Contra Costa Community College District Project and Construction Management RFQ Non-Mandatory Pre-Proposal Conference 7/26/19 1

Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Contra Costa Community College District

Project and Construction Management RFQ Non-Mandatory Pre-Proposal Conference

7/26/19

1

Page 2: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Agenda Capital Improvement Bond Program Overview

o Introductions o Sustainability Goalso Major Active Projects

Request for Qualifications Overview Q & A

2

Page 3: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Welcome and IntroductionsContra Costa CCD, Facilities Planning Department Leadership: Ines Zildzic, Vice Chancellor, Facilities Planning & Construction

Kathleen Halaszynski, Director, Construction Program Controls

P.J. Roach, Facilities Project Manager

Ben Azarnoush, District Design Director

Tracy Marcial, Energy & Sustainability Manager

Ben Cayabyab, Contracts Manager

Fiscal and Document Control Support Staff

Our partners: DVC, CCC, LMC Administration, M&O Directors, IT Managers, Users and Academic

Deans

3

Presenter
Presentation Notes
We provide centralized and comprehensive facilities planning, program and construction management functions serving our colleges in: The planning, design management, procurement, construction and implementation of a large scale, multi-project capital improvement program Capital improvement program activities reside at the District Office with project teams on each campus Districtwide physical plant is approximately 1.5 million gross square feet (gsf) Integrated team approach providing full program and project cycle activities Oversight of multiple funding source program budgets, cost and schedule management, reporting, communications and end users management
Page 4: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Contra Costa CCD At a Glance Three Campuses and two Centers Contra Costa College –San Pablo Diablo Valley College – Pleasant Hill San Ramon Campus

Los Medanos College – Pittsburg Brentwood Center

District Office – Martinez

50,323 Students / 4,559 Employees

$856.5M Capital Improvement Program

3 Local Bond Measures: Measure A 2002 $120M – closed out Measure A+ 2006, $286.5M – in

progress, 90% spent Measure E 2014, $450M – in progress

*$300M + Remaining*Multiple Funding Sources*Concurrent schedules, multiple sites

4

Page 5: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Program Overview

Over 30 active projects districtwide $4.5M in Proposition 39 funds = large number of executed projects and ongoing Districtwide sustainability initiatives Projects in various stages of planning, design and constructionMultiple funding sourcesConcurrent schedules; all college sites with active construction

2020-2025 Districtwide Strategic Plan completed2020 Accreditation - Facilities Master Plans, District and Colleges focused standards and guidelines, future bond preparation efforts.

5

Page 6: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Sustainability Goals All New Buildings & Major Renovations LEED Silver Target

State Mandates Driving our Goals◦ By 2030 - 50% of all existing buildings must be retrofit to ZNE

◦ Buildings under construction now will be existing buildings in 2030◦ ZNE Ready is MORE than roof ready for solar PV◦ Driving the energy use intensity down during design is FUNDAMENTAL

◦ By 2045, achieve statewide carbon neutrality – GHG Reductions◦ Moving toward electrification of our buildings (all electric heating, domestic

hot water, etc)

◦ By 2020 –75% waste diversion from landfill◦ Water use allowed in new buildings continues to ratchet down

6

Page 7: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

LOT 4LOT 3 LOT 2

LOT 1

LAKE

SOCCER

BASEBALL

POOL

LOT 5

LOT 7LOT 8 LOT 9

GOLF CLUB RD

VF

GYMPEO

ML

LOT10

M

ET

ET

L

PSLHS

SC

AB

LC

BC

MA

WL

PE

W

COURTS

SSC

HSF

A A

AOPAC

LAFO SU

AR

BFLH

ECN

ECS

C

PPOOLL

GYMPEOO

ML

LLOOT10

WL

PET

00

A A

AAAAAOOOOOOOOOOOOOOO

LAFO

C

ET

ET

LC

NEW ART COMPLEXEST CONST. 3/2020 - 12/2021 OCCUPANCY: 01/2022 DEMO (E) OLD MAINT. BLDG. TOTAL PROJECT BUDGET: $47M

AC

N

1. D-4012NEW PE/KINESIOLOGY COMPLEX EST. CONST. Demo Oct. 2019 Main project: 3/2020 - 4/2020 OCCUPANCY Spring/Summer 2022

TOTAL PROJECT BUDGET: $49M

L

3. NEW ACADEMIC COMPLEX EST. CONST. 10/2022 - 12/2024 OCCUPANCY: 01/2025 TOTAL PROJECT BUDGET: $58M

DEMO (E) FO, LA, & COUNSELING BLDGS.

ET BUILDING RENOVATIONEST.CONST:11/2024-09/2025 OCCUPANCY:12/2025 TOTAL PROJECT BUDGET: $11M

4.LEARNING CENTERRENOVATIONEST. CONST. 07/2024 - 3/2026 OCCUPANCY: 08/2026 TOTAL PROJECT BUDGET: TBD

2. D-4014

5.

SC

SCIENCE HILL DEMO ALL BLDGS.DEMO START FALL 2026 PROJ BUDGET NOT SET

7.FUTURE SITE DEVELO[PMENT EST. DEMO START FALL 2025 TOTAL PROJECT BUDGET: TBD

6.

DVC PLEASANT HILL CAMPUS, MEASURE E MAJOR BUILDING PROJECTSALL DATES SUBJECT TO CHANGE. ALL PROJECT WORK LIMIT LINES ARE I VIKAPPROXIMATE.NG DR 09/30/17: Facilities Planning

UNDERGROUND SITE UTILITIESAll utilities part of PE/K, Art Complex and CP HV ELECTRICALPOTABLE WATERSANITARY SEWERGASSTORM DRAINIRRIGATION (RECLAIMED WATER) TELEPHONECOMMUNICATIONS BUDGET: $4M

LOCALIZED ADA ISSUES MULTIPLE ADA PATH OF TRAVEL ISSUES ALONG THIS EDGE AS GRADE TRANSITIONS FROM GYM LEVEL TO LAKE LEVEL.

CENTRAL PLANT SCOPE INCLUDES SERVICES TO PE/K BUILDINGS & POOL, ART COMPLEX PROJECTS. BUDGET: $7M for site utilities; CP will be part of the Art Complex project construction

A.0

OTHER PROJECTS: * CLASSROOM DESIGNSTANDARDS* BUILDING SYSTEMS:MECHANICAL UPGRADE & CONTROLS RETROFIT * ELECTRICALSWITCHGEARREPLACEMENT* OTHERINFRASTRUCTURE UPGRADE PROJECTS* CAMPUS ADAIMPROVEMENTS

Page 8: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Diablo Valley College – Pleasant Hill CampusPhysical Education/Kinesiology ComplexStatus: Project in DSA; Early construction work for site utilities for Art and PE/K site utilities –in construction; swing space in progress. Demolition construction October 2019 –February 2020

Construction Start: March, 2020 with Art ComplexPlanned Completion: Spring 2022 Total SFT: 30,000, multiple buildingsTotal Budget: $49M Design team: HMCDelivery method: DBB

8

Page 9: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Diablo Valley College – Pleasant Hill CampusArt Complex

Status: In DSA; Early construction work for site utilities for Art and PE/K site utilities –in construction; demo warehouse done.

Construction Start: March, 2020 with PE/KPlanned Completion: Spring 2022 Total SFT: 37,000 Total Budget: $47M Design team: HMCDelivery method: DBB

10

Page 10: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

DVC PE/K and Art Complex - Coordination

9

Page 11: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Diablo Valley College – Pleasant Hill CampusAcademic Center

Status: Predesign Evaluation of project program requirements, location and SFT

Total SFT: 68,000Total Budget: $58MDesign Team: TBDDelivery: TBD

21

Page 12: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

C-4001 Campus Safety

Center

C-608 - PE/K C-4008 AA Building Renovation

C-4008 Future B&G

C-4025Future

Campus Site Work

Parking Lot 12

C-4016 New Science

Building

C-4016 Incr. 3 Future Land Bank

Bldg. Removal

eileen
Line
eileen
Polygonal Line
eileen
Polygonal Line
eileen
Line
eileen
Line
eileen
Line
eileen
Polygonal Line
eileen
Polygonal Line
eileen
Line
eileen
Line
eileen
Polygonal Line
eileen
Line
eileen
Polygonal Line
eileen
Line
Page 13: Contra Costa Community College District PM_CM...PS LHS SC AB LC BC MA WL PE W COURTS SSC HSF A A AO PAC FO LA SU AR BFL H ECN ECS C POOL PEO GYM ML LOT 10 WL PE AO FO LA ET ET LC NEW

Contra Costa College – New Science BuildingStatus: DSA Approved!Early increments for demolition and site work are close to completion

Construction Start: Fall 2019Planned Completion: Fall 2021Total SFT: 50,000Total Budget: $67M Design Team: SmithGroupDelivery Method: DBB