of Two CL Sch. Bldg. Pto. Diaz Central School V 0.288 C 0.298 0.220 0.300 - - - 81.80 *81.80%

V. Satisfactory

Oscan Builder 31158 Completion of MPB, Old Lukban E/S, Magsaysay Ave. CAR 0.953 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Oscan Builder 31158 Repair/Rehab. of Secondary Sch. Bldg. BCNHS-Main CAR 4.772 C 0.360 0.300 0.300 - - - 96.00 89.28%

V. Satisfactory

P. C. Panopio Construction and Trading 32824

Repair/Rehab. of Slope Protection of Flood Control

along Camachile River III 1.402 C 0.267 0.200 0.300 - - - 76.70 *76.70%

Satisfactory

P.B. Grey Construction 13383

Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (6) Classroom Sch.

Bldg. at San Rafael E/S

IVA 6.934 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

P.B. Grey Construction 13383 Rehab. of Road @ Litex Village IVA 1.303 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

P.B. Grey Construction 13383 Rehab. of Road @ Sitio San Roque IVA 1.434 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 309

Page 318: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

P.B. Grey Construction 13383 Rehab./Impvt. of Angono Diversion Road IVA 9.602 O 0.340 0.217 0.100 0.030 0.033 0.067 78.70 -

P.B. Obial Construction 16784 Const. of 1 unit, 4 Storey, 20 CL Bulacao H/S Bldg. VII 13.356 C 0.341 0.272 0.300 - - - 91.30 80.66%

V. Satisfactory

P.B. Obial Construction 16784 Const. of Multi-Purpose Building VII 0.289 C 0.355 0.300 0.300 - - - 95.50 94.31% Outstanding

P.B. Obial Construction 16784 Const. of Pedestrian Overpass VII 3.678 O 0.312 0.240 0.100 0.010 0.044 0.100 80.60 -

P.B. Obial Construction 16784Const./Rehab. of Sch. Bldg. @ Mandaue City School for the

ArtsVII 1.446 C 0.377 0.100 0.300 - - - 77.70 *77.70%

Satisfactory

P.J. Cruz Construction & Trading 14223 Const. of Additional Classroom

(Sampaloc Site II E/S) NCR 1.420 C 0.343 - 0.500 - - - 84.30 78.70% Satisfactory

P.J. Cruz Construction & Trading 14223

Const. Partial of Two (2) Storey, Four (4) Cl School Bldg. @ Unit

1, Baclaran E/SNCR 2.861 C 0.335 0.300 0.300 - - - 93.50 78.70%

Satisfactory

P.J. Cruz Construction & Trading 14223

Repair/Rehab. of Guardrails/Railings along Nat'l

Roads anng BridgesNCR 2.963 C 0.261 0.150 0.300 - - - 71.10 *71.10%

Satisfactory

P.J. San Pedro Const. Supply 14994

Const. / Rehab. / Completion & Repair of Secondary Sch. Bldg.

@ Sta. Ana NHSXI 1.323 C 0.376 0.300 0.300 - - - 97.60 *97.60%

Outstanding

P.J. San Pedro Const. Supply 14994 Const. of MPB @ Km. 6, Brgy.

Buhangin Proper XI 1.692 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi

Purpose Gynasium DOST 10.692 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding

P.J. San Pedro Construction and Supply 14994 Completion of School Bldg., 3-

Storey, 12 CL @ Bangoy NHS XI 9.633 C 0.383 0.300 0.300 - - - 98.30 91.86% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 310

Page 319: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

P.J. San Pedro Construction and Supply 14994

Conc. of Road at Catalunan Pequeño (Project C) Mintal-Cawa-

cawa RoadXI 2.032 C 0.370 0.300 0.300 - - - 97.00 *97.00%

Outstanding

P.J. San Pedro Construction and Supply 14994

Const. of Water Works System, Brgy. Tamugan (Lower Patag),

Marilog DistrictXI 4.710 C 0.260 0.300 0.300 - - - 86.00 86.54%

V.Satisfactory

P.J. San Pedro Construction and Supply 14994 Impvt. of Drainage along Agusan-

Davao Road XI 1.867 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding

P.L. Sebastian Construction 1076 Baobo River Irrigation Project NIA 224.599 O 0.368 0.162 0.070 0.030 0.042 0.200 87.17 -

P.L. Sebastian Construction 1076 Contract Package C, Malabang-

Sultan Gumander Road KFAED 793.246 C 0.373 0.300 0.300 - - - 97.30 89.66% V.Satisfactory

P.L. Sebastian Construction 1076 Const. of Bit-os Lat. Canal "D",

Sta.0+920-6+032 (new station) NIA 72.059 O 0.345 0.151 - 0.030 0.070 0.200 81.15 -

P.L. Sebastian Construction 1076 Const. of Bit-os Main Canal &

Regulating Pond NIA 247.675 C 0.299 0.300 0.300 - - - 85.47 88.47% V. Satisfactory

P.L. Sebastian Construction 1076

Const. of Limpapa-Sibuco Road, Lintangan-Pasilnahut Sect.,

Phase II along Zamboanga West Coast Road

IX 32.526 C 0.389 0.300 0.300 - - - 98.90 92.42% Outstanding

P.L. Sebastian Construction 1076 Const./Impv't. of Contract

Package XI-A Liboton-Tupas Rd. XI 101.877 C 0.337 0.300 0.070 0.030 0.037 0.067 84.10 -

P.L. Sebastian Construction 1076 Const./Impv't. of Contract

Package XI-A Liboton-Tupas Rd. XI 89.986 O 0.360 0.300 0.100 0.030 0.045 0.100 93.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 311

Page 320: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

P.L. Sebastian Construction 1076

CP9: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal

Road, (Manay-Boston) Cateel-Boston Section)

XI 197.331 O 0.393 0.271 0.100 0.030 0.065 0.100 95.90 -

P.L. Sebastian Construction 1076

Widening of Cotabato-Allah-General Santos National Rd.

Poblacion Shariff Aguak Sect.XII 6.170 C 0.436 - 0.500 - - - 93.60 82.98%

V. Satisfactory

P.T. Adhi Karya (Per Sero)/Vicente T. Lao Const.

(J.V.)7040

C.P. I-A: Replacement/Repair /Retrofitting of Thirteen Bridges Iligan-Cagayan de Oro-Butuan

Rd.

X 190.137 O 0.365 0.286 0.100 0.030 0.061 0.100 94.20 -

P.T. Diamond Merchandise & Construction 15451

Completion/Continuation of Unfinished/On-going Bridge, Sapilang along Manila North

Road

I 3.542 C 0.329 0.200 0.300 - - - 82.90 *82.90% Satisfactory

P.T. Diamond Merchandise & Construction 15451

Rehab./Slope Protection of Calaoaan, Tamurong FMR,

CalaoaanI 0.474 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -

P.T. Diamond Merchandise & Construction 15451 Replacement of Sapilang Bridge

along MNR I 12.993 C 0.379 0.200 0.000 - - - 57.90 73.40% Satisfactory

P.V.B. Construction and Trading 13269 Conc. of FMR @ Brgy. Mining III 0.912 C 0.352 0.218 0.300 - - - 87.00 *87.00%

SatisfactoryPablo S. Labasbas

Construction 6302 Concreting of Guiuan-Sulangan Road VIII 4.778 C 0.281 0.300 0.300 - - - 88.10 84.56%

V. SatisfactoryPablo S. Labasbas

Construction 6302 Const. of Sta. Maria Bridge IVB 13.507 C 0.328 0.200 0.300 - - - 82.80 82.20% V. Satisfactory

Pablo S. Labasbas Construction 6302 Rehab./Impvt. Along Tablas

Circumferential Road IVB 9.643 C 0.315 0.234 0.300 - - - 84.90 70.92% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 312

Page 321: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Pablo S. Labasbas Construction 6302 Rehabilitation of Cabacungan-

Panoypoy Farm-to-Market Road VIII 0.954 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding

Pacer Construction & Development Corporation 4839 Const. of Kabadiangan Bridge

(UK-Phase III) VIII 4.605 O 0.316 0.240 0.100 0.022 0.023 0.100 80.10 -

Pacer Construction & Development Corporation 4839 Conc. of Calubian Jct.-San Isidro-

Tabango Road VIII 4.737 C 0.301 0.201 0.300 - - - 80.20 *80.20% V. Satisfactory

Pacer Construction & Development Corporation 4839 Const. of Alawihaw Bridge &

Approaches VIII 6.407 C 0.394 0.200 0.300 - - - 89.40 85.20% V. Satisfactory

Pacer Construction & Development Corporation 4839 Const. of MPB, Brgy. 83-C, 60 &

107 VIII 0.678 C 0.364 0.100 0.300 - - - 76.40 80.11% V. Satisfactory

Pacer Construction & Development Corporation 4839 Rehab./Impvt. of Cabungaan-

Tabunok-Consuega Road VIII 7.115 C 0.350 0.200 0.300 - - - 85.00 80.86% V. Satisfactory

Pacific Construction 15800 Completion of the Rehab. of Pan-Phil. Hi-Way (Agas-Agas Sect.) VIII 14.092 C 0.388 0.300 0.300 - - - 98.80 85.61%

V. Satisfactory

Pacific Star Erectors 14224 Completion of Conner Multi-Purpose Building CAR 0.962 C 0.322 - 0.500 - - - 82.20 86.05%

V. Satisfactory

Pacific Star Erectors 14224 Const. of Apayao Science H/S Phase IV CAR 1.591 C 0.314 0.300 0.300 - - - 91.40 86.89%

V. Satisfactory

Pacific Star Erectors 14224 Const. of Apayao State College CAR 1.854 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory

Pacific Star Erectors 14224 Const. of Apayao State College Multi-Purpose Bldg CAR 1.395 C 0.464 - 0.500 - - - 96.40 92.27%

Outstanding

Pacific Star Erectors 14224 Const. of DPWH Regional Office Bldg. (Phase IV) II 26.973 C 0.384 0.300 0.300 - - - 98.40 93.46%

Outstanding

Pacific Star Erectors 14224 Const. of Poblacion-Bulo-Waga FMR CAR 0.919 C 0.190 0.300 0.300 - - - 79.00 81.85%

V. Satisfactory

Pacific Star Erectors 14224 Const. of San Carlos Bridge & Approaches II 10.903 C 0.360 0.300 0.000 - - - 66.00 76.32%

Satisfactory

Pacific Star Erectors 14224 Const. of Tammang Bridge (Pier 2 and 3) CAR 9.254 C 0.343 0.300 0.000 - - - 64.30 75.07%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 313

Page 322: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Pacific Star Erectors 14224Const./Road Impvt. of Calanasan-

Ilocos Norte Road, Parina Section

CAR 13.827 O 0.355 0.300 0.070 0.030 0.037 0.100 89.20 -

Pacific Star Erectors 14224Maintenance/Rehab. & Impv't. of

National Arterial Roads & Bridges

II 2.825 O 0.311 0.257 0.070 0.015 0.016 0.067 73.60 -

Pacific Star Erectors 14224 Proposed Const. of Pudtol MPB (Gymnasium) CAR 1.427 C 0.215 0.300 0.300 - - - 81.50 *81.50%

V. Satisfactory

Pacific Star Erectors 14224 Replacement of Capagu Bridge along MNR II 12.913 C 0.381 0.200 0.300 - - - 88.10 83.78%

V. Satisfactory

Pader Construction and Supply 20213 Conc. of Dualing-Baliki-Silik

Road (Dualing Section) XII 4.789 C 0.375 0.119 0.300 - - - 79.40 78.02% Satisfactory

Pader Construction and Supply 20213 Conc. of Road @ Brgy. Ulamian XII 0.468 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. SatisfactoryPader Construction and

Supply 20213 Const. of Water System @ Brgy. Upper Baguer XII 0.370 C 0.325 0.246 0.300 - - - 87.10 *87.10%

V. Satisfactory

Pagadian Aggregates & Marketing 14886 Conc. of Brgy. Road, Opol X 1.445 C 0.389 0.200 0.300 - - - 88.90 *89.90%

V. SatisfactoryPagadian Aggregates &

Marketing 14886 Conc. of Kimaya-Solana By-Pass Road X 4.820 O 0.305 0.227 0.100 0.024 0.050 0.067 77.30 -

Pagadian Aggregates & Marketing 14886 Conc. of Nat'l Roads Lourmah-

Poblacion Section IX 1.858 C 0.342 0.200 0.300 - - - 84.20 82.22% V. Satisfactory

Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua

Road X 9.540 O 0.319 0.300 0.070 0.030 0.055 0.067 84.10 -

Palafox Construction 18424 Const. of FTMR @ Cacandungan I 0.480 C 0.286 - 0.500 - - - 78.60 78.60% Satisfactory

Palmares General Merchandise 24657 Completion of MPB at Brgy.

Magsaysay XII 0.480 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Palmares General Merchandise 24657 Const. of Gymnasium Bldg. @

Brgy. Mayo XII 0.964 C 0.247 0.200 0.300 - - - 74.70 *74.70% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 314

Page 323: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Palmares General Merchandise 24657 Const. of MPB @ Brgy. Kenram

(Health Center) XII 0.240 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Palmares General Merchandise 24657 Const. of Multi-Purpose Bldg.

(Mini-Gym) Poblacion Uno XI 1.419 C 0.384 0.300 0.300 - - - 98.40 87.41% V. Satisfactory

Palmares General Merchandise 24657

Const. of Sch. Bldg. @ Sultan Kudarat Polytechnic State

College XII 0.921 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

Palmares General Merchandise 24657 Impvt. of Road from Koronadal

City to Carpenter Hill XII 4.819 C 0.357 0.300 0.300 - - - 95.70 84.84% V. Satisfactory

Palmares General Merchandise 24657

Widening/Conc. of Dulawan-Marbel Road (Kalandangan

Sect.)XII 9.450 C 0.335 0.289 0.300 - - - 92.40 *92.40%

Outstanding

Panay East Coast Construction and Supply 26469 Reblocking of Pototan-Bangga

Polot-An Road VI 4.255 O 0.314 0.300 0.100 0.030 0.043 0.067 85.40 -

Pangasinan New Wilson Lumber and Construction 8313 Conc. of Palapad-Torres Road,

Brgy. Palapad I 0.945 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satistfactory

Pangasinan New Wilson Lumber and Construction 8313 Const. of Multi-Purpose Bldg. for

Boy Scout I 0.944 C 0.298 - 0.500 - - - 79.80 *79.80% Satisfactory

Pangasinan New Wilson Lumber and Construction 8313 Const./Opening of Lipi Norte-

Pao Road (Phase II) I 1.919 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satistfactory

Paradox Construction 18557 Concreting of FTMR @ Palina East-Awed I 0.479 C 0.389 - 0.500 - - - 88.90 88.90%

V. Satisfactory

Paradox Construction 18557 Const. of Farm-to-Market Road Brgy. Cabaruan I 0.479 C 0.262 - 0.500 - - - 76.20 76.20%

Satisfactory

Paradox Construction 18557 Construction of Farm-to-Market Road I 0.477 C 0.272 0.300 0.300 - - - 87.20 *87.20%

V. Satisfactory

Paris Construction & Marketing 14306 Completion/Const. of Multi-

Purpose Building XII 0.669 C 0.385 0.300 0.300 - - - 98.50 84.36% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 315

Page 324: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Parojinog & Sons Construction Company 32765 Const. of MPB X 1.412 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

Parojinog & Sons Construction Company 32765 Const. of MPB X 2.384 C 0.250 0.200 0.300 - - - 75.00 *75.00%

Satisfactory

Parojinog & Sons Construction Company 32765 Rehab. of Guingona-Trigos Road X 2.328 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

Partido Construction and Supply 20631 Completion of Gubat-Tinawagan-

Libod Road V 9.360 O 0.330 0.238 0.100 0.020 0.023 0.100 81.10 -

Partido Construction and Supply 20631

Conc. of Bagong Silang-Capalonga Road, Dolores

SectionV 11.978 C 0.356 0.290 0.300 - - - 94.60 89.80%

V. Satisfactory

Partido Construction and Supply 20631 Concreting of Brgy. Road Mabca V 0.183 C 0.401 - 0.500 - - - 90.10 90.10%

Outstanding

Partido Construction and Supply 20631 Const. of 1 Cl School Buildings

@ San Miguel V 0.337 C 0.373 0.200 0.300 - - - 87.30 93.67% Outstanding

Partido Construction and Supply 20631 Const. of 1 Cl RM Sch. Bldg. @

Ipil E/S V 0.380 C 0.315 0.168 0.300 - - - 78.30 *78.30% Satisfactory

Partido Construction and Supply 20631 Const. of 1 CL Sch. Bldg at

Sibaguan Agro Industrial NHS V 0.518 C 0.372 0.203 0.300 - - - 87.50 *87.50% V. Satisfactory

Partido Construction and Supply 20631 Const. of Drainage along Baao-

Iriga-Nabua Road V 4.681 C 0.362 0.200 0.300 - - - 86.20 78.88% Satisfactory

Partido Construction and Supply 20631 Const. of Flood Control San

Roque V 0.453 C 0.233 - 0.500 - - - 73.30 73.30% Satisfactory

Partido Construction and Supply 20631 Const. of Igbac-San Pedro Road V 6.924 C 0.202 0.200 0.300 - - - 70.20 71.88%

Satisfactory

Partido Construction and Supply 20631 Const. of Multi-Purpose Bldg.

Goa Central School V 1.088 F 0.434 - 0.500 - - - 93.40 94.38% Outstanding

Partido Construction and Supply 20631

Const. of Various School Buildings @ 3rd District Congressional District of

Camarines Sur

V 0.337 O 0.393 0.300 0.100 0.030 0.041 0.100 96.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 316

Page 325: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Partido Construction and Supply 20631

Impv't./Conc. of Binalay-Tamban Road, Olag-Pequeño-Sitio-Malibtong-Antipolo Section

V 9.553 C 0.223 0.200 0.300 - - - 72.30 79.83% Satisfactory

Partido Construction and Supply 20631

Re-decking of 2nd Span & Repair of Bridge approaches

Agos BridgeV 1.418 C 0.299 0.137 0.300 - - - 73.60 85.72%

V. Satisfactory

Partido Construction and Supply/Jeff Const. (JV) JV-05-051 Const. of Gipangpang Bridge &

Approaches (Phase I) V 14.550 O 0.361 0.240 0.100 0.015 0.040 0.100 85.60 -

Pastrana Construction 17340 Const./Rehab. of Havana-Bugnay Road VI 1.910 C 0.312 0.269 0.300 - - - 88.10 84.86%

V. Satisfactory

Patricia Builders 28745 Concreting of Farm-to-Market Road IV-A 0.467 C 0.325 - 0.500 - - - 82.50 *82.50%

V. Satisfactory

Patricia Builders 28745 Const. of Road, Brgy. San Francisco-Calihan IV-A 4.824 C 0.269 0.300 0.300 - - - 86.90 *86.90%

V. Satisfactory

Patricia Builders 28745

Implementation of Priority Projects in the 3rd District of

Laguna (Brgy. Sta. Veronica-San Bartolome to San Benito

IV-A 4.824 C 0.343 0.262 0.300 - - - 90.50 *90.50% Outstanding

Patricia Builders 28745 Impvt. of Brgy. San Jose FMR IV-A 0.467 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

Patrick Construction 27780 Rehab./Conc. of Casili Brgy. Road II 0.943 C 0.284 0.200 0.300 - - - 78.40 *78.40%

Satisfactory

Patrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III VI 9.960 C 0.340 0.300 0.000 - - - 64.00 81.46%

V. Satisfactory

Paula Mae Buhong Construction 26128 Conc. of Jct. Alfonso Lista-Mt.

Province Bdry. Road CAR 8.297 C 0.349 0.287 0.300 - - - 93.60 65.22% Fair

Paula Mae Buhong Construction 26128 Const. of Municipal Health

Center CAR 1.911 C 0.295 0.111 0.300 - - - 70.60 80.72% V. Satisfactory

Paula Mae Buhong Construction 26128 Impvt/ along Banawe-Mayoyao-

Aguinaldo-Isabela Bdry. Road CAR 1.435 C 0.384 0.300 0.300 - - - 98.40 93.90% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 317

Page 326: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Paula Mae Buhong Construction/PBO Construction (JV)

JV-07-152 Widening/Conc. of Banaue-Bontoc Road (Halsema Highway) CAR 48.196 O 0.342 0.180 0.100 0.030 0.030 0.100 78.20 -

Payunan Builders 16824

Impv't. of Sarangani-Davao del Sur Coastal Road (Jct. Alabel-

Glan Boundary) Sarangani-Davao del Sur

XII 13.433 C 0.307 0.289 0.000 - - - 59.60 65.14% Fair

PBO Construction 18403 Const. of Bulanao Flood Control CAR 9.500 C 0.330 0.200 0.300 - - - 83.00 88.64% V. Satisfactory

PBO Construction 18403 Const. of Lawig-Pieza Bridge CAR 9.027 C 0.317 0.300 0.300 - - - 91.70 85.36% V. Satisfactory

PBO Construction 18403Const. of Sta. Maria-Paracelis

Road, Phase II (Pinto-Caragasan Paraceln Section)

CAR 13.344 C 0.329 0.263 0.300 - - - 89.20 *89.20% V. Satisfactory

PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) CAR 19.315 C 0.373 0.300 0.300 - - - 97.30 92.30%

Outstanding

PBO Construction 18403 Contruction of Habbang Bridge, Km. 362+303-Km. 302+460 CAR 20.145 C 0.389 0.300 0.300 - - - 98.90 *98.90%

Outstanding

PBO Construction 18403

Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Rd.,

Mananggol, Lubuagan-Wales Brook, Tinglayan

CAR 14.190 C 0.235 0.300 0.000 - - - 53.50 69.85% Fair

PBO Construction 18403

Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section

CAR 47.185 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -

PBO Construction 18403 Rehab. of Balawag - Malin-awa FMR CAR 19.315 O 0.360 0.190 0.100 0.023 0.054 0.100 82.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 318

Page 327: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

PBO Construction 18403

Repair/Rehab. of Romualdez-Santor-Calaocan-San Pascual Section, Babalag-Kinama-San

Francisco Section

CAR 9.537 O 0.256 0.240 0.100 0.015 0.030 0.100 74.10 -

PC Builders and Supply 19191Impvt./ Repair of Shore

Protection along side NHA-Seabreeze Homes

V 2.871 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory

Pentagon Industrial Development & Const. Co.,

Inc12796 Improvement/Widening of Manila

North Road (MNR) Package II III 87.050 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -

Pentagon Industrial Development &

Construction Company, Incorporated

12796 Riprapping of Sapangbalen Creek III 0.941 C 0.167 0.300 0.300 - - - 76.70 60.86%

Fair

Performance Builders & Dev't. Corp. 5303 Const. of Calatrava Seawall IV-B 0.462 C 0.440 0.500 94.00 94.00%

Outstanding

Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II IV-B 21.239 C 0.319 0.200 0.300 - - - 81.90 80.13%

V.SatisfactoryPerformance Builders &

Dev't. Corp. 5303 Desilting of Dubduban River IV-B 0.281 O 0.267 0.200 0.033 0.067 0.250 81.70 -

Persan Const. Inc. (Formerly: Persan

Construction)2852 Replacement of Loboc Bailey

Bridge VII 11.564 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -

Persan Construction, Inc. 2852Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-Bayasong

Section)V 40.123 C 0.397 210.000 0.300 - - - 90.70 93.94%

Outstanding

Persan Construction, Inc. 2852Improvement/asphalting of

Panglao Island Circumferential Road

VII 38.360 C 0.330 0.287 0.000 - - - 61.70 70.70% Satisfactory

Persan Construction, Inc. 2852Improvement/Const. of Bridge along Panabo Coastal Road

(Arieta Section)XI 28.764 C 0.436 - 0.500 - - - 93.60 91.56%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 319

Page 328: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Persan Construction, Inc. 2852Impvt. (Conc. Paving) along

Carmen-Sagbayan-Bacane Nat'l Road

VII 14.256 C 0.343 0.170 0.000 - - - 51.30 57.93% Poor

Persan Construction, Inc. 2852Impvt. (Conc. Paving) of Jct. Dat-

an Carmen-Sagbayan-Sierra Bullones, Pilar-Alicia Road

VII 30.557 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory

Persan Construction, Inc. 2852Impvt. And Rehab. of Daang

Maharlika Road, San Rafael-San Ildefonso Section

III 95.473 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -

Persan Construction, Inc. 2852 Impvt. of Panabo Coastal Road, Arieta-Puyod Section XI 28.257 C 0.380 0.300 0.300 - - - 98.00 91.82%

Outstanding

Persan Construction, Inc. 2852 Impvt./Conc. of Kapalong-Talaingod Road XI 53.764 O 0.395 0.296 0.070 0.030 0.033 0.067 89.10 -

Persan Construction, Inc. 2852 Impvt./Conc. of Kapalong-Talaingod Road XI 53.764 O 0.382 0.300 0.050 0.030 0.045 0.067 87.40 -

Persan Construction, Inc. 2852 Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso III 16.496 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

Persan Construction, Inc. 2852Rehab. Old Daang Maharlika Road (Cagayan Valley Road), San Rafael to San Ildefonso

III 28.640 O 0.395 0.225 0.100 0.030 0.035 0.100 88.50 -

Persan Construction, Inc. 2852Repair/Rehab. of Cavite-

Batangas Road, Sampaloc Section

IV-A 9.904 C 0.211 0.300 0.300 - - - 81.10 *81.10% V. Satisfactory

Persan Construction, Inc. 2852 Upgrading/Conc. With Drainage Impvt. P. Aquino St. NCR 11.515 C 0.356 0.200 0.300 - - - 85.60 80.26%

V. Satisfactory

Persan Construction/ A.L. Salazar Const., Inc. (JV) 2852/3899 Asphalt Overlay of Daang

Maharlika (MSR) V 41.038 C 0.450 - 0.500 - - - 95.00 93.62% Outstanding

Peter Construction and Aggregate Supply 17343 Const. of MPB (Covered Court)

@ Estaka E/S IX 2.036 C 0.330 0.173 0.300 - - - 80.30 *80.30% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 320

Page 329: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Peter Construction and Aggregate Supply 17343 Const./Extension of River

Control Structure IX 2.762 C 0.285 0.217 0.300 - - - 80.20 81.64% V. Satisfactory

Peter Construction and Aggregate Supply 17343

Road Improvement/Const. of Drainage Canal Jct. Polo-Dapitan

Park Nat'l. Rd.X 1.847 C 0.490 - 0.500 - - - 99.00 93.87%

Outstanding

Peter G. Chua Builders 25367 Completion of Multi-Purpose Building at Brgy. West Rembo NCR 0.480 C 0.366 - 0.500 - - - 86.60 86.60%

V. Satisfactory

Peter G. Chua Builders 25367 Conc. of Gil Puyat Ave. NCR 4.768 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding

Peter G. Chua Builders 25367 Const. of Bridge at Pamplona 3 NCR 4.609 C 0.319 0.200 0.300 - - - 81.90 79.08% Satisfactory

Peter G. Chua Builders 25367 Const. of MPB, Phase II @ Pulanglupa I NCR 1.048 C 0.373 0.200 0.300 - - - 87.30 84.36%

V. Satisfactory

Peter G. Chua Builders 25367 Const./Completion of San Agustin Elem. Sch. NCR 0.761 C 0.378 0.300 0.300 - - - 97.80 95.42%

Outstanding

Peter G. Chua Builders 25367 Improvement/Concreting of Merville-Moonwalk Access Road NCR 0.961 C 0.278 0.200 0.300 77.80 77.02%

Satisfactory

Petrina Grocers Marketing 29695 Const. of 2-Cl School Building @ Cugman ES X 0.839 O 0.377 0.300 0.100 0.020 0.006 0.100 90.30 -

Petrina Grocers Marketing 29695 Const. of MPB (Phase II) @ Brgy. Poblacion X 0.565 O 0.361 0.300 0.100 0.015 0.013 0.100 88.90 -

Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS X 1.394 C 0.357 0.200 0.300 - - - 85.70 83.53% V. Satisfactory

Petrina Grocers Marketing 29695 Const. of Multi-Purpose Barangay Hall Capinonan X 0.925 C 0.355 - 0.500 - - - 85.50 73.04%

Satisfactory

Petrina Grocers Marketing 29695 Const. of Multi-Purpose Building (Phase I) X 0.942 C 0.376 0.212 0.300 - - - 88.80 86.42%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 321

Page 330: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Pett Builders 26825 Completion of Multi-Purpose Building @ JEM Subdivision NCR 1.428 C 0.369 0.300 0.300 - - - 96.90 *96.90%

Outstanding

PGO Construction 15153Rehab./Reblocking of

Deteriorated Conc. Pavement along Bacolod North Road

VI 9.231 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -

Phil Manna Construction & Supply 10320 Const. of 1 CL Sch. Bldg. @

Taculod E/S Annex V 0.459 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding

Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building

at Sitio Maligay V 0.927 C 0.421 - 0.500 - - - 92.10 *92.10% Outstanding

Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building

at Sta. Cruz-Sta. Isabel V 0.851 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory

Philippine Chemsteel Industries Inc. 16965 Const. of Water System XI 3.271 C 0.330 0.200 0.300 - - - 83.00 *83.00%

V. Satisfactory

Philippine Chemsteel Industries Inc. 16965

Repair/Rehab. Along National Roads @ CDO-Lumbia Airport-

Uguiban Rd.X 4.709 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

Philippines Chemsteel Industries Inc. 16965

Const. of Round Abouts Traffic Signal Lights & Road Signs and

Pavement MarkingsV 4.625 C 0.395 0.262 0.300 - - - 95.70 *95.70%

Outstanding

Philippines Chemsteel Industries, Inc. 16965 Const. of Multi-Purpose

Pavement @ Ringgit St. Kabute IVA 0.308 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Philippines Chemsteel Industries, Inc. 16965 Rehab./Impvt. of Andalucia St. NCR 0.933 C 0.314 0.300 0.300 - - - 91.40 *91.40%

Outstanding

Philippines Chemsteel Industries, Inc. 16965

Repair/Rehab./Impvt. of Nat'l Roads along Calbiga Road-Jct.

Dolongan-Basey RoadVIII 9.625 C 0.197 0.300 0.300 - - - 79.70 *79.70%

Satisfactory

Philworks Construction & Supply (Formerly: Philworks Const.)

32103 Const. of Arimbay Bridge, Detour & Approaches V 18.504 O 0.386 0.300 0.100 0.023 0.060 0.100 96.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 322

Page 331: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Philworks Construction & Supply (Formerly: Philworks Const.)

10181 Const. of Basud Bridge & Approaches, Phase II-B V 55.604 C 0.405 - 0.500 - - - 90.50 88.94%

V. Satisfactory

Philworks Construction & Supply (Formerly: Philworks Const.)

10181 Const. of Panagan Bridge and Approaches (Phase II) V 12.497 O 0.316 0.259 0.100 0.020 0.028 0.100 82.30 -

Philworks Construction & Supply (Formerly: Philworks Const.)

10181Slope Protection of Various Slipped Sect. along Tigaon

Mayon-Rd, SibaguanV 4.506 C 0.333 - 0.500 - - - 83.30 90.26%

Outstanding

Philworks Construction and Supply 10181 Const. of Arimbay Bridge,

Detour & Approaches V 18.785 C 0.386 0.100 0.300 - - - 78.60 86.82% V. Satisfactory

Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and

Approaches (Phase 1) V 17.749 C 0.384 0.232 0.300 - - - 91.60 82.87% V. Satisfactory

Philworks Construction and Supply 32103 Const. of Mabolo Flood Control V 9.460 C 0.317 0.300 0.300 - - - 91.70 *91.70%

OutstandingPhilworks Construction

and Supply 32103 Const. of Tula-tula Bridge & Detour V 8.523 C 0.327 0.225 0.300 - - - 85.20 *85.20%

V. Satisfactory

Philworks Construction and Supply 32103 Impv't./Rehab./Reblocking of

Andaya Highway V 23.880 C 0.299 0.300 0.300 - - - 89.90 85.04% V. Satisfactory

Philworks Construction and Supply 32103

Reconst./Replacement of Damaged Bridge, Traversia

Bridge 1V 23.269 C 0.355 0.200 0.300 - - - 85.50 84.87%

V. Satisfactory

Philworks Construction and Supply 32103

Road Opening/Upgrading of Uson-Tampuhan-Mambayawas-

AwayanV 9.458 O 0.328 0.300 0.100 0.030 0.033 0.100 89.10 -

Phranaret Construction 16878 Ban-May-Agui-A. Lista Isabela Brgy. Road CAR 3.195 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -

Phranaret Construction 16878Impvt. Along Banawe-Mayoyao-Aguinaldo-Alfonso-Lista-Isabela

Bdry. Road, Kinakin SectionCAR 3.195 O 0.339 0.300 0.000 0.000 0.019 0.050 70.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 323

Page 332: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Phranaret Construction 16878Repair/Rehab. of Lamut River Control, (Upstream of Lamut

Bay) Pob. WestCAR 0.925 C 0.313 0.300 0.300 - - - 91.30 74.26%

Satisfactory

Phranaret Construction 16878Widening/Conc. of Banaue-

Hungduan-Tinoc-Benguet Bdry. Road, Bokiawan Section

CAR 1.906 C 0.321 0.213 0.300 - - - 83.40 90.84% Outstanding

PIBS Trading & Construction 14734 Const. of Multi-Purpose Bldg.

Isabela West E/S IX 0.459 C 0.397 - 0.500 - - - 89.70 89.70% V. Satisfactory

PIBS Trading & Construction 14734

Rehab. of DPWH - Lanao del Norte DEO Bldg. & Emloyees'

QuarteerX 2.814 O 0.346 0.274 0.100 0.030 0.019 0.067 83.60 -

Pietras Builders Inc. 26738Slope Protection & Reblocking

of Sabulawan-Calaguise-Colubian Road Section

VIII 2.340 C 0.399 0.200 0.300 - - - 89.90 *89.90% V.Satisfactory

Pins Construction 13630 Rehab. of Drainage System San Pedro District IX 0.929 C 0.375 - 0.500 - - - 87.50 88.94%

V. Satisfactory

Pins Construction 13630 Repair of Farm to Market Road, Poblacion-Tambo X 0.192 C 0.288 0.254 0.300 - - - 84.20 *84.20%

V. Satisfactory

PJ Construction & Supply 32305 Const. of MPB Btgy. Panacan 2 IVB 0.474 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding

PJ San Pedro Const. And Supply 14994 Completion of Multi-Purpose

Gymnasium DOST 10.426 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -

PJ San Pedro Const. Supply 14994 Const. of Roads Brgy. 18-B XI 0.414 C 0.397 - 0.500 - - - 89.70 89.70%

V. Satisfactory

PJ San Pedro Const. Supply 14994 Rehabilitation of Road @ Purok

5-Panalum Proper XI 0.365 O 0.373 0.000 0.100 0.030 0.033 0.100 63.60 -

PLD Construction 1859Asphalting of Brgy. Road 1: Dungoan, 2 San Isidro and 3

TacdogVII 1.646 C 0.437 - 0.500 - - - 93.70 93.70%

Outstanding

PLD Construction 1859 Const. of Multi-Purpose Bldg. (Phase III) VII 1.929 C 0.494 - 0.500 - - - 99.40 99.40%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 324

Page 333: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

PLD Construction 1859 Const. of Pedestrian Overpass VII 2.986 C 0.374 0.281 0.300 - - - 95.50 91.36% Outstanding

PLD Construction 1859Opening/Conc. of Cebu-Toledo

Wharf Road, Linao-Talisay-Minglanilla

VII 18.693 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -

PLD Construction 1859 Rehab. of Processional Rd. Including Const. of Bridge VII 1.274 O 0.325 0.300 0.100 0.030 0.040 0.100 89.50 -

PMC Construction Corporation 1630

Const. of Covered Basketball Court & Renovation of Viewdeck

at BLCNHA 5.657 C 0.371 0.300 0.300 - - - 97.10 98.57%

Outstanding

Polangui Construction 8660Repair/Rehab. of Unpaved

Shoulder with Reblocking San Jose

V 0.360 C 0.368 - 0.500 - - - 86.80 86.80% V. Satisfactory

Polangui Construction 8660 Road Const./Rehab. @ Bongoran V 0.377 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V.Satisfactory

Polymer-vic Construction 6157 Const. of 2 CL School Bldg. @ Luakan NHS III 0.865 C 0.293 0.090 0.300 - - - 68.30 86.43%

V.Satisfactory

Polymer-vic Construction 6157 Const. of Concrete Revetment @ Brgy. Pagalanggang III 0.855 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo

Road (Phase I)III 4.794 O 0.358 0.298 0.100 0.030 0.023 0.100 90.90 -

Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo

Road (Phase II)III 4.794 O 0.389 0.300 0.100 0.030 0.023 0.100 94.20 -

Polymer-vic Construction 6157 Repair and Rehab. Along Roman Expressway (Phase I) III 9.950 C 0.346 0.300 0.300 - - - 94.60 *94.60%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 325

Page 334: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Postema Construction & Development 15283

Conc. of Brgy Road going to Bulihan Cemetery, Brgy. Old

BulihanIV-A 1.901 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

Postema Construction & Development 15283 Conc. of FMR @ Sitio Payad,

Brgy. Pulong Bunga IV-A 0.390 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

Postema Construction & Development 15283 Concreting of Sitio Ilang-Ilang

Brgy. Batas FMR IV-A 0.952 C 0.306 - 0.500 - - - 80.60 83.42% V. Satisfactory

Postema Construction & Development 15283 Const. of Brgy. Hall at Medina IV-A 0.665 C 0.432 - 0.500 - - - 93.20 93.20%

OutstandingPostema Construction &

Development 15283 Const. of Multi-Purpose Building IV-A 2.121 C 0.399 0.300 0.300 - - - 99.90 *99.90% Outstanding

Postema Construction & Development 15283 Const. of Pooc Bridge IV-A 5.703 O 0.400 0.188 0.100 0.030 0.038 0.100 85.60 -

Postema Construction & Development 15283

Repair of Flood Control & Drainage System @ Timala River

Brgy. Cabuco (Baquero Br.)IV-A 0.630 O 0.306 0.200 0.300 - - - *80.60 -

Postema Construction & Development 15283 Widening of Tejero Bridge Phase

IV IV-A 8.664 C 0.320 0.300 0.300 - - - 92.00 87.56% V. Satisfactory

Power Move Builders & Construction Supply 22894

MBC CY 2004 Dumaguete Airport Road & DSR, DPR, DNR,

BKRVII 2.710 C 0.443 - 0.000 - - - 44.30 58.10%

Poor

PRC Construction 16631 Addalam River Irrigation Project NIA 2.607 C 0.300 0.240 0.300 84.000 *84.00% V. Satisfactory

PRC Construction 16631 Const. of 1-CL Acad Bldg., at Sanchez Mira C/S II 0.359 C 0.319 - 0.500 - - - 81.90 81.90%

V. Satisfactory

PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-02-06) NIA-II 4.804 C 0.389 0.200 0.000 0.015 0.028 0.200 83.19 83.19%

V.Satisfactory

PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-05-06) NIA-II 3.008 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 326

Page 335: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

PRC Construction 16631 Lapogan Communal Pump Irrigation Project NIA-II 5.541 C 0.261 0.240 0.300 - - - 80.10 80.80%

Satisfactory

Presli Deles Construction 22694Const. One (1) unit CL modified

std. Sch. Bldg., Brgy. Upper Laperian

IX 0.487 C 0.371 0.193 0.300 - - - 86.40 *86.40% V. Satisfactory

Prime Edge Construction & Concrete Products 7902 Concreting of Road at Camp 7

Brgy. CAR 0.961 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory

Prime Edge Construction & Concrete Products 7902 Concreting of Road, Salud Mitra

Brgy. CAR 0.573 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding

Prime Edge Construction & Concrete Products 7902

Const. of Road at Sto. Tomas Brgy. Sto. Tomas Proper leading

to Adiwang E/SCAR 1.233 C 0.389 0.300 0.300 - - - 98.90 92.66%

Outstanding

Prime Edge Construction & Concrete Products 7902

Const./ Rehab. of Health Facilities, Campo Filipino Health

Center Campo Pilipino Health District

CAR 1.924 C 0.376 0.178 0.300 - - - 85.40 85.89% V. Satisfactory

Primitivo P. Eslabon Construction and Hardware 21904 Const. of Sta. Marcela Hall &

Pudtol Mun. Hall CAR 1.405 C 0.444 - 0.500 - - - 94.40 76.67% Satisfactory

Prodel Construction and Development Corporation 10839 Const. of School Bldg. @

Malabobo E/S I 0.864 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory

Progressive Design & Construction 11826 Conc. of Camestizoan FMR I 0.190 C 0.328 0.300 0.300 - - - 92.80 *92.80%

Outstanding

Progressive Design & Construction 11826

Const. of FMR, Poblacion East Leading to Brgy. Sagneb, Arnap

& BelenI 0.474 C 0.200 - 0.500 - - - 70.00 70.00%

Fair

Progressive Design & Construction 11826 Const. of Multi-Purpose Building

@ University of Northern Phils. I 0.569 O 0.393 0.204 0.100 0.020 0.018 0.100 83.50 -

Progressive Resign & Construction 11826 Construction of Academic Bldg

I. DOST 4.295 O 0.353 0.241 0.07 0.015 0.028 0.1 80.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 327

Page 336: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

P-Square Contracting Services 17963 Const. of Brgy. Roads at

Munting Tubig IVA 0.193 C 0.364 0.200 0.300 - - - 86.40 79.80% Satisfactory

P-Square Contracting Services 17963 Const. of Brgy. Roads at Pangao IVA 0.193 C 0.376 0.200 0.300 - - - 87.60 85.32%

V. Satisfactory

Pulsar Construction 24422 Completion of Abbag Bridge & Approaches II 24.514 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V.Satisfactory

Pulsar Construction 24422 Conc. of Nabannaga West New Orlins-Cabatacan East Rd. II 11.984 C 0.386 - 0.500 - - - 88.60 83.20%

V. Satisfactory

Pulsar Construction 24422 Conc. Paving of Jct. Logac-Lasam-Gagabutan Road II 8.674 C 0.350 0.283 0.300 - - - 93.30 93.30%

Outstanding

Pulsar Construction 24422

Rehab. of Pinacanauan Bridge's Approaches & Extension of

River Bank Protection & Dredging works Phase IV

II 9.524 C 0.296 0.300 0.300 - - - 89.60 *89.60% V.Satisfactory

Pulsar Construction 24422

Rehab. of Pinacanauan Bridge's Approaches & Extension of

River Bank Protection Works Phase III

II 4.598 C 0.267 0.300 0.300 - - - 86.70 *86.70% V.Satisfactory

Pulsar Construction 24422 River Control along Cagayan River Basin II 8.611 C 0.347 0.300 0.300 - - - 94.70 85.46%

V.Satisfactory

QM Builders 30743Asphalt Overlay of Santander-Barili-Toledo Road, Camboang

SectionVII 3.294 C 0.260 0.300 0.300 - - - 86.00 *86.00%

V.Satisfactory

QM Builders 30743Asphalting of Sibonga-

Dumanjug Road, Brgy. Bulak Proper Section

VII 1.859 C 0.311 0.220 0.300 - - - 83.10 *83.10% V.Satisfactory

QM Builders 30743 Concreting of Dungo-an-Bolinawan Rd (Cluster C) VII 1.404 C 0.424 - 0.500 - - - 92.40 92.40%

Outstanding

QM Builders 30743 Const. of Flood Control Structure VII 3.555 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 328

Page 337: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

QM Builders 30743 Const. of Multi-Purpose Building VII 1.056 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -

QM Builders 30743 Const. of Pakigne Flood Control VII 2.862 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

QM Builders 30743 Impv't./Concreting of Kang-Actol Brgy. Rd. VII 1.088 C 0.429 - 0.500 - - - 92.90 83.96%

V. Satisfactory

QM Builders 30743 Rehab. & Repair of Brgy. Road @ Brgy. Manlapay VII 0.930 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V.Satisfactory

QM Builders 30743Repair/Rehab. of Sibunga-

Dumanjug Rd. (km. 51+950 - km. 53+298)

VII 9.645 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding

QM Builders 30743 Repair/Rehab. of Tangke Drainage VII 0.918 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V.Satisfactory

QM Builders 30743 Repair/Rehab./Conc. of Trocio St. Brgy. Poblacion VII 5.158 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V.Satisfactory

QM Builders 30743 Repair/Rehab./Impvt. of Simala-Lindogon Brgy. Road VII 9.478 C 0.324 0.300 0.300 - - - 92.40 *92.40%

Outstanding

Quality Builder Corporation 17790 Const. of Two Classroom School Bldg VII 1.350 C 0.425 - 0.500 - - - 92.50 92.50%

Outstanding

Queen City Builders 21535 Concreting of Road @ Sitio Habitat Coronon XI 0.611 C 0.361 - 0.500 - - - 86.10 86.10%

V. Satisfactory

Quezon Victory and Gen. Contractor 6631 Const. of Sta. Cruz Diversion

Dam for Sta. Sta Cruz RIS NIA 78.176 C 0.349 0.22 0.300 - - - 86.33 86.33% V. Satisfactory

Quezon Victory General Contractor 6631 Completion of Multi-Purpose

Bldg at Brgy. 3 Poblacion IV-A 0.235 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding

Quezon Victory General Contractor 6631 Conc. of Bonliw FMR IVB 0.287 C 0.326 0.203 0.300 - - - 82.90 *82.90%

V. Satisfactory

Quezon Victory General Contractor 6631 Conc. of Brgy. Road @ Tanada

St. Brgy. San Vicente IV-A 0.283 C 0.397 0.000 0.300 - - - 69.70 *69.70% Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 329

Page 338: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Quezon Victory General Contractor 6631 Conc. of MSR, Jct. Lopez-

Hondagua Port Road IVA 3.366 C 0.263 0.222 0.300 - - - 78.50 *78.50% Satisfactory

Quezon Victory General Contractor 6631 Conc. Reblocking along MSR

Diversion Road IV-A 0.288 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory

Quezon Victory General Contractor 6631 Concreting of Brgy. Road, Brgy.

Villa Padua IV-A 0.283 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding

Quezon Victory General Contractor 6631

Const. of 2 Storey 2 CL School Bldg., Library Bldg. @ Luis Palad

National H/SIV-A 1.060 C 0.162 0.300 0.300 - - - 76.20 *76.20%

Satisfactory

Quezon Victory General Contractor 6631 Const. of Drainage System at

Brgy. Cotta IV-A 0.755 C 0.473 - 0.500 - - - 97.30 *97.30% Outstanding

Quezon Victory General Contractor 6631 Const. of MPB IV-A 1.460 C 0.315 0.200 0.300 - - - 81.50 *81.50%

V. Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB @ Brgy.

Peñafrancia IV-A 0.333 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB @ Infanta E/S IV-A 1.925 C 0.358 0.200 0.300 - - - 85.80 73.27%

Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB, Brgy. Abo,

Nagcarlan IV-A 1.337 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

Quezon Victory General Contractor 6631 Const. of Multi-Purpose Hall @

Brgy. San Joaquin IV-A 0.862 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

Quezon Victory General Contractor 6631 Impvt. of Water Supply System

@ Brgy. Pacabit IV-A 0.964 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding

Quezon Victory General Contractor 6631

Maintenance, Rehab. & Impvt. of National Arterial Road along

Maharlika HighwayIV-A 9.969 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Quezon Victory General Contractor 6631 Rehab./Impvt. of Quezon-

Batangas Road IV-A 5.746 C 0.363 0.300 0.300 - - - 96.30 88.56% V. Satisfactory

Quirante Construction 32827 Const. of 1 CL Sch. Bldg. @ Balud NHS VII 0.482 C 0.341 0.248 0.300 - - - 88.90 *88.90%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 330

Page 339: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R A Ignacio Construction 29977 Const./Rehab. of MPB NCR 0.942 C 0.302 0.200 0.300 - - - 80.20 *80.20% V.Satisfactory

R L K Construction and Builders 32194 Conc. of Road in Carmen West I 1.925 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

R N V Construction 12570 Conc. of Dapawan-Torrel Road IV-B 4.693 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory

R N V Construction 12570 Rehab./Impvt. of Romblon DEO IV-B 4.693 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -

R N V Construction 12570 Repair/Rehab. of Odiongan North Central E/S IV-B 0.478 C 0.370 0.300 0.300 - - - 97.00 *97.00%

Outstanding

R. A. De Leon Construction 18078 Concreting of Binubusan Brgy. Road IV-A 0.945 C 0.389 - 0.500 - - - 88.90 88.90%

V. Satisfactory

R. Agullo Construction & Enterprises 11109 Const. of MPB @ Brgy. Sto.

Rosario (Phase III) VIII 0.282 C 0.311 0.200 0.300 - - - 81.10 *81.10% V. Satisfactory

R. Agullo Construction & Enterprises 11109 Const. of Sta. Margarita NHS

Bldg. VIII 0.508 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

R. Allosa Construction 12964 Concrete Paving Tabango-San Isidro Rd VIII 3.893 C 0.421 - 0.500 - - - 92.10 92.10%

Outstanding

R. Anin Jr. Construction 14888 Const. of Cabacao Flood Control IV-B 1.926 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

R. Anin Jr. Construction 14888

Resurfacing of Bulalacao-San Jose Jct. Mapaya Road, Paclolo

Section, Km.222+000-Km.225+500

IV-B 0.573 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

R. Agullo Construction & Enterprises 11109 Const. of Health Center @ Brgy.

Can-Uguib VIII 0.233 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

R. B. Ombao Const. 17042 Replacement of Cabcaben Bridge Cabcaben III 4.709 C 0.393 - 0.500 - - - 89.30 73.34%

Satisfactory

R. Calingasan Construction 8173 Conc/ Widening of Road Brgy. IV-A 0.188 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 331

Page 340: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R. D. Ramos Const. & Enterprises 18771 Concreting of Road at Brgy.

Pook ni Kapitan IV-A 0.284 C 0.394 - 0.500 - - - 89.40 89.40% V. Satisfactory

R. G. Diaz Builders & Trading 23814

Const./Repair/Rehab. of Multi-Purpose School Bldg., @

Angeles CityIV-B 0.748 C 0.488 - 0.500 - - - 98.80 98.00%

Outstanding

R. G. Roque Const. & Trading 21788 Rehab. of School Premises @

Mexico National H/S San Carlos III 0.952 C 0.468 - 0.500 - - - 96.80 96.80% Outstanding

R. K. Engineering & Construction 12534

Conc. of Critical Section along National Circumferential

(Salawad-Pawikan-Baso Section)VIII 4.755 C 0.291 0.300 0.300 - - - 89.10 88.20%

V.Satisfactory

R. K. Engineering & Construction 12534 Const. of Biliran NAHS 2 Cl Bldg. VIII 0.830 C 0.340 0.101 0.300 - - - 74.10 *74.10%

Satisfactory

R. K. Engineering & Construction 12534 Const. of Esperanza Drainage VIII 0.095 C 0.320 0.200 0.300 - - - 82.00 76.18%

Satisfactory

R. Ochea Construction & Supplies 15775

Concreting of Toledo-Tabuelan-San Remegio Road, Mangga

Sect.VII 4.675 C 0.385 0.200 0.300 - - - 88.50 89.88%

V. Satisfactory

R. Ochea Construction & Supplies 15575 Const. of Multi-Purpose Building VII 4.748 C 0.399 0.100 0.300 - - - 79.90 85.61%

V. Satisfactory

R. Ochea Construction & Supplies 15775 Const. of Multi-Purpose Building

at Poblacion Tuburan VII 4.748 O 0.373 0.240 0.100 0.015 0.027 0.100 85.50 -

R. R. Encabo Constructors and Traders 14716

Punta- Santa Ana URA Project, URA-MLA-02A 728 Housing

ProjectPRRC 218.4 O 0.33 0.3 0.1 0.03 0.05 0.1 91.34 -

R. R. Seismundo Construction and Supply 10961 Const. of 1 CL School Bldg., at

Montevista NHS, DNAS XI 0.469 C 0.335 0.000 0.100 0.020 0.032 0.100 58.72 60.40% Fair

R. Semilla Construction and Marketing 9263 Const. of Multi-Purpose Bldg.,

Lapulabao XI 0.939 C 0.404 - 0.500 - - - 90.40 59.74% Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 332

Page 341: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R. Semilla Construction and Marketing 9263

Rehab./Impvt. of DPWH Davao del Sur 1st DEO inc. Employees

QuartersXI 7.700 O 0.386 0.240 0.100 0.030 0.041 0.100 89.70 -

R.A. Abaño Construction 11828 Const. of Farm-to-Market Road IV-A 0.653 C 0.347 - 0.500 - - - 84.70 *84.70% V. Satisfactory

R.A. Abaño Construction 11828 Const. of Multi-Purpose Bldg. At Brgy. Malinao-Ilaya IV-A 0.236 C 0.464 - 0.500 - - - 96.40 96.40%

Outstanding

R.A. Del Rosario Construction 4636 Const. of MPB, Brgy. San

Agustin III IV-A 4.778 O 0.322 0.231 0.100 0.015 0.029 0.100 79.70 -

R.A. Del Rosario Construction 4636 Const. of Two (2), Four (4)Cl

School Building IV-A 2.857 C 0.367 0.300 0.300 - - - 96.70 70.17% Satisfactory

R.A. Del Rosario Construction 4636 Rehab./Reconst. (Concreting) of

Indang-Alfonso via Luksuhin Rd. IV-A 39.525 O 0.325 0.300 0.100 0.020 0.028 0.100 87.30 -

R.A. Matias Const. & Developer 26346 Concreting of FTMR @

Poblacion East I 0.480 C 0.259 - 0.500 - - - 75.90 75.90% Satisfactory

R.A. Matias Const. & Developer 26346

Const. of Multi-Purpose San Vicente Brgy. Hall Brgy. San

VicenteI 0.336 C 0.390 - 0.500 - - - 89.00 89.00%

V. Satisfactory

R.A. Montejo Construction 21718 Const. of Box Culvert VIII 0.963 C 0.332 0.200 0.300 - - - 83.20 *83.20% V.Satisfactory

R.A. Montejo Construction 21718 Renovation of Research Bldg. @ Leyte Normal University VIII 0.945 C 0.393 0.300 0.300 - - - 99.30 *99.30%

Outstanding

R.A. Pahati Gravel and Sand 22495

Rehab./Impvt. of Maculcol Dike/Approach including Impvt.

Of Access RoadIII 7.795 C 0.280 0.157 0.300 - - - 73.70 *73.70%

Satisfactory

R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of River Banks

(Abitonan River) III 3.856 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 333

Page 342: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.A. Pahati Gravel and Sand 22495

Rehab./Impvt. of Concrete Slope Protection along Digmala River

ControlIII 4.753 C 0.289 0.300 0.300 - - - 88.90 *88.90%

V. Satisfactory

R.A. Yolangco Construction 15602 Const. of Farm-to-Market Road IV-A 0.962 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

R.A. Yolangco Construction 15602 Const. of MPB (Coop. Union of Cavite) IV-A 1.433 C 0.376 0.247 0.300 - - - 92.30 *92.30%

Outstanding

R.A.M. Builders 10459 Conc. Of Quirino Highway, Quezon Side Phase XIV IV-A 14.420 C 0.255 0.199 0.300 - - - 75.40 *75.40%

Satisfactory

R.A.M. Builders 10549

Const. of Quezon Eco-Tourism Road (LUC-BAT CR) incl. RROW: Phase I, Guisguis-Talaan Sect.,

Conc. Of Guisguis Section

IV-A 17.780 O 0.337 0.300 0.100 0.030 0.037 0.100 90.40 -

R.A.M. Builders 10549 Impvt., Regravelling/Conc. of Road IV-A 14.387 C 0.122 0.300 0.300 - - - 72.20 79.52%

Satisfactory

R.A.M. Builders 10549Rehab./Impvt. of Lucena-

Tayabas Road, Gulang-gulang Sect.

IV-A 19.209 O 0.323 0.300 0.100 0.020 0.030 0.100 87.30 -

R.A.M. Builders 10549 Rehab./Impvt. of MSR-Old Route IV-A 14.328 O 0.315 0.300 0.100 0.020 0.030 0.100 86.50 -

R.A.M. Builders 10549Rehab./Impvt. of San Pablo-

Boundary-Dolores-Pinagdanglayan Road

IV-A 13.424 C 0.313 0.300 0.300 - - - 91.30 90.55% Outstanding

R.B. Basista Construction & Supply 26829 Impvt. of San Isidro-Trujillo Road VIII 4.796 C 0.307 0.200 0.300 - - - 80.70 * 80.70%

V. Satisfactory

R.B. Candare Construction 8819 Conc. of Bay-ang-Calamba Prov. Road XIII 1.896 C 0.354 0.200 0.300 - - - 85.40 *85.40%

V. Satisfactory

R.B. Candare Construction 8819 Const. of MPB (Covered Court) XIII 1.875 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory

R.C. Miranda Construction & Supplies 9036 Conc. of Sta. Ines-Matalapitap

Road Phase II III 5.795 C 0.325 - 0.500 - - - 82.50 80.88% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 334

Page 343: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.C. Tagala Construction 11597 Completion of Multi-Purpose Building VI 2.854 C 0.319 0.147 0.300 - - - 76.60 83.81%

V. Satisfactory

R.C. Tagala Construction 11597 Concreting of Calategas-Aramaywan Rd., Sect. IV-B 2.154 C 0.390 - 0.500 - - - 89.00 89.00%

V.Satisfactory

R.C. Tagala Construction 11597 Concreting of Parian-Cabuluan Road Section IV-B 3.749 C 0.424 - 0.500 - - - 92.40 93.88%

V. Satisfactory

R.C. Tagala Construction 11597 Concreting of Tugdan-Alcantara Looc Road IV-B 2.209 O 0.320 0.240 0.100 0.030 0.047 0.100 83.70 -

R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Road IV-B 28.854 C 0.327 0.300 0.300 - - - 92.70 81.84%

V. Satisfactory

R.C. Tagala Construction 11597 Const. of Barokan Flood Control along MWCR, Phase II IV-B 11.902 C 0.282 0.200 0.300 - - - 78.20 *78.20%

Satisfactory

R.C. Tagala Construction 11597 Const. of Boac River Control IV-B 3.981 C 0.282 - 0.500 - - - 78.20 75.50% Satisfactory

R.C. Tagala Construction 11597 Const. of Libtangin River Control IV-B 4.748 C 0.313 0.296 0.300 - - - 90.90 90.90% Outstanding

R.C. Tagala Construction 11597 Const. of Manggamnan Bridge Approach IV-B 1.672 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -

R.C. Tagala Construction 11597 Const. of Pagbahan Flood Control (Phase I) IV-B 13.920 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -

R.C. Tagala Construction 11597 Const. of Sch. Bldg. (4 CL) Narra Pilot Sch. IVB 3.789 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

R.C. Tagala Construction 11597Const. of Tanjay River Control, Brgys. 1,2,3,4 and San Isidro along the Nautical Highway

VII 9.444 C 0.336 0.247 0.300 - - - 88.30 70.78% Satisfactory

R.C. Tagala Construction 11597 Const. of Taritien Bridge IV-B 4.230 C 0.369 0.300 0.300 - - - 96.90 86.88% V. Satisfactory

R.C. Tagala Construction 11597 Const. of Various School Bldg. (Tagumpay E/S) IV-B 9.043 C 0.393 - 0.500 - - - 89.30 80.34%

V. Satisfactory

R.C. Tagala Construction 11597 Impvt. of Aramaywan-Berong Road IV-B 18.964 C 0.372 0.200 0.300 - - - 87.20 80.06%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 335

Page 344: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road IV-B 18.950 O 0.280 0.225 0.100 0.030 0.033 0.100 76.80 -

R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road IV-B 18.950 O 0.346 0.225 0.100 0.030 0.038 0.100 83.90 -

R.C. Tagala Construction 11597Reblocking of Jct. MWCR-San Jose Airport Rd.-Jct. Bubog

RoadIV-B 9.607 C 0.324 0.171 0.300 - - - 79.50 71.58%

Satisfactory

R.C. Tagala Construction 11597 Rehab. of Existing Asphalt and Const. of Lined Canal IV-B 5.491 C 0.376 - 0.500 - - - 87.60 49.54%

Poor

R.C. Tagala Construction 11597 Repair/Rehab. of FMR VII 0.464 C 0.293 0.300 0.300 - - - 89.30 79.04% Satisfactory

R.D. Cobacha Construction 20833 Const. of ABC Hall VIII 1.280 C 0.350 0.196 0.300 - - - 84.60 72.21% Satisfactory

R.D. Interior Junior Const./J.H. Pajara Const.

Corp. (J.V.)

SL2-SN-000366/JV-

02-019

Const./Impv't. (PCCP) of C.P.B.: Sultan Gumander-Dobliston Jct.

RoadKFAED 608.260 C 0.334 0.300 0.300 - - - 93.40 90.58%

Outstanding

R.D. Interior Junior Construction 6483 Asphalt Overlay along Cordon-

Aurora Brgy. Road II 4.920 C 0.392 0.300 0.300 - - - 99.20 *99.20% Outstanding

R.D. Interior Junior Construction 6483

Conc. of SDCR, Marihatag-Hinatuan-Bislig Section,

(Tagbina-Hinatuan Subsection)XIII 282.908 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -

R.D. Interior Junior Construction 6483 Const. of Runruno Bridge &

Approaches II 7.803 C 0.480 - 0.500 - - - 98.00 97.46% Outstanding

R.D. Interior Junior Construction 6483 Const. of Sinippil Bridge and

Approaches II 13.688 C 0.335 0.277 0.300 - - - 91.20 86.90% V. Satisfactory

R.D. Interior Junior Construction 6483 Const./Asphalting of Dumabato

Norte Brgy. Road II 0.455 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

R.D. Interior Junior Construction 6483 Const./Asphalting of Guinalbin

Brgy. Road II 0.932 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

R.D. Interior Junior Construction 6483 Const./Asphalting of Villa Norte

Brgy. Road II 1.388 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 336

Page 345: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.D. Interior Junior Construction 6483 Impvt. of Maria Clara-Gabriela

Road II 4.783 C 0.312 0.300 0.300 - - - *91.20 91.20% Outstanding

R.D. Interior Junior Construction 6483

Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag & San Vicente Bridge)

XIII 289.168 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -

R.D. Interior Junior Construction 6483

Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)

XIII 289.168 O 0.326 0.300 0.100 0.030 0.038 0.100 89.40 -

R.D. Interior Junior Construction 6483

Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)

XIII 289.168 O 0.294 0.281 0.100 0.022 0.055 0.100 85.20 -

R.D. Interior Junior Construction 6483

Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)

XIII 289.168 O 0.352 0.300 0.100 0.030 0.055 0.100 93.70 -

R.D. Interior Junior Construction 6483 Repair/Maint. of Nat'l Road along

Santiago-Tuguegarao Road II 4.975 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory

R.D. Policarpio & Co., INC. 4414Construction of Overpasses

Project in the Province of Bataan, Pampanga and Tarlac

BCDA 208.033 C 0.351 0.300 0.300 - - - 95.07 91.17% Outstanding

R.D. Policarpio & Company, Inc. / Pumyang

Construction Company, Ltd. (JV)

4414 ADB Sixth Road Impv't. Project CP 6MI-15 IX 740.582 O 0.360 0.300 0.000 0.024 0.037 0.067 78.80 -

R.D. Policarpio Company, Inc. 4414

Contract Package "N": Replacement/Retrofitting of

Three (3) BridgesADB 67.207 O 0.335 0.300 0.000 0.030 0.042 0.000 70.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 337

Page 346: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.D. Policarpio Company, Inc. 4414

CP 6: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston) Baganga Section Phase I

XI 157.077 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -

R.D. Policarpio Company, Inc. 4414

Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to

Mabalacat (Pampanga) Ph-IV Package VII, Replacement of

Tinajero Bridge & App.

III 45.805 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -

R.D. Policarpio Company, Inc. 4414

Sixth Road Project Component CP 4 Gen. Santos-Cotabato City

RoadXII 170.852 O 0.301 0.298 0.000 0.030 0.061 0.067 75.70 -

R.D. Sadsad Const. & Trading 19240 Concrete Reblocking with

Rehab., Impvt. of Rizal Ave, III 5.414 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding

R.D. Sadsad Const. & Trading 19240 Impvt./Rehab. of Anunas-Margot

Road III 2.820 C 0.326 0.200 0.300 - - - 82.60 * 82.60% V. Satisfactory

R.D. Sadsad Const. & Trading 19240

Package 16: Const./Rehab./Impv't. of FMR

Porac, Sta. Rita & GuaguaIII 0.944 C 0.311 - 0.500 - - - 81.10 81.10%

V. Satisfactory

R.D. Sadsad Const. & Trading 19240 Rehab. of Canal @ Brgy. San

Pablo II Road III 0.949 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

R.D. Sadsad Const. & Trading 19240 Rehab. of Road @ Brgy. Gulod

Malagu IV-A 0.960 C 0.387 0.300 0.300 - - - 98.70 *98.70% Outstanding

R.D. Sadsad Const. & Trading 19240 Repair/Rehab., Gapan-San

Fernando-Olongapo (GSO) III 9.653 O 0.348 0.200 0.100 0.030 0.058 0.100 83.60 -

R.D. Sadsad Const. & Trading 19240

Upgrading/Impvt. of San Fernando-Lubao Road (Sto.

Tomas Section)III 4.730 C 0.337 0.300 0.300 - - - 93.70 *93.70%

Outstanding

R.F. Diaz Construction 3398 Const. of School Building at University of Rizal System IV-A 9.609 C 0.155 0.300 0.300 - - - 75.50 69.83%

Fair

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 338

Page 347: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.F. Diaz Construction 3998 Impvt./Completion of Calalay Bldg. @ Sto. Cristo E/S NCR 2.631 C 0.326 0.300 0.300 - - - 92.60 90.99%

Outstanding

R.F. Diaz Construction 3998 Impvt./Rehab. of MPB NCR 2.387 C 0.369 0.300 0.300 - - - 96.90 85.21% V. Satisfactory

R.F. Varquez Const. 24302 Completion of Timamana MPB, Brgy. Timamana XIII 1.638 C 0.332 0.300 0.300 - - - 93.20 *93.20%

Outstanding

R.F.G. Construction 13188 Completion of MPB @ Brgy. Dayano XIII 0.555 C 0.377 0.221 0.300 - - - 89.80 68.73%

Fair

R.F.G. Construction 13188 Concreting of Shoulder along Surigao Wharf Road XIII 7.274 C 0.393 - 0.500 - - - 89.30 83.72%

V. Satisfactory

R.F.G. Construction 13188 Concreting of Surigao-San Juan Lipata Coastal Rd. XIII 1.548 C 0.411 - 0.500 - - - 91.10 84.74%

V. Satisfactory

R.F.G. Construction 13188 Const. of Banahaw Bridge, Phase IV XIII 9.904 C 0.367 0.300 0.300 - - - 96.70 91.30%

Outstanding

R.F.G. Construction 13188 Const. of MPB @ Brgy. 12 XIII 1.925 C 0.336 0.131 0.000 - - - 46.70 68.54% Fair

R.F.G. Construction 13188 Const. of Municipal Public Market, Phase III XIII 1.795 C 0.311 0.300 0.300 - - - 91.10 81.86%

V. Satisfactory

R.F.G. Construction 13188 Const. of Sabang Bridge III Phase V XIII 9.167 C 0.364 0.300 0.300 - - - 96.40 90.14%

Outstanding

R.F.G. Construction 13188 Const. of Sabang Bridge III, Phase IV XIII 4.583 C 0.328 - 0.500 - - - 82.80 79.38%

Satisfactory

R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB XIII 0.927 C 0.343 0.300 0.000 - - - 64.30 71.30% Satisfactory

R.F.G. Construction 13188 Const.Completion of Tayaga Disaster Evacuation Center XIII 0.463 C 0.384 0.224 0.300 - - - 90.80 90.80%

Outstanding

R.G. Diaz Builders & Trading 23814

Package XIV-Const. of Multi-Purpose Bldg. (Covered Court)

@ San Nicolas E/SIII 0.937 C 0.381 0.300 0.300 - - - 98.10 *98.10%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 339

Page 348: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.G. Erillo Construction, Incorporated 932 Widening/Impv't. of Bacolod

South-Kabankalan Rd. VI 9.623 C 0.396 - 0.500 - - - 89.60 90.68% Outstanding

R.G. Florentino Construction & Trading 18301 Concreting of Upper Jun Carlo

FMR IV-B 0.462 C 0.344 0.084 0.300 - - - 72.80 72.80% Satisfactory

R.G. Florentino Construction & Trading 18301 Const. of Brgy. Multi-Purpose

Bldg. Poblacion IV-B 0.268 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory

R.G. Florentino Construction & Trading 18301 Rep./Maintain of Colis RCDG

Bridge Approach Km.019+342 IV-B 0.189 C 0.433 0.500 - - - 93.30 93.30% Outstanding

R.J. Ibarra Construction 23538Asphalt Overlay & Conc.

Reblocking along Olongapo-Bugallon Rd.

III 4.670 C 0.333 0.300 0.000 - - - 63.30 77.34% Satisfactory

R.J. Ibarra Construction 23538 Completion of Bangal Bridge III 5.644 C 0.366 0.237 0.300 - - - 90.30 *90.30% Outstanding

R.J. Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary III 2.062 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -

R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal III 0.930 C 0.272 0.300 0.300 - - - 87.20 83.49% V. Satisfactory

R.J. Ibarra Construction 23538 Const. of MPB @ San Marcelino III 2.072 C 0.305 0.151 0.300 - - - 75.60 76.23% Satisfactory

R.J. Ibarra Construction 23538 Repair/Rehab. of 3-Cl, 1-Storey S/B Bangal E/S III 0.281 C 0.473 - 0.500 - - - 97.30 81.87%

V. Satisfactory

R.J. Ibarra Construction 23538

Repair/Rehab. of Slope Protection along Linasin Creek,

San Marcelino-San Antonio Road

III 1.930 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

R.K.X. Odiamar Construction 16107 Const. of MPB @ Penfrancia V 1.498 C 0.365 0.200 0.300 - - - 86.50 *86.50%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 340

Page 349: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.M. Nuñez Construction 26206Asphalt Overlay of Ninoy Aquino Ave., North Bound Kabihasnan

Duty Free w/ exceptionNCR 4.937 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

R.M. Nuñez Construction 26206 Const. of Lower Bicutan Bridge NCR 3.297 C 0.235 0.200 0.300 - - - 73.50 *73.50% Satisfactory

R.M. Padillo Builders 31206 Completion of MPB @ Remedios T. Romualdez Elem. Sch. VIII 0.964 C 0.274 0.200 0.300 - - - 77.40 *77.40%

Satisfactory

R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ Alang-alang NHS VIII 0.503 C 0.364 0.200 0.000 - - - 56.40 71.10%

Satisfactory

R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ San Jose NHS VIII 0.501 C 0.381 0.100 0.300 - - - 78.10 *78.10%

Satisfactory

R.M. Padillo Builders 31205 Const. of Reinforced Concrete Box Culvert (RCBC) VIII 2.830 C 0.358 0.300 0.300 - - - 95.80 70.36%

Satisfactory

R.M. Padillo Builders 31206

Repair/Replacement of Lined Canal & Road Embankment

Protection at Daan Maharlika km. 903+400 - km. 906+200

VIII 2.848 C 0.337 0.200 0.300 - - - 83.70 83.64% V.Satisfactory

R.M. Pingol Const. & Dev't. Corporation 11163

CP IV-A, Jct. Maharlika Highway-Jaen-San Isidro Rd.(Km.98+453.0 to Km.105+256.275) w/ exception

III 34.837 O 0.372 0.300 0.000 0.012 0.025 0.033 74.20 -

R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road III 4.026 C 0.361 - 0.500 - - - 86.10 86.10% V.Satisfactory

R.M. Vitug Construction 9227 Const. of MPB III 0.931 C 0.313 0.200 0.300 - - - 81.30 83.89% V. Satisfactory

R.M. Vitug Construction 9227 Const./Impvt. of San Jose Road III 5.703 C 0.328 0.200 0.300 - - - 82.80 *82.80% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 341

Page 350: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.M. Vitug Construction 9227 Const./Repair/Rehab. of Various Road Brgy. Cutcut III 3.380 C 0.416 - 0.500 - - - 91.60 91.60%

Outstanding

R.M. Vitug Construction 9227 Improvement of Multi-Purpose Building III 0.187 C 0.437 - 0.500 - - - 93.70 90.34%

Outstanding

R.M. Vitug Construction 9227 Repair/Rehab. of Retaining Wall and Drainage Out Fall III 0.468 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

R.M. Vitug Construction 9227 Riprapping of Balimbing River, Country Homes, NCR 0.958 C 0.350 - 0.500 - - - 85.00 *85.00%

V. Satisfactory

R.M.A.J. Construction 18623 Conc. of Manburao-Paluan Rd. (Tayamaan Sect.) IV-B 1.433 C 0.327 - 0.500 - - - 82.70 65.24%

Fair

R.M.A.J. Construction 18623 Concreting of Paclolo FMR IV-B 0.937 C 0.409 - 0.500 - - - 90.90 90.90% Outstanding

R.M.A.J. Construction 18623 Rehab. of Abut. B of Mompong Bridge Approach "B" IV-B 2.894 C 0.317 0.300 0.300 - - - 91.70 *91.70%

Outstanding

R.N.G.M. Construction 20281 Const. of Multi-Purpose Pavement III 0.521 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

R.N.G.M. Construction 20281 Water Supply Project @ Brgy. 3 & 4 III 2.353 C 0.311 0.300 0.300 - - - 91.10 85.50%

V. Satisfactory

R.O. Builders & Dev. Corp. 22393Conc. of Aritao-Dupax-Kasibu-

Quirino Road, Mangagyang-Banganan Section

II 6.566 C 0.366 0.172 0.300 - - - 83.80 89.38% V. Satisfactory

R.O. Builders & Dev. Corp. 22393Const. of Banganan Flood

Control, Upstream of Mangayang Bridge

II 2.853 C 0.380 0.300 0.300 - - - 98.00 76.82% Satisfactory

R.O. Builders & Dev. Corp. 22393 Const. of Inaban Bridge and Approaches II 7.939 C 0.472 - 0.500 - - - 97.20 97.20%

Outstanding

R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase IV, Banganan II 14.449 C 0.466 - 0.500 - - - 96.60 94.26%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 342

Page 351: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.O. Builders & Dev. Corp. 22393 Const. of Namamparan Bridge & Approaches II 13.528 O 0.262 0.253 0.070 0.030 0.028 0.067 71.00 -

R.O. Builders & Dev. Corp. 22393

Rehab. of Daang Maharlika Intermittent Section, from

Macate Section, Bambang-San Luis Sect.

II 19.289 C 0.267 0.300 0.300 - - - 86.70 86.40% V. Satisfactory

R.O. Builders & Dev. Corp. 22393 Repair/Maint./Rehab. & Impv't. of Daang Maharlika II 4.180 C 0.286 - 0.500 - - - 78.60 80.64%

V. Satisfactory

R.O. Builders & Development Corporation 22393

Conc. of Aritao-Dupax-Kasibu-Quirino Road, Mangayang

SectionII 16.182 O 0.351 0.279 0.100 0.020 0.033 0.067 85.00 -

R.O.M. Builders 28654 Conc. of Roads in Brgy. Kapito IV-A 0.471 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

R.O.M. Builders 28654 Conc. of Roads, Brgy. Gumamela IV-A 0.477 C 0.307 0.300 0.300 - - - 90.70 *90.70%

Outstanding

R.P. Inducil Construction 8984 Conc. of Roads at Brgy. Poblacion III 0.949 C 0.342 0.300 0.300 - - - 94.20 *94.20%

Outstanding

R.P. Parayno Construction 32862Dredging/Desilting & Const. of

Drainage @ Zone 1 7 III & Calambayan

I 1.435 O 0.364 0.120 0.100 0.020 0.042 0.133 77.90 -

R.R. A. Requillas Construction & Supply 20217 Const. of Revetment V 1.425 C 0.335 0.200 0.300 - - - 83.50 76.54%

Satisfactory

R.R. Encabo Const. & Traders 14716 Const. of 2 CL School Bldg. @

Cristo Rey H/S (ORES) III 0.885 C 0.297 0.272 0.300 - - - 86.90 *86.90% V. Satisfactory

R.R. Encabo Const. & Traders 14716

Punta-Santa Ana URA Project, URA-MLA-02A 728 Housing

ProjectPRRC 218.400 O 0.333 0.300 0.100 0.030 0.050 0.100 91.34 -

R.R. Ricafort Construction 14402 Conc. of FMR @ Brgy. Balayang III 0.614 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 343

Page 352: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.R. Ricafort Construction 14402Conc. of Main Canal @ Rizal St.

(San Gavino-Sta. Barbara Section)

III 2.330 C 0.362 0.200 0.300 - - - 86.20 84.46% V. Satisfactory

R.R. Ricafort Construction 14402 Const. of 1 CL Sch. Bldg. @ Paniqui South Central E/S III 0.480 C 0.263 0.300 0.300 - - - 86.30 * 86.30%

V. Satisfactory

R.R. Ricafort Construction 14402 Const. of 1 CL School Bldg. @ Carangian E/S III 0.376 O 0.356 0.262 0.100 0.030 0.029 0.100 87.70 -

R.R. Ricafort Construction 14402 Const. of North Central E/S III 0.373 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding

R.R. Ricafort Construction 14402Const. of Two (2) Storey 10 CL

Sch. Bldg. at Capas High School (Formerly Sto. Domingo H/S)

III 6.430 C 0.312 0.272 0.300 - - - 88.40 *88.40% V. Satisfactory

R.R. Ricafort Construction 14402 NHA-PNP Camp Macabulos Housing Project NHA 3.124 C 0.38 0.300 0.300 - - - 98.0 98.00%

Outstanding

R.R. Ricafort Construction 14402Repair and Rehab. of

Concepcion-Lapaz Road (Lapaz Section)

III 4.746 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory

R.R. Ricafort Construction 14402Repair/Rehab. of MPB @ Tarlac North Command (North Luzon

Command)III 0.917 C 0.344 0.174 0.300 - - - 81.80 * 81.80%

V. Satisfactory

R.R. Ricafort Construction and Supplies (Formerly:

R.R. Ricafort Construction)14402 Const. of MPB, Brgy. Burgos III 3.004 O 0.302 0.240 0.100 0.000 0.018 0.100 76.00 -

R.R. Seismundo Construction & Supply 10961

Const. of Add'l Two (2) Lanes @ Nabunturan-Mainit Park Rd. Pob.

Nabunturan Sect.XI 3.557 C 0.207 - 0.500 - - - 70.70 77.78%

Satisfactory

R.R. Seismundo Construction & Supply 10961 Const. of One (1) Cl School Bldg.

in New Allegria ES XI 0.384 C 0.367 0.209 0.300 - - - 87.60 84.80% V. Satisfactory

R.R. Seismundo Construction & Supply 10961 Const. of One (1) CL School

Bldg., at Montevista NHS, DNAS XI 0.469 O 0.352 0.000 0.100 0.020 0.032 0.100 60.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 344

Page 353: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.R. Seismundo Construction & Supply 10961 Const. of Two (2) CL Bldg., @

Mawab Nat'l. High School XI 0.723 C 0.475 - 0.500 - - - 97.50 97.50% Outstanding

R.R. Tandem Construction Corporation 12846 Rehab. of Manila North Road III 6.659 C 0.304 0.275 0.300 - - - 87.90 *87.90%

V. Satisfactory

R.S. Reyna Construction 9648 Const. of Inopacan Seawall VIII 4.698 C 0.350 0.200 0.300 - - - 85.00 80.92% V. Satisfactory

R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Maybog (Phase II) VIII 0.469 C 0.221 0.200 0.300 - - - 72.10 *72.10%

Satisfactory

R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Proteccion (Phase II) VIII 0.471 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

R.S. Sepian Construction and Trucking 20519

Impvt./Rehab. Of Bontoc-Lubuagan-Tabuk Rd., Circle-

Caluttit Road CAR 13.470 C 0.325 0.300 0.000 - - - 62.50 63.72%

Fair

R.T. Lim Construction and Supply 17045 Conc. of Road, Pan-ay Diot X 0.877 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

R.T. Lim Construction and Supply 17045

Improvement of Roads Including Drainage, Ozamis-Oroquieta

RoadX 0.803 C 0.381 - 0.500 - - - 88.10 *88.10%

V. Satisfactory

R.T. Morabe Construction 11377 Completion of UP Tacloban Multi-Purpose Bldg. VIII 0.921 C 0.462 - 0.500 - - - 96.20 *96.20%

Outstanding

R.T. Morabe Construction 11377 Conc. of Municipal Road VIII 4.720 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Satisfactory

R.T. Morabe Construction 11377 Conc. of Oras-San Policarpio Road Sect. VIII 9.430 C 0.341 0.109 0.000 - - - 45.00 61.20%

Fair

R.T. Morabe Construction 11377 Const. of Oras-Concepcion-Jipapad Rd VIII 11.428 C 0.385 - 0.500 - - - 88.50 83.46%

V.Satisfactory

R.T. Morabe Construction 11377 Impvt. of ABC Hall VIII 0.192 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory

R.T.Y. Construction 10341 Completion of San Roque Bridge I along Eco-Tourism Road IV-A 14.291 O 0.329 0.240 0.100 0.030 0.042 0.100 *84.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 345

Page 354: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.T.Y. Construction 10341Completion/Continuation of

Unfinished/On-going Bridge, San Roque Bridge I

IV-A 15.324 C 0.380 0.300 0.300 - - - 98.00 87.02% V. Satisfactory

R.T.Y. Construction 10341 Conc. of Bachao-Ibaba FMR IV-B 0.285 C 0.313 0.283 0.300 - - - 89.60 *89.60% V. Satisfactory

R.T.Y. Construction 10341Conc. of Boac-Mogpog

Circumferential Road (Murallon-Tampos Section)

IV-B 6.645 O 0.341 0.300 0.100 0.023 0.022 0.100 88.60 -

R.T.Y. Construction 10341 Conc. of Catanuan-San Roque (Agno) Road IV-A 6.750 C 0.306 0.200 0.300 - - - 80.60 *80.60%

V. Satisfactory

R.T.Y. Construction 10341Conc. of Marinduque

Circumferential Road, Dili Section

IV-B 2.658 C 0.295 0.294 0.300 - - - 88.90 *88.90% V. Satisfactory

R.T.Y. Construction 10341 Conc. of MCR (Bantauyan-Sibucao Section) IV-B 2.620 C 0.315 0.200 0.300 - - - 81.50 *81.50%

V. Satisfactory

R.T.Y. Construction 10341 Conc. of San Narciso-San Andres Road, San Narciso Sect. IV-A 6.750 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V. Satisfactory

R.T.Y. Construction 10341 Conc./Impvt. of Boac-Gasan Nat'l Road IV-B 10.803 C 0.343 0.219 0.300 - - - 86.20 70.54%

Satisfactory

R.T.Y. Construction 10341 Concreting of Sumangga-Magapua-Malusak Section IV-B 2.004 C 0.415 - 0.500 - - - *91.50 91.50%

Outstanding

R.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge IV-A 4.773 C 0.357 0.200 0.300 - - - 85.70 82.46%

V. Satisfactory

R.T.Y. Construction 10341Const. (Completion) of San Roque Bridge I along Eco-

Tourism RoadIV-A 9.573 C 0.378 0.249 0.300 - - - 92.70 *92.70%

Outstanding

R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro Elem. Sch. IV-A 1.020 C 0.398 0.210 0.300 - - - 90.80 *90.80%

Outstanding

R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro National High Sch. IV-A 0.558 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 346

Page 355: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.T.Y. Construction 10341Const. of 2 Classroom 2 Storey School bldg., Lusacan National

High SchoolIV-A 1.435 C 0.369 0.200 0.300 - - - 86.90 *86.90%

V. Satisfactory

R.T.Y. Construction 10341 Const. of 2 Storey 2 CL School Bldg., @ Luis Palad National H/S IV-A 1.439 C 0.396 0.217 0.100 0.030 0.015 0.100 85.80 85.80%

V. Satisfactory

R.T.Y. Construction 10341 Const. of 2-Cl, 2-Storey S/B @ Talao-Talao E/S IV-A 1.405 C 0.447 - 0.500 - - - 94.70 *94.70%

Outstanding

R.T.Y. Construction 10341 Const. of Bagtingon River Control IV-B 4.732 C 0.294 0.300 0.300 - - - 89.40 *89.40%

V. Satisfactory

R.T.Y. Construction 10341 Const. of Flood Control at Brgy. Muliguin IV-A 2.892 C 0.386 0.300 0.300 - - - 98.60 *98.60%

Outstanding

R.T.Y. Construction 10341 Const. of Line Canal IV-A 0.240 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

R.T.Y. Construction 10341 Const. of Magsaysay Elem. School IV-A 0.481 C 0.355 0.200 0.300 - - - 85.50 *85.50%

V. Satisfactory

R.T.Y. Construction 10341 Const. of Multi-Purpose Bldg. (Covered Court) at South E/S IV-A 1.137 C 0.473 - 0.500 - - - 97.30 97.30%

Outstanding

R.T.Y. Construction 10341 Const. of One (1) CL Sch. Bldg. at Brgy. Kalilayan E/S IV-A 0.541 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

R.T.Y. Construction 10341 Const. of Prov. Hospital (Dr. Damian Reyes Memorial Hospital IV-B 6.972 C 0.277 0.240 0.300 - - - 81.70 80.55%

V. Satisfactory

R.T.Y. Construction 10341 Const. of Various FMR (Caganhao B/R) IV-B 5.720 C 0.417 - 0.500 - - - 91.70 82.82%

V. Satisfactory

R.T.Y. Construction 10341Const./Impv't. of Multi-Purpose Bldg. @ Don Gregorio C. Yumul

Sr. E/SIV-A 0.473 C 0.476 - 0.500 - - - 97.60 *97.60%

Outstanding

R.T.Y. Construction 10341 Const./Impv't. of Spillway Bridge IV-A 0.472 C 0.369 0.233 0.300 - - - 90.20 *90.20% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 347

Page 356: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.T.Y. Construction 10341

Rehab./Recont. And Conc. Paving of San Francisco-San

Andres Nat'l Road, San Andres Section

IV-A 19.298 C 0.327 0.300 0.300 - - - 92.70 90.54% Outstanding

R.T.Y. Construction 10341Road Upgrading (Gravel to

Conc.) (HDM4 Project Analysis), Talaba-Summit-Panaon Road

IV-A 14.465 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding

R.U. Aquino Construction 23507 Repair and Rehabilitation of 70 Male and Female Comfort Room DBP 21.506 C 0.339 0.200 0.216 - - - 75.48 75.48%

Unsatisfactory

R.V. Construction 6110

Conc. of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,

km.798+800-km. 803+500 w/ exceptions

VIII 4.275 C 0.385 0.300 0.300 - - - 98.50 83.38% V. Satisfactory

R.V. Construction 6110 Const. of 1 Cl School Bldg. @ Brgy. Cag-Olango E/S VIII 0.477 C 0.275 0.300 0.300 - - - 87.50 *87.50%

V. Satisfactory

R.V. Construction 6110 Const. of Cabay Seawall VIII 2.821 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

R.V. Construction 6110 Const. of Covered Court VIII 1.392 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -

R.V. Construction 6110 Const. of Gandara-Matuguinao Road VIII 0.952 C 0.431 - 0.500 - - - 93.10 *93.10%

Outstanding

R.V. Construction 6110

Impvt./Rehab. of Flood Control Structure along Calbayog-

Catarman Road, Brgy. Oquendo Road Section

VIII 4.820 C 0.353 0.200 0.300 - - - 85.30 85.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 348

Page 357: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.V. Construction 6110 Impvt./Rehab. of Flood Control Structure, Brgy. Tinambacan VIII 3.850 C 0.359 0.200 0.300 - - - 85.90 81.34%

V. Satisfactory

R.V. Construction 6110 Rehabilitation of Gadgaran-Limarayon Brgy. Road VIII 0.952 C 0.307 0.300 0.300 - - - 90.70 *90.70%

Outstanding

R.V. Construction 6110 Repair/Maintenance of Lirang Revetment VIII 0.962 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

R.V. Construction 6110

Widening of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,

km.798+800-km. 803+500 w/ exceptions

VIII 4.275 O 0.190 0.300 0.100 0.020 0.023 0.100 73.30 -

R.V. Construction 6110 Widening of Existing Road, Brgy. Macawat-Brgy. Roxas II VIII 4.820 C 0.271 0.200 0.300 - - - 77.10 84.54%

V. Satisfactory

R.V. Gaitan Merchandising 7075 Const. of MPB @ Guimaras State College VI 1.283 C 0.314 0.200 0.300 - - - 81.40 *81.40%

V. Satisfactory

R.V. Gaitan Merchandising 7075 Const. of MPB @ Sta. Teresa E/S VI 0.419 C 0.370 0.200 0.300 - - - 87.00 80.42% V. Satisfactory

R.V. Gaitan Merchandising 7075 Const. of MPB, San Miguel VI 0.236 C 0.473 - 0.500 - - - 97.30 97.30% Outstanding

R.V. Laborte Builders 20459 Completio of Olongtao MPB IV-A 3.370 O 0.325 0.300 0.100 0.020 0.023 0.100 86.80 -

R.V. Laborte Builders 20459 Concreting of Tiaong By-Pass Road IV-A 9.435 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

R.V. Laborte Builders 20459Concreting of Torrijos-

Buenavista National Road (Phase I)

IV-B 2.869 C 0.422 - 0.500 - - - 92.20 91.00% Outstanding

R.V. Laborte Builders 20459

Concreting of Torrijos-Buenavista Road with exception Km.78+034-Km.78+463 (Marilao

Sect.) and Km.72+300-Km.73+367, Banocboc Section

IV-B 8.687 C 0.314 0.300 0.300 - - - 91.40 90.14% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 349

Page 358: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.V. Laborte Builders 20459 Const. of 1-Cl School Building IV-A 0.376 C 0.295 0.300 0.300 - - - 89.50 *89.50% V. Satisfactory

R.V. Laborte Builders 20459 Const. of 1-Cl School Building @ Jongo E/S IV-A 0.376 C 0.154 0.300 0.300 - - - 75.40 *75.40%

Satisfactory

R.V. Laborte Builders 20459 Const. of 2-Storey, 2-Cl S/B @ Gumaca 1 CS IVA 1.320 C 0.392 - 0.500 - - - 89.20 *89.20%

V. Satisfactory

R.V. Laborte Builders 20459 Const. of MPB @ Maasin Norte E/S IV-A 1.052 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

R.V. Laborte Builders 20459 Const./Impvt. of MSR, Daang Maharlika IV-A 14.457 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

R.V. Laborte Builders 20459Impvt. of (Geometric &

Protective Wall) Tiaong By-Pass Road

IV-A 10.495 C 0.304 0.200 0.300 - - - 80.40 81.78% V. Satisfactory

R.V. Laborte Builders 20459 Impv't./Concreting of Various Municipal Roads IV-B 10.625 C 0.275 - 0.500 - - - 77.50 74.92%

Satisfactory

R.V. Laborte Builders 20459 Rehab. of FMR, Sitio Yungib IV-A 0.383 C 0.347 0.300 0.300 - - - 94.70 85.76% V. Satisfactory

R.V. Laborte Builders 20459Rehab./Impvt. of MSR-Jct.-

Tiaong Dolores Road (Asphalt Section)

IV-A 14.359 C 0.353 0.300 0.300 - - - 95.30 88.16% V. Satisfactory

R.V. Laborte Builders 20459

Rehab./Recont. And Conc. Paving of Mulanay-San

Francisco-San Andres Nat'l Road, San Andres Section

IV-A 9.640 C 0.361 0.300 0.300 - - - 96.10 89.98% V. Satisfactory

R.V. Rieta Trading & Gen. Construction 28671 Conc. of Binakayan Diversion

Road IV-A 9.553 C 0.359 0.300 0.300 - - - 95.90 *95.90% Outstanding

R.V. Rieta Trading & Gen. Construction 28671 Concreting of Roads at San

Rafael III IV-A 0.288 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

R.V. Rieta Trading & Gen. Construction 28671 Const. of 2 Storey MPB IV-A 0.575 O 0.295 0.263 0.100 0.030 0.018 0.100 80.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 350

Page 359: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R.V. Rieta Trading & Gen. Construction 28671 Const. of 4 CL Sch. Bldg. at

Bacoor E/S IV-A 1.720 C 0.260 0.225 0.300 - - - 78.50 *78.50% Satisfactory

R.V. Rieta Trading & Gen. Construction 28671 Const. of Concrete Pathway IV-A 0.191 C 0.295 0.300 0.300 - - - 89.50 *89.50%

V. Satisfactory

R.V. Rieta Trading & Gen. Construction 28671 Impvt. (Conc. Widening) of

Dasmarinas-Carmona Road IV-A 9.553 C 0.255 0.200 0.300 - - - 75.50 *75.50% Satisfactory

R.V. Rieta Trading & Gen. Construction 28671

Slope Protection along Ilang-ilang River, Sta. Rosa & San

Antonio IIIV-A 4.033 C 0.250 0.200 0.300 - - - 75.00 *75.00%

Satisfactory

R2K Builders Construction and Trading 29708 Const. of Sch. Bldg. at Brgy.

High School Poblacion III 1.896 C 0.366 0.269 0.300 - - - 93.50 *93.50% Outstanding

Rabbit Construction & Development Corporation 8545

Completion (Impvt./Conc. Paving) of Licomo-Quiniput

Road, Segment 1 (Sinoropan-Vitali Section)

IX 33.007 C 0.306 0.300 0.000 - - - 60.60 77.46% Satisfactory

Rabbit Construction & Development Corporation 8545 Reconst. of Zamboanga City-

Labuan-Limpapa Road IX 46.600 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -

Rachel Faye Construction 30339 Conc. of Modayan-Kitongan FMR CAR 0.284 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Rachki Enterprises (Formerly: Geto Const.) 17689 Const. of MPB at Bilibiran IV-A 0.288 C 0.306 0.200 0.300 - - - 80.60 83.61%

V. Satisfactory

Rachki Enterprises (Formerly: Geto Const.) 17689

Impvt./Rehab. of Drainage, Marcos Highway (Intermittent

Sections)IV-A 0.956 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Rachki Enterprises (Formerly: Geto Const.) 17689

Riprapping/Impvt. of Various Brgys. (Package II) Upper East

Kamias CreekIV-A 2.586 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

Racso Construction 14601 Const. of DPWH Ifugao DEO, Phase II CAR 2.378 C 0.339 0.118 0.000 - - - 45.70 71.22%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 351

Page 360: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Racso Construction 14601 Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road CAR 1.196 C 0.415 - 0.500 - - - 91.50 82.92%

V. Satisfactory

Racso Construction 14601 Impv't. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Rd. CAR 0.985 C 0.373 - 0.500 - - - 87.30 85.86%

V.Satisfactory

Racso Construction 14601Preventive Maint. Along Nueva

Vizcaya-Ifugao-Mt. Province Bdry. Road

CAR 4.502 O 0.332 0.184 0.100 0.010 0.035 0.067 72.80 -

Racso Construction 14601Widening/Conc. of Banaue-

Hungdan-Tinoc-Benguet Bdry. Road, Gohang-Ujah Section

CAR 1.899 C 0.351 0.088 0.300 - - - 73.90 70.72% Satisfactory

Radiance Traders & Builders 32891 Const. of Aurora DEO III 1.909 C 0.385 0.247 0.300 - - - 93.20 *93.20%

Outstanding

Raf General Construction 6699 Const. of Baguinge-Mappit FMR CAR 0.465 O 0.322 0.196 0.100 0.007 0.030 0.100 *75.50 -

Raf General Construction 6699 Const. of Chico River Flood Control, Bontoc Section CAR 4.815 C 0.248 0.200 0.300 - - - 74.80 *74.80%

Satisfactory

Raf General Construction 6699 Const. of Flood Control X 4.787 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory

Raf General Construction 6699 Const. of MPB @ Upper Jasaan X 1.445 C 0.362 0.259 0.300 - - - 92.10 *92.10% Outstanding

Rain Construction 15959 Const. of Multi-Purpose Pavement @ Alabang E/S NCR 1.717 C 0.389 0.300 0.300 - - - 98.90 *98.90%

Outstanding

Rain Construction 29977 Const./Rehab. of MPB NCR 2.489 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory

Rain Construction 15959 Drainage Impvt.of Aguinaldo St. and Col. Santos St. NCR 2.860 C 0.374 0.200 0.300 - - - 87.40 *87.40%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 352

Page 361: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ramar Enterprises 8092Const. of Iriga Flood Control and

Drainage Structure PNR, San Francisco-San Roque

V 4.618 C 0.434 - 0.500 - - - 93.40 90.10% Outstanding

Ramar Enterprises 8092Deepening/Earthdiking of

Nancascasan River, Balangibang-Apad-Lanigay Sect.

V 19.155 C 0.400 - 0.500 - - - 90.00 *90.00% V. Satisfactory

Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road V 4.738 C 0.371 0.300 0.300 - - - 97.10 91.46% Outstanding

Ramconstrack Dev't Services & Supplies 22821 Rehab. of Old Hospital Building,

Malasin II 1.904 C 0.297 0.200 0.300 - - - 79.70 55.97% Poor

Ramconstrak Dev't Services & Supplies 22821 Conc. of Anting Road II 1.445 C 0.262 0.200 0.300 - - - 76.20 *76.20%

Satisfactory

Ramijo Construction 10963 Const. of MPB VII 0.958 C 0.264 0.300 0.300 - - - 86.40 *86.40% V. Satisfactory

Ramises Construction 17351 Const. of Lake Mainit Circumferential Road XIII 6.219 C 0.454 - 0.500 - - - 95.40 95.40%

Outstanding

Ramona Construction & Enterprises 14661 Const. of Multi-Purpose Bldg VII 0.865 C 0.396 - 0.500 - - - 89.60 71.89%

Satisfactory

Ramona Construction & Enterprises 14661 Repair/Rahab./Impv't. of FMR at

Olo VII 0.372 C 0.413 - 0.500 - - - 91.30 91.30% Outstanding

Ramona Construction and Enterprises 14661

Conc. of Jct. Tubod-Lakewood Nat'l Secondary Road

(Biswangan-Lukuan Section)IX 9.189 C 0.355 0.114 0.300 - - - 76.90 74.86%

Satisfactory

Ramona Construction and Enterprises 14661 Conc. of Midsalip-Sominot Road IX 4.645 C 0.317 0.200 0.300 - - - 81.70 77.98%

Satisfactory

Ramona Construction and Enterprises 14661

Concreting of Siquijor Circumferential Road Sta. 0+000-

Sta.0+130VII 1.867 C 0.341 0.300 0.300 - - - 94.10 92.06%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 353

Page 362: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ramona Construction and Enterprises 14661 Const. of 2 CL School Bldg. @

Payao NHS IX 0.871 C 0.369 0.218 0.300 - - - 88.70 74.00% Satisfactory

Ramona Construction and Enterprises 14661 Const. of MPB Phase 1 IX 4.600 C 0.285 0.169 0.300 - - - 75.40 73.65%

Satisfactory

Ramona Construction and Enterprises 14661 Const. of Multi-Purpose Building VII 4.722 C 0.378 0.168 0.300 - - - 84.60 87.47%

V. Satisfactory

Ramona Construction and Enterprises 14661 Repair/Rehab. of Campalanas to

Lower Cabangcalan Brgy. Road VII 0.928 C 0.341 0.213 0.300 - - - 85.40 *85.40% V.Satisfactory

Ramona Construction and Enterprises 14661 Repair/Rehab. of FMR at

Campalanas-Cangmunag VII 0.744 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory

Ramona Construction and Enterprises 14661 Repair/Rehab. of Licoan (to

Bonga to Capisacan) Brgy. Road VII 0.931 C 0.350 0.206 0.300 - - - 85.60 *85.60% V.Satisfactory

Ramsa Construction 25580 Completion of Home Economics Bldg., Pug-os E/S I 0.283 C 0.473 - 0.500 - - - 97.30 97.30%

Outstanding

Ramsa Construction 25580 Conc. of MNR Solot-Solot Road I 0.608 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Ramsa Construction 25580 Const. of Tagudin Bridge I 0.758 C 0.305 - 0.500 - - - 80.50 *80.50% V. Satisfactory

Ramsa Construction 25580 Improvement/Concreting of FMR Bayubay Sur I 0.473 C 0.375 - 0.500 - - - 87.50 87.50%

V. Satisfactory

Ramsa Construction 25580 Impv't./Concreting of Farm-to-Market Road, Brgy. Nanerma I 0.472 C 0.285 - 0.500 - - - 78.50 78.50%

Satisfactory

Rano's Construction 11433 Const. of Public Market XII 1.366 C 0.358 0.300 0.300 - - - 95.80 62.62% Fair

Rano's Construction 11433 Repair/Rehab. & Impv't. of Cabidianan-Mainit Sect. XI 4.815 C 0.300 - 0.500 - - - 80.00 80.00%

Satisfactory

Rasec Builders & General Merchandise 13866 Const. of MPB @ Brgy.

Caduawan VII 0.186 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 354

Page 363: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Raykin Construction and Supply 14404 Const. of School Bldg., @

Tagum National High School XI 0.944 C 0.437 - 0.500 - - - 93.70 88.94% V. Satisfactory

Raykin Construction and Supply 14404 Improvement of National Road

along Cateel-Baganga Section XI 9.434 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory

Raykin Construction and Supply 14404 Impv't. of Roads along Caraga

Sect. XI 4.704 C 0.384 - 0.500 - - - 88.40 88.82% V. Satisfactory

Raykin Construction and Supply 14404 Impvt./Rehab. of Lumao-San

Antonio Section XI 9.209 C 0.331 0.200 0.300 - - - 83.10 83.34% V.Satisfactory

Raymundo H. Tecson Const. 21681 Impv't./Concreting of Baguio-

Cadalian Road XI 4.091 C 0.447 - 0.500 - - - 94.70 71.48% Satisfactory

Raymundo H. Tecson Construction 21681 Const. of Bridge @ Purok 2 XI 1.354 C 0.302 - 0.500 - - - 80.20 *80.20%

V. Satisfactory

RBM Construction 5961 Const. of Multi-Purpose Bldg. Brgy. Gen. Luna III 0.468 C 0.451 - 0.500 - - - 95.10 73.82%

Satisfactory

RBM Construction 5961 Const. of Salian Concrete Revetment Brgy. Salian III 0.470 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

RBT Construction 15290 Impv't. of Multi-Purpose Bldg., @ Brgy. Nangkaan IV-A 0.191 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. SatisfactoryRCD Gen. Contractor &

Construction Supply 21616 Rehab. of Don Andres, Valdez & Ferdinand Road I 2.143 C 0.425 - 0.500 - - - 92.50 92.50%

Outstanding

RCD General Contractor & Construction Supply 21616 Completion of Banna Multi-

Purpose Hall I 2.850 C 0.386 0.200 0.300 - - - 88.60 85.94% V. Satisfactory

RCD General Contractor & Construction Supply 21616 Const. of MPB (Phase I) at Brgy.

Madamba I 0.379 C 0.194 0.300 0.300 - - - 79.40 *79.40% Satisfactory

RCDG Construction Corp. 5063

Impv't./Widening of Z.C. West Coast Road (Caragasan-Maasin Sect.) & Const. of 1 Barrel RCBC with exception of Maasin Bridge

IX 11.560 O 0.382 0.239 0.100 0.030 0.058 0.100 90.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 355

Page 364: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

RCDG Construction Corp. 5063Widening of Zamboanga City West Coast Road, Const. of

Three (3) Barrels RCBCIX 4.678 O 0.349 0.240 0.100 0.030 0.059 0.100 87.80 -

R'Cel General Contractor & General Merch. 13385 Concreting of Mabunga-San

Isidro Brgy. Road IV-A 0.471 C 0.398 - 0.500 - - - 89.80 89.80% V. Satisfactory

R'Cel General Contractor & General Merch. 13385 Concreting of Road at Hugo St.

Brgy. San Antonio IV-A 0.476 C 0.415 - 0.500 - - - 91.50 91.50% Outstanding

R'Cel General Contractor & General Merch. 13385 Const. of FTM Road @

Nagcarlan-Calauan Road IV-A 2.336 C 0.451 - 0.500 - - - 95.10 *95.10% Outstanding

R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sta. Ana IV-A 0.955 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sto. Angel

Sur IV-A 0.955 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory

R'Cel General Contractor & General Merchandise 13385 Const. of Academic Classroom

at Prudencia Fule NHS IV-A 1.465 C 0.353 0.259 0.300 - - - 91.20 *91.20% Outstanding

R'Cel General Contractor & General Merchandise 13385 Const. of Atingay Suspension

Bridge (Phase II) IV-A 2.192 C 0.308 0.278 0.300 - - - 88.60 *88.60% V. Satisfactory

R'Cel General Contractor & General Merchandise 13385 Const. of Drainage System IV-A 0.479 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

R'Cel General Contractor & General Merchandise 13385 Const. of FMR, Brgy. Bubukal IV-A 1.911 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

R'Cel General Contractor & General Merchandise 13385 Const. of Three (3) Storey, Six

(6) Classroom IV-A 4.776 O 0.397 0.180 0.100 0.023 0.053 0.067 82.00 -

R'Cel General Contractor & General Merchandise 13385 Const./Completion of Limao-

Perez Bridge IV-A 14.250 C 0.340 0.200 0.300 - - - 84.00 77.85% Satisfactory

R'Cel General Contractor & General Merchandise 13385 Const./Conc. of Tala-Malasena

FMR IV-A 1.896 C 0.290 0.293 0.300 - - - 88.30 *88.30% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 356

Page 365: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

R'Cel General Contractor & General Merchandise 13385 Impvt. of FMR at Brgy. San

Agustin IV-A 0.477 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory

R'Cel General Contractor & General Merchandise 13385 Repair/Rehab. of FMR, Brgy. San

Andres & San Ildefonso IV-A 0.478 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory

RD Cobacha Construction 8878 Const. of MPB @ Brgy. Lamak VIII 0.950 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory

RD Cobacha Construction 8878 Const. of MPB, Andaya Bldg., Naval Institute of Technology VIII 0.950 C 0.183 0.249 0.300 - - - 73.20 78.80%

Satisfactory

RD Cobacha Construction 8878 Const. of Shoreline Protection, Phase II District I VIII 0.723 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

RD Cobacha Construction 8878 Rehab./Impvt. of Bangon Flood Control VIII 1.920 C 0.371 0.200 0.300 - - - 87.10 89.38%

V. Satisfactory

RD Cobacha Construction 8878 Repair of Main DPWH Bldg., Eastern Samar DEO VIII 0.856 C 0.400 0.194 0.300 - - - 89.40 *89.40%

V.Satisfactory

RD Cobacha Construction 8878 Road Opening / Rehab. of FMR @ Tangay-Aligarog Road VIII 2.829 C 0.324 0.200 0.000 - - - 52.40 *52.40%

Poor

RD Pimentel Construction 19487 Completion of Multi-Purpose Building CAR 0.282 C 0.451 - 0.500 - - - 95.10 *95.10%

Outstanding

RD Pimentel Construction 19487Const. of Flood Control @ Magsaysay Private Road

BarangayCAR 0.953 C 0.267 0.200 0.300 - - - 76.70 *76.70%

Satisfactory

RDF Construction and Supply 12843 Const. of Barangay Hall @

Tubod XI 0.561 C 0.357 - 0.500 - - - 85.70 81.22% V. Satisfactory

RDF Construction and Supply 12843 Const. of MPB @ F. Bustamante

E/S XI 0.809 C 0.367 0.300 0.300 - - - 96.70 88.72% V.Satisfactory

RDG Construction & Supply (Formerly: RDG

Construction)19488

Const. of Multi Purpose Pavement @ Bastida E/S

Science ParkXI 1.181 C 0.346 0.300 0.300 - - - 94.60 93.04%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 357

Page 366: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Readycon Trading & Const. Corp. 15452

Repair & Maint. of Nat'l Road & Bridges (Asphalt Overlay) alon

P. Burgos-Potatanin Road (Malicboy Section)

IV-A 9.949 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

Readycon Trading & Const. Corp. 15452

Repair/Impvt. Asphalt Overlay of Marikina-Victoria Valley-Antipolo

RoadIV-A 14.430 C 0.286 0.200 0.300 - - - 78.60 *78.60%

Satisfactory

Readycon Trading & Const. Corp. 15452 Repair/Rehab. of MSR Old Route IV-A 14.401 C 0.274 0.200 0.300 - - - 77.40 *77.40%

Satisfactory

Rebsons Construction 17118 Const. of Mambalili-Sitio Bong FMR XIII 7.545 C 0.400 0.200 0.300 - - - 90.00 88.26%

V. Satisfactory

Red Mole Construction 15710 Const. of Uyugan Diversion Road II 1.922 C 0.417 - 0.500 - - - 91.70 91.70%

Outstanding

Red Scorpion Construction & Supply 32046 Completion of San Roque E/S NCR 0.812 C 0.355 0.300 0.300 - - - 95.50 *95.50%

Outstanding

Red Scorpion Construction & Supply 32045 Const. of Multi-Purpose Hall,

Brgy. Guitnang Bayan I IV-A 0.958 C 0.226 0.281 0.300 - - - 80.70 *80.70% V. Satisfactory

Redcar Trading & Construction 27368 Const. of Multi-Purpose Hall at

Topland NCR 1.878 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding

Redcar Trading & Construction 27368

Impvt. of Multi-Purpose Pavement @ Victoria Homes E/S

(Tunasan E/S Annex)NCR 2.372 C 0.387 0.206 0.300 - - - 89.30 *89.30%

V. Satisfactory

Redcar Trading & Construction 27368 Renovation of MPB, Rainbow

Village, Brgy. San Isidro NCR 1.428 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Redcar Trading & Construction 27368 Repair/Rehab. of MPB NCR 2.383 C 0.391 0.300 0.300 - - - 99.10 92.52%

Outstanding

Redcar Trading & Construction 27368

Repair/Rehab. of MPH, JPA Subdivision (Biason Covered

Court)NCR 1.152 C 0.294 0.200 0.300 - - - 79.40 *79.40%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 358

Page 367: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

REE Construction 10342 Conc. of FMR @ Brgy. Luna IVA 0.374 C 0.397 - 0.500 - - - 89.70 *89.70% V. Satisfactory

REE Construction 10342 Conc. of Road at Brgy. Bulihan IVA 0.471 C 0.357 0.216 0.300 - - - 87.30 *87.30% V. Satisfactory

Regenterprises Const. *Fabrication* Supplies &

Gen. Services17177

Conc. of Bambang-Kasibu-Solano National Road, Caloocan

SectionII 9.349 C 0.274 0.300 0.300 - - - 87.40 *87.40%

V. Satisfactory

Regenterprises Const. *Fabrication* Supplies &

Gen. Services17177 Const. of Abatan E/S School

Bldg. II 0.442 C 0.328 0.137 0.300 - - - 76.50 71.32% Satisfactory

Regenterprises Const. *Fabrication* Supplies &

Gen. Services17177 Const. of Drainage along Daang

Maharlika II 4.649 O 0.310 0.157 0.100 0.030 0.044 0.200 84.10 -

Regional Infrastructure Development Corporation 26373 Conc. of Bah-bah-Prosperidad

Road XIII 2.819 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Conc. of Talacogon-La Paz Road XIII 9.593 C 0.326 0.200 0.300 - - - 82.60 81.01%

V. Satisfactory

Regional Infrastructure Development Corporation 26373 Conc. of Trento-Bislig Road

(Salvacion Section XIII 9.580 C 0.267 0.300 0.300 - - - 86.70 84.72% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Conc. of Zillovia Road Section

along Talacogon San Luis Road XIII 2.342 C 0.388 0.200 0.300 - - - 88.80 92.94% Outstanding

Regional Infrastructure Development Corporation 26373 Concreting of Brgy. Marbon

along Secondary Road XIII 1.885 C 0.299 0.300 0.300 - - - 89.90 89.12% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Concreting of Osmeña-

Magkiangkang Road XIII 2.780 C 0.234 0.300 0.300 - - - 83.40 89.58% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Concreting of Talacogon-DPWH

Road Section XIII 2.330 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Const. of Mas-Omot Road,

Prosperidad ARC XIII 24.656 C 0.339 0.300 0.300 - - - 93.90 91.34% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 359

Page 368: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Regional Infrastructure Development Corporation 26373

Gravelling of Talacogon-La Paz-Loreto-Veruela-Sta. Josefa

Circumferential Rd., Desamparados-Osmena-Silco-

Waloe Sect.

XIII 11.515 C 0.250 0.200 0.300 - - - 75.00 73.68% Satisfactory

Regional Infrastructure Development Corporation 26373

Restoration of Andanan Bank Protection & Installation of Spur Dike along Agusan-Davao Road

XIII 10.792 C 0.237 0.186 0.300 - - - 72.30 84.27% V. Satisfactory

Regional Infrastructure Development Corporation 26373 Restoration of Shore Protection,

Afga Slip Agusan-Davao Road XIII 7.493 C 0.306 0.200 0.300 - - - 80.60 80.30% V. Satisfactory

Reko General Konstruct 14663 Conc. of Baguio-Itogon-Dalupirip Rd. km. 248+906.5-km. 249+119.5 CAR 2.890 C 0.328 0.200 0.300 - - - 82.80 *82.80%

V. Satisfactory

Reko General Konstruct 14663Conc. of Gurel-Bokod-Kabayan Buguias Road, km. 304+240-Km.

394+978CAR 6.669 C 0.355 0.100 0.300 - - - 75.50 81.53%

V. Satisfactory

Rely Construction & Supply 10433 Conc. of Bislig-Trento Road XIII 18.949 C 0.152 0.300 0.300 - - - 75.20 73.82% Satisfactory

Rely Construction & Supply 10433 Conc. of Juction Lingig-Trento Road XIII 28.878 O 0.342 0.212 0.100 0.030 0.043 0.100 82.70 -

Rely Construction & Supply 10433 Const. of Bigaan Bridge XIII 14.383 C 0.230 0.200 0.300 - - - 73.00 76.90% Satisfactory

Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon XI 1.886 C 0.379 0.060 0.300 - - - 73.90 76.60% Satisfactory

Rely Construction & Supply 10433 Const. of Flood Control XI 4.381 C 0.301 0.200 0.300 - - - 80.10 84.30% V. Satisfactory

Rely Construction & Supply 10433Const. of Libuganon Flood

Control crossing Agusan-Davao River, Tagum-Asuncion Area

XI 9.436 C 0.201 0.300 0.300 - - - 80.10 77.40% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 360

Page 369: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Rely Construction & Supply 10433Const. of Pigsapawan Bridge & Approaches, Tibanban-Lavigan

RoadXI 10.792 C 0.302 0.300 0.300 - - - 90.20 79.16%

Satisfactory

Rely Construction & Supply 10433 Impvt. of Cadalian-Baguio Road XI 14.164 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -

Rely Construction & Supply 10433 Impvt./Rehab. of Dapnan-Lambajon Section XI 9.607 C 0.336 0.200 0.300 - - - 83.60 85.34%

V. Satisfactory

Rely Construction & Supply 10433 Impv't/Conc. of Calinan-Baguio-Cadalian Road XI 9.599 C 0.345 0.287 0.300 - - - 93.20 93.20%

Outstanding

Rely Construction & Supply 10433 Rehab./Impv't. of Damian Reyes Memorial Road (Boac Side) IV-B 14.244 C 0.241 0.300 0.300 - - - 84.10 *84.10%

V. Satisfactory

Rely Construction & Supply 10433

Rehab./Impv't. of Tagum-Asuncion-Kapalong-Sto. Tomas-

Dapecol-Panabo Circ. Road, Kapalong-Sto. Tomas Sect.

XI 14.461 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Rely Construction & Supply 10433 Rehab./Repair of Butuan City-Masao Port Road XIII 4.469 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

Rely Construction & Supply 10433Repair/Rehab. of T-A-K-ST.-D-P

Circ. Road and Jct. Agusan-Davao Road-Panabo Wharf Road

XI 4.714 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding

Remigio General Construction 2298

Conc. Over Renolith Roads, MMSU-Bakukang Rd.

Cangrunaan Rd. & Mabaleng RdI 2.856 C 0.447 - 0.500 - - - 94.70 93.08%

Outstanding

Remigio General Construction 2298

Const. of Reinforced concrete Flume along Ilocos Norte-Abra

Rd.I 4.742 C 0.311 0.300 0.300 - - - 91.10 *91.10%

Outstanding

Remjie's Construction Development 13768 Conc. of Lino Type St., Four

Estate, San Antonio NCR 1.907 C 0.381 0.200 0.300 - - - 88.10 *88.10% V Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 361

Page 370: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Remjie's Construction Development 13768 Conc. of San Andres St., Ramos

Compound, Sun Valley NCR 1.429 C 0.334 0.200 0.300 - - - 83.40 *83.40% V Satisfactory

Remp Enterprises 25916 Const. of Drainage System @ Mercury St. III 0.465 O 0.310 0.175 0.100 0.030 0.029 0.200 84.40 -

Rene T. Bayawa Construction & Hauling

Services20740 Const. of 1 Unit 2 CL School

Bldg. @ Balok E/S IX 0.757 C 0.275 0.214 0.300 - - - 78.90 *78.90% Satisfactory

Rene T. Bayawa Construction & Hauling

Services20740 Repair/Rehab. of Library Bldg. at

Sindangan NHS IX 0.283 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory

RENZ Const. & Trading 25605 Completion of Itbud Diversion Road II 0.479 C 0.458 - 0.500 - - - 95.80 95.80%

Outstanding

Revere Construction & Supply 17426 Const. of Rancho Bridge &

Approaches IV-A 17.041 C 0.370 0.212 0.300 - - - 88.20 *88.20% V. Satisfactory

Revere Construction & Supply 17426

Rehab./Reconst. of Damaged National Roads, Batangas-Quezon Road, Padre Garcia

Section

IV-A 14.470 C 0.313 0.292 0.300 - - - 90.50 *90.50% Outstanding

Revere Construction & Supply 17426 Road Upgrading of Talisay-

Laurel-Agoncillo Road IV-A 13.506 O 0.323 0.300 0.100 0.030 0.033 0.100 88.60 -

Revere Construction & Supply 17426 Asphalt Overlay of Lipa-Rosario

Road IV-A 13.192 C 0.358 0.200 0.300 - - - 85.80 *85.80% V. Satisfactory

Revere Construction & Supply 17426 Const. of Multi-Purpose Bldg., @

Bilibinwang IV-A 0.336 C 0.364 0.207 0.300 - - - 87.10 *87.10% V. Satisfactory

Revere Construction and Supply 17426 Asphalt Overlay of Brgy.

Poblacion IV-A 1.147 C 0.490 - 0.500 - - - 99.00 *99.00% Outstanding

Revere Construction and Supply 17426 Const. of 2 Cl @ Quiling E/S IV-A 0.770 C 0.265 0.300 0.300 - - - 86.50 *86.50%

V. Satisfactory

Revere Construction and Supply 17426 Rehab. & Impvt. of Lipa-Balete

Road, Km. 77+476 to Km. 80+876 IV-A 9.996 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 362

Page 371: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Revere Construction and Supply 17426 Repair/Improvement of Lipa City

Museum & Library IV-A 1.843 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding

Revere Construction and Supply 17426 Widening/Impvt. of Manila-

Batangas Road, Lipa Section IV-A 9.641 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

Rex E. Morales Construction 17427 Const. of Multi-Purpose

Pavement VIII 0.944 C 0.418 - 0.500 - - - 91.80 *91.80% Outstanding

Reydan Builders 13059 Const. of MPB @ Brgy. Lamba XII 0.950 C 0.376 0.300 0.300 - - - 97.60 97.53% Outstanding

Reydan Builders 13059 Const. of MPB @ Carpenter Hill XII 0.770 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory

Reydan Builders 13059 Const. of Multi-Purpose Bldg., Open Warehouse (Mini-Gym) XI 1.218 C 0.446 - 0.500 - - - 94.60 62.12%

Fair

Reydan Builders 13059 Const. of Multi-Purpose Building (Mini Gym) XI 1.418 C 0.394 0.251 0.300 - - - 94.50 82.95%

V. Satisfactory

Reydan Builders 13059 Const. of Multi-Purpose Building @ Polomolok XII 0.460 C 0.394 - 0.500 - - - 89.40 *89.40%

V. Satisfactory

Reydan Builders 13059 Const. of Pedestrian Overpass XI 4.718 C 0.395 0.293 0.300 - - - 98.80 97.66% Outstanding

Reydan Builders 13059 Const. of San Felipe RCDG Bridge XII 3.856 C 0.387 0.145 0.300 - - - 83.20 84.88%

V. Satisfactory

Reydan Builders 13059 Const. of Shadol I Bridge XII 4.308 C 0.381 0.293 0.300 - - - 97.40 88.91% V. Satisfactory

Reyrose Construction 20748 Conc. of Various Municipal and Brgy. Roads II 1.149 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -

Reyrose Construction 20742 Const. of Drainage System at Centro II 0.942 C 0.296 0.200 0.300 - - - 79.60 *79.60%

Satisfactory

RFN Construction and Development Corporation 8722 Const. of Special Education

Bldg., (Additional 2Cl) NCR 1.444 C 0.290 - 0.500 - - - 79.00 82.90% V. Satisfactory

RGP Builders 20680 Concreting of Malvar-Punta FMR IV-A 1.875 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 363

Page 372: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

RGP Builders 20680 Concreting of Unisan Seawall (Extension) IV-A 0.749 C 0.392 - 0.500 - - - 89.20 89.20%

V. Satisfactory

RGP Builders 20680 Const. of 3 Units School Building with CRs IV-A 1.347 O 0.383 0.300 0.100 0.030 0.022 0.100 93.50 -

RGP Builders 20680 Const. of Water Works System III 0.288 C 0.428 - 0.500 - - - 92.80 *92.80% Outstanding

RGP Builders 20680 Impvt. of Gen. Luna Public Market IV-A 0.478 C 0.250 0.300 0.300 - - - 85.00 *85.00%

V.Satisfactory

RGP Builders 20680Repair/Rehab. of Drainage System along Gen. Luna-

Catanauan RoadIII 1.155 C 0.422 - 0.500 - - - 92.20 *92.20%

Outstanding

RGS Construction 14095 Const. of Various Multi-Purpose Building IX 0.314 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

RGS Construction 14095 Concreting of Purok 4, FMR IX 0.180 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding

RGS Construction 14095 Concreting/Widening of Dipolog-Aurora Road Sinaman IX 3.138 C 0.378 - 0.500 - - - 87.80 87.80%

V. Satisfactory

RGS Construction 14095 Const. of New Two (2) Storey MPB (TESDA) IX 4.722 C 0.316 0.200 0.300 - - - 81.60 74.46%

Satisfactory

RGS Construction 14095Const. of Two (2) Storey Bldg. @

Jose Rizal Memorial State College

IX 1.368 C 0.399 0.200 0.300 - - - 89.90 93.33% Outstanding

RHH Construction 11467 Conc. of Burgos-General Aguinaldo National Road II 18.329 C 0.356 0.300 0.300 - - - 95.60 93.20%

Outstanding

RHH Construction 11467 Conc. of Jct. National Potia Road II 10.697 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 364

Page 373: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

RHH Construction 11467Const. of Dalibubon Bridge

(Remaining Works) and Approaches (Partial Const.)

II 11.337 O 0.228 0.299 0.100 0.018 0.040 0.100 78.50 -

Rhodamay Construction Supply 25989 Const. of Multi-Purpose Bldg.

Sitio Tina Brgy. Tagusao IV-B 0.188 C 0.414 - 0.500 - - - 91.40 91.40% Outstanding

Rhodamay Construction Supply 25989 Const. of Multi-Purpose

Building, Brgy. Poblacion IV-B 0.466 C 0.393 0.136 0.300 - - - 82.90 87.52% V. Satisfactory

Rhodamay Construction Supply 25989 Const. of Panacan River Control IV-B 0.922 C 0.375 - 0.500 - - - 87.50 87.50%

V. SatisfactoryRhodamay Construction

Supply 25989 Const., of E/S Building Brgy. Taritien IV-B 0.282 C 0.230 0.079 0.300 - - - 60.90 63.21%

Fair

Rhodwill Parts and Hardware 18871 Conc. of Davao Oriental-Surigao

Coastal Road XI 13.812 C 0.280 0.300 0.300 - - - 88.00 *88.00% V. Satisfactory

Rhodwill Parts and Hardware 18871 Conc. of Mati-Maragusan Road

(Buso Section) XI 19.298 O 0.275 0.300 0.100 0.030 0.050 0.067 82.20 -

Rhodwill Parts and Hardware 18871 Const. of Manikling Multi-

Purpose Building XI 1.606 C 0.361 0.300 0.300 - - - 96.10 92.18% Outstanding

Rhodwill Parts and Hardware 18871 Improvement of National Road

along Baganga-Cateel Section XI 9.443 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

Rhodwill Parts and Hardware 18871

Impvt. of Manikling-Lavigan Road (Cambaleon-Talisay

Section)XI 14.470 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

Rhodwill Parts and Hardware 18871 Impvt./Rehab. of Manhoc-Ban-ao

Section XI 9.605 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -

Rhodwill Parts and Hardware 18871 Rehab./Impvt. of Compostela-

Cateel Road XI 4.720 C 0.283 0.300 0.000 - - - 58.30 72.88% Satisfactory

Rhodwill Parts and Hardware 18871 Repair of Scoured Approach

Carabatuan Bridge App. A XI 1.924 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 365

Page 374: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Richmar Construction 18797 Conc. of Nabua-Balatan Road (Mang-it Section) V 8.509 C 0.302 0.234 0.300 - - - 83.60 81.02%

V. Satisfactory

Richmar Construction 18797 Conc./Impvt. of Polangui Upland Rd. (Cepres-Itaran Section) V 9.595 C 0.346 0.189 0.300 - - - 83.50 *83.50%

V. Satisfactory

Richmar Construction 18797 Concreting of Irosin-Bulusan Asphalt Road V 3.276 C 0.344 0.208 0.300 - - - 85.20 *85.20%

V. Satisfactory

Richmar Construction 18797

Construction of Checkgate, Canal with Lining & Canal

Structures (Muladbucad Grande CIP)

NIA 3.903 C 0.358 0.087 0.300 - - - 74.40 *74.40% Satisfactory

Richmark Construction 14227 Completion of Antiao Bridge Approaches VIII 3.209 C 0.461 - 0.500 - - - 96.10 70.06%

Satisfactory

Richpil Builders 30923 Widening/Concreting of Binangonan Diversion Rd. IV-A 1.909 C 0.407 - 0.500 - - - 90.70 90.70%

Outstanding

Ricomar Construction 31606 Sch. Bldg. Project (C.P.G. H/S) VII 0.437 C 0.328 0.300 0.300 - - - 92.80 85.31% V. Satisfactory

R-II Builders Inc. 11235 Dev't. of 50-Hectare Reserved Area, NBP Compound, Ph. I NHA 155.77 O 0.380 0.300 0.100 0.030 0.056 0.100 96.6 -

R-II Builders, Inc./J.M. Luciano Const./310 Const.

(JV)JV-01-041

Rehab. of Surigao-Davao Coastal Road (Manay-Mati

Section)IBRD 746.066 C 0.293 0.200 0.300 - - - 79.30 85.36%

V. Satisfactory

R-II Builders,Inc./Bauer Int'l Phil./PhilEco Sys

Corp/Supermax Phils.,Inc.

Consortium

Comp. of Remaining Land Dev. Works,Garbage Disposal,Const

of STPs and Repair of Permanent Housing

NHA 217.993 D 0.374 0.300 0.000 0.018 0.019 0.000 71.10 71.10% Satisfactory

Rim Construction 15938 Conc. of Bulanao-Paracelis Road CAR 3.199 C 0.393 - 0.500 - - - 89.30 87.98% V. Satisfactory

Rim Construction 15938 Rehab./Impvt. of Bontoc-Lubuagan-Tabuk Road CAR 11.469 C 0.302 0.300 0.300 - - - 90.20 *90.20%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 366

Page 375: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ritche-Nathalie Builders and General Merchandise 27501 Concreting to Tangub-Polao

Road X 1.250 C 0.425 - 0.500 - - - 92.50 95.02% Outstanding

Ritche-Nathalie Builders and General Merchandise 27501 Const. of River Control @

Migcanawang River X 4.768 C 0.290 0.300 0.300 - - - 89.00 89.18% V. Satisfactory

Ritche-Nathalie Builders and General Merchandise 27501 Const. of Seawall/Shore

Protection Northern Poblacion X 0.385 C 0.315 - 0.500 - - - 81.50 81.50% V. Satisfactory

Ritche-Nathalie Builders and General Merchandise 27501 Rehab./Impvt. of Bonifacio-Don

Victoriano National Road X 2.860 C 0.328 0.283 0.300 - - - 91.10 71.54% Satisfactory

Ritche-Nathalie Builders and General Merchandise 27501 Repair/Rehab. of Multi-Purpose

Bldg. X 0.475 C 0.381 0.300 0.300 - - - 98.10 85.10% V. Satisfactory

Ritche-Nathalie Builders and General Merchandise 27501 Tangub-Polao By-Pass Road X 8.582 O 0.339 0.300 0.100 0.023 0.045 0.100 90.70 -

Ritz Commercial 19132 Concreting of Dapdap East Brgy. Road IV-A 4.752 O 0.356 0.300 0.050 0.030 0.028 0.067 83.10 -

Ritz Commercial 19132 Impvt. of Rizal-San Jose Road III 9.361 C 0.320 0.200 0.300 - - - *82.00 82.00% V.Satisfactory

Ritz Commercial 19132Impvt./Rehab. Along Daang

Maharlika Road, km. 390+000-km. 390+170, Naguilian-Gamu

II 9.567 C 0.378 0.261 0.300 - - - 93.90 *93.90% Outstanding

Ritz Commercial 19132Impvt./Rehab. Along Ganu-

Roxas Road, km. 408+900-km. 410+000

II 9.566 C 0.340 0.300 0.300 - - - 94.00 *94.00% Outstanding

Ritz Commercial 19132Reblocking/Impvt. of Roman

Expressway Alas-asin Section (Phase I)

III 9.445 C 0.375 0.290 0.300 - - - 96.50 *96.50% Outstanding

Riva Construction 23820 Cluster I- Const. of Various School Bldg. VII 10.280 C 0.363 - 0.500 - - - 86.30 87.98%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 367

Page 376: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

River of Life Engineering Construction & Aggregates 30516 Const. of 2 Storey 4 Cl Sch.

Bldg. @ Benguet NHS CAR 1.640 C 0.302 0.231 0.300 - - - 83.30 *83.30% V.Satisfactory

River of Life Engineering Construction & Aggregates 30516 Impvt. Along Acop-Kapangan-

Kibungan Road CAR 4.775 C 0.335 0.202 0.300 - - - 83.70 *83.70% V.Satisfactory

RKX Odiamar Construction 16107 Const. of Seawall at Kinahulugan V 0.183 C 4.160 - 0.500 - - - 91.60 91.60%

OutstandingRLK Construction and

Builders 32194 Const. of Sch. Bldg. @ Bakit-Bakit E/S I 0.385 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

RM Joyce Construction & Supplies 16642 Const. of Bauan-Mabini Circ.

Road (Mainit Section) IVA 0.664 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding

RM Joyce Construction & Supplies 16642 Const./Impvt. of MPB at

Malimatoc I IVA 0.380 C 0.166 0.200 0.300 - - - 66.60 *66.60% Fair

RM Joyce Construction & Supplies 16642 Const./Rehab. of Road at

Malimatoc II IVA 0.285 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory

RMAJ Construction 18623 Const. of Mompong Flood Control IV-B 0.954 C 0.309 0.205 0.300 - - - 81.40 *81.40%

V. Satisfactory

RMS Builder and Supply 19490 Rehab. of Farm-to-Market Road @ Cangmohao VII 0.932 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -

RNN Construction 24880 Repair/Strengthening of Old Viejo Bridge NCR 3.222 C 0.265 0.300 0.300 - - - 86.50 *86.50%

V.Satisfactory

RNV Construction 12570 Const. of Odiongan Multi-Purpose Bldg. IV-B 0.456 C 0.377 - 0.500 - - - 87.70 87.70%

V. Satisfactory

RNV Construction 12570 Rehab. of Boliganay FMR IV-B 0.901 C 0.352 - 0.500 - - - 85.20 85.20% V. Satisfactory

Road Edge Trading & Development Services 33140 Impvt./Conc. Along Daang

Maharlika II 4.822 C 0.370 0.200 0.300 - - - 87.00 *87.00% V.Satisfactory

Road Edge Trading & Development Services 33140 Impvt./Rehab. of del Carmen-San

Benito Road XIII 4.817 C 0.352 0.200 0.300 - - - 85.20 *85.20% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 368

Page 377: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Road Edge Trading & Development Services 33140 Repair/Rehab. Along del Carmen-

San Benito-Sta. Monica Road XIII 4.817 C 0.324 0.200 0.300 - - - 82.40 *82.40% V.Satisfactory

Road Edge Trading & Development Services 33140 Repair/Rehab. of Jct. Osmeña-

Pilar Road XIII 4.817 C 0.334 0.200 0.300 - - - 83.40 *83.40% V.Satisfactory

Roadtech Construction 17580 Conc.of Brgy. La Paz Road I 1.927 C 0.232 0.300 0.300 - - - 83.20 78.46% Satisfactory

Roadtech Construction 17580 Const. of School bldg., at San Jacinto E/S I 4.699 C 0.498 - 0.500 - - - 99.80 94.62%

Outstanding

Roadtech Construction 17580

Maintenance, Rehab. & Impvt. of Nat'l Road & Secondary Road

(Rehab. Of Drainage & Shoulder along Camiling-Wawa-

Bayambang-Malasiqui-Sta. Barbara)

I 0.998 C 0.350 0.300 0.300 - - - 95.00 *95.00% Outstanding

Roadtech Construction 17580

Rehab./Replacement of Calvo Bridge (Span 4 &5) Carmen Jct.-Bayambang San Carlos-Manat

Road

I 48.246 O 0.300 0.240 0.070 0.030 0.049 0.067 75.60 -

Roadtech Construction 17580

Rehab./Replacement of Calvo Bridge (Span 4 &5) Carmen Jct.-Bayambang San Carlos-Manat

Road

I 48.246 O 0.312 0.186 0.100 0.030 0.033 0.100 76.10 -

Roadtech Construction 17580Repair/Rehab. of Sinucalan

Bridge along Urd. Jct.-Dagupan Rd

I 2.704 C 0.375 - 0.500 - - - 87.50 92.48% Outstanding

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of MPB XII 0.942 C 0.352 0.293 0.300 - - - 94.50 *94.50%

Outstanding

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of School Building

at Sison Elem. School XII 0.375 C 0.345 0.285 0.300 - - - 93.00 86.84% V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 369

Page 378: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175

Conc. of Kapingkong Bridge Approaches along Kidapawan-

Allah Jct. RoadXII 8.489 C 0.353 0.288 0.300 - - - 94.10 94.10%

Outstanding

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175

Concreting of Jct. Kapaya Section along Dukay-Sen. Ninoy

Aquino-Lebak RoadXII 7.199 O 0.392 - 0.500 - - - 89.20 -

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of 3-Cl School Building XII 1.146 O 0.318 0.300 0.100 0.030 0.018 0.100 86.60 -

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. XII 0.954 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. at

Brgy. Dansuli XII 0.458 C 0.362 0.200 0.300 - - - 86.20 *86.20% V.Satisfactory

Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Road Upgarding, Gamasil

Section XII 14.048 O 0.161 0.300 0.100 0.030 0.043 0.100 73.40 -

Robitan Construction 10553 Concreting of Brgy. Rd., Brgy. Sapaan IV-A 0.471 C 0.366 - 0.500 - - - 86.60 86.60%

V. Satisfactory

Rocali Construction & Trading 18779 Const./Rehab./Impv't. of Road

Drainage NCR 0.932 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding

Rockstone Construction Services and Supply 22702 Const. of MPB at Simsiman XII 0.767 C 0.317 0.200 0.300 - - - 81.70 82.47%

V.Satisfactory

Rockstone Construction Services and Supply 22702 Const. of MPB, Lugan National

High School XII 0.754 O 0.328 0.240 0.100 0.030 0.014 0.100 81.20 -

Rockstone Construction Services and Supply 22702

Impvt. of MPB at Surallah National Agricultural School

(SUNAS)XII 1.437 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V.Satisfactory

Rockworld Industries 7582Const. of Drainage Sytem @

Daan Maharlika, Picas-Apitong Road

VIII 1.887 O 0.400 0.169 0.100 0.015 0.028 0.200 91.20 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 370

Page 379: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Rockworld Indutries 7582 Conc. of Shoulders, Tacloban-Lilo-an Road VIII 4.748 C 0.392 0.200 0.300 - - - 89.20 *89.20%

V.Satisfactory

Rockworld Indutries 7582 Conc. Paving of San Victor-Ada-San Victor Calsadahay Rd. VIII 1.927 C 0.337 0.200 0.300 - - - 83.70 80.46%

V.Satisfactory

Rockworld Indutries 7582Const. of Drainage Sytem @

Daan Maharlika, Picas-Apitong Road

VIII 1.930 C 0.280 0.300 0.300 - - - 88.00 89.92% V.Satisfactory

Rockworld Indutries 7582 Const. of FMR at Brgy. Plaridel VIII 1.414 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory

Rockworld Indutries 7582 Const. of FMR at Ciabu-Zacarito VIII 1.420 C 0.340 0.200 0.300 - - - 84.00 *84.00% V.Satisfactory

Rockworld Indutries 7582 Road Conc.at Brgy. Lapay VIII 0.193 C 0.326 0.200 0.300 - - - 82.60 *82.60% V.Satisfactory

Rocky 5 G Builders 32506 Repair/Rehab. of Tam-Awan Longlong Road CAR 0.187 C 0.368 0.100 0.300 - - - 76.80 85.50%

V.Satisfactory

Roda Construction & Gen. Supply 19674 Completion of Multi-Purpose

Building V 1.418 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding

Roda Construction & Gen. Supply 19674 Concreting of San Isidro FMR V 0.461 C 0.341 - 0.500 - - - 84.10 87.22%

V.Satisfactory

Roda Construction & Gen. Supply 19674 Const. of Allanosa National High

School Bldg. San Pedro V 1.375 C 0.437 - 0.500 - - - 93.70 77.60% Satisfactory

Roda Construction & Gen. Supply 19674 Const. of Ariman Seawall, Brgy.

Ariman V 0.183 C 0.433 - 0.500 - - - 93.30 93.30% Outstanding

Roda Construction & Gen. Supply 19674 Repair of Marok-Barok Spillway V 0.327 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

Roda Construction and General Supply 19674 Completion of Public Market V 0.477 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

Roda Construction and General Supply 19674 Const. of 1 Cl Sch. Bldg. @ San

Juan Bag-o HS V 0.528 C 0.397 0.122 0.300 - - - 81.90 *81.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 371

Page 380: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Roda Construction and General Supply 19674

Hand-laid Rock bed with concrete facing of Buenavista

River ControlV 0.907 C 0.300 0.200 0.300 - - - 80.00 79.64%

Satisfactory

Roda Construction and General Supply 19674 Repair/Rehab. of Brgy. J.P.

Laurel going to Inararan FMR V 0.945 C 0.395 0.300 0.300 - - - 99.50 70.16% Satisfactory

Roim Builders & Construction Supply 20226 Conc. of Bucac-Marcelina Road XIII 2.808 C 0.344 0.200 0.300 - - - 84.40 81.55%

V. Satisfactory

Roim Builders & Construction Supply 20226 Concreting along Patin-ay-La

Caridad Road XIII 1.846 C 0.192 0.300 0.300 - - - 79.20 79.86% Satisfactory

Roim Builders & Construction Supply 20226 Concreting of BAHBAH Road

(Road Network) XIII 1.823 C 0.199 0.300 0.300 - - - 79.90 85.54% V. Satisfactory

Roim Builders & Construction Supply 20226 Concreting of Barangay 1

Municipal Street XIII 1.864 C 0.268 0.300 0.000 - - - 56.80 72.52% Satisfactory

Roim Builders & Construction Supply 20226 Repair/Rehab. of Unsayawon

PSCG Bridge XIII 2.848 C 0.340 0.200 0.000 - - - 54.00 61.98% Fair

Roim Builders and Construction Supply 20226 Gravelling of Bitan-Agan-Das-

Agan Road XIII 1.832 C 0.400 0.200 0.300 - - - 90.00 84.06% V. Satisfactory

Rolingbell Construction & Trading 32543 Construction of Multi-Purpose

Building III 1.907 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

Rol-Mar Developer and Enterprises 26151 Const. of Multi-Purpose Bldg.,

Youth Council Bldg. X 0.943 C 0.333 0.300 0.000 - - - 63.30 69.60% Fair

Romanjo Construction 32485 Const. of 1 Cl Sch. Bldg. @ Lorenzo P. Ziga H/S V 0.518 C 0.396 0.197 0.300 - - - 89.30 *89.30%

V. Satisfactory

Romhead S.J. Builders and Development Incorporated 30279 Const. Macalelon Seawall IV-A 2.890 C 0.333 0.300 0.300 - - - 93.30 87.42%

V. Satisfactory

Romina Construction 32090 Const. of MPB at G. Perfecto H/S NCR 2.989 C 0.381 0.200 0.300 - - - 88.10 83.31% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 372

Page 381: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ronwood Const. Supply 25311BRS Pilot Project for Conc.

along Dapa-Cabugao-Lobogon Rd.

XIII 3.845 C 0.345 0.200 0.300 - - - 84.50 87.20% V. Satisfactory

Ronwood Const. Supply 25311 Conc. of Brgy. Ilihan Crossing XIII 2.829 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory

Ronwood Const. Supply 25311 Const. of Catangan-Cabitoonan-Libertad Road & Bridges XIII 9.644 O 0.284 0.213 0.100 0.030 0.032 0.100 75.90 -

Ronwood Const. Supply 25311 Const. of Drainage System XIII 0.928 C 0.381 0.300 0.300 - - - 98.10 93.48% Outstanding

Ronwood Const. Supply 25311 Const. of River Protection @ Mambayaan Bridge II (Phase I) X 4.720 C 0.369 0.219 0.300 - - - 88.80 88.56%

V. Satisfactory

Ronwood Const. Supply 25311Dela Carmen-San Benito-San Isidro Road along Cancohoy

SectionXIII 7.718 O 0.307 0.272 0.100 0.030 0.032 0.100 84.10 -

Ronwood Const. Supply 25311Impvt./Conc. of Siargao Circ.

Road (San Juan, San Benito, & Alegria, Sapao)

XIII 9.458 C 0.270 0.200 0.300 - - - 77.00 78.74% Satisfactory

Ronwood Const. Supply 25311 Replacement of Asinan Timber Bridge II to RCBC XIII 4.824 C 0.295 0.200 0.300 - - - 79.50 69.00%

Fair

Ronwood Const. Supply 25311 Slope Protection along Jct. Osmeña-Pilar Road XIII 5.447 C 0.343 0.300 0.000 - - - 64.30 82.12%

V. Satisfactory

Ronwood Construction & Supply 25311 Cluster EQ: Rehabilitation of

FMR Pook, X 0.951 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

Ronwood Construction & Supply 25311 Clustered Conc. of Municipal

Streets XIII 1.130 C 0.474 - 0.500 - - - 97.40 97.40% Outstanding

Ronwood Construction & Supply 25311 Conc.of FMR Brgy. Del Carmen XIII 0.944 C 0.478 - 0.500 - - - 97.80 *97.80%

Outstanding

Ronwood Construction & Supply 25311

Concreting of Dapa-Sayak-Cancohoy Road, Sta. Fe.

Lobongon Sect.XIII 6.112 C 0.404 - 0.500 - - - 90.40 89.86%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 373

Page 382: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ronwood Construction & Supply 25311 Const./Regravelling of Rd. XIII 0.940 C 0.427 - 0.500 - - - 92.70 92.70%

Outstanding

Ronwood Construction and Supply 25311 Improvement of Dapa-Del

Carmen Road (Slope Protection) XIII 1.373 O 0.367 0.200 0.300 - - - *86.70 -

Roprim Construction 8546 Const. of Cuartero Bridge, Phase II VI 8.881 C 0.350 0.300 0.300 - - - 95.00 92.00%

Outstanding

Roprim Construction 8546 Const. of Janiuay-Badiangan Road, Km.36+320-Km.37+620 VI 13.886 C 0.295 0.200 0.000 - - - 49.50 69.72%

Fair

Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 O 0.400 0.200 0.100 0.023 0.056 0.200 97.90 -

Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 O 0.356 0.200 0.070 0.023 0.047 0.133 82.90 -

Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) VI 1.430 C 0.357 0.208 0.000 - - - 56.50 71.29%

Satisfactory

Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road VI 9.546 O 0.293 0.225 0.100 0.015 0.032 0.100 76.50 -

Rosand Builders 15781 Beautification of K-H Park, Brgy. West Kamias NCR 0.700 C 0.392 - 0.500 - - - 89.20 89.20%

V.Satisfactory

Rosand Builders 15781Const. of Flood Control within the vicinity of Brgy. Tamugan

Bridge at Sitio AcaciaXI 4.714 C 0.287 0.200 0.300 - - - 78.70 82.00%

V.Satisfactory

Rosand Builders 15781 Const. of MPB (Student Pavillion) CSSP NCR 0.473 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

Rosand Builders 15781 Const. of Sch. Bldg. @ UP College of Music NCR 0.946 C 0.390 0.300 0.300 - - - 99.00 *99.00%

Outstanding

Rosand Builders 15781 Const. of Tugbok Lined Canal along Davao-Bukidnon Road XI 2.822 C 0.267 0.205 0.300 - - - 77.20 82.42%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 374

Page 383: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Rosand Builders 15781

Impvt. of Davao River Flood Control along Davao-Cotabato

Road, Generoso Bridge II (Downstream Right Side)

XI 2.826 C 0.293 0.300 0.300 - - - 89.30 *89.30% V.Satisfactory

Rosand Builders 15781 Impvt./Conc. of 20th Ave. NCR 4.752 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding

Rosand Builders 15781

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road

(Manay-Boston Section) Manay-Caraga Section

XI 14.633 C 0.328 0.237 0.300 - - - 86.50 *86.50% V.Satisfactory

Rosvar Enterprises and General Contractor 17998 Const. of Farm-to-Market Road IV-A 0.570 C 0.266 - 0.500 - - - 76.60 *76.60%

Satisfactory

Rosvar Enterprises and General Contractor 17998 Const. of Flood Control/Drainage

System IV-A 2.866 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Rosvar Enterprises and General Contractor 17998 Const. of FMR @ Municipalty of

Victoria IV-A 0.934 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding

Rosvar Enterprises and General Contractor 17998 Const. of MPB at Brgy. San Felix IV-A 1.143 C 0.359 0.200 0.300 - - - 85.90 *85.90%

V. SatisfactoryRosvar Enterprises and

General Contractor 17998 Const. of Multi-Purpose Hall IV-A 0.938 C 0.449 - 0.500 - - - 94.90 *94.90% Outstanding

Rovilla Construction 19514 Const. of 2-CL S/B (Part of Cluster A) VII 0.491 C 0.380 - 0.500 - - - 88.00 *88.00%

V. Satisfactory

Rovilla Construction 19514 Construction of 1-CL S/B at Tominjao NHS VII 0.480 C 0.366 0.153 0.300 - - - 81.90 *81.90%

V. Satisfactory

Rovilla Construction 19514 Construction of 2-CL S/B at San Remegio NHS VII 0.964 C 0.350 0.155 0.300 - - - 80.50 *80.50%

V. Satisfactory

Rowie's Construction 23595Completion of School Building

(New Admin.), SSPSC San Miguel Campus

XIII 2.030 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

Rowie's Construction 23565 Const. of Lambunao Flood Control XIII 4.715 C 0.336 0.300 0.300 - - - 93.60 *93.60%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 375

Page 384: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Farm-to-Market

Road Buenlag III 1.544 C 0.384 0.200 0.300 - - - 88.40 88.10% V. Satisfactory

Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Rizal-Caramutan-

Dumarais Road III 1.850 C 0.335 0.287 0.300 - - - 92.20 *92.20% Outstanding

Royal Crown Monarch Const. & Supplies Corp. 9036 Rehab. of Sto. Domingo Road III 8.261 C 0.361 0.289 0.300 - - - 95.00 *95.00%

OutstandingRoyal Crown Monarch

Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &

Supplies)

9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.235 O 0.308 0.221 0.100 0.030 0.048 0.100 80.70 -

Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &

Supplies)

9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.364 C 0.383 0.269 0.300 - - - 95.20 85.05%

V. Satisfactory

Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &

Supplies)

9036 Const./Rehab. of Tarlac River Dike Flood Control III 4.177 C 0.373 0.200 0.300 - - - 87.30 83.34%

V. Satisfactory

Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &

Supplies)

9036 Rehab. Of Old Manila North Road III 7.063 C 0.339 0.218 0.300 - - - 85.70 *85.70%

V. Satisfactory

Royal Sea Bees Construction 30099 Const. of Provincial Cooperative

Office MPB CAR 0.473 C 0.133 0.300 0.300 - - - 73.30 *73.30% Satisfactory

Royal Sea Bees Construction 30099 Implementation of Various

Projects under Package 15 CAR 0.933 O 0.241 0.214 0.100 0.030 0.030 0.067 68.20 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 376

Page 385: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Royal Sea Bees Construction 30099

Widening/Regravelling incl. slope protection & drainag of

Bontoc-Lubuagan-Tabuk RoadCAR 4.787 C 0.326 0.237 0.300 - - - 86.30 81.50%

V. Satisfactory

RPBJ Trading & Construction 30006 Const. of Drainage System along

Nulatula VIII 2.046 C 0.354 - 0.500 - - - 85.40 85.40% V.Satisfactory

RPBJ Trading & Construction 30006

Const. of Multi-Purpose Bldg., (Covered Court) at Brgy. 82

(Phase II)VIII 0.950 C 0.398 - 0.500 - - - 89.80 51.93%

Poor

RPBJ Trading & Construction 30006 Road Conc. of Brgy. Dagami-

Pastrana Road VIII 0.937 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding

RPBJ Trading and Construction 30006 Completion/Repair of 3 CL ES

Building @ Sangkahan ES VIII 0.499 C 0.400 0.200 0.300 - - - 90.00 *90.00% V.Satisfactory

RPBJ Trading and Construction 30006 Const. of 2 CL SB at Brgy. P.

Barrantes Primary School VIII 0.965 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory

RPBJ Trading and Construction 30006

Road Junction, Rechannelization at Maharlika-PHHC Anibong

RoadVIII 1.897 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V.Satisfactory

RREncabo Constructors & Traders 14716 Fort Santiago Linear Park

Project PRRC 13.595 O 0.349 0.300 0.100 0.030 0.050 0.100 92.90 -

RRMD Construction & Supply (Formerly: RRMD

Const.)23615 Conc. of Iligan-Bukidnon Road X 8.938 O 0.358 0.236 0.100 0.030 0.044 0.100 86.80 -

RRMD Construction & Supply (Formerly: RRMD

Const.)23615 Const. of Linamon-Zamboanga

Road, Kalabugan Section X 9.061 C 0.353 0.200 0.300 - - - 85.30 83.50% V.Satisfactory

RRN Construction 20228

Const. of Concrete Lined Ditch along Jct. A. H. Aglayan-Kibangay Rd. Poblacion

Lantapan Sect.

X 0.321 C 0.470 - 0.500 - - - 97.00 95.44% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 377

Page 386: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

RSP Enterprises Inc. 16795 Concreting of Road at Brgy. Tagakpan XI 0.940 C 0.333 - 0.500 - - - 83.30 81.02%

V.Satisfactory

RSP Enterprises Inc. 16795Const. of Flood

Control/Drainage, Guadalupe Village, Matina Crossing

XI 0.661 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding

RSP Enterprises Inc. 16795 Const. of Multi Purpose Pavement at Brgy. 7A XI 0.661 C 0.345 0.300 0.300 - - - 94.50 88.74%

V. Satisfactory

RSP Enterprises, Inc. 16795 Const. of 1-Cl, School Bldg. @ Elias Lopez Memorial H/S XI 0.330 C 0.309 - 0.500 - - - 80.90 87.20%

V. Satisfactory

RTY Construction 10341 Concreting of Balanacan FMR Balanacan IV-B 0.239 C 0.013 0.300 0.300 - - - 61.30 *61.30%

Fair

Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay III 4.606 O 0.334 0.225 0.100 0.030 0.016 0.100 80.50 -

Ruby Lim Const. & Supplies 11685 Conc. of Cudamos Brgy. Road

New Dagupan IV-B 0.366 C 0.449 - 0.500 - - - 94.90 94.90% Outstanding

Ruby Lim Const. & Supplies 11685 Conc. of San Fernando-Talisay

Road V 12.672 C 0.318 0.229 0.300 - - - 84.70 79.54% Satisfactory

Ruby Lim Const. & Supplies 11685 Const. of Multi-Purpose

Pavement V 0.364 C 0.332 0.100 0.300 - - - 73.20 *73.20% Satisfactory

Ruby Lim Const. & Supplies 11685 Const. of MPB V 9.448 C 0.355 0.200 0.300 - - - 85.50 76.47%

Satisfactory

Ruby Lim Const. & Supplies 11685 Const. of MPB (Gymnasium)

Phase IV V 4.720 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay III 4.606 C 0.255 0.253 0.300 - - - 80.80 80.62%

V. Satisfactory

Rumil Construction 13484 Const. of S/B @ Barobo NHS (Main), Package 1 XIII 1.156 C 0.369 0.200 0.300 - - - 86.90 86.34%

V. Satisfactory

Rumil Construction 13484 Const. of USEP-Bislig MPB @ Brgy. Maharlika XIII 1.923 C 0.213 0.300 0.300 - - - 81.30 81.65%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 378

Page 387: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Rusmen Builders & Development Corporation 10674 Asphalt Overlay of Lipa-Rosario

Road IV-A 10.543 C 0.366 0.200 0.300 - - - *86.60 86.60% V. Satisfactory

Rusmen Builders & Development Corporation 10674

Completion of Multi-Purpose Sch. Bldg. in Dr. Crisogono

Ermita Sr. NHSIV-A 3.858 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

Rusmen Builders & Development Corporation 10674 Const. of Brgy. Road at Brgy.

Maugat West (Sitio Ilaya) IV-A 1.928 C 0.357 0.200 0.300 - - - 85.70 *85.70% V.Satisfactory

Rusmen Builders & Development Corporation 10674 Rehab. of Banay-banay-Cuenca

Road (San Jose Section) IV-A 4.798 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

Rusmen Builders & Development Corporation 10674

Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, San Jose

Section

IV-A 13.509 C 0.347 0.267 0.300 - - - 91.40 *91.40% Outstanding

Rusmen Builders & Development Corporation

(Formerly: Rusmen Corporation)

10674 Const. of Multi-Purpose Building IV-A 4.769 O 0.369 0.200 0.100 0.030 0.043 0.100 84.20 -

Rusmen Builders & Dev't. Corp. 10674 Const of San Jose Market Brgy.

Taysan IV-A 8.595 O 0.400 0.217 0.100 0.030 0.020 0.100 86.70 -

Rusmen Builders & Dev't. Corp. 10674 Impv't. of Manila-Batangas By

Pass Road Phase I IV-A 9.562 C 0.456 - 0.500 - - - 95.60 95.60% Outstanding

RWD Construction 27116 Maintenance/Rehab. & Impvt. of GSO Road III 0.995 C 0.358 0.200 0.300 - - - 85.80 *85.80%

V. Satisfactory

S & G Construction 11773 Const. of Tacurong Drainage Canal XII 6.624 C 0.323 - 0.500 - - - 82.30 88.98%

V. Satisfactory

S & G Construction 11773 Rehabilitation of Manin Canal (Sta. 21+714-26+526) NIA-I 7.304 C 0.250 0.300 0.300 - - - 85.00 84.87%

V.Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 379

Page 388: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

S & K Builders, Inc. 24039 Const. of 5-CL School Building @ Quezon NHS X 1.406 C 0.347 0.000 0.500 0.000 0.000 0.000 84.70 77.91%

Satisfactory

S B G Construction 12022 Concreting of Brgy. Road, Bonbon X 0.960 C 0.353 0.218 0.300 - - - 87.10 *87.10%

V. Satisfactory

S. S. Tria Construction 18002 Rehab. of Public Market, New Dagupan IV-B 0.576 C 0.379 0.300 0.300 - - - 97.90 67.38%

Fair

S.A. Gomez Construction 6265 Const. of Malasag Eco-Tourism Facilities PTA 11.167 O 0.373 0.300 0.070 0.015 0.039 0.067 86.43 -

S.J. Yu Construction 17048Rehabilitation of Various

Buildings @ C.L. Montelibano Regional Hospital

VI 4.090 O 0.361 0.195 0.000 - - - 55.60 -

S.M. Castro Management & Construction Services 18216 Const. of Capinahan Bridge VIII 3.931 C 0.452 - 0.500 - - - 95.20 93.28%

Outstanding

S.M. Castro Management & Construction Services 18216

Gravelling of Roadway & Installation of Guardrails along

Dinagat-Loreto RoadXIII 4.814 C 0.311 0.200 0.300 - - - 81.10 74.56%

Satisfactory

S.M. Castro Management & Construction Services 18216 Impvt. Along Gamu-Roxas Road

(Guardrails Installation) II 9.644 C 0.272 0.225 0.300 - - - 79.70 *79.70% Satisfactory

S.M. Castro Management & Construction Services 18216 Rehab. & Maintenance of Roads

along Gamut-San Miguel Sect. XIII 14.390 C 0.400 0.146 0.300 - - - 84.60 *84.60% V. Satisfactory

S.R. Baldon Construction & Supply 15405 Concreting of Cabid-an Road

(Seabreeze), Cabid-an V 0.920 C 0.268 0.000 0.500 0.000 0.000 0.000 76.80 *76.80% Satisfactory

S.R. Baldon Construction & Supply 15405 Const. of Multi-Purpose

Building, Madlawan V 0.240 C 0.372 0.000 0.500 0.000 0.000 0.000 87.20 *87.20% V. Satisfactory

S.W. Taya-an Construction 33085 Const. of Mapaway Deepwell with Elevated Tank CAR 0.958 C 0.267 0.200 0.300 - - - 76.70 *76.70%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 380

Page 389: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sabutan Construction 5520 Const. of Footbridge, Brgy. Labnig IVA 0.479 C 0.270 0.300 0.300 - - - 87.00 82.20%

V. Satisfactory

Sabutan Construction 5520Repair/Rehab. of Manila South

Road, Pagbilao-Atimonan Section, Phase III

IVA 4.999 C 0.390 0.200 0.300 - - - 89.00 *89.00% V.Satisfactory

Sabutan Construction 5520Road Widening of

Canggumantong-Poo-Lazi Interior Road

VII 1.391 C 0.400 0.193 0.300 - - - 89.30 89.54% V. Satisfactory

Salidummay Gen. Construction 21403 Completion of Multi-Purpose

Building CAR 0.476 C 0.384 0.250 0.300 - - - 93.40 *93.40% Outstanding

Salidummay Gen. Construction 21403 Const. of Multi-Purpose

Building, Pinsao-Pilot Brgy. CAR 1.620 C 0.398 0.000 0.500 0.000 0.000 0.000 89.80 63.34% Fair

Samjan Builders 27855 Completion of Multi Purpose Bldg. At Campo Filipino Brgy. CAR 0.953 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

Samjan Builders 27855 Rehabilitation along Pico-Lamtang Road CAR 2.173 C 0.383 0.000 0.500 0.000 0.000 0.000 88.30 86.74%

V. Satisfactory

Sammi Construction Company , Ltd. FC-05008 CP IV, Const./Impvt. of Looc-

Odiongan-San Andres Road IV-B 649.871 O 0.400 0.300 0.050 0.030 0.070 0.067 91.70 -

Sammi Construction Company , Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-

Odiongan-San Andres Road IV-B 649.871 O 0.365 0.300 0.030 0.030 0.070 0.067 86.20 -

Samurai Construction 32214 Const. of Multi Purpose Pavement @ Brgy. Sarong IV-B 0.208 C 0.173 0.000 0.300 - - - 47.30 *47.30%

Poor

San Fernando Builders 21295 Conc. of Calingcamasan Road I 0.470 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

San Fernando Builders 21295 Const. of Multi-Purpose Bldg. I 2.846 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding

San Fernando Builders 21295 Const. of Multi-Purpose Structure at Brgy. Sili I 0.187 C 0.303 0.000 0.500 0.000 0.000 0.000 80.30 *80.30%

V. Satisfactory

San Fernando Builders 21295 Construction of Multi-Purpose Bldg. I 5.646 C 0.376 0.252 0.300 - - - 92.80 *92.80%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 381

Page 390: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

San Fernando Builders 21295 Construction of Multi-Purpose Bldg. @ Brgy. Ortega I 0.940 C 0.321 0.253 0.300 - - - 87.40 *87.40%

V. Satisfactory

San Fernando Builders 21295 Repair/Impvt. of FMR I 0.096 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sta. Rita West I 0.096 C 0.254 0.300 0.300 - - - 85.40 *85.40%

V. Satisfactory

San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sto. Rosario East I 0.096 C 0.291 0.300 0.300 - - - 89.10 *89.10%

V. Satisfactory

San Guillermo Const. and Trading Corp. 25661 Const. of MPB @ La

Consolacion NCR 1.627 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory

San Rafael Builders 30496 Rehab. of DPWH-Region IVA Building IV-A 1.915 C 0.391 0.200 0.300 - - - 89.10 85.46%

V. Satisfactory

Sandstorm Construction 23411 Const. of Flood Control System @ Brgy. Zone 13 IV-A 0.471 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Fair

Sandstorm Construction 23411 Const. of Line Canal IV-A 0.189 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

Sandstorm Construction 23411 Const. of MPB/Structure (2nd Floor) in Mahabang Ludlod IV-A 0.479 C 0.263 0.200 0.300 - - - 76.30 *76.30%

Satisfactory

Sandstorm Construction 23411 Const. of Multi-Purpose Building at Brgy. Sta. Elena IV-A 0.477 C 0.450 - 0.500 - - - 95.00 *95.00%

Outstanding

Sanlahi Group of Builders, Inc. 11874 Concreting of Baco-Puerto

Galera Road (Phase II) IV-B 9.500 C 0.314 0.300 0.300 - - - 91.40 81.50% V. Satisfactory

Sanlahi Group of Builders, Inc. 11874 Concreting of Brgy. Panikian

Road, Naujan IV-B 1.894 C 0.198 0.000 0.500 0.000 0.000 0.000 69.80 71.96% Satisfactory

Sanlahi Group of Builders, Inc. 11874 Concreting of Road @ Kalinisan IV-B 1.909 C 0.300 0.200 0.300 - - - 80.00 80.48%

V. Satisfactory

Sanlahi Group of Builders, Inc. 11874

Const. of Drainage System (w/cover) Brgy. Tawiran-Sta.

Isabel,IV-B 4.035 C 0.356 0.000 0.500 0.000 0.000 0.000 85.60 85.60%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 382

Page 391: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sanlahi Group of Builders, Inc. 11874 Const./Repair of Multi-Purpose

Building, Masipit IV-B 0.947 C 0.391 0.000 0.500 0.000 0.000 0.000 89.10 89.10% V. Satisfactory

Sanlahi Group of Builders, Inc. 11874 Rehab./Reconst. of Calapan

South Road IV-B 9.503 O 0.326 0.237 0.100 0.023 0.038 0.100 82.40 -

Sanlahi Group of Builders, Inc. 11874 Widening of Libis-Lumangbayan-

Sta. Isabel Road IV-B 6.441 C 0.378 0.300 0.300 - - - 97.80 94.32% Outstanding

Sanlahi Group of Builders, Inc./811 Trading & Const.

(JV)JV-06-067

Conc. of East Coast Road, Calapan-Mansalay Section,

Palaypay SectionIV-B 19.240 C 0.295 0.300 0.300 - - - 89.50 88.06%

V. Satisfactory

Santech Builders 16797 Concreting of Molimono-Pili Road, Cawayan (Phase VII) XIII 4.587 C 0.369 0.200 0.300 - - - 86.90 84.86%

V. Satisfactory

Santech Builders 16797 Const. of Magtangale-Macopa Road, San Francisco XIII 2.651 C 0.366 0.000 0.500 0.000 0.000 0.000 86.60 86.42%

V. Satsifactory

Santech Builders 16797 Const. of Multi-Purpose Building XIII 4.652 C 0.274 0.300 0.300 - - - 87.40 82.92% V. Satisfactory

Santech Builders 16797 Const. of Rosita Bridge III, PSCG (Type IV-B) XIII 4.608 C 0.377 0.300 0.300 - - - 97.70 87.38%

V. Satisfactory

Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 O 0.393 0.155 0.100 0.020 0.028 0.200 89.60 -

Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 O 0.357 0.200 0.050 0.015 0.035 0.200 85.70 -

Sanvar Development Corporation 2342

Repair/Renovation of DBP Commonwealth Branch Bldg.

and PremisesDBP 2.249 C 0.411 0.200 0.141 - - - 75.20 75.20%

Unsatisfactory

Sapdoy Enterprises 21995 Completion of MPB @ BGH Compound CAR 0.952 O 0.301 0.300 0.100 0.023 0.032 0.100 *85.60 -

Sarangani Rockmixer 6549Completion/Concreting of

Crossing Rubber-Tampakan Road

XII 5.583 C 0.465 - 0.500 - - - 96.50 96.44% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 383

Page 392: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sarangani Rockmixer 6549Const. of GSC Circumferential Road, San Isidro Section, Brgy.

San IsidroXII 4.698 C 0.435 0.000 0.500 0.000 0.000 0.000 93.50 *93.50%

Outstanding

Sarangani Rockmixer 6549 Rehab./Impvt. of Digos-Makar Road (Intermittent Section) XII 11.000 C 0.340 0.191 0.300 - - - 83.10 83.10%

V.Satisfactory

Sarangani Rockmixer 6549Widening of Additional 2 Lanes

of Marbel-Tupi-Makar Road, Carpenter Hill Sect.

XII 14.455 C 0.369 0.205 0.300 - - - 87.40 86.08% V. Satisfactory

Sarangani Rockmixer 6549Widening of Makar-Tupi-Marbel

Road (Labangal-Apopong Section)

XII 7.150 C 0.369 0.200 0.300 - - - 86.90 81.26% V. Satisfactory

Sarca Estate Development Corporation 20520

Completion of Municipal Health Center & Const. of Health Center

@ Brgy. GumianIV-A 0.964 C 0.311 0.282 0.300 - - - 89.30 *89.30%

V. Satisfactory

Sarca Estate Development Corporation 20520 Const. of Municipal Health

Center IV-A 0.964 C 0.271 0.300 0.300 - - - 87.10 82.62% V. Satisfactory

Sarca Estate Development Corporation 20520 Rehab. of Famy-Real-Infanta-

Dinahican Port Road IV-A 14.458 C 0.270 0.300 0.300 - - - 87.00 84.84% V. Satisfactory

Sards Construction 15408 Conc. (Concrete Reblocking) of 1,220 lm Nat'l Road VI 9.411 C 0.300 0.100 0.300 - - - 70.00 71.98%

Satisfactory

Sarex Builders 23734 Completion of Gutalac Public Market, Gutalac IX 0.739 C 0.482 0.000 0.500 0.000 0.000 0.000 98.20 88.20%

V. Satisfactory

Sarex Builders 23734 Conc. of Dualing-Baliki-Silik Road, Dualing Section XII 9.403 C 0.377 0.228 0.300 - - - 90.50 *90.50%

Outstanding

Sarex Builders 23734 Conc. of Road at Brgy. Dagupan XII 0.469 C 0.335 0.287 0.300 - - - 92.20 87.70% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 384

Page 393: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sarex Builders 23734 Concreting of Road at Molave Street, Poblacion Carmen XII 1.878 C 0.345 0.000 0.500 0.000 0.000 0.000 84.50 *84.50%

V. Satisfactory

Sarex Builders 23734 Const. of MPB XII 0.286 C 0.388 0.264 0.300 - - - 95.20 *95.20% Outstanding

Sarex Builders 23734 Const. of MPB @ Brgy Ilbocean XII 0.330 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

Sarex Builders 23734 Const. of Multi-Purpose Bldg. @ Brgy. Gen. Luna XII 0.235 C 0.432 0.000 0.500 0.000 0.000 0.000 93.20 *93.20%

Outstanding

Sarex Builders 23734 Const. of Multi-Purpose Pavement at Brgy. Presbitero XII 0.473 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

Sarex Builders 23734 Const. of Water Supply / Spring Development Brgy. Malitubog XII 0.462 C 0.336 0.000 0.300 - - - *63.60 79.56%

Satisfactory

Sarex Builders 23734Impvt. of Molo River

Control/Flood Control, Molo Section

XII 4.807 C 0.326 0.231 0.300 - - - 85.70 *85.70% V. Satisfactory

Sarex Builders 23734 Proposed Const. of Seawall Manil Leon Postigo IX 0.779 C 0.416 0.000 0.500 0.000 0.000 0.000 91.60 *91.60%

Outstanding

Sarex Builders 23734 Redecking of Carmen Bridge (Phase 2) XII 3.744 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V. Satisfactory

Sargasso Construction and Development Corp. 6587 Const. of Manggamnan Bridge IV-B 13.332 O 0.267 0.240 0.000 0.023 0.035 0.067 63.20 -

Sargasso Construction and Dev't. Corp. 6587 Const./ Replacement of

Manggamnan Bridge IV-B 13.347 O 0.289 0.237 0.100 0.030 0.047 0.100 80.30 -

SATRAP Construction Co., Inc. 2526 Improvement of San Fernando

Airport BCDA 471.406 O 0.3997 0.2988 0.070 0.024 0.03 0.067 88.91 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 385

Page 394: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

SATRAP Construction Co., Inc. 2526 Improvement of San Fernando

Airport BCDA 471.406 O 0.3831 0.3 0.050 0.024 0.055 0.067 87.88 -

Satrap Construction Co., INC. 2526 Improvement of San Fernando

Airport PPA 471.406 O 0.379 0.271 0.100 0.030 0.064 0.100 94.41 -

Satrap Construction Co., INC. 2526 Improvement of San Fernando

Airport PPA 471.406 O 0.368 0.297 0.100 0.030 0.055 0.100 94.94 -

Satrap Construction Co., INC. 2526 Improvement of San Fernando

Airport PPA 471.406 O 0.354 0.300 0.100 0.030 0.045 0.100 92.85 -

Satrap Construction Company, Inc. 2526 Asphalting of Shoulder along

MNR San Ildefonso I 1.256 C 0.317 - 0.500 - - - 81.70 81.76% V. Satisfactory

Satrap Construction Company, Inc. 2526 Rehab./Replacement of Bussawit

Bridge 2 along MNR I 8.364 C 0.391 0.200 0.300 - - - 89.10 89.52% V. Satisfactory

Satrap Construction Company, Inc. 2526 Replacement of Bantaoay along

Manila North Road I 19.893 O 0.363 0.214 0.100 0.030 0.047 0.100 85.40 -

Satrap Construction Company, Inc. 2526 Replacement of Bantaoay along

Manila North Road I 19.893 O 0.372 0.300 0.070 0.030 0.051 0.100 92.30 -

SBB Construction & Supply 31238 Conc. of Road at Catmon St., Sto. Nino-YCF XI 0.417 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

SBB Construction and Supply 31238 Concreting of Road @ Dama de

Noche XI 0.462 C 0.303 - 0.500 - - - 80.30 85.70% V. Satisfactory

SBB Construction and Supply 31238 Const. of 1CL 1 Storey S/B at

Mintal E/S XI 0.425 C 0.378 0.176 0.300 - - - 85.40 *85.40% V. Satisfactory

SBF Construction & Dev't Corp. 11470 Conc. of Passi-Calinog Road VI 13.509 C 0.342 0.300 0.300 - - - 94.20 85.56%

V. Satisfactory

SCP Construction 8797Conc. of SDCR, (Tagasaka-Bislig

Subsection) along Hinatuan-Bislig-Boston Section

XIII 158.872 O 0.278 0.184 0.100 0.030 0.030 0.100 72.20 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 386

Page 395: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

SCP Construction 8797 Const. of Brgy. Cuarenta-Luna Road, San Jose XIII 13.026 C 0.383 0.300 0.000 - - - 68.30 72.98%

Satisfactory

SCP Construction 8797

Rehab./Reconst. of Damaged Paved National Roads along Butuan City-Cagayan de Oro

City-Iligan City Road

X 18.867 O 0.365 0.240 0.100 0.030 0.035 0.067 83.70 -

SCP Construction / Persan Construction / G & P

Builders, Incorporated (JV)JV-99-175

Const./ Impv't. of Bulua (Jct. ICB Road)P.N. Road-Lumbia (Jct.

Airport Road)X 121.472 C 0.367 0.300 0.300 - - - 96.70 93.19%

Outstanding

SCV Construction 14523 Const. of Multi-Purpose Building X 0.933 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -

Segal Construction 17243 Const. of Drainage System, New Lucban Brgy. CAR 0.959 C 0.399 - 0.500 - - - 89.90 89.90%

V. Satisfactory

Sercher Development Corporation 26332 Const. of Flood Control &

Drainage System VII 0.477 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory

Serg Construction 8003Construction of 1-CL School Building @ Don Carlos NHS, Gupaco PS & Sinayawan PS

X 1.400 C 0.379 0.230 0.300 - - - 90.90 *90.90% Outstanding

Serra Ty Construction 7373Conc. of East/West Lateral Road,

(Tandag-Gamut-San Miguel-Bayugan Road)

XIII 19.274 O 0.342 0.237 0.030 0.023 0.027 0.100 75.90 -

Serra Ty Construction 7373 Concreting of Road from Airport to Brgy. Awasian XIII 1.353 C 0.357 0.000 0.500 0.000 0.000 0.000 85.70 *85.70%

V. Satisfactory

Serra Ty Construction 7373Impvt. of Road Slip and other

related activities, Cortes-Junction Section

XIII 2.885 C 0.244 0.200 0.300 - - - 74.40 76.38% Satisfactory

Serra Ty Construction 7373 Rehab./Impvt. of Gamut-Unaban Section, along SCDR XIII 9.605 C 0.285 0.268 0.300 - - - 85.30 78.34%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 387

Page 396: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Settlers Builder 21643 Conc. of Sibalom-San Remegio-Leon Road, Barangbang Section VI 2.746 C 0.278 0.276 0.300 - - - 85.40 83.72%

V. Satisfactory

Settlers Builder 21643 Const. of Libonan Bridge VI 7.199 C 0.400 0.200 0.300 - - - 90.00 88.26% V. Satisfactory

Seven Digit Construction & Supplies 25471 Conc. of PPSR, Km. 222+505.5 -

km. 223+063.50 IV-B 5.680 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding

Seven Digit Construction & Supplies 25471 Concreting of Roads in Brgy. 3 IV-B 0.473 C 0.376 0.200 0.300 - - - 87.60 *87.60%

V. SatisfactorySeven Digit Construction &

Supplies 25471 Const. of 1CL at Panindigan E/S IV-B 0.376 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

Seven Digit Construction & Supplies 25471 Const. of Caramay Seawall

(Phase 2) IV-B 0.473 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory

Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc.

Bridge, Dayandante Bridge I IV-B 9.347 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc.

Bridge, Talog Bridge IV-B 9.350 O 0.300 0.240 0.100 0.030 0.047 0.100 81.70 -

Seven Digit Construction & Supplies 25471

Raising of Grade of Puerto Princesa-Roxas, Taytay-El Nido

RoadIV-B 3.642 C 0.283 0.300 0.300 - - - 88.30 89.62%

V. Satisfactory

Seven Digit Construction & Supplies 25471 Reconst. of Kaylubong Bridge II IV-B 8.454 C 0.261 0.300 0.300 - - - 86.10 89.16%

V. Satisfactory

Seven Digit Construction & Supplies 25471 Rehab./Improvement of San

Vicente Airport Runway IV-B 9.139 C 0.280 0.300 0.300 - - - 88.00 83.86% V. Satisfactory

Seven Digit Construction & Supplies 25471 Repair/Maintenance of Puerto

Princesa North Road (PPNR) IV-B 9.513 O 0.358 0.159 0.100 0.030 0.048 0.100 79.50 -

Seven Digits Construction & Supplies 25471 Rehabilitation of San Jose-Port

Barton Road IV-B 4.102 C 0.389 0.209 0.300 - - - 89.80 85.66% V. Satisfactory

Seven Digits Construction & Supplies 25471 Repair/Rehab. & Const. of

Bagiong Bayan Bebeladan FMR IV-B 2.660 C 0.387 - 0.500 - - - 88.70 85.76% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 388

Page 397: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Seven Digits Construction & Supply 25471 Const. of Flood Control at

Barangay Sowangan IV-B 0.947 C 0.389 0.000 0.500 0.000 0.000 0.000 88.90 *88.90% V. Satisfactory

SGB Concrete Products & General Merchandise 20745 Rehab./Impv't. of Antipolo-

Tukulan Road IVA 1.917 C 0.359 - 0.500 - - - 85.90 91.00% Outstanding

SGL Trading 27767 Concreting of Agtangao-Manila Road, Benguet CAR 0.452 C 0.344 0.000 0.500 0.000 0.000 0.000 84.40 *84.40%

V. Satisfactory

SGSS Construction 27502 Const. of Covered Line Canal @ Brgy. Pob. 8 IV-A 0.192 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

SGSS Construction 27502 Const. of Multi-Purpose Building IVA 0.287 C 0.401 - 0.500 - - - 90.10 *90.10% Outstanding

Shak Construction and Supply 28289 Const. of 1 CL Tamborong E/S VI 0.500 C 0.290 0.300 0.300 - - - 89.00 *89.00%

V. Satisfactory

Sheen-Sheen Construction 29015 Concreting of Soro-Soro Road X 0.917 C 0.341 0.300 0.300 - - - 94.10 91.04% Outstanding

Sheen-Sheen Construction 29015 Const. of Agoho Multi-Purpose Building X 1.395 O 0.365 0.300 0.100 0.030 0.038 0.100 93.30 -

Sheen-Sheen Construction 29015 Const. of MPB @ Yumbing E/S X 0.376 C 0.363 0.174 0.300 - - - 83.70 *83.70% V. Satisfactory

Sheen-Sheen Construction 29015 Const./Conc. of Sitio Vulcan Brgy. Naasag Road X 0.921 C 0.343 0.200 0.300 - - - 84.30 80.52%

V. Satisfactory

Sheen-Sheen Construction 29015 Rehab./Conc. of Brgy. Butay Road X 0.556 C 0.385 0.300 0.300 - - - 98.50 *98.50%

Outstanding

Shinsung Eng'g. & Construction Corp. Co. Ltd.

SL2-SN-000402

Contract Package 3, Monkayo Tagum Section Compostella

ValleyPJHL 1,508.785 C 0.377 0.300 0.300 - - - 97.70 95.71%

Outstanding

Silk & Steel Construction 25314 Completion of One CL 2-Storey ESH @ Rizal Central School VIII 0.819 C 0.377 0.100 0.300 - - - 77.70 *77.70%

Satisfactory

Silk & Steel Construction 25314 Const. of 1 CL Sch. Bldg. at Abuyugon E/S VIII 0.435 C 0.272 0.183 0.300 - - - 75.50 *75.50%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 389

Page 398: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Silk & Steel Construction 25314 Const. of 1-Unit, 2-Cl RM School Building @ Brgy. Pinggan VIII 0.856 C 0.272 0.279 0.300 - - - 85.10 *85.10%

V. Satisfactory

Silliman Avenue Construction & Supply 22759 Completion of MPB VII 0.870 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -

Silliman Avenue Construction & Supply 22759 Const. of Provincial Road-Purok

2 Sulop Cemetery XI 0.469 C 0.324 0.000 0.500 0.000 0.000 0.000 82.40 79.64% Satisfactory

Silliman Avenue Construction & Supply 22759 Const./Completion of San Jose

Public Market (Phase II) XIII 2.595 C 0.383 - 0.500 - - - 88.30 *88.30% V. Satisfactory

Simplified Builders 20747 Const. of 2 CL School Building @ Solana North C/S II 0.951 C 0.329 0.190 0.300 - - - 81.90 *81.90%

V. Satisfactory

Sixteen Enterprises 18187Conc. of Calapan South

(Himpaparay-San Antonio Section), Mansalay

IV-B 4.020 C 0.396 0.000 0.500 - - - 89.60 89.60% V. Satisfactory

Sixteen Enterprises 18187 Const. of Bucayao River Control, Calapan City IV-B 4.749 C 0.442 0.000 0.500 - - - 94.20 94.20%

Outstanding

Sixteen Enterprises - Calapan Branch 18187

Conc. of Calapan North Road, San Teodoro and Puerto Galera

Road IV-B 17.896 C 0.349 0.300 0.300 - - - 94.90 92.56%

Oustanding

Sixteen Enterprises - Calapan Branch 18187 Conc. of Pinamalayan Airport

Road IV-B 9.464 O 0.308 0.256 0.100 0.023 0.043 0.100 *83.00 -

Sixteen Enterprises - Calapan Branch 18187

Const. of Bucayao-Magasawang Tubig River Flood Control

Mitigation ProjectsIV-B 4.038 C 0.417 0.000 0.500 0.000 0.000 0.000 91.70 89.60%

V. Satisfactory

Sixteen Enterprises - Calapan Branch 18187 Const. of MPB at Happy Valley IV-B 0.669 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Sixteen Enterprises - Calapan Branch 18187

Const. of Protection Dike and Riprapping at Sitio 2-13N Proper

AlcateIV-B 1.909 C 0.290 0.300 0.300 - - - 89.00 *89.00%

V. Satisfactory

Sixteen Enterprises - Calapan Branch 18187 Const. of San Rafael Road

Roxas IV-B 1.897 C 0.431 0.000 0.500 0.000 0.000 0.000 93.10 *93.10% Oustanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 390

Page 399: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sixteen Enterprises - Calapan Branch 18187 Rehab./Reconst. of CNR along

Calapan North Road IV-B 9.500 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory

SKI Const. Group, Inc. (Formerly: Summa

Kumagai, Inc.)3381

NAIA Expressway and its Related Roads Project, Phase I,

Package I, Sales Interchange Components

URPO 180.000 C 0.284 0.300 0.000 - - - 58.40 74.89% Satisfactory

SNR Builder 14539 Const. of MPB @ Brgy. Ramos West II 0.956 C 0.493 0.000 0.000 0.000 0.000 0.000 49.30 74.33%

Satisfactory

So Construction 17714 Const. of 1 CL Sch. Bldg., Dinalungan Central Sch. III 0.907 C 0.331 0.258 0.300 - - - 88.90 *88.90%

V. Satisfactory

So Construction 17714 Const. of Multi-Purpose Bldg., Brgy. Wenceslao III 0.185 C 0.373 0.300 0.300 - - - 97.30 *97.30%

Outstanding

So Construction 17714 Rehab. of MPB at Baler C/S III 0.927 C 0.298 0.237 0.300 - - - 83.50 81.33% V. Satisfactory

So Construction 17714 Rehab./Conc. of Road leading to Municipal Hall III 4.634 C 0.431 - 0.500 - - - 93.10 85.96%

V. Satisfactory

Socor Construction Corporation 8020

Asphalt Overlay of Mis. Or.-Lanao Road, Opol-Lugait

SectionX 9.614 C 0.325 0.300 0.300 - - - 92.50 *92.50%

Outstanding

Socor Construction Corporation 8020 Impvt./Asphalt Overlay of Road NCR 2.509 C 0.377 0.300 0.300 - - - 97.70 *97.70%

Outstanding

Socor Construction Corporation 8020

Impvt./Rehab. of Iligan-Cagayan de Oro-Butuan Road (Initao-

Lugait Section)X 14.305 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

Socor Construction Corporation 8020

Rehab./Impvt. of Asphalt Pavement along Sulat-Borongan

Road SectionVIII 9.461 C 0.355 0.300 0.300 - - - 95.50 *95.50%

Outstanding

Socor Construction Corporation 8020 Repair/Rehab. of Limon-Leyte-

Biliran Road VIII 9.474 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory

Socor Construction Corporation 8020 Repair/Rehab. of P. del Rosario

St. (Sta. 2+007-Sta. 2+505) VII 6.269 C 0.327 0.274 0.300 - - - 90.10 *90.10% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 391

Page 400: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Socor Construction Corporation 8020

Repair/Rehab./Impvt. of National Road (Asphalt Overlay)

Borongan-GuiuanVIII 24.115 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Socorro Villamor Enterprises 1529 Conc. of E. Rodriguez Ave. &

Impvt. of Drainage IVA 4.166 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory

Socorro Villamor Enterprises 1529 Improvement of San Vicente

Port, Ivana II 0.942 C 0.433 0.000 0.500 - - - 93.30 93.30% Outstanding

Solfio P. Jacinto Construction 17799 Concreting of Road in Brgy

Valdefuente III 3.260 O 0.356 0.300 0.100 0.030 0.022 0.100 90.80 -

Solid M Construction 30293 COLAB-OG CIS (Irrigation) NIA 0.774 C 0.337 0.176 0.300 - - - 81.30 *81.30% V.Satisfactory

Solid M Construction 30293 San Jose CIS (Irrigation) NIA 1.038 C 0.356 0.170 0.300 - - - 82.62 *82.62% V. Satisfactory

Solid Merchandising 31609 Const. of 3 Cl Sch. Bldg. @ Colong Colong NHS VI 1.085 C 0.378 0.200 0.300 - - - 87.80 86.82%

V. Satisfactory

Solid North Construction and Development

Corporation8204 Rehab. of Various Farm-to-

Market Roads I 0.473 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory

Solid Rock Construction 8958 Concreting of Brgy. Road St. Anthony IV-A 1.910 C 0.456 - 0.500 - - - 95.60 95.60%

Outstanding

Solid Rock Construction 8958 Const. of Congressional Avenue Extension, Phase V NCR 8.114 C 0.338 0.200 0.300 - - - 83.80 91.18%

Outstanding

Solid Rock Construction 8958

Proposed Const./Rehab./Completion & Repair of Elem. & Secondary Sch. Bldg., Marcelo Marcela

Elem. Sch.

NCR 2.142 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica NCR 1.439 C 0.342 0.300 0.300 - - - 94.20 93.99%

Outstanding

Solid Rock Construction 8958 Rehab./Asphalting of Sucat Road (Phase II) NCR 9.613 C 0.286 0.206 0.300 - - - 79.20 *79.20%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 392

Page 401: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Solid Rock Construction 8958 Widening/Conc. of Commonwealth Ave. NCR 48.138 C 0.353 0.300 0.300 - - - 95.30 *95.30%

Outstanding

Solid Square Construction 28566 Const. of Multi-Purpose Building @ Dugayong II 0.476 C 0.397 0.300 0.000 - - - 69.70 47.90%

Poor

Solid Square Construction 28566 Repainting of Ipil Bridge along Daang Maharlika II 0.268 C 0.311 0.300 0.300 - - - 91.10 *91.10%

Outstanding

South Builders and Construction Supplies 20238 Const. of FTM Road at Brgy.

Laguan IV-A 0.653 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding

South Builders and Construction Supplies

(Formerly: South Builders Const.)

20238 Completion of Home Economics Bldg. @ Unisan C/S IV-A 0.571 C 0.313 0.197 0.300 - - - 81.00 *81.00%

V. Satisfactory

South Builders and Construction Supplies

(Formerly: South Builders Const.)

20238 Const. of Water Supply System IV-A 0.722 C 0.373 0.200 0.300 - - - 87.30 *87.30% V.Satisfactory

South Builders and Construction Supplies

(Formerly: South Builders Const.)

20238Const. of 1 CL Sch. Bldg. at

Brgy. Kinagunan NHS /Danlagan Extension

IV-A 0.541 C 0.339 0.262 0.300 - - - 90.10 *90.10% Outstanding

South Pacific Builders Center, Inc. 24594

Iloilo Flood Control Proj., Ph II, Package III (Road Network)

Sooc, MandurriaoVI 29.561 C 0.466 0.000 0.500 - - - 96.60 93.00%

Outstanding

Southern Dawn Development Company 12294 Concreting of Barangay Road IVA 0.471 C 0.375 - 0.500 - - - 87.50 *87.50%

V. Satisfactory

Southern Dawn Development Company 12294 Const. of Multi-Purpose Building

(Covered Court) IV-A 1.420 C 0.454 0.000 0.500 - - - 95.40 *95.40% Outstanding

Soy Eng Construction 15533

Completion/Repair of Widening/Slope Protection along Rizal Shrine-Rizal Town Coastal

Loop Road

IX 2.788 C 0.359 0.300 0.300 - - - 95.90 94.16% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 393

Page 402: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Soy Eng Construction 15533Conc. Paving of Rizal Shrine-

Rizal Town Coastal Loop Road, Banbanan-Guimputian Sect.

IX 1.782 O 0.283 0.236 0.100 0.020 0.042 0.100 *78.10 -

Soy Eng Construction 15533 Concrete Paving of Canlucani-Tag-Ulo Road, Canlucani Section IX 1.681 C 0.435 0.000 0.500 - - - 93.50 *93.50%

Oustanding

Soy Eng Construction 15533Concreting of Rizal Shrine-Rizal

Town Coastal Loop Road (Talisay-Taguilon Section)

IX 2.788 C 0.377 0.230 0.300 - - - 90.70 90.58% Outstanding

Soy Eng Construction 15533 Const. of Multi-Purpose Building Brgy. Liyang E/S IX 0.929 C 0.490 0.000 0.500 - - - 99.00 90.60%

Oustanding

Soy Eng Construction 11533 Const./Completion of MPB (Farmer's Building) IX 0.950 C 0.400 0.200 0.350 - - - 95.00 *95.00%

Outstanding

Soy Eng Construction 11533 Const./Completion of MPB (Municipal Gym) IX 2.836 C 0.330 0.200 0.300 - - - 83.00 73.97%

Satisfactory

Soy Eng Construction 11533 Const./Completion of MPB at Mutia IX 0.945 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

Soy Eng Construction 15533

Const./Completion of Multipurpose Bldg. (Subanen

Tribe), Jose Rizal Memorial State College

IX 0.462 C 0.334 0.221 0.300 - - - 85.50 *85.50% V. Satisfactory

Soy Eng Construction 15533Const./Completion of

Multipurpose Bldg., Jose Rizal Memorial State College

IX 0.703 C 0.345 0.194 0.300 - - - 83.90 *83.90% V. Satisfactory

Spam Engineering Enterprise 14205

Impvt of NRJ Agusan-Misamis-R. Calo-Agusan Pequeno, Butuan

City (Phase II)XIII 6.260 C 0.444 - 0.500 - - - 94.40 87.32%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 394

Page 403: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Spectrum Builders 8124Impvt./Rehab. of Cuna-Sitio

Magkailaw Road Sitio Makailaw Cuna

X 2.245 C 0.323 0.242 0.100 0.030 0.048 0.100 84.30 -

Speed Movers Construction 19206 Completion of Del Rosario Bridge Approach (Tiaong Side) IV-A 2.046 C 0.392 0.000 0.500 - - - 89.20 *89.20%

V. Satisfactory

SPNR Builders 31329Completion of Concreting of

Road & Drainage Canal @ Guinhawa

III 3.796 C 0.062 0.292 0.300 - - - 65.40 72.24% Satisfactory

SPNR Builders 31329 Rehab. of Roman Expressway (Bilolo Section) III 2.880 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

SPNR Builders 31329 Road Concreting at Sta. Cruz III 0.477 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory

Spring Star Construction and Supply 20240

Const. of S.B. Sen. Rene Cayetano Science & Technology

Memorial H/SNCR 2.865 C 0.372 0.300 0.300 - - - 97.20 *97.20%

Outstanding

Springfield Construction 14097 Const. of Multi-Purpose Bldg., (Public Market) III 0.473 C 0.368 0.263 0.300 - - - 93.10 88.06%

V. Satisfactory

Springfield Construction 14097 Const. of Sto. Niño Public Market IV-B 1.800 C 0.344 0.300 0.300 - - - 94.40 *94.40%

OutstandingSquare Cube Trading

Division and Consruction Division

25120 Completion of MPB @ del Carmen Este VII 0.093 C 0.276 0.100 0.300 - - - 67.60 36.94%

Poor

Square Cube Trading Division and Consruction

Division25120 Conceting/Improvement of Loay

and Carmen VII 14.155 C 0.384 0.239 0.000 - - - 62.30 71.66% Satisfactory

Square Cube Trading Division and Consruction

Division25120 Impvt. of MPB @ Brgy.

Kalunasan VII 0.948 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory

Square Cube Trading Division and Construction

Division 25120

Const. of Farm-to-Market Road (Sta. 0+000-Sta. 3+820) Brgy.

Capt. ClaudioVII 9.439 O 0.311 0.024 0.100 0.010 0.013 0.100 55.80 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 395

Page 404: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

St. Bernard Construction 28368 Concreting of Brgy. Road, Brgy. Rebbron to Brgy. Lupi V 0.926 C 0.384 0.000 0.500 - - - 88.40 *88.40%

V. Satisfactory

St. Bernard Construction 28368 Const. of Health Center @ Brgy. San Isidro V 0.378 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

St. Bernardine Construction 18474 Completion of MPB V 1.425 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

St. Bernardine Construction 18474 Conc. of Barangay Road Brgy.

San Jose-Alanao, Lupi V 0.458 C 0.194 0.000 0.500 - - - *69.40 69.40% Fair

St. Bernardine Construction 18474 Conc. of Busak Bypass Road V 2.837 C 0.310 0.222 0.300 - - - 83.20 87.10%

V. SatisfactorySt. Bernardine Construction 18474 Concreting of Sta. Lucia-

Magarao Road, Sta. Lucia V 0.461 C 0.373 0.000 0.500 - - - *87.30 87.30% V. Satisfactory

St. Bernardine Construction 18474 Const. of MPB at Brgy. Colacling V 0.468 C 0.385 0.100 0.300 - - - *78.50 78.50%

SatisfactorySt. Bernardine Construction 18474 Const. of MPB, Municipal Hall

Complex V 0.950 C 0.381 0.214 0.300 - - - 89.50 *89.50% V. Satisfactory

Sta. Anastacia Builders 32472 Rehabilitation of Sta. Cruz RIS NIA 4.178 O 0.378 0.1574 0.1 0.023 0.045 0.1 80.35 -

Sta. Cruz Construction 9301 Concreting of Barangay Road, Brgy. Grijalvo, San Fernando V 0.459 C 0.246 0.000 0.500 - - - 74.60 *74.60%

Satisfactory

Sta. Cruz Construction 9301 Const. of MPB (Lying-in Center) V 1.405 C 0.378 0.154 0.300 - - - 83.20 83.20% V.Satisfactory

Sta. Isabel Construction Corporation 26774 Const. of Drainage System @

Brgy. Poblacion IV-B 1.637 C 0.391 0.222 0.300 - - - 91.30 *91.30% Outstanding

Sta. Isabel Construction Corporation 26774 Const. of Multi-Purpose Building IV-B 0.472 O 0.365 0.211 0.100 0.010 0.013 0.100 79.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 396

Page 405: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Stars & Stripes Construction 23484

Const. of 1 Unit - 2 CL School Bldg. @ Maras National High

School, MarasIX 0.627 C 0.397 0.000 0.500 - - - 89.70 89.70%

V. Satisfactory

Stars & Stripes Construction 23484 Repair of 3 CL School Building

Miputak East Central School IX 0.730 C 0.418 0.000 0.500 - - - 91.80 *91.80% Outstanding

Stay Construction 23323 Conc. of Itogon-Dalupirip-San Manuel Bdry. Road CAR 17.321 O 0.307 0.155 0.100 0.020 0.025 0.100 70.70 -

Stay Construction 23323 Const. of Buiguias NHS, Bot-oan Extension CAR 2.633 C 0.343 0.032 0.300 - - - 67.50 71.25%

Satisfactory

Steel City Fabricators Corporation 27035 Const. of 1 CL Sch. Bldg. at

Mimbunga NHS X 0.494 C 0.366 0.236 0.300 - - - 90.20 *90.20% Outstanding

Steel City Fabricators Corporation 27035 Const. of 1-CL Steeltek School

Building @ Laguindingan CES X 8.445 C 0.466 0.000 0.500 - - - 96.60 *96.60% Outstanding

Steel City Fabricators Corporation 27035 Const. of Various S/B (1-Cl S/B)

Brgy. Garcia, Tagoloan X 0.312 C 0.319 0.000 0.500 - - - 81.90 88.76% V. Satisfactory

Steven Construction and Supply 21987 Const. of 2 Storey MPB (Phase I)

@ Brgy. GRS V 0.940 C 0.396 0.100 0.300 - - - 79.60 77.78% Satisfactory

Steven Construction and Supply 21987 Const. of Covered Court,

Catbalogan V CES VIII 1.814 C 0.328 0.300 0.300 - - - 92.80 82.09% V. Satisfactory

Steven Construction and Supply 21987 Repair/Impv't. of DPWH Bldg.,

Albay Engineering District V 0.919 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding

Sto. Cristo Construction 26096 Const. of 1 Cl Sch. Bldg. at San Roque E/S III 0.477 C 0.296 0.200 0.300 - - - 79.60 *79.60%

Satisfactory

Sto. Cristo Construction 26096Const. of Two (2) Cl Sch. Bldg. at San Vicente-San Francisco

NHSIII 0.822 C 0.287 0.300 0.300 - - - 88.70 *88.70%

V. Satisfactory

Sto. Cristo Construction 26096 Const./Repair/Completion of Sto. Domingo Brgy. Road III 0.475 C 0.391 - 0.500 - - - 89.10 88.44%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 397

Page 406: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sto. Cristo Construction 26096 Impvt. of San Vicente FMR III 1.901 C 0.250 0.200 0.300 - - - 75.00 74.64% Satisfactory

Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.900 O 0.219 0.229 0.100 0.030 0.037 0.100 71.50 -

Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.690 O 0.357 0.230 0.100 0.030 0.030 0.067 81.40 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road (Mahayag-Josefina)

IX 18.549 O 0.318 0.160 0.100 0.030 0.042 0.100 75.00 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road (Mahayag-Josefina)

IX 18.549 O 0.374 0.240 0.100 0.030 0.035 0.100 87.90 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road (Molave-Mahayag Section)

IX 18.550 O 0.237 0.223 0.100 0.030 0.042 0.100 73.20 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road (Molave-Mahayag Section)

IX 18.550 O 0.340 0.220 0.100 0.030 0.030 0.100 82.00 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road, Blancia-Mahayag Section

IX 18.550 O 0.223 0.180 0.100 0.030 0.032 0.100 66.50 -

Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-

Josefina Road, Blancia-Mahayag Section

IX 18.550 O 0.340 0.220 0.100 0.030 0.030 0.067 78.70 -

Sto. Niño Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road IX 18.550 O 0.293 0.140 0.100 0.030 0.042 0.100 70.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 398

Page 407: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sto. Niño Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road IX 18.550 O 0.386 0.235 0.100 0.030 0.030 0.100 88.10 -

Sto. Niño Construction 4867 Conc. of Loguilo By-Pass Road X 8.679 O 0.301 0.299 0.100 0.030 0.040 0.067 83.70 -

Sto. Niño Construction 4867 Conc. of Midsalip-Sominot Road IX 9.299 C 0.298 0.107 0.300 - - - 70.50 75.48% Satisfactory

Sto. Niño Construction 4867Conc. of Pagadian City-Buug Rd. (Kamalarang Section), Pagadian-

Ipil RoadIX 27.550 O 0.324 0.186 0.100 0.030 0.025 0.100 76.50 -

Sto. Niño Construction 4867Conc. of Provincial Road Jct.

Lower Dimaya-Pob. Dinas Zamboanga Del Sur

IX 10.264 C 0.202 0.188 0.300 - - - 69.00 69.96% Fair

Sto. Niño Construction 4867 Const. of MPB @ Brgy. 24 X 0.943 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

Sto. Niño Construction 4867 Const. of Multi-Purpose Building IX 0.484 C 0.365 0.249 0.300 - - - 91.40 *91.40% Outstanding

Sto. Niño Construction 4867 Const. of Poblacion Opol Flood Control X 9.642 C 0.344 0.200 0.300 - - - 84.40 86.20%

V. Satisfactory

Sto. Niño Construction 4867 Const. of River Control @ Salug River IX 9.310 O 0.272 0.120 0.100 0.030 0.035 0.200 75.70 -

Sto. Niño Construction 4867 Const. of River Control at Maclob Bridge IX 1.667 C 0.223 0.200 0.300 - - - 72.30 *72.30%

Satisfactory

Sto. Niño Construction 4867Const./Extension of Dipolog Flood Control Dipolog City-

Dapitan City RoadIX 4.712 C 0.347 0.200 0.300 - - - 84.70 76.36%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 399

Page 408: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sto. Niño Construction 4867 Impvt./Conc. of Poblacion to Aromahon Road X 9.643 C 0.364 0.200 0.300 - - - 86.40 87.96%

V. Satisfactory

Sto. Niño Construction 4867 Impvt./Conc. Paving along Jct. Kagawasan-Tabina Rd. IX 4.759 C 0.214 0.285 0.300 - - - 79.90 77.86%

Satisfactory

Sto. Niño Construction 4867Impvt./Conc. Paving of Aurora-Dipolog City Road, Mahayag-

Josefina SectionIX 18.450 C 0.345 0.300 0.000 - - - 64.50 72.78%

Satisfactory

Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-Alicia Road, (Phase I), Baluran-

Guintolan SectionIX 34.948 C 0.317 0.190 0.300 - - - 80.70 77.54%

Satisfactory

Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-

Alicia Road, (Phase II), Guintolan Section

IX 33.916 O 0.301 0.200 0.070 0.030 0.045 0.067 71.30 -

Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-

Alicia Road, (Phase III), Guintolan Section

IX 33.916 O 0.295 0.235 0.100 0.030 0.042 0.100 80.20 -

Sto. Niño Construction 4867 Rehab. of Bawang-Silupa Roads IX 0.954 C 0.186 0.300 0.300 - - - 78.60 *78.60% Satisfactory

Sto. Niño Construction 4867 Rehab. of Oroquieta City-Calamba Mt. Road X 15.675 O 0.373 0.260 0.000 0.023 0.038 0.067 76.10 -

Sto. Niño Construction 4867Repair/Rehab. of Brgy. Kauswagan, Diplahan, Zamboanga Sibugay

IX 0.941 C 0.460 - 0.500 - - - 96.00 *96.00% Outstanding

Sto. Niño Construction 4867 Repair/Rehab. of Farm-to-Market Road, Diplo-Sanlagmanok Road IX 4.520 C 0.477 - 0.500 - - - 97.70 95.60%

Outstanding

Stocon Construction Service 26111 Concreting of Cugman By Pass

Road X 1.412 C 0.359 0.273 0.300 - - - 93.20 81.50% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 400

Page 409: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Stoneline Construction 13132 Conc. of Cotabao City Diversion Road XII 9.627 C 0.250 0.300 0.300 - - - 85.00 78.64%

Satisfactory

Stoneline Construction 13132Conc. of Cotabato City

Circumferential Highway, (Lugay-Lugay-Kalanganan Section)

XII 4.780 C 0.337 0.200 0.000 - - - 53.70 71.82% Satisfactory

Stoneline Construction 13132Conc. of Western

Circumferential Roads (Purok Balas-Purok Sagingan Sect.)

XII 1.901 C 0.343 0.200 0.300 - - - 84.30 76.20% Satisfactory

Stoneline Construction 13132Concrete Reblocking of

Cotabato-Alla-Marbel National Road

XII 4.761 C 0.331 0.200 0.000 - - - 53.10 67.38% Fair

Stoneline Construction 13132 Const. of MPB XII 0.761 O 0.347 0.240 0.100 0.020 0.027 0.100 83.40 -

Stoneline Construction 13132 Const. of Road at Esteros Rosario heights 9 XII 1.380 C 0.200 0.200 0.300 - - - 70.00 77.68%

Satisfactory

Stoneline Construction (Formerly: Abubakar

Engineering Exponent)13132 Concreting of SKC Lugay-Lugay

Road XII 3.717 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -

Stoneline Construction (Formerly: Abubakar

Engineering Exponent)13132 Const. of MPB XII 0.761 C 0.359 0.225 0.300 - - - 88.40 84.90%

V. Satisfactory

Struktura Teknika Services Company 16646 Const. of 2 Storey RGR Type

Sch. Bldg. Phase II IVA 5.752 C 0.398 0.200 0.300 - - - 89.80 87.98% V. Satisfactory

Struktura Teknika Services Company 16646 Const. of MPB @ M. Naval St. NCR 5.682 C 0.399 0.300 0.300 - - - 99.90 87.58%

V.Satisfactory

Stvinta Construction 32620 Conc. of road Valcres, Mabolo III 0.962 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 401

Page 410: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

STX Enterprises 21547 Const. / Improvement of MWCR, Balansay Section IV-B 1.412 C 0.335 - 0.500 - - - 83.50 80.92%

V. Satisfactory

Subcon Corporation 25079 Conc. of Mactan St. III 1.387 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

Subcon Corporation 25079Concreting of E-25th St. and

26th St. (Elicano St.,-Dead End) East

III 1.302 C 0.377 0.200 0.300 - - - 87.70 82.90% V. Satisfactory

Sui Generis Construction 28174 Const. of Lasti-Tadloc Riverside Road (Phase I) IVB 3.819 O 0.318 0.300 0.100 0.023 0.028 0.100 86.90 -

Sui Generis Construction 28174

Const. of Molino Blvd., Niog-Mambog-Molino Section, Sta.

0+510 - Sta. 7+770.29 (Intermittent Section)

IV-A 43.393 O 0.324 0.243 0.050 0.030 0.059 0.100 80.60 -

Sulim Construction & Supply 26588 Rosario CIS (Irrigation) NIA 0.763 C 0.358 0.174 0.300 - - - 83.26 *83.26%

V.SatisfactorySumitomo Construction Co.

Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 O 0.394 0.300 0.100 0.024 0.070 0.100 98.80 -

Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -

Summa Kumagai, Incorporated 3381

NAIA Expressway & Its related Proj., Phase I, Package I, Sales

Interchange ComponentURPO 164.128 O 0.348 0.300 0.100 0.030 0.043 0.100 92.10 -

Summa Kumagai, Incorporated 3381

NAIA Expressway and its Related Roads Project, Phase I,

Package I, Sales Interchange Components

URPO 164.128 O 0.320 0.300 0.100 0.030 0.065 0.100 91.50 -

Summercap Const. and Allied Services 30787 Completion of Lengey MPB CAR 2.279 C 0.334 0.219 0.000 - - - 55.30 73.01%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 402

Page 411: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Summercap Const. and Allied Services 30787 Const. of Poblacion-Bulo-

Magabta FMR CAR 1.331 C 0.370 0.300 0.300 - - - 97.00 *97.00% Outstanding

Sunstone Construction 11122 Conc. of Cotabao City Diversion Road XII 9.267 O 0.258 0.236 0.100 0.015 0.035 0.100 74.40 -

Sunstone Construction 11122Conc. of Dualing-New Panay-

Midsayap Road (New Leon-New Panay Sect.)

XII 9.437 O 0.370 0.254 0.100 0.030 0.027 0.067 84.80 -

Sunstone Construction 11122 Conc. of Road @ Brgy. Barongis XII 0.478 C 0.370 0.283 0.300 - - - 95.30 *95.30% Outstanding

Sunstone Construction 11122 Conc. of Road @ Brgy. Central Katingawan XII 0.826 C 0.351 0.300 0.300 - - - 95.10 75.06%

Satisfactory

Sunstone Construction 11122 Const. of FTMR @ Barangiran XII 0.428 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding

Sunstone Construction 11122 Const. of MPB @ Brgy. Batiocan XII 0.287 C 0.340 0.300 0.300 - - - 94.00 *94.00% Outstanding

Sunstone Construction 11122 Rehab./Conc. of Davao-Cotabato Road, Dualing Section XII 5.692 C 0.313 0.300 0.000 - - - 61.30 75.10%

Satisfactory

Sunwest Construction & Development Corporation 15906 Davao Port Expansion Project PPA 396.089 O 0.400 0.030 0.300 0.030 0.07 0.100 93.00 -

Sunwest Construction & Development Corporation 15906 Lamoa Port Expansion Project PPA 98.213 O 0.383 0.300 0.030 0.030 0.060 0.033 83.60 -

Sunwest Construction & Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 O 0.400 0.300 0.100 0.024 0.065 0.100 98.90 -

Sunwest Construction and Development Corporation 15906 Channelization Nasisi River V 14.420 C 0.417 - 0.500 - - - 91.70 *91.70%

Oustanding

Sunwest Construction and Development Corporation 15906 Channelization of Padang River V 7.183 C 0.333 - 0.500 - - - 83.30 *83.30%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 403

Page 412: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Sunwest Construction and Development Corporation 15906 Channelization of Tubli River V 28.497 C 0.300 - 0.500 - - - 80.00 *80.00%

Satisfactory

Sunwest Construction and Development Corporation 15906 Const. of Bahi Seawall, Rock

Causeway & Access Road V 47.945 C 0.450 0.500 - - - 95.00 95.12% Outstanding

Sunwest Construction and Development Corporation 15906 Dredging of Talisay River V 19.225 C 0.250 - 0.500 - - - 75.00 83.46%

V. Satisfactory

Sunwest Construction and Development Corporation 15906 Legaspi Airport Development

Project DOTC 59.212 O 0.351 0.296 0.150 0.020 0.057 0.050 92.40 -

Sunwest Construction and Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 C 40.000 30.000 30.000 - - - 99.39 99.39%

Outstanding

Sunwest Construction and Development Corporation 15906

Repair/Impvt./Asphalt Overlay of Shoulders of Calayucay-Sula-

Mosboron RoadV 11.415 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

Sunwest Construction and Development Corporation 15906 Replacement of Bubulusan

Bridge V 17.328 O 0.374 0.240 0.100 0.030 0.019 0.100 86.30 -

Sunwest Construction and Development Corporation 15906 Road Opening leading to Orok-

Osok Falls V 28.499 C 0.398 0.296 0.300 - - - 99.40 96.10% Oustanding

Sunwest Construction and Development Corporation 15906 Road Opening of Obi to Orok-

Osok Falls V 28.496 C 0.327 0.137 0.300 - - - 76.40 86.12% V. Satisfactory

Sunwest Construction and Development Corporation 15906 Road Opening of Tilod-Batolinao-

Pacugon Road V 19.260 C 0.400 0.277 0.000 - - - 67.70 73.14% Satisfactory

Sunwest Construction and Development Corporation 15906

Widening / Improvement of National Road, Bagamanoc-

Pandan RoadV 14.195 C 0.387 0.293 0.300 - - - 98.00 96.62%

Oustanding

Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.

Road (Bato-Baras Section) V 28.495 C 0.395 0.287 0.300 - - - 98.20 95.92% Oustanding

Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.

Road (Hinipaan Section) V 28.511 C 0.397 0.288 0.300 - - - 98.50 91.90% Oustanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 404

Page 413: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Superpower Construction 17149 Conc. of Brgy. Road, Brgy. Parang IV-A 0.577 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

Superpower Construction 17149 Const. of Pahinga Norte-Malabanban Sur Spillway IV-A 1.893 C 0.335 0.000 0.500 0.000 0.000 0.000 83.50 *83.50%

V. Satisfactory

SWACS Enterprises 30009 Conc. of Road going to the E/S @ Pinget Brgy. CAR 1.432 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

SWACS Enterprises 30009 Rehab. of Abatan-Poblacion FMR CAR 0.481 C 0.365 0.200 0.300 - - - 86.50 *86.50%

V. Satisfactory

SY Construction 30009 Rehab. of Drainage Canal @ St. Theresa St. CAR 0.285 C 0.252 0.119 0.300 - - - 67.10 *67.10%

Fair

SY Construction 12333 Rehabilitation/Restoration of Farm-to-Market Road IV-A 1.924 C 0.389 0.300 0.000 - - - 68.90 81.80%

V. Satisfactory

Sydglen Builders and Enterprises 28848

Conc. of Shoulders along Daan Maharlika-Naga-Naga Anibong

Sect.VIII 1.895 C 0.282 0.300 0.300 - - - 88.20 *88.20%

V. Satisfactory

Sydglen Builders and Enterprises 28848 Const. of 1 Cl Sch. Bldg. @

Alang-alang I C/S VIII 0.507 C 0.359 0.300 0.300 - - - 95.90 *95.90% Outstanding

Sysmic Enterprises & Construction 29697 Const. of Hernani Seawall,

Hernani VIII 0.914 C 0.312 0.000 0.500 0.000 0.000 0.000 81.20 *81.20% V. Satisfactory

System One Builders 26480Proposed Partial Const. of Zobel

Roxas Extension Alabastro to Onyx St.

NCR 4.719 C 0.414 0.000 0.500 0.000 0.000 0.000 91.40 81.14% V. Satisfactory

T R Construction 11697 Concreting of EM's Barrio Brgy. Road V 0.226 C 0.452 0.000 0.500 0.000 0.000 0.000 95.20 *95.20%

Oustanding

T. Solomon Construction 10046 Const. of Road @ Brgy. Banjo East IV-A 0.963 C 0.298 0.300 0.300 - - - 89.80 *89.80%

V. Satisfactory

T. Solomon Construction 10046 Const. of Six (6) CL Sch. Bldg. @ Brgy. Gonzales IV-A 2.890 C 0.334 0.200 0.300 - - - 83.40 *83.40%

V. Satisfactory

T. Solomon Construction 10046 Repair/Impvt. of MPB at Brgy. Balele IV-A 3.375 C 0.373 0.300 0.300 - - - 97.30 *97.30%

Outstanding

T.A.D. Construction 14098 Const. of Brgy. Road at Brgy. San Roque IVA 0.381 C 0.370 0.300 0.300 - - - 97.00 *97.00%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 405

Page 414: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

T.A.D. Construction 14098Const. of Flood Control Pilot Project at Kinanliman River

ControlIV-A 9.640 C 0.360 0.300 0.300 - - - 96.00 81.78%

V. Satisfactory

T.A.D. Construction 14098 Const. of MPB @ Quezon National Agricultural IVA 1.929 C 0.327 0.300 0.300 - - - 92.70 *92.70%

Outstanding

T.A.D. Construction 14098 Const. of Multi-Purpose Bldg. (BSP) @ Tayabas East (E/S) IVA 4.810 C 0.454 - 0.500 - - - 95.40 *95.40%

Outstanding

T.A.D. Construction 14098 Const. of Olo Bridge VII 2.744 C 0.327 0.300 0.300 - - - 92.70 *92.70% Outstanding

T.A.D. Construction 14098 Const./Completion of MPB at Caitican VII 0.472 C 0.261 0.237 0.300 - - - 79.80 *79.80%

Satisfactory

T.A.D. Construction 14098Repair/Maintenance of Lined Canal along Lucena Bdry.-

Tayabas-Lucban RoadIVA 0.289 C 0.232 0.300 0.300 - - - 83.20 *83.20%

V. Satisfactory

T.J. Velasco Construction and Supply 10560 Const. of 14 Core Housing Units NHA

Region I 3.023 C 0.394 0.300 0.300 - - - 99.40 85.40% V.Satisfactory

T.N.J. Buhong Construction 19687 Impvt. along Ban-Hung-Benguet

Bdry. Road Alimit-Hiwang Sect. CAR 2.455 C 0.366 - 0.500 - - - *86.60 86.60% V. Satisfactory

T.N.J. Buhong Construction 19687

Impvt. Along Jct. Potia-Mt. Province Bdry. Road, Pob.

SectionCAR 1.580 C 0.341 0.300 0.300 - - - 94.10 81.44%

V.Satisfactory

T.N.J. Buhong Construction 19687

Impvt. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Road,

Km. 297+000-Km. 300+000CAR 0.488 C 0.390 - 0.500 - - - 89.00 *89.00%

V. Satisfactory

T.N.J. Buhong Construction 19687

Widening/Conc. of Poblacion-Banaue-Brgy. Bangaan, Awaan-

Banagan SectionCAR 23.123 O 0.268 0.126 0.070 0.008 0.030 0.033 53.50 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 406

Page 415: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

T.R.A. Builders 26775 Const. of MPB, Don Jose Ynares Sr. MNHS IV-A 1.633 C 0.376 0.200 0.300 - - - 87.60 *87.60%

V. Satisfactory

Tabs Construction & Construction Supplies 10495

Replacement of Deteriorated Macadam Road to PCCP along

Davao-Cotabato Road (NORCIT-KPES Sect.)

XII 5.217 C 0.472 - 0.500 - - - 97.20 90.18% Outstanding

Tacloban Ras Construction Corporation 17184

Rehab./Impvt. of Asphalt Road leading to San Juanico Bridge

Field OfficeVIII 1.996 C 0.267 0.200 0.300 - - - 76.70 *76.70%

Satisfactory

Tacolod Enterprises 10721 Const. of One (1) Unit, 1-CL School Bdlg. @ Andulawan NHS VI 0.357 C 0.462 - 0.500 - - - 96.20 88.92%

V. Satisfactory

Taisei Philippine Construction Incorporated /

Marubeni (JV)

SL2-SN-000432

Const. of Cebu South Coastal Road Project-Segment 3B-1,

offshorre Ramps SectionMCDP 695.488 O 0.352 0.300 0.100 0.030 0.065 0.100 94.70 -

Tango Romeo General Construction 18926 Conc. of Legarda Road CAR 2.810 C 0.279 0.300 0.300 - - - 87.90 *87.90%

V. SatisfactoryTango Romeo General

Construction 18926 Conc./Widening of La Chesa @ Brgy. Upper Tadiangan CAR 2.782 C 0.298 0.300 0.300 - - - 89.80 *89.80%

V. Satisfactory

Tango Romeo General Construction 18926 Concreting/Widening of Road,

Trancoville Brgy. CAR 1.142 C 0.390 - 0.500 - - - 89.00 *89.00% V. Satisfactory

Tango Romeo General Construction 18926 Rehab./Impvt. of Harrison Road

2 CAR 4.724 C 0.394 0.108 0.300 - - - 80.20 *80.20% V. Satisfactory

Tantuco Const. and Trading Corp. 7255 Rehab./Impvt. of Road at Purok

Pinag-isa, Brgy. Cotta IV-A 0.329 C 0.375 - 0.500 - - - 87.50 87.50% V. Satisfactory

Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.

Supply)

7255 Conc. of San Pablo Boundary-Dolores-Pinagdanglayan Road IV-A 7.509 C 0.269 0.200 0.300 - - - 76.90 *76.90%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 407

Page 416: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.

Supply)

7255 Const. of Elevated Water Tank with Pipelines IV-A 0.944 C 0.352 0.300 0.300 - - - 95.20 *95.20%

Outstanding

Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.

Supply)

7255

Const. of Quezon Eco-Tourism Road (LUC-BAT CR) inc. RROW:

Phase II, Guisguis-Bantilan Sect., Conc. of Guisguis-Bignay I

Sect.

IV-A 17.750 C 0.348 0.265 0.300 - - - 91.30 *91.30% Outstanding

Tarifa Constuction & Supplies 33239 Const. of Road (FMR), Sito Sto.

Rosario, Brgy. Baculong III 1.685 C 0.330 0.279 0.300 - - - 90.90 *90.90% Outstanding

TCAT Construction 20822 Const. of Municipal Hall VIII 0.961 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding

TDR Construction & Supply 8560 Conc. of Brgy. Road @ Brgy. Kawit IVA 0.470 C 0.275 0.300 0.300 - - - 87.50 *87.50%

V. Satisfactory

Teddie Construction Development, Inc. 6313

Const. (New Opening) of Zamboanga West Coast Road, Sirawai-Sibuco Road, Bitugan-Tapanayan-Talabiga Section

IX 32.446 O 0.160 0.043 0.000 0.030 0.042 0.100 37.50 -

Teddie Construction Development, Inc. 6313 Const. of Bangayan Bridge and

Approaches IX 6.054 C 0.376 0.201 0.300 - - - 87.70 84.46% V. Satisfactory

Teddie Construction Development, Inc. 6313

Impvt. of Nat'l Road (Asphalt Overlay along Maria Clara L.

Lobregat HighwayIX 14.998 C 0.279 0.300 0.300 - - - 87.90 90.06%

Outstanding

Teddie Construction Development, Inc. 6313 Impvt./Road Widening of Sangali

Nat'l Road IX 9.201 C 0.356 0.200 0.300 - - - 85.60 81.16% V. Satisfactory

Teddie Construction Development, Inc. 6313

Rehab./Impvt. of Nat'l Road (Asphalt Overlay Labuan-

Limpapa Road along Zamboanga City)

IX 11.676 C 0.320 0.100 0.300 - - - 72.00 *72.00% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 408

Page 417: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Tessa Construction & Trading 26437 Concrete Paving of Brgy. Muñoz

West Road II 0.944 C 0.259 - 0.500 - - - 75.90 *75.90% Satisfactory

Tessa Construction & Trading 26437 Const. of Multi-Purpose Building II 1.889 O 0.365 0.300 0.070 0.015 0.027 0.067 84.40 -

Tessa Construction & Trading 26437 Rehab./Const. of Road II 1.889 O 0.330 0.294 0.100 0.030 0.055 0.100 90.90 -

Tessa Construction & Trading 26437 Repair/Rehab. of Multi-Purpose

Building with CR, Brgy. Marulas NCR 0.444 C 0.333 - 0.500 - - - 83.30 *83.30% V. Satisfactory

Tessa Construction & Trading 26437 Road Impvt. Along Gamu-Roxas

Road II 4.940 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

The Steadfast Builders 8176 Const. of Drainage System at Sto. Simona, Brgy. San Isidro IV-A 0.955 C 0.451 - 0.500 - - - 95.10 *95.10%

Outstanding

The Steadfast Builders 8176 Const. of Multi-Purpose Building (Dialysis) NCR 2.812 C 0.459 - 0.500 - - - 95.90 *95.90%

Outstanding

The Steadfast Builders 8176 Const. of Two (2) Storey, Six (6) Classroom IV-A 4.662 C 0.382 0.300 0.300 - - - 98.10 60.75%

Fair

The Steadfast Builders 8176

Maintenance by Contract Package I, CY-2003 R-10,

Tayuman, Zaragosa, Moriones and Juan Luna

NCR 5,279 C 0.408 - 0.500 - - - 90.80 83.30% V. Satisfactory

The Steadfast Builders 8176 Rehab. of MPB at Brgy. Nayong Kanluran (Covered Court) NCR 2.697 O 0.300 0.300 0.100 0.030 0.028 0.067 82.50 -

The Steadfast Builders 8176 Rehab./Const. of MPB @ Zone 25, 26, 29, 32, & 33 NCR 1.827 C 0.384 0.300 0.300 - - - 98.40 94.20%

Outstanding

The Steadfast Builders 8176 Rehab./Impvt. of F.P. Felix Ave. (Formerly Imelda Ave.) IV-A 14.417 C 0.365 0.200 0.300 - - - 86.50 *86.50%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 409

Page 418: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

The Steadfast Builders 8176 Rehab./Impvt. of Drainage and Flood Control IV-A 9.602 C 0.300 0.300 0.300 - - - 90.00 79.56%

Satisfactory

The Steadfast Builders 8176Upgrading/Concreting with

Drainage Impv't. of Brgy. 118, Zone 9

NCR 2.052 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory

The Tuscan Structures and Supplies 18257 Conc. of Bugko-Nenita Road VIII 14.313 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

The Tuscan Structures and Supplies 18257 Const./Impvt./Rehab. of

Bantayan-Malobago Road VIII 18.795 O 0.289 0.245 0.100 0.023 0.047 0.100 80.40 -

The Tuscan Structures and Supplies 18257 Rehab. of Naga to Mombon Sect.

along Calbayog Diversion Road VIII 9.630 O 0.338 0.235 0.100 0.030 0.042 0.100 84.50 -

Thel Construction & Supplies 17671

Conc. of Dualing-New Panay-Midsayap Road (Katalicanan

Sect.)XII 4.775 C 0.330 0.300 0.000 - - - 63.00 71.82%

Satisfactory

Thel Construction & Supplies 17671 Const. of 1-Cl School Building XII 0.375 C 0.325 - 0.500 - - - 82.50 *82.50%

V. Satisfactory

Thel Construction & Supplies 17671 Const. of MPB @ Brgy. Sta. Cruz XII 0.282 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

Three W Builders, Inc 19722 Repair/Rehabilitation/ Construction of Butas Dam NIA 34.95 C 0.3358 0.2184 0.300 - - - 85.41 85.41%

V. Satisfactory

Three W Builders, Incorporated 10722

Completion (conc.) of Ternate-Nasugbu Road, Balaytigue-

Calayo-Looc SectionIV-A 23.988 C 0.342 0.300 0.300 - - - 94.20 91.17%

Outstanding

Three W Builders, Incorporated 10722 Const. of 2- Storey, 4-CL School

Building IV-A 2.784 C 0.393 - 0.500 - - - 89.30 86.78% V. Satisfactory

Three-In-One Construction & Trading 14695 Conc. of Brgy. Road @ Brgy.

Callulut III 0.475 C 0.315 0.274 0.300 - - - 88.90 *88.90% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 410

Page 419: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Thrivelight Enterprises & Construction 26842 Const. of MPS @ Brgy.

Ambangonan, Rosaario I 0.930 C 0.331 - 0.500 - - - 83.10 *83.10% V. Satisfactory

Thunder Construction 17247 Conc. of Poblacion Pilar-Dalit Road CAR 1.884 C 0.277 0.200 0.300 - - - 77.70 *77.70%

Satisfactory

Thunder Construction 17247 Const. of MPB Completion of MPB (Package), Brgy. Calaba CAR 2.364 C 0.268 0.200 0.000 - - - 46.80 *46.80%

Poor

Thunder Construction 17247Const. of Slope Protection Work

along Abra-Cervantes Road, Bucay Section

CAR 4.722 C 0.200 0.116 0.300 - - - 61.60 72.52% Satisfactory

Thunder Construction 17247

Const./Road Opening of Abra-Cervantes Road, Gangal-

Subusob-Salapay Section, km. 445+000 - km. 457+945

CAR 12.076 C 0.229 0.200 0.000 - - - 42.90 53.82% Poor

Thunder Construction 17247 Rehabilitation of FMR @ Villa Mercedes CAR 0.468 C 0.284 0.200 0.300 - - - 78.40 74.08%

Satisfactory

Thunder/Gonzalo Joint Venture

SL1-SN-004984 (JV-07-

003)

Const. of Masiwsiw RCDG Bridge & Approaches CAR 15.537 C 0.353 0.100 0.300 - - - 75.30 76.84%

Satisfactory

Thunderheads Construction Corporation 22420 Conc. of Road @ San Isidro IV-B 0.951 O 0.372 0.300 0.100 0.023 0.047 0.067 90.90 -

Thunderheads Construction Corporation 22420 Conc. of Road @ San Isidro IV-B 0.951 C 0.347 0.280 0.300 - - - 92.70 91.62%

Outstanding

Thunderheads Construction Corporation 22420 Const. of Paclasan Seawall IV-B 0.875 C 0.396 - 0.500 - - - 89.60 89.60%

V. Satisfactory

Tibaraw Construction 22710 Const. of Multi-Purpose Building VIII 1.702 C 0.370 0.200 0.300 - - - 87.00 85.71% V. Satisfactory

Tibaraw Construction 22710 Const./Rehab. of FMR, Bagacay-Concord Road VIII 1.789 C 0.000 - 0.500 - - - 50.00 40.00%

Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 411

Page 420: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Titanium Builders Inc. 24921 Concreting of Barangay Road, Brgy. Poblacion X 0.964 C 0.337 0.300 0.300 - - - 93.70 88.18%

V. Satisfactory

Titanium Builders, Inc. 24921 Conc. of Purok Mutya-Brgy. Katipunan Road, Villanueva X 0.955 C 0.422 - 0.500 - - - 92.20 *92.20%

Outstanding

Titanium Builders, Inc. 24921 Const. of Brgy Maputi Flood Control, Naawan X 0.239 C 0.445 - 0.000 - - - 44.50 *44.50%

Poor

TKS Builders and Supplies 23415 Concreting of Roads at Sitio Batulosa Bangkas Heights XI 1.407 C 0.456 - 0.500 - - - 95.60 95.60%

Outstanding

TKS Builders and Supplies 23415 Const. of MPB at Brgy. Fire Station XI 2.599 C 0.364 0.300 0.300 - - - 96.40 96.82%

Outstanding

TKS Builders and Supplies 23415 Const. of MPB at Camanchiles XI 1.575 C 0.326 0.300 0.300 - - - 92.60 90.92% Outstanding

TLI Construction 19209Const. of MPB (Haven for the

elderly) inside the National Training School for Boys

IV-A 9.615 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding

TM Abad Construction 9302Completion/Conc. of Road @

Panorama Hills, Etn. Brgy. Cupang

IV-A 0.431 C 0.290 0.244 0.300 - - - 83.40 *83.40% V. Satisfactory

TM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S NCR 2.894 C 0.383 0.300 0.300 - - - 98.30 89.20% V. Satisfactory

TM Abad Construction 9302 Riprapping of Putting Kahoy Creek IV-A 1.050 C 0.375 - 0.500 - - - 87.50 *87.50%

V. Satisfactory

Toa Construction

FC-01-054/SLI-

SN-004426

Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 708.981 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 412

Page 421: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Toa Construction

FC-01-054/SL2-

SN-000567

Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 925.116 O 0.355 0.200 0.100 0.030 0.065 0.200 95.00 -

Tokwing Construction 9650 Const. of Mindanao Ave. Extension (Segment C) NCR 161.879 O 0.375 0.180 0.100 0.030 0.042 0.067 79.40 -

Tokwing Construction 9650 Repair/Rehab. of Ayala Bridge NCR 42.303 C 0.324 0.300 0.300 - - - 92.40 90.12% Outstanding

Tokwing Construction/ZM Construction (JV) JV-05-006

Const. of Maculcul Bridge & Approaches along Iba-South

Road (Phase III)III 93.730 O 0.377 0.300 0.100 0.030 0.037 0.100 94.40 -

Tokwing Construction/ZM Construction (JV)

SL1-SN-004749

Const. of Maculcul Bridge (Phase II) III 47.664 O 0.356 0.300 0.100 0.030 0.040 0.100 92.60 -

Tokwing Construction/ZM Construction (JV)

JV-060-054

Const. of Tarlac-Nueva Ecija-Dingalan Port Road, (Tarlac City-

Sta. Rosa-Fort Magsaysay-Palayan City-Laur Gabaldon-

Dingalan Road)

III 52.105 C 0.338 0.300 0.300 - - - 93.80 93.20% Outstanding

Tokwing Construction/ZM Construction (JV) JV-05-006

Construction of Maculcul Bridge & Approaches along Iba-South

Road (Phase III)III 94.890 C 0.389 0.300 0.300 - - - 98.90 96.20%

Outstanding

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway RampsURPO 414.099 O 0.355 0.256 0.100 0.030 0.065 0.100 90.60 -

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway RampsURPO 457.260 O 0.336 0.240 0.000 0.023 0.055 0.067 72.10 -

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway RampsURPO 597.836 O 0.284 0.240 0.000 0.024 0.061 0.100 70.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 413

Page 422: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway RampsURPO 597.836 O 0.283 0.240 0.050 0.024 0.059 0.100 75.60 -

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway Ramps 2 & 3URPO 597.836 O 0.294 0.291 0.000 0.024 0.047 0.100 75.60 -

Toledo Const. Corp./ Advanced Foundation

Const. System Corp. (JV)JV-02-063

NAIA Expressway & its Related Road Proj. Phase I, Package 3,

Skyway Ramps 2 & 3URPO 721.651 O 0.330 0.300 0.000 0.030 0.047 0.100 80.70 -

Toledo Construction Corporation 6349

Completion of Approaches/Slope Protection of

Kaliraya BridgeNCR 7.623 C 0.371 0.300 0.300 - - - 97.10 70.58%

Satisfactory

Toledo Construction Corporation 6349 Sct. Ranger Housing Village

Project. Phase 2 NCL 51.090 C 0.203 0.296 0.300 - - - 79.90 79.90% Satisfactory

Tonka Construction 4064 Upgrading/Asphalting of Manila North Road (Mabalacat Section) III 4.697 C 0.470 - 0.500 - - - 97.00 *97.00%

Outstanding

Tonn Builders (Phils.) Const., Inc. 5815

Const. (Widening) of Soro-Soro Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)

IVA 26.570 O 0.322 0.240 0.100 0.030 0.035 0.100 82.70 -

Tonn Builders (Phils.) Const., Inc. 5815

Const. (Widening) of Soro-Soro Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)

IVA 28.940 O 0.318 0.240 0.100 0.023 0.033 0.100 81.40 -

Tonn Builders (Phils.) Const., Inc. 5815 Const. of Lepote Bridge &

Approaches (Phase I & II) IVA 22.899 O 0.366 0.237 0.100 0.022 0.033 0.100 85.80 -

Top Most Development and Marketing Corporation 13361

Concreting of Lambunao-Pototan Road (Lambunao

Poblacion Portion)VI 2.595 C 0.431 - 0.000 - - - 43.10 71.45%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 414

Page 423: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Top Most Development and Marketing Corporation 13361 Const. of Nato Bridge VI 3.304 C 0.434 - 0.500 - - - 93.40 72.70%

Satisfactory

Top Most Development and Marketing Corporation 13361

Repair/Rehab. of National Road (Secondary Arterial), Bugnay-

Constancia SectionVI 6.629 C 0.334 0.300 0.300 - - - 93.40 *93.40%

Outstanding

Top Tech Trading & Construction 25522 Asphalt Overlay/Rehab. of Palico-

Balayan-Batangas Road IV-A 4.995 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

Top Tech Trading & Construction 25522 Conc. of Barangay Road @ Brgy.

Gulod IV-A 0.470 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

Top Tech Trading & Construction 25522 Concreting of FMR, Brgy. Dita IV-A 0.473 C 0.433 - 0.500 - - - 93.30 *93.30%

Outstanding

Top Tech Trading & Construction 25522

Const. of Drainage along Palico-Balayan-Batangas Road, Lemery

SectionIV-A 1.102 C 0.413 - 0.500 - - - 91.30 *91.30%

Outstanding

Toreja's Construction Supply Corporation 15453

Asphalt Overlay-Preventive Maintenance Palico-Balayan-

Batangas Rd. (Balayong-Manghinao I Sect.)

IV-A 20.740 C 0.231 0.300 0.300 - - - 83.10 *83.10% V. Satisfactory

Toreja's Construction Supply Corporation 15453 Conc. of Road @ Brgy. Simlog IV-A 4.744 C 0.333 0.281 0.300 - - - 91.40 *91.40%

Oustanding

Toreja's Construction Supply Corporation 15453 Const. of Open Canal IV-A 0.475 C 0.400 - 0.500 - - - 90.00 *90.00%

V. SatisfactoryToreja's Construction Supply Corporation 15453 Impvt./Rehab. of Lipa-Rosario

Road IV-A 4.817 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Toreja's Construction Supply Corporation 15453 Impvt./Rehab. of Rosario-Taysan

Road IV-A 4.817 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory

Toreja's Construction Supply Corporation 15453

Rehab./Reconst. of Lobo-Malabrigo-San Juan Road,

Malabrigo, Soloc-Sawang & Mabilog na Bundok Section

IV-A 19.294 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 415

Page 424: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Toyo Construction Co. Ltd. SL1-SN-004893

Rehab./Enhancement of Ormoc Flood Mitigation Structures MFCDP-II 121.513 C 0.389 0.300 0.300 - - - 98.90 94.36%

Oustanding

Toyo Construction Co., LTD

SL1-SN-004890

Const. of Super Diversion Canal(Sta. 26+600 to Sta.

29+240)NIA-III 506.085 O 0.373 0.200 0.100 0.024 0.047 0.200 94.40 -

Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038

Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.

(Quirino Bridge)UBCPRD 625.614 O 0.356 0.300 0.100 0.030 0.065 0.100 95.10 -

Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038

Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.

(Sarrat Bridge)UBCPRD 576.844 O 0.359 0.300 0.100 0.030 0.060 0.100 94.90 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Bacao Bridge)

UBCPRD 23.103 O 0.320 0.300 0.100 0.030 0.037 0.100 88.70 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Gusay Bridge)

UBCPRD 16.616 C 0.381 0.200 0.000 - - - 58.10 77.68% Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Madugo Bridge)UBCPRD 11.819 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Nagpatay Bridge)UBCPRD 37.840 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Piela Bridge)

UBCPRD 25.177 C 0.373 0.200 0.300 - - - 87.30 84.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 416

Page 425: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Salitran Bridge)UBCPRD 57.188 C 0.388 0.200 0.300 - - - 88.80 82.68%

V. Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Tiguisan Bridge)UBCPRD 14.821 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Bacao Bridge)

UBCPRD 23.103 O 0.308 0.259 0.100 0.030 0.051 0.100 84.80 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Basiao Bridge)

UBCPRD 22.310 O 0.399 0.300 0.000 0.024 0.061 0.067 85.10 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Batolinao Bridge)UBCPRD 18.351 O 0.379 0.300 0.000 0.024 0.061 0.000 76.40 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Borbocolan Bridge)UBCPRD 23.577 C 0.372 0.300 0.000 - - - 67.20 78.66%

Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Catmon Bridge)

UBCPRD 12.936 C 0.387 0.200 0.000 - - - 58.70 75.38% Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Gusay Bridge)

UBCPRD 16.616 O 0.370 0.271 0.050 0.030 0.055 0.067 84.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 417

Page 426: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Hulugan Bridge)UBCPRD 17.240 O 0.386 0.300 0.000 0.024 0.061 0.067 83.80 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for

Rural Devt. (Langgang Bridge)UBCPRD 14.949 C 0.356 0.300 0.000 - - - 65.60 78.17%

Satisfactory

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Piela Bridge)

UBCPRD 25.177 O 0.370 0.202 0.070 0.030 0.056 0.100 82.80 -

Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Salitran Bridge)

UBCPRD 57.188 O 0.310 0.240 0.050 0.030 0.056 0.100 78.60 -

Toyo-Tobishima (JV) FC-06-034 CP III UBCPRD - Const. of Pantal Bridge & Approaches UBCPRD 933.106 C 0.360 0.300 0.300 - - - 96.00 95.64%

Oustanding

TR Construction 11697Repair/Restoration of Legazpi-Punta De Jesus Road, Imalnod

SectionV 1.436 C 0.305 0.200 0.300 - - - 80.50 81.52%

V. Satisfactory

Tracsom Builders Inc. 5935 Const. of School Building @ Highway Hills E/S NCR 9.542 O 0.400 0.204 0.100 0.030 0.035 0.100 86.90 -

Tracsom Builders Incorporated 5935

Const. of 4 Storey 82 Classrooms Academic Building

@ Eulogio Rodriguez E/SNCR 14.316 C 0.256 0.201 0.300 - - - 75.70 72.64%

Satisfactory

Traffic Supplies and Construction Corp. 19584

Improvement of Midsayap-Dulawan-Marbel Road (Sta. Km.

1776-Sta. Km. 1793+000)XII 0.946 C 0.375 0.000 0.500 0.000 0.000 0.000 87.50 *87.50%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 418

Page 427: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Trams Construction 32964 Conc. of Access Road CAR 1.894 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory

Trams Construction 32964 Const. of MPB CAR 0.945 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory

Trans-Aurora Construction 11388 Conc. of Road leading to Dr. Juan C. Angara Airport III 4.703 C 0.306 0.300 0.300 - - - 90.60 *90.60%

Outstanding

Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.

Aurora-Castaneda Road, Brgy. Baubo -Brgy. Sto. Tomas Proper

III 13.453 C 0.360 0.200 0.300 - - - 86.00 89.06% V. Satisfactory

Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.

Aurora-Castaneda Road, Brgy. Sto. Tomas Proper

III 13.646 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Trans-Aurora Construction 11388Impvt./Conc. of Nat'l Road SLMAC Road, Wenceslao

SectionIII 7.177 C 0.299 0.227 0.300 - - - 82.60 84.82%

V. Satisfactory

Trez Construction and General Merchandise 32769 Const. of Malapatan Flood

Control XII 1.908 C 0.319 0.200 0.300 - - - 81.90 77.70% Satisfactory

Tribu Design Construction 12756 Const. of Pantal Bailey Bridge CAR 0.665 C 0.284 0.161 0.300 - - - 74.50 *74.50% Satisfactory

Tri-dom Trading and Construction 10843 Const. of Viga River Control V 3.856 C 0.260 0.300 0.300 - - - 86.00 *86.00%

V. Satisfactory

Tri-dom Trading and Construction 10843

Const. of Virac Drainage System along Francia-Lanao-

Constantino & MoonwalkV 8.191 C 0.270 0.100 0.300 - - - 0.67 67.00%

Fair

Tri-dom Trading and Construction 10843 Road Opening of Dugui-Wala-

Sinamla Road V 3.985 O 0.373 0.268 0.100 0.020 0.020 0.100 88.10 -

Trilex Builders Construction and Supply 26590 Completion of MPB at Albert

Elem. Sch. NCR 1.919 C 0.379 0.217 0.300 - - - 89.60 *89.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 419

Page 428: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Trilex Builders Construction and Supply 26590 Const. of MPB at the Albert E/S

(Phase I) NCR 1.919 O 0.231 0.300 0.100 0.030 0.047 0.100 80.80 -

Trinnadel Const. & Supply 15801 Asphalting of Access Road, Poblacion III 4.681 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

Trinnadel Const. & Supply 15801 Const. of Multi-Purpose Building III 2.794 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -

Triparco Development Corporation 23327 Asphalt Overlay/Impvt. of Butuan

Masao Port Road XIII 4.820 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satsifactory

Triparco Development Corporation 23327 Const. of Sangay-San Isidro

FMR, Kitcharo XIII 1.804 C 0.310 0.000 0.500 0.000 0.000 0.000 81.00 *81.00% V. Satsifactory

Triple 8 Construction & Supply 10684 Concreting/Upgrading of

Bustamante/M.H. del Pilar St. NCR 4,030 C 0.429 - 0.500 - - - 92.90 85.64% V. Satisfactory

Triple 8 Construction & Supply 10684 Rehab./Repair of Various Road /

Alleys and Drainage System NCR 0.954 C 0.317 0.300 0.300 - - - 91.70 *91.70% Outstanding

Triple 8 Construction & Supply 10684 Repair/Impvt. of Manila North

Road III 14.798 C 0.318 0.300 0.300 - - - 91.80 82.80% V. Satisfactory

Triple 8 Construction & Supply 10684

Upgrading/Conc. of Roads with Drainage Impvt. Of Gov. Pascual

Ave. NCR 9.492 C 0.374 0.200 0.300 - - - 87.40 *87.40%

V. Satisfactory

Triple 8 Construction & Supply 10684 Widening of Ortigas Ave. Phase

II NCR 9.544 C 0.314 0.300 0.300 - - - 91.40 91.64% Outstanding

Triple 8 Construction & Supply 10684

Widening/Concreting with Drainage Improvement along

M.H. Del Pilar St.NCR 3.778 C 0.389 - 0.500 - - - 88.90 *88.90%

V. Satisfactory

Triple P Construction 31616 Const. of District IV MPB (Reservist Phase II) II 0.747 C 0.400 0.240 0.300 - - - 94.00 *94.00%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 420

Page 429: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Triple P Construction 31616 Const. of Domang MPB (Phase II) II 0.481 C 0.299 0.300 0.300 - - - 89.90 85.70%

V. Satisfactory

Triple P Construction 31616 Const. of Mabulso MPB II 0.469 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding

Triple P Construction 31616 Const. of Malasin MPB II 0.285 C 0.358 0.220 0.300 - - - 87.80 *87.80% V. Satisfactory

Triple P Construction 31616 Const. of Mauan Women's Association MPB II 0.188 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

Tri-sons Construction and Supply 16890 Const. of Gymnasium Bldg. @

Brgy. Paitan XII 0.963 C 0.371 0.300 0.000 - - - 67.10 62.20% Fair

Triumph Builders and Steel Inc. 2272 Const. of one(1) unit Three-

Storey School Building NHA 18.007 C 0.383 0.300 0.300 - - - 98.30 98.30% Outstanding

TRM Construction & Dev't. Corp. 30713

Package IV-Concreting & Drainage Rehab. of Sorsogon St., Brgy. Nayong Kanluran &

East Riverside/Aragon St.,

NCR 1.914 C 0.426 - 0.500 - - - 92.60 *92.60% Outstanding

TRPL Construction 14236 Const. of Pagduque-Rosario Road VI 2.376 C 0.354 - 0.500 - - - 85.40 70.04%

Satisfactory

TSD Builders Construction and Supply 22129 Conc. of Bacolod-Granada-City

Bdry. Road VI 2.751 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

TSD Builders Construction and Supply 22129

Conc./Repair/Rehab. of Tangub Bridge I, along Bacolod-South

Kabankalan RoadVI 1.569 C 0.291 0.300 0.300 - - - 89.10 88.26%

V. Satisfactory

TSD Builders Construction and Supply 22129 Const. of Talisay Road at Brgy.

Zone1 VI 0.916 C 0.304 0.197 0.300 - - - 80.10 81.54% V. Satisfactory

TSD Builders Construction and Supply 22129 Widening of Bacolod-South

Kabankalan Road VI 1.294 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 421

Page 430: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

T-Square Builders 14268Completion of Big Margus RCDG

Bridge along Sarangani-Davao del Sur Coastal Road

XII 4.716 C 0.314 0.134 0.300 - - - 74.80 72.22% Satisfactory

T-Square Builders 14268 Conc. of Additional 2-lanes along Digos Junction Road XI 2.581 C 0.351 0.300 0.300 - - - 95.10 94.38%

Outstanding

T-Square Builders 14268Conc./Widening of Marbel-Tupi-Makar Road, Crossing Rubber-

Palian SectionXII 9.158 C 0.383 0.107 0.300 - - - 79.00 85.03%

V. Satisfactory

T-Square Builders 14268 Const. MPB @ Brgy. Poblacion (Municipal Hall) XII 4.751 C 0.361 0.300 - - - - 66.10 77.09%

Satisfactory

T-Square Builders 14268 Const. of 1-Cl at Malibago E/S Sitio Cassava VII 183.115 C 0.414 - 0.500 - - - 91.40 *91.40%

Outstanding

T-Square Builders 14268 Const. of MPB XII 0.477 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory

T-Square Builders 14268

Const./Conc. of General Santos City Circumferential Road (Western Section) Brgy.

Sinawal/Fatima

XII 7.917 C 0.355 0.157 0.300 - - - 81.20 *81.20% V. Satisfactory

T-Square Builders 14268 Const./Widening of Digos Junction Road XI 9.424 C 0.318 0.200 0.300 - - - 81.80 86.18%

V. Satisfactory

T-Square Builders 14268Impvt./Conc. of Road at

Bansalan-Mt. Apo National Park Road

XI 28.919 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -

T-Square Builders 14268Package I-Concreting of Various Road with Lined Canal Brgy. San

IsidroXII 1.439 C 0.366 - 0.500 - - - 86.60 *86.60%

V. Satisfactory

TTK Construction Corporation 31907 Cluster II: Const. of Multi-

Purpose Bldg. CAR 0.940 C 0.373 0.117 0.300 - - - 79.00 87.26% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 422

Page 431: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Tuchar Construction 13644 Completion of Multi-Purpose Building at Strip 70 NCR 0.609 C 0.435 - 0.500 - - - 93.50 *93.50%

Outstanding

Tuchar Construction 13644 Conc./Drainage Impvt. of Block 3, Sct. Borromeo NCR 0.474 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

Tuchar Construction 13644 Repair/Rehabilitation A. Bonifacio Avenue NCR 4.869 C 0.346 0.200 0.300 - - - 84.60 *84.60%

V. Satisfactory

Turquoise Construction 21801 Upgrading of National Road San Fernando - Lagundi III 4.771 C 0.385 - 0.500 - - - 88.50 88.50%

V. Satisfactory

Twin Dragon Construction 11392 Const. of Odiongan Multi-Purpose Bldg. IV-B 2.864 C 0.398 0.198 0.300 - - - 89.60 *89.60%

V. Satisfactory

Twin Dragon Construction 11392 Const. of Panique-Trangkalan Farm to Market Road IV-B 0.908 C 0.374 - 0.500 - - - 87.40 *87.40%

V. Satisfactory

Twin Dragon Construction 11392 Lining Ditches along Looc-Ferrol Rd., Km. 114+450 - 114+600 IV-B 0.283 C 0.444 0.500 - - - 94.40 94.40%

Outstanding

Twin Dragon Construction 11392 Repair of Odiongan Public Market IV-B 1.888 C 0.352 0.184 0.300 - - - 83.60 *83.60%

V. Satisfactory

Twin Dragon Construction 11392 Repair/Maint. of Bangon River Control IV-B 0.375 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

Twina Builders and Supply 23897 Const. of Water Supply Brgy. Luna, Kapalong XI 0.754 C 0.350 - 0.500 - - - 85.00 89.09%

V. Satisfactory

Twina Builders and Supply 23897 Rehab. of MPB (Cons. of Fire Station Bldg. Phase V) XI 4.714 C 0.354 0.200 0.300 - - - 85.40 88.27%

V. Satisfactory

Twina Builders and Supply 23897 Repair/Rehab. of MPB (Phase IV) @ Brgy. New Pandan XI 1.880 O 0.340 0.240 0.100 0.020 0.041 0.100 84.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 423

Page 432: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Twintech Builders & Developers, Inc. 23511 Conc. of Abra-Ilocos Sur Road,

Km. 387+200-Km. 407+000 CAR 4.754 C 0.294 0.195 0.300 - - - 78.90 *78.90% Satsifactory

Twintech Builders & Developers, Inc. 23511 Conc. of Riang-Penarrubia FMR CAR 2.843 C 0.206 0.300 0.300 - - - 80.60 *80.60%

V. Satisfactory

Twintech Builders & Developers, Inc. 23511 Const. of Multi-Purpose

Building, Dolores CAR 3.680 C 0.421 - 0.500 - - - 92.10 75.72% Satisfactory

Twintech Builders & Developers, Inc. 23511 Const. of Sinalang River

Irrigation Flume CAR 3.749 C 0.397 - 0.500 - - - 89.70 90.81% Outstanding

Twintech Builders & Developers, Inc. 23511

Const./Road Opening of Abra-Ilocos Norte Road, km. 436+000 -

km. 446+020, Sogao-Malango Section

CAR 10.663 O 0.400 0.300 0.070 0.015 0.028 0.067 88.00 -

Twintech Builders & Developers, Inc. 23511

Const./Road Opening of Abra-Ilocos Norte Road, km. 446+020 - km. 452+620, Singit-Nagbolang-

Atip Section

CAR 11.680 O 0.380 0.000 0.100 0.008 0.038 0.100 62.60 -

Two Aces Construction and Supplies 15413 Conc. of Lapucon Cemetery

Road XIII 3.749 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding

Two Aces Construction and Supplies 15413 Const. of Poblacion Drainage

Canal, Kitcharo XIII 0.453 C 0.319 - 0.500 - - - 81.90 77.22% Satisfactory

U & N Engineering Services 16743 Concreting of Municipal Streets, Malabuyoc VII 1.893 C 0.386 - 0.500 - - - 86.90 *86.90%

V. Satisfactory

Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.400 0.300 0.100 0.020 0.023 0.033 87.60 -

Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.132 0.300 0.100 0.030 0.037 0.100 69.90 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 424

Page 433: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -

UGM Construction 22047 Const. of Secondary Sch. Bldg.(3 Cl) IV-B 1.184 C 0.367 0.300 0.300 - - - 96.70 *96.70%

Satisfactory

UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase I VII 43.189 O 0.380 0.225 0.070 0.030 0.037 0.100 84.20 -

UKC Builders, Inc. 10759Const. of Cagayan de Oro City

3rd Bridge & Approaches Phase II

X 63.689 C 0.390 0.300 0.300 - - - 99.00 92.64% Outstanding

UKC-Equi-Parco, Joint Venture 0624S Backup Area for the Newly

Constructed Wharf PPA 429.380 C 0.396 0.300 0.300 99.64 99.64% Outstanding

Ulticon Bluilders, Inc. 17267Const./Impvt./Widening of

Caraga-Maragusan Sect. Road, Phase III

XI 47.149 C 0.235 0.106 0.300 - - - 64.10 79.28% Satisfactory

Ulticon Bluilders, Inc. 17267CP 10: Impv't./Conc. of Surogao Sur-Davao Oriental Coastal Road (Manay-Boston) Boston Section

XI 286.479 O 0.345 0.284 0.100 0.030 0.060 0.100 91.90 -

Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 O 0.374 0.277 0.100 0.030 0.037 0.100 91.80 -

Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 O 0.332 0.300 0.100 0.030 0.043 0.100 90.50 -

Ulticon Bluilders, Inc. 17267Maint./Impv't. of Malalag-Malita-

Jose Abad Santos Road, Kumassie-Bagsak Sect.

XI 19.268 C 0.328 0.300 0.300 - - - 92.80 90.52% Outstanding

Ulticon Bluilders, Inc. 17267

Rehab./Impvt. of Bukidnon-Davao City Road, Puntian-Sinuda Section (selective

Sections)

X 13.810 C 0.292 0.200 0.300 - - - 79.20 * 79.20% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 425

Page 434: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan

Road.XI 9.342 O 0.318 0.255 0.100 0.023 0.048 0.100 84.40 -

Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan

Road.XI 9.342 O 0.395 0.300 0.100 0.030 0.048 0.100 97.30 -

Ulticon Builders, Inc. 17267 Const. of Tubay-La Fraternidad-Binuangan FMR XIII 2.746 C 0.397 0.295 0.300 - - - 99.20 97.42%

Outstanding

Ulticon Builders, Inc. 17267 Impvt. of Mawab-Sawangan-Maco Alternate Road, Phase II XI 9.400 C 0.422 - 0.500 - - - 92.20 92.53%

Outstanding

Ulticon Builders, Inc. 17267 Rehabilitation & Improvement of Davao-Cotabato Road XI 18.869 C 0.330 0.205 0.300 - - - 83.50 82.42%

V. Satisfactory

Ultron Construction and Supply 30275

Const. of San Roque Bridge I along Quezon Eco-Tourism

Road (Phase I)IV-A 4.687 C 0.267 0.300 0.300 - - - 86.70 81.00%

V. Satisfactory

Ultron Construction Corporation 14313 Const. of San Antonio II Flood

Control IV-A 0.960 C 0.150 - 0.500 - - - 65.00 75.86% Satisfactory

Uni Construction 13198 Concreting of Brgy. Road, Sitio Paitan V 0.916 C 0.337 0.220 0.300 - - - 85.70 86.78%

V. Satisfactory

Uni Construction 13198Const. of MPB (Brgy. Covered Court and Perm. Roofing over

the Social Hall in front of Stage)V 0.954 O 0.394 0.240 0.100 0.030 0.016 0.067 84.70 -

Unicon Construction 26990 Repair/Rehab. of Burgos Ave. (Vicinity of McDonald Jct) IV-A 3.468 C 0.235 0.300 0.300 - - - 83.50 * 83.50%

V. Satisfactory

Unitec Builder, Inc. 4803 Const. of Labason Bridge and Approaches IX 14.626 C 0.343 0.200 0.000 - - - 54.30 74.31%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 426

Page 435: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Unitec Builders, Inc. 4803 Widening of Sinunuc Bridge &

Approaches, Phase I, along Zamboanga City-Labuan Road

IX 21.668 O 0.354 0.289 0.100 0.030 0.045 0.100 91.80 -

Unitec Builders, Inc. 4803

Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment IV (Curuan

Poblacion Section)

IX 16.521 C 0.342 0.230 0.300 - - - 87.20 89.60% V. Satisfactory

Unitec Builders, Inc. 4803

Completion of Road Widening (Gap Section) @ San Bernardino

Bridge, Maria Clara Lobregat Highway

IX 6.201 C 0.304 0.200 0.300 - - - 80.40 77.72% Satisfactory

Unitec Builders, Inc. 4803 Const. of MPB at San Roque VIII 0.946 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory

Unitec Builders, Inc. 4803

Impv't./Widening of Z.C. West Road (Caragasan Section)

including the Const. of 1 Barrel RCBC w/ except of Caragasan

Bridge

IX 12.112 C 0.336 0.200 0.300 - - - 83.60 87.04% V. Satisfactory

Unitec Builders, Inc. 4803

Proposed Widening of Sinunuc Bridge & Approaches, Phase I, along Zamboanga City-Labuan

Road

IX 21.672 O 0.311 0.240 0.000 0.030 0.042 0.067 69.00 -

Urban Infrastructures Incorporated 16144

Cluster III-Const. of School Building Projects-(E.B. Magalona

NHS)VI 0.410 C 0.365 0.099 0.300 - - - 76.40 81.51%

V. Satisfactory

Uy Construction & Development/ARN Builders

(JV)JV-07-001 Conc. of Bais-Kabankalan Road

@ Intermittent Section VII 95.268 O 0.388 0.238 0.100 0.024 0.055 0.100 90.50 -

Uy Construction & Development/ARN Builders

(JV)JV-07-001 Conc. of Bais-Kabankalan Road

@ Intermittent Section VII 95.268 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 427

Page 436: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Uy Construction and Development 12558 Asphalting of Valencia-Baconf

Road VII 1.163 C 0.415 - 0.500 - - - 91.50 *91.50% Outstanding

Uy Construction and Development 12336 Conc. of Dumaguete South Road

(DSR) VII 21.705 O 0.380 0.300 0.100 0.030 0.038 0.100 94.80 -

Uy Construction and Development 12336 Concreting of Jct. S.H.- Banglud -

Mailog-By Pass Road, Mailag X 4.439 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding

Uy Construction and Development 12558 Const. of Canturing River

Control (Bogo Section) VIII 3.762 C 0.373 0.122 0.300 - - - 79.50 *79.50% Satisfactory

Uy Construction and Development 12336 Const. of Weighbridge Station

along DNR VII 2.793 C 0.400 - 0.500 - - - 90.00 89.68% V . Satisfactory

Uy Construction and Development 12336 Const./Repair/Rehab. of School

Bldg. @ Buenavista E/S VIII 0.378 C 0.346 0.300 0.300 - - - 94.60 86.97% V. Satisfactory

Uy Construction and Development 12336 Dumaguete Airport Development

Project DOTC 81.824 C 0.460 0.200 0.300 - - - 96.00 96.00% Very Satisfctory

Uy Construction and Development 12336

Rehab. of Dumaguete North Road Sta. 110+000-Sta. 135+000

(Asphalt Overlay along Sta. 126+570-Sta. 127+920)

VII 9.995 C 0.394 0.200 0.300 - - - 89.40 *89.40% Satisfactory

Uy Construction and Development 12336 Rehab./Conc. of Hinigaran-

Isabela Road (Rumirang) VI 14.238 C 0.324 0.205 0.300 - - - 82.90 83.62% Satisfactory

Uy Construction and Development 12336 Rehab./Impvt. of Pob. NRJ-Ninoy

Aquino FMR X 11.846 C 0.352 0.281 0.300 - - - 93.30 77.10% Satisfactory

Uy Construction and Development 12336

Widening/Asphalting-Overlay of Bais-Kabankalan Road including

ReConst. of (2) Bridges-Cang-abok & Canlumbong

VII 22.315 C 0.384 0.300 0.300 - - - 98.40 94.98% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 428

Page 437: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

V N Grande Builders & Supply 32238 Const. of MPB (Justice Hall) VI 3.314 C 0.313 0.300 0.300 - - - 91.30 86.68%

V. Satisfactory

V N Grande Builders & Supply 32238 Const. of Road, Poblacion Ilaya

to Maravilla St. VI 0.941 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding

V T J Construction & Supply 11250

Widening of Quezon Ave. (Mabuhay Rotonda to Elliptical

Road)NCR 21.677 C 0.371 0.300 0.300 - - - 97.10 89.30%

V. Satisfactory

V.B. Manubay Construction 32705 Const. of 1 CL Sch. Bldg. at Arabiat E/S II 0.416 C 0.370 0.238 0.300 - - - 90.80 *90.80%

Outstanding

V.B. Manubay Construction 32705 Rehab. Along Santiago-Tuguegarao Road II 4.822 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

V.B. Manubay Construction 32705 Rehab. of Farm to Market Road at Salinungan West II 1.902 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

V.B. Manubay Construction 32705 Rehab./Regravelling along Ilagan-Delfin Albano-Mallig Road II 4.822 C 0.377 0.200 0.300 - - - 87.70 *87.70%

V. Satisfactory

V.B. Manubay Construction 32705 Rehab./Regravelling along Santiago-Tuguegarao Road II 4.822 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V. Satisfactory

V.C. Bautista Construction 21114 Concreting of Barangay Lebueg Road, Laoac I 0.480 C 0.295 - 0.500 - - - 79.50 *79.50%

Satisfactory

V.C.P. Concrete Products 7713 Concreting of Bislig-Surigao Road XIII 4.651 C 0.189 0.277 0.000 - - - 46.60 71.98%

Satisfactory

V.C.P. Concrete Products 7713Rehab./Reconst. of Damaged

Pavement along Surigao-Davao Coastal Road

XIII 9.594 C 0.239 0.300 0.300 - - - 83.90 81.08% V. Satisfactory

V.E. Solis Construction 30751 Const. of 1 CL @ Cabubugan E/S (Spacial Plan) VI 0.479 C 0.367 0.200 0.300 - - - 86.70 87.40%

V. Satisfactory

V.F. Construction 10048 Completion of Road, Barangay Salian, Abucay III 1.440 C 0.442 - 0.500 - - - 94.20 *94.20%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 429

Page 438: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

V.F. Construction 10048 Const. of FMR, Barangay Sta. Isabel III 0.468 C 0.282 - 0.500 - - - 78.20 *78.20%

Satisfactory

V.F. Construction 10048 Const. of Gabon-Decena Road III 1.871 C 0.356 0.164 0.300 - - - 82.00 *82.00% V. Satisfactory

V.F. Construction 10048 Const. of Salian Farm-to-Market Road III 1.868 C 0.300 - 0.500 - - - 80.00 48.20%

Poor

V.O. Chupuico Construction 17585 Rehab. of Drainage System

Mantuyong-Ibabao VII 0.905 C 0.352 0.300 0.300 - - - 95.20 90.22% Outstanding

V.R. Duque Construction 22233 Const. of 2-Classroom School Building @ Mabuhay E/S IV-B 0.953 C 0.283 0.300 0.300 - - - 88.30 83.12%

V. Satisfactory

V.R. Duque Construction 22233 Const. of MPB @ Ilaya IV-B 0.475 C 0.234 0.242 0.300 - - - 77.60 *77.60% Satisfactory

V.R. Duque Construction 22233 Rehabilitation of Multi-Purpose Bldg., Brgy. Ilaya IV-B 0.474 C 0.331 0.300 0.300 - - - 93.10 89.53%

V.Satisfactory

V.R. Guevarra Construction & Trading 31565 Const. of 1 Unit Free Flowing

Artesian Well III 0.596 C 0.207 0.300 0.300 - - - 80.70 * 80.70% V. Satisfactory

V.R. Patron Builders & Developers 13487 Const. (Conc.) of Crisanto M. de

los Reyes Ave., Amadeo Section IV-A 28.930 C 0.320 0.200 0.300 - - - 82.00 84.88% V. Satisfactory

V.R. Patron Builders & Developers 13487

Improvement of Quilo-Quilo Road, Padre Garcia Integrated

ARCIV-A 6.550 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -

V.R. Patron Builders & Developers 13487

Improvement of Quilo-Quilo Road, Padre Garcia Integrated

ARCIV-A 6.550 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -

V.R. Patron Builders & Developers 13487 Impvt./Rehab. of Banay-banay

Mojon Jct. Road IV-A 3.816 C 0.328 0.300 0.300 - - - 92.80 *92.80% Outstanding

V.R. Patron Builders & Developers 13487

Impvt./Rehab. of Flood Control Project along Tagaytay-Tuy-

Nasugbu Road, Kaylaway Section

IV-A 4.775 C 0.307 0.300 0.300 - - - 90.70 *90.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 430

Page 439: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

V.R. Patron Builders & Developers 13487

Rehab./Reconst. of Damaged National Roads, Manila-

Batangas Road, Lipa Section IV-A 19.292 O 0.380 0.254 0.100 0.030 0.030 0.100 89.40 -

V.R. Patron Builders & Developers 13487 Repair/Rehab. of Municipal Hall IV-A 0.955 C 0.412 - 0.500 - - - 91.20 91.20%

Outstanding

V.R. Patron Builders & Developers 13487 Road Conc. @ Brgy. Dalipit East IV-A 0.191 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

V.R.D.J. Construction 19837 Const. of 1 CL Std. School Bldg. at Josefina T. Albano NHS II 0.474 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

V.R.D.J. Construction 19837 Const. of Sto. Tomas MPB II 3.818 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -

V.R.D.J. Construction 19837 Rehab./Impvt. of Namnama Brgy Road II 0.317 C 0.317 0.012 0.000 - - - 32.90 *32.90%

Poor

V.R.D.J. Construction 19837 Repair/Rehab. of Pilitan E/S Bldg. II 0.094 C 0.400 0.200 0.300 - - - 90.00 * 90.00%

V. Satisfactory

V.R.P. Builders Construction and Supply 25056 Concreting of FTM Road at Brgy.

Malaya IV-A 0.764 C 0.447 - 0.500 - - - 94.70 94.70% Oustanding

V.R.P. Builders Construction and Supply 25056

Const. of Two (2) School Building at Pinagtung-Ulan NHS

Pinagtung-UlanIV-A 0.955 C 0.477 - 0.500 - - - 97.70 *97.70%

Outstanding

V4M Construction 3211 Const.of Canal @ Maloma III 0.477 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

Valley Construction & Aggregates 14315

Cluster I a) Conc. of Dantay-Sagada Rd., b) Conc. of Dantay-

Sagada Rd.,Ambasing Suyo Balili Rd.

CAR 10.754 C 0.360 0.300 0.300 - - - 96.00 92.70% Outstanding

Valley Construction & Aggregates 14315 Completion of MPB @ New

Lucban Brgy. CAR 1.904 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

Valley Construction & Aggregates 14315 Const. of Senior Citizen's MPB at

East Quirino Hill Brgy. CAR 1.926 C 0.384 0.172 0.300 - - - 85.60 *85.60% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 431

Page 440: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Valley Construction & Aggregates 14315

Continuation of Road Widening along Purok 4, Imelda Village

BarangayCAR 0.953 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan

National Road CAR 18.822 O 0.321 0.240 0.100 0.023 0.030 0.100 81.40 -

Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan-

Kibungan National Road CAR 18.822 O 0.272 0.276 0.100 0.020 0.037 0.100 80.50 -

Valley Construction & Aggregates 14315 Rehab. Along Acop-Kapangan-

Kibungan Road CAR 19.100 O 0.265 0.292 0.100 0.020 0.037 0.100 81.40 -

Vanmarvil Construction 19224Const. of MPB (Police Precinct)

@ Commonwealth Ave. Cor. Tandang Sora

NCR 1.909 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

Vannie General Merchandise 27335 Completion of Public Market VI 1.924 C 0.390 0.257 0.300 - - - 94.70 90.15%

Outstanding

Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage

Canal VI 5.738 O 0.320 0.200 0.070 0.030 0.032 0.133 78.50 -

Vans Turf Construction Corporation 13778 Const. of MPB III 3.253 C 0.357 0.294 0.300 - - - 95.10 *95.10%

Outstanding

Vans Turf Construction Corporation 10813 Const. of Multi-Purpose Building IV-A 2.708 C 0.439 - 0.500 - - - 93.90 *93.90%

Outstanding

Vans Turf Construction Corporation 13778 Const. of Multi-Purpose Building

@ Meycauayan III 2.837 C 0.483 - 0.500 - - - 98.30 *98.30% Outstanding

Vans Turf Construction Corporation 13778 Contruction of Multi-Purpose

Building III 2.591 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding

Vanvi Construction 29387 Completion of MPB at Langub E/S XI 0.752 C 0.382 0.300 0.300 - - - 98.20 96.52%

Outstanding

Vanvi Construction 29387 Const. of MPB at Clib XI 1.429 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding

Vanvi Construction 29387 Const. of Water System at Sinaragan XI 1.411 C 0.388 0.300 0.300 - - - 98.80 87.11%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 432

Page 441: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

VAR Builders 20327 Sagay City Resettlement Project NHA 5.910 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding

Various Construction 26640 Concreting of Upper Pinget Brgy. Road CAR 0.956 C 0.341 - 0.500 - - - 84.10 62.20%

Fair

VCD Construction 13949 Const. of Various Day Care Center I 0.329 C 0.291 - 0.500 - - - 79.10 *79.10%

Satisfactory

VCD Construction 13949 Rehabilitation of Ilocos Norte National School I 3.827 C 0.298 0.300 0.300 - - - 89.80 92.88%

OutstandingVCH Construction and

Trading 32050 Const. of MPB IV-B 0.479 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory

VCH Construction and Trading 32050 Const. of Sch. Bldg. (1CL)

Panacan NHS IV-B 0.945 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory

VCV Const. & Development Corp. 12575 Const. of MPB III 2.829 C 0.382 0.234 0.300 - - - 91.60 *91.60%

Outstanding

VCV Const. & Development Corp. 12575 Const. of MPB @ Brgy. Pilar VIII 3.339 C 0.327 0.272 0.300 - - - 89.90 *89.90%

V. Satisfactory

VCV Const. & Development Corp. 12575 Const. of MPB at Bgry. Alas-Asin III 3.310 C 0.381 0.215 0.300 - - - 89.60 *89.60%

V. Satisfactory

VCV Const. & Development Corp. 12575 Impvt. of Water Supply Project III 1.888 C 0.361 0.200 0.300 - - - 86.10 *86.10%

V.Satisfactory

VCV Const. & Development Corp. 12575 Const. of Conc. Revetment @

Tenejero River, Phase I III 3.456 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

VCV Const. & Development Corp. 12575 Const. of MPB @ Prov. Police

Headquarters III 3.741 C 0.330 0.224 0.300 - - - 85.40 *85.40% V. Satisfactory

VCV Const. & Development Corp. 12575 Repair/Rehab. of San Marcelino-

San Antonio Road III 9.851 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 433

Page 442: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ven Ray Construction 18310Conc. of Antonio de Pio

Highway, (Tigabawan-Olivio-Luyang Section)

VII 14.154 O 0.295 0.300 0.000 0.010 0.022 0.100 72.70 -

Ven Ray Construction 18310 Concreting of P. Gicain St., Pasamanos, Dawis Norte VII 0.385 C 0.335 - 0.500 - - - 85.50 *85.50%

V. Satisfactory

Ven Ray Construction 18310 Const. of 2 CL S/B @ Bulwang E/S Compostela VII 0.895 C 0.359 0.249 0.300 - - - 90.80 *90.80%

Outstanding

Ven Ray Construction 18310 Const. of 2 CL Sch. Bldg. @ Liloan NHS VII 1.930 O 0.354 0.265 0.100 0.030 0.013 0.100 86.20 -

Ven Ray Construction 18310 Const. of 2-Storey, 4-Cl Science High School VII 4.469 C 0.388 0.240 0.300 - - - 92.80 *92.80%

Outstanding

Ven Ray Construction 18310 Const. of 3 CL Sch. Bldg. @ Sogod Central School VII 1.394 C 0.341 0.200 0.300 - - - 84.10 * 84.10%

V. Satisfactory

Ven Ray Construction 18310 Const. of 4th Flr. Extension at Beatriz D. Durano Memorial NHS VII 1.768 C 0.366 0.300 0.300 - - - 96.60 *96.60%

Outstanding

Ven Ray Construction 18310 Const. of Annex Bldg. of Bogo Public Market VII 1.868 C 0.383 - 0.500 - - - 88.30 *88.30%

V. Satisfactory

Ven Ray Construction 18310 Const. of Drainage Sytem VII 0.445 C 0.263 0.200 0.300 - - - 76.30 *76.30% Satisfactory

Ven Ray Construction 18310 Const. of New Public Market VII 0.931 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory

Ven Ray Construction 18310 Const. of One (1) Storey Two (2) CL Sch. Bldg. Guinsay NHS VII 0.866 C 0.256 0.300 0.300 - - - 85.60 * 85.60%

V. Satisfactory

Ven Ray Construction 18310Reconst./Reblocking/Asphalt Overlay of Cebu Toledo Wharf

RoadVII 37.225 C 0.387 0.205 0.300 - - - 89.20 *89.20%

V. Satisfactory

Ven Ray Construction 18310 Rehab./Conc. of Roads at Barangay Poblacion VII 0.459 C 0.391 0.300 0.300 - - - 99.10 92.62%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 434

Page 443: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Ven Ray Construction 18310Rehab./Reconst. of Siquijor

Circ., Larena-Enrique Villanueva Rd. Sect.

VII 46.671 O 0.331 0.246 0.100 0.022 0.027 0.100 82.60 -

Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. VII 31.737 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -

Ven Ray Construction 18310Repair/Rehab. of Luyang-

Canggumantong Rd. (Intermittent Section)

VII 9.645 C 0.214 0.202 0.300 - - - 71.60 83.24% V. Satisfactory

Ven Ray Construction 18310Repair/Rehab./Impvt./Maint. of

Siquijor Circ. Road, Larena-Enrique Villanueva Road Section

VII 24.989 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Venus Engineering & Construction 18358

Const. of MP Hall Realigned to Impvt. of MP Hall Brgy.

BuenavistaVIII 0.187 C 0.460 - 0.500 - - - 96.00 79.55%

Satisfactory

Verca Const. Trading & Services 14477 Const. of FMR @ Brgy. Bacong III 0.475 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Verca Const. Trading & Services 14477 Const. of Multi-Purpose Bldg. at

Tenejero E/S III 0.610 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding

Versatile Builders 12069 Const. of MPB @ Vitali NHS IX 4.679 C 0.398 0.152 0.300 - - - 85.00 80.84% V. Satisfactory

Vertical Builders 14029Conc. of Sarangani-Davao del

Sur Coastal Road, Gumasa Section

XII 9.422 C 0.276 0.300 0.000 - - - 57.60 66.60% Fair

Vertical Builders 14029 Const. of 2 Cl @ FVR E/S III 1.351 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -

Vertical Builders 14029 Datu Paglas Resttlement Project NHA 5.925 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -

Vertical Builders 14029 Saub River Flood Control XII 1.897 C 0.315 0.225 0.300 - - - 84.00 82.98% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 435

Page 444: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vertical Builders 14029 Small Margus Seawall XII 4.769 C 0.379 0.300 0.000 - - - 67.90 71.68% Satisfactory

VF Construction 10048Const. of Drainge Canal from RBM Ent. To ER Venzon Plant

Brgy. Panillao & Brgy. Sta. RosaIII 0.845 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

VF Construction 10048 Impvt. of Multi-Purpose Pavement @ Brgy. Pto. Rivas III 0.488 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

VF Construction 10048 Rehab./Impv't. of Roman Expressway (Sabatan Section) III 0.990 C 0.295 0.300 0.300 - - - 89.50 *89.50%

V. Satisfactory

Vicente T. Lao Construction 7040 Cotabato Airport Development Project DOTC 14.404 C 0.443 0.200 0.300 - - - 94.30 94.30%

Very Satisfactory

Vicente T. Lao Construction 7040 CP MN - D3 (Katipunan-Manukan Road) ADB 462.152 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -

Vicente T. Lao Construction 7040CP MN-D (3-1) Nipaan -

Sindangan Rd., Oroquieta-Sindangan Road

ADB 184.345 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -

Vicente T. Lao Construction 7040Impvt. of Tagum-Asuncion-

Kapalong-Sto. Tomas-Dapecol-Panabo Circ. Road, Left Side

XI 16.396 C 0.220 0.300 0.300 - - - 82.00 *82.00% V. Satisfactory

Vicente T. Lao Construction 7040Impvt./Conc. Paving of

Sindangan-Siayan-Dumingag Road

IX 28.546 O 0.304 0.240 0.000 0.030 0.042 0.100 71.60 -

Vicente T. Lao Construction 7040Impvt./Conc. Paving of

Sindangan-Siayan-Dumingag Road

IX 28.948 O 0.345 0.240 0.100 0.030 0.040 0.100 85.50 -

Vicente T. Lao Construction 7040Impvt./Concrete Paving of

Gutalac-Baliguian-Siocon Road, Sta. Maria Section

IX 48.156 O 0.270 0.252 0.000 0.030 0.042 0.100 69.40 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 436

Page 445: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vicente T. Lao Construction 7040Impvt./Rehab. of Butuan-

Cagayan de Oro-Iligan Road, Dampil-Kabulawan Section

X 9.461 C 0.263 0.206 0.300 - - - 76.90 88.90% V. Satisfactory

Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-

Polanco-Piñan Jct. Oroquieta Road, Barcelona-Polanco Sect.

IX 14.316 C 0.291 0.122 0.300 - - - 71.30 *71.30% Satisfactory

Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-

Sindangan-Liloy Road, Talinga-Bacungan Section

IX 28.943 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory

Vicente T. Lao Construction 7040 Impvt./Rehab. of Road, Davao-Cotabato Road XI 12.408 C 0.339 0.300 0.300 - - - 93.90 *93.90%

Outstanding

Vicente T. Lao Construction 7040 Impvt./Rehab. of Sindangan-Liloy Road IX 4.899 C 0.388 0.300 0.300 - - - 98.80 *98.80%

Outstanding

Vicente T. Lao Construction 7040 Laguindingan Resttlement Project, Phase II NHA 38.798 O 0.383 0.297 0.000 0.018 0.047 0.067 81.16 -

Vicente T. Lao Construction 7040Reconst. of Dipolog-Polanco-

Piñan Jct. Oroquieta Nat'l Road, Pob. Piñan Section

IX 19.092 C 0.387 0.201 0.300 - - - 88.80 *88.80% V. Satisfactory

Vicente T. Lao Construction 7040 Rehab. Along Junction Polo-Dapitan Park Road IX 4.818 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V.Satisfactory

Vicente T. Lao Construction 7040

Rehab./Impvt. (Asphalt Overlay) of Sarangani-Davao del Sur Coastal Road, Gian Padidu

Section

XII 14.456 C 0.365 0.277 0.300 - - - 94.20 87.12% V. Satisfactory

Vicente T. Lao Construction 7040Rehab./Impvt. of Banisilan-

Guiling-Alamada-Libungan Road (Nicaan-Montay Section)

XII 11.433 C 0.359 0.234 0.300 - - - 89.30 *89.30% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 437

Page 446: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vicente T. Lao Construction 7040 Rehab./Impvt. of Digos-Makar Road, Malalag Cogon Section XII 14.466 C 0.375 0.300 0.300 - - - 97.50 *97.50%

Outstanding

Vicente T. Lao Construction 7040Rehab./Impvt. of Dualing-New

Panay-Midsayap Road Kimagango Highway Junction

XII 14.288 C 0.360 0.258 0.300 - - - 91.80 *91.80% Outstanding

Vicente T. Lao Construction 7040 Rehab./Impvt. of National Road Ozamis City-Oroquieta City Road X 14.366 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

Vicente T. Lao Construction 7040

Rehab./Impvt. of Nat'l Roads Preventive Maint. (Asphalt

Overlay), Oroquieta-Plaridel-Calamba-Sapang Dalaga Road

X 14.384 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding

Vicente T. Lao Construction 7040 Remaining Works of Asphalt Overlay of Makar-Kiamba Road XII 39.554 C 0.374 0.300 0.300 - - - 97.40 80.72%

V. Satisfactory

Vicente T. Lao Construction 7040

Upgrading/Impvt./Rehab. Along Dipolog By Pass Road Ph III,

Dicayas-Minaog Section (Supply & Installation of Traffic Eng'g)

IX 9.635 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

Vicente T. Lao Construction 7040

Upgrading/Impvt./Rehab. of Dipolog-Oroquieta Road

(Supply & Installation of Traffic Eng'g)

IX 14.456 C 0.346 0.136 0.300 - - - 78.20 84.23% V. Satisfactory

Vicmar Construction Inc. 28997 Conc. of Brgy. Road @ Poblacion IV-A 1.416 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -

Vicmar Construction Inc. 28997Const. of Baywalk Facilities,

Foreshore Area, Phase 3, Brgy. 11

IV-A 9.594 O 0.360 0.272 0.100 0.030 0.035 0.100 89.70 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 438

Page 447: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vicmar Construction Inc. 28997 Const. of Bridge at Batangas-Lobo Road (San Miguel Sect.) IV-A 9.498 C 0.339 0.200 0.300 - - - 83.90 81.02%

V. Satisfactory

Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion IV-A 1.423 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -

Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa IV-A 0.476 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding

Vicmar Construction Inc. 28997 Rehab./Impvt. of Batangas-Lobo Road IV-A 6.803 O 0.354 0.300 0.100 0.030 0.030 0.100 91.40 -

Vicmar Construction Inc. 28997

Rehab./Impvt. of Damaged National Road at Batangas-Tabangao-Lobo Road, Pulot

Aplaya-Talahib Pandayan Section

IV-A 19.295 O 0.344 0.300 0.100 0.030 0.035 0.100 90.90 -

Victoria Development and Construction Supply 32638 Conc. of Belen-Consuegra Road VIII 9.473 C 0.288 0.200 0.300 - - - 78.80 75.92%

Satisfactory

Victoria Development and Construction Supply 32638 Const. of MPB VIII 0.933 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

Victoria Development and Construction Supply 32638 Rehab./Impvt. of Villaba Flood

Control VIII 3.785 C 0.307 0.200 0.300 - - - 80.70 82.56% V. Satisfactory

Victoria Trading 15717 Const. of Drainage @ Brgy. Calapandayan III 0.354 C 0.247 0.300 0.300 - - - 84.70 *84.70%

V. Satisfactory

Victoria Trading 15717 Const. of Multi-Purpose Building @ Brgy. Calapacuan III 0.606 C 0.273 0.200 0.300 - - - 77.30 *77.30%

Satisfactory

Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Bldg.,

(Public Market) X 9.331 C 0.341 0.300 0.300 - - - 94.10 84.02% V. Satisfactory

Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Building

(Phase I), Calamba X 1.445 C 0.439 - 0.500 - - - 93.90 85.5% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 439

Page 448: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Victoriano C. Lim Construction 25318 Const. of Ozamiz City Coastal By

Pass Road @ Brgy.Malaubang X 11.823 C 0.309 0.300 0.300 - - - 90.90 82.86% V. Satisfactory

Victoriano C. Lim Construction 25318 Gravelling of Guimad-Guingona-

Trigos Road X 2.826 C 0.317 0.300 0.000 - - - 61.70 *61.70% Fair

Victoriano C. Lim Construction 25318

Gravelling/Concreting of Pavement Ozamis By-Pass

Circumferential- Bangkal Airport Road

X 2.020 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding

Victoriano C. Lim Construction 25318 Impvt./Rehab. of Lagbas Creek X 9.546 C 0.290 0.300 0.300 - - - 89.00 82.70%

V. Satisfactory

Victoriano C. Lim Construction 25318 Regravelling of Litapan-Manaka-

Gala Road X 2.822 C 0.381 - 0.500 - - - 88.10 75.50% Satisfactory

Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon

Road (Maluko Slip Section) X 14.457 O 0.356 0.300 0.050 0.030 0.035 0.100 87.10 -

Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon

Road (Maluko Slip Section) X 14.457 O 0.347 0.236 0.000 0.030 0.035 0.067 71.50 -

Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon

Road (Maluko Slip Section) X 14.457 O 0.304 0.300 0.000 0.030 0.050 0.067 75.10 -

Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon

Road (Mangima Section) X 14.451 C 0.366 0.200 0.000 - - - 56.60 68.34% Fair

Victoriano C. Lim Construction 25318 Rehab./Impvt. of S.H. Alae-

Kisolon Road (Mangima Section) X 14.451 O 0.336 0.300 0.030 0.030 0.041 0.000 73.70 -

Victoriano C. Lim Construction 25318 Rehabilitation of Manaca-Gala

Road X 1.903 C 0.395 0.231 0.300 - - - 92.60 88.64% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 440

Page 449: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Victoriano C. Lim Construction 25318 San Juro CIP MOPIO 10.103 C 0.342 0.240 0.300 - - - 88.15 *88.15%

V.Satisfactory

Victoriano C. Lim Construction 25318 Sumasap-Panaon Communal

Irrigation ProjectCARP-IC

ARCD 8.380 C 0.342 0.242 0.300 - - - 88.45 *88.45% V.Satisfactory

Victorino Baroña, Jr. Construction 15166 Const. of Sinalang Bridge &

Approaches CAR 10.890 C 0.352 0.212 0.300 - - - 86.40 85.80% V. Satisfactory

Victorino Baroña, Jr. Construction 15166 Impvt. of Abra-Kalinga Road,

Baguio Section, Baay-Licuan CAR 3.135 C 0.387 - 0.500 - - - 88.70 *88.70% V. Satisfactory

Victorino Baroña, Jr. Construction 15166 Impvt. of Denden-Callao Road,

Villaviciosa ARC CAR 15.862 C 0.334 0.300 0.300 - - - 93.40 87.28 V. Satisfactory

Victorino Baroña, Jr. Construction 15166 Rehabilitation of Abra-Ilocos

Norte Road CAR 0.941 C 0.372 - 0.500 - - - 87.20 *87.20% V. Satisfactory

Vicvera Builders, Inc. 13903 Const. of Three (3) Storey, 12 CL School Bldg. at Alabang E/S NCR 4.569 C 0.336 0.300 0.300 - - - 93.60 85.34%

V. Satisfactory

Vicvera Builders, Inc. 13903 Rehab. of Road, Brgy. Poblacion NCR 2.087 C 0.257 0.197 0.300 - - - 75.40 *75.40% Satisfactory

Vigan Fortune Construction 3887 Candon-Salcedo Road I 18.922 O 0.344 0.060 0.100 0.022 0.025 0.067 61.80 -

Vigan Fortune Construction 3887 Const. of Darapidap Seawall I 9.454 C 0.333 0.200 0.300 - - - 83.30 85.70% V. Satisfactory

Vigan Fortune Construction 3887 Const. of Santa Seawall & Flood Control I 9.493 C 0.320 0.300 0.300 - - - 92.00 77.36%

Satisfactory

Vigan Fortune Construction 3887 Continuation of Const. of Candon City Hospital I 4.744 C 0.358 - 0.500 - - - 85.80 85.80%

Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 441

Page 450: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vigan Fortune Construction 3887Continuation of the Phil. Science High School Bldg. (PSHS) Ilocos

Region CampusI 7.952 C 0.296 - 0.500 - - - 79.60 72.53%

Satisfactory

Vigan Fortune Construction 3887 Impvt. of San Emilio-del Pilar Road I 9.451 O 0.335 0.194 0.070 0.022 0.025 0.067 71.30 -

Vigan Fortune Construction 3887 Impv't. of Sta.Lucia-Salcedo Road I 4.002 C 0.272 - 0.500 - - - 77.20 58.12%

Poor

Vigan Fortune Construction 3887 Rehab./Replacement of Gongogong Bridge along MNR I 7.127 C 0.310 0.200 0.300 - - - 81.00 81.42%

V. Satisfactory

Vigan Fortune Construction 3887 Rehab./Replacement of Paing Bridge 2 along MNR I 8.362 O 0.272 0.300 0.100 0.030 0.035 0.100 83.70 -

Vigan Fortune Construction 3887 Rehab./Replacement of Paing Bridge 2 along MNR I 8.362 O 0.302 0.271 0.100 0.030 0.037 0.100 84.00 -

Vigan Fortune Construction 3887Stone Masonry of Sabangan Seawall, Phase III, Sabangan,

SantiagoI 1.207 C 0.293 - 0.500 - - - 79.30 *79.30%

Satisfactory

Viguz Construction Corporation 8178 Const. of Candi-is Bridge VIII 5.518 C 0.348 0.189 0.300 - - - 83.70 77.94%

Satisfactory

Viguz Construction Corporation 8178 Const. of Malirong Bridge VIII 4.655 C 0.381 0.180 0.300 - - - 86.10 83.94%

V. Satisfactory

Viguz Construction Corporation 8178 Road Widening of Carigara

Wharf VIII 1.424 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

Viguz Construction Corporation (Formerly:

Viguz Const.)8178 Conc. of Burauen-Mahagnao

Road VIII 9.448 C 0.271 0.168 0.300 - - - 73.90 81.52% V. Satisfactory

Viguz Construction Corporation (Formerly:

Viguz Const.)8178 Const. of Maasin Flood Control VIII 9.442 C 0.341 0.156 0.300 - - - 79.70 84.08%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 442

Page 451: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Viguz Construction Corporation (Formerly:

Viguz Const.)8178 Const./Extension of Canturing

River Control (Bogo Section) VIII 9.449 C 0.130 0.300 0.300 - - - 73.00 81.40% V. Satisfactory

Vijisi Construction 26643 Impvt./Concrete Paving of Don Federico Sison St. I 0.617 C 0.355 0.300 0.300 - - - 95.50 *95.50%

Outstanding

Viking Construction and Supplies 18129 Completion of Bigbiga Multi-

Purpose Building I 0.759 C 0.385 0.287 0.300 - - - 97.20 88.94% V. Satisfactory

Viking Construction and Supplies 18129 Completion of MPB I 3.743 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

Viking Construction and Supplies 18129 Conc. of Eco-Tourism Road I 14.395 C 0.324 0.200 0.300 - - - 82.40 86.84%

V. Satisfactory

Viking Construction and Supplies 18129 Rehab. of Concrete Pavement

along MNR, Candon Section I 9.484 C 0.277 0.200 0.300 - - - 77.70 80.46% V. Satisfactory

Viking Construction and Supplies 18129 Rehab. of Manila North Road I 4.739 C 0.175 0.300 0.300 - - - 77.50 *77.50%

Satisfactory

Viking Construction and Supplies 18129 Repair/Rehab. of MPB I 0.189 C 0.318 0.300 0.300 - - - 91.80 *91.80%

Outstanding

Viking Construction and Supplies 18129 Sta. Lucia-Salcedo Road I 9.457 O 0.305 0.092 0.050 0.015 0.027 0.067 55.60 -

Villaflor Construction and Supplies 21631 Const. of Multi-Purpose Hall,

Phase II VI 1.439 C 0.363 0.210 0.300 - - - 87.30 90.17% Outstanding

Virac NRC Construction 11396 Const. of Multi-Purpose Building (Phase I) V 0.944 C 0.391 - 0.500 - - - 89.10 *89.10%

V. Satisfactory

Virginia Construction 12893 Concreting of Farm-to-Market Brgy. Saang Bago III 0.374 C 0.293 - 0.500 - - - 79.30 *79.30%

Satisfactory

Virlo Construction 5765Conc. of Antonio de Pio

Highway, Luyang Victoria, Kinawahan Sect.

VII 30.402 O 0.292 0.239 0.100 0.020 0.022 0.100 77.30 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 443

Page 452: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) VI 22.306 O 0.335 0.225 0.100 0.010 0.038 0.067 77.50 -

Virlo Construction 5765Const/Rehab. of 4-CL, 2-Storey

S/B @ Central Lilo-An E/S Poblacion

VII 1.516 C 0.406 - 0.500 - - - 90.60 90.60% Outstanding

Virlo Construction 5765 Repair/Impvt./Rehab. of Bonbon-Sinsin Road VII 9.996 C 0.212 0.200 0.300 - - - 71.20 *71.20%

Satisfactory

Virlo Construction 5765 Repair/Rehab. of S. Osmena Blvd. VII 9.646 C 0.054 0.100 0.300 - - - 45.40 72.16%

Satisfactory

Virlo Construction 5765 Road Widening of Osmeña St. Radaza Plaza to Petron VII 20.948 C 0.377 0.200 0.300 - - - 87.70 87.04%

V. Satisfactory

Vision 3000 Builders 32327 Const. of MPB, Region I Medical Center I 2.110 C 0.294 0.300 0.300 - - - 89.40 *89.40%

V. Satisfactory

Vites Construction & Development Corporation 9444 Rehab./Const. of Multi-Purpose

Building @ Zone 38 (Brgy. 377) NCR 5.035 C 0.328 0.300 0.300 - - - 92.80 91.26% Outstanding

Vites Construction & Development Corporation (Formerly: Vites Trading &

Const.)

9444 Drainage Impvt. With Concreting/Upgrading NCR 1.151 C 0.386 0.200 0.300 - - - 88.60 *88.60%

V. Satisfactory

Vivid Construction 21115 Proposed Const. of 2 Storey MPB NCR 1.925 C 0.285 0.237 0.300 - - - 82.20 *82.20%

V. Satisfactory

Vivid Construction 21115 Rehab. of Roxas Boulevard Service Road NCR 9.649 C 0.231 0.200 0.300 - - - 73.10 *73.10%

Satisfactory

Vivid Construction 21115 Riprapping of Creek at Sitio Tanag IVA 0.959 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

VNKC Construction 12614Construction, Fabrication &

Installation of Garbage Conveyor System with Boomtrap

PRRC 17.008 C 0.499 0.338 0.100 - - - 93.70 *93.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 444

Page 453: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

VRF Construction 15301 Conc. of Bertese-Sta. Rita Road, Quezon Section III 6.465 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

VRF Construction 15301 Paving/Upgrading of Bongabon-Rizal Road (Rizal Section) III 8.250 C 0.299 0.200 0.300 - - - 79.90 *79.90%

Satisfactory

VRF Construction 15301Repair/Rehab. of Gapan-

Peñaranda-Fort Magsaysay Road

III 7.720 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

VRP Builders Construction and Supply 25056 Road Conc. @ Brgy. Maugat IV-A 0.481 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

VTJ Construction & Supply 11250 Const. of Multi-Purpose Building at Brgy. Geronimo IV-A 0.964 C 0.459 - 0.500 - - - 95.90 *95.90%

Outstanding

VUC Engineering 7918Conc. of Luna-Kabugao-Pudtol-Luna Road, Cabatacan-Dagupan

SectionCAR 9.395 C 0.339 0.200 0.300 - - - 83.90 80.51%

V. Satisfactory

VUC Engineering 7918Concreting of Dagupan-

Palongkada Section Kabugay-Pudtol-Luna Road

CAR 7.692 C 0.425 - 0.500 - - - 92.50 86.11% V. Satisfactory

VUC Engineering 7918 Const. of Lanna Retaining Wall, Lanna CAR 0.873 C 0.352 0.300 0.300 - - - 95.20 *95.20%

Outstanding

VUC Engineering 7918 Impvt./Conc. of Tabuk-Tinglayan Road (Bantay Section) CAR 4.777 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -

VUC Engineering 7918 Rehabilitation & Concreting of Magsaysay-Mapaway Road CAR 7.615 C 0.353 - 0.500 - - - 85.30 *85.30%

V. Satisfactory

VUC Engineering 7918 Road Impvt. of Dagupan-Palangkada Section, Luna CAR 7.692 C 0.264 0.235 0.070 0.030 0.030 0.100 72.90 -

VUC Engineering 7918Upgrading & Conc. of

Tuguegarao-Tabuk-Tinglayan Road (Banat-Gonogon Section)

CAR 9.510 C 0.215 0.051 0.300 - - - 56.60 70.28% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 445

Page 454: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Vulcan Development Construction 19080 Concreting of Jct. Milagros-

Aroroy Road V 9.592 O 0.321 0.240 0.100 0.023 0.037 0.067 78.80 -

Vulcan Development Construction 19080 Const. of Circumferential Road

@ Brgy. Ibingay V 9.490 C 0.360 0.200 0.300 - - - 86.00 83.00% V. Satisfactory

VVER Construction 14122 Completion of East Central Home Economics Bldg. VII 0.548 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

VVER Construction 14122 Completion of MPB (Day Care Center) @ Brgy. Batinguel VII 0.277 C 0.331 0.200 0.300 - - - 83.10 *83.10%

V. Satisfactory

VVER Construction 14122 Const. of 1-Unit, 3-Cl School Building @ Olandao E/S VII 1.033 O 0.369 0.240 0.070 0.030 0.029 0.067 80.50 -

VVER Construction 14122 Const. of Brgy. Road at Canlasog VII 1.400 C 0.278 0.246 0.300 - - - 82.40 78.44%

Satisfactory

VVER Construction 14122 Const. of Cambagahan E/S VII 0.442 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory

VVER Construction 14122 Const. of MPB at Poblacion VII 0.949 C 0.307 0.032 0.300 - - - 63.90 *63.90% Fair

VVER Construction 14122 Const. of MPB/Center at Cang-Alwang VII 0.469 C 0.267 0.300 0.300 - - - 86.70 84.95%

V. Satisfactory

VVER Construction 14122 Continuation of MPB at Sibulan VII 0.917 C 0.289 0.300 0.300 - - - 88.90 84.49% V. Satisfactory

VVER Construction 14122 Repair/Rehab. of Upper Cabangcalan VII 1.393 C 0.337 0.207 0.300 - - - 84.40 *84.40%

V.Satisfactory

W B X Construction 28370Impvt. of Farm to Market Road, Brgy. Bagbaguin Sto. Tomas

RoadIII 2.569 C 0.324 0.300 0.300 - - - 92.40 *92.40%

Outstanding

W B X Construction 28370 Repair/Rehab. of Roads Brgy. Pinagkuartelan III 0.382 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

W B X Construction 28370 Repair/Rehab. of two (2) units of Classroom Bldg. at Caingin E/S III 0.954 C 0.343 0.300 0.300 - - - 94.30 *94.30%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 446

Page 455: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

W B X Construction 28370 Road Concreting San Pedro III 0.478 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory

W. Palma Construction 11988Const. of 4 Storey 12 Cl

Secondary Sch. Bldg. @ Roman Duterte Memorial NHS

VII 6.895 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory

W. Rivera Construction & Equipment Rentals 31378

Const. of 2 Storey RGR Type Sch. Bldg. @ Sta. Maria & San

Pedro E/SIVA 9.546 C 0.376 0.246 0.300 - - - 92.20 91.57%

Outstanding

W.C. Doyola Construction 26044 Paguite CIS PIO 833.488 C 0.339 0.175 0.300 - - - 81.35 81.35% V.Satisfactory

W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.240 O 0.400 0.160 0.100 0.020 0.028 0.133 84.10 -

W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.238 O 0.380 0.155 0.100 0.022 0.028 0.133 81.80 -

W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.240 C 0.267 0.200 0.300 - - - 76.70 77.27%

Satisfactory

W.D. Navarro Construction Co. 14327

Upgrading/Impvt. of Manila North Road (Jct. Bangag-

Mabanguc-Paruddun Sect.)II 20.042 O 0.320 0.240 0.100 0.020 0.033 0.067 78.00 -

W.J. Construction 19497 Installation of Pipeline @ Brgy. Camaysa IVA 0.477 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

W.J.P. Construction and Supply 23192 Conc. of Balicanaway Road I 2.886 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V. Satisfactory

W.M. Salayog Construction and General Merchadise 12851 Conc. of Cristobal Road, Brgy.

Sapangi I 0.568 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

W.S. Aniar Trading & Construction 23192 Conc. of Casanicolasan Road I 0.960 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

W.S. Aniar Trading & Construction 20471 Const. of Multi Purpose

Pavement @ Brgy. Sapa IV-B 0.208 C 0.244 0.000 0.300 - - - 54.40 *54.40% Poor

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 447

Page 456: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Walter Ng Lao Construction 23739 Concreting of Oroqueta-Calamba Mt. Rd., X 1.603 O 0.351 0.300 0.000 - - - 65.10 -

Walter Ng Lao Construction 23739 Panansalan-Cartagena Communal Irrigation System NIA 5.787 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -

Wangjo Construction 29924Conc. of Sta. Maria-Paracelis Road (Phase I), Busilac-Pito

SectionCAR 9.529 C 0.362 0.287 0.300 - - - 94.90 58.84%

Poor

Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) CAR 1.601 C 0.261 0.288 0.300 - - - 84.90 86.52%

V. Satisfactory

Wangjo Construction 29924 Const. of Poblacion East Lamut MPB CAR 0.477 C 0.383 0.300 0.300 - - - 98.30 *98.30%

Outstanding

Wangjo Construction 29924 Installation of Tupaya Bridge CAR 0.946 C 0.335 0.300 0.300 - - - 93.50 90.02% Outstanding

WBX Construction 28370 Completion of 4 Cl 2 Storey Bldg. @ Bagbagin E/S III 1.520 C 0.250 0.291 0.300 - - - 84.10 *84.10%

V. Satisfactory

WBX Construction 28370 Const. of Brgy. Multi-Purpose Bldg., Brgy. Andaya III 0.468 C 0.296 0.300 0.300 - - - 89.60 87.29%

V. Satisfactory

WBX Construction 28370 Rehab. of Sta. Maria By Pass Road III 5.711 C 0.264 0.300 0.300 - - - 86.40 *86.40%

V. Satisfactory

WBX Construction 28370 Road Rehabilitation Pulang Gubat III 0.376 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

WCS Construction Inc. 6516 Const. of Multi-Purpose Hall-Phase II V 1.865 C 0.296 0.300 0.300 - - - 89.60 *89.60%

V. Satisfactory

WCS Construction Inc. 6516Development/Const. of Sula Seawall "A" and "B" and its

Access RoadV 9.355 C 0.254 0.252 0.300 - - - 80.60 85.94%

V. Satisfactory

WCS Construction Inc. 6516 Improvement of Lidong-Polangui Road V 33.052 C 0.304 0.200 0.300 - - - 80.40 87.00%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 448

Page 457: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

WCS Construction Incorporated 6516 Land Development of Polangui

Resettlement Project NHA 23.994 O 0.38 0.300 0.100 0.03 0.045 0.100 95.5 -

WCS Construction Incorporated 6516 Land Development of Polangui

Resettlement Project SLB 23.994 O 0.332 0.243 0.000 0.030 0.065 0.033 70.29 -

WCS Construction, Inc. 6516 Const. of Buang River Control V 8.073 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

WCS Construction, Inc. 6516 Const. of Lubad Bridge V 23.885 C 0.386 0.172 0.300 - - - 85.80 80.49% V. Satisfactory

WCS Construction, Inc. 6516 Const. of MPB Covered Court (Phase I) V 4.279 C 0.357 0.200 0.300 - - - 85.70 86.05%

V. Satisfactory

WCS Construction, Inc. 6516 Land Dev't. of Polangui Resettlement Project NHA 23.994 C 0.368 0.300 0.000 - - - 66.82 66.82%

Fair

WCS Construction, Inc. 6516 Opening/Const. of Iluluan-Mapaco Road V 19.230 C 0.363 0.244 0.300 - - - 90.70 90.16%

Outstanding

WCS Construction, Inc. 6516 Yawa River (Banag Section & Culiat Section) V 47.661 C 0.333 0.200 0.300 - - - 83.30 83.03%

V. Satisfactory

WCS Construction, Inc. 6516 Yawa River (Banag Section) V 47.661 O 0.328 0.160 0.100 0.008 0.038 0.200 83.40 -

WDM Construction & Supplies 18877 Cluster EM: Concreting of FMR

Agay-Ayan-Sitio Kulgao Rd. X 0.456 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

WDM Construction & Supplies 18877 Conc. of FMR at South

Poblacion X 0.462 O 0.297 0.253 0.100 0.030 0.055 0.067 80.20 -

WDM Construction & Supplies 18877 Concreting of FMR, Barangay 24 X 0.477 C 0.385 0.300 0.300 - - - 98.50 *98.50%

Outstanding

WDM Construction & Supplies 18877 Const. of FMR, Odiongan-

Malinao-Sio-an Rd. X 0.953 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 449

Page 458: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

WDM Construction & Supplies 18877 Const. of MPB X 0.464 C 0.309 0.200 0.300 - - - 80.90 *80.90%

V. Satisfactory

WDM Construction & Supplies 18877 Const. of MPB X 0.187 C 0.341 0.200 0.300 - - - 84.10 *84.10%

V. Satisfactory

WDM Construction & Supplies 18877 Const. of Multi-Purpose Building

(Initial) X 1.908 C 0.367 0.300 0.300 - - - 96.70 91.31% Outstanding

WDM Construction & Supplies 18877 Rehab. of Butuan-Cagayan-Iligan

Road, Medina By-Pass X 9.293 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding

Wearr Enterprises & Devt. Corp. 14123 Repair/Impvt. of Cabilogan River

Control V 14.474 C 0.350 0.200 0.300 - - - 85.00 73.42% Satisfactory

Wearr Enterprises & Devt. Corp. 14123 Restoration of San Vicente River

Control V 4.750 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Wee Builders 16375

Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment III (Mulawin-

Tigbalabag Section)

IX 36.863 C 0.363 0.125 0.000 - - - 48.80 70.04% Satisfactory

Wee Eng Construction, Inc. 16380 Const. of Reiforced Box Culvert, Macalelon-Mulanay Road IV-A 1.939 C 0.376 0.200 0.300 - - - 87.60 *87.60%

V. Satisfactory

Wee Eng Construction, Inc. 16380Const. of Reinforced Conc. Box

Culvert along Macalelon-Mulanay Road

IV-A 0.816 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding

Wee Eng Construction, Inc. 16380

Const. of SCDR Marihatag-Barobo Section (Conc. of

Amontay-Sto. Niño Section with Toril & Amontay Bridges)

XIII 122.026 C 0.374 0.300 0.300 - - - 97.40 89.56% V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 450

Page 459: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Wee Eng Construction, Inc. 16380Const. of SCDR Marihatag-

Hinatuan-Bislig Road (Marihatag-San Agustin-Lianga Sect)

XIII 146.935 O 0.351 0.300 0.100 0.030 0.045 0.100 92.60 -

Wee Eng Construction, Inc. 16380Const. of SDCR (Lianga-Barobo

Subsection) along Marihatag-Hinatuan-Bislig Sect

XIII 257.508 O 0.317 0.300 0.100 0.030 0.065 0.100 91.20 -

Wee Eng Construction, Inc. 16380 Rehab./Impvt. of Rtalomo River Control, NHA Village XI 18.871 C 0.382 0.300 0.300 - - - 98.20 *98.20%

Outstanding

Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project

(Rehab. of Taytay-El Nido Road) SPIADP 898.994 C 0.342 0.294 0.300 - - - 93.60 94.54% Outstanding

Welex Construction 9323 Land Dev't. of Taysan Resettlement Project Region V 49.807 O 0.372 0.275 0.000 0.030 0.065 0.100 84.20 -

Welex Construction 9323 Land Dev't. of Taysan Resettlement Project

SLBMO-Region V 49.802 O 0.382 0.288 0.000 0.030 0.070 0.067 83.70 -

Werr Corporation (International) 14133 Const. of 2-Cl, 2-Storey S/B @

Bangoy NHS XI 0.683 O 0.189 0.250 0.000 0.015 0.018 0.033 50.50 -

Werr Corporation (International) 14133 Const. of 4-CL, 2-Storey S/B @

Eulogio Rodriguez, Jr. E/S IVA 5.550 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding

Werr Corporation (International) 14133 Const. of Bucal Bypass Bridge

(Phase I) IVA 10.176 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Westan Construction and Supply 24331 Const. of Flood Control @

Brgy. Parparoroc I 4.689 O 0.354 0.106 0.100 0.023 0.030 0.133 74.60 -

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 451

Page 460: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Westmin Enterprises and Construction Services 20989

Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop Road,

Tag-ulo-Guimputlan Sect.IX 2.747 C 0.354 0.220 0.300 - - - 87.40 *87.40%

V. Satisfactory

Westmin Enterprises and Construction Services 20989 Const. of MPB @ Rizal IX 0.945 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

Westmin Enterprises and Construction Services 20989 Const./Completion of MPB

(Municipal Gym) IX 2.842 C 0.287 0.200 0.300 - - - 78.70 80.24% V. Satisfactory

Westmin Enterprises and Construction Services 20989 Const./Impvt. of MPB IX 0.099 C 0.340 0.300 0.300 - - - 94.00 *94.00%

Outstanding

Westmin Enterprises and Construction Services 20989

Improvement/Concrete Paving along Rizal Shrine-Rizal Town

Coastal Road, Guimputlan-Banbanan-Carang Road Section

(Guimputlan-Banbanan Sect.)

IX 2.758 C 0.388 0.200 0.300 - - - 88.80 91.92% Outstanding

Westmin Enterprises and Construction Services 20989

Impv't./Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop

RoadIX 2.743 C 0.361 0.300 0.300 - - - 96.10 90.34%

Outstanding

Westmin Enterprises and Construction Services 20989 Rehab. of Banbanan-Carang

Road IX 1.893 C 0.326 0.225 0.300 - - - 85.10 79.10% Satisfactory

Westwalk Corporation 30650 Const. of MPB NCR 2.101 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory

Whee Bon Construction & Supply 21731 Repair//Rehab. of Classroom @

Gumaca Nat'l. H/S IV-A 0.094 C 0.400 0.000 0.335 - - - 73.50 *73.50% Satisfactory

Wilper Construction, Inc. 1632 M'lang Airport Development Project DOTC 28.833 C 0.400 0.200 0.300 - - - 90.00 90.90%

Very Satisfactory

Wilper Construction, Inc. 1632 Conc. of Tigbao-Pulac Sta. Fe-San Miguel Road VIII 9.629 C 0.362 0.200 0.300 - - - 86.20 87.28%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 452

Page 461: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Wilper Construction, Inc. 1632 Impvt. of Drainage Canal System along SLMAC III 4.701 C 0.323 0.200 0.300 - - - 82.30 *82.30%

V. Satisfactory

Wilper Construction, Inc. 1632Widening/Lowering/Impvt. of

Baler-Casiguran Road, Abuleg Sect.

III 5.864 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory

Wilper Construction, Inc. 1632Widening/Lowering/Impvt. of

Baler-Casiguran Road, Pimpolisan Sect.

III 5.856 C 0.308 0.200 0.300 - - - 80.80 75.46% Satisfactory

Wilpres Enterprises 19698 Conc. of FMR @ Brgy. Bocaclew I 0.482 C 0.273 0.200 0.300 - - - 77.30 *77.30% Satisfactory

Wilsam Construction & Dev. Corp. 27046 Continuation of Concreting of

Borongan Boulevard VIII 9.162 O 0.346 0.000 0.100 0.030 0.032 0.100 60.80 -

Winley Tan Construction 22368 Completion of School Building with CR @ Siparok E/S IX 0.182 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

Winley Tan Construction 22368 Const. of 1-Unit, Two (2) CL School Bldg. @ Roxas E/S IX 0.719 C 0.379 0.200 0.300 - - - 87.90 93.36%

Outstanding

Winley Tan Construction 22368 Const. of MPB (Covered Court) at Galas E/S IX 2.367 C 0.361 0.200 0.300 - - - 86.10 91.63%

Outstanding

Winley Tan Construction 22368Const. of One (1) CL Sch. Bldg.

at Pamansalan Ecotech High Sch.

IX 0.563 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

Winley Tan Construction 22368

Const. of Patunan River Control (Downstream) crossing Nat'l

Highway along Dipolog Dumingag Drainage Section

IX 4.746 C 0.348 0.200 0.300 - - - 84.80 85.94% V. Satisfactory

Winley Tan Construction 22368 Repair/Rehab. of Sch. Bldg. (ESP Bldg.) @ JRMSC IX 0.448 C 0.307 0.200 0.300 - - - 80.70 *80.70%

V. Satisfactory

Wizard Enterprises 27504 Const. of Water Works System IV-A 0.964 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 453

Page 462: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Wizard Trading and Construction 21921 Conc. of San Jose-Llanera Road III 2.980 C 0.354 0.209 0.300 - - - 86.30 *86.30%

V. Satisfactory

Wizard Trading and Construction 21921 Const. of Box Culvert III 2.300 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Wizard Trading and Construction 21921 Const. of MPB @ Brgy. Bagong

Flores III 1.695 C 0.310 0.269 0.300 - - - 87.90 *87.90% V. Satisfactory

Wizard Trading and Construction 21921 Const. of MPB @ Namulandayan

E/S III 1.264 C 0.335 0.300 0.300 - - - 93.50 84.54% V. Satisfactory

Wizard Trading and Construction 21921 Const. of MPB at Balbalungao

E/S III 0.752 C 0.304 0.300 0.300 - - - 90.40 *90.40% Outstanding

Wizard Trading and Construction 21921 Const. of MPB, Brgy. Cordero III 1.030 C 0.369 0.200 0.300 - - - 86.90 83.75%

V. Satisfactory

WMLC Trading & Construction Supply 24535 Rehab. of San Juan-Laiya Road IV-A 14.468 C 0.320 0.202 0.300 - - - 82.20 *82.20%

V. Satisfactory

Worldwide Builders 31408 Construction of Multi-Purpose Building VII 0.479 C 0.310 0.000 0.300 - - - 61.00 *61.00%

Fair

Worldwide Builders 31408 Const. of 2 CL Academic Sch. Bldg., Mantalongon NHS VII 0.888 C 0.290 0.300 0.300 - - - 89.00 *89.00%

V. Satisfactory

Worldwide Builders 31408 Rehab. & Repair of Duldol-Bitoon Rd. VII 0.934 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Worldwide Builders 31408 Rehab. & Repair of Poblacion-Bunlan Road VII 0.932 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

WSR Enterprises 17589 Rehabilitation of Caugahan Bridge I V 0.755 C 0.250 0.300 0.300 - - - 85.00 *85.00%

V. Satisfactory

WT Construction, Inc. 5490Const. of CP MN-D2, Oroquieta-

Sindangan Rd., Barcelona-Katipunan Section

ADB 267.525 O 0.382 0.300 0.070 0.030 0.042 0.067 89.10 -

WT Construction, Inc. 5490 Const. of CP PY-C, Kalibo-Nabas Road VI 208.009 C 0.375 0.300 0.300 - - - 97.50 88.83%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 454

Page 463: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

WTG Construction and Development Corporation 7494 Asphalt Overlay of Antonio Y. de

Pio Highway VII 6.468 C 0.313 0.204 0.300 - - - 81.70 *81.70% V. Satisfactory

WTG Construction and Development Corporation 7494 Conc. of Toledo-Pinagmungahan-

Aloguinsan-Mantalongon Road VII 45.125 O 0.348 0.225 0.030 0.023 0.022 0.100 74.80 -

WTG Construction and Development Corporation 7494 Concrerting of Road @ Brgy.

Dacudao, Brgy. Dacudao XI 1.880 C 0.280 0.300 0.300 - - - 88.00 74.40% Satisfactory

WTG Construction and Development Corporation 7494 Const. of Asturias Bridge VII 7.899 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

WTG Construction and Development Corporation 7494

Const. of Bango Bridge & Approaches, Compostela-Cateel

RoadXI 9.834 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

WTG Construction and Development Corporation 7494 Const. of DPWH Regional Office

No. VII Bldg. (Phase III) VII 9.384 C 0.373 0.200 0.300 - - - 87.30 84.40% V. Satisfactory

WTG Construction and Development Corporation 7494

Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S.

Fortuna St. VII 86.914 O 0.281 0.220 0.100 0.030 0.047 0.100 77.80 -

WTG Construction and Development Corporation 7494

Const. of Mambusao Bridge & Approaches, Compostela-Cateel

RoadXI 6.669 C 0.395 0.300 0.300 - - - 99.50 94.94%

Outstanding

WTG Construction and Development Corporation 7494 Impv't of Binawan-Cabantian

Road XI 9.440 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding

WTG Construction and Development Corporation 7494

Naga-Toledo Road Project, Jct. Proog to Jct. Sangi, Sta. 20+504-

Sta.32+000VII 91.674 C 0.285 0.261 0.300 - - - 84.60 88.80%

V. Satisfactory

WTG Construction and Development Corporation 7494 Widening of Velez Bridge VII 12.301 C 0.338 0.300 0.300 - - - 93.80 82.34%

V. Satisfactory

WYNN Construction 19358 Bien Unido Port Development Project DOTC 478.918 C 0.458 0.200 0.300 - - - 95.80 95.80%

Very Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 455

Page 464: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

WYNN Construction 19358 Tagbilaran Airport Development Project DOTC 2.404 C 0.458 0.200 0.300 - - - 95.80 95.80%

Very Satisfactory

Y.S. Construction 11928 Const. of Sagbayan Multi-Purpose Building VII 0.891 C 0.367 0.300 0.300 - - - 96.70 92.36%

Outstanding

Yakal Construction 9685 Asphalt Overlay of Lapaz-Javier-Bito Road VIII 9.635 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

Yakal Construction 9685Conc. of Toledo-Pinamungajan-Aloguinsan-Mantalongon Road

(Bojo Section)VII 9.470 C 0.273 0.300 0.300 - - - 87.30 83.76%

V. Satisfactory

Yakal Construction 9685 Conc. of Toledo-Tabuelan-San Remegio Road VII 9.469 C 0.354 0.200 0.300 - - - 85.40 84.08%

V. Satisfactory

Yakal Construction 9685 Const. of Anas Flood Control VIII 3.798 C 0.350 0.300 0.300 - - - 95.00 83.00% V. Satisfactory

Yakal Construction 9685 Const. of Balaquid Bridge VIII 3.649 C 0.360 0.300 0.300 - - - 96.00 80.76% V. Satisfactory

Yakal Construction 9685 Const. of Catbalogan Diversion Road (Phase VI) VIII 28.949 O 0.400 0.283 0.030 0.022 0.043 0.033 81.10 -

Yakal Construction 9685 Rehab. Along Tacloban-Baybay South Road, Maihi Section VIII 1.890 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

Yakal Construction 9685 Rehab. of Dale River Control, Catarman-Rawis Road VIII 9.463 C 0.397 0.200 0.300 - - - 89.70 *89.70%

V. Satisfactory

Yakal Construction 9685Rehab. of Salog Bridge &

Approaches along Tac-Ormoc-Baybay-Maasin Rd.

VIII 6.085 C 0.343 0.200 0.300 - - - 84.30 84.60% V. Satisfactory

Yakal Construction 9685 Rehab./Impv't. of Tagnipa-Batwan-Tomoy Tomoy FMR VIII 14.467 C 0.383 0.300 0.300 - - - 98.30 87.80%

V. Satisfactory

Yakal Construction 9685 Rehabilitation of Roxas City Roads VI 4.736 C 0.340 0.300 0.300 - - - 94.00 88.78%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 456

Page 465: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Yap Mabuhay Enterprises, Inc. 15540 Completion of Multi-Purpose

Bldg., Brgy. Benitez XII 0.943 C 0.376 0.300 0.300 - - - 97.60 90.32% Outstanding

Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez

Jaena XII 0.758 O 0.312 0.240 0.100 0.020 0.027 0.100 79.90 -

Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez

Jaena XII 0.711 C 0.270 0.300 0.300 - - - 87.00 82.03% V. Satisfactory

Yap Mabuhay Enterprises, Inc. 15540

Widening to 4 Lanes of Marbel-Tupi-Makar Road, Saravia Sect.,

Brgy. SaraviaXII 16.394 C 0.278 0.300 0.300 - - - 87.80 85.49%

V. Satisfactory

Yap Mabuhay Enterprises, Incorporated 15540 Completion of Multi-Purpose

Bldg. @ Zone II XII 0.865 C 0.236 0.267 0.300 - - - 80.30 82.47% V. Satisfactory

YCT Builders Center Co. 23830 Const. of 1 Cl Standard Sch. Bldg. at Jimalalud NHS VII 0.406 C 0.362 0.257 0.300 - - - 91.90 85.35%

V. Satisfactory

YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road VII 3.764 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road, Luz Section VII 5.710 C 0.350 0.300 0.300 - - - 95.00 *95.00%

Outstanding

YCT Builders Center, Co. Inc. 23830 Const. of 2CL S/B @ Dungcan

E/S VII 0.711 C 0.367 0.100 0.300 - - - 76.70 77.96% Satisfactory

YCT Builders Center, Co. Inc. 23830

Impvt. of Nat'l Road (Missing Link) along Vallehermoso-La

Castellana RoadVII 2.454 C 0.330 0.149 0.300 - - - 77.90 *77.90%

Satisfactory

YCT Builders Center, Co. Inc. (Formerly YCT Builders

Center Co.)23830 Impv't./Repair of DNR Sta. Cruz,

Tayasan VII 0.886 C 0.321 0.290 0.300 - - - 91.10 57.08% Poor

YL Trading General Merchandising 22543 Conc. of Iloilo-Antique Rd. along

Pob. Culasi VI 9.622 C 0.353 0.300 0.300 - - - 95.30 93.29% Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 457

Page 466: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

YL Trading General Merchandising 22543

Conc. of Iloilo-Antique Rd. along Poblacion Culasi, Antique

National Road ( w/ exception)VI 9.622 O 0.340 0.261 0.100 0.030 0.047 0.100 87.80 -

YL Trading General Merchandising 22543 Conc. of the Gap Portion of Iloilo-

Antique Road, Culasi Section VI 4.814 O 0.365 0.225 0.100 0.023 0.037 0.100 85.00 -

YL Trading General Merchandising 22543

Conc. of the Gap Portion of Iloilo-Antique Road, Culasi, Tibiao &

Barbasa SectionVI 19.237 C 0.346 0.200 0.300 - - - 84.60 85.74%

V. Satisfactory

YL Trading General Merchandising 22543 Concreting of 247.50 L.M.

National Road VI 2.886 C 0.345 0.115 0.300 - - - 76.00 78.10% Satisfactory

Yoyen Enterprises 15541 Completion of Multi Purpose Hall @ Brgy. Jaena VIII 0.462 O 0.264 0.263 0.100 0.000 0.027 0.100 75.40 -

Yoyen Enterprises 15541Conc. of Culaba-Caibiran

National Circ. Road, Culaba-Looc Section

VIII 3.742 O 0.320 0.281 0.100 0.015 0.037 0.100 85.30 -

Yoyen Enterprises 15541 Conc. of Dayhagan-Salvacion-Coob-Libertad Road VIII 12.537 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -

Yoyen Enterprises 15541 Conc. of Kananga-Tungonan Road (Hotspring ) VIII 14.461 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Yoyen Enterprises 15541

Conc. Paving of Critical Portion of National Circ. Road, Caibiran-Cabucgayan Road (Rawid Road

Section)

VIII 3.807 C 0.266 0.200 0.300 - - - 76.60 82.60% V. Satisfactory

Yoyen Enterprises 15541Const. of Divisoria-Libertad-

Antipolo-Mabini-Liong-Nabangig Road

V 3.673 O 0.272 0.225 0.100 0.015 0.014 0.100 72.60 -

Yoyen Enterprises 15541 Const. of Farm-to-Market Road VIII 1.840 C 0.261 0.300 0.300 - - - 86.10 76.44% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 458

Page 467: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Yoyen Enterprises 15541 Const. of Multi-Purpose Pavement, INAVS VIII 0.465 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Yoyen Enterprises 15541 Rehab./Deepening of Can-Untog River Control VIII 9.461 C 0.381 0.275 0.300 - - - 95.60 *95.60%

Outstanding

Yoyen Enterprises 15541 Rehab./Deepening of Panilahan River Control VIII 9.567 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

Yoyen Enterprises 15541 Repair/Restoration of Buenavista Slope Protection VIII 0.248 C 0.331 0.300 0.300 - - - 93.10 *93.10%

Outstanding

YS Construction 11928 Conc. of Critical Sections along Danao-Sagbayan Road VII 4.690 C 0.328 0.300 0.300 - - - 92.80 92.14%

Outstanding

YS Construction 11928Conc. of Sta. Fe-Magtangtang

Road Leading to Francisco Dagohoy Cave

VII 0.947 C 0.307 0.300 0.300 - - - 90.70 75.64% Satisfactory

YS Construction 11928Const. of Drainage Project

(Outfall), Tagbilaran City-San Jose St.

VII 9.380 C 0.294 0.300 0.300 - - - 89.40 87.48% V. Satisfactory

YS Construction 11928 Const. of MPB VII 4.665 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding

YSL Builders 19516Conc./Rehab. of Punta-

Dansullan-Cogon-Sergio Osmena Road

IX 2.706 C 0.251 0.193 0.300 - - - 74.40 83.70% V. Satisfactory

YSL Builders 19516 Concreting of Liloy-Labason Road (Ganase-Patawag Sect.) IX 4.637 C 0.355 0.300 0.300 - - - 95.50 92.50%

Outstanding

YSL Builders 19516 Const. of MPB (Covered Court) @ Olingan E/S IX 2.367 C 0.336 0.300 0.300 - - - 93.60 *93.60%

Outstanding

YSL Builders 19516 Const. of MPB (Gymnasium Phase IV) IX 0.957 C 0.389 0.187 0.300 - - - 87.60 *87.60%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 459

Page 468: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

YSL Builders 19516 Const. of MPB (Mini Gym) IX 1.079 C 0.383 0.000 0.300 - - - 68.30 *68.30% Fair

YSL Builders 19516Proposed Concreting of Liloy-

Labason Road (Patawag Section)

IX 4.632 C 0.392 0.295 0.300 - - - 98.70 96.78% Outstanding

Yu Construction 10470 Concreting of Corella-Sikatuna Road VII 9.187 O 0.342 0.247 0.100 0.030 0.037 0.100 85.60 -

Yu Construction 10470 Const. of 8 CL Bldg. for CVSCAFT VII 11.135 C 0.356 0.300 0.300 - - - 95.60 83.49%

V. Satisfactory

Yu Construction 10470 Impvt. (Conc. Paving) of Jct. Ter, Trinidad-Bien Unido Rd. VII 18.950 C 0.349 0.300 0.300 - - - 94.90 89.80%

V. Satisfactory

Yu Construction 10470Rehab./Const. of Damaged

Paved National Road along TER (Loay-Jagna)

VII 15.052 O 0.353 0.240 0.100 0.030 0.048 0.100 87.10 -

Yu Construction 10470 Talibon Small Reservoir Irrigation Project SRIP 14.630 O 0.322 0.177 0.100 0.030 0.047 0.200 87.60 -

YU Construction - ARN Builders joint venture JV-06-006

Const. of Dam Embankment - Phase III, Talibon Small Resrvior

Irrigation ProjectNIA 14.799 O 0.293 0.300 0.300 - - - *89.30 -

Z & L Construction & Supplies 25322 Const. of Multi-Purpose Bldg. X 0.681 C 0.396 0.259 0.300 - - - 95.50 90.53%

Outstanding

Z.A.S. Construction 8971Concreting of Critical Portion along Julita-Balaquid Road

SectionVIII 2.678 C 0.349 0.300 0.300 - - - 94.90 72.97%

Satisfactory

Z.A.S. Construction 8971 Const. of 1 CL Sch. Bldg. of Carigara Sch. of Fisheries VIII 0.499 C 0.327 0.200 0.300 - - - 82.70 *82.70%

V. Satisfactory

Z.A.S. Construction 8971 Const. of MPB Phase I, Brgy. San Pedro VIII 0.469 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Z.A.S. Construction 8971 Const. of Multi-Purpose Building (Health Center) VIII 0.189 C 0.365 0.300 0.300 - - - 96.50 93.42%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 460

Page 469: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Z.A.S. Construction 8971 Const. of One (1) CL Elem. School Bldg. @ Mercyville E/S VIII 0.440 C 0.395 0.100 0.300 - - - 79.50 *79.50%

Satisfactory

Z.F. Construction 17676 Const. of 2-CL Building III 0.809 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding

Z.F. Construction 17676Impvt./Conc. of San Luis-Ma. Aurora Rd., So. Hilltop-So.

Gulugod Baboy, Brgy. DianawanIII 18.346 C 0.318 0.300 0.300 - - - 91.80 *91.80%

Outstanding

Zabu Engineering 31104 Completion of School Bldg., at SPED Center CAR 0.293 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

Zabu Engineering 31104 Const./ Rehab./Impv't. of Angngalipan FMR Road CAR 0.960 C 0.267 0.300 0.300 - - - 86.70 90.48%

Outstanding

Zabu Engineering 31104 Repair/Rehab. of Liwan West-Santor FMR CAR 1.910 C 0.236 0.300 0.300 - - - 83.60 *83.60%

V. Satisfactory

Zacarias Enterprise 17446 Const. of MPB III 0.473 C 0.379 0.259 0.300 - - - 93.80 *93.80% Outstanding

Zamboanga Engineers & Contractors, Inc. 6239 Const. of MPB @ Mercedes Nat'l

High School IX 3.774 C 0.326 0.200 0.300 - - - 82.60 80.15% V. Satisfactory

Zillion Builders 15655Completion of Marouy Multi-

Purpose Building, DPWH Compound

IVA 4.810 O 0.369 0.240 0.100 0.030 0.055 0.100 89.40 -

Zillion Builders 15655 Const. of Waterworks at Brgy. San Pedro II IVA 1.579 C 0.354 0.200 0.300 - - - 85.40 *85.40%

V. Satisfactory

Zion Construction 14881 Const. of Bato II Bridge along Santander-Barili-Toledo Road VII 11.021 C 0.361 0.257 0.300 - - - 91.80 *91.80%

Outstanding

Zion Construction 14881 Const./Replacement of Giligaon Bridge VII 14.410 C 0.376 0.300 0.300 - - - 97.60 93.04%

Outstanding

Zion Construction (Formerly: Masterpiece

Const. & Supply14881

Const./Repair of Two (2) Storey Industrial Building At Badian

NHSVII 1.855 C 0.255 0.300 0.300 - - - 85.50 *85.50%

V. Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 461

Page 470: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

Zion Construction (Formerly: Masterpiece

Const. & Supply)14881

Asphalt Overlay of Natallio Bacalso Ave. (NBA), Bojoon-

Oslob SectionVII 14.998 C 0.308 0.300 0.300 - - - 90.80 *90.80%

Outstanding

Zion Construction (Formerly: Masterpiece

Const. & Supply)14881

Asphalt Overlay of Natallio Bacalso Ave. (NBA), Oslob

SectionVII 11.998 C 0.340 0.300 0.300 - - - 94.00 *94.00%

Outstanding

Zion Construction (Formerly: Masterpiece

Const. & Supply)14881 Const. of Retaining Wall (Riprap)

along Butuanon River, Tambis VII 1.394 C 0.244 0.200 0.300 - - - 74.40 *74.40% Satisfactory

ZM Construction 9052Asphalt Overlay along Iba National Road Candelaria

SectionIII 4.850 C 0.373 0.207 0.300 - - - 88.00 *88.00%

V. Satisfactory

ZM Construction 9052 Concreting of Balacbac Brgy. Road III 0.933 C 0.479 - 0.500 - - - 97.90 81.90%

V. Satisfactory

ZM Construction 9052 Impvt./Rehab. of Bataan Expressway, Mabatang Section III 14.342 C 0.259 0.205 0.300 - - - 76.40 76.40%

Satisfactory

ZM Construction 9052Rehab./Asphalting of Road,

Slope Protection along Iba North Road

III 7.165 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding

ZM Construction 9052 Rehab./Widening of Consuelo Bridge along Iba South Road III 18.705 C 0.321 0.289 0.300 - - - 91.00 *91.00%

Outstanding

ZMS Construction 10471 Conc. of Imelda-Alicia Road, Guintolan Section IX 4.810 C 0.238 0.208 0.300 - - - 74.60 74.30%

Satisfactory

ZMS Construction 10471Conc. of Tubod-Lakewood-

Pob.Lakewood Nat'l Secondary Road, Sibuwan-Tubod Section

IX 14.235 C 0.316 0.115 0.300 - - - 73.10 *73.10% Satisfactory

ZMS Construction 10471Conc. of Tubod-Lakewood-

Pob.Lakewood Nat'l Secondary Road, Tubod-Sibuwan Section

IX 14.248 C 0.348 0.112 0.300 - - - 76.00 *76.00% Satisfactory

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 462

Page 471: CPES Report 8th Release Jan. 1, 06-Dec. 30, 2008 · 2014. 11. 28. · 2 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities,

CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008

NAME of CONSTRUCTOR LICENSE NO.

CONTRACT*IMPL.

AGENCY

PROJECT

PROJECTWMS MTLSTATUSAMOUNT

(Php, M)

FINAL RATING/QUALITA

TIVE DESCRIPTION

CPES VISIT

RATINGTIME FAC ESH RDR

ZMS Construction 10471Conc. Paving of Siquijor

Circumferential Road, Lazi-San Juan Section

VII 4.674 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory

ZMS Construction 10471Const. of Demorok Bridge &

Approaches, Phase II, Josefina-Sergio Osmena Nat'l Road

IX 4.499 C 0.155 0.300 0.300 - - - 75.50 79.76% Satisfactory

ZMS Construction 10471Impvt./Conc. Paving of Pagadian-Buug Road Section (Segment VI)

along Pagadian-Ipil RoadIX 30.684 C 0.263 0.291 0.300 - - - 85.40 85.76%

V. Satisfactory

ZMS Construction 10471Impvt./Conc. Paving of Pagadian-

Buug Road Section (Segment VIII) along Pagadian-Ipil Road

IX 41.843 C 0.271 0.300 0.000 - - - 57.10 75.88% Satisfactory

ZMS Construction 10471

Impv't./Concrete Paving of Road Pagadian-Buug Road Section,

Segment II, Phase I along Pagadian-Ipil Road

IX 23.264 C 0.367 0.225 0.300 - - - 89.20 89.98% V. Satisfactory

ZMS Construction 10471Rehab. & Conc. Paving of Jct.

Tubod-Lakewood Road ( Lukuan-Tubod Section)

IX 19.199 C 0.207 0.200 0.300 - - - 70.70 *70.70% Satisfactory

Zoniuq Enterprises 25223 Improvement of Roads, Salasad (Brgy. Lumot-Mahipon) IV-A 0.286 C 0.406 - 0.500 - - - 90.60 *90.60%

Outstanding

Zota Trading and Construction 21424 Const. of Multi-Purpose Building

@ Ceralde E/S I 0.479 C 0.366 0.206 0.300 - - - 87.20 *87.20% V. Satisfactory

ZPM General Merchandise 28726 Const. of MPB, Canizales High School XII 1.907 C 0.328 0.300 0.300 - - - 92.80 *92.80%

Outstanding

18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed

8th CPES release Page 463