Upload
adeolutoni
View
223
Download
0
Embed Size (px)
Citation preview
8/8/2019 CoreCSDesignrequirements
1/15
Lucent Technologies ProprietaryUse pursuant to company instruction
NDER - Core CS Design Requirements
Mohamamad Hamid
8/8/2019 CoreCSDesignrequirements
2/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 2
Over View of CS Requirements
Network architecture details
Call Flows
Requirements for Mobile to Land call
Requirements for Land to Mobile call
LNP Query Requirements
Hand Over requirements (IRAT)
Supplementary services Requirements
Emergency call setup Requirements
IP assignments for LSS, MGWs, LMRS, CCDU, CDDU, etc will be discussed in IP
presentation.
NDER tabs for Core CS requirements.
8/8/2019 CoreCSDesignrequirements
3/15
8/8/2019 CoreCSDesignrequirements
4/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 4
Network Architecture Requirements: Contd
Understand Topology, LSS architecture connectivity to
LMRS
pMGW, uMGW
STP (Local STP, STP-G, STP-L), HLR (SRI Query flow)
Switches and router
Various N/W Elements(LNP, VM, SMSC, CAMEL ).
Understand Type of interfaces, Link Count, and width customer IP switches and
routes for following
IuCS flow,
H.248 Signalling, earer
O AM messages flow, illing CDRs
PSTN connectivity
STP connectivity. (HSL ,LSL links)
8/8/2019 CoreCSDesignrequirements
5/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction
Call Flows: Mobile to Land
uMGW
pMGWRNC
Remove: GSMMSC
RNC
3
1
LSSServer
PST
2
Steps:
1: Registration
2: Mobile dials PSTN
3: Digit analysis TG selection
4: Call is routed to PSTN via pMGW
STP
TDM
ATM
IP
H.248
8/8/2019 CoreCSDesignrequirements
6/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 6
Mobile to Land call Requirements (Contd)Registration,
HPLMN (MCC, MNC), EPLMN
IMSI, MSISDN,
CLLI, PC, N PC, e164 address for LSS/VLR
CLLI, PC, Alias PC for STPs serving the SSA like Local STP, STP-G (GFLE ),
STP-L (LNP)
TT, SSN for HLR queries (Defined by 3GPP)
Mo ile dials PST num er:
Trun plan:
Trunk groups for local, LD , IMT, CALEA, E911, Hand Over trunks
TG name, TG number, DPC, CLLI code, Number of members, CIC, Framing,
line coding, glare rules, hunting options, echo canceling, out pulsed digits.
Voice mail (Direct trunk or IMT). Cingular uses IMT trunk to connect to VM.
8/8/2019 CoreCSDesignrequirements
7/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction
Mobile to Land call Requirements (Contd)
ial plan:
List of NPA, N (Local, Long distance, International).
NPA N routing information (Primary secondary routes).
List of N11 and ADC codes (including * # codes) and their routing information (
Number translated, TG).
Routing Type: IMSI based routing or Location ased routing.
Important ote:
Work with customer to build a Standard layout for Digit table, Route tables, TG
and RL naming standards and follow the same standard in the entire network
deployment.
L
CCDU (TG, CICs, members, IP address).
CDDU (Point Code, RTU License for UMTS, IP address).
8/8/2019 CoreCSDesignrequirements
8/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 8
Land to Mobile call
uMGW
pMGWRNC
GSMMSC
1. PSTN dials Mobile and call is routed to GSM underlay2. GSM-MSC performs SRI Query to HLR
3. HLR send PRN query to 3G-MSC
4: 3G-MSC returns MSRN
. GSM-MSC routes to pMGW.
RNC
4
1
2
LSSServer
PST
3
STP
TDM
ATM
IP
H.248
8/8/2019 CoreCSDesignrequirements
9/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 9
Land to Mobile Requirements (Contd)
SRI Query One MSRN Pool
MSRN handling Impact on Call routing
Incoming IMT trunks: Cingular used IMTs trunks to support secondary treatments on
e isting infrastructure..
8/8/2019 CoreCSDesignrequirements
10/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 10
LNP Query Requirements
LRN numbers for LSS
LNP Database SSN, TT, PC, e164 address
LNP query implementation (Will the LNP query done by LSS or 2GMSC)
Direct trunk to LNP data base
JIP (Jurisdiction Information parameter) to identify originating switch for billing purposes.
LNP query requirements for NPA N move into LNP query
8/8/2019 CoreCSDesignrequirements
11/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 11
IRAT Requirements
Hand over numbers for LSS
2G MSC IRAT Information
Hand off strategy and its implementation
Call Delivery MSRN, Mobile HON,
GSM MSC/VLR e164 address, PC
MCC, MNC,
LAC, SAC,
EPLMN
Hand off Trunk
8/8/2019 CoreCSDesignrequirements
12/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 12
Supplementary services requirementsAnnouncements:
List of Announcements
Cause code to treatment mapping
CD for Announcements with market tags.
Voice mail
VM Pilot numbers
CLLI name, PC ( if Direct trunks are built from pMGW to VMS)
SMS Requirements
Type of SMSC (OTA, MO, MT)
PC, e164 address, SSN, TT
CAMEL Requirements:
Cingular is implementing Hot line OD on CAMEL SCP
SSN, TT, PC, e164 address
8/8/2019 CoreCSDesignrequirements
13/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 13
Emergency call setup requirementsE911 & 11 Routing:
Implementation methods:
Phase 2: RRC redirect is used, 911 call is forced to go on GSM network for phase2 support.
Phase 1 is used as fall back for Phase 2 on UMTS network
Phase1 and Phase 0: Call is handled on UMTS network.
Phase 0 is used as fall back for phase 1.
E911 Architecture. Connectivity to GMLC PSAPs
List of Node with LAC, RAC, SAC, ESRN, ESRK, default routing number, PSAP
Name, E911 Phase supported
GMLC PC, e164 address.
E911 Trunks for GMLC (Incoming, Loop around)
E911 ISUP Trunks to PSAP: Since some PSAPs dont have ISUP trunks.
Trunks to PSAP Selective router.
using IMT trunks for routing to PSAP via GSM MSC.
8/8/2019 CoreCSDesignrequirements
14/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 14
NDER Tabs for Core CS
Translations - UMTS MSRNs HONs
Translations - Local NPA
Translation - ADC-SAC
Translations -LRN
Translations - PSTN Routing Translations- VM Routing
Translations- arred Codes
Translations - CAMEL Routing
Translations - Announcement
Topology Diagram (Albuquerque)
Network Planning
RNC Data - Node 911
Alcatel RSP-ESE-ATM
IP Subnets
SS Network
Physical Connectivity
Translation-IRAT
Transport- pMGW T1 -OC3
mapping Interconnect - Trunk Groups
Interconnect-Route list
Sample ER -
Microsoft Excel
Worksheet
8/8/2019 CoreCSDesignrequirements
15/15
October 4, 2010Lucent Technologies Proprietary
Use pursuant to company instruction 1
NDER- Core CS Design Requirements
Q&A
Than you for ha ing me!