TABEL OF CONTENTS

INSTALLATION OF CATHODIC PROTECTION SYSTEMKR1 WWTP 1B PROJECT

0Issue For Approval16/6/2007AA

REVDESCRIPTIONDATEPREPDCHKDAPVDAUTHD

REKAYASA INDUSTRI MALAYSIA SDN. BHD

TABLE OF CONTENT

No.ItemsPage

1.0Introduction4

2.0Purpose4

3.0Scope4

4.0Reference4

5.0Definitions5

1.0 PURPOSE

The purpose of this Inspection and Test Plan is to define the quality assurance and quality control requirements for the KR1 WWTP 1B. This plan identifies the minimum inspection and test requirements. Level of inspection and test to be utilized and verified in accordance with the acceptability of materials or equipments based on scope of the contract.

2.0 DEFINITIONS

OWNER shall mean Petronas Penapisan ( T ) Sdn. Bhd. and includes its representatives, successors and permitted assigns.

CONTRACTOR shall mean the Rekayasa Industri Malaysia Sdn. Bhd. includes its representatives, subcontractors, vendors, suppliers, successors and permitted assigns.

3.0

PROJECT TITLE AND PLANT LOCATIONProject Title

: KR1 WWTP 1B

Location of the Plant in : KERTEH, TERENGGANU,MALAYSIA.

4.0

REFERENCES

Project Quality Plan PTS 33.64.10.10Electrical Engineering Guidelines

PTS 33.64.10.11Electrical Network Monitoring & Control System Application

PTS 33.64.10.12Electrical Supply and Generation Design and Operation

PTS 33.66.05.31Electrical Machines-cage Induction Types

PTS 33.66.05.33Electrical Variable Speed Drive System

PTS 33.67.01.31Low-Voltage Switchgear and Control Gear Assemblies

(Amendments/Supplements to IEC 439-1)

5.0

ABBREVIATIONS

5.1 I Inspect

Mandatory examination of work after completion of activities as indicated by the symbol I on the approved Shop Inspection and Test Plan. Verify acceptance to the acceptance to the specification, industry code and manufacturers requirements. Can be visual /dimensional inspection or test.

5.2 W Witness

A point, that required to be witnessed by the QC inspector or designated representative on the process of production or installation activity. In the event this Inspector representative is not present at the time of inspection or examination, the inspection and examination may proceed without designated witnesses.

5.3 (W) Random Witness

A point, that required to be random witnessed by the QC inspector or designated representative on the process of productivity or installation activity.

In the event inspector or representative is not present at the time of inspection and examination, the inspection or examination may proceed without designated witness.

5.4 H Hold Point

A point, that mandatory requirement has to be inspected or examined, before further the work can be performed. The Hold Point shall not be by-passed without QC inspectors or designated representatives concurrence.

5.5 R Review

Review and evaluation of reports, procedures, qualifications and verify conformance to specified requirements.