Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding educational needs and has provided a preliminary design of the building to the district. Architects will continue working to complete construction drawings and will accept bids in early 2016. Construction should be completed in July 2018. Construction work will begin in the late spring of 2016 and will continue through three summers and selectively during the school year. The primary focus of all work is safety and minimizing any interruption of the educational process. Anderson High School preliminary building design. Questions should be directed to Ray Johnson, Director of Business Operations, at [email protected] or 231-3600, ext. 2987. www.foresthills.edu facebook.com/foresthillsschooldistrict @fhschools #FacilitiesFriday New science classroom s New entrance and office

Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Construction Update September 2015

Anderson High School The design team has completed interviewing the building staff regarding educational needs and has

provided a preliminary design of the building to the district. Architects will continue working to complete construction drawings and will accept bids in early 2016. Construction should be completed in July 2018.

• Construction work will begin in the late spring of 2016 and will continue through three summers and selectively during the school year. The primary focus of all work is safety and minimizing any interruption of the educational process.

Anderson High School preliminary building design.

Questions should be directed to Ray Johnson, Director of Business Operations, at [email protected] or 231-3600, ext. 2987.

www.foresthills.edu

facebook.com/foresthillsschooldistrict @fhschools #FacilitiesFriday

New science classrooms

New entrance and office

Page 2: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

A current aerial view of Anderson High School. The multipurpose addition will be added in the parking lot area on the right.

Ayer Elementary School

• The design team completed interviewing the building staff regarding educational needs, provided a preliminary design of the building to the district and completed construction drawings. The project is currently being advertised for bids. Bids will be accepted on August 25, 2015. Construction should be completed in July 2017.

• Roof replacement over the gym and air conditioning in the gym will be completed by start of the 2015-16 school year.

• Construction work, including new classrooms and security vestibules, will begin in the fall of 2015 and continue through two summers with minimal work during the school year. All work will be done with safety and minimizing interruption of the educational process as a primary focus.

• A ramp has been designed to provide ADA handicap access from the main building to the gym. The

ramp construction project is currently underway and will be completed by Oct. 2015. When school begins in 2015, the work will be isolated from the students and staff and will be completed after school

Page 3: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

hours. The primary focus of all work is safety and minimizing any interruption of the educational process.

A current aerial view of Ayer Elementary.

Ayer Elementary preliminary building design.

Rendering of the new Ayer Elementary entrance.

New band room

Relocated art room

New classrooms

New office and entrance

and entrance

AD

A

Page 4: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Maddux Elementary School • The design team has completed interviewing the building staff regarding educational needs and has

provided a preliminary design of the building to the district. Architects will continue working to complete construction drawings and will accept bids for the work in early 2016. Construction should be completed in August 2017.

• Construction work will begin in the late spring of 2016 and continue through two summers with minimal work during the school year. The primary focus of all work is safety and minimizing any interruption of the educational process.

Rendering of the new Maddux Elementary entrance. entrance.

A current aerial view of Maddux Elementary.

Maddux Elementary preliminary building design.

Page 5: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Mercer Elementary School • The design team has completed interviewing the building staff regarding educational needs and has

provided a preliminary design of the building to the district. Architects are working to complete construction drawings and will accept bids for the work late in 2015.

• Construction work will begin in the late spring of 2016 and continue through two summers with minimal

work during the school year. The primary focus of all work is safety and minimizing any interruption of the educational process. Construction should be completed in July 2017.

Mercer Elementary preliminary building design.

A rendering of the new Mercer Elementary entrance. entrance.

A current aerial view of Mercer Elementary. Elementary.

New wall for separation

Page 6: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Nagel Middle School • The design team has completed interviewing the building staff regarding educational needs and provided

the district with a preliminary design of the proposed new entrance and interior improvements. Architects have also completed construction drawings. The project is currently being advertised for bids. Bids will be accepted on August 25, 2015.

• The entrance to the cafeteria has been expanded and improved for circulation and capacity. This project started in June 2015 and will be completed by the beginning of the 2015 school year.

• The HVAC renovations will be completed by the beginning of the 2015 school year.

• Interior work will begin in the fall of 2015 and will be completed by the spring of 2016. Site improvements will be completed by the fall of 2016. Work on the movable partition for the stage will begin in December 2015 and will be completed in January 2016. The primary focus of all work is safety and minimizing any interruption of the educational process.

A current aerial view of Nagel Middle School (north to south).

Updated Nagel cafeteria.

New Nagel cafeteria wall tile.

Nagel cafeteria floor.

Page 7: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Sherwood Elementary School

• The design team completed interviewing the building staff regarding educational needs and has provided a preliminary design of the building to the district. Architects have also completed construction drawings. The project is currently being advertised for bids. Bids will be accepted on August 25, 2015.

• Work on the air conditioning in the gym should be completed by the start of the 2015 school year.

• Construction work will begin in the fall of 2015 and continue through two summers with minimal work

during school the school year. The primary focus of all work is safety and minimizing any interruption of the educational process. Construction should be completed in July 2017.

• A ramp has been designed to provide ADA handicap access from the main building to the gym. The ramp construction project is currently underway and will be completed by October 2015. Once school starts, the work will be isolated from the students and staff and will be completed after school hours. The primary focus of all work is safety and minimizing any interruption of the educational process.

Sherwood Elementary preliminary building design.

A current aerial view of Sherwood Elementary.

ADA ramp construction to the gym, with dust containment. for

A rendering of the new Sherwood Elementary entrance.

Page 8: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Summit Elementary School

• The design team has completed interviewing the building staff regarding educational needs and has provided a preliminary design of the building to the district. Architects will continue working to complete construction drawings and be ready to bid the project in late 2015.

• Construction work will begin in the spring of 2016 and continue through two summers with minimal work during school the school year. The primary focus of all work is safety and minimizing any interruption of the educational process. Construction should be completed in August 2017.

Summit Elementary preliminary building design.

A rendering of the new Summit Elementary entrance.

A current aerial view of Summit Elementary.

Page 9: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Turpin High School • The design team has completed interviewing the building staff regarding educational needs and has

provided a preliminary design of the building to the district. Architects will continue working to complete construction drawings and will bid the project in early 2016.

• Construction work will begin in the summer of 2016 and will continue through three summers and selectively during school the school year. The primary focus of all work is safety and minimizing any interruption of the educational process. Construction should be completed in July 2018.

A rendering of the new Turpin High School entrance.

A current aerial view of Turpin High School.

Turpin High School preliminary building design for the lower level.

Page 10: Construction Update - Forest Hills Local School District...Construction Update September 2015 Anderson High School The design team has completed interviewing the building staff regarding

Wilson Elementary School • The design team has completed interviewing the building staff and has provided a preliminary design of the

building. The architects will continue working to complete construction drawings and will bid the project later this year.

• The drilling of geothermal test wells has been completed and the drilling report is favorable for a geothermal system to be installed, a feature that could reduce building operating costs by providing heat to Wilson in a cost-effective, energy-efficient manner. Currently, the district is doing a cost-analysis to determine the pay-back time of the higher initial cost for a geothermal system to be installed.

• Construction work will begin in the spring of 2016 and should be completed for the beginning of the 2017-18 school year.

\

A current aerial view of Wilson Elementary School.

Wilson Elementary preliminary building design.

A rendering of the new Wilson Elementary entrance.

Playground Area

Main entrance

Multipurpose Field

Bus Drop-off

Parent Drop-off

Visitor Spaces (10)

Staff Parking Spaces (appx. 100)