14
Location: Labor: Construction Foreman at  /day  0.00  0.00 Materials: bag/s Portland Cement at  /bag  0.00 m 3 Gravel /m 3 0.00 m 3 Whitesand /m 3 0.00 pcs CHB #5 /pc 0.00 pcs CHB #4 /pc 0.00 pcs Reinforced Steel Bar, 10mm /pc 0.00 pcs Reinforced Steel Bar, 12mm /pc 0.00 pcs ¼" x 4' x 8' Ordinary Plywood /pc 0.00 pcs Coco Lumber 2" x 2" x 12', 60 bdft /pc 0.00 pcs Coco Lumber 20" x 3" x 12', 72 bdft /pc 0.00 kg Assorted Common Wire Nails /kg 0.00 kg GI Tie Wire #16 /kg 0.00  0.00 Equipment: unit Rental of Concrete Mixer at  /day   0.00 Labor: Construction Foreman at  /day  0.00 Mason /day 0.00 Carpenter /day 0.00 Steel man /day 0.00 Laborer /day 0.00  0.00  0.00 Materials: at  ₱ 0.00 0.00 0.00 0.00 0.00 0.00  0.00 Labor Cost I. PREPARATION & EXCAVATION WORKS II. CONCRETE & MASONRY WORKS Material Cost SUB-TOTAL Material Cost Labor Cost III. CEILING WORKS

Construction Material Estimate sheet

Embed Size (px)

Citation preview

Page 1: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 1/14

Location:

Labor:

Construction Foreman at   ₱ /day   ₱ 0.00

₱   0.00

Materials:

bag/s Portland Cement at   ₱ /bag   ₱ 0.00

m3

Gravel /m3

0.00

m3

Whitesand /m3

0.00

pcs CHB #5 /pc 0.00

pcs CHB #4 /pc 0.00

pcs Reinforced Steel Bar, 10mm /pc 0.00

pcs Reinforced Steel Bar, 12mm /pc 0.00

pcs ¼" x 4' x 8' Ordinary Plywood /pc 0.00

pcs Coco Lumber 2" x 2" x 12', 60 bdft /pc 0.00

pcs Coco Lumber 20" x 3" x 12', 72 bdft /pc 0.00

kg Assorted Common Wire Nails /kg 0.00

kg GI Tie Wire #16 /kg 0.00

₱   0.00

Equipment:

unit Rental of Concrete Mixer at   ₱ /day   ₱   0.00

Labor:

Construction Foreman at   ₱ /day   ₱ 0.00Mason /day 0.00

Carpenter /day 0.00

Steel man /day 0.00

Laborer /day 0.00

₱   0.00

₱   0.00

Materials:

at   ₱ 0.00

0.00

0.00

0.00

0.00

0.00

₱   0.00

Labor Cost

I. PREPARATION & EXCAVATION WORKS

II. CONCRETE & MASONRY WORKS

Material Cost

SUB-TOTAL

Material Cost

Labor Cost

III. CEILING WORKS

Page 2: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 2/14

Labor:

Construction Foreman at   ₱ /day   ₱ 0.00

Mason /day 0.00

Carpenter /day 0.00

Steel man /day 0.00

Laborer /day 0.00

₱  0.00

₱   0.00

Materials:

set Panel Door; 0.8 m x 2.1 m at   ₱ /set 0.00

set PVC Door; 0.6 m x 2.1 m /set 0.00

ft2

Steel Casement Windows /ft2

0.00

set Door Hinges /set 0.00

set Door lock /set 0.00

set Aluminum Screen Door /set 0.00

set Window Screen Protector /set 0.00

₱   0.00

Labor:

Laborer /day 0.00

₱   0.00

₱   0.00

Materials:

lnm Pre-painted Roofing; GA 26 at   ₱ /lnm   ₱ 0.00

lnm Pre-painted Flashing; GA 26 /lnm 0.00

pcs Angle Bar; 2" x 3/16" /pc 0.00

pcs C-Purlins; 2" x 3" x 1.5 mm /pc 0.00

pcs C-Purlins; 2" x 4" x 1.5 mm /pc 0.00

pcs Reinforced Steel Bar, 10mm (sag rod) /pc 0.00

tube Rubber sealant /tube 0.00

₱   0.00

Equipment:

unit Rental of Concrete Mixer at   ₱ /day   ₱   0.00

Labor:

Tinsmith at   ₱ /day   ₱ 0.00

Welder /day 0.00

Laborer /day 0.00

₱   0.00

IV. DOORS & WINDOWS WORKS

Material Cost

Labor Cost

SUB-TOTAL

SUB-TOTAL

Labor Cost

V. STEEL & TINSMITHRY WORKS

Material Cost

Labor Cost

Page 3: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 3/14

₱   0.00

Materials:

pcs Floor Tiles; 40 x 40 cm at   ₱ /pc 0.00

pcs Glazed Tiles; 40 x 40 cm /pc 0.00pcs Unglazed Tiles; 40 x 40 cm /pc 0.00

bag Tile Adhesive /bag 0.00

kg Tile Grout /kg 0.00

₱   0.00

Labor:

Tile Setter /day 0.00

Helper /day 0.00

₱   0.00

₱   0.00

Materials:

set Water Closet with Fittings at   ₱ /set   ₱ 0.00

set Lavatory with Fittings & P-trap /set 0.00

set Urinal with Fittings /set 0.00

pcs uPVC Pipe; 3/4" dia /pc 0.00

pcs uPVC Elbow; 4" dia /pc 0.00

pcs uPVC Tee; 4" dia /pc 0.00

pcs uPVC Reducer; 1/2" & 3/4" dia /pc 0.00pcs PVC Pipe; 4" dia /pc 0.00

pcs PVC Elbow; 4" dia /pc 0.00

pcs PVC Tee; 4" dia /pc 0.00

pcs Faucet (ordinary) /kg 0.00

Other Plumbing Materials 1000.00 0.00

₱   0.00

Labor:

Plumber at   ₱ /day   ₱ 0.00

Laborer /day 0.00

₱   0.00

₱   0.00

Materials:

set Main Switch 60A at   ₱ /set   ₱ 0.00

set Flourescent Lamp; 40W /set 0.00

VII. PLUMBING & SANITARY WORKS

Material Cost

Labor Cost

VIII. ELECTRICAL WORKS

SUB-TOTAL

SUB-TOTAL

VI. TILE WORKS

Material Cost

Labor Cost

SUB-TOTAL

Page 4: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 4/14

pcs CFL Lamp; 18W /pc 0.00

pcs Convenience Outlet /pc 0.00

pcs Switch; 2 gangs /pc 0.00

pcs Switch; 1 gang /pc 0.00

roll Flexible Hose /pc 0.00

roll 0.5 box THHN Wire; 3.5 mm2

/pc 0.00

roll 0.5 box THHN Wire; 5.5 mm2

/pc 0.00pcs Utility Box /pc 0.00

pcs Junction Box /pc 0.00

roll Electrical Tape /pc 0.00

Other Materials 1000.00 0.00

₱   0.00

Labor:

Electrician at   ₱ /day   ₱ 0.00

Laborer /day 0.00

₱   0.00

₱   0.00

Materials:

gal Latex Paint Flat at   ₱ /gal   ₱ 0.00

gal Latex Paint Semi-gloss /gal 0.00

gal Red Oxide Primer /gal 0.00

gal QDE Paint /gal 0.00

gal Paint Thinner /gal 0.00

gal Concrete Neutralizer /gal 0.00Masonry Putty 0.00

Other Painting Materials 0.00

₱   0.00

Labor:

Painter at   ₱ /day   ₱ 0.00

Helper /day 0.00

₱   0.00

₱   0.00

₱ 0.00

0.00

0.00

0.00

0.00

0.00

Material Cost

Labor Cost

SUB-TOTAL

* SUMMARY

IX. PAINTING WORKS

VI. TILE WORKS

SUB-TOTAL

Material Cost

Labor Cost

I. PREPARATION & EXCAVATION WORKS

II. CONCRETE & MASONRY WORKS

III. CEILING WORKS

IV. DOORS & WINDOWS WORKS

V. STEEL & TINSMITHRY WORKS

Page 5: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 5/14

0.00

0.00

0.00

₱   0.00

0.00

₱   0.00

VII. PLUMBING & SANITARY WORKS

VIII. ELECTRICAL WORKS

IX. PAINTING WORKS

DIRECT COST

10% PROFIT

10% OCM

12% VATENG'G SUPERVISION

ESTIMATED TOTAL COST

Page 6: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 6/14

SLAB

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.005 0.00 0.00

Total 0.00   0.00

CONCRETE WALL or RETAINING WALL

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.00   0.00

COLUMN

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

C1 2 3.6 0.125 0.2 0.09 0.18

C2 4 4.4 0.125 0.2 0.11 0.44

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.20   0.62

COLUMN (Circular)

Description No. of Set/s Pi Radius Height   Volumeset   VOLUMETOTAL

1   3.141593 0.3 3 0.85 0.00

2   3.141593 0.00 0.00

3   3.141593 0.00 0.00

4   3.141593 0.00 0.00

5   3.141593 0.00 0.00

Total 0.85   0.00

FOOTING

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

F1 3 0.6 0.6 0.2 0.07 0.22

F2 3 0.8 0.8 0.2 0.13 0.38

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.20   0.60

BEAM

   S   L   A   B

   W   A   L   L

   C   O   L   U   M   N

   C   O   L   U   M   N

   F   O   O   T   I   N   G

Page 7: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 7/14

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0   0

GIRDER

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.00   0.00

CONCRETE HOLLOW BLOCKS (CHB)

LengthCHB   WidthCHB   HeightCHB

0.40 0.15 0.20

Description No. of Set/s Length   LengthSUB   Height   HeightSUB   No. of Layers No. of CHB

WF2 2 1.8 0 2.6 0 13 117

WF2 1 1.2 0 2.6 0 13 39

WF2 2 0.1 0 2.6 0 13 6.5

4 0 0 0 0 0 0 0

5 0 0 0 0 0 0 0

Total 162.5

CEMENT MORTAR

Description No. of Set/s Length Width Height   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.00   0.00

CEMENT MORTAR (for Plastering)

Description No. of Set/s Length Width Thickness   Volumeset   VOLUMETOTAL

1 0.00 0.00

2 0.00 0.00

3 0.00 0.00

4 0.00 0.00

5 0.00 0.00

Total 0.00   0.00

   C   H   B

   C   E   M   E   N   T   M   O   R   T   A   R

   P   L   A   S   T   E   R

   B   E   A   M

   G   I   R   D   E   R

Page 8: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 8/14

Page 9: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 9/14

Class CEMENT SAND GRAVEL CEMENT SAND

0 0 0 0 0

Class CEMENT SAND GRAVEL CEMENT SAND

0 0 0 0 0

Class CEMENT SAND GRAVEL CEMENT SAND

A 9.0 0.5 1 5.58 0.31

9 0.5 1 5.58 0.31

Class CEMENT SAND GRAVEL CEMENT SAND

0 0 0 0 0

FACTOR

Class CEMENT SAND GRAVEL CEMENT SANDA 9.0 0.5 1 5.4 0.3

9 0.5 1 5.4 0.3

SAY 

SAY 

SAY 

SAY 

SAY 

SAY 

Page 10: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 10/14

Class CEMENT SAND GRAVEL CEMENT SAND

0 0 0 0 0

Class CEMENT SAND GRAVEL CEMENT SAND

0 0 0 0 0

No. of Layers No. of CHB

Class CEMENT SAND

0 0

Class CEMENT SAND

0 0

SAY:

SAY 

Page 11: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 11/14

Page 12: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 12/14

GRAVEL

0

GRAVEL

0

GRAVEL

0.62

0.62

GRAVEL

0

GRAVEL0.6

0.6

Page 13: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 13/14

GRAVEL

0

GRAVEL

0

Page 14: Construction Material Estimate sheet

8/10/2019 Construction Material Estimate sheet

http://slidepdf.com/reader/full/construction-material-estimate-sheet 14/14

40 kg 50 kg

AA 1 : 1/2 : 3 12.0 9.5 0.5 1.0

A 1:02:04 9.0 7.0 0.5 1.0

B 1 : 2 1/2 : 3 7.5 6.0 0.5 1.0

C 1:03:06 6.0 5.0 0.5 1.0

Table 1. CONCRETE PROPORTION

Mixture

Class  Proportion

  Cement in BagSand Gravel