C O R P O R A T E A L I G N M E N T L O G O

Page 3: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C O R P O R A T E M V V

Page 4: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Founded in 1957

• A group of companies composed of more than 50 subsidiaries operating in 6 major geographical

areas: CIS, Asia, Middle East, Europe, Africa & Turkey

• More than 500 projects in 45 countries, with historical value of US$ 43 billion

• Turnover $3,5 B (2016)

• Amongst the top 100 international construction contractors of the World since 1982

• Ranked #79 in ENR Top 250 International Contractors in 2016

• More than 30,000 people

• Traded publicly in Borsa Istanbul (BIST) with a Market Cap of more than $7 B

• Holds ISO 9001, OHSAS 18001 & ISO 14001 and ASME certificates

• Shares the vision & goals of its customers, adopts to their needs and to local conditions

BUSINESS LINES:

• Engineering & Construction, Power, Real Estate, Trade

Page 5: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C I M T A S G R O U P A b o u t

www.cimtas.comwww.cimtaspipe.com

www.cimtasmachining.com

www.cimtasshipyard.com

www.cimtasnbo.com

• A subsidiary of ENKA

• Incorporated in 1973 in Turkey as a local steel fabricator now an EPMFI group of 5 companies: Gemlik, Turkey:• Cimtas Steel, • Cimtas Pipe Fabrication and Trading Ltd. Co.,• Cimtas Precision Machining Industries and Trading Ltd. Co.Kocaeli, Turkey:• Cimtas Module and Shipyard,

Ningbo, China:

• Cimtas Ningbo Modular Skids Pipe Spools

• 2,200 people including 220 engineers

• With Activities in

• Engineering (structural, pressure vessels, piping, plant engineering)

• Manufacturing & Fabrication (7 facilities including pipe/fitting manufacturing and machining shops, 6 in Turkey & 1 in China, over 210,000 tons/year total capacity)

• Modularization (Pre-assembled racks, Pre-assembled units)

• Installation - Structural & Mechanical & Electrical (domestic and overseas jobsites)

• Shipbuilding (powerships, barges, tankers / gas carriers)

Page 6: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

A C T I V I T I E S

Page 7: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 8: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Plant Design Engineering

Power, Refineries, Petrochemical

• Process Design

• Power and Process Piping

• OEM Piping

• Pressure Vessels

• Heat Exchanger

• Storage Tanks

• Civil & Structural Design

• Gas Processing Equipment

• BOP Equipment

• Technical Procurement

Valves, Instruments, Pipe Supports,

Process Equipment Packages

• Reverse Engineering-Laser Scanning

Cimtas Plant Design and Engineering Group (Bursa, Turkey) provides various engineering

and design services including conceptual, basic and detail engineering for the industries

including but not limited to power, oil and gas, chemical, offshore and refinery.

E N G I N E E R I N G

S C O P E

Page 9: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Stress & Structural Analysis

PDMS/Aveva

MDS/Aveva

PDMS LMI/Aveva

Smart Plant 3D & PID

PDS

Leica CloudWorx

SPR (review)

Tekla Structures

Solidworks

Autocad

Catia v5

Visual Vessel Design

3D Design & Modeling Process & Flow Analysis

I & C – Electrical

Drafting

ChemCad

Flow Consultant

Sinetz

Thermoflow

ETAP

Dialux

ePlan

AutoCAD

Spoolgen

Isogen

Microstation

Smartsketch

Rohr2

Caesar II

Compress

Ansys

PVElite

Abaqus

ETABS

SAP 2000

STAAD Pro

E N G I N E E R I N G S O F T W A R E

Page 10: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

3x42 MW SCGT Power PlantWest Qurna-2 Oilfield, Iraq ENKA

Propylene Storage Tanks, Turkey, PETKIM

Muscat Int.’l Airport Roof Structure, Oman, ENKA

Interconnecting Piping, DLN 1 Upgrade, China, GE

Pressure Vessels D107-D203, Turkey, PETKIM

111 MW KPS 6, Powership, Turkey , KARADENIZ ENERGY

Compressor Manifold Skid, SGP, Kazakhstan, TCO

E N G I N E E R I N G E X P E R I E N C E

Page 11: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 12: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

M A N U F A C T U R I N G S C O P E

• LSAW Pipes• Fittings

• Hot Forming• Elbows• Tees

• Hot Forming 2 Halves• Elbows

• Cold Forming• Elbows

• Cold Rolling• Reducers

• Flanges• Branch Components• Cimtas Design Cim-Lets

• Bending• Induction Bending• Automated Cold Bending

• Mechanical Testing & Metallography Laboratory(ISO 17025 Certified)

Page 13: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 14: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

F A B R I C A T I O N S C O P E

• Pressure Vessels (up to 1,300 tons unit weight, t= 200 mm, P= 225 bar, P11 alloy)

• Full Scope Piping (Engineering, Procurement, Fabrication, Induction and Cold Bending,

Painting, Packing, Framing, t= 108 mm, P= 277 bar, P92 alloy)

• Heat Exchangers and Steam Drums (HP, t= 114 mm, P= 172 bar, P91 alloy)

• Structural Steel (High Rises, Industrial Buildings)

• Steel Wind Towers

• Spherical & Cylindrical Gas & Liquid Storage Tanks

• Heat Recovery Steam Generators

• Air Intakes, Exhaust Ducts, Bypass Stacks

• GT Combustion Components

Page 15: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

CO2 Absorber (1,050 mt, 48 m)Angola LNG, Angola, BECHTEL

Slug Catcher Surge Vessel, Hasdrubal Project, Tunisia, PETROFAC

4,950 m3 Spherical Tank Izmit Refinery, TurkeyTUPRAS

HRSG, Dow Chemical Plant, U.S.A., AUSTRIAN ENERGY

HP Absorber, AGD II Project, K.S.A., GASCO

Claus Reactors, SGP,Kazakhstan, TCO

Debutaniser, SGP,Kazakhstan, TCO

F A B R I C A T I O N E X P E R I E N C E P r e s s u r i z e d E q u i p m e n t

Page 16: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

FC Shaktar Donetsk Stadium, Ukraine, ENKA

Eurasia Tower (310 m), the Russian Federation, ENKA

Izmit Bay Suspension Bridge, Turkey, IHI

Wind Towers, Worldwide,ENERCON, NORDEX, GE WIND

Golden Horn Bridge, Turkey, IHI

Air Inlet & Exhaust Ducts, Worldwide, GE

Makkah Clock Tower, K.S.A.,SBL GROUP

F A B R I C A T I O N E X P E R I E N C E Stru c tura l S te e l & Win d To wers

Page 17: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Bulk Spool Shipment,Equatorial Guinea LNG Project,BECHTEL

GE Turbine Piping,Frames 9E, 9F, 9FA, 6F, 6B, 7FA, 7E

Robotic Welding Automated Welding

Cold Bending Induction Bending

Manual Welding

F A B R I C A T I O N E X P E R I E N C E P i p i n g

Page 18: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 19: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Precision Machining & Combustion Parts

ACTIVIT IES | FABRICATION G T C o m b u s t i o n C o m p o n e n t s

CMM Inspection

Electron Beam WeldingFabrication

Vacuum Heat Treatment & Brazing Roll Bending

Surface Treatment & Brazing

Page 20: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C i m t a s D e s i g n e d P r o d u c t s

BRANCH CONNECTIONS

CIM INSERT 45

CIM INSERT 45 CIM BW

CIM SW CIM TH

ACTIVIT IES | MACHINING

Page 21: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 22: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Modules• Pre-assembled Units (PAUs)• Pre-assembled Racks (PARs)

• Process Skids• Turbine Machinery Skids• Flow Divider & Measuring Units

• Detail Design and Engineering

• Procurement and/or Prefabrication of;

• Structural Steel and Supports

• Piping Systems

• Manual and Automated Valves

• Electrical and Instrumentation

• Engineered Equipment

• Insulation and Heat Tracing

• Pressure Vessels

• Assembly of;• Mechanical Systems • E & I Systems • Tubing • Insulation and Heat Tracing

• Complete Unit Testing;• Hydrostatic• Functional • Electrical

• Trial Assembly• Packaging and Delivery

P R O D U C T S

S C O P E

M O D U L A R I Z A T I O N

Page 23: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Rominserv Storage Tanks Farm Revamping Romania, EMERSON-DANIEL

Poly Bed Hydrogen Purification Skids,UOP

Sour Gas Sieve Skid, Tengiz Oil Field Kazakhstan, TCO

6 Modules, 613 tons, Petrobrazi Plant CCR Tower, Romania UOP

M O D U L A R I Z A T I O N E X P E R I E N C E

Page 24: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Water Injection Module, GEFuel Gas Module, GE Liquid Fuel & Atomizing Air Unit, GE

Turbine Machinery Skids MHI

M O D U L A R I Z A T I O N E X P E R I E N C E

Page 25: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 26: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Piping incl. Critical and Heavy Wall

• Power Plants

• Petrochemical Plants

• Refineries

• Pump & Compressor Stations

• High Rise Buildings

• Industrial Plants

• Steel Bridges

• Storage Tank Farms

• Ammonia Plants

Over 650,000 tons installed in total

Structural, Piping, Hook up, Mechanical, Electrical

3 Continents, 15 Countries including the Netherlands and Germany

I N S T A L L A T I O N S C O P E

Page 27: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Tengiz Second Generation Project, Kazakhstan, TCO

2 x 140,000 m3 EGEGAZ LNG, Tank Farm, Turkey, EGEGAZ

Spherical Storage Tanks, Marmara Ereğlisi, BUTANGAZ

790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV

411 MW, Yajva CCPP, the Russian Federation, ENKA

3,854 MW, Turkey BOO(Gebze-Adapazarı-İzmir CCPP) ENKA

111 MW, KPS 6 Powership,KARADENIZ ENERJI

I N S T A L L A T I O N E X P E R I E N C E

Page 28: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Eurasia Tower, 310 mthe Russian Federation, ENKA

Naberezhnaya Tower, 270 mthe Russian Federation, ENKA

Izmit Bay Crossing Suspension Bridge, Turkey, IHI

Makkah Clock Tower, 601 mK.S.A., SBL GROUP

FC Shaktar Donetsk Stadium, Ukraine, ENKA

I N S T A L L A T I O N E X P E R I E N C E

Page 29: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

800 MW Walsum Coal Fired Power Plant, Germany,HITACHI POWER EUROPE

Walsum Plant P92 Welding

111 MW, KPS 6 Powership,Turkey, KARADENIZ ENERGY

Petkim Aromatics, Turkey, PETKIM

Walsum Plant P92 Welding

1,532 MW, Izmir CCPP, Turkey, ENKA

790 MW, Rijnmond CCPP, the Netherlands, BECHTEL

I N S T A L L A T I O N E X P E R I E N C E

Page 30: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C I M T A S G R O U P L o c a t i o n s

Page 32: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Engineering, Procurement, Fabrication, Installation

• 2 km from 4 International Deep Sea Ports

• 2 hrs/200 km from İstanbul

• 21 Bays, 80 Overhead Cranes

• Fenced Area: 160,000 sqm (1,722,000 sq ft)

• Covered Shop Area: 60,000 sqm (645,800 sq ft)

• 50,000 tons/year Fabrication Capacity

C I M T A S G E M L I K W O R K S

Page 33: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• LSAW Pipes• (Edge Crimping), JCO Bending, Post Bending,, (Mechanical Expander)

• Fittings, Flanges, Branch Components• Cold Forming, Cold Rolling, Hot Forming, Hot Forming by Mandrel and Machining• Cimtas Designed (Brand) Products: CIM-INSERT®& CIM LET

• Pipe Spools• Integrated Design & Engineering, Material Procurement, Surface Treatment, Packing, Framing

• Induction Bending (2 machines, 40 and 108 mm thk. P92)• ASME NPT, NS, NA Nuclear Certificates• Fenced Area: 110,500 sqm (1,189.400 sq ft)• Covered Shop and Office Space: 66,000 sqm (710,418 sq ft)• 3,500 t spool, 1,000 t fitting, +15,000 t LSAW Pipe monthly capacities

C I M T A S P I P E F A B R I C A T I O N A N D T R A D I N G L T D . C O .

Page 34: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Precision Machining and Fabrication of GT Combustion Parts• Multi-axis CNC Precise Machining and Forming• Compliance With Stringent Machining Tolerances +/- 0.005mm• Electron Beam Welding• Ferrous & Non-Ferrous components• Vacuum Heat Treatment & Brazing Furnace• 3D CMM and Laser Inspection• CAD/CAM Software• Fenced Area: 12,000 sqm (129,200 sq ft)• Covered Shop and Office Space : 8,000 sqm (86,110 sq ft)• New Expansion: to be operational in Q1, 2018

Total area : 6,320 sqm (68,030 sq ft)

CIMTAS P RES IC ION MACH INING I NDUSTRI ES AND TRADI NG LTD. CO.

Page 35: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• One of the Largest and Most Modern Shipyards in Turkey • Location: Kocaeli Free Zone Near Gölcük Town of the Marmara Sea• Slipway 1: 180 x 56 m with 400 t Gantry and 60,000 DWT capacity• Slipway 2: 106 x 20 m with 100 t Gantry and 10,000 DWT capacity• Floating CC Power Plant Ships, Chemical/Oil Product Tankers• Fenced Area: 210,000 sqm (2,260,000 sq ft) with 250 m Water Front • Covered Area: 43,000 sqm (462,850 sq ft)

(Fabrication, Piping, Painting Shops, Offices)• 35,000 tons/year Fabrication Capacity

C I M T A S M O D U L E A N D S H I P Y A R D

Page 36: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

• Established in July 2002 at the Ningbo Free Trade Zone, China

• Fully Owned Subsidiary of Cimtas, Turkey

• Fabrication of OEM, Power and Process Piping

• Assembly of Process Skids and Modules

• Fabrication and supply of piping and auxiliary components to maintenance, repair & overhaul operations

• Supply of Quick Release Flange solutions

• Fenced Area: 27,200 sqm (292,780 sq ft)

• Covered Area: 21,300 sqm (230,000 sq ft)

C I M T A S N I N G B O M O D U L A R S K I D S P I P E S P O O L S

Page 37: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C I M T A S N I N G B O M O D U L A R S K I D S P I P E S P O O L S

New investment: • Located at the Ningbo Export Processing Zone• 13km / 8 miles drive from Cimtas Ningbo existing facility• To be operational by 2019 Q1 • Fenced Area: 55,250 sqm (595,000 sq ft)• Covered Area: 35,000 sqm (377,000 sq ft)

Page 38: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

I N F O R M A T I O N T E C H N O L O G Y A N D S H A R I N G

for effective management of interfaces, changes, revisions, material shorts and priorities

P R O J E C T P O R T A L S

O R A C L E E R P S Y S T E MISO 27001 Certified

Page 39: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

C E R T I F I C A T E S

Page 40: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

A W A R D S

Page 41: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

R E F E R E N C E S

Page 42: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir
Page 43: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Owner : Republic of TurkeyEPC Contractor : NÖMAYG JVBridge Contractor : IHI & ITOCHUBridge Fabricator : Cimtas Gemlik Works Ground Assembler : Cimtas Module and ShipyardBridge length x height : 2,682 m x 242 mMain span : 1,550 mBridge Total Steel Weight : 52,000 tons

The 4th longest suspension bridge in the world

I Z M I T B A Y C R O S S I N G S U S P E N S I O N B R I D G E

Page 44: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Owner/Customer : Government / SBL GroupLocation : Makkah, K.S.A.Completion : 2011Scope : Detailing, Supply, Field InstallationHeight : 601 m Cimtas Scope : +346 to +601 m Tonnage : 14,500 tons

M A K K A H C L O C K T O W E R

The tallest clock tower and world’s largest clock face

Page 45: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Owner : Angola LNG Customer : Bechtel Location : Angola Completion : 2011Scope : Design, Detailing, Supply, FabricationPiping : 7,250 tonsPressure Vessels : 18 units, 2,000 tons

A N G O L A L N G

The Heaviest Single Piece Exported from TurkeyW: 1,050 mt, L: 48 m, T: 162-163 mm , ID: 5,26 m

Page 46: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Owner : E.ON Customer : ENKA Location : Perm Region/ Russian Federation Scope : Design, Detailing, Supply, Fabrication,

Installation Completion : 2010 Tonnage : 3,700 tons

The Best Project in the Power/Industrial category in 2013 Global Best Projects Competition of ENR

YA J V A S TAT E D I S T R I C T P O W E R P L A N T, C C P P, 4 1 1 M W

Page 47: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Owner : TengizChevrOil (TCO)Customer : PFD, Senimdi Kurylys Location : KazakhstanScope : Design, Detailing, Supply, FabricationCompletion : 2005Piping : 10,500 tons Pressure Vessels : 55 units, 2,600 tons

S E C O N D G E N E R A T I O N P R O J E C T

Page 48: CORPORATE ALIGNMENT LOGO · 790 MW, Rijnmond Energy Center, the Netherlands, BECHTEL-ENKA JV 411 MW, Yajva CCPP, the Russian Federation, ENKA 3,854 MW, Turkey BOO (Gebze-Adapazarı-İzmir

Facilities: Full scope, large and flexible capacity, efficient layout, well positioned facilities

Hardware: High capacity, multifunctional, modern, computerized machinery and hardware

Procedures: Highly automated and benchmark planning, welding, qc, tracking and marking

Processes: Systematic Kaizen, Six Sigma, Lean Production, EFQM, BSC applications

Information: Advanced systems and applications, real time and shared information

People: Dynamic, educated, high skilled, motivated, aligned labor and staff pool

Learning: Inductions, training, alignment, teamwork, lessons learnt, best practice roll outs

Growth: In house capacity and capability to design, build and commission efficient facilities

F E A T U R E S & D I F F E R E N T I A T O R S