8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 1/14
Location:
Labor:
Construction Foreman at ₱ /day ₱ 0.00
₱ 0.00
Materials:
bag/s Portland Cement at ₱ /bag ₱ 0.00
m3
Gravel /m3
0.00
m3
Whitesand /m3
0.00
pcs CHB #5 /pc 0.00
pcs CHB #4 /pc 0.00
pcs Reinforced Steel Bar, 10mm /pc 0.00
pcs Reinforced Steel Bar, 12mm /pc 0.00
pcs ¼" x 4' x 8' Ordinary Plywood /pc 0.00
pcs Coco Lumber 2" x 2" x 12', 60 bdft /pc 0.00
pcs Coco Lumber 20" x 3" x 12', 72 bdft /pc 0.00
kg Assorted Common Wire Nails /kg 0.00
kg GI Tie Wire #16 /kg 0.00
₱ 0.00
Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00
Labor:
Construction Foreman at ₱ /day ₱ 0.00Mason /day 0.00
Carpenter /day 0.00
Steel man /day 0.00
Laborer /day 0.00
₱ 0.00
₱ 0.00
Materials:
at ₱ 0.00
0.00
0.00
0.00
0.00
0.00
₱ 0.00
Labor Cost
I. PREPARATION & EXCAVATION WORKS
II. CONCRETE & MASONRY WORKS
Material Cost
SUB-TOTAL
Material Cost
Labor Cost
III. CEILING WORKS
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 2/14
Labor:
Construction Foreman at ₱ /day ₱ 0.00
Mason /day 0.00
Carpenter /day 0.00
Steel man /day 0.00
Laborer /day 0.00
₱ 0.00
₱ 0.00
Materials:
set Panel Door; 0.8 m x 2.1 m at ₱ /set 0.00
set PVC Door; 0.6 m x 2.1 m /set 0.00
ft2
Steel Casement Windows /ft2
0.00
set Door Hinges /set 0.00
set Door lock /set 0.00
set Aluminum Screen Door /set 0.00
set Window Screen Protector /set 0.00
₱ 0.00
Labor:
Laborer /day 0.00
₱ 0.00
₱ 0.00
Materials:
lnm Pre-painted Roofing; GA 26 at ₱ /lnm ₱ 0.00
lnm Pre-painted Flashing; GA 26 /lnm 0.00
pcs Angle Bar; 2" x 3/16" /pc 0.00
pcs C-Purlins; 2" x 3" x 1.5 mm /pc 0.00
pcs C-Purlins; 2" x 4" x 1.5 mm /pc 0.00
pcs Reinforced Steel Bar, 10mm (sag rod) /pc 0.00
tube Rubber sealant /tube 0.00
₱ 0.00
Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00
Labor:
Tinsmith at ₱ /day ₱ 0.00
Welder /day 0.00
Laborer /day 0.00
₱ 0.00
IV. DOORS & WINDOWS WORKS
Material Cost
Labor Cost
SUB-TOTAL
SUB-TOTAL
Labor Cost
V. STEEL & TINSMITHRY WORKS
Material Cost
Labor Cost
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 3/14
₱ 0.00
Materials:
pcs Floor Tiles; 40 x 40 cm at ₱ /pc 0.00
pcs Glazed Tiles; 40 x 40 cm /pc 0.00pcs Unglazed Tiles; 40 x 40 cm /pc 0.00
bag Tile Adhesive /bag 0.00
kg Tile Grout /kg 0.00
₱ 0.00
Labor:
Tile Setter /day 0.00
Helper /day 0.00
₱ 0.00
₱ 0.00
Materials:
set Water Closet with Fittings at ₱ /set ₱ 0.00
set Lavatory with Fittings & P-trap /set 0.00
set Urinal with Fittings /set 0.00
pcs uPVC Pipe; 3/4" dia /pc 0.00
pcs uPVC Elbow; 4" dia /pc 0.00
pcs uPVC Tee; 4" dia /pc 0.00
pcs uPVC Reducer; 1/2" & 3/4" dia /pc 0.00pcs PVC Pipe; 4" dia /pc 0.00
pcs PVC Elbow; 4" dia /pc 0.00
pcs PVC Tee; 4" dia /pc 0.00
pcs Faucet (ordinary) /kg 0.00
Other Plumbing Materials 1000.00 0.00
₱ 0.00
Labor:
Plumber at ₱ /day ₱ 0.00
Laborer /day 0.00
₱ 0.00
₱ 0.00
Materials:
set Main Switch 60A at ₱ /set ₱ 0.00
set Flourescent Lamp; 40W /set 0.00
VII. PLUMBING & SANITARY WORKS
Material Cost
Labor Cost
VIII. ELECTRICAL WORKS
SUB-TOTAL
SUB-TOTAL
VI. TILE WORKS
Material Cost
Labor Cost
SUB-TOTAL
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 4/14
pcs CFL Lamp; 18W /pc 0.00
pcs Convenience Outlet /pc 0.00
pcs Switch; 2 gangs /pc 0.00
pcs Switch; 1 gang /pc 0.00
roll Flexible Hose /pc 0.00
roll 0.5 box THHN Wire; 3.5 mm2
/pc 0.00
roll 0.5 box THHN Wire; 5.5 mm2
/pc 0.00pcs Utility Box /pc 0.00
pcs Junction Box /pc 0.00
roll Electrical Tape /pc 0.00
Other Materials 1000.00 0.00
₱ 0.00
Labor:
Electrician at ₱ /day ₱ 0.00
Laborer /day 0.00
₱ 0.00
₱ 0.00
Materials:
gal Latex Paint Flat at ₱ /gal ₱ 0.00
gal Latex Paint Semi-gloss /gal 0.00
gal Red Oxide Primer /gal 0.00
gal QDE Paint /gal 0.00
gal Paint Thinner /gal 0.00
gal Concrete Neutralizer /gal 0.00Masonry Putty 0.00
Other Painting Materials 0.00
₱ 0.00
Labor:
Painter at ₱ /day ₱ 0.00
Helper /day 0.00
₱ 0.00
₱ 0.00
₱ 0.00
0.00
0.00
0.00
0.00
0.00
Material Cost
Labor Cost
SUB-TOTAL
* SUMMARY
IX. PAINTING WORKS
VI. TILE WORKS
SUB-TOTAL
Material Cost
Labor Cost
I. PREPARATION & EXCAVATION WORKS
II. CONCRETE & MASONRY WORKS
III. CEILING WORKS
IV. DOORS & WINDOWS WORKS
V. STEEL & TINSMITHRY WORKS
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 5/14
0.00
0.00
0.00
₱ 0.00
0.00
₱ 0.00
VII. PLUMBING & SANITARY WORKS
VIII. ELECTRICAL WORKS
IX. PAINTING WORKS
DIRECT COST
10% PROFIT
10% OCM
12% VATENG'G SUPERVISION
ESTIMATED TOTAL COST
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 6/14
SLAB
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.005 0.00 0.00
Total 0.00 0.00
CONCRETE WALL or RETAINING WALL
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
COLUMN
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
C1 2 3.6 0.125 0.2 0.09 0.18
C2 4 4.4 0.125 0.2 0.11 0.44
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.20 0.62
COLUMN (Circular)
Description No. of Set/s Pi Radius Height Volumeset VOLUMETOTAL
1 3.141593 0.3 3 0.85 0.00
2 3.141593 0.00 0.00
3 3.141593 0.00 0.00
4 3.141593 0.00 0.00
5 3.141593 0.00 0.00
Total 0.85 0.00
FOOTING
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
F1 3 0.6 0.6 0.2 0.07 0.22
F2 3 0.8 0.8 0.2 0.13 0.38
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.20 0.60
BEAM
S L A B
W A L L
C O L U M N
C O L U M N
F O O T I N G
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 7/14
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0 0
GIRDER
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
CONCRETE HOLLOW BLOCKS (CHB)
LengthCHB WidthCHB HeightCHB
0.40 0.15 0.20
Description No. of Set/s Length LengthSUB Height HeightSUB No. of Layers No. of CHB
WF2 2 1.8 0 2.6 0 13 117
WF2 1 1.2 0 2.6 0 13 39
WF2 2 0.1 0 2.6 0 13 6.5
4 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0
Total 162.5
CEMENT MORTAR
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
CEMENT MORTAR (for Plastering)
Description No. of Set/s Length Width Thickness Volumeset VOLUMETOTAL
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
C H B
C E M E N T M O R T A R
P L A S T E R
B E A M
G I R D E R
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 8/14
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 9/14
Class CEMENT SAND GRAVEL CEMENT SAND
0 0 0 0 0
Class CEMENT SAND GRAVEL CEMENT SAND
0 0 0 0 0
Class CEMENT SAND GRAVEL CEMENT SAND
A 9.0 0.5 1 5.58 0.31
9 0.5 1 5.58 0.31
Class CEMENT SAND GRAVEL CEMENT SAND
0 0 0 0 0
FACTOR
Class CEMENT SAND GRAVEL CEMENT SANDA 9.0 0.5 1 5.4 0.3
9 0.5 1 5.4 0.3
SAY
SAY
SAY
SAY
SAY
SAY
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 10/14
Class CEMENT SAND GRAVEL CEMENT SAND
0 0 0 0 0
Class CEMENT SAND GRAVEL CEMENT SAND
0 0 0 0 0
No. of Layers No. of CHB
Class CEMENT SAND
0 0
Class CEMENT SAND
0 0
SAY:
SAY
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 11/14
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 12/14
GRAVEL
0
GRAVEL
0
GRAVEL
0.62
0.62
GRAVEL
0
GRAVEL0.6
0.6
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 13/14
GRAVEL
0
GRAVEL
0
8/10/2019 Construction Material Estimate sheet
http://slidepdf.com/reader/full/construction-material-estimate-sheet 14/14
40 kg 50 kg
AA 1 : 1/2 : 3 12.0 9.5 0.5 1.0
A 1:02:04 9.0 7.0 0.5 1.0
B 1 : 2 1/2 : 3 7.5 6.0 0.5 1.0
C 1:03:06 6.0 5.0 0.5 1.0
Table 1. CONCRETE PROPORTION
Mixture
Class Proportion
Cement in BagSand Gravel