Contractor and Facility Safety Programs
February 12, 2016By: Ryan Sawall and Kevin Maitland
Core Values
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
5
Upstream benchmarks
BIM 360
Bench Mark Data
�Downstream
�After incident
�Upstream
�Before incident
8
CHFM Summary
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
9
Safety orientations
Planning work
Enforcement of polices
Make It Count! 13
428 Violations by 88
14
� Assistant Superintendents
� Superintendents
� Project Engineers
� Assistant Project Managers
� Project Managers
� Director
� VP Operations
� Safety Geeks
Safety Enforcement
Make It Count! 15
Falls = 220 warning = 100time off = 115
removed = 5PPE = 94 warning = 83
time off = 8removed = 3
Other = 114 warning=76time off = 23
removed = 15TOTAL = 428
Safety training
4 Elements of Safety Program
�Management Commitment
�Workplace Analysis
�Hazard Prevention and Control
�Safety and Health Training and Education
17
CHFM Summary
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
18
Fire Protection
ABCK
PASS
Infrared Technology
Heat detects problem
before it occurs
CHFM Summary
Water Infiltration Protection
Fire Protection
�NFPA 99 –Healthcare Codes
�Fire Extinguisher Classes A B C K
�Extinguishers placed 150’ apart
� Infrared Camera
�Maintain sprinkled areas
25
CHFM Summary
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
�Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
26
LOTO Plan
Lock Out Tag Out (LOTO)
LOTO Energy Sources
Lockout Tagout
�All energy sources
�De-energize and bleed the system
� Individual locks with tags
�Never cut off a lock
�Maintain log
30
CHFM Summary
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
31
Site IH reminders
� Communicate and work with IC staff
� Preplan IC
� Establish primary project boundaries
� Locate fresh air intakes for HVAC
� Protect against recycle of exhaust into HVAC supply
Isolation
� Set isolation walls as required
� Hard vs. soft
� Floor to ceiling or floor to deck
� High Risk areas
� (ICU, OR, Labor and Delivery, Cancer, Dialysis)
� May require secondary walls
(Vestibules, 2 door entry/exit)
Containment
� Exhaust/Air Filtering
� Direct to outside space – May still need filtration
� Through existing exhaust – Make sure it is direct to outside with no tie-ins
� Negative Pressure –maintain 0.02” H2O
� Magnehelic Gauges
� Electronic Monitors with local display and alarms (local and remote)
Containment
� Monitor pressure drop across HEPA filters
� Walk-off mats
� Keep clean change as needed
� Tacky mats
� Change as needed – multiple times/day
Containment
� Keep material covered when removing
� Wipe down the outside
� Including tools, ladders and supplies
� Check workers for contamination
� Vac off clothes
� Use disposable coveralls
Infection Control ICRA
� Infectious Control meeting EARLY
�Risk assessment
�Specific hazards and protection levels
�Post plan at construction door
�Monitor 24/7
48
CHFM Summary
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
49
Site Specific Topics
� Glove use
� Electrical – assured grounding
� Fall protection
� Emergency evacuation
� Hazard communication
� Overhead protection
Site Inspections
� Scaffolds – daily
� Crane – daily, monthly, annual
� Aerial lifts – daily
� Forklifts – daily
Site Permits
� Hot work
� Roof access
� Confined space
Site Training/Certifications
� Certified crane operators
� Certified forklift operators
� Rigging and signaling
� Aerial lift
� Confine space
Safety focus items
� Post Incident Reviews
� Floor Opening Program
� High Visibility Vests/Shirts
� Falling Object Prevention /Protection
Safety focus items
� Properly using step ladders
� No keys in equipment/vehicles
� No free rigging
� Kevlar sleeves above ceiling tile
Above ceiling protection
Safety focus items
� Heat stress prevention/protection
� Managing the Human Element
� Stretching exercises daily
Agenda
�Bench Marks
�Effective Safety Programs
�Fire Protection
� Lockout Tagout
� IH Program
�Best Practices
�Questions/
Concerns
59
You would not be
allowed to do this at
work
Please don’t do this
at home
Take safety home
with you
www.mccarthy.com