21
Coupling Low Voltage Microgrids into GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011 Mid-Voltage Distribution Systems

Coupling Low Voltage Microgrids into Mid-Voltage ...lemmon/projects/GE-project-2010/pubs/GE-midterm.pdfGE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • Coupling Low Voltage Microgrids into

    GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Mid-Voltage Distribution Systems

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Each bus connected to a microgrid;Representing typical rural distribution network;Usually with severe voltage-rise problem;

    Radial system structure with buses connected to primary substation:

    Distribution System Control Architecture

    VoltageRegulator

    microgrid microgrid microgrid

    GEMEMwirelesscomm.

    GEMEMwirelesscomm.

    GEMEMwirelesscomm.

    VoltageRegulator switchable

    capacitor banks

    switchable capacitor banks

  • Project Objective and Approach

    GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Objective: Maximize real power exported bycoupled low-voltage microgrids.

    Issues:- Voltage Rise Problem;

    Transient Stability;Legacy Controls.

    - -

    Approach:- Two-layer Voltage Control Architecture:

    Decentralized Voltage Controler

    Simulation Studies and Analysis.-

    Benefits:- Minimize impact on DSO

    voltage regulation policies;Maximize real power exported back to distribution network.

    - Reactive Power Dispatch

    VoltageRegulator

    microgrid microgrid microgrid

    wirelesscomm. wirelesscomm.wirelesscomm.

    VoltageRegulator switchable

    capacitor banks

    switchable capacitor banks

    MCM

    MIC MIC MIC

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Talk Outline

    Distribution System Model

    Voltage Rise Problem

    Proposed Controller Architecture

    Optimization Problem

    Task Status and Schedule

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Micro-Source

    Bus 1

    Bus 2 Bus 3 Bus N. . .

    . . .PrimarySubstation 2PP 2Q 3PP 3Q NPP NQ

    1PP 1Q

    LoadMicro-Source Load

    Micro-Source Load

    Define voltage magnitude and phase angle of ith bus as:Distribution network is a passive system that only consumes power;

    Bus 1 is reference bus with and .

    System Model

    Ei , δi

    2E 2δ E δ3 3 E δN N

    Real and reactive power injected through ith bus:Pi , Qi (i = 1,2,· · ·,N)

    (i = 2,3,· · ·,N)

    E = 1.0 pu1 δ = 0 rad1

    Distribution Network

    A microgrid can be represented as a microsource and a load;

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Schematic diagram of a five-bus example system:

    System Model

    Primary Substation

    B3 B4B1

    Load 2

    B5

    Micro-Source1

    Micro-Source2

    B2

    Load 1

    A B C

    A B C

    A B C

    A B C

    powergui

    Discrete,Ts = 5e-005 s.

    ms_4_scope

    ms_4_internal_scope

    ms_4

    E_req

    P_req

    mabc

    ms_3_scope

    ms_3_internal_scope

    ms_3

    E_req

    P_req

    mabc

    Vab

    cIa

    b cP

    QR

    MS

    (V-I )

    A B C

    a b c

    Vab

    cIa

    b cP

    QR

    MS

    (V-I )

    A B C

    a b c

    VabcIabcPQ

    RMS (V-I)

    A

    B

    C

    abc

    Vab

    cIa

    b cP

    QR

    MS

    (V-I )

    A B C

    a b c

    VabcIabcPQ

    RMS (V-I)

    A

    B

    C

    abc

    Vab

    cIa

    b cP

    QR

    MS

    (V-I )

    A B C

    a b c

    VabcIabcPQ

    RMS (V-I)

    A

    B

    C

    abc Vabc

    IabcPQ

    RMS (V-I)

    A

    B

    C

    abc

    VabcIabcPQ

    RMS (V-I)

    A

    B

    C

    abc

    load_2_scope

    load_2

    A B C

    load_1_scope

    load_1

    A B C

    grid_scope

    cable S3-S4ABC

    A*B*C*

    cable S2-S3ABC

    A*B*C*

    cable S1-S2ABC

    A*B*C*

    cable G-S1ABC

    A*B*C*

    ABC

    abcSubstation

    A

    B

    C

    S4_scope

    S3_scope

    S2_scope

    S1_scope

    P_req40.6P_req3

    0.6

    E_req4-C-

    E_req3-C-

    Corresponding SimPower Model:

    Z = 0.5+1j Ω Z = 0.5+1j Ω Z = 0.5+1j Ω Z = 0.5+1j Ω480 V

    P = 30 kWQ = 10 kvar

    P = 30 kWQ = 10 kvar

    P = 0~60 kWQ = -20~20 kvar

    P = 0~60 kWQ = -20~20 kvar

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Example with farthest bus injecting real power:

    Voltage Rise Problem Illustration

    Primary Substation

    B3 B4B1 B5B2

    Bus voltage magnitudes of the distribution network:

    P = 0 kWQ = 0 kvar

    Z = 0.5+1j ΩZ = 0.5+1j ΩZ = 0.5+1j ΩZ = 0.5+1j Ω

    Bus 1 Bus 2 Bus 3 Bus 4 Bus 50.8

    0.85

    0.9

    0.95

    1

    1.05

    1.1

    1.15

    Bus

    Vol

    tage

    Mag

    nitu

    de (V

    )

    1.2

    1

    P = 200 kW

    P = 100 kW

    P = 20 kW

    P = 0 kWQ = 0 kvar

    P = 0 kWQ = 0 kvar

    P > 0 kWQ = 0 kvar

    2

    2

    3

    3

    4

    4

    5

    5

    5

    5

    5

    480 V

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Example with farthest bus 100 kW real power injection, and keep all bus voltages to be 1.0 pu:

    Reactive Power Control Illustration

    Primary Substation

    B3 B4B1 B5B2

    Reactive power support required to maintain 1.0 pu bus voltages:

    Z = 0.5+1j ΩZ = 0.5+1j ΩZ = 0.5+1j ΩZ = 0.5+1j Ω

    Bus 1 Bus 2 Bus 3 Bus 4 Bus 5

    -100

    -80

    -60

    -40

    -20

    0

    20

    40

    60

    80

    100

    Rea

    ctiv

    e P

    ower

    Inje

    ctio

    n (k

    var)

    P = 0 kWE = 1.0 pu

    P = 0 kWE = 1.0 pu

    P = 0 kWE = 1.0 pu

    P = 100 kWE = 1.0 pu

    2

    2

    3

    3

    4

    4

    5

    5

    Bus

    Vol

    tage

    Mag

    nitu

    de (V

    )

    0.95

    1

    1.05

    1.10

    1.15

    1.20

    0.90

    0.85

    0.80

    Q = 20 kvar

    Q = -20 kvar

    480 V

  • GE Energy Coupled Microgrid Project - University of Notre Dame - Oct. 21, 2011

    Voltage Rise Problem

    Z R jX= +

    E

    E E

    SP jQ= +

    I∠φ

    V0 ∠ 0° E∠δ

    IR

    IX

    δI∠φ

    V0 ∠0°

    E∠δ

    95%

    105%

    Distribution line impedance, Z=R+jXSubstation voltage V0∠ 0°Line current, I∠φInjected Power, SE = PE+ jQETerminal voltage, E∠δ

    Phasor diagram shows injected power’s impact on current flows result in line voltages that exceed the 5% voltage regulation rule.

    Without reactive power support: QE = 0PE > 0

  • GE Energy Coupled Microgrid Project - University of Notre Dame - Oct. 21, 2011

    Reactive Control of Voltage Rise Problem

    Z R jX= +

    E

    E E

    SP jQ= +

    I∠φ

    V0 ∠ 0° E∠δ

    � Total Injected Power:SE = PE + jQE = EI∠ ( δ - φ )

    � We reduce voltage rise by forcing linecurrent to lead terminus voltage

    � This strategy implies= EI sin(δ φ) < 0.

    � Voltage rise can be reduced by absorbingreactive power at the terminal bus.

    � Reactive control mechanisms:static var compensator, voltage regulator, capacitor banks, and Q-E droop controls

    I∠φ

    V0 ∠ 0°

    E∠δ

    95%

    105%IR

    IX

    φ δ

    -QE

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Ancillary Services

    Defined by Federal Energy Regulatory Commission (FERC):“... those necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.”

    Six Ancillary Services:Scheduling and Dispatch;Load Following;Operating Reserves.

    Energy Imbalance;Real-power-loss Replacement;Voltage Control.

    Coupled microgrids provide “voltage control” service, and become a player in the market.

    Coupled microgrids can provide reactive power support, while exporting real power to the distribution network.

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Providing Other Ancillary Services

    Microgrid Consortium Manager (MCM):Predicting consortium’s overall capacity;Using the prediction to bid in ancillary service market;Distributing service bid among participating microgrids.

    Maintaining set points with both P-freq & Q-E droop control;Rearranging if a microgrid’s capacity or network topology changes.

    Microgrid Interface Controller (MIC):

    -

    - -

    - -

    VoltageRegulator

    microgrid microgrid microgrid

    wirelesscomm. wirelesscomm.wirelesscomm.

    VoltageRegulator capacitor

    bankscapacitor banks

    MCM

    MIC MIC MIC

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Objective Function

    Maximizing real power exportation by downstream buses;Minimizing real power loss along the distribution line.

    Cost function is accordingly defined as:

    J(P, E )N�

    i=2(Pcap,i � Pload ,i � Pi ) +

    N�i=1

    Pi =N�

    i=2(Pcap,i � Pload ,i ) + P1Σ Σ- -Σ

    J(P, E ) = P1 = E1N�

    j=1

    Ej(GBUS ,1j cos(δ1 δj) + BBUS ,1j sin(δ1 � δj))Σ - -The cost function worked on is actually:

    Bus 1

    Bus 2 Bus 3 Bus N. . .

    . . .PrimarySubstation 2PP 2Q 3PP 3Q NPP NQ

    1PP 1Q

    2E 2δ E δ3 3 E δN N

    Distribution Network

    =

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Optimization Problem

    E 1

    N�

    j=1

    Ej (GBUS,1j cos(δ1- δj ) + BBUS,1j sin(δ1 � δj ))

    w.r.t. Ei , Pi (i = 2, 3, · · · , N)

    Pgen,i ≤ Pgen,i ≤ Pgen,iQgen,i ≤ Qgen,i ≤ Qgen,i

    (i = 2, 3, · · · , N)

    (j = 1, 2, · · · , N -1)

    Pi = Ei

    N�

    j=1

    Ej (GBUS,ij cos(δi- δj ) + BBUS,ij sin(δi- δj ))

    i = 1, 2, · · · , N)

    Qi = Ei

    N�

    j=1

    Ej (GBUS,ij sin(δi- δj � BBUS,ij cos(δi- δj ))

    Σ

    Σ

    Σ

    Minimize

    Subject to

    (

    ) +

    E i ≤ ≤ Ei (i = 2, 3, · · · , N)E i

    Pln, j ≤ ≤≤ ≤

    Pln, j Pln, j

    Qln, j Qln, j Qln, j

    Expression of P1

    Voltage Magnitude and RealPower Injected at ith Bus;

    Voltage Regulation Rule at ith Bus;

    Real an Reactive Power Constraints Determined by Generation Capability;

    Real and Reactive Power FlowConstraints of jth Distribution Line;

    Real and Reactive Power Balance Relationship at ith Bus.

  • GE Energy Coupled Microgrid Project - University of Notre Dame - Oct. 21, 2011

    CERTS Microsource Controller

    PowerInverterDG

    localcontroller

    Distributed Dispatch Integrated into Inverter ControlDispatcher generates P and E set points, as inputs to the CERTS inverter controller.

    DG source TerminalMeasurement

    CERTS DroopController c

    3

    b2

    a1Vpk

    w

    Va

    Vb

    Vc

    Vabc

    IabcA

    B

    C

    a

    b

    c

    v_meas

    i_meas

    E_req

    P_req

    Vpk

    w

    P_req2

    E_req1

    dispatchagent

    Decentralized Inverter Controls (CERTS)-

    Provide small-signal stability;Mimic P-freq & Q-E droop control;

    - Interface to any DG unit.-

    -

  • Microgrid Simulation Example

    simPower Simulation of UWM Microgrid Testbed- validated against UWM testbed- 42.5 kW Generation (storage, micorsource, genset) - 32 kW real load (8 kW can be automatically shed

    GE Global Research Telecon - Notre Dame Microgrid Research - October 21, 2011

    smartcoupler3

    event connected

    A

    B

    C

    a

    b

    c

    smartcoupler2

    event connected

    A

    B

    C

    a

    b

    c

    smartcoupler1

    event connected

    A

    B

    C

    a

    b

    c

    reset pulses

    Out1

    powergui

    Discrete,

    Ts = 2e−05 s.

    microsource

    E_req

    P_req

    PQ

    V

    I

    RMS

    freq

    Pmm

    a

    b

    c

    PQ

    V

    I

    RMS

    freq

    A

    B

    C

    a

    b

    c

    PQ

    V

    I

    RMS

    freq

    A

    B

    C

    a

    b

    c

    main grid

    A

    B

    C

    genset

    Ereq

    Preq

    PQ

    V

    I

    RMS

    freq

    Pmm

    a

    b

    c

    external storage

    E_req

    P_req

    PQ

    V

    I

    RMS

    freq

    Pmm

    a

    b

    c

    dispatch request1

    dispatch request

    disconnect event2

    Out1

    disconnect event1

    Out1

    disconnect event

    Out1

    Switch

    Step1

    Step

    A B C

    a b c

    SS

    comABC

    a

    b

    c

    PC6

    PQA B C

    A* B * C*

    PC5

    PQA B C

    A * B* C*

    PC4

    PQA B C

    A * B* C*

    PC3

    PQA B C

    A * B* C*

    PC2

    A

    B

    C

    A*

    B*

    C*

    MainGrid

    MS

    Line Summary

    Level−2 M−fileS−Function1

    dispatcher3

    L6

    A B C

    L5

    A B C L42

    A B C

    L4

    A B C

    L3

    A B C

    L2

    A B C

    L1

    A B C

    [PQgenMS]

    [IgenMS]

    [VgenMS]

    [PmmES]

    [PmmMS]

    [PmmGS]

    [PQcable31]

    [PQcable43]

    [freqES]

    [PQcable42]

    [PQcable21]

    [loadshed]

    [ESconnect]

    [MSconnect]

    [IslandState]

    [RMSeb4]

    [Ieb4]

    [Veb4]

    [PQeb4]

    [PQgenES]

    [EB4state]

    [freqEB4]

    [RMSeb3]

    [Ieb3]

    [RMSeb2]

    [Ieb2]

    [Veb2]

    [PQeb2]

    [RMSeb1]

    [Ieb1]

    [IgenES]

    [Veb1]

    [PQeb1]

    [RMSbus]

    [freqmain]

    [RMSgenGS]

    [RMSgenMS]

    [PQgenGS]

    [freqMS]

    [VgenES]

    [Vmain]

    [reset]

    [RMSgenES]

    [RMSmain]

    [freqbus]

    [Ibus]

    [Vbus]

    [PQbus]

    [Veb3]

    [PQeb3]

    [EB3state]

    [freqEB3]

    [Imain]

    [PreqGS]

    [PreqMS]

    [PreqES]

    [IgenGS]

    [VgenGS]

    [freqGS]

    [EB2state]

    [freqEB2]

    [EB1state]

    [freqEB1]

    [PQmain]

    [GSconnect]

    Generation Summary

    Gain7

    −K−

    Gain6

    −K−

    Gain5

    −K−

    Gain4

    −K−

    2/15

    2/15

    2/15

    2/15

    GS

    [freqGS]

    [freqES]

    [PQgenGS]

    [PQgenMS]

    [PQgenES]

    [PQcable43]

    [PQcable42]

    [PQcable31]

    [RMSmain]

    [PQcable21]

    [PQcable43]

    [PQcable42]

    [PQcable31]

    [PQcable21]

    [PQgenGS]

    [PQgenMS]

    [PQgenES]

    [freqMS]

    [PmmGS]

    [Vmain]

    [PmmMS]

    [PmmES]

    [GSconnect]

    [MSconnect]

    [ESconnect]

    [IslandState]

    [PQgenGS]

    [PQgenMS]

    [PQgenES]

    [PQmain]

    [PQmain]

    [loadshed]

    [loadshed]

    [loadshed]

    [loadshed]

    [loadshed]

    [EB1state]

    [EB4state]

    [EB3state]

    [EB2state]

    [PQbus]

    [Imain]

    [Vbus]

    [freqES]

    [freqEB4]

    [Veb4]

    [PQeb4]

    [Ieb4]

    [EB4state]

    [RMSeb4]

    [freqEB4]

    [Veb3]

    [reset]

    [PQeb3]

    [Ieb3]

    [EB3state]

    [RMSeb3]

    [freqEB3]

    [Veb2]

    [PQeb2]

    [Ieb2]

    [EB2state]

    [RMSeb2]

    [reset]

    [freqEB2]

    [Veb1]

    [PQeb1]

    [Ieb1]

    [EB1state]

    [RMSeb1]

    [freqEB1]

    [RMSbus]

    [Vbus]

    [PQbus]

    [reset]

    [Ibus]

    [freqbus]

    [RMSgenGS]

    [VgenGS]

    [PreqGS]

    [RMSgenES]

    [PQgenGS]

    [IgenGS]

    [freqGS]

    [RMSgenMS]

    [reset]

    [PreqMS]

    [PreqES][VgenMS]

    [PQgenMS]

    [IgenMS]

    [freqMS]

    [VgenES]

    [PQgenES]

    [IgenES]

    [freqES]

    [freqmain]

    1

    1

    1ES

    EB4

    EB3

    EB2

    EB1

    2

    1

    1

    1

    1

    1

    2

    2

    .8

    .5

    −.1

    2

    Bus SummaryBUS

    2 kW e−board4

    reset

    priority

    shed_load

    w

    state

    PQ

    V

    I

    RMS

    A

    B

    C

    2 kW e−board3

    reset

    priority

    shed_load

    w

    state

    PQ

    V

    I

    RMS

    A

    B

    C

    2 kW e−board2

    reset

    priority

    shed_load

    w

    state

    PQ

    V

    I

    RMS

    A

    B

    C

    2 kW e−board1

    reset

    priority

    shed_load

    w

    state

    PQ

    V

    I

    RMS

    A

    B

    C

    Measurement Block

    Computes amount of shed load

    Dispatch Logic

    main grid

    External Storage (ES)15 kW

    Microsource (MS)15 kW

    Genset (GS) - 12.5 kW

    Load 2 kW Load 6 kW

    Load 8 kW

    Load 8 kW

    eboard 2 kW

    eboard 2 kW

    eboard 2 kW

    eboard 2 kW

    smartswitch

    smartswitch

    smartswitch

    cable

    cable

    cablecable

    eboard bus

    cable

    0 1 2 3 4 5 6 7 8

    59

    60

    61ES and eBoard4 Frequency (Hz)

    0 1 2 3 4 5 6 7 8−200

    0

    200eBoard Bus Voltage (V)

    0 1 2 3 4 5 6 7 8−1

    0

    1

    x 104 real/reactive power (W)

    0 1 2 3 4 5 6 7 8−0.5

    0

    0.5

    1

    1.5Shed Load Power (pu)

    dispatcherenabled

    islandingevent

    loss ofmicrosource

    loadshedding

    microsourcereconnect

  • Transient Stability

    GE Global Research Telecon - Notre Dame Microgrid Research - October 21, 2011

    • System State equations

    δ̇i = mP (Pi − P 0i )Ėi = k(E

    0i − Ei −mQQi)

    Pi = Ei

    n∑

    j=1

    EjYij cos(δi − δj + αij)

    Qi = Ei

    n∑

    j=1

    EjYij sin(δi − δj + αij)

    • This system interconnects two net-worked systems

    – System of coupled nonlinearoscillators (δ)

    – Voltage control system (E)

    • Stable interconnection occurs whenthe oscillators are synchronized.

    Q Calculation Low PassFilter

    Q vs E Droop

    VoltageControl

    P vs FreqDroop

    Low PassFilter

    Low PassFilter

    Magnitude Calculation

    P Calculation

    Gate PulseGenerator

    InverterCurrent

    Load Voltage(measured)

    Line Current

    Q

    P

    E

    RequestedVoltage, Ereq

    RequestedPower, Preq

    Requestedfrequency, freq

    δv

    V

    E0

    δ̇i = mP (Pi(δ, E)− P 0i )

    Ėi = k(E0i − Ei −mQQi(δ, E))

    P0

    E δ

    power setpoint

    voltage setpoint

    coupled oscillators

    voltage controllers

    CERTS Controller for Fast Inverters

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Example of Optimization Problem

    P = 60 kW req,1 E = 1.0433 pureq,1 P = 60 kW req,2 E = 1.0426 pureq,2

    Set points of microgrid determined by the optimization problem:

    Primary Substation

    B3 B4B1

    Load 2

    B5

    Micro-Source1

    Micro-Source2

    B2

    Load 1

    Z = 0.5+1j Ω Z = 0.5+1j Ω Z = 0.5+1j Ω Z = 0.5+1j Ω480 V

    P = 30 kWQ = 10 kvar

    P = 30 kWQ = 10 kvar

    P = 0~60 kWQ = -20~20 kvar

    P = 0~60 kWQ = -20~20 kvar

    P1 Q1 E2 E3 E4 E543.54 kW -55.35 kvar 0.9570 pu 0.9650 pu 1.0334 pu 1.0502 pu

    P = 60 kW req,1 E = 1 pureq,1 P = 60 kW req,2 E = 1 pureq,2

    For comparison, we can use set points as:

    In this situation, even though more reactive power support is provided, voltages of two load buses exceed the upper and lower limits defined byvoltage regulation rule.

  • GE Energy Coupled Microgirid Project - University of Notre Dame - Oct. 21, 2011

    Future Work

    Verification of Compatibility with Legacy Equipments:Algorithm must not contradict with current control mechanism;Must consider both automatic controller and DSO controls;Use simpower model to verify the compatibility.

    - - -

    VoltageRegulator

    microgrid microgrid microgrid

    wirelesscomm. wirelesscomm.wirelesscomm.

    VoltageRegulator capacitor

    bankscapacitor banks

    MCM

    MIC MIC MIC

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

    CERTSController

  • Task 1 Summary

    GE Project Summary - University of Notre Dame - Oct. 21, 2011

    Task 1.1 - Algorithm DevelopmentAlgorithm determine “exported real power” and “voltage levels”, microgrid controllers automatically supply reactive power to maintain voltage levels.Zhao Wang currently developing algorithms for optimal power and voltage assignment.Algorithm development to be completed by mid Nov. 2011, technical report by Jan. 2012.

    Task 1.2 - Simulation DevelopmentPrototype simPower models of distribution line and microgrid completed in mid-July 2011.Current simulations include UWM controllers, and use capacitor banks for voltage control.Zhao Wang currently integrating microgrid controller and optimization algorithm into MV distribution line simulation.Integration to be completed by mid Nov. 2011, technical report by Jan. 2012.

    -

    --

    ---

    -

    Task 1.3 - EvaluationNot started yet, and expected start date is Jan. 2012.Goal is to integrate capacitor banks and microgrid controls into simulation, and study interaction of microgrid control with automatic capacitor bank controls.Expected completion by end of Apr. 2012, findings to be presented in project final report by May 2012.

    --

    -

  • Task 1 Overview - Coupled Microgrid

    GE Project Summary - University of Notre Dame - Oct. 21, 2011

    - Task 1.1 (algorithm development) about 4 months behind schedule- Task 1.2 (simulation) to be done in parallel with task 1.1- Interim Technical Report on Task 1.1/1.2 to be completed by January 2012- Task 1.3 (evaluation) to start in November 2011 and complete in April 2012- Final Report to be finished by May 2012.

    4/1/

    2012

    Page_1 Cover SlidePage_2 Distribution System Control ArchitecturePage_3 Project Objective and ApproachPage_4 Outline of The TalkPage_5 System ModelPage_6 SimPower Simulation ModelPage_7 Voltage Rise Problem IllustrationPage_8 Reactive Power Control IllustrationPage_9 Voltage Rise ProblemPage_10 Solution to Voltage Rise ProblemPage_11 Ancillary ServicesPage_12 Controller Architecture to Provide Ancillary ServicesPage_13 Objective FunctionPage_14 Optimization Problem DescriptionPage_15 Controller StracturePage_16 Microgrid Simulation ExamplePage_17 Transient StabilityPage_18 Example of Optimization ProblemPage_19 Future WorkPage_20 Task SummaryPage_21 Task Overview