65
9/15/2014 Construction of National Automotive Test Tracks - Unique features and challenges faced Dr. N. Karuppaiah & A. Prabhakar, Tejpal Mahajan, Manish Mishra, Vishalender Singh 1

Construction of National Automotive Test Tracks - Unique

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction of National Automotive Test Tracks - Unique

9/15/2014

Construction of National Automotive Test Tracks

- Unique features and challenges faced

Dr. N. Karuppaiah

&

A. Prabhakar, Tejpal Mahajan, Manish Mishra, Vishalender Singh

1

Page 2: Construction of National Automotive Test Tracks - Unique

9/15/2014

➢ To emerge as a Global Automotive Hub

➢ To invest in research and development to increase innovativebreakthroughs for vehicle design and in manufacturing technology

➢ To provide a world class infrastructure for Automotive R & D

➢ To achieve the mission plan, NATRIP (National Automotive Testingand R&D Infrastructure Project) is an important Initiative byGovernment of India

➢Unique partnership with joining hands by Union Government, StateGovernment and the Indian Automotive Industry.

AUTOMOTIVE MISSION PLAN 2006-16

2

Page 3: Construction of National Automotive Test Tracks - Unique

NATIONAL AUTOMOTIVE TESTING AND R&D INFRASTRUCTURE PROJECT

Project of Government of India with Investment of over Rs.3,700 Crores

9/15/2014 3

Page 4: Construction of National Automotive Test Tracks - Unique

• ARAI - CHAKAN and VRDE-Ahmednagar inwestern hub, in Maharashtra.

• ICAT-Manesar, Haryana and GARC-Oragadam, Chennai, Tamil Nadu.

• A world-class Proving Ground on 3,000acres of land at NATRAX- Pithampur, nearIndore, Madhya Pradesh.

• Hill Area Driving Training Centre and In-UseVehicle Inspection & Maintenance Centre inNorth East at NIAIMT-Silchar, in Assam.

NATRIP CENTRES

9/15/2014

ICAT, Manesar

NATRAX, INDORE

VRDE, Ahmednagar

ARAI Chakan, Pune

NIAMIT, Silchar

GARC -Chennai

4

Page 5: Construction of National Automotive Test Tracks - Unique

TEST TRACKS AT NATRAX

Dynamic Platform Multi Friction Braking Track Gradient Track

Accelerated Fatigue Track Comfort Track Handling Track-2W

Dynamic Platform Braking Track Gradient Track

TEST TRACKS AT NATRAX

9/15/2014 5

Page 6: Construction of National Automotive Test Tracks - Unique

Sustainability Track

Handling Track- 4W

Wet Skid Pad

Noise Track

TEST TRACKS AT NATRAX

9/15/2014 6

Page 7: Construction of National Automotive Test Tracks - Unique

LAYOUT OF NATRAX – 2960 AcresLAYOUT OF NATRAX – 2,960 ACRES

9/15/2014 7

Page 8: Construction of National Automotive Test Tracks - Unique

➢ Comprehensive Performance Validation / Evaluation :

❖ Performance - Max speed, Acceleration, Gradeability, Vibration / Ride Comfort etc.

❖ Safety – Brake efficiency, Steering effort, TCD, Handling & Stability, Noise etc.

❖ Durability - Accelerated Durability Testing

➢ To contain a variety of surfaces to simulate all sorts of terrain conditions

➢ Essential for product development at lower costs by auto industry

➢ Ability to innovate and offer new products for localized conditions

OBJECTIVE OF TEST TRACKS

9/15/2014 8

Page 9: Construction of National Automotive Test Tracks - Unique

➢ Capable of producing Accurate, Repeatable, Reproducible results

➢ High precision surface finish; Evenness and Geometric tolerance

on levels ± 3mm

➢ Specific properties of surfaces (Noise / Braking track)

➢Variety of surfaces (Comfort / Fatigue track)

➢ Durable, Long lasting surfaces

➢ Open Air Laboratory

➢ Know how obtained from Global Consultant / Developed countries

UNIQUE FEATURES / REQUIREMENTS OF TEST TRACKS

9/15/2014 9

Page 10: Construction of National Automotive Test Tracks - Unique

Volume of Work

Track

Excav- Soil Excav - Rock Embankment SubgradeDrainage

LayerGSB WMM DBM

BC-VG-30 & PMB

PCC/RCC

Volume in Cubic Metre

OTT 16,08,000 1,51,000 15,64,000 1,85,000 33,000 2,50,800 1,46,000 60,000 28,700 54,000

HST 15,46,000 8,84,000 9,31,000 47,500 62,900 93,500 75,400 38,350 25,900 61,000

Total 31,54,000 10,35,000 24,95,000 2,32,500 95,450 3,44,300 2,21,400 98,350 54,600 1,15,000

Earthwork : 65 Lakhs cum; Base / Sub Base work : 9 Lakhs cum; Bituminous/RCC work : 2.5 Lakhs cum

9/15/2014 10

Page 11: Construction of National Automotive Test Tracks - Unique

CHALLENGES / DIFFERENCES IN CONSTRUCTION OF TEST TRACKS

9/15/2014

➢ Design of Pavement composition / Geometry

➢ Selection of Materials

➢ Grading of the Mix

➢ Laying methodology

➢ Rolling methodology

➢ Special Construction methodology

➢ Quality assurance and control procedure

11

Page 12: Construction of National Automotive Test Tracks - Unique

Geometry Parameters Specifications Parameters

Diameter 300 m Longitudinal slope 0 %

Total length 1,800 m Evenness / Tolerance in levels ± 3 mm

Dynamic Platform (T-2)

9/15/2014 12

Page 13: Construction of National Automotive Test Tracks - Unique

9/15/2014

LIMIT HANDLING TESTS ON DYNAMIC PLATFORM

13

Page 14: Construction of National Automotive Test Tracks - Unique

9/15/2014

ACCEPTANCE CRITERIA

S. No. Parameters Highway Test Tracks

Evenness Geometric Tolerance

1. Wearing Course ± 6 mm ± 2 mm ± 3 mm

2. Bituminous Base Course ± 6 mm ± 3 mm ± 4 mm

3. Non Bituminous Base Course ± 10 mm ± 4 mm ± 5 mm

4. Non Bituminous Sub-base course

± 10 mm ± 5 mm

5. Sub-Grade course ± 20 mm ± 10 mm

14

Page 15: Construction of National Automotive Test Tracks - Unique

Removal of BC Soil and replacement with Suitable soil

9/15/2014 15

Page 16: Construction of National Automotive Test Tracks - Unique

9/15/2014

Remedial Measures for Sub-Surface Water

16

Page 17: Construction of National Automotive Test Tracks - Unique

Selection of Materials

S. No. Typical Specifications – Highways Special Specifications – Test Tracks

1.0 Materials for GSB/DL shall be crushed gravel,crushed stone, crushed slag or their combination.

Only crushed stone is permitted.; CBR More than 30 %

2.0 Material for Sub-grade shall be good earth with 10% CBR

CBR 15% for good earth, if the Sub-grade bottom is 1.5m below from OGL than drainage layer of crushed stone of 30% CBR used in lieu of Sub-grade

3.0 Combined Flakiness & Elongation of coarseaggregate should be 35% (Max)

The limit of Combined Flakiness & Elongation of coarse aggregaterestricted to 25% (Max) to ensure the better quality of work.

4.0 VG-30 and the Minimum Stability (At 60⁰) of bituminous mix shall be 9.0 KN for VG Grade Bitumen

VG-30 with Polymer modified bitumen used (PMB-40) and The Minimum Stability (At 60⁰) of bituminous mix shall be 12.5 KN for VG Grade Bitumen

5.0 Bituminous mix prepared by using Indian Standardsieve.

Bituminous mix prepared by using British Standard sieve in line withInternational practice for proving grounds

9/15/2014 17

Page 18: Construction of National Automotive Test Tracks - Unique

Asphalt laying with Wooden Batton Wooden Blocks for vertical edges

9/15/2014 18

Page 19: Construction of National Automotive Test Tracks - Unique

Continuous supply through MTV

9/15/2014 19

Page 20: Construction of National Automotive Test Tracks - Unique

9/15/2014 20

Page 21: Construction of National Automotive Test Tracks - Unique

9/15/2014

Road unevenness measurement - Travelling Beam

21

Page 22: Construction of National Automotive Test Tracks - Unique

Sl. No. Type of Constructions Tests Frequency (min)

National Highways as per MORTH Technical specification Test Tracks

1. Embankment/Subgrade for Borrow Material

Plasticity Test Each soil type to be tested, Two Tests Four tests per 3000cum soil.

Density Test Each soil type to be tested, Two Tests Four tests per 2000cum soil.

Moisture Content Two tests Three tests for every 250cum of Soil.

CBR Test One CBR for closer as and when required by Engineer Two CBR test for every 3000cum or closer as when required by Engineer

2. Granular Sub base Gradation One test per 400 cum Two test per 200 cum

Atterberg limits One test per 400 cum Two test per 200 cum

Moisture content prior to compaction

One test per 400 cum Two test per 200 cum

Density of compacted layer One test per 1000 sqm Two test per 500 sqm

3. Wet Mix Macadam Aggregate Impact value One test per 1000 cum aggregate Two test per 200 cum of aggregate

Gradation of aggregate One test per 200 cum aggregate Two test per 100 cum of aggregate

Combined Flakiness and Elongation index

One test per 500 cum aggregate Two test per 200 cum of aggregate

Atterberg limits of portion of aggregate passing 425 micron sieve

One test per 200 cum aggregate Two test per 100 cum of aggregate

Density of compacted layer One test per 1000 sqm Two test per 500 sqm

Stringent Quality Assurance Procedure

9/15/2014 22

Page 23: Construction of National Automotive Test Tracks - Unique

Sl. No. Type of Constructions Tests Frequency (min)

National Highways as per MORTH Technical specification

Test Tracks

4 Prime coat/Track coat Rate of spray of binder Three test per day Not less than 2 tests per day: Two test per 500 sqm

5. Dense Bituminous Macadam/Bituminous concrete

Aggregate Impact value

One test per 350 cum of aggregate for each source and whenever there is a change in the quality of aggregate.

Two test per 50 cum of aggregate

Flakiness and Elongation index

One test per 350 cum of aggregate for each source and whenever there is a change in the quality of aggregate.

Two test per 50 cum of aggregate

Density compacted layer

One test per 700 sqm area. Two test per 250 sqm area ; 10% of total shall be taken from edges

6 Bituminous Macadam Aggregate Impact value

One test per 350 cum of aggregate for each source and whenever there is a change in the quality of aggregate.

Two test per 50 cum of aggregate

Flakiness and Elongation index

One test per 350 cum of aggregate for each source and whenever there is a change in the quality of aggregate.

Two test per 50 cum of aggregate

Density compacted layer

One test per 700 sqm area. Two test per 250 sqm area ; 10% of total shall be taken from edges.

Stringent Quality Assurance Procedure

9/15/2014 23

Page 24: Construction of National Automotive Test Tracks - Unique

Friction coefficient : 0.15 – 0.9

Surfaces : Ceramic / Basalt Tiles / Polished Concrete / High Friction Asphalt

Multi Friction Braking Track (T-3)

9/15/2014 24

Page 25: Construction of National Automotive Test Tracks - Unique

Laid over RCC pavement base;Selection of special type of mortar and grouting materialsSelection of adhesive materials based on pull out tests.Maintenance of suitable gap and levels

Basalt Tiles Surface Ceramic Tiles Surface

9/15/2014 25

Page 26: Construction of National Automotive Test Tracks - Unique

BASALT TILES FIXING

Placing ofreference tiles

Premixedmortar overprimed surface

Fixing ofBasalt Tilesover mortar

Basalt Tiles aftergrouting

Page 27: Construction of National Automotive Test Tracks - Unique

CERAMIC TILES FIXING

Fixing oftiles

Leveling oftiles bytemplate

Adjustment of gap(3 mm)between tiles

CeramicTiles aftergrouting

Page 28: Construction of National Automotive Test Tracks - Unique

9/15/2014

S. No.

Parameter Basalt Tiles Ceramic Tiles

1. Dimension 200mm x 200mm x 40mm (thick)200mm x 200mm x 40mm (thick)-At Edges only

98.0 X 98.0 X 11.0 mm (Thick)148.0 X 98.0 X 11.0 mm (Thick)- at Edges only

2. Dimensional Tolerances ± 2 mm ± 0.5%

3. Water absorption 0% 0.08% < E < 1%

4. Modulus of Rupture ( N/mm2)

Not applicable Avg.50 (Min),Individual Min.47.0

5 Bending strength Min. 45 MPa Not applicable

6 Compression strength Min. 300 - 450 MPa Not applicable

7 Minimum Flexion Strength ( Break)

Not Applicable 47 N/mm2

8 Breaking strength ( in N)

Not Applicable >= 7.5 mm thickness, Min 2100

9 Mohs hardness 8.0 ( Mohs scale) 7.0 ( Mohs scale)

10 Abrasion Resistance Max. loss 110 mm3 (ČSN EN ISO 10545-6) Min(III),For commercial operation as per IS

11 BPN 25-35 (on BPN Scale) 10-15 (on BPN Scale)

Important Parameter of Basalt & Ceramic Tiles for Low mu Surfaces

28

Page 29: Construction of National Automotive Test Tracks - Unique

Road Friction measurement

9/15/2014

British Pendulum Tester -

Skid Resistance m/mTyre Traction Trailer -

Peak Braking Coefficient m/m

29

Page 30: Construction of National Automotive Test Tracks - Unique

ISO-10844-2014

ISO-10844-1994

External Noise Track T-13

9/15/2014 30

Page 31: Construction of National Automotive Test Tracks - Unique

Surface properties of the drive lane

The surface of the drive lane shall

a) exhibit a sound absorption equal to or less than 8 % in any one third octave band between 315 Hz and 1600Hz

a) have a mean profile depth (MPD) shall be 0.5 mm +/- 0.2mm.

b) Longitudinal and Transverse irregularity shall be less than or equal to 2 mm and 3 mm respectively

Surface properties of the propagation area

a) The average of the values of the sound absorption in each one-third-octave band between 315 Hz and 1600 Hz central frequency shall be less than or equal to 10%

Homogeneity of surface properties

The properties of drive lane and propagation area shall be homogenous with respect to acoustic absorption, surface texture and geometrical compliance

9/15/2014 31

Page 32: Construction of National Automotive Test Tracks - Unique

Testing properties of Noise Track Surface

9/15/2014 32

Page 33: Construction of National Automotive Test Tracks - Unique

9/15/2014

Splash road

Wash board CobblestonesPot HolesBelgium Pave Track

Resonance Track Rough RoadTwist Track

Low Severity High Severity

Fatigue Track (T-5)

33

Page 34: Construction of National Automotive Test Tracks - Unique

Twist Track

• CNC Shuttering Concrete Pouring

Concrete finishing & texturing

9/15/2014 34

Page 35: Construction of National Automotive Test Tracks - Unique

Manual Finishing of Rough ConcreteFixing of Back Up rods for Levels

Rough Road

9/15/2014 35

Page 36: Construction of National Automotive Test Tracks - Unique

9/15/2014

Cobble Stones & Potholes

Fixing of Cobble Stones Finishing of potholes

36

Page 37: Construction of National Automotive Test Tracks - Unique

Construction Method – Pave Track

Finished Surface

Fixing of granite stones as per given Data

9/15/2014 37

Page 38: Construction of National Automotive Test Tracks - Unique

Use of Poly Fiber in Concrete Works

M45 Concrete Steelfiber

Polymer fiber

Cement (Kg) 385 385

W/C Ratio 0.38 0.37

Fiber (Kg) 35 4.05

90 min Slump 55 40

Comp. Strength @ 28 days

59.3 59.7

Page 39: Construction of National Automotive Test Tracks - Unique

Comfort Track (T-8)

9/15/2014 39

Page 40: Construction of National Automotive Test Tracks - Unique

Wash Board-1Speed Braker-1

Rough Bitumen

Rough Concerte-2

Big step @ h = 20mm Scratch Road patchesCleat Set @ h-10mm

U shape @ D = 35mm Rough Concerte-1

Wash Board-2

Step Input Sinusoidal input Random input

Comfort Track @ NATRAX

9/15/2014 40

Page 41: Construction of National Automotive Test Tracks - Unique

9/15/2014

PSD Plots of Road Profiles

41

Page 42: Construction of National Automotive Test Tracks - Unique

9/15/2014

Gradient Track (T-4)

6 % / 8 % 12 % 18 % 20 % 24 % 30 %

42

Page 43: Construction of National Automotive Test Tracks - Unique

Hillock converted to Gradient Track

Page 44: Construction of National Automotive Test Tracks - Unique

Handling Track (T-7)

9/15/2014 44

Page 45: Construction of National Automotive Test Tracks - Unique

Parameters Typical Specifications -Highways

Special Specifications –High Friction Asphalt (HFA)

Special Specifications – Noise Test Track

Special Specifications –Handling Track/Aquaplaning Track

Chipping size of aggregates

13.2 mm down – 90 to 100 %

12.5-7.5mm - 45-50% , 11.2mm-8mm - 4% 7.5-4.5mm - 21%

13.2 – 4.75 mm - 40 % 7.5-4.75mm - 28-30%, 8mm-5.6mm - 12% 5.6mm- 4mm -18%

4.75-2.5mm - 25%

4.75 mm down – 60 % 4.75mm down - 20% 4.0mm down is 66% 2.5mm down - 54%

Difference in Mix Design - Bituminous roads on Highways and Test Tracks

9/15/2014 45

Page 46: Construction of National Automotive Test Tracks - Unique

9/15/2014

Safety Features

46

Page 47: Construction of National Automotive Test Tracks - Unique

9/15/2014

Sustainability Track (T-10)

Page 48: Construction of National Automotive Test Tracks - Unique

9/15/2014

Wet Skid Pad (T-11)

Page 49: Construction of National Automotive Test Tracks - Unique

Parabolic Sensor Paver

High Speed Track (T-1)

9/15/2014 49

Page 50: Construction of National Automotive Test Tracks - Unique

9/15/2014 50

Page 51: Construction of National Automotive Test Tracks - Unique

Super-elevation Vs. Width Cross Profile Vs. Width

9/15/2014 51

Page 52: Construction of National Automotive Test Tracks - Unique

9/15/2014 52

Page 53: Construction of National Automotive Test Tracks - Unique

9/15/2014 53

Page 54: Construction of National Automotive Test Tracks - Unique

9/15/2014 54

Page 55: Construction of National Automotive Test Tracks - Unique

9/15/2014 55

Page 56: Construction of National Automotive Test Tracks - Unique

9/15/2014

Page 57: Construction of National Automotive Test Tracks - Unique

9/15/2014

Trapezoidal and U Drain

57

Page 58: Construction of National Automotive Test Tracks - Unique

9/15/2014

Kerb Drain & Other Drains

58

Page 59: Construction of National Automotive Test Tracks - Unique

COST EFFECTIVE SOLUTIONS

9/15/2014

➢ Gravel in lieu of Argex Clay balls

➢ Local ceramic tiles in lieu of imported tiles

➢ Use of natural slopes on L section for Fatigue Track

➢ Use of existing hillock for gradient track

➢ Kerb drain in lieu of U drains in fatigue track

59

Page 60: Construction of National Automotive Test Tracks - Unique

9/15/2014

IDIADA, SPAIN

ATP, GERMANY JARI, JAPAN MIRA, UK

GM, USANATRAX, INDIA

BENCHMARKING OF NATRAX WITH INTERNATIONAL PROVING GROUNDS

60

Page 61: Construction of National Automotive Test Tracks - Unique

CONCLUSION

9/15/2014

➢World Class Automobile Test Tracks created

➢ Being utilized by Industry

➢ Indigenous capability enhanced

➢ Experience can be carried forward

61

Page 62: Construction of National Automotive Test Tracks - Unique

ACKNOWLEDGEMENT

9/15/2014

➢ Department of Heavy Industries, MoHIPE, Govt of India

➢ Government of Madhya Pradesh

➢ IDIADA, Spain; RITES, Gurgaon; SGSITS, Indore; IIT Roorkee

➢ Mr. Nitin Gokarn, Ms. Neeti Sarkar - CEO & PD, NATRiP

➢ Mr. VP Singh, Mr. Pradeep Agrawal – Director (C&I)

➢ Management/Team from NATRAX / NATRIP; RITES & L&T

62

Page 63: Construction of National Automotive Test Tracks - Unique

9/15/2014 63

Page 64: Construction of National Automotive Test Tracks - Unique

Thank You

9/15/2014 64

Page 65: Construction of National Automotive Test Tracks - Unique

9/15/2014

TYPICAL PAVEMENT SECTION