Volume 27, Number 46 December 11, 2015 Construction Weekly By Kenneth S. Grossbart Abdulaziz, Grossbart & Rudman As all licensed contractors know, in order to operate as a contractor, you must have in place a contractor’s license bond. Many contractors satisfy this requirement by depositing with the Contractors’ State License Board the cash amount required by the Board. Although depositing money with the Contractors’ State License Board is acceptable, the greater majority of contractors obtain a bond from a licensed admitted surety, which will post the bond for you in exchange for a paid premium. The current amount of the license bond is $12,500.00. Senate Bill 467, is a bill that amends Business and Professions Code section 7071.6, and increases the $12,500.00 contractor’s license bond requirement to $15,000.00. Senate Bill 467 is now the law and has been approved. It becomes effective January 1, 2016. As stated, the amount of the bond will increase to $15,000.00. The last time that the bond amount was increased was January of 2008. The increase is long overdue. The increase in the amount allows for someone that makes a claim on the bond to now be able to recover a greater amount. Presently, $7,500.00 of the $12,500.00 bond is available to anyone that qualifies. Pursuant to Business and Professions Code section 7071.5, the additional $5,000.00 is made available to residential owners. Even though the penal sum of the bond amount increases to $15,000.00, the amount of $7,500.00 will remain the amount available to those who qualify. For those who qualify pursuant to Business and Professions Code section 7071.5, the entire $15,000.00 bond amount will be made available in residential situations. As a reminder, Business and Professions Code section 7071.6 still states that the CSLB can require twice the bond amount to be posted if there has been a violation pursuant to Business and Professions Code section 7028, which is regarding non-licensure. For those of you that hold an inactive license, the law remains the same, “No bond shall be required of a holder of a license that has been inactivated on the official records of the board during the period the license is inactive.” However, if reinstatement or reactivation is ever desired, a bond or cash deposit will be required. The Contractors’ State License Board and the bonding companies are currently working together to prepare themselves for the increase in the amount of the bond. The end effect is that all contractors’ license bonds will be increased by the sum of $2,500.00 by January 1, 2016. It is very important that you maintain a proper bond and therefore, very important that you contact your bonding agent or broker to make sure you have the proper bond in place. Lack of proper bonding will have a direct effect on your contractor’s license. Kenneth Grossbart is recognized as one of the foremost authorities in California construction law. Over the past 35 years, Ken has become a respected speaker on Mechanic’s Liens and other construction related issues. Abdulaziz, Grossbart & Rudman provides this information as a service to its friends & clients and it does not establish an attorney-client relationship with the reader. This document is of a general nature and is not a substitute for legal advice. Since laws change frequently, contact an attorney before using this information. Ken Grossbart can be reached at Abdulaziz, Grossbart & Rudman: (818) 760-2000 or by E-Mail at [email protected], or at www.agrlaw.com Nov / Dec 2015

Construction weekly december 11, 2015

Embed Size (px)

DESCRIPTION

 

Citation preview

Volume 27, Number 46 • December 11, 2015

Construction Weekly

By Kenneth S. GrossbartAbdulaziz, Grossbart & Rudman

As all licensed contractors know, in order to operate as a contractor, you must have in place acontractor’s license bond. Many contractors satisfy this requirement by depositing with theContractors’ State License Board the cash amount required by the Board. Although depositingmoney with the Contractors’ State License Board is acceptable, the greater majority ofcontractors obtain a bond from a licensed admitted surety, which will post the bond for you inexchange for a paid premium. The current amount of the license bond is $12,500.00.

Senate Bill 467, is a bill that amends Business and Professions Code section 7071.6, andincreases the $12,500.00 contractor’s license bond requirement to $15,000.00. Senate Bill 467is now the law and has been approved. It becomes effective January 1, 2016. As stated, theamount of the bond will increase to $15,000.00. The last time that the bond amount wasincreased was January of 2008. The increase is long overdue.

The increase in the amount allows for someone that makes a claim on the bond to now be ableto recover a greater amount. Presently, $7,500.00 of the $12,500.00 bond is available toanyone that qualifies. Pursuant to Business and Professions Code section 7071.5, theadditional $5,000.00 is made available to residential owners. Even though the penal sum of thebond amount increases to $15,000.00, the amount of $7,500.00 will remain the amountavailable to those who qualify. For those who qualify pursuant to Business and ProfessionsCode section 7071.5, the entire $15,000.00 bond amount will be made available in residentialsituations.

As a reminder, Business and Professions Code section 7071.6 still states that the CSLB canrequire twice the bond amount to be posted if there has been a violation pursuant to Businessand Professions Code section 7028, which is regarding non-licensure.

For those of you that hold an inactive license, the law remains the same, “No bond shall berequired of a holder of a license that has been inactivated on the official records of the boardduring the period the license is inactive.” However, if reinstatement or reactivation is everdesired, a bond or cash deposit will be required.

The Contractors’ State License Board and the bonding companies are currently workingtogether to prepare themselves for the increase in the amount of the bond. The end effect isthat all contractors’ license bonds will be increased by the sum of $2,500.00 by January 1, 2016.

It is very important that you maintain a proper bond and therefore, very important that youcontact your bonding agent or broker to make sure you have the proper bond in place. Lack ofproper bonding will have a direct effect on your contractor’s license.

Kenneth Grossbart is recognized as one of the foremost authorities in California construction law.Over the past 35 years, Ken has become a respected speaker on Mechanic’s Liens and other

construction related issues. Abdulaziz, Grossbart & Rudman provides this information as a service toits friends & clients and it does not establish an attorney-client relationship with the reader. This

document is of a general nature and is not a substitute for legal advice. Since laws change frequently,contact an attorney before using this information. Ken Grossbart can be reached at Abdulaziz,Grossbart & Rudman: (818) 760-2000 or by E-Mail at [email protected], or at www.agrlaw.com

Nov / Dec 2015

2 • Construction Weekly

Business Ads

Ohio National Cooperative Advertising Fund GuidelinesFormat ads may be altered in size and style, but not in content. The typestyle (Adobe Garamond) of the Ohio National Financial Services logo, as well as the logo itself, may not be altered.

Agent imprint: Agents may use their names, life insurance professional designations, and address and telephone numbers in this area. Designations such as JD and CPA may not be used (since agents are not representing the company in those capacities), as well as other titles containing terms such as insur-ance or financial consultant; financial, insurance or estate planner; financial or insurance counselor; insurance, financial or investment adviser; or other words implying an independent or non-representative capacity. For co-op reimbursement, general agents should submit: 1. a copy of the paid invoice. 2. tear sheet/photo of the ad. 3. completed Form 1914 (Request for Reimbursement), including approval number for the ad.

No payment will be made for advertising that does not comply with these guidelines.

Approval Number: A-0078-BU-002 Rev. 2-13

What You Don’t Know Can Hurt Your Business

What You Don’t Know Can Hurt Your Business

The Ohio National Life Insurance CompanyOhio National Life Assurance Corporation

You know your day-to-day business better than anyone. But, do you know the best ways to protect your key assets? Provide important employee benefits? Minimize your taxes? Reward yourself and reach your financial goals?

Help your business succeed by bolstering its long-term health. From individual life and disability income insurance, to 401(k) and simplified employee pension plans, we can help you make the right moves.

Call today for Free information and consultation.

Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI and NY. Disability income insurance not available in AK, CA, HI, ME and NY.

You know your day-to-day business better than anyone. But, do you know the best ways to protect your key assets? Provide important employee benefits? Minimize your taxes? Reward yourself and reach your financial goals?Help your business succeed by bolstering its long-term health. From individual life and disability income insurance, to 401(k) and simplified employee pension plans, we can help you make the right moves.

Call today for Free information and consultation.

The Ohio National Life Insurance CompanyOhio National Life Assurance Corporation

Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI and NY. Disability income insurance not available in AK, CA, HI, ME and NY.

Agent Name/Agency Name Street Address City, State ZIP 000.000.0000

Licensed in (List all states that apply)

Agent Name/Agency Name Street Address City, State ZIP 000.000.0000

Licensed in (List all states that apply)

Dennis J. Goldstrand, CLU, ChFC, AEPGoldstrand Planning Group

[email protected] W. March Lane, Suite 326 • Stockton, CA 95219-8202

Office: (209) 472-7000 • Toll Free: (800) 507-9911 • Fax: (209) 472-1551www.goldstrand.com

construction weeklyThe official publication of the

Builders’ Exchange of Stockton

7500 West Lane • Stockton, CA 95210Phone (209) 478-1000

Fax (209) 478-6507Plan Room (209) 478-1005

www.besonline.com

OFFICE HOURSMonday - Thursday 8-5

Friday 8-4

DIRECTORSTONY ARCEO, Grayson EngineeringDUSTIN SACCONE, Comfort Air, Inc.

RYAN HAGGERTY, Haggerty ConstructionJASON HJELMSTAD, Holt of California

J.J. JONES, United Rentals A&A Tool RentalsSCOTT LOVOTTI, Lovotti Air

TOM MAYO, Tom Mayo ConstructionTOM PATTI, Delta Cranes

AL TOCCOLI, Al Toccoli ConstructionNICK WOODY, Bockmon and Woody Electric Co.

OFFICERSAL TOCCOLI, President

JASON HJELMSTAD, Vice PresidentTONY ARCEO, Treasurer

TOM MAYO, Member at LargeNICK WOODY, Past President

STAFFMICHAEL SELF, Executive Director

[email protected] PUIG-HINK, Director of Events • Editor

[email protected] LARA, Bookkeeper

[email protected] ROBINSON, Administrative Assistant

[email protected]

• Contractor Connection Page 5

• Economic Update Page 7

• Classified Page 8

• Projects Out to Bid Pages 12-35

• Legal Notices Pages 36-37

• Tail Gate Topic Page 38

Contents

Construction Weekly • 3

4 • Construction Weekly

Call Steve for a Informational Webinar Presentation at 209.331.3216http://www.raymorgan.com/welcome_builders_exchange

Ray Morgan CompanyDOCUMENT TECHNOLOGY SOLUTIONS

Do you need Document Management?

Build Better Business Processes From the Job Site to the Corporate O�ce and Access All Your Information from Wherever You Are

Local insurance solutions for the construction industryWells Fargo Insurance delivers an outstanding combination of resources with excellent local service and support. And, as part of Wells Fargo & Company, we can provide access to financial solutions to help ensure your success.

Bonds | Insurance | Construction risk management

Wells Fargo Insurance Services USA, Inc. Dave Weise10940 White Rock RoadRancho Cordova, CA 95670916-589-8035 | [email protected]

Products and services are offered through Wells Fargo Insurance Services USA, Inc., and Wells Fargo Insurance Services of West Virginia, Inc., non-bank insurance agency affiliates of Wells Fargo & Company.

Products and services are underwritten by unaffiliated insurance companies except crop and flood insurance, which may be underwritten by an affiliate, Rural Community Insurance Company. Some services require additional fees and may be offered directly through third-party providers. Banking and insurance decisions are made independently and do not influence each other.

© 2013 Wells Fargo Insurance Services USA, Inc. All rights reserved.

040113AMb_Builders_Exch_ad color.indd 1 4/3/2013 12:50:58 PM

Commercial Residential Design/Build

Al Toccoli • General [email protected]

(209) 639-7608 • Fax (209) 931-3513License #522916

We reported several months ago that the governor had signed legislation that, effective January 1, 2016, will simplify the home improvement salesperson registration process, significantly. Following is a press release from the CSLB:

The Contractors State License Board (CSLB) is moving quickly to implement a new law that will simplify the cur-rent Home Improvement Salesperson (HIS) registration process. The new law takes effect January 1, 2016.

Senate Bill 561 (Monning) simplifies the process to a single registration, while still allowing salespersons to represent multiple employers. The new law removes the current requirement that an HIS register separately with CSLB for each contractor that employs them.

As part of the implementation process, CSLB is notifying by mail the more than 14,000 currently registered HIS in order to update and convert all HIS registration records. Letters are also being sent to licensees who employ regis-tered salespersons.

CSLB encourages all HIS registrants as well as licensees who employ salespersons to review and verify HIS details via CSLB’s online Instant License Check , and take steps immediately to correct any inaccurate or outdated infor-mation by filling out a form and sending it to CSLB.

In addition to the single registration, the new law requires licensees to notify CSLB in writing prior to employing an already registered HIS, and to notify CSLB in writing when employment of a registered HIS ends. These new forms will be available on the CSLB website beginning January 1, 2016.

Construction Weekly • 5

Contractor Connection

2120 28th Street • Sacramento, California 95818 • 916-451-1114 direct • 916-451-1118 fax • [email protected]

CSLB Taking Steps to Implement New, Simplified Home Improvement Salespersons Registration

ProcessLicensees should also be aware that a HIS is defined in Business and Professions (B&P) Code section 7152 as a person who is employed by a licensed contractor to solicit, sell, negotiate, or execute contracts for home improvements, for the sale, installation or furnishing of home improvement goods or services, or of swimming pools, spas, or hot tubs.

The HIS registration requirement does not apply to those who only sell goods or negotiate contracts at a licensee’s fixed business establishment, where the goods orservices are exhibited, or persons who contact prospec-tive buyers for the exclusive purpose of scheduling ap-pointments for a registered HIS.

Licensees should also use this as an opportunity to reg-ister any currently unregistered HIS. B&P Code section 7154 states that a home improvement contractor who employs an unregistered salesperson is subject to disci-pline by CSLB.

Licensees or registrants with questions about the new law, or who want to learn more about the HIS process are encouraged to visit the applicant section of the CSLB website, or call CSLB’s Licensing Information Center at 1-800-321-CSLB (2752).

For a copy of the press release which also contains a side by side comparison of the existing requirements to the new requirements, please go to:

http://www.cslb.ca.gov/Media_Room/Industry_Bulle-tins/2015/November_12.aspx

6 • Construction Weekly

Requesting subbids from all Qualified DBE, Subcontractors and Materials Suppliers for the following project:

Vehicle Maintenance Shop & Administration BuildingModesto, CA

Acme Construction Co., Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all work including but not limited to materials, labor and equipment. Acme Construction Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. DBE goal is 21% participation. Acme will pay bond premium up to 2%. Insurance Waiver of Subrogation also required. However, Certified DBE are encouraged to contact Acme and request for assistance if unable to meet Acme’s standard bonding or insurance requirements. DBE are also encouraged to contact Acme for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services.

Project is Federally funded and is subject to the Buy America Act and Federal Wage rates as well as State Prevailing Wage rates. Equal Employment Opportunity Form MUST BE SUBMITTED WITH PROPOSAL. (See attached form). Cost breakdown for each Shop and Administration Building requires as well as unit prices.

Bids December 16, 2015 @ 2:00 PM

ACME CONSTRUCTION COMPANY, INC. P.O. Box 4710

Modesto, CA 95352 (209) 523-2674 and (209) 523-0213 (Fax)

Contact Mike Mastagni – ext. 106 [email protected]

All Subcontractors may be required to furnish sub-bond

We are an Equal Opportunity Employer

Weekly Economic Update provided by Dennis Goldstrand

For disclosure information contact Dennis Goldstrand at (209) 472-7000. 2800 West March Lane, Suite 326 • Stockton, CA 95219

www.goldstrand.com • [email protected]

Construction Weekly • 7

8 • Construction Weekly

Employment Opportunities

Classified

Account ManagerThe Account Manager position manages Service Providers from various angles including but not limited to: scheduling, workman-ship, cost, scope compliance and overall customer satisfaction. Additionally, they assist with Service Provider selection and ongoing management. 25-30 Hours per week. Please email resumes to Jaclyn Frenzel at [email protected] or to see a full job position description.

SEEKING Employment

Project ManagerProactive, competitive construction professional Project Manager / Construction Estimator experienced in all levels of residential, com-mercial, light commercial and industrial projects including heating, ven-tilation & air conditioning, sheet metal, electrical, plumbing, foundation, carpentry, landscaping, solar, civil, architectural and structural design per all related code requirements. Contact Mark at 209-474-3894.

• Brakes• Chassis

• Suspension• Cooling Systems

Monday-Friday 7:30am - 4:30pm2700 Waterloo RdStockton, CA 95205(209) 466-0641

For over 81 years, Peirano’s Automotive has been delivering the highest quality in professional

automotive repair and maintenance services.

• Diagnostic Services• Differentials

• Diesel• Heavy Duty Repair

• Transmissions• A/C Service – Sales

• Tune-ups•Oil Changes (209) 981-2288

[email protected]

1150 W. Robinhood Dr. Ste. 3BStockton, CA 95207

Your Best Real Estate Resource!

Find me and my business on Facebook!

Call or Message me for an estimate of your home’s value or a free MLS Property Search account!

“Rich’s patience, expertise, and professionalism made our home buying experience truly pleasurable.” –Silvia and Chris Rodriguez

Construction Weekly • 9

Commercial Doors, Builder’s Hardware,

Toilet Partitions, General Hardware & More

924 E. Church Street, Stockton, CA 95203 WWW.CVHARDWARE.COM

Phone (209) 464-7305 * Fax (209) 464-1737

We Offer:Medical, Dental, Vision and MORE!

For a complete list of products go to www.cbxbenefits.com

For More Information:Denise Haycock - Benefits Consultant

800-595-1339 or [email protected]&A Insurance Marketing, CA License #0B17048

Membership has its Benefits...

10 • Construction Weekly

Construction Weekly • 11

800-UR-RENTSunitedrentals.com

Rentals • Sales • Service • Supplies Consider it done.tm

• Widest selection of construction equipment• In-stock availability of over 9,000 contractor supply

items• Helpful, expert staff to assist with your project• On site maintenance, equipment and safety training• Delivery to your job site• Nearly 700 locations

Working with You from Start to Finish

Visit us today:Stockton #1 Rental Store2911 East Fremont StreetStockton, CA 95205209-948-9500

Branch hours: Weekdays 7:00am - 5:00pm

GSA #: GS-06F-0068R

Steven PerryTerritory ManagerModesto District - Ready Mix

131 Vultee AvenueShafter, California 93263 USADispatch (209) 529-4115 EXT 2/ FAX (661) 215-6054Mobile (209) [email protected] / WWW.CEMEXUSA.COM

VIP LUNCH CLUB

FOR GREAT MEALS AT MIDGLEY’S PUBLIC HOUSE LOCATED IN THE LINCOLN CENTER20% Discount Cards Available at the Exchange

Pick up your reusable VIP Discount Lunch Club Card or call to have them sent to you.

EXCLUSIVE OFFER!Stockton BuilderS’ exchange MeMBerS only!

Stockton Exchange ~ 7500 West Lane • (209) 478-1000Midgley’s ~ 296 Lincoln Center • (209) 474-7700

20% DISCOUNT

12 • Construction Weekly

CSI SPECIFICATION

LEGEND-DIVISIONS

1 General Requirements 2 Sitework 3 Concrete 4 Masonry 5 Metals 6 Wood/Plastic 7 Thermal/Moisture Protection 8 Doors/Windows 9 Finishes10 Specialties11 Equipment12 Furnishings13 Special Construction14 Conveying system15 Mechanical16 Electrical

Projects out to bid

December 14

LANDFILL GAS TO ELECTRICITY OPERATION AND MAINTENANCEYolo County Plan OnlineOnlyProject #: 9198Bid Date: 12/14/2015 3:00 PM Yolo County Planning, Public Works Services (530) 666-8775Addenda: 0Description: Yolo County is seeking a qualified and experienced contractor to operate and maintain the landfill gas to electricity facility at the Yolo County Central Landfill.

PAYLESS SUPER STORE San Jose Plan OnlineOnlyBid Date: 12/14/2015 5:00 PM Marco Contractors, Inc. 724-741-0300Addenda: 0Description: Work consists of Se-lective demolition, steel, drywall/acoustical, carpentry, roofing, doors/frames/hardware, rolling grille, glass/glazing (storefront, break meal), flooring, paint/wallcovering, plumbing, sprinkler, HVAC, electrical fire alarm, EMS

ON-CALL GENERAL CON-TRACTING SERVICESSacramento Plan OnlineOnlyProject #: P16014541005Bid Date: 12/14/2015 2:00 PM Estimated Cost: $0 to $250,000Prebid: 12/2/15 at 10:00amAddenda: 2Description: This Request for PROPOSALS (RFP) solicits qualification statements from local professional construction firms for the purpose of establishing an on-call list to assist our facilities staff on future commercial facili-ties projects designated as small projects. For the purposes of this RFP, a small project is defined as a project not exceeding $250,000 in total project cost, and may include, but is not limited to, public buildings and facilities, public safety facilities, community centers, libraries, park facilities, pools, corporation yards, and offsite improvements.

GENERAL CONTRACTOR / CONSTRUCTION MANAGER FOR SHOCKLEY TERRACESelma Plan OnlineOnlyProject #: P15011Bid Date: 12/14/2015 4:00 PM Fresno Housing Authority 559-445-8965Prebid: 12/2/15 at 11:00 amAddenda: 0Description: The Fresno Hous-ing Authority (FH) is requesting proposals from licensed general contractors/construction manag-ers for pre-construction services and construction phase services associated with the new construc-tion of 48 multifamily housing units at 1445 Peach Street, Selma, California. Work shall in-clude all professional fees, profit, overhead and general require-ments, insurance and bonding, as set forth in the General Scope of Work, and in a condition accept-able to the FH.

ROOF REPLACEMENT SER-VICESRoseville Plan OnlineOnlyProject #: 01-3063Bid Date: 12/14/2015 3:00 PM City of Roseville - Purchasing 916-774-5720Estimated Cost: $0 to $32,000Prebid: MAND 12/7/15 at 8:30 amAddenda: 0Description: Replace +/- 1,500 SF of roofing on an electrical control house building.

CONSTRUCTION MANAGER AT RISK FOR THE UPGRADES TOTHE INTERNATIONAL AR-RIVALS BUILDING PROJECT AT THE OAKLAND INTERNATIONAL AIRPORTOak-land Plan OnlineOnlyProject #: X2015-10-A1Bid Date: 12/14/2015 2:00 PM Port of Oakland 510-627-1281Prebid: MAND 11/16/15 at 2:00 pmAddenda: 1Description: See specifications for details.

December 15BACKHOE AND BORING THROUGH 2018Sacramento County Plan Onli-neOnlyProject #: 150349.CABBid Date: 12/15/2015 5:00 PM SMUD 916-732-5607Estimated Cost: $0 to $4,900,000Prebid: 12/1/15 at 10:00am - ONLINEAddenda: 0Description: The Contractor shall furnish all supervision, labor, ma-terials, equipment and incidentals necessary to accomplish the work in accordance with the Contract. The work generally consists of providing backhoe and trench-ing equipment (including fuel and maintenance) and qualified journey level operators, spotters and a driver with valid Class A licenses to excavate safely in all types of conditions for under-ground construction, and installing conduit, pull boxes and lids.

Construction Weekly • 13

Projects out to bidSUTRO ELEMENTARY SCHOOL WINDOW REPLACEMENTSan Francisco Plan OnlineOnlyProject #: 11037Bid Date: 12/15/2015 2:00 PM San Francisco Unified School District (415) 241-6158Estimated Cost: $0 to $480,000Prebid: MAND 11/23/15 or 11/30/15 at 3:30pmAddenda: 0Description: Window and window covering removal and replace-ment with associated flashing, finishes (cutting/patching and repair) and hazardous material abatement. Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 CLW Builders, Inc., San Fran-cisco PH: 415-333-9788 FAX: 415-333-9787 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

TRAFFIC SIGNAL IN AT THE INTERSECTION OF BARSTOW AND BRAWLEY AVENUESFresno Plan OnlineOnlyProject #: 3436 - 11352Bid Date: 12/15/2015 3:00 PM City of Fresno 559-621-1332Estimated Cost: $0 to $408,600Prebid: 12/7/15 at 11:00 amAddenda: 0Description: The Scope of work includes, but is not limited to: Traffic signal and detector loop installation, crosswalks, signage and pavement markings, ADA compliant wheelchair ramp and minor concrete improvements and modifications to the streetlight system.

LAKESHORE ELEMENTARY SCHOOL WINDOW REPLACE-MENTSan Francisco Plan OnlineOnlyProject #: 11058Bid Date: 12/15/2015 3:00 PM San Francisco Unified School District (415) 241-6158Prebid: MAND 11/24/15 or 12/1/15 at 3:30pmAddenda: 0Description: Exterior Window Replacement, including but not limited to interior and exterior patching and painting at affected areas, demolition and hazardous material remediation and other misc. renovation work, replace-ment of fencing, and addition of new overflow drains on roof. Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 CLW Builders, Inc., San Fran-cisco PH: 415-333-9788 FAX: 415-333-9787 CWS Construction Group Inc, Novato PH: (415) 59-95585 FAX: (415) 20-90228 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

PARK MAINTENANCE MCKIN-LEY PARK POND MAINTE-NANCE AND TESTINGSacramento Plan OnlineOnlyProject #: B16191311003Bid Date: 12/15/2015 2:00 PM City of Sacramento 916-808-1458Addenda: 1Description: The City of Sac-ramento is requesting bids to provide pond maintenance and water quality monitoring.

REGUS -SAN FRANCISCO CENTER #3916San Francisco Plan OnlineOnlyBid Date: 12/15/2015 2:00 PM SD Deacon 916-969-0900Addenda: 0Description: Work consists of 34,395 s.f Office Tenant Improve-ment. Trades to include: demoli-tion, finish carpentry/cabinets/countertops, insulation, caulking, insulation, doors/frames/hard-ware, windows/glazing, drywall/metal framing, ceramic tile, acous-tical ceilings, resielient flooring, painting, wallcovering, window treatments, appliances, fire sprin-klers, plumbing, HVAC, electrical, fire alarm, telephone and data.

DELTA ISLAND ELEMENTARY SCHOOL DEMOLITION AND SITE GRADINGStockton Plan OnlineOnlyBid Date: 12/15/2015 2:00 PM Tracy Unified School District 209-830-3200Prebid: MAND 12/3/15 at 10:00 am Addenda: 0Description: Abatement and de-molition of all structures and site work including, but not limited to, all underground plumbing, electri-cal, irrigation, landscape, septic system and well as well as site grading and erosion control.

PLEASANT HILL REGENCY BUILDING PADPleasant Hill Plan OnlineOnlyBid Date: 12/15/2015 5:00 PM Woodland Construction 209-545-1987 Addenda: 0Description: All Site and Building Shell Related Construction Eleven Western Builders, Inc., Rocklin PH: 916-408-6950 FAX: 916-408-6955 STUART JAMES CONSTRUC-TION, INC., Rocklin PH: (916) 608-4800 FAX: (916) 608-4810

INDUSTRIAL AVENUE BRIDGE REPLACEMENT PROJECTRoseville Plan OnlineOnlyProject #: BRLS-5182(056)Bid Date: 12/15/2015 3:00 PM City of Roseville 916-774-5251Estimated Cost: $0 to $3,700,000Addenda: 0Description: Work replacement of the existing bridge over Pleas-ant Grove Creek and roadway improvements including: roadway widening and realignment, profile adjustment, utilities (including storm drain, sanitary sewer, water, irrigation and street lighting), con-crete curb, gutter, and sidewalk, and other minor improvements. Teichert Construction - Lincoln District, Roseville PH: 916-645-4800 FAX: 916-645-4801

WATER STORAGE TANK IN-SPECTION SERVICESTurlock Plan OnlineOnlyProject #: 15-337 Bid Date: 12/15/2015 3:00 PM City of Turlock - Engineering 209-668-5599Addenda: 0Description: The City of Turlock desires to solicit qualified Bids for Water storage tank comprehen-sive inspections, as described in Section 1, in accordance with this Request for Proposal. Award resulting from this RFP will be firm for one (1) year term contract with Turlock City Council approval.

14 • Construction Weekly

Projects out to bidCONTRACT FOR HUD-FUNDED FIRE STATION 1 BREEZEWAY IMPROVEMENTSBakersfield Plan OnlineOnlyProject #: 15-16-29Bid Date: 12/15/2015 11:00 AM City of Bakersfield 661-326-3746Estimated Cost: $0 to $70,000Prebid: 12/1/15 at 11:00amAddenda: 1Description: The City of Bakers-field is requesting bids from expe-rienced and reputable contractors for providing a Contract for HUD-Funded Fire Station 1 Breezeway Improvements. Vortex, Bakersfield PH: (661) 324-5846 FAX: (661) 324-5864

NEW SIDEWALKS FY16 - DON-ALD AVENUE & HAYWARD BOULEVARDHayward Plan OnlineOnlyProject #: 05268Bid Date: 12/15/2015 2:00 PM City of Hayward 510-583-4738Estimated Cost: $0 to $596,440Prebid: 12/2/15 at 2:30 pmAddenda: 1Description: The work consists, in general, of demolition of existing improvements, sawcutting, road-way excavation, hot mix asphalt deep lift, construction of concrete sidewalk, curb & gutter, driveway approaches, curb ramps, retaining curbs and performing other items or details, not mentioned above, that are required by the plans, Standard Specifications or these Special Provisions. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601

CAISO LINCOLN OPERATIONS CENTER IN LINCOLNLincoln Plan OnlineOnlyBid Date: 12/15/2015 2:00 PM Turner Construction 916-444-4421Addenda: 0Description: CAISO Lincoln Operations Center is a 35,800 sf two-story steel frame data/opera-tions center with precast concrete exterior along with associated site work Sitework and UG utilities began on 9/4/15. Foundations un-derway October 2015. Structural steel erection in Jan/Feb 2016. Substantial completion in Oct 2016. All subcontractors must be pre-qualified to submit a Proposal. It is assumed that the invited bid-ders were previously prequalified during the design/build competi-tion. THE DUE DATE FOR PRE-QUALIFICATION PACKAGES IS @ December 10, 2015 at 10:00 A.M. ONLY PRE-QUALIFIED SUBCONTRACTOR’S PROPOS-ALS WILL BE ACCEPTED. Pre-qualification packages may be requested from Lauren Bennett @ 916-554-7955 or via e-mail at [email protected].

December 16NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FLOOR-ING AND CARPETBakersfield Plan OnlineOnlyProject #: 3030Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $63,920Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide flooring and carpet for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 MA-SONRYBakersfield Plan OnlineOnlyProject #: 3015Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,128,711Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide masonry for completion of North High School Modernization Phase 2

RFP - CIVIL ENGINEERING SERVICES FOR CAREER AND TECHNICAL EDUCATION REGIONAL TRAINING CENTER (CTERTC) - 2015Bakersfield Plan OnlineOnlyProject #: 3345Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Addenda: 2Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015. NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 VERTI-CAL PLATFORM LIFTBakersfield Plan OnlineOnlyProject #: 3038Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $40,000Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide vertical platform lift for completion of North High School Modernization Phase 2.

TEMPORARY ROCK BARRIERS - 2016, 2017 & 2018Solano / San Joaquin Counties Plan OnlineOnlyProject #: 15-15 / C51517Bid Date: 12/16/2015 2:00 PM Department of Water Resources 916-653-4867Prebid: 12/1/15 at 10:00 amAddenda: 2Description: Construct / remove temporary rock barriers and appurtenances at Middle River, Old River and Grant Line Canal including placement and removal of Department furnished rock ma-terials, culverts, docks, articulating concrete mats and other accesso-ries; maintenance, refurbishment and/or replacement of appurte-nances; dredging; debris removal; slope protection; etc. Teichert Construction - Sacra-mento Office, Sacramento PH: 916-386-5800 FAX: 916-386-2392

MAE FONG PARK LANDSCAPE IMPROVEMENTSSacramento Plan OnlineOnlyProject #: B16190021009Bid Date: 12/16/2015 12:00 PM City of Sacramento 916-808-1458Estimated Cost: $97,500 to $107,200Addenda: 0Description: The work to be per-formed consists of developing the landscape improvements at Mae Fong Park in Sacramento at 3004 Redding Avenue. The improve-ments will consist of 0.75 acres, (clearing and grubbing, individual picnic area, concrete flatwork and mow curbs, site furnishings, disc golf baskets, irrigation and landscaping. Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

Construction Weekly • 15

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ORNA-MENTAL METALBakersfield Plan OnlineOnlyProject #: 3017Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $141,780Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide ornamental metal for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FIRE SPRINKLER SYSTEMBakersfield Plan OnlineOnlyProject #: 3039Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $163,663Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide fire sprinkler system for completion of North High School Modernization Phase 2 NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 HVAC AND SHEET METALBakersfield Plan OnlineOnlyProject #: 3041Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,069,948Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide HVAC and sheet metal for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ARCHI-TECTURAL WOODWORKBakersfield Plan OnlineOnlyProject #: 3019Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $123,070Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide architectural woodwork for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 TELE-SCOPING BLEACHERSBakersfield Plan OnlineOnlyProject #: 3037Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $271,181Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide telescoping bleachers for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 PAINT-INGBakersfield Plan OnlineOnlyProject #: 3031Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $159,416Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide painting for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 INSULA-TIONBakersfield Plan OnlineOnlyProject #: 3020Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $52,863Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide insulation for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 STRUC-TURAL CONCRETEBakersfield Plan OnlineOnlyProject #: 3014Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,185,172Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide structural concrete for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 TOILET PARTITIONS AND ACCESSO-RIESBakersfield Plan OnlineOnlyProject #: 3032Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $78,070Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide toilet parti-tions and accessories for comple-tion of North High School Modern-ization Phase 2.

PANERA BREAD # 4488San Jose Plan OnlineOnlyBid Date: 12/16/2015 10:00 PM Tilton Pacific Construction (916) 630-7200Addenda: 0Description: Concrete slab demo-lition, concrete, rough carpentry, finish carpentry, FPR, insulation, store front, metal stud drywall, ceramic tile, painting, roofing, restroom accessories, plumbing, HVAC, electrical, fire alarm.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 METAL ROOFINGBakersfield Plan OnlineOnlyProject #: 3022Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $425,000Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide metal roof-ing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 DOORS, FRAMES & HARDWAREBakersfield Plan OnlineOnlyProject #: 3023Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $361,230Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide doors, frames and hardware for comple-tion of North High School Modern-ization Phase 2.

16 • Construction Weekly

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 RESIL-IENT WOOD FLOORINGBakersfield Plan OnlineOnlyProject #: 3029Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $211,725Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide resilient wood flooring for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ACOUS-TICAL CEILING AND TECTUM Bakersfield Plan OnlineOnlyProject #: 3028Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $238,943Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide acoustical ceiling and tectum for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 DOORS, WINDOWS, GLASS AND GLAZ-INGBakersfield Plan OnlineOnlyProject #: 3025Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $132,110Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide doors, windows, glass and glazing for completion of North High School Modernization Phase 2.

RECONSTRUCTION OF SUMPS 40 & 146Sacramento Plan OnlineOnlyProject #: B16141321013Bid Date: 12/16/2015 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $0 to $925000Prebid: 12/4/15 at 9:00 amAddenda: 0Description: The City of Sacra-mento is soliciting sealed propos-als for Reconstruction of Sumps 40 & 146. Sealed proposals will be received by the City Clerk of the City of Sacramento at the Office of the City Clerk, City Hall, located at 915 I Street, 5th Floor, Public Counter, up to the hour of 2:00 p.m. on December 16, 2015. Proposals will then be opened and read as soon thereafter as business allows, in the Hear-ing Room, 2nd Floor Room, in Historic City Hall.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 OVER-HEAD COILING COUNTER DOORSBakersfield Plan OnlineOnlyProject #: 3024Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $26,610Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide overhead coiling counter doors for comple-tion of North High School Modern-ization Phase 2.

ORTH HIGH SCHOOL MODERN-IZATION PHASE 2 CERAMIC TILEBakersfield Plan OnlineOnlyProject #: 3027Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $168,710Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide ceramic tile for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 STRUC-TURAL STEEL AND MISC. IRONBakersfield Plan OnlineOnlyProject #: 3016Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $2,017,963Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide structural steel and misc.iron for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 LATH, PLASTER, DRYWALL AND METAL STUDS Bakersfield Plan OnlineOnlyProject #: 3026Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,777,587Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide lath, plas-ter, drywall and metal studs for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 GEN-ERAL CONSTRUCTIONBakersfield Plan OnlineOnlyProject #: 3018Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $169,603Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide general construction for completion of North High School Modernization Phase 2.

RFP - ENVIRONMENTAL (CEQA) SERVICES FOR CAREER AND TECHNICAL EDUCATION REGIONAL TRAINING CENTER (CTERTC) - 2015Bakersfield Plan OnlineOnlyProject #: 3344Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Addenda: 2Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015.

RFP - PRELIMINARY ENVIRON-MENTAL ASSESSMENT (PEA) SERVICES FOR CAREER AND TECHNICAL EDUCATION RE-GIONAL TRAINING CENTER (CTERTC) - 2015 Bakersfield Plan OnlineOnlyProject #: 3343Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Addenda: 2Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015

Construction Weekly •17

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ROOF-INGBakersfield Plan OnlineOnlyProject #: 3021Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $550,000Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide roofing for completion of North High School Modernization Phase 2.

PUBLIC WORKS VEHICLE MAINTENANCE SHOP AND ADMINISTRATION BUILDINGModesto Plan OnlineOnlyBid Date: 12/16/2015 2:00 PM Stanislaus County Public Works 209-575-5235Estimated Cost: $0 to $15,000,000Prebid: MAND 12/2/15 at 2:00pmAddenda: 1Description: Work consists of con-struction of vehicle maintenance and administration buildings and associated site and street improvements at County Center No. 4. Acme Construction, Modesto PH: 209-523-2674 FAX: 209-523-0213 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 F&H Construction, Stockton PH: 209-931-3738 FAX: 209-931-4427

SEISMIC RETROFIT OF PWTP CONTROL BUILDING (IRP2) AND PWTP CLEANWELL RE-COAT AND REPAIR PROJECTS (SECURED JOB)San Jose Plan OnlineOnlyProject #: 93764003 and 93234043Bid Date: 12/16/2015 2:00 PM Santa Clara Valley Water District 408-265-2600Prebid: MAND 11/30/15 at 2:00 pmAddenda: 0Description: See Specifications for details.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ELEC-TRICALBakersfield Plan OnlineOnlyProject #: 3042Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $2,391,743Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide electrical for completion of North High School Modernization Phase 2. NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE DEMOLITION & EARTHWORKBakersfield Plan OnlineOnlyProject #: 3008Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $900,000Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide site demoli-tion and earthwork for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SELEC-TIVE DEMOLITIONBakersfield Plan OnlineOnlyProject #: 3009Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $160,000Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide selective demolition for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FIRE ALARM SYSTEMBakersfield Plan OnlineOnlyProject #: 3043Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $112,000Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide fire alarm system for completion of North High School Modernization Phase 2

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 CHAIN LINK FENCINGBakersfield Plan OnlineOnlyProject #: 3012Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $151,555Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide chain link fencing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ATHLET-IC EQUIPMENTBakersfield Plan OnlineOnlyProject #: 3036Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $80,710Prebid: 11/10/15 at 3:00pmAddenda: 2Description: Provide athletic equipment for completion of North High School Modernization Phase 2

ALAMO SQUARE RESTROOM AND IRRIGATION UPGRADESan Francisco Plan OnlineOnlyProject #: 3202V-R, FCP15104Bid Date: 12/16/2015 2:30 PM City of San Francisco 415-551-4603Estimated Cost: $0 to $1,900,000Prebid: 11/18/15 AT 10:00AMAddenda: 0Description: See specs for details. Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 AS-PHALT CONCRETE PAVINGBakersfield Plan OnlineOnlyProject #: 3010Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $588,278Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide asphalt concrete paving for completion of North High School Modernization Phase 2.

18 • Construction Weekly

Projects out to bidJAMES DENMAN MIDDLE SCHOOL WINDOW REPLACE-MENTSan Francisco Plan OnlineOnlyProject #: 11770Bid Date: 12/16/2015 2:00 PM SFJUSD - Simon Reyes 415-241-4311Estimated Cost: $0 to $1,130,000Prebid: MAND 11/24/15 at 1:00pmAddenda: 0Description: Selective demolition, cutting & patching, metal fabri-cations, rough carpentry, sheet metal flashing & trim, glazed aluminum curtain walls, aluminum windows & panning, glazing, fixes louvers, tiling repair, window shades, cleaning. CLW Builders, Inc., San Fran-cisco PH: 415-333-9788 FAX: 415-333-9787 CWS Construction Group Inc, Novato PH: (415) 59-95585 FAX: (415) 20-90228

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ARCHI-TECTURAL SPECIALTIESBakersfield Plan OnlineOnlyProject #: 3033Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $135,050Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide architectural specialties for completion of North High School Modernization Phase 2.

AMBROSE AQUATIC CENTER RENOVATION PROJECTPittsburg Plan OnlineOnlyProject #: 2013·25Bid Date: 12/16/2015 2:00 PM City of Pittsburg 925-252-4930Estimated Cost: $0 to $1,212,000Prebid: 12/2/15 at 10:00amAddenda: 1Description: Work consists in general of the rehabilitation of the existing pool and pool facilities. The scope includes but is not limited to demolition of the exist-ing bath house, pool deck and mechanical building, restoration of the existing pool, replacement of the deck area, and a new pad for a Romtec building (by others); new fencing; accessible parking stalls; chemical storage building; and landscaping. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Tricon Construction, Rancho Cordova PH: (916) 638-9866 FAX: (916) 638-9867

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FOOD SERVICE EQUIPMENTBakersfield Plan OnlineOnlyProject #: 3035Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $49,700Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide food service equipment for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 PLUMB-INGBakersfield Plan OnlineOnlyProject #: 3040Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $585,850Prebid: 11/10/15 AT 3:00PMAddenda: 2Description: Provide plumbing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE UTILITIESBakersfield Plan OnlineOnlyProject #: 3011Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $611,060Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide site utili-ties for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE CONCRETEBakersfield Plan OnlineOnlyProject #: 3013Bid Date: 12/16/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,642,510Prebid: 11/10/15 at 3:00 pmAddenda: 2Description: Provide site concrete for completion of North High School Modernization Phase 2.

ACALANES HIGH SCHOOL SCI-ENCE CLASSROOM & REST-ROOM PROJECTLafayette Plan OnlineOnlyProject #: PTN 61630-50Bid Date: 12/16/2015 11:00 AM Acalanes Union High School District 925-376-6200Estimated Cost: $0 to $900,000Prebid: MAND 11/18/15 at 3:45amAddenda: 0Description: Increment 1 includes but not limited to renovation of storage room to science class-room with new roofing & windows. Increment 2 includes but not limited to the renovation of exist-ing restroom in Room 511 & the addition of a restroom in Room 510. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156Integra Construction Services, Inc., Pleasanton PH: (925) 596-5032 FAX: (925) 398-8245 Pacific-Mountain Contractors of California, Inc., Pittsburg PH: (925) 603-2652 FAX: (925) 687-8430 S W ALLEN CONSTRUCTION, SACRAMENTO PH: (916) 344-2098 FAX: (916) 344-0307 Sausal Corporation, San Leandro PH: 510-568-6600 FAX: 510-632-9769

Construction Weekly •19

Projects out to bidVEHICLE MAINTENANCE SHOP & ADMINISTRATION BUILDINGModesto Plan OnlineOnlyProject #: CIP #9457A 9457Bid Date: 12/16/2015 2:00 PM County of Stanislaus 209-525-4130Estimated Cost: $0 to $15,000,000Prebid: MAND 12/2/15 at 2:00pmAddenda: 2Description: Work includes con-struction of vehicle maintenance and administration buildings and associated site and street improvements at County Center No. 4. Acme Construction, Modesto PH: 209-523-2674 FAX: 209-523-0213 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681

December 17RFQ SAN JOSE CITY COLLEGE PHYSICAL EDUCATION BUILD-ING AND WELLNESS CENTER SUBCONTRACTOR SERVICESSan Jose Plan Project #: 0119-16SubBid Date: 12/17/2015 10:00 AM San Jose/Evergreen Community College District 408-270-6431Addenda: 1Description: Prequalification for Subcontractor services for SJCC PE Bldg. Only prequalified sub-contractors will be allow to bid on this construction project San Jose Evergreen Community College Dist is interested in the following trades: Structural & Site Concrete, Structural Steel, Roof-ing, Glass & Glazing, Drywall, & Framing, Plumbing, Mechanical, Electrical.

STREET IMPROVEMENTS, NORTH OF BRUNDAGE LANE AND WEST OF UNION A VENUE, PHASES 3, 4, & 5Bakersfield Plan OnlineOnlyProject #: T6K220Bid Date: 12/17/2015 11:00 AM City of Bakersfield 661-326-3746Estimated Cost: $0 to $344,140Prebid: MAND 11/30/15 at 10:00amAddenda: 1Description: The work to be performed consists, in general, of repairing and augmenting existing street improvements north of Brundage Lane and west of Union Avenue. The work includes but is not limited to the removal and replacement of various reaches of curb, gutter, sidewalk and associ-ated drive approaches; construc-tion of new sidewalk in absence of existing; construction of ADA complaint wheelchair (handicap) ramps; and sawcut, removal, and replacement of existing pavement; all in conformance with these contract documents. This project has a base bid (Phases 3&4) and an additive alternate (Phase 5). Central Valley Asphalt, Lindsay PH: (559) 562-7802 FAX: (559) 562-7902 Dalian Construction, Bakersfield PH: (661) 303-5977 FAX: (661) 282-5699

VEHICLE MAINTENANCE SHOP & ADMINISTRATION BUILDINGModesto Plan OnlineOnlyProject #: CIP #9457A 9457Bid Date: 12/16/2015 2:00 PM County of Stanislaus 209-525-4130Estimated Cost: $0 to $15,000,000Prebid: MAND 12/2/15 at 2:00pmAddenda: 2Description: Work includes con-struction of vehicle maintenance and administration buildings and associated site and street improvements at County Center No. 4. Acme Construction, Modesto PH: 209-523-2674 FAX: 209-523-0213 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681

TUOLUMNE RIVER REGIONAL PARK (TRRP) GATEWAY PAR-CEL – PHASE 2 Modesto Plan OnlineOnlyBid Date: 12/17/2015 11:00 AM City of Modesto 209-571-5526Addenda: 1Description: The project will include grading, trails, pedestrian bridge, river overlook and planting and irrigation forhabitat restoration adjacent to the north bank of the Tuolumne River between Highway 99 and 7th Street. Burdick Excavating, CARSON CITY PH: 775-297-4566 FAX: 775-297-0974 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 Diede Construction, Inc., Lodi PH: 209-369-8255 FAX: 209-368-0600 Harris Builders, Inc., Hilmar PH: (209) 664-9486 FAX: (209) 667-0738

STILLWATER WASTWATER TREATMENT PLANT FILTER UNDERDRAIN REPLACEMENT PROJECTRedding Plan OnlineOnlyProject #: 4738 / 2465Bid Date: 12/17/2015 3:00 PM City of Redding 530-245-7024Estimated Cost: $0 to $470,000Addenda: 0Description: Rehabilitate two 16' wide x 65' long automatic back-wash filter mechanisms, traveling bridges control panel and filter sand media.

NORTH 12TH COMPLETE STREET PROJECTSacramento Plan OnlineOnlyProject #: T15165000Bid Date: 12/17/2015 4:00 PM City of Sacramento 916-808-5515Prebid: 11/30/15 at 2:00pmAddenda: 2Description: This Request for Pro-posals (RFP) solicits a proposal for consultant services to provide engineering and environmental services for the North 12th Com-plete Street Project. CHASE BANK TI OAKLANDOakland Plan OnlineOnlyBid Date: 12/17/2015 2:00 PM Moorefield Construction 916-614-7888 Addenda: 0Description: Work consists of 9,566 sf of Interior Tenant Improvement for Chase Bank of Newly Constructed 2 Story Shell Building. Dunton Construction , Anderson PH: (530) 365-9652 FAX: (530) 365-3178 Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601 TEAM GHILOTTI INC, PETA-LUMAPH: (707) 763-8700 FAX: (707) 763-8711

20 • Construction Weekly

Projects out to bidFACILITIES BUILDING RE-PLACEMENT-INCREMENT 2 WEST VALLEY COLLEGESaratoga Plan OnlineOnlyProject #: 01-1516Bid Date: 12/17/2015 2:00 PM West Valley- Mission Community College District 408-741-2187Estimated Cost: $0 to $12,590,000Prebid: MAND 11/9/15 at 11:00amAddenda: 2Description: See specifications for details. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 F&H Construction, Stockton PH: 209-931-3738 FAX: 209-931-4427 GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

LAKE CUNNINGHAM BIKE PARKSan Jose Plan OnlineOnlyProject #: 7187Bid Date: 12/17/2015 3:00 PM City of San Jose 408-277-3671Estimated Cost: $0 to $2,200,000Addenda: 1Description: See specifications for details. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601

KIEFER LANDFILL EXTRAC-TION WELLl 15 (REBID)Sloughhouse Plan OnlineOnlyProject #: 4290Bid Date: 12/17/2015 2:00 PM County of Sacramento 916-876-6300Estimated Cost: $0 to $600,000Prebid: 11/12/15 or 12/9/15 at 9:00 amAddenda: 1Description: Work consists of 1) Drilling a test hole* to an approxi-mate depth of 235 feet using the dual wall reverse circulation meth-od 2) Constructing and develop-ing a 10-inch-diameter extraction well* to a depth of about 230 feel 3) Equipping the extraction well with a 25 HP submersible pump and motor, concrete pad, above ground piping and valves, buried pipeline, and connection lo the ex-isting buried pipeline 4) Providing and installing all electrical. control, structural and pump discharge equipment lo connect to an exist-ing pipeline 5) Rehabilitating five (5) existing extraction wells

VILLA SPORT BERRYESSA - REBIDSan Jose Plan OnlineOnlyBid Date: 12/17/2015 2:00 PM Moorefield Construction 916-614-7888Estimated Cost: $0 to $32,000,000Addenda: 0Description: See specifications for details. Moorefield Construction, Sacra-mento PH: 916-614-7888 FAX: 916-419-8870

CHP ACADEMY HIGH SPEED TRACKWest Sacramento Plan Onli-neOnlyProject #: 141035Bid Date: 12/17/2015 2:00 PM Department of General Services (916) 376-1673Estimated Cost: $0 to $1,391,000Prebid: MAND 12/1/15 at 9:30 amAddenda: 1Description: **WE WILL POST DOCS ONCE THEY ARE MADE AVAILABLE Grind and resurface the existing high speed track with an asphalt overlay. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 Central Valley Asphalt, Lindsay PH: (559) 562-7802 FAX: (559) 562-7902 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Teichert Construction, Pleasanton PH: 925-621-5700

LE GRAND HS ATHLETIC IM-PROVEMENTSLe Grand Plan OnlineOnlyBid Date: 12/17/2015 2:00 PM C.T. Brayton & Sons, Inc. 209-838-7388Prebid: 12/9/15 at 8:30amAddenda: 0Description: Work consists of High School Stadium and Gymnasium Improvements and ADA site improvements with all associ-ated trades. Includes all trades associated with work to add new bleachers, press box, lighting and sound systems at the Stadium and replace the existing bleach-ers and refinish flooring in the Gymnasium.

ACCESSIBILITY IMPROVE-MENTS - SIGNALIZED INTER-SECTIONS - 2016 & HURLEY WAY SIDEWALK IMPROVE-MENTS - JONAS TO MORSESacramento County Plan Onli-neOnlyProject #: 4298Bid Date: 12/17/2015 2:00 PM Estimated Cost: $0 to $1,070,000Prebid: 11/18/15 at 1:30 pmAddenda: 2Description: Includes clearing and grubbing, pavement grinding and removal, tree removal, roadway excavation, installation of curb gutter and sidewalk, installation of drainage pipes, manholes and inlets, aggregate base and asphalt pavement, traffic striping, traffic signal modifications, street lighting, median construction, placement of landscaping and other incidental work. Teichert Construction, Pleasanton PH: 925-621-5700

MCLAUGHLIN PARK IMPROVE-MENTSan Jose Plan OnlineOnlyProject #: 7441Bid Date: 12/17/2015 3:00 PM City of San Jose 408-993-4600Estimated Cost: $0 to $336,000Addenda: 0Description: Demolition, concrete reinforcing, metal fabrications, painting, playground equipment, site clearing, grading, base courses, rigid paving, playgrpound protective surfacing, planting irrigation.

Construction Weekly •21

Projects out to bidSOUTHEAST WATER POLLU-TION CONTROL PLANT 521/522 & DISINFECTION UPGRADES SECURED PROJECTSan Francisco Plan OnlineOnlyProject #: WW-613Bid Date: 12/17/2015 2:00 PM City of San Francisco 415-551-4603 Estimated Cost: $0 to $22,000,000Prebid: 11/5/15 at 10:00 amAddenda: 2Description: SECURED DOCS WILL NOT BE POSTED The objective of the project is to up-grade the controls and chemical sampling station in Building 521 and relocate most of the electrical equipment into a new building. In addition, improvements to the No. 3 water system and replacement of valves/actuator will occur. Western Water Constructors, Santa Rosa PH: 707-540-9640 FAX: 707-540-9641

FURNISH AND INSTALL STAND-BY GENERATOR FOR FIRE STATION 11Bakersfield Plan OnlineOnlyProject #: 15-16-32Bid Date: 12/17/2015 11:00 AM City of Bakersfield 661-326-3746Estimated Cost: $0 to $55,000Prebid: 12/4/15 at 9:30amAddenda: 0Description: The City of Bakers-field is requesting bids from expe-rienced and reputable contractors to Furnish & Install a Standby Generator for Fire Station 11 as specified herein.

CORPORATION YARD PARKING LOT AND K-9 TRAINING AREA IMPROVEMENTS PROJECTElk Grove Plan OnlineOnlyProject #: WCY005Bid Date: 12/17/2015 4:00 PM City of Elk Grove 916-478-2212Estimated Cost: $635,500 to $676,500Prebid: 12/11/15 at 1:00 pmAddenda: 1Description: Work consists of the construction of a parking lot on the empty parcel adjacent to the City’s Corporation Yard. Improve-ments include paving, striping, lighting installation, landscaping, and installation of artificial turf in the Police Department’s K-9 train-ing area (Work). Biondi Paving & Engineering, Sacramento PH: 916-383-5982 FAX: 916-383-3077 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 Lamon Construction Co., Inc., Yuba City PH: (530) 671-1370 FAX: (530) 673-6501 McFadden Construction, Inc., Stockton PH: 209-478-7407 FAX: 209-478-1516 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220 WESTERN ENGINEERING CONTRS., INC., LOOMIS PH: (916) 652-3990 FAX: (916) 652-3995

WATT AVENUE PEDESTRIAN ENHANCEMENTSSacramento Plan OnlineOnlyProject #: 4295Bid Date: 12/17/2015 2:00 PM County of Sacramento - Municipal Services Agency 916-874-6544Estimated Cost: $0 to $520,000Addenda: 2Description: The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for installation of curb, gutter and sidewalk, ADA ramp improve-ments, installation of street lighting, installation of drainage facilities, installation of retaining wall, application of slurry seal and thermoplastic striping and other incidental work. Biondi Paving & Engineering, Sacramento PH: 916-383-5982 FAX: 916-383-3077 CE GREEN INC, Orangevale PH: (916) 365-4925 FAX: (916) 583-7504 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

WELL 34 SITE IMPROVEMENTS, CIP NO. 8174 AND CONVER-SION OF WELLS 31 AND 33 TO VARIABLE FREQUENCY DRIVE PUMPS, PROGRAM NO. 7522Davis Plan OnlineOnlyProject #: 66.458Bid Date: 12/17/2015 2:00 PM City of Davis, Public Works De-partment 530-757-5686Estimated Cost: $0 to $1,830,000Addenda: 7Description: Work consists of the the construction of improve-ments to an existing well site including installation of a vertical turbine pump and motor, a sodium hypochlorite feed system, a pre-engineered building and well en-closure, an above ground diesel fuel tank and standby generator, an electrical main service panel, a motor control center, a SCADA system, instrumentation, site im-provements including extension of existing fence system, site grad-ing, paving, drainage, upgraded utility service for electrical, offsite storm drain and water pipelines, and associated appurtenances. Work also includes installation of variable frequency drives and well enclosures for existing Well Nos. 31 and 33. Anvil Builders Inc., San Francisco PH: (415) 285-5000 FAX: (415) 285-5005 BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 J J M ENGINEERING CON-STRUCTORS, INC., SACRA-MENTO PH: (916) 992-2840 FAX: (916) 992-1000 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

22 • Construction Weekly

Projects out to bidDecember 18

ARCHITECTURAL AND ENGI-NEERING (A-E) SERVICES FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES, NEW JAIL FACILITYSanta Clara County Plan Onli-neOnlyProject #: RFS-FAF-FY16-0086Bid Date: 12/18/2015 2:00 PM County of Santa Clara 408-993-4600 Prebid: 12/3/15 at 10:00amAddenda: 1Description: The County pro-poses to design and construct a new seven (7) story, 203,000 square foot building comprised of 465 cells (105 beds in single occupancy cells and 710 beds in double occupancy cells), inclusive of medium and high-medium security housing, mental health housing, and accessible cells, with a maximum rated capacity of 815 beds plus multi-purpose/programs space, visitation and recreation space, mental health treatment and program space, custody administration space, security operations, staff support, institutional support space, and related mechanical, electrical, and plumbing space.

LOLLI & POPSSan Jose Plan OnlineOnlyBid Date: 12/18/2015 5:00 PM ALEGIS Construction, Inc. 206-434-8501 Addenda: 0Description: Work consists of a candy and sweets shop tenant improvement.

ELECTRIC VEHICLE SUPPLY EQUIPMENT INSTALLATIONSan Francisco/Alameda Counties Plan OnlineOnlyProject #: 138353Bid Date: 12/18/2015 2:00 PM Department of General Services 916-376-1622Estimated Cost: $0 to $243,000Prebid: MAND 12/2/15 at 9:00 amAddenda: 1 Description: Install two City furnished Electric Vehicle Chargers (ChargePoint Model CT 4000) per the attached Plans and Specifications. The Contractor's bid proposal shall include, but not be limited to: all labor, materials, testing, taxes, and bonds neces-sary to install and get operational two EV chargers, including but not limited too; trenching, backfill-ing, conduits, conductors, pull boxes, transformer and mounting hardware, testing, mounting EV chargers, signage, mobilization, water pollution control, cleanup, and traffic and pedestrian control. Class C-10 License required.

RECYCLED WATER RELIABIL-ITY UPGRADE PROJECTRichmond Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM GSE Construction 925-447-0292Estimated Cost: $0 to $23,700,000 Addenda: 0Description: Work consists of the construction of Aeration basin No.3, improvements to Aeration Basins No.1 & No.2, improve-ments to aeration piping and controls, improvements to the WAS pumps and WAS piping, construction of a new aeration ba-sin splitter box, improvements to all feed systems, improvements to Secondary Sedimentation Basins No.3 and No.4, and demolition of the Roughing Filter and Roughing Filter Pump Station.

BASIN #5 LANDSCAPE MAINTE-NANCENorth Natomas Plan OnlineOnlyProject #: B16141431021Bid Date: 12/18/2015 2:00 PM City of Sacramento 916-808-1458Addenda: 0Description: Landscape mainte-nance services at Basin # 5 which is located on Terracina Ave (see enclosed maps) North Natomas, Sacramento, CA. 95834 The scope of services shall be set forth in the Maintenance Perfor-mance Schedule and Landscape Maintenance General Specifi-cation and provisions (LS10), all incorporated herein by this reference.

HOME 2 SUITES BY HILTONHanford Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM Construction Developers, Inc. 559-277-4700 Addenda: 0Description: Work consists of a ground up 4 story hotel.

ADMINISTRATION BUILDING EMERGENCY BACKUP GEN-ERATORSacramento Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM Sacramento Regional Transit District 916-321-3845Prebid: 12/1/15 at 2:00pmAddenda: 0Description: Work consists of Contractor providing and install-ing all necessary materials, labor and equipment for an emergency power generator for RT's Ad-ministration Building located at 1400 291h Street in accordance with the Technical Specifications and Plans. The work includes, but is not limited to, trenching, backfilling, concrete removal and replacement, concrete pad, fenc-ing, generator, automatic transfer switch, and diesel fuel.

MAJOR STREET REHABILITA-TION – GIDDINGS STREETVisalia Plan OnlineOnlyProject #: 2370-72000/CP0144-999, 15-16-40Bid Date: 12/18/2015 3:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $1,500,000Prebid: 12/1/15 at 10:00 amAddenda: 1Description: See specifications for details.

December 21WOLFE ROAD RECYCLED WA-TER FACILITIES PROJECTSunnyvale Plan OnlineOnlyProject #: C0607, 91244001Bid Date: 12/21/2015 2:00 PM Santa Clara Valley Water District 408-265-2600Estimated Cost: $10,000,000 to $13,000,000Prebid: MAND 11/30/15 at 10:30 am & 12/10/15 at 11:00 amAddenda: 3Description: See specs for details. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601 R.J. Gordon Construction, Pleas-ant Hill PH: (925) 680-8660 FAX: (925) 680-8670

BLACK BEAR DINER OAKLANDOakland Plan OnlineOnlyBid Date: 12/21/2015 2:00 PM R.C. Benson & Sons, Inc. 650-965-3430Addenda: 0Description: Work consist of pro-viding a complete build-out with all finishes, structural, mechanical and electrical components as shown or indicated on drawings.

Construction Weekly •23

Projects out to bidBEST BUY #685Mountain View Plan OnlineOnlyBid Date: 12/21/2015 2:00 PM SD Deacon 916-969-0900Addenda: 0Description: Work consists of the tenant improvement for a new 49,038 SF Best Buy Store located in Mountainview, CA. Subcontractor Trades include: surveying, demolition, earthwork, asphalt paving, pavement mark-ing, concrete, masonry, structural steel, carpentry, finish carpentry, solid surface counters, FRP, building insulation, metal roofing, roofing, sheet metal, joint sealer, doors & hardware, overhead doors, entrances and storefront, plaster, drywall/metal framing, tile, acoustical ceiling, painting, toilet partitions & accessories, loading dock equipment, fire sprinklers, plumbing, hvac, electrical, fire alarm system, communication cabling, telephone & intercommu-nication equipment, fixturing.

MT. SHASTA MALLl - ULTA VANILLA SHELL (SELECT BID-DERS)Redding Plan OnlineOnlyBid Date: 12/21/2015 2:00 PM Deacon Corp. 916-969-0900Addenda: 0Description: Construct a vanilla shell for a new Ulta Store, trades needed include demolition, finish carpentry, cabinets / countertops, insulation, metal panels, roofing, caulking, doors/frames/hardware, storefront / glazing, drywall / metal framing, ceramic tile, acoustical ceiling, resilient flooring, painting, fire sprinklers, plumbing, HVAC and electrical.

CENTURY HOWE BOUT ARDEN XD14Sacramento Plan OnlineOnlyBid Date: 12/21/2015 2:00 PM Moorefield Construction 916-614-7888Addenda: 0Description: Construction of a new 65,134 SF ground-up theater, including architectural, structural, site work, plumbing, mechanical & electrical work.

December 22PINOLE GATEWAY SHOPPING CENTERPinole Plan OnlineOnlyBid Date: 12/22/2015 2:00 PM Midstate Construction 707-762-3200Addenda: 1Description: Work includes: Grad-ing, Storm, Sewer, Water, Paving, Landscaping, Site Electrical. Off-Site Work: Turn Pocket, Signal Relocation, Bus Stop, Striping, Driveways. Building Construc-tion Sprouts: New Ground Up Construction with Full TI. Shops Building: New Ground Up Retail Shops Building

ALVARADO-NILES ROAD PE-DESTRIAN SAFETY IMPROVE-MENTSUnion City Plan OnlineOnlyProject #: 12-10, 5354(035)Bid Date: 12/22/2015 2:00 PM City of Union City - Public Works 510-675-5305Addenda: 0Description: See specs for details.

DIGESTERS NO 10 AND 11 REHABILITATIONElk Grove Plan OnlineOnlyProject #: 8195Bid Date: 12/22/2015 3:00 PM Sacramento Regional County Sanitation District 916-875-9070Prebid: MAND 12/8/15 at 9:00 amAddenda: 0Description: This project consists of rehabilitation to Digesters No. 10 and 11. BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 NMI Industrial Holdings, Inc, Sacramento PH: (916) 635-7030 FAX: (916) 852-1635

MCBEAN STADIUM BASEBALL FIELD RENOVATION PROJECTLincoln Plan OnlineOnlyBid Date: 12/22/2015 3:00 PM City of Lincoln 916-434-2400Prebid: 12/9/15 at 2:00 pmAddenda: 0Description: The purpose of this Request for Proposal (RFP) is to solicit proposals from a landscape architecture firm for the design of McBean Stadium Baseball Field Renovation Project (Project). McBean Stadium is a 950 seat baseball stadium that is located at McBean Park in Lincoln, Califor-nia. The City, in conjunction with our stakeholders, William Jessup University and Little League, desire to renovate the stadium so that the stadium can support collegiate level baseball.

REMOVAL OF LEAD BASED PAINT AND ASBESTOS CON-TAINING MATERIALSFresno Plan OnlineOnlyProject #: 42153 42155Bid Date: 12/22/2015 2:00 PM City of Fresno 559-621-1332Prebid: MAND 12/16/15 at 8:00 amAddenda: 0Description: The scope of the work includes removal and disposal of lead based paint and asbestos containing materials in accordance with the specifications and all local, state and federal regulations. JOB ORDER CONTRACTING (JOC) FOR MISCELLANEOUS STREET MAINTENANCE WORKSalinas Plan OnlineOnlyBid Date: 12/22/2015 2:00 PM City of Salinas 831-758-7972Estimated Cost: $50,000 to $1,000,000Prebid: MAND 12/3/15 at 1:30 pmAddenda: 1Description: A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at differ-ent locations within the city. The Contract Documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor, material and equipment prices and are for the direct cost of construction.

24 • Construction Weekly

Projects out to bidDEMOLITION OF SUBSTAN-DARD STRUCTURES Fresno Plan OnlineOnlyProject #: 42154, 42156Bid Date: 12/22/2015 2:00 PM City of Fresno 559-621-1151Prebid: MAND 12/16/15 at 8:00am Addenda: 0Description: Work includes demolition of structures, removal of foundations, flat work, demoli-tion debris, back fill/compaction of foundation area, and removal of trees, weeds, etc. leaving a clean level vacant lot.

NAPA COUNTY HALL OF JUSTICE THIRD FLOOR CELL REPAIRSNapa Plan OnlineOnlyProject #: 15-15BBid Date: 12/22/2015 3:00 PM Napa County - Public Works 707-253-4351Estimated Cost: $0 to $565385Prebid: MAND 12/3/15 at 10:00amAddenda: 1Description: Work consists of the demolition and replacement of grout between precast panels, demolition and replacement of VCT floor tiles, floor crack epoxy sealing, painting and plumbing testing listed in the Plans and Technical Specifications for the Napa County Hall of Justice Third Floor Cell Repairs. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156

DIGESTER GAS PRODUCTION, POWER GENERATION AND CREDIT OPTMIZATION ANALY-SIS FOR THE CITY OF FRESNO REGIONAL WASTEWATER RECLAMATION FACILITYFresno Plan OnlineOnlyProject #: 101915KNBid Date: 12/22/2015 4:00 PM City of Fresno 559-621-8713Addenda: 0Description: The City of Fresno (City) is requesting Statements of Qualifications (SOQ) from quali-fied engineering firms to conduct an optimization assessment for the City’s anaerobic digestion facilities and power generation facilities located at the City’s Fresno-Clovis Regional Water Reclamation Facility BRIDGE ENGINEER, ENVIRON-MENTAL SERVICES & SURVEY SERVICESYolo County Plan OnlineOnlyProject #: PPWSRFPCS1508Bid Date: 12/22/2015 3:00 PM Yolo County Planning, Public Works Services (530) 666-8775Estimated Cost: $0 to $600,000Addenda: 1Description: Request for Proposal Notice – Bridge Engineer, Envi-ronmental Services & Survey Ser-vices: Preliminary Engineering, Surveying & Mapping, Engineer-ing Studies, Bridge Replacement on County Road (CR) 29, and Bride Replacement on CR 95 in Yolo County, California.

AMADOR PLAZA ROAD BI-CYCLE AND PEDESTRIAN IMPROVEMENTS PROJECTDublin Plan OnlineOnlyProject #: ST0815Bid Date: 12/22/2015 12:00 PM City of Dublin 925-833-6630Addenda: 0Description: The Project is more specifically defined in the Contract Documents, but gener-ally includes: furnishing all labor, materials, tools, equipment, transportation, and services nec-essary to perform the construction and installation of the following: removal of curb, gutter, and sidewalk, removal of trees, modi-fications to storm drain system, removal of pavement markings and striping, installation of new pavement markings and striping, installation of median islands, curb extensions, and decora-tive crosswalks, installation of rectangular rapid flashing beacon systems, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Direc-tor, to which reference is hereby made for further particulars. KOTTINGER GARDENSPleasanton Plan OnlineOnlyBid Date: 12/22/2015 5:00 PM L & D Construction 408-2920128Addenda: 0Description: Work consists of the new construction of 131 apartment units across nine (9) one-story wood-framed apartment buildings, one (1) two-and three-story wood-framed apartment building, and related onsite and offsite improvements.

BASALT WATER TANK PROJ-ECTGustine Plan OnlineOnlyProject #: C1562032Bid Date: 12/22/2015 4:00 PM Department of Parks & Recreation 916-808-8529Prebid: MAND 12/16/15 at 9:00amAddenda: 0Description: Work consists of installing floating, solar powered, circulating equipment for potable water reservoirs. Day/night opera-tion on solar only by utilizing a battery to store excess daytime power for nighttime operation.

PROFESSIONAL ENGINEERING SERVICES FOR BRIDGE RE-PLACEMENT/REHABILITATION PROJECTSChico Plan OnlineOnlyProject #: 2015-001Bid Date: 12/22/2015 2:00 PM City of Chico 530-879-6959Prebid: 12/16/15 at 2:00pmAddenda: 1Description: The City of Chico is soliciting sealed proposals from qualified firms to provide profes-sional engineering services for three bridge projects: Guynn Road at Lindo Channel (Replace-ment), Pomona Avenue at Little Chico Creek (Rehabilitation), and Salem Street at Little Chico Creek (Rehabilitation). Proposals must include all three projects. The City intends to award a single contract for all three projects, hereinafter referred to as “The Project.” The Project is funded through the Highway Bridge Program (HBP). No as-built information will be provided as part of the RFP.

Construction Weekly •25

Projects out to bidPUBLIC HEALTH OFFICE RE-MODEL Oroville Plan OnlineOnlyProject #: 53-16Bid Date: 12/22/2015 3:00 PM County of Butte 530-538-4353Prebid: 12/8/15 at 10:00amAddenda: 0Description: Work consists of a single story, concrete tilt up building. The remodel area is approximately 4,295 square feet, and construction work will be phased into two separate phases to allow ongoing operations within the Public Health Clinic, which will remain operational throughout construction. Project includes selective demolition, tie-in to exist-ing systems, exterior civil acces-sibility modifications, framing and drywall modifications, the design, approval and field modification of Fire Sprinkler system by a Licensed Fire Sprinkler contractor, an additional accessible restroom and finishes, an additional sink, custom millwork, storefront fram-ing and safety glass, suspended ceiling system and ceiling tile with insulation to match existing, HVAC, light fixtures, insulation, signage, electrical, tie-in of ad-ditional fire alarm strobes, and plumbing as indicated by the Public Health Office Remodel Rev 2 drawings dated 06/11/15.

December 23SLURRY SEAL 2016Sunnyvale Plan OnlineOnlyProject #: 16-18, ST-15-12Bid Date: 12/23/2015 3:00 PM City of Sunnyvale - Public Works 408-730-7406Addenda: 0Description: Work consists of ap-plying slurry seal on various street surfaces.

CITY CLERK/HUMAN RE-SOURCES OFFICE REMODELMountain View Plan OnlineOnlyProject #: 15-46Bid Date: 12/23/2015 2:00 PM City of Mountain View 650-903-6527Estimated Cost: $200,000 to $250,000Prebid: 12/10/15 at 2:00pmAddenda: 0Description: Work consists of the remodel of two office areas and include modifications to existing millwork, new partitions, bullet-re-sistant glazing, carpet, card read security doors, shelving, kitch-enette, power and data outlets, electrical, and plumbing. Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

PARKING PLAZA DRIVEWAY AP-PROACH IMPROVEMENTSLos Altos Plan OnlineOnlyProject #: TS-01028Bid Date: 12/23/2015 4:00 PM City of Los Altos 650-947-2780Addenda: 0Description: The City of Los Altos is soliciting proposals from qualified architectural-engineering firms to provide design and construction services for a project to improve pedestrian safety. The work includes the preparation of plans, specifications, construction cost estimate, and contract bid documents, bid period support, and construction support during construction. The successful con-sultant or consulting team shall have relevant pedestrian facility and storm drain design experience. A detailed scope of services for the projects is outlined in the attached Scope of Services.

December 28RFQ-FOR ASBESTOS ABATE-MENT - HELLYER COUNTY PARKSan Jose Plan OnlineOnlyProject #: RFQ-FAF-FY16-0090Bid Date: 12/28/2015 3:00 PM City of Santa Clara - Public Works 408-615-3000Prebid: MAND 12/17/15 at 10:00 amAddenda: 0Description: Contractor shall be responsible for all necessary equipment, tools, materials, labor, and supplies required to perform the asbestos abatement at the Hellyer County Park – Flooring removal from Ranger Office and Visitor Center located at Hellyer County Park.

December 29GREEN STORMWATER IN-FRASTRUCTURE INCENTIVE PROGRAMSacramento Plan OnlineOnlyProject #: Q16141311007Bid Date: 12/29/2015 3:00 PM City of Sacramento 916-808-1458Addenda: 0Description: The Consultants shall furnish all services as required in order to recommend a Green Stormwater incentive program. Although the Consultant should generally adhere to the following tasks, the Consultant is encour-aged to propose modifications to the individual tasks or the entire scope of work if the Consultant can demonstrate innovative, ad-vanced, experienced, and/or well thought-out methodologies that the City may not have specifically identified in the Proposed Scope of Work.

INTERSECTION IMPROVE-MENTS AT THE INTERSECTION OF BEN MADDOX WAY AND DOUGLAS AVENUEVisalia Plan OnlineOnlyProject #: 15-16-26Bid Date: 12/29/2015 2:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $610,000Prebid: 12/9/15 at 10:00 amAddenda: 0Description: Intersection Im-provements at the Intersection of Ben Maddox Way and Douglas Avenue

FIRE STATION NO. 5 EXPAN-SIONSalinas Plan OnlineOnlyProject #: 9235Bid Date: 12/29/2015 2:00 PM City of Salinas 831-758-7972Prebid: MAND 11/17/15 at 2:00pmAddenda: 0Description: In general, the work shall include, but is not limited to expanding existing apparatus room to accommodate additional vehicles including a new ladder truck; regrading and paving for a new concrete driveways; Expand existing interior restrooms to add additional toilet to both men’s and women’s restrooms; Reconfigur-ing plumbing fixtures to meet current ADA requirements; Add partition wall to subdivide sleeping quarters for privacy; Reconfigure existing countertop and cabinets in kitchen for additional storage; Addition of exterior fuel station to also serve vehicles from other Fire Stations; and Adjust exist-ing ADA parking stalls to meet current ADA requirements, and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions

26 • Construction Weekly

Projects out to bidDecember 30

RFQ ON-CALL CONSTRUCTION MANAGEMENT SERVICESChico Plan OnlineOnlyProject #: 2015-002Bid Date: 12/30/2015 12:00 PM City of Chico 530-879-6959Prebid: 12/21/15 at 10:00 amAddenda: 0Description: The City of Chico (“CITY”) is seeking Statements of Qualifications (SOQ) from qualified firms for the purposes of selecting a firm to provide on-call construction management services for capital improvements and other projects. The types of activities may include, but are not limited to, construction manage-ment, construction engineering, office engineering, contract management, reporting for an array of bridge, roadway/highway, landscaping and traffic signal-ization projects. In general, the projects are likely to be funded by CITY and state or federal fund.

SNELL PIPELINE (SANTA TERESA WATER TREATMENT PLANT TO COYOTE CREEK LINE VALVE) REHABILITATION PROJECTSan Jose Plan OnlineOnlyProject #: 95084001 , C0608 Bid Date: 12/30/2015 2:00 PM Santa Clara Valley Water District 408-265-2600Estimated Cost: $3,000,000 to $4,000,000Prebid: MAND 12/1/15 at 9:00amAddenda: 0Description: See specs for details.

SHAFTER HIGH SCHOOL: CTE-FP MODERNIZATION PHASE THREE FOR AGRICULTURAL MECHANICSShafter Plan OnlineOnlyProject #: 3337Bid Date: 12/30/2015 2:00 PM Kern High School District 661-827-3122 Estimated Cost: $0 to $1,258,000 Prebid: 12/8/15 at 3:00 pm Addenda: 0Description: Contractor shall provide all labor, materials, and equipment as shown or implied, per the plans and specifications, for the AG Mechanics Building (900), along with the associated site work. The work shall include, but not be limited to demolition, hazardous material removal, ac-cessibility requirements, plumb-ing, HVAC, electrical, fire, and data requirements. Klassen Corporation, Bakersfield PH: (661) 324-3000 FAX: (661) 324-3900 Superior Construction, Bakers-field PH: (661) 588-0552 FAX: (661) 588-0264

December 31STANISLAUS COUNTY OFFICE OF EDUCATION (CUPPC)Stanislaus County Plan Onli-neOnlyBid Date: 12/31/2015 5:00 PM Stanislaus County Office of Edu-cation 209-238-1900 Addenda: 0Description: Stanislaus County Office of Education is inviting licensed contractors, under the provision of PCC Section 22036 of the Uniform Public Construc-tion Code Accounting Act, to be included o n the agency's list of qualified bidders for the entire 2016 calendar year. Qualified Bidder form is available on our website.

ANTIOCH UNIFIED SCHOOL DISTRICT (CUPPC)Antioch Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Antioch Unified School District 925-706-5241 Addenda: 0Description: The Antioch Uni-fied School District is seeking to update its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifications for details.

MERCED UNION HIGH SCHOOL DISTRICT (CUPCC)Merced Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Merced Union High School District 209-385-6400Addenda: 0Description: The Merced Union School District is updating its list of contractors who may be inter-ested in performing public works for the year 2016. Interested con-tractors must submit all required information by mail or email.

CITY OF ALAMEDA (CUPPC)Alemeda Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM City of Alameda 510-747-7900Addenda: 0Description: The City of Alameda is seeking to update its "list of qualified bidders" as specified un-der the Uniform Construction Cost Accounting Act. See specifications for details.

LODI UNIFIED SCHOOL DIS-TRICT (CUPCCAA)Lodi Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Lodi Unified School District 209-331-7228 Addenda: 0Description: The Lodi Unified School District is updating its list of contractors who may be inter-ested in performing public works for the year 2016.

FRESNO COUNTY OFFICE OF EDUCATION (CUPPC)Fresno Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Fresno County Office of Educa-tion (559) 497-3705Addenda: 0Description: The Fresno County Office of Education may create a new contractors list effective January 1 of each year and may include any contractor’s name it desires on the contractors list, but must include, at a minimum, all contractors who have properly provide d the District with the required information, either during the calendar year in which the list is valid or during November and December of the prior year. A con-tractor may have their firm added to the school district’s contractors list at any time by providing the required information.

SOLANO COUNTY PRE-QUALI-FICATION LISTSolano County Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Solano Community College Dis-trict 707-864-7416Addenda: 0Description: Solano County’s Notice to Contractors (attached) invites all interested licensed con-tractors to submit their company for inclusion on Solano County’s Informal Bidders’ List for calendar year 2016 in accordance with the California Uniform Construction Cost Accounting Act (UCCAA). The attached Notice to Contractors includes instructions. For further information, email [email protected], or phone/fax (707) 784-6320.

Construction Weekly •27

Projects out to bidNOTICE FOR INCLUSION MER-CED COMMUNITY COLLEGE DISTRICTMerced Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Merced Community College District 209-384-6300Addenda: 0Description: Pursuant to Section 22034 of the California Public contract Code, the Merced Com-munity College District (herein-after MCCD) hereby invites all licensed contractors to submit the following information for inclusion in our, 2016 calendar year, list of bidders.To be included in our list of Bid-ders, you must provide the MCCD the following information: 1. Name of your Company 2. Contact person's name, phone, email and fax number at you company. 3. The address to which all Notices to Contractors and/or Proposals shall be mailed. 4. The general phone number of your company (if different from item #2 above). 5. The type of work in which your company is interested in perform-ing and is currently licensed to do(earthwork, pipelines, electri-cal, painting, general building, etc.)6. The class of contractor's license(s) held, your contractor license number and DIR number. The information should be submit-ted in the order above and mailed to the MCCD on a single sheet of paper, any advertisements, litera-ture, and/or cut sheets should be enclosed in a separate envelope. All information must be submitted to the MCCD no later than 2:00 pm on Friday December 18, 2015. The information should be mailed to the address below and to the attention of: Mr. Chuck Hergen-raeder, Purchasing Manager.

CITY OF PITTSBURG (CUPPC)Pittsburg Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM City of Pittsburg 925-252-4930Addenda: 0Description: The City of Pittsburg is seeking to update its "list of qualified bidders" as specified un-der the Uniform Construction Cost Accounting Act. See specifications for details.

NAPA COUNTY PUBLIC WORKS (CUPPC)Napa Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM County of Napa - Public Works 707-253-4351 Addenda: 0Description: The Napa County Public Works Department is seek-ing to update its "list of qualified bidders" as specified under the Uniform Construction Cost Ac-counting Act. See specifications for details.

JEFFERSON SCHOOL DIS-TRICT (CUPCC)Tracy Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Jefferson Elementary School Dis-trict 209-836-3388 Addenda: 0Description: The Jefferson School District is updating its list of con-tractors who may be interested in performing public works for the year 2016. Interested contractors must submit the following: Name & Address, Phone Number, Type of Work, License Classification & Number.

SAN JOAQUIN COUNTY (UPC-CAA)San Joaquin County Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Addenda: 0Description: Names will be added to the Contractors List through our on-line registration only.

STANISLAUS UNION DISTRICT OF STANISLAUS COUNTY (CUPCC)Stanislaus County Plan Onli-neOnlyBid Date: 12/31/2015 5:00 PM Stanislaus Union School District 209-529-9546Addenda: 0Description: Contractors are asked to submit which construc-tion work they are interested in (for example: earthwork, pipe-lines, electrical, painting, general building, etc.) together with the class of contractor's license(s) held and contractor license number(s)

SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT ANNUAL RENEWAL OF CONTRACTORS LISTSSan Ramon Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM San Ramon Valley Unified School District 925-552-2960Addenda: 0Description: The San Ramon Val-ley Unified School District is up-dating its lists of contractors which may be interested in performing public works projects for the year 2016. Interested contractors must submit the following: Name and Address: The name and address to which notices of Public Projects should be mailed. Phone Number and Email Address: Phone num-ber and email address at which the contractor may be reached. Type of Work: The type of work that the contractor is interested in and currently licensed to perform. License Classification & Number: The class of contractor license(s) held and the contractor’s license number(s).

ELK GROVE USD QUALIFICA-TION LISTElk Grove Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Elk Grove Unified School District 916-686-7711Addenda: 0Description: Notice is hereby given that all contractors required to pre-qualify for Elk Grove Uni-fied School District (“District”) proj-ects must adhere to the following procedures, submit the following documentation and information at least annually, with quarterly certi-fications or updates, and must be found by the District on a quarterly basis to pre-qualify, as a condi-tion of bidding the District project during any quarterly period. The District is required to have a pre-qualification process pursuant to applicable California law (in particular Public Contracts Code sections 20111.5 and 20111.6) for any projects projected to cost $1,000,000 or more. Any General Contractors, Electrical, Mechanical, and Plumbing Sub-contractors bidding on projects projected to cost $1,000,000 or more are required to participate in the District’s pre-qualification process. Pre-qualification ap-plication packages are available by contacting the Facilities and Planning Department located at the address shown below, via telephone at (916) 686-7711, or via email at [email protected].

28 • Construction Weekly

Projects out to bidNOTICE FOR INCLUSION ON YUBA COMMUNITY COLLEGE DISTRICT (YCCD) BIDDERS LIST 2016Yuba Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Yuba Community College District 530-741-6801 Addenda: 0Description: If you would like to be included on the YCCD's list of qualified bidders for Calendar Year 2016, you must fill out and submit the Bidders List Infor-mation Form with all required information.

QUALIFIED CONTRACTOR LIST REVISIONS - CITY OF TUR-LOCKTurlock Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM City of Turlock - Engineering 209-668-5599Addenda: 0Description: The City of Turlock maintains a Qualified Contractor List (List) as required by Public Contract Code Section 22034 and updates the List annually. When a city project is advertised for bids these contractors receive an email notification of that ad-vertisement. If you are a licensed contractor and wish to be placed on the List, please submit your request in writing as outlined in the attached Notice to Contrac-tors. See project URL.

SYLVAN UNION SCHOOL DIS-TRICT (CUPPC)Modesto Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Addenda: 0Description: The Sylvan Union School District is seeking to up-date its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifications for details.

January 04NAPA COUNTY SHERIFF'S BUILDING REPAIRSNapa Plan OnlineOnlyProject #: PW 15-300Bid Date: 1/4/2016 3:30 PM County of Napa - Public Works 707-253-4351Estimated Cost: $0 to $1,200,000Prebid: MAND 12/8/15 at 10:00 amAddenda: 1Description: Div_02-selective Building demolition; Div_03-concrete; Div_04-repair mortar, stone veneer repair; Div_05-cold formed metal framing, metal fabrications; Div_07-acoustic batt insulation, exterior insulation fin-ish system repair, bldg envelope underlayment, standing seam metal roof repaors, metal roofing underlayment, flashing & sheet metal, precast concrete pavers & open joint pedestal system, joint sealants; Div_08-aluminim store-fronts; Div_09-gypsum board assemblies, painting & coating; Div_10-signage, fire extinguisher cabients; Div_22-plumbing; Div_23-HVAC; Div_26-electrical system. NOTE: Non-Mandatory Pre-Bid Site Visit for subcontrac-tors 12/17 @ 10AM at 1535 Airport Blvd, Napa. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156 Helmer & Sons, Inc., Angwin PH: (707) 965-2425 FAX: (707) 965-2982

January 05MAIN JAIL INMATE SHOWER RENOVATION PROJECTSanta Cruz Plan OnlineOnlyProject #: 15C1-003Bid Date: 1/5/2016 2:30 PM County of Santa Cruz 831-454-2210Estimated Cost: $0 to $320,000Prebid: MAND 12/21/15 at 10:00 am Addenda: 0Description: This project is for licensed contractors with a Type C36-Plumbing and/or C43-Sheet Metal and/or C60-Welding license to fabricate and cover showers with stainless steel at the County of Santa Cruz Main Jail. Prime contractor will be required to subcontract with all trades listed above that he does not hold a license for. ST. STEPHEN’S SENIOR HOUS-INGSanta Cruz Plan OnlineOnlyBid Date: 1/5/2016 5:00 PM L & D Construction 408-2920128Addenda: 0Description: Work consists of This is a 40-unit senior project in one 2-story building comprised of four (4) studios, thirty-two (32) 1-BR units, and four (4) 2-BR units. Site improvements will con-sist of constructing underground utilities, and various landscape and hardscape improvements. The project will follow Build-It-Green guidelines and is seeking 188 points.

MODIFICATIONS OF FIVE EX-ISTING TRAFFIC SIGNALSVisalia Plan OnlineOnlyProject #: 15-16-39, 3010-72000/CP8407-999Bid Date: 1/5/2016 2:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $1,180,000Addenda: 0Description: Work consists of modifying 5 existing traffic signals.

ADMINISTRATION BUILDING REMODEL PHASE 2 - HUMAN RESOURCES & RESTROOM PROJECTStockton Plan OnlineOnlyProject #: 713Bid Date: 1/5/2016 2:00 PM San Joaquin Delta Community College 209-954-5065Estimated Cost: $0 to $486,000Prebid: MAND 12/3/15 at 9:00amAddenda: 1Description: Work consists of demolition of interior walls, new Work Room, new finishes, electrical and telecommunica-tions upgrades, and second floor restroom modernization to be ADA compliant with new finishes, plumbing and electrical work. Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 Hometown, Rio Linda PH: (916) 991-2486 FAX: (916) 991-2881

Construction Weekly •29

Projects out to bidREROOF CONCORD SHOP LOWER ROOF, CONCORD STA-TION PLATFORM CANOPY AND SUPERVISOR'S BUILDINGConcord Plan OnlineOnlyProject #: 15QJ-170Bid Date: 1/5/2016 2:00 PM BART - S.F. Bay Area Rapid Transit District 510-464-6540Estimated Cost: $420,000 to $500,000Prebid: 12/3/15 at 2:00pmAddenda: 0Description: Work consists of the performance of all operations to completely remove existing roof-ing system to the roof deck, and install a new roof as indicated in the Specifications and Contract Drawings for Concord Shop Lower Roof and Concord Station Platform Canopy and Supervi-sor's Building.

January 06SAN JOAQUIN HATCHERY PUBLIC ACCESS AND TRAIL PROJECT SAN JOAQUIN RIVER SOUTH CENTRAL REGION FOR SAN JOAQUIN CONSERVANCYFresno Plan OnlineOnlyProject #: 15-12, C51514Bid Date: 1/6/2016 2:00 PM Department of Water Resources - Delta Field Divisi 209-833-2074Prebid: 12/17/15 at 9:00amAddenda: 0Description: See specifications for details.

NORTH SACRAMENTO WATER METER RETROFITSacramento Plan OnlineOnlyProject #: B16141321015Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $0 to $2,202,575Addenda: 0Description: The work to be performed under these Special Provisions generally consists of furnishing and installing meter setters, meter boxes, lids, meter valves and water meters at vari-ous commercial and residential properties within designated ar-eas of the City of Sacramento as indicated on the project area map found in the Appendix. The work to be performed includes excava-tion, backfill, surface restoration, retrofitting water meters on exist-ing water services, and any other work required to complete the project as specified in the Special Provisions.

NINOS PARKWAY COMMUNITY GARDENSacramento Plan OnlineOnlyProject #: B16190021010Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $164,260 to $202,690 Addenda: 0Description: The work to be performed consists of Ninos Parkway Community Garden, in Sacramento. The improvements will consist of demolition, grading, irrigation system, landscaping, concrete flatwork and curbs, special pavement, decomposed granite paving, chain link fencing and gates, irrigation, and picnic tables. Sierra Valley Construction, Inc., Loomis PH: (916) 772-0800 FAX: (916) 772-0825

UPPER SOUTH SAC DRAIN-AGE CANAL SEWER REPLACE-MENTSacramento Plan OnlineOnlyProject #: 816141321014Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $0 to $845,443Addenda: 0Description: The Special Provi-sions cover, in general, the replacement of several sewer pipe segments located in streets and backyard easements using pipe bursting techniques. Ad-ditional work includes replacing and reconnecting sewer services, restoring manholes, and other associated work. Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project as shown on the improvement plans (Plans) and as specified.

SIERRA AVENUE AND D STREET SEWER PUMP STA-TION REPLACEMENT PROJ-ECTOakdale Plan OnlineOnlyBid Date: 1/6/2016 2:00 PM City of Oakdale 209-845-3600Estimated Cost: $0 to $1,077,438Addenda: 0Description: Work consists of construction of new wet well, controls, piping, bypasspumping, and demolition of existing pump station.

FLUORIDATION AT WATER TREATMENT PLANTSSan Jose Plan OnlineOnlyProject #: 93084011 C0610Bid Date: 1/6/2016 2:00 PM Santa Clara Valley Water District 408-265-2600Prebid: MAND 12/2/15 at 10:00 amAddenda: 0Description: See Specifications for details. BUTTE REGIONAL TRANSIT OPERATIONS CENTER TEN-ANT IMPROVEMENT REMODEL PROJECTChico Plan OnlineOnlyBid Date: 1/6/2016 2:00 PM Kitchell 916-648-9700Estimated Cost: $0 to $2,000,000Prebid: MAND 12/15/15 at 9:00amAddenda: 1Description: Work consists of the construction remodel of an existing office and maintenance shop building. The existing of-fices, electrical room, and shop improvements will require soft demo to a cold shell structure. The improvements will include storefront aluminum window wall infill, the BCAG boardroom and associated casework, finishes and Audio Video improvements, approximately 14 offices with conference rooms, reception, restrooms and break room areas. BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 Modern Building, Inc., Chico PH: (530) 891-4533 FAX: (530) 891-6834 S W ALLEN CONSTRUCTION, SACRAMENTO PH: (916) 344-2098 FAX: (916) 344-0307

30 • Construction Weekly

Projects out to bidREPLACE 5KV MEDIUM VOLT-AGE CABLES AND SWITCH-GEAR Norwalk Plan OnlineOnlyProject #: 137634Bid Date: 1/6/2016 2:00 PM Department of General Services 916-375-4292Prebid: MAND 12/15/15 at 10:00amAddenda: 0Description: Work consists of the replacement of underground 5kv cables with new replacement of 5kv sectionalizing SF6 switch-gear, OFC’s, dry and oil filled transformers, 5kv pull box covers and manhole sump pumps with new, as well as conducting primary distribution load study. Removal and disposal of 5kv lead cables, mineral oil and recycling SF6 gas.

LANDSCAPE MAINTENANCE FOR MEADOWVIEW CITY SER-VICE COMPLEXSacramento Plan OnlineOnlyProject #: B16155711002Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1437Prebid: MAND 12/9/15 at 9:00amAddenda: 1Description: Work to be per-formed comprises general horti-cultural maintenance, related IPM services, the operation of manual and automatic irrigation, cleanup of landscape areas as designated in the attached list of locations and, when necessary, repairs of irrigation systems and replace-ment of plant materials. Require-ments vary by location depending upon the landscaping present.

SOUTH YOSEMITE PEDESTRI-AN IMPROVEMENT PROJECTOakdale Plan OnlineOnlyProject #: 5153(036)Bid Date: 1/6/2016 3:00 PM City of Oakdale 209-845-3600Estimated Cost: $0 to $568,893Addenda: 0Description: Work consists of frontage improvements (curb & gutter, sidewalk, fencing, etc.), pavement widening, median installation, and striping improve-ments.

January 07CABLING AND ELECTRI-CAL SERVICES FOR THE DMV FIELD OFFICES IN THE SOUTHERN CALIFORNA RE-GION 3Various Locations Plan Onli-neOnlyProject #: 15-390Bid Date: 1/7/2016 3:00 PM DMV - Contracts Section 916-657-8697Estimated Cost: $0 to $109,000Addenda: 0Description: Cabling and Electrical Services for Closed Circuit Televisions (CCTV’s), Self Service Terminals (SST’s), Document Authentication Devices (DAD’s), Automated Knowledge Touch Equipment (AKTE’s) and Queing Systems, for specific DMV field offices in the South-ern California Region 3. Term: March 1, 2016 or upon contract approval, through December 31, 2017. See Exhibit A, Scope of Work, for a complete description of services.

JOB ORDER CONTRACTS: JOC-001, JOC-002 And JOC-003Merced County Plan Onli-neOnlyBid Date: 1/7/2016 3:00 PM Merced County - Public Works 209-385-7601Prebid: MAND 12/15/15 at 10:00 amAddenda: 0Description: This Advertise-ment for bids is for the award of three separate JOC and the work includes repair, alterations, modernizations, maintenance, re-habilitations, and demolition work performed on buildings, offices, facilities, infrastructure, and and other real property.

VARIOUS IMPROVEMENTS IN THE ELIHU HARRIS BUILDINGOakland Plan OnlineOnlyProject #: 131130Bid Date: 1/7/2016 2:00 PM Department of General Services (916) 376-1673Prebid: 12/9/15 at 10:00 amAddenda: 0Description: Major components of Project Work consist of: Demoli-tion, Tenant improvements on the Third Floor; Construction of a se-cure evidence storage room and an employee break room, HVAC, fire sprinkler modifications, elec-trical and Title 24 upgrades. Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

FLORIN CREEK MULTI-USE BASIN PROJECTSacramento Plan OnlineOnlyProject #: 4297Bid Date: 1/7/2016 2:00 PM County of Sacramento 916-876-6300Estimated Cost: $2,650,000 to $3,150,000Prebid: 12/15/15 at 10:00 amAddenda: 0Description: Includes the excava-tion of +/- 65,000 CY of soil for the construction of a multi-use detention basin and the con-struction of park enhancements including a pond, drainage and roadway construction, pedestrian bridge relocation, wetland habitat construction and the modifica-tion, installation or relocation of utilities. **Include "Contract No. 4297" in subject line of email cor-respondence. Anderson Dragline, Inc., Gridley PH: (530) 695-1352 FAX: (530) 695-3131 Nichelini General Engineering Contractors Inc., Vallejo PH: (707) 226-5877 FAX: (707) 287-9200 Steelhead Constructors Inc., Palo Cedro PH: (530) 226-6400 FAX: (530) 226-6401 Westcon Construction Corp, Rocklin PH: (916) 663-2425 FAX: (916) 663-2448

300 W. Pine StreetLodi, California 95240

p 209.333.1116f 209.333.8597

Rich PiomboAdministrative Manager

[email protected]

Construction Weekly •31

Projects out to bidCHERRY DAM OUTLET WORKS REHABILITATION Tuolumne Plan OnlineOnlyProject #: HH-983Bid Date: 1/7/2016 2:00 PM City & County of San Francisco 415-557-4751Estimated Cost: $0 to $4,520,000Prebid: 12/3/15 at 10:00 amAddenda: 1Description: The Objective of the project is to replace two 66" hol-low jet valves upgrade the inflow stream release system, and upgrade the electrical distribution system at Cherry Valve house. This project is located at Cherry Lake in the Stanislaus National Forest. The work is to be per-formed in Tuolumne, CA.

NORTH POINT OUTFALL REHABILITATION SECURED PROJECTSan Francisco Plan OnlineOnlyProject #: WW-614Bid Date: 1/7/2016 2:00 PM City & County of San Francisco 415-557-4751Estimated Cost: $0 to $8,900,000Prebid: 12/7/15 at 10:00 amAddenda: 0Description: DOCS WILL NOT BE POSTED SECURITY SENSI-TIVE MATERIAL The objective of the project is to repair reinforced concrete sewers, reline outfall pipes, remove and dispose of Bay sediments, remove sediment inside diffusers, install corro-sion protection system for outfall pipes and associated structural supports and install air release mechanism. F.D. THOMAS, INC. - SEALANT DIVISION, SACRAMENTO PH: (916) 379-0010 FAX: (916) 379-0030

DOCK REPLACEMENT PROJ-ECT FOR BOARD OF EQUAL-IZATIONSacramento Plan OnlineOnlyProject #: 136698Bid Date: 1/7/2016 2:00 PM Department of General Services 916-375-4292Prebid: MAND 12/3/15 at 9:30amAddenda: 0Description: Work consists of de-molition and removal of manual dock levelers, purchase and installation of new stationary dock levelers with hydraulic operating systems, associated alterations to existing dock pits, installation of raceways and boxes for electri-cal systems, installation of low voltage electrical power conduc-tors, installation of hangers and supports for electrical systems, and related work.

HOLDEN RANCH GYMNASIUM HVAC UPGRADEMorgan Hill Plan OnlineOnlyProject #: 263-CP15006Bid Date: 1/7/2016 2:00 PM County of Santa Clara 408-993-4600Estimated Cost: $0 to $350,000Prebid: 12/3/15 at 10:00amAddenda: 0Description: Work consists of providing a new package air conditioning unit, housekeeping pad, and associated duct work to serve the existing exercise room and hallway space of the Holden Ranch Gymnasium.

January 08SANTA FE STREET SIGNAL INSTALLATION AT FOUR LOCA-TIONSVisalia Plan OnlineOnlyProject #: 3010-72000/CP8286-999, 15-16-36Bid Date: 1/8/2016 2:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $1,350,000Prebid: 12/16/15 at 2:00pmAddenda: 0Description: See specs for details.

CITY OF FRESNO PARKS MAS-TER PLAN UPDATEFresno Plan OnlineOnlyProject #: 120715GWBid Date: 1/8/2016 3:00 PM City of Fresno 559-621-1332Addenda: 0Description: The City of Fresno, California is seeking proposals from qualified consultants who can demonstrate their expertise in planning, urban design related to parks, trails, and other open spaces in order to prepare an update to the City’s Parks Master Plan. Project teams involving multiple firms with the skills to complete the necessary tasks are encouraged. The City’s previous Parks Master Plan was complet-ed in 1989. The City is also un-derway with the preparation of an Active Transportation Plan, which will not only meet State ATP requirements but will also update the City’s 2010 Bicycle, Trail and Pedestrian Master Plan. The goal of this process is the develop-ment of a Park Master Plan that is integrated with the 2035 General Plan as well as the ATP currently under development, in order to support the City’s needs over the next 20 years.

AIRPORT SECURITY INFRA-STRUCTURE PROGRAMSan Francisco Plan OnlineOnlyProject #: 10511.66Bid Date: 1/8/2016 2:00 PM Estimated Cost: $0 to $90,000,000Prebid: 11/23/15 at 9:00amAddenda: 3Description: Work consists of upgrading security infrastructure. The work is campus-wide and will encompass the Airport’s waterside and landside perimeter, Airfield operations, and Terminal buildings.

January 11SIERRA UNIFIED SCHOOL DISTRICT SOLAR POWER PURCHASEFresno and Clovis Plan Onli-neOnlyBid Date: 1/11/2016 5:00 PM TerraVerde Renewable Partners 888-316-2597Prebid: MAND 12/8/15 AT 9:30AMAddenda: 0Description: The District is seek-ing proposals from qualified solar contractors (“Respondents”) to design, engineer, procure, construct, interconnect, com-mission, maintain, operate and own solar photovoltaic systems (“Systems” or “Solar Facilities”) at one or more of the sites listed in the Executive Summary (“Proj-ect Sites”). The Project may be split into two or more stages or phases if the District determines, after reviewing responses to this Request for Proposals (“RFP”), that staging is advisable.

32 • Construction Weekly

Projects out to bidJanuary 12

COUNTRY HILLS DRIVE AND VISTA GRANDE DRIVE WATER MAIN REPLACEMENTAntioch Plan OnlineOnlyProject #: 503-16Bid Date: 1/12/2016 2:00 PM City of Antioch - Capital Improve-ments 925-779-7050Estimated Cost: $0 to $1,250,000Addenda: 0Description: Work consists of installing domestic water facilities and cathodic protection in the areas shown on the plans.Ad-ditional work shall include, but not be limited to, surface restoration, traffic control, water pollution control and all other work shown on the plans, specified in the Standard Specifications, Special Provisions and as directed by the Engineer. R.J. Gordon Construction, Pleas-ant Hill PH: (925) 680-8660 FAX: (925) 680-8670

TES TANK LINER REPLACE-MENT AND CHILLED WATER PIPING REPAIRLos Angeles Plan OnlineOnlyProject #: 137741Bid Date: 1/12/2016 2:00 PM Department of General Services (916) 376-1673Prebid: MAND 12/17/15 at 9:00 amAddenda: 0Description: Replace the TES liners, seal TES tank piping pen-etrations, replace TES tank drain lines/pipe level controls, replace TES pumps/new VFDs and con-trols sensors to match existing capacity, replace the 8" risers, replace TES butterfly valves, new main pipe with new valves and insulation, replace TES piping, valves, and appurtenances with new insulated and jacketed pip-ing, new TES annunciation board with LED lights, new water level controls and full wall height sight glass piping/appurtenances at each TES tank.

January 13REPAINT STREET LIGHT POLESSunnyvale Plan OnlineOnlyProject #: PW16-12, ST-15-10Bid Date: 1/13/2016 3:00 PM City of Sunnyvale - Public Works 408-730-7406Addenda: 0Description: Work consists of painting existing City light poles with the specified paint, includ-ing preparing the pole surfaces, removing existing paint and ap-plying prime coat.

WATER TREATMENT PLANT CAPITAL IMPROVEMENTS PROJECT, PHASE 1BPittsburg Plan OnlineOnlyProject #: 2012-16BBid Date: 1/13/2016 2:00 PM City of Pittsburg - Redevelopment Agency 925-252-4044Prebid: MAND 12/2/15 & 12/16/15 at 2:00 pm Addenda: 0Description: Work consists of constructing facilities to improve operability and reliability of the treatment plant (Type A) improve-ments and facilities to remove and process water treatment plant sludge (Type B improve-ments). See specifications for further details. C. Overaa and Co., Richmond PH: (510) 234-0926 FAX: (510) 237-2435 Taber Construction, Martinez PH: (925) 682-6133 FAX: (925) 682-6122 Valentine Corporation, San Rafael PH: (415) 453-3732 FAX: (415) 457-5820 Western Water Constructors, Santa Rosa PH: 707-540-9640 FAX: 707-540-9641

ORINDA WTP RELIABILITY AND MAINTENANCEOrinda Plan OnlineOnlyProject #: 2089Bid Date: 1/13/2016 1:30 PM Eastern Municipal Water District 951-928-3777Estimated Cost: $11,000,000 to $14,000,000Prebid: 12/15/15 at 9:00amAddenda: 0Description: Work includes items from three categories - Shutdown Projects, Power Building and Above-Ground Diesel Tank, and Hypochlorite System Improve-ments. Please see the Notice to Contractrors for detailed project information.

January 14EBBETTS PASS WATER SYSTEM REACH 3A PIPELINE REPLACEMENT PROJECTCalaveras County Plan Onli-neOnlyProject #: 11078Bid Date: 1/14/2016 2:00 PM Calaveras County Water District 209-754-3181Prebid: 11/3/15 at 10:00 amAddenda: 2Description: The Project consists of constructing approximately 19,310 feet of 12-inch water transmission pipeline to replace an existing pipeline and includes replacement of sixteen (16) pressure reducing stations and multiple fire hydrants. Gener-ally, with a few exceptions, the new pipeline follows the existing alignment in the same location or immediately adjacent to the exist-ing pipeline. The alignment starts near Cal-Fire Station at Lake-mont Drive, follows east side of Hwy 4, crossing Hwy 4 by bore & jack in front of the Meadowmont shopping center, continues along west shoulder of Hwy 4 crossing Meadowmont Drive, transitions to east edge of golf course and continues to Pine Drive, via utility easements crosses to Oak Circle and then to Sequoia Street, con-tinues on Fir Street and Dunbar Road to intersection of Hwy 4 at Blagen Road, then follows Blagen Road to White Pines, tra-verses uphill above White Pines along a utility pole easement to our water storage tank. Herback General Engineering, Minden PH: (775) 267-6800 FAX: (775) 786-7595 K.W. Emerson, Inc., San An-dreas PH: (209) 754-3839 FAX: (209) 754-3830

Construction Weekly •33

Projects out to bidBIG TREES SOUTH ZONERED-WOOD POTABLE WATER STORAGE TANKSWILDFIRE HAZARD MITIGATION PROJ-ECTCalaveras County Plan Onli-neOnlyProject #: 11073Bid Date: 1/14/2016 2:00 PM Calaveras County Water District 209-754-3181Prebid: 12/1/15 at 10:00amAddenda: 1Description: Work consists of De-molition services and general site clean-up of the Tank 1 and Tank 60K sites; the supply and instal-lation and operation of temporary facilities to maintain customer service during construction; supply and install two (2) glass fused, bolted steel tanks, one at the Tank 1 site and one at the Tank 60K site; supply and install all tank appurtenances including concrete foundations, ladders, hatches, valves, and piping; sup-ply and install approximately 900 feet of 8-inch diameter ductile iron pipeline including isolation valves; supply and install one (1) pressure regulating station including two pressure regulat-ing valves, one pressure relief valve, isolation valves, piping, and street improvements; and the supply and installation of electri-cal and instrumentation improve-ments BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600

DELTA SERVICE DISTRICT CENTER RELOCATION/CON-STRUCTIONStockton Plan OnlineOnlyProject #: 107756Bid Date: 1/14/2016 2:00 PM Department of General Services 916-376-1622 Estimated Cost: $0 to $19,500,000Prebid: MAND 11/19/15 at 10:00 am Addenda: 3Description: Project comprises labor, material and services necessary for: Construction of a California Conservation Corps District Center, which includes, site improvements, excavation, concrete, steel, plaster, skylights, coiling doors, cold storage room, Kitchen and equipment, HVAC, fire protection, security, lighting electrical, data and communica-tions, transformers, switchgear, and related work AMG & Associates, Inc., Santa Clarita PH: 661-251-7401 FAX: 661-251-7405 Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 D.L. Falk Construction Inc., Hay-ward PH: (510) 887-6500 FAX: (510) 887-6501 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 F & H Construction, Lodi PH: (209) 931-3738 FAX: (209) 931-4427 Flint Builders, Inc., ROSEVILLE PH: (916) 757-1000 FAX: (916) 797-7400 Roebbelen Contracting, Inc., EL DORADO HILLS PH: (916) 939-1110 FAX: (916) 939-4027 Zovich Construction, Hayward PH: 510-784-1273 FAX: 510-784-0173

BELVEDERE AREA STREETS RESURFACINGStockton Plan OnlineOnlyBid Date: 1/14/2016 1:30 PM City of Stockton 209-937-8818Estimated Cost: $0 to $200,000Addenda: 0Description: See specifications for details.CITY FIBER PROJECT - RE-VISEDHollister Plan OnlineOnlyProject #: C1403Bid Date: 1/14/2016 2:00 PM City of Hollister - Engineering 831-636-4340Estimated Cost: $0 to $350,000Addenda: 1Description: Furnishing all labor, material, incidentals and equip-ment necessary for the construc-tion of City Fiber Optic Project including installation of conduit fiber optic cable, pull boxes, ter-mination points, pavement repair, backfill and other related work as described within the contract specifications and drawings.

GIANONE PARK AREA STREETS RESURFACINGStockton Plan OnlineOnlyBid Date: 1/14/2016 1:30 PM County of San Joaquin 209-468-3240Addenda: 0Description: Gianone Park Area Streets Resurfacing (Francis Street; Gilchrist Avenue; John Street; Myran Avenue and Sunset Avenue)

CALIFORNIA CORRECTIONAL CENTER (CCC) HEALTH CARE FACILITY IMPROVEMENT PRO-GRAM (HCFIP) & HIGH DESERT STATE PRISON HCFIPSusanville Plan OnlineOnlyProject #: 6000001904Bid Date: 1/14/2016 2:00 PM Department of Corrections and Rehabilitation 209-274-4911Estimated Cost: $0 to $23,457,000Prebid: MAND 12/10/15 at 9:00am - Clearance Requests must be submitted by 12/2 @ 4 PMAddenda: 1Description: See specifications for details. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600

WINDOW REPLACEMENT - X01 UNIT LMNG ROOMS UNIVER-SITY PARK NORTH - REBIDSan Francisco Plan OnlineOnlyProject #: D000814Bid Date: 1/14/2016 2:00 PM San Francisco State University 415-338-7242Estimated Cost: $0 to $750000Prebid: 152/16/15 AT 10:00AMAddenda: 0Description: Work consists of fur-nishing labor and material neces-sary to replace the X01 unit living room windows in Buildings 6, 7, 8 and 9 at University Park North on the campus of San Francisco State University.

34 • Construction Weekly

Projects out to bidCITYWIDE CURB RAMP IM-PROVEMENTSConcord Plan OnlineOnlyProject #: 2325Bid Date: 1/14/2016 2:00 PM City of Concord 925-671-3361Estimated Cost: $250,000 to $300,000 Addenda: 0Description: The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include adjusting utility covers, asphalt concrete, traffic control, pedestrian detours, stag-ing of the work, water pollution control program ; and such other items or details that are required by the Plans, Standard Specifica-tions, the Special Provisions and as directed by the Engineer.

January 19OLD MUNICIPAL SWIMMING POOL BUILDING RETROFIT PHASE 1Salinas Plan OnlineOnlyProject #: 9535Bid Date: 1/19/2016 2:00 PM City of Salinas 831-758-7972Estimated Cost: $287,700Prebid: 11/17/15 at 1:30pmAddenda: 3Description: Work consists the demolition/removal of the existing swimming pool deck and the top 18” of vertical pool wall; fracturing of the existing pool bottom; struc-tural backfill of the existing pool; construction of new, reinforced concrete slab/surfacing; minor ADA upgrades in the restroom areas, installation of new emer-gency exit door mechanisms, and compliance with Water Pollution Control requirements as required by the City’s National Pollutant Discharge Elimination System (NPDES) program.

FACILITY UPGRADES TO AIR-PORT T-52 BUILDINGSalinas Plan OnlineOnlyProject #: 9151Bid Date: 1/19/2016 2:00 PM City of Salinas 831-758-7972Estimated Cost: $0 to $96,000Prebid: 11/24/15 at 1:30pmAddenda: 3Description: In general, the work shall include, but is not limited to the remodeling of the two non-compliant restrooms and a break room, replacing them with two new ADA-compliant restrooms, and a break area; including all related mechanical, plumbing, and electrical work, and other work associated with the remod-eling including all incidental and appurtenant improvements and restorations specified on the Plans and Specifications.

CULTURAL ARTS DISTRICT (CAD) PARK REBIDFresno Plan OnlineOnlyProject #: 3440-11731Bid Date: 1/19/2016 3:00 PM City of Fresno 559-621-1332Estimated Cost: $0 to $830,000Prebid: 1/5/16 at 10:00 amAddenda: 0Description: The scope of work includes, but is not limited to: construction of an .7 acre park on the northwest corner of Fulton and Calaveras Streets to include such features as: open space/multi-purpose field, terraced performance structure, shaded tot lot (2-5 years old) with soft-fall surfacing, outdoor exercise equipment, community art/monu-ment feature, site furnishings, landscape and irrigation, perim-eter fencing and safety lighting.

January 20BIOLOGICAL NUTRIENT RE-MOVAL (BNR) PROJECTElk Grove Plan OnlineOnlyProject #: 4208Bid Date: 1/20/2016 2:00 PM Sacramento Regional County Sanitation District 916-875-9015Estimated Cost: $0 to $503,933,780Prebid: 11/18/15 at 9:00 amAddenda: 1Description: The District is implementing the EchoWater Program to meet new standards for discharge to the Sacramento River and for possible reuse as recycled water. This project to implement Biological Nutrient Removal (BNR) is an integral part of the overall program and gener-ally includes: Area 50—Primary Effluent Pumping Station which includes (1) a new biofilter for odor control, (2) a new Primary Effluent Pump Station (PEPS) with a Primary Effluent Channel extension to convey primary effluent, (3) a new PEPS Distribution Structure Area 51—Biological Nutrient Removal Facility which includes (4) a new Primary Effluent Flow Splitting facility, (5) a new BNR Basin Complex consisting of eight BNR basins, mixed liquor channel, and associated pipe galleries and electrical buildings, (6) a new Mixed Liquor (ML) flow Splitting Structure to distribute mixed liquor to three existing secondary sedimentation tank batteries; and Area 52—Blower Building and Area Control Center (ACC) which includes (7) a new Blower Building to provide air supply to the BNR basins, and (8) and new ACC for system electri-cal and control functions.

January 26BASIN L PIPELINE REHABILITA-TION PROJECT #5Napa Plan OnlineOnlyProject #: CIP 16701Bid Date: 1/26/2016 2:00 PM Napa Sanitation District 707-258-6000Estimated Cost: $0 to $2,400,000Prebid: MAND 1/12/16 at 2:00 pmAddenda: 0Description: Demolition & sal-vage, site preparation, excavtion dewatering, excavation support systems, utility earthwork, curd-in-place lining, sanitary sewer lateral reinstatement, manhole structures, pipe bursting, sanitary sewer system testing, sewer cleaning, CCTC inspection of sewer lines, site restoration, poly-vinyl chloride pipe, high density polyethlene pipe

DESIGN-BUILD SERVICES FOR TEMINAL 3 WEST MODERNIZA-TION AND BOARDING AREA F PASSANGER BOARDING BRIDGE PROJECTSSan Francisco Plan OnlineOnlyProject #: 10071.66Bid Date: 1/26/2016 2:00 PM San Francisco International Airport 650-821-7878Estimated Cost: $0 to $623,000Prebid: 12/15/15 at 10:00 amAddenda: 0Description: See specifications for details. Claudia Luquin, Con-tract Manager, @ 650-821-7721

Construction Weekly •35

Projects out to bidJanuary 27

MOTOR CONTROL CENTER REPLACEMENT PHASE 1Oakland Plan OnlineOnlyProject #: SD-352Bid Date: 1/27/2016 1:30 PM East Bay Municipal Utility District (EBMUD) - Water Division 510-287-1040Estimated Cost: $340,000 to $360,000Prebid: 1/12/16 at 10:00amAddenda: 0Description: See specs for details.

ORINDA WTP RELIABILITY AND MAINTENANCE - FILTER UN-DERDRAIN REPLACEMENTSOrinda Plan OnlineOnlyProject #: 2095Bid Date: 1/27/2016 1:30 PM East Bay Municipal Utility District (EBMUD) - Waste Water Division 510-287-1754Estimated Cost: $11,000,000 to $13,000,000Prebid: 12/15/15, 15/17/15 at 11:00 am Addenda: 0Description: Work includes the items summarized below: 1) Filter Underdrain Replacements a. Remove and store filter media and surface wash piping; demol-ish plastic-block underdrains and mortar bedding; repair concrete; install new filter underdrains, replace and add filter media; and modify surface wash piping in 19 filters; furnish and install stainless steel headers and connections to underdrain laterals for air scour piping in 20 filters; and perform related required work as shown on the drawings and as specified b. Assume an Equipment Supply Contract for the filter underdrain equipment. Estimated cost of this work is between $11,000,000 and $13,000,000.

January 28ELMWOOD M1 SUNDECK/MEDICAL HOUSING UNITSMilpitas Plan OnlineOnlyProject #: RFP-FAF-FY16-0049Bid Date: 1/28/2016 5:00 PM County of Santa Clara 408-993-4600Prebid: 12/14/15 at 10:00 amAddenda: 2Description: This project includes the reprogramming, realignment of interior spaces of the upper level of building M1 Elmwood correctional facility and also necessary accessibility upgrades to interior facilities used by staff and inmates. work also includes structural work, mechanical, plumbing, fire protection, and electrical upgrades. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681

JAIL SECURITY SYSTEM MAIN-TENANCE AND UPGRADES PHASE IINapa Plan OnlineOnlyProject #: PW 11-04BBid Date: 1/28/2016 3:30 PM County of Napa - Public Works 707-253-4351Estimated Cost: $0 to $1,400,000Prebid: MAND 1/7/15 at 10:00 amAddenda: 0Description: Electronic safety & security, conductors & cables, raceways & boxes, system signal grounding, cabinets, enclosures & racks, electronic components, intercom systems, video surveil-lance systems, fire alarm system, integrated sequence of op-erations, PLC integrated control systems

CDE-1,OOOKVA CP TRANS-FORMER REPLACEMENTFremont Plan OnlineOnlyProject #: 138052Bid Date: 1/28/2016 2:00 PM Department of General Services (916) 376-1673Prebid: MAND 8/6/15 at 10:30amAddenda: 3Description: Work consists of the replacement of the exist-ing 1,OOOKVA, 12KV-480/277 volt transformer within the Unit Substation NO.1 line up. New 1,OOOKVA transformer on Pre-Fabricated pad located outside of the Central Plant building. Coordination Arc Flash study, relay settings per study and related work.

February 04EAST "C" STREET REPAVE-MANT AND WATERLINE PROJ-ECT - PHASE 1Oakdale Plan OnlineOnlyBid Date: 2/4/2016 2:00 PM City of Oakdale 209-845-3600Addenda: 2Description: See specifications for details. Central Valley Asphalt, Lindsay PH: (559) 562-7802 FAX: (559) 562-7902 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

February 25SOLANO AVENUE DRAINAGE DITCH REPAIRNapa Plan OnlineOnlyProject #: 15-27Bid Date: 2/25/2016 3:30 PM Napa County - Public Works 707-253-4351Estimated Cost: $0 to $50,000Prebid: MAND 11/18/15 & 11/24/15 at 10:00 amAddenda: 1Description: The engineer's estimate for construction of this project which includes but is not limited to the demolition and repair of an existing damaged concrete segmental retaining wall and fencing is $50,000.

36 • Construction Weekly

NOTICE OF COMPLETION Recordation Completion Date Owner Name Date Contractor Name Property Address 11/23/15 Brookfield Windrift LLC 11/20/15 960 Evergreen Ave, Lthrp City of Stockton 05/18/15 Robert Burns Const Inc Oxidation Ponds #2 & 3 External Levies Repair Proj #M14025 KB Home Central Valley Inc 11/12/15 3645 Jagger Ln, Stkn Pulte Home Corp 11/19/15 1360 Arbor Brook Dr, Mtca River Island 68 LLC 11/20/15 Van Daele Dev of Nor Calif 584 River Bend Dr, Lthrp Stockton Unified School District 10/26/15 AMS.net Cleveland, Grunsky, McKinley, Pittman, Van Buren, Victory Woodside 05N LP 11/17/15 1264 S Shields Ave, Mtn Hse11/24/15 CalAtlantic Group Inc 11/19/15 2512 Coloma Ln, Trcy Caresco Bldrs Corp 11/19/15 1514 Little Grass Wy, Stkn Central Valley Executive Bldrs Inc 11/18/15 McRoy Wilbur Communities Inc 350 Diamond Wy, Rpn CPG River Island Communities 11/20/15 DeNova Homes Inc 1250 Darrow Dr, Lthrp LLC KB Home Central Valley Inc 11/19/15 3651 Jagger Ln, Stkn Meritage Homes of Calif Inc 11/23/15 1080 Bensen St, Mtca Meritage Homes of Calif Inc 11/19/15 2318 Azevedo Ave, Mtca Meritage Homes of Calif Inc 11/20/15 2319 Emigrant Pl, Mtca Oakwood LT Ventures LLC 11/19/15 Casner Communities Inc 1524 Riva Trigoso Dr, Mtca Oakwood LT Ventures LLC 11/23/15 Casner Communities Inc 3620 Chiavari Wy, Mtca Pulte Home Corp 11/20/15 1366 Arbor Brook Dr, Mtca Reclamation Dist No 404 11/20/15 AM Stephens Const Co Inc Boggs Tract at Various Locations Along French Camp Slough & San Joaquin River Between Levee Station 10+00 & Station 230+00 River Island 68 LLC 11/13/15 Van Daele Dev of Nor Calif 18635 Delta Ct, Lthrp Shea Homes LP 11/12/15 565 N Castellina Terr, Mtn Hse TRI Pointe Homes Inc 11/23/15 1031 Walcott Ave, Mtn Hse Union Ranch Partners LLC 11/06/15 Atherton Homes 2463 Finchwood Landing Ln, Mtca Woodside 05N LP 11/23/15 1283 S Central Pkwy, Mtn Hse Woodside 05N LP 11/18/15 Woodside Homes Lot 79 Tract 2535 Northbrook11/25/15 BMC Cornerstone II Ripon LLC 11/18/15 323 Gemstone Ln, Rpn Brookfield Windrift LLC 11/16/15 984 River Bend Dr, Lthrp Caresco Bldrs Corp 11/19/15 1522 Little Grass Wy, Stkn County of San Joaquin 11/19/15 Mark Scott Const Inc San Joaquin Cty Manteca Court House Dist Atty Support Space Proj

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

Construction Weekly •37

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

DR Horton Bay Inc 11/23/15 1975 Southwell Pl, Mtca KB Home Central Valley Inc 11/19/15 3635 Hendrix Dr, Stkn Pulte Home Corp 11/23/15 1345 Chestnut Grove Dr, Mtca Pulte Home Corp 11/23/15 1637 Glazzy Ln, APN 238-620-52, Trcy Richmond American Homes of 11/24/15 142 W Bonner Dr, Mtn Hse Maryland Inc San Joaquin Delta Community 10/16/15 Pro Bldrs Science & Math Punch/Warranty College District Completion Proj SJD #14-171 TL Shoreline LP 11/24/15 542 Channel Dr, Lthrp Union Ranch Partners LLC 11/17/15 Atherton Homes 1136 Clearwater Creek Blvd, Mtca William Lyon Homes Inc 11/16/15 2615 Remy Javier Ct, Trcy Woodside 05N LP 11/18/15 Woodside Homes 17111 Iron Horse Trail, Lthrp11/26/15 No Recorded Notices of Completion 11/27/15 No Recorded Notices of Completion

MECHANICS LIENS Date Lien Recorded Owner Name Amount Contractor Name Property Address No Recorded Mechanics Liens

LIEN RELEASES Date Recorded Owner Name Contractor Name Property Address 11/24/15 Raghbir S Sohal; Sukhbir Kaur Grade Tec Inc 2454 Teepee Dr, Stkn

Pre-Lien Research & ProcessingMechanics Lien Law Training

www.thelienlady.comP (209) 599-8895 F (209) 599-6530

PO Box 554 Ripon CA 95366

38 • Construction Weekly

by State Compensation Insurance Fund

builders’ safety services!

Skin Protection

Meeting Attended By

Employee Recommendations

Reviewed MSDS# Subject

Supervisor’s Signature

This information does not supercede local, State, or Federal regulations.

Dec

embe

r 1

1, 2

015

The skin is the single largest organ of the body. The skin, when healthy, pro-tects us from chemical, physical, and biological hazards. Skin weighs about 10% of our total body weight and is approximately one eighth of an inch thick. The skin is made up of two layers, the epidermis (outer layer) and the dermis (inner layer). The outer layer of skin is only 1/250th of an inch thick, and is the part of our skin that forms the protective barrier.

There are many skin irritants that employees may be exposed to in the work-place. One out of every four workers may be exposed to something that will irritate the skin. Many different things may cause skin damage. When some-thing penetrates through the outer layer, the inner layer of skin reacts to it. Strong, or regularly repeated irritations of the skin may lead to skin diseases.

The skin contains oil glands, hair follicles, and sweat glands. These are like tiny holes. So the skin can be like a sponge when it contacts something. Skin also contains blood vessels, and some chemicals can penetrate the outer layer and enter the blood stream.

The type of environment you are in can cause skin problems directly or they can work with other factors to increase skin problems. These factors include:•Heat – causes sweating. Sweating may dissolve chemicals and bring them into closer contact with the skin. Heat increases the blood flow at the skin surface and may increase the absorption of substances into the body.•Cold – dries the skin and causes microscopic cracking. This cracking allows substances to cross the outer layer of the skin, thus entering the body.•Sun – burns and damages the skin. Sun can increase absorption of chemi-cals. Sun reacts with some chemicals to enhance their negative affects on the body.

How to Protect Your Skin•Wear long sleeve shirts and pants, to minimize the amount of skin exposed.•When working outdoors, wear a hat with a brim.•Use a high sun protection factor (SPF) sunscreen.•Wash your hands regularly during and after work.•Wear gloves when handling chemicals.•Where possible, use tools to handle hazardous substances instead of your hands.

When using gloves or clothing to protect yourself and your skin, you should be careful when removing contaminated clothing, so as not to contaminate yourself.

If a worker is exposed, or thinks he/she may have been exposed to a hazard-ous substance, the area should be rinsed for at least 15 minutes. If a worker is accidentally contaminated, he or she should get under a shower immedi-ately and remove the clothing while showering. Certain substances can be absorbed quickly across the skin. Time is critical. Medical help should be obtained immediately.

Construction Weekly •39

builders’ safety services!

Skin Protection

builders’ safety services!

Be prepared for El Niño with these

great pump specials!

www.multiquip.com

Multiquip Submersible PumpsST2037 2 " Discharge, 115V 1Ø, 1.0 HP, 73 GPM, 37' Total HeadList $405 • Sale $294

ST20472 " Discharge, 115V 1Ø, 1.0 HP, 87 GPM, 47' Total Head List $630 • Sale $450

ST2040T Submersible Trash Pump2 " Discharge, 115V 1Ø, 1.0 HP, 79 GPM, 40' Total HeadList $415 • Sale $300

SST3020BCUL 3 " Discharge, 230V 1Ø, 2.0 HP, 170 GPM, 72' Total HeadList $1,790 • Sale $1,232

Submersible Pumps w/mechanical floatST2037F 2 " Discharge, 115V 1Ø, 1.0 HP, 73 GPM, 37’ Total HeadList $510 • Sale $394

ST2040TF Submersible Trash Pump2 " Discharge, 115V 1Ø, 1.0 HP, 87 GPM, 47’ Total HeadList $489 • Sale $388

Multiquip Engine Driven Trash PumpsQP2TH 2" Suction, Trash Pump, 211 GPM, 98 ft. Head; Honda GX160List $1,470 • Sale $1,013

QP3TH3" Suction, Trash Pump, 396 GPM, 95 ft. Head; Honda GX-240List $1,805.00 • Sale $1,244

QP4TH4" Suction, Trash Pump, 555 GPM, 92 ft. Head; Honda GX340List $3,245 • Sale $2,320

Multiquip 500G Water Trailer also available

© C

OP

YR

IGH

T 2

015,

MU

LTIQ

UIP

INC

. (0

9151

5)

This special promotion ends on December 31, 2015.

3223 N. Deer Run Dr. Carson City, CA 89701 775-884-4745

2855 Fair St. Chico, CA 95928 530-894-7799

3132 Jacobs Ave. Eureka, CA 95501 707-442-9378

5741 S. Toyota Ave. Fresno, CA 559-834-6207

750 Madera Ave. Madera, CA 559-673-2343

5616 Lindhurst Ave. Marysville, CA 95901 530-743-8989

1346 W. 16th St. Merced, CA 209-383-2984

1331 Coldwell Ave. Modesto, CA 209-521-6250

3040 Crossroads Dr. Redding, CA 96003 530-221-8851

4700 Pacific St. Rocklin, CA 95677 916-624-0641

625 Display Way Sacramento, CA 95838 916-922-9895

790 Glendale Ave. Sparks, NV 89431 775-359-6600

2911 E. Fremont St. Stockton, CA 209-948-9500

925 N. Ben Maddox Visalia, CA 559-627-5112

Your local United Rentals locations...

BUILDERS’ EXCHANGEOF STOCKTON

7500 West Lane • Stockton, CA 95210

RETURN SERVICE REQUESTED

844-4CenCal www.cencalglass.com

AUTO H STORES H HOMES

H Window Film H Table Tops H Storefronts H Screens

H Windows H Mirrors H Tenant Improvements

H Door Repair Service H Glass Replacement

H Shower Enclosures

Email: [email protected] Phone(209)467-0000 Fax(209)467-0400

The Central Valley’s Newest Glass Shop