02.07.07 BILCW 07 - Beijing BILCW 07 - Beijing 1 Conventional Facilities and Siting GG Conventional Facilities and Siting GG Global Design Effort Global Design Effort Conventional Facilities and Conventional Facilities and Siting Global Group Siting Global Group Summary Report Summary Report A. Enomoto, J-L Baldy, V. Kuchler A. Enomoto, J-L Baldy, V. Kuchler

Conventional Facilities and Siting Global Group Summary Report

Embed Size (px)

DESCRIPTION

Conventional Facilities and Siting Global Group Summary Report. A. Enomoto, J-L Baldy, V. Kuchler. Overview of Parallel Session General Discussion of CFS Work with Regard to RDR, EDR, Regional Site Dependent Engineering and General Timeline to Start of Construction - PowerPoint PPT Presentation

Citation preview

Page 1: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 1

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

Conventional Facilities and Conventional Facilities and Siting Global GroupSiting Global Group

Summary ReportSummary Report

A. Enomoto, J-L Baldy, V. KuchlerA. Enomoto, J-L Baldy, V. Kuchler

Page 2: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 2

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

Overview of Parallel SessionOverview of Parallel Session• General Discussion of CFS Work with Regard General Discussion of CFS Work with Regard

to RDR, EDR, Regional Site Dependent to RDR, EDR, Regional Site Dependent Engineering and General Timeline to Start Engineering and General Timeline to Start

of of ConstructionConstruction• Review and Discussion of Previous Project Review and Discussion of Previous Project

Schedules and Development of a Draft Schedules and Development of a Draft CFS CFS Work ScheduleWork Schedule• General Discussion of the Content and General Discussion of the Content and Expectations of the Engineering Design Expectations of the Engineering Design Report and the Resulting Impact on CFS Report and the Resulting Impact on CFS Work Schedule and the Development of CFS Work Schedule and the Development of CFS

Work PackagesWork Packages

Page 3: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 3

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

Short Term PlansShort Term Plans• Complete Required CFS Text for RDR by April 2007Complete Required CFS Text for RDR by April 2007• Finalize of CFS RDR Support DocumentFinalize of CFS RDR Support Document• Prepare CFS Response to the Report of the Daresbury ILC Prepare CFS Response to the Report of the Daresbury ILC

Machine Advisory Committee ReviewMachine Advisory Committee Review• Begin Formal Investigation of Near Surface/Cut and Cover Begin Formal Investigation of Near Surface/Cut and Cover

Design SolutionsDesign Solutions• Review Regional Requirements for Project Development, Review Regional Requirements for Project Development, Approvals and Site Selection Processes and Identify Approvals and Site Selection Processes and Identify Similarities and DistinctionsSimilarities and Distinctions• Review Existing Project SchedulesReview Existing Project Schedules• Begin to Define the Requirements that Could be Used to Begin to Define the Requirements that Could be Used to Develop Bid to Host/Regional Interest DocumentsDevelop Bid to Host/Regional Interest Documents• Participate as Needed in the Development of the ILC Project Participate as Needed in the Development of the ILC Project

Management SystemManagement System

Page 4: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 4

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

Profile of CFS Design ProcessProfile of CFS Design Process• CFS, and the Entire Project, is Entering into the CFS, and the Entire Project, is Entering into the Transition Period from RDR to EDRTransition Period from RDR to EDR• While the Transition will be Different for Various While the Transition will be Different for Various

Parts of the Machine, Portions of the CFS Parts of the Machine, Portions of the CFS Transition are Dependent on Regional Decisions, Transition are Dependent on Regional Decisions, Requirements and Approvals Requirements and Approvals • These Regional Impacts Vary in TimeThese Regional Impacts Vary in Time• International and GDE Definitions Need Consensus International and GDE Definitions Need Consensus

for Effective Progressfor Effective Progress• Funding Availability will Impact Progress on the Funding Availability will Impact Progress on the Overall CFS Design EffortOverall CFS Design Effort• Regional Input for Portions of the CFS Effort will Regional Input for Portions of the CFS Effort will

also Impact the Overall Project Schedule also Impact the Overall Project Schedule

Page 5: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 5

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

-5 -4 -3 -1 +1 +2 +3 +4 +5 +6 +7

T0 = 20122007

-2

RDR/Reviews

Bid to Host Specs

Preparation of Bids to Host

Site Selection Process

EDR (All CFS)

Site Investigations

Call for Tender Preparation (CE Works + early Services)

Call for Tender Procedure (CE Works + early Services)

Contract(s) Placing(CE Works + early Services)

Administrative Procedures+ Site Preparation Utilities

CE + other CFS Works

Machine Supply, Install, Assembly

Commissioning

R&D

TENTATIVE OVERALL TIME SCHEDULE2018

Selection of Main Consultants

Site Independent Eng. Studies(All CFS)

Page 6: Conventional Facilities and Siting Global Group Summary Report

02.07.07 BILCW 07 - BeijingBILCW 07 - Beijing 6

Conventional Facilities and Siting GGConventional Facilities and Siting GGGlobal Design EffortGlobal Design Effort

Summary and ConclusionsSummary and Conclusions• The Process of International Site Selection will The Process of International Site Selection will have a Substantial Influence on the Planning of have a Substantial Influence on the Planning of CFS Work Forward to the Start of ConstructionCFS Work Forward to the Start of Construction• Completion of CFS Short Term Plans will ProceedCompletion of CFS Short Term Plans will Proceed• Development of Work Packages will Follow the Development of Work Packages will Follow the Development of the CFS Project ScheduleDevelopment of the CFS Project Schedule• The GDE Project Management Structure will also The GDE Project Management Structure will also

Influence the Progress of the CFS GroupInfluence the Progress of the CFS Group• Specific Definition and Direction from the GDE Specific Definition and Direction from the GDE Project Management Structure as well as the Project Management Structure as well as the Various Regional Interests will Facilitate the Various Regional Interests will Facilitate the Overall Planning ProcessOverall Planning Process