STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION 2016 CONTRACT COST DATA A SUMMARY OF COST BY ITEMS FOR HIGHWAY CONSTRUCTION PROJECTS © 2017 California Department of Transportation All Rights Reserved

cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

STATE OF CALIFORNIA

BUSINESS, TRANSPORTATION AND HOUSING AGENCY

DEPARTMENT OF TRANSPORTATION

2016 CONTRACT COST DATA

A SUMMARY OF COST BY ITEMS FOR HIGHWAY CONSTRUCTION PROJECTS

© 2017 California Department of Transportation All Rights Reserved

Page 2: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls
Page 3: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

2016 CONTRACT COST DATA

The Contract Cost Data book is published annually by the Department of

Transportation, Division of Engineering Services – Program/Project Management and Office

Engineer, Office of Construction Contract Awards. This book includes standard contract

items for major highway contracts for which bids were opened in 2016. Some of the units of

measure for these items were in U.S. Customary Units (English) and were converted to

International System of Units (SI) for this publication. The conversion factors used for this

purpose are listed in Appendix A. For those who wish to convert back to English units, the

appropriate conversion factors are listed in Appendix B.

Advertised item quantities have been used as source information. Item quantities may

vary from the final quantities incorporated into the completed contract. Prices shown in this

tabulation are the mechanically weighted average of the awarded bidders’ prices and are

affected by location, time, quantity in the job and size of the item (relative to the size of the

job). In this book, a six-digit item code has been assigned to each standard contract item

and the items are listed numerically.

For assistance, contact Department of Transportation, Division of Engineering Services –

Program/Project Management and Office Engineer, Office of Construction Contract Awards by e-

mail at this address: DES-OE_Contract_Service @dot.ca.gov. The Web site address to download

this book is http://www.dot.ca.gov/hq/esc/oe/awards.

Page 4: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

TABLE OF CONTENTS

CONTRACT ITEM COST DATA…………………………………………………………………………………1 APPENDIX A……………………………………………………………………………………………………290 (CONVERSION FACTORS FROM ENGLISH UNITS TO SI UNITS) APPENDIX B……………………………………………………………………………………………………290 (CONVERSION FACTORS FROM SI UNITS TO ENGLISH UNITS)

Page 5: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 1 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 070030 LEAD COMPLIANCE PLAN LS 01 35 105,728.00 LS 02 32 60,260.28 LS 03 45 125,171.57 LS 04 53 157,136.00 LS 05 29 112,998.15 LS 06 34 95,887.67 LS 07 54 155,907.90 LS 08 52 125,457.98 LS 09 7 18,700.00 LS 10 39 94,912.50 LS 11 26 102,724.12 LS 12 22 82,845.00 UNIT TOTAL LS 428 1,237,729.17 ITEM CODE 070030 TOTAL 428 1,237,729.17* 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 01 3 36,000.00 LS 02 6 26,322.73 LS 03 7 40,700.00 LS 04 13 102,605.00 LS 05 8 85,300.00 LS 06 3 7,580.00 LS 07 13 95,462.00 LS 08 10 41,985.00 LS 10 4 56,903.00 LS 11 8 72,037.00 LS 12 12 108,530.00 UNIT TOTAL LS 87 673,424.73 ITEM CODE 080050 TOTAL 87 673,424.73* 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 01 1 385.0 1,200.0000 462,000.00 WDAY 02 6 1,420.0 605.9155 860,400.00 WDAY 03 1 300.0 7,000.0000 2,100,000.00 WDAY 04 2 798.0 20,412.9073 16,289,500.00 WDAY 05 8 3,110.0 1,586.5756 4,934,250.00 WDAY 06 2 350.0 895.7143 313,500.00 WDAY 07 14 5,155.0 2,282.1726 11,764,600.00 WDAY 08 11 3,035.0 1,942.9325 5,896,800.00 WDAY 10 3 590.0 1,994.2373 1,176,600.00

Page 6: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 2 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) TIME-RELATED OVERHEAD (WDAY) WDAY 11 8 2,140.0 2,048.4112 4,383,600.00 WDAY 12 6 1,670.0 1,416.5868 2,365,700.00 UNIT TOTAL WDAY 62 18,953.0* 2,666.9630 50,546,950.00* ITEM CODE 090100 TOTAL 62 50,546,950.00* 090105 TIME-RELATED OVERHEAD (LS) LS 01 2 50,000.00 LS 03 4 1,657,535.60 LS 04 12 6,951,000.00 LS 10 1 341,602.00 LS 12 1 325,000.00 UNIT TOTAL LS 20 9,325,137.60 ITEM CODE 090105 TOTAL 20 9,325,137.60* 120090 CONSTRUCTION AREA SIGNS EA 08 1 37.0 50.0000 1,850.00 UNIT TOTAL EA 1 37.0* 50.0000 1,850.00* LS 01 34 233,770.00 LS 02 29 299,361.29 LS 03 35 232,284.00 LS 04 60 1,063,649.00 LS 05 30 607,974.00 LS 06 34 304,184.60 LS 07 53 1,216,483.80 LS 08 53 948,260.30 LS 09 8 99,600.00 LS 10 39 412,684.00 LS 11 27 1,030,969.76 LS 12 28 594,428.00 UNIT TOTAL LS 430 7,043,648.75 ITEM CODE 120090 TOTAL 431 7,045,498.75* 120100 TRAFFIC CONTROL SYSTEM LS 01 35 4,028,445.44 LS 02 32 4,436,066.44 LS 03 42 6,402,478.07

Page 7: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 3 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) TRAFFIC CONTROL SYSTEM LS 04 60 9,513,259.29 LS 05 30 5,510,135.00 LS 06 33 5,974,876.31 LS 07 54 10,557,457.11 LS 08 54 7,870,549.97 LS 09 8 1,933,765.20 LS 10 39 6,712,326.56 LS 11 27 6,026,954.62 LS 12 28 4,922,256.50 UNIT TOTAL LS 442 73,888,570.51 ITEM CODE 120100 TOTAL 442 73,888,570.51* 120105 AUTOMATED WORK ZONE INFORMATION SYSTEM LS 11 1 53,000.00 UNIT TOTAL LS 1 53,000.00 ITEM CODE 120105 TOTAL 1 53,000.00* 120110 FLASHING ARROW SIGN EA 01 1 1.0 7,000.0000 7,000.00 EA 08 3 15.0 840.0000 12,600.00 UNIT TOTAL EA 4 16.0* 1,225.0000 19,600.00* ITEM CODE 120110 TOTAL 4 19,600.00* 120116 TYPE II BARRICADE EA 08 5 101.0 67.2277 6,790.00 EA 11 1 70.0 40.0000 2,800.00 EA 12 4 436.0 13.3455 5,818.64 UNIT TOTAL EA 10 607.0* 25.3849 15,408.64* ITEM CODE 120116 TOTAL 10 15,408.64* 120119 TRAFFIC CONE EA 08 1 480.0 7.7500 3,720.00 UNIT TOTAL EA 1 480.0* 7.7500 3,720.00*

Page 8: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 4 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 120119 TOTAL 1 3,720.00* 120120 TYPE III BARRICADE EA 01 4 17.0 96.5882 1,642.00 EA 02 2 15.0 95.0000 1,425.00 EA 03 5 97.0 126.7526 12,295.00 EA 04 2 39.0 100.9231 3,936.00 EA 05 6 203.0 84.3350 17,120.00 EA 06 5 236.0 68.3432 16,129.00 EA 07 3 346.0 81.7919 28,300.00 EA 08 7 124.0 115.5968 14,334.00 EA 10 5 157.0 83.5347 13,114.95 EA 11 4 155.0 44.2065 6,852.00 EA 12 5 20.0 87.5000 1,750.00 UNIT TOTAL EA 48 1,409.0* 82.9652 116,897.95* ITEM CODE 120120 TOTAL 48 116,897.95* 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 01 13 7,338.0 4.5849 33,644.16 SQFT 02 3 630.0 13.9810 8,808.00 SQFT 03 3 8,914.0 2.8411 25,326.00 SQFT 04 10 4,639.0 4.2309 19,627.00 SQFT 05 4 5,540.0 2.5473 14,112.00 SQFT 06 2 330.0 4.7606 1,571.00 SQFT 07 4 4,530.0 2.9011 13,142.00 SQFT 08 5 13,510.0 1.4791 19,982.50 SQFT 10 2 154.0 10.0000 1,540.00 SQFT 11 5 5,110.0 3.5822 18,305.00 SQFT 12 3 8,720.0 .7846 6,841.80 UNIT TOTAL SQFT 54 59,415.0* 2.7417 162,899.46* ITEM CODE 120149 TOTAL 54 162,899.46* 120151 TEMPORARY TRAFFIC STRIPE (TAPE) LF 01 5 9,700.0 3.1726 30,774.50 LF 02 1 3,600.0 3.5000 12,600.00 LF 04 3 13,780.0 2.0000 27,560.00 LF 05 3 151,120.0 1.1221 169,574.50 LF 06 8 216,280.0 1.3737 297,113.00 LF 10 2 7,810.0 1.5288 11,940.00 UNIT TOTAL LF 22 402,290.0* 1.3661 549,562.00*

Page 9: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 5 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 120151 TOTAL 22 549,562.00* 120152 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 01 1 20.0 25.0000 500.00 SQFT 02 11 5,316.0 3.7599 19,987.50 SQFT 06 4 4,058.0 4.8669 19,750.00 UNIT TOTAL SQFT 16 9,394.0* 4.2833 40,237.50* ITEM CODE 120152 TOTAL 16 40,237.50* 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 01 11 441,400.0 .3065 135,292.50 LF 02 2 19,760.0 1.5445 30,520.00 LF 03 3 114,150.0 .3272 37,345.50 LF 04 13 943,810.0 .2546 240,295.00 LF 05 6 496,820.0 .3169 157,459.00 LF 07 6 190,240.0 .3243 61,689.00 LF 08 8 4,512,360.0 .1362 614,784.00 LF 09 2 301,800.0 .8241 248,700.00 LF 10 4 292,420.0 .2505 73,262.20 LF 11 10 232,980.0 .4688 109,226.00 LF 12 4 599,700.0 .0513 30,747.00 UNIT TOTAL LF 69 8,145,440.0* .2135 1,739,320.20* ITEM CODE 120159 TOTAL 69 1,739,320.20* 120165 CHANNELIZER (SURFACE MOUNTED) EA 01 17 1,257.0 41.6207 52,317.20 EA 02 2 400.0 42.5250 17,010.00 EA 03 3 192.0 37.9411 7,284.70 EA 04 20 2,391.0 41.7281 99,772.00 EA 05 11 2,639.0 40.1250 105,890.00 EA 06 13 2,156.0 31.9017 68,780.00 EA 07 15 3,559.0 32.4797 115,595.40 EA 08 15 5,201.0 48.5678 252,601.30 EA 10 13 3,364.0 37.1203 124,872.54 EA 11 2 72.0 68.3472 4,921.00 EA 12 11 1,786.0 29.7606 53,152.52 UNIT TOTAL EA 122 23,017.0* 39.1970 902,196.66* ITEM CODE 120165 TOTAL 122 902,196.66* 120166 CHANNELIZER (SURFACE MOUNTED) (LEFT IN PLACE)

Page 10: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 6 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 120166 CHANNELIZER (SURFACE MOUNTED) (LEFT IN PLACE) EA 01 1 15.0 35.0000 525.00 EA 07 4 59.0 33.6610 1,986.00 UNIT TOTAL EA 5 74.0* 33.9324 2,511.00* ITEM CODE 120166 TOTAL 5 2,511.00* 120182 PORTABLE DELINEATOR EA 04 2 184.0 33.1522 6,100.00 EA 05 1 61.0 44.0000 2,684.00 EA 08 1 170.0 40.0000 6,800.00 EA 10 2 126.0 41.8254 5,270.00 EA 12 1 410.0 10.0000 4,100.00 UNIT TOTAL EA 7 951.0* 26.2397 24,954.00* ITEM CODE 120182 TOTAL 7 24,954.00* 120199 TRAFFIC PLASTIC DRUM EA 02 1 14.0 75.0000 1,050.00 EA 03 4 706.0 55.8782 39,450.00 EA 05 1 41.0 40.0000 1,640.00 EA 06 1 250.0 60.0000 15,000.00 EA 08 2 570.0 40.6140 23,150.00 EA 10 2 37.0 75.2703 2,785.00 EA 11 15 2,196.0 27.4625 60,307.71 EA 12 1 180.0 70.0000 12,600.00 UNIT TOTAL EA 27 3,994.0* 39.0543 155,982.71* ITEM CODE 120199 TOTAL 27 155,982.71* 120200 FLASHING BEACON (PORTABLE) EA 08 6 83.0 245.1807 20,350.00 EA 11 1 15.0 359.0000 5,385.00 EA 12 2 114.0 386.2281 44,030.00 UNIT TOTAL EA 9 212.0* 329.0802 69,765.00* ITEM CODE 120200 TOTAL 9 69,765.00* 120300 TEMPORARY PAVEMENT MARKER

Page 11: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 7 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 120300 TEMPORARY PAVEMENT MARKER EA 03 1 7.0 5.5000 38.50 EA 04 9 17,599.0 3.1610 55,631.00 EA 05 3 4,470.0 2.9841 13,339.00 EA 06 7 4,230.0 2.8605 12,100.00 EA 07 3 2,120.0 3.9623 8,400.00 EA 08 6 31,270.0 1.8666 58,367.90 EA 10 5 14,410.0 3.7328 53,789.00 EA 11 10 7,500.0 4.5313 33,985.00 EA 12 1 13.0 6.0000 78.00 UNIT TOTAL EA 45 81,619.0* 2.8882 235,728.40* ITEM CODE 120300 TOTAL 45 235,728.40* 121161 TEMPORARY TERMINAL SECTION (TYPE K) EA 06 1 2.0 3,350.0000 6,700.00 EA 07 4 8.0 2,025.0000 16,200.00 UNIT TOTAL EA 5 10.0* 2,290.0000 22,900.00* ITEM CODE 121161 TOTAL 5 22,900.00* 128601 TEMPORARY SIGNAL SYSTEM LS 01 4 541,506.96 LS 02 1 165,000.00 LS 03 2 665,000.00 LS 04 5 681,612.00 LS 06 2 425,000.00 LS 07 2 563,000.00 LS 10 1 250,000.00 UNIT TOTAL LS 17 3,291,118.96 ITEM CODE 128601 TOTAL 17 3,291,118.96* 128605 TEMPORARY SIGNAL AND LIGHTING LS 07 1 682,500.00 UNIT TOTAL LS 1 682,500.00 ITEM CODE 128605 TOTAL 1 682,500.00* 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA)

Page 12: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 8 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 01 7 20.0 8,241.6430 164,832.86 EA 04 4 15.0 2,773.3333 41,600.00 EA 08 50 218.0 3,216.3596 701,166.40 EA 11 27 130.0 5,331.8615 693,141.99 EA 12 7 59.0 4,473.0339 263,909.00 UNIT TOTAL EA 95 442.0* 4,218.6657 1,864,650.25* LS 08 1 1,500.00 UNIT TOTAL LS 1 1,500.00 ITEM CODE 128651 TOTAL 96 1,866,150.25* 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 01 27 223,206.50 LS 02 31 407,231.00 LS 03 42 392,227.00 LS 04 56 889,499.27 LS 05 30 399,080.00 LS 06 33 496,529.46 LS 07 4 45,460.00 LS 09 8 127,000.00 LS 10 39 511,854.50 LS 12 20 396,546.00 UNIT TOTAL LS 290 3,888,633.73 ITEM CODE 128652 TOTAL 290 3,888,633.73* 128660 TEMPORARY FLASHING BEACON LS 01 1 34,575.00 LS 02 1 32,300.00 UNIT TOTAL LS 2 66,875.00 ITEM CODE 128660 TOTAL 2 66,875.00* 129000 TEMPORARY RAILING (TYPE K) LF 01 18 12,060.0 46.2474 557,743.60 LF 02 3 17,980.0 16.6307 299,020.40 LF 03 6 11,960.0 23.3411 279,160.00 LF 04 26 290,180.0 9.0077 2,613,852.40 LF 05 13 173,440.0 9.8057 1,700,706.00

Page 13: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 9 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) TEMPORARY RAILING (TYPE K) LF 06 14 39,420.0 22.8006 898,800.00 LF 07 14 185,740.0 16.9667 3,151,402.00 LF 08 12 125,700.0 14.0308 1,763,666.00 LF 10 14 76,480.0 15.8862 1,214,978.20 LF 11 16 94,500.0 15.4741 1,462,302.80 LF 12 10 126,280.0 13.0281 1,645,190.00 UNIT TOTAL LF 146 1,153,740.0* 13.5098 15,586,821.40* ITEM CODE 129000 TOTAL 146 15,586,821.40* 129100 TEMPORARY CRASH CUSHION MODULE EA 03 2 282.0 184.0426 51,900.00 EA 04 12 2,154.0 168.2642 362,441.00 EA 05 7 858.0 181.8765 156,050.00 EA 06 14 1,169.0 187.0796 218,696.00 EA 07 13 3,012.0 208.5803 628,244.00 EA 08 11 947.0 195.7521 185,377.20 EA 10 14 2,104.0 183.9876 387,110.00 EA 11 8 482.0 196.8220 94,868.20 EA 12 6 391.0 284.3990 111,200.00 UNIT TOTAL EA 87 11,399.0* 192.6385 2,195,886.40* ITEM CODE 129100 TOTAL 87 2,195,886.40* 129110 TEMPORARY CRASH CUSHION EA 01 3 10.0 3,900.0000 39,000.00 EA 07 1 88.0 110.0000 9,680.00 EA 08 1 14.0 700.0000 9,800.00 UNIT TOTAL EA 5 112.0* 522.1429 58,480.00* ITEM CODE 129110 TOTAL 5 58,480.00* 129150 TEMPORARY TRAFFIC SCREEN LF 04 1 2,370.0 8.0000 18,960.00 LF 05 2 7,900.0 4.9968 39,475.00 LF 08 1 2,400.0 2.2900 5,496.00 LF 10 1 3,420.0 5.0000 17,100.00 LF 11 1 580.0 4.0000 2,320.00 LF 12 9 117,310.0 2.3516 275,871.00 UNIT TOTAL LF 15 133,980.0* 2.6812 359,222.00*

Page 14: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 10 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 129150 TOTAL 15 359,222.00* 130100 JOB SITE MANAGEMENT LS 01 35 787,447.00 LS 02 32 364,340.67 LS 03 44 575,705.74 LS 04 63 3,004,953.30 LS 05 30 906,100.00 LS 06 34 331,692.19 LS 07 54 579,054.80 LS 08 56 1,402,049.46 LS 09 10 262,812.40 LS 10 39 782,904.94 LS 11 27 575,690.43 LS 12 30 577,586.00 UNIT TOTAL LS 454 10,150,336.93 ITEM CODE 130100 TOTAL 454 10,150,336.93* 130200 PREPARE WATER POLLUTION CONTROL PROGRAM EA 01 1 1.0 5,000.0000 5,000.00 UNIT TOTAL EA 1 1.0* 5,000.0000 5,000.00* LS 01 26 68,621.00 LS 02 25 37,434.52 LS 03 39 65,815.50 LS 04 52 112,261.00 LS 05 23 42,137.50 LS 06 27 52,046.10 LS 07 40 71,044.60 LS 08 39 86,948.44 LS 09 9 39,970.49 LS 10 30 45,319.95 LS 11 17 30,782.00 LS 12 23 95,577.50 UNIT TOTAL LS 350 747,958.60 ITEM CODE 130200 TOTAL 351 752,958.60* 130300 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 01 8 25,391.78 LS 02 7 24,790.00 LS 03 6 16,450.00

Page 15: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 11 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 04 13 136,292.50 LS 05 7 58,850.00 LS 06 7 16,900.00 LS 07 14 77,110.00 LS 08 17 35,633.00 LS 09 1 3,000.00 LS 10 9 43,084.00 LS 11 10 29,018.67 LS 12 7 48,156.00 UNIT TOTAL LS 106 514,675.95 ITEM CODE 130300 TOTAL 106 514,675.95* 130310 RAIN EVENT ACTION PLAN EA 01 7 342.0 494.1520 169,000.00 EA 02 6 154.0 500.0000 77,000.00 EA 03 6 123.0 454.2683 55,875.00 EA 04 11 612.0 500.0000 306,000.00 EA 05 6 345.0 500.0000 172,500.00 EA 06 2 89.0 383.1461 34,100.00 EA 07 10 261.0 499.3563 130,332.00 EA 08 5 133.0 500.0000 66,500.00 EA 10 2 78.0 500.0000 39,000.00 EA 11 8 127.0 500.0000 63,500.00 EA 12 6 183.0 500.0000 91,500.00 UNIT TOTAL EA 69 2,447.0* 492.5652 1,205,307.00* ITEM CODE 130310 TOTAL 69 1,205,307.00* 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 01 8 333.0 539.6694 179,709.90 EA 02 5 260.0 653.5385 169,920.00 EA 03 5 202.0 477.7228 96,500.00 EA 04 11 383.0 181.5731 69,542.50 EA 05 6 160.0 433.8750 69,420.00 EA 06 2 12.0 1,020.8333 12,250.00 EA 07 10 139.0 463.3957 64,412.00 EA 08 5 91.0 276.3736 25,150.00 EA 10 2 39.0 508.9744 19,850.00 EA 11 7 79.0 404.4304 31,950.00 EA 12 6 77.0 437.7532 33,707.00 UNIT TOTAL EA 67 1,775.0* 435.1614 772,411.40*

Page 16: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 12 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 130320 TOTAL 67 772,411.40* 130330 STORM WATER ANNUAL REPORT EA 01 8 20.0 2,000.0000 40,000.00 EA 02 7 14.0 2,000.0000 28,000.00 EA 03 7 17.0 1,688.2353 28,700.00 EA 04 13 25.0 4,280.0000 107,000.00 EA 05 7 21.0 2,000.0000 42,000.00 EA 06 7 14.0 1,785.7143 25,000.00 EA 07 14 27.0 1,878.2963 50,714.00 EA 08 18 25.0 1,652.0000 41,300.00 EA 09 1 1.0 2,000.0000 2,000.00 EA 10 9 11.0 2,000.0000 22,000.00 EA 11 10 23.0 2,000.0000 46,000.00 EA 12 7 15.0 2,000.0000 30,000.00 UNIT TOTAL EA 108 213.0* 2,172.3662 462,714.00* ITEM CODE 130330 TOTAL 108 462,714.00* 130500 TEMPORARY EROSION CONTROL BLANKET SQYD 01 3 2,950.0 3.7729 11,130.00 SQYD 03 2 10,800.0 3.6741 39,680.00 SQYD 07 3 62,050.0 4.7707 296,025.00 SQYD 08 2 47,000.0 1.5957 75,000.00 UNIT TOTAL SQYD 10 122,800.0* 3.4351 421,835.00* ITEM CODE 130500 TOTAL 10 421,835.00* 130505 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) EA 01 8 23.0 845.2957 19,441.80 EA 02 4 28.0 982.1429 27,500.00 EA 03 5 41.0 804.8780 33,000.00 EA 04 1 1.0 1,000.0000 1,000.00 EA 05 5 51.0 676.8627 34,520.00 EA 06 3 6.0 500.0000 3,000.00 EA 07 3 22.0 507.5455 11,166.00 EA 08 3 34.0 821.1765 27,920.00 EA 10 1 6.0 100.0000 600.00 EA 11 4 24.0 533.3333 12,800.00 UNIT TOTAL EA 37 236.0* 724.3551 170,947.80* ITEM CODE 130505 TOTAL 37 170,947.80*

Page 17: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 13 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 130510 TEMPORARY MULCH SQYD 01 5 3,240.0 11.0944 35,946.00 SQYD 03 1 10,700.0 .8500 9,095.00 SQYD 06 1 200.0 4.0000 800.00 SQYD 07 1 3,400.0 6.3000 21,420.00 SQYD 12 1 2,230.0 .8200 1,828.60 UNIT TOTAL SQYD 9 19,770.0* 3.4947 69,089.60* ITEM CODE 130510 TOTAL 9 69,089.60* 130520 TEMPORARY HYDRAULIC MULCH SQYD 06 1 1,580.0 .5000 790.00 SQYD 07 5 100,540.0 .5310 53,384.00 SQYD 08 2 185,000.0 .5000 92,500.00 SQYD 10 2 107,310.0 .4263 45,743.00 SQYD 11 3 13,390.0 .3725 4,988.00 UNIT TOTAL SQYD 13 407,820.0* .4840 197,405.00* ITEM CODE 130520 TOTAL 13 197,405.00* 130530 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) SQYD 01 7 24,600.0 1.2475 30,688.00 SQYD 02 5 54,510.0 .9759 53,197.00 SQYD 03 7 125,020.0 .8753 109,435.00 SQYD 04 18 173,213.0 1.0200 176,680.50 SQYD 05 8 1,054,000.0 .6651 701,036.00 SQYD 07 1 10,000.0 .6500 6,500.00 SQYD 10 2 7,150.0 1.5375 10,993.00 SQYD 11 2 56,300.0 .5842 32,889.00 SQYD 12 4 59,720.0 .6458 38,569.00 UNIT TOTAL SQYD 54 1,564,513.0* .7414 1,159,987.50* ITEM CODE 130530 TOTAL 54 1,159,987.50* 130540 TEMPORARY TACKED STRAW SQYD 02 1 10,700.0 .9600 10,272.00 UNIT TOTAL SQYD 1 10,700.0* .9600 10,272.00* ITEM CODE 130540 TOTAL 1 10,272.00* 130550 TEMPORARY HYDROSEED

Page 18: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 14 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 130550 TEMPORARY HYDROSEED SQYD 07 1 600.0 4.4000 2,640.00 UNIT TOTAL SQYD 1 600.0* 4.4000 2,640.00* ITEM CODE 130550 TOTAL 1 2,640.00* 130560 TEMPORARY SOIL BINDER SQYD 06 2 36,800.0 .4228 15,560.00 SQYD 07 1 3,000.0 2.3000 6,900.00 SQYD 08 19 351,240.0 .3098 108,821.10 SQYD 10 1 98,900.0 .1400 13,846.00 UNIT TOTAL SQYD 23 489,940.0* .2962 145,127.10* ITEM CODE 130560 TOTAL 23 145,127.10* 130570 TEMPORARY COVER SQYD 01 10 15,220.0 5.2638 80,114.60 SQYD 02 7 17,860.0 2.8639 51,150.00 SQYD 03 5 27,380.0 4.1409 113,379.00 SQYD 04 15 28,020.0 4.4625 125,040.00 SQYD 07 6 19,800.0 2.6253 51,980.00 SQYD 08 7 54,800.0 2.5985 142,400.00 SQYD 10 1 630.0 3.0000 1,890.00 UNIT TOTAL SQYD 51 163,710.0* 3.4570 565,953.60* ITEM CODE 130570 TOTAL 51 565,953.60* 130610 TEMPORARY CHECK DAM LF 01 12 6,090.0 7.4604 45,433.60 LF 02 7 2,685.0 6.9460 18,650.00 LF 03 6 15,100.0 9.4227 142,282.20 LF 04 14 1,970.0 9.3045 18,329.90 LF 05 6 18,172.0 3.4281 62,296.00 LF 07 1 100.0 10.0000 1,000.00 LF 08 2 3,400.0 11.5882 39,400.00 LF 11 2 600.0 14.5030 8,701.80 LF 12 3 400.0 3.4275 1,371.00 UNIT TOTAL LF 53 48,517.0* 6.9556 337,464.50* ITEM CODE 130610 TOTAL 53 337,464.50*

Page 19: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 15 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 01 18 108.0 274.9526 29,694.88 EA 02 11 139.0 281.9712 39,194.00 EA 03 31 746.0 195.5637 145,890.50 EA 04 47 1,310.0 178.8106 234,241.87 EA 05 12 449.0 229.2339 102,926.00 EA 06 13 224.0 256.4018 57,434.00 EA 07 29 1,673.0 153.2358 256,363.50 EA 08 18 583.0 206.3551 120,305.00 EA 09 4 44.0 384.9773 16,939.00 EA 10 14 323.0 216.5124 69,933.50 EA 11 16 373.0 259.8216 96,913.45 EA 12 22 571.0 177.5552 101,384.00 UNIT TOTAL EA 235 6,543.0* 194.2870 1,271,219.70* LS 03 1 100.00 UNIT TOTAL LS 1 100.00 ITEM CODE 130620 TOTAL 236 1,271,319.70* 130640 TEMPORARY FIBER ROLL LF 01 22 20,540.0 5.7869 118,863.70 LF 02 11 27,870.0 3.8229 106,545.00 LF 03 11 117,178.0 2.9524 345,953.00 LF 04 35 177,170.0 3.1341 555,271.50 LF 05 9 174,450.0 2.7745 484,003.20 LF 06 10 45,380.0 3.0223 137,150.00 LF 07 15 102,620.0 3.3049 339,150.00 LF 08 24 231,780.0 3.3429 774,816.00 LF 09 5 4,900.0 5.8000 28,420.00 LF 10 7 65,480.0 2.6159 171,287.30 LF 11 14 85,520.0 3.1347 268,076.40 LF 12 13 72,510.0 2.9828 216,280.00 UNIT TOTAL LF 176 1,125,398.0* 3.1507 3,545,816.10* ITEM CODE 130640 TOTAL 176 3,545,816.10* 130650 TEMPORARY GRAVEL BAG BERM LF 01 9 20,352.0 5.5375 112,700.00 LF 02 9 3,465.0 8.2414 28,556.50 LF 03 3 4,000.0 9.3475 37,390.00 LF 04 5 2,270.0 12.4454 28,251.00 LF 05 2 11,550.0 4.5519 52,575.00

Page 20: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 16 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) TEMPORARY GRAVEL BAG BERM LF 06 2 490.0 21.6531 10,610.00 LF 07 9 74,360.0 3.3901 252,090.00 LF 08 10 20,320.0 5.9715 121,340.00 LF 09 4 470.0 29.6170 13,920.00 LF 10 3 5,010.0 9.9697 49,948.40 LF 11 2 100.0 4.4000 440.00 LF 12 6 11,880.0 4.6470 55,206.20 UNIT TOTAL LF 64 154,267.0* 4.9461 763,027.10* ITEM CODE 130650 TOTAL 64 763,027.10* 130660 TEMPORARY LARGE SEDIMENT BARRIER LF 01 2 1,925.0 11.7403 22,600.00 LF 03 1 500.0 8.0000 4,000.00 LF 05 5 59,400.0 8.9346 530,715.00 UNIT TOTAL LF 8 61,825.0* 9.0144 557,315.00* ITEM CODE 130660 TOTAL 8 557,315.00* 130670 TEMPORARY REINFORCED SILT FENCE LF 01 8 2,020.0 17.6337 35,620.00 LF 02 2 430.0 9.7907 4,210.00 LF 03 1 1,000.0 7.0000 7,000.00 LF 04 7 24,870.0 6.7974 169,052.00 LF 10 2 3,480.0 3.3667 11,716.00 LF 12 1 400.0 4.9500 1,980.00 UNIT TOTAL LF 21 32,200.0* 7.1298 229,578.00* ITEM CODE 130670 TOTAL 21 229,578.00* 130680 TEMPORARY SILT FENCE LF 01 17 8,925.0 6.3082 56,300.70 LF 02 6 6,520.0 4.4808 29,215.00 LF 03 3 31,500.0 2.5159 79,250.00 LF 04 18 34,580.0 3.3880 117,155.50 LF 06 4 3,070.0 4.6954 14,415.00 LF 07 8 11,640.0 4.0677 47,348.00 LF 08 4 55,250.0 2.5388 140,268.00 LF 09 1 700.0 8.0000 5,600.00 LF 10 3 1,770.0 3.2806 5,806.60

Page 21: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 17 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) TEMPORARY SILT FENCE LF 11 1 1,170.0 6.8900 8,061.30 LF 12 1 460.0 7.1000 3,266.00 UNIT TOTAL LF 66 155,585.0* 3.2567 506,686.10* ITEM CODE 130680 TOTAL 66 506,686.10* 130690 TEMPORARY STRAW BALE BARRIER LF 05 1 720.0 13.0000 9,360.00 LF 10 4 7,590.0 6.5429 49,660.30 UNIT TOTAL LF 5 8,310.0* 7.1023 59,020.30* ITEM CODE 130690 TOTAL 5 59,020.30* 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 01 11 22.0 3,467.6186 76,287.61 EA 02 4 19.0 2,765.7895 52,550.00 EA 03 6 29.0 3,724.3903 108,007.32 EA 04 16 54.0 2,904.5326 156,844.76 EA 05 6 33.0 3,630.3030 119,800.00 EA 06 7 23.0 3,745.2174 86,140.00 EA 07 8 28.0 3,624.5714 101,488.00 EA 08 10 35.0 3,572.8571 125,050.00 EA 10 5 22.0 2,105.8864 46,329.50 EA 11 13 67.0 2,898.4266 194,194.58 EA 12 7 22.0 2,960.5909 65,133.00 UNIT TOTAL EA 93 354.0* 3,197.2451 1,131,824.77* ITEM CODE 130710 TOTAL 93 1,131,824.77* 130720 TEMPORARY CONSTRUCTION ROADWAY SQYD 01 1 710.0 30.0000 21,300.00 SQYD 04 2 370.0 26.2162 9,700.00 SQYD 06 1 2,300.0 42.0000 96,600.00 SQYD 07 1 1,560.0 21.0000 32,760.00 SQYD 08 1 450.0 10.0000 4,500.00 SQYD 10 2 10,140.0 8.3333 84,500.00 UNIT TOTAL SQYD 8 15,530.0* 16.0567 249,360.00* ITEM CODE 130720 TOTAL 8 249,360.00*

Page 22: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 18 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 130730 STREET SWEEPING LS 01 15 226,591.42 LS 02 5 71,056.00 LS 03 15 509,350.00 LS 04 54 686,312.00 LS 05 8 842,800.00 LS 06 10 191,180.00 LS 07 18 729,780.00 LS 08 12 638,050.00 LS 09 2 109,000.00 LS 10 12 422,020.00 LS 11 17 553,527.51 LS 12 8 185,631.00 UNIT TOTAL LS 176 5,165,297.93 ITEM CODE 130730 TOTAL 176 5,165,297.93* 130800 TEMPORARY ACTIVE TREATMENT SYSTEM LS 01 1 30,000.00 LS 03 1 25,000.00 LS 04 4 183,000.00 UNIT TOTAL LS 6 238,000.00 ITEM CODE 130800 TOTAL 6 238,000.00* 130900 TEMPORARY CONCRETE WASHOUT LS 01 27 131,240.92 LS 02 14 49,343.56 LS 03 24 93,466.00 LS 04 37 156,373.50 LS 05 22 118,150.00 LS 06 22 107,636.90 LS 07 42 236,530.50 LS 08 23 128,864.31 LS 09 4 5,307.24 LS 10 29 109,198.45 LS 11 20 173,467.36 LS 12 14 101,115.00 UNIT TOTAL LS 278 1,410,693.74 ITEM CODE 130900 TOTAL 278 1,410,693.74* 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY

Page 23: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 19 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 01 2 60.0 866.6667 52,000.00 EA 02 2 35.0 1,092.5714 38,240.00 EA 03 1 60.0 600.0000 36,000.00 EA 04 4 284.0 121.7254 34,570.00 EA 06 4 30.0 750.0000 22,500.00 EA 07 1 54.0 270.0000 14,580.00 EA 10 1 10.0 737.0000 7,370.00 EA 12 1 10.0 319.0000 3,190.00 UNIT TOTAL EA 16 543.0* 383.8858 208,450.00* ITEM CODE 131103 TOTAL 16 208,450.00* 131104 WATER QUALITY MONITORING REPORT EA 01 2 50.0 560.0000 28,000.00 EA 02 2 14.0 1,014.2857 14,200.00 EA 03 1 60.0 250.0000 15,000.00 EA 04 4 23.0 336.9565 7,750.00 EA 06 3 9.0 361.1111 3,250.00 EA 07 1 12.0 290.0000 3,480.00 EA 12 1 10.0 183.0000 1,830.00 UNIT TOTAL EA 14 178.0* 412.9775 73,510.00* ITEM CODE 131104 TOTAL 14 73,510.00* 131105 WATER QUALITY ANNUAL REPORT EA 01 1 1.0 1,100.0000 1,100.00 EA 04 1 1.0 350.0000 350.00 EA 06 3 6.0 933.3333 5,600.00 UNIT TOTAL EA 5 8.0* 881.2500 7,050.00* ITEM CODE 131105 TOTAL 5 7,050.00* 140003 ASBESTOS COMPLIANCE PLAN LS 01 5 14,000.00 LS 02 5 9,360.73 LS 03 3 9,630.00 LS 04 1 5,000.00 LS 05 2 40,725.00 LS 06 2 4,870.00 LS 08 5 15,365.00

Page 24: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 20 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ASBESTOS COMPLIANCE PLAN LS 10 1 3,000.00 LS 12 1 6,000.00 UNIT TOTAL LS 25 107,950.73 ITEM CODE 140003 TOTAL 25 107,950.73* 141000 TEMPORARY FENCE (TYPE ESA) LF 01 13 13,770.0 5.4322 74,801.00 LF 02 7 7,410.0 4.9070 36,361.00 LF 03 8 12,240.0 3.3627 41,159.00 LF 04 20 40,766.0 3.4269 139,703.00 LF 05 12 23,037.0 3.6586 84,282.60 LF 06 7 7,100.0 5.7761 41,010.00 LF 07 2 2,320.0 2.6845 6,228.00 LF 08 9 47,570.0 3.4968 166,344.00 LF 09 1 9,430.0 4.0000 37,720.00 LF 10 5 7,690.0 3.3931 26,093.00 LF 11 5 9,850.0 4.5005 44,330.00 LF 12 2 22,750.0 6.9101 157,205.50 UNIT TOTAL LF 91 203,933.0* 4.1937 855,237.10* ITEM CODE 141000 TOTAL 91 855,237.10* 141001 HEALTH AND SAFETY PLAN LS 01 1 2,500.00 LS 02 1 4,000.00 LS 03 2 15,500.00 LS 07 1 7,500.00 UNIT TOTAL LS 5 29,500.00 ITEM CODE 141001 TOTAL 5 29,500.00* 141101 REMOVE YELLOW PAINTED TRAFFIC STRIPE (HAZARDOUS WASTE) LF 07 4 327,350.0 .2928 95,852.50 LF 11 3 62,590.0 .5820 36,430.00 LF 12 2 26,210.0 .3910 10,247.50 UNIT TOTAL LF 9 416,150.0* .3425 142,530.00* ITEM CODE 141101 TOTAL 9 142,530.00*

Page 25: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 21 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 01 8 764,380.0 .3499 267,454.50 LF 03 4 2,660.0 4.1078 10,926.80 LF 04 25 273,670.0 1.0380 284,078.10 LF 05 13 514,480.0 .2930 150,754.50 LF 06 6 197,620.0 .4437 87,692.00 LF 07 33 485,130.0 .4636 224,927.80 LF 08 20 741,374.0 .3708 274,866.40 LF 10 14 451,975.0 .5011 226,506.00 LF 12 9 223,780.0 .3129 70,017.00 UNIT TOTAL LF 132 3,655,069.0* .4370 1,597,223.10* ITEM CODE 141103 TOTAL 132 1,597,223.10* 141104 REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE) SQFT 04 4 3,270.0 5.4890 17,949.00 SQFT 06 1 270.0 12.0000 3,240.00 SQFT 07 7 2,115.0 3.4778 7,355.50 SQFT 08 3 1,620.0 3.3557 5,436.20 SQFT 12 1 930.0 2.0000 1,860.00 UNIT TOTAL SQFT 16 8,205.0* 4.3682 35,840.70* ITEM CODE 141104 TOTAL 16 35,840.70* 141107 NOA BURIAL LOCATION REPORT LS 05 1 2,300.00 UNIT TOTAL LS 1 2,300.00 ITEM CODE 141107 TOTAL 1 2,300.00* 141109 ADL BURIAL LOCATION REPORT LS 03 1 1,500.00 LS 04 1 30,000.00 LS 05 1 10,000.00 UNIT TOTAL LS 3 41,500.00 ITEM CODE 141109 TOTAL 3 41,500.00* 141110 WORK AREA MONITORING (BRIDGE)

Page 26: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 22 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 141110 WORK AREA MONITORING (BRIDGE) LS 01 2 13,700.00 LS 02 3 59,600.00 LS 03 2 15,000.00 LS 04 5 162,800.00 LS 05 1 15,100.00 LS 06 1 10,000.00 LS 07 5 103,100.00 LS 10 1 9,000.00 LS 12 1 15,000.00 UNIT TOTAL LS 21 403,300.00 ITEM CODE 141110 TOTAL 21 403,300.00* 141120 TREATED WOOD WASTE LB 01 10 252,780.0 .2673 67,571.50 LB 02 21 598,485.0 .2633 157,609.00 LB 03 18 538,251.0 .1633 87,908.90 LB 04 23 630,640.0 .1496 94,355.00 LB 05 17 606,280.0 .3006 182,226.00 LB 06 17 186,163.0 .4336 80,728.40 LB 07 20 1,783,500.0 .1436 256,035.00 LB 08 16 526,400.0 .2136 112,438.00 LB 09 1 84,500.0 .2000 16,900.00 LB 10 21 431,002.0 .4097 176,569.00 LB 11 16 376,470.0 .2373 89,324.60 LB 12 14 691,530.0 .2457 169,891.50 UNIT TOTAL LB 194 6,706,001.0* .2224 1,491,556.90* ITEM CODE 141120 TOTAL 194 1,491,556.90* 146001 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) DAY 01 3 28.0 916.0714 25,650.00 DAY 03 3 210.0 689.2857 144,750.00 DAY 08 3 335.0 1,184.2812 396,734.20 UNIT TOTAL DAY 9 573.0* 989.7630 567,134.20* WDAY 08 1 176.0 900.0000 158,400.00 UNIT TOTAL WDAY 1 176.0* 900.0000 158,400.00* ITEM CODE 146001 TOTAL 10 725,534.20* 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS)

Page 27: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 23 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 01 5 224,997.92 LS 02 2 22,500.00 LS 03 2 47,588.00 LS 04 2 1,137,000.00 LS 08 13 733,533.16 LS 12 1 54,400.00 UNIT TOTAL LS 25 2,220,019.08 ITEM CODE 146002 TOTAL 25 2,220,019.08* 146003 NATURAL RESOURCE PROTECTION PLAN LS 01 2 16,398.06 LS 02 1 1,300.00 LS 03 3 9,025.00 LS 08 3 28,000.00 UNIT TOTAL LS 9 54,723.06 ITEM CODE 146003 TOTAL 9 54,723.06* 146004 FISH PROTECTION LS 01 2 76,000.00 UNIT TOTAL LS 2 76,000.00 ITEM CODE 146004 TOTAL 2 76,000.00* 148005 NOISE MONITORING LS 04 19 81,654.00 LS 07 1 50,000.00 LS 08 1 5,398.49 UNIT TOTAL LS 21 137,052.49 ITEM CODE 148005 TOTAL 21 137,052.49* 149001 DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS) LS 01 6 12,500.00 LS 02 1 1,000.00 LS 05 1 1,100.00 UNIT TOTAL LS 8 14,600.00

Page 28: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 24 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 149001 TOTAL 8 14,600.00* 149003 SAMPLING AND ANALYSIS PLAN (NATURALLY OCCURRING ASBESTOS) LS 05 1 2,300.00 UNIT TOTAL LS 1 2,300.00 ITEM CODE 149003 TOTAL 1 2,300.00* 150100 PUBLIC SAFETY PLAN LS 02 3 7,500.00 LS 03 4 20,620.00 LS 04 6 38,470.00 LS 05 3 22,550.00 LS 06 2 12,750.00 LS 07 14 73,288.98 LS 08 4 26,530.00 LS 10 3 16,750.00 LS 11 1 5,300.00 LS 12 2 33,470.00 UNIT TOTAL LS 42 257,228.98 ITEM CODE 150100 TOTAL 42 257,228.98* 150190 INJECT CRACK (EPOXY) LF 03 1 180.0 73.0000 13,140.00 LF 05 1 70.0 297.5000 20,825.00 LF 07 3 581.0 78.6594 45,701.13 LF 08 1 190.0 60.0000 11,400.00 UNIT TOTAL LF 6 1,021.0* 89.1931 91,066.13* ITEM CODE 150190 TOTAL 6 91,066.13* 150202 CORE AND PRESSURE GROUT DOWEL LF 04 1 75.0 200.0000 15,000.00 UNIT TOTAL LF 1 75.0* 200.0000 15,000.00* ITEM CODE 150202 TOTAL 1 15,000.00* 150203 ABANDON CULVERT (EA)

Page 29: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 25 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150203 ABANDON CULVERT (EA) EA 01 3 5.0 2,900.0000 14,500.00 EA 02 1 1.0 3,922.0000 3,922.00 EA 04 3 6.0 2,594.5000 15,567.00 EA 05 3 46.0 1,996.3043 91,830.00 EA 06 1 2.0 4,000.0000 8,000.00 EA 07 1 1.0 4,500.0000 4,500.00 EA 09 1 2.0 1,000.0000 2,000.00 EA 10 2 7.0 1,785.7143 12,500.00 EA 11 6 13.0 2,494.9085 32,433.81 UNIT TOTAL EA 21 83.0* 2,231.9616 185,252.81* ITEM CODE 150203 TOTAL 21 185,252.81* 150204 ABANDON CULVERT (LF) LF 01 4 428.0 116.7336 49,962.00 LF 02 1 590.0 18.0000 10,620.00 LF 03 2 282.0 56.1702 15,840.00 LF 06 2 90.0 111.4000 10,026.00 LF 09 1 400.0 18.0000 7,200.00 LF 11 1 490.0 17.5000 8,575.00 LF 12 3 500.0 74.5000 37,250.00 UNIT TOTAL LF 14 2,780.0* 50.1701 139,473.00* ITEM CODE 150204 TOTAL 14 139,473.00* 150221 ABANDON INLET EA 03 1 2.0 1,015.0000 2,030.00 EA 11 1 3.0 1,000.0000 3,000.00 UNIT TOTAL EA 2 5.0* 1,006.0000 5,030.00* ITEM CODE 150221 TOTAL 2 5,030.00* 150227 ABANDON PIPELINE EA 07 2 3.0 3,226.6667 9,680.00 EA 11 1 1.0 300.0000 300.00 UNIT TOTAL EA 3 4.0* 2,495.0000 9,980.00* ITEM CODE 150227 TOTAL 3 9,980.00* 150230 DESTROY WELL

Page 30: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 26 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150230 DESTROY WELL EA 01 9 45.0 2,608.3789 117,377.05 EA 05 1 1.0 5,000.0000 5,000.00 EA 06 1 4.0 8,160.0000 32,640.00 UNIT TOTAL EA 11 50.0* 3,100.3410 155,017.05* LS 04 1 40,000.00 UNIT TOTAL LS 1 40,000.00 ITEM CODE 150230 TOTAL 12 195,017.05* 150305 OBLITERATE SURFACING SQYD 03 4 8,230.0 6.4605 53,170.00 SQYD 04 1 10,300.0 3.0000 30,900.00 SQYD 06 1 5,170.0 3.5000 18,095.00 SQYD 07 1 45,700.0 1.8000 82,260.00 SQYD 10 2 13,860.0 2.7597 38,250.00 UNIT TOTAL SQYD 9 83,260.0* 2.6745 222,675.00* ITEM CODE 150305 TOTAL 9 222,675.00* 150310 RAPID SETTING CONCRETE (PATCH) CF 01 2 166.0 76.7470 12,740.00 CF 02 1 144.0 72.0000 10,368.00 CF 03 6 7,702.0 13.3976 103,188.50 CF 04 4 1,406.6 28.4231 39,980.00 CF 05 3 621.0 37.5395 23,312.00 CF 06 3 389.0 150.4627 58,530.00 CF 07 13 1,570.0 55.7205 87,481.12 CF 08 2 74.0 20.0000 1,480.00 CF 10 4 32.6 321.8865 10,493.50 CF 11 1 20.0 1,100.0000 22,000.00 CF 12 1 77.0 25.0000 1,925.00 UNIT TOTAL CF 40 12,202.2* 30.4452 371,498.12* ITEM CODE 150310 TOTAL 40 371,498.12* 150312 REPAIR SPALLED SURFACE AREA SQFT 01 2 229.0 250.1965 57,295.00 SQFT 03 1 44.0 275.0000 12,100.00 SQFT 04 2 17.0 152.9412 2,600.00

Page 31: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 27 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REPAIR SPALLED SURFACE AREA SQFT 07 14 9,100.0 53.7246 488,893.94 SQFT 08 3 39.0 398.4615 15,540.00 SQFT 10 1 1.0 2,975.0000 2,975.00 SQFT 12 1 540.0 50.0000 27,000.00 UNIT TOTAL SQFT 24 9,970.0* 60.8229 606,403.94* ITEM CODE 150312 TOTAL 24 606,403.94* 150604 REMOVE WOOD FENCE LF 05 1 220.0 13.0000 2,860.00 LF 10 1 160.0 20.0000 3,200.00 UNIT TOTAL LF 2 380.0* 15.9474 6,060.00* ITEM CODE 150604 TOTAL 2 6,060.00* 150605 REMOVE FENCE LF 01 1 1,220.0 6.0000 7,320.00 LF 03 1 1,800.0 3.0000 5,400.00 LF 04 3 1,400.0 6.3000 8,820.00 LF 05 3 44,005.0 1.6588 72,995.00 LF 06 1 260.0 13.0000 3,380.00 LF 08 4 8,990.0 5.2069 46,810.00 LF 10 1 75.0 8.0000 600.00 LF 11 4 6,640.0 4.4358 29,454.00 LF 12 1 45.0 18.0000 810.00 UNIT TOTAL LF 19 64,435.0* 2.7251 175,589.00* ITEM CODE 150605 TOTAL 19 175,589.00* 150606 REMOVE FENCE (TYPE BW) LF 03 2 12,750.0 1.8353 23,400.00 LF 04 3 490.0 7.4184 3,635.00 LF 05 2 4,090.0 3.7540 15,353.80 LF 06 1 16,600.0 .8000 13,280.00 LF 08 1 680.0 1.1500 782.00 LF 12 1 4,400.0 2.5000 11,000.00 UNIT TOTAL LF 10 39,010.0* 1.7291 67,450.80* ITEM CODE 150606 TOTAL 10 67,450.80*

Page 32: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 28 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150607 REMOVE FENCE (TYPE WM) LF 01 1 630.0 2.0000 1,260.00 UNIT TOTAL LF 1 630.0* 2.0000 1,260.00* ITEM CODE 150607 TOTAL 1 1,260.00* 150608 REMOVE CHAIN LINK FENCE LF 04 6 4,520.0 10.2412 46,290.00 LF 05 2 7,302.0 9.1516 66,825.00 LF 06 2 1,238.0 4.9245 6,096.50 LF 07 6 14,740.0 6.4046 94,403.20 LF 08 2 150.0 34.9920 5,248.80 LF 10 1 1,600.0 10.0000 16,000.00 LF 11 1 100.0 21.1000 2,110.00 LF 12 1 420.0 9.2500 3,885.00 UNIT TOTAL LF 21 30,070.0* 8.0099 240,858.50* ITEM CODE 150608 TOTAL 21 240,858.50* 150620 REMOVE GATE EA 01 1 2.0 500.0000 1,000.00 EA 03 1 2.0 400.0000 800.00 EA 04 3 11.0 1,045.4545 11,500.00 EA 05 1 4.0 160.0000 640.00 EA 07 1 2.0 105.0000 210.00 EA 10 1 1.0 200.0000 200.00 UNIT TOTAL EA 8 22.0* 652.2727 14,350.00* ITEM CODE 150620 TOTAL 8 14,350.00* 150630 REMOVE MARKER EA 01 3 140.0 5.5000 770.00 EA 02 5 177.0 17.0169 3,012.00 EA 03 1 43.0 17.0000 731.00 EA 04 2 178.0 16.5730 2,950.00 EA 05 2 18.0 17.6667 318.00 EA 08 1 170.0 6.0000 1,020.00 EA 09 2 84.0 1.9048 160.00 EA 10 1 2.0 97.0000 194.00 UNIT TOTAL EA 17 812.0* 11.2746 9,155.00*

Page 33: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 29 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 150630 TOTAL 17 9,155.00* 150646 REMOVE PEDESTRIAN BARRICADE EA 04 1 1.0 250.0000 250.00 EA 11 1 1.0 150.0000 150.00 UNIT TOTAL EA 2 2.0* 200.0000 400.00* ITEM CODE 150646 TOTAL 2 400.00* 150655 REMOVE BARRIER LF 05 1 9,800.0 8.5000 83,300.00 UNIT TOTAL LF 1 9,800.0* 8.5000 83,300.00* ITEM CODE 150655 TOTAL 1 83,300.00* 150661 REMOVE GUARDRAIL LF 01 7 9,938.0 8.1461 80,956.00 LF 02 13 7,808.0 7.5949 59,301.00 LF 03 10 31,750.0 5.6356 178,930.00 LF 04 19 43,588.0 8.8956 387,743.50 LF 05 17 74,114.0 6.3643 471,683.00 LF 06 10 11,494.0 10.2245 117,520.00 LF 07 15 84,540.0 7.1963 608,379.00 LF 08 9 12,617.0 10.6236 134,038.00 LF 09 1 9,390.0 6.0000 56,340.00 LF 10 14 29,220.0 7.3564 214,953.10 LF 11 12 29,627.0 6.6144 195,965.57 LF 12 11 45,999.0 8.1165 373,352.00 UNIT TOTAL LF 138 390,085.0* 7.3809 2,879,161.17* ITEM CODE 150661 TOTAL 138 2,879,161.17* 150662 REMOVE METAL BEAM GUARD RAILING LF 02 1 380.0 6.0000 2,280.00 UNIT TOTAL LF 1 380.0* 6.0000 2,280.00* ITEM CODE 150662 TOTAL 1 2,280.00* 150665 REMOVE SINGLE METAL BEAM BARRIER

Page 34: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 30 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150665 REMOVE SINGLE METAL BEAM BARRIER LF 04 1 1,020.0 10.0000 10,200.00 LF 08 1 1,320.0 5.5000 7,260.00 UNIT TOTAL LF 2 2,340.0* 7.4615 17,460.00* ITEM CODE 150665 TOTAL 2 17,460.00* 150667 REMOVE DOUBLE METAL BEAM BARRIER LF 05 1 630.0 9.0000 5,670.00 LF 07 3 16,449.0 7.7404 127,322.00 LF 08 2 2,790.0 7.3482 20,501.40 UNIT TOTAL LF 6 19,869.0* 7.7253 153,493.40* ITEM CODE 150667 TOTAL 6 153,493.40* 150668 REMOVE FLARED END SECTION EA 01 3 8.0 318.7500 2,550.00 EA 02 2 3.0 150.0000 450.00 EA 03 2 4.0 390.0000 1,560.00 EA 04 2 4.0 275.0000 1,100.00 EA 05 5 18.0 409.7222 7,375.00 EA 06 1 2.0 750.0000 1,500.00 EA 07 1 1.0 300.0000 300.00 EA 08 1 8.0 500.0000 4,000.00 EA 09 1 2.0 20.0000 40.00 EA 10 3 8.0 836.3800 6,691.04 EA 11 1 3.0 1,112.1400 3,336.42 UNIT TOTAL EA 22 61.0* 473.8108 28,902.46* ITEM CODE 150668 TOTAL 22 28,902.46* 150685 REMOVE IRRIGATION FACILITY LS 04 5 39,800.00 LS 05 3 6,300.00 LS 06 3 12,470.00 LS 07 6 71,607.00 LS 10 1 7,500.00 LS 11 9 59,010.68 LS 12 8 51,480.00 UNIT TOTAL LS 35 248,167.68

Page 35: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 31 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 150685 TOTAL 35 248,167.68* 150711 REMOVE PAINTED TRAFFIC STRIPE LF 01 4 12,660.0 .9344 11,829.00 LF 02 2 2,880.0 2.5833 7,440.00 LF 04 3 37,860.0 .4796 18,156.00 LF 05 5 553,030.0 .2490 137,726.00 LF 06 1 5,200.0 .6500 3,380.00 LF 07 12 417,990.0 .3041 127,103.60 LF 08 2 11,900.0 .6248 7,435.00 LF 09 1 6,080.0 .8000 4,864.00 LF 10 1 24,700.0 .4000 9,880.00 LF 11 17 1,920,340.0 .2323 446,106.90 LF 12 11 181,720.0 .3032 55,089.40 UNIT TOTAL LF 59 3,174,360.0* .2612 829,009.90* ITEM CODE 150711 TOTAL 59 829,009.90* 150712 REMOVE PAINTED PAVEMENT MARKING SQFT 01 8 412.0 12.5961 5,189.58 SQFT 02 1 504.0 9.0000 4,536.00 SQFT 04 4 703.0 2.9826 2,096.80 SQFT 05 3 3,303.0 1.4944 4,936.00 SQFT 06 1 130.0 4.0000 520.00 SQFT 07 5 18,548.0 1.1289 20,939.00 SQFT 08 1 1,130.0 2.0000 2,260.00 SQFT 09 2 2,240.0 3.2617 7,306.30 SQFT 10 3 284.0 8.2641 2,347.00 SQFT 11 3 3,244.0 1.2188 3,953.80 SQFT 12 4 1,194.0 2.0070 2,396.40 UNIT TOTAL SQFT 35 31,692.0* 1.7822 56,480.88* ITEM CODE 150712 TOTAL 35 56,480.88* 150714 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 01 19 54,110.0 1.4960 80,949.50 LF 02 4 9,920.0 2.6981 26,765.00 LF 03 11 171,560.0 .3506 60,157.50 LF 04 21 427,430.0 .4663 199,327.00 LF 05 18 1,260,710.0 .2331 293,812.50 LF 06 11 88,200.0 .4946 43,626.00 LF 07 36 931,450.0 .3318 309,022.00 LF 08 17 674,320.0 .2814 189,745.00

Page 36: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 32 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 10 22 1,490,021.0 .2469 367,892.00 LF 11 17 256,330.0 .4049 103,795.40 LF 12 16 743,890.0 .2690 200,097.80 UNIT TOTAL LF 192 6,107,941.0* .3070 1,875,189.70* ITEM CODE 150714 TOTAL 192 1,875,189.70* 150715 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 01 7 10,540.0 4.5880 48,357.40 SQFT 02 14 8,373.0 5.0638 42,399.60 SQFT 03 9 6,011.0 3.0887 18,566.00 SQFT 04 15 10,720.0 3.7872 40,599.00 SQFT 05 14 41,066.0 1.5847 65,077.00 SQFT 06 9 9,320.0 2.2886 21,330.00 SQFT 07 28 45,791.0 1.5279 69,963.10 SQFT 08 17 53,280.0 1.5233 81,163.20 SQFT 09 1 2,990.0 3.2500 9,717.50 SQFT 10 15 12,619.0 2.9231 36,887.20 SQFT 11 16 50,366.0 1.8705 94,211.60 SQFT 12 17 23,279.0 1.5147 35,259.55 UNIT TOTAL SQFT 162 274,355.0* 2.0540 563,531.15* SQYD 05 1 480.0 5.0000 2,400.00 UNIT TOTAL SQYD 1 480.0* 5.0000 2,400.00* ITEM CODE 150715 TOTAL 163 565,931.15* 150720 REMOVE CONTRAST TREATMENT SQFT 11 1 768.0 16.5000 12,672.00 UNIT TOTAL SQFT 1 768.0* 16.5000 12,672.00* ITEM CODE 150720 TOTAL 1 12,672.00* 150722 REMOVE PAVEMENT MARKER EA 01 14 1,886.0 4.7723 9,000.60 EA 02 2 171.0 7.9298 1,356.00 EA 04 24 124,169.0 .8208 101,922.30 EA 05 19 62,650.0 .7796 48,840.00 EA 06 11 17,226.0 1.0460 18,019.00 EA 07 44 292,276.0 .7093 207,306.30

Page 37: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 33 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REMOVE PAVEMENT MARKER EA 08 25 97,751.0 .9129 89,234.90 EA 09 1 720.0 7.0000 5,040.00 EA 10 20 58,323.0 .8643 50,407.20 EA 12 17 109,185.0 .5456 59,570.90 UNIT TOTAL EA 177 764,357.0* .7728 590,697.20* LS 08 2 5,500.00 UNIT TOTAL LS 2 5,500.00 ITEM CODE 150722 TOTAL 179 596,197.20* 150730 REMOVE CHANNELIZERS EA 01 1 36.0 25.0000 900.00 EA 07 1 23.0 11.0000 253.00 UNIT TOTAL EA 2 59.0* 19.5424 1,153.00* ITEM CODE 150730 TOTAL 2 1,153.00* 150741 REMOVE ROADSIDE SIGN MOUNTED ON MAST ARM EA 11 1 11.0 150.0000 1,650.00 EA 12 2 5.0 519.6000 2,598.00 UNIT TOTAL EA 3 16.0* 265.5000 4,248.00* ITEM CODE 150741 TOTAL 3 4,248.00* 150742 REMOVE ROADSIDE SIGN EA 01 6 39.0 76.1590 2,970.20 EA 02 7 188.0 57.2021 10,754.00 EA 03 10 144.0 106.3958 15,321.00 EA 04 10 191.0 102.6702 19,610.00 EA 05 6 309.0 110.4822 34,139.00 EA 06 9 56.0 100.0893 5,605.00 EA 07 5 180.0 125.6111 22,610.00 EA 08 5 23.0 109.8261 2,526.00 EA 10 12 185.0 120.2378 22,244.00 EA 11 14 229.0 120.1803 27,521.28 EA 12 14 328.0 135.6555 44,495.00 UNIT TOTAL EA 98 1,872.0* 111.0019 207,795.48* ITEM CODE 150742 TOTAL 98 207,795.48*

Page 38: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 34 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150743 REMOVE SIGN FROM ELECTROLIER EA 10 1 6.0 52.5000 315.00 UNIT TOTAL EA 1 6.0* 52.5000 315.00* ITEM CODE 150743 TOTAL 1 315.00* 150744 REMOVE ROADSIDE SIGN (WOOD POST) EA 01 1 11.0 150.0000 1,650.00 EA 02 2 249.0 75.9036 18,900.00 EA 04 3 48.0 111.5208 5,353.00 EA 07 7 115.0 109.3617 12,576.60 EA 08 1 18.0 100.0000 1,800.00 EA 10 2 8.0 133.8275 1,070.62 UNIT TOTAL EA 16 449.0* 92.0940 41,350.22* ITEM CODE 150744 TOTAL 16 41,350.22* 150745 REMOVE ROADSIDE SIGN (METAL POST) EA 02 2 64.0 103.9950 6,655.68 EA 04 1 4.0 112.0000 448.00 EA 07 3 6.0 98.3333 590.00 EA 10 1 1.0 61.0000 61.00 EA 12 1 1.0 650.0000 650.00 UNIT TOTAL EA 8 76.0* 110.5879 8,404.68* ITEM CODE 150745 TOTAL 8 8,404.68* 150747 REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD) EA 02 1 4.0 45.0000 180.00 EA 03 1 17.0 55.0000 935.00 EA 04 3 23.0 71.5217 1,645.00 EA 05 2 10.0 136.6000 1,366.00 EA 07 2 8.0 162.5000 1,300.00 EA 10 3 9.0 76.1111 685.00 EA 11 1 26.0 125.0000 3,250.00 EA 12 7 89.0 77.7528 6,920.00 UNIT TOTAL EA 20 186.0* 87.5323 16,281.00* ITEM CODE 150747 TOTAL 20 16,281.00* 150748 REMOVE ROADSIDE SIGN PANEL

Page 39: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 35 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150748 REMOVE ROADSIDE SIGN PANEL EA 02 1 1.0 100.0000 100.00 EA 03 2 47.0 27.6170 1,298.00 EA 04 1 49.0 55.0000 2,695.00 EA 05 2 107.0 35.0000 3,745.00 EA 07 1 1.0 120.0000 120.00 EA 10 2 4.0 209.5000 838.00 EA 12 5 55.0 130.4545 7,175.00 UNIT TOTAL EA 14 264.0* 60.4962 15,971.00* ITEM CODE 150748 TOTAL 14 15,971.00* 150749 REMOVE METAL POST EA 05 1 2.0 200.0000 400.00 EA 11 1 1.0 75.0000 75.00 UNIT TOTAL EA 2 3.0* 158.3333 475.00* ITEM CODE 150749 TOTAL 2 475.00* 150750 REMOVE ROADSIDE SIGN (STEEL POST) EA 02 1 9.0 100.0000 900.00 UNIT TOTAL EA 1 9.0* 100.0000 900.00* ITEM CODE 150750 TOTAL 1 900.00* 150755 REMOVE SIGN STRUCTURE WALKWAY (EA) EA 04 2 280.0 795.4107 222,715.00 UNIT TOTAL EA 2 280.0* 795.4107 222,715.00* ITEM CODE 150755 TOTAL 2 222,715.00* 150757 REMOVE SIGN STRUCTURE (EA) EA 03 2 7.0 3,342.8571 23,400.00 EA 04 3 5.0 5,840.0000 29,200.00 EA 06 2 2.0 5,487.0000 10,974.00 EA 07 3 11.0 4,681.8182 51,500.00 EA 10 2 15.0 5,253.1013 78,796.52 EA 11 4 16.0 2,046.6875 32,747.00 EA 12 3 17.0 2,800.0000 47,600.00

Page 40: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 36 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 19 73.0* 3,756.4044 274,217.52* ITEM CODE 150757 TOTAL 19 274,217.52* 150761 REMOVE SIGN PANEL AND REMOVABLE SIGN PANEL FRAME EA 04 1 3.0 1,200.0000 3,600.00 UNIT TOTAL EA 1 3.0* 1,200.0000 3,600.00* ITEM CODE 150761 TOTAL 1 3,600.00* 150762 REMOVE SIGN FROM SIGN FRAME EA 02 1 1.0 110.0000 110.00 EA 07 1 15.0 590.0000 8,850.00 UNIT TOTAL EA 2 16.0* 560.0000 8,960.00* ITEM CODE 150762 TOTAL 2 8,960.00* 150767 REMOVE BRIDGE MOUNTED SIGN EA 04 2 4.0 4,250.0000 17,000.00 UNIT TOTAL EA 2 4.0* 4,250.0000 17,000.00* ITEM CODE 150767 TOTAL 2 17,000.00* 150768 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 04 1 35.0 225.0000 7,875.00 CY 05 1 8.0 270.0000 2,160.00 CY 09 1 400.0 30.0000 12,000.00 CY 10 1 880.0 29.0000 25,520.00 UNIT TOTAL CY 4 1,323.0* 35.9448 47,555.00* ITEM CODE 150768 TOTAL 4 47,555.00* 150770 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 04 2 168,050.0 .6043 101,550.00 SQFT 05 3 6,600.0 3.2024 21,136.00 SQFT 08 3 67,020.0 4.3359 290,590.00 SQFT 10 1 730.0 6.0000 4,380.00 SQFT 11 1 980.0 5.4100 5,301.80 SQFT 12 1 86.0 10.0000 860.00

Page 41: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 37 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL SQFT 11 243,466.0* 1.7408 423,817.80* ITEM CODE 150770 TOTAL 11 423,817.80* 150771 REMOVE ASPHALT CONCRETE DIKE LF 01 8 19,298.0 3.1110 60,036.00 LF 02 5 15,905.0 6.8658 109,200.00 LF 03 10 74,176.0 1.7098 126,828.00 LF 04 18 141,940.0 1.3040 185,093.60 LF 05 13 277,697.0 .8835 245,355.70 LF 06 9 9,837.0 5.5865 54,954.00 LF 07 10 184,220.0 2.1205 390,641.00 LF 08 11 134,972.0 .9540 128,766.50 LF 09 1 10,400.0 4.0000 41,600.00 LF 10 19 83,077.0 2.3990 199,298.30 LF 11 10 88,630.0 4.3899 389,078.00 LF 12 7 12,380.0 5.7587 71,293.20 UNIT TOTAL LF 121 1,052,532.0* 1.9022 2,002,144.30* ITEM CODE 150771 TOTAL 121 2,002,144.30* 150772 REMOVE CURB LF 04 2 135.0 27.5926 3,725.00 LF 05 1 520.0 10.0000 5,200.00 LF 06 1 1,000.0 1.2000 1,200.00 LF 07 2 450.0 15.2191 6,848.60 LF 11 1 76.0 21.0000 1,596.00 LF 12 1 2,020.0 5.2200 10,544.40 UNIT TOTAL LF 8 4,201.0* 6.9303 29,114.00* ITEM CODE 150772 TOTAL 8 29,114.00* 150776 REMOVE DRAINAGE FACILITY (EA) EA 03 2 6.0 1,656.6667 9,940.00 EA 07 1 4.0 2,023.0000 8,092.00 EA 08 1 1.0 1,575.0000 1,575.00 UNIT TOTAL EA 4 11.0* 1,782.4545 19,607.00* ITEM CODE 150776 TOTAL 4 19,607.00* 150801 REMOVE OVERSIDE DRAIN

Page 42: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 38 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150801 REMOVE OVERSIDE DRAIN EA 01 1 3.0 200.0000 600.00 EA 02 1 2.0 2,500.0000 5,000.00 EA 03 3 8.0 662.5000 5,300.00 EA 04 1 1.0 3,500.0000 3,500.00 EA 05 3 158.0 783.3354 123,767.00 EA 06 2 12.0 387.5000 4,650.00 EA 07 1 1.0 450.0000 450.00 EA 08 2 7.0 785.7143 5,500.00 EA 11 1 1.0 650.0000 650.00 EA 12 1 2.0 870.0000 1,740.00 UNIT TOTAL EA 16 195.0* 775.1641 151,157.00* ITEM CODE 150801 TOTAL 16 151,157.00* 150808 REMOVE CULVERT (EA) EA 01 3 24.0 947.8333 22,748.00 EA 03 1 1.0 4,000.0000 4,000.00 EA 04 1 1.0 5,000.0000 5,000.00 UNIT TOTAL EA 5 26.0* 1,221.0769 31,748.00* ITEM CODE 150808 TOTAL 5 31,748.00* 150809 REMOVE CULVERT (LF) LF 01 9 2,404.0 52.6841 126,652.64 LF 02 9 3,101.0 42.7985 132,718.00 LF 03 7 5,591.0 38.3983 214,685.00 LF 04 15 4,183.0 53.8764 225,365.00 LF 05 6 7,832.5 24.7194 193,615.00 LF 06 6 642.0 41.9393 26,925.00 LF 07 1 960.0 44.0000 42,240.00 LF 09 1 3,330.0 3.0000 9,990.00 LF 10 8 1,366.0 37.4092 51,100.90 LF 11 3 893.0 28.4638 25,418.13 LF 12 2 590.0 30.7119 18,120.00 UNIT TOTAL LF 67 30,892.5* 34.5336 1,066,829.67* ITEM CODE 150809 TOTAL 67 1,066,829.67* 150810 REMOVE PIPE (EA) EA 01 1 1.0 5,000.0000 5,000.00

Page 43: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 39 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 1 1.0* 5,000.0000 5,000.00* ITEM CODE 150810 TOTAL 1 5,000.00* 150812 REMOVE PIPE (LF) LF 03 1 79.0 74.0000 5,846.00 LF 04 2 23.0 35.8696 825.00 LF 05 2 37.0 162.6486 6,018.00 LF 06 1 49.0 50.0000 2,450.00 LF 07 7 16,388.0 17.9950 294,902.00 LF 08 6 2,294.0 41.1325 94,358.00 LF 10 1 1,680.0 10.0000 16,800.00 LF 11 2 160.0 246.2500 39,400.00 LF 12 6 11,934.0 18.4902 220,662.00 UNIT TOTAL LF 28 32,644.0* 20.8694 681,261.00* ITEM CODE 150812 TOTAL 28 681,261.00* 150814 REMOVE DOWNDRAIN (EA) EA 01 6 19.0 1,985.4868 37,724.25 EA 02 1 1.0 3,370.0000 3,370.00 EA 04 2 3.0 666.6667 2,000.00 EA 05 2 61.0 990.1639 60,400.00 EA 06 1 5.0 600.0000 3,000.00 EA 10 3 11.0 906.6000 9,972.60 UNIT TOTAL EA 15 100.0* 1,164.6685 116,466.85* ITEM CODE 150814 TOTAL 15 116,466.85* 150817 REMOVE REINFORCED CONCRETE BOX CULVERT (LF) LF 07 1 160.0 85.0000 13,600.00 UNIT TOTAL LF 1 160.0* 85.0000 13,600.00* ITEM CODE 150817 TOTAL 1 13,600.00* 150818 REMOVE REINFORCED CONCRETE BOX CULVERT (CY) CY 05 1 10.0 435.0000 4,350.00 UNIT TOTAL CY 1 10.0* 435.0000 4,350.00* ITEM CODE 150818 TOTAL 1 4,350.00*

Page 44: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 40 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150820 REMOVE INLET EA 01 8 29.0 713.3793 20,688.00 EA 02 6 36.0 641.6111 23,098.00 EA 03 4 77.0 1,345.9091 103,635.00 EA 04 10 69.0 975.2754 67,294.00 EA 05 6 86.0 1,441.8023 123,995.00 EA 06 3 17.0 1,285.2941 21,850.00 EA 07 5 118.0 1,398.7288 165,050.00 EA 08 2 9.0 1,533.3333 13,800.00 EA 10 8 39.0 656.8462 25,617.00 EA 11 3 17.0 1,561.6453 26,547.97 EA 12 5 58.0 749.0345 43,444.00 UNIT TOTAL EA 60 555.0* 1,144.1783 635,018.97* ITEM CODE 150820 TOTAL 60 635,018.97* 150821 REMOVE HEADWALL EA 01 6 17.0 661.2353 11,241.00 EA 02 4 13.0 1,256.9231 16,340.00 EA 03 1 6.0 1,500.0000 9,000.00 EA 04 1 5.0 3,000.0000 15,000.00 EA 05 5 62.0 884.6774 54,850.00 EA 06 1 7.0 1,950.0000 13,650.00 EA 07 1 4.0 500.0000 2,000.00 EA 08 3 93.0 656.4516 61,050.00 EA 10 2 4.0 800.0000 3,200.00 EA 12 4 7.0 1,762.8571 12,340.00 UNIT TOTAL EA 28 218.0* 911.3349 198,671.00* ITEM CODE 150821 TOTAL 28 198,671.00* 150824 REMOVE SEWER MANHOLE EA 04 1 1.0 700.0000 700.00 EA 07 1 5.0 3,900.0000 19,500.00 UNIT TOTAL EA 2 6.0* 3,366.6667 20,200.00* ITEM CODE 150824 TOTAL 2 20,200.00* 150826 REMOVE MANHOLE EA 03 1 1.0 2,675.0000 2,675.00 EA 04 1 1.0 2,500.0000 2,500.00

Page 45: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 41 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REMOVE MANHOLE EA 07 1 10.0 2,200.0000 22,000.00 EA 12 1 2.0 1,500.0000 3,000.00 UNIT TOTAL EA 4 14.0* 2,155.3571 30,175.00* ITEM CODE 150826 TOTAL 4 30,175.00* 150827 REMOVE CATCH BASIN EA 07 1 21.0 1,630.0000 34,230.00 UNIT TOTAL EA 1 21.0* 1,630.0000 34,230.00* ITEM CODE 150827 TOTAL 1 34,230.00* 150828 REMOVE JUNCTION BOX EA 03 1 1.0 2,000.0000 2,000.00 EA 05 1 1.0 3,100.0000 3,100.00 UNIT TOTAL EA 2 2.0* 2,550.0000 5,100.00* ITEM CODE 150828 TOTAL 2 5,100.00* 150832 REMOVE RETAINING WALL (CY) CY 04 1 90.0 140.0000 12,600.00 CY 07 1 325.0 120.0000 39,000.00 UNIT TOTAL CY 2 415.0* 124.3373 51,600.00* ITEM CODE 150832 TOTAL 2 51,600.00* 150833 REMOVE RETAINING WALL (LF) LF 03 1 1,290.0 15.0000 19,350.00 UNIT TOTAL LF 1 1,290.0* 15.0000 19,350.00* ITEM CODE 150833 TOTAL 1 19,350.00* 150834 REMOVE RETAINING WALL (WOOD) LF 06 1 150.0 12.0000 1,800.00 UNIT TOTAL LF 1 150.0* 12.0000 1,800.00*

Page 46: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 42 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 150834 TOTAL 1 1,800.00* 150838 REMOVE RETAINING WALL (PORTION) (LF) LF 12 1 5.0 579.0000 2,895.00 UNIT TOTAL LF 1 5.0* 579.0000 2,895.00* ITEM CODE 150838 TOTAL 1 2,895.00* 150839 REMOVE RETAINING WALL (PORTION) (LS) LS 01 1 21,000.00 LS 07 1 13,000.00 LS 12 1 2,286.00 UNIT TOTAL LS 3 36,286.00 ITEM CODE 150839 TOTAL 3 36,286.00* 150841 REMOVE SEWER PIPE LF 04 1 50.0 30.0000 1,500.00 LF 07 1 1,020.0 61.0000 62,220.00 UNIT TOTAL LF 2 1,070.0* 59.5514 63,720.00* ITEM CODE 150841 TOTAL 2 63,720.00* 150847 REMOVE CONCRETE PAVEMENT AND BASE CY 04 1 130.0 75.0000 9,750.00 CY 05 1 34,000.0 7.0000 238,000.00 CY 07 1 1,110.0 90.0000 99,900.00 CY 11 1 910.0 13.2000 12,012.00 UNIT TOTAL CY 4 36,150.0* 9.9492 359,662.00* ITEM CODE 150847 TOTAL 4 359,662.00* 150852 REMOVE SLOPE PAVING (SQYD) SQYD 08 1 41.0 50.0000 2,050.00 SQYD 12 1 510.0 16.0000 8,160.00 UNIT TOTAL SQYD 2 551.0* 18.5299 10,210.00* ITEM CODE 150852 TOTAL 2 10,210.00*

Page 47: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 43 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 150853 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 04 1 630.0 25.0000 15,750.00 SQYD 06 1 730.0 68.2000 49,786.00 SQYD 07 2 13,880.0 49.4856 686,860.00 SQYD 10 1 42.0 55.0000 2,310.00 UNIT TOTAL SQYD 5 15,282.0* 49.3853 754,706.00* ITEM CODE 150853 TOTAL 5 754,706.00* 150854 REMOVE CONCRETE PAVEMENT (CY) CY 04 2 10,070.0 51.9467 523,103.00 CY 05 1 1,400.0 7.0000 9,800.00 CY 06 2 1,830.0 102.9508 188,400.00 CY 07 2 16,670.0 20.2897 338,230.00 CY 12 2 1,894.0 52.6716 99,760.00 UNIT TOTAL CY 9 31,864.0* 36.3825 1,159,293.00* ITEM CODE 150854 TOTAL 9 1,159,293.00* 150857 REMOVE ASPHALT CONCRETE SURFACING SQFT 01 2 14,937.0 4.2350 63,258.00 SQFT 02 1 4,354.0 6.5000 28,301.00 SQFT 03 4 172,154.0 .6329 108,960.65 SQFT 04 5 211,621.0 .9190 194,487.12 SQFT 05 4 37,497.0 1.7343 65,032.13 SQFT 06 2 145,784.0 .2952 43,034.00 SQFT 07 7 96,646.0 1.2817 123,868.35 SQFT 08 3 39,275.0 1.5904 62,461.16 SQFT 10 3 2,515.0 5.4891 13,805.00 SQFT 11 1 80.0 22.0000 1,760.00 SQFT 12 2 84,060.0 5.4744 460,180.00 UNIT TOTAL SQFT 34 808,923.0* 1.4404 1,165,147.41* SQYD 08 1 1,210.0 15.0000 18,150.00 UNIT TOTAL SQYD 1 1,210.0* 15.0000 18,150.00* ITEM CODE 150857 TOTAL 35 1,183,297.41* 150859 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 02 1 1.0 3,370.0000 3,370.00 EA 03 1 2.0 900.0000 1,800.00

Page 48: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 44 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 04 4 4.0 800.0000 3,200.00 EA 05 1 22.0 380.0000 8,360.00 EA 08 2 3.0 1,916.6667 5,750.00 EA 09 1 6.0 1,000.0000 6,000.00 EA 10 2 42.0 229.5238 9,640.00 EA 11 1 84.0 325.0000 27,300.00 UNIT TOTAL EA 13 164.0* 398.9024 65,420.00* ITEM CODE 150859 TOTAL 13 65,420.00* 150860 REMOVE BASE AND SURFACING CY 01 2 290.0 87.4138 25,350.00 CY 03 2 7,620.0 15.3150 116,700.00 CY 04 3 1,297.0 181.1758 234,985.00 CY 05 2 3,341.0 15.2086 50,812.00 CY 08 3 17,760.0 18.0124 319,900.00 CY 11 3 1,289.0 13.9837 18,025.00 UNIT TOTAL CY 15 31,597.0* 24.2356 765,772.00* ITEM CODE 150860 TOTAL 15 765,772.00* 150870 REMOVE CONCRETE DECK SURFACE SQFT 03 1 13.0 100.0000 1,300.00 SQFT 04 2 34,353.0 1.5942 54,765.00 SQFT 07 2 2,843.0 37.6957 107,169.00 UNIT TOTAL SQFT 5 37,209.0* 4.3869 163,234.00* ITEM CODE 150870 TOTAL 5 163,234.00* 151224 REMOVE DELINEATOR EA 02 6 952.0 5.7468 5,471.00 EA 03 1 1.0 500.0000 500.00 EA 04 3 741.0 5.1484 3,815.00 EA 05 6 455.0 22.1604 10,083.00 EA 09 2 27.0 28.3333 765.00 EA 11 1 9.0 11.1200 100.08 EA 12 6 8,331.0 4.0732 33,933.58 UNIT TOTAL EA 25 10,516.0* 5.1985 54,667.66* ITEM CODE 151224 TOTAL 25 54,667.66*

Page 49: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 45 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 151226 SALVAGE GRATE EA 01 1 2.0 100.0000 200.00 EA 10 1 5.0 500.0000 2,500.00 UNIT TOTAL EA 2 7.0* 385.7143 2,700.00* ITEM CODE 151226 TOTAL 2 2,700.00* 151227 SALVAGE FRAME AND GRATE EA 03 1 6.0 500.0000 3,000.00 EA 09 1 6.0 500.0000 3,000.00 UNIT TOTAL EA 2 12.0* 500.0000 6,000.00* ITEM CODE 151227 TOTAL 2 6,000.00* 151230 SALVAGE DOWNDRAIN EA 05 1 2.0 2,250.0000 4,500.00 UNIT TOTAL EA 1 2.0* 2,250.0000 4,500.00* ITEM CODE 151230 TOTAL 1 4,500.00* 151251 SALVAGE IRRIGATION FACILITY LS 05 1 3,500.00 LS 07 1 3,959.00 LS 10 1 2,000.00 LS 12 1 2,300.00 UNIT TOTAL LS 4 11,759.00 ITEM CODE 151251 TOTAL 4 11,759.00* 151266 SALVAGE DOUBLE THRIE BEAM BARRIER LF 05 1 82.0 20.0000 1,640.00 UNIT TOTAL LF 1 82.0* 20.0000 1,640.00* ITEM CODE 151266 TOTAL 1 1,640.00* 151270 SALVAGE METAL BRIDGE RAILING LF 02 1 4,606.0 1.0000 4,606.00

Page 50: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 46 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) SALVAGE METAL BRIDGE RAILING LF 04 2 4,780.0 17.5481 83,880.00 LF 05 2 476.0 15.5357 7,395.00 LF 06 1 520.0 20.0000 10,400.00 LF 08 1 798.0 12.0000 9,576.00 LF 10 1 2,891.0 15.0000 43,365.00 LF 11 1 3,010.0 7.0000 21,070.00 UNIT TOTAL LF 9 17,081.0* 10.5551 180,292.00* ITEM CODE 151270 TOTAL 9 180,292.00* 151274 SALVAGE CONCRETE BARRIER (TYPE K) LF 01 2 780.0 10.9231 8,520.00 LF 05 1 240.0 22.0000 5,280.00 LF 07 1 880.0 8.0000 7,040.00 LF 08 1 500.0 8.0000 4,000.00 UNIT TOTAL LF 5 2,400.0* 10.3500 24,840.00* ITEM CODE 151274 TOTAL 5 24,840.00* 151287 SALVAGE SIGNS AND FLASHING BEACONS EA 01 1 6.0 500.0000 3,000.00 UNIT TOTAL EA 1 6.0* 500.0000 3,000.00* ITEM CODE 151287 TOTAL 1 3,000.00* 151295 SALVAGE GUARDRAIL (STEEL POST) LF 06 1 460.0 6.0000 2,760.00 LF 09 1 1,940.0 8.0000 15,520.00 UNIT TOTAL LF 2 2,400.0* 7.6167 18,280.00* ITEM CODE 151295 TOTAL 2 18,280.00* 151296 SALVAGE GUARDRAIL LF 06 3 3,650.0 7.6329 27,860.00 LF 08 2 24,563.0 5.0231 123,382.00 UNIT TOTAL LF 5 28,213.0* 5.3607 151,242.00* ITEM CODE 151296 TOTAL 5 151,242.00*

Page 51: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 47 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 151512 RECONSTRUCT INLET EA 01 1 1.0 2,015.0000 2,015.00 EA 02 1 1.0 3,000.0000 3,000.00 UNIT TOTAL EA 2 2.0* 2,507.5000 5,015.00* ITEM CODE 151512 TOTAL 2 5,015.00* 151531 RECONSTRUCT FENCE LF 02 1 260.0 41.0000 10,660.00 LF 05 1 450.0 10.0000 4,500.00 UNIT TOTAL LF 2 710.0* 21.3521 15,160.00* ITEM CODE 151531 TOTAL 2 15,160.00* 151534 RECONSTRUCT WOOD FENCE LF 05 1 43.0 50.0000 2,150.00 UNIT TOTAL LF 1 43.0* 50.0000 2,150.00* ITEM CODE 151534 TOTAL 1 2,150.00* 151536 RECONSTRUCT FENCE (TYPE BW) LF 03 1 80.0 5.0000 400.00 LF 08 2 2,160.0 12.8519 27,760.00 LF 09 1 180.0 15.0000 2,700.00 UNIT TOTAL LF 4 2,420.0* 12.7521 30,860.00* ITEM CODE 151536 TOTAL 4 30,860.00* 151537 RECONSTRUCT FENCE (TYPE WM) LF 01 2 420.0 11.6250 4,882.50 UNIT TOTAL LF 2 420.0* 11.6250 4,882.50* ITEM CODE 151537 TOTAL 2 4,882.50* 151540 RECONSTRUCT CHAIN LINK FENCE LF 02 1 300.0 30.0000 9,000.00 LF 06 1 500.0 89.0000 44,500.00

Page 52: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 48 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) RECONSTRUCT CHAIN LINK FENCE LF 07 1 690.0 50.0000 34,500.00 LF 12 1 65.0 48.0000 3,120.00 UNIT TOTAL LF 4 1,555.0* 58.5981 91,120.00* ITEM CODE 151540 TOTAL 4 91,120.00* 151568 RECONSTRUCT THRIE BEAM BARRIER LF 10 1 150.0 25.0000 3,750.00 UNIT TOTAL LF 1 150.0* 25.0000 3,750.00* ITEM CODE 151568 TOTAL 1 3,750.00* 151570 RECONSTRUCT DOUBLE THRIE BEAM BARRIER LF 05 1 55.0 86.0000 4,730.00 UNIT TOTAL LF 1 55.0* 86.0000 4,730.00* ITEM CODE 151570 TOTAL 1 4,730.00* 151573 RECONSTRUCT GUARDRAIL LF 01 2 1,270.0 25.2598 32,080.00 LF 02 9 11,170.0 21.6365 241,680.00 LF 03 2 2,573.0 28.3793 73,020.00 UNIT TOTAL LF 13 15,013.0* 23.0986 346,780.00* ITEM CODE 151573 TOTAL 13 346,780.00* 151626 RECONSTRUCT GUARDRAIL (7' POST) LF 01 1 3,690.0 21.0000 77,490.00 LF 02 4 9,250.0 19.4243 179,675.00 UNIT TOTAL LF 5 12,940.0* 19.8736 257,165.00* ITEM CODE 151626 TOTAL 5 257,165.00* 151627 RECONSTRUCT GUARDRAIL (WOOD POST) LF 01 1 200.0 80.0000 16,000.00 UNIT TOTAL LF 1 200.0* 80.0000 16,000.00*

Page 53: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 49 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 151627 TOTAL 1 16,000.00* 152255 RESET MAILBOX EA 01 1 2.0 650.0000 1,300.00 EA 02 1 1.0 420.0000 420.00 EA 04 1 5.0 275.0000 1,375.00 EA 06 1 3.0 750.0000 2,250.00 EA 08 2 162.0 271.9753 44,060.00 EA 10 1 2.0 300.0000 600.00 UNIT TOTAL EA 7 175.0* 285.7429 50,005.00* ITEM CODE 152255 TOTAL 7 50,005.00* 152291 RESET GATE EA 02 1 3.0 400.0000 1,200.00 UNIT TOTAL EA 1 3.0* 400.0000 1,200.00* ITEM CODE 152291 TOTAL 1 1,200.00* 152299 RESET MILEPOST MARKER EA 01 2 3.0 527.3800 1,582.14 EA 02 1 14.0 50.0000 700.00 EA 04 1 2.0 50.0000 100.00 EA 05 3 8.0 78.3750 627.00 EA 08 2 8.0 50.6250 405.00 EA 10 2 3.0 40.1000 120.30 UNIT TOTAL EA 11 38.0* 93.0116 3,534.44* ITEM CODE 152299 TOTAL 11 3,534.44* 152300 RESET OBJECT MARKER EA 01 1 1.0 100.0000 100.00 EA 02 1 33.0 84.0000 2,772.00 EA 08 1 3.0 940.0000 2,820.00 UNIT TOTAL EA 3 37.0* 153.8378 5,692.00* ITEM CODE 152300 TOTAL 3 5,692.00* 152301 RESET MARKER

Page 54: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 50 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 152301 RESET MARKER EA 01 3 26.0 67.6538 1,759.00 EA 02 1 110.0 45.0000 4,950.00 EA 05 1 3.0 35.0000 105.00 EA 06 1 9.0 70.0000 630.00 UNIT TOTAL EA 6 148.0* 50.2973 7,444.00* ITEM CODE 152301 TOTAL 6 7,444.00* 152303 RESET MARKERS AND DELINEATORS EA 08 2 111.0 42.5225 4,720.00 EA 09 1 57.0 20.0000 1,140.00 UNIT TOTAL EA 3 168.0* 34.8810 5,860.00* ITEM CODE 152303 TOTAL 3 5,860.00* 152315 RESET CRASH CUSHION EA 04 1 1.0 1,000.0000 1,000.00 UNIT TOTAL EA 1 1.0* 1,000.0000 1,000.00* ITEM CODE 152315 TOTAL 1 1,000.00* 152316 RESET ROADSIDE SIGN (ONE POST) EA 01 3 14.0 335.0429 4,690.60 EA 02 1 1.0 300.0000 300.00 EA 05 2 58.0 233.7931 13,560.00 EA 08 4 239.0 177.6569 42,460.00 EA 10 1 1.0 250.0000 250.00 UNIT TOTAL EA 11 313.0* 195.7208 61,260.60* ITEM CODE 152316 TOTAL 11 61,260.60* 152317 RESET ROADSIDE SIGN (TWO POST) EA 01 1 1.0 525.0000 525.00 EA 02 1 1.0 500.0000 500.00 EA 05 1 1.0 575.0000 575.00 EA 08 2 17.0 379.4118 6,450.00 UNIT TOTAL EA 5 20.0* 402.5000 8,050.00*

Page 55: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 51 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 152317 TOTAL 5 8,050.00* 152320 RESET ROADSIDE SIGN EA 02 2 18.0 219.8333 3,957.00 EA 03 6 77.0 447.9870 34,495.00 EA 04 3 54.0 204.2778 11,031.00 EA 05 5 43.0 230.4651 9,910.00 EA 06 3 25.0 197.4000 4,935.00 EA 08 3 19.0 263.5789 5,008.00 EA 09 2 17.0 717.6471 12,200.00 EA 10 4 14.0 231.7857 3,245.00 EA 11 3 21.0 316.4286 6,645.00 UNIT TOTAL EA 31 288.0* 317.4514 91,426.00* TON 08 1 13.0 800.0000 10,400.00 UNIT TOTAL TON 1 13.0* 800.0000 10,400.00* ITEM CODE 152320 TOTAL 32 101,826.00* 152324 RESET ROADSIDE SIGN (METAL POST) EA 01 1 1.0 100.0000 100.00 EA 07 1 3.0 210.0000 630.00 UNIT TOTAL EA 2 4.0* 182.5000 730.00* ITEM CODE 152324 TOTAL 2 730.00* 152370 RELOCATE MAILBOX EA 11 1 18.0 150.0000 2,700.00 UNIT TOTAL EA 1 18.0* 150.0000 2,700.00* ITEM CODE 152370 TOTAL 1 2,700.00* 152372 RELOCATE CONCRETE BARRIER (TYPE K) LF 04 1 2,800.0 4.5000 12,600.00 LF 07 1 500.0 6.0000 3,000.00 UNIT TOTAL LF 2 3,300.0* 4.7273 15,600.00* ITEM CODE 152372 TOTAL 2 15,600.00* 152380 RELOCATE CHAIN LINK FENCE

Page 56: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 52 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 152380 RELOCATE CHAIN LINK FENCE LF 04 1 32.0 80.0000 2,560.00 UNIT TOTAL LF 1 32.0* 80.0000 2,560.00* ITEM CODE 152380 TOTAL 1 2,560.00* 152381 RELOCATE GATE EA 05 1 1.0 600.0000 600.00 EA 06 1 3.0 736.0000 2,208.00 EA 11 1 1.0 500.0000 500.00 UNIT TOTAL EA 3 5.0* 661.6000 3,308.00* ITEM CODE 152381 TOTAL 3 3,308.00* 152386 RELOCATE ROADSIDE SIGN-ONE POST EA 01 1 1.0 150.0000 150.00 EA 04 1 2.0 250.0000 500.00 EA 05 1 3.0 250.0000 750.00 EA 12 1 2.0 200.0000 400.00 UNIT TOTAL EA 4 8.0* 225.0000 1,800.00* ITEM CODE 152386 TOTAL 4 1,800.00* 152387 RELOCATE ROADSIDE SIGN-TWO POST EA 01 1 1.0 800.0000 800.00 EA 04 1 1.0 400.0000 400.00 EA 05 1 2.0 500.0000 1,000.00 EA 12 2 3.0 447.9167 1,343.75 UNIT TOTAL EA 5 7.0* 506.2500 3,543.75* ITEM CODE 152387 TOTAL 5 3,543.75* 152388 RELOCATE CRASH CUSHION EA 06 1 1.0 1,800.0000 1,800.00 EA 07 1 2.0 7,500.0000 15,000.00 UNIT TOTAL EA 2 3.0* 5,600.0000 16,800.00* ITEM CODE 152388 TOTAL 2 16,800.00*

Page 57: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 53 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 152390 RELOCATE ROADSIDE SIGN EA 02 1 3.0 295.0000 885.00 EA 03 4 11.0 312.7273 3,440.00 EA 04 1 2.0 200.0000 400.00 EA 05 4 70.0 230.4286 16,130.00 EA 06 2 5.0 360.4000 1,802.00 EA 07 3 32.0 393.7500 12,600.00 EA 10 5 9.0 254.1111 2,287.00 EA 11 6 32.0 296.3750 9,484.00 UNIT TOTAL EA 26 164.0* 286.7561 47,028.00* ITEM CODE 152390 TOTAL 26 47,028.00* 152391 RELOCATE ROADSIDE SIGN (METAL POST) EA 03 1 1.0 470.0000 470.00 EA 04 1 1.0 300.0000 300.00 EA 07 2 3.0 187.6667 563.00 UNIT TOTAL EA 4 5.0* 266.6000 1,333.00* ITEM CODE 152391 TOTAL 4 1,333.00* 152393 RELOCATE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD) EA 03 1 1.0 520.0000 520.00 UNIT TOTAL EA 1 1.0* 520.0000 520.00* ITEM CODE 152393 TOTAL 1 520.00* 152422 ADJUST MONUMENT COVER EA 05 2 37.0 525.0000 19,425.00 EA 06 2 16.0 678.1250 10,850.00 EA 10 3 43.0 1,096.5116 47,150.00 UNIT TOTAL EA 7 96.0* 806.5104 77,425.00* ITEM CODE 152422 TOTAL 7 77,425.00* 152423 ADJUST MONUMENT TO GRADE EA 04 1 1.0 600.0000 600.00 EA 06 1 7.0 500.0000 3,500.00 EA 08 1 15.0 600.0000 9,000.00

Page 58: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 54 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 3 23.0* 569.5652 13,100.00* ITEM CODE 152423 TOTAL 3 13,100.00* 152430 ADJUST INLET EA 01 2 29.0 1,825.8621 52,950.00 EA 02 1 13.0 1,811.0000 23,543.00 EA 03 1 2.0 1,500.0000 3,000.00 EA 04 3 134.0 2,569.3657 344,295.00 EA 05 11 87.0 2,104.7126 183,110.00 EA 07 1 2.0 2,000.0000 4,000.00 EA 08 1 2.0 1,500.0000 3,000.00 EA 09 2 3.0 3,666.6667 11,000.00 EA 10 3 71.0 2,171.8310 154,200.00 EA 12 1 2.0 3,500.0000 7,000.00 UNIT TOTAL EA 26 345.0* 2,278.5449 786,098.00* ITEM CODE 152430 TOTAL 26 786,098.00* 152432 ADJUST MANHOLE EA 04 1 2.0 1,400.0000 2,800.00 EA 05 2 7.0 742.8571 5,200.00 EA 07 1 1.0 1,500.0000 1,500.00 EA 08 2 5.0 1,460.0000 7,300.00 UNIT TOTAL EA 6 15.0* 1,120.0000 16,800.00* ITEM CODE 152432 TOTAL 6 16,800.00* 152437 ADJUST OVERSIDE DRAIN EA 01 1 5.0 2,000.0000 10,000.00 EA 03 1 5.0 1,060.0000 5,300.00 UNIT TOTAL EA 2 10.0* 1,530.0000 15,300.00* ITEM CODE 152437 TOTAL 2 15,300.00* 152438 ADJUST FRAME AND COVER TO GRADE EA 05 2 9.0 700.0000 6,300.00 UNIT TOTAL EA 2 9.0* 700.0000 6,300.00* ITEM CODE 152438 TOTAL 2 6,300.00*

Page 59: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 55 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 152439 ADJUST FRAME AND GRATE TO GRADE EA 03 1 7.0 1,000.0000 7,000.00 EA 05 1 2.0 2,400.0000 4,800.00 EA 10 6 167.0 1,703.2939 284,450.08 UNIT TOTAL EA 8 176.0* 1,683.2391 296,250.08* ITEM CODE 152439 TOTAL 8 296,250.08* 152440 ADJUST MANHOLE TO GRADE EA 03 1 27.0 1,285.0000 34,695.00 EA 04 2 3.0 3,600.0000 10,800.00 EA 05 2 21.0 1,271.8095 26,708.00 EA 07 4 32.0 834.3750 26,700.00 EA 08 2 32.0 625.0000 20,000.00 EA 11 2 8.0 512.5000 4,100.00 EA 12 1 1.0 1,100.0000 1,100.00 UNIT TOTAL EA 14 124.0* 1,000.8306 124,103.00* ITEM CODE 152440 TOTAL 14 124,103.00* 152441 ADJUST VALVE BOX FRAME AND COVER TO GRADE EA 04 1 3.0 500.0000 1,500.00 EA 07 1 11.0 150.0000 1,650.00 EA 08 1 24.0 300.0000 7,200.00 EA 10 1 1.0 1,000.0000 1,000.00 UNIT TOTAL EA 4 39.0* 291.0256 11,350.00* ITEM CODE 152441 TOTAL 4 11,350.00* 152443 ADJUST PIPE INLET TO GRADE EA 09 1 6.0 4,000.0000 24,000.00 EA 10 1 8.0 1,170.0000 9,360.00 UNIT TOTAL EA 2 14.0* 2,382.8571 33,360.00* ITEM CODE 152443 TOTAL 2 33,360.00* 152453 ADJUST VALVE BOX EA 01 1 13.0 1,700.0000 22,100.00 EA 03 1 63.0 900.0000 56,700.00

Page 60: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 56 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ADJUST VALVE BOX EA 05 1 21.0 600.0000 12,600.00 UNIT TOTAL EA 3 97.0* 942.2680 91,400.00* ITEM CODE 152453 TOTAL 3 91,400.00* 152454 ADJUST PULL BOX EA 05 2 8.0 509.3750 4,075.00 EA 07 2 36.0 360.7778 12,988.00 EA 08 1 25.0 200.0000 5,000.00 UNIT TOTAL EA 5 69.0* 319.7536 22,063.00* ITEM CODE 152454 TOTAL 5 22,063.00* 152469 ADJUST UTILITY COVER TO GRADE EA 01 2 11.0 1,900.0000 20,900.00 EA 02 1 5.0 1,200.0000 6,000.00 EA 04 1 1.0 850.0000 850.00 EA 05 1 20.0 1,272.0000 25,440.00 EA 06 1 8.0 680.0000 5,440.00 EA 08 1 1.0 315.0000 315.00 EA 09 1 6.0 477.3600 2,864.16 EA 10 1 4.0 272.0000 1,088.00 UNIT TOTAL EA 9 56.0* 1,123.1636 62,897.16* ITEM CODE 152469 TOTAL 9 62,897.16* 152472 ADJUST UTILITY COVER EA 04 1 4.0 1,110.0000 4,440.00 EA 05 1 4.0 1,500.0000 6,000.00 UNIT TOTAL EA 2 8.0* 1,305.0000 10,440.00* ITEM CODE 152472 TOTAL 2 10,440.00* 152475 ADJUST SEWER MANHOLE EA 05 1 7.0 1,500.0000 10,500.00 EA 11 1 16.0 600.0000 9,600.00 UNIT TOTAL EA 2 23.0* 873.9130 20,100.00*

Page 61: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 57 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 152475 TOTAL 2 20,100.00* 152501 ADJUST GUARDRAIL LF 02 3 948.0 14.2089 13,470.00 LF 03 4 29,130.0 4.9219 143,374.00 UNIT TOTAL LF 7 30,078.0* 5.2146 156,844.00* ITEM CODE 152501 TOTAL 7 156,844.00* 152600 MODIFY DRAINAGE FACILITY EA 03 1 3.0 7,920.0000 23,760.00 UNIT TOTAL EA 1 3.0* 7,920.0000 23,760.00* ITEM CODE 152600 TOTAL 1 23,760.00* 152604 MODIFY INLET EA 07 2 3.0 4,266.6667 12,800.00 UNIT TOTAL EA 2 3.0* 4,266.6667 12,800.00* ITEM CODE 152604 TOTAL 2 12,800.00* 152606 MODIFY DOWNDRAIN EA 05 1 15.0 1,100.0000 16,500.00 UNIT TOTAL EA 1 15.0* 1,100.0000 16,500.00* ITEM CODE 152606 TOTAL 1 16,500.00* 152608 MODIFY SLOTTED PIPE GRATE LF 09 1 560.0 60.0000 33,600.00 UNIT TOTAL LF 1 560.0* 60.0000 33,600.00* ITEM CODE 152608 TOTAL 1 33,600.00* 152609 MODIFY INLET TO MANHOLE EA 04 3 8.0 3,575.0000 28,600.00 UNIT TOTAL EA 3 8.0* 3,575.0000 28,600.00*

Page 62: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 58 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 152609 TOTAL 3 28,600.00* 152610 MODIFY MANHOLE EA 05 1 1.0 2,650.0000 2,650.00 UNIT TOTAL EA 1 1.0* 2,650.0000 2,650.00* ITEM CODE 152610 TOTAL 1 2,650.00* 152641 MODIFY SIGN STRUCTURE EA 11 1 2.0 4,213.0000 8,426.00 UNIT TOTAL EA 1 2.0* 4,213.0000 8,426.00* ITEM CODE 152641 TOTAL 1 8,426.00* 153103 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 01 22 163,064.0 7.3188 1,193,440.50 SQYD 02 23 147,940.0 3.9041 577,570.00 SQYD 03 23 1,386,260.0 2.0878 2,894,232.30 SQYD 04 26 1,998,900.0 2.3080 4,613,452.50 SQYD 05 21 1,158,630.0 2.1020 2,435,409.50 SQYD 06 18 1,668,710.0 1.2420 2,072,514.00 SQYD 07 14 1,470,975.0 2.1318 3,135,783.00 SQYD 08 19 5,052,340.0 1.2093 6,109,991.50 SQYD 09 5 331,670.0 4.2442 1,407,660.00 SQYD 10 24 502,782.0 3.0666 1,541,832.50 SQYD 11 14 391,970.0 2.8690 1,124,543.20 SQYD 12 7 504,442.0 .7247 365,586.66 UNIT TOTAL SQYD 216 14,777,683.0* 1.8590 27,472,015.66* ITEM CODE 153103 TOTAL 216 27,472,015.66* 153120 REMOVE CONCRETE (LF) LF 04 1 16.0 196.0000 3,136.00 LF 07 2 172.0 79.4767 13,670.00 LF 12 1 2,980.0 18.6300 55,517.40 UNIT TOTAL LF 4 3,168.0* 22.8294 72,323.40* ITEM CODE 153120 TOTAL 4 72,323.40* 153121 REMOVE CONCRETE (CY)

Page 63: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 59 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 153121 REMOVE CONCRETE (CY) CY 01 1 1.0 100.0000 100.00 CY 02 3 114.0 372.5958 42,475.92 CY 03 5 766.0 162.1436 124,202.00 CY 04 4 2,058.0 100.5466 206,925.00 CY 05 3 251.5 150.1988 37,775.00 CY 06 4 348.0 261.2385 90,911.00 CY 07 5 2,273.6 148.9321 338,612.00 CY 08 2 29.0 303.4483 8,800.00 CY 10 3 109.1 300.2750 32,760.00 CY 11 6 2,062.7 75.1655 155,043.93 CY 12 6 589.6 156.1415 92,061.00 UNIT TOTAL CY 42 8,602.5* 131.3183 1,129,665.85* ITEM CODE 153121 TOTAL 42 1,129,665.85* 153123 REMOVE CONCRETE (SQYD) SQYD 04 1 920.0 25.0000 23,000.00 SQYD 05 1 100.0 22.0000 2,200.00 SQYD 08 1 38.0 68.2500 2,593.50 UNIT TOTAL SQYD 3 1,058.0* 26.2698 27,793.50* ITEM CODE 153123 TOTAL 3 27,793.50* 153130 REMOVE CONCRETE CURB (LF) LF 02 1 48.0 60.0000 2,880.00 LF 03 2 510.0 6.5000 3,315.00 LF 04 1 470.0 10.0000 4,700.00 LF 05 4 6,244.0 7.7918 48,652.00 LF 07 4 6,119.0 10.1095 61,860.00 LF 10 2 58.0 25.5172 1,480.00 LF 11 1 520.0 20.0000 10,400.00 LF 12 4 2,136.0 9.2978 19,860.00 UNIT TOTAL LF 19 16,105.0* 9.5093 153,147.00* ITEM CODE 153130 TOTAL 19 153,147.00* 153131 REMOVE CONCRETE CURB (CY) CY 04 1 2.0 520.0000 1,040.00 CY 05 1 140.0 200.0000 28,000.00 CY 11 1 15.0 333.3300 4,999.95

Page 64: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 60 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL CY 3 157.0* 216.8150 34,039.95* ITEM CODE 153131 TOTAL 3 34,039.95* 153136 REMOVE CONCRETE CURB AND SIDEWALK (LF) LF 09 1 7.0 100.0000 700.00 LF 12 1 40.0 20.0000 800.00 UNIT TOTAL LF 2 47.0* 31.9149 1,500.00* ITEM CODE 153136 TOTAL 2 1,500.00* 153138 REMOVE CONCRETE CURB AND SIDEWALK (SQYD) SQYD 01 2 920.0 136.7391 125,800.00 SQYD 04 1 140.0 75.0000 10,500.00 SQYD 06 1 36.0 67.6500 2,435.40 SQYD 08 1 450.0 16.1500 7,267.50 UNIT TOTAL SQYD 5 1,546.0* 94.4391 146,002.90* ITEM CODE 153138 TOTAL 5 146,002.90* 153140 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 02 1 1,460.0 25.0000 36,500.00 SQYD 04 2 1,150.0 30.6522 35,250.00 SQYD 07 2 4,940.0 6.2230 30,741.50 UNIT TOTAL SQYD 5 7,550.0* 13.5750 102,491.50* ITEM CODE 153140 TOTAL 5 102,491.50* 153141 REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 1 650.0 25.0000 16,250.00 SQYD 05 1 250.0 14.0000 3,500.00 UNIT TOTAL SQYD 2 900.0* 21.9444 19,750.00* ITEM CODE 153141 TOTAL 2 19,750.00* 153142 REMOVE CONCRETE ISLAND (PORTIONS) (CY) CY 04 1 5.0 405.0000 2,025.00 UNIT TOTAL CY 1 5.0* 405.0000 2,025.00*

Page 65: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 61 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 153142 TOTAL 1 2,025.00* 153211 REMOVE CONCRETE SIDEWALK AND DRIVEWAY CY 07 1 370.0 50.8000 18,796.00 UNIT TOTAL CY 1 370.0* 50.8000 18,796.00* SQYD 08 1 451.0 50.0000 22,550.00 UNIT TOTAL SQYD 1 451.0* 50.0000 22,550.00* ITEM CODE 153211 TOTAL 2 41,346.00* 153213 REMOVE CONCRETE (STRUCTURE) CY 04 1 7.0 500.0000 3,500.00 CY 05 1 76.0 280.0000 21,280.00 CY 07 1 145.0 150.0000 21,750.00 UNIT TOTAL CY 3 228.0* 204.0789 46,530.00* ITEM CODE 153213 TOTAL 3 46,530.00* 153215 REMOVE CONCRETE (CURB AND GUTTER) CY 04 1 12.0 165.0000 1,980.00 UNIT TOTAL CY 1 12.0* 165.0000 1,980.00* LF 02 1 680.0 10.0000 6,800.00 LF 03 2 15,404.0 2.5552 39,360.00 LF 04 4 12,420.0 10.3240 128,224.00 LF 07 7 54,834.0 5.1225 280,885.80 LF 08 1 2,850.0 7.0000 19,950.00 LF 10 2 487.0 16.5934 8,081.00 UNIT TOTAL LF 17 86,675.0* 5.5760 483,300.80* ITEM CODE 153215 TOTAL 18 485,280.80* 153219 REMOVE CONCRETE FLARED END SECTION EA 05 1 1.0 3,500.0000 3,500.00 EA 07 1 3.0 750.0000 2,250.00 EA 10 1 3.0 189.0000 567.00 UNIT TOTAL EA 3 7.0* 902.4286 6,317.00* ITEM CODE 153219 TOTAL 3 6,317.00*

Page 66: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 62 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 153220 REMOVE CONCRETE (CHANNEL) CY 05 3 439.0 38.0501 16,704.00 CY 07 4 284.8 50.2107 14,300.00 CY 12 2 260.0 87.5000 22,750.00 UNIT TOTAL CY 9 983.8* 54.6392 53,754.00* ITEM CODE 153220 TOTAL 9 53,754.00* 153221 REMOVE CONCRETE BARRIER LF 01 1 20.0 190.0000 3,800.00 LF 02 1 25.0 295.0000 7,375.00 LF 04 2 9,010.0 16.4178 147,924.00 LF 05 2 1,142.0 213.7426 244,094.00 LF 06 4 556.0 56.1835 31,238.00 LF 07 6 7,662.0 29.1105 223,045.00 LF 08 1 7,300.0 77.0000 562,100.00 LF 10 1 430.0 98.6000 42,398.00 LF 11 2 705.0 14.7078 10,369.00 LF 12 3 3,585.0 29.3250 105,130.00 UNIT TOTAL LF 23 30,435.0* 45.2595 1,377,473.00* ITEM CODE 153221 TOTAL 23 1,377,473.00* 153223 REMOVE UNSOUND CONCRETE CF 01 2 166.0 162.1687 26,920.00 CF 02 1 144.0 210.0000 30,240.00 CF 03 6 7,702.0 17.1008 131,710.25 CF 04 3 1,399.0 27.7877 38,875.00 CF 05 3 621.0 60.9662 37,860.00 CF 06 3 389.0 80.3599 31,260.00 CF 07 13 1,570.0 71.6260 112,452.89 CF 08 2 74.0 58.9189 4,360.00 CF 10 4 32.6 354.6779 11,562.50 CF 11 1 20.0 110.0000 2,200.00 CF 12 1 77.0 75.0000 5,775.00 UNIT TOTAL CF 39 12,194.6* 35.5252 433,215.64* ITEM CODE 153223 TOTAL 39 433,215.64* 153224 POLYESTER CONCRETE EXPANSION DAM CF 05 1 9.0 457.8800 4,120.92

Page 67: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 63 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) POLYESTER CONCRETE EXPANSION DAM CF 06 1 163.0 275.0000 44,825.00 CF 07 1 95.0 117.0000 11,115.00 CF 10 2 61.0 684.3115 41,743.00 UNIT TOTAL CF 5 328.0* 310.3778 101,803.92* ITEM CODE 153224 TOTAL 5 101,803.92* 153225 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 01 6 213,529.0 .6346 135,504.00 SQFT 02 5 70,817.0 .7126 50,465.00 SQFT 03 6 655,409.0 .3165 207,444.20 SQFT 04 9 1,535,264.0 .1614 247,742.64 SQFT 05 4 532,160.0 .3152 167,745.53 SQFT 06 3 166,915.0 .3852 64,289.30 SQFT 07 14 6,259,884.0 .1406 880,100.12 SQFT 08 4 717,216.0 .1636 117,339.66 SQFT 10 7 556,992.0 .2463 137,210.80 SQFT 11 3 347,394.0 .2767 96,111.78 SQFT 12 3 1,511,025.0 .1059 160,015.90 UNIT TOTAL SQFT 64 12,566,605.0* .1802 2,263,968.93* ITEM CODE 153225 TOTAL 64 2,263,968.93* 153226 REFINISH BRIDGE DECK SQFT 01 2 490.0 27.8571 13,650.00 SQFT 06 1 500.0 25.0000 12,500.00 SQFT 12 1 873.0 30.0000 26,190.00 UNIT TOTAL SQFT 4 1,863.0* 28.0945 52,340.00* ITEM CODE 153226 TOTAL 4 52,340.00* 153227 FURNISH POLYESTER CONCRETE OVERLAY CF 01 4 2,069.0 117.2040 242,495.00 CF 02 5 5,633.0 97.7076 550,387.00 CF 03 6 45,435.0 78.0932 3,548,164.20 CF 04 6 7,301.0 88.0286 642,697.10 CF 05 3 4,516.0 76.8027 346,841.00 CF 06 2 2,617.0 95.7337 250,535.00 CF 07 5 15,043.0 63.6473 957,445.90 CF 08 2 3,492.0 99.1552 346,250.00

Page 68: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 64 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) FURNISH POLYESTER CONCRETE OVERLAY CF 10 1 7,045.0 63.0000 443,835.00 CF 11 1 546.0 108.0000 58,968.00 CF 12 1 1,933.0 108.0000 208,764.00 UNIT TOTAL CF 36 95,630.0* 79.4351 7,596,382.20* ITEM CODE 153227 TOTAL 36 7,596,382.20* 153228 PLACE POLYESTER CONCRETE OVERLAY SQFT 01 4 20,473.0 3.3989 69,586.00 SQFT 02 5 70,817.0 2.9506 208,955.75 SQFT 03 6 487,886.0 1.6210 790,874.96 SQFT 04 6 100,347.0 3.4464 345,833.85 SQFT 05 3 48,754.0 2.7069 131,973.64 SQFT 06 2 41,873.0 2.5244 105,706.00 SQFT 07 5 104,622.0 3.2321 338,152.52 SQFT 08 2 29,440.0 2.0980 61,766.00 SQFT 10 1 56,360.0 3.8000 214,168.00 SQFT 11 1 8,733.0 8.5000 74,230.50 SQFT 12 1 30,930.0 1.2500 38,662.50 UNIT TOTAL SQFT 36 1,000,235.0* 2.3794 2,379,909.72* ITEM CODE 153228 TOTAL 36 2,379,909.72* 153229 REMOVE CONCRETE BARRIER (TYPE K) LF 04 3 380.0 9.9079 3,765.00 LF 07 3 2,510.0 15.3028 38,410.00 LF 12 1 11,500.0 5.9200 68,080.00 UNIT TOTAL LF 7 14,390.0* 7.6619 110,255.00* ITEM CODE 153229 TOTAL 7 110,255.00* 153230 REMOVE CONCRETE BARRIER (TYPE 50) LF 07 1 140.0 65.0000 9,100.00 UNIT TOTAL LF 1 140.0* 65.0000 9,100.00* ITEM CODE 153230 TOTAL 1 9,100.00* 153233 TREAT BRIDGE DECK

Page 69: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 65 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 153233 TREAT BRIDGE DECK SQFT 01 3 193,056.0 .5333 102,961.20 SQFT 03 4 167,523.0 .2824 47,306.63 SQFT 04 5 1,439,227.0 .2555 367,700.25 SQFT 05 3 448,686.0 .3312 148,612.48 SQFT 06 1 125,042.0 .3000 37,512.60 SQFT 07 14 6,155,262.0 .1751 1,077,795.82 SQFT 08 4 687,776.0 .2166 148,970.93 SQFT 10 6 500,632.0 .3584 179,415.80 SQFT 11 2 338,661.0 .7891 267,241.62 SQFT 12 2 1,480,095.0 .2358 348,969.65 UNIT TOTAL SQFT 44 11,535,960.0* .2363 2,726,486.98* ITEM CODE 153233 TOTAL 44 2,726,486.98* 153234 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 01 3 2,308.0 61.8609 142,775.00 GAL 03 4 1,938.0 71.1876 137,961.50 GAL 04 5 16,008.0 47.7074 763,700.00 GAL 05 3 4,986.0 25.5495 127,390.00 GAL 06 1 1,586.0 54.0000 85,644.00 GAL 07 14 73,080.0 52.0324 3,802,531.32 GAL 08 4 8,596.0 46.4460 399,250.00 GAL 10 6 5,773.0 33.7048 194,578.00 GAL 11 2 3,788.0 41.6411 157,736.50 GAL 12 2 21,154.0 43.3469 916,959.75 UNIT TOTAL GAL 44 139,217.0* 48.3312 6,728,526.07* ITEM CODE 153234 TOTAL 44 6,728,526.07* 153237 REMOVE CHIP SEAL SQFT 01 1 72,987.0 .7500 54,740.25 SQFT 03 1 43,622.0 1.3500 58,889.70 SQFT 06 2 107,744.0 .5488 59,129.15 SQFT 10 1 13,830.0 3.2000 44,256.00 UNIT TOTAL SQFT 5 238,183.0* .9111 217,015.10* ITEM CODE 153237 TOTAL 5 217,015.10* 153240 REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 1 250.0 100.0000 25,000.00

Page 70: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 66 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 6 830.3 237.7564 197,409.10 CY 05 1 16.0 300.0000 4,800.00 CY 07 5 538.0 296.5985 159,570.00 UNIT TOTAL CY 13 1,634.3* 236.6635 386,779.10* ITEM CODE 153240 TOTAL 13 386,779.10* 153241 REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (LF) LF 05 1 3,250.0 6.0000 19,500.00 UNIT TOTAL LF 1 3,250.0* 6.0000 19,500.00* ITEM CODE 153241 TOTAL 1 19,500.00* 153247 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 01 1 11.0 700.0000 7,700.00 CY 03 1 8.0 265.0000 2,120.00 CY 05 2 840.0 37.5000 31,500.00 CY 08 3 622.1 178.7655 111,210.00 CY 11 2 188.0 383.1647 72,034.96 CY 12 3 191.0 201.3089 38,450.00 UNIT TOTAL CY 12 1,860.1* 141.3983 263,014.96* ITEM CODE 153247 TOTAL 12 263,014.96* 153248 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) SQFT 05 1 160.0 8.0000 1,280.00 SQFT 06 1 4,320.0 2.0000 8,640.00 SQFT 07 3 17,670.0 6.8751 121,482.50 SQFT 10 4 6,030.0 6.6061 39,835.00 SQFT 12 2 4,190.0 4.1806 17,516.80 UNIT TOTAL SQFT 11 32,370.0* 5.8311 188,754.30* ITEM CODE 153248 TOTAL 11 188,754.30* 153251 REMOVE SOUND WALL (LF) LF 07 1 530.0 27.0000 14,310.00 UNIT TOTAL LF 1 530.0* 27.0000 14,310.00*

Page 71: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 67 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 153251 TOTAL 1 14,310.00* 153252 REMOVE SOUND WALL (LS) LS 04 1 7,000.00 UNIT TOTAL LS 1 7,000.00 ITEM CODE 153252 TOTAL 1 7,000.00* 153301 CORE CONCRETE (1") LF 01 1 65.0 300.0000 19,500.00 LF 04 1 54.0 250.0000 13,500.00 LF 06 1 168.0 140.0000 23,520.00 UNIT TOTAL LF 3 287.0* 196.9338 56,520.00* ITEM CODE 153301 TOTAL 3 56,520.00* 153303 CORE CONCRETE (3") LF 04 2 8.0 375.0000 3,000.00 UNIT TOTAL LF 2 8.0* 375.0000 3,000.00* ITEM CODE 153303 TOTAL 2 3,000.00* 153304 CORE CONCRETE (4") LF 04 1 7.0 400.0000 2,800.00 UNIT TOTAL LF 1 7.0* 400.0000 2,800.00* ITEM CODE 153304 TOTAL 1 2,800.00* 153307 CORE CONCRETE (7") LF 06 1 42.0 464.0000 19,488.00 UNIT TOTAL LF 1 42.0* 464.0000 19,488.00* ITEM CODE 153307 TOTAL 1 19,488.00* 153310 CORE CONCRETE (10") LF 06 2 60.0 292.8000 17,568.00 UNIT TOTAL LF 2 60.0* 292.8000 17,568.00*

Page 72: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 68 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 153310 TOTAL 2 17,568.00* 153312 CORE CONCRETE (12") LF 06 1 15.0 400.0000 6,000.00 UNIT TOTAL LF 1 15.0* 400.0000 6,000.00* ITEM CODE 153312 TOTAL 1 6,000.00* 153319 CORE CONCRETE (1 1/4") LF 01 1 63.0 250.0000 15,750.00 UNIT TOTAL LF 1 63.0* 250.0000 15,750.00* ITEM CODE 153319 TOTAL 1 15,750.00* 153320 CORE CONCRETE (1 1/2") LF 06 1 504.0 125.0000 63,000.00 UNIT TOTAL LF 1 504.0* 125.0000 63,000.00* ITEM CODE 153320 TOTAL 1 63,000.00* 153531 ACCESS OPENING, SOFFIT EA 02 1 16.0 2,000.0000 32,000.00 EA 06 2 30.0 3,647.8667 109,436.00 UNIT TOTAL EA 3 46.0* 3,074.6957 141,436.00* ITEM CODE 153531 TOTAL 3 141,436.00* 155003 CAP INLET EA 04 3 9.0 2,329.4444 20,965.00 EA 05 1 1.0 2,100.0000 2,100.00 EA 06 1 2.0 1,690.0000 3,380.00 EA 07 4 44.0 1,134.0909 49,900.00 EA 09 1 4.0 750.0000 3,000.00 EA 10 1 2.0 750.0000 1,500.00 EA 11 2 4.0 2,964.7350 11,858.94 UNIT TOTAL EA 13 66.0* 1,404.6052 92,703.94* ITEM CODE 155003 TOTAL 13 92,703.94*

Page 73: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 69 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 155112 15" ALTERNATIVE PIPELINER LF 04 1 675.0 125.8200 84,928.50 UNIT TOTAL LF 1 675.0* 125.8200 84,928.50* ITEM CODE 155112 TOTAL 1 84,928.50* 155115 18" ALTERNATIVE PIPELINER LF 01 1 260.0 125.0000 32,500.00 LF 08 1 40.0 193.0000 7,720.00 UNIT TOTAL LF 2 300.0* 134.0667 40,220.00* ITEM CODE 155115 TOTAL 2 40,220.00* 155121 24" ALTERNATIVE PIPELINER LF 01 1 400.0 160.0000 64,000.00 LF 03 1 210.0 365.0000 76,650.00 LF 08 1 740.0 231.0000 170,940.00 UNIT TOTAL LF 3 1,350.0* 230.8074 311,590.00* ITEM CODE 155121 TOTAL 3 311,590.00* 155127 30" ALTERNATIVE PIPELINER LF 01 1 260.0 200.0000 52,000.00 LF 08 1 180.0 237.0000 42,660.00 UNIT TOTAL LF 2 440.0* 215.1364 94,660.00* ITEM CODE 155127 TOTAL 2 94,660.00* 155130 36" ALTERNATIVE PIPELINER LF 01 1 350.0 335.0000 117,250.00 LF 08 1 40.0 418.0000 16,720.00 UNIT TOTAL LF 2 390.0* 343.5128 133,970.00* ITEM CODE 155130 TOTAL 2 133,970.00* 155133 42" ALTERNATIVE PIPELINER LF 08 1 160.0 720.0000 115,200.00

Page 74: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 70 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 1 160.0* 720.0000 115,200.00* ITEM CODE 155133 TOTAL 1 115,200.00* 155136 48" ALTERNATIVE PIPELINER LF 01 1 200.0 515.0000 103,000.00 UNIT TOTAL LF 1 200.0* 515.0000 103,000.00* ITEM CODE 155136 TOTAL 1 103,000.00* 155213 CLEANING, INSPECTING, AND PREPARING CULVERT (LF) LF 01 2 1,600.0 45.5000 72,800.00 LF 03 1 1,450.0 18.0000 26,100.00 LF 05 1 200.0 100.0000 20,000.00 LF 06 1 710.0 26.0000 18,460.00 LF 08 1 1,160.0 6.0000 6,960.00 LF 12 2 2,440.0 21.2674 51,892.40 UNIT TOTAL LF 8 7,560.0* 25.9540 196,212.40* ITEM CODE 155213 TOTAL 8 196,212.40* 155230 CONCRETE INVERT PAVING CY 01 1 27.0 2,032.6000 54,880.20 CY 12 1 52.0 1,266.9200 65,879.84 UNIT TOTAL CY 2 79.0* 1,528.6081 120,760.04* ITEM CODE 155230 TOTAL 2 120,760.04* 155231 CULVERT SLURRY-CEMENT BACKFILL CY 03 1 1,020.0 190.0000 193,800.00 CY 04 2 3,653.0 127.6827 466,425.00 CY 08 1 1,440.0 190.0000 273,600.00 UNIT TOTAL CY 4 6,113.0* 152.7605 933,825.00* ITEM CODE 155231 TOTAL 4 933,825.00* 155232 SAND BACKFILL CY 01 4 168.0 198.6548 33,374.00 CY 02 1 43.0 200.0000 8,600.00

Page 75: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 71 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) SAND BACKFILL CY 04 1 10.0 75.0000 750.00 CY 05 3 910.0 109.7033 99,830.00 CY 07 3 59.0 294.0339 17,348.00 CY 09 2 46.0 207.6087 9,550.00 CY 11 4 282.0 91.7066 25,861.25 CY 12 2 51.0 78.2353 3,990.00 UNIT TOTAL CY 20 1,569.0* 127.0257 199,303.25* ITEM CODE 155232 TOTAL 20 199,303.25* 155312 12" CURED-IN-PLACE PIPELINER LF 03 1 81.0 130.0000 10,530.00 UNIT TOTAL LF 1 81.0* 130.0000 10,530.00* ITEM CODE 155312 TOTAL 1 10,530.00* 155314 18" CURED-IN-PLACE PIPELINER LF 03 1 1,160.0 144.0000 167,040.00 LF 05 1 200.0 440.0000 88,000.00 LF 06 1 710.0 199.0000 141,290.00 LF 12 1 470.0 108.9000 51,183.00 UNIT TOTAL LF 4 2,540.0* 176.1862 447,513.00* ITEM CODE 155314 TOTAL 4 447,513.00* 155316 24" CURED-IN-PLACE PIPELINER LF 12 2 680.0 189.7175 129,007.90 UNIT TOTAL LF 2 680.0* 189.7175 129,007.90* ITEM CODE 155316 TOTAL 2 129,007.90* 156572 REMOVE RAILING LS 07 1 25,000.00 UNIT TOTAL LS 1 25,000.00 ITEM CODE 156572 TOTAL 1 25,000.00* 156576 REMOVE METAL RAILING

Page 76: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 72 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 156576 REMOVE METAL RAILING LF 10 1 310.0 12.0000 3,720.00 UNIT TOTAL LF 1 310.0* 12.0000 3,720.00* ITEM CODE 156576 TOTAL 1 3,720.00* 156585 REMOVE CRASH CUSHION EA 04 1 1.0 420.0000 420.00 EA 07 5 7.0 2,008.5714 14,060.00 EA 11 1 1.0 4,000.0000 4,000.00 EA 12 1 24.0 30.0000 720.00 UNIT TOTAL EA 8 33.0* 581.8182 19,200.00* ITEM CODE 156585 TOTAL 8 19,200.00* 156590 REMOVE CRASH CUSHION (SAND FILLED) EA 02 1 22.0 200.0000 4,400.00 EA 04 2 2.0 1,450.0000 2,900.00 EA 05 1 4.0 575.0000 2,300.00 EA 06 3 18.0 188.4444 3,392.00 EA 07 4 67.0 139.7015 9,360.00 EA 10 2 13.0 334.6154 4,350.00 EA 12 1 56.0 74.0000 4,144.00 UNIT TOTAL EA 14 182.0* 169.4835 30,846.00* ITEM CODE 156590 TOTAL 14 30,846.00* 157550 BRIDGE REMOVAL LS 02 1 256,000.00 LS 03 1 500,000.00 LS 04 5 1,445,000.00 LS 05 1 70,000.00 LS 06 1 110,000.00 LS 08 2 300,000.00 UNIT TOTAL LS 11 2,681,000.00 ITEM CODE 157550 TOTAL 11 2,681,000.00* 157551 BRIDGE REMOVAL, LOCATION A

Page 77: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 73 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 157551 BRIDGE REMOVAL, LOCATION A LS 05 2 400,000.00 LS 07 1 701,400.00 UNIT TOTAL LS 3 1,101,400.00 ITEM CODE 157551 TOTAL 3 1,101,400.00* 157552 BRIDGE REMOVAL, LOCATION B LS 05 2 296,000.00 LS 07 1 315,500.00 UNIT TOTAL LS 3 611,500.00 ITEM CODE 157552 TOTAL 3 611,500.00* 157553 BRIDGE REMOVAL, LOCATION C LS 05 1 215,000.00 UNIT TOTAL LS 1 215,000.00 ITEM CODE 157553 TOTAL 1 215,000.00* 157560 BRIDGE REMOVAL (PORTION) LS 01 2 335,000.00 LS 02 1 400,000.00 LS 03 3 31,350.00 LS 04 7 16,792,100.00 LS 05 1 52,300.00 LS 06 3 244,500.00 LS 07 4 37,385.00 LS 08 1 29,000.00 LS 10 4 2,009,400.00 LS 11 3 493,200.00 LS 12 4 227,260.00 UNIT TOTAL LS 33 20,651,495.00 ITEM CODE 157560 TOTAL 33 20,651,495.00* 157561 BRIDGE REMOVAL (PORTION), LOCATION A LS 01 1 50,000.00 LS 02 2 255,000.00

Page 78: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 74 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) BRIDGE REMOVAL (PORTION), LOCATION A LS 03 1 25,000.00 LS 04 2 58,090.00 LS 05 4 88,165.00 LS 06 1 150,000.00 LS 07 3 76,250.00 LS 08 1 2,000.00 LS 10 1 33,000.00 UNIT TOTAL LS 16 737,505.00 ITEM CODE 157561 TOTAL 16 737,505.00* 157562 BRIDGE REMOVAL (PORTION), LOCATION B LS 01 1 30,000.00 LS 02 2 605,000.00 LS 03 1 25,000.00 LS 04 2 73,090.00 LS 05 4 100,665.00 LS 06 1 75,000.00 LS 07 3 76,000.00 LS 08 1 2,000.00 LS 10 1 25,000.00 UNIT TOTAL LS 16 1,011,755.00 ITEM CODE 157562 TOTAL 16 1,011,755.00* 157563 BRIDGE REMOVAL (PORTION), LOCATION C LS 01 1 30,000.00 LS 02 1 60,000.00 LS 04 1 8,570.00 LS 05 2 52,500.00 LS 07 1 36,750.00 LS 10 1 20,400.00 UNIT TOTAL LS 7 208,220.00 ITEM CODE 157563 TOTAL 7 208,220.00* 157564 BRIDGE REMOVAL (PORTION), LOCATION D LS 01 1 40,000.00 LS 04 1 8,215.00 LS 05 2 52,500.00

Page 79: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 75 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LS 4 100,715.00 ITEM CODE 157564 TOTAL 4 100,715.00* 157565 BRIDGE REMOVAL (PORTION), LOCATION E LS 04 1 2,740.00 LS 05 1 86,000.00 UNIT TOTAL LS 2 88,740.00 ITEM CODE 157565 TOTAL 2 88,740.00* 157566 BRIDGE REMOVAL (PORTION), LOCATION F LS 04 1 2,740.00 UNIT TOTAL LS 1 2,740.00 ITEM CODE 157566 TOTAL 1 2,740.00* 158100 SALVAGE CRASH CUSHION EA 05 2 3.0 1,900.0000 5,700.00 EA 06 2 8.0 1,275.0000 10,200.00 EA 10 1 2.0 800.0000 1,600.00 UNIT TOTAL EA 5 13.0* 1,346.1538 17,500.00* ITEM CODE 158100 TOTAL 5 17,500.00* 158101 SALVAGE CRASH CUSHION MODULES EA 01 1 14.0 115.0000 1,610.00 UNIT TOTAL EA 1 14.0* 115.0000 1,610.00* ITEM CODE 158101 TOTAL 1 1,610.00* 158210 RESET TEMPORARY RAILING (TYPE K) LF 01 3 1,240.0 9.2419 11,460.00 LF 04 2 2,740.0 18.0146 49,360.00 UNIT TOTAL LF 5 3,980.0* 15.2814 60,820.00* ITEM CODE 158210 TOTAL 5 60,820.00* 159010 RECONSTRUCT METAL RAILING (BRIDGE)

Page 80: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 76 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 159010 RECONSTRUCT METAL RAILING (BRIDGE) LF 01 1 6.0 1,200.0000 7,200.00 LF 12 1 80.0 50.0000 4,000.00 UNIT TOTAL LF 2 86.0* 130.2326 11,200.00* ITEM CODE 159010 TOTAL 2 11,200.00* 159800 MODIFY PUMP PLANT LS 04 1 467,296.00 UNIT TOTAL LS 1 467,296.00 ITEM CODE 159800 TOTAL 1 467,296.00* 160102 CLEARING AND GRUBBING (LS) LS 01 21 426,891.49 LS 02 12 1,041,935.18 LS 03 16 814,427.60 LS 04 34 1,019,178.00 LS 05 12 941,100.00 LS 06 19 778,465.00 LS 07 11 788,420.70 LS 08 17 748,075.00 LS 09 1 10,000.00 LS 10 18 675,561.00 LS 11 10 475,839.16 LS 12 9 427,023.00 UNIT TOTAL LS 180 8,146,916.13 ITEM CODE 160102 TOTAL 180 8,146,916.13* 160103 CLEARING AND GRUBBING (ACRE) ACRE 05 1 3.7 79,730.0000 295,001.00 UNIT TOTAL ACRE 1 3.7* 79,730.0000 295,001.00* ITEM CODE 160103 TOTAL 1 295,001.00* 170101 DEVELOP WATER SUPPLY LS 01 6 65,473.73 LS 02 16 114,567.65

Page 81: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 77 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) DEVELOP WATER SUPPLY LS 03 7 79,000.00 LS 04 7 159,970.00 LS 05 5 488,500.00 LS 08 9 648,270.00 LS 09 1 10,000.00 LS 11 3 65,000.00 UNIT TOTAL LS 54 1,630,781.38 ITEM CODE 170101 TOTAL 54 1,630,781.38* 180105 DUST SUPPRESSANT SQYD 02 1 42,500.0 .2500 10,625.00 SQYD 03 1 9,010.0 2.0000 18,020.00 SQYD 05 1 2,340.0 2.1000 4,914.00 UNIT TOTAL SQYD 3 53,850.0* .6232 33,559.00* ITEM CODE 180105 TOTAL 3 33,559.00* 180106 DUST PALLIATIVE LS 01 4 23,500.00 LS 03 1 2,000.00 LS 04 2 21,000.00 LS 05 3 154,300.00 LS 06 2 3,500.35 LS 08 6 208,300.00 LS 10 2 20,500.00 LS 11 5 58,500.00 UNIT TOTAL LS 25 491,600.35 ITEM CODE 180106 TOTAL 25 491,600.35* 190101 ROADWAY EXCAVATION CY 01 19 87,186.0 21.4858 1,873,261.00 CY 02 12 229,416.0 24.1360 5,537,175.44 CY 03 15 295,323.0 16.1696 4,775,248.80 CY 04 25 94,264.0 39.8143 3,753,052.30 CY 05 11 1,241,301.0 10.6623 13,235,112.00 CY 06 14 109,999.0 22.9724 2,526,940.00 CY 07 19 445,530.0 21.3353 9,505,516.70 CY 08 19 913,008.0 6.5384 5,969,631.00

Page 82: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 78 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ROADWAY EXCAVATION CY 09 5 50,177.5 6.7522 338,806.40 CY 10 17 178,646.3 18.8558 3,368,513.00 CY 11 13 148,419.0 29.7196 4,410,948.90 CY 12 18 106,577.0 31.4809 3,355,135.40 UNIT TOTAL CY 187 3,899,846.8* 15.0389 58,649,340.94* ITEM CODE 190101 TOTAL 187 58,649,340.94* 190105 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) CY 03 3 910.0 309.4458 281,595.70 CY 04 7 5,898.0 229.6050 1,354,210.00 CY 05 5 2,590.0 248.2239 642,900.00 CY 07 12 8,778.0 183.6129 1,611,754.00 CY 10 1 140.0 161.0000 22,540.00 CY 11 7 9,072.0 139.8765 1,268,960.00 CY 12 1 150.0 280.0000 42,000.00 UNIT TOTAL CY 36 27,538.0* 189.7000 5,223,959.70* ITEM CODE 190105 TOTAL 36 5,223,959.70* 190106 ROADWAY EXCAVATION (TYPE Z-3) (AERIALLY DEPOSITED LEAD) CY 07 3 841.0 224.2449 188,590.00 UNIT TOTAL CY 3 841.0* 224.2449 188,590.00* ITEM CODE 190106 TOTAL 3 188,590.00* 190107 ROADWAY EXCAVATION (TYPE Y-1) (AERIALLY DEPOSITED LEAD) CY 04 1 6,910.0 16.0000 110,560.00 CY 05 1 12,300.0 28.0000 344,400.00 CY 07 1 3,380.0 25.0000 84,500.00 CY 11 1 210.0 77.4800 16,270.80 CY 12 4 2,876.0 40.6120 116,800.20 UNIT TOTAL CY 8 25,676.0* 26.1930 672,531.00* ITEM CODE 190107 TOTAL 8 672,531.00* 190108 ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) CY 07 1 3,430.0 28.0000 96,040.00

Page 83: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 79 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) CY 11 1 15,800.0 11.2000 176,960.00 CY 12 2 113.0 353.9823 40,000.00 UNIT TOTAL CY 4 19,343.0* 16.1816 313,000.00* ITEM CODE 190108 TOTAL 4 313,000.00* 190109 ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 1 460.0 32.0000 14,720.00 UNIT TOTAL CY 1 460.0* 32.0000 14,720.00* ITEM CODE 190109 TOTAL 1 14,720.00* 190112 ROADWAY EXCAVATION (TYPE A) CY 05 1 120.0 130.0000 15,600.00 UNIT TOTAL CY 1 120.0* 130.0000 15,600.00* ITEM CODE 190112 TOTAL 1 15,600.00* 190139 ROADWAY EXCAVATION (UNSUITABLE MATERIAL) CY 05 1 900.0 170.0000 153,000.00 CY 07 1 2,140.0 40.0000 85,600.00 CY 08 1 187,000.0 2.5000 467,500.00 UNIT TOTAL CY 3 190,040.0* 3.7155 706,100.00* ITEM CODE 190139 TOTAL 3 706,100.00* 190160 ROCK EXCAVATION (CONTROLLED BLASTING) CY 11 1 300.0 275.0000 82,500.00 UNIT TOTAL CY 1 300.0* 275.0000 82,500.00* ITEM CODE 190160 TOTAL 1 82,500.00* 190161 ROCK EXCAVATION CY 01 1 44,300.0 17.0000 753,100.00 CY 06 1 500.0 30.0000 15,000.00 CY 10 1 3,880.0 82.8000 321,264.00

Page 84: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 80 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ROCK EXCAVATION CY 11 1 6,120.0 56.9500 348,534.00 UNIT TOTAL CY 4 54,800.0* 26.2390 1,437,898.00* ITEM CODE 190161 TOTAL 4 1,437,898.00* 190185 SHOULDER BACKING TON 01 18 12,877.0 42.3869 545,815.55 TON 02 21 40,703.0 34.0421 1,385,614.00 TON 03 11 19,373.0 20.5482 398,081.00 TON 04 10 1,580.5 76.3847 120,726.00 TON 05 12 24,695.0 46.0938 1,138,287.00 TON 06 8 16,380.0 30.8993 506,130.00 TON 07 3 4,370.0 35.5126 155,190.00 TON 08 9 50,717.0 10.1094 512,718.96 TON 09 4 13,440.0 54.4278 731,510.00 TON 10 14 28,145.0 22.2621 626,567.50 TON 11 5 9,820.0 44.5570 437,550.00 UNIT TOTAL TON 115 222,100.5* 29.5280 6,558,190.01* ITEM CODE 190185 TOTAL 115 6,558,190.01* 192001 STRUCTURE EXCAVATION CY 01 1 21,100.0 31.1700 657,687.00 CY 02 1 88.0 75.0000 6,600.00 CY 04 2 115.0 197.6000 22,724.00 CY 07 4 17,345.0 33.8387 586,933.00 CY 12 1 5.0 364.0000 1,820.00 UNIT TOTAL CY 9 38,653.0* 33.0056 1,275,764.00* ITEM CODE 192001 TOTAL 9 1,275,764.00* 192003 STRUCTURE EXCAVATION (BRIDGE) CY 01 4 445.0 190.7416 84,880.00 CY 02 3 1,394.0 112.3967 156,681.00 CY 03 1 684.0 160.0000 109,440.00 CY 04 4 8,802.0 90.6067 797,520.00 CY 05 3 9,775.0 33.4961 327,424.00 CY 06 4 1,497.0 209.2452 313,240.00 CY 07 1 20,019.0 18.6500 373,354.35 CY 08 3 7,251.0 43.0148 311,900.00

Page 85: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 81 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) STRUCTURE EXCAVATION (BRIDGE) CY 10 2 115.0 196.6957 22,620.00 CY 11 1 210.0 65.4000 13,734.00 CY 12 1 680.0 70.0000 47,600.00 UNIT TOTAL CY 27 50,872.0* 50.2908 2,558,393.35* ITEM CODE 192003 TOTAL 27 2,558,393.35* 192008 STRUCTURE EXCAVATION (TYPE A) CY 02 1 366.0 131.0000 47,946.00 CY 04 1 1,044.0 90.0000 93,960.00 UNIT TOTAL CY 2 1,410.0* 100.6426 141,906.00* ITEM CODE 192008 TOTAL 2 141,906.00* 192009 STRUCTURE EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 1 131.0 750.0000 98,250.00 CY 05 1 42.0 107.0000 4,494.00 UNIT TOTAL CY 2 173.0* 593.8960 102,744.00* ITEM CODE 192009 TOTAL 2 102,744.00* 192020 STRUCTURE EXCAVATION (TYPE D) CY 01 1 165.0 600.0000 99,000.00 CY 02 1 593.0 193.0000 114,449.00 CY 03 2 904.0 63.0304 56,979.50 CY 05 2 12,314.0 40.1031 493,829.00 CY 06 2 98.0 1,874.4592 183,697.00 CY 07 1 3,971.0 66.0000 262,086.00 UNIT TOTAL CY 9 18,045.0* 67.0568 1,210,040.50* ITEM CODE 192020 TOTAL 9 1,210,040.50* 192025 STRUCTURE EXCAVATION (CULVERT) CY 04 3 371.0 124.4420 46,168.00 CY 08 2 3,804.0 45.7776 174,138.04 CY 11 1 246.0 78.0000 19,188.00 UNIT TOTAL CY 6 4,421.0* 54.1719 239,494.04*

Page 86: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 82 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 192025 TOTAL 6 239,494.04* 192032 STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) CY 04 1 7.0 165.0000 1,155.00 CY 07 1 91.0 39.0000 3,549.00 UNIT TOTAL CY 2 98.0* 48.0000 4,704.00* ITEM CODE 192032 TOTAL 2 4,704.00* 192036 STRUCTURE EXCAVATION (CRIB WALL) CY 01 1 1,005.0 48.0000 48,240.00 UNIT TOTAL CY 1 1,005.0* 48.0000 48,240.00* ITEM CODE 192036 TOTAL 1 48,240.00* 192037 STRUCTURE EXCAVATION (RETAINING WALL) CY 03 2 1,569.0 44.0994 69,192.00 CY 04 3 4,825.0 65.5648 316,350.00 CY 05 2 4,799.0 35.2123 168,984.00 CY 07 4 41,279.0 23.1950 957,468.00 CY 08 1 500.0 22.0000 11,000.00 CY 10 4 4,023.0 50.3908 202,722.35 CY 11 2 3,599.0 61.3790 220,902.90 CY 12 4 5,218.0 53.6282 279,831.92 UNIT TOTAL CY 22 65,812.0* 33.8305 2,226,451.17* ITEM CODE 192037 TOTAL 22 2,226,451.17* 192049 STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 6 5,807.0 51.4010 298,485.40 CY 02 1 44.0 170.0000 7,480.00 CY 04 4 541.0 116.2754 62,905.00 CY 07 1 79.0 125.0000 9,875.00 CY 11 1 57.0 241.0000 13,737.00 UNIT TOTAL CY 13 6,528.0* 60.1229 392,482.40* ITEM CODE 192049 TOTAL 13 392,482.40* 192053 STRUCTURE EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD)

Page 87: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 83 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 192053 STRUCTURE EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) CY 04 2 230.0 363.0435 83,500.00 CY 07 1 219.0 130.0000 28,470.00 CY 11 1 4,260.0 120.0000 511,200.00 UNIT TOTAL CY 4 4,709.0* 132.3360 623,170.00* ITEM CODE 192053 TOTAL 4 623,170.00* 192055 STRUCTURE EXCAVATION (SOIL NAIL WALL) CY 01 1 528.0 86.0000 45,408.00 CY 03 1 420.0 30.0000 12,600.00 CY 04 1 2,100.0 100.0000 210,000.00 CY 05 1 625.0 31.0000 19,375.00 CY 07 1 980.0 42.0000 41,160.00 CY 12 1 176.0 82.0500 14,440.80 UNIT TOTAL CY 6 4,829.0* 71.0258 342,983.80* ITEM CODE 192055 TOTAL 6 342,983.80* 192057 STRUCTURE EXCAVATION (TYPE Y-1) (AERIALLY DEPOSITED LEAD) CY 07 1 49.0 40.0000 1,960.00 UNIT TOTAL CY 1 49.0* 40.0000 1,960.00* ITEM CODE 192057 TOTAL 1 1,960.00* 192058 STRUCTURE EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) CY 07 1 33.0 45.0000 1,485.00 UNIT TOTAL CY 1 33.0* 45.0000 1,485.00* ITEM CODE 192058 TOTAL 1 1,485.00* 192060 STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 1 829.0 29.0000 24,041.00 CY 12 1 240.0 53.0000 12,720.00 UNIT TOTAL CY 2 1,069.0* 34.3882 36,761.00* ITEM CODE 192060 TOTAL 2 36,761.00* 192502 SAND BEDDING

Page 88: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 84 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 192502 SAND BEDDING CY 02 1 75.0 75.0000 5,625.00 CY 03 2 105.0 66.1429 6,945.00 CY 04 2 40.0 166.7000 6,668.00 UNIT TOTAL CY 5 220.0* 87.4455 19,238.00* ITEM CODE 192502 TOTAL 5 19,238.00* 193001 STRUCTURE BACKFILL CY 02 1 54.0 140.0000 7,560.00 CY 03 1 146.0 200.0000 29,200.00 CY 04 3 378.0 94.6561 35,780.00 CY 07 4 2,977.0 95.4300 284,095.00 CY 08 1 10.0 282.0000 2,820.00 CY 10 1 12.0 500.0000 6,000.00 CY 12 1 3.0 447.0000 1,341.00 UNIT TOTAL CY 12 3,580.0* 102.4570 366,796.00* ITEM CODE 193001 TOTAL 12 366,796.00* 193003 STRUCTURE BACKFILL (BRIDGE) CY 01 4 161.0 475.7764 76,600.00 CY 02 3 1,152.0 116.5781 134,298.00 CY 03 1 341.0 160.0000 54,560.00 CY 04 6 6,177.0 94.4763 583,580.00 CY 05 4 6,799.0 91.1208 619,530.00 CY 06 4 733.0 153.6289 112,610.00 CY 07 2 10,642.0 83.9712 893,622.00 CY 08 3 1,827.0 119.1024 217,600.00 CY 10 3 163.0 183.9264 29,980.00 CY 11 1 247.0 67.0000 16,549.00 CY 12 1 621.0 65.0000 40,365.00 UNIT TOTAL CY 32 28,863.0* 96.2926 2,779,294.00* ITEM CODE 193003 TOTAL 32 2,779,294.00* 193004 STRUCTURE BACKFILL (CULVERT) CY 04 1 1.4 630.0000 882.00 CY 08 1 490.0 135.0000 66,150.00 CY 11 1 170.0 132.0000 22,440.00 UNIT TOTAL CY 3 661.4* 135.2767 89,472.00*

Page 89: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 85 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 193004 TOTAL 3 89,472.00* 193006 STRUCTURE BACKFILL (SLURRY CEMENT) CY 04 6 1,954.0 119.0745 232,671.50 CY 05 1 86.0 140.0000 12,040.00 UNIT TOTAL CY 7 2,040.0* 119.9566 244,711.50* ITEM CODE 193006 TOTAL 7 244,711.50* 193012 STRUCTURE BACKFILL (CRIB WALL) CY 01 1 1,253.0 120.0000 150,360.00 UNIT TOTAL CY 1 1,253.0* 120.0000 150,360.00* ITEM CODE 193012 TOTAL 1 150,360.00* 193013 STRUCTURE BACKFILL (RETAINING WALL) CY 03 2 1,333.0 145.7419 194,274.00 CY 04 3 11,273.0 87.3485 984,680.00 CY 05 2 9,122.0 78.1809 713,166.00 CY 07 5 34,503.0 69.5495 2,399,668.00 CY 08 1 650.0 55.0000 35,750.00 CY 10 3 3,439.0 88.3684 303,899.00 CY 11 3 5,803.0 45.2392 262,523.20 CY 12 4 4,676.0 41.7626 195,282.00 UNIT TOTAL CY 23 70,799.0* 71.8830 5,089,242.20* ITEM CODE 193013 TOTAL 23 5,089,242.20* 193027 STRUCTURE BACKFILL (GROUND ANCHOR WALL) CY 11 1 46.0 178.0000 8,188.00 CY 12 1 12.0 146.0000 1,752.00 UNIT TOTAL CY 2 58.0* 171.3793 9,940.00* ITEM CODE 193027 TOTAL 2 9,940.00* 193028 STRUCTURE BACKFILL (SOIL NAIL WALL) CY 01 1 4.0 630.0000 2,520.00 CY 03 1 40.0 100.0000 4,000.00 CY 04 1 450.0 200.0000 90,000.00

Page 90: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 86 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) STRUCTURE BACKFILL (SOIL NAIL WALL) CY 05 1 57.0 41.0000 2,337.00 CY 12 1 20.0 146.0000 2,920.00 UNIT TOTAL CY 5 571.0* 178.2434 101,777.00* ITEM CODE 193028 TOTAL 5 101,777.00* 193029 STRUCTURE BACKFILL (SOLDIER PILE WALL) CY 01 6 2,032.0 165.3670 336,025.68 CY 02 1 380.0 55.0000 20,900.00 CY 04 4 343.0 136.5773 46,846.00 CY 07 1 42.0 67.0000 2,814.00 CY 11 1 12.0 135.0000 1,620.00 UNIT TOTAL CY 13 2,809.0* 145.3206 408,205.68* ITEM CODE 193029 TOTAL 13 408,205.68* 193030 PERVIOUS BACKFILL MATERIAL CY 04 1 499.0 51.0500 25,473.95 UNIT TOTAL CY 1 499.0* 51.0500 25,473.95* ITEM CODE 193030 TOTAL 1 25,473.95* 193031 PERVIOUS BACKFILL MATERIAL (RETAINING WALL) CY 02 1 .6 1,000.0000 600.00 CY 03 2 161.0 169.0124 27,211.00 CY 04 1 340.0 85.0000 28,900.00 CY 05 1 221.0 66.0000 14,586.00 CY 06 1 2.0 874.0000 1,748.00 CY 07 3 297.0 133.3333 39,600.00 CY 10 2 195.0 147.6785 28,797.30 CY 11 3 158.0 109.4367 17,291.00 CY 12 2 109.0 109.1743 11,900.00 UNIT TOTAL CY 16 1,483.6* 115.0130 170,633.30* ITEM CODE 193031 TOTAL 16 170,633.30* 193116 CONCRETE BACKFILL (SOLDIER PILE WALL) CY 01 6 3,072.0 330.8617 1,016,407.25

Page 91: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 87 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) CONCRETE BACKFILL (SOLDIER PILE WALL) CY 02 1 51.0 440.0000 22,440.00 CY 04 4 1,045.0 222.6117 232,629.25 CY 07 1 67.0 187.0000 12,529.00 CY 11 1 38.0 160.0000 6,080.00 UNIT TOTAL CY 13 4,273.0* 301.9156 1,290,085.50* ITEM CODE 193116 TOTAL 13 1,290,085.50* 193118 CONCRETE BACKFILL CY 01 1 6.0 250.0000 1,500.00 UNIT TOTAL CY 1 6.0* 250.0000 1,500.00* ITEM CODE 193118 TOTAL 1 1,500.00* 193119 LEAN CONCRETE BACKFILL CY 01 6 1,523.0 283.3865 431,597.70 CY 02 1 17.0 440.0000 7,480.00 CY 04 5 234.0 231.4806 54,166.45 CY 07 1 125.0 187.0000 23,375.00 CY 11 1 24.0 140.0000 3,360.00 CY 12 1 30.0 192.8100 5,784.30 UNIT TOTAL CY 15 1,953.0* 269.2081 525,763.45* ITEM CODE 193119 TOTAL 15 525,763.45* 194001 DITCH EXCAVATION CY 01 5 266.0 98.1917 26,119.00 CY 02 4 227.0 90.5374 20,552.00 CY 03 2 749.0 22.0294 16,500.00 CY 04 12 2,860.8 59.3848 169,888.00 CY 05 4 2,865.0 46.6185 133,562.00 CY 06 1 2.7 325.0000 877.50 CY 07 6 1,633.5 40.0640 65,444.50 CY 08 1 2,600.0 12.0000 31,200.00 CY 10 1 34.0 60.0000 2,040.00 CY 11 1 70.0 71.0000 4,970.00 CY 12 2 129.0 87.9380 11,344.00 UNIT TOTAL CY 39 11,437.0* 42.1874 482,497.00* ITEM CODE 194001 TOTAL 39 482,497.00*

Page 92: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 88 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 198010 IMPORTED BORROW (CY) CY 01 5 14,177.0 20.9255 296,661.00 CY 02 3 7,405.0 7.8366 58,030.00 CY 03 7 316,156.0 16.9499 5,358,814.00 CY 04 10 125,662.0 2.5501 320,450.00 CY 05 6 63,990.0 3.4386 220,037.00 CY 06 3 22,880.0 12.2321 279,870.00 CY 07 5 140,079.0 8.9114 1,248,295.00 CY 08 7 687,565.0 11.2603 7,742,211.65 CY 09 2 747.0 95.2477 71,150.00 CY 10 5 79,080.0 17.6827 1,398,349.50 CY 11 3 18,597.0 1.4029 26,089.71 CY 12 6 14,228.0 3.5374 50,330.00 UNIT TOTAL CY 62 1,490,566.0* 11.4522 17,070,287.86* ITEM CODE 198010 TOTAL 62 17,070,287.86* 198011 IMPORTED BORROW (TON) TON 08 1 50.0 194.0000 9,700.00 UNIT TOTAL TON 1 50.0* 194.0000 9,700.00* ITEM CODE 198011 TOTAL 1 9,700.00* 198206 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS A1 SQYD 04 1 210,000.0 .8000 168,000.00 SQYD 07 1 4,940.0 1.9000 9,386.00 SQYD 10 2 105,940.0 1.0192 107,977.00 UNIT TOTAL SQYD 4 320,880.0* .8893 285,363.00* ITEM CODE 198206 TOTAL 4 285,363.00* 198208 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B1 SQYD 02 1 1,190.0 10.0000 11,900.00 SQYD 04 1 190.0 10.0000 1,900.00 UNIT TOTAL SQYD 2 1,380.0* 10.0000 13,800.00* ITEM CODE 198208 TOTAL 2 13,800.00* 198209 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2

Page 93: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 89 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 198209 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2 SQYD 01 2 12,730.0 3.2896 41,877.00 SQYD 04 1 300.0 3.0000 900.00 UNIT TOTAL SQYD 3 13,030.0* 3.2830 42,777.00* ITEM CODE 198209 TOTAL 3 42,777.00* 198210 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B3 SQYD 04 1 2,000.0 4.5000 9,000.00 SQYD 05 1 110.0 4.0000 440.00 UNIT TOTAL SQYD 2 2,110.0* 4.4739 9,440.00* ITEM CODE 198210 TOTAL 2 9,440.00* 198215 SUBGRADE ENHANCEMENT GEOGRID SQYD 07 1 4,720.0 6.0000 28,320.00 UNIT TOTAL SQYD 1 4,720.0* 6.0000 28,320.00* ITEM CODE 198215 TOTAL 1 28,320.00* 198250 GEOSYNTHETIC REINFORCEMENT SQYD 04 3 35,760.0 3.1465 112,520.00 UNIT TOTAL SQYD 3 35,760.0* 3.1465 112,520.00* ITEM CODE 198250 TOTAL 3 112,520.00* 200002 ROADSIDE CLEARING LS 02 1 2,000.00 LS 03 2 31,000.00 LS 04 10 142,165.00 LS 05 4 267,500.00 LS 06 2 10,500.00 LS 07 9 289,708.00 LS 08 4 51,241.00 LS 11 10 258,756.36 LS 12 10 366,336.00 UNIT TOTAL LS 52 1,419,206.36 ITEM CODE 200002 TOTAL 52 1,419,206.36*

Page 94: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 90 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 200052 PRUNE EXISTING PLANTS LS 04 3 5,050.00 LS 05 1 4,510.00 LS 10 1 2,500.00 LS 12 2 28,900.00 UNIT TOTAL LS 7 40,960.00 ITEM CODE 200052 TOTAL 7 40,960.00* 200114 ROCK BLANKET SQFT 02 1 99.0 60.0000 5,940.00 SQFT 03 3 24,500.0 3.9612 97,050.00 SQFT 05 2 3,600.0 34.2306 123,230.00 SQFT 06 4 189,870.0 13.5129 2,565,690.00 SQFT 07 5 185,463.0 11.4156 2,117,180.00 SQFT 08 2 197,800.0 8.0217 1,586,690.00 SQFT 11 2 32,100.0 14.3854 461,770.00 SQFT 12 4 45,800.0 8.9156 408,335.00 UNIT TOTAL SQFT 23 679,232.0* 10.8444 7,365,885.00* SQYD 08 1 140.0 100.0000 14,000.00 UNIT TOTAL SQYD 1 140.0* 100.0000 14,000.00* ITEM CODE 200114 TOTAL 24 7,379,885.00* 200122 WEED GERMINATION SQYD 02 1 1,980.0 .5000 990.00 SQYD 11 3 34,092.0 .4326 14,748.40 SQYD 12 1 18,100.0 .3500 6,335.00 UNIT TOTAL SQYD 5 54,172.0* .4075 22,073.40* ITEM CODE 200122 TOTAL 5 22,073.40* 200123 CULTIVATION SQYD 06 1 4,790.0 1.3000 6,227.00 SQYD 11 1 74.0 1.0000 74.00 UNIT TOTAL SQYD 2 4,864.0* 1.2954 6,301.00* ITEM CODE 200123 TOTAL 2 6,301.00* 202004 IRON SULFATE (LB)

Page 95: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 91 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 202004 IRON SULFATE (LB) LB 04 2 26.0 6.1538 160.00 LB 06 1 13.0 1.0000 13.00 LB 11 6 1,262.0 1.1440 1,443.71 LB 12 1 4,420.0 .7000 3,094.00 UNIT TOTAL LB 10 5,721.0* .8234 4,710.71* ITEM CODE 202004 TOTAL 10 4,710.71* 202006 SOIL AMENDMENT CY 03 1 4.0 220.0000 880.00 CY 04 8 53.0 191.9811 10,175.00 CY 05 1 6.0 100.0000 600.00 CY 06 3 73.6 165.5163 12,182.00 CY 07 5 192.0 71.7370 13,773.50 CY 10 1 7.0 120.0000 840.00 CY 12 8 992.0 37.5504 37,250.00 UNIT TOTAL CY 27 1,327.6* 57.0206 75,700.50* ITEM CODE 202006 TOTAL 27 75,700.50* 202027 RELOCATE WATER METER EA 04 1 3.0 9,000.0000 27,000.00 EA 11 1 9.0 1,514.0000 13,626.00 UNIT TOTAL EA 2 12.0* 3,385.5000 40,626.00* ITEM CODE 202027 TOTAL 2 40,626.00* 202028 RELOCATE IRRIGATION CONTROLLER EA 12 1 1.0 3,050.0000 3,050.00 UNIT TOTAL EA 1 1.0* 3,050.0000 3,050.00* ITEM CODE 202028 TOTAL 1 3,050.00* 202037 ORGANIC FERTILIZER LB 01 2 12.5 105.5968 1,319.96 LB 04 1 220.0 10.0000 2,200.00 LB 05 1 26.0 6.0000 156.00 LB 07 1 4,520.0 1.1000 4,972.00

Page 96: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 92 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ORGANIC FERTILIZER LB 12 1 4,800.0 .9300 4,464.00 UNIT TOTAL LB 6 9,578.5* 1.3689 13,111.96* ITEM CODE 202037 TOTAL 6 13,111.96* 202038 PACKET FERTILIZER EA 01 2 70.0 5.7500 402.50 EA 03 2 1,890.0 .5989 1,132.00 EA 04 4 3,190.0 .5241 1,672.00 EA 06 2 182.0 .4643 84.50 EA 07 2 1,000.0 1.8180 1,818.00 EA 10 1 630.0 .6000 378.00 EA 11 5 6,547.0 .2033 1,331.05 EA 12 1 39,200.0 .1300 5,096.00 UNIT TOTAL EA 19 52,709.0* .2260 11,914.05* ITEM CODE 202038 TOTAL 19 11,914.05* 202039 SLOW-RELEASE FERTILIZER LB 04 3 61.0 12.7541 778.00 LB 06 1 440.0 6.0000 2,640.00 LB 07 7 21,161.0 2.5653 54,285.25 LB 11 5 708.0 2.6175 1,853.16 LB 12 2 1,950.0 5.1500 10,042.50 UNIT TOTAL LB 18 24,320.0* 2.8618 69,598.91* ITEM CODE 202039 TOTAL 18 69,598.91* 204003 PLANT (GROUP C) EA 12 1 20.0 781.0000 15,620.00 UNIT TOTAL EA 1 20.0* 781.0000 15,620.00* ITEM CODE 204003 TOTAL 1 15,620.00* 204006 PLANT (GROUP F) EA 06 1 12,600.0 3.0000 37,800.00 EA 11 1 115,000.0 .6500 74,750.00 EA 12 4 177,000.0 .4889 86,531.00

Page 97: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 93 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 6 304,600.0* .6536 199,081.00* ITEM CODE 204006 TOTAL 6 199,081.00* 204008 PLANT (GROUP H) EA 01 2 70.0 57.1857 4,003.00 EA 04 1 230.0 55.0000 12,650.00 EA 07 6 939,450.0 .7900 742,130.50 EA 09 1 110.0 28.0000 3,080.00 EA 11 6 74,447.0 .6006 44,710.60 EA 12 2 524,200.0 .6744 353,498.00 UNIT TOTAL EA 18 1,538,507.0* .7540 1,160,072.10* ITEM CODE 204008 TOTAL 18 1,160,072.10* 204009 PLANT (GROUP I) EA 04 5 631.0 63.1347 39,838.00 EA 07 2 23,300.0 1.6189 37,720.00 UNIT TOTAL EA 7 23,931.0* 3.2409 77,558.00* ITEM CODE 204009 TOTAL 7 77,558.00* 204010 PLANT (GROUP O) EA 03 1 1,210.0 9.5000 11,495.00 UNIT TOTAL EA 1 1,210.0* 9.5000 11,495.00* ITEM CODE 204010 TOTAL 1 11,495.00* 204011 PLANT (GROUP K) EA 12 3 455.0 298.7649 135,938.04 UNIT TOTAL EA 3 455.0* 298.7649 135,938.04* ITEM CODE 204011 TOTAL 3 135,938.04* 204013 PLANT (GROUP M) EA 03 1 950.0 22.0000 20,900.00 EA 08 1 59,200.0 3.6500 216,080.00 EA 11 1 160.0 11.0000 1,760.00 EA 12 1 12,200.0 4.9500 60,390.00

Page 98: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 94 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 4 72,510.0* 4.1254 299,130.00* ITEM CODE 204013 TOTAL 4 299,130.00* 204030 TRANSPLANT TREE EA 08 1 27.0 1,000.0000 27,000.00 EA 12 1 3.0 3,000.0000 9,000.00 UNIT TOTAL EA 2 30.0* 1,200.0000 36,000.00* ITEM CODE 204030 TOTAL 2 36,000.00* 204035 PLANT (GROUP A) EA 01 2 183.0 33.8153 6,188.20 EA 04 4 1,113.0 16.8050 18,704.00 EA 05 1 72.0 10.0000 720.00 EA 06 1 52.0 25.0000 1,300.00 EA 07 9 24,310.0 7.5343 183,158.00 EA 10 1 540.0 13.5000 7,290.00 EA 11 1 3,020.0 8.6000 25,972.00 EA 12 7 46,954.0 6.1731 289,851.40 UNIT TOTAL EA 26 76,244.0* 6.9931 533,183.60* ITEM CODE 204035 TOTAL 26 533,183.60* 204036 PLANT (GROUP B) EA 01 1 63.0 52.4300 3,303.09 EA 03 1 22.0 440.0000 9,680.00 EA 04 3 585.0 48.1709 28,180.00 EA 07 5 281.0 35.6313 10,012.40 EA 10 1 30.0 68.0000 2,040.00 EA 11 3 730.0 27.7260 20,240.00 EA 12 5 688.0 26.9869 18,567.00 UNIT TOTAL EA 19 2,399.0* 38.3587 92,022.49* ITEM CODE 204036 TOTAL 19 92,022.49* 204038 PLANT (GROUP U) EA 01 1 38.0 153.8900 5,847.82 EA 03 1 5.0 990.0000 4,950.00 EA 04 2 159.0 152.7107 24,281.00 EA 05 1 29.0 120.0000 3,480.00

Page 99: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 95 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PLANT (GROUP U) EA 06 1 26.0 66.0000 1,716.00 EA 07 5 818.0 136.1528 111,373.00 EA 11 4 375.0 124.4048 46,651.80 EA 12 5 294.0 146.5034 43,072.00 UNIT TOTAL EA 20 1,744.0* 138.4012 241,371.62* ITEM CODE 204038 TOTAL 20 241,371.62* 204045 SOD SQYD 11 3 866.0 26.9561 23,344.00 SQYD 12 2 1,980.0 15.3015 30,297.00 UNIT TOTAL SQYD 5 2,846.0* 18.8479 53,641.00* ITEM CODE 204045 TOTAL 5 53,641.00* 204096 MAINTAIN EXISTING PLANTED AREAS LS 04 3 189,000.00 LS 06 2 35,580.00 LS 07 5 75,007.00 LS 10 1 2,500.00 LS 11 6 69,080.68 LS 12 9 198,340.00 UNIT TOTAL LS 26 569,507.68 ITEM CODE 204096 TOTAL 26 569,507.68* 204097 PLANT ESTABLISHMENT WORK (MINIMUM BID) LS 07 1 450,000.00 LS 12 1 250,000.00 UNIT TOTAL LS 2 700,000.00 ITEM CODE 204097 TOTAL 2 700,000.00* 204099 PLANT ESTABLISHMENT WORK LS 01 3 54,135.27 LS 03 2 44,417.00 LS 04 8 342,200.00 LS 05 1 100,000.00

Page 100: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 96 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PLANT ESTABLISHMENT WORK LS 06 3 42,025.00 LS 07 10 474,675.00 LS 08 2 60,000.00 LS 10 1 15,000.00 LS 11 10 333,541.36 LS 12 8 232,823.00 UNIT TOTAL LS 48 1,698,816.63 ITEM CODE 204099 TOTAL 48 1,698,816.63* 205033 GRAVEL MULCH SQFT 03 2 87,400.0 1.6899 147,700.00 SQFT 06 1 3,590.0 2.5000 8,975.00 SQFT 07 1 4,310.0 3.1500 13,576.50 SQFT 08 1 194,000.0 2.9000 562,600.00 SQFT 11 2 9,900.0 3.8293 37,910.00 SQFT 12 2 32,590.0 2.7265 88,856.70 UNIT TOTAL SQFT 9 331,790.0* 2.5909 859,618.20* ITEM CODE 205033 TOTAL 9 859,618.20* 205034 DECOMPOSED GRANITE SQFT 04 1 310.0 15.0000 4,650.00 SQFT 05 1 13,000.0 1.5000 19,500.00 SQFT 11 1 7,280.0 5.0000 36,400.00 UNIT TOTAL SQFT 3 20,590.0* 2.9407 60,550.00* ITEM CODE 205034 TOTAL 3 60,550.00* 205035 WOOD MULCH CY 01 11 495.0 147.3095 72,918.20 CY 02 6 3,365.0 37.1084 124,869.75 CY 03 5 804.0 83.1082 66,819.00 CY 04 8 2,606.0 44.3131 115,480.00 CY 05 2 4,360.0 60.9977 265,950.00 CY 06 10 4,200.0 59.2759 248,958.80 CY 07 11 12,161.0 42.2155 513,383.10 CY 10 4 3,463.0 35.4866 122,890.00 CY 11 9 4,286.6 48.8360 209,340.20 CY 12 11 16,695.0 42.7771 714,162.90

Page 101: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 97 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL CY 77 52,435.6* 46.8150 2,454,771.95* ITEM CODE 205035 TOTAL 77 2,454,771.95* 205051 FOLIAGE PROTECTOR EA 03 1 410.0 10.0000 4,100.00 EA 04 4 248.0 57.4395 14,245.00 EA 07 1 130.0 15.0000 1,950.00 EA 12 1 2,100.0 25.0000 52,500.00 UNIT TOTAL EA 7 2,888.0* 25.2060 72,795.00* ITEM CODE 205051 TOTAL 7 72,795.00* 205061 ROOT PROTECTOR EA 05 1 110.0 105.0000 11,550.00 EA 06 1 52.0 15.0000 780.00 UNIT TOTAL EA 2 162.0* 76.1111 12,330.00* ITEM CODE 205061 TOTAL 2 12,330.00* 205062 ROOT BARRIER LF 04 1 1,070.0 13.3000 14,231.00 LF 06 1 840.0 9.4500 7,938.00 LF 11 1 460.0 8.0000 3,680.00 LF 12 1 60.0 7.9000 474.00 UNIT TOTAL LF 4 2,430.0* 10.8325 26,323.00* ITEM CODE 205062 TOTAL 4 26,323.00* 206005 EDGING LF 03 1 750.0 27.0000 20,250.00 LF 04 1 160.0 15.0000 2,400.00 LF 11 1 11,700.0 5.8000 67,860.00 LF 12 1 430.0 10.6000 4,558.00 UNIT TOTAL LF 4 13,040.0* 7.2905 95,068.00* ITEM CODE 206005 TOTAL 4 95,068.00* 206400 CHECK AND TEST EXISTING IRRIGATION FACILITIES

Page 102: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 98 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 206400 CHECK AND TEST EXISTING IRRIGATION FACILITIES LS 03 2 8,860.00 LS 04 5 26,204.00 LS 05 3 26,800.00 LS 06 5 20,422.00 LS 07 7 99,709.00 LS 08 1 10,000.00 LS 10 2 16,207.00 LS 11 9 68,108.20 LS 12 10 82,457.00 UNIT TOTAL LS 44 358,767.20 ITEM CODE 206400 TOTAL 44 358,767.20* 206402 OPERATE EXISTING IRRIGATION FACILITIES LS 04 4 16,050.00 LS 06 4 9,850.00 LS 07 7 100,324.00 LS 10 1 2,300.00 LS 11 6 64,100.68 LS 12 10 87,733.00 UNIT TOTAL LS 32 280,357.68 ITEM CODE 206402 TOTAL 32 280,357.68* 206559 CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD) LS 04 3 110,884.00 LS 06 1 15,000.00 LS 08 1 10,000.00 UNIT TOTAL LS 5 135,884.00 ITEM CODE 206559 TOTAL 5 135,884.00* 206560 CONTROL AND NEUTRAL CONDUCTORS LS 04 1 500.00 LS 05 2 21,030.00 LS 06 1 6,240.00 LS 07 7 321,400.00 LS 10 1 13,553.00 LS 11 8 89,941.02 LS 12 8 231,669.53

Page 103: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 99 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LS 28 684,333.55 ITEM CODE 206560 TOTAL 28 684,333.55* 206561 3/4" REMOTE CONTROL VALVE EA 07 2 5.0 431.0000 2,155.00 UNIT TOTAL EA 2 5.0* 431.0000 2,155.00* ITEM CODE 206561 TOTAL 2 2,155.00* 206562 1" REMOTE CONTROL VALVE EA 04 2 53.0 430.8491 22,835.00 EA 06 1 1.0 2,000.0000 2,000.00 EA 07 6 104.0 408.5058 42,484.60 EA 11 7 36.0 437.6406 15,755.06 EA 12 3 75.0 377.4400 28,308.00 UNIT TOTAL EA 19 269.0* 414.0619 111,382.66* ITEM CODE 206562 TOTAL 19 111,382.66* 206563 1 1/4" REMOTE CONTROL VALVE EA 04 2 3.0 366.6667 1,100.00 EA 07 1 20.0 460.0000 9,200.00 UNIT TOTAL EA 3 23.0* 447.8261 10,300.00* ITEM CODE 206563 TOTAL 3 10,300.00* 206564 1 1/2" REMOTE CONTROL VALVE EA 04 2 22.0 435.9091 9,590.00 EA 05 1 1.0 500.0000 500.00 EA 06 1 1.0 525.0000 525.00 EA 07 6 351.0 405.8632 142,458.00 EA 08 1 1.0 436.0000 436.00 EA 11 6 89.0 559.0167 49,752.49 EA 12 3 192.0 392.4688 75,354.00 UNIT TOTAL EA 20 657.0* 424.0723 278,615.49* ITEM CODE 206564 TOTAL 20 278,615.49* 206565 2" REMOTE CONTROL VALVE

Page 104: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 100 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 206565 2" REMOTE CONTROL VALVE EA 04 1 9.0 470.0000 4,230.00 EA 07 3 37.0 397.4595 14,706.00 EA 08 1 12.0 478.0000 5,736.00 EA 12 7 213.0 432.4131 92,104.00 UNIT TOTAL EA 12 271.0* 430.9077 116,776.00* ITEM CODE 206565 TOTAL 12 116,776.00* 206567 3" REMOTE CONTROL VALVE EA 07 1 4.0 1,000.0000 4,000.00 UNIT TOTAL EA 1 4.0* 1,000.0000 4,000.00* ITEM CODE 206567 TOTAL 1 4,000.00* 206570 REMOTE CONTROL VALVE WITH FLOW SENSOR EA 04 1 1.0 2,060.0000 2,060.00 EA 12 1 4.0 1,260.0000 5,040.00 UNIT TOTAL EA 2 5.0* 1,420.0000 7,100.00* ITEM CODE 206570 TOTAL 2 7,100.00* 206631 1" WYE STRAINER ASSEMBLY EA 04 1 1.0 400.0000 400.00 UNIT TOTAL EA 1 1.0* 400.0000 400.00* ITEM CODE 206631 TOTAL 1 400.00* 206632 1 1/4" WYE STRAINER ASSEMBLY EA 04 1 1.0 500.0000 500.00 UNIT TOTAL EA 1 1.0* 500.0000 500.00* ITEM CODE 206632 TOTAL 1 500.00* 206633 1 1/2" WYE STRAINER ASSEMBLY EA 04 3 8.0 574.3750 4,595.00 EA 06 1 1.0 315.0000 315.00

Page 105: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 101 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 4 9.0* 545.5556 4,910.00* ITEM CODE 206633 TOTAL 4 4,910.00* 206634 2" WYE STRAINER ASSEMBLY EA 01 1 2.0 507.0000 1,014.00 EA 04 3 34.0 429.1176 14,590.00 UNIT TOTAL EA 4 36.0* 433.4444 15,604.00* ITEM CODE 206634 TOTAL 4 15,604.00* 206749 8 STATION IRRIGATION CONTROLLER (WALL MOUNTED) EA 07 2 2.0 5,777.5000 11,555.00 UNIT TOTAL EA 2 2.0* 5,777.5000 11,555.00* ITEM CODE 206749 TOTAL 2 11,555.00* 206751 12 STATION IRRIGATION CONTROLLER (WALL MOUNTED) EA 04 2 8.0 6,375.0000 51,000.00 UNIT TOTAL EA 2 8.0* 6,375.0000 51,000.00* ITEM CODE 206751 TOTAL 2 51,000.00* 206757 16-18 STATION IRRIGATION CONTROLLER (WALL MOUNTED) EA 04 1 2.0 5,300.0000 10,600.00 EA 07 4 22.0 8,843.7273 194,562.00 UNIT TOTAL EA 5 24.0* 8,548.4167 205,162.00* ITEM CODE 206757 TOTAL 5 205,162.00* 206758 24-32 STATION IRRIGATION CONTROLLER (WALL MOUNTED) EA 07 3 19.0 8,735.7895 165,980.00 UNIT TOTAL EA 3 19.0* 8,735.7895 165,980.00* ITEM CODE 206758 TOTAL 3 165,980.00* 206761 24-32 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED)

Page 106: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 102 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 206761 24-32 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED) EA 04 1 2.0 15,000.0000 30,000.00 UNIT TOTAL EA 1 2.0* 15,000.0000 30,000.00* ITEM CODE 206761 TOTAL 1 30,000.00* 206921 SOLAR POWERED IRRIGATION CONTROLLER EA 04 1 2.0 4,000.0000 8,000.00 UNIT TOTAL EA 1 2.0* 4,000.0000 8,000.00* ITEM CODE 206921 TOTAL 1 8,000.00* 206922 TWO-WIRE IRRIGATION CONTROLLER EA 12 1 2.0 10,400.0000 20,800.00 UNIT TOTAL EA 1 2.0* 10,400.0000 20,800.00* ITEM CODE 206922 TOTAL 1 20,800.00* 207055 2" COPPER PIPE (SUPPLY LINE) LF 07 1 90.0 32.5300 2,927.70 LF 11 1 12.0 70.0000 840.00 UNIT TOTAL LF 2 102.0* 36.9382 3,767.70* ITEM CODE 207055 TOTAL 2 3,767.70* 208003 1" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 07 1 20.0 15.7500 315.00 LF 12 1 60.0 5.6000 336.00 UNIT TOTAL LF 2 80.0* 8.1375 651.00* ITEM CODE 208003 TOTAL 2 651.00* 208004 1 1/4" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 12 1 20.0 7.7000 154.00 UNIT TOTAL LF 1 20.0* 7.7000 154.00* ITEM CODE 208004 TOTAL 1 154.00*

Page 107: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 103 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208005 1 1/2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 04 1 10.0 57.0000 570.00 LF 12 1 30.0 7.4000 222.00 UNIT TOTAL LF 2 40.0* 19.8000 792.00* ITEM CODE 208005 TOTAL 2 792.00* 208006 2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 04 1 130.0 25.0000 3,250.00 LF 07 3 365.0 72.0937 26,314.20 LF 12 1 20.0 8.6500 173.00 UNIT TOTAL LF 5 515.0* 57.7421 29,737.20* ITEM CODE 208006 TOTAL 5 29,737.20* 208007 2 1/2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 06 1 6.0 26.0000 156.00 UNIT TOTAL LF 1 6.0* 26.0000 156.00* ITEM CODE 208007 TOTAL 1 156.00* 208008 3" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 07 1 60.0 100.0000 6,000.00 LF 12 1 30.0 13.5000 405.00 UNIT TOTAL LF 2 90.0* 71.1667 6,405.00* ITEM CODE 208008 TOTAL 2 6,405.00* 208009 4" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 07 1 70.0 123.8600 8,670.20 LF 12 1 85.0 20.2500 1,721.25 UNIT TOTAL LF 2 155.0* 67.0416 10,391.45* ITEM CODE 208009 TOTAL 2 10,391.45* 208028 3" SUPPLY LINE (BRIDGE) LF 05 1 1,295.0 87.0000 112,665.00

Page 108: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 104 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 1 1,295.0* 87.0000 112,665.00* ITEM CODE 208028 TOTAL 1 112,665.00* 208029 4" SUPPLY LINE (BRIDGE) LF 11 1 781.0 171.0000 133,551.00 UNIT TOTAL LF 1 781.0* 171.0000 133,551.00* ITEM CODE 208029 TOTAL 1 133,551.00* 208220 1/2" DRIP IRRIGATION TUBING LF 12 1 5,500.0 3.0000 16,500.00 UNIT TOTAL LF 1 5,500.0* 3.0000 16,500.00* ITEM CODE 208220 TOTAL 1 16,500.00* 208222 5/8" DRIP IRRIGATION TUBING LF 01 1 1,930.0 2.5000 4,825.00 LF 04 1 282.0 7.0000 1,974.00 UNIT TOTAL LF 2 2,212.0* 3.0737 6,799.00* ITEM CODE 208222 TOTAL 2 6,799.00* 208301 IRRIGATION CONTROLLER ENCLOSURE CABINET EA 04 1 1.0 3,300.0000 3,300.00 EA 07 5 41.0 2,968.2927 121,700.00 EA 12 1 1.0 2,000.0000 2,000.00 UNIT TOTAL EA 7 43.0* 2,953.4884 127,000.00* ITEM CODE 208301 TOTAL 7 127,000.00* 208416 CERTIFY EXISTING BACKFLOW PREVENTERS LS 04 2 1,500.00 LS 11 1 400.00 LS 12 2 5,500.00 UNIT TOTAL LS 5 7,400.00 ITEM CODE 208416 TOTAL 5 7,400.00*

Page 109: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 105 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208423 1" BACKFLOW PREVENTER ASSEMBLY EA 07 1 1.0 3,675.0000 3,675.00 UNIT TOTAL EA 1 1.0* 3,675.0000 3,675.00* ITEM CODE 208423 TOTAL 1 3,675.00* 208425 1 1/2" BACKFLOW PREVENTER ASSEMBLY EA 04 1 1.0 4,080.0000 4,080.00 UNIT TOTAL EA 1 1.0* 4,080.0000 4,080.00* ITEM CODE 208425 TOTAL 1 4,080.00* 208426 2" BACKFLOW PREVENTER ASSEMBLY EA 04 1 4.0 4,600.0000 18,400.00 EA 06 1 1.0 7,600.0000 7,600.00 EA 07 4 23.0 3,800.3043 87,407.00 EA 11 2 3.0 3,866.6667 11,600.00 UNIT TOTAL EA 8 31.0* 4,032.4839 125,007.00* ITEM CODE 208426 TOTAL 8 125,007.00* 208428 3" BACKFLOW PREVENTER ASSEMBLY EA 07 2 6.0 5,731.3333 34,388.00 UNIT TOTAL EA 2 6.0* 5,731.3333 34,388.00* ITEM CODE 208428 TOTAL 2 34,388.00* 208440 BACKFLOW PREVENTER ENCLOSURE EA 04 1 4.0 3,000.0000 12,000.00 UNIT TOTAL EA 1 4.0* 3,000.0000 12,000.00* ITEM CODE 208440 TOTAL 1 12,000.00* 208442 FLOW SENSOR EA 04 1 9.0 750.0000 6,750.00 EA 07 5 37.0 758.2162 28,054.00 EA 11 2 3.0 1,180.0000 3,540.00

Page 110: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 106 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 8 49.0* 782.5306 38,344.00* ITEM CODE 208442 TOTAL 8 38,344.00* 208445 TREE WELL SPRINKLER ASSEMBLY EA 04 1 29.0 52.0000 1,508.00 EA 05 1 30.0 20.5000 615.00 EA 07 1 200.0 30.0000 6,000.00 EA 11 4 768.0 37.3516 28,686.00 EA 12 2 450.0 55.0667 24,780.00 UNIT TOTAL EA 9 1,477.0* 41.6987 61,589.00* ITEM CODE 208445 TOTAL 9 61,589.00* 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 06 1 21.0 307.0000 6,447.00 EA 07 5 3,161.0 41.5190 131,241.50 EA 11 6 542.0 45.4018 24,607.75 EA 12 7 2,487.0 34.5380 85,896.10 UNIT TOTAL EA 19 6,211.0* 39.9601 248,192.35* ITEM CODE 208446 TOTAL 19 248,192.35* 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 11 7 349.0 54.3266 18,960.00 EA 12 5 847.0 54.2229 45,926.80 UNIT TOTAL EA 12 1,196.0* 54.2532 64,886.80* ITEM CODE 208447 TOTAL 12 64,886.80* 208448 RISER SPRINKLER ASSEMBLY EA 01 1 660.0 24.0000 15,840.00 EA 04 8 2,024.0 24.1102 48,799.00 EA 06 1 39.0 120.0000 4,680.00 EA 07 7 2,925.0 28.2343 82,585.40 EA 10 1 600.0 23.0000 13,800.00 EA 11 2 59.0 47.1525 2,782.00 EA 12 8 3,425.0 32.2044 110,300.00 UNIT TOTAL EA 28 9,732.0* 28.6464 278,786.40* ITEM CODE 208448 TOTAL 28 278,786.40*

Page 111: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 107 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208449 POP-UP SPRINKLER ASSEMBLY EA 03 1 36.0 145.0000 5,220.00 EA 04 1 36.0 89.0000 3,204.00 EA 05 1 1.0 35.0000 35.00 EA 07 3 1,160.0 39.8724 46,252.00 EA 11 1 10.0 41.0000 410.00 EA 12 4 133.0 26.8609 3,572.50 UNIT TOTAL EA 11 1,376.0* 42.6552 58,693.50* ITEM CODE 208449 TOTAL 11 58,693.50* 208450 DRIP VALVE ASSEMBLY EA 04 1 1.0 300.0000 300.00 EA 12 5 36.0 618.8056 22,277.00 UNIT TOTAL EA 6 37.0* 610.1892 22,577.00* ITEM CODE 208450 TOTAL 6 22,577.00* 208562 CAM COUPLER ASSEMBLY EA 04 7 12.0 930.8333 11,170.00 EA 06 1 1.0 500.0000 500.00 EA 11 1 1.0 965.0000 965.00 EA 12 2 5.0 1,230.0000 6,150.00 UNIT TOTAL EA 11 19.0* 988.6842 18,785.00* ITEM CODE 208562 TOTAL 11 18,785.00* 208572 1" GATE VALVE EA 07 1 2.0 210.0000 420.00 EA 11 1 2.0 150.0000 300.00 UNIT TOTAL EA 2 4.0* 180.0000 720.00* ITEM CODE 208572 TOTAL 2 720.00* 208573 1 1/4" GATE VALVE EA 07 1 5.0 370.0000 1,850.00 UNIT TOTAL EA 1 5.0* 370.0000 1,850.00* ITEM CODE 208573 TOTAL 1 1,850.00*

Page 112: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 108 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208574 1 1/2" GATE VALVE EA 04 1 1.0 250.0000 250.00 EA 07 1 1.0 400.0000 400.00 EA 11 2 11.0 390.9091 4,300.00 UNIT TOTAL EA 4 13.0* 380.7692 4,950.00* ITEM CODE 208574 TOTAL 4 4,950.00* 208575 2" GATE VALVE EA 02 1 2.0 500.0000 1,000.00 EA 04 2 27.0 537.4815 14,512.00 EA 06 2 4.0 512.5000 2,050.00 EA 07 3 41.0 396.3415 16,250.00 EA 11 8 40.0 510.5345 20,421.38 EA 12 1 1.0 507.0000 507.00 UNIT TOTAL EA 17 115.0* 476.0033 54,740.38* ITEM CODE 208575 TOTAL 17 54,740.38* 208576 2 1/2" GATE VALVE EA 08 1 2.0 500.0000 1,000.00 UNIT TOTAL EA 1 2.0* 500.0000 1,000.00* ITEM CODE 208576 TOTAL 1 1,000.00* 208588 3" GATE VALVE EA 06 1 1.0 1,120.0000 1,120.00 EA 07 1 12.0 900.0000 10,800.00 EA 08 1 1.0 800.0000 800.00 EA 11 7 25.0 1,003.1884 25,079.71 EA 12 1 12.0 671.0000 8,052.00 UNIT TOTAL EA 11 51.0* 899.0531 45,851.71* ITEM CODE 208588 TOTAL 11 45,851.71* 208589 4" GATE VALVE EA 04 1 1.0 3,000.0000 3,000.00 EA 12 2 25.0 843.4400 21,086.00 UNIT TOTAL EA 3 26.0* 926.3846 24,086.00*

Page 113: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 109 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 208589 TOTAL 3 24,086.00* 208590 6" GATE VALVE EA 04 1 5.0 4,000.0000 20,000.00 EA 07 1 1.0 5,250.0000 5,250.00 UNIT TOTAL EA 2 6.0* 4,208.3333 25,250.00* ITEM CODE 208590 TOTAL 2 25,250.00* 208591 8" GATE VALVE EA 04 1 4.0 5,000.0000 20,000.00 UNIT TOTAL EA 1 4.0* 5,000.0000 20,000.00* ITEM CODE 208591 TOTAL 1 20,000.00* 208594 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 02 1 720.0 19.5000 14,040.00 LF 03 1 90.0 8.0000 720.00 LF 04 8 21,895.0 6.3043 138,032.75 LF 06 3 2,985.0 9.8677 29,455.00 LF 07 7 73,980.0 3.0685 227,009.85 LF 10 1 5,408.0 2.4000 12,979.20 LF 12 4 10,980.0 2.9685 32,594.50 UNIT TOTAL LF 25 116,058.0* 3.9190 454,831.30* ITEM CODE 208594 TOTAL 25 454,831.30* 208595 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 02 1 1,810.0 9.5000 17,195.00 LF 03 1 65.0 9.0000 585.00 LF 04 8 6,560.0 6.9371 45,507.50 LF 05 2 400.0 6.5250 2,610.00 LF 06 3 1,198.0 19.6014 23,482.45 LF 07 7 32,784.0 3.4171 112,027.40 LF 10 1 189.0 4.5000 850.50 LF 11 11 32,198.0 3.6459 117,389.75 LF 12 11 116,236.0 2.5801 299,895.75 UNIT TOTAL LF 45 191,440.0* 3.2362 619,543.35* ITEM CODE 208595 TOTAL 45 619,543.35*

Page 114: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 110 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208596 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 02 1 1,320.0 11.5000 15,180.00 LF 03 1 180.0 10.0000 1,800.00 LF 04 7 7,546.0 7.3752 55,653.25 LF 06 1 62.0 8.7500 542.50 LF 07 6 53,295.0 3.4823 185,590.95 LF 10 1 147.0 7.0000 1,029.00 LF 11 10 12,070.0 4.9592 59,857.85 LF 12 7 42,261.0 2.4434 103,259.25 UNIT TOTAL LF 34 116,881.0* 3.6183 422,912.80* ITEM CODE 208596 TOTAL 34 422,912.80* 208597 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 02 1 510.0 27.6000 14,076.00 LF 03 1 140.0 11.0000 1,540.00 LF 04 9 9,465.0 7.3735 69,789.75 LF 05 1 64.0 10.0000 640.00 LF 06 2 995.0 9.6683 9,620.00 LF 07 6 45,295.0 3.4901 158,082.40 LF 10 1 48.0 12.0000 576.00 LF 11 8 5,389.0 6.7658 36,460.80 LF 12 9 31,833.0 3.4004 108,246.00 UNIT TOTAL LF 38 93,739.0* 4.2568 399,030.95* ITEM CODE 208597 TOTAL 38 399,030.95* 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 01 2 219.0 5.4795 1,200.00 LF 02 1 4.0 25.0000 100.00 LF 03 2 274.0 42.9927 11,780.00 LF 04 5 7,509.0 8.6072 64,631.50 LF 05 2 476.0 12.5798 5,988.00 LF 07 6 69,159.0 5.6820 392,959.35 LF 08 2 7,470.0 5.6513 42,215.00 LF 11 7 7,153.0 6.9091 49,420.55 LF 12 9 57,165.0 3.8055 217,541.80 UNIT TOTAL LF 36 149,429.0* 5.2589 785,836.20* ITEM CODE 208598 TOTAL 36 785,836.20* 208599 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)

Page 115: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 111 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208599 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 07 1 565.0 7.8000 4,407.00 LF 08 2 7,330.0 6.9119 50,664.00 LF 10 1 920.0 50.2500 46,230.00 LF 12 1 570.0 3.4000 1,938.00 UNIT TOTAL LF 5 9,385.0* 11.0004 103,239.00* ITEM CODE 208599 TOTAL 5 103,239.00* 208600 3" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 07 3 21,682.0 6.3688 138,088.50 LF 08 1 74.0 16.0000 1,184.00 UNIT TOTAL LF 4 21,756.0* 6.4016 139,272.50* ITEM CODE 208600 TOTAL 4 139,272.50* 208601 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 04 1 520.0 25.0000 13,000.00 LF 07 1 8.0 615.0000 4,920.00 LF 12 1 400.0 7.2500 2,900.00 UNIT TOTAL LF 3 928.0* 22.4353 20,820.00* ITEM CODE 208601 TOTAL 3 20,820.00* 208602 6" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 07 3 1,211.0 35.8898 43,462.50 LF 12 1 72.0 25.0000 1,800.00 UNIT TOTAL LF 4 1,283.0* 35.2786 45,262.50* ITEM CODE 208602 TOTAL 4 45,262.50* 208603 8" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 07 1 123.0 465.0000 57,195.00 UNIT TOTAL LF 1 123.0* 465.0000 57,195.00* ITEM CODE 208603 TOTAL 1 57,195.00* 208604 10" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)

Page 116: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 112 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208604 10" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 07 1 68.0 365.0000 24,820.00 UNIT TOTAL LF 1 68.0* 365.0000 24,820.00* ITEM CODE 208604 TOTAL 1 24,820.00* 208605 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 02 2 4,910.0 13.3992 65,790.00 LF 03 1 140.0 12.0000 1,680.00 LF 04 2 13,119.0 9.0381 118,571.00 LF 05 2 3,424.0 28.2056 96,576.00 LF 06 2 300.0 16.1667 4,850.00 LF 10 1 261.0 6.0000 1,566.00 LF 11 2 2,129.0 6.9037 14,698.00 LF 12 1 3,690.0 5.6500 20,848.50 UNIT TOTAL LF 13 27,973.0* 11.6033 324,579.50* ITEM CODE 208605 TOTAL 13 324,579.50* 208606 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 04 1 1,323.0 9.5000 12,568.50 LF 06 1 1,880.0 11.0000 20,680.00 LF 10 1 452.0 5.5000 2,486.00 LF 11 3 1,405.0 7.5441 10,599.50 UNIT TOTAL LF 6 5,060.0* 9.1569 46,334.00* ITEM CODE 208606 TOTAL 6 46,334.00* 208607 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 03 1 40.0 13.0000 520.00 LF 04 1 40.0 2.0000 80.00 LF 05 1 1,350.0 43.0000 58,050.00 LF 06 3 1,030.0 20.4175 21,030.00 LF 11 9 15,231.0 8.9936 136,981.40 LF 12 5 19,745.0 6.0717 119,884.95 UNIT TOTAL LF 20 37,436.0* 8.9899 336,546.35* ITEM CODE 208607 TOTAL 20 336,546.35* 208608 4" PLASTIC PIPE (CLASS 315) (SUPPLY LINE)

Page 117: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 113 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 208608 4" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 03 1 31.0 15.0000 465.00 LF 12 2 22,770.0 7.8865 179,575.90 UNIT TOTAL LF 3 22,801.0* 7.8962 180,040.90* ITEM CODE 208608 TOTAL 3 180,040.90* 208609 6" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 12 1 30.0 12.6400 379.20 UNIT TOTAL LF 1 30.0* 12.6400 379.20* ITEM CODE 208609 TOTAL 1 379.20* 208640 PRESSURE REGULATING VALVE EA 11 2 3.0 1,433.3333 4,300.00 EA 12 2 5.0 1,089.2000 5,446.00 UNIT TOTAL EA 4 8.0* 1,218.2500 9,746.00* ITEM CODE 208640 TOTAL 4 9,746.00* 208649 QUICK COUPLING VALVE EA 04 4 40.0 295.3250 11,813.00 EA 11 1 1.0 400.0000 400.00 UNIT TOTAL EA 5 41.0* 297.8780 12,213.00* ITEM CODE 208649 TOTAL 5 12,213.00* 208670 CHECK VALVE EA 06 1 1.0 1,400.0000 1,400.00 EA 10 1 7.0 175.0000 1,225.00 EA 12 1 18.0 95.0000 1,710.00 UNIT TOTAL EA 3 26.0* 166.7308 4,335.00* ITEM CODE 208670 TOTAL 3 4,335.00* 208683 BALL VALVE EA 03 1 2.0 1,000.0000 2,000.00

Page 118: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 114 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) BALL VALVE EA 04 5 46.0 311.7391 14,340.00 EA 05 1 1.0 500.0000 500.00 EA 07 6 160.0 412.4000 65,984.00 EA 11 2 8.0 770.6250 6,165.00 EA 12 7 139.0 506.2371 70,366.96 UNIT TOTAL EA 22 356.0* 447.6291 159,355.96* ITEM CODE 208683 TOTAL 22 159,355.96* 208690 PVC PIPE CONDUIT (SLEEVE) LF 11 1 274.0 25.0000 6,850.00 LF 12 1 120.0 14.0000 1,680.00 UNIT TOTAL LF 2 394.0* 21.6497 8,530.00* ITEM CODE 208690 TOTAL 2 8,530.00* 208738 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 02 1 1,580.0 96.0000 151,680.00 LF 03 1 26.0 330.0000 8,580.00 LF 04 3 1,250.0 73.6720 92,090.00 LF 05 1 1,140.0 119.0000 135,660.00 LF 06 2 220.0 82.4091 18,130.00 LF 07 1 170.0 76.5000 13,005.00 LF 11 3 329.0 101.9757 33,550.00 LF 12 2 135.0 47.4074 6,400.00 UNIT TOTAL LF 14 4,850.0* 94.6588 459,095.00* ITEM CODE 208738 TOTAL 14 459,095.00* 208739 10" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 05 1 900.0 121.0000 108,900.00 LF 11 3 1,193.0 103.2523 123,180.00 UNIT TOTAL LF 4 2,093.0* 110.8839 232,080.00* ITEM CODE 208739 TOTAL 4 232,080.00* 208740 12" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 03 1 6.0 340.0000 2,040.00

Page 119: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 115 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 12" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 06 1 76.0 190.0000 14,440.00 LF 10 1 730.0 57.0000 41,610.00 LF 12 1 110.0 25.9500 2,854.50 UNIT TOTAL LF 4 922.0* 66.1003 60,944.50* ITEM CODE 208740 TOTAL 4 60,944.50* 208756 6" CORRUGATED STEEL PIPE CONDUIT (.064" THICK) LF 01 1 38.0 25.0000 950.00 LF 12 1 20.0 138.0000 2,760.00 UNIT TOTAL LF 2 58.0* 63.9655 3,710.00* ITEM CODE 208756 TOTAL 2 3,710.00* 208758 8" CORRUGATED STEEL PIPE CONDUIT (.064" THICK) LF 12 1 250.0 65.0000 16,250.00 UNIT TOTAL LF 1 250.0* 65.0000 16,250.00* ITEM CODE 208758 TOTAL 1 16,250.00* 208813 1 1/4" WELDED STEEL PIPE CONDUIT LF 12 1 510.0 56.0000 28,560.00 UNIT TOTAL LF 1 510.0* 56.0000 28,560.00* ITEM CODE 208813 TOTAL 1 28,560.00* 208815 2" WELDED STEEL PIPE CONDUIT LF 05 1 110.0 35.0000 3,850.00 UNIT TOTAL LF 1 110.0* 35.0000 3,850.00* ITEM CODE 208815 TOTAL 1 3,850.00* 208817 4" WELDED STEEL PIPE CONDUIT LF 04 1 80.0 100.0000 8,000.00 UNIT TOTAL LF 1 80.0* 100.0000 8,000.00*

Page 120: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 116 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 208817 TOTAL 1 8,000.00* 208818 6" WELDED STEEL PIPE CONDUIT LF 06 1 38.0 160.0000 6,080.00 LF 07 2 1,040.0 149.3288 155,302.00 LF 12 1 18.0 450.0000 8,100.00 UNIT TOTAL LF 4 1,096.0* 154.6369 169,482.00* ITEM CODE 208818 TOTAL 4 169,482.00* 208819 8" WELDED STEEL PIPE CONDUIT LF 04 2 345.0 113.7101 39,230.00 UNIT TOTAL LF 2 345.0* 113.7101 39,230.00* ITEM CODE 208819 TOTAL 2 39,230.00* 208820 10" WELDED STEEL PIPE CONDUIT LF 07 1 200.0 339.0000 67,800.00 UNIT TOTAL LF 1 200.0* 339.0000 67,800.00* ITEM CODE 208820 TOTAL 1 67,800.00* 208821 12" WELDED STEEL PIPE CONDUIT LF 05 2 265.0 367.9245 97,500.00 UNIT TOTAL LF 2 265.0* 367.9245 97,500.00* ITEM CODE 208821 TOTAL 2 97,500.00* 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 01 5 14.0 1,580.0000 22,120.00 EA 03 3 9.0 1,510.0000 13,590.00 EA 04 6 30.0 768.3333 23,050.00 EA 05 8 32.0 866.0000 27,712.00 EA 06 4 10.0 1,049.8000 10,498.00 EA 07 1 1.0 500.0000 500.00 EA 08 5 32.0 944.3750 30,220.00 EA 10 8 27.0 1,010.9630 27,296.00 EA 11 1 2.0 500.0000 1,000.00 EA 12 3 13.0 511.5385 6,650.00

Page 121: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 117 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 44 170.0* 956.6824 162,636.00* ITEM CODE 210010 TOTAL 44 162,636.00* 210110 IMPORTED TOPSOIL (CY) CY 01 3 269.0 112.7323 30,325.00 CY 02 1 150.0 75.0000 11,250.00 CY 03 1 5,880.0 35.0000 205,800.00 CY 04 3 1,583.9 78.1173 123,730.00 CY 05 3 2,270.0 75.8359 172,147.50 CY 07 1 120.0 110.0000 13,200.00 CY 11 1 19.0 62.0000 1,178.00 CY 12 1 1,130.0 36.0000 40,680.00 UNIT TOTAL CY 14 11,421.9* 52.3827 598,310.50* ITEM CODE 210110 TOTAL 14 598,310.50* 210130 DUFF ACRE 05 2 3.7 6,591.8919 24,390.00 ACRE 08 5 328.0 682.6220 223,900.00 ACRE 11 1 1.4 17,554.2071 24,575.89 UNIT TOTAL ACRE 8 333.1* 819.1711 272,865.89* ITEM CODE 210130 TOTAL 8 272,865.89* 210210 EROSION CONTROL (DRY SEED) (SQFT) SQFT 02 1 690.0 2.0000 1,380.00 SQFT 03 2 18,800.0 .2996 5,632.00 SQFT 04 4 24,520.0 .4156 10,190.30 SQFT 05 1 23,300.0 .6200 14,446.00 SQFT 06 3 27,880.0 .4969 13,854.80 SQFT 08 5 3,625,100.0 .0634 229,770.00 SQFT 09 1 12,100.0 .3500 4,235.00 SQFT 10 5 775,900.0 .0358 27,763.00 SQFT 11 5 65,030.0 .2835 18,433.00 UNIT TOTAL SQFT 27 4,573,320.0* .0712 325,704.10* ITEM CODE 210210 TOTAL 27 325,704.10* 210211 EROSION CONTROL (DRY SEED) (ACRE) ACRE 09 1 31.0 2,500.0000 77,500.00

Page 122: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 118 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL ACRE 1 31.0* 2,500.0000 77,500.00* ITEM CODE 210211 TOTAL 1 77,500.00* 210220 EROSION CONTROL (DRILL SEED) (SQYD) SQYD 05 1 22,900.0 .3600 8,244.00 SQYD 06 1 462,000.0 .1900 87,780.00 SQYD 10 1 49,700.0 .2100 10,437.00 UNIT TOTAL SQYD 3 534,600.0* .1991 106,461.00* ITEM CODE 210220 TOTAL 3 106,461.00* 210250 EROSION CONTROL (BONDED FIBER MATRIX) (SQFT) SQFT 01 7 264,450.0 .2781 73,550.00 SQFT 02 5 1,435,100.0 .1881 269,922.00 SQFT 03 6 1,453,000.0 .1972 286,463.00 SQFT 06 2 16,790.0 .4770 8,008.00 SQFT 07 1 247,000.0 .0700 17,290.00 SQFT 08 1 1,000.0 6.0000 6,000.00 SQFT 10 1 12,000.0 .4000 4,800.00 SQFT 11 6 451,340.0 .1539 69,481.00 SQFT 12 5 1,827,500.0 .0909 166,172.00 UNIT TOTAL SQFT 34 5,708,180.0* .1580 901,686.00* ITEM CODE 210250 TOTAL 34 901,686.00* 210251 EROSION CONTROL (BONDED FIBER MATRIX) (ACRE) ACRE 08 3 276.0 2,943.6957 812,460.00 ACRE 09 1 31.0 900.0000 27,900.00 UNIT TOTAL ACRE 4 307.0* 2,737.3290 840,360.00* ITEM CODE 210251 TOTAL 4 840,360.00* 210260 ROLLED EROSION CONTROL PRODUCT (JUTE MESH) SQFT 01 4 47,120.0 1.3506 63,638.00 SQFT 07 1 6,050.0 1.7000 10,285.00 UNIT TOTAL SQFT 5 53,170.0* 1.3903 73,923.00* ITEM CODE 210260 TOTAL 5 73,923.00* 210270 ROLLED EROSION CONTROL PRODUCT (NETTING)

Page 123: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 119 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 210270 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 01 7 96,730.0 1.0494 101,508.30 SQFT 02 3 29,090.0 1.0049 29,233.00 SQFT 03 5 707,400.0 .3311 234,207.00 SQFT 04 19 379,440.0 .7409 281,111.00 SQFT 05 5 968,600.0 .4837 468,543.00 SQFT 06 1 6,200.0 .9000 5,580.00 SQFT 10 1 39,500.0 1.0500 41,475.00 SQFT 11 1 35,300.0 .6000 21,180.00 SQFT 12 2 395,900.0 .3825 151,421.00 UNIT TOTAL SQFT 44 2,658,160.0* .5019 1,334,258.30* ITEM CODE 210270 TOTAL 44 1,334,258.30* 210280 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 02 1 350.0 4.2000 1,470.00 SQFT 03 2 18,800.0 .6529 12,274.00 SQFT 04 1 120.0 5.0000 600.00 SQFT 08 1 533,000.0 .4000 213,200.00 UNIT TOTAL SQFT 5 552,270.0* .4120 227,544.00* ITEM CODE 210280 TOTAL 5 227,544.00* 210290 ROLLED EROSION CONTROL PRODUCT (TRM) SQFT 03 1 220.0 7.2500 1,595.00 UNIT TOTAL SQFT 1 220.0* 7.2500 1,595.00* ITEM CODE 210290 TOTAL 1 1,595.00* 210300 HYDROMULCH SQFT 01 13 427,470.0 .1634 69,839.00 SQFT 03 1 162,000.0 .0300 4,860.00 SQFT 04 18 1,539,350.0 .0475 73,163.80 SQFT 05 5 2,554,100.0 .0259 66,056.00 SQFT 06 11 7,754,220.0 .0290 225,224.20 SQFT 07 4 198,440.0 .0584 11,594.90 SQFT 08 7 3,968,600.0 .0398 157,842.00 SQFT 10 12 2,744,480.0 .0341 93,512.00 SQFT 12 1 79,900.0 .0800 6,392.00 UNIT TOTAL SQFT 72 19,428,560.0* .0365 708,483.90*

Page 124: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 120 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 210300 TOTAL 72 708,483.90* 210350 FIBER ROLLS LF 01 9 17,140.0 5.2766 90,441.00 LF 03 5 22,710.0 2.7874 63,301.00 LF 04 20 178,380.0 2.6270 468,604.10 LF 05 3 19,140.0 2.7727 53,069.00 LF 06 2 1,980.0 4.0000 7,920.00 LF 08 3 42,044.0 2.9990 126,088.00 LF 10 5 22,850.0 3.5701 81,576.20 LF 11 1 2,070.0 3.0000 6,210.00 LF 12 2 27,500.0 2.1512 59,158.00 UNIT TOTAL LF 50 333,814.0* 2.8650 956,367.30* ITEM CODE 210350 TOTAL 50 956,367.30* 210360 COMPOST SOCK LF 01 3 13,930.0 11.4133 158,987.00 LF 02 1 2,910.0 4.5000 13,095.00 LF 04 1 530.0 7.5000 3,975.00 LF 05 4 23,290.0 6.9784 162,526.30 LF 11 9 35,300.0 6.9548 245,504.40 LF 12 1 39,800.0 3.4200 136,116.00 UNIT TOTAL LF 19 115,760.0* 6.2215 720,203.70* ITEM CODE 210360 TOTAL 19 720,203.70* 210420 STRAW SQFT 01 12 373,970.0 .0971 36,316.00 SQFT 02 2 31,350.0 .1054 3,303.00 SQFT 03 1 53,900.0 .1000 5,390.00 SQFT 04 2 262,300.0 .0323 8,484.00 SQFT 05 2 2,155,000.0 .0263 56,750.00 SQFT 10 2 482,800.0 .0407 19,670.00 UNIT TOTAL SQFT 21 3,359,320.0* .0387 129,913.00* ITEM CODE 210420 TOTAL 21 129,913.00* 210430 HYDROSEED SQFT 01 13 427,470.0 .2576 110,106.00 SQFT 02 2 149,600.0 .2105 31,498.00

Page 125: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 121 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) HYDROSEED SQFT 03 1 22,400.0 .4500 10,080.00 SQFT 04 19 1,540,790.0 .1291 198,949.60 SQFT 05 10 8,972,400.0 .0651 583,683.00 SQFT 06 9 3,534,480.0 .0488 172,628.00 SQFT 07 4 446,050.0 .0871 38,864.50 SQFT 08 6 990,300.0 .1321 130,791.00 SQFT 10 8 1,651,180.0 .0342 56,439.00 SQFT 11 1 4,830.0 .2000 966.00 SQFT 12 2 89,460.0 .2804 25,082.20 UNIT TOTAL SQFT 75 17,828,960.0* .0762 1,359,087.30* ITEM CODE 210430 TOTAL 75 1,359,087.30* 210600 COMPOST SQFT 01 5 123,870.0 .6433 79,689.60 SQFT 02 3 65,350.0 .4870 31,828.00 SQFT 03 4 208,000.0 .3321 69,068.00 SQFT 04 19 954,300.0 .2417 230,667.00 SQFT 05 7 748,200.0 .3020 225,931.00 SQFT 06 8 1,873,240.0 .1072 200,832.40 SQFT 07 7 520,320.0 .1233 64,147.00 SQFT 08 5 3,625,100.0 .1594 577,678.00 SQFT 10 10 1,965,500.0 .1432 281,379.00 SQFT 11 7 270,600.0 .3133 84,767.00 SQFT 12 3 354,900.0 .1998 70,907.00 UNIT TOTAL SQFT 78 10,709,380.0* .1790 1,916,894.00* ITEM CODE 210600 TOTAL 78 1,916,894.00* 210630 INCORPORATE MATERIALS SQFT 01 6 136,500.0 .1472 20,092.20 SQFT 02 2 22,550.0 .3632 8,190.00 SQFT 03 3 36,660.0 .4243 15,556.00 SQFT 04 9 180,040.0 .1569 28,250.00 SQFT 05 6 2,546,800.0 .0333 84,750.00 SQFT 06 6 1,853,500.0 .0391 72,414.00 SQFT 07 5 235,495.0 .1777 41,835.90 SQFT 08 2 2,304,000.0 .0510 117,480.00 SQFT 10 1 4,380.0 .9000 3,942.00 SQFT 11 7 222,190.0 .2858 63,493.00 SQFT 12 2 340,400.0 .0886 30,160.00 UNIT TOTAL SQFT 49 7,882,515.0* .0617 486,163.10*

Page 126: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 122 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 210630 TOTAL 49 486,163.10* 220101 FINISHING ROADWAY LS 01 1 37,000.00 LS 02 8 83,960.00 LS 03 2 150,000.00 UNIT TOTAL LS 11 270,960.00 ITEM CODE 220101 TOTAL 11 270,960.00* 250101 CLASS 1 AGGREGATE SUBBASE CY 05 4 221,530.0 24.0902 5,336,699.00 UNIT TOTAL CY 4 221,530.0* 24.0902 5,336,699.00* ITEM CODE 250101 TOTAL 4 5,336,699.00* 250201 CLASS 2 AGGREGATE SUBBASE CY 04 1 350.0 95.0000 33,250.00 CY 05 1 41.0 162.0000 6,642.00 CY 06 2 8,720.0 33.1537 289,100.00 CY 12 3 21,670.0 21.8091 472,603.40 UNIT TOTAL CY 7 30,781.0* 26.0419 801,595.40* ITEM CODE 250201 TOTAL 7 801,595.40* 250301 CLASS 3 AGGREGATE SUBBASE CY 10 1 650.0 80.4500 52,292.50 CY 12 3 12,670.0 43.3587 549,354.50 UNIT TOTAL CY 4 13,320.0* 45.1687 601,647.00* ITEM CODE 250301 TOTAL 4 601,647.00* 250401 CLASS 4 AGGREGATE SUBBASE CY 04 3 14,220.0 27.8970 396,696.00 CY 11 1 690.0 32.2000 22,218.00 UNIT TOTAL CY 4 14,910.0* 28.0962 418,914.00* ITEM CODE 250401 TOTAL 4 418,914.00*

Page 127: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 123 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 260200 AGGREGATE BASE CY 12 1 150.0 300.0000 45,000.00 UNIT TOTAL CY 1 150.0* 300.0000 45,000.00* ITEM CODE 260200 TOTAL 1 45,000.00* 260203 CLASS 2 AGGREGATE BASE (CY) CY 01 19 20,695.0 56.8162 1,175,812.26 CY 02 13 32,213.0 53.2855 1,716,485.60 CY 03 12 43,146.0 59.4590 2,565,420.00 CY 04 11 23,052.0 47.4503 1,093,825.31 CY 05 10 88,792.0 48.7933 4,332,455.00 CY 06 10 64,604.0 35.3299 2,282,450.00 CY 07 1 330.0 110.0000 36,300.00 CY 08 16 53,157.0 44.5425 2,367,745.50 CY 10 16 62,218.0 33.0507 2,056,347.00 CY 11 14 68,359.0 40.0710 2,739,216.90 CY 12 7 22,304.0 28.9303 645,260.70 UNIT TOTAL CY 129 478,870.0* 43.8769 21,011,318.27* ITEM CODE 260203 TOTAL 129 21,011,318.27* 260302 CLASS 3 AGGREGATE BASE (TON) TON 04 1 64.0 203.0000 12,992.00 UNIT TOTAL TON 1 64.0* 203.0000 12,992.00* ITEM CODE 260302 TOTAL 1 12,992.00* 260303 CLASS 3 AGGREGATE BASE (CY) CY 04 2 329.0 121.7325 40,050.00 CY 07 15 115,162.0 33.6269 3,872,542.00 UNIT TOTAL CY 17 115,491.0* 33.8779 3,912,592.00* ITEM CODE 260303 TOTAL 17 3,912,592.00* 280000 LEAN CONCRETE BASE CY 04 2 620.0 470.0565 291,435.00 CY 05 2 16,350.0 154.3119 2,523,000.00 CY 06 2 1,480.0 302.9865 448,420.00

Page 128: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 124 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) LEAN CONCRETE BASE CY 07 7 37,464.0 119.5582 4,479,130.00 CY 08 2 600.0 268.2477 160,948.60 CY 12 1 710.0 230.0000 163,300.00 UNIT TOTAL CY 16 57,224.0* 140.9589 8,066,233.60* ITEM CODE 280000 TOTAL 16 8,066,233.60* 280010 RAPID STRENGTH CONCRETE BASE CY 04 3 438.0 473.7443 207,500.00 CY 08 1 150.0 479.4300 71,914.50 UNIT TOTAL CY 4 588.0* 475.1947 279,414.50* ITEM CODE 280010 TOTAL 4 279,414.50* 280015 LEAN CONCRETE BASE RAPID SETTING CY 04 2 5,670.0 470.9656 2,670,375.00 CY 05 2 3,850.0 376.0675 1,447,860.00 CY 06 1 160.0 540.0000 86,400.00 CY 07 12 3,222.0 405.4864 1,306,477.12 CY 11 2 1,560.0 522.0256 814,360.00 UNIT TOTAL CY 19 14,462.0* 437.3857 6,325,472.12* ITEM CODE 280015 TOTAL 19 6,325,472.12* 280020 ASPHALTIC EMULSION (CONCRETE BASE) TON 04 1 2.0 197.0000 394.00 UNIT TOTAL TON 1 2.0* 197.0000 394.00* ITEM CODE 280020 TOTAL 1 394.00* 280200 REPLACE BASE CY 04 1 240.0 525.0000 126,000.00 CY 05 1 140.0 290.0000 40,600.00 CY 07 4 1,436.0 316.2674 454,160.00 CY 11 1 580.0 30.0000 17,400.00 UNIT TOTAL CY 7 2,396.0* 266.3439 638,160.00* ITEM CODE 280200 TOTAL 7 638,160.00*

Page 129: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 125 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 290201 ASPHALT TREATED PERMEABLE BASE CY 04 1 1,030.0 177.6900 183,020.70 CY 12 1 1.1 4,200.0000 4,620.00 UNIT TOTAL CY 2 1,031.1* 181.9811 187,640.70* ITEM CODE 290201 TOTAL 2 187,640.70* 290301 CEMENT TREATED PERMEABLE BASE CY 07 1 37.0 200.0000 7,400.00 UNIT TOTAL CY 1 37.0* 200.0000 7,400.00* ITEM CODE 290301 TOTAL 1 7,400.00* 304000 FULL-DEPTH RECLAMATION-CEMENT SQYD 02 1 16,800.0 8.2500 138,600.00 UNIT TOTAL SQYD 1 16,800.0* 8.2500 138,600.00* ITEM CODE 304000 TOTAL 1 138,600.00* 304100 CEMENT (FULL-DEPTH RECLAMATION-CEMENT) TON 02 1 150.0 210.0000 31,500.00 UNIT TOTAL TON 1 150.0* 210.0000 31,500.00* ITEM CODE 304100 TOTAL 1 31,500.00* 304300 ASPHALTIC EMULSION (FULL-DEPTH RECLAMATION-CEMENT) TON 02 1 9.0 1,300.0000 11,700.00 UNIT TOTAL TON 1 9.0* 1,300.0000 11,700.00* ITEM CODE 304300 TOTAL 1 11,700.00* 304400 MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT) LS 02 1 15,000.00 UNIT TOTAL LS 1 15,000.00 ITEM CODE 304400 TOTAL 1 15,000.00*

Page 130: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 126 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 360200 BASE BOND BREAKER SQFT 05 1 730.0 1.0000 730.00 UNIT TOTAL SQFT 1 730.0* 1.0000 730.00* SQYD 04 6 12,588.0 1.4759 18,578.00 SQYD 07 7 57,740.0 .9295 53,670.00 SQYD 08 1 1,100.0 2.3000 2,530.00 SQYD 11 1 10.0 150.0000 1,500.00 SQYD 12 1 8,400.0 3.0000 25,200.00 UNIT TOTAL SQYD 16 79,838.0* 1.2710 101,478.00* ITEM CODE 360200 TOTAL 17 102,208.00* 370001 SAND COVER (SEAL) TON 02 6 2,040.0 79.3076 161,787.50 TON 05 1 125.0 125.0000 15,625.00 TON 08 1 1,290.0 10.0000 12,900.00 TON 09 2 1,740.0 47.7586 83,100.00 TON 10 1 80.0 210.0000 16,800.00 TON 11 6 5,703.0 84.0433 479,299.00 UNIT TOTAL TON 17 10,978.0* 70.0958 769,511.50* ITEM CODE 370001 TOTAL 17 769,511.50* 370120 ASPHALT-RUBBER BINDER TON 02 6 2,770.0 594.4946 1,646,750.00 TON 04 1 180.0 813.7500 146,475.00 TON 05 2 640.0 370.0000 236,800.00 TON 08 1 1,170.0 400.0000 468,000.00 TON 09 1 1,080.0 400.0000 432,000.00 TON 10 1 73.0 393.7500 28,743.75 TON 11 5 5,381.0 667.7290 3,593,050.00 UNIT TOTAL TON 17 11,294.0* 580.1150 6,551,818.75* ITEM CODE 370120 TOTAL 17 6,551,818.75* 374002 ASPHALTIC EMULSION (FOG SEAL COAT) TON 01 3 2.0 1,397.5000 2,795.00 TON 02 8 105.9 869.6922 92,100.40 TON 03 4 38.2 740.8377 28,300.00 TON 04 3 4.6 2,706.5217 12,450.00

Page 131: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 127 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ASPHALTIC EMULSION (FOG SEAL COAT) TON 05 6 6.2 1,875.8065 11,630.00 TON 06 2 128.0 412.9688 52,860.00 TON 07 1 40.0 765.0000 30,600.00 TON 08 3 112.2 723.8859 81,220.00 TON 09 3 173.8 739.3556 128,500.00 TON 10 7 538.0 612.7849 329,678.30 TON 11 18 687.9 763.9953 525,552.34 UNIT TOTAL TON 58 1,836.8* 705.4040 1,295,686.04* ITEM CODE 374002 TOTAL 58 1,295,686.04* 374004 ASPHALTIC EMULSION (FLUSH COAT) TON 02 6 292.0 898.8699 262,470.00 TON 05 1 20.0 750.0000 15,000.00 TON 10 1 7.0 1,312.5000 9,187.50 UNIT TOTAL TON 8 319.0* 898.6129 286,657.50* ITEM CODE 374004 TOTAL 8 286,657.50* 374207 CRACK TREATMENT LNMI 01 1 4.0 8,200.0000 32,800.00 LNMI 03 5 27.7 5,755.4513 159,426.00 LNMI 04 3 39.0 5,487.4872 214,012.00 LNMI 06 1 5.0 6,825.0000 34,125.00 LNMI 07 1 18.0 2,640.0000 47,520.00 LNMI 08 5 145.0 4,143.4483 600,800.00 UNIT TOTAL LNMI 16 238.7* 4,560.8840 1,088,683.00* ITEM CODE 374207 TOTAL 16 1,088,683.00* 374493 POLYMER ASPHALTIC EMULSION (SEAL COAT) TON 09 1 430.0 550.0000 236,500.00 UNIT TOTAL TON 1 430.0* 550.0000 236,500.00* ITEM CODE 374493 TOTAL 1 236,500.00* 375001 SCREENINGS TON 08 1 6,440.0 121.0000 779,240.00

Page 132: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 128 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) SCREENINGS TON 09 2 10,560.0 95.6250 1,009,800.00 TON 11 1 6,400.0 100.0000 640,000.00 UNIT TOTAL TON 4 23,400.0* 103.8051 2,429,040.00* ITEM CODE 375001 TOTAL 4 2,429,040.00* 375009 TACK COAT (SEAL) TON 03 1 1.0 5,000.0000 5,000.00 UNIT TOTAL TON 1 1.0* 5,000.0000 5,000.00* ITEM CODE 375009 TOTAL 1 5,000.00* 375020 PARKING AREA SEAL TON 02 1 18.0 2,939.5500 52,911.90 UNIT TOTAL TON 1 18.0* 2,939.5500 52,911.90* ITEM CODE 375020 TOTAL 1 52,911.90* 375035 PRECOATED SCREENINGS TON 02 6 17,720.0 68.3257 1,210,731.00 TON 04 1 2,100.0 288.7500 606,375.00 TON 05 2 4,650.0 235.3871 1,094,550.00 TON 10 1 540.0 120.7500 65,205.00 TON 11 5 46,940.0 93.2914 4,379,100.00 UNIT TOTAL TON 15 71,950.0* 102.2371 7,355,961.00* ITEM CODE 375035 TOTAL 15 7,355,961.00* 377501 SLURRY SEAL TON 05 2 4,010.0 164.2070 658,470.00 TON 07 2 1,472.0 280.2079 412,466.00 TON 08 5 13,400.0 148.9667 1,996,154.20 TON 11 2 980.0 288.8163 283,040.00 UNIT TOTAL TON 11 19,862.0* 168.6703 3,350,130.20* ITEM CODE 377501 TOTAL 11 3,350,130.20* 390011 PREPAVING INERTIAL PROFILER

Page 133: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 129 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 390011 PREPAVING INERTIAL PROFILER LS 01 8 66,000.00 LS 02 11 39,656.50 LS 03 3 23,500.00 LS 04 4 15,642.75 LS 05 11 35,000.00 LS 06 11 131,194.17 LS 07 1 2,500.00 LS 08 13 124,657.30 LS 09 2 20,000.00 LS 10 12 66,407.00 LS 11 8 165,600.00 LS 12 2 58,550.00 UNIT TOTAL LS 86 748,707.72 ITEM CODE 390011 TOTAL 86 748,707.72* 390020 PREPAVING GRINDING DAY EA 01 7 35.0 16,400.0000 574,000.00 EA 02 11 44.0 12,802.2727 563,300.00 EA 03 2 17.0 10,529.4118 179,000.00 EA 04 2 8.0 16,358.9250 130,871.40 EA 05 6 68.0 10,588.2353 720,000.00 EA 06 8 22.0 10,416.2800 229,158.16 EA 09 2 5.0 17,200.0000 86,000.00 EA 10 8 35.0 11,954.7143 418,415.00 EA 11 6 93.0 14,086.0215 1,310,000.00 UNIT TOTAL EA 52 327.0* 12,876.8947 4,210,744.56* ITEM CODE 390020 TOTAL 52 4,210,744.56* 390030 INTELLIGENT COMPACTION LS 02 1 30,000.00 LS 03 1 26,400.00 LS 04 3 23,800.00 LS 05 4 281,000.00 LS 06 1 90,000.00 LS 07 1 14,050.00 LS 09 1 80,000.00 UNIT TOTAL LS 12 545,250.00 ITEM CODE 390030 TOTAL 12 545,250.00*

Page 134: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 130 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 390095 REPLACE ASPHALT CONCRETE SURFACING CY 01 9 6,475.0 412.9807 2,674,050.00 CY 02 17 9,455.0 341.6244 3,230,059.00 CY 03 4 3,314.0 174.6711 578,860.00 CY 05 1 99.0 375.0000 37,125.00 CY 06 1 1.5 950.0000 1,425.00 CY 07 3 5,372.5 207.5775 1,115,210.00 CY 08 11 21,890.0 220.4455 4,825,552.00 CY 10 1 21.0 785.0000 16,485.00 CY 11 2 1,660.0 334.1928 554,760.00 UNIT TOTAL CY 49 48,288.0* 269.9123 13,033,526.00* ITEM CODE 390095 TOTAL 49 13,033,526.00* 390100 PRIME COAT TON 04 6 17.4 936.0057 16,286.50 TON 08 13 394.0 731.0383 288,029.10 UNIT TOTAL TON 19 411.4* 739.7073 304,315.60* ITEM CODE 390100 TOTAL 19 304,315.60* 390132 HOT MIX ASPHALT (TYPE A) TON 01 25 18,564.3 152.8604 2,837,746.20 TON 02 20 96,058.0 105.4515 10,129,459.00 TON 03 23 75,820.0 96.1346 7,288,923.40 TON 04 40 311,106.5 74.0514 23,037,879.30 TON 05 21 293,240.0 80.7295 23,673,111.00 TON 06 23 116,756.0 79.3751 9,267,518.60 TON 07 15 109,316.0 79.1522 8,652,605.00 TON 08 22 799,155.0 68.3694 54,637,785.00 TON 09 4 50,110.0 97.4333 4,882,382.50 TON 10 26 126,643.0 77.2637 9,784,903.10 TON 11 14 46,040.0 122.6501 5,646,811.04 TON 12 17 158,254.0 60.9845 9,651,045.00 UNIT TOTAL TON 250 2,201,062.8* 77.0038 169,490,169.14* ITEM CODE 390132 TOTAL 250 169,490,169.14* 390135 HOT MIX ASPHALT (LEVELING) TON 01 2 340.0 181.5882 61,740.00 TON 04 1 20,400.0 67.7500 1,382,100.00

Page 135: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 131 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) HOT MIX ASPHALT (LEVELING) TON 10 1 3,490.0 69.2000 241,508.00 UNIT TOTAL TON 4 24,230.0* 69.5563 1,685,348.00* ITEM CODE 390135 TOTAL 4 1,685,348.00* 390136 MINOR HOT MIX ASPHALT TON 01 4 281.0 316.4680 88,927.50 TON 02 2 6.0 1,077.3333 6,464.00 TON 03 14 3,676.0 124.8694 459,020.00 TON 04 1 13.0 295.0000 3,835.00 TON 05 4 972.0 226.0782 219,748.00 TON 06 2 342.0 202.9240 69,400.00 TON 07 2 281.0 78.7648 22,132.90 TON 08 6 123.2 247.0779 30,440.00 TON 10 4 88.0 402.2727 35,400.00 TON 11 15 3,688.0 122.3901 451,374.85 UNIT TOTAL TON 54 9,470.2* 146.4322 1,386,742.25* ITEM CODE 390136 TOTAL 54 1,386,742.25* 390137 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 01 11 95,800.0 120.6946 11,562,540.00 TON 02 5 105,900.0 102.7613 10,882,425.00 TON 03 9 187,810.0 80.7958 15,174,250.00 TON 04 14 195,320.0 86.7336 16,940,811.00 TON 05 10 245,530.0 102.3816 25,137,744.00 TON 06 4 90,020.0 80.9127 7,283,760.00 TON 07 13 187,373.0 98.8777 18,527,008.00 TON 08 12 438,900.0 91.6793 40,238,025.00 TON 09 2 41,100.0 139.1241 5,718,000.00 TON 10 13 165,040.0 75.0373 12,384,149.80 TON 11 11 65,470.0 113.4114 7,425,046.00 TON 12 8 18,145.0 89.2153 1,618,811.25 UNIT TOTAL TON 112 1,836,408.0* 94.1471 172,892,570.05* ITEM CODE 390137 TOTAL 112 172,892,570.05* 390151 ASPHALTIC EMULSION (BONDED WEARING COURSE) TON 01 3 371.0 541.3747 200,850.00 TON 03 2 230.0 1,021.7391 235,000.00

Page 136: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 132 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ASPHALTIC EMULSION (BONDED WEARING COURSE) TON 04 1 45.0 1,800.0000 81,000.00 TON 06 6 1,784.0 303.1278 540,780.00 UNIT TOTAL TON 12 2,430.0* 435.2387 1,057,630.00* ITEM CODE 390151 TOTAL 12 1,057,630.00* 390161 HOT MIX ASPHALT (BRIDGE) TON 04 2 574.0 187.8659 107,835.00 TON 05 1 450.0 226.2000 101,790.00 TON 07 1 95.0 479.0000 45,505.00 TON 08 1 114.0 440.0000 50,160.00 TON 10 1 39.0 350.0000 13,650.00 UNIT TOTAL TON 6 1,272.0* 250.7390 318,940.00* ITEM CODE 390161 TOTAL 6 318,940.00* 390401 HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) TON 01 3 740.0 216.8378 160,460.00 TON 03 4 2,593.0 106.0515 274,991.61 TON 04 2 82.0 277.5610 22,760.00 TON 05 1 230.0 175.0000 40,250.00 TON 12 3 3,120.0 114.6154 357,600.00 UNIT TOTAL TON 13 6,765.0* 126.5427 856,061.61* ITEM CODE 390401 TOTAL 13 856,061.61* 390402 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) TON 01 3 1,480.0 171.3851 253,650.00 TON 02 1 12,600.0 104.0000 1,310,400.00 TON 03 3 54,080.0 80.5279 4,354,950.00 TON 04 1 6,570.0 126.0000 827,820.00 TON 05 3 33,000.0 99.8070 3,293,630.00 TON 06 1 3,000.0 66.7800 200,340.00 TON 12 1 160.0 143.0000 22,880.00 UNIT TOTAL TON 13 110,890.0* 92.5572 10,263,670.00* ITEM CODE 390402 TOTAL 13 10,263,670.00* 390403 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED HIGH BINDER(OPEN GRADED FRICTION COURSE)

Page 137: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 133 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 390403 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED HIGH BINDER(OPEN GRADED FRICTION COURSE) TON 04 2 46,600.0 80.3411 3,743,895.00 TON 06 1 19,900.0 84.0000 1,671,600.00 UNIT TOTAL TON 3 66,500.0* 81.4360 5,415,495.00* ITEM CODE 390403 TOTAL 3 5,415,495.00* 391006 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER) TON 01 8 8.0 1,209.8813 9,679.05 TON 04 1 330.0 1.0500 346.50 TON 07 1 .4 2,000.0000 800.00 TON 12 2 292.0 308.8082 90,172.00 UNIT TOTAL TON 12 630.4* 160.2118 100,997.55* ITEM CODE 391006 TOTAL 12 100,997.55* 393004 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC) SQYD 01 10 4,270.0 9.6220 41,086.00 SQYD 02 1 170.0 41.0000 6,970.00 SQYD 03 1 1,080.0 3.5000 3,780.00 SQYD 04 1 14,500.0 1.3000 18,850.00 SQYD 07 2 500.0 4.5920 2,296.00 SQYD 11 1 24,300.0 1.7300 42,039.00 SQYD 12 3 381,960.0 .6815 260,290.00 UNIT TOTAL SQYD 19 426,780.0* .8794 375,311.00* ITEM CODE 393004 TOTAL 19 375,311.00* 393005 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING MAT) SQYD 04 4 679,890.0 1.5426 1,048,804.00 UNIT TOTAL SQYD 4 679,890.0* 1.5426 1,048,804.00* ITEM CODE 393005 TOTAL 4 1,048,804.00* 393006 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING GRID) SQYD 04 1 180.0 10.0000 1,800.00 UNIT TOTAL SQYD 1 180.0* 10.0000 1,800.00* ITEM CODE 393006 TOTAL 1 1,800.00*

Page 138: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 134 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 394050 RUMBLE STRIP STA 08 1 6,520.0 20.0000 130,400.00 STA 11 1 27.0 150.0000 4,050.00 UNIT TOTAL STA 2 6,547.0* 20.5361 134,450.00* ITEM CODE 394050 TOTAL 2 134,450.00* 394053 SHOULDER RUMBLE STRIP (HMA,GROUND-IN INDENTATIONS) STA 01 4 148.0 86.8919 12,860.00 STA 02 1 1,110.0 10.5000 11,655.00 STA 03 3 4,413.0 39.8368 175,800.00 STA 04 5 2,360.0 34.4583 81,321.55 STA 05 9 5,800.0 28.3121 164,210.00 STA 06 5 4,730.0 27.5567 130,343.00 STA 07 1 4,980.0 32.0000 159,360.00 STA 08 12 13,494.0 24.8588 335,444.10 STA 09 3 2,082.0 53.3381 111,050.00 STA 10 8 4,619.2 25.6147 118,319.40 STA 11 7 7,666.0 28.7289 220,235.68 UNIT TOTAL STA 58 51,402.2* 29.5824 1,520,598.73* ITEM CODE 394053 TOTAL 58 1,520,598.73* 394060 DATA CORE LS 01 8 43,000.00 LS 02 15 52,771.00 LS 03 11 53,375.00 LS 04 9 42,830.00 LS 05 13 73,500.00 LS 06 12 77,542.00 LS 07 8 58,590.00 LS 08 8 56,010.22 LS 09 4 32,500.00 LS 10 9 61,920.00 LS 11 2 1,600.00 LS 12 1 17,500.00 UNIT TOTAL LS 100 571,138.22 ITEM CODE 394060 TOTAL 100 571,138.22* 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A)

Page 139: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 135 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 01 11 11,872.0 6.2451 74,142.40 LF 02 5 3,475.0 6.7837 23,573.25 LF 03 7 38,120.0 1.3904 53,003.00 LF 04 4 5,628.0 2.2670 12,758.50 LF 05 12 134,266.0 1.2156 163,212.00 LF 06 1 75.0 2.2000 165.00 LF 07 7 176,690.0 1.4484 255,914.00 LF 08 1 35.0 18.0000 630.00 LF 09 1 3,080.0 7.0000 21,560.00 LF 10 4 14,150.0 1.3914 19,688.00 LF 11 4 24,790.0 1.9107 47,366.90 LF 12 2 440.0 28.7273 12,640.00 UNIT TOTAL LF 59 412,621.0* 1.6593 684,653.05* ITEM CODE 394073 TOTAL 59 684,653.05* 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 02 4 517.0 5.5853 2,887.60 LF 03 7 1,379.0 6.6265 9,138.00 LF 04 13 6,064.0 4.5243 27,435.50 LF 05 9 7,720.0 1.4815 11,437.00 LF 06 7 1,283.0 12.3952 15,903.00 LF 07 8 11,316.0 3.0235 34,214.20 LF 08 5 4,815.0 1.8431 8,874.70 LF 10 10 4,030.0 3.2275 13,007.00 LF 11 9 7,048.0 5.1998 36,648.30 LF 12 6 5,220.0 5.5080 28,751.80 UNIT TOTAL LF 78 49,392.0* 3.8123 188,297.10* ITEM CODE 394074 TOTAL 78 188,297.10* 394075 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 01 4 8,260.0 2.5242 20,850.00 LF 02 4 4,396.0 3.7223 16,363.10 LF 03 5 18,890.0 2.2280 42,087.00 LF 05 2 15,140.0 1.1859 17,954.00 LF 07 1 1,630.0 1.2500 2,037.50 LF 08 6 6,585.0 4.6725 30,768.20 LF 11 3 23,720.0 1.1151 26,450.00 LF 12 2 940.0 7.7287 7,265.00 UNIT TOTAL LF 27 79,561.0* 2.0585 163,774.80*

Page 140: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 136 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 394075 TOTAL 27 163,774.80* 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 01 3 2,800.0 5.1570 14,439.60 LF 02 4 7,090.0 2.2406 15,885.60 LF 03 7 16,240.0 2.3740 38,554.00 LF 04 18 102,175.0 1.8651 190,571.50 LF 05 14 221,358.0 1.2658 280,191.00 LF 06 7 9,960.0 4.2030 41,862.00 LF 07 2 4,110.0 4.4844 18,431.00 LF 08 8 120,757.0 1.3334 161,012.00 LF 09 1 6,000.0 8.0000 48,000.00 LF 10 10 66,183.0 1.8233 120,669.00 LF 11 14 38,680.0 4.0678 157,342.80 LF 12 4 4,490.0 2.6646 11,964.10 UNIT TOTAL LF 92 599,843.0* 1.8320 1,098,922.60* ITEM CODE 394076 TOTAL 92 1,098,922.60* 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 01 5 2,570.0 11.0156 28,310.00 LF 02 6 17,067.0 2.4790 42,309.00 LF 03 5 8,940.0 1.6394 14,656.00 LF 04 17 50,456.0 2.0357 102,713.50 LF 05 4 6,585.0 1.5509 10,213.00 LF 06 4 453.0 12.9792 5,879.60 LF 07 2 1,060.0 4.7302 5,014.00 LF 08 6 11,100.0 2.1666 24,049.70 LF 09 1 880.0 9.0000 7,920.00 LF 10 12 9,537.0 6.3024 60,106.00 LF 11 7 10,054.0 2.7677 27,826.80 LF 12 4 6,225.0 4.3103 26,831.50 UNIT TOTAL LF 73 124,927.0* 2.8483 355,829.10* ITEM CODE 394077 TOTAL 73 355,829.10* 394090 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 12 4,058.0 26.6190 108,020.00 SQYD 02 11 3,769.0 34.6012 130,412.00 SQYD 03 10 12,248.4 18.0219 220,739.50 SQYD 04 9 763.5 65.6568 50,129.00 SQYD 05 15 13,059.0 27.7138 361,914.50 SQYD 06 7 1,520.0 33.1691 50,417.00

Page 141: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 137 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 5 18,653.0 12.9888 242,281.00 SQYD 08 11 5,801.0 28.0247 162,571.00 SQYD 09 1 91.0 48.0000 4,368.00 SQYD 10 7 3,431.0 13.8527 47,528.50 SQYD 11 8 4,336.0 35.7757 155,123.65 SQYD 12 3 1,630.0 30.4073 49,563.90 UNIT TOTAL SQYD 99 69,359.9* 22.8240 1,583,068.05* ITEM CODE 394090 TOTAL 99 1,583,068.05* 394095 ROADSIDE PAVING (MISCELLANEOUS AREAS) SQYD 08 3 2,640.0 218.4015 576,580.00 SQYD 12 3 707.0 129.8444 91,800.00 UNIT TOTAL SQYD 6 3,347.0* 199.6952 668,380.00* ITEM CODE 394095 TOTAL 6 668,380.00* 395010 BONDED WEARING COURSE-GAP GRADED TON 01 2 3,840.0 155.6563 597,720.00 TON 03 1 12,400.0 100.0000 1,240,000.00 UNIT TOTAL TON 3 16,240.0* 113.1601 1,837,720.00* ITEM CODE 395010 TOTAL 3 1,837,720.00* 395020 RUBBERIZED HOT MIX ASPHALT-GAP GRADED (BONDED WEARING COURSE) TON 01 1 22,900.0 111.0000 2,541,900.00 TON 03 1 6,650.0 100.0000 665,000.00 TON 04 1 4,260.0 135.0000 575,100.00 TON 06 5 92,870.0 85.9173 7,979,140.00 UNIT TOTAL TON 8 126,680.0* 92.8413 11,761,140.00* ITEM CODE 395020 TOTAL 8 11,761,140.00* 395040 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (BONDED WEARING COURSE) TON 01 2 1,860.0 236.3978 439,700.00 TON 06 2 19,970.0 96.8853 1,934,800.00 UNIT TOTAL TON 4 21,830.0* 108.7723 2,374,500.00*

Page 142: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 138 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 395040 TOTAL 4 2,374,500.00* 397005 TACK COAT TON 01 22 315.2 796.8719 251,174.03 TON 02 23 644.1 590.3625 380,252.51 TON 03 26 1,340.3 141.1223 189,146.28 TON 04 34 3,046.5 558.3434 1,700,993.10 TON 05 21 1,428.8 554.9863 792,964.40 TON 06 22 636.6 67.8404 43,187.21 TON 07 18 739.1 671.6114 496,388.00 TON 08 28 1,790.9 554.2061 992,527.64 TON 09 6 454.4 301.1554 136,845.00 TON 10 24 674.9 705.9889 476,471.93 TON 11 15 204.9 1,051.7857 215,510.88 TON 12 4 151.0 423.3444 63,925.00 UNIT TOTAL TON 243 11,426.7* 502.2785 5,739,385.98* ITEM CODE 397005 TOTAL 243 5,739,385.98* 398000 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 11 1 140.0 86.2500 12,075.00 UNIT TOTAL CY 1 140.0* 86.2500 12,075.00* ITEM CODE 398000 TOTAL 1 12,075.00* 400050 CONTINUOUSLY REINFORCED CONCRETE PAVEMENT CY 05 2 72,200.0 180.8227 13,055,400.00 CY 06 1 11,200.0 205.0000 2,296,000.00 CY 10 1 24,500.0 227.8500 5,582,325.00 CY 12 1 5,350.0 251.6000 1,346,060.00 UNIT TOTAL CY 5 113,250.0* 196.7310 22,279,785.00* ITEM CODE 400050 TOTAL 5 22,279,785.00* 401050 JOINTED PLAIN CONCRETE PAVEMENT CY 05 2 1,910.0 295.2094 563,850.00 CY 06 3 5,030.0 297.2863 1,495,350.00 CY 07 3 66,510.0 170.3947 11,332,950.00 CY 08 2 1,380.0 421.3130 581,411.90 CY 10 1 8,750.0 223.6500 1,956,937.50 CY 11 1 2,420.0 370.0000 895,400.00

Page 143: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 139 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) JOINTED PLAIN CONCRETE PAVEMENT CY 12 1 2,940.0 290.0000 852,600.00 UNIT TOTAL CY 13 88,940.0* 198.7688 17,678,499.40* ITEM CODE 401050 TOTAL 13 17,678,499.40* 401055 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 04 3 1,350.0 544.6296 735,250.00 CY 06 1 530.0 405.0000 214,650.00 CY 07 10 8,619.0 473.1204 4,077,824.30 CY 08 2 446.0 621.5839 277,226.40 CY 11 1 710.0 630.0000 447,300.00 CY 12 1 44.0 2,200.0000 96,800.00 UNIT TOTAL CY 18 11,699.0* 499.9616 5,849,050.70* ITEM CODE 401055 TOTAL 18 5,849,050.70* 401083 SHOULDER RUMBLE STRIP (CONCRETE PAVEMENT, GROUND-IN INDENTATIONS) STA 04 1 1,170.0 65.1200 76,190.40 STA 05 2 761.0 130.8555 99,581.00 STA 06 1 34.0 320.0000 10,880.00 STA 07 1 3,220.0 75.0000 241,500.00 STA 10 1 440.0 179.2200 78,856.80 UNIT TOTAL STA 6 5,625.0* 90.1348 507,008.20* ITEM CODE 401083 TOTAL 6 507,008.20* 410096 DRILL AND BOND (DOWEL BAR) EA 03 2 1,240.0 17.0274 21,114.00 EA 04 1 5,580.0 9.0500 50,499.00 EA 06 1 400.0 39.5000 15,800.00 EA 07 7 43,030.0 17.0196 732,355.00 EA 08 1 360.0 34.8700 12,553.20 EA 11 2 3,810.0 21.1155 80,450.00 UNIT TOTAL EA 14 54,420.0* 16.7727 912,771.20* ITEM CODE 410096 TOTAL 14 912,771.20* 410097 DRILL AND BOND (TIE BAR)

Page 144: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 140 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 410097 DRILL AND BOND (TIE BAR) EA 04 2 560.0 14.1964 7,950.00 EA 07 2 3,460.0 10.7225 37,100.00 UNIT TOTAL EA 4 4,020.0* 11.2065 45,050.00* ITEM CODE 410097 TOTAL 4 45,050.00* 410120 SPALL REPAIR (POLYESTER CONCRETE) SQYD 03 1 25.0 290.5700 7,264.25 SQYD 04 2 390.0 838.4615 327,000.00 SQYD 07 1 9.0 1,700.0000 15,300.00 SQYD 11 1 220.0 875.0000 192,500.00 UNIT TOTAL SQYD 5 644.0* 841.7147 542,064.25* ITEM CODE 410120 TOTAL 5 542,064.25* 411105 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 03 2 1,060.0 726.4342 770,020.20 CY 04 4 8,484.0 663.0387 5,625,220.00 CY 05 2 1,490.0 577.1409 859,940.00 CY 06 1 300.0 505.0000 151,500.00 CY 07 5 9,820.0 484.6527 4,759,290.00 CY 10 1 150.0 1,044.7500 156,712.50 CY 11 2 1,490.0 912.3221 1,359,360.00 CY 12 1 2,830.0 580.0000 1,641,400.00 UNIT TOTAL CY 18 25,624.0* 598.0113 15,323,442.70* ITEM CODE 411105 TOTAL 18 15,323,442.70* 413000 CRACK AND SEAT SQYD 04 1 278,000.0 .7000 194,600.00 SQYD 05 1 116,000.0 .7000 81,200.00 SQYD 10 1 26,700.0 1.2200 32,574.00 UNIT TOTAL SQYD 3 420,700.0* .7330 308,374.00* ITEM CODE 413000 TOTAL 3 308,374.00* 414200 JOINT SEAL (ASPHALT RUBBER) LF 05 1 270.0 7.7000 2,079.00

Page 145: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 141 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) JOINT SEAL (ASPHALT RUBBER) LF 07 1 13,700.0 2.8000 38,360.00 LF 11 1 6,360.0 2.7000 17,172.00 UNIT TOTAL LF 3 20,330.0* 2.8338 57,611.00* ITEM CODE 414200 TOTAL 3 57,611.00* 414201 JOINT SEAL (SILICONE) LF 11 2 102,400.0 1.8043 184,760.00 UNIT TOTAL LF 2 102,400.0* 1.8043 184,760.00* ITEM CODE 414201 TOTAL 2 184,760.00* 414202 JOINT SEAL (PREFORMED COMPRESSION) LF 04 2 2,900.0 9.7224 28,195.00 LF 07 3 82,380.0 3.5214 290,096.60 LF 08 2 5,820.0 10.5577 61,446.00 UNIT TOTAL LF 7 91,100.0* 4.1684 379,737.60* ITEM CODE 414202 TOTAL 7 379,737.60* 414220 REPLACE JOINT SEAL (ASPHALT RUBBER) LF 03 1 2,258.0 15.5000 34,999.00 UNIT TOTAL LF 1 2,258.0* 15.5000 34,999.00* ITEM CODE 414220 TOTAL 1 34,999.00* 414221 REPLACE JOINT SEAL (SILICONE) LF 07 1 154,000.0 1.7500 269,500.00 UNIT TOTAL LF 1 154,000.0* 1.7500 269,500.00* ITEM CODE 414221 TOTAL 1 269,500.00* 414240 ISOLATION JOINT SEAL (ASPHALT RUBBER) LF 05 2 650.0 6.8508 4,453.00 LF 07 1 4,520.0 3.0000 13,560.00 LF 11 1 4,000.0 4.2500 17,000.00

Page 146: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 142 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 4 9,170.0* 3.8182 35,013.00* ITEM CODE 414240 TOTAL 4 35,013.00* 414241 ISOLATION JOINT SEAL (SILICONE) LF 06 1 4,760.0 5.0000 23,800.00 LF 08 2 870.0 12.7094 11,057.20 LF 10 1 61,800.0 3.6200 223,716.00 LF 12 2 17,700.0 11.6271 205,800.00 UNIT TOTAL LF 6 85,130.0* 5.4549 464,373.20* ITEM CODE 414241 TOTAL 6 464,373.20* 414242 ISOLATION JOINT SEAL (PREFORMED COMPRESSION) LF 07 4 39,340.0 5.5502 218,345.00 UNIT TOTAL LF 4 39,340.0* 5.5502 218,345.00* ITEM CODE 414242 TOTAL 4 218,345.00* 420102 GROOVE EXISTING CONCRETE PAVEMENT SQYD 04 1 9,440.0 12.0000 113,280.00 SQYD 12 3 245,500.0 2.2601 554,860.00 UNIT TOTAL SQYD 4 254,940.0* 2.6208 668,140.00* ITEM CODE 420102 TOTAL 4 668,140.00* 420201 GRIND EXISTING CONCRETE PAVEMENT SQYD 03 3 55,870.0 7.5199 420,138.00 SQYD 04 3 14,150.0 5.1827 73,335.00 SQYD 06 1 6,350.0 7.8000 49,530.00 SQYD 07 8 1,315,670.0 4.4208 5,816,347.50 SQYD 11 2 3,370.0 8.5534 28,825.00 SQYD 12 3 216,340.0 4.4885 971,040.00 UNIT TOTAL SQYD 20 1,611,750.0* 4.5660 7,359,215.50* ITEM CODE 420201 TOTAL 20 7,359,215.50* 420203 GRIND EXISTING BRIDGE DECK SQYD 03 3 1,539.0 32.3398 49,770.92

Page 147: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 143 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) GRIND EXISTING BRIDGE DECK SQYD 04 1 50.0 75.0000 3,750.00 SQYD 05 1 133.0 282.2400 37,537.92 SQYD 07 3 1,201.0 60.8093 73,032.00 SQYD 08 2 454.0 66.5639 30,220.00 SQYD 12 1 1,450.0 20.0000 29,000.00 UNIT TOTAL SQYD 11 4,827.0* 46.2629 223,310.84* ITEM CODE 420203 TOTAL 11 223,310.84* 460200 GROUND ANCHOR (VERTICAL) EA 07 1 18.0 3,125.0000 56,250.00 UNIT TOTAL EA 1 18.0* 3,125.0000 56,250.00* ITEM CODE 460200 TOTAL 1 56,250.00* 460210 GROUND ANCHOR (SUBHORIZONTAL) EA 01 6 823.0 5,966.7722 4,910,653.50 EA 04 1 146.0 3,300.0000 481,800.00 EA 07 1 27.0 3,410.0000 92,070.00 EA 11 1 118.0 2,685.0000 316,830.00 EA 12 1 27.0 2,300.0000 62,100.00 UNIT TOTAL EA 10 1,141.0* 5,138.8725 5,863,453.50* ITEM CODE 460210 TOTAL 10 5,863,453.50* 460300 SOIL NAIL LF 01 1 11,700.0 48.0000 561,600.00 LF 03 1 2,385.0 45.0000 107,325.00 LF 04 2 26,065.0 25.8749 674,430.00 LF 05 1 3,981.0 56.0000 222,936.00 LF 07 1 10,795.0 46.0000 496,570.00 LF 12 1 1,960.0 26.0000 50,960.00 UNIT TOTAL LF 7 56,886.0* 37.1589 2,113,821.00* ITEM CODE 460300 TOTAL 7 2,113,821.00* 473000 REINFORCED CONCRETE CRIB WALL (TYPE A) SQFT 01 1 1,830.0 185.0000 338,550.00

Page 148: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 144 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL SQFT 1 1,830.0* 185.0000 338,550.00* ITEM CODE 473000 TOTAL 1 338,550.00* 475010 RETAINING WALL (MASONRY WALL) SQFT 01 1 1,890.0 38.0000 71,820.00 UNIT TOTAL SQFT 1 1,890.0* 38.0000 71,820.00* ITEM CODE 475010 TOTAL 1 71,820.00* 477021 MECHANICALLY STABILIZED EMBANKMENT, LOCATION A SQFT 04 1 1,379.0 100.0000 137,900.00 UNIT TOTAL SQFT 1 1,379.0* 100.0000 137,900.00* ITEM CODE 477021 TOTAL 1 137,900.00* 477022 MECHANICALLY STABILIZED EMBANKMENT, LOCATION B SQFT 04 1 7,695.0 90.0000 692,550.00 UNIT TOTAL SQFT 1 7,695.0* 90.0000 692,550.00* ITEM CODE 477022 TOTAL 1 692,550.00* 477023 MECHANICALLY STABILIZED EMBANKMENT, LOCATION C SQFT 04 1 6,271.0 95.0000 595,745.00 UNIT TOTAL SQFT 1 6,271.0* 95.0000 595,745.00* ITEM CODE 477023 TOTAL 1 595,745.00* 480300 TEMPORARY SUPPORT LS 01 1 60,000.00 LS 04 3 126,000.00 LS 05 1 26,500.00 LS 08 1 180,000.00 LS 10 2 720,000.00 LS 11 1 216,700.00 LS 12 1 160,000.00 UNIT TOTAL LS 10 1,489,200.00 ITEM CODE 480300 TOTAL 10 1,489,200.00*

Page 149: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 145 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 480400 TEMPORARY DECKING LS 04 1 30,705.00 LS 07 1 15,000.00 LS 08 1 19,000.00 LS 12 2 33,950.00 UNIT TOTAL LS 5 98,655.00 ITEM CODE 480400 TOTAL 5 98,655.00* 480600 TEMPORARY SHORING LS 08 1 90,000.00 UNIT TOTAL LS 1 90,000.00 ITEM CODE 480600 TOTAL 1 90,000.00* 490313 STEEL SOLDIER PILE (HP 12 X 84) LF 01 2 3,451.0 106.7995 368,565.00 UNIT TOTAL LF 2 3,451.0* 106.7995 368,565.00* ITEM CODE 490313 TOTAL 2 368,565.00* 490316 STEEL SOLDIER PILE (HP 14 X 73) LF 01 1 720.0 82.9300 59,709.60 UNIT TOTAL LF 1 720.0* 82.9300 59,709.60* ITEM CODE 490316 TOTAL 1 59,709.60* 490325 STEEL SOLDIER PILE (HP 14 X 117) LF 01 1 1,800.0 114.0000 205,200.00 UNIT TOTAL LF 1 1,800.0* 114.0000 205,200.00* ITEM CODE 490325 TOTAL 1 205,200.00* 490400 24" DRILLED HOLE LF 01 2 3,438.0 96.3269 331,172.00 LF 04 2 1,482.0 108.6869 161,074.00 LF 11 1 41.0 217.0000 8,897.00

Page 150: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 146 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 5 4,961.0* 101.0165 501,143.00* ITEM CODE 490400 TOTAL 5 501,143.00* 490403 30" DRILLED HOLE LF 01 2 7,284.0 102.1392 743,982.06 LF 02 1 379.0 200.0000 75,800.00 LF 11 1 115.0 179.0000 20,585.00 UNIT TOTAL LF 4 7,778.0* 108.0441 840,367.06* ITEM CODE 490403 TOTAL 4 840,367.06* 490406 36" DRILLED HOLE LF 01 1 8,442.0 22.0000 185,724.00 LF 04 2 4,200.0 70.8813 297,701.30 UNIT TOTAL LF 3 12,642.0* 38.2396 483,425.30* ITEM CODE 490406 TOTAL 3 483,425.30* 490409 42" DRILLED HOLE LF 01 1 1,587.0 143.0000 226,941.00 LF 07 1 544.0 111.0000 60,384.00 UNIT TOTAL LF 2 2,131.0* 134.8311 287,325.00* ITEM CODE 490409 TOTAL 2 287,325.00* 490508 FURNISH STEEL PILING (HP 10 X 57) LF 02 1 1,022.0 40.0000 40,880.00 LF 03 1 581.0 30.0000 17,430.00 LF 05 1 5,486.0 35.0000 192,010.00 LF 11 1 1,648.0 31.0000 51,088.00 UNIT TOTAL LF 4 8,737.0* 34.4979 301,408.00* ITEM CODE 490508 TOTAL 4 301,408.00* 490509 DRIVE STEEL PILE (HP 10 X 57) EA 02 1 50.0 3,010.0000 150,500.00 EA 03 1 22.0 4,000.0000 88,000.00 EA 05 1 186.0 1,700.0000 316,200.00

Page 151: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 147 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) DRIVE STEEL PILE (HP 10 X 57) EA 11 1 42.0 2,889.1700 121,345.14 UNIT TOTAL EA 4 300.0* 2,253.4838 676,045.14* ITEM CODE 490509 TOTAL 4 676,045.14* 490528 FURNISH STEEL PILING (HP 14 X 89) LF 03 1 1,176.0 45.0000 52,920.00 LF 04 1 4,216.0 48.0000 202,368.00 UNIT TOTAL LF 2 5,392.0* 47.3457 255,288.00* ITEM CODE 490528 TOTAL 2 255,288.00* 490529 DRIVE STEEL PILE (HP 14 X 89) EA 03 1 36.0 3,000.0000 108,000.00 EA 04 1 88.0 1,800.0000 158,400.00 UNIT TOTAL EA 2 124.0* 2,148.3871 266,400.00* ITEM CODE 490529 TOTAL 2 266,400.00* 490550 FURNISH 24" STEEL PIPE PILING LF 07 1 84,442.0 73.5000 6,206,487.00 UNIT TOTAL LF 1 84,442.0* 73.5000 6,206,487.00* ITEM CODE 490550 TOTAL 1 6,206,487.00* 490553 FURNISH STEEL SHEET PILING SQFT 04 1 2,100.0 14.0000 29,400.00 UNIT TOTAL SQFT 1 2,100.0* 14.0000 29,400.00* ITEM CODE 490553 TOTAL 1 29,400.00* 490554 DRIVE STEEL SHEET PILE SQFT 04 1 2,100.0 50.0000 105,000.00 UNIT TOTAL SQFT 1 2,100.0* 50.0000 105,000.00* ITEM CODE 490554 TOTAL 1 105,000.00*

Page 152: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 148 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 490555 DRIVE 24" STEEL PIPE PILE EA 07 1 1,562.0 1,260.0000 1,968,120.00 UNIT TOTAL EA 1 1,562.0* 1,260.0000 1,968,120.00* ITEM CODE 490555 TOTAL 1 1,968,120.00* 490591 60" PERMANENT STEEL CASING LF 04 1 79.0 585.0000 46,215.00 UNIT TOTAL LF 1 79.0* 585.0000 46,215.00* ITEM CODE 490591 TOTAL 1 46,215.00* 490594 96" PERMANENT STEEL CASING LF 03 1 96.0 400.0000 38,400.00 UNIT TOTAL LF 1 96.0* 400.0000 38,400.00* ITEM CODE 490594 TOTAL 1 38,400.00* 490601 16" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 01 1 29.0 626.0000 18,154.00 LF 04 1 2,220.0 97.7400 216,982.80 LF 05 1 2,385.0 150.0000 357,750.00 LF 07 1 710.0 100.0000 71,000.00 UNIT TOTAL LF 4 5,344.0* 124.2303 663,886.80* ITEM CODE 490601 TOTAL 4 663,886.80* 490603 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 01 3 2,151.0 327.2315 703,875.00 LF 04 2 12,775.0 122.7187 1,567,731.60 LF 05 1 3,919.0 146.0000 572,174.00 LF 07 2 1,410.0 150.6383 212,400.00 LF 10 1 160.0 350.0000 56,000.00 LF 12 1 5,831.0 90.0000 524,790.00 UNIT TOTAL LF 10 26,246.0* 138.5724 3,636,970.60* ITEM CODE 490603 TOTAL 10 3,636,970.60* 490604 30" CAST-IN-DRILLED-HOLE CONCRETE PILING

Page 153: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 149 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 490604 30" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 01 1 2,150.0 370.0000 795,500.00 LF 02 1 35.0 400.0000 14,000.00 UNIT TOTAL LF 2 2,185.0* 370.4805 809,500.00* ITEM CODE 490604 TOTAL 2 809,500.00* 490605 36" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 02 1 644.0 550.0000 354,200.00 LF 04 1 210.0 265.0000 55,650.00 UNIT TOTAL LF 2 854.0* 479.9180 409,850.00* ITEM CODE 490605 TOTAL 2 409,850.00* 490606 42" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 07 1 5,913.0 268.0000 1,584,684.00 LF 08 1 416.0 230.0000 95,680.00 UNIT TOTAL LF 2 6,329.0* 265.5023 1,680,364.00* ITEM CODE 490606 TOTAL 2 1,680,364.00* 490607 48" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 04 1 246.0 735.0000 180,810.00 LF 06 1 730.0 750.0000 547,500.00 UNIT TOTAL LF 2 976.0* 746.2193 728,310.00* ITEM CODE 490607 TOTAL 2 728,310.00* 490609 60" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 03 1 326.0 1,500.0000 489,000.00 LF 04 1 79.0 735.0000 58,065.00 UNIT TOTAL LF 2 405.0* 1,350.7778 547,065.00* ITEM CODE 490609 TOTAL 2 547,065.00* 490611 72" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 05 1 256.0 1,000.0000 256,000.00

Page 154: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 150 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 1 256.0* 1,000.0000 256,000.00* ITEM CODE 490611 TOTAL 1 256,000.00* 490615 18" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 04 1 300.0 160.0000 48,000.00 UNIT TOTAL LF 1 300.0* 160.0000 48,000.00* ITEM CODE 490615 TOTAL 1 48,000.00* 490616 84" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 04 1 595.0 1,700.0000 1,011,500.00 LF 08 1 605.0 1,310.0000 792,550.00 UNIT TOTAL LF 2 1,200.0* 1,503.3750 1,804,050.00* ITEM CODE 490616 TOTAL 2 1,804,050.00* 490618 96" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 03 1 96.0 1,400.0000 134,400.00 UNIT TOTAL LF 1 96.0* 1,400.0000 134,400.00* ITEM CODE 490618 TOTAL 1 134,400.00* 490620 108" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 11 1 188.0 2,395.0000 450,260.00 UNIT TOTAL LF 1 188.0* 2,395.0000 450,260.00* ITEM CODE 490620 TOTAL 1 450,260.00* 490742 FURNISH PILING (CLASS 90) (ALTERNATIVE W) LF 07 1 34,314.0 40.0000 1,372,560.00 UNIT TOTAL LF 1 34,314.0* 40.0000 1,372,560.00* ITEM CODE 490742 TOTAL 1 1,372,560.00* 490743 DRIVE PILE (CLASS 90) (ALTERNATIVE W) EA 07 1 669.0 1,100.0000 735,900.00

Page 155: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 151 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 1 669.0* 1,100.0000 735,900.00* ITEM CODE 490743 TOTAL 1 735,900.00* 490746 FURNISH PILING (CLASS 140) (ALTERNATIVE W) LF 05 1 258.0 45.0000 11,610.00 LF 07 1 28,001.0 47.2500 1,323,047.25 UNIT TOTAL LF 2 28,259.0* 47.2295 1,334,657.25* ITEM CODE 490746 TOTAL 2 1,334,657.25* 490747 DRIVE PILE (CLASS 140) (ALTERNATIVE W) EA 05 1 10.0 1,650.0000 16,500.00 EA 07 1 476.0 1,100.0000 523,600.00 UNIT TOTAL EA 2 486.0* 1,111.3169 540,100.00* ITEM CODE 490747 TOTAL 2 540,100.00* 490782 FURNISH PILING (CLASS 200) (ALTERNATIVE W) LF 04 1 13,704.0 55.0000 753,720.00 LF 05 1 16,055.0 55.0000 883,025.00 LF 06 1 2,403.0 50.0000 120,150.00 UNIT TOTAL LF 3 32,162.0* 54.6264 1,756,895.00* ITEM CODE 490782 TOTAL 3 1,756,895.00* 490783 DRIVE PILE (CLASS 200) (ALTERNATIVE W) EA 04 1 164.0 700.0000 114,800.00 EA 05 1 302.0 1,675.0000 505,850.00 EA 06 1 44.0 2,200.0000 96,800.00 UNIT TOTAL EA 3 510.0* 1,406.7647 717,450.00* ITEM CODE 490783 TOTAL 3 717,450.00* 495115 FURNISH 24" CAST-IN-STEEL SHELL CONCRETE PILING LF 07 1 9,387.0 73.5000 689,944.50 UNIT TOTAL LF 1 9,387.0* 73.5000 689,944.50* ITEM CODE 495115 TOTAL 1 689,944.50*

Page 156: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 152 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 495116 DRIVE 24" CAST-IN-STEEL SHELL CONCRETE PILE EA 07 1 242.0 2,890.0000 699,380.00 UNIT TOTAL EA 1 242.0* 2,890.0000 699,380.00* ITEM CODE 495116 TOTAL 1 699,380.00* 498009 16" CAST-IN-DRILLED-HOLE CONCRETE PILING (BARRIER) LF 07 1 4,380.0 66.0000 289,080.00 UNIT TOTAL LF 1 4,380.0* 66.0000 289,080.00* ITEM CODE 498009 TOTAL 1 289,080.00* 498022 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (SOUND WALL) LF 05 1 2,860.0 285.0000 815,100.00 UNIT TOTAL LF 1 2,860.0* 285.0000 815,100.00* ITEM CODE 498022 TOTAL 1 815,100.00* 498042 30" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION) LF 07 1 22.0 820.0000 18,040.00 UNIT TOTAL LF 1 22.0* 820.0000 18,040.00* ITEM CODE 498042 TOTAL 1 18,040.00* 498044 36" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION) LF 04 1 26.0 850.0000 22,100.00 LF 07 1 15.0 565.0000 8,475.00 LF 11 2 122.0 750.0000 91,500.00 UNIT TOTAL LF 4 163.0* 748.9264 122,075.00* ITEM CODE 498044 TOTAL 4 122,075.00* 498050 54" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION) LF 10 1 140.0 895.0000 125,300.00 LF 12 2 62.0 866.1290 53,700.00 UNIT TOTAL LF 3 202.0* 886.1386 179,000.00*

Page 157: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 153 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 498050 TOTAL 3 179,000.00* 498052 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION) LF 03 2 184.0 985.4348 181,320.00 LF 04 3 170.0 1,437.5397 244,381.75 LF 05 1 23.0 740.0000 17,020.00 LF 06 2 48.0 1,575.8333 75,640.00 LF 07 3 439.0 928.8155 407,750.00 LF 08 3 132.0 798.6667 105,424.00 LF 10 5 395.0 1,006.3089 397,492.00 LF 11 5 257.0 1,077.9611 277,036.00 LF 12 3 441.0 1,621.6553 715,150.00 UNIT TOTAL LF 27 2,089.0* 1,159.0300 2,421,213.75* ITEM CODE 498052 TOTAL 27 2,421,213.75* 500001 PRESTRESSING CAST-IN-PLACE CONCRETE LS 02 1 85,000.00 LS 03 2 230,300.00 LS 04 1 90,000.00 LS 05 2 610,000.00 LS 07 1 504,000.00 LS 08 1 340,000.00 LS 11 1 210,800.00 UNIT TOTAL LS 9 2,070,100.00 ITEM CODE 500001 TOTAL 9 2,070,100.00* 500010 PRESTRESSING LS 02 1 50,000.00 UNIT TOTAL LS 1 50,000.00 ITEM CODE 500010 TOTAL 1 50,000.00* 510000 SEAL COURSE CONCRETE CY 02 1 60.0 466.0000 27,960.00 CY 04 1 145.0 300.0000 43,500.00 UNIT TOTAL CY 2 205.0* 348.5854 71,460.00* ITEM CODE 510000 TOTAL 2 71,460.00*

Page 158: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 154 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 510050 STRUCTURAL CONCRETE CY 02 1 35.0 850.0000 29,750.00 CY 07 4 3,441.0 523.6739 1,801,962.00 CY 08 1 1,628.0 650.0000 1,058,200.00 UNIT TOTAL CY 6 5,104.0* 566.2053 2,889,912.00* ITEM CODE 510050 TOTAL 6 2,889,912.00* 510051 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 01 1 34.0 1,600.0000 54,400.00 CY 02 3 505.0 649.3069 327,900.00 CY 03 1 114.0 425.0000 48,450.00 CY 04 5 1,309.0 596.9060 781,350.00 CY 05 3 1,664.0 347.9026 578,910.00 CY 06 3 538.0 801.0223 430,950.00 CY 07 1 6,964.0 285.0000 1,984,740.00 CY 08 3 861.0 462.5436 398,250.00 CY 11 1 52.0 377.0000 19,604.00 CY 12 1 49.0 600.0000 29,400.00 UNIT TOTAL CY 22 12,090.0* 384.9424 4,653,954.00* ITEM CODE 510051 TOTAL 22 4,653,954.00* 510053 STRUCTURAL CONCRETE, BRIDGE CY 01 5 202.0 3,350.6188 676,825.00 CY 02 4 2,361.0 2,023.6908 4,777,934.00 CY 03 4 1,677.0 2,211.5301 3,708,736.00 CY 04 8 3,516.3 1,148.7894 4,039,488.00 CY 05 7 8,899.6 749.4332 6,669,655.30 CY 06 6 1,440.0 1,475.6250 2,124,900.00 CY 07 6 32,464.2 591.9604 19,217,519.60 CY 08 4 6,725.0 701.1303 4,715,101.00 CY 10 3 118.9 4,008.4104 476,600.00 CY 11 2 1,712.0 616.1669 1,054,877.72 CY 12 4 689.0 1,088.5457 750,008.00 UNIT TOTAL CY 53 59,805.0* 806.1474 48,211,644.62* ITEM CODE 510053 TOTAL 53 48,211,644.62* 510054 STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 01 1 262.0 1,640.0000 429,680.00

Page 159: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 155 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 02 3 1,044.0 1,165.8621 1,217,160.00 CY 03 1 878.0 909.0000 798,102.00 CY 04 3 1,853.0 729.3578 1,351,500.00 CY 05 1 1,067.0 965.0000 1,029,655.00 CY 06 1 269.0 2,235.0000 601,215.00 CY 12 2 428.0 1,012.5000 433,350.00 UNIT TOTAL CY 12 5,801.0* 1,010.2848 5,860,662.00* ITEM CODE 510054 TOTAL 12 5,860,662.00* 510058 STRUCTURAL CONCRETE, WALL CY 04 1 21.8 600.0000 13,080.00 CY 11 1 13.0 1,140.0000 14,820.00 UNIT TOTAL CY 2 34.8* 801.7241 27,900.00* ITEM CODE 510058 TOTAL 2 27,900.00* 510060 STRUCTURAL CONCRETE, RETAINING WALL CY 01 1 57.0 1,400.0000 79,800.00 CY 03 2 473.0 782.4524 370,100.00 CY 04 5 2,922.0 712.8264 2,082,878.75 CY 05 2 3,129.0 518.0511 1,620,982.00 CY 06 1 30.0 2,083.0000 62,490.00 CY 07 5 10,846.0 435.1871 4,720,039.00 CY 08 1 200.0 450.0000 90,000.00 CY 10 3 1,362.0 1,681.7860 2,290,592.50 CY 11 3 2,982.0 458.7976 1,368,134.34 CY 12 4 1,454.0 462.6528 672,697.20 UNIT TOTAL CY 27 23,455.0* 569.5039 13,357,713.79* ITEM CODE 510060 TOTAL 27 13,357,713.79* 510061 STRUCTURAL CONCRETE, SOUND WALL CY 02 1 11.0 850.0000 9,350.00 CY 05 1 434.0 570.0000 247,380.00 UNIT TOTAL CY 2 445.0* 576.9213 256,730.00* ITEM CODE 510061 TOTAL 2 256,730.00* 510069 STRUCTURE CONCRETE (PUMPING PLANT)

Page 160: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 156 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 510069 STRUCTURE CONCRETE (PUMPING PLANT) LS 03 1 100.00 UNIT TOTAL LS 1 100.00 ITEM CODE 510069 TOTAL 1 100.00* 510072 STRUCTURAL CONCRETE, BARRIER SLAB CY 01 5 823.0 797.7914 656,582.30 CY 02 2 278.0 701.1331 194,915.00 CY 04 4 671.0 567.1714 380,572.00 CY 05 1 412.0 530.0000 218,360.00 CY 07 1 295.0 540.0000 159,300.00 CY 12 1 90.0 785.6000 70,704.00 UNIT TOTAL CY 14 2,569.0* 654.1196 1,680,433.30* ITEM CODE 510072 TOTAL 14 1,680,433.30* 510080 STRUCTURAL CONCRETE, APPROACH SLAB CY 04 1 879.0 735.0000 646,065.00 UNIT TOTAL CY 1 879.0* 735.0000 646,065.00* ITEM CODE 510080 TOTAL 1 646,065.00* 510081 AGGREGATE BASE (APPROACH SLAB) CY 02 2 51.0 745.5882 38,025.00 CY 03 1 11.0 375.0000 4,125.00 CY 04 2 94.0 831.6489 78,175.00 CY 07 1 38.0 350.0000 13,300.00 CY 10 5 64.0 389.2773 24,913.75 UNIT TOTAL CY 11 258.0* 614.4913 158,538.75* ITEM CODE 510081 TOTAL 11 158,538.75* 510086 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) CY 04 3 736.0 584.0965 429,895.00 CY 05 2 856.0 677.6636 580,080.00 CY 07 1 884.0 643.0000 568,412.00 CY 08 3 672.0 721.2054 484,650.00 CY 12 1 33.0 600.0000 19,800.00

Page 161: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 157 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL CY 10 3,181.0* 654.7743 2,082,837.00* ITEM CODE 510086 TOTAL 10 2,082,837.00* 510087 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R) CY 02 2 496.0 1,173.1452 581,880.00 CY 03 2 330.0 1,429.8884 471,863.16 CY 04 1 835.0 945.0000 789,075.00 CY 05 1 724.0 655.0000 474,220.00 CY 07 7 2,203.0 924.8643 2,037,476.00 CY 10 7 935.0 1,195.6912 1,117,971.25 CY 11 1 60.0 1,520.0000 91,200.00 CY 12 2 567.0 1,076.7196 610,500.00 UNIT TOTAL CY 23 6,150.0* 1,003.9326 6,174,185.41* ITEM CODE 510087 TOTAL 23 6,174,185.41* 510088 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 2 313.0 586.4217 183,550.00 CY 07 1 420.0 662.0000 278,040.00 UNIT TOTAL CY 3 733.0* 629.7271 461,590.00* ITEM CODE 510088 TOTAL 3 461,590.00* 510090 STRUCTURAL CONCRETE, BOX CULVERT CY 04 1 901.0 1,000.0000 901,000.00 CY 05 3 4,164.4 481.0369 2,003,230.00 CY 06 1 460.0 815.0000 374,900.00 CY 07 1 617.0 360.0000 222,120.00 CY 08 1 6.0 2,000.0000 12,000.00 CY 11 2 411.0 887.7737 364,875.00 UNIT TOTAL CY 9 6,559.4* 591.2317 3,878,125.00* ITEM CODE 510090 TOTAL 9 3,878,125.00* 510092 STRUCTURAL CONCRETE, HEADWALL CY 01 2 211.5 2,128.3452 450,145.00 CY 03 1 20.0 1,100.0000 22,000.00 CY 05 2 73.1 1,214.5691 88,785.00 CY 06 1 62.0 867.0000 53,754.00 CY 08 2 1,151.0 776.3684 893,600.00

Page 162: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 158 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) STRUCTURAL CONCRETE, HEADWALL CY 11 1 15.0 1,600.0000 24,000.00 CY 12 1 1.5 2,616.8000 3,925.20 UNIT TOTAL CY 10 1,534.1* 1,001.3749 1,536,209.20* ITEM CODE 510092 TOTAL 10 1,536,209.20* 510094 STRUCTURAL CONCRETE, DRAINAGE INLET CY 01 1 11.0 1,810.0000 19,910.00 CY 02 1 3.9 2,500.0000 9,750.00 CY 03 3 51.0 2,045.0980 104,300.00 CY 04 11 93.0 2,350.7634 218,621.00 CY 05 2 175.7 1,509.0211 265,135.00 CY 06 2 22.8 2,262.3684 51,582.00 CY 07 1 24.0 1,750.0000 42,000.00 CY 11 4 322.0 1,831.5901 589,772.00 CY 12 3 295.5 1,695.4948 501,018.70 UNIT TOTAL CY 28 998.9* 1,804.0732 1,802,088.70* ITEM CODE 510094 TOTAL 28 1,802,088.70* 510501 MINOR CONCRETE CY 02 1 2.9 600.0000 1,740.00 CY 03 3 314.4 744.5929 234,100.00 CY 04 1 1,395.0 143.7500 200,531.25 UNIT TOTAL CY 5 1,712.3* 254.8451 436,371.25* ITEM CODE 510501 TOTAL 5 436,371.25* 510502 MINOR CONCRETE (MINOR STRUCTURE) CY 01 12 385.3 2,224.3665 857,048.40 CY 02 8 344.4 2,056.7276 708,337.00 CY 03 9 1,163.8 1,348.1379 1,568,962.92 CY 04 11 429.3 1,616.4046 693,922.50 CY 05 8 734.7 1,619.5141 1,189,857.00 CY 06 6 42.8 2,202.4907 94,266.60 CY 07 15 1,422.4 1,693.2846 2,408,528.02 CY 08 7 496.1 1,324.4306 657,050.00 CY 10 8 128.8 2,347.8102 302,397.95 CY 11 12 416.7 1,918.2644 799,340.78 CY 12 10 234.0 1,751.8985 409,944.24

Page 163: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 159 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL CY 106 5,798.3* 1,671.1201 9,689,655.41* ITEM CODE 510502 TOTAL 106 9,689,655.41* 510526 MINOR CONCRETE (BACKFILL) CY 01 1 41.0 239.0000 9,799.00 CY 02 1 1.0 500.0000 500.00 CY 03 3 310.0 202.1129 62,655.00 CY 04 3 192.4 191.9569 36,932.50 CY 05 1 42.0 500.0000 21,000.00 CY 08 1 180.0 485.0000 87,300.00 CY 11 2 38.0 541.2105 20,566.00 CY 12 1 25.0 315.0000 7,875.00 UNIT TOTAL CY 13 829.4* 297.3565 246,627.50* ITEM CODE 510526 TOTAL 13 246,627.50* 510800 PAVING NOTCH EXTENSION CF 02 1 485.0 110.0000 53,350.00 CF 03 2 231.0 439.4954 101,523.44 CF 04 1 361.0 606.9000 219,090.90 CF 05 1 430.0 90.0000 38,700.00 CF 07 5 976.0 128.8823 125,789.10 CF 10 6 488.0 218.3791 106,569.00 CF 11 1 27.0 154.0000 4,158.00 CF 12 1 402.0 350.0000 140,700.00 UNIT TOTAL CF 18 3,400.0* 232.3178 789,880.44* ITEM CODE 510800 TOTAL 18 789,880.44* 510805 DIAPHRAGM BOLSTER EA 06 3 44.0 4,134.0909 181,900.00 UNIT TOTAL EA 3 44.0* 4,134.0909 181,900.00* ITEM CODE 510805 TOTAL 3 181,900.00* 511001 LIGHTWEIGHT CONCRETE CY 04 1 87.0 260.0000 22,620.00 UNIT TOTAL CY 1 87.0* 260.0000 22,620.00* ITEM CODE 511001 TOTAL 1 22,620.00*

Page 164: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 160 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 511035 ARCHITECTURAL TREATMENT SQFT 03 1 2,030.0 45.0000 91,350.00 SQFT 05 1 597.0 11.0000 6,567.00 SQFT 10 1 548.0 47.0000 25,756.00 SQFT 11 1 4,536.0 20.0000 90,720.00 UNIT TOTAL SQFT 4 7,711.0* 27.8035 214,393.00* ITEM CODE 511035 TOTAL 4 214,393.00* 511055 CONCRETE SURFACE TEXTURE SQFT 04 1 4,386.0 6.2500 27,412.50 SQFT 08 1 1,440.0 30.0000 43,200.00 UNIT TOTAL SQFT 2 5,826.0* 12.1202 70,612.50* ITEM CODE 511055 TOTAL 2 70,612.50* 511063 FRACTURED FIN TEXTURE SQFT 12 1 1,100.0 21.0000 23,100.00 UNIT TOTAL SQFT 1 1,100.0* 21.0000 23,100.00* ITEM CODE 511063 TOTAL 1 23,100.00* 511064 FRACTURED RIB TEXTURE SQFT 04 2 14,660.0 11.1362 163,256.25 SQFT 06 1 2,788.0 25.0000 69,700.00 SQFT 07 1 2,600.0 5.5000 14,300.00 SQFT 11 1 973.0 34.9300 33,986.89 UNIT TOTAL SQFT 5 21,021.0* 13.3792 281,243.14* ITEM CODE 511064 TOTAL 5 281,243.14* 511070 RIPPED TEXTURE (REINFORCING BAR) SQFT 06 1 250.0 30.2500 7,562.50 UNIT TOTAL SQFT 1 250.0* 30.2500 7,562.50* ITEM CODE 511070 TOTAL 1 7,562.50* 511106 DRILL AND BOND DOWEL

Page 165: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 161 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 511106 DRILL AND BOND DOWEL LF 01 4 433.0 45.0947 19,526.00 LF 02 3 1,753.0 38.2191 66,998.00 LF 04 4 968.0 42.2800 40,927.00 LF 05 2 1,171.0 32.5952 38,169.00 LF 06 3 3,695.0 35.3819 130,736.00 LF 07 6 4,365.0 21.0323 91,806.20 LF 10 1 180.0 90.0000 16,200.00 LF 11 2 375.0 68.8534 25,820.04 LF 12 3 338.0 50.1302 16,944.00 UNIT TOTAL LF 28 13,278.0* 33.6742 447,126.24* ITEM CODE 511106 TOTAL 28 447,126.24* 511110 DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) EA 01 1 1,216.0 37.0000 44,992.00 EA 02 1 490.0 33.0000 16,170.00 EA 05 1 2,383.0 31.0000 73,873.00 EA 07 1 1,398.0 29.4000 41,101.20 EA 08 1 54.0 67.0000 3,618.00 EA 12 1 70.0 40.0000 2,800.00 UNIT TOTAL EA 6 5,611.0* 32.5351 182,554.20* ITEM CODE 511110 TOTAL 6 182,554.20* 511118 CLEAN EXPANSION JOINT LF 01 2 1,158.0 27.4758 31,817.00 LF 02 2 437.0 39.6224 17,315.00 LF 03 5 3,111.0 24.6011 76,533.88 LF 04 5 8,001.0 18.4919 147,953.50 LF 05 3 1,650.0 17.7081 29,218.34 LF 06 2 1,297.0 16.0231 20,782.00 LF 07 17 32,441.0 13.0228 422,474.10 LF 08 4 3,354.0 18.8805 63,325.20 LF 10 6 1,983.0 24.5935 48,768.84 LF 11 2 3,744.0 23.7965 89,094.00 LF 12 2 542.0 16.7897 9,100.00 UNIT TOTAL LF 50 57,718.0* 16.5699 956,381.86* ITEM CODE 511118 TOTAL 50 956,381.86* 511123 CONCRETE (RAPID SETTING)

Page 166: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 162 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 511123 CONCRETE (RAPID SETTING) CF 04 2 1,370.0 20.0365 27,450.00 CF 11 1 6,550.0 2.6000 17,030.00 UNIT TOTAL CF 3 7,920.0* 5.6162 44,480.00* ITEM CODE 511123 TOTAL 3 44,480.00* 512001 FURNISH PRECAST CONCRETE GIRDER (20'-30') EA 05 1 8.0 9,300.0000 74,400.00 UNIT TOTAL EA 1 8.0* 9,300.0000 74,400.00* ITEM CODE 512001 TOTAL 1 74,400.00* 512202 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (30'-40') EA 05 1 8.0 11,200.0000 89,600.00 UNIT TOTAL EA 1 8.0* 11,200.0000 89,600.00* ITEM CODE 512202 TOTAL 1 89,600.00* 512203 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (40'-50') EA 02 1 6.0 19,344.0000 116,064.00 EA 05 1 2.0 12,800.0000 25,600.00 UNIT TOTAL EA 2 8.0* 17,708.0000 141,664.00* ITEM CODE 512203 TOTAL 2 141,664.00* 512204 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (50'-60') EA 05 1 6.0 14,100.0000 84,600.00 UNIT TOTAL EA 1 6.0* 14,100.0000 84,600.00* ITEM CODE 512204 TOTAL 1 84,600.00* 512206 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (70'-80') EA 08 1 14.0 13,000.0000 182,000.00 UNIT TOTAL EA 1 14.0* 13,000.0000 182,000.00* ITEM CODE 512206 TOTAL 1 182,000.00*

Page 167: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 163 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 512207 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (80'-90') EA 05 1 12.0 23,800.0000 285,600.00 EA 08 1 14.0 15,000.0000 210,000.00 UNIT TOTAL EA 2 26.0* 19,061.5385 495,600.00* ITEM CODE 512207 TOTAL 2 495,600.00* 512210 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (110'-120') EA 05 1 6.0 32,000.0000 192,000.00 UNIT TOTAL EA 1 6.0* 32,000.0000 192,000.00* ITEM CODE 512210 TOTAL 1 192,000.00* 512279 FURNISH PRECAST PRESTRESSED CONCRETE BULB-TEE GIRDER (100'-110') EA 05 1 20.0 41,000.0000 820,000.00 UNIT TOTAL EA 1 20.0* 41,000.0000 820,000.00* ITEM CODE 512279 TOTAL 1 820,000.00* 512281 FURNISH PRECAST PRESTRESSED CONCRETE BULB-TEE GIRDER (120'-130') EA 07 1 14.0 69,300.0000 970,200.00 UNIT TOTAL EA 1 14.0* 69,300.0000 970,200.00* ITEM CODE 512281 TOTAL 1 970,200.00* 512350 FURNISH PRECAST PRESTRESSED CONCRETE SLAB SQFT 04 1 10,400.0 56.0000 582,400.00 SQFT 07 1 4,703.0 60.9000 286,412.70 UNIT TOTAL SQFT 2 15,103.0* 57.5258 868,812.70* ITEM CODE 512350 TOTAL 2 868,812.70* 512354 FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV) SQFT 04 1 2,046.0 60.0000 122,760.00 SQFT 08 1 26,963.0 42.0000 1,132,446.00 UNIT TOTAL SQFT 2 29,009.0* 43.2695 1,255,206.00*

Page 168: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 164 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 512354 TOTAL 2 1,255,206.00* 512401 ERECT PRECAST CONCRETE GIRDER EA 04 1 34.0 5,000.0000 170,000.00 EA 05 1 8.0 600.0000 4,800.00 UNIT TOTAL EA 2 42.0* 4,161.9048 174,800.00* ITEM CODE 512401 TOTAL 2 174,800.00* 512500 ERECT PRECAST PRESTRESSED CONCRETE GIRDER EA 02 1 6.0 5,760.0000 34,560.00 EA 04 1 10.0 6,250.0000 62,500.00 EA 05 1 54.0 1,220.0000 65,880.00 EA 07 1 14.0 3,465.0000 48,510.00 EA 08 1 28.0 1,700.0000 47,600.00 UNIT TOTAL EA 5 112.0* 2,312.9464 259,050.00* ITEM CODE 512500 TOTAL 5 259,050.00* 512510 ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT EA 04 1 11.0 1,700.0000 18,700.00 EA 07 1 198.0 397.0000 78,606.00 EA 08 1 221.0 690.0000 152,490.00 UNIT TOTAL EA 3 430.0* 580.9209 249,796.00* ITEM CODE 512510 TOTAL 3 249,796.00* 513501 CONCRETE CLOSURE WALL SQFT 07 1 8,033.0 44.0000 353,452.00 UNIT TOTAL SQFT 1 8,033.0* 44.0000 353,452.00* ITEM CODE 513501 TOTAL 1 353,452.00* 518040 REPLACE BEARING PAD EA 01 1 6.0 1,800.0000 10,800.00 UNIT TOTAL EA 1 6.0* 1,800.0000 10,800.00* ITEM CODE 518040 TOTAL 1 10,800.00*

Page 169: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 165 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 518051 PTFE SPHERICAL BEARING EA 03 1 6.0 6,000.0000 36,000.00 EA 07 1 86.0 2,585.0000 222,310.00 EA 08 1 8.0 4,800.0000 38,400.00 EA 10 1 14.0 20,000.0000 280,000.00 UNIT TOTAL EA 4 114.0* 5,058.8596 576,710.00* ITEM CODE 518051 TOTAL 4 576,710.00* 519078 SNOWPLOW DEFLECTOR EA 03 1 60.0 225.0000 13,500.00 UNIT TOTAL EA 1 60.0* 225.0000 13,500.00* ITEM CODE 519078 TOTAL 1 13,500.00* 519081 JOINT SEAL (MR 1/2") LF 01 2 769.0 33.7789 25,976.00 LF 02 2 821.0 47.5700 39,055.00 LF 03 4 450.0 40.5134 18,231.04 LF 04 5 3,371.0 35.4393 119,466.00 LF 05 4 1,099.0 63.0177 69,256.48 LF 06 1 572.0 26.0000 14,872.00 LF 07 14 16,014.0 20.1422 322,556.47 LF 08 1 78.0 60.0000 4,680.00 LF 10 4 1,451.0 35.0398 50,842.72 LF 11 1 710.0 21.4000 15,194.00 LF 12 2 680.0 37.7971 25,702.00 UNIT TOTAL LF 40 26,015.0* 27.1317 705,831.71* ITEM CODE 519081 TOTAL 40 705,831.71* 519088 JOINT SEAL (MR 1") LF 01 3 434.0 58.4124 25,351.00 LF 02 2 619.0 40.7932 25,251.00 LF 03 2 500.0 33.5600 16,780.00 LF 04 8 3,093.0 40.7005 125,886.50 LF 05 5 1,534.0 71.6217 109,867.64 LF 06 2 300.0 72.6667 21,800.00 LF 07 14 7,568.0 30.3631 229,787.74 LF 08 4 1,778.0 33.2693 59,152.80 LF 10 5 845.0 59.0828 49,924.94

Page 170: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 166 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) JOINT SEAL (MR 1") LF 11 2 2,068.0 33.0513 68,350.00 LF 12 3 1,049.0 43.7703 45,915.00 UNIT TOTAL LF 50 19,788.0* 39.3201 778,066.62* ITEM CODE 519088 TOTAL 50 778,066.62* 519091 JOINT SEAL (MR 1 1/2") LF 02 1 181.0 73.0000 13,213.00 LF 03 1 106.0 60.4800 6,410.88 LF 04 4 912.0 46.6737 42,566.40 LF 05 3 891.0 75.5163 67,285.00 LF 06 1 20.0 250.0000 5,000.00 LF 07 11 1,840.0 67.4811 124,165.29 LF 08 4 1,444.0 67.0305 96,792.00 LF 10 1 39.0 80.0000 3,120.00 LF 11 1 267.0 50.0000 13,350.00 UNIT TOTAL LF 27 5,700.0* 65.2461 371,902.57* ITEM CODE 519091 TOTAL 27 371,902.57* 519092 JOINT SEAL ASSEMBLY (MR 2 1/2") LF 02 1 42.0 300.0000 12,600.00 UNIT TOTAL LF 1 42.0* 300.0000 12,600.00* ITEM CODE 519092 TOTAL 1 12,600.00* 519093 JOINT SEAL ASSEMBLY (MR 3") LF 07 2 275.0 334.7055 92,044.00 UNIT TOTAL LF 2 275.0* 334.7055 92,044.00* ITEM CODE 519093 TOTAL 2 92,044.00* 519094 JOINT SEAL ASSEMBLY (MR 3 1/2") LF 02 1 42.0 300.0000 12,600.00 LF 07 1 135.0 230.0000 31,050.00 UNIT TOTAL LF 2 177.0* 246.6102 43,650.00* ITEM CODE 519094 TOTAL 2 43,650.00*

Page 171: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 167 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 519095 JOINT SEAL ASSEMBLY (MR 4") LF 07 2 168.0 513.0952 86,200.00 LF 08 2 185.0 298.9189 55,300.00 LF 11 1 39.0 260.0000 10,140.00 UNIT TOTAL LF 5 392.0* 386.8367 151,640.00* ITEM CODE 519095 TOTAL 5 151,640.00* 519097 JOINT SEAL ASSEMBLY (MR 5") LF 12 1 95.0 780.0000 74,100.00 UNIT TOTAL LF 1 95.0* 780.0000 74,100.00* ITEM CODE 519097 TOTAL 1 74,100.00* 519099 JOINT SEAL ASSEMBLY (MR 6") LF 07 1 122.0 1,492.0000 182,024.00 UNIT TOTAL LF 1 122.0* 1,492.0000 182,024.00* ITEM CODE 519099 TOTAL 1 182,024.00* 519100 JOINT SEAL (MR 2") LF 02 1 42.0 490.0000 20,580.00 LF 03 5 989.0 83.2324 82,316.80 LF 04 4 924.0 71.4606 66,029.60 LF 05 2 312.0 115.7692 36,120.00 LF 06 2 262.0 148.4733 38,900.00 LF 07 5 668.0 90.7021 60,589.00 LF 08 2 266.0 111.0150 29,530.00 LF 10 3 389.0 67.4366 26,232.84 LF 11 1 52.0 73.0000 3,796.00 UNIT TOTAL LF 25 3,904.0* 93.2618 364,094.24* ITEM CODE 519100 TOTAL 25 364,094.24* 519102 JOINT SEAL (TYPE AL) LF 03 1 735.0 14.0000 10,290.00 LF 04 1 648.0 14.2000 9,201.60 LF 07 7 2,857.0 18.9428 54,119.65 LF 08 1 60.0 35.0000 2,100.00

Page 172: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 168 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 10 4,300.0* 17.6073 75,711.25* ITEM CODE 519102 TOTAL 10 75,711.25* 519105 JOINT SEAL ASSEMBLY (MR 7") LF 03 1 44.0 2,000.0000 88,000.00 UNIT TOTAL LF 1 44.0* 2,000.0000 88,000.00* ITEM CODE 519105 TOTAL 1 88,000.00* 519109 JOINT SEAL ASSEMBLY (MR 6 1/2") LF 07 1 131.0 1,500.0000 196,500.00 UNIT TOTAL LF 1 131.0* 1,500.0000 196,500.00* ITEM CODE 519109 TOTAL 1 196,500.00* 519118 JOINT SEAL ASSEMBLY (MR 9") LF 07 1 135.0 2,095.0000 282,825.00 UNIT TOTAL LF 1 135.0* 2,095.0000 282,825.00* ITEM CODE 519118 TOTAL 1 282,825.00* 519119 JOINT SEAL ASSEMBLY (MR 9 1/2") LF 12 1 41.0 1,683.0000 69,003.00 UNIT TOTAL LF 1 41.0* 1,683.0000 69,003.00* ITEM CODE 519119 TOTAL 1 69,003.00* 520101 BAR REINFORCING STEEL LB 01 3 79,026.0 1.4430 114,031.50 LB 02 1 1,338.0 2.5000 3,345.00 LB 04 3 17,022.0 1.2598 21,444.00 LB 05 1 25,452.0 1.5000 38,178.00 LB 06 2 1,919.0 3.1866 6,115.00 LB 07 5 822,958.1 .8498 699,346.10 LB 08 2 295,266.0 1.2810 378,239.20 LB 10 1 3,114.0 2.5000 7,785.00 UNIT TOTAL LB 18 1,246,095.1* 1.0180 1,268,483.80*

Page 173: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 169 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 520101 TOTAL 18 1,268,483.80* 520102 BAR REINFORCING STEEL (BRIDGE) LB 01 5 80,065.0 1.8014 144,228.60 LB 02 3 430,484.0 1.0648 458,366.30 LB 03 3 629,416.0 1.0059 633,137.00 LB 04 7 1,830,106.0 .8740 1,599,536.20 LB 05 7 3,234,025.0 .9809 3,172,345.25 LB 06 6 656,966.0 1.2642 830,522.50 LB 07 6 11,438,360.0 .9203 10,527,196.60 LB 08 4 1,792,743.0 .8088 1,449,895.06 LB 10 3 15,665.0 3.0533 47,830.17 LB 11 1 663,123.0 1.0000 663,123.00 LB 12 4 431,450.0 .9074 391,514.00 UNIT TOTAL LB 49 21,202,403.0* .9394 19,917,694.68* ITEM CODE 520102 TOTAL 49 19,917,694.68* 520103 BAR REINFORCING STEEL (RETAINING WALL) LB 01 1 5,811.0 1.0000 5,811.00 LB 03 1 30,847.0 1.0000 30,847.00 LB 04 6 827,576.0 1.0124 837,830.40 LB 05 2 358,082.0 1.0000 358,082.00 LB 06 1 1,347.0 .8300 1,118.01 LB 07 5 1,846,215.0 1.1664 2,153,449.95 LB 08 1 30,900.0 .8000 24,720.00 LB 10 3 168,145.0 1.4767 248,306.82 LB 11 3 407,272.0 1.0140 412,957.90 LB 12 4 205,523.0 1.1072 227,545.47 UNIT TOTAL LB 27 3,881,718.0* 1.1079 4,300,668.55* ITEM CODE 520103 TOTAL 27 4,300,668.55* 520106 BAR REINFORCING STEEL (EPOXY COATED) LB 11 1 81.0 25.0000 2,025.00 UNIT TOTAL LB 1 81.0* 25.0000 2,025.00* ITEM CODE 520106 TOTAL 1 2,025.00* 520107 BAR REINFORCING STEEL (BOX CULVERT) LB 04 1 236,800.0 1.0000 236,800.00

Page 174: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 170 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) BAR REINFORCING STEEL (BOX CULVERT) LB 05 2 860,853.0 .7669 660,191.96 LB 06 1 79,219.0 1.0000 79,219.00 LB 07 1 116,452.0 .8700 101,313.24 LB 11 2 86,991.0 .8265 71,895.50 LB 12 1 3,950.0 1.5700 6,201.50 UNIT TOTAL LB 8 1,384,265.0* .8348 1,155,621.20* ITEM CODE 520107 TOTAL 8 1,155,621.20* 520110 BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE) LB 01 1 37,775.0 1.3500 50,996.25 LB 02 4 461,070.0 1.1927 549,939.50 LB 03 1 395.0 1.0000 395.00 LB 07 1 45,920.0 .8000 36,736.00 LB 08 1 668,902.0 1.0000 668,902.00 LB 10 1 39,100.0 2.1600 84,456.00 UNIT TOTAL LB 9 1,253,162.0* 1.1103 1,391,424.75* ITEM CODE 520110 TOTAL 9 1,391,424.75* 520115 BAR REINFORCING STEEL (GALVANIZED) LB 03 1 1,657.0 3.0000 4,971.00 LB 07 2 7,227.0 2.0540 14,844.00 UNIT TOTAL LB 3 8,884.0* 2.2304 19,815.00* ITEM CODE 520115 TOTAL 3 19,815.00* 520120 HEADED BAR REINFORCEMENT EA 01 1 76.0 25.0000 1,900.00 EA 02 1 104.0 16.0000 1,664.00 EA 04 2 1,958.0 17.1706 33,620.00 EA 05 1 322.0 5.0000 1,610.00 EA 07 1 4,766.0 4.5000 21,447.00 EA 10 1 120.0 27.0000 3,240.00 EA 12 2 134.0 188.4328 25,250.00 UNIT TOTAL EA 9 7,480.0* 11.8624 88,731.00* ITEM CODE 520120 TOTAL 9 88,731.00* 530050 SCULPTED SHOTCRETE

Page 175: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 171 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 530050 SCULPTED SHOTCRETE SQFT 01 1 14,469.0 4.7500 68,727.75 SQFT 04 1 9,760.0 10.0000 97,600.00 UNIT TOTAL SQFT 2 24,229.0* 6.8648 166,327.75* ITEM CODE 530050 TOTAL 2 166,327.75* 530100 SHOTCRETE CY 05 1 144.0 730.0000 105,120.00 CY 11 1 326.0 1,005.0000 327,630.00 UNIT TOTAL CY 2 470.0* 920.7447 432,750.00* ITEM CODE 530100 TOTAL 2 432,750.00* 530200 STRUCTURAL SHOTCRETE CY 01 2 937.0 484.1836 453,680.00 CY 03 1 50.0 700.0000 35,000.00 CY 04 2 718.0 637.6462 457,830.00 CY 07 1 170.0 1,070.0000 181,900.00 CY 12 1 95.0 550.0000 52,250.00 UNIT TOTAL CY 7 1,970.0* 599.3198 1,180,660.00* ITEM CODE 530200 TOTAL 7 1,180,660.00* 540100 DECK SEAL SQFT 04 1 972.0 6.5000 6,318.00 SQFT 05 1 15,382.0 2.5800 39,685.56 UNIT TOTAL SQFT 2 16,354.0* 2.8130 46,003.56* ITEM CODE 540100 TOTAL 2 46,003.56* 540101 ASPHALT MEMBRANE WATERPROOFING SQFT 01 1 231.0 25.0000 5,775.00 SQFT 05 1 1,500.0 6.4000 9,600.00 SQFT 06 1 266.0 120.0000 31,920.00 SQFT 10 1 345.0 13.0000 4,485.00 UNIT TOTAL SQFT 4 2,342.0* 22.1093 51,780.00* ITEM CODE 540101 TOTAL 4 51,780.00*

Page 176: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 172 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 540115 SLURRY LEVELING COURSE GAL 05 1 152.0 355.0000 53,960.00 UNIT TOTAL GAL 1 152.0* 355.0000 53,960.00* ITEM CODE 540115 TOTAL 1 53,960.00* 550102 STRUCTURAL STEEL (BRIDGE) LB 01 1 2,082.0 17.0000 35,394.00 LB 04 1 1,948.0 35.0000 68,180.00 LB 05 1 1,062.0 17.1700 18,234.54 LB 06 1 90,250.0 7.5000 676,875.00 LB 07 1 32.0 65.0000 2,080.00 LB 10 1 133,200.0 9.9900 1,330,668.00 UNIT TOTAL LB 6 228,574.0* 9.3249 2,131,431.54* LS 03 2 300.00 UNIT TOTAL LS 2 300.00 ITEM CODE 550102 TOTAL 8 2,131,731.54* 550110 COLUMN CASING LB 01 1 34,177.0 9.5000 324,681.50 LB 06 1 29,815.0 7.5000 223,612.50 UNIT TOTAL LB 2 63,992.0* 8.5682 548,294.00* ITEM CODE 550110 TOTAL 2 548,294.00* 550203 FURNISH STRUCTURAL STEEL (BRIDGE) LB 02 2 442,824.0 1.6976 751,740.40 LB 04 1 2,133.0 10.0000 21,330.00 LB 12 1 115,030.0 1.6000 184,048.00 UNIT TOTAL LB 4 559,987.0* 1.7092 957,118.40* ITEM CODE 550203 TOTAL 4 957,118.40* 550204 ERECT STRUCTURAL STEEL (BRIDGE) LB 02 2 442,824.0 1.2873 570,036.22 LB 04 1 2,133.0 17.5000 37,327.50 LB 12 1 115,030.0 1.1500 132,284.50

Page 177: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 173 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LB 4 559,987.0* 1.3208 739,648.22* ITEM CODE 550204 TOTAL 4 739,648.22* 560213 FURNISH SIGN STRUCTURE (LIGHTWEIGHT) LB 04 1 13,300.0 5.0000 66,500.00 LB 07 2 33,459.0 4.3926 146,972.70 LB 11 2 30,690.0 5.1315 157,485.00 UNIT TOTAL LB 5 77,449.0* 4.7897 370,957.70* ITEM CODE 560213 TOTAL 5 370,957.70* 560214 INSTALL SIGN STRUCTURE (LIGHTWEIGHT) LB 04 1 13,300.0 .8000 10,640.00 LB 07 2 33,459.0 .8027 26,859.00 LB 11 2 30,690.0 .9711 29,802.00 UNIT TOTAL LB 5 77,449.0* .8690 67,301.00* ITEM CODE 560214 TOTAL 5 67,301.00* 560218 FURNISH SIGN STRUCTURE (TRUSS) LB 03 2 112,664.0 3.9751 447,845.20 LB 04 3 111,282.0 3.4780 387,037.35 LB 05 1 17,600.0 3.2000 56,320.00 LB 06 2 31,212.0 4.1560 129,716.88 LB 07 3 380,329.0 3.1917 1,213,885.70 LB 08 3 91,900.0 3.7669 346,180.00 LB 10 5 390,695.0 3.4588 1,351,339.40 LB 11 5 183,154.0 3.3607 615,527.10 LB 12 3 314,163.0 3.7532 1,179,107.45 UNIT TOTAL LB 27 1,632,999.0* 3.5070 5,726,959.08* ITEM CODE 560218 TOTAL 27 5,726,959.08* 560219 INSTALL SIGN STRUCTURE (TRUSS) LB 03 2 112,664.0 .3092 34,836.08 LB 04 3 111,282.0 .3458 38,480.35 LB 05 1 17,600.0 .3000 5,280.00 LB 06 2 31,212.0 .3983 12,431.36 LB 07 3 380,329.0 .3314 126,034.60 LB 08 3 91,900.0 .2666 24,502.00

Page 178: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 174 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) INSTALL SIGN STRUCTURE (TRUSS) LB 10 5 390,695.0 .2818 110,090.20 LB 11 5 183,154.0 .2739 50,157.20 LB 12 3 314,163.0 .4266 134,024.90 UNIT TOTAL LB 27 1,632,999.0* .3281 535,836.69* ITEM CODE 560219 TOTAL 27 535,836.69* 560223 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY) LB 04 4 13,278.0 7.7853 103,373.00 LB 11 1 5,600.0 5.2700 29,512.00 UNIT TOTAL LB 5 18,878.0* 7.0391 132,885.00* ITEM CODE 560223 TOTAL 5 132,885.00* 560224 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY) LB 04 4 13,278.0 6.5523 87,002.00 LB 11 1 5,600.0 4.2100 23,576.00 UNIT TOTAL LB 5 18,878.0* 5.8575 110,578.00* ITEM CODE 560224 TOTAL 5 110,578.00* 560233 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 04 2 1,440.0 19.5000 28,080.00 SQFT 07 1 2,400.0 12.5000 30,000.00 UNIT TOTAL SQFT 3 3,840.0* 15.1250 58,080.00* ITEM CODE 560233 TOTAL 3 58,080.00* 560244 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 04 4 1,640.0 28.2248 46,288.70 SQFT 07 2 850.0 24.0353 20,430.00 SQFT 12 3 1,340.0 27.6807 37,092.20 UNIT TOTAL SQFT 9 3,830.0* 27.1047 103,810.90* ITEM CODE 560244 TOTAL 9 103,810.90* 560245 FURNISH LAMINATED PANEL SIGN (1"-TYPE B)

Page 179: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 175 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 560245 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 05 1 1,970.0 29.0000 57,130.00 SQFT 07 1 96.0 24.0000 2,304.00 SQFT 12 2 128.0 39.8750 5,104.00 UNIT TOTAL SQFT 4 2,194.0* 29.4157 64,538.00* ITEM CODE 560245 TOTAL 4 64,538.00* 560246 FURNISH LAMINATED PANEL SIGN (2 1/2"-TYPE B) SQFT 05 1 270.0 36.0000 9,720.00 UNIT TOTAL SQFT 1 270.0* 36.0000 9,720.00* ITEM CODE 560246 TOTAL 1 9,720.00* 560248 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) SQFT 01 5 2,941.0 7.1465 21,018.00 SQFT 02 8 815.0 13.2571 10,804.50 SQFT 03 8 930.0 12.8746 11,973.38 SQFT 04 9 4,306.0 12.7303 54,816.50 SQFT 05 4 1,330.0 15.0301 19,990.00 SQFT 06 4 357.0 12.0672 4,308.00 SQFT 07 7 1,313.0 14.6609 19,249.80 SQFT 08 9 982.0 11.6390 11,429.50 SQFT 10 12 598.0 13.2458 7,920.98 SQFT 12 16 3,615.0 18.9884 68,643.10 UNIT TOTAL SQFT 82 17,187.0* 13.3912 230,153.76* ITEM CODE 560248 TOTAL 82 230,153.76* 560249 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) SQFT 01 1 240.0 7.5000 1,800.00 SQFT 02 2 500.0 12.1600 6,080.00 SQFT 03 2 24.0 15.3333 368.00 SQFT 04 5 1,055.0 12.5886 13,281.00 SQFT 05 3 1,120.0 14.3482 16,070.00 SQFT 06 1 370.0 10.0000 3,700.00 SQFT 07 3 780.0 15.3590 11,980.00 SQFT 08 4 347.0 25.3919 8,811.00 SQFT 10 4 106.0 16.9721 1,799.04 SQFT 12 5 420.0 17.5536 7,372.50 UNIT TOTAL SQFT 30 4,962.0* 14.3615 71,261.54*

Page 180: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 176 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 560249 TOTAL 30 71,261.54* 560250 FURNISH SINGLE SHEET ALUMINUM SIGN (0.125"-UNFRAMED) SQFT 08 1 36.0 26.2500 945.00 UNIT TOTAL SQFT 1 36.0* 26.2500 945.00* ITEM CODE 560250 TOTAL 1 945.00* 560251 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) SQFT 01 1 13.0 20.0000 260.00 SQFT 03 1 23.0 29.5000 678.50 SQFT 04 3 223.0 19.4709 4,342.00 SQFT 05 1 18.0 18.0000 324.00 SQFT 07 2 104.0 19.1538 1,992.00 SQFT 08 1 44.0 20.0000 880.00 SQFT 10 1 23.0 27.0000 621.00 SQFT 12 4 392.0 19.8878 7,796.00 UNIT TOTAL SQFT 14 840.0* 20.1113 16,893.50* ITEM CODE 560251 TOTAL 14 16,893.50* 560252 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) SQFT 01 1 430.0 15.0000 6,450.00 SQFT 02 1 240.0 20.0000 4,800.00 SQFT 04 4 725.0 21.0952 15,294.00 SQFT 07 2 346.0 18.7601 6,491.00 SQFT 08 1 60.0 28.6500 1,719.00 SQFT 10 1 190.0 23.4200 4,449.80 SQFT 12 1 22.0 16.0000 352.00 UNIT TOTAL SQFT 11 2,013.0* 19.6502 39,555.80* ITEM CODE 560252 TOTAL 11 39,555.80* 562001 METAL (ROADSIDE SIGN) LB 07 3 8,080.0 10.9574 88,536.00 LB 11 1 600.0 8.0000 4,800.00 UNIT TOTAL LB 4 8,680.0* 10.7530 93,336.00* ITEM CODE 562001 TOTAL 4 93,336.00* 562002 METAL (BARRIER MOUNTED SIGN)

Page 181: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 177 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 562002 METAL (BARRIER MOUNTED SIGN) LB 06 1 160.0 11.0000 1,760.00 LB 12 1 4,540.0 19.0000 86,260.00 UNIT TOTAL LB 2 4,700.0* 18.7277 88,020.00* ITEM CODE 562002 TOTAL 2 88,020.00* 562004 METAL (RAIL MOUNTED SIGN) LB 07 1 1,020.0 15.5000 15,810.00 UNIT TOTAL LB 1 1,020.0* 15.5000 15,810.00* ITEM CODE 562004 TOTAL 1 15,810.00* 566011 ROADSIDE SIGN - ONE POST EA 01 7 37.0 303.2432 11,220.00 EA 02 10 336.0 294.3690 98,908.00 EA 03 9 131.0 348.7176 45,682.00 EA 04 15 456.0 281.5877 128,404.00 EA 05 5 347.0 314.0346 108,970.00 EA 06 5 257.0 234.2062 60,191.00 EA 07 11 168.0 319.4970 53,675.50 EA 08 11 74.0 309.8649 22,930.00 EA 10 14 172.0 304.7471 52,416.50 EA 11 14 209.0 314.1508 65,657.51 EA 12 15 258.0 328.1357 84,659.00 UNIT TOTAL EA 116 2,445.0* 299.6783 732,713.51* ITEM CODE 566011 TOTAL 116 732,713.51* 566012 ROADSIDE SIGN - TWO POST EA 02 6 169.0 593.2840 100,265.00 EA 03 4 8.0 419.6250 3,357.00 EA 04 7 31.0 506.1290 15,690.00 EA 05 3 48.0 413.1250 19,830.00 EA 06 8 50.0 558.4200 27,921.00 EA 07 6 27.0 847.6296 22,886.00 EA 08 2 4.0 665.0000 2,660.00 EA 10 8 50.0 904.2600 45,213.00 EA 11 7 43.0 1,056.7442 45,440.00 EA 12 7 44.0 759.4318 33,415.00 UNIT TOTAL EA 58 474.0* 668.0949 316,677.00*

Page 182: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 178 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 566012 TOTAL 58 316,677.00* 568001 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 02 2 10.0 190.0000 1,900.00 EA 03 6 88.0 85.1568 7,493.80 EA 04 8 81.0 132.7901 10,756.00 EA 05 2 4.0 199.0000 796.00 EA 06 4 29.0 55.5172 1,610.00 EA 07 9 48.0 177.7604 8,532.50 EA 08 1 20.0 100.0000 2,000.00 EA 10 7 30.0 148.6667 4,460.00 EA 11 8 121.0 136.6322 16,532.50 EA 12 10 163.0 126.7791 20,665.00 UNIT TOTAL EA 57 594.0* 125.8347 74,745.80* ITEM CODE 568001 TOTAL 57 74,745.80* 568007 INSTALL SIGN OVERLAY SQFT 06 1 18.0 157.0000 2,826.00 SQFT 11 1 24.0 31.0000 744.00 SQFT 12 1 130.0 28.0000 3,640.00 UNIT TOTAL SQFT 3 172.0* 41.9186 7,210.00* ITEM CODE 568007 TOTAL 3 7,210.00* 568015 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 04 3 20.0 553.0000 11,060.00 EA 10 1 7.0 220.0000 1,540.00 EA 11 1 5.0 400.0000 2,000.00 EA 12 2 5.0 780.0000 3,900.00 UNIT TOTAL EA 7 37.0* 500.0000 18,500.00* ITEM CODE 568015 TOTAL 7 18,500.00* 568016 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 02 1 94.0 5.0000 470.00 SQFT 04 2 61,070.0 4.7897 292,505.00 SQFT 07 2 15,240.0 11.3319 172,698.00 SQFT 12 3 4,230.0 12.1785 51,515.00 UNIT TOTAL SQFT 8 80,634.0* 6.4140 517,188.00*

Page 183: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 179 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 568016 TOTAL 8 517,188.00* 568017 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST EA 01 1 350.0 150.0000 52,500.00 EA 02 1 1.0 192.0000 192.00 EA 03 1 3.0 165.0000 495.00 EA 04 1 29.0 100.0000 2,900.00 EA 05 3 110.0 128.9727 14,187.00 EA 10 2 4.0 332.5000 1,330.00 EA 11 7 128.0 155.7852 19,940.50 EA 12 7 68.0 187.5699 12,754.75 UNIT TOTAL EA 23 693.0* 150.5040 104,299.25* ITEM CODE 568017 TOTAL 23 104,299.25* 568023 INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST) EA 01 1 3.0 1,500.0000 4,500.00 EA 02 1 10.0 1,220.0000 12,200.00 EA 04 1 2.0 1,500.0000 3,000.00 EA 05 2 27.0 1,796.2963 48,500.00 EA 10 1 2.0 1,195.0000 2,390.00 EA 12 2 5.0 3,455.0000 17,275.00 UNIT TOTAL EA 8 49.0* 1,793.1633 87,865.00* ITEM CODE 568023 TOTAL 8 87,865.00* 570115 ABUTMENT LUMBER BLOCKING MFBM 01 1 1.5 10,000.0000 15,000.00 MFBM 04 1 1.0 2,400.0000 2,400.00 UNIT TOTAL MFBM 2 2.5* 6,960.0000 17,400.00* ITEM CODE 570115 TOTAL 2 17,400.00* 575004 TIMBER LAGGING MFBM 01 6 288.0 4,937.8384 1,422,097.47 MFBM 02 1 14.0 3,500.0000 49,000.00 MFBM 04 4 33.0 5,906.4242 194,912.00 MFBM 07 1 16.0 7,000.0000 112,000.00 MFBM 11 1 1.0 6,000.0000 6,000.00 UNIT TOTAL MFBM 13 352.0* 5,068.2087 1,784,009.47*

Page 184: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 180 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 575004 TOTAL 13 1,784,009.47* 582001 SOUND WALL (MASONRY BLOCK) SQFT 02 1 530.0 28.0000 14,840.00 SQFT 04 2 38,080.0 18.3152 697,443.72 SQFT 05 1 44,282.0 30.0000 1,328,460.00 SQFT 07 1 6,890.0 17.5000 120,575.00 SQFT 12 1 1,625.0 19.0000 30,875.00 UNIT TOTAL SQFT 6 91,407.0* 23.9828 2,192,193.72* ITEM CODE 582001 TOTAL 6 2,192,193.72* 582002 ACCESS GATE (SOUND WALL) EA 02 1 1.0 7,900.0000 7,900.00 UNIT TOTAL EA 1 1.0* 7,900.0000 7,900.00* ITEM CODE 582002 TOTAL 1 7,900.00* 590106 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 01 1 115,000.00 LS 02 1 41,000.00 LS 03 1 350,000.00 LS 04 2 1,300,000.00 LS 07 1 1,226,868.00 LS 10 1 55,000.00 UNIT TOTAL LS 7 3,087,868.00 ITEM CODE 590106 TOTAL 7 3,087,868.00* 590111 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 01 1 90,000.00 LS 02 1 41,000.00 LS 03 1 543,000.00 LS 04 2 1,815,115.00 LS 07 1 614,655.00 LS 10 1 280,000.00 UNIT TOTAL LS 7 3,383,770.00 ITEM CODE 590111 TOTAL 7 3,383,770.00* 590115 CLEAN AND PAINT STRUCTURAL STEEL

Page 185: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 181 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 590115 CLEAN AND PAINT STRUCTURAL STEEL LS 02 2 219,300.00 LS 04 1 11,200.00 LS 05 1 7,200.00 LS 06 1 60,000.00 LS 10 1 60,000.00 LS 12 1 65,000.00 UNIT TOTAL LS 7 422,700.00 ITEM CODE 590115 TOTAL 7 422,700.00* 590116 CLEAN AND PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 04 2 66,400.00 LS 07 2 101,000.00 UNIT TOTAL LS 4 167,400.00 ITEM CODE 590116 TOTAL 4 167,400.00* 590120 CLEAN AND PAINT STEEL SOLDIER PILING LS 01 6 653,618.87 LS 02 1 21,000.00 LS 04 4 170,750.00 LS 07 1 15,000.00 LS 11 1 23,400.00 UNIT TOTAL LS 13 883,768.87 ITEM CODE 590120 TOTAL 13 883,768.87* 590125 SPOT BLAST CLEAN SQFT 10 1 6,500.0 34.0000 221,000.00 UNIT TOTAL SQFT 1 6,500.0* 34.0000 221,000.00* ITEM CODE 590125 TOTAL 1 221,000.00* 590135 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 01 1 1,547.0 13.0000 20,111.00 SQFT 02 2 5,069.0 43.8400 222,225.00 SQFT 03 1 7,925.0 19.0000 150,575.00 SQFT 04 2 71,540.0 10.3558 740,855.00

Page 186: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 182 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 07 1 18,200.0 39.0000 709,800.00 SQFT 10 1 8,900.0 34.0000 302,600.00 SQFT 12 1 48.0 150.0000 7,200.00 UNIT TOTAL SQFT 9 113,229.0* 19.0178 2,153,366.00* ITEM CODE 590135 TOTAL 9 2,153,366.00* 591200 ROCK STAIN SQFT 03 1 2,690.0 4.0000 10,760.00 SQFT 05 2 19,280.0 1.9367 37,340.00 SQFT 11 1 36,500.0 .4000 14,600.00 SQFT 12 1 23,300.0 .4000 9,320.00 UNIT TOTAL SQFT 5 81,770.0* .8808 72,020.00* ITEM CODE 591200 TOTAL 5 72,020.00* 597401 PAINT CURB (2-COAT) SQFT 04 2 436.0 6.2844 2,740.00 SQFT 07 1 36.0 11.0000 396.00 SQFT 12 3 2,210.0 2.8981 6,404.80 UNIT TOTAL SQFT 6 2,682.0* 3.5573 9,540.80* ITEM CODE 597401 TOTAL 6 9,540.80* 597600 PREPARE AND PAINT CONCRETE SQFT 03 1 3,657.0 5.0000 18,285.00 SQFT 05 2 6,201.0 38.6884 239,907.00 UNIT TOTAL SQFT 3 9,858.0* 26.1911 258,192.00* ITEM CODE 597600 TOTAL 3 258,192.00* 597601 PREPARE AND STAIN CONCRETE SQFT 01 4 6,622.0 12.5863 83,346.55 SQFT 02 1 947.0 34.0000 32,198.00 SQFT 04 4 12,781.0 4.4121 56,391.00 SQFT 05 1 24,416.0 1.5000 36,624.00 SQFT 07 2 9,371.0 8.9200 83,589.00 SQFT 08 1 80,612.0 1.0000 80,612.00

Page 187: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 183 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PREPARE AND STAIN CONCRETE SQFT 10 1 16,900.0 6.5000 109,850.00 SQFT 12 1 10,112.0 3.0000 30,336.00 UNIT TOTAL SQFT 15 161,761.0* 3.1710 512,946.55* ITEM CODE 597601 TOTAL 15 512,946.55* 597602 PREPARE AND STAIN SHOTCRETE SQFT 01 1 14,469.0 2.9000 41,960.10 SQFT 04 1 11,000.0 1.8200 20,020.00 UNIT TOTAL SQFT 2 25,469.0* 2.4336 61,980.10* ITEM CODE 597602 TOTAL 2 61,980.10* 598001 ANTI-GRAFFITI COATING SQFT 04 1 19,607.0 .7500 14,705.25 SQFT 05 1 8,800.0 1.0000 8,800.00 SQFT 07 1 2,411.0 3.7000 8,920.70 SQFT 11 1 4,120.0 3.0000 12,360.00 UNIT TOTAL SQFT 4 34,938.0* 1.2819 44,785.95* ITEM CODE 598001 TOTAL 4 44,785.95* 600031 REMOVE CONCRETE DECK SURFACE SQFT 11 1 8,733.0 2.0000 17,466.00 UNIT TOTAL SQFT 1 8,733.0* 2.0000 17,466.00* ITEM CODE 600031 TOTAL 1 17,466.00* 620020 8" ALTERNATIVE PIPE CULVERT LF 03 1 61.0 104.0000 6,344.00 LF 04 1 48.0 90.0000 4,320.00 UNIT TOTAL LF 2 109.0* 97.8349 10,664.00* ITEM CODE 620020 TOTAL 2 10,664.00* 620040 10" ALTERNATIVE PIPE CULVERT

Page 188: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 184 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 620040 10" ALTERNATIVE PIPE CULVERT LF 03 1 91.0 107.0000 9,737.00 UNIT TOTAL LF 1 91.0* 107.0000 9,737.00* ITEM CODE 620040 TOTAL 1 9,737.00* 620060 12" ALTERNATIVE PIPE CULVERT LF 04 1 70.0 255.0000 17,850.00 LF 05 1 81.0 87.0000 7,047.00 LF 10 1 11.0 200.0000 2,200.00 UNIT TOTAL LF 3 162.0* 167.2654 27,097.00* ITEM CODE 620060 TOTAL 3 27,097.00* 620061 12" ALTERNATIVE PIPE CULVERT (TYPE A) LF 04 1 50.0 97.7400 4,887.00 UNIT TOTAL LF 1 50.0* 97.7400 4,887.00* ITEM CODE 620061 TOTAL 1 4,887.00* 620100 18" ALTERNATIVE PIPE CULVERT LF 01 2 65.0 263.8769 17,152.00 LF 02 1 400.0 80.0000 32,000.00 LF 03 3 658.0 168.7520 111,038.80 LF 04 7 2,625.0 99.3524 260,800.00 LF 05 6 1,601.0 62.9204 100,735.50 LF 06 1 270.0 50.0000 13,500.00 LF 08 2 1,880.0 37.1543 69,850.00 LF 09 1 140.0 140.0000 19,600.00 LF 10 1 39.0 151.5000 5,908.50 LF 11 3 1,204.6 85.6882 103,220.00 UNIT TOTAL LF 27 8,882.6* 82.6115 733,804.80* ITEM CODE 620100 TOTAL 27 733,804.80* 620101 18" ALTERNATIVE PIPE CULVERT (TYPE A) LF 04 1 7,930.0 59.3000 470,249.00 UNIT TOTAL LF 1 7,930.0* 59.3000 470,249.00*

Page 189: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 185 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 620101 TOTAL 1 470,249.00* 620102 18" ALTERNATIVE PIPE CULVERT (TYPE B) LF 04 1 340.0 206.0000 70,040.00 UNIT TOTAL LF 1 340.0* 206.0000 70,040.00* ITEM CODE 620102 TOTAL 1 70,040.00* 620140 24" ALTERNATIVE PIPE CULVERT LF 01 5 2,032.0 317.2008 644,552.00 LF 02 3 180.0 194.1931 34,954.76 LF 03 1 940.0 195.0000 183,300.00 LF 04 2 1,006.0 108.6187 109,270.40 LF 05 6 17,584.0 72.8788 1,281,500.00 LF 06 2 1,212.0 65.0347 78,822.00 LF 07 1 670.0 150.0000 100,500.00 LF 08 3 1,011.0 129.3670 130,790.00 LF 09 1 1,410.0 140.0000 197,400.00 LF 10 2 997.0 74.9729 74,748.00 LF 11 4 3,281.0 96.3929 316,265.00 UNIT TOTAL LF 30 30,323.0* 103.9509 3,152,102.16* ITEM CODE 620140 TOTAL 30 3,152,102.16* 620180 30" ALTERNATIVE PIPE CULVERT LF 01 3 236.0 385.3051 90,932.00 LF 03 2 228.0 132.6842 30,252.00 LF 05 3 561.0 81.7291 45,850.00 UNIT TOTAL LF 8 1,025.0* 162.9600 167,034.00* ITEM CODE 620180 TOTAL 8 167,034.00* 620220 36" ALTERNATIVE PIPE CULVERT LF 05 2 4,880.0 102.5902 500,640.00 UNIT TOTAL LF 2 4,880.0* 102.5902 500,640.00* ITEM CODE 620220 TOTAL 2 500,640.00* 620260 42" ALTERNATIVE PIPE CULVERT

Page 190: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 186 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 620260 42" ALTERNATIVE PIPE CULVERT LF 05 2 990.0 134.3838 133,040.00 UNIT TOTAL LF 2 990.0* 134.3838 133,040.00* ITEM CODE 620260 TOTAL 2 133,040.00* 620300 48" ALTERNATIVE PIPE CULVERT LF 01 1 120.0 220.0000 26,400.00 LF 05 2 930.0 143.7097 133,650.00 LF 09 1 81.0 180.0000 14,580.00 UNIT TOTAL LF 4 1,131.0* 154.4032 174,630.00* ITEM CODE 620300 TOTAL 4 174,630.00* 620340 54" ALTERNATIVE PIPE CULVERT LF 05 1 380.0 196.0000 74,480.00 UNIT TOTAL LF 1 380.0* 196.0000 74,480.00* ITEM CODE 620340 TOTAL 1 74,480.00* 620380 60" ALTERNATIVE PIPE CULVERT LF 05 1 1,620.0 209.0000 338,580.00 UNIT TOTAL LF 1 1,620.0* 209.0000 338,580.00* ITEM CODE 620380 TOTAL 1 338,580.00* 620800 CONCRETE BACKFILL (PIPE TRENCH) CY 01 1 21.0 380.0000 7,980.00 CY 02 2 87.0 228.2989 19,862.00 CY 03 2 8.3 384.3373 3,190.00 CY 04 1 64.0 500.0000 32,000.00 CY 05 5 373.0 151.1448 56,377.00 CY 06 2 77.0 292.8571 22,550.00 CY 07 1 340.0 123.0000 41,820.00 CY 09 1 790.0 170.0000 134,300.00 CY 10 2 84.0 181.7173 15,264.25 CY 11 1 78.0 400.0000 31,200.00 UNIT TOTAL CY 18 1,922.3* 189.6391 364,543.25*

Page 191: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 187 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 620800 TOTAL 18 364,543.25* 623001 12" TEMPORARY CULVERT LF 04 1 52.0 100.0000 5,200.00 LF 05 1 280.0 43.0000 12,040.00 LF 10 1 860.0 31.3000 26,918.00 UNIT TOTAL LF 3 1,192.0* 37.0453 44,158.00* ITEM CODE 623001 TOTAL 3 44,158.00* 623003 18" TEMPORARY CULVERT LF 04 1 100.0 120.0000 12,000.00 LF 05 2 1,120.0 73.5714 82,400.00 UNIT TOTAL LF 3 1,220.0* 77.3770 94,400.00* ITEM CODE 623003 TOTAL 3 94,400.00* 623004 24" TEMPORARY CULVERT LF 05 2 172.0 115.5814 19,880.00 UNIT TOTAL LF 2 172.0* 115.5814 19,880.00* ITEM CODE 623004 TOTAL 2 19,880.00* 623006 36" TEMPORARY CULVERT LF 07 1 480.0 135.0000 64,800.00 UNIT TOTAL LF 1 480.0* 135.0000 64,800.00* ITEM CODE 623006 TOTAL 1 64,800.00* 641101 12" PLASTIC PIPE LF 03 1 450.0 75.0000 33,750.00 UNIT TOTAL LF 1 450.0* 75.0000 33,750.00* ITEM CODE 641101 TOTAL 1 33,750.00* 641104 15" PLASTIC PIPE LF 03 1 2,830.0 72.0000 203,760.00

Page 192: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 188 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 1 2,830.0* 72.0000 203,760.00* ITEM CODE 641104 TOTAL 1 203,760.00* 641107 18" PLASTIC PIPE LF 02 2 2,830.0 109.0813 308,700.00 LF 03 1 1,340.0 76.0000 101,840.00 LF 04 1 300.0 120.0000 36,000.00 LF 11 1 630.0 60.0000 37,800.00 UNIT TOTAL LF 5 5,100.0* 94.9686 484,340.00* ITEM CODE 641107 TOTAL 5 484,340.00* 641110 21" PLASTIC PIPE LF 03 1 140.0 112.0000 15,680.00 UNIT TOTAL LF 1 140.0* 112.0000 15,680.00* ITEM CODE 641110 TOTAL 1 15,680.00* 641113 24" PLASTIC PIPE LF 02 2 2,424.0 88.1856 213,762.00 LF 03 1 400.0 105.0000 42,000.00 LF 04 1 220.0 75.0000 16,500.00 LF 09 1 1,050.0 140.0000 147,000.00 UNIT TOTAL LF 5 4,094.0* 102.4089 419,262.00* ITEM CODE 641113 TOTAL 5 419,262.00* 641119 30" PLASTIC PIPE LF 03 1 170.0 144.0000 24,480.00 LF 09 1 380.0 165.0000 62,700.00 UNIT TOTAL LF 2 550.0* 158.5091 87,180.00* ITEM CODE 641119 TOTAL 2 87,180.00* 641125 36" PLASTIC PIPE LF 04 1 50.0 375.0000 18,750.00 UNIT TOTAL LF 1 50.0* 375.0000 18,750.00*

Page 193: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 189 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 641125 TOTAL 1 18,750.00* 650010 12" REINFORCED CONCRETE PIPE LF 03 1 150.0 157.0000 23,550.00 LF 04 1 40.0 275.0000 11,000.00 LF 06 2 268.0 92.3134 24,740.00 LF 10 1 36.0 93.0000 3,348.00 LF 12 2 36.0 341.5000 12,294.00 UNIT TOTAL LF 7 530.0* 141.3811 74,932.00* ITEM CODE 650010 TOTAL 7 74,932.00* 650012 15" REINFORCED CONCRETE PIPE LF 04 2 624.0 129.8077 81,000.00 LF 07 1 36.0 300.0000 10,800.00 UNIT TOTAL LF 3 660.0* 139.0909 91,800.00* ITEM CODE 650012 TOTAL 3 91,800.00* 650014 18" REINFORCED CONCRETE PIPE LF 02 1 5.0 752.0000 3,760.00 LF 03 2 4,600.0 105.5652 485,600.00 LF 04 4 3,792.0 115.8623 439,350.00 LF 05 2 112.0 208.7500 23,380.00 LF 06 7 1,197.0 136.8505 163,810.00 LF 07 5 1,770.0 158.3992 280,366.50 LF 08 2 1,485.0 95.6000 141,966.00 LF 10 2 134.0 95.0418 12,735.60 LF 11 3 1,072.0 100.4276 107,658.40 LF 12 4 573.0 105.3746 60,379.66 UNIT TOTAL LF 32 14,740.0* 116.6219 1,719,006.16* ITEM CODE 650014 TOTAL 32 1,719,006.16* 650018 24" REINFORCED CONCRETE PIPE LF 03 3 340.0 153.8176 52,298.00 LF 04 2 67.0 219.4030 14,700.00 LF 05 3 99.0 212.3232 21,020.00 LF 06 4 503.0 174.4712 87,759.00 LF 07 5 1,812.0 181.8150 329,448.80 LF 10 3 49.0 146.6796 7,187.30

Page 194: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 190 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 24" REINFORCED CONCRETE PIPE LF 11 5 2,508.0 125.3481 314,373.00 LF 12 4 16,160.0 80.2456 1,296,768.50 UNIT TOTAL LF 29 21,538.0* 98.5957 2,123,554.60* ITEM CODE 650018 TOTAL 29 2,123,554.60* 650022 30" REINFORCED CONCRETE PIPE LF 04 1 110.0 175.0000 19,250.00 LF 05 1 220.0 125.0000 27,500.00 LF 07 1 28.0 200.0000 5,600.00 LF 11 3 541.0 121.6745 65,825.92 LF 12 1 110.0 141.0600 15,516.60 UNIT TOTAL LF 7 1,009.0* 132.5000 133,692.52* ITEM CODE 650022 TOTAL 7 133,692.52* 650026 36" REINFORCED CONCRETE PIPE LF 03 2 5.3 1,404.5283 7,444.00 LF 05 4 1,603.0 146.9083 235,494.00 LF 07 2 1,230.0 133.4634 164,160.00 LF 08 1 220.0 270.0000 59,400.00 LF 10 1 11.0 155.0000 1,705.00 LF 11 1 15.0 347.0000 5,205.00 LF 12 2 2,880.0 147.0925 423,626.40 UNIT TOTAL LF 13 5,964.3* 150.4006 897,034.40* ITEM CODE 650026 TOTAL 13 897,034.40* 650030 42" REINFORCED CONCRETE PIPE LF 05 1 960.0 160.0000 153,600.00 LF 07 2 1,850.0 152.5081 282,140.00 LF 08 1 130.0 315.0000 40,950.00 UNIT TOTAL LF 4 2,940.0* 162.1395 476,690.00* ITEM CODE 650030 TOTAL 4 476,690.00* 650034 48" REINFORCED CONCRETE PIPE LF 03 1 320.0 225.0000 72,000.00

Page 195: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 191 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 48" REINFORCED CONCRETE PIPE LF 07 1 300.0 158.0000 47,400.00 LF 08 1 190.0 340.0000 64,600.00 UNIT TOTAL LF 3 810.0* 227.1605 184,000.00* ITEM CODE 650034 TOTAL 3 184,000.00* 650038 54" REINFORCED CONCRETE PIPE LF 07 1 230.0 154.0000 35,420.00 LF 08 1 120.0 375.0000 45,000.00 UNIT TOTAL LF 2 350.0* 229.7714 80,420.00* ITEM CODE 650038 TOTAL 2 80,420.00* 650042 60" REINFORCED CONCRETE PIPE LF 07 1 240.0 205.0000 49,200.00 UNIT TOTAL LF 1 240.0* 205.0000 49,200.00* ITEM CODE 650042 TOTAL 1 49,200.00* 650046 66" REINFORCED CONCRETE PIPE LF 07 1 720.0 242.0000 174,240.00 UNIT TOTAL LF 1 720.0* 242.0000 174,240.00* ITEM CODE 650046 TOTAL 1 174,240.00* 650050 72" REINFORCED CONCRETE PIPE LF 05 1 65.0 460.0000 29,900.00 LF 07 1 620.0 317.0000 196,540.00 UNIT TOTAL LF 2 685.0* 330.5693 226,440.00* ITEM CODE 650050 TOTAL 2 226,440.00* 650058 84" REINFORCED CONCRETE PIPE LF 07 1 590.0 302.0000 178,180.00 UNIT TOTAL LF 1 590.0* 302.0000 178,180.00*

Page 196: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 192 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 650058 TOTAL 1 178,180.00* 650311 18" REINFORCED CONCRETE PIPE (CLASS III) LF 02 1 490.0 165.0000 80,850.00 LF 03 1 6.0 137.0000 822.00 UNIT TOTAL LF 2 496.0* 164.6613 81,672.00* ITEM CODE 650311 TOTAL 2 81,672.00* 650316 24" REINFORCED CONCRETE PIPE (CLASS III) LF 02 1 390.0 208.0000 81,120.00 UNIT TOTAL LF 1 390.0* 208.0000 81,120.00* ITEM CODE 650316 TOTAL 1 81,120.00* 650320 30" REINFORCED CONCRETE PIPE (CLASS III) LF 03 1 240.0 75.0000 18,000.00 UNIT TOTAL LF 1 240.0* 75.0000 18,000.00* ITEM CODE 650320 TOTAL 1 18,000.00* 650324 36" REINFORCED CONCRETE PIPE (CLASS III) LF 02 1 170.0 206.0000 35,020.00 UNIT TOTAL LF 1 170.0* 206.0000 35,020.00* ITEM CODE 650324 TOTAL 1 35,020.00* 650411 18" REINFORCED CONCRETE PIPE (CLASS IV) LF 07 1 400.0 105.0000 42,000.00 UNIT TOTAL LF 1 400.0* 105.0000 42,000.00* ITEM CODE 650411 TOTAL 1 42,000.00* 650416 24" REINFORCED CONCRETE PIPE (CLASS IV) LF 07 1 1,690.0 99.0000 167,310.00 UNIT TOTAL LF 1 1,690.0* 99.0000 167,310.00*

Page 197: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 193 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 650416 TOTAL 1 167,310.00* 650420 30" REINFORCED CONCRETE PIPE (CLASS IV) LF 07 1 770.0 123.0000 94,710.00 UNIT TOTAL LF 1 770.0* 123.0000 94,710.00* ITEM CODE 650420 TOTAL 1 94,710.00* 650424 36" REINFORCED CONCRETE PIPE (CLASS IV) LF 07 1 860.0 127.0000 109,220.00 UNIT TOTAL LF 1 860.0* 127.0000 109,220.00* ITEM CODE 650424 TOTAL 1 109,220.00* 652311 18" REINFORCED CONCRETE PIPE (CLASS III, RUBBER GASKET JOINT) LF 10 3 183.0 224.2370 41,035.38 UNIT TOTAL LF 3 183.0* 224.2370 41,035.38* ITEM CODE 652311 TOTAL 3 41,035.38* 652316 24" REINFORCED CONCRETE PIPE (CLASS III, RUBBER GASKET JOINT) LF 10 2 1,220.0 137.7992 168,115.00 UNIT TOTAL LF 2 1,220.0* 137.7992 168,115.00* ITEM CODE 652316 TOTAL 2 168,115.00* 652324 36" REINFORCED CONCRETE PIPE (CLASS III, RUBBER GASKET JOINT) LF 10 1 70.0 259.0000 18,130.00 UNIT TOTAL LF 1 70.0* 259.0000 18,130.00* ITEM CODE 652324 TOTAL 1 18,130.00* 665002 6" CORRUGATED STEEL PIPE (.064" THICK) LF 02 1 10.0 227.8400 2,278.40 UNIT TOTAL LF 1 10.0* 227.8400 2,278.40* ITEM CODE 665002 TOTAL 1 2,278.40*

Page 198: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 194 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 665005 8" CORRUGATED STEEL PIPE (.064" THICK) LF 01 1 46.0 70.0000 3,220.00 UNIT TOTAL LF 1 46.0* 70.0000 3,220.00* ITEM CODE 665005 TOTAL 1 3,220.00* 665006 8" CORRUGATED STEEL PIPE (.079" THICK) LF 01 1 7.0 200.0000 1,400.00 LF 05 1 4.0 150.0000 600.00 UNIT TOTAL LF 2 11.0* 181.8182 2,000.00* ITEM CODE 665006 TOTAL 2 2,000.00* 665009 10" CORRUGATED STEEL PIPE (.079" THICK) LF 05 1 6.0 100.0000 600.00 UNIT TOTAL LF 1 6.0* 100.0000 600.00* ITEM CODE 665009 TOTAL 1 600.00* 665011 12" CORRUGATED STEEL PIPE (.064" THICK) LF 04 2 100.0 133.9360 13,393.60 LF 08 1 34.0 60.0000 2,040.00 UNIT TOTAL LF 3 134.0* 115.1761 15,433.60* ITEM CODE 665011 TOTAL 3 15,433.60* 665012 12" CORRUGATED STEEL PIPE (.079" THICK) LF 03 1 60.0 100.0000 6,000.00 LF 04 1 60.0 175.0000 10,500.00 LF 05 1 6.0 100.0000 600.00 UNIT TOTAL LF 3 126.0* 135.7143 17,100.00* ITEM CODE 665012 TOTAL 3 17,100.00* 665013 15" CORRUGATED STEEL PIPE (.064" THICK) LF 04 1 1.5 315.0000 472.50 UNIT TOTAL LF 1 1.5* 315.0000 472.50*

Page 199: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 195 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 665013 TOTAL 1 472.50* 665015 15" CORRUGATED STEEL PIPE (.109" THICK) LF 04 1 110.0 115.0000 12,650.00 UNIT TOTAL LF 1 110.0* 115.0000 12,650.00* ITEM CODE 665015 TOTAL 1 12,650.00* 665016 18" CORRUGATED STEEL PIPE (.064" THICK) LF 04 4 532.0 90.7462 48,277.00 LF 05 1 5.0 300.0000 1,500.00 LF 08 1 150.0 73.0000 10,950.00 LF 10 1 110.0 100.0000 11,000.00 LF 11 1 14.0 233.0000 3,262.00 UNIT TOTAL LF 8 811.0* 92.4649 74,989.00* ITEM CODE 665016 TOTAL 8 74,989.00* 665017 18" CORRUGATED STEEL PIPE (.079" THICK) LF 02 1 14.0 125.0000 1,750.00 LF 04 2 83.0 127.3494 10,570.00 LF 06 1 170.0 143.0000 24,310.00 LF 07 1 8.0 281.0000 2,248.00 UNIT TOTAL LF 5 275.0* 141.3745 38,878.00* ITEM CODE 665017 TOTAL 5 38,878.00* 665018 18" CORRUGATED STEEL PIPE (.109" THICK) LF 01 3 68.0 158.0882 10,750.00 LF 02 3 1,119.0 94.6783 105,945.00 LF 04 1 14.0 125.0000 1,750.00 LF 07 2 138.0 223.2609 30,810.00 LF 08 2 640.0 142.5781 91,250.00 UNIT TOTAL LF 11 1,979.0* 121.5285 240,505.00* ITEM CODE 665018 TOTAL 11 240,505.00* 665022 24" CORRUGATED STEEL PIPE (.064" THICK) LF 08 2 475.0 109.9789 52,240.00

Page 200: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 196 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 2 475.0* 109.9789 52,240.00* ITEM CODE 665022 TOTAL 2 52,240.00* 665023 24" CORRUGATED STEEL PIPE (.079" THICK) LF 02 1 52.0 139.0000 7,228.00 LF 04 1 16.0 88.0000 1,408.00 LF 06 1 3.0 105.0000 315.00 LF 08 1 430.0 70.0000 30,100.00 UNIT TOTAL LF 4 501.0* 77.9461 39,051.00* ITEM CODE 665023 TOTAL 4 39,051.00* 665024 24" CORRUGATED STEEL PIPE (.109" THICK) LF 01 5 920.0 179.3374 164,990.40 LF 02 5 1,540.0 148.5065 228,700.00 LF 04 1 40.0 250.0000 10,000.00 LF 07 1 22.0 180.0000 3,960.00 LF 08 1 570.0 200.0000 114,000.00 LF 10 2 200.0 97.4170 19,483.40 LF 12 1 30.0 211.6500 6,349.50 UNIT TOTAL LF 16 3,322.0* 164.8053 547,483.30* ITEM CODE 665024 TOTAL 16 547,483.30* 665025 24" CORRUGATED STEEL PIPE (.138" THICK) LF 01 2 500.0 229.1280 114,564.00 LF 03 1 30.0 152.0000 4,560.00 UNIT TOTAL LF 3 530.0* 224.7623 119,124.00* ITEM CODE 665025 TOTAL 3 119,124.00* 665032 30" CORRUGATED STEEL PIPE (.109" THICK) LF 02 1 19.0 175.0000 3,325.00 UNIT TOTAL LF 1 19.0* 175.0000 3,325.00* ITEM CODE 665032 TOTAL 1 3,325.00* 665033 30" CORRUGATED STEEL PIPE (.138" THICK)

Page 201: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 197 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 665033 30" CORRUGATED STEEL PIPE (.138" THICK) LF 01 2 42.0 413.0000 17,346.00 UNIT TOTAL LF 2 42.0* 413.0000 17,346.00* ITEM CODE 665033 TOTAL 2 17,346.00* 665035 36" CORRUGATED STEEL PIPE (.064" THICK) LF 10 1 5.0 250.0000 1,250.00 UNIT TOTAL LF 1 5.0* 250.0000 1,250.00* ITEM CODE 665035 TOTAL 1 1,250.00* 665036 36" CORRUGATED STEEL PIPE (.079" THICK) LF 08 1 2,140.0 160.0000 342,400.00 UNIT TOTAL LF 1 2,140.0* 160.0000 342,400.00* ITEM CODE 665036 TOTAL 1 342,400.00* 665037 36" CORRUGATED STEEL PIPE (.109" THICK) LF 08 1 610.0 155.0000 94,550.00 UNIT TOTAL LF 1 610.0* 155.0000 94,550.00* ITEM CODE 665037 TOTAL 1 94,550.00* 665038 36" CORRUGATED STEEL PIPE (.138" THICK) LF 01 3 249.0 254.4980 63,370.00 UNIT TOTAL LF 3 249.0* 254.4980 63,370.00* ITEM CODE 665038 TOTAL 3 63,370.00* 665042 42" CORRUGATED STEEL PIPE (.109" THICK) LF 08 1 300.0 120.0000 36,000.00 UNIT TOTAL LF 1 300.0* 120.0000 36,000.00* ITEM CODE 665042 TOTAL 1 36,000.00* 665045 48" CORRUGATED STEEL PIPE (.064" THICK)

Page 202: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 198 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 665045 48" CORRUGATED STEEL PIPE (.064" THICK) LF 10 1 10.0 300.0000 3,000.00 UNIT TOTAL LF 1 10.0* 300.0000 3,000.00* ITEM CODE 665045 TOTAL 1 3,000.00* 665046 48" CORRUGATED STEEL PIPE (.079" THICK) LF 08 2 215.0 159.6512 34,325.00 UNIT TOTAL LF 2 215.0* 159.6512 34,325.00* ITEM CODE 665046 TOTAL 2 34,325.00* 665047 48" CORRUGATED STEEL PIPE (.109" THICK) LF 08 1 210.0 150.0000 31,500.00 UNIT TOTAL LF 1 210.0* 150.0000 31,500.00* ITEM CODE 665047 TOTAL 1 31,500.00* 665048 48" CORRUGATED STEEL PIPE (.138" THICK) LF 01 1 160.0 792.0000 126,720.00 UNIT TOTAL LF 1 160.0* 792.0000 126,720.00* ITEM CODE 665048 TOTAL 1 126,720.00* 665049 48" CORRUGATED STEEL PIPE (.168" THICK) LF 01 1 55.0 515.0000 28,325.00 UNIT TOTAL LF 1 55.0* 515.0000 28,325.00* ITEM CODE 665049 TOTAL 1 28,325.00* 665051 54" CORRUGATED STEEL PIPE (.109" THICK) LF 08 1 310.0 155.0000 48,050.00 UNIT TOTAL LF 1 310.0* 155.0000 48,050.00* ITEM CODE 665051 TOTAL 1 48,050.00* 665055 60" CORRUGATED STEEL PIPE (.109" THICK)

Page 203: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 199 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 665055 60" CORRUGATED STEEL PIPE (.109" THICK) LF 08 1 450.0 155.0000 69,750.00 UNIT TOTAL LF 1 450.0* 155.0000 69,750.00* ITEM CODE 665055 TOTAL 1 69,750.00* 665056 60" CORRUGATED STEEL PIPE (.138" THICK) LF 12 1 20.0 325.0000 6,500.00 UNIT TOTAL LF 1 20.0* 325.0000 6,500.00* ITEM CODE 665056 TOTAL 1 6,500.00* 665062 72" CORRUGATED STEEL PIPE (.138" THICK) LF 08 1 150.0 270.0000 40,500.00 UNIT TOTAL LF 1 150.0* 270.0000 40,500.00* ITEM CODE 665062 TOTAL 1 40,500.00* 665068 90" CORRUGATED STEEL PIPE (.138" THICK) LF 08 1 310.0 320.0000 99,200.00 UNIT TOTAL LF 1 310.0* 320.0000 99,200.00* ITEM CODE 665068 TOTAL 1 99,200.00* 665075 18" CORRUGATED STEEL PIPE (.138" THICK) LF 03 1 130.0 150.0000 19,500.00 LF 09 1 90.0 150.0000 13,500.00 UNIT TOTAL LF 2 220.0* 150.0000 33,000.00* ITEM CODE 665075 TOTAL 2 33,000.00* 665112 12" BITUMINOUS COATED CORRUGATED STEEL PIPE (.079" THICK) LF 12 1 40.0 185.5100 7,420.40 UNIT TOTAL LF 1 40.0* 185.5100 7,420.40* ITEM CODE 665112 TOTAL 1 7,420.40*

Page 204: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 200 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 665116 18" BITUMINOUS COATED CORRUGATED STEEL PIPE (.064" THICK) LF 11 1 280.0 120.0000 33,600.00 UNIT TOTAL LF 1 280.0* 120.0000 33,600.00* ITEM CODE 665116 TOTAL 1 33,600.00* 665123 24" BITUMINOUS COATED CORRUGATED STEEL PIPE (.079" THICK) LF 12 1 20.0 129.6200 2,592.40 UNIT TOTAL LF 1 20.0* 129.6200 2,592.40* ITEM CODE 665123 TOTAL 1 2,592.40* 665135 36" BITUMINOUS COATED CORRUGATED STEEL PIPE (.064" THICK) LF 11 2 9.0 422.6111 3,803.50 UNIT TOTAL LF 2 9.0* 422.6111 3,803.50* ITEM CODE 665135 TOTAL 2 3,803.50* 665716 18" SLOTTED CORRUGATED STEEL PIPE (.064" THICK) LF 08 1 1,230.0 200.0000 246,000.00 LF 10 1 170.0 98.0000 16,660.00 UNIT TOTAL LF 2 1,400.0* 187.6143 262,660.00* ITEM CODE 665716 TOTAL 2 262,660.00* 665717 18" SLOTTED CORRUGATED STEEL PIPE (.079" THICK) LF 04 1 460.0 71.5000 32,890.00 LF 07 1 2,590.0 59.0000 152,810.00 LF 12 1 380.0 194.0000 73,720.00 UNIT TOTAL LF 3 3,430.0* 75.6327 259,420.00* ITEM CODE 665717 TOTAL 3 259,420.00* 665718 18" SLOTTED CORRUGATED STEEL PIPE (.168" THICK) LF 11 1 29.0 222.0000 6,438.00 UNIT TOTAL LF 1 29.0* 222.0000 6,438.00*

Page 205: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 201 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 665718 TOTAL 1 6,438.00* 665816 18" BITUMINOUS COATED SLOTTED CORRUGATED STEEL PIPE (.064" THICK) LF 11 1 20.0 190.0000 3,800.00 UNIT TOTAL LF 1 20.0* 190.0000 3,800.00* ITEM CODE 665816 TOTAL 1 3,800.00* 665828 18" BITUMINOUS COATED SLOTTED CORRUGATED STEEL PIPE (.168" THICK) LF 11 1 30.0 400.0000 12,000.00 UNIT TOTAL LF 1 30.0* 400.0000 12,000.00* ITEM CODE 665828 TOTAL 1 12,000.00* 667001 17" X 13" CORRUGATED STEEL PIPE ARCH (.079" THICK) LF 02 1 28.0 61.0000 1,708.00 LF 03 1 4,020.0 116.0000 466,320.00 UNIT TOTAL LF 2 4,048.0* 115.6196 468,028.00* ITEM CODE 667001 TOTAL 2 468,028.00* 667006 21" X 15" CORRUGATED STEEL PIPE ARCH (.109" THICK) LF 01 1 300.0 177.0000 53,100.00 LF 12 1 480.0 68.0000 32,640.00 UNIT TOTAL LF 2 780.0* 109.9231 85,740.00* ITEM CODE 667006 TOTAL 2 85,740.00* 667014 28" X 20" CORRUGATED STEEL PIPE ARCH (.109" THICK) LF 03 1 73.0 198.0000 14,454.00 UNIT TOTAL LF 1 73.0* 198.0000 14,454.00* ITEM CODE 667014 TOTAL 1 14,454.00* 667020 35" X 24" CORRUGATED STEEL PIPE ARCH (.138" THICK) LF 09 1 84.0 180.0000 15,120.00 UNIT TOTAL LF 1 84.0* 180.0000 15,120.00*

Page 206: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 202 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 667020 TOTAL 1 15,120.00* 667038 64" X 43" CORRUGATED STEEL PIPE ARCH (.109" THICK) LF 09 1 210.0 200.0000 42,000.00 UNIT TOTAL LF 1 210.0* 200.0000 42,000.00* ITEM CODE 667038 TOTAL 1 42,000.00* 680283 3" PLASTIC PIPE UNDERDRAIN LF 05 2 2,100.0 10.0000 21,000.00 LF 11 1 20.0 53.0000 1,060.00 UNIT TOTAL LF 3 2,120.0* 10.4057 22,060.00* ITEM CODE 680283 TOTAL 3 22,060.00* 680285 4" PLASTIC PIPE UNDERDRAIN LF 03 1 12.0 40.0000 480.00 LF 04 1 60.0 12.0000 720.00 LF 07 1 290.0 20.0000 5,800.00 LF 11 1 230.0 10.0000 2,300.00 UNIT TOTAL LF 4 592.0* 15.7095 9,300.00* ITEM CODE 680285 TOTAL 4 9,300.00* 680405 8" PERFORATED STEEL PIPE UNDERDRAIN (.064" THICK) LF 04 1 140.0 45.0000 6,300.00 UNIT TOTAL LF 1 140.0* 45.0000 6,300.00* ITEM CODE 680405 TOTAL 1 6,300.00* 680902 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 01 2 376.0 126.2034 47,452.48 LF 03 1 108.0 91.0000 9,828.00 LF 04 3 380.0 17.0263 6,470.00 LF 07 4 3,470.0 16.9294 58,745.00 LF 12 1 320.0 37.8100 12,099.20 UNIT TOTAL LF 11 4,654.0* 28.9202 134,594.68* ITEM CODE 680902 TOTAL 11 134,594.68*

Page 207: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 203 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 680903 6" NON-PERFORATED PLASTIC PIPE UNDERDRAIN LF 01 3 293.0 48.9143 14,331.89 LF 03 1 20.0 97.0000 1,940.00 LF 04 2 370.0 47.4324 17,550.00 LF 07 4 1,290.0 20.6744 26,670.00 UNIT TOTAL LF 10 1,973.0* 30.6599 60,491.89* ITEM CODE 680903 TOTAL 10 60,491.89* 680905 8" PERFORATED PLASTIC PIPE UNDERDRAIN LF 01 2 1,110.0 79.4414 88,180.00 LF 02 1 1,150.0 45.0000 51,750.00 LF 04 1 70.0 170.0000 11,900.00 LF 11 1 290.0 48.6900 14,120.10 UNIT TOTAL LF 5 2,620.0* 63.3397 165,950.10* ITEM CODE 680905 TOTAL 5 165,950.10* 681103 3" PLASTIC PIPE (EDGE DRAIN) LF 04 1 88,000.0 4.1200 362,560.00 LF 05 1 530.0 12.0000 6,360.00 LF 11 1 11.0 100.0000 1,100.00 UNIT TOTAL LF 3 88,541.0* 4.1791 370,020.00* ITEM CODE 681103 TOTAL 3 370,020.00* 681104 4" PLASTIC PIPE (EDGE DRAIN) LF 07 1 86.0 69.0000 5,934.00 UNIT TOTAL LF 1 86.0* 69.0000 5,934.00* ITEM CODE 681104 TOTAL 1 5,934.00* 681107 3" PLASTIC PIPE (EDGE DRAIN OUTLET) LF 04 1 4,000.0 24.1400 96,560.00 LF 05 2 594.0 13.2492 7,870.00 LF 07 1 640.0 20.0000 12,800.00 UNIT TOTAL LF 4 5,234.0* 22.3978 117,230.00* ITEM CODE 681107 TOTAL 4 117,230.00*

Page 208: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 204 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 681132 GEOCOMPOSITE DRAIN SQFT 04 3 3,704.0 2.5729 9,530.00 SQFT 05 1 910.0 3.0000 2,730.00 UNIT TOTAL SQFT 4 4,614.0* 2.6571 12,260.00* ITEM CODE 681132 TOTAL 4 12,260.00* 681501 FURNISH AND INSTALL DRAIN PIPE (HORIZONTAL DRAIN) LF 01 2 11,310.0 3.6718 41,527.80 UNIT TOTAL LF 2 11,310.0* 3.6718 41,527.80* ITEM CODE 681501 TOTAL 2 41,527.80* 681502 DRILL HOLE (HORIZONTAL DRAIN) LF 01 2 11,220.0 21.5235 241,494.00 LF 04 1 630.0 29.0000 18,270.00 UNIT TOTAL LF 3 11,850.0* 21.9210 259,764.00* ITEM CODE 681502 TOTAL 3 259,764.00* 682008 PERMEABLE MATERIAL (BLANKET) CY 03 1 1.5 1,360.0000 2,040.00 UNIT TOTAL CY 1 1.5* 1,360.0000 2,040.00* ITEM CODE 682008 TOTAL 1 2,040.00* 682022 CLASS 1 PERMEABLE MATERIAL (BLANKET) CY 03 1 527.0 193.0000 101,711.00 CY 06 1 20.0 238.0000 4,760.00 CY 10 1 1.7 500.0000 850.00 CY 12 1 16.0 156.0000 2,496.00 UNIT TOTAL CY 4 564.7* 194.4696 109,817.00* ITEM CODE 682022 TOTAL 4 109,817.00* 682042 CLASS 2 PERMEABLE MATERIAL (BLANKET) CY 03 1 61.0 204.0000 12,444.00

Page 209: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 205 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) CLASS 2 PERMEABLE MATERIAL (BLANKET) CY 04 1 110.0 250.0000 27,500.00 UNIT TOTAL CY 2 171.0* 233.5906 39,944.00* ITEM CODE 682042 TOTAL 2 39,944.00* 682049 CLASS 3 PERMEABLE MATERIAL (BLANKET) CY 02 1 4.8 210.0000 1,008.00 CY 04 3 37.0 214.9189 7,952.00 CY 05 1 41.0 105.0000 4,305.00 UNIT TOTAL CY 5 82.8* 160.2053 13,265.00* ITEM CODE 682049 TOTAL 5 13,265.00* 685020 8" ALTERNATIVE PIPE UNDERDRAIN LF 03 1 470.0 55.0000 25,850.00 UNIT TOTAL LF 1 470.0* 55.0000 25,850.00* ITEM CODE 685020 TOTAL 1 25,850.00* 685060 12" ALTERNATIVE PIPE UNDERDRAIN LF 03 1 700.0 94.0000 65,800.00 UNIT TOTAL LF 1 700.0* 94.0000 65,800.00* ITEM CODE 685060 TOTAL 1 65,800.00* 685100 18" ALTERNATIVE PIPE UNDERDRAIN LF 03 1 290.0 97.0000 28,130.00 UNIT TOTAL LF 1 290.0* 97.0000 28,130.00* ITEM CODE 685100 TOTAL 1 28,130.00* 690103 6" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK) LF 01 1 9.0 30.0000 270.00 UNIT TOTAL LF 1 9.0* 30.0000 270.00* ITEM CODE 690103 TOTAL 1 270.00*

Page 210: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 206 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 690105 8" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK) LF 01 1 39.0 40.0000 1,560.00 UNIT TOTAL LF 1 39.0* 40.0000 1,560.00* ITEM CODE 690105 TOTAL 1 1,560.00* 690106 8" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK) LF 02 1 60.0 83.0000 4,980.00 UNIT TOTAL LF 1 60.0* 83.0000 4,980.00* ITEM CODE 690106 TOTAL 1 4,980.00* 690110 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 02 1 16.0 300.0000 4,800.00 LF 05 1 420.0 58.0000 24,360.00 LF 06 1 260.0 50.0000 13,000.00 LF 12 1 60.0 103.0700 6,184.20 UNIT TOTAL LF 4 756.0* 63.9474 48,344.20* ITEM CODE 690110 TOTAL 4 48,344.20* 690112 12" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK) LF 01 2 342.0 56.2281 19,230.00 LF 04 2 165.0 114.0909 18,825.00 LF 05 2 711.0 61.9044 44,014.00 UNIT TOTAL LF 6 1,218.0* 67.3801 82,069.00* ITEM CODE 690112 TOTAL 6 82,069.00* 690116 18" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK) LF 11 1 87.0 82.0000 7,134.00 UNIT TOTAL LF 1 87.0* 82.0000 7,134.00* ITEM CODE 690116 TOTAL 1 7,134.00* 690117 18" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK) LF 05 2 207.0 48.5024 10,040.00

Page 211: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 207 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 2 207.0* 48.5024 10,040.00* ITEM CODE 690117 TOTAL 2 10,040.00* 690118 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK) LF 01 1 11.0 175.0000 1,925.00 LF 02 1 27.0 120.0000 3,240.00 LF 04 1 48.0 100.0000 4,800.00 LF 07 1 130.0 290.0000 37,700.00 UNIT TOTAL LF 4 216.0* 220.6713 47,665.00* ITEM CODE 690118 TOTAL 4 47,665.00* 690124 24" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK) LF 01 4 129.0 122.6181 15,817.74 LF 02 2 193.0 81.9896 15,824.00 UNIT TOTAL LF 6 322.0* 98.2663 31,641.74* ITEM CODE 690124 TOTAL 6 31,641.74* 690125 24" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK) LF 01 1 63.0 203.0000 12,789.00 LF 05 1 170.0 62.0000 10,540.00 UNIT TOTAL LF 2 233.0* 100.1245 23,329.00* ITEM CODE 690125 TOTAL 2 23,329.00* 690134 30" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK) LF 01 1 43.0 145.0000 6,235.00 UNIT TOTAL LF 1 43.0* 145.0000 6,235.00* ITEM CODE 690134 TOTAL 1 6,235.00* 690137 36" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK) LF 01 1 310.0 190.0000 58,900.00 UNIT TOTAL LF 1 310.0* 190.0000 58,900.00* ITEM CODE 690137 TOTAL 1 58,900.00*

Page 212: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 208 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 690138 36" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK) LF 01 2 207.0 99.1014 20,514.00 UNIT TOTAL LF 2 207.0* 99.1014 20,514.00* ITEM CODE 690138 TOTAL 2 20,514.00* 690148 48" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK) LF 01 3 203.0 154.9557 31,456.00 UNIT TOTAL LF 3 203.0* 154.9557 31,456.00* ITEM CODE 690148 TOTAL 3 31,456.00* 690318 18" BITUMINOUS COATED PAVED INVERT CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK) LF 11 1 36.0 158.5600 5,708.16 UNIT TOTAL LF 1 36.0* 158.5600 5,708.16* ITEM CODE 690318 TOTAL 1 5,708.16* 691900 FLUME DOWNDRAIN LF 05 1 130.0 90.0000 11,700.00 UNIT TOTAL LF 1 130.0* 90.0000 11,700.00* ITEM CODE 691900 TOTAL 1 11,700.00* 692003 8" ENTRANCE TAPER EA 01 2 3.0 1,066.6667 3,200.00 EA 02 1 2.0 2,200.0000 4,400.00 UNIT TOTAL EA 3 5.0* 1,520.0000 7,600.00* ITEM CODE 692003 TOTAL 3 7,600.00* 692005 12" ENTRANCE TAPER EA 01 1 1.0 237.0000 237.00 EA 02 1 2.0 1,500.0000 3,000.00 EA 04 1 1.0 852.2500 852.25 EA 05 3 54.0 441.1111 23,820.00 EA 12 1 2.0 243.0000 486.00

Page 213: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 209 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 7 60.0* 473.2542 28,395.25* ITEM CODE 692005 TOTAL 7 28,395.25* 692007 18" ENTRANCE TAPER EA 05 1 1.0 200.0000 200.00 EA 08 1 6.0 300.0000 1,800.00 UNIT TOTAL EA 2 7.0* 285.7143 2,000.00* ITEM CODE 692007 TOTAL 2 2,000.00* 692101 TAPERED INLET EA 05 1 12.0 490.0000 5,880.00 UNIT TOTAL EA 1 12.0* 490.0000 5,880.00* ITEM CODE 692101 TOTAL 1 5,880.00* 692205 12" DOWNDRAIN SLIP JOINT EA 01 1 1.0 148.0000 148.00 EA 05 2 27.0 310.0000 8,370.00 EA 12 1 2.0 1,859.3200 3,718.64 UNIT TOTAL EA 4 30.0* 407.8880 12,236.64* ITEM CODE 692205 TOTAL 4 12,236.64* 692301 ANCHOR ASSEMBLY EA 01 3 25.0 674.8000 16,870.00 EA 03 1 2.0 660.0000 1,320.00 UNIT TOTAL EA 4 27.0* 673.7037 18,190.00* ITEM CODE 692301 TOTAL 4 18,190.00* 692303 8" ANCHOR ASSEMBLY EA 01 2 5.0 180.0000 900.00 EA 02 1 5.0 855.0000 4,275.00 UNIT TOTAL EA 3 10.0* 517.5000 5,175.00* ITEM CODE 692303 TOTAL 3 5,175.00*

Page 214: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 210 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 692305 12" ANCHOR ASSEMBLY EA 05 3 54.0 322.0370 17,390.00 EA 12 1 6.0 139.3200 835.92 UNIT TOTAL EA 4 60.0* 303.7653 18,225.92* ITEM CODE 692305 TOTAL 4 18,225.92* 692307 18" ANCHOR ASSEMBLY EA 04 1 19.0 355.0000 6,745.00 EA 07 1 7.0 640.0000 4,480.00 UNIT TOTAL EA 2 26.0* 431.7308 11,225.00* ITEM CODE 692307 TOTAL 2 11,225.00* 692309 24" ANCHOR ASSEMBLY EA 01 2 4.0 545.9300 2,183.72 EA 02 2 11.0 477.0000 5,247.00 UNIT TOTAL EA 4 15.0* 495.3813 7,430.72* ITEM CODE 692309 TOTAL 4 7,430.72* 692361 FLUME ANCHOR ASSEMBLY EA 05 1 12.0 400.0000 4,800.00 UNIT TOTAL EA 1 12.0* 400.0000 4,800.00* ITEM CODE 692361 TOTAL 1 4,800.00* 692381 CONCRETE ANCHOR AND CABLE ASSEMBLY EA 01 5 9.0 7,133.3333 64,200.00 EA 02 1 3.0 6,000.0000 18,000.00 UNIT TOTAL EA 6 12.0* 6,850.0000 82,200.00* ITEM CODE 692381 TOTAL 6 82,200.00* 698020 8" ALTERNATIVE PIPE DOWNDRAIN LF 01 1 56.0 60.0000 3,360.00 UNIT TOTAL LF 1 56.0* 60.0000 3,360.00*

Page 215: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 211 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 698020 TOTAL 1 3,360.00* 698060 12" ALTERNATIVE PIPE DOWNDRAIN LF 01 1 25.0 74.4000 1,860.00 UNIT TOTAL LF 1 25.0* 74.4000 1,860.00* ITEM CODE 698060 TOTAL 1 1,860.00* 698100 18" ALTERNATIVE PIPE DOWNDRAIN LF 05 1 50.0 54.0000 2,700.00 UNIT TOTAL LF 1 50.0* 54.0000 2,700.00* ITEM CODE 698100 TOTAL 1 2,700.00* 698140 24" ALTERNATIVE PIPE DOWNDRAIN LF 01 1 66.0 97.5000 6,435.00 UNIT TOTAL LF 1 66.0* 97.5000 6,435.00* ITEM CODE 698140 TOTAL 1 6,435.00* 700615 CORRUGATED STEEL PIPE INLET LF 08 1 4.0 250.0000 1,000.00 UNIT TOTAL LF 1 4.0* 250.0000 1,000.00* ITEM CODE 700615 TOTAL 1 1,000.00* 700617 DRAINAGE INLET MARKER EA 03 4 171.0 95.7368 16,371.00 EA 04 2 8.0 54.3750 435.00 EA 05 4 164.0 117.6829 19,300.00 EA 07 1 4.0 30.0000 120.00 EA 08 1 15.0 500.0000 7,500.00 EA 10 2 5.0 131.6000 658.00 EA 11 2 16.0 96.8750 1,550.00 EA 12 4 16.0 403.1250 6,450.00 UNIT TOTAL EA 20 399.0* 131.2882 52,384.00* ITEM CODE 700617 TOTAL 20 52,384.00*

Page 216: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 212 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 700638 36" CORRUGATED STEEL PIPE INLET (.079" THICK) LF 02 1 6.0 455.6800 2,734.08 LF 12 1 2.0 1,268.0000 2,536.00 UNIT TOTAL LF 2 8.0* 658.7600 5,270.08* ITEM CODE 700638 TOTAL 2 5,270.08* 700639 36" CORRUGATED STEEL PIPE INLET (.109" THICK) LF 01 3 59.0 850.8475 50,200.00 LF 04 1 11.0 546.0000 6,006.00 UNIT TOTAL LF 4 70.0* 802.9429 56,206.00* ITEM CODE 700639 TOTAL 4 56,206.00* 700640 36" CORRUGATED STEEL PIPE INLET (.138" THICK) LF 05 1 22.0 260.0000 5,720.00 LF 09 1 4.0 700.0000 2,800.00 UNIT TOTAL LF 2 26.0* 327.6923 8,520.00* ITEM CODE 700640 TOTAL 2 8,520.00* 700641 36" CORRUGATED STEEL PIPE INLET (.168" THICK) LF 01 1 9.0 252.0000 2,268.00 LF 02 1 4.0 425.0000 1,700.00 LF 04 1 2.4 1,035.0000 2,484.00 LF 05 1 6.5 542.0000 3,523.00 UNIT TOTAL LF 4 21.9* 455.4795 9,975.00* ITEM CODE 700641 TOTAL 4 9,975.00* 702123 24" TO 18" CORRUGATED STEEL ECCENTRIC REDUCER (.079" THICK) EA 02 1 1.0 1,810.0000 1,810.00 UNIT TOTAL EA 1 1.0* 1,810.0000 1,810.00* ITEM CODE 702123 TOTAL 1 1,810.00* 702614 18" CORRUGATED STEEL PIPE ENERGY DISSIPATOR (.064" THICK)

Page 217: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 213 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 702614 18" CORRUGATED STEEL PIPE ENERGY DISSIPATOR (.064" THICK) EA 02 1 8.0 950.0000 7,600.00 EA 05 1 3.0 490.0000 1,470.00 UNIT TOTAL EA 2 11.0* 824.5455 9,070.00* ITEM CODE 702614 TOTAL 2 9,070.00* 702616 24" CORRUGATED STEEL PIPE ENERGY DISSIPATOR (.064" THICK) EA 02 1 1.0 300.0000 300.00 EA 05 1 2.0 540.0000 1,080.00 UNIT TOTAL EA 2 3.0* 460.0000 1,380.00* ITEM CODE 702616 TOTAL 2 1,380.00* 703211 12" CORRUGATED STEEL PIPE RISER (.079" THICK) LF 05 1 3.0 340.0000 1,020.00 LF 07 1 2.0 560.0000 1,120.00 UNIT TOTAL LF 2 5.0* 428.0000 2,140.00* ITEM CODE 703211 TOTAL 2 2,140.00* 703225 24" CORRUGATED STEEL PIPE RISER (.138" THICK) LF 09 1 .5 1,500.0000 750.00 UNIT TOTAL LF 1 .5* 1,500.0000 750.00* ITEM CODE 703225 TOTAL 1 750.00* 703233 GRATED LINE DRAIN LF 01 1 100.0 180.0000 18,000.00 LF 02 1 32.0 307.0900 9,826.88 LF 03 2 453.0 157.1325 71,181.00 LF 07 1 42.0 160.0000 6,720.00 LF 11 3 74.0 228.9189 16,940.00 UNIT TOTAL LF 8 701.0* 174.9898 122,667.88* ITEM CODE 703233 TOTAL 8 122,667.88* 703238 36" CORRUGATED STEEL PIPE RISER (.079" THICK)

Page 218: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 214 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 703238 36" CORRUGATED STEEL PIPE RISER (.079" THICK) LF 08 1 14.0 340.0000 4,760.00 UNIT TOTAL LF 1 14.0* 340.0000 4,760.00* ITEM CODE 703238 TOTAL 1 4,760.00* 703450 WELDED STEEL PIPE CASING (BRIDGE) LF 04 1 153.0 100.0000 15,300.00 LF 05 1 235.0 156.0000 36,660.00 UNIT TOTAL LF 2 388.0* 133.9175 51,960.00* ITEM CODE 703450 TOTAL 2 51,960.00* 703460 24" WELDED STEEL PIPE CASING (BRIDGE) LF 08 1 236.0 160.0000 37,760.00 UNIT TOTAL LF 1 236.0* 160.0000 37,760.00* ITEM CODE 703460 TOTAL 1 37,760.00* 703502 4" WELDED STEEL PIPE (.105" THICK) LF 05 1 28.0 70.0000 1,960.00 UNIT TOTAL LF 1 28.0* 70.0000 1,960.00* ITEM CODE 703502 TOTAL 1 1,960.00* 703509 6" WELDED STEEL PIPE (.134" THICK) LF 05 1 120.0 50.0000 6,000.00 UNIT TOTAL LF 1 120.0* 50.0000 6,000.00* ITEM CODE 703509 TOTAL 1 6,000.00* 703515 8" WELDED STEEL PIPE (.134" THICK) LF 01 1 620.0 32.9600 20,435.20 LF 04 1 420.0 440.0000 184,800.00 UNIT TOTAL LF 2 1,040.0* 197.3415 205,235.20* ITEM CODE 703515 TOTAL 2 205,235.20*

Page 219: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 215 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 703525 10" WELDED STEEL PIPE (.250" THICK) LF 05 1 590.0 60.0000 35,400.00 UNIT TOTAL LF 1 590.0* 60.0000 35,400.00* ITEM CODE 703525 TOTAL 1 35,400.00* 703533 12" WELDED STEEL PIPE (.250" THICK) LF 02 1 48.0 196.0000 9,408.00 UNIT TOTAL LF 1 48.0* 196.0000 9,408.00* ITEM CODE 703533 TOTAL 1 9,408.00* 705007 12" STEEL FLARED END SECTION EA 01 1 2.0 160.0000 320.00 EA 05 1 22.0 210.0000 4,620.00 EA 06 1 8.0 95.0000 760.00 EA 10 1 1.0 800.0000 800.00 UNIT TOTAL EA 4 33.0* 196.9697 6,500.00* ITEM CODE 705007 TOTAL 4 6,500.00* 705011 18" STEEL FLARED END SECTION EA 02 1 1.0 210.0000 210.00 EA 03 1 1.0 320.0000 320.00 EA 06 1 1.0 125.0000 125.00 EA 07 1 1.0 340.0000 340.00 EA 08 4 29.0 337.4138 9,785.00 EA 09 1 2.0 250.0000 500.00 EA 10 2 5.0 880.0000 4,400.00 EA 12 1 8.0 231.5500 1,852.40 UNIT TOTAL EA 12 48.0* 365.2583 17,532.40* ITEM CODE 705011 TOTAL 12 17,532.40* 705015 24" STEEL FLARED END SECTION EA 01 3 6.0 442.3333 2,654.00 EA 02 6 13.0 470.4615 6,116.00 EA 06 1 2.0 700.0000 1,400.00 EA 08 3 10.0 316.0000 3,160.00

Page 220: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 216 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 24" STEEL FLARED END SECTION EA 09 1 48.0 275.0000 13,200.00 EA 10 2 4.0 445.6150 1,782.46 EA 12 1 9.0 300.8300 2,707.47 UNIT TOTAL EA 17 92.0* 337.1732 31,019.93* ITEM CODE 705015 TOTAL 17 31,019.93* 705019 30" STEEL FLARED END SECTION EA 01 1 1.0 550.0000 550.00 EA 02 1 1.0 850.0000 850.00 EA 03 1 1.0 535.0000 535.00 UNIT TOTAL EA 3 3.0* 645.0000 1,935.00* ITEM CODE 705019 TOTAL 3 1,935.00* 705023 36" STEEL FLARED END SECTION EA 01 2 4.0 632.0000 2,528.00 EA 08 2 13.0 630.7692 8,200.00 UNIT TOTAL EA 4 17.0* 631.0588 10,728.00* ITEM CODE 705023 TOTAL 4 10,728.00* 705027 42" STEEL FLARED END SECTION EA 08 1 2.0 700.0000 1,400.00 UNIT TOTAL EA 1 2.0* 700.0000 1,400.00* ITEM CODE 705027 TOTAL 1 1,400.00* 705031 48" STEEL FLARED END SECTION EA 01 1 1.0 1,250.0000 1,250.00 EA 08 2 5.0 890.0000 4,450.00 UNIT TOTAL EA 3 6.0* 950.0000 5,700.00* ITEM CODE 705031 TOTAL 3 5,700.00* 705065 24" BITUMINOUS COATED STEEL FLARED END SECTION

Page 221: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 217 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 705065 24" BITUMINOUS COATED STEEL FLARED END SECTION EA 12 1 1.0 215.8200 215.82 UNIT TOTAL EA 1 1.0* 215.8200 215.82* ITEM CODE 705065 TOTAL 1 215.82* 705204 18" CONCRETE FLARED END SECTION EA 04 2 5.0 1,380.0000 6,900.00 EA 05 1 6.0 1,200.0000 7,200.00 EA 06 3 8.0 916.2500 7,330.00 EA 07 2 9.0 1,532.2222 13,790.00 EA 08 1 2.0 1,470.0000 2,940.00 EA 10 1 1.0 721.4000 721.40 UNIT TOTAL EA 10 31.0* 1,254.2387 38,881.40* ITEM CODE 705204 TOTAL 10 38,881.40* 705206 24" CONCRETE FLARED END SECTION EA 03 1 2.0 1,500.0000 3,000.00 EA 05 1 11.0 1,350.0000 14,850.00 EA 07 3 5.0 1,316.0000 6,580.00 EA 10 4 19.0 794.9132 15,103.35 EA 11 3 7.0 1,725.9457 12,081.62 EA 12 1 8.0 1,225.0000 9,800.00 UNIT TOTAL EA 13 52.0* 1,181.0571 61,414.97* ITEM CODE 705206 TOTAL 13 61,414.97* 705208 30" CONCRETE FLARED END SECTION EA 03 2 2.0 1,400.0000 2,800.00 EA 11 1 1.0 2,589.6200 2,589.62 UNIT TOTAL EA 3 3.0* 1,796.5400 5,389.62* ITEM CODE 705208 TOTAL 3 5,389.62* 705210 36" CONCRETE FLARED END SECTION EA 07 1 1.0 2,600.0000 2,600.00 EA 10 2 2.0 1,467.2500 2,934.50 UNIT TOTAL EA 3 3.0* 1,844.8333 5,534.50*

Page 222: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 218 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 705210 TOTAL 3 5,534.50* 705214 48" CONCRETE FLARED END SECTION EA 03 1 2.0 1,850.0000 3,700.00 EA 11 1 2.0 2,900.0000 5,800.00 UNIT TOTAL EA 2 4.0* 2,375.0000 9,500.00* ITEM CODE 705214 TOTAL 2 9,500.00* 705307 12" ALTERNATIVE FLARED END SECTION EA 05 1 4.0 320.0000 1,280.00 UNIT TOTAL EA 1 4.0* 320.0000 1,280.00* ITEM CODE 705307 TOTAL 1 1,280.00* 705311 18" ALTERNATIVE FLARED END SECTION EA 02 1 1.0 1,500.0000 1,500.00 EA 03 3 13.0 1,052.6062 13,683.88 EA 05 3 7.0 355.0000 2,485.00 EA 06 1 2.0 545.0000 1,090.00 EA 10 1 1.0 472.6500 472.65 UNIT TOTAL EA 9 24.0* 801.3138 19,231.53* ITEM CODE 705311 TOTAL 9 19,231.53* 705315 24" ALTERNATIVE FLARED END SECTION EA 01 1 2.0 372.0000 744.00 EA 02 2 2.0 1,075.0000 2,150.00 EA 03 1 14.0 1,200.0000 16,800.00 EA 04 2 3.0 1,427.3333 4,282.00 EA 05 5 30.0 757.7000 22,731.00 EA 06 1 17.0 380.0000 6,460.00 EA 08 1 2.0 1,300.0000 2,600.00 EA 10 1 1.0 547.7500 547.75 EA 11 2 4.0 608.7500 2,435.00 UNIT TOTAL EA 16 75.0* 783.3300 58,749.75* ITEM CODE 705315 TOTAL 16 58,749.75* 705319 30" ALTERNATIVE FLARED END SECTION

Page 223: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 219 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 705319 30" ALTERNATIVE FLARED END SECTION EA 03 1 2.0 1,200.0000 2,400.00 EA 05 1 3.0 1,100.0000 3,300.00 UNIT TOTAL EA 2 5.0* 1,140.0000 5,700.00* ITEM CODE 705319 TOTAL 2 5,700.00* 705321 36" ALTERNATIVE FLARED END SECTION EA 05 3 4.0 2,509.0000 10,036.00 UNIT TOTAL EA 3 4.0* 2,509.0000 10,036.00* ITEM CODE 705321 TOTAL 3 10,036.00* 705409 35" X 24" STEEL FLARED END PIPE ARCH SECTION EA 09 1 2.0 400.0000 800.00 UNIT TOTAL EA 1 2.0* 400.0000 800.00* ITEM CODE 705409 TOTAL 1 800.00* 705529 42" AUTOMATIC DRAINAGE GATE EA 07 1 1.0 10,185.0000 10,185.00 UNIT TOTAL EA 1 1.0* 10,185.0000 10,185.00* ITEM CODE 705529 TOTAL 1 10,185.00* 707117 36" PRECAST CONCRETE PIPE INLET LF 02 2 12.6 431.0317 5,431.00 LF 03 1 13.0 650.0000 8,450.00 LF 05 2 35.0 908.2857 31,790.00 LF 06 1 3.4 400.0000 1,360.00 UNIT TOTAL LF 6 64.0* 734.8594 47,031.00* ITEM CODE 707117 TOTAL 6 47,031.00* 707125 48" PRECAST CONCRETE PIPE INLET LF 03 1 4.0 1,975.0000 7,900.00 UNIT TOTAL LF 1 4.0* 1,975.0000 7,900.00*

Page 224: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 220 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 707125 TOTAL 1 7,900.00* 707217 36" PRECAST CONCRETE PIPE MANHOLE LF 01 1 7.0 1,200.0000 8,400.00 LF 03 1 3.6 1,900.0000 6,840.00 LF 04 1 33.0 1,500.0000 49,500.00 LF 07 3 227.0 405.1982 91,980.00 LF 12 2 11.7 1,042.7350 12,200.00 UNIT TOTAL LF 8 282.3* 598.3705 168,920.00* ITEM CODE 707217 TOTAL 8 168,920.00* 707225 48" PRECAST CONCRETE PIPE MANHOLE LF 03 1 6.0 180.0000 1,080.00 LF 06 1 9.0 400.0000 3,600.00 UNIT TOTAL LF 2 15.0* 312.0000 4,680.00* ITEM CODE 707225 TOTAL 2 4,680.00* 709522 INLET DEPRESSION EA 05 5 36.0 818.6389 29,471.00 EA 06 1 15.0 1,800.0000 27,000.00 EA 10 4 18.0 1,040.9067 18,736.32 UNIT TOTAL EA 10 69.0* 1,089.9612 75,207.32* ITEM CODE 709522 TOTAL 10 75,207.32* 720110 SMALL-ROCK SLOPE PROTECTION CY 02 3 181.0 126.3536 22,870.00 CY 07 3 10.3 1,189.1563 12,248.31 CY 12 1 250.0 170.7500 42,687.50 UNIT TOTAL CY 7 441.3* 176.3105 77,805.81* ITEM CODE 720110 TOTAL 7 77,805.81* 720117 ROCK SLOPE PROTECTION (4T, METHOD A) CY 07 1 3,338.0 110.0000 367,180.00 UNIT TOTAL CY 1 3,338.0* 110.0000 367,180.00*

Page 225: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 221 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 720117 TOTAL 1 367,180.00* 720118 ROCK SLOPE PROTECTION (2T, METHOD A) CY 02 1 1,170.0 65.0000 76,050.00 CY 05 1 16,900.0 85.0000 1,436,500.00 UNIT TOTAL CY 2 18,070.0* 83.7050 1,512,550.00* ITEM CODE 720118 TOTAL 2 1,512,550.00* 720119 ROCK SLOPE PROTECTION (1T, METHOD A) CY 01 2 33.0 341.8182 11,280.00 CY 05 1 11,700.0 70.0000 819,000.00 UNIT TOTAL CY 3 11,733.0* 70.7645 830,280.00* ITEM CODE 720119 TOTAL 3 830,280.00* 720121 ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY) CY 01 1 3,860.0 86.0000 331,960.00 CY 04 1 290.0 191.0000 55,390.00 CY 05 1 1,190.0 226.0000 268,940.00 CY 07 1 801.0 88.0000 70,488.00 CY 10 1 620.0 95.4000 59,148.00 UNIT TOTAL CY 5 6,761.0* 116.2440 785,926.00* ITEM CODE 720121 TOTAL 5 785,926.00* 721013 ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY) CY 01 7 5,925.0 111.3612 659,815.00 CY 03 1 6,160.0 100.0000 616,000.00 CY 04 2 575.0 233.8696 134,475.00 CY 05 2 9,880.0 82.7834 817,900.00 CY 08 4 3,553.0 93.1500 330,962.00 CY 09 1 490.0 150.0000 73,500.00 CY 12 1 5.3 310.0000 1,643.00 UNIT TOTAL CY 18 26,588.3* 99.0772 2,634,295.00* ITEM CODE 721013 TOTAL 18 2,634,295.00* 721015 ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY)

Page 226: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 222 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 721015 ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) CY 01 4 547.0 171.8840 94,020.56 CY 02 2 145.0 158.5517 22,990.00 CY 03 4 1,864.0 97.9453 182,570.00 CY 04 1 2.8 400.0000 1,120.00 CY 05 1 5,330.0 89.0000 474,370.00 CY 07 1 69.0 80.0000 5,520.00 CY 08 3 844.0 77.9799 65,815.00 CY 10 2 62.0 114.5968 7,105.00 CY 11 1 27.0 291.0600 7,858.62 UNIT TOTAL CY 19 8,890.8* 96.8832 861,369.18* ITEM CODE 721015 TOTAL 19 861,369.18* 721017 ROCK SLOPE PROTECTION (FACING, METHOD B) (CY) CY 01 5 177.9 98.8230 17,580.62 CY 02 1 18.0 100.0000 1,800.00 CY 03 2 131.0 217.7786 28,529.00 CY 04 2 10.5 406.2857 4,266.00 CY 05 2 2,393.0 100.7689 241,140.00 CY 07 3 167.0 165.8084 27,690.00 CY 08 2 2,717.0 78.1148 212,238.00 CY 09 1 12.0 200.0000 2,400.00 CY 10 2 89.0 324.9202 28,917.90 CY 11 2 18.0 319.5833 5,752.50 UNIT TOTAL CY 22 5,733.4* 99.4722 570,314.02* ITEM CODE 721017 TOTAL 22 570,314.02* 721019 ROCK SLOPE PROTECTION (NO. 3, METHOD B) (CY) CY 01 1 620.0 88.0000 54,560.00 CY 02 2 213.0 120.8873 25,749.00 CY 04 2 70.0 352.8571 24,700.00 CY 05 2 3,040.6 94.1196 286,180.00 CY 08 1 85.0 90.0000 7,650.00 CY 11 1 39.0 107.0000 4,173.00 UNIT TOTAL CY 9 4,067.6* 99.0786 403,012.00* ITEM CODE 721019 TOTAL 9 403,012.00* 721020 ROCK SLOPE PROTECTION (NO. 3, METHOD B) (TON)

Page 227: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 223 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 721020 ROCK SLOPE PROTECTION (NO. 3, METHOD B) (TON) TON 02 1 70.0 227.8400 15,948.80 TON 04 1 5.0 130.0000 650.00 UNIT TOTAL TON 2 75.0* 221.3173 16,598.80* ITEM CODE 721020 TOTAL 2 16,598.80* 721022 ROCK SLOPE PROTECTION (1T, METHOD B) CY 03 1 26.0 200.0000 5,200.00 CY 08 1 1,350.0 65.0000 87,750.00 UNIT TOTAL CY 2 1,376.0* 67.5509 92,950.00* ITEM CODE 721022 TOTAL 2 92,950.00* 721026 ROCK SLOPE PROTECTION (NO. 1, METHOD B) (CY) CY 01 4 155.4 168.0502 26,115.00 CY 02 2 83.0 85.3614 7,085.00 CY 04 2 36.0 345.2778 12,430.00 CY 05 2 6,458.0 95.1858 614,710.00 CY 07 2 774.0 92.6537 71,714.00 CY 08 4 2,142.0 97.8011 209,490.00 CY 10 1 140.0 99.0000 13,860.00 UNIT TOTAL CY 17 9,788.4* 97.6057 955,404.00* ITEM CODE 721026 TOTAL 17 955,404.00* 721028 ROCK SLOPE PROTECTION (NO. 2, METHOD B) (CY) CY 01 1 349.0 150.0000 52,350.00 CY 02 3 432.0 117.9398 50,950.00 CY 03 3 17.0 430.6118 7,320.40 CY 04 4 35.0 221.9714 7,769.00 CY 05 1 910.0 159.0000 144,690.00 CY 06 4 55.0 350.7273 19,290.00 CY 07 1 2.0 400.0000 800.00 CY 08 1 7.0 520.0000 3,640.00 CY 10 1 8.0 394.5000 3,156.00 CY 11 2 21.0 230.9524 4,850.00 UNIT TOTAL CY 21 1,836.0* 160.5748 294,815.40* ITEM CODE 721028 TOTAL 21 294,815.40*

Page 228: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 224 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 721029 ROCK SLOPE PROTECTION (NO. 2, METHOD B) (TON) TON 01 1 6.0 172.0000 1,032.00 TON 02 1 63.0 51.0000 3,213.00 UNIT TOTAL TON 2 69.0* 61.5217 4,245.00* ITEM CODE 721029 TOTAL 2 4,245.00* 721030 ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY) CY 01 1 242.0 170.0000 41,140.00 CY 08 2 2,023.0 67.7716 137,102.00 UNIT TOTAL CY 3 2,265.0* 78.6940 178,242.00* ITEM CODE 721030 TOTAL 3 178,242.00* 721031 ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON) TON 02 1 760.0 35.0000 26,600.00 UNIT TOTAL TON 1 760.0* 35.0000 26,600.00* ITEM CODE 721031 TOTAL 1 26,600.00* 721410 CONCRETE (GUTTER LINING) CY 04 1 24.0 810.0000 19,440.00 UNIT TOTAL CY 1 24.0* 810.0000 19,440.00* ITEM CODE 721410 TOTAL 1 19,440.00* 721420 CONCRETE (DITCH LINING) CY 04 4 32.1 1,219.9128 39,159.20 CY 05 2 410.0 481.7073 197,500.00 CY 07 3 242.0 578.5124 140,000.00 CY 11 3 330.5 456.3171 150,812.80 UNIT TOTAL CY 12 1,014.6* 519.8817 527,472.00* ITEM CODE 721420 TOTAL 12 527,472.00* 721430 CONCRETE (CHANNEL LINING) CY 07 2 2.5 918.0000 2,295.00

Page 229: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 225 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) CONCRETE (CHANNEL LINING) CY 11 1 53.0 558.0000 29,574.00 UNIT TOTAL CY 3 55.5* 574.2162 31,869.00* ITEM CODE 721430 TOTAL 3 31,869.00* 721431 CONCRETE (CONCRETE APRON) CY 02 1 1.9 525.0000 997.50 CY 04 1 1.0 1,186.4000 1,186.40 CY 05 2 163.0 637.6074 103,930.00 CY 11 1 1.0 1,000.0000 1,000.00 UNIT TOTAL CY 5 166.9* 641.7849 107,113.90* ITEM CODE 721431 TOTAL 5 107,113.90* 721512 CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY) CY 01 1 4.6 323.7000 1,489.02 CY 07 2 29.7 382.8283 11,370.00 UNIT TOTAL CY 3 34.3* 374.8985 12,859.02* ITEM CODE 721512 TOTAL 3 12,859.02* 721612 CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY) CY 07 1 6.0 300.0000 1,800.00 UNIT TOTAL CY 1 6.0* 300.0000 1,800.00* ITEM CODE 721612 TOTAL 1 1,800.00* 721810 SLOPE PAVING (CONCRETE) CY 03 1 52.0 1,100.0000 57,200.00 CY 04 1 62.0 2,100.0000 130,200.00 CY 05 1 148.0 2,300.0000 340,400.00 CY 07 1 24.0 900.0000 21,600.00 CY 10 1 210.0 705.0000 148,050.00 CY 11 3 72.0 756.7778 54,488.00 UNIT TOTAL CY 8 568.0* 1,323.8345 751,938.00* ITEM CODE 721810 TOTAL 8 751,938.00*

Page 230: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 226 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 721812 SLOPE PAVING (CONCRETE PAVERS) SQFT 04 1 1,159.0 75.0000 86,925.00 UNIT TOTAL SQFT 1 1,159.0* 75.0000 86,925.00* ITEM CODE 721812 TOTAL 1 86,925.00* 721813 SLOPE PAVING (EXPOSED AGGREGATE) CY 05 1 130.0 698.0000 90,740.00 CY 11 1 150.0 1,100.0000 165,000.00 UNIT TOTAL CY 2 280.0* 913.3571 255,740.00* ITEM CODE 721813 TOTAL 2 255,740.00* 722020 GABION CY 02 1 880.0 275.0000 242,000.00 CY 07 4 136.0 279.8897 38,065.00 CY 12 1 50.0 202.0000 10,100.00 UNIT TOTAL CY 6 1,066.0* 272.1998 290,165.00* ITEM CODE 722020 TOTAL 6 290,165.00* 723050 ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY) CY 05 1 130.0 160.0000 20,800.00 CY 06 1 4.0 900.0000 3,600.00 UNIT TOTAL CY 2 134.0* 182.0896 24,400.00* ITEM CODE 723050 TOTAL 2 24,400.00* 723060 ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY) CY 05 1 260.0 160.0000 41,600.00 UNIT TOTAL CY 1 260.0* 160.0000 41,600.00* ITEM CODE 723060 TOTAL 1 41,600.00* 723070 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY) CY 05 1 56.0 71.0000 3,976.00 CY 06 1 .4 1,410.0000 564.00

Page 231: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 227 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL CY 2 56.4* 80.4965 4,540.00* ITEM CODE 723070 TOTAL 2 4,540.00* 723080 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) CY 05 1 20.0 160.0000 3,200.00 CY 06 1 3.5 555.0000 1,942.50 UNIT TOTAL CY 2 23.5* 218.8298 5,142.50* ITEM CODE 723080 TOTAL 2 5,142.50* 723095 ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY) CY 10 1 7.0 200.0000 1,400.00 UNIT TOTAL CY 1 7.0* 200.0000 1,400.00* ITEM CODE 723095 TOTAL 1 1,400.00* 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 01 12 8,860.0 5.6463 50,026.65 SQYD 02 8 8,344.0 2.4205 20,196.25 SQYD 03 5 11,145.0 6.2876 70,075.00 SQYD 04 11 1,451.0 5.5960 8,119.80 SQYD 05 5 21,810.0 3.6907 80,494.00 SQYD 06 7 231.0 15.1905 3,509.00 SQYD 07 7 754.0 12.6936 9,571.00 SQYD 08 6 11,231.0 4.3826 49,221.50 SQYD 09 1 500.0 3.0000 1,500.00 SQYD 10 6 1,104.0 6.5201 7,198.20 SQYD 11 6 506.0 6.8660 3,474.18 SQYD 12 1 32.0 5.0000 160.00 UNIT TOTAL SQYD 75 65,968.0* 4.6014 303,545.58* ITEM CODE 729011 TOTAL 75 303,545.58* 729012 ROCK SLOPE PROTECTION FABRIC (CLASS 10) SQYD 02 1 460.0 8.0000 3,680.00 SQYD 03 1 65.0 10.0000 650.00 SQYD 04 1 140.0 12.0000 1,680.00 SQYD 05 1 17,300.0 2.0000 34,600.00 SQYD 07 2 3,800.0 2.5142 9,554.00 SQYD 08 1 2,950.0 6.0000 17,700.00

Page 232: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 228 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL SQYD 7 24,715.0* 2.7459 67,864.00* ITEM CODE 729012 TOTAL 7 67,864.00* 730010 MINOR CONCRETE (CURB) (LF) LF 05 2 1,063.0 50.2888 53,457.00 LF 10 1 87.0 50.0000 4,350.00 UNIT TOTAL LF 3 1,150.0* 50.2670 57,807.00* ITEM CODE 730010 TOTAL 3 57,807.00* 730020 MINOR CONCRETE (CURB) (CY) CY 01 2 9.4 1,576.9362 14,823.20 CY 02 1 8.0 1,150.0000 9,200.00 CY 03 2 61.2 932.3529 57,060.00 CY 05 5 818.0 540.1956 441,880.00 CY 07 2 158.0 702.1519 110,940.00 CY 10 2 68.0 1,115.4118 75,848.00 UNIT TOTAL CY 14 1,122.6* 632.2387 709,751.20* ITEM CODE 730020 TOTAL 14 709,751.20* 730040 MINOR CONCRETE (GUTTER) (LF) LF 01 2 424.0 46.5000 19,716.00 LF 03 1 290.0 100.0000 29,000.00 LF 04 1 141.0 52.1300 7,350.33 LF 05 1 2,048.0 22.0000 45,056.00 LF 06 1 130.0 60.0000 7,800.00 LF 07 3 756.0 59.5622 45,029.00 LF 10 1 150.0 34.1000 5,115.00 LF 11 2 1,539.0 34.9064 53,721.00 LF 12 1 314.0 65.0000 20,410.00 UNIT TOTAL LF 13 5,792.0* 40.2620 233,197.33* ITEM CODE 730040 TOTAL 13 233,197.33* 730045 MINOR CONCRETE (GUTTER) (CY) CY 05 2 52.3 482.4474 25,232.00 CY 06 1 2.5 1,980.0000 4,950.00 CY 07 2 15.0 1,350.0000 20,250.00 CY 10 2 90.0 424.4556 38,201.00

Page 233: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 229 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) MINOR CONCRETE (GUTTER) (CY) CY 12 1 25.0 658.4000 16,460.00 UNIT TOTAL CY 8 184.8* 568.6851 105,093.00* ITEM CODE 730045 TOTAL 8 105,093.00* 730070 DETECTABLE WARNING SURFACE SQFT 01 2 1,510.0 26.9338 40,670.00 SQFT 02 1 380.0 32.5000 12,350.00 SQFT 03 6 2,080.0 36.2043 75,305.00 SQFT 04 10 1,972.0 31.8043 62,718.00 SQFT 05 6 2,189.0 33.2956 72,884.00 SQFT 06 5 3,378.0 24.8076 83,800.00 SQFT 07 8 6,395.0 28.8616 184,570.00 SQFT 08 4 764.0 39.9843 30,548.00 SQFT 09 1 12.0 70.0000 840.00 SQFT 10 5 779.0 29.0154 22,603.00 SQFT 11 5 1,902.0 26.6982 50,780.00 SQFT 12 8 1,039.0 63.5101 65,987.00 UNIT TOTAL SQFT 61 22,400.0* 31.3864 703,055.00* ITEM CODE 730070 TOTAL 61 703,055.00* 731501 MINOR CONCRETE (CURB) CY 08 1 49.0 350.0000 17,150.00 UNIT TOTAL CY 1 49.0* 350.0000 17,150.00* ITEM CODE 731501 TOTAL 1 17,150.00* 731502 MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) CY 02 4 72.4 1,338.2488 96,889.21 CY 03 2 30.0 745.6000 22,368.00 CY 04 12 2,083.5 759.4754 1,582,367.00 CY 05 4 687.0 659.9418 453,380.00 CY 06 8 2,531.0 609.7708 1,543,330.00 CY 07 5 438.0 666.2416 291,813.80 CY 08 6 2,338.0 440.7367 1,030,442.50 CY 10 6 210.2 782.7520 164,534.48 CY 11 4 1,870.0 520.0866 972,562.00 CY 12 10 889.0 466.4567 414,680.00 UNIT TOTAL CY 61 11,149.1* 589.4975 6,572,366.99*

Page 234: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 230 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 731502 TOTAL 61 6,572,366.99* 731504 MINOR CONCRETE (CURB AND GUTTER) CY 02 1 360.0 438.0900 157,712.40 CY 03 3 884.9 592.1675 524,009.00 CY 04 3 189.0 536.7011 101,436.50 CY 07 5 1,618.0 381.0816 616,590.00 CY 08 3 36.0 990.0000 35,640.00 CY 10 3 256.8 498.7539 128,080.00 UNIT TOTAL CY 18 3,344.7* 467.4464 1,563,467.90* ITEM CODE 731504 TOTAL 18 1,563,467.90* 731507 MINOR CONCRETE (GUTTER DEPRESSION) CY 02 1 .6 525.0000 315.00 CY 03 2 43.0 798.3721 34,330.00 CY 05 1 64.0 435.0000 27,840.00 CY 07 1 3.0 470.0000 1,410.00 CY 10 1 18.0 650.0000 11,700.00 UNIT TOTAL CY 6 128.6* 587.8305 75,595.00* ITEM CODE 731507 TOTAL 6 75,595.00* 731508 MINOR CONCRETE (EXPOSED AGGREGATE CONCRETE) SQFT 05 6 170,430.0 10.6286 1,811,426.00 SQFT 11 8 179,680.0 8.5889 1,543,258.80 SQFT 12 1 9,280.0 9.9500 92,336.00 UNIT TOTAL SQFT 15 359,390.0* 9.5913 3,447,020.80* ITEM CODE 731508 TOTAL 15 3,447,020.80* 731510 MINOR CONCRETE (CURB, GUTTER, SIDEWALK AND DRIVEWAY) CY 03 1 500.0 750.0000 375,000.00 CY 04 2 361.0 613.4626 221,460.00 CY 05 2 29.0 1,098.2759 31,850.00 CY 07 1 390.0 288.0000 112,320.00 UNIT TOTAL CY 6 1,280.0* 578.6172 740,630.00* ITEM CODE 731510 TOTAL 6 740,630.00* 731511 MINOR CONCRETE (ISLAND PAVING)

Page 235: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 231 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 731511 MINOR CONCRETE (ISLAND PAVING) CY 04 3 69.0 557.8261 38,490.00 CY 06 1 47.0 550.0000 25,850.00 UNIT TOTAL CY 4 116.0* 554.6552 64,340.00* ITEM CODE 731511 TOTAL 4 64,340.00* 731516 MINOR CONCRETE (DRIVEWAY) CY 02 1 95.0 429.3000 40,783.50 CY 03 2 1,012.0 533.7352 540,140.00 CY 05 1 41.0 540.0000 22,140.00 CY 06 1 5.0 1,040.0000 5,200.00 CY 07 1 280.0 384.0000 107,520.00 CY 08 1 15.0 750.0000 11,250.00 CY 10 1 1.2 750.0000 900.00 CY 12 1 110.0 432.1000 47,531.00 UNIT TOTAL CY 9 1,559.2* 497.3477 775,464.50* ITEM CODE 731516 TOTAL 9 775,464.50* 731518 MINOR CONCRETE (BRUSHED CONCRETE) SQFT 04 3 109,530.0 6.3908 699,980.00 SQFT 07 2 20,040.0 10.2445 205,300.00 UNIT TOTAL SQFT 5 129,570.0* 6.9868 905,280.00* ITEM CODE 731518 TOTAL 5 905,280.00* 731519 MINOR CONCRETE (STAMPED CONCRETE) SQFT 03 1 4,500.0 12.0000 54,000.00 SQFT 05 2 81,200.0 12.5667 1,020,416.00 SQFT 07 2 6,290.0 10.7223 67,443.00 SQFT 08 1 19,100.0 1.5000 28,650.00 SQFT 10 1 3,620.0 9.7700 35,367.40 UNIT TOTAL SQFT 7 114,710.0* 10.5124 1,205,876.40* ITEM CODE 731519 TOTAL 7 1,205,876.40* 731521 MINOR CONCRETE (SIDEWALK) CY 02 1 250.0 575.1000 143,775.00

Page 236: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 232 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) MINOR CONCRETE (SIDEWALK) CY 03 3 1,145.0 542.4236 621,075.00 CY 04 3 284.0 432.7465 122,900.00 CY 05 1 490.0 430.0000 210,700.00 CY 07 1 3.0 1,000.0000 3,000.00 CY 08 1 75.0 350.0000 26,250.00 CY 10 1 96.0 500.0000 48,000.00 CY 12 1 12.0 845.0000 10,140.00 UNIT TOTAL CY 12 2,355.0* 503.5414 1,185,840.00* ITEM CODE 731521 TOTAL 12 1,185,840.00* 731530 MINOR CONCRETE (TEXTURED PAVING) CY 02 1 43.0 1,012.5000 43,537.50 CY 03 3 143.0 1,137.7986 162,705.20 CY 04 1 21.0 800.0000 16,800.00 CY 06 1 97.0 815.0000 79,055.00 CY 07 1 620.0 560.0000 347,200.00 CY 10 3 940.0 656.7261 617,322.50 CY 11 1 70.0 640.0000 44,800.00 CY 12 2 180.5 900.1385 162,475.00 UNIT TOTAL CY 13 2,114.5* 697.0419 1,473,895.20* ITEM CODE 731530 TOTAL 13 1,473,895.20* 731623 MINOR CONCRETE (CURB RAMP) CY 03 4 258.3 720.8099 186,185.20 CY 04 2 11.3 1,405.3805 15,880.80 CY 05 3 121.0 539.6694 65,300.00 CY 10 1 23.0 400.0000 9,200.00 CY 12 1 5.0 960.0000 4,800.00 UNIT TOTAL CY 11 418.6* 672.1596 281,366.00* ITEM CODE 731623 TOTAL 11 281,366.00* 731626 MINOR CONCRETE (CURB AND CURB RAMP) CY 09 1 1.3 2,900.0000 3,770.00 UNIT TOTAL CY 1 1.3* 2,900.0000 3,770.00* ITEM CODE 731626 TOTAL 1 3,770.00*

Page 237: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 233 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 731627 MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP) CY 01 2 243.0 1,156.1728 280,950.00 CY 03 2 799.0 493.1352 394,015.00 CY 04 3 153.0 1,163.9216 178,080.00 CY 05 1 3.6 2,600.0000 9,360.00 CY 07 6 1,821.0 754.1461 1,373,300.00 CY 08 2 724.0 673.8398 487,860.00 CY 10 1 16.0 1,500.0000 24,000.00 CY 11 3 234.0 712.3932 166,700.00 CY 12 3 115.0 654.9130 75,315.00 UNIT TOTAL CY 23 4,108.6* 727.6396 2,989,580.00* ITEM CODE 731627 TOTAL 23 2,989,580.00* 733000 PRE/POST CONSTRUCTION SURVEYS EA 03 5 245.0 734.9184 180,055.00 EA 04 5 48.0 1,578.6458 75,775.00 EA 05 1 38.0 750.0000 28,500.00 EA 06 3 64.0 1,169.5313 74,850.00 EA 07 6 303.0 549.5380 166,510.00 EA 08 1 26.0 380.0000 9,880.00 EA 10 3 22.0 1,300.0000 28,600.00 EA 11 2 64.0 759.3750 48,600.00 EA 12 6 53.0 926.7925 49,120.00 UNIT TOTAL EA 32 863.0* 766.9641 661,890.00* ITEM CODE 733000 TOTAL 32 661,890.00* 735000 PARKING BUMPER (PRECAST CONCRETE) EA 04 1 170.0 53.0000 9,010.00 EA 06 1 8.0 116.0000 928.00 UNIT TOTAL EA 2 178.0* 55.8315 9,938.00* ITEM CODE 735000 TOTAL 2 9,938.00* 740550 PUMPING PLANT EQUIPMENT LS 03 1 647,577.00 UNIT TOTAL LS 1 647,577.00 ITEM CODE 740550 TOTAL 1 647,577.00*

Page 238: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 234 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 741001 PUMPING PLANT ELECTRICAL EQUIPMENT LS 03 1 46,273.00 UNIT TOTAL LS 1 46,273.00 ITEM CODE 741001 TOTAL 1 46,273.00* 750001 MISCELLANEOUS IRON AND STEEL LB 01 12 87,853.0 3.2910 289,124.20 LB 02 9 55,770.0 2.1722 121,144.20 LB 03 8 47,709.0 2.5648 122,362.22 LB 04 24 135,333.0 1.9922 269,612.60 LB 05 11 110,048.0 2.1552 237,172.70 LB 06 6 11,944.0 2.0479 24,459.90 LB 07 8 161,954.0 1.5162 245,556.30 LB 08 6 44,896.0 1.8424 82,716.00 LB 09 2 620.0 3.8581 2,392.00 LB 10 8 13,968.0 2.1383 29,867.27 LB 11 10 70,523.0 1.6145 113,861.33 LB 12 9 52,014.0 2.2617 117,639.44 UNIT TOTAL LB 113 792,632.0* 2.0891 1,655,908.16* ITEM CODE 750001 TOTAL 113 1,655,908.16* 750007 FRAME AND GRATE EA 06 1 1.0 874.0000 874.00 EA 07 1 7.0 750.0000 5,250.00 UNIT TOTAL EA 2 8.0* 765.5000 6,124.00* ITEM CODE 750007 TOTAL 2 6,124.00* 750010 MANHOLE FRAME AND COVER EA 03 1 57.0 820.0000 46,740.00 EA 04 4 11.0 1,002.2727 11,025.00 EA 05 1 8.0 850.0000 6,800.00 EA 06 2 3.0 1,404.5833 4,213.75 EA 11 1 3.0 800.0000 2,400.00 UNIT TOTAL EA 9 82.0* 868.0335 71,178.75* ITEM CODE 750010 TOTAL 9 71,178.75* 750011 MANHOLE FRAME AND GRATE

Page 239: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 235 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 750011 MANHOLE FRAME AND GRATE EA 05 1 3.0 850.0000 2,550.00 UNIT TOTAL EA 1 3.0* 850.0000 2,550.00* ITEM CODE 750011 TOTAL 1 2,550.00* 750013 MANHOLE FRAME AND COVER (PRESSURE) EA 04 1 2.0 1,800.0000 3,600.00 UNIT TOTAL EA 1 2.0* 1,800.0000 3,600.00* ITEM CODE 750013 TOTAL 1 3,600.00* 750041 ISOLATION CASING LB 08 1 53,600.0 6.2000 332,320.00 UNIT TOTAL LB 1 53,600.0* 6.2000 332,320.00* ITEM CODE 750041 TOTAL 1 332,320.00* 750049 INLET GRATE (TYPE 36R) EA 06 1 1.0 500.0000 500.00 UNIT TOTAL EA 1 1.0* 500.0000 500.00* ITEM CODE 750049 TOTAL 1 500.00* 750496 MISCELLANEOUS METAL (RESTRAINER - PIPE TYPE) LB 07 1 16,229.0 6.3000 102,242.70 UNIT TOTAL LB 1 16,229.0* 6.3000 102,242.70* ITEM CODE 750496 TOTAL 1 102,242.70* 750500 MISCELLANEOUS METAL LB 07 7 8,102.0 35.7190 289,395.25 LB 09 1 158.0 6.0000 948.00 UNIT TOTAL LB 8 8,260.0* 35.1505 290,343.25* ITEM CODE 750500 TOTAL 8 290,343.25*

Page 240: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 236 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 750501 MISCELLANEOUS METAL (BRIDGE) LB 01 2 834.0 16.4125 13,688.00 LB 02 2 5,982.0 7.8338 46,862.00 LB 03 1 5,715.0 11.0000 62,865.00 LB 04 4 3,119.0 10.2565 31,990.00 LB 05 2 2,165.0 10.0484 21,754.70 LB 06 1 895.0 12.0000 10,740.00 LB 07 1 626.0 16.0000 10,016.00 LB 08 1 310.0 40.0000 12,400.00 LB 12 1 1,847.0 5.0000 9,235.00 UNIT TOTAL LB 15 21,493.0* 10.2150 219,550.70* ITEM CODE 750501 TOTAL 15 219,550.70* 750502 MISCELLANEOUS METAL (RETAINING WALL) LB 10 1 362.0 40.0000 14,480.00 LB 11 1 66.0 13.0000 858.00 UNIT TOTAL LB 2 428.0* 35.8364 15,338.00* ITEM CODE 750502 TOTAL 2 15,338.00* 750505 BRIDGE DECK DRAINAGE SYSTEM LB 02 1 1,524.0 8.0000 12,192.00 LB 04 3 116,063.0 13.6418 1,583,313.00 LB 05 2 21,063.0 9.0877 191,414.00 LB 06 1 7,292.0 11.0000 80,212.00 LB 07 1 96,240.0 3.2500 312,780.00 UNIT TOTAL LB 8 242,182.0* 9.0011 2,179,911.00* ITEM CODE 750505 TOTAL 8 2,179,911.00* 800001 FENCE (TYPE BW, METAL POST) LF 04 2 180.0 39.8333 7,170.00 LF 08 1 730.0 9.7500 7,117.50 LF 11 1 6,400.0 6.8700 43,968.00 LF 12 1 4,470.0 7.5000 33,525.00 UNIT TOTAL LF 5 11,780.0* 7.7912 91,780.50* ITEM CODE 800001 TOTAL 5 91,780.50* 800003 FENCE (TYPE BW, 4-STRAND)

Page 241: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 237 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 800003 FENCE (TYPE BW, 4-STRAND) LF 03 1 900.0 12.0000 10,800.00 UNIT TOTAL LF 1 900.0* 12.0000 10,800.00* ITEM CODE 800003 TOTAL 1 10,800.00* 800004 FENCE (TYPE BW, 5-STRAND, WOOD POST) LF 04 1 100.0 70.0000 7,000.00 UNIT TOTAL LF 1 100.0* 70.0000 7,000.00* ITEM CODE 800004 TOTAL 1 7,000.00* 800007 FENCE (TYPE BW, 5-STRAND, METAL POST) LF 04 1 340.0 11.0800 3,767.20 LF 05 3 43,350.0 4.1373 179,350.00 LF 06 1 17,500.0 3.7500 65,625.00 LF 08 1 20,800.0 5.0000 104,000.00 UNIT TOTAL LF 6 81,990.0* 4.3023 352,742.20* ITEM CODE 800007 TOTAL 6 352,742.20* 800051 FENCE (TYPE WM, METAL POST) LF 01 1 560.0 27.0000 15,120.00 LF 03 1 12,600.0 8.5000 107,100.00 LF 04 1 20.0 89.0000 1,780.00 UNIT TOTAL LF 3 13,180.0* 9.4082 124,000.00* ITEM CODE 800051 TOTAL 3 124,000.00* 800054 FENCE (TYPE WM, MODIFIED) LF 05 1 13,700.0 8.2500 113,025.00 UNIT TOTAL LF 1 13,700.0* 8.2500 113,025.00* ITEM CODE 800054 TOTAL 1 113,025.00* 800060 FENCE (TYPE WM AND BW) LF 01 1 1,830.0 34.0000 62,220.00

Page 242: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 238 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) FENCE (TYPE WM AND BW) LF 05 1 1,380.0 12.0000 16,560.00 UNIT TOTAL LF 2 3,210.0* 24.5421 78,780.00* ITEM CODE 800060 TOTAL 2 78,780.00* 800100 TEMPORARY FENCE LF 01 1 840.0 28.0000 23,520.00 LF 02 1 120.0 17.0000 2,040.00 LF 04 1 1,320.0 6.0000 7,920.00 LF 06 1 220.0 26.0000 5,720.00 LF 09 1 580.0 5.0000 2,900.00 UNIT TOTAL LF 5 3,080.0* 13.6688 42,100.00* ITEM CODE 800100 TOTAL 5 42,100.00* 800103 TEMPORARY FENCE (TYPE CL-6) LF 03 2 990.0 8.8384 8,750.00 LF 04 6 1,809.0 20.7988 37,625.00 LF 05 1 2,440.0 15.5000 37,820.00 LF 06 1 430.0 10.0000 4,300.00 LF 07 1 19,000.0 14.2000 269,800.00 LF 08 2 200.0 75.0920 15,018.40 LF 11 3 5,890.0 9.0462 53,282.00 UNIT TOTAL LF 16 30,759.0* 13.8690 426,595.40* LS 03 1 750.00 UNIT TOTAL LS 1 750.00 ITEM CODE 800103 TOTAL 17 427,345.40* 800320 CHAIN LINK FENCE (TYPE CL-4) LF 08 1 60.0 154.0000 9,240.00 LF 11 2 750.0 30.4413 22,831.00 UNIT TOTAL LF 3 810.0* 39.5938 32,071.00* ITEM CODE 800320 TOTAL 3 32,071.00* 800321 CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD)

Page 243: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 239 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 800321 CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD) LF 05 1 654.0 20.0000 13,080.00 UNIT TOTAL LF 1 654.0* 20.0000 13,080.00* ITEM CODE 800321 TOTAL 1 13,080.00* 800360 CHAIN LINK FENCE (TYPE CL-6) LF 02 1 47.0 91.0400 4,278.88 LF 04 6 1,172.0 26.1485 30,646.00 LF 06 4 2,757.0 16.5482 45,623.50 LF 07 5 5,069.0 23.0902 117,044.20 LF 08 2 274.0 37.8832 10,380.00 LF 10 2 7,180.0 9.9699 71,583.70 LF 11 4 3,650.0 27.4247 100,100.00 UNIT TOTAL LF 24 20,149.0* 18.8424 379,656.28* LS 03 1 1,800.00 UNIT TOTAL LS 1 1,800.00 ITEM CODE 800360 TOTAL 25 381,456.28* 800361 CHAIN LINK FENCE (TYPE CL-6, VINYL-CLAD) LF 04 1 1,230.0 29.0000 35,670.00 LF 05 1 2,225.0 34.0000 75,650.00 LF 07 1 1,650.0 30.4500 50,242.50 UNIT TOTAL LF 3 5,105.0* 31.6479 161,562.50* ITEM CODE 800361 TOTAL 3 161,562.50* 800363 CHAIN LINK FENCE (TYPE CL-6, EXTENSION ARM) LF 08 1 875.0 32.2000 28,175.00 UNIT TOTAL LF 1 875.0* 32.2000 28,175.00* ITEM CODE 800363 TOTAL 1 28,175.00* 800365 CHAIN LINK FENCE (TYPE CL-6, SLATTED) LF 05 1 92.0 20.0000 1,840.00 UNIT TOTAL LF 1 92.0* 20.0000 1,840.00*

Page 244: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 240 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 800365 TOTAL 1 1,840.00* 800400 CHAIN LINK FENCE (TYPE CL-8) LF 06 1 120.0 60.0000 7,200.00 UNIT TOTAL LF 1 120.0* 60.0000 7,200.00* ITEM CODE 800400 TOTAL 1 7,200.00* 801120 5' WIRE MESH GATE EA 05 1 1.0 870.0000 870.00 UNIT TOTAL EA 1 1.0* 870.0000 870.00* ITEM CODE 801120 TOTAL 1 870.00* 801150 8' WIRE MESH GATE EA 05 1 8.0 125.0000 1,000.00 UNIT TOTAL EA 1 8.0* 125.0000 1,000.00* ITEM CODE 801150 TOTAL 1 1,000.00* 801230 16' WIRE MESH GATE EA 08 1 6.0 2,000.0000 12,000.00 UNIT TOTAL EA 1 6.0* 2,000.0000 12,000.00* ITEM CODE 801230 TOTAL 1 12,000.00* 801360 12' METAL GATE EA 01 1 1.0 2,500.0000 2,500.00 UNIT TOTAL EA 1 1.0* 2,500.0000 2,500.00* ITEM CODE 801360 TOTAL 1 2,500.00* 801364 16' METAL GATE EA 01 1 1.0 3,200.0000 3,200.00 UNIT TOTAL EA 1 1.0* 3,200.0000 3,200.00* ITEM CODE 801364 TOTAL 1 3,200.00*

Page 245: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 241 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 802120 6' CHAIN LINK GATE (TYPE CL-4) EA 11 1 1.0 2,000.0000 2,000.00 UNIT TOTAL EA 1 1.0* 2,000.0000 2,000.00* ITEM CODE 802120 TOTAL 1 2,000.00* 802500 3' CHAIN LINK GATE (TYPE CL-6) EA 08 1 4.0 515.0000 2,060.00 UNIT TOTAL EA 1 4.0* 515.0000 2,060.00* ITEM CODE 802500 TOTAL 1 2,060.00* 802501 4' CHAIN LINK GATE (TYPE CL-6) EA 02 1 1.0 799.7200 799.72 EA 04 2 2.0 1,000.0000 2,000.00 EA 05 1 12.0 2,000.0000 24,000.00 EA 07 2 2.0 1,900.0000 3,800.00 UNIT TOTAL EA 6 17.0* 1,799.9835 30,599.72* ITEM CODE 802501 TOTAL 6 30,599.72* 802503 4' CHAIN LINK GATE (TYPE CL-6, EXTENSION ARM) EA 08 1 1.0 400.0000 400.00 UNIT TOTAL EA 1 1.0* 400.0000 400.00* ITEM CODE 802503 TOTAL 1 400.00* 802510 5' CHAIN LINK GATE (TYPE CL-6) EA 06 1 1.0 1,100.0000 1,100.00 EA 10 1 1.0 600.0000 600.00 UNIT TOTAL EA 2 2.0* 850.0000 1,700.00* ITEM CODE 802510 TOTAL 2 1,700.00* 802520 6' CHAIN LINK GATE (TYPE CL-6) EA 04 1 1.0 700.0000 700.00 EA 11 3 5.0 2,890.3080 14,451.54

Page 246: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 242 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 4 6.0* 2,525.2567 15,151.54* ITEM CODE 802520 TOTAL 4 15,151.54* 802540 8' CHAIN LINK GATE (TYPE CL-6) EA 06 1 2.0 1,500.0000 3,000.00 UNIT TOTAL EA 1 2.0* 1,500.0000 3,000.00* ITEM CODE 802540 TOTAL 1 3,000.00* 802580 12' CHAIN LINK GATE (TYPE CL-6) EA 07 1 2.0 1,600.0000 3,200.00 UNIT TOTAL EA 1 2.0* 1,600.0000 3,200.00* ITEM CODE 802580 TOTAL 1 3,200.00* 802620 16' CHAIN LINK GATE (TYPE CL-6) EA 07 1 2.0 1,700.0000 3,400.00 EA 10 1 1.0 1,400.0000 1,400.00 EA 11 1 1.0 2,000.0000 2,000.00 UNIT TOTAL EA 3 4.0* 1,700.0000 6,800.00* ITEM CODE 802620 TOTAL 3 6,800.00* 802901 4' CHAIN LINK GATE (TYPE CL-8) EA 05 1 1.0 2,250.0000 2,250.00 UNIT TOTAL EA 1 1.0* 2,250.0000 2,250.00* ITEM CODE 802901 TOTAL 1 2,250.00* 802920 6' CHAIN LINK GATE (TYPE CL-8) EA 06 1 2.0 800.0000 1,600.00 UNIT TOTAL EA 1 2.0* 800.0000 1,600.00* ITEM CODE 802920 TOTAL 1 1,600.00* 810111 SURVEY MONUMENT (TYPE A)

Page 247: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 243 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 810111 SURVEY MONUMENT (TYPE A) EA 05 3 63.0 1,316.6667 82,950.00 EA 06 3 12.0 1,525.0000 18,300.00 UNIT TOTAL EA 6 75.0* 1,350.0000 101,250.00* ITEM CODE 810111 TOTAL 6 101,250.00* 810112 SURVEY MONUMENT (TYPE B) EA 01 1 2.0 3,000.0000 6,000.00 EA 06 2 28.0 1,337.5000 37,450.00 UNIT TOTAL EA 3 30.0* 1,448.3333 43,450.00* ITEM CODE 810112 TOTAL 3 43,450.00* 810116 SURVEY MONUMENT (TYPE D) EA 05 3 10.0 1,535.0000 15,350.00 EA 06 1 2.0 900.0000 1,800.00 EA 08 7 300.0 1,205.4783 361,643.50 EA 10 2 5.0 1,500.0000 7,500.00 UNIT TOTAL EA 13 317.0* 1,218.5915 386,293.50* ITEM CODE 810116 TOTAL 13 386,293.50* 810120 REMOVE PAVEMENT MARKER EA 01 1 26,400.0 .5000 13,200.00 UNIT TOTAL EA 1 26,400.0* .5000 13,200.00* ITEM CODE 810120 TOTAL 1 13,200.00* 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 01 1 32,700.0 3.0000 98,100.00 UNIT TOTAL EA 1 32,700.0* 3.0000 98,100.00* ITEM CODE 810230 TOTAL 1 98,100.00* 820105 DELINEATOR (SPECIAL) EA 09 1 8.0 200.0000 1,600.00

Page 248: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 244 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL EA 1 8.0* 200.0000 1,600.00* ITEM CODE 820105 TOTAL 1 1,600.00* 820107 DELINEATOR (CLASS 1) EA 01 3 17.0 50.8824 865.00 EA 02 1 11.0 50.0000 550.00 EA 03 7 707.0 42.7581 30,230.00 EA 04 8 1,398.0 50.2289 70,220.00 EA 05 12 1,158.0 44.8541 51,941.00 EA 06 3 345.0 47.2464 16,300.00 EA 07 1 42.0 50.0000 2,100.00 EA 08 3 1,368.0 50.0512 68,470.00 EA 10 6 111.0 46.6261 5,175.50 EA 11 2 149.0 7.7211 1,150.45 EA 12 8 822.0 38.4818 31,632.00 UNIT TOTAL EA 54 6,128.0* 45.4690 278,633.95* ITEM CODE 820107 TOTAL 54 278,633.95* 820108 DELINEATOR (CLASS 2) EA 01 3 86.0 57.6744 4,960.00 EA 02 10 1,465.0 43.9331 64,362.00 EA 03 2 47.0 54.6809 2,570.00 EA 07 1 260.0 85.0000 22,100.00 EA 08 1 69.0 52.0000 3,588.00 EA 09 1 18.0 100.0000 1,800.00 EA 10 3 58.0 59.3276 3,441.00 UNIT TOTAL EA 21 2,003.0* 51.3335 102,821.00* ITEM CODE 820108 TOTAL 21 102,821.00* 820110 MILEPOST MARKER EA 01 5 10.0 67.5000 675.00 EA 02 8 103.0 55.4272 5,709.00 EA 05 3 25.0 67.2400 1,681.00 EA 07 2 18.0 270.5556 4,870.00 EA 08 2 187.0 87.2727 16,320.00 EA 11 2 3.0 73.3333 220.00 EA 12 1 20.0 85.0000 1,700.00 UNIT TOTAL EA 23 366.0* 85.1776 31,175.00* ITEM CODE 820110 TOTAL 23 31,175.00*

Page 249: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 245 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 820111 UNDERDRAIN MARKER EA 03 2 10.0 125.0000 1,250.00 UNIT TOTAL EA 2 10.0* 125.0000 1,250.00* ITEM CODE 820111 TOTAL 2 1,250.00* 820112 MARKER (CULVERT) EA 01 10 150.0 61.6170 9,242.55 EA 02 8 236.0 47.6780 11,252.00 EA 03 8 129.0 63.8450 8,236.00 EA 09 1 78.0 60.0000 4,680.00 UNIT TOTAL EA 27 593.0* 56.3416 33,410.55* ITEM CODE 820112 TOTAL 27 33,410.55* 820115 SNOW POLE MARKER EA 03 1 310.0 170.0000 52,700.00 UNIT TOTAL EA 1 310.0* 170.0000 52,700.00* ITEM CODE 820115 TOTAL 1 52,700.00* 820118 GUARD RAILING DELINEATOR EA 01 5 303.0 22.6403 6,860.00 EA 04 6 961.0 38.1946 36,705.00 EA 05 8 404.0 19.9406 8,056.00 EA 06 2 18.0 33.3333 600.00 EA 07 7 3,122.0 28.5378 89,095.00 EA 08 2 117.0 25.1282 2,940.00 EA 10 14 804.0 33.9610 27,304.65 EA 11 10 742.0 24.5755 18,235.00 EA 12 10 1,689.0 27.0811 45,740.00 UNIT TOTAL EA 64 8,160.0* 28.8647 235,535.65* ITEM CODE 820118 TOTAL 64 235,535.65* 820121 TEMPORARY DELINEATOR (CLASS 1) EA 04 1 78.0 40.0000 3,120.00 UNIT TOTAL EA 1 78.0* 40.0000 3,120.00*

Page 250: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 246 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 820121 TOTAL 1 3,120.00* 820130 OBJECT MARKER EA 01 2 22.0 65.9091 1,450.00 EA 02 2 7.0 132.1429 925.00 EA 04 1 18.0 35.0000 630.00 EA 05 8 349.0 93.2120 32,531.00 EA 06 2 22.0 68.6364 1,510.00 EA 07 1 6.0 25.0000 150.00 EA 08 4 22.0 231.8182 5,100.00 UNIT TOTAL EA 20 446.0* 94.8341 42,296.00* ITEM CODE 820130 TOTAL 20 42,296.00* 820131 OBJECT MARKER (TYPE K) EA 10 2 35.0 95.0286 3,326.00 UNIT TOTAL EA 2 35.0* 95.0286 3,326.00* ITEM CODE 820131 TOTAL 2 3,326.00* 820132 OBJECT MARKER (TYPE L) EA 02 1 2.0 55.0000 110.00 EA 06 1 4.0 45.0000 180.00 EA 10 10 54.0 53.0046 2,862.25 UNIT TOTAL EA 12 60.0* 52.5375 3,152.25* ITEM CODE 820132 TOTAL 12 3,152.25* 820133 OBJECT MARKER (TYPE N) EA 07 2 3.0 61.0000 183.00 EA 12 1 8.0 90.0000 720.00 UNIT TOTAL EA 3 11.0* 82.0909 903.00* ITEM CODE 820133 TOTAL 3 903.00* 820134 OBJECT MARKER (TYPE P) EA 01 3 5.0 92.6200 463.10 EA 02 2 12.0 80.0000 960.00 EA 04 10 160.0 80.2875 12,846.00

Page 251: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 247 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) OBJECT MARKER (TYPE P) EA 05 5 93.0 114.5161 10,650.00 EA 06 3 11.0 76.3636 840.00 EA 07 1 75.0 20.0000 1,500.00 EA 08 1 1.0 60.0000 60.00 EA 10 4 15.0 67.1067 1,006.60 EA 12 7 67.0 64.7761 4,340.00 UNIT TOTAL EA 36 439.0* 74.4093 32,665.70* ITEM CODE 820134 TOTAL 36 32,665.70* 820135 OBJECT MARKER (TYPE R) EA 07 1 2.0 75.0000 150.00 UNIT TOTAL EA 1 2.0* 75.0000 150.00* ITEM CODE 820135 TOTAL 1 150.00* 820141 OBJECT MARKER (TYPE K-1) EA 03 2 6.0 51.6667 310.00 EA 04 2 5.0 68.0000 340.00 EA 05 1 48.0 71.5000 3,432.00 EA 08 1 14.0 50.0000 700.00 EA 09 1 4.0 100.0000 400.00 UNIT TOTAL EA 7 77.0* 67.2987 5,182.00* ITEM CODE 820141 TOTAL 7 5,182.00* 820143 OBJECT MARKER (TYPE K-2) EA 03 1 9.0 50.0000 450.00 EA 12 1 120.0 40.0000 4,800.00 UNIT TOTAL EA 2 129.0* 40.6977 5,250.00* ITEM CODE 820143 TOTAL 2 5,250.00* 820151 OBJECT MARKER (TYPE L-1) EA 02 13 227.0 72.4978 16,457.00 EA 03 8 81.0 50.1111 4,059.00 EA 04 5 101.0 51.7079 5,222.50 EA 05 3 39.0 95.8974 3,740.00

Page 252: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 248 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) OBJECT MARKER (TYPE L-1) EA 06 1 6.0 65.0000 390.00 EA 07 1 18.0 25.0000 450.00 EA 09 1 17.0 200.0000 3,400.00 EA 10 2 17.0 47.5412 808.20 UNIT TOTAL EA 34 506.0* 68.2346 34,526.70* ITEM CODE 820151 TOTAL 34 34,526.70* 820190 SPECIAL MARKER EA 05 1 4.0 71.5000 286.00 EA 08 1 6.0 115.0000 690.00 UNIT TOTAL EA 2 10.0* 97.6000 976.00* ITEM CODE 820190 TOTAL 2 976.00* 832002 METAL BEAM GUARD RAILING (STEEL POST) LF 02 2 1,300.0 27.7769 36,110.00 UNIT TOTAL LF 2 1,300.0* 27.7769 36,110.00* ITEM CODE 832002 TOTAL 2 36,110.00* 832005 MIDWEST GUARDRAIL SYSTEM LF 01 4 556.0 47.4910 26,405.00 LF 02 1 94.0 75.0000 7,050.00 LF 04 5 4,340.0 26.0106 112,886.00 LF 10 1 3,500.0 31.5000 110,250.00 LF 11 8 12,538.0 31.5445 395,505.30 LF 12 1 75.0 75.0000 5,625.00 UNIT TOTAL LF 20 21,103.0* 31.1672 657,721.30* ITEM CODE 832005 TOTAL 20 657,721.30* 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 01 3 1,785.0 34.3361 61,290.00 LF 02 3 12,040.0 25.6836 309,230.00 LF 03 6 6,435.0 29.9115 192,480.40 LF 05 13 47,490.0 26.9429 1,279,520.00 LF 06 12 6,123.0 44.2696 271,063.00

Page 253: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 249 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 07 2 1,220.0 29.0041 35,385.00 LF 08 6 15,740.0 26.5397 417,735.00 LF 09 1 5,230.0 40.0000 209,200.00 LF 10 7 2,556.0 39.1252 100,004.00 LF 11 4 8,995.0 24.3202 218,760.00 UNIT TOTAL LF 57 107,614.0* 28.7571 3,094,667.40* ITEM CODE 832006 TOTAL 57 3,094,667.40* 832007 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 01 3 4,853.0 26.4651 128,435.00 LF 03 2 9,808.0 25.6605 251,678.00 LF 04 11 35,218.0 25.6271 902,535.00 LF 07 11 59,949.0 27.2987 1,636,530.50 LF 08 6 24,520.0 26.9650 661,181.00 LF 10 11 19,595.0 30.5147 597,935.10 LF 12 10 15,955.0 29.6300 472,747.00 UNIT TOTAL LF 54 169,898.0* 27.3755 4,651,041.60* ITEM CODE 832007 TOTAL 54 4,651,041.60* 832011 MIDWEST GUARDRAIL SYSTEM (SPECIAL) LF 01 1 280.0 150.0000 42,000.00 UNIT TOTAL LF 1 280.0* 150.0000 42,000.00* ITEM CODE 832011 TOTAL 1 42,000.00* 832015 MIDWEST GUARDRAIL SYSTEM (7' WOOD POST) LF 01 2 630.0 30.9929 19,525.50 LF 04 3 1,840.0 37.5815 69,150.00 LF 07 3 32,280.0 28.9380 934,120.00 LF 11 1 3,850.0 30.4300 117,155.50 LF 12 4 9,290.0 32.4026 301,020.00 UNIT TOTAL LF 13 47,890.0* 30.0892 1,440,971.00* ITEM CODE 832015 TOTAL 13 1,440,971.00* 832016 MIDWEST GUARDRAIL SYSTEM (7' POST)

Page 254: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 250 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 832016 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 01 1 130.0 25.0000 3,250.00 LF 02 1 220.0 42.0000 9,240.00 LF 11 1 4,880.0 28.0000 136,640.00 UNIT TOTAL LF 3 5,230.0* 28.5143 149,130.00* ITEM CODE 832016 TOTAL 3 149,130.00* 832017 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 03 1 890.0 42.6300 37,940.70 LF 05 8 10,430.0 42.1807 439,945.00 LF 06 2 2,220.0 48.5405 107,760.00 LF 07 1 140.0 47.5000 6,650.00 LF 08 1 12,000.0 48.0000 576,000.00 LF 09 1 4,220.0 45.0000 189,900.00 UNIT TOTAL LF 14 29,900.0* 45.4246 1,358,195.70* ITEM CODE 832017 TOTAL 14 1,358,195.70* 832070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 01 7 9,064.0 57.8994 524,800.00 SQYD 02 2 3,480.0 60.4195 210,260.00 SQYD 03 3 3,160.0 77.9747 246,400.00 SQYD 04 14 20,650.0 69.1744 1,428,451.80 SQYD 05 12 28,220.0 60.1279 1,696,810.00 SQYD 06 6 51,100.0 45.9718 2,349,160.00 SQYD 07 13 45,190.0 56.0001 2,530,643.00 SQYD 08 15 69,725.0 39.6115 2,761,914.00 SQYD 10 10 50,324.0 43.4574 2,186,950.00 SQYD 11 6 8,187.0 52.9490 433,493.80 SQYD 12 5 14,065.0 61.0107 858,115.00 UNIT TOTAL SQYD 93 303,165.0* 50.2268 15,226,997.60* ITEM CODE 832070 TOTAL 93 15,226,997.60* 833020 CHAIN LINK RAILING LF 02 1 480.0 135.0000 64,800.00 LF 11 1 88.0 94.0000 8,272.00 UNIT TOTAL LF 2 568.0* 128.6479 73,072.00* ITEM CODE 833020 TOTAL 2 73,072.00*

Page 255: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 251 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 833032 CHAIN LINK RAILING (TYPE 7) LF 04 2 770.0 140.1558 107,920.00 LF 11 1 912.0 91.0000 82,992.00 UNIT TOTAL LF 3 1,682.0* 113.5030 190,912.00* ITEM CODE 833032 TOTAL 3 190,912.00* 833033 CHAIN LINK RAILING (TYPE 7 MODIFIED) LF 04 1 745.0 110.0000 81,950.00 LF 06 1 2,472.0 150.0000 370,800.00 UNIT TOTAL LF 2 3,217.0* 140.7367 452,750.00* ITEM CODE 833033 TOTAL 2 452,750.00* 833072 WILDLIFE PASSAGE WAY (TYPE S) EA 05 1 14.0 99.0000 1,386.00 EA 06 1 22.0 165.0000 3,630.00 UNIT TOTAL EA 2 36.0* 139.3333 5,016.00* ITEM CODE 833072 TOTAL 2 5,016.00* 833077 PEDESTRIAN BARRICADE EA 04 2 2.0 1,250.0000 2,500.00 EA 07 2 3.0 3,056.6667 9,170.00 EA 10 2 2.0 1,628.2500 3,256.50 EA 11 1 1.0 3,000.0000 3,000.00 EA 12 1 6.0 981.2500 5,887.50 UNIT TOTAL EA 8 14.0* 1,701.0000 23,814.00* ITEM CODE 833077 TOTAL 8 23,814.00* 833080 CONCRETE BARRIER (TYPE K) LF 06 1 940.0 45.0000 42,300.00 UNIT TOTAL LF 1 940.0* 45.0000 42,300.00* ITEM CODE 833080 TOTAL 1 42,300.00* 833088 TUBULAR HANDRAILING

Page 256: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 252 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 833088 TUBULAR HANDRAILING LF 04 1 682.0 91.0000 62,062.00 LF 11 1 490.0 73.0000 35,770.00 UNIT TOTAL LF 2 1,172.0* 83.4744 97,832.00* ITEM CODE 833088 TOTAL 2 97,832.00* 833090 TUBULAR HANDRAILING (MODIFIED) LF 07 1 6,055.0 48.3000 292,456.50 UNIT TOTAL LF 1 6,055.0* 48.3000 292,456.50* ITEM CODE 833090 TOTAL 1 292,456.50* 833142 CONCRETE BARRIER (TYPE 26 MODIFIED) LF 04 2 956.0 232.1130 221,900.00 LF 07 1 8,507.0 158.0000 1,344,106.00 LF 11 1 779.0 207.0400 161,284.16 UNIT TOTAL LF 4 10,242.0* 168.6477 1,727,290.16* ITEM CODE 833142 TOTAL 4 1,727,290.16* 833143 CONCRETE BARRIER (TYPE 26A MODIFIED) LF 11 1 133.0 247.4800 32,914.84 UNIT TOTAL LF 1 133.0* 247.4800 32,914.84* ITEM CODE 833143 TOTAL 1 32,914.84* 839218 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 11 1 1,180.0 45.0000 53,100.00 UNIT TOTAL LF 1 1,180.0* 45.0000 53,100.00* ITEM CODE 839218 TOTAL 1 53,100.00* 839219 DOUBLE MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 05 3 1,500.0 43.8000 65,700.00 LF 06 4 1,305.0 41.8774 54,650.00 UNIT TOTAL LF 7 2,805.0* 42.9055 120,350.00*

Page 257: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 253 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 839219 TOTAL 7 120,350.00* 839221 DOUBLE MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 03 1 2,100.0 37.4000 78,540.00 LF 04 1 94.0 36.7500 3,454.50 LF 08 1 200.0 68.0000 13,600.00 LF 10 1 1,290.0 40.9500 52,825.50 LF 12 1 50.0 61.0000 3,050.00 UNIT TOTAL LF 5 3,734.0* 40.5651 151,470.00* ITEM CODE 839221 TOTAL 5 151,470.00* 839301 SINGLE THRIE BEAM BARRIER LF 03 1 50.0 180.0000 9,000.00 LF 07 2 1,540.0 32.8929 50,655.00 LF 11 1 320.0 40.0000 12,800.00 UNIT TOTAL LF 4 1,910.0* 37.9346 72,455.00* ITEM CODE 839301 TOTAL 4 72,455.00* 839302 SINGLE THRIE BEAM BARRIER (WOOD POST) LF 02 1 50.0 57.0000 2,850.00 LF 04 4 5,760.0 29.8682 172,041.00 LF 07 1 160.0 38.0000 6,080.00 LF 08 1 330.0 47.0000 15,510.00 LF 10 2 4,060.0 28.2020 114,500.00 UNIT TOTAL LF 9 10,360.0* 30.0175 310,981.00* ITEM CODE 839302 TOTAL 9 310,981.00* 839303 SINGLE THRIE BEAM BARRIER (STEEL POST) LF 02 1 120.0 66.0000 7,920.00 LF 03 1 580.0 36.5400 21,193.20 LF 05 1 5,090.0 38.0000 193,420.00 UNIT TOTAL LF 3 5,790.0* 38.4341 222,533.20* ITEM CODE 839303 TOTAL 3 222,533.20* 839310 DOUBLE THRIE BEAM BARRIER

Page 258: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 254 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839310 DOUBLE THRIE BEAM BARRIER LF 04 1 590.0 56.0000 33,040.00 LF 07 1 920.0 45.9000 42,228.00 LF 08 2 28,990.0 38.8675 1,126,770.00 UNIT TOTAL LF 4 30,500.0* 39.4111 1,202,038.00* ITEM CODE 839310 TOTAL 4 1,202,038.00* 839311 DOUBLE THRIE BEAM BARRIER (WOOD POST) LF 04 1 480.0 37.8000 18,144.00 LF 10 1 33,800.0 31.8600 1,076,868.00 UNIT TOTAL LF 2 34,280.0* 31.9432 1,095,012.00* ITEM CODE 839311 TOTAL 2 1,095,012.00* 839312 DOUBLE THRIE BEAM BARRIER (STEEL POST) LF 05 1 580.0 51.0000 29,580.00 LF 08 1 160.0 69.2800 11,084.80 UNIT TOTAL LF 2 740.0* 54.9524 40,664.80* ITEM CODE 839312 TOTAL 2 40,664.80* 839514 HANDRAILING LF 02 1 2.0 200.0000 400.00 LF 05 1 110.0 132.0000 14,520.00 UNIT TOTAL LF 2 112.0* 133.2143 14,920.00* ITEM CODE 839514 TOTAL 2 14,920.00* 839521 CABLE RAILING LF 01 8 2,142.0 59.1961 126,798.00 LF 02 1 11.0 250.0000 2,750.00 LF 03 2 352.0 49.8040 17,531.00 LF 04 4 712.0 34.9383 24,876.05 LF 05 4 2,981.0 38.0466 113,417.00 LF 07 7 5,486.0 32.6090 178,892.75 LF 08 3 3,266.0 48.2884 157,710.00 LF 10 1 97.0 140.0000 13,580.00 LF 11 4 1,474.0 31.3056 46,144.50

Page 259: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 255 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) CABLE RAILING LF 12 2 867.0 22.3280 19,358.40 UNIT TOTAL LF 36 17,388.0* 40.3185 701,057.70* ITEM CODE 839521 TOTAL 36 701,057.70* 839527 CABLE RAILING (MODIFIED) LF 03 1 290.0 40.0000 11,600.00 UNIT TOTAL LF 1 290.0* 40.0000 11,600.00* ITEM CODE 839527 TOTAL 1 11,600.00* 839539 TERMINAL SYSTEM (TYPE SKT) EA 04 1 1.0 4,435.0000 4,435.00 UNIT TOTAL EA 1 1.0* 4,435.0000 4,435.00* ITEM CODE 839539 TOTAL 1 4,435.00* 839540 TRANSITION RAILING (TYPE STB) EA 02 1 1.0 5,498.0000 5,498.00 EA 03 1 3.0 4,060.0000 12,180.00 EA 04 3 4.0 3,525.0000 14,100.00 EA 05 1 2.0 3,900.0000 7,800.00 EA 07 2 4.0 4,034.0000 16,136.00 EA 10 1 1.0 4,200.0000 4,200.00 UNIT TOTAL EA 9 15.0* 3,994.2667 59,914.00* ITEM CODE 839540 TOTAL 9 59,914.00* 839542 TRANSITION RAILING (TYPE DTB) EA 04 1 1.0 4,000.0000 4,000.00 EA 05 2 3.0 4,784.7333 14,354.20 EA 07 1 2.0 4,372.0000 8,744.00 UNIT TOTAL EA 4 6.0* 4,516.3667 27,098.20* ITEM CODE 839542 TOTAL 4 27,098.20* 839543 TRANSITION RAILING (TYPE WB-31)

Page 260: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 256 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839543 TRANSITION RAILING (TYPE WB-31) EA 01 9 38.0 4,831.0000 183,578.00 EA 02 2 20.0 4,230.0000 84,600.00 EA 03 3 61.0 3,776.1475 230,345.00 EA 04 12 114.0 4,277.2807 487,610.00 EA 05 10 88.0 4,167.7273 366,760.00 EA 06 8 38.0 4,358.7042 165,630.76 EA 07 11 198.0 3,721.8788 736,932.00 EA 08 6 44.0 3,391.3636 149,220.00 EA 10 10 58.0 4,886.2069 283,400.00 EA 11 6 80.0 3,744.6750 299,574.00 EA 12 8 98.0 3,494.2245 342,434.00 UNIT TOTAL EA 85 837.0* 3,978.5947 3,330,083.76* ITEM CODE 839543 TOTAL 85 3,330,083.76* 839561 RAIL TENSIONING ASSEMBLY EA 03 1 12.0 252.0000 3,024.00 EA 05 2 11.0 626.3636 6,890.00 EA 06 3 9.0 641.6667 5,775.00 EA 08 1 6.0 1,475.0000 8,850.00 EA 11 1 5.0 600.0000 3,000.00 UNIT TOTAL EA 8 43.0* 640.4419 27,539.00* ITEM CODE 839561 TOTAL 8 27,539.00* 839565 TERMINAL SYSTEM (TYPE SRT) EA 03 1 1.0 2,400.0000 2,400.00 UNIT TOTAL EA 1 1.0* 2,400.0000 2,400.00* ITEM CODE 839565 TOTAL 1 2,400.00* 839572 RETURN CAP (TYPE TA) EA 08 1 7.0 175.0000 1,225.00 UNIT TOTAL EA 1 7.0* 175.0000 1,225.00* ITEM CODE 839572 TOTAL 1 1,225.00* 839576 END CAP (TYPE A)

Page 261: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 257 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839576 END CAP (TYPE A) EA 02 1 4.0 300.0000 1,200.00 EA 03 1 2.0 507.5000 1,015.00 EA 07 8 75.0 272.9467 20,471.00 EA 08 1 2.0 82.0000 164.00 EA 10 2 9.0 260.1111 2,341.00 EA 12 4 10.0 253.5000 2,535.00 UNIT TOTAL EA 17 102.0* 271.8235 27,726.00* ITEM CODE 839576 TOTAL 17 27,726.00* 839578 END CAP (TYPE TC) EA 02 1 1.0 225.0000 225.00 EA 03 2 18.0 547.0556 9,847.00 EA 06 1 9.0 275.0000 2,475.00 EA 07 2 6.0 206.6667 1,240.00 EA 10 2 10.0 237.2000 2,372.00 UNIT TOTAL EA 8 44.0* 367.2500 16,159.00* ITEM CODE 839578 TOTAL 8 16,159.00* 839581 END ANCHOR ASSEMBLY (TYPE SFT) EA 01 5 15.0 1,276.6667 19,150.00 EA 02 10 46.0 884.2391 40,675.00 EA 03 9 42.0 857.5000 36,015.00 EA 04 8 53.0 930.5660 49,320.00 EA 05 10 64.0 785.4688 50,270.00 EA 06 7 31.0 1,003.7419 31,116.00 EA 07 10 145.0 724.9862 105,123.00 EA 08 7 172.0 598.7558 102,986.00 EA 09 1 1.0 4,000.0000 4,000.00 EA 10 14 92.0 832.3948 76,580.32 EA 11 12 48.0 943.4892 45,287.48 EA 12 9 74.0 701.3108 51,897.00 UNIT TOTAL EA 102 783.0* 782.1453 612,419.80* ITEM CODE 839581 TOTAL 102 612,419.80* 839582 END ANCHOR ASSEMBLY (TYPE CA) EA 05 1 5.0 1,600.0000 8,000.00 EA 08 1 7.0 2,100.0000 14,700.00

Page 262: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 258 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) END ANCHOR ASSEMBLY (TYPE CA) EA 10 1 2.0 1,500.0000 3,000.00 UNIT TOTAL EA 3 14.0* 1,835.7143 25,700.00* ITEM CODE 839582 TOTAL 3 25,700.00* 839584 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 01 5 15.0 3,340.0000 50,100.00 EA 02 8 16.0 3,332.8750 53,326.00 EA 03 5 22.0 3,046.3636 67,020.00 EA 04 9 41.0 3,250.0000 133,250.00 EA 05 11 85.0 3,273.4706 278,245.00 EA 06 3 6.0 3,050.0000 18,300.00 EA 07 10 115.0 3,402.5043 391,288.00 EA 08 7 121.0 2,690.6281 325,566.00 EA 09 1 11.0 2,500.0000 27,500.00 EA 10 11 43.0 3,141.9414 135,103.48 EA 11 5 37.0 3,325.3324 123,037.30 EA 12 4 40.0 3,342.5000 133,700.00 UNIT TOTAL EA 79 552.0* 3,145.7170 1,736,435.78* ITEM CODE 839584 TOTAL 79 1,736,435.78* 839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 01 9 45.0 3,178.5333 143,034.00 EA 02 13 81.0 2,619.1358 212,150.00 EA 03 5 74.0 2,381.1993 176,208.75 EA 04 14 101.0 2,938.3663 296,775.00 EA 05 13 123.0 2,574.5366 316,668.00 EA 06 10 47.0 2,987.6796 140,420.94 EA 07 12 115.0 2,439.3043 280,520.00 EA 08 10 115.0 2,171.6522 249,740.00 EA 09 1 21.0 1,500.0000 31,500.00 EA 10 14 91.0 2,841.6927 258,594.04 EA 11 9 52.0 2,921.6823 151,927.48 EA 12 10 110.0 2,465.1000 271,161.00 UNIT TOTAL EA 120 975.0* 2,593.5377 2,528,699.21* ITEM CODE 839585 TOTAL 120 2,528,699.21* 839591 CRASH CUSHION, SAND FILLED

Page 263: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 259 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839591 CRASH CUSHION, SAND FILLED EA 02 1 22.0 500.0000 11,000.00 EA 04 3 4.0 5,220.0000 20,880.00 EA 06 1 1.0 6,500.0000 6,500.00 EA 12 1 14.0 200.0000 2,800.00 UNIT TOTAL EA 6 41.0* 1,004.3902 41,180.00* ITEM CODE 839591 TOTAL 6 41,180.00* 839601 CRASH CUSHION (TYPE CAT) EA 03 1 12.0 5,260.0000 63,120.00 EA 07 2 5.0 5,720.0000 28,600.00 UNIT TOTAL EA 3 17.0* 5,395.2941 91,720.00* ITEM CODE 839601 TOTAL 3 91,720.00* 839602 CRASH CUSHION (TYPE CAT) BACKUP EA 03 1 12.0 145.0000 1,740.00 UNIT TOTAL EA 1 12.0* 145.0000 1,740.00* ITEM CODE 839602 TOTAL 1 1,740.00* 839699 CONCRETE BARRIER (TYPE 60P) LF 06 1 12.0 745.0000 8,940.00 UNIT TOTAL LF 1 12.0* 745.0000 8,940.00* ITEM CODE 839699 TOTAL 1 8,940.00* 839700 CONCRETE BARRIER (TYPE 60F) LF 04 1 160.0 281.4000 45,024.00 LF 05 1 170.0 240.0000 40,800.00 LF 06 1 370.0 200.0000 74,000.00 LF 12 3 1,162.0 254.4509 295,672.00 UNIT TOTAL LF 6 1,862.0* 244.6273 455,496.00* ITEM CODE 839700 TOTAL 6 455,496.00* 839701 CONCRETE BARRIER (TYPE 60)

Page 264: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 260 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839701 CONCRETE BARRIER (TYPE 60) LF 02 1 13.0 1,115.0000 14,495.00 LF 04 5 1,880.0 116.6383 219,280.00 LF 05 4 4,220.0 87.8626 370,780.00 LF 06 2 2,900.0 79.3503 230,115.80 LF 07 2 1,130.0 117.1535 132,383.40 LF 08 1 3,370.0 52.2700 176,149.90 LF 11 5 8,975.0 78.4153 703,777.60 LF 12 2 10,760.0 82.9368 892,400.00 UNIT TOTAL LF 22 33,248.0* 82.3924 2,739,381.70* ITEM CODE 839701 TOTAL 22 2,739,381.70* 839702 CONCRETE BARRIER (TYPE 60A) LF 04 1 135.0 89.2500 12,048.75 LF 07 1 108.0 106.0000 11,448.00 UNIT TOTAL LF 2 243.0* 96.6944 23,496.75* ITEM CODE 839702 TOTAL 2 23,496.75* 839703 CONCRETE BARRIER (TYPE 60C) LF 04 3 26,720.0 76.8219 2,052,682.00 LF 05 2 910.0 160.2527 145,830.00 LF 06 2 250.0 234.1600 58,540.00 LF 07 3 264.0 209.2159 55,233.00 LF 11 2 800.0 155.5875 124,470.00 LF 12 3 4,419.0 96.4094 426,033.00 UNIT TOTAL LF 15 33,363.0* 85.8073 2,862,788.00* ITEM CODE 839703 TOTAL 15 2,862,788.00* 839704 CONCRETE BARRIER (TYPE 60D) LF 04 2 1,536.0 77.2786 118,700.00 LF 05 1 740.0 54.0000 39,960.00 LF 07 2 900.0 64.9333 58,440.00 LF 11 2 1,190.0 65.1639 77,545.00 LF 12 3 10,030.0 50.4332 505,845.00 UNIT TOTAL LF 10 14,396.0* 55.6050 800,490.00* ITEM CODE 839704 TOTAL 10 800,490.00*

Page 265: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 261 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839706 CONCRETE BARRIER (TYPE 60G) LF 08 1 470.0 170.0000 79,900.00 LF 11 2 690.0 101.7681 70,220.00 LF 12 1 16.0 280.0000 4,480.00 UNIT TOTAL LF 4 1,176.0* 131.4626 154,600.00* ITEM CODE 839706 TOTAL 4 154,600.00* 839707 CONCRETE BARRIER (TYPE 60GA) LF 07 1 202.0 105.0000 21,210.00 UNIT TOTAL LF 1 202.0* 105.0000 21,210.00* ITEM CODE 839707 TOTAL 1 21,210.00* 839708 CONCRETE BARRIER (TYPE 60GC) LF 12 1 11,300.0 75.5000 853,150.00 UNIT TOTAL LF 1 11,300.0* 75.5000 853,150.00* ITEM CODE 839708 TOTAL 1 853,150.00* 839709 CONCRETE BARRIER (TYPE 60GE) LF 07 1 1,140.0 268.0000 305,520.00 LF 11 1 320.0 410.0000 131,200.00 LF 12 2 1,470.0 314.3508 462,095.70 UNIT TOTAL LF 4 2,930.0* 306.7630 898,815.70* ITEM CODE 839709 TOTAL 4 898,815.70* 839710 CONCRETE BARRIER (TYPE 60S) LF 05 1 10.0 435.0000 4,350.00 LF 07 2 527.0 123.3290 64,994.40 LF 08 1 120.0 920.0000 110,400.00 UNIT TOTAL LF 4 657.0* 273.5836 179,744.40* ITEM CODE 839710 TOTAL 4 179,744.40* 839717 CONCRETE BARRIER (TYPE 732 MODIFIED)

Page 266: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 262 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839717 CONCRETE BARRIER (TYPE 732 MODIFIED) LF 01 1 376.0 250.0000 94,000.00 LF 04 2 1,381.0 128.4062 177,329.00 LF 05 1 705.0 180.0000 126,900.00 LF 06 1 1,900.0 85.0000 161,500.00 LF 07 1 300.0 85.0000 25,500.00 LF 12 1 117.0 180.0000 21,060.00 UNIT TOTAL LF 7 4,779.0* 126.8652 606,289.00* ITEM CODE 839717 TOTAL 7 606,289.00* 839720 CONCRETE BARRIER (TYPE 732) LF 12 1 326.0 125.0000 40,750.00 UNIT TOTAL LF 1 326.0* 125.0000 40,750.00* ITEM CODE 839720 TOTAL 1 40,750.00* 839721 CONCRETE BARRIER (TYPE 732A) LF 10 1 500.0 132.0000 66,000.00 LF 11 1 560.0 95.0000 53,200.00 UNIT TOTAL LF 2 1,060.0* 112.4528 119,200.00* ITEM CODE 839721 TOTAL 2 119,200.00* 839723 CONCRETE BARRIER (TYPE 732B) LF 04 1 508.0 193.0000 98,044.00 LF 07 1 5,390.0 130.0000 700,700.00 LF 08 1 20.0 198.0900 3,961.80 LF 12 1 340.0 180.0000 61,200.00 UNIT TOTAL LF 4 6,258.0* 138.0482 863,905.80* ITEM CODE 839723 TOTAL 4 863,905.80* 839725 CONCRETE BARRIER (TYPE 736) LF 02 1 4,733.0 150.0000 709,950.00 LF 05 1 1,558.0 110.0000 171,380.00 LF 07 1 999.0 115.0000 114,885.00 LF 08 2 2,449.0 73.3442 179,620.00 LF 12 2 957.0 90.7816 86,878.00

Page 267: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 263 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) UNIT TOTAL LF 7 10,696.0* 118.0547 1,262,713.00* ITEM CODE 839725 TOTAL 7 1,262,713.00* 839726 CONCRETE BARRIER (TYPE 736A) LF 04 1 763.0 100.0000 76,300.00 LF 07 1 1,917.0 69.3000 132,848.10 LF 12 2 618.0 130.7605 80,810.00 UNIT TOTAL LF 4 3,298.0* 87.9194 289,958.10* ITEM CODE 839726 TOTAL 4 289,958.10* 839727 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 01 1 275.0 100.0000 27,500.00 LF 04 4 4,939.0 146.3272 722,710.00 LF 05 2 4,593.0 108.9560 500,435.00 LF 07 2 3,044.0 77.7658 236,719.00 LF 08 1 1,431.0 140.0000 200,340.00 UNIT TOTAL LF 10 14,282.0* 118.1700 1,687,704.00* ITEM CODE 839727 TOTAL 10 1,687,704.00* 839731 CONCRETE BARRIER (TYPE 736B) LF 04 1 160.0 350.0000 56,000.00 LF 05 1 100.0 170.0000 17,000.00 LF 07 1 20.0 240.0000 4,800.00 LF 11 1 81.0 150.0000 12,150.00 UNIT TOTAL LF 4 361.0* 249.1690 89,950.00* ITEM CODE 839731 TOTAL 4 89,950.00* 839734 CONCRETE BARRIER (TYPE 736SV) LF 04 1 512.0 175.0000 89,600.00 LF 07 1 251.0 400.0000 100,400.00 UNIT TOTAL LF 2 763.0* 249.0170 190,000.00* ITEM CODE 839734 TOTAL 2 190,000.00* 839735 CONCRETE BARRIER (TYPE 742)

Page 268: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 264 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 839735 CONCRETE BARRIER (TYPE 742) LF 04 1 303.0 100.0000 30,300.00 UNIT TOTAL LF 1 303.0* 100.0000 30,300.00* ITEM CODE 839735 TOTAL 1 30,300.00* 839736 CONCRETE BARRIER (TYPE 742A) LF 04 1 12.0 135.0000 1,620.00 UNIT TOTAL LF 1 12.0* 135.0000 1,620.00* ITEM CODE 839736 TOTAL 1 1,620.00* 839737 CONCRETE BARRIER (TYPE 742B) LF 08 1 230.0 155.0000 35,650.00 UNIT TOTAL LF 1 230.0* 155.0000 35,650.00* ITEM CODE 839737 TOTAL 1 35,650.00* 839745 CONCRETE BARRIER TRANSITION LF 04 1 457.0 500.0000 228,500.00 LF 05 2 185.0 651.3514 120,500.00 LF 07 1 12.0 125.0000 1,500.00 LF 11 1 90.0 280.0000 25,200.00 LF 12 2 1,915.0 515.4369 987,061.61 UNIT TOTAL LF 7 2,659.0* 512.5091 1,362,761.61* ITEM CODE 839745 TOTAL 7 1,362,761.61* 840501 THERMOPLASTIC TRAFFIC STRIPE LF 01 1 310.0 32.0000 9,920.00 LF 04 5 35,030.0 1.1226 39,325.00 LF 06 1 7,130.0 1.0000 7,130.00 LF 07 1 5,390.0 .9000 4,851.00 LF 08 2 122,260.0 .2380 29,100.00 UNIT TOTAL LF 10 170,120.0* .5310 90,326.00* ITEM CODE 840501 TOTAL 10 90,326.00* 840502 THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)

Page 269: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 265 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 840502 THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 04 2 45,570.0 .6254 28,500.00 LF 05 1 269,000.0 .4000 107,600.00 LF 08 1 82,000.0 .4700 38,540.00 UNIT TOTAL LF 4 396,570.0* .4404 174,640.00* ITEM CODE 840502 TOTAL 4 174,640.00* 840504 4" THERMOPLASTIC TRAFFIC STRIPE LF 01 24 2,203,330.0 .4656 1,025,889.90 LF 02 2 181,250.0 .3513 63,665.00 LF 03 4 9,520.0 1.8255 17,379.00 LF 04 15 136,460.0 .8825 120,431.50 LF 05 15 1,475,190.0 .4145 611,452.00 LF 06 20 1,653,930.0 .3911 646,823.00 LF 07 34 2,208,960.0 .3913 864,379.90 LF 10 13 286,900.0 .4960 142,291.90 LF 12 4 58,000.0 .4353 25,250.00 UNIT TOTAL LF 131 8,213,540.0* .4283 3,517,562.20* ITEM CODE 840504 TOTAL 131 3,517,562.20* 840505 6" THERMOPLASTIC TRAFFIC STRIPE LF 04 2 1,560.0 .8576 1,337.90 LF 05 4 16,120.0 .5890 9,494.50 LF 06 1 250.0 .5000 125.00 LF 07 3 84,340.0 .4267 35,987.00 UNIT TOTAL LF 10 102,270.0* .4590 46,944.40* ITEM CODE 840505 TOTAL 10 46,944.40* 840506 8" THERMOPLASTIC TRAFFIC STRIPE LF 01 8 11,460.0 1.7359 19,893.00 LF 02 1 360.0 .6900 248.40 LF 03 1 860.0 2.0000 1,720.00 LF 04 9 14,040.0 1.4957 20,999.90 LF 05 11 63,340.0 .9673 61,271.50 LF 06 14 25,040.0 .7593 19,012.10 LF 07 27 244,510.0 .8867 216,795.50 LF 08 4 14,056.0 1.1390 16,010.00 LF 10 9 30,273.0 .9541 28,883.30

Page 270: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 266 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 8" THERMOPLASTIC TRAFFIC STRIPE LF 12 2 1,750.0 1.1943 2,090.00 UNIT TOTAL LF 86 405,689.0* .9537 386,923.70* SQFT 08 1 630.0 1.1000 693.00 UNIT TOTAL SQFT 1 630.0* 1.1000 693.00* ITEM CODE 840506 TOTAL 87 387,616.70* 840507 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4) LF 03 1 110.0 2.0000 220.00 LF 04 1 1,400.0 .7000 980.00 UNIT TOTAL LF 2 1,510.0* .7947 1,200.00* ITEM CODE 840507 TOTAL 2 1,200.00* 840508 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3) LF 03 1 320.0 1.1000 352.00 LF 04 2 5,300.0 .9819 5,204.00 LF 05 2 192.0 2.7813 534.00 LF 06 1 600.0 3.1000 1,860.00 LF 07 18 111,410.0 .5932 66,090.20 LF 10 4 13,710.0 .8251 11,312.30 LF 12 1 2,640.0 .8000 2,112.00 UNIT TOTAL LF 29 134,172.0* .6519 87,464.50* ITEM CODE 840508 TOTAL 29 87,464.50* 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 01 9 13,830.0 7.7347 106,971.00 SQFT 02 24 23,513.0 6.1073 143,601.30 SQFT 03 4 5,366.0 5.5460 29,760.00 SQFT 04 12 16,887.0 5.5336 93,446.20 SQFT 05 18 58,613.0 3.0152 176,732.30 SQFT 06 17 17,542.0 3.8724 67,929.30 SQFT 07 27 103,748.0 2.7461 284,900.40 SQFT 08 27 79,502.0 3.0205 240,137.10 SQFT 09 1 3,230.0 3.5000 11,305.00 SQFT 10 17 17,157.0 4.2116 72,257.60 SQFT 12 3 5,741.0 3.3391 19,170.00 UNIT TOTAL SQFT 159 345,129.0* 3.6109 1,246,210.20*

Page 271: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 267 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 840515 TOTAL 159 1,246,210.20* 840516 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 01 1 130.0 10.0000 1,300.00 SQFT 03 12 21,446.0 5.9799 128,245.40 SQFT 04 13 36,070.0 5.7217 206,381.80 SQFT 05 1 1,820.0 3.6000 6,552.00 SQFT 06 2 7,840.0 4.1575 32,595.00 SQFT 07 3 11,190.0 3.6387 40,716.50 SQFT 08 1 810.0 2.6000 2,106.00 SQFT 10 2 5,730.0 4.5260 25,933.80 SQFT 11 20 73,279.0 3.7379 273,906.75 SQFT 12 8 11,320.0 3.0239 34,230.00 UNIT TOTAL SQFT 63 169,635.0* 4.4329 751,967.25* ITEM CODE 840516 TOTAL 63 751,967.25* 840519 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING SQFT 04 1 760.0 16.0000 12,160.00 SQFT 07 1 17,900.0 3.0000 53,700.00 UNIT TOTAL SQFT 2 18,660.0* 3.5295 65,860.00* ITEM CODE 840519 TOTAL 2 65,860.00* 840521 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1) LF 01 1 500.0 .3000 150.00 LF 03 1 220.0 2.0000 440.00 LF 05 3 990.0 .5869 581.00 LF 07 5 2,615.0 .8213 2,147.60 LF 10 1 270.0 .6100 164.70 UNIT TOTAL LF 11 4,595.0* .7581 3,483.30* ITEM CODE 840521 TOTAL 11 3,483.30* 840523 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3) LF 01 6 5,270.0 .6098 3,213.80 LF 02 1 1,220.0 .2300 280.60 LF 03 1 96.0 2.2000 211.20 LF 05 3 620.0 .5258 326.00 LF 06 9 8,870.0 .2661 2,360.50 UNIT TOTAL LF 20 16,076.0* .3976 6,392.10*

Page 272: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 268 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) ITEM CODE 840523 TOTAL 20 6,392.10* 840525 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12) LF 01 14 158,810.0 .5062 80,390.00 LF 02 1 11,200.0 .2300 2,576.00 LF 03 2 2,620.0 1.0000 2,620.00 LF 04 3 13,400.0 .6231 8,350.00 LF 05 14 373,610.0 .2599 97,104.50 LF 06 17 702,860.0 .2868 201,603.70 LF 07 26 1,363,810.0 .2374 323,763.60 LF 10 8 279,620.0 .2418 67,620.90 LF 12 1 40,600.0 .2000 8,120.00 UNIT TOTAL LF 86 2,946,530.0* .2688 792,148.70* ITEM CODE 840525 TOTAL 86 792,148.70* 840526 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7) LF 01 2 500.0 .5136 256.80 LF 03 1 50.0 2.0000 100.00 LF 04 6 3,850.0 1.2052 4,640.00 LF 05 6 7,472.0 .4038 3,017.50 LF 06 5 4,450.0 .5634 2,507.00 LF 07 23 150,999.0 .2494 37,653.70 LF 10 8 8,773.0 .7204 6,320.15 LF 12 3 3,490.0 .9072 3,166.00 UNIT TOTAL LF 54 179,584.0* .3211 57,661.15* ITEM CODE 840526 TOTAL 54 57,661.15* 840527 4" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 18-12) LF 07 2 37,600.0 .5660 21,280.00 LF 10 2 3,330.0 1.1830 3,939.50 UNIT TOTAL LF 4 40,930.0* .6162 25,219.50* ITEM CODE 840527 TOTAL 4 25,219.50* 840545 4" THERMOPLASTIC TRAFFIC STRIPE (RECESSED, BROKEN 36-12) LF 03 1 22,500.0 1.5000 33,750.00 UNIT TOTAL LF 1 22,500.0* 1.5000 33,750.00* ITEM CODE 840545 TOTAL 1 33,750.00*

Page 273: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 269 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 840550 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12) LF 07 10 29,150.0 .6236 18,178.70 LF 12 1 10,600.0 .6000 6,360.00 UNIT TOTAL LF 11 39,750.0* .6173 24,538.70* ITEM CODE 840550 TOTAL 11 24,538.70* 840560 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) LF 02 28 2,344,090.0 .3259 763,935.00 LF 05 6 193,480.0 .3149 60,925.00 LF 08 35 6,449,039.0 .1997 1,288,097.05 LF 10 13 2,303,504.0 .2453 565,035.20 UNIT TOTAL LF 82 11,290,113.0* .2372 2,677,992.25* ITEM CODE 840560 TOTAL 82 2,677,992.25* 840581 4" THERMOPLASTIC TRAFFIC STRIPE (RECESSED) LF 03 1 9,100.0 2.2000 20,020.00 LF 08 1 174,000.0 1.4300 248,820.00 UNIT TOTAL LF 2 183,100.0* 1.4683 268,840.00* ITEM CODE 840581 TOTAL 2 268,840.00* 840582 4" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 03 2 246,000.0 .2999 73,780.00 LF 06 1 270.0 15.0000 4,050.00 LF 07 1 31,700.0 .8000 25,360.00 UNIT TOTAL LF 4 277,970.0* .3712 103,190.00* ITEM CODE 840582 TOTAL 4 103,190.00* 840651 PAINTED STALL LINES AND PAVEMENT MARKINGS SQFT 05 1 810.0 2.5500 2,065.50 SQFT 06 1 3,580.0 2.7300 9,773.40 UNIT TOTAL SQFT 2 4,390.0* 2.6968 11,838.90* ITEM CODE 840651 TOTAL 2 11,838.90* 840655 PAINT TRAFFIC STRIPE (1-COAT)

Page 274: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 270 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 840655 PAINT TRAFFIC STRIPE (1-COAT) LF 01 1 460.0 5.0000 2,300.00 LF 03 2 20,000.0 .3255 6,510.00 LF 04 1 960.0 1.1000 1,056.00 LF 07 1 7,870.0 .7500 5,902.50 LF 09 1 18,200.0 1.0000 18,200.00 LF 11 17 667,780.0 .1645 109,831.10 UNIT TOTAL LF 23 715,270.0* .2010 143,799.60* ITEM CODE 840655 TOTAL 23 143,799.60* 840656 PAINT TRAFFIC STRIPE (2-COAT) LF 04 2 3,600.0 1.0500 3,780.00 LF 05 1 188,000.0 .1400 26,320.00 LF 06 1 124,000.0 .1200 14,880.00 LF 07 15 1,209,620.0 .2158 261,094.70 LF 08 1 294,000.0 .0800 23,520.00 LF 09 8 1,440,120.0 .1978 284,920.00 LF 10 3 235,260.0 .1772 41,698.00 LF 11 7 2,474,910.0 .1265 313,049.10 LF 12 15 939,502.0 .1724 162,016.70 UNIT TOTAL LF 53 6,909,012.0* .1637 1,131,278.50* ITEM CODE 840656 TOTAL 53 1,131,278.50* 840661 TWO-COMPONENT PAINT PAVEMENT MARKING SQFT 03 1 1,690.0 10.0000 16,900.00 UNIT TOTAL SQFT 1 1,690.0* 10.0000 16,900.00* ITEM CODE 840661 TOTAL 1 16,900.00* 840666 PAINT PAVEMENT MARKING (2-COAT) SQFT 07 5 3,778.0 3.6556 13,811.00 SQFT 08 1 620.0 4.0000 2,480.00 SQFT 09 3 7,110.0 7.6063 54,080.50 SQFT 10 2 730.0 4.6507 3,395.00 SQFT 11 1 2,850.0 2.5000 7,125.00 SQFT 12 4 1,194.0 2.1159 2,526.40 UNIT TOTAL SQFT 16 16,282.0* 5.1233 83,417.90* ITEM CODE 840666 TOTAL 16 83,417.90*

Page 275: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 271 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 846000 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12) LF 01 3 6,270.0 1.3566 8,506.00 LF 04 1 23,800.0 .2000 4,760.00 LF 05 1 2,500.0 .7000 1,750.00 UNIT TOTAL LF 5 32,570.0* .4610 15,016.00* ITEM CODE 846000 TOTAL 5 15,016.00* 846001 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 01 5 42,000.0 1.1930 50,108.00 LF 03 16 1,566,020.0 .4776 747,914.00 LF 04 20 1,338,550.0 .5249 702,570.00 LF 05 5 382,700.0 .5070 194,015.00 LF 06 3 158,400.0 .5370 85,060.00 LF 07 6 399,320.0 .4255 169,915.40 LF 10 2 467,000.0 .3952 184,550.00 LF 11 16 759,880.0 .4799 364,673.50 LF 12 13 510,030.0 .4513 230,169.80 UNIT TOTAL LF 86 5,623,900.0* .4852 2,728,975.70* ITEM CODE 846001 TOTAL 86 2,728,975.70* 846002 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) LF 03 1 210.0 .7500 157.50 LF 04 3 820.0 .4626 379.30 LF 11 3 3,326.0 .7342 2,442.00 LF 12 3 1,310.0 .4878 639.00 UNIT TOTAL LF 10 5,666.0* .6385 3,617.80* ITEM CODE 846002 TOTAL 10 3,617.80* 846003 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) LF 03 9 10,780.0 .4449 4,795.70 LF 04 2 1,980.0 .2341 463.50 LF 06 1 730.0 .6500 474.50 UNIT TOTAL LF 12 13,490.0* .4250 5,733.70* ITEM CODE 846003 TOTAL 12 5,733.70* 846004 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)

Page 276: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 272 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 846004 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) LF 03 5 12,898.0 .4432 5,716.60 LF 04 10 47,670.0 .5448 25,968.50 LF 05 3 3,865.0 .3906 1,509.50 LF 06 2 3,486.0 .4000 1,394.40 LF 07 3 12,450.0 .3736 4,651.50 LF 11 6 30,810.0 .4788 14,753.00 LF 12 12 40,100.0 .5446 21,837.10 UNIT TOTAL LF 41 151,279.0* .5013 75,830.60* ITEM CODE 846004 TOTAL 41 75,830.60* 846005 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) LF 01 1 250.0 1.1000 275.00 LF 03 13 342,290.0 .3207 109,759.10 LF 04 7 87,360.0 .3744 32,707.00 LF 05 4 56,750.0 .3755 21,307.50 LF 06 3 63,700.0 .3298 21,010.00 LF 07 5 122,860.0 .3235 39,747.00 LF 11 11 54,440.0 .4864 26,480.40 LF 12 6 727,700.0 .2139 155,677.00 UNIT TOTAL LF 50 1,455,350.0* .2796 406,963.00* ITEM CODE 846005 TOTAL 50 406,963.00* 846007 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 03 2 6,870.0 1.4898 10,235.00 LF 04 3 14,330.0 .7495 10,740.70 LF 06 1 4,900.0 .7500 3,675.00 LF 07 1 54,400.0 .5800 31,552.00 LF 11 10 661,830.0 .6486 429,283.80 LF 12 1 620.0 .7000 434.00 UNIT TOTAL LF 18 742,950.0* .6540 485,920.50* ITEM CODE 846007 TOTAL 18 485,920.50* 846008 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) LF 03 1 410.0 1.5000 615.00 LF 04 2 4,140.0 .6728 2,785.50 LF 07 1 500.0 .5900 295.00 LF 11 3 1,010.0 .7891 797.00

Page 277: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 273 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 12 1 820.0 .6000 492.00 UNIT TOTAL LF 8 6,880.0* .7245 4,984.50* ITEM CODE 846008 TOTAL 8 4,984.50* 846009 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 03 10 31,570.0 .9008 28,437.40 LF 04 16 129,360.0 1.2064 156,065.20 LF 05 4 22,160.0 1.0831 24,001.00 LF 06 2 12,790.0 .8969 11,471.50 LF 07 5 5,610.0 1.2324 6,913.60 LF 08 1 100.0 2.0700 207.00 LF 10 1 6,840.0 .7100 4,856.40 LF 11 18 87,240.0 1.0873 94,853.50 LF 12 13 408,700.0 1.1023 450,498.00 UNIT TOTAL LF 70 704,370.0* 1.1035 777,303.60* ITEM CODE 846009 TOTAL 70 777,303.60* 846010 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) LF 03 3 1,836.0 .5275 968.50 LF 04 4 20,180.0 .8101 16,347.70 LF 07 2 4,920.0 .9317 4,584.00 LF 11 5 11,530.0 .7852 9,052.80 LF 12 5 41,230.0 .8191 33,772.50 UNIT TOTAL LF 19 79,696.0* .8122 64,725.50* ITEM CODE 846010 TOTAL 19 64,725.50* 846011 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) LF 07 1 4,830.0 .9200 4,443.60 LF 12 3 56,280.0 .6221 35,010.40 UNIT TOTAL LF 4 61,110.0* .6456 39,454.00* ITEM CODE 846011 TOTAL 4 39,454.00* 846012 THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 04 3 9,710.0 4.6522 45,172.50

Page 278: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 274 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 05 2 7,550.0 4.4728 33,770.00 SQFT 07 2 1,390.0 4.4895 6,240.40 SQFT 11 1 5,150.0 3.0000 15,450.00 SQFT 12 6 13,980.0 3.9271 54,901.00 UNIT TOTAL SQFT 14 37,780.0* 4.1168 155,533.90* ITEM CODE 846012 TOTAL 14 155,533.90* 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 01 1 161,000.0 .2000 32,200.00 UNIT TOTAL LF 1 161,000.0* .2000 32,200.00* ITEM CODE 846030 TOTAL 1 32,200.00* 846046 6" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) STA 05 2 940.0 16.8085 15,800.00 UNIT TOTAL STA 2 940.0* 16.8085 15,800.00* ITEM CODE 846046 TOTAL 2 15,800.00* 846051 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) STA 02 1 1,670.0 28.0000 46,760.00 STA 03 1 255.0 38.0000 9,690.00 STA 04 2 4.0 1,500.0000 6,000.00 STA 05 3 1,790.0 23.0056 41,180.00 STA 08 2 730.0 48.7005 35,551.40 STA 10 1 130.0 55.0000 7,150.00 STA 11 2 2,210.0 33.2353 73,450.00 UNIT TOTAL STA 12 6,789.0* 32.3732 219,781.40* ITEM CODE 846051 TOTAL 12 219,781.40* 850101 PAVEMENT MARKER (NON-REFLECTIVE) EA 01 4 5,350.0 4.7867 25,609.00 EA 03 5 1,200.0 3.9562 4,747.40 EA 04 22 120,505.0 1.7158 206,767.80 EA 05 18 39,330.0 1.3220 51,995.00 EA 06 2 286.0 4.3741 1,251.00

Page 279: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 275 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PAVEMENT MARKER (NON-REFLECTIVE) EA 07 31 154,460.0 1.2557 193,949.00 EA 08 13 94,410.0 1.1041 104,233.60 EA 10 2 9,914.0 1.6925 16,779.16 EA 11 19 94,955.0 1.1224 106,578.10 EA 12 11 72,950.0 .9787 71,395.20 UNIT TOTAL EA 127 593,360.0* 1.3201 783,305.26* ITEM CODE 850101 TOTAL 127 783,305.26* 850111 PAVEMENT MARKER (RETROREFLECTIVE) EA 01 16 20,452.0 5.8580 119,808.10 EA 02 2 18,530.0 4.1489 76,880.00 EA 03 22 30,256.0 3.5778 108,250.50 EA 04 39 88,604.0 3.0378 269,163.90 EA 05 25 59,592.0 2.4854 148,110.00 EA 06 22 39,346.0 3.8683 152,200.80 EA 07 42 152,932.0 2.5216 385,632.85 EA 08 27 85,728.0 2.6748 229,301.90 EA 10 25 57,450.0 3.2461 186,490.80 EA 11 25 97,932.0 2.5730 251,978.60 EA 12 17 62,485.0 2.3930 149,525.30 UNIT TOTAL EA 262 713,307.0* 2.9123 2,077,342.75* ITEM CODE 850111 TOTAL 262 2,077,342.75* 850121 PAVEMENT MARKER (NON-REFLECTIVE- RECESSED) EA 08 1 560.0 4.0700 2,279.20 UNIT TOTAL EA 1 560.0* 4.0700 2,279.20* ITEM CODE 850121 TOTAL 1 2,279.20* 850122 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) EA 01 14 6,769.0 11.2757 76,325.20 EA 02 13 45,498.0 6.7050 305,064.04 EA 03 3 4,300.0 7.4856 32,188.00 EA 05 2 2,480.0 7.8024 19,350.00 EA 06 1 4,470.0 6.0000 26,820.00 EA 07 6 22,720.0 6.9926 158,872.00 EA 08 16 57,270.0 5.7186 327,504.00 EA 09 1 720.0 12.0000 8,640.00

Page 280: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 276 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) EA 12 1 68.0 15.0000 1,020.00 UNIT TOTAL EA 57 144,295.0* 6.6238 955,783.24* ITEM CODE 850122 TOTAL 57 955,783.24* 860090 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS 01 5 12,000.00 LS 02 12 27,599.21 LS 03 12 20,008.00 LS 04 18 101,915.00 LS 05 13 44,130.00 LS 06 22 64,581.87 LS 07 42 127,519.20 LS 08 36 131,902.80 LS 09 4 16,500.00 LS 10 28 55,540.99 LS 11 14 92,044.14 LS 12 20 36,304.00 UNIT TOTAL LS 226 730,045.21 ITEM CODE 860090 TOTAL 226 730,045.21* 860201 SIGNAL AND LIGHTING LS 03 1 279,820.90 LS 04 3 2,377,600.00 LS 07 3 945,617.00 LS 08 2 455,966.00 LS 11 1 225,000.00 UNIT TOTAL LS 10 4,284,003.90 ITEM CODE 860201 TOTAL 10 4,284,003.90* 860297 SIGNAL AND LIGHTING (CITY) LS 04 1 22,200.00 LS 05 1 129,000.00 LS 07 1 325,500.00 UNIT TOTAL LS 3 476,700.00 ITEM CODE 860297 TOTAL 3 476,700.00*

Page 281: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 277 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 860300 SIGNAL AND LIGHTING (CITY STREET LOCATION 1) LS 11 1 38,220.00 UNIT TOTAL LS 1 38,220.00 ITEM CODE 860300 TOTAL 1 38,220.00* 860302 SIGNAL AND LIGHTING (CITY STREET LOCATION 2) LS 11 1 310,935.00 UNIT TOTAL LS 1 310,935.00 ITEM CODE 860302 TOTAL 1 310,935.00* 860303 SIGNAL AND LIGHTING (CITY STREET LOCATION 3) LS 11 1 160,115.00 UNIT TOTAL LS 1 160,115.00 ITEM CODE 860303 TOTAL 1 160,115.00* 860400 LIGHTING (TEMPORARY) LS 07 3 612,500.00 LS 12 1 23,000.00 UNIT TOTAL LS 4 635,500.00 ITEM CODE 860400 TOTAL 4 635,500.00* 860401 LIGHTING LS 04 4 828,500.00 LS 05 2 225,000.00 LS 10 1 1,041,847.00 LS 12 1 35,000.00 UNIT TOTAL LS 8 2,130,347.00 ITEM CODE 860401 TOTAL 8 2,130,347.00* 860402 LIGHTING (CITY STREET) LS 04 2 344,200.00 LS 05 2 408,000.00

Page 282: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 278 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) LIGHTING (CITY STREET) LS 07 4 1,132,000.00 LS 11 1 149,000.00 UNIT TOTAL LS 9 2,033,200.00 ITEM CODE 860402 TOTAL 9 2,033,200.00* 860407 LIGHTING (PARKING LOT) LS 06 1 13,125.00 LS 12 1 108,000.00 UNIT TOTAL LS 2 121,125.00 ITEM CODE 860407 TOTAL 2 121,125.00* 860415 LIGHTING (STAGE CONSTRUCTION) LS 04 1 25,000.00 UNIT TOTAL LS 1 25,000.00 ITEM CODE 860415 TOTAL 1 25,000.00* 860420 LIGHTING (TUNNEL) LS 04 1 572,100.00 UNIT TOTAL LS 1 572,100.00 ITEM CODE 860420 TOTAL 1 572,100.00* 860508 MODIFY SIGN ILLUMINATION LS 04 1 191,000.00 UNIT TOTAL LS 1 191,000.00 ITEM CODE 860508 TOTAL 1 191,000.00* 860532 CHANGEABLE MESSAGE SIGN SYSTEM (LS) LS 08 1 200.00 UNIT TOTAL LS 1 200.00 ITEM CODE 860532 TOTAL 1 200.00*

Page 283: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 279 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 860604 FLASHING BEACON SYSTEM LS 03 1 29,300.00 LS 04 1 235,005.75 LS 06 1 50,000.00 LS 07 2 2,154,171.00 LS 08 1 121,000.00 UNIT TOTAL LS 6 2,589,476.75 ITEM CODE 860604 TOTAL 6 2,589,476.75* 860705 INTERCONNECTION CONDUIT AND CABLE (LS) LS 05 1 11,500.00 LS 07 1 60,900.00 LS 11 1 79,050.00 UNIT TOTAL LS 3 151,450.00 ITEM CODE 860705 TOTAL 3 151,450.00* 860797 ELECTRIC SERVICE (IRRIGATION) LS 02 1 10,537.00 LS 07 1 23,100.00 UNIT TOTAL LS 2 33,637.00 ITEM CODE 860797 TOTAL 2 33,637.00* 860806 INDUCTIVE LOOP DETECTOR (EA) EA 01 1 19.0 1,204.0000 22,876.00 EA 07 1 166.0 430.0000 71,380.00 EA 08 6 28.0 1,278.7143 35,804.00 EA 11 1 60.0 360.0000 21,600.00 EA 12 1 65.0 310.0000 20,150.00 UNIT TOTAL EA 10 338.0* 508.3136 171,810.00* ITEM CODE 860806 TOTAL 10 171,810.00* 860807 INDUCTIVE LOOP DETECTOR (LS) LS 01 1 18,000.00 LS 03 1 62,000.00 LS 04 3 52,200.00

Page 284: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 280 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) INDUCTIVE LOOP DETECTOR (LS) LS 05 2 33,600.00 LS 06 1 20,000.00 LS 07 1 340,000.00 LS 08 4 60,978.00 LS 09 1 20,000.00 LS 10 1 4,773.77 LS 11 2 98,500.00 LS 12 3 235,000.00 UNIT TOTAL LS 20 945,051.77 ITEM CODE 860807 TOTAL 20 945,051.77* 860809 DETECTOR LOOP (LS) LS 06 1 3,465.00 LS 10 1 76,000.00 UNIT TOTAL LS 2 79,465.00 ITEM CODE 860809 TOTAL 2 79,465.00* 860812 MICROWAVE VEHICLE DETECTION SYSTEM LS 08 1 52,500.00 LS 10 1 29,227.80 UNIT TOTAL LS 2 81,727.80 ITEM CODE 860812 TOTAL 2 81,727.80* 860889 MODIFY TRAFFIC MONITORING STATION LS 03 1 14,000.00 LS 06 1 45,800.00 LS 07 3 66,060.00 LS 08 2 24,509.47 LS 10 1 41,900.00 LS 11 2 119,500.00 UNIT TOTAL LS 10 311,769.47 ITEM CODE 860889 TOTAL 10 311,769.47* 860890 MODIFY TRAFFIC MONITORING STATION (COUNT)

Page 285: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 281 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 860890 MODIFY TRAFFIC MONITORING STATION (COUNT) LS 08 2 4,681.00 LS 11 1 63,391.77 UNIT TOTAL LS 3 68,072.77 ITEM CODE 860890 TOTAL 3 68,072.77* 860925 TRAFFIC MONITORING STATION (COUNT) EA 08 1 8.0 475.0000 3,800.00 UNIT TOTAL EA 1 8.0* 475.0000 3,800.00* LS 08 1 16,750.00 UNIT TOTAL LS 1 16,750.00 ITEM CODE 860925 TOTAL 2 20,550.00* 860930 TRAFFIC MONITORING STATION LS 07 1 115,500.00 LS 11 1 5,500.00 LS 12 1 8,000.00 UNIT TOTAL LS 3 129,000.00 ITEM CODE 860930 TOTAL 3 129,000.00* 860931 TRAFFIC MONITORING STATION (LOCATION 1) LS 06 2 64,928.25 LS 10 1 55,000.00 UNIT TOTAL LS 3 119,928.25 ITEM CODE 860931 TOTAL 3 119,928.25* 860932 TRAFFIC MONITORING STATION (LOCATION 2) LS 06 2 65,000.00 LS 10 1 14,500.00 UNIT TOTAL LS 3 79,500.00 ITEM CODE 860932 TOTAL 3 79,500.00* 860933 TRAFFIC MONITORING STATION (LOCATION 3)

Page 286: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 282 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 860933 TRAFFIC MONITORING STATION (LOCATION 3) LS 06 2 60,000.00 UNIT TOTAL LS 2 60,000.00 ITEM CODE 860933 TOTAL 2 60,000.00* 860934 TRAFFIC MONITORING STATION (LOCATION 4) LS 06 2 45,376.25 UNIT TOTAL LS 2 45,376.25 ITEM CODE 860934 TOTAL 2 45,376.25* 860935 TRAFFIC MONITORING STATION (LOCATION 5) LS 06 2 100,567.50 UNIT TOTAL LS 2 100,567.50 ITEM CODE 860935 TOTAL 2 100,567.50* 860990 CLOSED CIRCUIT TELEVISION SYSTEM LS 03 1 2,464,213.00 LS 08 1 32,500.00 UNIT TOTAL LS 2 2,496,713.00 ITEM CODE 860990 TOTAL 2 2,496,713.00* 861088 MODIFY RAMP METERING SYSTEM LS 04 2 87,000.00 LS 07 7 948,250.00 LS 08 1 14,400.00 LS 11 3 361,750.00 LS 12 1 20,000.00 UNIT TOTAL LS 14 1,431,400.00 ITEM CODE 861088 TOTAL 14 1,431,400.00* 861100 RAMP METERING SYSTEM LS 04 3 1,835,357.00

Page 287: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 283 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) RAMP METERING SYSTEM LS 07 1 299,250.00 LS 10 1 116,804.96 LS 11 2 1,038,550.00 LS 12 1 79,350.00 UNIT TOTAL LS 8 3,369,311.96 ITEM CODE 861100 TOTAL 8 3,369,311.96* 861101 RAMP METERING SYSTEM (LOCATION 1) LS 04 1 15,000.00 LS 08 1 186,000.00 LS 12 1 100,000.00 UNIT TOTAL LS 3 301,000.00 ITEM CODE 861101 TOTAL 3 301,000.00* 861102 RAMP METERING SYSTEM (LOCATION 2) LS 04 1 75,000.00 LS 08 1 180,000.00 LS 12 1 54,000.00 UNIT TOTAL LS 3 309,000.00 ITEM CODE 861102 TOTAL 3 309,000.00* 861103 RAMP METERING SYSTEM (LOCATION 3) LS 04 1 45,000.00 UNIT TOTAL LS 1 45,000.00 ITEM CODE 861103 TOTAL 1 45,000.00* 861104 RAMP METERING SYSTEM (LOCATION 4) LS 04 1 20,000.00 UNIT TOTAL LS 1 20,000.00 ITEM CODE 861104 TOTAL 1 20,000.00* 861497 MODIFY SIGNAL AND LIGHTING (LOCATION 1)

Page 288: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 284 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 861497 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 07 2 235,000.00 LS 08 2 122,880.00 UNIT TOTAL LS 4 357,880.00 ITEM CODE 861497 TOTAL 4 357,880.00* 861498 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 07 1 133,000.00 LS 08 2 103,505.00 UNIT TOTAL LS 3 236,505.00 ITEM CODE 861498 TOTAL 3 236,505.00* 861499 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 08 2 159,950.00 UNIT TOTAL LS 2 159,950.00 ITEM CODE 861499 TOTAL 2 159,950.00* 861500 MODIFY SIGNAL AND LIGHTING (LOCATION 4) LS 08 2 145,075.00 UNIT TOTAL LS 2 145,075.00 ITEM CODE 861500 TOTAL 2 145,075.00* 861501 MODIFY SIGNAL AND LIGHTING LS 07 1 109,000.00 LS 08 3 156,800.00 LS 11 1 18,000.00 UNIT TOTAL LS 5 283,800.00 ITEM CODE 861501 TOTAL 5 283,800.00* 861502 MODIFY SIGNAL LS 05 1 11,200.00 LS 07 1 27,040.00

Page 289: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 285 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) MODIFY SIGNAL LS 08 2 56,800.00 LS 11 1 7,006.46 UNIT TOTAL LS 5 102,046.46 ITEM CODE 861502 TOTAL 5 102,046.46* 861503 MODIFY LIGHTING LS 03 1 454,935.00 LS 05 2 155,345.40 LS 06 2 108,500.00 LS 07 2 138,200.00 LS 10 1 42,000.00 LS 11 2 168,000.00 UNIT TOTAL LS 10 1,066,980.40 ITEM CODE 861503 TOTAL 10 1,066,980.40* 861504 MODIFY LIGHTING AND SIGN ILLUMINATION LS 07 3 1,466,500.00 LS 11 1 75,000.00 UNIT TOTAL LS 4 1,541,500.00 ITEM CODE 861504 TOTAL 4 1,541,500.00* 861505 MODIFY SIGNAL AND LIGHTING (LOCATION 5) LS 08 2 126,705.00 UNIT TOTAL LS 2 126,705.00 ITEM CODE 861505 TOTAL 2 126,705.00* 869050 GUARD POST EA 04 1 22.0 665.0000 14,630.00 UNIT TOTAL EA 1 22.0* 665.0000 14,630.00* ITEM CODE 869050 TOTAL 1 14,630.00* 869075 SYSTEM TESTING AND DOCUMENTATION

Page 290: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 286 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 869075 SYSTEM TESTING AND DOCUMENTATION LS 12 1 607,725.00 UNIT TOTAL LS 1 607,725.00 ITEM CODE 869075 TOTAL 1 607,725.00* 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS 01 1 2,500.00 UNIT TOTAL LS 1 2,500.00 ITEM CODE 870009 TOTAL 1 2,500.00* 870136 ELECTRIC SERVICE FOR IRRIGATION LS 04 2 15,800.00 LS 07 2 231,170.00 LS 11 2 19,336.00 UNIT TOTAL LS 6 266,306.00 ITEM CODE 870136 TOTAL 6 266,306.00* 870200 LIGHTING SYSTEM LS 03 1 32,100.00 LS 04 5 885,043.10 LS 05 1 20,000.00 LS 06 3 310,900.00 LS 07 1 1,818,844.40 LS 10 2 97,191.11 LS 11 1 286,500.00 UNIT TOTAL LS 14 3,450,578.61 ITEM CODE 870200 TOTAL 14 3,450,578.61* 870300 SIGN ILLUMINATION SYSTEM LS 12 1 7,000.00 UNIT TOTAL LS 1 7,000.00 ITEM CODE 870300 TOTAL 1 7,000.00* 870400 SIGNAL AND LIGHTING SYSTEM

Page 291: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 287 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 870400 SIGNAL AND LIGHTING SYSTEM LS 04 1 638,327.00 LS 07 1 287,000.00 LS 08 2 546,700.00 LS 10 3 875,877.75 LS 11 1 300,000.00 LS 12 1 173,721.00 UNIT TOTAL LS 9 2,821,625.75 ITEM CODE 870400 TOTAL 9 2,821,625.75* 870600 TRAFFIC MONITORING STATION SYSTEM LS 02 1 62,000.00 LS 03 2 93,512.00 LS 05 1 20,000.00 LS 06 5 287,005.00 LS 10 2 94,444.32 UNIT TOTAL LS 11 556,961.32 ITEM CODE 870600 TOTAL 11 556,961.32* 871200 CHANGEABLE MESSAGE SIGN SYSTEM LS 03 2 206,357.00 LS 06 2 74,805.00 LS 08 1 60,000.00 LS 11 2 432,000.00 UNIT TOTAL LS 7 773,162.00 ITEM CODE 871200 TOTAL 7 773,162.00* 872000 TEMPORARY LIGHTING SYSTEM LS 04 1 15,000.00 LS 07 1 28,000.00 LS 12 1 40,000.00 UNIT TOTAL LS 3 83,000.00 ITEM CODE 872000 TOTAL 3 83,000.00* 872130 MODIFYING EXISTING ELECTRICAL SYSTEM

Page 292: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 288 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 872130 MODIFYING EXISTING ELECTRICAL SYSTEM LS 02 3 168,000.00 LS 03 10 6,967,779.00 LS 04 8 1,131,581.65 LS 05 6 736,370.00 LS 06 11 2,587,376.87 LS 07 11 6,839,016.00 LS 08 7 6,229,380.00 LS 10 9 2,003,320.00 LS 11 5 2,203,950.00 LS 12 7 5,846,956.10 UNIT TOTAL LS 77 34,713,729.62 ITEM CODE 872130 TOTAL 77 34,713,729.62* 872140 REMOVING EXISTING ELECTRICAL SYSTEM LS 03 4 79,084.00 LS 06 1 18,900.56 LS 10 2 32,819.34 UNIT TOTAL LS 7 130,803.90 ITEM CODE 872140 TOTAL 7 130,803.90* 994650 BUILDING WORK LS 02 1 5,678,047.21 LS 03 2 2,077,525.00 LS 04 1 319,146.00 LS 08 3 5,923,210.84 LS 09 1 2,774,411.77 UNIT TOTAL LS 8 16,772,340.82 ITEM CODE 994650 TOTAL 8 16,772,340.82* 995100 WATER METER CHARGES LS 04 2 41,410.00 LS 07 2 56,400.00 UNIT TOTAL LS 4 97,810.00 ITEM CODE 995100 TOTAL 4 97,810.00* 995200 IRRIGATION WATER SERVICE CHARGES

Page 293: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

CUC040 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION PAGE 289 DATE 02/22/17 CONTRACT ITEM COST DATA TIME 08:09 AM ITEM I T E M D E S C R I P T I O N UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT CODE CODE OF (TO 1/10 PER UNIT (TO $1/100) PROJ. UNIT) (TO $1/10,000) 995200 IRRIGATION WATER SERVICE CHARGES LS 04 1 48,000.00 UNIT TOTAL LS 1 48,000.00 ITEM CODE 995200 TOTAL 1 48,000.00* 999990 MOBILIZATION LS 01 28 6,519,675.06 LS 02 10 4,624,201.88 LS 03 29 16,997,608.93 LS 04 52 26,498,314.81 LS 05 23 16,752,596.54 LS 06 19 6,178,500.00 LS 07 54 21,128,078.64 LS 08 38 15,642,895.74 LS 09 2 1,060,000.00 LS 10 27 7,269,809.96 LS 11 27 9,172,181.13 LS 12 28 7,161,900.00 UNIT TOTAL LS 337 139,005,762.69 ITEM CODE 999990 TOTAL 337 139,005,762.69* SUB-TOTAL ITEMS 07-END 20,572 1,644,360,829.88 FINAL TOTAL 20,572 1,644,360,829.88

Page 294: cover2014ccdb - Californiappmoe.dot.ca.gov/hq/esc/oe/awards/2016CCDB/2016ccdb.pdf · 2017. 4. 7. · 2016 contract cost data a summary of cost by items ... ls 04 53 157,136.00 ls

APPENDIX A

Conversion Factors from English Units to SI Units Unit Abbr. Multiply: Unit Abbr.

Acre ACRE 0.4046856 Hectare HA

Calendar Day CDAY 1 Calendar Day CDAY Cubic Foot CF 0.02831685 Cubic Meter M3 Cubic Yard CY 0.7645549 Cubic Meter M3

Each EA 1 Each EA Gallon GAL 3.785412 Liter L Hour HR 1 Hour H

Pound LB 0.4535924 Kilogram KG Linear Foot LF 0.3048 Meter M Lane Mile LNMI 1.609344 Lane Kilometer LNKM Lump Sum LS 1 Lump Sum LS

Thousand Foot Board Measure

MFBM 2.359737 Cubic Meter M3

Mile MI 1.609344 Kilometer KM Square Foot SQFT 0.09290304 Square Meter M2 Square Yard SQYD 0.8361274 Square Meter M2

Station (100 Ft) STA 0.3048 Station (100 m) STA Tablet TAB 1 Tablet TAB Ton TON 0.9071847 Tonne (1000 kg) TONN

Track Foot TF 1 Track Foot TF Working Day WDAY 1 Working Day WDAY

APPENDIX B Conversion Factors from SI Units to English Units

Unit Abbr. Multiply: Unit Abbr.

Hectare HA 2.471054 Acre ACRE Calendar Day CDAY 1 Calendar Day CDAY Cubic Meter M3 35.31467 Cubic Foot CF Cubic Meter M3 1.307951 Cubic Yard CY

Each EA 1 Each EA Liter L 0.2641720 Gallon GAL Hour H 1 Hour HR

Kilogram KG 2.204623 Pound LB Meter M 3.280840 Linear Foot LF

Lane Kilometer LNKM 0.6213712 Lane Mile LNMI Lump Sum LS 1 Lump Sum LS Cubic Meter M3 0.4237760 Thousand Foot Board

Measure MFBM

Kilometer KM 0.6213712 Mile MI Square Meter M2 10.76391 Square Foot SQFT Square Meter M2 1.195990 Square Yard SQYD

Station (100 m) STA 3.280840 Station (100 Ft) STA Tablet TAB 1 Tablet TAB

Tonne (1000 kg) TONN 1.102312 Ton TON Track Foot TF 1 Track Foot TF

Working Day WDAY 1 Working Day WDAY