C
P
&
E
D
B
d
y
0 50105 15 20 25
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1007 P02
P01
P02
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1003 P02
P01
P02
C
P
&
E
D
B
d
y
050105 15 20 25
Proposed Site Plan
PA
PB
Drainage pond
1143 m²
SG
Urea Off Load
District
Heating
connection
Electrical
substation
WASTE
RECEPTION &
PREPARATION
POWER
GENERATION
FUEL
STORAGE
GASIFICATION
PROCESS HALL
CO
ND
EN
SE
RS
CO
ND
EN
SE
RS
Area used for site access
37900
27570853002200014600
80
70
0
E
Existing
landscaping
UP UP
UP
UP
HV/LV Sub-station
Lobby
Corridor
OFFICES, RECEPTION &
AMENITIES
CS
EGT
EGF
FWT FWT
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1001 P02
P01
KEY:
CS - CYCLE STORE
E - ENTRANCE
EGT - EMERGENCY GENERATOR TURBINE
EGF - EMERGENCY GENERATOR FIRE WATER
PB - PROCESS BACKUP PUMP
PA - PROCESS AUXILIARY
IWB - IN WEIGH BRIDGE
OWB - OUT WEIGH BRIDGE & VEHICLE INSPECTION
FWT - FIRE WATER TANK
P02
52.00 AOD
51.00 AOD
50.00 AOD
49.00 AOD
48.00 AOD
47.00 AOD
46.00 AOD
SIT
E
BO
UN
DA
RY
Site Section 3
49.00 AOD
48.00 AOD
47.00 AOD
46.00 AOD
50.00 AOD
49.00 AOD
48.00 AOD
47.00 AOD
46.00 AOD
49.00 AOD
48.00 AOD
47.00 AOD
46.00 AOD
50.00 AOD
49.00 AOD
48.00 AOD
47.00 AOD
46.00 AOD
51.00 AOD
50.00 AOD
Site Section 2
51.00 AOD
52.00 AOD
50.00 AOD
Site Section 1
51.00 AOD
52.00 AOD
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
010 252015
CO
NT
IN
UE
S A
BO
VE
CO
NT
IN
UE
S B
EL
OW
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
P01
A2
One Didsbury Point, Didsbury, Manchester, M20 2EYTel: 0161 249 1000 Fax: 0161 249 1001
Transfer House, Rankine Ave, Scottish EnterpriseTechnology Park, East Kilbride, G75 0QFTel: 01355 234567 Fax: 01355 266466
88 Glasgow Road, Ratho Station, Newbridge,Edinburgh, EH28 8PPTel: 0131 3353305 Fax: 0131 3353297
2 Lancaster Place, Copse Farm, South Marston Park,Swindon, SN3 4UQTel: 01793 828966 Fax: 01793 828965
Ashmill Business Park, Ashford Road, Lenham,Kent, ME17 2GQTel: 01622 858200 Fax: 01622 850065
D1002 P02
Site section location diagram
P02
ADGMP
010 252015
OFFICES, RECEPTION & AMENITIES
FUEL STORAGEWASTE RECEPTION & PREPARATION GASIFICATION PROCESS HALL POWER GENERATION
Section A-A
Sprinkler pump/fire
Suppression
Lift
Female Change
Store
Lobby
Section B-B
010 252015
+45.00m
Flue stack colour coated to
be Metallic grey
Roller Shutter
Door
Roller Shutter
Door
Roller Shutter
Door
T
GASIFICATION PROCESS HALL
OFFICES, RECEPTION & AMENITIES
GASIFICATION PROCESS HALL
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D2001 P02
P01
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
P02
OFFICES, RECEPTION & AMENITIES
South East Elevation
District Heating connection in
background with Electrical
substation behind
Aluminium framed curtain walling
system, frame: Dark grey
Site Reception
in foreground
+ 3.00 m
SIT
E
BO
UN
DA
RY
Roller Shutter
Door
010 252015
172264
Escape Doors to be Metallic Grey
Colourcoated metal profiled cladding:
Pale Green - RAL 6021
Rooflights
Photo Voltaic Panels
FFL
50.25 AOD
SIT
E
BO
UN
DA
RY
Existing groundline
(shown dashed)
Roller Shutter Door
Roller Shutter
Door
Roller Shutter
Door
Metal Roller shutter doors:
Mid blue
Metal cladding panels:
Metallic Grey
Projecting frame:
Dark Grey
FUEL STORAGE WASTE RECEPTION & PREPARATIONGASIFICATION PROCESS HALLPOWER GENERATION
+45.00m
Flue stack colour coated to
be Metallic grey
Extract Grilles
North West Elevation
Metal louvred wall system:
Metallic Grey
Escape Doors to be Metallic Grey
Colourcoated metal profiled cladding:
Pale Green - RAL 6021
Rooflights
Photo Voltaic Panels
010 252015
FFL
50.25 AOD
Electrical substation with
District Heating connection
behind
Site Reception
in background
+ 3.00 m
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
Existing groundline
(shown dashed)
Roller Shutter DoorRoller Shutter DoorRoller Shutter Door
172264
PROCESS HALLFUEL STORAGEWASTE RECEPTION & PREPERATION POWER GENERATIOJN
+45.00m
Flue stack colour coated to
be Metallic grey
Extract Grilles
Metal cladding panel:
Metallic Grey
Metal fascia:Dark Grey
Site Reception
SIT
E
BO
UN
DA
RY
North East Elevation
Roller Shutter Door
SIT
E
BO
UN
DA
RY
Extract Grilles
Metal Roller shutter doors:
Mid blue
Grille:
Mid blue
Personell/Escape
Door:
Mid blue
Roller Shutter Door
Existing ground line
(shown dashed)
010 252015
+45.00m
Flue stack colour coated to
be Metallic grey
Roller Shutter
Door
80340
South West Elevation
Metal Cladding panles: Metallic
Grey, with frame/ trim in Mid Grey
SIT
E
BO
UN
DA
RY
SIT
E
BO
UN
DA
RY
Existing groundline
(shown dashed)
Metal cladding panel:
Metallic Grey
Metal fascia:Dark Grey
+45.00m
Flue stack colour coated to
be Metallic grey
Extract Grille
Personell/Escape Door:
Mid blue
Roller Shutter
Door
Roller Shutter
Door
010 252015
Fire water tank
Site Reception
background
A1
One Didsbury Point, Didsbury, Manchester, M20 2EYTel: 0161 249 1000 Fax: 0161 249 1001
Transfer House, Rankine Ave, Scottish EnterpriseTechnology Park, East Kilbride, G75 0QFTel: 01355 234567 Fax: 01355 266466
88 Glasgow Road, Ratho Station, Newbridge,Edinburgh, EH28 8PPTel: 0131 3353305 Fax: 0131 3353297
2 Lancaster Place, Copse Farm, South Marston Park,Swindon, SN3 4UQTel: 01793 828966 Fax: 01793 828965
Ashmill Business Park, Ashford Road, Lenham,Kent, ME17 2GQTel: 01622 858200 Fax: 01622 850065
D2000 P02
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
P01
P02
UP
UP
UP
UP
HV/LV Sub-station
Reception
Co
rrid
or
Store
Switch room
Sprinkler pump/fire
Suppression
G H I JK
Escape
Stair
L
Lift
DN
DN
UP
CONTROL
ROOM
Open Plan
Office
FEMALE
CHANGE
MALE CHANGE
CANTEEN
AC
CE
SS
IB
LE
WC
/C
HA
NG
E
STORE
LOBBY
Lift
CONFERENCE/
EDUCATION SUITE
Sun tunnels & internal vision panels
to provide light to level 01 rooms
G H I JK
L
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1005 P02
P01
LEVEL 01
Office, Education & Staff Facilities
LEVEL 00
Reception Lobby & Services Distribution
P02
UP
UP
UP
UP
HV/LV Sub-station
Reception
Co
rrid
or
Store
Switch room
Sprinkler pump/fire
Suppression
A B C D E F G H I J K M N O P
9500 9500 9500 9500 9500 9500 9500 9500 9500 9500 8600
Pass through 1
Fly Ash Room
5MW Turbine Room
Pass through 2
10MW Turbine Room
Stack Room
Hazardous Waste
Store
Sample Store
Urea RoomWorkshop
Escape
Stair
Ash Handling Bay
L
Standby Generator
Room
Crane Grab
Maintanence 02
Crane Grab
Maintanence 01
Lift
GASIFICATION
PROCESS
HALL
FUEL
STORAGE
WASTE
RECEPTION
&
PREPARATION
8950
Q
9500
R
9500
S
9500
T
9500725072507250
1. This drawing represents the schematic design, and
is subject to detail design development.
2. All waste reception & deliveries will be carried out
within the building.
3. Roof lights are to maximise natural daylight within
the building.
DRAWING NOTES:
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1004 P02
P01
P02
ROOF PLAN
A
B
B
RL
PV
RL
Colourcoated Metal profiled cladding:
Pale Green - Ral 6021.
Rainwater gutter
Metal standing seam roof:
Mid metallic grey
Rainwater gutter
PV = Photovoltaic Panels
RL = Rooflight
Face of building
below
Total area 1615m²
010 252015
A
1. Do not scale from this drawing.
2. All dimensions are in millimeters unless otherwise stated.
3. All dimensions must be checked on site.
4. The designers shall be notified of any discrepancies.
5. This drawing has been produced for sole use on this project and
is not intended for use by any other person or any other purpose.
Notes:
A3 D1006 P02
P01
P02