GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED CONSTRUCTION DIVISION NAVSARI TENDER TECHNICAL BID SUB: - Annual carting contract for transportation of equipment from any destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory. PARTY’S NAME: TENDER NOTICE NO: TCNS/AC/44 Dtd.3.09.10 TENDER NO: 347 DUE DT. OF TENDER: - 21.09.2010

CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION

CORPORATION LIMITED

CONSTRUCTION DIVISION

NAVSARI

TENDER

TECHNICAL BID

SUB: - Annual carting contract for transportation of equipment from any

destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory.

PARTY’S NAME:

TENDER NOTICE NO: TCNS/AC/44 Dtd.3.09.10

TENDER NO: 347

DUE DT. OF TENDER: - 21.09.2010

Page 2: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

Tender No. Name of work Tender Fee (Non

Refundable) Estimated Cost. Tender

will be Received

by

Tender Notice No-61 (New)

CDNS/ 347

1st exten

Annual carting contract for transportation of

equipment from any destination to Vav

Const Store or any Construction Side of

Navsari Construction Division and Vice

Versa with in Gujarat & Union Territory.

500 500000.00 EE (Const)

Navsari

Receipt up to 15.00 P.M. of (By RPAD only)… 21.09.2010 O p en i n g a t 16 . 00 P . M . o n … ( I f p o ss i b l e i n t h e p resen ce o f t h e b i d ders i f t h e y re mai n p resen t . )

21.09.2010

Page 3: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. CONSTRUCTION DIVISION

NAVSARI.

1 Name of work. : Annual carting contract for transportation of equipment from any destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory.

2 Estimated Cost. : Rs:- 500000.00

3 Earnest Money. : Rs:- 5000.00

4 Security Deposit. : Rs. :- 25000=00

5 Last date of receipt.

(By RPAD Only)

: 31.08.2010 Upto 13.00 Hrs.

6 Date of Opening Tender. : 31.08.2010 At 15.00 Hours if possible.

7 Price of Tender. : Rs.500.00

8 Time Limit. : 12 Months.

Earnest Money Deposit will be accepted or by Demand draft or any

pay order Schedule Bank at Navsari in favour of Gujarat Energy

Transmission Corporation Ltd., cheque will not be accepted.

Date are extended upto

Issuedto:- ________________________________________________

________________________________________________.

Supdt.Account. Executive Engineer (Const.)

Const. Dvn, Navsari.

Navsari.

Every contractor shall except the registered contractor of the approved list of Corporation unless exempted by the Superintending Engineer /

Accounts Officer jointly of the concerned circle produce alongwith his

tenders a solvency certificate of his district within which he resides or a Bankers Certificate of his financial ability if he fails to produce such a

certificate for such a tenders are liable to be reject

Page 4: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

DOCUMETS TO BE ATTACHED WITH TECHINCAL BID

1) Registration Certificate.

2) Provident fund accounts code No Registration.

3) Solvency certificate.

4) Experience certificate.

5) Tin No:

If party fails to submit the above mention documents along with

Technical Bid, his price bid will not be considered and tender shall

be rejected.

EXECUTI VE ENGINEER (CONST)

NAVSARI.

Page 5: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED CONSTRUCTION DIVISION – NAVSARI.

TENDER NOTICE NO. : TCNS/AC/69

Sealed & super scribed Tenders in two bids only, are invited from registered in Govt. / Semi. Govt. Dept. and experienced contractors by Executive Engineer

(Const.), GETCO, Kabil pore, Grid NAVSARI through RPAD only for following

described work.

Sr.

No.

Tender No. Name of work Est. Cost in

Rs.

Time

Limit

Tender

Fee

1 CDN/347 Annual carting contract for transportation of equipment from any destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory.

500000.00 12 MONTH

500.00

EMD : Rs.5000.00

Security Deposit: 5% of the contract value.

Last Date of receipt of Tender : 25.08.2010 up to 15:00 Hrs.

Date of Opening of Tender : 25.08.2010 at 16:00 Hrs. (If possible)

Validity of tender: 180 Days from the date of opening of technical bid.

THE CONTRACTOR WILL HAVE TO SUBMIT THEIR OFFER IN TWO BID (1)

TECHNICAL BID (2) PRICE BID. THEY HAVE TO PUT PRICE BID SEALED

COVER INTO THE TECHNICAL BID SEALED COVER. OTHERWISE OFFER

WILL BE REJECTED.

Tender document can be down loaded from our web site WWW.gseb.com

Interested party requested to visit our Web Site as mentioned.

The GETCO reserves the right to reject any or all tenders or accept any tenders without

assigning any reasons thereof.

Executive Engineer (Const.),

GETCO, Construction Division,

Navsari

Page 6: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LTD

CONSTRUCTION DIVISION

NAVSARI

PART 1

. GENERAL TERMS AND SPECIFICATIONS:

I) the rates the work quoted by the contractor will be valid for the period of six months from

the Date of opening of the tenders. a) Rates quoted in the tender shall be considered final;

thereafter any change of rates quoted shall not be taken in to consideration. b) If rates are not

quoted on %age basis rate offered by you shall be considered as estimated cost.

II) PAYMENT OF SECURITY DEPOSIT:

The contractor will have to pay the security deposit at 5% of the order Value on placing

the order2.50% will have to be paid in cash or demand Draft drawn in favour of GETCO within

7 days from the date of the issue of work order, and the remaining 2.50% will be recovered from

the bills.

III) TIME LIMIT:

The time limit for the above work will be TWELVE months from the date of issue of

work Order the time being the arrange, the same will be strictly adhered to.

IV) SIGNING OF AGREEMENT:

The contractor will have to sign agreement as per GETCO’s rules in the prescribed

Performa of the GETCO. The cost of the required stamp paper will have to be borne by the

contractor.

V) PAYMENT OF BILLS:

Only first and final bill be paid .The 90% cost of work done will be paid to the contractor

on his presentation of bill. Giving the material account and signing the joint measurement of the

work done with our DE (STORE.)VAV The bill should be submitted to our DE (STORE.)VAV

with a copy of Ex. Engineer (const.) GETCO. const. dn. Navsari

The final bill will be prepared by our DE (STORE.)VAV _within about fort night from

the date of completion of work contractor on presentation of the final bill with complete material

account of the work contract, by the contractor.

VI) Tender without payment of EMD will be liable to be rejected

.

VII) DEPARTURE FROM SPECIFICATION AND DRAWING:

Should the tenderer wish to depart from the specification in any respect, they should

drawn attention to such departure giving his reasons thereof and should get approved before

doing any further work.

The working drawing is attached with the tender’s .However, in case of any clarification

the decision of the Engineer-in-charge will be final and binding.

VIII) AVAILABILITY OF MATERIAL AND IDLE LABOUR CHARGES:

Most of the materials are readily available and arrangement is made to procure the rest.

However, the contractor should be prepared to carry out the work as and when the materials are

received. No idle labour charges will be borne by the GETCO in case such occasion of idle

arises due to want any materials. However, this idle period will be counted of assessing the time

limit for completion of work as mentioned in the work order.

IX) Corporation does not accept any responsibility as regards to factory act minimum wages act,

workman’s compensation Act. etc, or any other acts, rules or regulations that have to be observed

Page 7: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

by the contractor for carrying out the work, subject to be the availability of raw materials, the

contract is to be completed within……….months from the commencement date or as may be

mentioned in the work order,

X) The contract will be governed by the General condition of works contract of the Corporation.

A copy of booklet will be available along with the tender issued by the Divisional office at

Navsari and the contractor is deemed to have studied the same thoroughly before filling up the

tenders.

XI) ACCOUNTING OF CORPORATION’S MATERIALS:

The contractor will be fully answerable and responsible for all the materials issued to him

for the Work by the Corporation for the theft loss of pilferage and shall have to furnish account

for the same after Completion of the work and before preparation of final bill. lf the loss referred

above is not made good before the preparation of the final bill, the cost of the materials will be

recovered form the final bill as per the rules of the Board,

XII) PROGRESS OF WORK AND PENALTY:

Lf it is found that the work is unsatisfactory not progressing as per schedule then any

action would Be taken by the Corporation as may be demand fit to see that work is completed at

the risk and cost of contractor. lf the work is not completed within the schedule period penalty up

to 0.5% per week of the Contractor value subject value to the maximum of 10% will be levied.

XIII) [a] The undersigned reserves rights to reject any or all the tenders without assigning any

reasons There of.

[b] The tender should furnish details of past experience of wiring works handed by him.

[c] The tenders will abide by and fulfill all the terms and provisions of the tenders and

contract for Work as applicable and in case of any default there to the corporation shall forfeit

etc and of Money due in respect of completion of work through other agency on failure of

Tenderer to comp the work as required in the order.

[d] The contractor must have his own electrical contractor license and must give the

reference of his license number with tender.

[e] All the materials used for wiring work must be ISI marked only and ISI certificate must

be produce for the materials used like wire switches, holders tube light, fixtures, ceiling fan

along with bill then only payment will be released.

[f] Contractor has to produce work completion certificate from… DE (STORE.)VAV .of

the work then only payment will be made,

Signature with stamp and EXECUTIVE ENGINEER, (CONST)

Lience No. of the contractor GETCO, NAVSARI

Page 8: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

SECTION - IV (A)

COMMERCIAL TERMS AND CONDITION

TENDER FEE:-

The tender fee specified in notice inviting tender will have to pay by Demand Draft

payable at Navsari drawn on any nationalized bank, which shall be placed in EMD cover along

with DD of EMD.

EARNEST MONEY DEPOSIT:

The amount E.M.D. at the rate of 1% of the estimated cost as Earnest Money Deposit (E. M. D.)

is payable. The EMD payable by Demand Draft (DD) in favour of Gujarat Energy Transmission

Corporation Ltd. on any Scheduled Bank in Navsari. Cheque for EMD is not accepted. Co-

operative Bank Guarantees are not allowed.

No Interest will be allowed against payment of E.M.D. Documents towards payment of Earnest

Money Deposit (EMD) shall be submitted in one envelop and the tender documents in the other

and then both these envelopes shall be kept in envelop supplied by the Corporation or tenderer’s

own envelop for submitting the tender.

EMD will be forfeited in case (i) if the tender which it covers is withdrawn during the validity of

the offer and (ii) the Tenderer fails to furnish / deposit the security deposit as per this tender

specification.

For claiming refund of the EMD, the Bidder has to submit the original receipt issued by the

Corporation to the EE (Const.), GETCO, Construction D.O., Navsari along with application &

advance stamped receipt. However the EMD will be refunded only after placement of order on

the successful bidder and acceptance of the same by the Bidder.

VALIDITY PERIOD:-The offer should be valid for a minimum period of 180 days from the

date of opening of tender.

4.4 (A) Tenderer should furnish the following details:

Sales Tax Registration No. date and issuing authority.

Registration No. under shops and Estt. Act and issuing authority.

A list of the Partners / Directors with the permanent as well as present address, phone, mobile &

fax numbers and other details as their relationship, if any with the Corporation’s employee

should be furnished along with the tender.

List of pending orders (with orders Nos. & date) and customer’s name and address and orders

executed so far with other electricity Corporation’s.

Furnish Audited Accounts of last three years of the firm.

All the testing equipment MUST have been calibrated up to date; the details for the same may be

submitted.

The list of machinery available at factory for manufacturing the item required for transmission

line.

The factory License obtained from State Government authority.

Copy of Registration with validity of the registration.

Copy of latest bank solvency certificate of 20% of tender value.

Copy of experience certificate.

Service tax registration No.

4.4.2. Revision of prices or any commercial terms affecting the price after opening of technical

bids shall not be considered and will be ignored.

4.4.3. Tenderer should indicate the name of their partners of their manufacturing firm.

Page 9: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

4.4.4. Tenderer should specifically mention in the offers and should indicate in Block letters the

name of the Partners / Proprietor / Directors who is / are the signing authority.

(B) Prices:

The quoted prices for erection of S/S shall be on firm price basis and shall be valid up to

completion of contract

The service tax shall be indicated in erection part of price bid.

No price variation shall be allowed on supply and /or erection part.

EXCISE DUTY:-

100% value of Excise duty on tower materials & line materials shall be reimbursed on

submission of documents of excise duty paid by the bidder at the prevailing or offered applicable

rate, whichever is lower. Neither however have Chartered Accountants certificated along with

last advance bill that excise duty paid by the tenderer and claim from GETCO has not been

refunded nor refund claim is pending with excise department. Further, tenderer have to furnish

and undertaking to Corporation that in any event, if any refund of excise duty either in full or

part is received by tenderer in further in respect of the material supplied to GETCO against all

under reference and the same shall be passed on to the Corporation without any former claim to

that effect from GETCO.

The rate quoted shall be inclusive of freight, transportation, loading, –unloading & stacking at

site.

The prices accepted by the Corporation shall remain valid till completion of the contract for the

main order.

The contractor shall take suitable storage-cum-erection insurance against theft; loss/damage

accident etc. up to completion of line for all towers and line materials at no extra cost to the

Corporation and prices quoted shall be inclusive of this item.

No extra payment toward all type of template including extensions and special tower will be

made to successful bidder.

SALES TAX:-The prices should be quoted inclusive of sales tax i.e. GST or CST to be

indicated. The rate of sales tax (GST or CST) should clearly be indicated. However, in the

breakup of end cost, sales tax has to be shown separately. The stores are required for

consumption in generation, transmission and distribution of electrical energy and as such,

Gujarat State forms “C” / C-1” / Central “C” from will be issued at the time of payment of bills,

you are requested to quote your sales tax registration Number and date in all the bills.

No sales tax will be paid on bolt-nuts being bought out item.

The Gujarat sales tax is applicable on Freight component also for the dispatches within the

Gujarat State.

As per the Government of Gujarat directives, while evaluating your offer incidence of sales tax

will not be considered.

Sale Tax on works contract:

Works contact tax is a liability of the bidder and if applicable, the same shall be borne by the

bidder.

In case of contract value exceeding RS. One crore, tax shall be deducted at source at 2% of the

net value payable as per the section 57(b) of the Gujarat Sale Tax Act of 1969 amended up to

date. However, if contractor desires payment without deduction of 2% TDS, he has to obtain

and produce certificate from competent authority of sales tax department to that effect.

E.D. / ST amount ceiling:

Bidder shall also confirm that the total claim of excise duty and sales tax shall not exceed the

amount indicated in the price bid.

Page 10: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

STATUTORY VARIATION:-

Any statutory increase or decrease in the taxes and duties subsequent to your offer if it

takes place within the original contractual delivery date will be to the Corporation’s account

subject to the claim being supported by documentary evidence. However, if any decrease takes

place after the contractual delivery date, the advantage will have to be passed on to the

Corporation.

No statutory variation shall be admitted, if the excise duty becomes payable because of

exceeding the prescribed limits for turn over or for any such other reasons.

4.4.16. INCOME TAX:-

Income-tax at source at the prevailing rate will be deducted from bill in

accordance with the provision of Income-Tax Laws and to that effect a certificate will be issued

to the contractor.

SECURITY DEPOSIT CUM PERFORMANCE GUARANTEE DEPOSIT :-

The contractor will have to pay the security deposit at 5% of the order Value on

placing the order 2.50% will have to be paid in cash or demand Draft drawn in favour of GETCO

within 7 days from the date of intimation from this Office and the remaining 2.50% will be

recovered from the bills.

SD will be refundable after completion of Guarantee period of 06 Months from Date of

completion of satisfactory of work

The successful bidder will be required to pay an amount equivalent to 5% of the value of the

order as a security deposit for satisfactory execution of the contract and performance guarantee.

Such Security Deposit will be payable either in Cash / DD payable at Navsari / Bank guarantees

from Scheduled / Nationalized Banks will be acceptable, if the amount of security deposit

payable exceed Rs. 50,000/-. The Bank Guarantees furnished / submitted should have clear one

time validity till the completion of the order in all respect and up to the expiry of the Guarantee

period of Two years from the date of commissioning of Transmission line. Bank Guarantee for

interim period will not be allowed. If by any reason the contract period is extended, then

contractor should undertake to renew the Bank Guarantee at least one month before the expiry of

the validity failing which Corporation will be at liberty to en cash the same, without entering into

further correspondence formalities, etc in the matter.

No interest will be allowed on amount of Security deposit.

The Security Deposit cum performance Guarantee deposit of 10% on total contract value shall be

valid up 12 months from the date of charging of line.

This security deposit is for the performance of contract and the same is liable to be forfeited by

the Corporation in event of non fulfillment of the term and conditions of this contract by the

contractor.

(CORPORATE BANK GUARANTEES NOT ALLOWED)

Completion Period:

The contractor should start all relevant activities like mobilization of gang, collection of drawing

from GETCO, profiles and tower schedules, selection of site store for storage of materials for

supply and erection on receipt of LOI from the Corporation. No separate commencement period

will be given by the Corporation for this activity.

The contractor is required to commence his activity for supply and erection work on receipt of

detail order date and shall complete all activities in all respect with in 3(Three) Months from the

date of order as indicated in SCHEDULES -B hereunder.

Page 11: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

The tenderer shall confirm that on placement of order, the work will be executed as per

Schedule-03 of section-VII only. The tenderer have to submit the bar-chart accordingly.

Time being the essence of this contract. Completion period shall be strictly adhered to by the

contractor in view of urgency of this project in time.

4.7. Guarantee Period:

Total material supplied and work executed shall be covered under guarantee period

against any defect in materials, poor workmanship or defect/ wrong design etc. for a period of 12

Months from the date of commissioning of line.

4.8. Penalty for Delay:

4.8.1. The tenderer should note that the completion time allowed for carrying out the work

should be strictly observed. Any delay that may take place in supply and erection beyond

Contractual cut off date stated as per stipulated delivery period shall be subject to the penalty at

the rate of ½ % of the contract value per week (of delayed supply and/or work) OR part there of

with a ceiling of 10 % of the contract value.

4.8.2 The penalty will be deducted from bills payable either against this contract or from any

Bank Guarantee or any other amount payable under any other contract with the Corporation.

4.8.3 Tenderer shall have to supply all materials to match with the erection activities.

4.9. Presentation of Bills:

4.9.1 Monthly RA bills for 80% value of the supplied material and work executed including

cost of material consumed is to be prepared in triplicate and submitted to Dy. Engineer (Const)

in-charge of the work, who will in turn process the same and forward it to the concern Executive

Engineer (Const), in-charge of the work for necessary payment. These bills shall be serially

numbered with suffix SE-I.

4.9.2 10% payment out of balance 20% shall be released on completion of line work, handing

over and acceptance by the concern E.E. (Const) after rectification work if any and settlement of

material account according to actual quantity utilized for completion of line. No extra payment

will be release for to material which is not required for completion of line if supplied excess

during execution work. D.E (Const) in charge of the work will in turn process the same and

forward it to concern Ex. (Const) in-charge of the work for necessary payment. This bill shall be

serially numbered with suffix SE-1.

4.9.3 Balance 10% payment shall be released only after finalization of material account and

passing of final bill only. The contractor has to submit the final bill along with the material

consumption statement and other required data of the work carried out within 3 months from the

date of completion of work. These bills shall be serially numbered with suffix SE-I.

4.9.4 All the bills in accordance with the above clauses must be submitted with the following

information:

a) Item wise work done during billing period.

b) Item wise cumulative work done.

c) Account for material consumed and balance stock.

4.9.5 For non-submission or part submission of above information, an additional 5% amount of

the respective RA bill shall be withheld and shall only be released at the time of final bill.

4.9.6 The intimation of above indicated bills shall be submitted to concerned Superintending

Engineering (TR) in-charge of the work and Chief Engineer (Trans.), GETCO, HO, Baroda, for

information and records.

Terms of Payment:

Page 12: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

The payment for materials to be supplied and erected shall be made as under only after

execution of the contract documents/furnishing of Security Deposit and on execution of

transmission line work.

4.10.1. For erection works.

(i) 100% payment of amount claimed covering various activities such as excavation, foundation,

tower erection, earthing, tack welding stringing of conductor and earth wire including insulator

hoisting works against R.A. bills duly certified by EIC within 60 days from the date of R.A. bill.

4.11. TAKING DELIVERY AND INSURANCE:

4.11.1 The contractor has keep tower materials & line materials in safe custody and transport to

the respective sites and will be fully responsible for any damage to or loss of all materials at any

stage during transportation or erection or taking over of the line by Corporation.

4.11.2 The Contractor has to open site store nearby the route of the line and ensure for safe

custody of all the stored materials at his own cost.

4.11.3. The Contractor shall have total responsibility for the entire materials stored, loose, semi

assembled and/or erected by him at site in his custody. The Contractor shall make suitable

security arrangements at his own cost to ensure the protection of all materials, equipment and

works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of

the contractor to arrange for security till the works are finally taken over by the Corporation.

4.11.4 STORAGE CUM INSURANCE:-The contractor shall take suitable storage cum erection

insurance cover at his cost for the entire project for 60 % cost of line materials, which are

required to complete the line. Contractor shall have to take comprehensive insurance policy

against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection

and commissioning up to the time of taking over of the transmission line by the Corporation. The

contractor shall deal directly and pursue the claim with the Insurance Company and shall be

responsible in regard to maintenance of all insurance coverage as well as for settlement of claim.

The proof of insurance policy taken by the successful contractor shall be furnished to E.E

(const), Navsari, SE (TR), Navsari and C.E (TR), GETCO, H.O., Baroda. In absence of the

above insurance policy, R.A. Bill payment will be with held.

4.11.5 In the event of any damage, theft, loss, pilferage, fire etc., you shall be responsible to

lodge, pursue and settle all the claims with the Insurance Company for all items, materials and

the Corporation shall be kept informed about it. You shall replace the lost / damaged materials /

items promptly irrespective of the settlement of the claims by under writer and ensure that the

work progress is as per agreed schedule. The loss, if any, such replacement will have to be borne

by you and Corporation will not entertain any claim / representation in this regard. However it

will be contractor's responsibility to insure entire project till the line is taken over by the

Corporation

4.12. MATCHING OF END COST:

In case the Corporation decides to award CONTRACT on matching end cost basis, the bidder

has to reduce all the quoted rates proportionately. The reduction on overall basis will not be

accepted (i.e. all unit rates of erection schedule shall be reduced proportionately by difference in

percentage). The confirmation for matching end cost shall be given within 7 (seven) days from

the latter from GETCO.

Page 13: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

CONSTRUCTION DIVISION

NAVSARI

TERMS AND CONDITION OF CONTRACT:-

Relating to tender Notification no. CDN/347

1. The work to be carried out by the contractor consists of transport of various types of

plants, equipments, and materials from the respective Railway Station/Transport Co.,

received from time to time at various places/different stores of Corporation to Sub

Division or Stores of the Corporation and vice-versa for the period of 1(one) year from

the date of the order and to the period extended (Maximum 3 months) as may be required

by the Department.

2. The quantity mentioned in schedule-‘B’ is on approximate basis. However, the contractor

has to carry out the work as per actual quantities received during the period of contract

and the contractor will not claim any additional extra rates for quantities received to be

executed over or below the tendered quantities if he is called upon to cart.

3. The scope of work excludes the carting of materials which require to be transported (i.e.

over dimensioned consignments) through the big Ben registring special permission from

R.T.O. and also consignments one place) weighing more than 10 tones.

4. Waiting time at the places of getting or giving delivery would repaid at the supplier

and /or the Railways and / or the in charge store officer and no responsibility for

detention charges shall be accepted by the Corporation though efforts would be made to

minimize such detention.

5. In addition to the loading, unloading, transporting, sorting, etc., the contractor shall also

have to act as out clearing and forwarding agent for collecting goods from Railway or

other sources without any extra remuneration, for preparing necessary clearances of

booking and / or marking and weighting at weigh bridges to record the correct weights

etc. etc..

6. The contractor shall have to complete the job immediately on receipt of the intimation

from our local office by the letter or telephones. As far as possible, sufficient notice will

be given to the contractor to arrange for coolies, etc. for transporting the materials. The

authorized agent of the contractor shall have to call at our local office at least twice a day

to inquire about the proposed dispatches and receipts.

Page 14: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

7. All materials collected from suppliers or cleared from Railway’s OR taken over from our

local office OR godown for booking shall be very carefully handled and transported. Any

loss or damage in transit will be the responsibility of the contractor and cost their of will

be recovered from him. The assessment of damage shall be done by our field officer at

his sole discretion and his decision will be final and biding of the contractor.

8. Materials must be booked then booking for the Station or which intimation has been

send, is open. This should be ascertained from the Railway and intimated to the Field

Officers regularly.

9. Clear Railway receipt/ LR must be presented within one (1) day from the date of

delivery of materials from booking. If in any case there is possibility of delay due to

unforeseen circumstances, the matter should be reported in writing to our local office

immediately.

10. Railway receipt/L.R. will have to be sent always “freight Paid” for which the contractor

shall have to pay Railway freight in advance on behalf of the Corporation except in case

where it is informed to send the goods “Freights to pay”. The freight charges thus paid

may be claimed by producing Railway freight receipt and the payment of such amounts

shall be made by us.

11. If the contractor fails to present the Railway Receipts for dispatched materials within

stipulated time, the demurrage charges etc. Paid by the consignees at the other end due to

late receipt of R.R. shall be recovered from the contractor.

12. Contractor’s authorized representative should always be present at the time of taking

delivery of the consignment to avid any complications thereafter.

13. Advance intimation should be given on phone OR in person regarding next days

This should be immediately delivered by a written confirmation.

14. The contractor shall be responsible for the consequences if wagons are not unloaded

within the stipulated time. Due to inadequate number of Majdoors engaged OR for any

other reasons on his part.

15. Transporting rates should be inclusive of all operations of loading and unloading the

materials from wagons, stores yard or store room into trucks or other conveyance and

stacking of the same according to size and lengths item wise as per the instructions of the

In-charge store officer and vice-versa.

16. On receipt of the materials at stores the same should be properly stacked within 2 (two)

days from the due of receipt. The same should be strictly followed.

17. The methods employed for carting and conveying all he materials and equipments will

have to be got approved by the filed officer of this division and the decision of Executive

Engineer (Const) Navsari shall be final and shall be binding on the contractor.

Page 15: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

18. Freight charges against the R.R. for the incoming consignments to the Railway

authorities will have to be arranged by the contractor for freight not exceeding Rs. 10/-

per R.R. It will be paid to contractor by the Corporation on presentation of the

relevant money receipts. The money Receipt shall have to be provided to this office

within a week’s time, for reimbursement.

19. On the receipt of the R.R. the same will be handed over to the contractor along with the

letter for exemption of octroi duty i.e. to say the contractor will have to make his

arrangements to obtain exemption certificate for Octroi purposes from Municipality.

20. Payment of transport bills shall be based on actual weights if the same are available or

R.R. weight or calculated weights, at the discretion of our Field Officer and the paying

authority.

21. Deposits for allotment of Wagons, if any, will have to be paid by the contractor to the

Railways for which no advance shall be paid.

22. The contractor has to make his own arrangements for all sorts of tools and tackles, as and

when necessary arises and according to requirements. Frocuring requisite machinery for

moving items of heavy machinery shall be the sole responsibility of the contractor and no

extra payment will be made on that account. However, the crane changes for lifting the

consignment form Railway will be to the Corporation’s account and the same will be

reimbursed to the contractor on production of relevant money receipt from Railways.

23 It the contractor fails to carry out the job at any time within he specified period, the work

will be got done at the risk and cost of the contractor and the difference between the rates

paid and actually payable to the contractor as per the contract will be adjusted from the

pending bills.

24. The contractor should intimae to the office-in-charge at Corporation’s office, the names

and addresses and telephone number of his authorized and responsible representatives, so

that our Field Officer can contract them in connection with the transport work.

25. The bill in triplicate should be forwarded to the concerned Field Officer and payment will

be made y Division office after the receipt of the certificate from the Field Officer that

the materials have been received correct and in good conditions and properly stacked.

26. The Transport rates should be quoted without any condition. The rate for all items should

be written in Ink, both in words and figures in legible hand.

27. The Executive Engineers GETCO, Construction Division, Navsari reserves the right to

reject any OR all the tenders without assigning any equable hand.

28. The 5% of the Tendered value will have to be paid in Cash as Security Deposit if the

tender is accepted. Also the successful tenderer will have to produce the required

solvency certificate as per the rules of the Corporation.

Page 16: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

29. The quantities mentioned in the Schedule, are approximate and the Contractor is bond to

carry out the work for the period of 1 (one) year. The period will be reckoned fro the date

of issue of regular order. The period will be extendable for the period of 3 (three) months

OR further as may be required by the Department. The contract will be governed required

by the “General Conditions of Contract” of the Corporation. A copy of the booklet is

available in office. The contractor will have to enter into Agreement with the Corporation

on Stamped paper the charges of which will be borne by the contractor.

30. The form of conditions is to be signed by the tenderer in token of his acceptance of all the

conditions and terms, and should be returned along with his tender.

31. The rates should be filled in the schedule of quantities attached herewith and should be

signed by the contractor.

32. The Corporation will not take any responsibility OR liability as regards factory Act,

minimum wages Act, workmen’s compensation Act etc.. OR any other Act rules Or

Regulations that have to be observed by the contractor for carrying out the work entrusted

to the contractor. Any accidents fatal-non-fatal or injuries to the workers working during

the execution of the transport, loading etc. of Corporation materials on behalf of the

Corporation will be at the risk and cost of the contractor.

33. Should this tender by accepted, I/We hereby agree to abide by and fulfill all the terms and

provisions of the ‘TENDER AND CONTRCT FOR WORK’ as applicable and in default

thereof to forfeit the security deposit etc.. Paid by the contractor and to pay to the

Corporation the sums of money due.

34. The full value of the “EARNEST MONEY” paid herewith should be absolutely forfeited

to the Corporation should I/we not deposit the full amount of specified security deposit

within the specified time in the work order.

Signature of Contractor

Executive Engineer (Const)

Navsari.

Page 17: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

CONSTRUCTION DIVISION OFFICE - NAVSARI

TERMS & CONDITIONS REGARDING INDUSTRIAL

LAWS AND OTHER RELATED MATTERS

(1) Wages to be paid at time of payment etc. by the contractor.

(A) The contractor shall pay minimum prevailing rates per day or as may be

specified hereafter or rates fixed under the minimum wages Act. Whichever is higher. The wages or very contract labour employed by him

under this contact shall be paid by him before the expiry of 7th day of the

month in respective of which the wages are payable (i.e. wages of a

month have to be paid by him in the first week of the next month). The payment shall be disbursed in the presence of management

representative during the working hours in factory premises and the

contractor shall get the entries certified in the register of wages by the representative of the GETCO. Any default will result in cancellation of

contract forthwith or also the contractor shall be paid punishable to the

extent of Rs.100/- fine per each day. (B) The contractor shall give his telephone number and address to the GETCO

so that in case of labour troubles etc. the contractor can be contacted.

The contractor shall arrange to have his office outside the factory

premises and the contractor shall keep himself present through out the working hours.

(2) Labour Laws :-

(A) Person below the age of 18 years shall not be employed for the work.

(B) No. female worker shall be employed in the night shift between 7 p.m. to 6 a.m.

(C) Contractor shall maintain a valid labor license under the contract labour

(Regulation and Abolition) Act for employing necessary manpower to be

required by him. In the absence of such license the contract shall be liable to be terminated without assigning any reason thereof.

(D) The contractor shall at his own expenses comply with all labour laws and

keep the GETCO indemnified in respective thereof. Some of the major liabilities under various labour and industrial laws which the contractor

shall comply with are as under :-

(i) Payment of contribution by way of employer’s contribution towards provident fund, family pension scheme, Deposit linked insurance scheme,

Administrative charge etc. at the rates make applicable from time to time

Page 18: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

by Government of Gujarat/Government of India or other statutory

authority. (ii) Payment of deposit in respect of each contract labour at the rate as per

admissible with the office of commissioner of Labour as per the contract

Labour (Regulation and abolition Act.).

(iii) License fee as prescribed under the contract labour (Regulation and abolition Act) and rules framed there under depending upon the number

of workmen employed by the contractor.

(iv) Paid leave facility and wages as per the provision of the factories Act at the rate of one day for every 20 days of working.

(v) Identify cards as prescribed under the factories Act with photo at fixed

there to the same identification. Liabilities as per industrial Disputes Act any payment to the contractor’s employees arising out of any claim or

disputes under the industrial Disputes Act, 1947 or any other labour laws.

(vi) Payment of compensation in case accidental injury.

(vii) Maternity leave as per the provisions of the maternity Benefit Act. The above are some of the major liabilities of the contractor in addition to

other liabilities. Prescribed under the various labour laws in force from

time to time from statutory authorities like State Government/ Government of India which the contractor shall have to comply with.

(3) Provident fund & Family pension Scheme:-

The contractor shall submit along with his bill (month wise) a statement regarding deduction against employees provident fund and family pension

scheme in respective of each concerned employee, provident fund and family

pension scheme at the rate at admissible ( or at the rate made applicable by

the Government from time to time ) of the wages. The contractor’s contribution and his workers contribution towards provident fund and family

pension scheme shall be deposited by the contractor with regional Provident

Fund Commissioner, Ahmedabad. (4) Deposit Linked Insurance Scheme:-

The contractor shall have to deposit ½ % of the wage in respect of

employees who is a member of the Provident Fund as the contribution to the deposit.

Linked insurance Scheme with Regional Provident Fund Commissioner,

Ahmedabad.

(5) Administrative Charges:- Administrative charges for maintaining provident fund A/C shall be deposited

by the contractor with Regional Provident Fund Commissioner, Ahmedabad at

the rates applicable. (6) Paid Leave Facility:-

Paid leave facility at the rate of one day for every twenty days worked by the

contract labour shall be provided by the contractor to his workers. He shall

maintain leave Records/leave cards for individual labourer which shall be duly verified and approved/certified by the authorized officer of the GETCO.

(7) Workmen’s compensation fund & Employer’s Liability Insurance:-

The contractor shall cover all his employees under workmen’s compensation fund and under the liability insurance.

Page 19: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

(8) The contractor shall employ adequate number of experienced staff at site for

dial supervision and for maintenance of various register and records required under the law and contract No. payment for supervision shall be admissible.

(9) Contractor to Identify the GETCO:-

The contractor shall indemnify the GETCO and every member officer and

employees of the GETCO also, engineering in charge and his staff against all actions, proceeding, claims demands, costs and expenses which may be

made against the GETCO or Government for or in respective of formance of

his obligation under the contract documents. The GETCO shall not liable for or in respective of or in consequence of any accident or injury to any

workman or other person in the employment of the contractor or his sub-

contractor and the contractor shall indemnify and keep indemnified the GETCO against all such damage and compensation and against all claims,

demands, proceedings costs, charges and expenses whatever in respective

thereof in relation thereto.

(10) Workmen’s compensation and employer’s liability insurance:- Insurance shall be affected for the entire contractor’s employee engaged in

the performance of this contract. If any of the work is subject the contractor

shall require the sub-contractor to provide workmen’s compensation and employer’s liability insurance for the latter’s employees unless such

employees are covered under the contractor’s insurance.

(11) The GETCO reserves the right to terminate this rate contract at any time during its tendency without giving notice of termination or any reasons

thereof.

(12) The GETCO will be entitled to deduct directly from the bills, to be paid to the

contractor any sum or payable by you and which sum/sums the GETCO is required to pay as principal employer on account of your default in respect of

all liabilities referred to in above clauses.

Signature of Contractor Executive Engineer (Const.)

With rubber stamp. GETCO, D.O., NAVSARI.

Page 20: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LTD.

CONSTRUCTION DIVISION NAVSARI.

1 Name of work. : Annual carting contract for transportation of equipment from any destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory.

2 Estimated Cost. : Rs:- 500000.00

3 Earnest Money. : Rs:- 5000.00

4 Security Deposit. : Rs. :- 25000=00

5 Last date of receipt.

(By RPAD Only)

: 25.08.2010 Upton 13.00 Hrs.

6 Date of Opening Tender. : 25.08.2010 At 15.00 Hours if

possible.

7 Price of Tender. : Rs.500.00

8 Time Limit. : 12 Months.

Earnest Money Deposit will be accepted or by Demand draft or any

pay order Schedule Bank at Navsari in favour of Gujarat Energy

Transmission Corporation Ltd., cheque will not be accepted.

Date are extended upto

Issuedto: - ________________________________________________

________________________________________________ ________________________________________________.

Supdt.Account. Executive Engineer (Const.) Const.Dvn. Navsari.

Navsari.

Every contractor shall except the registered contractor of the approved list

of Corporation unless exempted by the Superintending Engineer /

Page 21: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

Accounts Officer jointly of the concerned circle produce alongwith his

tenders a solvency certificate of his district within which he resides or a Bankers Certificate of his financial ability if he fails to produce such a

certificate for such a tenders are liable to be rejected.

Page 22: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

CONSTRUCTION DIVISION

NAVSARI

TENDER

PRICE BID

SUB: - Annual carting contract for transportation of equipment from any destination to Vav Const Store or any Construction Side of Navsari Construction Division and Vice Versa with in Gujarat & Union Territory.

PARTY’S NAME: ____________________________

TENDER NOTICE NO: CDNS-69

TENDER NO: 347

DUE DT. OF TENDER:-

Page 23: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

Construction Division, Navsari

Estimate/Schedule B

Sub:- Annual carting contract for transportation of Equipment from any destination to Vav Const Store or any Construction Site of Navsari

Construction Division and Vice Versa with in Gujarat & Union Territory

Sr. No.

Particulars Qty Unit Rate Amount

1

TRANSPORT OF S/S Structure, tower MATERIAL & EQUIMENTS or cable/conductor drum/insulator from any GETCO'S store to Vav Store or vice versa. Trip will be consider on Volume basis it is considered 10MTXKmXRate as one trip and on weight basis KMX MTX Rate is considered as per inst of EIC

90000.00 Tonne 5.00 450000.00

2 Labour / Crane charges for loading unloading of material

50 Job 1000.00 50000.00

Total Rs:- 500000.00

I/We am /are willing to carry out the work of Carting of Material % above / below (should be written in wards and figure)

Total amount of tender :- Rs.-

Total amount of tender in wards :- Rupees

Note: - Validity of this tender will be up to 12 months from the date of submission of the tender.

Sign. and address of Executive Engineer(Const)

the contractor. GETCO, Navsari

Page 24: CORPORATION LIMITED CONSTRUCTION DIVISION ... Office...Sales Tax Registration No. date and issuing authority. Registration No. under shops and Estt. Act and issuing authority. A list

I/We am /are willing to carry out the work of Carting of Material % above / below (should be written in words and figures), the estimated rates mentioned above. Amount of my tender works out as under.

Total amount of tender :- Rs.-

Total amount of tender in wards :- Rupees

Note: - Validity of this tender will be up to THREE months from the date of submission of the tender.

Sign. and address of Executive Engineer(Const)

the contractor. GETCO, Navsari