Course on Stringing Material

Embed Size (px)

Citation preview

  • 8/16/2019 Course on Stringing Material

    1/2

    COURSE GOALS

    The tasks that are covered included planning the job, pulling wire, sagging wire, and clipping-in, which isthe process of permanently attaching a conductor to a string of insulators. SUBJECTS AND OBJECTIVES

    Job Planning

    Eplain some of the basic considerations forplanning a transmission line installation job.

    • !escribe or demonstrate how to determine the

    length of wire needed for stringing, how tocalculate the average span length, and how tocalculate a ruling span.

    • Eplain what guard structures are and when

    they are used.

    Job Preparation

    • Eplain the basic preparation necessary for

    stringing wire.• !escribe some of the basic e"uipment that

    must be assembled in preparation for stringingwire.

    • Eplain where the e"uipment necessary for

    stringing wire is generally placed on the sectionof line being strung.

    • Eplain why it is important to pull wire under

    tension.

    Pulling #onductor 

    !escribe or demonstrate how a pilot line ispulled into position.

    • !escribe or demonstrate how a bull line is

    pulled into position.

    • !escribe or demonstrate how a conductor is

    pulled into position.

    • Eplain the basic concerns associated with the

    pulling process.

    $agging, Part %

    • Eplain the purpose of sagging wire and basic

    considerations that must be taken into accountwhen sagging wire.

    • Eplain the preparations that must be made in

    order to sag wire.

    • !escribe or demonstrate how a dynamometer

    can be used for sagging wire.

    $agging, Part &

  • 8/16/2019 Course on Stringing Material

    2/2

    • !escribe or demonstrate how a transit or a

    sagging scope can be used for sagging wire.

    • !escribe or demonstrate the stopwatch method

    of sagging.

    #lipping-'n

    • !emonstrate and eplain the basic process of

    clipping-in.

    • 'dentify some additional items that may be

    installed on transmission lines.

    #opyright &(%( T)! Power$kills, **#. + ll ights eserved