CONSTRUCTION INDUSTRY AUTHORITY
OF THE PHILIPPINES – PHILIPPINE DOMESTIC CONTRUCTION BOARD
CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
(CPES REPORTS)
(ON-GOING/COMPLETED PROJECTS) From January 1, 2005 – December 31, 2007
You may access this report on this website http://www.gppb.gov.ph
1
BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION: The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.
Information on contractors’ CPES ratings shall be used for the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and (h) in adopting measure to further improve performance of contractors in the prosecution of government projects.
REPORT COVERAGE: This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.
REPORT CONTENTS: Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: Part 1) Constructor General Information; Part 2) Project Data; and Part 3) CPES Rating.
Part 1 of the report includes the name of constructor/s, and PCAB License Number.
Information contained in Part 2 pertains to the project name, contract amount, implementing agency/region, number of visit, and status of project (on-going or completed).
CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB) 3/F, Jupiter Bldg., #56 Jupiter St., Bel-Air Village, Makati City
Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791
CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports - On-going and Completed Projects from January 1, 2005 – December 31, 2007
2
Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safety and health, and f) resources deployment, and the CPES Rating/Final Rating and its Qualitative Description. Should there be need for more detailed information about the project such as PCAB/ARC category and type of contractor, project type, location, funding source, duration of project, date started and completed, status of project, slippage, and date of evaluation, please contact PDCB and/or other agency concerned.
(NOTE: Please refer to pages 3 an 4 for the meaning of other codes presented in this report)
SOURCES OF INFORMATION Data contained in this report were culled from the CPES Summary Report submitted by the *Departments of Public Works and Highways (DPWH), National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Pasig River Rehabilitation Commission (PRRC), and Bases Conversion Development Authority (BCDA) covering the period January 1, 2005 – December 31, 2007. * For DPWH projects, only the region is listed in the column “Implementing Agency/Region”. With regards to data on negative slippage, this matter may be brought about by any of the three (3) problems: a) Constructor-Related Problems, b) Agency-Related Problems; and c) Other Related Problems. Please see the enumerated problems on each classification on page 5 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, per project, please contact the agency implementing the project.
For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned implementing agencies listed below:
Melrose Pailma (DPWH) Tess Pantalla (NIA) Ma. Otelia F. Eclavea (NHA) Amy Gamay (PRRC) Arnel Fortunado (BCDA) Tel. Nos. 304-3511 Tel. Nos. 927-0923 Tel. Nos. 928-4561 Tel. Nos. 433-3444 Tel. Nos. 816-6666
For further information and queries, you may visit us at the Philippine Domestic Construction Board (PDCB), 3rd Floor, Jupiter 1 Building, 56 Jupiter Street, Bel-Air Village, Makati City; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.
3
UNIFORM CODING SCHEME FOR THE CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) – INFORMATION SYSTEM
AGENCY REMARKS CODE DESCRIPTION CODE DESCRIPTION
BCDA Bases Conversion Development Authority AHD Project is Ahead of Schedule DPWH Department of Public Works and Highways DEL Project is Delayed of Schedule NIA National Irrigation Administration ONS Project is On Schedule NHA National Housing Authority CWS Contract Works Suspended PPA Philippine Ports Authority PSC Project Substantially Completed PRRC Pasig River Rehabilitation Center TER Terminated
PCAB-ARC CATEGORY CPES RATING/QUALITATIVE DESCRIPTION DESCRIPTION CODE DESCRIPTION CPES RATING
Agency Registration Classification Small “A” SA Outstanding > 90% Small “B” SB Very Satisfactory > 80% but < 90% Medium “A” MA Satisfactory > 70% but < 80% Medium “B” MB Fair > 60% but < 70% Large “A” LA Poor < 60% Large “B” LB
4
PCAB PROJECT CLASSIFICATION CODE DESCRIPTION
GB-1 Building or Industrial Plant
GB-2 Sewerage or Sewage Treatment/Disposal System
GE-1 Road, Highway, Pavement, Railways, Airport Horizontal Structure & Bridges
GE-2 Irrigation or Flood Control
GE-3 Dam, Reservoir or Tunneling
GE-4 Water Supply
GE-5 Port, Harbor or Offshore
SP-EE Specialty – Electrical Work
SP-WD Specialty – Well-Drilling Work
SP Other Specialty Works Not Included in the Classification
5
*CAUSES OF DELAY
CONSTRUCTOR-RELATED PROBLEMS AGENCY-RELATED PROBLEMS
C-W01 - Insufficient manpower deployed in project site A - VO1 - Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A - TO1 - Delays in the approval of contract time C-EO2 - Lack/Insufficient/Inadequate equipment deployed in extension project site C-MO1- Lack/Inadequate/Insufficient supply of construction A - SO1 - Delays in the approval of suspension Materials order C-RO1- Lack of financial resources A - DO1 - Changes in construction designs A - FO1 - Delays in the releases of funds A - RO1 - Right of Way (ROW) acquisition problem (squatter relocation problems, relocation of utilities, (i.e. PLDT, MERALCO posts and other similar cases) OTHER- RELATED PROBLEMS A - PO1 - Delays in acquisition of necessary permits O-WO1- Unfavorable weather condition (Occurrence of natural Calamities; occurrence of flooding/siltation on site; Unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDR
121 Construction 21686 Const. of Cemented Footbridge, Sapang Bayan Final III 0.946 C 0.304 0.285 0.300 - - - 88.90 91.06%
Outstanding
121 Construction 21686 Const. of MPB @ Bulacan State University Compound 1st III 0.945 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 -
2H2L Construction 16293 Conc. of Road @ Package 3-2 1st/Final XI 0.565 C 0.343 0.300 0.300 - - - 94.30 94.30% Oustanding
2H2L Construction 16293 Const. (Completion) of Sch. Bldg. @ dela Paz E/S 1st/Final IVA 0.791 C 0.366 0.200 0.300 - - - 86.60 86.60%
V.Satisfactory
310 Construction Specialist Corporation 4875 Asphalt Overlay of Tigaon-Goa-
Lagonoy Road Final V 47.945 C 0.450 - 0.500 - - - 95.00 95.12% Outstanding
310 Construction Specialist Corporation 4875 Const. of Tumana Bridge (Phase III) 1st NCR 26.854 O 0.345 0.223 0.100 0.030 0.051 0.100 84.90 -
310 Construction Specialist Corporation 4875 Const. of Tumana Bridge (Phase III) Final NCR 26.854 C 0.221 0.190 0.300 - - - 71.10 79.38%
Satisfactory
3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 2nd X 2.365 O 0.268 0.300 0.050 0.030 0.044 0.067 75.90 -
3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 3rd X 2.365 O 0.394 0.300 0.050 0.020 0.047 0.067 87.80 -
3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 4th X 2.365 O 0.219 0.300 0.100 0.030 0.035 0.100 78.40 -
3K Builders 27277 Const. of Curifang FMR 1st/Final II 0.277 C 0.386 0.300 0.300 - - - 98.60 98.60% Outstanding
3K Builders 27277 Const. of Multi-Purpose Building 1st/Final I 0.480 C 0.362 0.200 0.300 - - - 86.20 86.20% V.Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building (Gymnasium) 1st/Final II 1.194 C 0.327 0.200 0.300 - - - 82.70 82.70%
V.Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building @ MIT 1st/Final II 0.478 C 0.297 0.300 0.300 - - - 89.70 89.70%
V.Satisfactory
3K Rock Engineering 27908 Completion of One (1) CL, Secondary School Building 1st/Final II 0.182 C 0.349 - 0.500 - - - 84.90 84.90%
V.Satisfactory
3-L Construction 16745 Concreting of Barangay Road 1st V 0.550 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -
NAME of CONSTRUCTOR LICENSE NO. PROJECT NAME
CONTRACT AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 1
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
3-L Construction 16745 Const. of Multi-Purpose Hall, Lupi H/S 1st/Final V 0.469 C 0.393 0.182 0.300 - - - 87.50 87.50%
V.Satisfactory
3RB Construction and Supply 19541 Const. of Almine-Bagacay Road,
Almine Section 2nd V 4.625 O 0.184 0.059 0.100 0.015 0.027 0.100 48.50 -
3RB Construction and Supply 19541 Const. of Municipal High School
Building Final IV-A 9.130 C 0.382 0.183 0.300 - - - 86.50 84.82% V.Satisfactory
3RB Construction and Supply 19541 Rehabilitation of Canal Network
(phase 1) 1st NIA Region V 11.008 O 0.276 0.200 0.100 0.018 0.033 0.200 82.70 -
3RB Construction and Supply 19541 Rehabilitation of Canal Network
(phase 2) 1st NIA Region V 8.856 O 0.291 0.200 0.100 0.018 0.033 0.200 84.20 -
4 A's Construction 9446 Const. of 2 Storey 4 Classroom School Bldg. @ Gosi E/S 1st/Final II 1.077 C 0.312 0.258 0.300 - - - 87.00 87.00%
V.Satisfactory
4 A's Construction 9446 Repair/Rehab. of Saint Paul Vocational H/S 1st/Final II 0.189 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
4B Construction and Corporation 23445 Rehab. of Olongapo-Bugallon Road,
San Marcelino Section 1st/Final III 4.675 C 0.394 0.200 0.300 - - - 89.40 89.40% V.Satisfactory
525 Construction 28532 Repair & Impvt. of Daang Maharlika Road 1st/Final III 14.801 C 0.333 0.200 0.300 - - - 83.30 83.30%
V.Satisfactory
525 Construction 28532 Road Conc., Taal Bocaue 1st/Final III 1.899 C 0.357 0.289 0.300 - - - 94.60 94.60% Outstanding
525 Construction 28532 Road Rehabilitation at Mapulang Lupa 1st/Final III 0.944 C 0.382 0.300 0.300 - - - 98.20 98.20%
Outstanding558 Builders &
Construction Supply 25751 Const. of FMR Lower Mainit 1st XII 0.465 O 0.297 0.132 0.100 0.022 0.041 0.100 69.20 -
558 Builders & Construction Supply 25751 Const. of FMR Lower Mainit 2nd XII 0.465 O 0.056 0.225 0.000 0.030 0.042 0.033 38.60 -
558 Builders & Construction Supply 25751 Const. of FMR Lower Mainit Final XII 0.465 C 0.160 0.300 0.300 - - - 76.00 63.74%
Fair558 Builders &
Construction Supply 25751 Const. of Maligang River Flood Control Final XII 2.217 C 0.278 0.300 0.000 - - - 57.80 61.28%
Fair
558 Builders & Construction Supply 25751 Const. of MPB (Mini Gym) @ Padada
Central E/S Final XI 1.420 C 0.387 0.260 0.300 - - - 94.70 82.66% V.Satisfactory
558 Builders & Construction Supply 25751 Const. of Public Market @ Poblacion
Alabel 1st XII 2.818 O 0.333 0.159 0.050 0.030 0.037 0.100 70.90 -
739 Builders 31174 Const. of Repair of Villamar Bridge 1st/Final I 0.474 C 0.400 0.200 0.300 - - - 90.00 90.00% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 2
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
747 Builders & Trader 16892 Impvt./Dredging/Rehab. of Baybay Sapa (along Lopezville Subd.) 1st IVA 4.797 O 0.213 0.200 0.100 0.030 0.028 0.200 77.10 -
747 Builders & Trader 16892 Impvt./Dredging/Rehab. of Baybay Sapa (along Lopezville Subd.) Final IVA 4.797 C 0.250 0.300 0.300 - - - 85.00 80.26%
V.Satisfactory
8 R's Construction 22997 Barangay Hulo Linear Park Project (EPA - LPP - 19) 2nd PRRC 22.542 O 0.311 0.270 0.100 0.015 0.042 0.100 83.80 -
811 Trading & Construction 21215 Rehab. of Mansalay-Bulalacao Road 1st/Final IV-B 1.408 O 0.328 0.276 0.100 0.022 0.016 0.100 84.20 -
A. Ballesta Construction 8446 Const. of One (1) Cl School Building Final VIII 0.360 C 0.442 - 0.500 - - - 94.20 61.02% Fair
A. De Guia Construction 18228 Const. of Balluyan Brgidge, Phase I Sta. Maria 1st CAR 3.626 O 0.158 0.120 0.100 0.015 0.035 0.100 52.80 -
A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria 2nd CAR 3.626 O 0.326 0.240 0.070 0.015 0.049 0.067 76.70 -
A. De Guia Construction 18228 Improvement of Buluan-Daga Road 1st CAR 7.519 O 0.110 0.018 0.050 0.008 0.033 0.033 25.20 -
A. De Guia Construction 18228 Improvement of Buluan-Daga Road Final CAR 7.519 C 0.179 0.300 0.000 - - - 47.90 34.28% Poor
A. De Guia Construction 18228 Widening of Ballacayu-Simanu Road Final II 2.751 C 0.270 0.200 0.300 - - - 77.00 75.71% Satisfactory
A. Munas Integrals Builders & Trading 32003 Const./Rehab. of MPB @ Block 4,
Kaingin 1 1st/Final NCR 3.803 C 0.347 0.300 0.300 - - - 94.70 94.70% Outstanding
A. Seva Construction 20124 Const. of Building at San Fernando H/S 1st V 0.468 O 0.395 0.201 0.100 0.030 0.038 0.067 83.10 -
A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. Final VII 0.415 C 0.382 0.100 0.300 - - - 78.20 85.69% V.Satisfactory
A.C. Rivero Construction & Dev't. Corporation 5122 Const. of Candaguit Bridge Final VI 9.922 C 0.347 0.200 0.300 - - - 84.70 88.89%
V.Satisfactory
A.C. Rivero Construction & Dev't. Corporation 5122
Const./Replacement of Caliban Bridge (Phase 2) along Bacolod-Murcia-D.S. Benedicto-San Carlos City National Road
1st VI 6.951 O 0.400 0.300 0.070 0.020 0.023 0.067 88.00 -
A.C. Rivero Construction & Dev't. Corporation 5122
Const./Replacement of Caliban Bridge (Phase 2) along Bacolod-Murcia-D.S. Benedicto-San Carlos City National Road
Final VI 7.289 C 0.379 0.300 0.300 - - - 97.90 90.22% Outstanding
A.D. Construction 6946 Const. of MPB 1st/Final IV-A 0.944 C 0.343 0.200 0.300 - - - 84.30 84.30% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 3
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
A.D. Construction 6946 Rehab. of Panganiban Drainage Final V 4.212 C 0.288 0.300 0.300 - - - 88.80 77.82% Satisfactory
A.D. Gonzales Jr. Construction and Trading
Company Inc.10012 Const. of BGHMC Acute Psychiatric
Unit Bldg. 2nd CAR 21.206 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -
A.D. Gonzales Jr. Construction and Trading
Company Inc.10012 Impv't./Rehab. of San Ahustin-San
Joaquin Road 1st III 4.752 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -
A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road 1st VI 18.917 O 0.370 0.220 0.050 0.008 0.037 0.067 75.20 -
A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) 1st VI 10.561 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR 2nd VI 13.743 O 0.328 0.300 0.100 0.024 0.035 0.100 88.70 -
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR 3rd VI 13.922 O 0.325 0.240 0.070 0.023 0.032 0.067 75.70 -
A.D.S. San Juan Construction 12853 Const. of St. Benedict MPB 1st/Final NCR 1.721 C 0.280 0.300 0.300 - - - 88.00 88.00%
V.Satisfactory
A.E. Belleza Builders 22646 Const. of Day Care Center, Phase I Final V 0.379 C 0.415 - 0.500 - - - 91.50 84.78% V.Satisfactory
A.J. Taylan Const. Corp./BSP & Co., Inc.
(J.V.)
JV-020104
Const. of Gasgas Bridge under JICA Bridge Projects along Rural 3rd I 63.299 O 0.343 0.275 0.050 0.030 0.055 0.067 82.00 -
A.L. Dare Construction 11932 Impv't. of Balaybay Farm-to-Market Road Brgy. Balaybay 1st III 0.930 O 0.288 0.225 0.100 0.015 0.032 0.067 72.70 -
A.L. Salazar Construction, Inc. 3899 Rehab./Const. of Port Barton-
Kemdeng Road 1st IV-B 9.122 O 0.322 0.045 0.100 0.030 0.033 0.067 59.70 -
A.M. Donceras Construction 30528
Const. of Arteche-Lapinig Road, Sta.960-160-Sta.961-260 with exceptions
Final VIII 8.008 C 0.247 - 0.000 - - - 24.70 48.28% Poor
A.M. Robles Construction 28056 Const. of Multi-Purpose Bldg. @ Brgy. Minuyan 1st III 2.850 O 0.356 0.248 0.100 0.030 0.035 0.100 86.90 -
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Lomboy E/S 1st/Final III 0.637 C 0.363 0.178 0.300 - - - 84.10 84.10%
V.Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Talavera CES 1st/Final III 0.640 C 0.316 0.255 0.300 - - - 87.10 87.10%
V.Satisfactory
A.M.P. Construction 16574 Const. of 2-Cl S/B @ Tabacao H/S Final III 0.737 C 0.403 - 0.500 - - - 90.30 90.30% Outstanding
A.M.P. Construction 16574 Const. of Multi-Purpose Bldg. @ Zaragosa Nat'l. H/S Final III 2.807 C 0.295 0.217 0.300 - - - 81.20 66.71%
Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 4
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
A.M.P. Construction 16574 Const. of Multi-Purpose Building at Poblacion Sison 1st/Final I 1.349 C 0.297 0.235 0.300 - - - 83.20 83.20%
V.Satisfactory
A.P. Palacios Construction 29021 Concreting of Provincial Road, Brgy.
Matawe 1st/Final III 3.239 C 0.286 0.300 0.300 - - - 88.60 88.60% V.Satisfactory
A.P. Palacios Construction 29021 Concreting of Road 1st/Final III 0.935 C 0.425 - 0.500 - - - 92.50 92.50%
OutstandingA.P.O. General Construction 7010 Completion of School Bldg., Happy
Hollow E/S 1st CAR 0.638 O 0.373 0.240 0.100 0.023 0.018 0.100 85.40 -
A.Q. Dominguez Construction & Supply 19843 Con. of Casanicolan-Sn. Marcelino
Road 1st I 0.964 O 0.318 0.180 0.100 0.023 0.041 0.100 76.20 -
A.R. Cruz Construction, Inc. (Formerly: AR Cruz
Const.)12157 Concreting of Callaguip Barangay
Road 1st/Final I 0.707 C 0.264 - 0.500 - - - 76.40 76.40% Satisfactory
A.R. Lustre Jr. Construction 7680 Completion of 2-Storey Building @
BSU Matungao Branch 1st/Final III 1.403 C 0.329 0.300 0.300 - - - 92.90 92.90% Outstanding
A.R. Lustre Jr. Construction 7680 Concreting of Puerto Princesa
Sabang Rd., (Underground River) 1st IV-B 9.468 O 0.355 0.300 0.100 0.030 0.033 0.100 91.80 -
A.R. Lustre Jr. Construction 7680 Concreting of Puerto Princesa
Sabang Rd., (Underground River) Final IV-B 9.468 C 0.372 0.300 0.300 - - - 97.20 93.96% Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Bobosawen-Apurawan
FMR 1st IV-B 46.650 O 0.353 0.249 0.100 0.030 0.070 0.100 90.20 -
A.R. Lustre Jr. Construction 7680 Const. of Culasian Bridge 1st/Final IV-B 10.076 C 0.333 0.300 0.300 - - - 93.30 93.30%
Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Culasian Bridge &
Approaches (Completion) Phase II 1st IV-B 5.828 O 0.360 0.300 0.100 0.030 0.035 0.100 92.50 -
A.R. Lustre Jr. Construction 7680
Const. of Std. 2-Cl School Bldg. @ Santor E/S & Rehab. of Sch. Bldg. @ Mambog E/S
1st/Final III 1.119 C 0.318 0.300 0.300 - - - 91.80 91.80% Outstanding
A.R. Lustre Jr. Construction 7680 Const./Rehab. of Iwahig-Tacduan
Diversion Road National Highway 1st IVB 11.430 O 0.238 0.096 0.100 0.030 0.040 0.100 60.40 -
A.R.L. Construction 27645 Repair/Rehabilitation of Tatalon Street, Brgy. Ugong 1st/Final NCR 2.312 C 0.389 - 0.500 - - - 88.90 88.90%
V.Satisfactory
A.R.L. Construction 27645 Upgrading of A.T. Santiago Brgy. Viente Reales 1st/Final NCR 0.897 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 5
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
A.R.L. Construction 27645 Upgrading of Sapang Bakaw Road, Brgy. Lawang Bato Final NCR 1.881 C 0.333 0.300 0.300 - - - 93.30 88.80%
V.Satisfactory
A.V. Construction Supply 13202 Const. of 4-Cl, 2-Storey School Building 1st/Final IV-A 2.617 C 0.354 0.200 0.300 - - - 85.40 85.40%
V.Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of 1 Cl 1 Storey Sch. Bldg. @
Gasco E/S 1st/Final XI 0.434 C 0.375 0.157 0.300 - - - 83.20 83.20% V.Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building Final XI 0.657 C 0.415 - 0.500 - - - 91.50 87.51%
V.Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building @
Purok Rivera Final XI 0.472 C 0.325 - 0.500 - - - 82.50 83.69% V.Satisfactory
AAA Structures & Builders, Inc. 30935 Conc./Impv't. of Magsaysay Brgy.
Road 1st/Final II 0.878 C 0.270 - 0.500 - - - 77.00 77.00% Satisfactory
AB Vision Engineering Construction 19845 Const. of MPB 1st/Final XI 1.607 C 0.393 0.300 0.300 - - - 99.30 99.30%
Outstanding
Aboitiz Construction Group, Inc. 2608 C.P. PY-D Structural Overlay of
Patnongon-Nabas Road Final ADB 166.347 C 0.323 0.200 0.000 - - - 54.80 71.86% Satisfactory
Aboitiz Construction Group, Inc/Kumagai Gumi
Co. Ltd. (J.V.)
SLI-SN-003884
Cebu South Road Improvement Project CP-1 (Talisay-Jct. Toledo Sect.)
2nd VII 513.289 O 0.332 0.300 0.000 0.030 0.065 0.100 82.70 -
Abulug Construction 5593 Construction of Canal and Canal Structures (LMC-ARIP-10-06) Final NIA
Region II 4.877 C 0.400 0.300 - - - - 70.00 70.00% Fair
Abulug Construction Company, Inc. 5593 Const. of Dagupan MPB 1st/Final CAR 0.442 C 0.226 0.184 0.300 - - - 71.00 71.00%
SatisfactoryAbulug Construction
Company, Inc. 5593 Const./Completion of Cabaruan Bridge 1st/Final II 0.383 C 0.178 0.271 0.300 - - - 74.90 74.90%
SatisfactoryAbulug Construction
Company, Inc. 5593 Regravelling of Allsitan-Biduang-Nagattatan Road 1st II 1.923 O 0.300 0.225 0.100 0.030 0.051 0.067 77.30 -
Abulug Construction Company, Inc. 5593 Rehab. of Drainage Canal Bangued-
Pidigan Section 1st CAR 2.385 O 0.225 0.000 0.100 0.008 0.022 0.200 55.50 -
Abulug Construction Company, Inc. 5593 Rehab. of Drainage Canal Bangued-
Pidigan Section Final CAR 2.385 C 0.288 0.300 0.300 - - - 88.80 68.82% Fair
Abulug Construction Company, Inc. 5593 Repair of Cristina H/S and Rehab. of
Bucay C/S 1st CAR 0.474 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -
Abulug Construction Company, Inc. 5593 Repair/Impv't. of Calog-Luna-Pudtol
Road 1st II 1.180 O 0.369 0.200 0.100 0.010 0.033 0.100 81.20 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 6
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Abulug Construction Company, Inc. 5593 Repair/Impv't. of Calog-Luna-Pudtol
Road Final II 1.180 C 0.293 0.218 0.300 - - - 81.10 81.16% V.Satisfactory
Abulug Construction Company, Inc. 5593
Restoration of Damaged Roadways along BAMR (Sinking Pavement @ Logac Section)
1st/Final II 1.392 C 0.316 - 0.500 - - - 81.60 81.60% V.Satisfactory
ACJ Construction Resources 10635 Const. of Mayor Ricardo L. Ipong
Memorial National H/S Final XII 4.634 C 0.355 0.300 0.300 - - - 95.50 86.19% V.Satisfactory
ACJ Construction Resources 10635
Const. of Saguing Bridge along Davao-Cotabato Rd., Including Approaches and Gap Section
2nd XII 9.328 O 0.337 0.300 0.100 0.030 0.052 0.100 91.90 -
ACJ Construction Resources 10635
Const. of Saguing Bridge along Davao-Cotabato Rd., Including Approaches and Gap Section
Final XII 9.328 C 0.283 0.297 0.300 - - - 88.00 90.16% Outstanding
ACJ Construction Resources 10635 Const./Impvt of Jct. Meocad-
Salasang-Katipunan Road Final XII 28.842 C 0.337 0.300 0.300 - - - 93.70 94.18% Outstanding
ACO Construction 13105 Repair of OB-Gyne Zamboanga City Medical Center 1st/Final IX 5.704 C 0.121 0.200 0.300 - - - 62.10 62.10%
FairAdelfa & Charlie
Enterprises 11569 Concrete Paving of Sambulawan-Calaguise Rd. 1st VIII 4.477 O 0.359 0.247 0.100 0.030 0.037 0.100 87.30 -
Adelfa & Charlie Enterprises 11569 Const. of Imbornal Bridge 1st/Final VIII 4.239 C 0.371 0.300 0.300 - - - 97.10 97.10%
OutstandingAdelfa & Charlie
Enterprises 11569 Const. of Palid Bridge 1st/Final VIII 5.281 C 0.348 0.300 0.300 - - - 94.80 94.80% Outstanding
Adelfa & Charlie Enterprises 11569 Rehab. of Palompon-Villaba Road 1st VIII 9.490 O 0.352 0.214 0.100 0.030 0.056 0.100 85.20 -
Adelfa & Charlie Enterprises 11569
Repair of Roads along Tabango-Villaba-Palompon Road & Sto. Rosario-Villaba Road
1st VIII 9.641 O 0.350 0.200 0.100 0.030 0.032 0.100 81.20 -
Adfil Corporation 14437 Conc. of Agusan-Surigao Road (Ampayon Section) 1st XIII 4.691 O 0.383 0.300 0.100 0.030 0.025 0.100 93.80 -
Adfil Corporation 14437 Conc. of Agusan-Surigao Road (Ampayon Section) Final XIII 4.691 C 0.367 0.300 0.300 - - - 96.70 94.96%
Outstanding
Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) 1st XIII 22.141 O 0.334 0.300 0.030 0.030 0.028 0.033 75.50 -
Adfil Corporation 14437 Const. of Taguibo Flood Control 1st/Final XIII 14.413 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
Adfil Corporation 14437 Const. of Waloe Bridge 1st XIII 9.199 O 0.372 0.300 0.100 0.030 0.054 0.100 95.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 7
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Adfil Corporation 14437 Const. of Waloe Bridge Final XIII 9.199 C 0.339 0.200 0.300 - - - 83.90 90.92% Outstanding
Adfil Corporation 14437 Improvement of Masao River Flood Control, Phase III Final XIII 4.590 C 0.500 0.567 - - - - 106.70 94.70%
Outstanding
Adfil Corporation 14437 Impvt. of Agusan-Surigao Road (Ampayon Section) 1st/Final XIII 9.290 C 0.354 0.200 0.300 - - - 85.40 85.40%
V.Satisfactory
Adfil Corporation 14437 Impvt. of Lake Mainit CircumferentialRoad, Brgy. Colorado Section 1st/Final XIII 9.525 C 0.172 0.233 0.300 - - - 70.50 70.50%
Satisfactory
Adfil Corporation 14437 Rehab./Impvt. of Sagal-ang Manubiray FMR Final X 13.894 C 0.358 0.278 0.300 - - - 93.60 73.32%
Satisfactory
Adimre Construction 25534Const. of Std. 1-Cl School Bldg. @ N. Clemena E/S, Bulihan & Bagbaguin E/S
Final III 0.868 C 0.318 0.300 0.300 - - - 91.80 82.63% V.Satisfactory
Advanced Foundation Construction Systems
Corp.15449 Const. of Subic-Cawag Bridge I,
along Subic-Cawag-Balaybay Road 1st III 47.952 O 0.331 0.300 0.100 0.030 0.040 0.100 90.10 -
AG Construction 7921 Conc. of Wright Park Grounds 1st/Final CAR 0.936 C 0.286 0.300 0.300 - - - 88.60 88.60% V.Satisfactory
Agafer Construction 7912 Conc. of Centro 2 1st/Final II 0.963 C 0.284 0.204 0.300 - - - 78.80 78.80% Satisfactory
AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc 2nd XII 21.500 O 0.314 0.159 0.100 0.030 0.042 0.100 74.50 -
AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc 4th XII 22.822 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -
AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc Final XII 22.822 C 0.279 0.200 0.300 - - - 77.90 81.22%
V.Satisfactory
AJYSC Marketing 26924 Impvt. of Highway Jct. Malandag-Allae FMR, Malungon ARC Final XII 18.364 C 0.330 0.300 0.300 - - - 93.00 80.16%
V.Satisfactory
Akela Builders 26444 Const./Rehab. of MPB @ Novaliches Proper 1st/Final NCR 1.335 C 0.386 0.291 0.300 - - - 97.70 97.70%
OutstandingAKH Construction and Trading Corporation 20759 Const. of MPB @ Brgy. 177 1st/Final NCR 4.745 C 0.399 0.300 0.300 - - - 99.90 99.90%
Outstanding
AKN Construction Corp. (Formerly: AKN Const.) 11845 Concreting of Quirino Avenue, Brgy.
La Huerta San Isidro Final NCR 4.766 O 0.339 0.300 0.300 - - - 93.90 -
Al Chris Construction 12406 Conc. of Maribojoc-Antequera Road Final VII 9.142 C 0.337 0.100 0.300 - - - 73.70 71.24% Satisfactory
Al Chris Construction 12406 Concreting of Maribojoc-Antequera Road 1st VII 9.142 O 0.281 0.238 0.070 0.015 0.025 0.067 69.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 8
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Al Chris Construction 12406 Const. of 1-Cl School Bldg., Ipo, Anda, Bohol Final VII 0.435 C 0.439 - 0.000 - - - 43.90 71.62%
Satisfactory
Al Fahdel Construction & Engineering 17953
Concreting of Iligan-Bukidnon Road Bonbonan Digkilaan & Rogongon Sections,
1st X 2.238 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -
Al Hussein Construction 18438 Cluster III-Const. of Various Projects in Salvador Inasagan & Sudlon Final X 4.242 C 0.297 0.300 0.300 - - - 89.70 81.44%
V.Satisfactory
Al Hussein Construction 18438 Completion of Malaapo Bridge & Approaches 1st X 5.380 O 0.267 0.233 0.100 0.030 0.022 0.100 75.20 -
Al Hussein Construction 18438 Completion of Malaapo Bridge & Approaches Final X 5.380 C 0.325 0.300 0.300 - - - 92.50 82.12%
V.Satisfactory
Al Hussein Construction 18438 Const. of Cagascas Bridge and Approaches 1st X 11.983 O 0.332 0.300 0.100 0.030 0.037 0.100 89.90 -
Al Niño Construction Supply 18378 Construction of Diversion Work 1st NIA 4.048 C 0.381 0.124 0.100 0.018 0.029 0.200 85.20 85.20%
V.Satisfactory
Alajeño Construction and Supplies 28713 Const. of Spring Development 1st/Final IX 1.208 C 0.394 0.016 0.300 - - - 71.00 71.00%
Satisfactory
Alberto Uy Construction & Development 20924 Const. of 1 CL @ Labasan NHS 1st IV-B 0.437 O 0.344 0.267 0.100 0.008 0.025 0.050 79.40 -
Alberto Uy Construction & Development 20924 Const. of 1 CL @ Labasan NHS Final IV-B 0.437 C 0.348 0.143 0.300 - - - 79.10 79.31%
Satisfactory
Alberto Uy Construction & Development 20924 Const. of Bongabong River Front 1st IV-B 4.700 O 0.270 0.300 0.100 0.023 0.035 0.100 82.80 -
Alberto Uy Construction & Development 20924 Const. of Bongabong River Front
(Phase II) 1st IV-B 1.871 O 0.350 0.275 0.100 0.023 0.021 0.100 86.90 -
Albeva Konstrukt & Development Corporation 25480 Const. of NIA Central office Covered
Court 1st NIA 6.660 O 0.274 0.300 0.100 0.030 0.038 0.100 84.20 -
Alcel Construction 15129 Asphalt Overlay along Pangasinan-Zambales Road 1st I 9.497 O 0.300 0.200 0.100 0.008 0.028 0.100 73.60 -
Alcel Construction 15129 Asphalt Overlay along Pangasinan-Zambales Road Final I 9.497 C 0.215 0.300 0.300 - - - 81.50 76.76%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 9
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Alcel Construction and Supply 15129
Asphalt Overlay along Manila North Road Km. 299+100 to Km. 299+300 with exception and San Fernando access road to Poro Pt. Km. 269+715Km. 270+042
1st I 0.949 O 0.287 0.300 0.100 0.020 0.030 0.100 83.70 -
Alcel Construction and Supply 15129
Asphalt Overlay along Manila North Road Km. 299+100 to Km. 299+300 with exception and San Fernando access road to Poro Pt. Km. 269+715Km. 270+042
Final I 0.947 C 0.304 0.200 0.300 - - - 80.40 74.34% Satisfactory
Alcel Construction and Supply 15129 Const. of Multi-Purpose Building @
Poblacion Final I 0.948 C 0.386 0.200 0.300 - - - 88.60 87.62% V.Satisfactory
Aldana Construction 21736 Const. of 1 Unit 3 CL School Building at SEPNAS 1st I 1.135 C 0.226 0.300 0.100 0.015 0.056 0.100 79.70 -
Aldana Construction 21736 Const. of 1 Unit 3 CL School Building at SEPNAS Final I 1.135 C 0.357 0.300 0.300 - - - 95.70 84.50%
V.Satisfactory
Aldana Construction 21736 Const. of 4-Cl Sta. Ana Elementary School Building 1st/Final I 2.892 C 0.376 - 0.500 - - - 87.60 87.60%
V.Satisfactory
ALE Builders Construction and
Development Corp.5180 Const. of MPB at Brgy. 34 & 35 1st NCR 4.666 O 0.349 0.240 0.100 0.030 0.056 0.067 84.20 -
Alebon Genuine Merchandising 26300
Conc. of By-Pass Road & Lined Canal w/ spillway along By Pass Road
1st X 4.089 O 0.376 0.300 0.000 0.023 0.040 0.067 80.60 -
Alebon Genuine Merchandising 26300
Conc. of By-Pass Road & Lined Canal w/ spillway along By Pass Road
Final X 4.089 C 0.170 0.300 0.000 - - - 47.00 67.16% Fair
Alex V. Pamatong Trading & Construction 13290 Cagayan De Oro Convention Center
Access Road Brgy. Indahag Final X 7.434 C 0.274 0.284 0.300 - - - 85.80 67.46% Fair
Alexa Trading & Construction 22143 Proposed Barangka Ibaba Linear
Park 2nd/Final PRRC 5.836 Suspended 0.350 0.300 0.300 - - - 90.10
Al-Fahdel Construction & Engineering 17953 Const. of Tugar Bridge 2nd X 4.678 O 0.337 0.300 0.100 0.023 0.051 0.100 91.10 -
Alfalfa Construction 29712 Repair/Rehab. of Poblacion-Boliwong Road 1st/Final CAR 0.378 C 0.397 0.071 0.300 - - - 76.80 76.80%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 10
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Concreting of Bacolod-Murcia-D.S. Benedicto Road 2nd VI 4.644 O 0.012 0.181 0.000 0.023 0.005 0.033 25.40 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Concreting of Bacolod-Murcia-D.S. Benedicto Road Final VI 4.644 C 0.300 0.289 0.300 - - - 88.90 66.34%
Fair
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Const. of Libas-Panaquiao Bridge 2nd VI 25.628 O 0.346 0.300 0.100 0.030 0.070 0.100 94.60 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Const. of Libas-Panaquiao Bridge Final VI 25.628 C 0.311 0.300 0.300 - - - 91.10 90.47% Outstanding
Algimar Construction 15232 Concreting of Moyot Street Final V 4.624 C 0.362 - 0.500 - - - 86.20 78.28% Satisfactory
Algimar Construction 15232 Const. of 1-Unit Classroom Modified School Building 1st V 0.367 O 0.325 0.300 0.100 0.030 0.022 0.100 87.70 -
Algimar Construction 15232 Const. of MPB at DECS Compound 1st/Final V 1.918 C 0.373 0.200 0.300 - - - 87.30 86.08% V.Satisfactory
Algimar Construction 15232 Const. of Multi-Purpose Building (Phase II) 2nd V 4.626 O 0.334 0.300 0.100 0.030 0.035 0.100 89.90 -
Algimar Construction 15232 Const. of Multi-Purpose Building @ DECS Compound 1st V 4.790 O 0.396 0.225 0.100 0.030 0.041 0.100 89.20 -
Algimar Construction 15232 Gravelling of San Fernando South Road 1st/Final V 1.841 C 0.220 0.200 0.300 - - - 72.00 72.00%
Satisfactory
Algimar Construction 15232 Rehab. of Sitio Calumpang-Malinta Road 1st/Final V 0.955 C 0.363 0.300 0.300 - - - 96.30 96.30%
Outstanding
Algimar Construction 15232 Rehabilitation of San Fernando North Road 1st/Final V 1.859 C 0.442 - 0.500 - - - 94.20 94.20%
OutstandingAlgimar Construction 15232 Repair of Calapi Bridge 1st V 1.898 O 0.341 0.240 0.100 0.010 0.019 0.100 81.00 -
Algimar Construction 15232 Repair of Calapi Bridge Final V 1.898 C 0.381 0.100 0.300 - - - 78.10 79.84% Satisfactory
Algon Engineering Construction Corporation 270
Const. of Hulid Bridge & Approaches along-Cateel-Compostela Secondary Nat'l Rd.
1st XI 11.798 O 0.320 0.256 0.100 0.030 0.048 0.100 85.40 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 11
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Allen Construction 12584 Conc. of Agbanawag-Cabucbucan Road 1st/Final III 1.885 C 0.290 0.300 0.300 - - - 89.00 89.00%
V.Satisfactory
Allen Construction 12584 Const. of School Building @ CLSU (Mini Amphi-Theatre) 1st III 0.937 O 0.385 0.212 0.100 0.015 0.032 0.100 84.40 -
Allencon Development Corporation 12302 Asphalt Overlay of Janiuay-
Lambunao Nat'l. Road 1st VI 1.918 C 0.421 - 0.500 - - - 92.10 92.10% Outstanding
Allencon Development Corporation 12302 Asphalting of Magamay-Napandong
Road 1st/Final VI 2.825 C 0.249 0.300 0.300 - - - 84.90 84.90% V.Satisfactory
Allencon Development Corporation 12302 Asphalting of Priority Road Section,
San Antonio-Calaya Road 1st/Final VI 3.547 C 0.318 0.300 0.300 - - - 91.80 91.80% Outstanding
Alleyway Construction 15310 Const. of MPB @ So. Cabading 1st/Final IV-A 1.437 C 0.346 0.213 0.300 - - - 85.90 85.90% V.Satisfactory
Alleyway Construction 15310 Const. of School Building in Tondo, Manila, Centex E/S 1st NCR 1.850 O 0.336 0.300 0.100 0.030 0.042 0.100 90.80 -
Alleyway Construction 15310 Const. of School Building in Tondo, Manila, Centex E/S Final NCR 1.859 C 0.272 0.300 0.300 - - - 87.20 89.72%
V.Satisfactory
Alleyway Construction 15310 Rehab./Impvt. of Antipolo Circumferential Road "A" 1st/Final IV-A 9.994 C 0.313 0.300 0.300 - - - 91.30 91.30%
Outstanding
Almakar Builders & Metal Works 21929 Const. of 2 Storey 4 Classroom
School Bldg., @ Jimenez E/S Wawa I 1st/Final IV-A 2.891 C 0.166 0.229 0.300 - - - 69.50 69.50% Fair
Alnor Construction & Const. Supplies 26705 Completion of PNP Bldg. Final XIII 1.853 C 0.367 0.200 0.300 - - - 86.70 75.25%
SatisfactoryAlnor Construction &
Const. Supplies 26705 Const. of 2 Cl Magpayang NHS 1st XIII 0.801 O 0.382 0.240 0.100 0.030 0.039 0.100 89.10 -
Alnor Construction & Const. Supplies 26705 Const. of 2 Cl Magpayang NHS 2nd XIII 0.801 O 0.347 0.286 0.100 0.015 0.013 0.100 86.10 -
Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran 1st XIII 0.926 O 0.373 0.240 0.100 0.030 0.030 0.100 87.30 -
Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran 2nd XIII 0.926 O 0.345 0.300 0.100 0.022 0.013 0.100 88.00 -
Alnor Construction & Construction Supplies 26705 Completion of PNP Bldg. 1st XIII 1.852 O 0.313 0.000 0.100 0.023 0.032 0.100 56.80 -
Alnor Construction & Construction Supplies 26705 Completion of PNP Bldg. 2nd XIII 1.852 O 0.354 0.240 0.100 0.030 0.015 0.100 83.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 12
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Alnor Construction & Construction Supplies 26705 Const. of School Building 1st XIII 0.458 O 0.350 0.250 0.030 0.022 0.027 0.100 77.90 -
Alpha Ryder Construction & Supplies 12197 Concreting of Salvacion-Carjela
Road 1st/Final V 0.569 C 0.299 - 0.500 - - - 79.90 79.90% Satisfactory
Alpha Ryder Construction and Supplies 12197 Const. of Dancalan Bridge &
Approaches 1st/Final V 1.170 O 0.338 0.240 0.100 0.023 0.043 0.100 84.40 -
Alpha Tech Builders 26072 Conc. of Taloot RORO Road 1st/Final VII 4.628 C 0.364 0.300 0.300 - - - 96.40 96.40% Outstanding
Alpha Tech Builders 26072 Const. of Philippine Science High School Dormitory Ph 1 1st VII 4.625 O 0.308 0.240 0.100 0.030 0.040 0.100 81.80 -
Alpha Tech Builders 26072 Const. of Philippine Science High School Dormitory Ph 1 Final VII 4.625 C 0.310 0.300 0.300 - - - 91.00 84.56%
V.Satisfactory
Alphin Trading & Construction 26260 Const. of Ventinilla MPB 1st/Final I 1.034 C 0.357 0.300 0.300 - - - 95.70 95.70%
OutstandingAlphin Trading &
Construction 26260 Rehab. of Barangobong Bridge II 1st/Final I 1.068 O 0.275 0.300 0.100 0.015 0.047 0.100 83.70 -
Alphin Trading & Construction 26260 Rehab. of Barangobong Bridge II Final I 1.068 C 0.295 0.300 0.300 - - - 89.50 86.02%
V.Satisfactory
Alphin Trading and Construction 26260 Const. of 1-Unit 1Cl Bldg. @
Nagsaling E/S 1st/Final I 0.385 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory
Alphin Trading and Construction 26260 Const. of Multi-Purpose Bldg. @
Tuliao E/S 1st I 0.963 O 0.389 0.300 0.100 0.030 0.035 0.100 95.40 -
Alphin Trading and Construction 26260 Const. of Multi-Purpose Bldg. @
Tuliao E/S Final I 0.963 C 0.388 0.300 0.300 - - - 98.80 96.42% Outstanding
Alraf Construction & Enterprises 17297
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment II Manguso-Mulawin Section
1st IX 36.137 O 0.338 0.300 0.100 0.030 0.047 0.100 91.50 -
Alraf Construction & Enterprises 17297 Impvt./Widening of Sangali Nat'l
Road 1st/Final IX 6.592 C 0.243 0.300 0.300 - - - 84.30 84.30% V.Satisfactory
Alro Construction & Development Corp. 18361 Rehabilitation of Barangay Coguit-
San Isidro Brgy. Road 1st/Final V 3.706 C 0.406 - 0.500 - - - 90.60 90.60% Outstanding
Al's Enterprise and Construction 9721
Const. of All Weather FMR along Cabay-Caisawan Road (Sta.3+000-Sta.1+600)
1st/Final VIII 4.512 C 0.220 - 0.500 - - - 72.00 72.00% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 13
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Al's Enterprise and Construction 9721 Const. of MPB @ Brgy. Sabang
South 1st/Final VIII 1.431 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory
Al's Enterprise and Construction 9721
Rehab./Impvt. of Asphalt Pav't. along San Julian-Borongan Road Section
1st/Final VIII 9.530 C 0.233 0.200 0.300 - - - 73.30 73.30% Satisfactory
Alzam Enterprises 19113Const. of River Dike along Talomo River from Purok 9 going downstream
1st XI 4.704 O 0.390 0.160 0.100 0.020 0.043 0.200 91.30 -
Alzam Enterprises 19113 Widening/ Impvt. of Davao-Agusan Road, Ilang Tibungco Section 1st XI 9.419 O 0.376 0.300 0.100 0.030 0.040 0.100 94.60 -
Alzam Enterprises 19113 Widening/ Impvt. of Davao-Agusan Road, Ilang Tibungco Section Final XI 9.420 C 0.347 0.300 0.300 - - - 94.70 94.64%
Outstanding
Alzen Engineering & Construction Supplies 13911 Const. of Drainage Canal along
Cotabato-Davao Road Old Final XII 2.412 C 0.375 - 0.500 - - - 87.50 82.22% V.Satisfactory
Alzen Engineering & Construction Supplies 13911 Const./Impvt. of Binoongan-
Napaliko-Katipunan Road Final XII 24.050 C 0.322 0.300 0.300 - - - 92.20 92.98% Outstanding
AMJC Construction 21002 Const. of 3-CL School Building @ Ilocos Norte NHS 1st I 1.290 O 0.350 0.157 0.100 0.020 0.023 0.100 75.00 -
AMJC Construction 21002 Const. of 3-CL School Building @ Ilocos Norte NHS Final I 1.044 C 0.367 0.100 0.000 - - - 46.70 66.51%
Fair
Amopia Construction and Supplies 27511 Conc. of FMR at Purok 4 1st/Final XII 0.457 C 0.392 0.200 0.300 - - - 89.20 89.20%
V.Satisfactory
Angel & Sam Construction & General
Merchandise19968
Cluster I-Const. of Various School Buildings @ Cagayan de Oro City NHS
1st X 2.673 O 0.347 0.250 0.100 0.030 0.027 0.100 85.40 -
Angel & Sam Construction & General
Merchandise19968
Cluster I-Const. of Various School Buildings @ Cagayan de Oro City NHS
2nd X 2.673 O 0.293 0.300 0.100 0.015 0.042 0.100 85.00 -
Angel & Sam Construction & General
Merchandise19968
Cluster I-Const. of Various School Buildings @ Cagayan de Oro City NHS
Final X 2.673 C 0.370 0.300 0.000 - - - 67.00 79.74% Satisfactory
Angel & Sam Construction & General
Merchandise19968 Const. of 4 Cl School Bldg. @
Kauswagan E/S 1st X 1.682 O 0.234 0.300 0.100 0.030 0.029 0.100 79.30 -
Angel & Sam Construction & General
Merchandise19968 Const. of School Bldg. @
Minadanao Polytechnic College Final X 0.929 C 0.362 0.200 0.300 - - - 86.20 64.57% Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 14
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Angel & Sam Construction & General
Merchandise19968 Provision of Concrete Line Canal Final X 0.768 C 0.333 - 0.500 - - - 83.30 86.69%
V.Satisfactory
Anilos Trading & Construction 31557 Const. of 3 units 3 CL Sch. Bldg. w/
CR, Palawan Natl. H/S 1st/Final IV-B 1.293 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory
Anilo's Trading and Construction 31557 Const. of MPB (Phase II) Brgy.
Inagawan 1st/Final IV-B 0.934 C 0.315 0.161 0.300 - - - 77.60 77.60% Satisfactory
Anilo's Trading and Construction 31557 Const./Impvt. of Multi-Purpose
Buidling, Phase 1, 2-CL 1st/Final IV-B 1.897 C 0.373 0.200 0.300 - - - 87.30 87.30% V.Satisfactory
Anrol Construction 10136 Const. of Storey 2 CL School Building @ Dulong Bayan E/S 1st IV-A 6.014 O 0.361 0.227 0.100 0.030 0.011 0.100 82.90 -
Antonio V. Nidea Construction 6382 Repair/Rehab. of Sala-Cagbulacao
Road Final V 4.675 C 0.332 0.300 0.300 - - - 93.20 87.44% V.Satisfactory
AOG Construction 29758 Conc. Paving of Dongon-Laboon Road 1st/Final VIII 14.176 C 0.244 0.300 0.300 - - - 84.40 84.40%
V.Satisfactory
AOG Construction 29758 Const. of Amambahag Bridge Final VIII 7.596 C 0.363 0.300 0.300 - - - 96.30 78.06% Satisfactory
AOG Construction 29758 Const. of Basak II UK Bridge Final VIII 3.342 C 0.329 0.300 0.000 - - - 62.90 65.36% Fair
AP Mercado Trading and Construction 25269 Rehabilitation of Lateral D (Sta.
0+000-4+666) Final NIA Region I 7.483 C 0.250 0.300 0.300 - - - 85.00 85.09%
AP Mercado Trading and Construction 25269 Road Surfacing along Lat D (Sta.
12+957-17+068) Final NIA Region I 1.502 C 0.240 0.300 0.300 - - - 84.00 84.00%
APB Construction 17055 Completion of MPB 1st CAR 1.908 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -
APD Construction 17467 Conc. of Ilagan-Delfin-Albano-Mallig National Road, Villa Cacho Section 1st II 11.868 O 0.330 0.300 0.100 0.020 0.023 0.100 87.30 -
APD Construction 17467Concrete Reblocking along Cabatuan-Enrile Road (MBC) Km. 406+00-Km. 407+500
1st II 1.288 O 0.311 0.258 0.100 0.030 0.030 0.100 82.90 -
APD Construction 17467Concrete Reblocking along Cabatuan-Enrile Road (MBC) Km. 406+00-Km. 407+500
Final II 1.566 C 0.284 0.300 0.300 - - - 88.40 85.10% V.Satisfactory
APD Construction 17467 Const. of Diversion Dam and Access Road for Cabaruan 1st/Final NIA
Region 2 12.267 C 0.315 0.240 0.300 - - - 85.50 85.50% V.Satisfactory
APD Construction 17467 Const. of Diversion Dam and Access Road for Dumalinono 1st/Final NIA
Region 2 11.583 C 0.295 0.240 0.300 - - - 83.50 83.50% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 15
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
APD Construction 17467 Const. of MPB at San Mateo (Phase VI) 1st/Final II 1.891 C 0.392 0.208 0.300 - - - 90.00 90.00%
V.Satisfactory
APD Construction 17467 Const. of Pigalo Bridge (Phase II) 1st II 2.820 O 0.400 0.240 0.100 0.030 0.023 0.067 86.00 -
APD Construction 17467Const./Impvt. (Reblocking) along Santiago City-Baluarte Isabela/Quirino Bdry.
Final II 6.531 C 0.335 0.300 0.300 - - - 93.50 93.86% Outstanding
APD Construction 2006-0594 Construction of Canal and Canal Structures (LMC-ARIP-04-06) 1st/Final NIA
Region II 5.490 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
APD Construction 2006-0594 Construction of Canal and Canal Structures (LMC-ARIP-06-06) Final NIA
Region II 2.529 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
APO General Construction 7010 Completion of School Bldg., Happy
Hollow E/S Final CAR 0.638 O 0.307 0.262 0.300 - - - 86.90 -
Aqualine Construction 11555 Const. of Limopoca CIP Final NIA Region VII 3.232 C 0.321 0.300 0.300 - - - 92.10 92.1%
Outstanding
Aquino-Dela Cruz Engineering & Construction
16751Concreting/Improvement of San Carlos-Calasiao Road (Manson-Balingit Section)
1st I 9.444 O 0.332 0.291 0.100 0.030 0.038 0.100 89.10 -
Aquino-Dela Cruz Engineering & Construction
16751 Const. of 1 Cl Sch. Bldg. @ Matic-Matic E/S 1st/Final I 0.386 C 0.384 0.300 0.300 - - - 98.40 98.40%
Outstanding
AR Adlawan Construction 13108 Asphalting along Cebu Toledo Wharf Road, Km.28+180-Km.28+460 1st/Final VII 1.067 C 0.285 0.300 0.300 - - - 88.50 88.50%
V.Satisfactory
Arcinue Commercial 6746 Const. of Modified Conventional Type Single Storey S/B Final I 0.703 C 0.356 0.300 0.300 - - - 95.60 85.45%
V.Satisfactory
Arcinue Commercial 6746Const. of Modified Conventional Type Single Storey S/B at Tagudtud NHS
1st/Final I 0.827 C 0.292 0.300 0.300 - - - 89.20 89.20% V.Satisfactory
Arcinue Commercial 6746 Const. of Maypalic Bridge 1st I 12.048 O 0.295 0.265 0.050 0.030 0.035 0.067 74.20 -
Arcinue Commercial 6746Const. of Modified Conventional Type Single Storey Sch. Bldg. @ BailE/S
1st/Final I 0.607 C 0.396 0.100 0.300 - - - 79.60 79.60% Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union Final I 0.990 C 0.286 - 0.500 - - - 78.60 85.88%
V.Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union Final I 0.656 C 0.310 - 0.500 - - - 81.00 69.24%
Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 16
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Arcinue Commercial 6746 Impvt./Conc. Paving of Lingayen-Binmaley By-Pass Road 1st I 14.434 O 0.287 0.205 0.100 0.030 0.037 0.100 75.90 -
Arellano General Construction 31694 Const. of Multi-Purpose Building Final IV-A 2.120 C 0.356 0.300 0.300 - - - 95.60 79.22%
Satisfactory
ARGEALIS Construction 16122Construction of Fence for the San Fernando Runway Strip (Western Portion)
1st/Final BCDA 3.747 C 0.310 0.300 0.300 - - - 91.02 91.02% V.Satisfactory
Armando U. Khong General Contractor 16163 Proposed Completion of Malibay
Bridge along EDSA (Phase I) Final NCR 14.169 C 0.339 0.300 0.300 - - - 93.90 83.46% V.Satisfactory
ARN Builders 18930 Const. of Banica Bridge 2nd VI 12.540 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -
ARN Builders 18930 Const. of Dumalag Bridge Final VI 16.494 C 0.341 0.114 0.300 - - - 75.50 81.70% V.Satisfactory
Arrowhead Construction 22697 Concreting of Road & Const. of Drainage at Liyang Final III 2.837 C 0.385 0.300 0.300 - - - 98.50 85.12%
V.Satisfactory
Arsvi Construction 23518 Const. of Multi-Purpose Bldg. 1st IV-A 4.821 O 0.349 0.240 0.100 0.030 0.045 0.100 86.40 -Art Star Construction and
Enterprises 18416 Const. of Water System Project @ Brgy. Bungro Final I 2.243 C 0.304 0.300 0.300 - - - 90.40 78.94%
SatisfactoryArt-Star Construction &
Enterprises 18416 Const. of Multi-Purpose Bldg. (Phase II) 1st/Final I 6.109 C 0.278 - 0.500 - - - 77.80 77.80%
SatisfactoryArt-Star Construction &
Enterprises 18416 Rehab. of Multi-Purpose Building 1st I 1.429 O 0.337 0.256 0.100 0.000 0.029 0.100 82.20 -
Art-Star Construction & Enterprises 18416 Rehab. of Multi-Purpose Building Final I 1.430 C 0.367 0.143 0.300 - - - 81.00 81.84%
V.Satisfactory
Asanco General Merchandising &
Construction30517 Const. of Multi-Purpose Building,
Poblacion Final IV-B 0.465 C 0.390 0.221 0.300 - - - 91.10 83.61% V.Satisfactory
ASC Construction 26788 Construction of Canal and Canal Structures (LMC-ARIP-08-06) Final NIA
Region II 3.448 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
ASC Construction and Concrete Products 26788 Const. of (9) Nine Units Academic
School Building @ Libertad NHS Final II 0.384 C 0.286 0.300 0.300 - - - 88.60 88.18% V.Satisfactory
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building @
Enrile Vocational H/S 1st II 1.445 O 0.355 0.300 0.100 0.015 0.019 0.067 85.60 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building @
Enrile Vocational H/S Final II 1.449 C 0.271 0.058 0.300 - - - 62.90 70.01% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 17
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building @
Lemu H/S 1st II 0.963 O 0.337 0.000 0.100 0.000 0.027 0.067 53.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building @
Lemu H/S 2nd II 0.963 O 0.345 0.258 0.100 0.030 0.038 0.100 87.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building,
Cagumitan E/S Final II 0.943 C 0.444 - 0.500 - - - 94.40 84.42% V.Satisfactory
ASC Construction and Concrete Products 26788 Const./Completion of Secondary
Sch. Bldg. @ Cagayan NHS 1st II 0.784 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -
ASC Construction and Concrete Products 26788
Reha./Impvt. of National Road along Cagayan-Apayao Road, Solana Section
1st II 1.896 O 0.315 0.212 0.100 0.030 0.028 0.100 78.50 -
ASC Construction and Concrete Products 26788 Rehab. of Manila North Road (MNR) 1st/Final II 4.821 C 0.350 0.200 0.300 - - - 85.00 85.00%
V.Satisfactory
ASC Construction and Concrete Products 26788 Repair/Rehab of CIS of Aglipay and
Maddela 1st/Final NIA Region 2 2.511 C 0.289 0.240 0.300 - - - 82.90 82.90%
V.Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Const. of Gabaldon Bldg. & Grounds
@ Ilocos Norte NHS 1st I 7.594 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -
Asian Pearl Construction & Dev't. Corp. 9059 Impvt./Rehab. of Paoay Flood
Control 1st I 1.422 O 0.331 0.200 0.100 0.008 0.019 0.133 79.10 -
Asian Pearl Construction & Dev't. Corp. 9059 Impvt./Rehab. of Paoay Flood
Control Final I 1.422 C 0.238 0.300 0.300 - - - 83.80 80.98% V.Satisfactory
Asian Pearl Construction & Dev't. Corp. (Formerly: Asian Pearl Enterprises)
9059 Const. of Gabaldon Bldg. & Grounds @ Ilocos Norte NHS Final I 7.594 C 0.322 0.300 0.300 - - - 92.20 92.66%
Outstanding
Asian Pearl Enterprises 9059 Concreting of Magnuang Barangay Road 1st/Final I 1.424 C 0.320 - 0.500 - - - 82.00 82.00%
V.Satisfactory
Atlanta Construction Company, Inc. 31290
Const./Rehab./Replacement/ Completion/ and Repair of Elem. And Secondary Sch. Bldg.at Sugod P/S
1st X 5.214 O 0.364 0.200 0.100 0.030 0.032 0.100 82.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 18
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Atlantic Erectors Builders Inc. / Brostan
Construction & Development
JV-99-167 / 12360
Construction of Diversion Dam & Intake Barrel Final NIA
Region II 232.105 C 0.381 0.300 0.000 - - - 68.10 69.20% Fair
Atlantic Erectors Builders Inc. / Brostan
Construction & Development
JV-99-167 / 12360
Construction of Main Canal, Laterals & Appurtenant 1st NIA
Region II 73.392 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -
Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road (San
Jose-Mahayahay Section) 1st XIII 10.411 O 0.300 0.000 0.100 0.030 0.050 0.100 58.00 -
Avatar Constructions Company 31455 Conc. of Mahayahay-Glenville Road 1st/Final XIII 4.578 C 0.373 0.200 0.300 - - - 87.30 87.30%
V.Satisfactory
Avatar Constructions Company 31455 Const. of Aurelio-Mahayhay Road Final XIII 3.153 C 0.369 0.247 0.300 - - - 91.60 85.90%
V.Satisfactory
Avatar Constructions Company 31455 Const./Conc. of Don Ruben-Sta.
Cruz 1st/Final XIII 1.087 C 0.379 0.244 0.300 - - - 92.30 92.30% Outstanding
Avatar Constructions Company 31455 Const./Conc. of San Juan Road 1st/Final XIII 2.596 C 0.283 0.300 0.300 - - - 88.30 88.30%
V.Satisfactory
Azul Builders 21870Const. of Multi-Purpose Bldg., Sapang Palay NHS (Phase II) SapangPalay City
1st/Final III 3.035 C 0.353 0.300 0.300 - - - 95.30 95.30% Outstanding
Azul Builders 21870 Package 4: Concreting of Road, G4 Between Citrus & Lawang Pare 1st/Final III 0.473 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
B. Bernardo Construction 6196 Impvt./Rehab. of Sta. Maria-Norzagaray Road 1st III 14.198 O 0.391 0.225 0.100 0.030 0.035 0.100 88.10 -
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Bldg., @
Brgy. Tañong 1st/Final NCR 1.431 C 0.386 0.300 0.300 - - - 98.60 98.60% Outstanding
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose bldg., @
Tayabas West E/S 1st IV-A 0.476 O 0.400 0.240 0.100 0.020 0.009 0.067 83.60 -
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Brgy. Ampid I 1st/Final IVA 0.957 C 0.293 0.200 0.300 - - - 79.30 79.30%
Satisfactory
B. Vicencio Construction 9687 Const. of Tagbilaran City-San Jose St. Drainage Project (Outfall) 1st VIII 14.174 O 0.333 0.179 0.100 0.030 0.051 0.200 89.30 -
B. Vicencio Construction 9687Const./Opening of Calbayog Diversion Road, Monbon-Naga Road Section
1st VIII 13.715 O 0.368 0.300 0.100 0.020 0.035 0.100 92.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 19
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
B. Vicencio Construction 9687 Rehab.Impvt. of Calbayog-Catarman Road, Calbayog-Sinidman Sect. 1st VIII 9.330 O 0.256 0.300 0.100 0.010 0.028 0.100 79.40 -
B.A. Lagazo Builders 22056 Concrete Paving of Belado St. (Phase II) Final II 0.951 C 0.263 0.300 0.300 - - - 86.30 82.76%
V.Satisfactory
B.C.T. Trading and Construction 15199 Conc. of PPNR (Sandoval-Iraan
Section) 1st IV-B 28.841 O 0.318 0.273 0.100 0.023 0.037 0.100 85.10 -
B.C.T. Trading and Construction 15199 Improvement/Concreting of Puerto
Princesa South Road 1st IV-B 4.729 O 0.231 0.300 0.100 0.030 0.030 0.100 79.10 -
B.C.T. Trading and Construction 15199 Improvement/Concreting of Puerto
Princesa South Road Final IV-B 4.729 C 0.338 0.200 0.300 - - - 83.80 80.98% V.Satisfactory
B.C.T. Trading and Construction 15199 Replacement of Solomon Bridge
along Puerto Princesa South Road 1st IV-B 12.533 O 0.400 0.156 0.100 0.030 0.030 0.100 81.60 -
B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section 1st VI 8.819 O 0.303 0.245 0.000 0.030 0.035 0.067 68.00 -
B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section 2nd VI 8.819 O 0.359 0.236 0.000 0.030 0.035 0.067 72.70 -
B.E. Construction 2730 Conc. of Concepcion-Ajuy Road 1st VI 4.761 O 0.240 0.300 0.100 0.030 0.035 0.100 80.50 -
B.E. Construction 2730 Conc. of Concepcion-Ajuy Road 2nd VI 4.761 O 0.371 0.218 0.070 0.008 0.028 0.067 76.20 -
B.E. Construction 2730 Const. of Iloilo City Technical Vocational Colleges 1st VI 4.821 O 0.373 0.240 0.100 0.015 0.032 0.100 86.00 -
B.E. Construction 2730 Const. of Iloilo City Technical Vocational Colleges Final VI 4.821 C 0.354 0.069 0.300 - - - 72.30 81.89%
V.Satisfactory
B.E. Construction 2730 Const. of Lanag River Control 1st VI 14.450 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -
B.E. Construction 2730 Const. of Leonora Salapandan NHS Phase II 1st VI 0.948 O 0.313 0.000 0.050 0.030 0.035 0.100 52.80 -
B.E. Construction 2730 Const. of MPB at UP Visayas Gender Studies Center Bldg. 1st VI 11.446 O 0.342 0.240 0.100 0.030 0.027 0.100 83.90 -
B.E. Construction 2730 Const. of MPB Phase II @ Leganes E/S 1st VI 0.950 O 0.291 0.109 0.050 0.030 0.035 0.067 58.20 -
B.E. Construction 2730 Const. of MPB Phase II @ Leganes E/S Final VI 0.950 C 0.373 0.248 0.300 - - - 92.10 68.37%
Fair
B.E. Construction 2730 Const. of Multi-Purpose Building, Leon National H/S Final VI 1.901 C 0.311 0.126 0.300 - - - 73.70 75.10%
Satisfactory
B.E. Construction 2730 Const. of Multi-Purpose Workshop @ Balantang E/S Final VI 0.625 C 0.425 - 0.000 - - - 42.50 64.20%
Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 20
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
B.E. Construction 2730Impv't. of Metro Iloilo Circumferential Road, Zarraga Section
Final VI 3.853 C 0.350 - 0.500 - - - 85.00 80.02% V.Satisfactory
B.F.T. Construction 14424 Const. of 2-Cl @ Magpapalayok H/S Final III 0.559 C 0.445 - 0.500 - - - 94.50 84.00% V.Satisfactory
B.G. Giron Construction & Supply 15197 Const. of FMR @ Brgy. Malupa 1st III 1.421 O 0.293 0.223 0.100 0.010 0.019 0.100 74.50 -
B.Q. Construction & Supply 10217 Const. of Urdaneta Flood Control
Drainage, Phase I 1st I 11.772 O 0.375 0.160 0.100 0.023 0.030 0.200 88.80 -
B.R.G. Construction 21931Const. of Two (2) Units, Storey Multi-Purpose Building with 12 stalls each (Phase I) @ NVAT
1st II 4.174 O 0.305 0.250 0.100 0.030 0.027 0.100 81.20 -
B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk 1st XIII 1.916 O 0.290 0.300 0.100 0.022 0.025 0.100 83.70 -
B.S.U. Construction, Inc. 8457 Impvt. of Tandawan Road Sect. along Surigao-Davao Coastal Road 1st XIII 9.550 O 0.314 0.300 0.100 0.030 0.038 0.100 88.20 -
B.S.U. Construction, Inc. 8457 Impvt. of Tandawan Road Sect. along Surigao-Davao Coastal Road Final XIII 9.550 C 0.358 0.200 0.300 - - - 85.80 87.24%
V.Satisfactory
B.S.U. Construction, Incorporated 8457 Conc./Reblocking along JNR-
Barobo-Agusan sur Boundary 1st XIII 9.594 O 0.364 0.300 0.100 0.030 0.061 0.100 95.50 -
B.S.U. Construction, Incorporated 8457 Conc./Reblocking along JNR-
Barobo-Agusan sur Boundary Final XIII 9.594 C 0.287 0.300 0.300 - - - 88.70 92.78% Outstanding
B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.
Pulong Maragul 1st/Final III 0.941 C 0.375 0.200 0.300 - - - 87.50 87.50% V.Satisfactory
Baby Santiago Construction & Supply 31662 Const. of Multi-Purpose Building Final IV-A 1.925 C 0.274 0.300 0.000 - - - 57.40 42.42%
Poor
Badoc Builders 31564 Concreting of Badio Norte Barangay Road 1st/Final I 0.747 C 0.333 - 0.500 - - - 83.30 83.30%
V.Satisfactory
Bap Construction 16215 Asphalt Overlay of Brgy. Mabini Road (Intermittent Section) 1st/Final IVA 1.927 C 0.360 0.200 0.300 - - - 86.00 86.00%
V.Satisfactory
Baque Corporation 15235 Makati DES Linear Park 1st/Final PRRC 14.609awaiting
approval of V.O. No.1
0.481 - 0.500 - - - 98.10
Barillo Construction & Enterprises 23836 Conc. of Lower Taway Road 1st/Final IX 0.951 C 0.279 0.221 0.300 - - - 80.00 80.00%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 21
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Barillo Construction & Enterprises 23836 Repair/Concreting of Roads at
Malvar Street 1st IX 0.706 O 0.394 0.300 0.100 0.030 0.035 0.100 95.90 -
Barillo Construction & Enterprises 23836 Repair/Rehab./Impvt. of Dagohoy St. 1st/Final IX 0.759 C 0.312 0.230 0.300 - - - 84.20 84.20%
V.Satisfactory
Barit Builders and Construction 30095 Const./Completion of MPB @
Isabela National H/S Final II 0.936 C 0.317 - 0.500 - - - 81.70 82.05% V.Satisfactory
Barman Construction Corp. 7974
Const. of Abaton-Bridge and Approaches (Phase II) Brgy. Parang
2nd IV-B 11.745 O 0.314 0.300 0.100 0.030 0.037 0.100 88.10 -
Barman Construction Corp. 7974 Const. of Abaton-Maidlang II Bridge 2nd IVB 9.615 O 0.313 0.300 0.100 0.023 0.042 0.100 87.80 -
Barman Construction Corp. 7974 Const./Rehab. of Mahabang Parang
FMR, Mahabang Parang ARC 1st IV-B 17.832 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -
Barman Construction Corp. 7974 Const./Rehab. of Mahabang Parang
FMR, Mahabang Parang ARC Final IV-B 17.832 C 0.310 0.300 0.300 - - - 91.00 88.78% V.Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Completion of Matabao Bridge 1st XIII 9.243 O 0.383 0.240 0.100 0.023 0.027 0.100 87.30 -
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Completion of Matabao Bridge Final XIII 9.243 C 0.394 0.200 0.300 - - - 89.40 88.14%
V.Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Const. of Drainage Facilities alogn
Agusan-Misamis Oriental Road, 1st/Final XIII 3.628 C 0.372 - 0.500 - - - 87.20 87.20% V.Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510
Rehab. of Ngilan Bridge along Daang Maharlika Highway (Agusan-Surigao Section)
1st XIII 9.104 O 0.356 0.200 0.100 0.030 0.045 0.100 83.10 -
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Replacement of Matabao Bridge 1st XIII 9.468 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Replacement of Matabao Bridge 2nd XIII 9.468 O 0.387 0.272 0.000 0.030 0.030 0.067 78.60 -
BCT Trading and Construction 15199 Const./ Completion of San Miguel
NHS 5 CL (Two storey 6 CL) Final IV-B 2.952 C 0.446 0.500 94.60 83.54% V.Satisfactory
BCT Trading and Construction 15199 Improvement of Plaridel-Sitio Apis
Road, Plaridel-Jose Rizal ARC Final IV-B 20.211 C 0.144 0.195 0.300 - - - 63.90 78.42% Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 22
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Bendimil Construction and Development Corp. 6135 Const. of Pedestrian Overpass 1st IX 4.253 O 0.393 0.240 0.100 0.030 0.043 0.100 90.60 -
Bendimil Construction and Development Corp. 6135 Const. of Pedestrian Overpass Final IX 4.603 C 0.346 0.260 0.000 - - - 60.60 78.60%
Satisfactory
Benny's Trading & Construction 8762 Conc. of Irawan-Tagburos Road 1st IV-B 5.245 O 0.080 0.000 0.100 0.020 0.035 0.100 33.50 -
Benny's Trading & Construction 8762 Const. of 2 CL Sta. Monica E/S Final IV-B 0.698 C 0.437 0.500 93.70 83.06%
V.Satisfactory
Benny's Trading & Construction 8762 Const. of Sidewalk Pavement 1st/Final IV-B 0.329 C 0.336 0.000 0.300 - - - 63.60 63.60%
Fair
Bet Construction of Supply 31764 Concreting of Marcos Highway Road 1st/Final I 0.749 C 0.332 0.222 0.300 - - - 85.40 85.40%
V.Satisfactory
Beta Construction 9829 Conc. of Brgy. Road @ Balogo 1st/Final V 0.800 C 0.244 0.189 0.300 - - - 73.30 73.30% Satisfactory
Beta Construction 9829 Conc. of Brgy. Road @ LRV Site Road 1st/Final V 0.480 C 0.345 0.183 0.300 - - - 82.80 82.80%
V.Satisfactory
Better Work Construction 24432Completion of Multi-Purpose Bldg., DENR Regional office XII Brgy. Zone IV
Final XII 1.428 C 0.368 0.225 0.300 - - - 89.30 92.24% Outstanding
Bevel Construction 16423 Improvement/Concreting of Cantaan Barangay Road 1st X 0.920 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -
Bigfoot Construction and Supply 24769 Conc. of Basak-Nasig-id FMR 1st/Final VII 0.903 C 0.190 0.300 0.300 - - - 79.00 79.00%
SatisfactoryBill Hill Construction and
Supply 18046 Completion of Roofing of Multi Purpose Hall @ Brgy. Mabini 1st/Final XIII 0.182 C 0.400 0.240 0.300 - - - 94.00 94.00%
OutstandingBill Hill Construction and
Supply 18046 Conc. of Magsaysay Road 1st XIII 0.916 O 0.367 0.255 0.100 0.030 0.039 0.100 89.10 -
Bill Hill Construction and Supply 18046 Conc. of Magsaysay Road Final XIII 0.916 C 0.290 0.170 0.300 - - - 76.00 83.86%
V.Satisfactory
Billco Construction 18191 Const. of Don Ruben Seawall (Phase III) 1st XIII 2.690 O 0.379 0.160 0.070 0.023 0.042 0.200 87.40 -
Billco Construction 18191 Const. of Don Ruben Seawall (Phase III) Final XIII 2.690 C 0.370 0.300 0.000 - - - 67.00 79.24%
SatisfactoryBimbo Construction &
Supply (Formerly: Bimbo Const.)
25022 Repair/Improvement of Milaor Revetment 1st/Final V 2.837 C 0.381 0.300 0.300 - - - 98.10 98.10%
Outstanding
Blimex Construction & Supply 27259 Const. of 4 Cl School Bldg. @
Patalinhug E/S 1st/Final XII 1.659 C 0.373 0.300 0.300 - - - 97.30 97.30% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 23
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Blue Dragon Construction 11524 Const. of Candon Flood Control, MNR Final I 8.248 C 0.341 0.200 0.300 - - - 84.10 82.78%
V.Satisfactory
BMJ Construction 14571Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase V), Cansan-Bagutari Overflow Bridge
1st II 14.394 O 0.400 0.300 0.100 0.020 0.028 0.100 94.80 -
BMJ Construction 14571Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase IV), Cansan-Bagutari Overflow Bridge
1st II 9.092 O 0.359 0.240 0.100 0.020 0.042 0.100 86.10 -
BMJ Construction 14571Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase IV), Cansan-Bagutari Overflow Bridge
Final II 9.092 C 0.267 0.300 0.300 - - - 86.70 86.34% V.Satisfactory
BMJ Construction 14571 Concreting of Sto. Tomas-D. Albano Road (Gap Section) Final II 9.649 C 0.261 - 0.500 - - - 76.10 79.25%
Satisfactory
BMJ Construction 14571 Const. of 2-CL School Building @ Magassi High School Final II 0.632 C 0.291 0.300 0.300 - - - 89.10 89.45%
V.Satisfactory
BMJ Construction 14571 Rehab. of Pinacanauan Br. App. "A" & River Bank Protection works 2nd II 11.699 O 0.267 0.200 0.100 0.030 0.040 0.200 83.70 -
BMJ Construction 14571 Rehab. of Pinacanauan Br. App. "A" & River Bank Protection works 3rd II 11.699 O 0.395 0.200 0.070 0.020 0.023 0.133 84.10 -
BMJ Construction 14571 Road Concreting of Garita Brgy. Road (Phase II) Final II 0.472 C 0.321 0.300 0.300 - - - 92.10 89.04%
V.Satisfactory
BMK Construction 8292 Const. of Mitura Bridge along Urdaneta-Manaoag Road 1st I 24.737 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -
BMK Construction 8292
Repair/Rehabilitation of Drainage System along old Judge de Venecia Sr. Ave., 3 Rows Cross Drainage along Calasiao Road
Final I 4.821 C 0.351 - 0.500 - - - 85.10 85.19% V.Satisfactory
BN Builders & Construction Supply 28232 Const. of Two (2) Storey MPB
(Completion) 1st/Final XIII 0.948 C 0.353 - 0.500 - - - 85.30 85.30% V.Satisfactory
BNG Construction and General Services 18503 Concreting of San Francisco-
Malimono Road Phase XXIV Final XIII 4.455 C 0.390 0.200 0.300 - - - 89.00 83.48% V.Satisfactory
BNG Construction and General Services 18503 Const. of MPB @ Brgy. 7 1st/Final XIII 0.939 C 0.276 0.000 0.300 - - - 57.60 57.60%
Poor
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 24
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
BNG Construction and General Services 26705 Const. of Surigao Del Norte National
High School Final XIII 0.371 C 0.369 0.116 0.300 - - - 78.50 85.43% V.Satisfactory
BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.
Siana 1st XIII 0.916 O 0.150 0.000 0.100 0.023 0.012 0.100 38.50 -
BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.
Siana 2nd XIII 0.916 O 0.388 0.300 0.100 0.030 0.025 0.100 94.30 -
BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.
Siana Final XIII 0.916 C 0.379 0.244 0.300 - - - 92.30 74.17% Satisfactory
BNR Construction & Development Corporation 12903
Completion of Putat Bridge I (Phase IV) along Toledo-Tabuel San Remigio Road Km.103.503 (approach)
1st/Final VII 3.092 C 0.350 0.290 0.300 - - - 94.00 94.00% Outstanding
BNR Construction & Development Corporation 12903 Concreting of Farm-to-Market Road Final VII 0.949 C 0.372 - 0.500 - - - 87.20 79.82%
Satisfactory
BNR Construction and Development Corporation 12903
Const. of Drainage Facilities with Cub and Gutter at Open-Airport Road (Realigned to Const. of Drainage Facilities at Open-Airport Road)
1st VII 1.845 O 0.389 0.240 0.100 0.010 0.038 0.100 87.70 -
BNR Construction and Development Corporation 12903
Const. of Drainage Facilities with Cub and Gutter at Open-Airport Road (Realigned to Const. of Drainage Facilities at Open-Airport Road)
Final VII 1.845 C 0.386 0.300 0.300 - - - 98.60 92.06% Outstanding
BNR Construction and Development Corporation 12903 Const. of Pedestrian Overpass at
Talamban 1st VII 4.295 O 0.353 0.300 0.100 0.030 0.060 0.100 94.30 -
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building 1st VII 0.942 O 0.361 0.240 0.100 0.010 0.035 0.100 84.60 -
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building Final VII 0.942 C 0.384 0.100 0.300 - - - 78.40 82.74% V.Satisfactory
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building (Cultural Center) 1st VII 0.927 O 0.207 0.240 0.100 0.010 0.047 0.100 70.40 -
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building (Cultural Center) Final VII 0.927 C 0.206 0.200 0.300 - - - 70.60 70.46% Satisfactory
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-Antequera
Road 1st VII 4.770 O 0.346 0.034 0.100 0.023 0.025 0.100 62.80 -
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-Antequera
Road 2nd VII 4.770 O 0.307 0.191 0.100 0.023 0.025 0.100 74.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 25
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
BNYU Enterprises & Construction 27725 Repair/Improvement of Multi-
Purpose Building 1st/Final VII 0.933 C 0.285 0.300 0.300 - - - 88.50 88.50% V.Satisfactory
Bonifacio M. Carlos Construction 3303 Completion of Multi-Purpose Bldg.,
Purok Matahimik Brgy. San Pedro Final IV-B 0.326 C 0.443 - 0.500 - - - 94.30 94.30% Outstanding
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South
Road Final IV-B 13.698 C 0.298 0.300 0.300 - - - 89.80 91.60% Outstanding
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South
Road, Calategas Section 1st IV-B 5.671 O 0.302 0.270 0.100 0.030 0.048 0.100 85.00 -
Borderline Construction and Supply 24433 Rehab./Impvt. of Bukidnon-Cotabato
Road, Poblacion Section 1st/Final XII 4.653 C 0.329 0.200 0.300 - - - 82.90 82.90% V.Satisfactory
Brillantes Construction 26447 Const. of Multi-Purpose Building (Phase I) Final X 0.940 C 0.400 0.209 0.690 - - - 129.90 97.63%
Outstanding
Brillantes Construction 26447Provision of Line Canal at Nabangunan Section along Jct. Dologan-Busco-Quezon Road
Final X 0.275 C 0.354 0.300 0.300 - - - 95.40 88.50% V.Satisfactory
Brima Construction and Enterprises 8746 Rehab./Impvt./Conc. of Tubod-
Ganassi National Road 1st X 9.142 O 0.309 0.300 0.100 0.030 0.037 0.067 84.30 -
Bros Construction and Supply 10507 Conc. of Surigao-Davao Coastal
Road (Bad-as SDN Section) 1st XIII 6.509 O 0.384 0.238 0.070 0.008 0.019 0.100 81.90 -
Bros Construction and Supply 10507 Concreting of NRJ Osmeña-
Magkiangkan Road Final XIII 0.943 C 0.430 - 0.500 - - - 93.00 90.78% Outstanding
Bros Construction and Supply 10507 Concreting of San Jose-Trento Road
Section Final XIII 8.078 C 0.347 0.200 0.300 - - - 84.70 83.89% V.Satisfactory
Bros Construction and Supply 10507 Const./Rehabilitation of San
Francisco By-Pass Road 1st XIII 0.886 O 0.400 0.173 0.100 0.018 0.023 0.100 81.40 -
Bros Construction and Supply 10507 Rehab. of Balingasag By-Pass Road 1st X 4.640 O 0.287 0.289 0.070 0.030 0.035 0.100 81.10 -
Bros Construction and Supply 10507 Repair/Rehab. of del Monte PSCG
Bridge 1st XIII 1.635 O 0.312 0.300 0.000 0.030 0.035 0.033 71.00 -
Brostan Consruction & Development 12360 Completion/Extension of Multi-
Purpose Building 1st/Final II 0.652 C 0.366 0.200 0.300 - - - 86.60 86.60% V.Satisfactory
Brostan Construction & Development 12360 Const. of MPB, Isabela State
University Final II 0.756 C 0.341 - 0.000 - - - 34.10 48.45% Poor
Brostan Construction & Development 12360 Const. of Multi-Purpose Bldg. @
Victoria, Alicia, Isabela Final II 0.691 C 0.302 - 0.500 - - - 80.20 88.78% V.Satisfactory
Brostan Construction & Development 12360 Rehab. of Calapan South Road &
East Coastal Road 1st/Final IVB 0.952 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 26
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Brostan Construction & Development 12360 Rehab. of Farm to Market Road 1st/Final II 0.469 C 0.286 0.225 0.300 - - - 81.10 81.10%
V.Satisfactory
Brostan Construction & Development 12360 Rehab. of Nat'l Road along Jct.
Oscariz-Ramon Putia Section 1st/Final II 9.629 C 0.390 0.200 0.300 - - - 89.00 89.00% V.Satisfactory
Brostan Construction & Development 12360 Rehab./Impv't. of Sotero Nuesa-
Simimbaan Road Final II 4.699 C 0.312 - 0.500 - - - 81.20 85.88% V.Satisfactory
Brostan Construction & Development 12360
Rehab./Replacement of Damaged Bridges along CDMA Road, Pinaripad Bridge
3rd II 13.472 O 0.343 0.300 0.000 0.022 0.025 0.067 75.70 -
Busilac Builders, Incorporated 7701 Concreting of Various Roads
(Sulquiano & Purungganan) 1st I 0.939 O 0.360 0.246 0.100 0.030 0.035 0.100 87.10 -
Busilac Builders, Incorporated 7701 Const. of Drainage along MNR, San
Nicolas-Nangalisan Section 1st I 6.641 O 0.328 0.200 0.100 0.008 0.019 0.133 78.80 -
Busilac Builders, Incorporated 7701 Const. of Drainage along MNR, San
Nicolas-Nangalisan Section Final I 6.641 C 0.239 0.300 0.300 - - - 83.90 80.84% V.Satisfactory
BYA Builders and Construction Supply 24158 Const. of One (1) Cl Schl. Bldg. @
Ipil NHS 1st/Final VIII 0.442 C 0.363 0.297 0.300 - - - 96.00 96.00% Outstanding
BYA Builders and Construction Supply 24158 Impvt./Rehab. of Nat'l Road along
Tacloban-Baybay South Road 1st/Final VIII 0.940 C 0.355 0.200 0.300 - - - 85.50 85.50% V.Satisfactory
C & F Construction & Development Corporation 3509
Rehab. of Sandiat Bridge & Approaches along Santiago-Tuguegarao Road
1st/Final II 3.779 C 0.271 0.205 0.300 - - - 77.60 77.60% Satisfactory
C & F Construction & Development Corporation 3509
Widening/Rehab. of Quirino Highway, Gumaoc-Tungkong-Mangga, San Jose Del Monte City.
Final III 9.433 C 0.456 - 0.500 - - - 95.60 87.62% V.Satisfactory
C.B. Tampengco Construction & Supply 18505 Const. of Multi-Purpose at Brgy. 80,
Zone 7 1st NCR 2.136 O 0.366 0.250 0.100 0.023 0.041 0.100 88.00 -
C.B. Tampengco Construction and Supply 18505 Const. of 2 Cl Sch. Bldg. @ San
Mateo H/S 1st IV-A 0.962 O 0.286 0.267 0.100 0.030 0.032 0.100 81.50 -
C.B. Tampengco Construction and Supply 18505 Const. of MPB (Public Market) @
Brgy 186 2nd NCR 4.682 O 0.391 0.273 0.100 0.024 0.018 0.100 90.60 -
C.B. Tampengco Construction and Supply 18505 Const. of MPB (Public Market) @
Brgy 186 Final NCR 4.682 C 0.280 0.200 0.300 - - - 78.00 88.29% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 27
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
C.B. Tampengco Construction and Supply 18505 Const. of Multi-Purpose at Brgy.
NBBS, Navotas, Metro Manila Final NCR 2.836 C 0.342 0.300 0.300 94.20 90.70% Outstanding
C.B. Tampengco Construction and Supply 18505 Impvt. of V. Ilustre St., Brgy. Don
Manuel 1st/Final NCR 1.878 C 0.375 0.300 0.300 - - - 97.50 97.50% Outstanding
C.C.M. Construction 11043 Completion of Cogon Night High School Building 2nd VII 1.112 O 0.343 0.221 0.100 0.010 0.029 0.100 80.30 -
C.C.M. Construction 11043 Completion of Cogon Night School Building 1st VII 1.112 O 0.378 0.240 0.100 0.010 0.029 0.100 85.70 -
C.D. Valbuena Construction 26794 Const. of Water Supply System at
Brgy. Bagong Anyo 1st/Final IV-A 0.574 C 0.377 0.300 0.300 - - - 97.70 97.70% Outstanding
C.E. Padilla Construction 11278 PUP Linear Park Project 1st PRRC 19.989 O 0.370 0.290 0.100 0.030 0.070 0.100 96.00 -
C.E. Padilla Construction 11278 PUP Linear Park Project Final PRRC 19.989 C 0.331 0.300 0.300 - - - 93.10 95.13% Outstanding
C.F. Trinidad Construction 9199 Riprapping of Creek, beside
Ferretville Subdivision Final IV-A 3.840 C 0.218 0.300 0.300 - - - 81.80 77.72% Satisfactory
C.G.I. Construction 10606 Conc. of FMR @ Brgy. Daang Bago 1st/Final III 0.470 C 0.297 0.300 0.300 - - - 89.70 89.70% V.Satisfactory
C.J. Maramat Construction 6007 Completion of SLU-SVP Brgy.
Bakakeng Multi-Purpose Building Final CAR 1.427 C 0.368 0.300 0.300 - - - 96.80 85.32% V.Satisfactory
C.J. Maramat Construction 6007 Const. of Multi-Purpose Building at
BGH Compound Brgy. Final CAR 1.414 C 0.372 0.300 0.300 - - - 97.20 91.88% Outstanding
C.J. Maramat Construction 6007 Const. of Two (2) Storey Reinforce
Concrete Municipal Bldg. 3rd I 11.288 O 0.295 0.269 0.100 0.015 0.035 0.100 81.40 -
C.L. Carandang Enterprises 29494 Concreting of Jct. Mandaon-
Mandaon Road 1st V 9.590 O 0.339 0.300 0.100 0.008 0.028 0.067 84.20 -
C.L. Carandang Enterprises 29494 Const. of Flood Control Project @
Tugbo 1st/Final V 0.939 C 0.350 0.200 0.300 - - - 85.00 85.00% V.Satisfactory
C.L. Carandang Enterprises 29494 Const. of MPB at DILG Compound 1st/Final V 0.379 C 0.369 0.200 0.300 - - - 86.90 86.90%
V.Satisfactory
C.L. Carandang Enterprises 29494 Rehab. of Dayao-Bugtong FTMR 1st/Final V 4.791 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
C.M. Dancel Const. & Supply / FRD Const. (JV) JV-03-106 Const. of Tulnagan Bridge Final I 19.981 C 0.326 0.300 0.300 - - - 92.60 84.08%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 28
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
C.M. Dancel Construction & Supply 12640 Const. of Drainage along MNR,
Nangalisan Section Final I 2.742 C 0.372 0.200 0.300 - - - 87.20 84.62% V.Satisfactory
C.M. Dancel Construction & Supply 12640 ReConst. of River Control Protection 1st/Final I 4.725 C 0.200 0.300 0.300 - - - 80.00 80.00%
Satisfactory
C.M. Pancho Construction Incorporated
183
Bohol Circumferential Road Improvement Project, CP-2, CandijayJagna-Valencia Sect.Sat. 169+240-Sta. 221+040
4th PJHL 724.891 O 0.375 0.300 0.100 0.030 0.070 0.100 97.50 -
C.M. Pancho Construction Incorporated
183
Bohol Circumferential Road Improvement Project, CP-2, CandijayJagna-Valencia Sect.Sat. 169+240-Sta. 221+040
6th PJHL 856.155 O 0.378 0.300 0.100 0.030 0.070 0.100 97.80 -
C.M. Pancho Construction Incorporated
183 Bridge Replacement Sixth Road Project Bridge Component CP-M Final I 86.581 C 0.341 0.200 0.300 - - - 84.10 81.46%
V.Satisfactory
C.M. Pancho Construction Incorporated
183 Const. of Aloragat Bridge & Approaches 1st I 51.651 O 0.376 0.300 0.100 0.030 0.065 0.100 97.10 -
C.M. Pancho Construction Incorporated
183 Const. of Daang Hari Extension Aguinaldo-Highway-Coastal Road 1st/Final IVA 9.568 C 0.314 0.300 0.300 - - - 91.40 91.40%
Outstanding
C.S. Garcia Construction 1901 Const./Rehab. of Sch. Bldg. F. De Mesa E/S 1st/Final NCR 1.427 C 0.386 0.300 0.300 - - - 98.60 98.60%
Outstanding
C.S. Rayos Construction & General Services 9790 Completion of Ternate-Nasugbu
Road, Calayo-Looc Section 1st IV-A 23.966 O 0.362 0.240 0.000 0.030 0.030 0.033 69.50 -
C.S. Rayos Construction & General Services 9790 Completion of Ternate-Nasugbu
Road, Calayo-Looc Section Final IV-A 23.966 C 0.370 0.290 0.300 - - - 96.00 85.56% V.Satisfactory
C.V. Construction & Development 8334 Conc. of Road @ Sampaguita East
St. Purok NHA 2 1st/Final XI 0.564 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
C.V. Construction & Development 8334 Const. of 1 Cl 1 Storey Sch. Bldg. @
Saloy H/S 1st/Final XI 0.433 C 0.329 0.247 0.300 - - - 87.60 87.60% V.Satisfactory
CA Miguel Construction, Incorporated 10221 Conc. of Brgy. Roads 1st/Final IVA 1.917 C 0.365 0.300 0.300 - - - 96.50 96.50%
Outstanding
Cager Construction & Supply 21743
Site Development Const. of Standard Day Care Center KV1 (Package 2)
1st PRRC 1.776 O 0.388 0.297 0.100 0.015 0.055 0.100 95.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 29
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Cager Construction & Supply 21743
Site Development Const. of Standard Day Care Center KV1 (Package 8)
1st PRRC 2.116 O 0.378 0.300 0.100 0.023 0.028 0.100 92.90 -
Camia Construction 20506 Completion of Public Market 1st II 1.096 O 0.320 0.240 0.100 0.015 0.027 0.050 75.20 -
Camia Construction 20506 Completion of Public Market Final II 1.096 C 0.328 0.239 0.300 - - - 86.70 78.65% Satisfactory
Camia Construction 20506 Conc. of Dugo-San Vicente Road with Drainage 1st II 5.630 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -
Camia Construction 20506 Const. of Balluyan Bridge, Phase II 1st CAR 2.830 O 0.346 0.300 0.100 0.030 0.035 0.100 91.10 -
Camia Construction 20506 Replacement/Const. of Malabang Bridge 1st CAR 15.218 O 0.309 0.300 0.100 0.030 0.045 0.100 88.40 -
Candace Construction 12084Const. & Repair/Rehab. of Various School Bldgs. (Clustered-1) 1st Batch CY 2004
1st/Final IX 0.359 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Carlo Joseph Construction 21017 Const. of 1 unit 1Cl Sch. Bldg. @
Lubao Vocational School 1st/Final III 0.285 C 0.324 0.195 0.300 - - - 81.90 81.90% V.Satisfactory
Carlo Joseph Construction 21017 Const. of Lined Canal, San Vicente
(Part of Package 17) 1st/Final III 2.090 C 0.398 0.204 0.300 - - - 90.20 90.20% V.Satisfactory
Carlo Joseph Construction 21017 Improvement of Public Market
(Porac Mall) 1st/Final III 2.366 C 0.353 0.200 0.300 - - - 85.30 85.30% V.Satisfactory
Carrascal Integrated Enterprises 4764 Completion of Madrid District
Hospital (Phase III) 1st XIII 3.629 O 0.352 0.211 0.100 0.030 0.048 0.100 84.10 -
Carrascal Integrated Enterprises 4764 Completion of Madrid District
Hospital (Phase III) Final XIII 3.629 C 0.357 0.254 0.300 - - - 91.10 86.20% V.Satisfactory
Carrascal Integrated Enterprises 4764 Completion of MPB 1st XIII 3.635 O 0.373 0.300 0.100 0.030 0.056 0.100 95.90 -
Carrascal Integrated Enterprises 4764 Completion of MPB Final XIII 3.635 C 0.366 0.200 0.300 - - - 86.60 93.11%
OutstandingCarrascal Integrated
Enterprises 4764 Const. of Abacahan Bridge 1st XIII 10.236 O 0.321 0.300 0.050 0.030 0.051 0.100 85.20 -
Carrascal Integrated Enterprises 4764 Const. of Abacahan Bridge Final XIII 10.214 C 0.324 0.200 0.300 - - - 82.40 84.08%
V.Satisfactory
Carrascal Integrated Enterprises 4764 Improvement of Coastal Road
Lanuza Final XIII 4.551 C 0.370 0.201 0.300 - - - 87.10 85.96% V.Satisfactory
Carry-on Construction 8014 Const. of MPB at Brgy. NBBS 1st/Final NCR 2.850 C 0.385 0.300 0.300 - - - 98.50 98.50% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 30
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Cauayan United Enterprises and Builders 8816 Construction of Canal and Canal
Structures (LMC-ARIP-09-06) 1st NIA Region II 1.983 C 0.329 0.133 0.000 0.015 0.028 0.200 70.50 70.51%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Const. of 1 Cl Sch. Bldg. @
Daramuangan E/S 1st/Final II 0.319 C 0.366 0.174 0.300 - - - 84.00 84.00% V.Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Const. of 5-Units Deep Well (Light
Duty Type), Minate I 1st/Final II 0.184 C 0.260 0.200 0.300 - - - 76.00 76.00% Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. Along Cabatuan-
Enrile Road 1st/Final II 6.717 C 0.286 0.262 0.300 - - - 84.80 84.80% V.Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. of Cauayan-Cabatuan
Road 1st/Final II 0.947 C 0.400 0.200 0.300 - - - 90.00 90.00% V.Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Rehab. of FMR at Muñoz West-
Sinamar Road 1st/Final II 0.944 C 0.267 0.300 0.300 - - - 86.70 86.70% V.Satisfactory
Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.)
2622 Rehabilitation/ Widening (Concreting) of Paliparan Road 2nd IV-A 21.226 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -
Cavite Ideal International Const. & Development
Corp.5599
Contract Package I, Baguio-Pangawan, Kayapa Section under Cordillera Road Improvement Project (Baguio-Aritao Road Improvement Project)
2nd PJHL 1,562.663 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -
Cavite Ideal International Const. & Development
Corp.5599
Contract Package I, Baguio-Pangawan, Kayapa Section under Cordillera Road Improvement Project (Baguio-Aritao Road Improvement Project)
3rd PJHL 1,562.663 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -
Cavite Ideal International Const. & Development
Corp.5599
CP II, Abuyog-Silago Road Section under the Arterial Road Links Development Project, Phase IV (Himayangan-Silago Abuyog Road and Liloan-San Ricardo Road Projects)
2nd PJHL 829.719 O 0.389 0.300 0.100 0.030 0.056 0.100 97.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 31
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Cavite Ideal International Const. & Development
Corp.5599
CP II, Abuyog-Silago Sect. Under the Arterial Road Links Dev't. Proj., Phase IV (Himayangan-Silago-Abuyog Road and Liloan-San Ricardo Road Projects)
3rd PJHL 904.189 O 0.321 0.300 0.100 0.030 0.042 0.100 89.30 -
Cavite Ideal International Const. & Development
Corp.5599 Naga-Toledo Road Project ARLDP
Phase IV 1st PJHL 805.321 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -
CBN Construction & Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of Jct. Dan Enriave-Pontevedra By Pass Rd.
Final VI 4.542 C 0.371 0.300 0.300 - - - 97.10 90.92% Outstanding
CBN Construction and Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of Bago-Mailum-Mambucal-Canla-on Road
Final VI 6.141 C 0.301 0.100 0.300 - - - 70.10 80.42% V.Satisfactory
CBN Construction and Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of Jct. Dan Enriave-Pontevedra By Pass Rd.
1st VI 4.542 O 0.400 0.300 0.070 0.030 0.035 0.033 86.80 -
CDC Construction and Supplies 28275 Const. of Multi-Purpose Bld., @
RMTI, RMTI Compound Final III 4.658 C 0.241 0.300 0.300 - - - 84.10 72.20% Satisfactory
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building 1st I 0.853 O 0.360 0.300 0.050 0.030 0.023 0.067 83.00 -
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building 2nd I 0.853 O 0.393 0.240 0.000 0.023 0.030 0.067 75.30 -
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building
(Phase I) 1st/Final I 0.948 C 0.333 0.300 0.300 - - - 93.30 93.30% Outstanding
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Bldg.
Ramon Magsaysay Tech. Inst. 1st III 4.658 O 0.193 0.180 0.100 0.030 0.020 0.100 62.30 -
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Building 1st/Final I 0.949 C 0.352 - 0.500 - - - 85.20 85.2%
V.Satisfactory
Cebu 7H Technochem Industries, Inc. 31578
Rehab. of Loay Interior Road (Asphalt Overlay & Reflectorized Tehrmoplastic Pav't Markings)
1st/Final VII 4.750 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
Cebu 7H Technochem Industries, Inc. 31578 Rehab. of Loay Interior Road/ Loboc-
Bilar-Carmen Section Final VII 9.640 C 0.386 - 0.500 - - - 88.60 89.74% V.Satisfactory
Cebu Young Construction 3195 Const. of Multi-Purpose Building @ Inayawan E/S 1st VII 0.956 O 0.400 0.240 0.100 0.020 0.041 0.100 90.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 32
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Cebu Young Construction 3195 Const. of Multi-Purpose Building @ Inayawan E/S Final VII 0.956 C 0.383 0.300 0.300 - - - 98.30 92.56%
Outstanding
Cedan Construction 10172 Asphalt Overlay along Olongapo-Bugallon Road Iba Section, Iba 1st/Final III 9.498 C 0.398 0.300 0.300 - - - 99.80 99.80%
Outstanding
Cedan Construction 10172 Const. of Magsaysay Bridge Final I 4.799 C 0.365 0.300 0.300 - - - 96.50 79.16% Satisfactory
Cedan Construction 10172 Rehab. of La Paz Multi-Purpose Building 1st/Final III 1.408 C 0.427 - 0.500 - - - 92.70 92.70%
Outstanding
Cedar Construction 24865 Const. of Multi-Purpose Building Final III 0.948 C 0.317 0.300 0.300 - - - 91.70 85.40% V.Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative
23697 Completion of 1-Unit PWSP Final XII 1.862 C 0.440 - 0.500 - - - 94.00 87.10% V.Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative
23697 Const. of Footbridge Final XII 0.231 C 0.394 - 0.500 - - - 89.40 86.64% V.Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative
23697 Const. of Kisante CES Multi Purpose Bldg. 1st/Final XII 0.238 C 0.333 0.200 0.300 - - - 83.30 83.30%
V.Satisfactory
Cesar T. Carpio Construction 20833 Const. of Two (2) CL School
Building @ Cawayan E/S Final VIII 0.861 C 0.349 0.200 0.300 - - - 84.90 77.97% Satisfactory
Cesar T. Carpio Construction 20833 Reflectorized Road Pavement
Markings & Road Signs 1st/Final VIII 0.957 C 0.400 0.000 0.300 - - - 70.00 70.00% Fair
CGGA Builders & Enterprises 23762 Completion of Multi-Purpose
Building 1st/Final VIII 0.232 C 0.283 0.300 0.300 - - - 88.30 88.30% V.Satisfactory
CGGA Builders & Enterprises 23762 Conc. of Shoulder at Manlurip
Arthur Park Road 1st/Final VIII 1.897 C 0.319 0.300 0.300 - - - 91.90 91.90% Outstanding
CGGA Builders & Enterprises 23762 Const. of Cabibihan Bridge Final VIII 4.960 C 0.245 0.200 0.300 - - - 74.50 72.10%
Satisfactory
CGGA Builders & Enterprises 23762 Rehab. of Layog Bridge Approach
along Maharlika Highway 1st/Final VIII 4.603 C 0.334 0.223 0.300 - - - 85.70 85.70% V.Satisfactory
CGI Construction 11346
Improvement of CICs in the Municipality of Ocampo, Camarines Sur, namely; Gatibo, Hibago & San Antonio
1st/Final NIA Region V 2.362 C 0.400 0.300 0.000 - - - 70.00 70%
Fair
CGI Construction 11346
Improvement of CICs in the Municipality of Ocampo, Camarines Sur, namely; Gatibo, Hibago & San Antonio
1st/Final NIA Region V 2.362 C 0.400 0.300 0.000 - - - 70.00 70%
Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 33
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Cha Construction and Supply 28420 Const. of 2-CL School Bldg. Final V 0.923 C 0.444 - 0.500 - - - 94.40 78.34%
SatisfactoryCha Construction and
Supply 28420 Const. of 2-Rooms School Bldg. 1st/Final V 0.468 C 0.402 - 0.500 - - - 90.20 90.20% Outstanding
Cha Construction and Supply 28420 Const. of Multi-Purpose Building at
Camarines Sur H/S 1st/Final V 2.080 C 0.396 0.120 0.300 - - - 81.60 81.60% V.Satisfactory
Charlz Construction 8709 Const. of 2-Cl Building @ Taglimao ES 1st X 0.849 O 0.400 0.300 0.100 0.030 0.026 0.100 95.60 -
Charlz Construction 8709 Const. of 3 Storey, 9 Cl Secondary Sch. Bldg. @ Adlaon NHS 1st VII 5.711 O 0.385 0.180 0.100 0.030 0.054 0.100 84.90 -
Charlz Construction 8709 Const. of 3 Storey, 9 Cl Secondary Sch. Bldg. @ Adlaon NHS Final VII 5.711 C 0.364 0.300 0.300 - - - 96.40 88.35%
V.Satisfactory
Charlz Construction 8709 Const. of MPB Manolo Fortich Municipal Hall Phase X, Calanawan 2nd X 4.728 O 0.306 0.300 0.050 0.030 0.052 0.067 80.50 -
Charlz Construction 8709 Const. of MPB Manolo Fortich Municipal Hall Phase X, Calanawan 3rd X 4.728 O 0.363 0.300 0.070 0.030 0.035 0.067 86.50 -
Charlz Construction 8709 Const. of MPB Manolo Fortich Municipal Hall Phase X, Calanawan Final X 4.728 C 0.363 0.200 0.300 - - - 86.30 83.13%
V.Satisfactory
Charlz Construction 8709 Const. of Tertiary Sch. Bldg. (NBCC Phase II) 1st X 2.360 O 0.220 0.259 0.100 0.030 0.032 0.100 74.10 -
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang Road
2nd X 22.146 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang Road
3rd X 22.155 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -
Charlz Construction 8709 Rehab./ Impv't. of DPWH 3rd DEO Bldg., Dicklum Final X 0.789 C 0.373 0.300 0.300 - - - 97.30 93.10%
Outstanding
Chiara Construction 8736 Retrofitting of Kalibo Bridge Phase III 1st/Final VI 9.013 C 0.313 0.300 0.300 - - - 91.30 91.30%
Outstanding
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Casecnan Multi-Purpose Irrigation & Power Project 1st NIA 1,108.222 O 0.342 0.175 0.100 0.030 0.056 0.200 90.30 -
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Const. of Super Diversion Canal(Sta. 19+200 to Sta. 26+600) 2nd NIA
Region III 1215.409 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 34
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
China Geo-Engineering (Phils.) Corp.
FC-03-020
Baguio-Aritao Road Impvt. Project CP II, Pangawan-Aritao-Kayapa Section
1st/Final PJHL 858.809 C 0.362 0.300 0.300 - - - 96.20 96.20% Outstanding
China Geo-Engineering (Phils.) Corporation
SL2-SN-000459
MWCR-CP VI, Mamburao-Abra De Ilog Section 3rd PJHL 857.228 O 0.380 0.300 0.100 0.030 0.061 0.100 97.10 -
China Geo-Engineering (Phils.) Corporation
SL2-SN-000459
MWCR-CP VI, Mamburao-Abra De Ilog Section Final PJHL 858.783 C 0.316 0.300 0.300 - - - 91.60 95.38%
Outstanding
China International Water & Electric Corp.
FC-03-028
IFCP Phase II, Package II, Impvt. of Jaro Mouth, Iloilo River & Upper Ingore Creek
2nd MFCP-I 507.803 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -
China International Water & Electric Corp.
FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan River Impv't. (East Bank) & Cut-off Channel
6th CARBDP 638.462 O 0.395 0.200 0.100 0.030 0.070 0.200 99.50 -
China International Water & Electric Corp.
FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan River Impv't. (East Bank) & Cut-off Channel
7th CARBDP 759.724 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -
China International Water & Electric Corp.
FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan River Impv't. (East Bank) & Cut-off Channel
9th CARBDP 889.009 O 0.353 0.199 0.100 0.030 0.070 0.200 95.20 -
China International Water & Electric Corp.
FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan River Impv't. (East Bank) & Cut-off Channel
Final CARBDP-MFCDP II 889.009 C 0.392 0.288 0.300 - - - 98.00 98.63%
Outstanding
China International Water & Electric Corp.
FC-03-028/SL1-
SN-004568
Metro Manila Flood Control Proj.-West Mangahan Floodway, CP-2 3rd NCR 182.915 O 0.333 0.200 0.100 0.030 0.056 0.133 FALSE -
China International Water & Electric Corp.
SL1-SN-004568
Rehab. of Malalag-Malita-Jose Abad Santos Road 4th IBRD 485.779 O 0.367 0.300 0.100 0.030 0.065 0.100 96.20 -
China International Water & Electric Corp.
SL1-SN-004568
Rehab. of Malalag-Malita-Jose Abad Santos Road 5th IBRD 485.779 O 0.380 0.300 0.100 0.030 0.056 0.100 96.60 -
China International Water & Electric Corp.
FC-03-028
Rehab. of Malalag-Malita-Jose Abad Santos Road Final IBRD 533.694 C 0.393 0.300 0.300 - - - 99.30 97.53%
Outstanding
China International Water and Electric Corporation
SL1-SN-004851
Bago River Irrigation System Rehabilitation Project 1st NIA 7.037 O 0.349 0.153 0.000 0.024 0.033 0.133 69.20 69.20%
Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 35
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
China National Constructional and
Agricultural Machinery Import and Export
Corporation (CAMC)
NO LICENSE Banaoang Pump Irrigation Project 1st NIA USD 38.475
M O 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -
China National Constructional and
Agricultural Machinery Import and Export
Corporation (CAMC)
NO LICENSE Banaoang Pump Irrigation Project 2nd NHA USD 34.475 O 0.375 0.176 0.100 0.018 0.037 0.133 83.90 -
China Road & Bridge Construction
SL2-SN-000479
CP 1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) 1st PJHL 952.564 O 0.386 0.300 0.100 0.030 0.035 0.100 95.10 -
China Road & Bridge Corporation
SL2-SN-000479
Const./Impv't. of CP VIII, Bayawan-Kalumboyan Road Project, Sta. 0+000-Sta.17+369.88
Final RRNDP 211.007 C 0.368 0.300 0.300 - - - 96.80 94.22% Outstanding
China Road & Bridge Corporation
SL-I-SN-004585/FC-03-029
Contract Package I, Himayangan Silago Sect., Arterial road links Dev't. Project, Phase IV
2nd PJHL 763.161 O 0.373 0.300 0.100 0.030 0.037 0.100 94.00 -
China Road & Bridge Corporation
SL-I-SN-004585/FC-03-029
Contract Package I, Himayangan Silago Sect., Arterial road links Dev't. Project, Phase IV
3rd PJHL 810.619 O 0.297 0.300 0.100 0.030 0.033 0.100 86.00 -
China Road & Bridge Corporation
SL-I-SN-004585/FC-03-029
Contract Package I, Himayangan Silago Sect., Arterial road links Dev't. Project, Phase IV
5th PJHL 810.619 O 0.327 0.300 0.100 0.030 0.042 0.100 89.90 -
China Road & Bridge Corporation
SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial road links Dev't. Project, Phase VI
1st PJHL 1,397.424 O 0.393 0.300 0.100 0.030 0.065 0.100 98.80 -
China Road & Bridge Corporation
SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) Km.175+423-Km.204+609/Km.0+000-Km.50+537
3rd PJHL 952.564 O 0.373 0.300 0.100 0.030 0.057 0.100 96.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 36
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
China Road & Bridge Corporation
SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) Km.175+423-Km.204+609/Km.0+000-Km.50+537
4th PJHL 1,135.918 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -
China State (Phils.) Construction Engineering
Corp.
FC-98-270 Const. of Package 6PY-1 Final ADB 706.209 C 0.466 - 0.500 - - - 96.60 92.04%
Outstanding
China State (Phils.) Construction Engineering
Corp.
SL1-SN-004314/FC-02-072
CP 2, Catarman-Calbayog via Lope de Vega Road under the Arterial Road Links Development Project, Phase V
2nd PJHL 621.279 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -
China State (Phils.) Construction Engineering
Corp.
FC-02-072
CP 2, Catarman-Calbayog via Lope de Vega Road under the Arterial Road Links Development Project, Phase V
4th PJHL 643.720 O 0.300 0.300 0.100 0.030 0.033 0.100 86.30 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-03-045
Metro Manila Urban Transport Integration Project (MMURTRIP), Phase I, Package 3: Marikina Bridge and Access Road
1st URPO 991.913 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-03-045
Metro Manila Urban Transport Integration Project (MMURTRIP), Phase I, Package 3: Marikina Bridge and Access Road
2nd URPO 991.913 O 0.236 0.295 0.100 0.030 0.047 0.100 80.80 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-03-045
Metro Manila Urban Transport Integration Project (MMURTRIP), Phase I, Package 3: Marikina Bridge and Access Road
3rd URPO 1,087.276 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-03-045
Metro Manila Urban Transport Integration Project (MMURTRIP), Phase I, Package 3: Marikina Bridge and Access Road
4th URPO 1,156.423 O 0.358 0.300 0.100 0.030 0.070 0.100 95.80 -
China State Construction Engineering Corporation
FC-02-039
Casecnan Multi-Purpose Irrigation & Power Project 1st NIA 608.637 O 0.330 0.154 0.100 0.021 0.033 0.200 84.00 -
China State Construction Engineering Corporation
FC-02-039
CP 1, Alegria-Santiago Sect. Under the PJHL, Mindanao Sect. Rehab. Project, Phase II
Final PJHL 540.791 C 0.384 0.300 0.300 - - - 98.40 96.56% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 37
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Chivas Construction 28316 Rehabilitation of Abra-Kalinga Road, Km.434+960-Km.435+260 Final CAR 1.872 O 0.371 - 0.500 - - - 87.10 -
Cholo Construction & Trading 32138 Const./Repair/Completion of San
Vicente Brgy. Road 1st/Final III 0.380 C 0.339 0.300 0.300 - - - 93.90 93.90% Outstanding
Chris-James Construction 11202Conc. Reblocking along Ferry Terminal-San Juan Section, Ferry Terminal-Caglanipao Rd.
1st VIII 6.921 O 0.250 0.000 0.100 0.030 0.020 0.100 50.00 -
Chris-James Construction 11202Conc. Reblocking along Ferry Terminal-San Juan Section, Ferry Terminal-Caglanipao Rd.
Final VIII 6.921 C 0.165 0.300 0.300 - - - 76.50 60.60% Fair
Chris-James Construction 11202 Repair/Rehab. of Roadslip along Maharlika Highway 1st VIII 4.678 O 0.267 0.145 0.100 0.015 0.013 0.100 64.00 -
Christian Ian Construction Corporation 8191 Completion of Sports Complex @
North Cental E/S 1st III 52.383 O 0.399 0.300 0.100 0.030 0.040 0.100 96.90 -
Cielito A. Bay-ag Construction 19032
Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road, Tadji-Runruno Section, Km. 312+300-Km.312+380
1st II 0.953 O 0.347 0.240 0.100 0.010 0.023 0.100 82.00 -
Cielito A. Bay-ag Construction 19032
Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road, Tadji-Runruno Section, Km. 312+300-Km.312+380
Final II 0.954 C 0.339 0.300 0.300 - - - 93.90 86.76% V.Satisfactory
Cielito A. Bay-ag Construction 19032 Const. of FMR @ Brgy. Yaway 1st/Final II 0.282 C 0.309 0.200 0.300 - - - 80.90 80.90%
V.Satisfactory
Cielito A. Bay-ag Construction 19032 Const./Completion of Multi-Purpose
Bldg. at Kayapa H/S 1st/Final II 0.909 C 0.400 0.200 0.300 - - - 90.00 90.00% V.Satisfactory
Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfina Albano Road 1st II 198.304 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -
Ciriaco Corporation 6932Const. of Domalandan Bridge, Lingayen-Labrador Road (SA #4 & #5)
Final I 216.544 C 0.383 0.300 0.300 - - - 98.30 97.16% Outstanding
Ciriaco Corporation 6932 Const. of Domalandan Bridge, Lingayen-Labrador Road (SA #4) 1st I 92.778 O 0.373 0.300 0.100 0.030 0.061 0.100 96.40 -
Ciriaco Corporation 6932 Const. of Domalandan Bridge, Lingayen-Labrador Road (SA #4) Final I 77.193 C 0.354 0.300 0.300 - - - 95.40 93.72%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 38
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Clifford Construction Corporation 3724 Completion of Janipaan Bridge,
Phase II Final VI 12.494 C 0.365 0.300 0.300 - - - 96.50 96.11% Outstanding
Clifford Construction Corporation 3724 Completion of Pasanghilan Bridge Final VI 6.431 C 0.348 0.300 0.000 - - - 64.80 70.50%
SatisfactoryClifford Construction
Corporation 3724 Const. of Altavas Bridge 1st VI 14.323 O 0.350 0.300 0.100 0.030 0.051 0.100 93.10 -
Clifford Construction Corporation 3724 Const. of Altavas Bridge 2nd VI 14.323 O 0.336 0.240 0.000 0.030 0.043 0.067 71.60 -
Clifford Construction Corporation 3724 Const. of Altavas Bridge Final VI 15.755 C 0.349 0.230 0.000 - - - 57.90 69.92%
FairClifford Construction
Corporation 3724 Const. of Dumga Bridge 2nd VI 13.932 O 0.337 0.300 0.100 0.030 0.030 0.100 89.70 -
Clifford Construction Corporation 3724 Const. of Dumga Bridge Final VI 13.932 C 0.311 0.200 0.300 - - - 81.10 84.73%
V.Satisfactory
Clifford Construction Corporation 3724 Const. of Padanghilan Bridge
(Phase I) Final VI 4.868 C 0.333 0.300 0.300 - - - 93.30 87.14% V.Satisfactory
Clifford Construction Corporation 3724 Retrofitting/Underpinning of Kalibo
Bridge (Phase I) Final VI 4.801 C 0.356 0.300 0.300 - - - 95.60 92.72% Outstanding
CLTG Builders 16852 Concreting of Road @ Purok Sagrada Familia, Brgy. Indangan Final XI 1.413 C 0.299 - 0.500 - - - 79.90 87.58%
V.Satisfactory
CLV Enterprises 18512 Const. MPB (Phase II) @ Mabuhay 1st X 0.942 O 0.328 0.300 0.100 0.015 0.032 0.067 84.20 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Const. of Bayan-Cabahian Farm-to-
Market Road 1st XIII 13.790 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Const./Widening of Dinagat-Loreto
Road (Busay-Pangi Sect.) 1st XIII 2.500 O 0.355 0.205 0.000 0.020 0.022 0.067 66.90 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Const./Widening of Dinagat-Loreto
Road (Busay-Pangi Sect.) 2nd XIII 2.500 O 0.369 0.284 0.000 0.022 0.025 0.067 76.70 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Upgrading of Kong Street 1st/Final XIII 3.954 C 0.364 - 0.500 - - - 86.40 86.40%
V.Satisfactory
Coastland Construction and Development Corp. 11487 Concreting of Magsaysay Road 1st XI 1.130 O 0.361 0.240 0.100 0.020 0.051 0.100 87.20 -
Coastland Construction and Development Corp. 11487 Impvt. of Manikling-Sigaboy Road
(Talisay-Launion Section) 1st XI 6.931 O 0.382 0.300 0.100 0.030 0.040 0.100 95.20 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 39
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Coastland Construction and Development Corp. 11487 Impvt. of Manikling-Sigaboy Road
(Talisay-Launion Section) Final XI 6.931 C 0.256 0.277 0.300 - - - 83.30 90.44% Outstanding
Cofejok Construction and Supply 27493 Competion of Multi-Purpose Bldg.,
Lamba Final XII 1.036 C 0.360 0.300 0.300 - - - 96.00 90.19% Outstanding
Cofejok Construction and Supply 27493 Completion of Multi-Purpose
Building (Mini Gym) @ Tres de Mayo 1st XII 1.420 O 0.331 0.227 0.100 0.020 0.040 0.100 81.80 -
Cofejok Construction and Supply 27493 Completion of Multi-Purpose
Building @ Pamantingan 1st/Final XII 0.289 C 0.315 0.300 0.300 - - - 91.50 91.50% Outstanding
Cofejok Construction and Supply 27493 Const. of 2-Cl, Academic Bldg. @
Davao del Sur NHS Final XI 0.658 C 0.393 - 0.500 - - - 89.30 90.70% Outstanding
Cofejok Construction and Supply 27493 Const. of 2-Storey Academic Bldg.
@ Sta. Cruz NHS, Package I Final R-XI 1.468 C 0.309 - 0.500 - - - 80.90 82.72% V.Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB at Bayya E/S 1st XII 0.481 O 0.367 0.200 0.100 0.030 0.047 0.100 84.40 -
Cofejok Construction and Supply 27493 Renovation of Multi-Purpose Bldg.,
Brgy. Poblacion CES Final XII 1.283 C 0.371 0.152 0.300 - - - 82.30 82.30% V.Satisfactory
Collera's Construction 13246 Conc. of Sta. Fe-San Isidro-Pulak Road 1st VIII 4.748 O 0.310 0.272 0.100 0.030 0.033 0.100 84.50 -
Collera's Construction 13246 Concreting of Critical Portion of National Circumferential Road Final VIII 3.832 C 0.418 - 0.500 - - - 91.80 61.32%
Fair
Collera's Construction 13246Const. of Multi-Purpose Building (ABC Hall) @ Palo Municipal Compound
1st/Final VIII 1.446 C 0.388 0.300 0.300 - - - 98.80 98.80% Outstanding
Collera's Construction 13246 Const. of Multi-Purpose Building (Inner Court) 1st VIII 1.900 O 0.327 0.300 0.100 0.020 0.022 0.100 86.90 -
Collera's Construction 13246 Const. of Multi-Purpose Building (Inner Court) Final VIII 1.900 C 0.347 0.300 0.300 - - - 94.70 89.24%
V.Satisfactory
Compass Rose Builders 27024 Repair/Rehab. of Flood Control along Kennon-Agat-National Road 1st/Final CAR 4.619 C 0.244 0.235 0.300 - - - 77.90 77.90%
Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge Final X 16.558 C 0.368 0.300 0.300 - - - 96.80 87.50%
V.Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge
Approaches and Access Road 1st X 27.513 O 0.300 0.300 0.100 0.030 0.037 0.100 86.70 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 40
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge 1st XIII 19.168 O 0.388 0.300 0.100 0.030 0.020 0.100 93.80 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge 2nd XIII 19.168 O 0.393 0.240 0.100 0.030 0.048 0.100 91.10 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge Final XIII 19.169 C 0.391 0.300 0.300 - - - 99.10 95.11%
Outstanding
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge Final XIII 28.876 C 0.286 0.300 0.300 - - - 88.60 90.61%
Outstanding
Congimar Mechanical Services 31490 Repair/Rehab. of District Hospital @
Bayambang Final I 0.373 C 0.287 0.300 0.300 - - - 88.70 89.61% V.Satisfactory
Constructicons, Inc. 31632 Rehab./Const. (Conc.) of Talaba-Summit-Panaon National Road 1st/Final IV-A 3.855 C 0.280 0.300 0.300 - - - 88.00 88.00%
V.Satisfactory
Constructor's Development Multi-
Purpose Cooperative31538
Conc. of Bual Bridge Approaches including Slope Protection along Makilala Jct. National Road
1st XII 7.325 O 0.375 0.225 0.100 0.023 0.04 0.100 86.30 -
Constructor's Development Multi-
Purpose Cooperative31538 Const. of Access Road Dep-Ed 1st/Final XII 0.433 C 0.323 0.249 0.300 - - - 87.20 87.20%
V.Satisfactory
Constructor's Development Multi-
Purpose Cooperative31538 Const. of MPB @ DTI Training
Center 1st/Final XII 0.477 C 0.378 0.300 0.300 - - - 97.80 97.80% Outstanding
Constructor's Development Multi-
Purpose Cooperative31538 Const./ Completion of Multi-Purpose
Bldg., at Senior Citizens Kinsante 1st/Final XII 0.228 C 0.350 0.300 0.300 - - - 95.00 95.00% Outstanding
Constructor's Development Multi-
Purpose Cooperative31538 Const./Completion of Multi-Purpose
Pavement Kampo Uno, Saguing 1st/Final XII 0.159 C 0.371 0.300 0.300 - - - 97.10 97.10% Outstanding
Constructor's Development Multi-
Purpose Cooperative31538
Const./Completion of Multi-Purpose School Building (2-Span Covered Court), Phase II
1st/Final XII 0.466 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
Constructor's Development Multi-
Purpose Cooperative31538 Const./Completion of PWSP 1st XII 0.273 O 0.386 0.300 0.100 0.008 0.019 0.100 91.30 -
Constructor's Development Multi-
Purpose Cooperative31538 Const./Completion of PWSP @
Purok 6 (Calzado) 1st/Final XII 0.528 C 0.371 0.200 0.300 - - - 87.10 87.10% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 41
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Crazy Cut Construction 18324 Completion of Baguio Health Center Final CAR 1.905 C 0.378 0.300 0.300 - - - 97.80 92.76% Outstanding
CRDC Construction 29738 Repair/Rehab. of Various Sch. Bldgs., Tabiawan E/S 1st IX 0.027 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -
Crest Construction 15240 Const. of San Pedro Bridge (Phase 1) 1st II 4.782 O 0.397 0.300 0.100 0.030 0.023 0.100 95.00 -
Crishelle Construction 17108 Completion of Multi-Purpose Building 1st/Final IV-B 0.369 C 0.396 0.238 0.300 - - - 93.40 93.04%
Outstanding
Crishelle Construction 17108 Concreting of Brgy Roads @ Brgy. Pancol 1st/Final IV-B 0.458 C 0.386 0.200 0.300 - - - 88.60 88.60%
V.Satisfactory
Crishelle Construction 17108 Concreting of Palawan South Road with Exception Final IV-B 4.371 C 0.258 0.200 0.300 - - - 75.80 77.00%
Satisfactory
Crishelle Construction 17108 Const. of Line Canal Final IV-B 0.185 C 0.380 0.500 88.00 88.00% V.Satisfactory
Crishelle Construction 17108 Const. of Puerto Princesa Pilot E/S Phase II 1st/Final IV-B 1.077 C 0.397 0.200 0.300 - - - 89.70 89.70%
V.Satisfactory
Crishelle Construction 17108
Repair of Slip & Installation of Slope Protection, Roxas-Taytay National Road Km. 174+885 & Km. 174+895 & Km. 175+365-Km. 1755+385
1st IV-B 2.128 O 0.360 0.300 0.100 0.030 0.023 0.100 91.30 -
Crishelle Construction 17108Strengthening of General Luna Bridge along Puerto Princesa South Road (PPSR)
1st IV-B 4.796 O 0.307 0.245 0.100 0.030 0.035 0.067 78.40 -
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of 1 unit Sch. Bldg. @
Madanding NHS 1st/Final XII 0.462 C 0.341 0.200 0.300 - - - 84.10 84.10% V.Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of MPB @ Brgy. Makat 1st/Final XII 0.463 C 0.385 0.300 0.300 - - - 98.50 98.50%
Outstanding
CSR Construction and Supply ( Formerly: CSR
Const.)14427 Const. of Agnipa Multi-Purpose
Building Final IV-B 1.807 C 0.384 0.200 0.300 - - - 88.40 79.37% Satisfactory
CSR Construction and Supply ( Formerly: CSR
Const.)14427 Const. of Macario Molino National
High School Final IV-B 0.673 C 0.389 0.000 0.300 - - - 68.90 66.24% Fair
CTC Builder and Supplies Incorporated 12088 Rehab. of Buhatan Bridge,
Sorsogon-Casiguran Road 1st V 9.403 O 0.366 0.203 0.100 0.030 0.038 0.100 83.70 -
Currimao Integrated Builders Corporation 8738 Concreting of Sta. Cruz Road 1st/Final I 3.339 C 0.332 0.297 0.300 - - - 92.90 92.90%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 42
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
CVAP Construction 20410 Const. of Lined Canal 1st/Final V 0.139 C 0.382 0.200 0.300 - - - 88.20 88.20% V.Satisfactory
CVAP Construction 20410 Repair/Repainting of Bicol Medical Center 1st/Final V 0.716 C 0.395 0.200 0.300 - - - 89.50 89.50%
V.Satisfactory
D. Morales Engineering Works 8531 Const. of Multi-Purpose Pavement 1st/Final VIII 0.473 C 0.368 0.221 0.300 - - - 88.90 88.90%
V.Satisfactory
D.C.E. Construction 29347 Const. of 3CL School Building @ Amulung H/S, Bayabat 1st/Final II 1.060 C 0.317 0.200 0.300 - - - 81.70 81.70%
V.Satisfactory
D.C.E. Construction 29347 Const. of Conner Public Market 1st CAR 4.611 O 0.400 0.242 0.100 0.030 0.042 0.100 91.40 -
D.C.E. Construction 29347 Const. of Conner Public Market 2nd CAR 4.611 O 0.317 0.300 0.070 0.030 0.018 0.067 80.20 -
D.C.E. Construction 29347Impv't. Concreting of Tabuk-Tinglayan Road Bantay-Pinagan Section
1st CAR 4.763 O 0.325 0.240 0.070 0.023 0.037 0.067 76.20 -
D.C.E. Construction 29347Impv't. Concreting of Tabuk-Tinglayan Road Bantay-Pinagan Section
2nd CAR 4.763 O 0.319 0.289 0.050 0.015 0.038 0.033 74.40 -
D.C.M. Construction 5641 Const. of Agus III Bridge (Pumping Bridge) & Approaches, Phase III 2nd X 19.418 O 0.351 0.300 0.100 0.030 0.016 0.100 89.70 -
D.C.M. Construction 5641 Const. of Agus III Bridge (Pumping Bridge) & Approaches, Phase III 3rd X 19.418 O 0.358 0.300 0.100 0.015 0.018 0.100 89.10 -
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. Camp Tinio 1st/Final III 2.574 C 0.267 0.300 0.300 - - - 86.70 86.70%
V.Satisfactory
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. San
Gregorio 1st/Final III 1.390 C 0.317 0.282 0.300 - - - 89.90 89.90% V.Satisfactory
D.G. Sarmenta Construction 13024 Const. of Multi-Purpose Bldg.,
(Gymnasium) Brgy. Bakod Bayan 1st/Final III 1.655 C 0.373 0.300 0.300 - - - 97.30 97.30% Outstanding
D.G. Sarmenta Construction 13024 Rehab. of Tambo-Magpapalayok
Road 1st/Final III 7.398 C 0.293 0.300 0.300 - - - 89.30 89.30% V.Satisfactory
D.J.D. Construction 32217 Conc. of Enrile St. 1st II 0.937 O 0.320 0.240 0.030 0.020 0.028 0.000 63.80 -
D.K. Jocson Construction 6896 Const. of One (1) Unit 3-CL SB @ Ramon Torres NHS Final VI 0.988 C 0.386 0.300 0.300 - - - 98.60 85.58%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 43
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
D.K. Jocson Construction 6896 Rehab./Conc. of Isabela-Guihulngan Road Final VI 14.306 C 0.283 0.200 0.300 - - - 78.30 80.34%
V.Satisfactory
D.L. Aureo Construction 24894 Const. of Multi-Purpose Building 1st/Final VIII 0.207 C 0.359 0.277 0.300 - - - 93.60 93.60% Outstanding
D.L. Aureo Construction 24894 Const. of Multi-Purpose Building 1st/Final VIII 0.191 C 0.382 0.300 0.300 - - - 98.20 98.20% Outstanding
D.L. Aureo Construction 24894 Const. of Seawall Barugo Boulevard 1st/Final VIII 0.376 C 0.292 0.200 0.300 - - - 79.20 79.20% Satisfactory
D.L. Aureo Construction 24894 Repair/Rehab. of 3 Cl Elem. Sch. Bldg. @ Panalaron C/S 1st/Final VIII 0.897 C 0.392 0.183 0.300 - - - 87.50 87.50%
V.Satisfactory
D.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S 1st/Final III 0.940 C 0.339 0.173 0.300 - - - 81.20 81.20% V.Satisfactory
D.M. Wenceslao & Associates, Inc. 150 Widening of R-10 Road Project
Marala Bridge and its Approaches Final NCR 68.073 C 0.153 0.200 0.000 - - - 35.30 64.66% Fair
D.R. Robles Construction 28559 Repair and Maintenance of Sagbat-Pililia Diversion Road Final IV-A 1.705 C 0.373 0.300 0.300 - - - 97.30 87.10%
V.Satisfactory
D.R. Robles Construction 28559 Riprapping of Angono River (Phase IV) 1st/Final IV-A 2.881 C 0.293 0.300 0.300 - - - 89.30 89.30%
V.Satisfactory
D.S.B. Construction and Supply 16126 Rehabilitation/Renovation of Multi-
Purpose Building Final NCR 3.772 C 0.388 0.300 0.300 - - - 98.80 84.45% V.Satisfactory
D.W. G & A Developers 27573 Const. of Flood Control @ Hibalyo 1st VII 0.906 O 0.213 - 0.200 0.000 0.031 0.250 69.40 -
D.W. G & A Developers 27573 Const./Repair of Seawall at Guihulngan 1st/Final VII 0.365 C 0.307 0.300 0.300 - - - 90.70 90.70%
Outstanding
Dadoy Freight Services Construction & Supply 28465 Conc. of San Andres-Calatrava
Road (Agpudlos Section) 1st IV-B 0.914 O 0.341 0.135 0.100 0.030 0.022 0.100 72.80 -
Daewoo Engineering & Construction Company,
Ltd.
FC-03-047/SL2-
SN-000411
CP II, Phil-Japan Friendship Highway Mindanao Section Rehab. Project, Phase II, (Km.130+100-Km.1376+805.34
3rd PJHL 1,559.690 O 0.350 0.300 0.050 0.030 0.048 0.100 87.80 -
Daewoo Engineering & Construction Company,
Ltd.
SL2-SN-000543/FC-98-113
Metro Manila Flood Control Project-West of Mangahan Floodway, CP1 5th MFCP I 740.742 O 0.316 0.200 0.100 0.024 0.061 0.200 90.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 44
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Daewoo Engineering & Construction Company,
Ltd.
FC-98-113/SL2-
SN-000543
Metro Manila Flood Control Project-West of Mangahan Floodway, CP1, 2nd MFCP I 725.017 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -
Daewoo Engineering & Construction Company,
Ltd.
SL2-SN-000543/FC-98-113
Metro Manila Flood Control Project-West of Mangahan Floodway, CP1, 4th MFCP I 740.742 O 0.342 0.200 0.100 0.024 0.059 0.200 92.50 -
Daewoo Engineering & Construction Company,
Ltd.
SL2-SN-000544/FC-01-047
Philippine-Japn Friendship Highway Mindanao Section, Rehabilitation Project, Phase II, CP-II, Km.130+000-Km.1376+805.34
4th PJHL 1,559.690 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -
Daewoo Engineering & Construction Company,
Ltd.
FC-03-047
Philippine-Japn Friendship Highway Mindanao Section, Rehabilitation Project, Phase II, CP-II, Km.130+000-Km.1376+805.34
5th XIII 1,559.690 O 0.393 0.295 0.050 0.030 0.070 0.067 90.50 -
Daewoo Engineering & Construction Company,
Ltd.
FC-03-047
Philippine-Japn Friendship Highway Mindanao Section, Rehabilitation Project, Phase II, CP-II, Km.130+000-Km.1376+805.34
6th PJHL 1,586.357 O 0.350 0.300 0.100 0.030 0.056 0.100 93.60 -
Daewoo Engineering & Construction, Ltd.
FC-03-047
Philippine-Japn Friendship Highway Mindanao Section, Rehabilitation Project, Phase II, CP-II, Km.130+000-Km.1376+805.34
7th PJHL 1,586.357 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -
Dahl Construction 8931 Completion of Concepcion Elementary School 1st/Final NCR 3.813 C 0.309 0.300 0.300 - - - 90.90 90.90%
OutstandingDamico Buildes &
Supplies 30355 Const. of Water System at Brgy. Sta. Juliana 1st III 0.472 O 0.368 0.294 0.100 0.010 0.019 0.100 89.10 -
Damico Buildes & Supplies 30355 Const. of Water System at Brgy. Sta.
Juliana Final III 0.472 C 0.309 0.300 0.300 - - - 90.90 89.64% V.Satisfactory
Danfran Construction 28088 Const. of MPB (for Police Station) and other impvt. Within the area 1st/Final NCR 1.190 C 0.364 0.300 0.300 - - - 96.40 96.40%
Outstanding
Danvic Construction 24439 Conc. of Additional 2 lanes along Davao City Diversion Road 1st/Final XI 3.516 C 0.309 0.300 0.300 - - - 90.90 90.90%
Outstanding
Danvic Construction 24439 Const./Rehab. of School Bldg. @ Bucana E/S 1st/Final XI 1.408 C 0.383 0.300 0.300 - - - 98.30 98.30%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 45
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Darynn Construction & Supply 22322 Const. of 2 Cl Academic Sch. Bldg.
@ Dongan Pekong E/S 1st/Final XI 0.704 C 0.366 0.300 0.300 - - - 96.60 96.60% Outstanding
Darynn Construction & Supply 22322 Const. of MPB at Brgy. 76-A 1st/Final XI 0.752 C 0.356 0.240 0.300 - - - 89.60 89.60%
V.Satisfactory
Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road Final XI 13.974 C 0.318 0.300 0.300 - - - 91.80 90.54%
Outstanding
Davao Concrete Products 12090 Const. of 3 Cl Academic @ Digos City NHS 1st/Final XI 1.247 C 0.369 0.300 0.300 - - - 96.90 96.90%
Outstanding
Davao Concrete Products 12090 Const. of Flood Control Moralizon High School Final XI 4.245 C 0.240 0.300 0.300 - - - 84.00 84.48%
V.Satisfactory
Davao Concrete Products 12090 Repair/Rehab. of MPB Bldg. (DAPECOL Hospital) 1st XI 4.151 O 0.396 0.287 0.100 0.030 0.038 0.100 95.10 -
Davao Concrete Products 12090Widening of Cotabato-Davao National Road, Pob. Pagalungan Section
Final XII 5.436 C 0.323 0.300 0.000 - - - 62.30 54.71% Poor
Davao Contractors Development Cooperative
(DACODECO)28542
Const. of 2 CL Mod. Single Storey School Bldg., At Manat NHS Kao Annex
1st XI 0.802 O 0.318 0.000 0.100 0.000 0.013 0.100 53.10 -
Davao Contractors Development Cooperative
(DACODECO)28542
Const. of 2 CL Mod. Single Storey School Bldg., At Manat NHS Kao Annex
Final XI 0.802 C 0.351 0.200 0.300 - - - 85.10 62.70% Fair
Davao Contractors Development Cooperative
(DACODECO)28542 Const. of N.N.C.H.S. Bldg. (Phase V) 1st XI 2.828 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -
Davao Gene Construction 3317 Const. of Rock Causeway and RC Pier 1st PPA 16.556 O 0.380 0.300 0.100 0.030 0.060 0.100 97.05 -
Davao L.A. Parts & Hardware Corporation 27208 Conc. Reblocking of Digos
Diversion Road 1st XI 4.821 O 0.384 0.300 0.100 0.030 0.035 0.100 94.90 -
Davao L.A. Parts & Hardware Corporation 27208 Conc. Reblocking of Digos
Diversion Road Final XI 4.821 C 0.360 0.300 0.300 - - - 96.00 95.34% Outstanding
Davao L.A. Parts & Hardware Corporation 27208 Const./Rehab. of FMR 1st/Final XI 2.824 C 0.301 0.219 0.300 - - - 82.00 82.00%
V.Satisfactory
Daybreak Enterprises Engineering & Construction
30174 Package II-Const. of Multi-Purpose Building on Various Location 1st VIII 1.275 O 0.269 0.225 0.100 0.020 0.032 0.100 74.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 46
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Digos Tesston Construction & Supplies 8921 Const. of FMR @ Baracata-Atan-Awe
Sebulan Road 1st XI 4.710 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -
Dimson (Manila), Inc. 112 Const. of Jones 2 Bridge and Approaches 2nd II 102.498 O 0.284 0.300 0.030 0.030 0.045 0.033 72.20 -
Dimson (Manila), Inc. 112 Improvement/Widening of MNR Package I, Meycauayan 1st III 88.097 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -
Diplahan Commercial & Construction 32037 Conc. of Tinungtungan along
Kauswagan-Lindag Road 1st IX 0.953 O 0.371 0.300 0.100 0.030 0.032 0.100 93.30 -
Diplahan Commercial & Construction 32037 Conc. of Tinungtungan along
Kauswagan-Lindag Road Final IX 0.953 C 0.272 0.300 0.300 - - - 87.20 90.86% Outstanding
DL Enterprises 18155 Conc. of Tudela Road (Municipal Ground) 1st X 0.952 O 0.338 0.300 0.100 0.015 0.032 0.100 88.50 -
DL Enterprises 18155 Conc./Rehab. of FMR @ Sta. Cruz, Boniao & Maguiles Road Final IX 9.127 C 0.318 0.184 0.300 - - - 80.20 80.44%
V.Satisfactory
DL Enterprises 18155 Conc./Rehab. of FMR @ Sta. Cruz, Boniao & Manguiles Road 1st IX 8.320 O 0.289 0.265 0.100 0.018 0.056 0.100 82.80 -
DL Enterprises 18155 Concreting of Roads at Brgy. Kinuman Sur Final X 0.952 C 0.329 0.282 0.300 - - - 91.10 87.92%
V.Satisfactory
DL Enterprises 18155Const. of Classrooms @ Northern Mindanao State College of Science & Technology
1st X 1.906 O 0.308 0.300 0.100 0.015 0.053 0.100 87.60 -
DL Enterprises 18155Const. of Classrooms @ Northern Mindanao State College of Science & Technology
Final X 1.906 C 0.305 0.300 0.300 - - - 90.50 79.02% Satisfactory
DL Enterprises 18155 Resurfacing of Unpaved Shoulder Final X 1.121 C 0.320 0.300 0.300 - - - 92.00 72.26% Satisfactory
DMJ Construction & Supply 17211 Asphalt Overlay along Amungan-
Palauig-Banlog Road, Iba Section 1st/Final III 9.553 C 0.354 0.300 0.300 - - - 95.40 95.40% Outstanding
DMJ Construction & Supply 17211 Asphalt Overlay of Cabangan-
Dolores Section 1st/Final III 9.554 C 0.364 0.207 0.300 - - - 87.10 87.10% V.Satisfactory
DMJ Construction & Supply 17211
Completion/ Continuation of Unfinshed On-going Bridge Matain Bridge along Olongapo-Bugallom Road-Phase II, Matain
Final III 10.706 C 0.301 0.261 0.300 - - - 86.20 89.08% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 47
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
DMM Construction Indsutries 31136 Const. of 6 Cl Sch. Bldg., Sta. Paz
E/S (Pinamudlan E/S) 1st/Final VIII 2.283 C 0.372 0.200 0.300 - - - 87.20 87.20% V.Satisfactory
Dofel Construction 16333 Const. of FMR @ Lantian 1st IX 1.861 O 0.298 0.000 0.100 0.020 0.028 0.100 54.60 -
Dofel Construction 16333 Const. of FMR @ Lantian Final IX 1.861 C 0.310 0.265 0.300 - - - 87.50 67.76% Fair
Dofel Construction 16333 Const. of Molave Vocational Technical School Building 1st IX 0.371 O 0.347 0.300 0.100 0.030 0.041 0.100 91.80 -
Domarax Construction and Development 5502 Const. of 1 Cl @ Claudia P. Pimentel
Memorial E/S 1st/Final XIII 0.443 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
Domvee Construction Corporation 19872
Rehab./Completion of CCR, Guinsiliban Sagay Road Section along Camiguin Circumferential Road
Final X 1.850 C 0.320 0.300 0.000 - - - 62.00 53.81% Poor
Donber Construction & Supply 15334 Improvement of MASSBA PIS 1st/Final NIA
Region V 1.191 O 0.359 0.180 0.300 - - - 83.90 -
Donber Construction & Supply 15334 Improvement of MASSBA PIS 1st/Final NIA
Region V 1.191 C 0.359 0.180 0.300 - - - 83.90 83.87% V.Satisfactory
Double L Construction & Development Enterprises 9834 Conc. of Multi-Purpose Pavement at
Brgy. Poblacion 1st/Final VII 0.475 C 0.303 0.300 0.300 - - - 90.30 90.30% Outstanding
Double L Construction & Development Enterprises 9834 Const. of Flood Control @
Maragondong 1st/Final VII 0.445 C 0.362 0.100 0.300 - - - 76.20 76.20% Satisfactory
Double L Construction and Development
Enterprises9834 Concreting of Bunga Brgy. Road 1st VII 0.827 O 0.306 0.300 0.100 0.030 0.040 0.100 87.60 -
Double L Construction and Development
Enterprises9834
Const. of Ayuquitan Bridge & Approaches, Km.13.922 along Dumaguete North Road
2nd VII 10.416 O 0.330 0.280 0.070 0.008 0.050 0.067 80.50 -
Double L Construction and Development
Enterprises9834
Const. of Ayuquitan Bridge & Approaches, Km.13.922 along Dumaguete North Road
Final VII 10.417 C 0.242 0.300 0.000 - - - 54.20 72.24% Satisfactory
Double R Double M Construction 25385 Const. of Cagayan River Control @
Catayauan 1st II 9.468 O 0.400 0.160 0.000 0.020 0.028 0.000 60.80 -
DSB Construction and Supply 16126 Const. of San Lorenzo Lined Canal 1st/Final V 0.375 C 0.345 0.100 0.300 - - - 74.50 74.50%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 48
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
DSO Enterprises 10733 Completion of School Bldg. 1st/Final IV-A 0.955 C 0.322 0.227 0.300 - - - 84.90 84.90% V.Satisfactory
DSO Enterprises 10733 Conc. of CSCF Jct. Road, Pagsanjan Section 1st IV-A 5.254 O 0.400 0.237 0.100 0.030 0.048 0.100 91.50 -
DSO Enterprises 10733 Const. of FMR @ Sitio Tanliwan 1st/Final IV-A 0.955 C 0.268 0.300 0.300 - - - 86.80 86.80% V.Satisfactory
Dungan Constructors & Trading 19301 Conc. of FMR @ Brgy. Buhilit 1st/Final III 0.611 C 0.341 0.196 0.300 - - - 83.70 83.70%
V.Satisfactory
Duragold Trading & Const. - CDO Branch 31929 Const. of One (1) Storey Multi-
Purpose Bldg. Final X 0.471 C 0.392 0.300 0.300 - - - 99.20 92.13% Outstanding
Duros Development Corp. 22729 Repair/Rehab. & Widening of Cansaga 1st VII 5.694 O 0.362 0.300 0.100 0.030 0.050 0.067 90.90 -
Duros Development Corp. 22729 Repair/Rehab. & Widening of Cansaga Bridge Final VII 11.388 C 0.400 0.100 0.300 - - - 80.00 86.54%
V.Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Impv't./Widening of Bacolod South Kabankalan Road, Km.4+953 - Km.5+420
3rd VI 17.790 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Impv't./Widening of Bacolod South Kabankalan Road, Km.4+953 - Km.5+420
4th VI 17.790 S 0.289 0.300 0.100 0.030 0.060 0.100 87.90 87.90% V.Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Impv't./Widening of Bacolod South Kabankalan Road, Km.4+953 - Km.5+420
Final VI 17.790 C 0.276 0.300 0.000 - - - 57.60 78.04% Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road, Km.5+200 - Km.5+775.5 with exception
1st VI 9.538 O 0.377 0.294 0.100 0.030 0.070 0.100 97.10 -
E & L Reyes Construction 15338 Const. of 1-unit 2 Cl High Sch. Bldg.
at Samboan NHS 1st/Final VII 0.826 C 0.362 0.300 0.300 - - - 96.20 96.20% Outstanding
E & L Reyes Construction 15338 Const. of Getafe Public Market 1st VII 1.895 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -
E & L Reyes Construction 15338 Rehab. (Conc.) of Maria Antonia
Village Road 1st/Final VII 0.740 C 0.313 0.300 0.300 - - - 91.30 91.30% Outstanding
E and D Construction 32064 Const. of MPB (DENR Building) 1st XII 0.939 O 0.311 0.231 0.100 0.023 0.029 0.067 76.10 -
E and D Construction 32064 Const./Conc. of Lagundungan-Buaya-Buaya Road 1st XII 4.815 O 0.345 0.300 0.000 0.015 0.043 0.067 77.00 -
E and D Construction 32064 Const./Conc. of Lagundungan-Buaya-Buaya Road Final XII 4.815 C 0.343 0.200 0.300 - - - 84.30 79.92%
SatisfactoryE S De Guzman
Construction 17494 Const. of Pob. South MPB Final II 0.277 C 0.228 0.200 0.300 - - - 72.80 72.73% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 49
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
E. Cañeda Construction 22168 Road Conc. of Danglag-Garing Road 1st/Final VII 0.458 C 0.282 0.200 0.300 - - - 78.20 78.20% Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of MPB @ Bonot 1st V 0.948 O 0.365 0.245 0.100 0.020 0.042 0.100 87.20 -
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of MPB @ Bonot Final V 0.948 C 0.389 0.138 0.300 - - - 82.70 85.85%
V.Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of Water System Final V 2.808 C 0.391 0.300 0.300 - - - 99.10 94.90%
Outstanding
E. Gardiola Construction 17542 Const. of C-5 Ext. Proj., from SLEX to Sucat Road Final NCR 95.556 C 0.295 0.300 0.300 - - - 89.50 86.26%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. Along San Celestino-San Francisco-Sto. Toribio Rd. 1st/Final IVA 9.642 C 0.362 0.254 0.300 - - - 91.60 91.60%
Outstanding
E. Guadiz Construction 27172 Const. of 2-CL at Guilermo A. Barsatan School of Arts & Trades 1st CAR 0.558 O 0.319 0.218 0.100 0.022 0.016 0.067 74.20 -
E. Guadiz Construction 27172 Const. of 2-CL at Guilermo A. Barsatan School of Arts & Trades Final CAR 0.558 C 0.361 0.300 0.000 - - - 66.10 76.04%
Satisfactory
E. Guadiz Construction 27172 Const. of Marag Valley Agricultural and Trade High School 1st CAR 0.559 O 0.400 0.250 0.100 0.008 0.028 0.100 88.60 -
E. Guadiz Construction 27172 Const. of Marag Valley Agricultural and Trade High School Final CAR 0.559 C 0.344 0.300 0.000 - - - 64.40 81.34%
V.Satisfactory
E. Lapus Enterprises 10813 Const. of Balangkas Road Final NCR 3.514 C 0.330 0.200 0.300 83.00 87.80% V.Satisfactory
E. Lapus Enterprises 10813 Const. of Multi-Purpose Building 1st/Final VIII 3.340 C 0.399 0.285 0.300 - - - 98.40 98.40% Outstanding
E. Lapuz Enterprises 10813 Const. of MP Building @ Sto. Tomas E/S 1st/Final III 3.029 C 0.385 0.176 0.300 - - - 86.10 86.10%
V.Satisfactory
E. Simba Marketing and Construction Supply 16398 Completion of MPB at Brgy. 36-D 1st/Final XI 0.939 C 0.345 0.268 0.300 - - - 91.30 91.30%
Outstanding
E.A. Sancho Construction 5648 Const. of Adiangao Bridge # 1 and Approaches (Phase I) 2nd V 5.536 O 0.323 0.273 0.100 0.020 0.023 0.100 83.90 -
E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR 1st/Final CAR 0.458 C 0.377 0.240 0.300 - - - 91.70 91.70% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 50
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project Phase V, Estancia-Ajuy Section
2nd PJHL 381.914 O 0.376 0.296 0.050 0.030 0.056 0.033 84.10 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project Phase V, Estancia-Ajuy Section
3rd PJHL 496.473 O 0.252 0.300 0.100 0.030 0.046 0.100 82.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project, Estancia-Ajuy Section
4th PJHL 530.586 O 0.337 0.300 0.100 0.030 0.051 0.100 91.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road Sect.
Phase IV 1st PJHL 1,458.041 O 0.367 0.300 0.100 0.030 0.051 0.100 94.80 -
E.C. Samonte Construction 31019 Conc. of Sirawal Boulevard 1st/Final IX 1.846 C 0.265 0.200 0.300 - - - 76.50 76.50%
SatisfactoryE.C. Samonte Construction 31019 Const. of MPB (Gym) 1st/Final IX 0.925 C 0.297 0.200 0.300 - - - 79.70 79.70%
SatisfactoryE.C. Samonte Construction 31019 Const. of MPB (Gym) Final IX 1.851 C 0.300 0.200 0.300 - - - 80.00 70.90%
SatisfactoryE.C. Samonte Construction 31019 Impv't./Conc. Along Liloy-Labason
Road (Lopoc Sect.) 1st/Final IX 2.771 C 0.365 0.300 0.300 - - - 96.50 96.50% Outstanding
E.C. Samonte Construction 31019 Repair (w/ Const.) of Sitio Binculan
Road to Poblacion via Lumay 1st IX 0.926 O 0.400 0.300 0.070 0.000 0.023 0.100 89.30 -
E.C. Samonte Construction 31019 Repair (w/ Const.) of Sitio Binculan
Road to Poblacion via Lumay Final IX 0.926 C 0.306 0.024 0.300 - - - 63.00 78.78% Satisfactory
E.C. Timbancaya Enterprises 15244 Const. of 1 Cl @ Montevista E/S 1st/Final IV-B 0.367 C 0.348 0.300 0.300 - - - 94.80 94.80%
OutstandingE.C. Timbancaya
Enterprises 15244 Const. of 1 Cl at Alimanguan NHS 1st/Final IV-B 0.368 C 0.354 0.133 0.300 - - - 78.70 78.70% Satisfactory
E.D. Angas Construction 32106 Const./Repair of School Bldg. @ Campalanas H/S 1st VII 0.469 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-Egana-
Sibalom Road 2nd VI 4.137 O 0.257 0.189 0.100 0.030 0.020 0.100 69.60 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-Egana-
Sibalom Road 3rd VI 4.137 O 0.259 0.221 0.100 0.030 0.041 0.100 75.10 -
E.D. Solano Construction & Engineering Services 14758 Const. of MPB (Brgy. Hall) Phase 2
@ Brgy. Pogo Grande 1st/Final I 0.668 C 0.373 0.300 0.300 - - - 97.30 97.30% Outstanding
E.D. Tabangay Consruction 31978
Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo Section
1st/Final IV-B 9.100 C 0.295 0.264 0.300 - - - 85.90 85.90% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 51
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
E.D. Tabangay Consruction 31978 Const. of 1 Cl @Panitian National
High School 1st/Final IV-B 0.424 C 0.370 0.300 0.300 - - - 97.00 97.00% Outstanding
E.D. Tabangay Consruction 31978 Const. of San Juan High School 1st IV-B 0.424 O 0.350 0.000 0.100 0.030 0.029 0.100 60.90 -
E.D. Tabangay Consruction 31978 Const. of San Juan High School Final IV-B 0.424 C 0.379 0.300 0.300 - - - 97.90 72.00%
SatisfactoryE.D. Tabangay Consruction 31978 Rehab. of Cross-Country Road Final IV-B 1.866 C 0.240 0.300 0.300 - - - 84.00 87.48%
Satisfactory
E.G. Canabe Construction 27358Const. of One (1) Storey 4-CL H/S Bldg. Carigara NHS (Jugaban Annex),
1st/Final VIII 1.888 C 0.375 0.221 0.300 - - - 89.60 89.60% V.Satisfactory
E.I. Templonuevo & Asso. Inc. 1090 Const. of Brgy Laguinbanwa Road Final VI 2.409 C 0.301 0.286 0.300 - - - 88.70 86.06%
V.Satisfactory
E.K.C. Construction & Aggregates 14833
Const. of Galap Bridge I and its Approaches Gurel-Bokod-Kabayan-Abatan Road, Loo
Final CAR 13.979 C 0.378 0.300 0.300 - - - 97.80 90.60% Outstanding
E.L. Torres Construction and Trading 31406 Repair of Roads & Drainage along P.
Jacinto St. 1st/Final NCR 0.555 C 0.347 0.300 0.300 - - - 94.70 94.70% Outstanding
E.M. Bayatan Construction 21332 Const. of MPB Phase III @ NVPH 1st/Final II 1.745 C 0.312 0.200 0.300 - - - 81.20 81.20%
V.Satisfactory
E.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project 1st PRRC 11.379 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -
E.M. Palomares Construction 23471 Const. of Multi-Purpose Building 1st/Final I 0.950 C 0.382 0.200 0.300 - - - 88.20 88.20%
V.Satisfactory
E.M. Palomares Construction 23471 Impvt. of Gangal-Bazar-Sallapadan
Bo. FMR Sallapadan ARC 3rd CAR 12.255 O 0.333 0.278 0.070 0.018 0.013 0.067 77.90 -
E.M. Palomares Construction 23471 Impvt. of Gangal-Bazar-Sallapadan
Bo. FMR Sallapadan ARC Final CAR 12.255 C 0.286 0.300 0.300 - - - 88.60 80.04% V.Satisfactory
E.P. Manantan Construction and
Development Corp.6457 Conc./Reblocking of Agusan-Davao
Road 2nd XI 9.949 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -
E.P. Manantan Construction and
Development Corp.6457 Impvt./Conc. of 4 lanes at Tuganay
Bridge & Approaches 1st XI 7.701 O 0.290 0.300 0.070 0.030 0.060 0.067 81.70 -
E.P.L. General Construction 15559 Const. of 1Cl Sch. Bldg. @
Calabanga H/S 1st/Final V 0.439 C 0.335 0.237 0.300 - - - 87.20 87.20% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 52
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
E.P.M. Construction 13307 Const. of 1 Storey 2 Cl Sch. Bldg. @ Luck E/S 1st/Final IV-A 0.858 C 0.334 0.300 0.300 - - - 93.40 93.40%
Outstanding
E.S.L. Builders and Parts Supply 9014 Const. of MPB @ Brgy. Camilmil Final IV-B 0.668 C 0.345 0.300 0.300 - - - 94.50 86.10%
V.Satisfactory
E.T. Latawan Construction 13919 Const. of Tigil-Betwagan FMR 1st CAR 4.765 O 0.400 0.300 0.100 0.020 0.020 0.100 94.00 -
EA-EC Constuction 15737 Const. of Flood Control 1st/Final V 2.088 C 0.307 0.100 0.300 - - - 70.70 70.70% Satisfactory
Eastern Construction Company, Inc. 2225 Completion of MPB @ Cainta Green
Park 1st/Final IVA 2.395 C 0.340 0.200 0.300 - - - 84.00 84.00% V.Satisfactory
EBJR Construction 19780 Const. of Baluan-Mawigui-Allanguigan Road Final CAR 1.413 C 0.280 0.300 0.300 - - - 88.00 91.18%
Outstanding
ECDA Construction 7013 Rehab. of Road Network Poblacion Floridablanca 1st/Final III 0.474 C 0.313 0.100 0.300 - - - 71.30 71.30%
Satisfactory
Ecpiatos Construction and Supply 31540 Const. of Caramcam Bridge 1st XIII 3.693 O 0.320 0.200 0.100 0.030 0.027 0.100 77.70 -
Ecpiatos Construction and Supply 31540 Const. of Caramcam Bridge Final XIII 3.693 C 0.213 0.300 0.300 - - - 81.30 76.47%
Satisfactory
Ed Ting Builders and Construction Supply 26199 Const. of San Jose-Trento Road
Boundary 2nd XIII 9.180 O 0.361 0.225 0.000 0.020 0.028 0.100 73.40 -
Ed Ting Builders and Construction Supply 26199 Const. of San Jose-Trento Road
Boundary Final XIII 9.180 C 0.186 0.300 0.000 - - - 48.60 65.13% Fair
Eddie G. Guillen Builders 14174Conc. Paving of Jct. Dibalio-Calanasan Road, Phase VI, San Antonio Section
Final II 4.512 C 0.297 0.300 0.300 - - - 89.70 87.66% V.Satisfactory
Eddie G. Guillen Builders 14174 Concreting of Road Leading to Cagayan State University 1st II 2.849 O 0.311 0.293 0.100 0.010 0.033 0.067 81.40 -
Eddie G. Guillen Builders 14174 Concreting of Road Leading to Cagayan State University Final II 2.849 C 0.321 0.210 0.300 - - - 83.10 82.08%
V.Satisfactory
Eddie G. Guillen Builders 14174 Const. of Tupang River Control 1st II 4.699 O 0.187 0.150 0.100 0.008 0.025 0.133 60.30 -
Eddie G. Guillen Builders 14174 Const. of Tupang River Control Final II 4.699 C 0.373 0.300 0.300 - - - 97.30 75.10% Satisfactory
EDDMARI Construction & Trading 20301 Sct. Ranger Housing Project, Phase
IV 1st NHA 46.983 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 53
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Eddmari Construction and Trading 20301
Asphalting of Arayat-Apalit-Masantol Setback Levee (Candaba-San Luis-Apalit-San Simon-Macabebe & Masantol Section
1st/Final III 9.510 C 0.309 0.200 0.300 - - - 80.90 80.90% V.Satisfactory
Eddmari Construction and Trading 20301 Concreting of Laon FMR 1st/Final IVB 0.239 C 0.444 - 0.500 - - - 94.40 94.40%
OutstandingEddmari Construction
and Trading 20301 Concreting of Road, Brgy. Minuyan 4 1st/Final III 0.473 C 0.385 0.300 0.300 - - - 98.50 98.50%
Outstanding
Eddmari Construction and Trading 20301 Concreting of San Matias Brgy.
Road 1st/Final III 0.475 C 0.324 0.184 0.300 - - - 80.80 80.80% V.Satisfactory
Eddmari Construction and Trading 20301 Const./Repair/Rehab. of Sta. Rita
Brgy. Road 1st/Final III 0.381 C 0.258 0.230 0.300 - - - 78.80 78.80% Satisfactory
Edelcriz Construction 30864 Conc. of Road @ Brgy. Sapang Palay, Proper Sitio Lote 1st/Final III 0.446 C 0.253 0.300 0.300 - - - 85.30 85.30%
V.Satisfactory
Edison Lumber and Construction 31333 Const. of 1-Classroom School
Building 1st/Final I 0.480 C 0.363 0.200 0.300 - - - 86.30 86.30% V.Satisfactory
Edward Lui Construction 8459 Completion of MPB at Brgy. Sawang Calero 1st VII 0.959 O 0.383 0.300 0.100 0.030 0.027 0.100 94.00 -
EEI Corporation 333NAIA Expressway and its Related Roads Project, Phase I, CP-II, Skyway Interchange Ramps 1 & 4
3rd URPO 523.999 O 0.319 0.300 0.100 0.030 0.070 0.100 91.90 -
EEI Corporation 333NAIA Expressway and its Related Roads Project, Phase I, CP-II, Skyway Interchange Ramps 1 & 4
5th URPO 601.681 O 0.370 0.240 0.100 0.023 0.065 0.100 89.80 -
EFC Enterprises 11795 Completion of Pieta Bridge along Dasmariñas-Carmona Road 1st/Final IVA 11.093 C 0.366 0.200 0.300 - - - 86.60 86.60%
V.Satisfactory
EFC Enterprises 11795 Conc. of A. P. Reyes Ave. 1st/Final NCR 9.539 C 0.310 0.300 0.300 - - - 91.00 91.00% Oustanding
EFC Enterprises 11795Const. of Las Piñas-Muntinlupa-San Pedro Road (Including Drainage System) Phase VI
Final NCR 13.571 C 0.355 0.200 0.300 - - - 85.50 89.94% V.Satisfactory
EFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente 1st IVA 1.920 O 0.358 0.240 0.100 0.030 0.027 0.100 85.50 -
EFC Enterprises 11795 Maeztranza Linear Park Project 1st PRRC 22.850 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 54
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
EG & I Construction Corporation 16225 Const. of Argao River Control 1st/Final VII 0.185 C 0.334 0.300 0.300 - - - 93.40 93.40%
OutstandingEG & I Construction
Corporation 16225 Const. of Access Road to RORO Port (Phase I) 1st/Final VII 4.742 C 0.372 0.300 0.300 - - - 97.20 97.20%
Outstanding
EGB Construction 13722Concrete Paving of Ilagan-Delfin Albano-Mallig Road, Sta. Isabel Norte Section
1st II 1.852 O 0.355 0.235 0.100 0.020 0.037 0.100 84.70 -
EGB Construction 13722Concrete Paving of Ilagan-Delfin Albano-Mallig Road, Sta. Isabel Norte Section
Final II 1.852 O 0.312 0.284 0.300 - - - 89.60 -
EGB Construction 13722 Const. of School Building (Clustered 15 Units) 1-CL@ Bimonton E/S 1st II 0.384 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -
EGB Construction 13722 Const. of Various School Bldg., 3CL Sch. Bldg. Cabagan Pilot School 1st/Final II 0.790 C 0.322 0.200 0.300 - - - 82.20 82.20%
V.Satisfactory
EJR Builders and Construction Supply 24255 Completion of Multi-Purpose
Building 1st I 1.424 O 0.378 0.240 0.100 0.020 0.018 0.100 85.60 -
EJR Builders and Construction Supply 24255 Completion of Multi-Purpose
Building Final I 1.424 C 0.376 0.100 0.300 - - - 77.60 83.20% V.Satisfactory
El Nido Construction & Trading 25814 Const. of 1Cl Dumarao BHS 1st IVB 0.378 O 0.286 0.300 0.100 0.020 0.035 0.100 84.10 -
El Nido Construction & Trading 25814
Repair/Restoration of Tabuan Road Sect. & Inst. of Box Culvert & Slope Protection
1st/Final IVB 6.413 C 0.303 0.300 0.300 - - - 90.30 90.30% Outstanding
Elkan Konstrak & Aggregates 26220 Const. of Barangay Road, Sogod-
Sto. Domingo 1st/Final V 0.458 C 0.281 0.226 0.300 - - - 80.70 80.70% V.Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Multi-Purpose Building 1st/Final V 0.280 C 0.394 0.200 0.300 - - - 89.40 89.40%
V.Satisfactory
EMMROS Construction 27065Resurfacing of MWCR, Pagbahan-Talabaan Section, Km.391+134-Km.392+500
1st/Final IV-B 0.573 C 0.324 0.300 0.300 - - - 92.40 92.40% Outstanding
EMQ Designs and Construction 16128 Concreting/Improvement of Binocot
FMR Bunsuran 1st/Final IV-B 0.446 C 0.278 0.284 0.300 - - - 86.20 86.20% V.Satisfactory
EMS Sarmiento Construction 29097 Impvt. (Conc. Paving) of Danao-
Getafe Road 1st VII 9.470 O 0.370 0.300 0.100 0.023 0.045 0.100 93.80 -
ENC Enterprises 29819 Const. of Multi-Purpose Bldg., Sta. Clara Sur 1st IV-A 0.477 O 0.398 0.300 0.100 0.030 0.011 0.067 90.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 55
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
EP Manantan Construction &
Development Corp.6457 Conc./Reblocking of Agusan-Davao
Road 1st XI 9.949 O 0.338 0.000 0.100 0.008 0.043 0.100 58.90 -
EPN Builders and Developers 30341 Const. of MPB ( Phase I) @ Andres
Bonifacio 1st/Final II 0.566 C 0.360 0.200 0.300 - - - 86.00 86.00% V.Satisfactory
EPN Builders and Developers 30341 Const. of MPB (Community Center) 1st/Final II 0.189 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
EPN Builders and Developers 30341
Const. of One Unit Classroom School Building @ San Leonardo E/S
1st II 0.416 O 0.369 0.213 0.100 0.015 0.027 0.100 82.40 -
EPN Builders and Developers 30341
Const. of One Unit Classroom School Building @ San Leonardo E/S
Final II 0.416 C 0.379 0.228 0.300 - - - 90.70 84.89% V.Satisfactory
EPN Builders and Developers 30341 Const. of School Bldg. at Bannawag 1st/Final II 0.476 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
Equi-Parco Construction Co. 14332 Const. of Jagupit Flood Control &
Highway Restoration 1st XIII 14.317 O 0.398 0.200 0.070 0.030 0.059 0.200 95.70 -
Equi-Parco Construction Co. 14332 Const. of Jagupit Flood Control &
Highway Restoration Final XIII 14.317 C 0.325 0.020 0.300 - - - 64.50 83.22% V.Satisfactory
Equi-Parco Construction Co. 14332 Const. of Palapay Bridge and
Approaches, Gingoog Claveria Road 1st X 21.819 O 0.328 0.300 0.100 0.030 0.050 0.100 90.80 -
Equi-Parco Construction Co. 14332
Impvt. of JSH-Bagontaas-Lurogan-MVC-Lilingayeon Road, MVC Section
1st X 23.709 O 0.274 0.273 0.100 0.030 0.047 0.100 82.40 -
Equi-Parco Construction Co. 14332 Rehab. of Puyo River Flood Control
(Downstream) 1st/Final XIII 14.303 C 0.469 - 0.500 - - - 96.90 96.90% Outstanding
Equi-Parco Construction Company 14332 Const. of Amontay Flood Control 1st XIII 9.317 O 0.398 0.200 0.100 0.030 0.051 0.200 97.90 -
Equi-Parco Construction Company 14332 Improvement of Butuan City-Masao
Port Road 2nd XIII 4.674 O 0.386 0.300 0.100 0.030 0.051 0.100 96.70 -
Equi-Parco Construction Company 14332 Improvement of Butuan City-Masao
Port Road Final XIII 4.674 C 0.295 0.284 0.300 - - - 87.90 93.18% Outstanding
Equi-Parco Construction Company 14332 Masao Flood Control 1st/Final XIII 14.451 C 0.472 - 0.500 - - - 97.20 97.20%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 56
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Equi-Parco Construction Company 14332 Nasipit Port Expansion Project 1st PPA 198.545 O 0.400 0.298 0.100 0.030 0.055 0.100 98.30 -
Eric Van P. Sesbreno Construction 26243 Const. of Aritao NHS, 2-Storey Bldg.,
8-CL School Building Final II 4.817 C 0.363 0.200 0.300 - - - 86.30 75.28% Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of MPB at Villaflores 1st/Final II 0.286 C 0.362 0.200 0.300 - - - 86.20 86.20%
V.Satisfactory
Ermy Construction 15741 Concreting of Brgy. Road at Brgy. Sindalan City 1st/Final III 0.478 C 0.360 0.221 0.300 - - - 88.10 88.10%
V.Satisfactory
Ermy Construction 15741 Impvt./Rehab. of Cabetican Road 1st/Final III 1.906 C 0.291 0.300 0.300 - - - 89.10 89.10% V.Satisfactory
ESD Cruz Construction & Supply 32368 Const. of Conc. Drainage @ Brgy.
Sto. Niño 1st/Final VIII 0.241 C 0.332 0.200 0.300 - - - 83.20 83.20% V.Satisfactory
ESEK Construction Corporation 12871 Completion of Malanday E/S 1st NCR 4.772 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -
ESR Construction and Supplies 10451 Concreting of Roads at Brgy.
Canicapan Final X 0.949 C 0.331 0.280 0.300 - - - 91.10 88.52% V.Satisfactory
ESR Construction and Supplies 10451 Siloy ARC (Rehab. of Purok 1, 2, 3, 4,
5 Circumferntial) 1st/Final X 8.341 C 0.329 0.200 0.300 - - - 82.90 82.90% V.Satisfactory
ETM Construction 16285 Conc. of Brgy. Road, Purok 1 Brgy. San Jose 1st/Final III 0.437 C 0.363 0.108 0.300 - - - 77.10 77.10%
Satisfactory
F. Gurrea Construction, Incorporated 6995 Const. of Diclum Bridge Final VI 13.665 C 0.387 0.200 0.300 - - - 88.70 86.99%
V.Satisfactory
F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge 1st VI 12.459 O 0.393 0.300 0.070 0.030 0.035 0.067 89.50 -
F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge 2nd VI 12.459 O 0.400 0.261 0.030 0.030 0.033 0.067 82.10 -
F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center 1st X 349.995 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -
F. Vargas Construction 2366Const. of Permanent Bridge Support & Rehab. of Existing Pony Truss of Magapit Suspension Bridge
1st II 13.307 O 0.338 0.266 0.100 0.030 0.045 0.100 87.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 57
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
F. Vargas Construction 2366Const. of Permanent Bridge Support & Rehab. of Existing Pony Truss of Magapit Suspension Bridge
3rd II 13.307 O 0.236 0.240 0.100 0.023 0.050 0.100 74.90 -
F. Vargas Construction 2366Const. of Permanent Bridge Support & Rehab. of Existing Pony Truss of Magapit Suspension Bridge
Final II 13.168 C 0.400 0.200 0.300 - - - 90.00 84.18% V.Satisfactory
F.C. Martinez Construction 31243 Const. of Four (4) Classroom, San
Felipe H/S 1st/Final III 1.331 C 0.390 0.200 0.300 - - - 89.00 89.00% V.Satisfactory
F.F. Cruz and Company, Incorporated 123 Const. of Magsaysay Viaduct 3rd CARBDP 427.121 O 0.396 0.300 0.100 0.030 0.070 0.100 99.60 -
F.F. Cruz and Company, Incorporated 123 Const. of Magsaysay Viaduct 4th CARBDP 468.782 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -
F.F. Cruz and Company, Incorporated 123 Const. of Magsaysay Viaduct 6th CARBDP 468.782 O 0.394 0.300 0.100 0.030 0.070 0.100 99.40 -
F.F. Cruz and Company, Incorporated 123 Const. of Magsaysay Viaduct 7th CARBDP 468.782 O 0.344 0.300 0.100 0.030 0.070 0.100 94.40 -
F.F. Cruz and Company, Incorporated 123 Const. of Magsaysay Viaduct 8th CARBDP 511.480 O 0.388 0.300 0.100 0.030 0.060 0.100 97.80 -
F.F. Cruz and Company, Incorporated 123 San Juan Port Development Project 1st PPA 45.336 O 0.397 0.300 0.000 0.030 0.065 0.033 82.50 -
F.F. Galang Construction 26801 Const. of Multi-Purpose Building Final IV-B 0.745 C 0.395 0.206 0.300 - - - 90.10 85.34% V.Satisfactory
F.F. Galang Construction 26801 Const. of Multi-Purpose Building (Bleacher), Brgy. Punta Baja Final IV-B 0.279 C 0.328 0.200 0.300 - - - 82.80 79.93%
Satisfactory
F.F. Rosales Construction 8814 Const. of Eco-Tourism Road 1st IV-A 14.410 O 0.331 0.300 0.100 0.030 0.028 0.100 88.90 -
F.F. Rosales Construction 8814 Const. of Eco-Tourism Road 1st IV-A 14.410 O 0.374 0.240 0.100 0.020 0.037 0.100 87.10 -
F.L. Reguyal Construction 3315 Completion of Along-Along Bridge, Phase IV 1st III 2.848 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -
F.L. Reguyal Construction 3315 Const. of 2-CL @ Eastern Cabu E/S 1st/Final III 0.614 C 0.359 0.300 0.300 - - - 95.90 95.90% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 58
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
F.P. De Guzman Construction, Inc. 10296 Concreting of Pathways @ Brgy.
391, Brgy. 392, Soler St. & Vicinity Final NCR 3.713 C 0.285 0.200 0.300 78.50 74.78% Satisfactory
F.V. Chua Construction and Supply 27267 Const. of MP Building at Brgy.
Tiaong 1st/Final III 0.237 C 0.390 0.138 0.300 - - - 82.80 82.80% V.Satisfactory
Fairchild Builders & Developers Inc.
(Formerly: Fairchild Marketing & Const.)
10024 Concreting of Tabango & Liling Bridge Approaches Final VIII 4.766 C 0.379 0.300 0.300 - - - 97.90 93.64%
Outstanding
Fairchild Builders & Developers, Inc. 10024 Const. of Tabunok II Bridge @ Brgy.
Tabunok Final VIII 4.071 C 0.267 0.300 0.300 - - - 86.70 84.24% V.Satisfactory
Fatima Builders 27939 Const. & Repair of School Building @ Lazi National Agricultural School 1st/Final VII 0.944 C 0.374 0.300 0.300 - - - 97.40 97.40%
Outstanding
Fatima Builders 27939 Repair/Rehab. of FMR at Pisong A 1st/Final VII 0.463 C 0.328 0.261 0.300 - - - 88.90 88.90% V.Satisfactory
Ferdstar Builders Contractors 4965 Const. Brgy. Roads @ Brgys,
Capaya & Pulung Maragul 1st/Final III 0.469 C 0.352 0.300 0.300 - - - 95.20 95.20% Outstanding
Ferdstar Builders Contractors 4965 Const. of Kipot Bridge Final VI 8.141 C 0.346 0.300 0.000 - - - 64.60 73.90%
SatisfactoryFernz Construction
Corporation 28238 Const. of Farm to Market Road 1st X 2.834 O 0.379 0.300 0.100 0.023 0.059 0.100 96.10 -
Fernz Construction Corporation 28238 Const. of Farm to Market Road Final X 2.830 C 0.266 0.200 0.300 - - - 76.60 78.04%
Satisfactory
FFJJ Construction 16712 Const. of 2-CL School Building @ Molopolo Annex 1st XI 0.721 O 0.315 0.240 0.100 0.020 0.041 0.100 81.60 -
FFJJ Construction 16712 Const./Replacement of Malalag Bridge 1st XI 14.265 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -
FFJJ Construction 16712 Repair of Jones Timbol CES 1st/Final XI 0.150 C 0.329 0.300 0.300 - - - 92.90 92.90% Outstanding
FGM Builders Resources & Development Corp. 31807 Rehab. of MPB at R.O. Quimpo E/S 1st/Final XI 0.465 C 0.287 0.212 0.300 - - - 79.90 79.90%
Satisfactory
FH Gopiteo Construction & Supply 21336 Const. of Lined Canal @ Brgy.
Kalkam Final XII 0.882 C 0.388 0.300 0.300 - - - 98.80 91.48% Outstanding
Fiat Construction Services 5463
Cluster A-2004: Const. of Various School Building under the 2nd Congressional District of Oriental
3rd X 8.449 O 0.381 0.300 0.070 0.030 0.070 0.100 95.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 59
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Fiat Construction Services 5463
Cluster A-2004: Const. of Various School Building under the 2nd Congressional District of Oriental
Final X 8.449 C 0.293 0.300 0.000 - - - 59.30 65.58% Fair
First Northway Development and
Construction Corporation11645 Conc. of Tablac Road 1st/Final I 1.609 C 0.208 0.300 0.300 - - - 80.80 80.80%
V.Satisfactory
Flordes Construction & Trading 16916 Conc. of Sta. Trinidad St., Old
Panaderos 1st/Final NCR 0.945 C 0.351 0.300 0.300 - - - 95.10 95.10% Outstanding
Flordes Construction & Trading 16916 Proposed Road Rehab. along
Pandacan & Sta. Mesa 1st/Final NCR 4.719 C 0.358 0.300 0.300 - - - 95.80 95.80% Outstanding
Flordes Construction & Trading 16916 Repair/Rehab. of
Roofing/Renovation of MPB 1st/Final NCR 1.420 C 0.337 0.300 0.300 - - - 93.70 93.70% Outstanding
Flordes Construction & Trading 16916
Repair/Rehab. of Roofing/Renovation of Stage and Repair of Toilet @ Pio del Pilar E/S
1st/Final NCR 2.150 C 0.386 0.300 0.300 - - - 98.60 98.60% Outstanding
Flordes Construction & Trading 16916 Road & Drainage Rehab. @ Brgy.
599, Narra St. 1st NCR 1.895 O 0.350 0.240 0.100 0.023 0.035 0.100 84.80 -
Floriane Construction and Supply 12261 Const. of FMR at Kitambis-
Valdeconcha Road 1st/Final X 0.940 C 0.286 0.300 0.300 - - - 88.60 88.60% V.Satisfactory
Floriane Construction and Supply 12261 Const. of River Control at
Mambayaan (Phase 2) 1st X 4.644 O 0.246 0.200 0.100 0.030 0.032 0.200 80.80 -
Floriane Construction and Supply 12261
Rehab. of Buluan-Cagayan de Oro-City-Iligan Road, Lagonglong By Pass Road
1st X 9.534 O 0.332 0.300 0.100 0.015 0.040 0.100 88.70 -
Floriane Construction and Supply 12261
Rehab. of Butuan-Cagayan de Oro-City-Iligan Road, Lagonglong By Pass Road
Final X 9.535 C 0.361 0.251 0.300 - - - 91.20 82.83% V.Satisfactory
FNR Construction 7051 Restoration of Multi-Purpose Building 2nd I 5.601 O 0.387 0.300 0.000 0.030 0.035 0.067 81.90 -
FNR Construction 7051 Restoration of Multi-Purpose Building Final I 5.601 C 0.385 0.100 0.000 - - - 48.50 55.43%
Poor
Foremost Builders 23774Const. / Rehab. / Replacement / Completion & Repair of Sch. Bldg. @ Ma-a NHS
1st/Final XI 0.440 C 0.368 0.300 0.300 - - - 96.80 96.80% Oustanding
Fortrica Builders 24220 Concreting of FMR @ Brgy. Calingcuan 1st/Final III 0.625 C 0.287 0.300 0.300 - - - 88.70 88.70%
V.Satisfactory
Fortstone Construction Enterprises 31668 Const. of Multi-Purpose Bldg. At
DPWH-Region XII 3rd XII 1.832 O 0.361 0.300 0.100 0.015 0.007 0.067 85.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 60
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Fortunato T. Sanchez 407 Asphalt Overlay (Pier to City Hall) 1st XIII 4.729 O 0.350 0.200 0.100 0.015 0.028 0.100 79.30 -
Fortunato T. Sanchez 407 Asphalt Overlay along Surigao Wharf Road 1st XIII 3.640 O 0.343 0.300 0.100 0.030 0.051 0.100 92.40 -
Fortunato T. Sanchez 407 Asphalt Overlay along Surigao Wharf Road Final XIII 3.640 C 0.323 0.281 0.300 - - - 90.40 91.60%
Outstanding
Four J Construction 15104 Conc. of Road @ So. Nazareneville 1st/Final IV-A 1.918 C 0.297 0.244 0.300 - - - 84.10 84.10% V.Satisfactory
Four J Construction 15104 Const. of MPB @ UPS V Area I 1st NCR 0.475 O 0.353 0.200 0.100 0.030 0.047 0.100 83.00 -
Four J Construction 15104 Const. of Multi-Purpose Building at Emilio Jacinto E/S Final NCR 2.976 C 0.292 0.300 0.300 - - - 89.20 83.67%
V.Satisfactory
Four J Construction 15104 Impvt. of Valenzuela General Hospital Bldg. Final NCR 0.937 C 0.372 0.300 0.300 - - - 97.20 94.89%
Outstanding
Four J Construction 15104 Repair & Impvt. of McArthur Highway Final NCR 9.387 C 0.334 0.300 0.300 - - - 93.40 91.72%
Outstanding
Four Side Construction and Supply 24446 Rep./Maint/of Looc Ferrol Road Km.
103+500 (Tuburan Sect. Box Culvert) 1st/Final IV-B 0.516 C 0.388 0.000 0.300 - - - 68.80 68.80% Fair
Framecon Builders 22482 Repair/Impvt. of Mallorca-Tabuating Road 1st III 1.853 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -
FRD Construction 10227 Rehab./Impvt. of Laoang-Calomotan Rd. (Sta. 793+713 - 796+298) 1st VIII 9.314 O 0.351 0.300 0.070 0.020 0.033 0.067 84.10 -
Full Blast Trading and Construction 29548 Const./Rehab. of Multi-Purpose
Building @ Brgy. Poblacion 1st/Final III 0.944 C 0.397 0.300 0.300 - - - 99.70 99.70% Outstanding
Fullido's Construction and Enterprises 20347 Const. of CVSCAFT School Building 1st VII 0.928 O 0.392 0.240 0.100 0.020 0.023 0.100 87.50 -
Fullido's Construction and Enterprises 20347 Const. of CVSCAFT School Building Final VII 0.929 C 0.388 0.100 0.300 - - - 78.80 84.89%
V.Satisfactory
G & P Builders, Incorporated 3960 Const. of CDO 3rd Bridge & Access
Road Phase I, Kauswagan 2nd X 35.266 O 0.289 0.199 0.100 0.015 0.048 0.100 75.10 -
G. Uymatiao Jr. Construction 6663 Conc. of Brgy. Daro Road 1st VII 0.474 O 0.288 0.300 0.100 0.030 0.056 0.100 87.40 -
G.C.I. Construction 11346 Conc. of Brgy. Bagadion Danawan-San Vicente FMR Final V 2.852 C 0.250 0.300 0.300 - - - 85.00 73.30%
Satisfactory
G.C.I. Construction 11346 Concreting of Tierra Nevada-Lupi Road Final V 0.955 C 0.292 0.100 0.300 - - - 69.20 75.68%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 61
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
G.C.I. Construction 11346 Const. of MPB (Executive Building) 1st/Final V 2.837 C 0.390 0.200 0.300 - - - 89.00 89.00% V.Satisfactory
G.C.I. Construction 11346 Const./Road Opening of San Vicente-Gutan-Luban-Aguib Road (P III) 1st II 28.102 O 0.218 0.000 0.100 0.010 0.023 0.067 41.80 -
G.C.I. Construction 11346 Rehab./Impvt. of Nabua-Balatan Road Cabanban Section 1st/Final V 0.468 C 0.305 0.200 0.300 - - - 80.50 80.50%
V.Satisfactory
G.C.I. Construction 11346 Repair/Rehab. of National Road, San Andres-Caramoan Section 1st V 28.326 O 0.400 0.300 0.100 0.020 0.025 0.100 94.50 -
G.C.I. Construction 11346 Repair/Rehab. of National Road, San Andres-Caramoan Section Final V 28.326 C 0.346 0.300 0.300 - - - 94.60 91.72%
Outstanding
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building 1st VI 3.850 O 0.225 0.240 0.100 0.023 0.013 0.100 70.10 -
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building 2nd VI 3.848 O 0.348 0.170 0.100 0.030 0.035 0.100 78.30 -
G.F. Rovero Merchandising 27268 Const./Impvt. of Multi Purpose
Pavement @ Poblacion 1st VI 4.817 O 0.399 0.196 0.100 0.030 0.023 0.100 84.80 -
G.F. Rovero Merchandising 27268 Const./Impvt. of Multi Purpose
Pavement @ Poblacion Final VI 4.817 C 0.232 0.200 0.300 - - - 73.20 80.16% V.Satisfactory
G.F. Rovero Merchandising 27268 Rehab. of New Buswang Prov'l.
Road at New Buswang 1st/Final VI 0.988 C 0.316 0.300 0.300 - - - 91.60 91.60% Outstanding
G.G. Uy Construction 32319 Rehabilitation of Main Canal (Sta. 13+150-Sta. 16+600 Final NIA
Region I 12.410 C 0.250 0.300 0.300 - - - 85.00 84.84%
G.O. Marron General Contractor 6844 Conc. Paving of Sitio Nagbayugan
Feeder Road 1st I 1.881 O 0.236 0.225 0.100 0.000 0.005 0.000 56.60 -
G.O. Marron General Contractor 6844 Const. of Multi-Purpose Bulding at
Bacsil 1st I 0.936 O 0.367 0.221 0.100 0.030 0.047 0.067 83.20 -
G.O. Marron General Contractor 6844 Const./Rehab. of MPB 2nd I 4.674 O 0.265 0.234 0.100 0.015 0.020 0.100 73.40 -
G.O. Marron General Contractor 6844 Const./Rehab. of MPB 3rd I 4.674 O 0.307 0.257 0.100 0.008 0.006 0.000 67.80 -
Gacutan Construction 10789 Alibadabad CPIP Final NIA Region II 2.560 C 0.272 0.159 0.300 - - - 73.10 73.10%
Galeno Construction, Inc. 3427 Const. of Magballo Bridge (Phase I) Final VI 7.547 T 0.333 0.300 0.000 - - - 63.30 69.24% Fair
Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II 2nd VI 6.838 O 0.237 0.203 0.000 0.008 0.000 0.000 44.80 -
Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II Final VI 6.838 C 0.259 0.256 0.000 - - - 51.50 58.58% Poor
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 62
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Carmen-
Patag-Bulua Road 1st/Final X 14.462 C 0.259 0.286 0.300 - - - 84.50 84.50% V.Satisfactory
Gampik Construction & Development Inc. 8019
Concreting of Babak-Samal-Kaputian Road, IGACOS, Island Garden City of Samal
1st XI 9.394 O 0.228 0.240 0.100 0.010 0.035 0.100 71.30 -
Gampik Construction & Development Inc. 8019
Const. of Babak-Samal-Kaputian Road, IGACOS, Island Garden City of Samal
Final XI 9.392 C 0.350 0.300 0.300 - - - 95.00 85.34% V.Satisfactory
Gampik Construction & Development Inc. 8019
Impvt./Rehab of Marbel-Allah-Valley-Cotabato Road, Ampatuan-Talayan Section
Final XII 14.372 C 0.371 0.300 0.300 - - - 97.10 92.78% Outstanding
Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay of
Initao-Naawan Road Sect. 1st X 14.462 O 0.343 0.200 0.100 0.008 0.038 0.100 78.90 -
Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay of
Initao-Naawan Road Sect. 2nd X 14.462 O 0.349 0.251 0.000 0.030 0.047 0.000 67.70 -
Gampik Construction & Development Inc. 8019
Provision of Slope Protection @ Sinuda Slip and Repair of Bituminous Pavement
Final X 2.027 C 0.377 0.300 0.300 - - - 97.70 78.53% Satisfactory
Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road Final XI 14.130 C 0.343 0.272 0.300 - - - 91.50 84.27%
V.Satisfactory
Garnic Construction 22861 Package 3: Const. of MP Building (2nd Floor Only) @ Brgy. Bulac 1st/Final III 0.756 C 0.359 0.253 0.300 - - - 91.20 91.20%
Outstanding
Gawanato Construction 28687 Const. of Line Canal @ Talaga 1st/Final IV-A 0.191 C 0.371 0.200 0.300 - - - 87.10 87.10% V.Satisfactory
GCI Construction 11346 Concreting of Tierra Nevada-Lupi Road 1st V 0.955 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -
GCI Construction 11346 Repair/Rehab of LCPIS 1st NIA Region V 11.652 C 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90%
Satisfactory
GCI Construction 11346 Repair/Rehab of LCPIS 1st NIA Region V 11.652 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90%
Satisfactory
GCMG Construction 9743 Completion of Sagay Public Market Final X 1.845 C 0.375 0.300 0.300 - - - 97.50 90.85% Outstanding
GCMG Construction 9743 Const./Conc. of Manduao Road 1st X 0.930 O 0.322 0.191 0.100 0.008 0.038 0.100 75.90 -
GCMG Construction 9743 Const./Conc. of Manduao Road Final X 0.930 C 0.334 0.200 0.300 - - - 83.40 78.90% Satisfactory
G-Cube Construction 17219 Concrete Reblocking of Del Monte Avenue, Quezon City 1st/Final NCR 4.891 C 0.294 0.300 0.300 - - - 89.40 89.40%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 63
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
GED Construction 13614 Const. of Road @ San Antonio 1st/Final I 0.475 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory
Geety Realty & Dev. Corporation 30447 Asphalt Overlay of Imus Road
(Sta.1+606 - Sta.2+523 w/ exception) 1st/Final VII 9.647 C 0.330 0.250 0.300 - - - 88.00 88.00% V.Satisfactory
Geety Realty & Development Corporation 30447 Rehabilitation of Canlumampao 1st NIA
Region VII 9.598 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -
Gemma Construction Supply 5044
Cluster I - Const. of Various School Bldg., Project CY 2003 Oringo E/S, Brgy. Dadiagas Heights
Final XII 0.686 C 0.361 0.254 0.300 - - - 91.50 87.51% V.Satisfactory
Gemma Construction Supply 5044 Const. of Bridge 1st XII 3.687 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -
Gemma Construction Supply 5044
Const. of Multi-Purpose Building @ Purok Marcos, Sta. Cruz Tampakan realigned to Const. of Multi-Purpose Building
1st XII 0.903 O 0.397 0.300 0.100 0.030 0.018 0.100 94.50 -
Geneson Construction & Supply 13728 Rehab. w/ Asphalt Overlay, Crack &
Joint Sealing @ Onyx St. 1st/Final NCR 1.887 C 0.366 0.300 0.300 - - - 96.60 96.60% Outstanding
Genetian Builders 18052 Const. of 1 Cl Sch. Bldg. @ Pioneer NHS San Pedro Annex 1st/Final IX 0.500 C 0.178 0.138 0.300 - - - 61.60 61.60%
Fair
Geovan Marketing 10824 Const. of Agbalili River Control Final VI 4.815 C 0.277 0.300 0.300 - - - 87.70 83.38% V.Satisfactory
Gerezsons Resources Corporation 20699 Const. of Drainage Canal @ Pob. 1 1st/Final VIII 0.275 C 0.336 0.200 0.300 - - - 83.60 83.60%
V.Satisfactory
Gerezsons Resources Corporation 20699 Const. of Inopacan Seawall 1st/Final VIII 9.297 C 0.133 0.300 0.300 - - - 73.30 73.30%
Satisfactory
Gershli Construction & Supply 28480 Conc. of Road @ Brgy. Sico 1st/Final IV-A 0.189 C 0.373 0.200 0.300 - - - 87.30 87.30%
V.Satisfactory
Gershli Construction and Supply 28480 Const. of Multi-Purpose Bldg., @
(Talipapa) Brgy. 2-A 1st/Final IV-A 0.478 C 0.379 0.200 0.300 - - - 87.90 87.90% V.Satisfactory
Gershli Construction and Supply 28480 Const. of Reinforced Concrete Box
Culvert 1st/Final IV-A 0.191 C 0.367 0.200 0.300 - - - 86.70 86.70% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 64
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Geto Construction 17689 Concreting of Interior Roads 1st/Final IV-A 1.910 C 0.398 0.200 0.300 - - - 89.80 89.80% V.Satisfactory
Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I 1st XIII 10.274 O 0.334 0.300 0.100 0.030 0.043 0.100 90.70 -
Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I 2nd XIII 10.274 O 0.346 0.200 0.100 0.030 0.040 0.100 81.60 -
Gicar Construction 12624 Impvt./Conc. of Lantay-Maraboc-Pangantucan Road 2nd X 14.005 O 0.302 0.236 0.070 0.023 0.047 0.067 74.50 -
Gicar Construction 12624 Replacement of San Isidro Bridge 1st XIII 14.151 O 0.370 0.123 0.100 0.030 0.048 0.100 77.10 -
Gind Construction and Enterprises 18679 Repair of Multi-Purpose Building @
Poblacion Este Final I 0.567 C 0.363 0.200 0.300 - - - 86.30 87.56% V.Satisfactory
Giovanni Construction 12168 Conc. of Jct. Agusan-Misamis Nat'l Highway 1st XIII 9.193 O 0.353 0.300 0.100 0.030 0.019 0.100 90.20 -
Giovanni Construction 12168 Conc. of Jct. Agusan-Misamis Nat'l Highway Final XIII 9.193 C 0.354 0.200 0.300 - - - 85.40 88.28%
V.Satisfactory
GJD Construction & Supply 25866 Const. of 2 CL Sch. Bldg. @ Titay
NHS Malagandis Annex 1st IX 0.871 O 0.264 0.110 0.100 0.015 0.026 0.100 61.50 -
GJE Builders 18286 Conc. of FMR @ Brgy. Bawa 1st/Final III 0.614 C 0.250 0.200 0.300 - - - 75.00 75.00% Satisfactory
GLCT Construction 30657Completion/Continuation of Unfinished Matain Bridge along Olongapo-Bugallon Road
Final III 5.519 C 0.328 0.149 0.300 - - - 77.70 78.66% Satisfactory
GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge 1st III 13.950 O 0.320 0.257 0.070 0.022 0.028 0.067 76.40 -
Global V Builders / HITRI Construction joint venture 29763
Boracay Environmental Infrastucture Project Drainage System
PTA Region VI 94.176 Suspended 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -
GNE Construction 21764
Conc. of Liloy-Labason Road (Osukan Sect.) Realigned to Labason-Gutalac, Zamboanga del Norte
Final IX 4.631 C 0.395 0.291 0.300 - - - 98.60 94.22% Outstanding
Goldbern Construction 28509Repair / Rehabilitation of Buildings 9 & 10 @ Bagong Lipunan Condominium (BLC)
1st / Final NCR 1.690 C 0.393 0.300 0.300 99.30 99.30% Outstanding
Goldfin Construction 21343 Completion of Multi-Purpose Building 1st VII 1.324 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -
Gonzalo Construction 1826 Replacement/ Const. of Man-asok Bridge & Approaches 1st CAR 9.305 O 0.324 0.300 0.100 0.030 0.045 0.100 89.90 -
Good Fortune International, Inc. 9246 Const. of Arevalo-Sooc Bridge &
Approaches 1st VI 7.237 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 65
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San
Miguel-Alimodin-Maasim Road 1st VI 11.564 O 0.313 0.231 0.050 0.023 0.035 0.067 71.90 -
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San
Miguel-Alimodin-Maasin Road 2nd VI 11.564 O 0.304 0.237 0.100 0.030 0.028 0.100 79.90 -
Good Fortune International, Incorporated
9246 Const. of Arevalo-Sooc Bridge & Approaches Final VI 7.237 C 0.281 0.300 0.300 - - - 88.10 87.62%
V.Satisfactory
Good Fortune International, Incorporated
9246 Const. of Odol Bridge 1st VI 12.222 O 0.400 0.248 0.070 0.030 0.035 0.067 85.00 -
Good Fortune International, Incorporated
9246 Const. of Odol Bridge 2nd VI 12.222 O 0.400 0.281 0.050 0.030 0.028 0.067 85.60 -
Good Medal Construction and Supplies 19309 Const. of Drainage System @ San
Isidro 1st/Final V 0.143 C 0.200 0.300 0.300 - - - 80.00 80.00% Satisfactory
Gowil Builders 18733 Repair/Rehab. of Roads at N. Bacalso Ave. 1st/Final VII 4.795 C 0.276 0.300 0.300 - - - 87.60 87.60%
V.Satisfactory
GPJ Construction 10613 Conc. of Makati Ave. (Phase III) 1st/Final NCR 0.712 C 0.398 0.300 0.300 - - - 99.80 99.80% Outstanding
Grace Construction Corporation 3771
Completion of Tagoloan Parallel Bridge & Approaches along Butuan-Cagyan de Oro-Iligan Road (SA #3)
1st X 54.184 O 0.396 0.300 0.100 0.030 0.055 0.100 98.10 -
Grace Construction Corporation 3771 Conc. of Oroqiueta-Calamba Mt.
Road 2nd X 2.863 O 0.352 0.300 0.100 0.023 0.045 0.100 92.00 -
Grace Construction Corporation 3771 Conc. of Oroqiueta-Calamba Mt.
Road Final X 2.863 C 0.294 0.300 0.300 - - - 89.40 85.02% V.Satisfactory
Grace Construction Corporation 3771 Const. of 108 m Steel Truss Bridge
with one Pier Steel Components 1st IX 62.851 O 0.331 0.291 0.100 0.022 0.033 0.100 87.70 -
Grace Construction Corporation 3771 Const. of Cagayan de Oro City 3rd
Bridge & Approaches Phase V Final X 16.854 C 0.395 0.300 0.300 - - - 99.50 86.56% V.Satisfactory
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches 3rd IX 69.136 O 0.338 0.300 0.100 0.030 0.043 0.067 87.80 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches 5th IX 69.136 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches 6th IX 69.136 O 0.284 0.293 0.000 0.030 0.042 0.100 74.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 66
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Grace Construction Corporation 3771
Const./Impv't. (PCCP) of CP-D: Sect. A-Monte Alegre Jct.-Aurora Road Sect. B-Monte Alegre Jct.-Molave Road
4th KFAED 310.371 O 0.361 0.283 0.050 0.030 0.047 0.067 83.80 -
Grace Construction Corporation 3771
Const./Impv't. (PCCP) of CP-D: Sect. A-Monte Alegre Jct.-Aurora Road Sect. B-Monte Alegre Jct.-Molave Road
Final KFAED 310.371 C 0.378 0.300 0.000 - - - 67.80 81.29% V.Satisfactory
Grace Construction Corporation 3771
Maint./Rehab. & Imp. of National Arterial & Secondary Rd., Oroquieta-Plaridel-Calamba-Sapang Dalaga Rd.
Final X 4.780 C 0.301 0.300 0.300 - - - 90.10 88.54% V.Satisfactory
Grace Construction Corporation/Ulticon Builders, Inc. (JV)
JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
1st XI 226.982 O 0.354 0.300 0.050 0.030 0.060 0.067 86.10 -
Graia Const. & Supply (Formerly: Graia Const. &
Supplies30826 Impvt./Rehab. of Mc-Donald
Junction-Aguinaldo via Talaba Road 1st/Final IV-A 14.449 C 0.344 0.300 0.300 - - - 94.40 94.40% Outstanding
Granby Trading & Construction 27554 Concreting of Brgy. Road @ Brgy.
Sabang 1st IV-A 1.917 O 0.315 0.300 0.100 0.020 0.014 0.100 84.90 -
Granby Trading & Construction 27554 Concreting of Brgy. Road @ Brgy.
Sabang Final IV-A 1.917 C 0.386 0.200 0.300 - - - 88.60 88.55% V.Satisfactory
Granby Trading & Construction 27554 Const. of Malvar Public Market Final IV-A 3.855 C 0.347 0.200 0.300 - - - 84.70 88.55%
V.Satisfactory
Grand Tower Engineering Technology 31946 Const. of Library & Multi-Purpose
HE Type Building (P-I) BNHS Annex Final X 0.471 C 0.343 0.300 0.300 - - - 94.30 83.59% V.Satisfactory
Grand Tower Engineering Technology 31946 Const. of MPB @ Nabag-o Final X 0.471 C 0.346 0.300 0.300 - - - 94.60 66.46%
Fair
Green Horizons Landscapers and Developers, Inc.
18802Conc. of Calapan South Road (Conc./Impvt. of Pasi II & Happy Valley Section)
1st IVB 28.906 O 0.334 0.235 0.100 0.030 0.054 0.100 85.30 -
Green Horizons Landscapers and Developers, Inc.
18802Conc. of Calapan South Road (Conc./Impvt. of Pasi II & Happy Valley Section)
Final IVB 28.906 C 0.205 0.287 0.300 - - - 79.20 82.86% V.Satisfactory
Green Horizons Landscapers and Developers, Inc.
18802 Const. of MPB @ Sitio IV Agua 1st IVB 1.899 O 0.360 0.241 0.100 0.030 0.053 0.100 88.40 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 67
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Guinsalinan Construction & Concrete Aggregates
Supplies28965 Completion of Baywalk 1st XIII 1.913 O 0.271 0.300 0.100 0.030 0.070 0.067 83.80 -
GVN Builders 29577 Rehab. of MPB @ Cupang West 1st/Final III 1.410 C 0.320 0.153 0.300 - - - 77.30 77.30% Satisfactory
H R B Construction 10528 Const./Impvt. of Multi-Purpose Bldg. @ Gubat 1st/Final V 0.141 C 0.373 0.200 0.300 - - - 87.30 87.30%
V.Satisfactory
H.G. Lopez Construction 17691 Const. of Multi-Purpose Building (Phse II) Town Proper Final I 2.817 C 0.396 0.300 0.300 - - - 99.60 86.86%
V.Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Iloilo-Capiz Road (New
Route) 1st VI 16.538 O 0.371 0.245 0.100 0.030 0.055 0.100 90.10 -
H.L.J. Construction & Enterprises 18080 Concrete Paving of Brgy. Carol-an-
Ayungon Farm-to-Market Road Final VI 1.518 C 0.228 0.200 0.300 - - - 72.80 77.12% Satisfactory
H.L.J. Construction & Enterprises 18080 Const. of 1 CL @ @ Hermenegilda F.
Gloria Memorial H/S 1st VII 0.414 O 0.397 0.240 0.100 0.030 0.039 0.100 90.60 -
H.L.J. Construction & Enterprises 18080 Const. of 1 CL @ @ Hermenegilda F.
Gloria Memorial H/S Final VII 0.432 C 0.301 0.300 0.300 - - - 90.10 90.45% Outstanding
H.L.J. Construction & Enterprises 18080 Const. of 1 Unit 1 CL School Bldg. @
Daan Banua E/S Final VI 0.378 C 0.380 0.245 0.300 - - - 92.50 91.59% Outstanding
H.L.J. Construction & Enterprises 18080 Const. of Naiba-Maningcao Road 1st VII 0.940 O 0.308 0.234 0.100 0.008 0.025 0.100 77.50 -
H.L.J. Construction & Enterprises 18080 Const. of Pedestrian Overpass Final VII 4.522 C 0.398 0.300 0.300 - - - 99.80 94.25%
OutstandingH.P.L. General Construction 22289 Concreting of Various Municipal and
Barangya Roads 1st II 1.708 O 0.329 0.240 0.100 0.022 0.030 0.100 82.10 -
Haidee Construction and Development Corporation 10365 Completion of Friendship Bridge &
Approaches, Phase V 1st III 23.917 O 0.303 0.300 0.100 0.030 0.040 0.100 87.30 -
Haidee Construction and Development Corporation 10365 Const. of Friendship Bridge &
Approaches, Phase III 1st III 23.478 O 0.274 0.204 0.100 0.030 0.054 0.100 76.20 -
Halrey Construction, Inc. 2267Geometric Improvement/Rehab./Reblocking of Portions of EDSA Q.C.
1st/Final NCR 9.530 C 0.347 0.300 0.300 - - - 94.70 94.70% Outstanding
Halrey Construction, Inc. 2267Rehab. (Concrete Blocking) of EDSA from Quezon Ave. to Annapolis (South Bound)
1st NCR 9.554 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 68
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Halrey Construction, Inc. 2267Rehab. (Concrete Blocking) of EDSA from Quezon Ave. to Annapolis (South Bound)
Final NCR 9.554 C 0.382 0.300 0.300 - - - 98.20 96.88% Outstanding
Hanjin Heavy Industries & Const. Co. Ltd.
FC-98-329
Const./Impv't. (PCCP) of C.P.A. Sect. A-Tukuran Rd., Dobliston Jct. & Sect. B-Kapatagan-Dobliston Jct. Road
Final KFAED 633.001 C 0.304 0.300 0.300 - - - 90.40 89.65% V.Satisfactory
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum & Aganan River
2nd MFCP I 1,194.106 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-000445
Bohol Cicumferential Road Impv't. Project CP-1, Valencia-Tagbilaran-Calape Section
7th PJHL 1,000.084 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-000445
Bohol Circumferential Road Impv't. Project Phase 2, CP-1, Valencia-Tagbilaran-Calape Section
4th PJHL 784.924 O 0.385 0.300 0.100 0.030 0.070 0.100 98.50 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-000445
Bohol Circumferential Road Impv't. Project Phase 2, CP-1, Valencia-Tagbilaran-Calape Section
6th PJHL 1,000.084 O 0.385 0.300 0.100 0.030 0.070 0.100 98.50 -
Hanjin Heavy Industries & Construction Co. Ltd.
FC-98-216
CP MN-A: Iligan-Aurora Road 6th Road Project Final ADB 714.824 C 0.385 0.300 0.300 - - - 98.50 96.85%
Outstanding
Hanjin Heavy Industries & Construction Co. Ltd.
FC-98-329
CP-A Section A: Const./Impv't. of Tukuran-Dobliston Road 4th KFAED 577.304 O 0.368 0.297 0.050 0.030 0.042 0.100 88.70 -
Hanjin Heavy Industries & Construction Co. Ltd.
FC-98-329
CP-A Section A: Const./Impv't. of Tukuran-Dobliston Road 5th KFAED 577.304 O 0.330 0.300 0.100 0.030 0.054 0.100 91.40 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-00556
CP-III, Reconst. of Four (4) Bridges along Arterial Roads Project, Phase IV (Baroro Bridge)
1st PJHL 128.692 O 0.363 0.300 0.070 0.030 0.050 0.067 88.00 -
Hanjin/ Kurimoto JV SL2-SN-000452 Bohol Irrigation Project Stage 2 2nd NIA 1,561.393 O 0.356 0.200 0.100 0.030 0.054 0.200 94.00 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 10th BCDA
Region III 9,097.880 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 11th BCDA
Region III 9,097.880 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 69
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 12th BCDA
Region III 9,097.880 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 13th BCDA
Region III 9,097.880 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 1st BCDA
Region III 9,097.880 O 0.385 0.289 0.070 0.018 0.051 0.067 88.08 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 2nd BCDA
Region III 9,097.880 O 0.373 0.275 0.070 0.030 0.047 0.033 82.79 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 3rd BCDA
Region III 9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 4th BCDA
Region III 9,097.880 O 0.378 0.298 0.050 0.030 0.047 0.033 83.62 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 5th BCDA
Region III 9,097.880 O 0.365 0.296 0.050 0.012 0.051 0.033 80.69 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 14th BCDA
Region III 9,097.880 O 0.335 0.295 0.070 0.030 0.051 0.033 81.49 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 6th BCDA
Region III 9,097.880 O 0.362 0.299 0.050 0.023 0.056 0.067 85.58 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 7th BCDA
Region III 9,097.880 O 0.362 0.295 0.050 0.030 0.047 0.033 81.69 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 8th BCDA
Region III 9,097.880 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -
Hazama/ Taisei/ Nippon Steel HTN JV
FC-04-025
Subic-Clark-Tarlac Expressway Project-Package 2 9th BCDA
Region III 9,097.880 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -
HCM Construction Corporation 19382 Const. of Las Piñas-Muntinlupa-San
Pedro Link Road 1st/Final NCR 9.519 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
HCM Construction Corporation 19382 Const. of Road/Bridge 2nd NCR 14.374 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -
HCM Construction Corporation 19382 Const. of Road/Bridge 3rd NCR 14.374 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 70
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
HCM Construction Corporation 19382 Slope Protection of Creek @ Brgy.
Pulang Lupa & Manuyo 1st NCR 9.600 O 0.337 0.200 0.100 0.030 0.063 0.200 93.00 -
HCM Construction Corporation 19382 Slope Protection of Creek @ Brgy.
Pulang Lupa & Manuyo Final NCR 9.600 C 0.376 0.300 0.300 - - - 97.60 94.84% Outstanding
HG III Construction and Dev't Corp. 8431 Sct. Ranger Housing Project, Phase
III 1st NHA 49.688 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -
HGG Builders and Supply 17824 Const. of Multi-Purpose Building Final V 1.929 C 0.400 0.249 0.300 - - - 94.90 89.93% V.Satisfactory
Hibiscus Trading and Construction Services 28280 Completion of Pedestrian Overpass
Across Commonwealth Ave. 1st NCR 1.873 O 0.340 0.250 0.100 0.030 0.035 0.100 85.50 -
Hibiscus Trading and Construction Services 28280 Completion of Pedestrian Overpass
Across Commonwealth Ave. Final NCR 1.873 C 0.267 0.300 0.300 - - - 86.70 85.98% V.Satisfactory
Hibiscus Trading and Construction Services 28280
Package 8: a) Renovation/Improvement of Multi-Purpose Bldg. Brgy. Socorro: b) Completion of Multi-Purpose Bldg. Brgy. Masagana
1st NCR 1.590 O 0.368 0.245 0.100 0.023 0.029 0.100 86.50 -
Hibiscus Trading and Construction Services 28280
Package 8: a) Renovation/Improvement of Multi-Purpose Bldg. Brgy. Socorro: b) Completion of Multi-Purpose Bldg. Brgy. Masagana
Final NCR 1.590 C 0.282 0.277 0.300 - - - 85.90 86.32% V.Satisfactory
Hibiscus Trading and Construction Services 28280 Repair/Rehab. of Multi-Purpose
Building Final NCR 2.687 C 0.294 0.300 0.300 - - - 89.40 88.14% V.Satisfactory
Hi-point Construction Corporation 30744 Rehab./Conc. of Roads 1st/Final VIII 4.563 C 0.125 0.200 0.300 - - - 62.50 62.50%
Fair
HLC Construction and Development Corporation 8775 Rehab./Impvt. of Panabo Coastal
Road, Arieta Section 1st XI 11.096 O 0.375 0.300 0.070 0.030 0.065 0.067 90.70 -
HLJ Construction & Enterprises 18080 Concreting of Roads 1st/Final VI 0.892 C 0.356 0.300 0.300 - - - 95.60 95.60%
OutstandingHLJ Construction &
Enterprises 18080 Const. of Pedestrian Bridge @ Hibbard Avenue 1st VII 4.472 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -
Horamabi Builders 24129 Const. of MPB @ Bataan NHS Final III 1.881 C 0.253 0.300 0.300 - - - 85.30 77.53% Satisfactory
HPL General Construction 22289 Completion of Multi-Purpose Building 1st II 0.426 O 0.329 0.263 0.100 0.015 0.027 0.067 80.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 71
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
HPL General Construction 22289 Completion of Multi-Purpose Building Final II 0.426 C 0.327 0.250 0.300 - - - 87.70 82.38%
V.Satisfactory
HPL General Construction 22289 Concreting of Various Municipal and Brgy. Roads Final II 1.708 C 0.323 0.300 0.300 - - 92.30 89.48%
V.Satisfactory
HPL General Construction 22289 Const. of Tupang River Control 1st II 1.871 O 0.185 0.092 0.100 0.015 0.025 0.133 55.00 -
HPL General Construction 22289 Const. of Tupang River Control Final II 1.871 C 0.373 0.300 0.300 - - - 97.30 71.92% Satisfactory
HRB Construction 10528 Road Concreting of Sta. Cruz-Ratay (CSSAC School Campus) 1st/Final V 0.620 C 0.357 0.300 0.300 - - - 95.70 95.70%
OutstandingHVC Sagittarius Commercial and
Construction12954 Completion of Multi-Purpose Bldg., Final XII 2.751 C 0.375 0.292 0.300 - - - 96.70 86.31%
V.Satisfactory
I & E Construction 10410 Improvement/Rehab. of city Streets (Rueda & Navarro Sts.) 1st/Final VIII 1.908 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
I & E Construction 10410 Impv't./Rehab. of Roadside Lopez-Buenavista Road 1st/Final IV-A 4.728 C 0.388 0.200 0.300 - - - 88.80 88.80%
V.Satisfactory
I & E Construction 10410
Repair/Rehab./Impvt. of Nat'l Roads along Bagahupi-Babatngon Road, Tanauan-Dagami Road, Mainit-San Miguel Santoil Road
1st/Final VIII 24.097 C 0.372 0.300 0.300 - - - 97.20 97.20% Outstanding
I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road 1st/Final IV-B 4.709 O 0.263 0.300 0.100 0.030 0.022 0.100 81.50 -
I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road Final IV-B 4.710 C 0.298 0.230 0.300 - - - 82.80 86.80% V.Satisfactory
I.M. Construction Corporation 20074 Concrete Reblocking along Gov. A.
Pascual St. 1st NCR 4.744 O 0.336 0.300 0.100 0.030 0.047 0.100 91.30 -
IBC International Builders Corporation 8576
Asphalting of Priority Gravel Road Gap along Guimaras Circumferential Road
1st/Final VI 2.722 C 0.355 0.200 0.300 - - - 85.50 85.50% V.Satisfactory
IBC International Builders Corporation 8576 Completion of Cabano Bridge (Final) 1st/Final VI 4.776 C 0.355 0.253 0.300 - - - 90.80 90.80%
OutstandingIBC International Builders
Corporation 8576 Const. of Banayan Bridge 1st VI 15.499 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -
IBC International Builders Corporation 8576 Const. of Banayan Bridge 2nd VI 15.499 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 72
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
IBC International Builders Corporation 8576 Rehab. of Batiano Bridge @ Molo
Blvd. Final VI 4.375 C 0.286 0.300 0.300 - - - 88.60 86.56% V.Satisfactory
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Asphalt Overlay of M. Laserma
Street-C. Laserma Street 1st/Final VI 2.404 C 0.333 0.300 0.300 - - - 93.30 93.30% Outstanding
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road 1st VI 6.258 O 0.273 0.268 0.100 0.030 0.040 0.100 81.10 -
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road 3rd VI 6.258 O 0.274 0.300 0.100 0.030 0.037 0.100 84.10 -
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Const. of Cuartero Bridge (Phase I) 1st/Final VI 9.661 C 0.290 0.240 0.300 - - - 83.00 83.00%
V.Satisfactory
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Const. of Two (2) Storey Iloilo Hall of
Justice Building 1st VI 11.480 O 0.376 0.300 0.100 0.023 0.050 0.100 94.90 -
IBC International Builders Corporation (Formerly:
IBC Iloilo Builders Corp.)8576 Const. of Two (2) Storey Iloilo Hall of
Justice Building Final VI 12.629 C 0.368 0.191 0.300 - - - 85.90 87.41% V.Satisfactory
Icalina Builders and Construction Supply 26889 Rehab./Impvt./Conc. of Tubod
Ganassi National Road 1st/Final X 4.574 C 0.308 0.300 0.300 - - - 90.80 90.80% Outstanding
IDI Trading & Contractor 29006 Completion of Multi-Purpose Building 1st/Final III 0.762 C 0.377 0.279 0.300 - - - 95.60 95.60%
OutstandingIM Construction
Corporation 20074 Concrete Reblocking along Gov. A. Pascual St. Final NCR 4.744 C 0.347 0.300 0.300 - - - 94.70 92.66%
OutstandingIM Construction
Corporation 20074 Rehab./Reblocking of General Luis St. 1st/Final NCR 2.862 C 0.317 0.300 0.300 - - - 91.70 91.70%
Outstanding
IMB Construction 13259 Const. of Multi-Purpose Building 1st/Final VII 0.938 C 0.306 0.200 0.300 - - - 80.60 80.60% V.Satisfactory
International Builders Corporation (IBC) 8576 Fort San Pedro Improvement Project 1st PPA 181.489 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -
Irving Doyle T. Paras Construction 27362 Conc. of Caraycaray-Cabungan-
Libtong FMR 1st/Final VIII 0.944 C 0.355 0.200 0.300 - - - 85.50 85.50% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 73
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Irving Doyle T. Paras Construction 27362 Const. of River Control 1st/Final VIII 4.339 C 0.267 0.300 0.300 - - - 86.70 86.70%
V.Satisfactory
Isaga Builders 8652 Const. of Conner Central National High School Final CAR 0.864 C 0.326 0.265 0.300 - - - 89.10 84.97%
V.Satisfactory
Isaga Builders 8652Repair & Maintenance of Nat'l Road & Bridges, Abbut-Conner-Kabugao Road
2nd CAR 4.711 O 0.331 0.128 0.100 0.030 0.050 0.100 73.90 -
Isaga Builders 8652Repair & Maintenance of Nat'l Road & Bridges, Abbut-Conner-Kabugao Road
Final CAR 4.711 C 0.323 0.261 0.300 - - - 88.40 82.40% V.Satisfactory
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building 1st NHA 16.404 O 0.338 0.138 0.100 0.030 0.070 0.100 77.52 -
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building 2nd NHA 17.762 C 0.394 0.295 0.300 - - - 98.94 83.95%
Italian-Thai Development Public Company Limited
SL2-SN-000419
CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project (Himayangan-Silago-Abuyog Road & Liloan-San Ricardo Road Project) Phase IV
2nd VIII 971.846 O 0.385 0.291 0.100 0.030 0.028 0.100 93.40 -
Italian-Thai Development Public Company Limited
SL2-SN-000419
CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project (Himayangan-Silago-Abuyog Road & Liloan-San Ricardo Road Project) Phase IV
3rd PJHL 971.846 O 0.349 0.300 0.100 0.030 0.037 0.100 91.60 -
Italian-Thai Development Public Company Limited
SL2-SN-000419
CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project (Himayangan-Silago-Abuyog Road & Liloan-San Ricardo Road Project) Phase IV
4th PJHL 1,010.701 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -
ITP Construction, Inc. 9392 Sct. Ranger Housing Project, Phase I 1st NHA 51.850 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -
Ivy Michelle Trading & Construction 24093
Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo Section
1st/Final IV-B 11.395 C 0.226 0.299 0.300 - - - 82.50 82.50% V.Satisfactory
Ivy Michelle Trading & Construction 24093 Concreting of PPNR Roxas Taytay-
El Nido National Road Final IV-B 3.508 C 0.233 0.300 0.300 - - - 83.30 87.02% V.Satisfactory
Ivy Michelle Trading & Construction 24093 Const. of 1 Cl Sch. Bldg. @ Narra
NHS 1st/Final IV-B 0.435 C 0.335 0.118 0.300 - - - 75.30 75.30% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 74
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Ivy Michelle Trading & Construction 24093
Const. of 1-CL, New Barbacan E/S, Roxas North (part of CY 2004 DepEd School Building Program Clustered)
Final IV-B 0.381 C 0.390 0.285 0.300 - - - 97.50 83.92% V.Satisfactory
J & A Pimentel Construction 7953 Const. of Balibadon I Bridge 1st XIII 5.785 O 0.331 0.300 0.070 0.030 0.043 0.100 87.40 -
J & A Pimentel Construction 7953 Const. of Balibadon I Bridge Final XIII 5.785 C 0.223 0.200 0.300 - - - 72.30 81.36%
V.Satisfactory
J & A Pimentel Construction 7953 Const. of Bocawe Bridge &
Approaches 1st XIII 11.180 O 0.333 0.300 0.100 0.030 0.043 0.100 90.60 -
J & A Pimentel Construction and Supply 7953 Const. of Banahaw Bridge Phase VI 1st XIII 19.263 O 0.343 0.300 0.050 0.022 0.032 0.067 81.40 -
J & A Pimentel Construction and Supply 7953 Const. of Multi-Purpose Building
Phase III 1st XIII 4.552 O 0.294 0.300 0.050 0.030 0.006 0.067 74.70 -
J & A Pimentel Construction and Supply 7953 Const. of Multi-Purpose Building
Phase III Final XIII 4.522 C 0.362 0.300 0.300 - - - 96.20 81.15% V.Satisfactory
J & A Pimentel Construction and Supply 7953 Const. of Tandag Multi-Purpose
Bldg. Phase II Final XIII 4.546 C 0.131 0.300 0.300 - - - 73.10 75.41% Satisfactory
J. C. Baac Construction Corporation 25974 Replacement/Const. of Langso
Bridge 2nd CAR 7.699 O 0.331 0.233 0.000 0.030 0.045 0.100 73.90 -
J. Custorio Construction 16237Rehab./Conc. Paving along Bantayan-Malobago-Pagsang-an-Genagdanan Road
1st/Final VIII 0.477 C 0.247 0.200 0.300 - - - 74.70 74.70% Satisfactory
J. Custorio Construction 16237 Rehab./Impv't. of DPWH-Northern Samar 2nd DEO 1st/Final VIII 0.246 C 0.396 0.158 0.300 - - - 85.40 85.40%
V.Satisfactory
J.B. Alarcon Enterprises 18849 Const. of 2 CL Sch. Bldg. @ Cavinti E/S 1st IVA 0.681 O 0.367 0.247 0.100 0.030 0.022 0.100 86.60 -
J.B. Alarcon Enterprises 18849 Const. of 2 CL Sch. Bldg. @ Cavinti E/S Final IVA 0.681 C 0.370 0.200 0.300 - - - 87.00 86.72%
V.Satisfactory
J.B. De Jesus Builders and Design Services 22867 Const. of FMR at Brgy. San Agustin 1st/Final III 4.693 C 0.318 0.204 0.300 - - - 82.20 82.20%
V.Satisfactory
J.D. Legaspi Construction 9608 Pasig River Ferry Service Station 1st PRRC 7.303 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 75
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
J.E. Arradaza Construction & Supply 42124 Const. of Duguan Communal
Irrigation Project Final NIA Region VII 2.338 C 0.326 0.300 0.300 - - - 92.60 92.60%
J.E. Arradaza Construction & Supply 25353 Const. of Public Market-Building
Phase II 1st/Final VIII 1.421 C 0.375 0.212 0.300 - - - 88.70 88.70% V.Satisfactory
J.E. Arradaza Consttruction & Supply 25353 Const. of Multi Purpose Pavement at
Brgy. Banilad 1st/Final VII 0.478 C 0.336 0.217 0.300 - - - 85.30 85.30% V.Satisfactory
J.E. Manalo & Company, Inc. 422 Zamboanga Port Expansion Project 1st PPA 282.050 O 0.400 0.300 0.100 0.030 0.059 0.100 98.92 -
J.G. & P Enterprises 5090 Ripraping of Imus River Brgy. Salinas 1st/Final IV-A 0.961 C 0.279 0.300 0.300 - - - 87.90 87.90%
V.Satisfactory
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &
Approaches (Phase I) 2nd Sp. Bridges 174.420 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -
J.H. Pajara Construction Corp. 1890 Const. of Dalibubon Bridge, along
Ipil-Jones-San Agustin Final II 239.834 C 0.393 0.284 0.000 - - - 67.70 79.96% Satisfactory
J.H. Pajara Construction Corporation 1890 Const. of Dalibubon Bridge along
Ipil-Jones-San Agustin Rd. 7th II 235.627 O 0.356 0.240 0.100 0.030 0.030 0.100 85.60 -
J.H. Pajara Construction Corporation 1890
NAIA Expressway & its Related Road Projects Phase I Package-IVA Sales St. Viaduct Ramp Structure (M & E Retaining Wall)
1st URPO 403.779 O 0.283 0.300 0.000 0.030 0.070 0.067 75.00 -
J.I. Viacrusis Construction 14382 Completion of 4CL, Storey School
Building Balic-balic E/S Final III 0.889 C 0.378 0.242 0.300 - - - 92.00 84.51% V.Satisfactory
J.I.L. Trading & Construction Co. 14634 Const. of Brgy Road @ Brgy.
Kayumanggi 1st/Final IVA 1.921 C 0.349 0.200 0.300 - - - 84.90 84.90% V.Satisfactory
J.M. Luciano Const., Inc./Dimson (Manila), Inc.
(JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation Project, Phase 1 (Contract Package 7 & 8)
4th XIII 655.465 O 0.358 0.300 0.100 0.030 0.037 0.100 92.50 -
J.M. Luciano Const., Inc./Dimson (Manila), Inc.
(JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation Project, Phase 1 (Contract Package 7 & 8)
6th PJHL 713.641 O 0.136 0.300 0.100 0.030 0.070 0.100 73.60 -
J.M. Luciano Const., Inc./Dimson (Manila), Inc.
(JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation Project, Phase 1 (Contract Package 7 & 8)
7th PJHL 754.879 O 0.284 0.297 0.100 0.030 0.056 0.100 86.70 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 76
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
J.M. Luciano Const., Inc./Dimson (Manila), Inc.
(JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation Project, Phase 1 (Contract Package 7 & 8)
Final PJHL 754.879 C 0.265 0.300 0.300 - - - 86.50 87.01% V.Satisfactory
J.M. Maligaya Construction &
Construction Supply15018 Concreting of Farm-to-Market Road
@ Brgy. Asis II (Sitio Magsili) 1st/Final IV-A 0.380 C 0.387 0.200 0.300 - - - 88.70 88.70% V.Satisfactory
J.N. Dela Torre Construction 24978 Const. of Canangcaan Road (ARISP)
Phase II, Sofronio 1st IV-B 6.220 O 0.347 0.300 0.100 0.015 0.027 0.067 85.60 -
J.N. Dela Torre Construction 24978 Const. of Canangcaan Road
(ARISP), Phase II, Sofronio Final IV-B 6.219 C 0.376 0.200 0.300 - - - 87.60 86.40% V.Satisfactory
J.N. Dela Torre Construction 24978 Const. of Multi-Purpose Bldg. (PNP) 1st IV-B 0.467 O 0.338 0.245 0.100 0.020 0.026 0.100 82.90 -
J.N. Dela Torre Construction 24978 Const. of Multi-Purpose Building
(PNP), Brgy. Poblacion Final IV-B 0.466 C 0.361 0.200 0.300 - - - 86.10 83.86% V.Satisfactory
J.N. Dela Torre Construction 24978 Impvt. of MPB @ Pinaglabanan 1st/Final IV-B 0.365 C 0.282 0.218 0.300 - - - 80.00 80.00%
SatisfactoryJ.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S 1st III 1.091 O 0.317 0.222 0.100 0.030 0.011 0.100 78.00 -
J.R.C.F. Construction 31641 Const. of Multi-Purpose Building @ Various Sts. Brgy. Roxas 1st/Final NCR 0.662 C 0.396 0.300 0.300 - - - 99.60 99.60%
Outstanding
J.S. General Contractor 15258 Const. of Multi-Purpose Bldg. @ Brgy. Maranan I 1st IV-A 0.475 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -
J.S. General Contractor 15258 Improvement of School Building at Cavite State University 1st IV-A 0.950 O 0.353 0.240 0.100 0.030 0.047 0.100 87.00 -
J.T. Gamolo Construction 15759 Cementing of Road from Mountain View College to Bagontaas 1st/Final X 0.916 C 0.320 0.300 0.300 - - - 92.00 92.00%
Outstanding
J.T. Gamolo Construction 15759 Completion of Quezon NHS 2nd X 2.790 O 0.367 0.300 0.100 0.030 0.058 0.100 95.50 -
J.T. Gamolo Construction 15759 Completion of Quezon NHS Final X 2.790 C 0.397 0.300 0.300 - - - 99.70 95.82% Outstanding
J.T. Gamolo Construction 15759 Concreting of Dologon Busco-Quezon Road (Maramag Sect.) Final X 4.688 C 0.335 0.300 0.300 - - - 93.50 94.40%
Outstanding
J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) 1st X 14.008 O 0.342 0.246 0.100 0.008 0.057 0.100 85.30 -
J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) 2nd X 14.008 O 0.237 0.300 0.100 0.030 0.051 0.100 81.80 -
J.V. Lagon Construction Corporation 11561 Widening of Kapingkong Bridge Bo.
2, Final XII 13.377 C 0.287 0.179 0.000 - - - 46.60 65.68% Fair
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 77
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
J.V. Loreto Const. & Dev't.Corp. 13120 Const. of Marcasa Bridge 1st/Final VIII 9.370 C 0.356 0.300 0.300 - - - 95.60 95.60%
Outstanding
Jager Construction & Supply 13619 Const. of Multi Purpose Building @
San Pablo Final III 0.467 C 0.363 0.300 0.300 - - - 96.30 82.79% V.Satisfactory
Jag-Vail Construction & Supply 24055 Const. of Potenciano Gregorio Multi-
Purpose Building 1st/Final V 1.156 C 0.390 0.300 0.300 - - - 99.00 99.00% Outstanding
Jalse Construction 13839 Const. of FMR , Lumbia-Canitoan Road 1st X 1.889 O 0.359 0.300 0.100 0.030 0.048 0.100 93.70 -
Jameetrix Construction 19176Conc. of Additional 2-lanes along Davao City Diversion Road, Buhangin-Maa Section
1st XI 9.234 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -
Jan Sha Construction & Supply 19462 Rehabilitation of Mataoroc CIS,
Taisan CIS & Tariric CIS 1st/Final NIA Region V 1.763 C 0.323 0.244 0.300 - - - 86.70 86.70%
Jann-Norris Construction and Supplies 31814 Const. of Banganan Flood Control 1st/Final II 2.850 C 0.207 0.218 0.300 - - - 72.50 72.50%
Satisfactory
Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., 2nd X 3.257 O 0.357 0.300 0.100 0.030 0.047 0.100 93.40 -
Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., Final X 3.257 C 0.360 0.300 0.300 - - - 96.00 88.09%
V.Satisfactory
Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., Final X 1.394 C 0.382 0.300 0.300 - - - 98.20 82.87%
V.Satisfactory
Japuz-Jansol Enterprises 22869Const. of Lined Canal along National Road (Poblacion Letecia & Poblacion San Roque)
1st/Final X 2.106 C 0.244 0.300 0.300 - - - 84.40 84.40% V.Satisfactory
Japuz-Jansol Enterprises 22869 Const./Impv't. of Yumbing Multi-Purpose Building 1st/Final X 1.395 C 0.311 0.300 0.300 - - - 91.10 91.10%
Outstanding
Jargon Construction & Supply 23474 Const. of MPB (Brgy. Stage) at Brgy.
Baluntay 1st/Final XII 0.193 C 0.329 0.200 0.300 - - - 82.90 82.90% V.Satisfactory
Jargon Construction & Supply 23474 Const. of Valdez Street Final XII 0.939 C 0.311 0.200 0.300 - - - 81.10 88.42%
V.Satisfactory
Jargon Construction & Supply 23474 Rehab. of Sitio Niño-Sitio Taclobo @
Brgy. Upper Mainit Final XII 3.660 C 0.000 0.000 0.300 - - - 30.00 38.64% Poor
Jaro Builders and Construction Supply 25560 Const. of MPB @ San Vicente East 1st/Final IV-B 0.474 C 0.343 0.300 0.300 - - - 94.30 94.30%
Oustanding
Jaro Builders and Construction Supply 25560
Replacement of Slope Protection along National Rd., Minas-Macatoc Sect.
1st/Final IV-B 1.566 C 0.217 0.000 0.300 - - - 51.70 51.70% Poor
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 78
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Jasa Builders 31330 Conc. of Road at Sitio Camambugan 1st/Final I 0.473 C 0.266 0.300 0.300 - - - 86.60 86.60% V.Satisfactory
Jasa Builders 31330 Const. of 1 Cl Sch. Bldg. @ Magalong NHS 1st/Final I 0.436 C 0.279 0.173 0.300 - - - 75.20 75.20%
Satisfactory
Jasmarc Builders and Construction Supply, Co. 31801 Const. of MPB @ Brgy. Mahayag 1st XI 1.177 O 0.316 0.300 0.100 0.020 0.053 0.100 88.90 -
Jasmig Construction Supply 26069 Const. of 2 Storey 6 CL RGR Type
S/B @ Bonifacio E/S 1st/Final IV-A 8.547 C 0.376 0.200 0.300 - - - 87.60 87.60% V.Satisfactory
Jasmig Construction Supply 26069 Const. of Brgy. MPB @ San
Fernando 1st/Final IV-A 0.287 C 0.293 0.300 0.300 - - - 89.30 89.30% V.Satisfactory
Jaykris Enterprises 30906 Conc. of Datu Panas St. 1st/Final IX 0.960 C 0.303 0.200 0.300 - - - 80.30 80.30% V.Satisfactory
Jay-mar Builder 7900 Const. of MPB @ SAV 12 Brgy. San Isidro 1st/Final NCR 1.426 C 0.348 0.300 0.300 - - - 94.80 94.80%
Outstanding
Jay-mar Builder 7900 Repair of Sidewalk/Roads of San Nicolas St. 1st NCR 1.424 O 0.333 0.000 0.100 0.030 0.032 0.100 59.50 -
JBGM Construction 2005-0283 Construction of Canal and Canal Structures (LMC-ARIP-03-06) 1st NIA
Region II 4.919 C 0.360 0.200 0.000 0.020 0.060 0.200 84.00 84.15% V.Satisfactory
JBGM Construction 2005-0283 Construction of Canal and Canal Structures (LMC-ARIP-07-06) Final NIA
Region II 4.684 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
JCA Builders & Supply 20358 Rehab. of FMR, Little Panay-Kasilak Road Final XI 2.864 C 0.200 0.300 0.300 - - - 80.00 68.72%
Fair
JCA Builders & Supply 20358 Repair/Rehab. of Road @ Package 2, 02634 (A) Brgy. Cabantian 3rd XI 2.359 O 0.211 0.225 0.000 0.030 0.025 0.000 49.10 -
JDC Builders 32048 Rehab./Impvt. of MPB (Covered Court) Phase II 1st/Final VIII 1.918 C 0.373 0.300 0.300 - - - 97.30 97.30%
Outstanding
Jeada Construction 17869Improvement/Rehabilitation of ShoreProtection alongside NHA, Sea Breeze Homes
1st V 6.745 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -
Jecel Construction Supply 21956
Const. / Rehab. / Replacement / Completion & Repair of E/S Bldg. @ Sixto Babao E/S
Final XI 0.833 C 0.276 0.300 0.300 - - - 87.60 84.38% V.Satisfactory
Jegma Construction and Development Corporation 14775 Repair/Maintenace of Trancentral
Highway 1st VII 19.096 O 0.363 0.300 0.100 0.030 0.070 0.100 96.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 79
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Jejor's Construction Corporation 5143 Rehab./ Impv't. of CCR, MAAC-
Kalipagas Section 6th X 9.063 O 0.378 0.200 0.100 0.015 0.048 0.200 94.10 -
Jejor's Construction Corporation 5143 Rehab./ Impv't. of CCR, MAAC-
Kalipagas Section Final X 8.994 C 0.272 0.200 0.300 - - - 77.20 82.78% V.Satisfactory
Jejor's Construction Corporation 5143 Rehab./Improvement of CCR, MAAC-
Kalipagas Sect. 1st X 9.263 O 0.286 0.300 0.100 0.030 0.025 0.100 84.10 -
Jejor's Construction Corporation 5143 Rehab./Improvement of CCR, MAAC-
Kalipagas Sect. 3rd X 9.063 O 0.323 0.300 0.100 0.030 0.035 0.100 88.80 -
Jejor's Construction Corporation 5143 Rehab./Improvement of CCR, MAAC-
Kalipagas Sect. 4th X 9.063 O 0.347 0.300 0.100 0.023 0.040 0.100 91.00 -
Jenzab Construction & Design 30654 Const. of 1 Cl Sch. Bldg @ Simeon
Ayuda E/S 1st VII 0.386 O 0.388 0.180 0.100 0.030 0.028 0.100 82.60 -
Jenzab Construction & Design 30654 Const. of 1 Cl Sch. Bldg @ Simeon
Ayuda E/S Final VII 0.386 C 0.265 0.300 0.300 - - - 86.50 83.77% V.Satisfactory
Jenzab Construction & Design 30654 Road Conc. At Brgy. Sta. Catalina,
Bagong Daan 1st/Final VII 0.741 C 0.168 0.300 0.300 - - - 76.80 76.80% Satisfactory
Jerber Trading and Construction 19713 Const. of Multi-Purpose Building/
Structure @ Brgy. Valle Cruz 1st/Final III 0.468 C 0.362 0.300 0.300 - - - 96.20 96.20% Outstanding
Jervie Const. & Supply Corp. 7022 Completion of MPB @ Brgy.
Bulwang Final VI 0.959 C 0.375 0.240 0.000 - - - 61.50 75.78% Satisfactory
Jet Construction Supply 7063 Concreting of Ajuy-Concepcion Road 2nd/Final VI 9.626 C 0.345 0.200 0.300 - - - 84.50 74.48%
Satisfactory
JFAP Construction 21706 Const./Rehab. of Ormoc-Margen-Sitio Palimpinon Box Culvert 1st/Final VIII 0.381 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
JFAP Construction 21706Const./Rehab./Impv't. of Multi-Purpose Bldg. Ormoc City Center for Sports & Development
1st/Final VIII 0.480 C 0.374 0.241 0.300 - - - 91.50 91.50% Outstanding
Jhall Marketing & Services 15760 Conc. of Carles-Balasan Road,
Guinticgan Section 1st/Final VI 5.099 C 0.280 0.211 0.300 - - - 79.10 79.10% Satisfactory
JHJ Construction 3781 Completion of Codingle Bridge Final VI 4.452 C 0.200 0.200 0.300 - - - 70.00 75.64% Satisfactory
JHJ Construction 3781Const. of Capiz State University Auditorium, Capiz State University Main Campus
1st VI 5.708 O 0.330 0.240 0.100 0.023 0.018 0.100 81.10 -
JHJ Construction 3781Const. of Capiz State University Auditorium, Capiz State University Main Campus
Final VI 5.708 C 0.348 0.300 0.300 - - - 94.80 85.21% V.Satisfactory
JHJ Construction 3781 Const. of Maragubdob Bridge 1st VI 7.999 O 0.333 0.300 0.070 0.030 0.035 0.067 83.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 80
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
JHJ Construction 3781 Const. of Maragubdob Bridge Final VI 7.999 C 0.400 0.200 0.300 - - - 90.00 86.10% V.Satisfactory
Jireh Construction & Supply 8240 Const. of Libtong-Mobo Bridge,
Phase XVI @ Estancia-Mobo 1st/Final VI 4.906 C 0.362 0.293 0.300 - - - 95.50 95.50% Outstanding
Jireh Construction & Supply 8240 Const./Impv't. of Sitio-Agtinga-
Madrona Estate FMR, Camili ARC 2nd IV-B 17.318 O 0.380 0.300 0.100 0.030 0.028 0.100 93.80 -
Jireh Construction & Supply 8240 Const./Impv't. of Sitio-Agtinga-
Madrona Estate FMR, Camili ARC 3rd IV-B 17.443 O 0.371 0.240 0.100 0.030 0.028 0.100 86.90 -
Jireh Construction & Supply 8240 Const./Impv't. of Sitio-Agtinga-
Madrona Estate FMR, Camili ARC Final IV-B 17.443 C 0.232 0.267 0.000 - - - 49.90 70.48% Satisfactory
Jirk Construction 29918 Const. of Cagayan River Control 1st II 9.469 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -
Jirk Construction 29918 Const. of Drainage Canal @ Bagumbayan and Tucalana 1st/Final II 0.435 C 0.260 0.104 0.300 - - - 66.40 66.40%
Fair
JJ & J Construction & General Supply 3023 Rehabilitation of Owak Isidro
Communal Irrigation System Final NIA Region VII 2.377 O 0.342 0.300 0.300 - - - 94.20 -
JJ & J Construction and General Supply 30231 Const. of Multi-Purpose Building @
Brgy. Dumlog 2nd VII 1.138 O 0.372 0.240 0.100 0.010 0.048 0.100 87.00 -
JJ & J Construction and General Supply 30231 Const. of Multi-Purpose Building @
Brgy. Dumlog Final VII 1.138 C 0.366 0.300 0.300 - - - 96.60 91.46% Outstanding
JJ & J Construction and General Supply 30231 Impvt. of Sapangdaku Riverwall 1st/Final VII 1.898 C 0.311 0.300 0.300 - - - 91.10 91.10%
OutstandingJJA Construction and
Supply 22676 Conc. of Calanan Jct.-Pinukpuk Jct. Road 1st CAR 4.599 O 0.358 0.300 0.100 0.030 0.030 0.100 91.80 -
JLP Construction & Supply (Formerly: JLP
Construction)26983 Rehab. of 4 Cl Sch.Bldg. (Gabaldon
Type) @ Solsona South E/S 1st I 2.842 O 0.336 0.300 0.100 0.008 0.022 0.067 83.30 -
JLP Construction & Supply (Formerly: JLP
Construction)26983 Rehab. of 4 Cl Sch.Bldg. (Gabaldon
Type) @ Solsona South E/S 2nd I 2.842 O 0.302 0.300 0.100 0.015 0.018 0.100 83.50 -
JLV Construction & Supply 9953 Const. of Multi-Purpose Building Final IV-A 0.960 C 0.259 0.300 0.300 - - - 85.90 84.36%
V.Satisfactory
JLV Construction & Supply 9953 Const. of School and MPB @ Batuan
CENTEX 1st/Final IV-A 1.430 C 0.262 0.268 0.300 - - - 83.00 83.00% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 81
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
JLV Construction & Supply 9953 Impvt./Rehab. of Multi-Purpose
Building @ Brgy. Pantay Matanda 1st IV-A 3.858 O 0.367 0.240 0.100 0.030 0.025 0.100 86.20 -
J-Marbela Construction and Supply 24268 Const. of 3 Cl Sch. Bldg. @ San
Roque E/S 1st/Final V 1.146 C 0.334 0.120 0.300 - - - 75.40 75.40% Satisfactory
JMT Construction 14186 Const. of Jagupit-Lilang FMR 1st/Final XIII 4.563 C 0.352 0.200 0.300 - - - 85.20 85.20% V.Satisfactory
JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road 1st XIII 9.522 O 0.321 0.237 0.100 0.023 0.015 0.100 79.60 -
JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road 2nd XIII 9.522 O 0.388 0.248 0.070 0.030 0.018 0.067 82.10 -
JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road 3rd XIII 9.522 O 0.363 0.240 0.000 0.022 0.035 0.067 72.70 -
JMU Construction 6877 Const. of Multi-Purpose Building (Gymnasium) 2nd II 1.888 O 0.317 0.300 0.070 0.015 0.027 0.050 77.90 -
JNA Construction 10615 Const. of FMR Cluster 1, Brgy. Poblacion III 1st/Final III 0.773 C 0.315 0.300 0.300 - - - 91.50 91.50%
Outstanding
J'ner Cepada Construction 30212 Concrete Paving of Barangay
Cambooc Road 1st/Final VIII 0.471 C 0.311 0.200 0.300 - - - 81.10 81.10% V.Satisfactory
J'ner Cepada Construction 30212 Mahayhay CIS 1st/Final NIA 1.910 C 0.362 0.180 0.300 - - - 84.20 84.20%
V.Satisfactory
J'ner Cepada Construction 30212 San Francisco CIS 1st NIA 1.993 O 0.381 0.180 0.070 0.015 0.023 0.100 76.90
J'ner Cepada Construction 30212 Tambis CIS 1st/Final NIA 1.994 C 0.369 0.180 0.300 - - - 84.90 84.90%
V.Satisfactory
John Arne Construction 24621 Const. of Pinamungajan Public Market, Cebu (Phase VII) Final VII 2.089 C 0.284 0.178 0.300 - - - 76.20 76.78%
Satisfactory
John Ray Developer & Supplies 20795
Const. of Drainage Canal along Cotabato-Davao Road (Central Marketing/Metro Bank Side)
1st XII 4.508 O 0.334 0.159 0.100 0.023 0.045 0.200 86.10 -
John Ray Developer & Supplies 20795 Const./Completion (Repair/Rehab.)
of MPB @ BPI Balindog 1st XII 0.466 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -
John Ray Developer & Supplies 20795 Rehab./Impv't. of Cotabato 1st
District Engineering office Bldg., 1st/Final XII 0.964 C 0.390 0.265 0.300 - - - 95.50 95.50% Outstanding
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building 1st/Final V 0.953 C 0.257 0.300 0.300 - - - 85.70 85.70% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 82
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building @ Brgy. Bagumbayan 1st V 0.469 O 0.344 0.249 0.100 0.000 0.022 0.100 81.50 -
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building @ Brgy. Bagumbayan Final V 0.469 C 0.286 0.100 0.300 - - - 68.60 77.63%
SatisfactoryJomarcann General
Construction 30599 Const. Flood Control along Ambalanga River 1st CAR 4.765 O 0.390 0.120 0.100 0.022 0.032 0.200 86.40 -
Jomarcann General Construction 30599 Const. Flood Control along
Ambalanga River Final CAR 4.763 C 0.305 0.300 0.300 - - - 90.50 88.04% V.Satisfactory
Jometron Engineering & Construction 23147 Const. of Castilla Flood Control 1st V 4.778 O 0.352 0.124 0.100 0.023 0.025 0.200 82.40 -
Jometron Engineering & Construction 23147 Const. of Castilla Flood Control Final V 4.778 C 0.373 0.200 0.300 - - - 87.30 84.36%
V.Satisfactory
Jorvivs Construction 6527
Const. of Tertiary School Bldg. Northern Bukidnon Community College (Const. of 3-Storey Bldg. Phase I)
1st X 4.744 O 0.381 0.244 0.100 0.022 0.062 0.100 90.90 -
Jorvivs Construction 6527
Const. of Tertiary School Bldg. Northern Bukidnon Community College (Const. of 3-Storey Bldg. Phase I)
3rd X 4.744 O 0.371 0.300 0.000 0.030 0.057 0.067 82.50 -
Jorvivs Construction 6527
Const. of Tertiary School Bldg. Northern Bukidnon Community College (Const. of 3-Storey Bldg. Phase I)
Final X 4.744 C 0.372 0.300 0.000 - - - 67.20 80.06% V.Satisfactory
Joselle Construction 16243 Const./Completion of Multi-Purpose Building 1st/Final XIII 0.914 C 0.388 0.300 0.300 - - - 98.80 98.80%
Outstanding
Joy Construction 14386 Const of 1-Unit, 1-CL School Building Final IX 0.362 C 0.385 0.257 0.300 - - - 94.20 82.09%
V.Satisfactory
Joy Construction 14386Const. & Repair/Rehab. of Various School Bldg. (Clustered-2) 2nd Batch CY 2004
Final IX 0.657 C 0.378 0.000 0.300 - - - 67.80 82.22% V.Satisfactory
Joy Construction 14386 Const. of 1 unit 2 Cl at Port Holand E/S 1st IX 0.675 O 0.268 0.208 0.000 0.030 0.020 0.050 57.60 -
Joy Construction 14386 Const. of 1-Unit 1-CL School Building @ Tumahubong CES 1st/Final IX 0.366 C 0.362 0.200 0.300 - - - 86.20 86.20%
V.Satisfactory
JR Contractor 9638 Const. of Drainage System, 1st V 0.951 O 0.273 0.200 0.100 0.010 0.013 0.200 79.60 -JSG Construction
Company, Inc. 9350 Impvt./Rehab. of Lipa-Mataas na Kahoy Road, Lipa Section 1st IVA 14.458 O 0.367 0.231 0.100 0.030 0.033 0.100 86.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 83
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
JUF Construction 17987 Const. of Brgy. Road @ Brgy. San Rufino 1st/Final VIII 0.952 C 0.365 0.262 0.300 - - - 92.70 92.70%
Outstanding
JUF Construction 17987Impvt. Along Nabang-Bagaho Road Section, Calbayog-Catarman via Lope de Vega Road
1st/Final VIII 4.819 C 0.205 0.290 0.300 - - - 79.50 79.50% Satisfactory
Julita Builders 13936 Const. of Multi-Purpose Building @ Brgy. Parasan 1st/Final VIII 0.289 C 0.368 0.300 0.300 - - - 96.80 96.80%
Outstanding
Juncynth Construction General Services 18385 Const. of Bontoc MPB 1st/Final VIII 0.950 C 0.300 0.300 0.300 - - - 90.00 90.00%
V.Satisfactory
Jupa Construction 23577 Lined Canal along Allen-Catarman Road (Lavezares-Enriquita Section) 1st/Final VIII 1.444 C 0.233 0.300 0.300 - - - 83.30 83.30%
V.Satisfactory
JV Lagon Construction Corporation 11561
Concreting of Chua Sect. along Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino-Lebak Road
2nd XII 10.267 O 0.358 0.300 0.050 0.030 0.023 0.067 82.80 -
JV Lagon Construction Corporation 11561
Const. of Approach & Riverbed Protection of Sinawal Bridge II along GSC Circumferential Road
1st XII 2.518 O 0.374 0.143 0.030 0.030 0.051 0.200 82.80 -
JV Lagon Construction Corporation 11561
Const. of Approach & Riverbed Protection of Sinawal Bridge II along GSC Circumferential Road
Final XII 2.518 C 0.353 0.300 0.000 - - - 65.30 70.79% Satisfactory
JV Lagon Construction Corporation 11561 Widening of Kapingkong Bridge 3rd XII 13.377 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -
K.D.C.M. Construction 29023 Const. of Binwaan Bridge (Phase II) 1st/Final CAR 5.961 C 0.328 0.300 0.300 - - - 92.80 92.80% Outstanding
Kajima Corporation SL2-SN-000286
Lower Agusan Dev't. Project, Stage 1, Phase II, Package IV Masao River Improvements and Const. of Urban Drainage System
7th CARBDP 912.171 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -
Kajima Corporation SL2-SN-000286
Masao River Improvement & Const. of Urban Drainage System CP IV (Lower Agusan Development Project - Stage I, Phase II)
Final CARBDP 1,083.477 C 0.382 0.300 0.300 - - - 98.20 99.00% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 84
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Kajima Corporation FC-04-023
Const. of Cebu South Coastal Road Project, Segment 3B-2, MCDP III, Subway Tunnel Section
1st MCDP III 1,264.367 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 10th BCDA
Region III 13968.698 O 0.378 0.285 0.000 0.030 0.051 0.067 81.04 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 11th BCDA
Region III 13968.698 O 0.379 0.264 0.000 0.030 0.061 0.067 80.03 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 12th BCDA
Region III 13968.698 O 0.349 0.300 0.030 0.030 0.065 0.067 84.07 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 13th BCDA
Region III 13968.698 O 0.368 0.272 0.070 0.024 0.033 0.067 83.27 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 1st BCDA
Region III 13968.698 O 0.364 0.284 0.070 0.030 0.050 0.067 86.40 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 2nd BCDA
Region III 13968.698 O 0.369 0.261 0.070 0.030 0.042 0.067 83.87 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 3rd BCDA
Region III 13968.698 O 0.387 0.262 0.070 0.030 0.032 0.067 84.82 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 4th BCDA
Region III 13968.698 O 0.390 0.229 0.050 0.030 0.056 0.067 82.13 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 5th BCDA
Region III 13968.698 O 0.386 0.291 0.030 0.024 0.035 0.067 83.30 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 6th BCDA
Region III 13968.698 O 0.374 0.264 0.050 0.023 0.040 0.067 81.73 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 7th BCDA
Region III 13968.698 O 0.365 0.279 0.050 0.024 0.033 0.033 78.42 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV
FC-04-023
Subic-Clark-Tarlac Expressway Project-Package 1 8th BCDA
Region III 13968.698 O 0.369 0.269 0.030 0.023 0.051 0.067 80.92 -
Kalantas Construction & Development Corporation 23915 Rehabilitation of Dughan-Gamut
FMR 9th BCDA Region III 1.733 O 0.351 0.263 0.100 0.022 0.022 0.100 85.80 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 85
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Kalantas Construction & Development Corporation 23915 Rehabilitation of Dughan-Gamut
FMR 1st XIII 1.733 C 0.000 0.073 0.300 - - - 37.30 66.40% Fair
Kamagong Builders & Developers Corporation 1720 Const. of Molino Blvd. By Pass (Inc.
RROW Acquisition) Final XIII 20.527 O 0.381 0.282 0.100 0.030 0.058 0.100 95.10 -
Kamagong Builders & Developers Corporation 1720 Const. of Molino Blvd. By Pass (Inc.
RROW Acquisition) 2nd IV-A 20.032 C 0.353 0.200 0.300 - - - 85.30 84.46% V.Satisfactory
Kane Construction, Inc. 2888 Completion of 2 Storey 2 CL SB @ BCNHS-Main Final IV-A 1.442 C 0.373 0.249 0.300 - - - 92.20 91.43%
Outstanding
Karangyan Builders & Traders 22622 Const. of 2-Classroom Building @
Polytechnic College of Calapan Final CAR 0.951 C 0.366 0.300 0.300 - - - 96.60 81.34% V.Satisfactory
Kawi Construction 25844 Completion of MPB Phase III Final IV-B 0.960 O 0.330 0.300 0.100 0.030 0.026 0.100 88.60 -
Kenwood Construction Enterprises 22186 Const. of 12 Cl Building with CR 1st CAR 4.816 O 0.235 0.210 0.100 0.023 0.016 0.100 68.40 -
Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Covered
Court @ Lomboy E/S 1st I 2.357 C 0.332 0.300 0.300 - - - 93.20 87.55% V.Satisfactory
Kez Enterprises (Formerly: I. Agripo
Construction)25556 Const. of Flood Control/Concrete
Canal Final I 0.800 C 0.391 0.300 0.300 - - - 99.10 99.10% Outstanding
KGD Builders 21960 Const. of Water System @ Purok Pag-asa 2 1st/Final X 0.752 C 0.318 0.200 0.300 - - - 81.80 81.80%
V.Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Conc. of Access Road (Jct. Agusan-
Davao Road) 1st/Final XII 2.245 O 0.328 0.300 0.100 0.030 0.052 0.100 91.00 -
Kim Harold Trading Manufacturing and Const. 28019 Repair/Maintenance of Kaylubong I
River Waterways 1st XI 0.431 C 0.320 0.000 0.300 - - - 62.00 62.00% Fair
Kim-Harold Trading, Manufacturing &
Construction28019 Rehab. of Roxas-Taytay-El Nido Rd.,
PPNR 1st/Final IV-B 1.828 C 0.309 0.144 0.300 - - - 75.30 77.94% Satisfactory
Kimphil Construction 21890 Const. of Calapan South Road, Banti Section Final IV-B 1.408 C 0.375 0.300 0.300 - - - 97.50 97.50%
Outstanding
Kimphil Construction 21890 Const. of Calapan South Road, Himpararay Section 1st/Final IV-B 2.351 O 0.348 0.300 0.100 0.007 0.028 0.100 88.30 -
King's Builders & Development Corporation 29199 Const. of 1-CL @ Vicente Ylagan
National High School 1st IVB 0.764 C 0.287 0.244 0.300 - - - 83.10 83.10% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 86
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
King's Builders & Development Corporation 29199 Const. of Calapan South Road (San
Francisco Sect.) 1st/Final IV-B 1.409 C 0.263 0.300 0.300 - - - 86.30 86.30% V.Satisfactory
King's Builders & Development Corporation 29199 Const. of Line Canal at Brgy. Sta.
Teresita 1st/Final IV-B 0.941 O 0.229 0.145 0.100 0.030 0.045 0.200 74.90 -
King's Builders & Development Corporation 29199 Improvement of Sta. Teresita
Section Road 1st IV-B 0.937 C 0.458 - 0.500 - - - 95.80 92.56% Outstanding
KLDS Trading and Construction 28091
Const. of 2 Storey 2 Classroom Schoolbuilding w/ CR @ Amuyong Elem. School
Final IVB 1.333 C 0.396 0.200 0.300 - - - 89.60 89.60% V.Satisfactory
Krenz Construction & Trading 19907 Const. of MPB @ Pamantasan ng
Lungsod ng Maynila 1st/Final IV-A 7.460 C 0.393 0.300 0.300 - - - 99.30 89.36% V.Satisfactory
Krisjohn Construction and Supply Corporation 31901 Repair/Rehab. of San Francisco
River Control Final NCR 0.905 C 0.400 0.200 0.300 - - - 90.00 87.84% V.Satisfactory
Kuntel Construction 10234 Concreting of Road along Magsunday Bridge III Final V 0.956 C 0.287 0.185 0.300 - - - 77.20 82.30%
V.Satisfactory
Kuntel Construction 10234 Rehab./Conc. of Himamaylan Road Section Final VI 7.324 O 0.386 0.220 0.100 0.008 0.035 0.100 84.90 -
KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS 1st VI 3.189 C 0.371 0.180 0.300 - - - 85.10 85.14% V.Satisfactory
KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS 1st/Final NIA Region V 3.189 C 0.371 0.180 0.300 - - - 85.10 85.14%
V.Satisfactory
KVC Construction 28959 Const. of Tocucan Bridge 1st/Final NIA Region V 4.041 C 0.359 0.200 0.300 - - - 85.90 77.74%
Satisfactory
KVC Construction 28959 Repair/Rehab. Along Alapang-Labueg Road Final CAR 0.284 C 0.276 0.300 0.300 - - - 87.60 87.60%
V.Satisfactory
Kwikbuilt Construction 24577 Const. of Std. 1 unit 1Cl Sch. Bldg. @ Paglaum NHS NOSof Ext. 1st/Final CAR 3.181 C 0.335 0.300 0.300 - - - 93.50 93.50%
Outstanding
Kyro Builders 19567 Const. of Multi-Purpose Building/Health Center 1st/Final VI 7.488 O 0.329 0.223 0.050 0.023 0.022 0.033 68.00 -
Kyro Builders 19567 Const. of Multi-Purpose Building/Health Center 2nd III 7.488 C 0.348 0.200 0.300 - - - 84.80 75.21%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 87
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
L. Baltonado Construction &
Development Corporation25250 Conc. Paving of San Isidro-Tabango
Road Final III 2.846 C 0.364 0.200 0.300 - - - 86.40 86.40% V.Satisfactory
L. Baltonado Construction &
Development Corporation25250 Const. of Multi-Purpose Building
(Bleacher & Gym) 1st/Final VIII 1.444 C 0.343 0.276 0.300 - - - 91.90 91.90% Outstanding
L. P. O. Enterprises 20730 Const, of River Control in Brgy, Dela Paz 1st/Final VIII 0.477 O 0.264 0.240 0.100 0.030 0.016 0.100 75.00 -
L.A. Arizola Construction & Supply 31060 Const. of 1 Cl 1 Storey Sch. Bldg. @
Mulig NHS 1st IV-A 0.452 C 0.275 0.300 0.300 - - - 87.50 87.50% V.Satisfactory
L.A. Arizola Construction & Supply 31060
Impvt./Conc. of Additional 2 lanes from Church of Later Day Saints up to Carmen
1st/Final XI 4.129 O 0.293 0.143 0.100 0.030 0.050 0.100 71.60 -
L.A. Arizola Construction & Supply 31060 Road Conc. @ Sitio Tamayong 1st XI 0.914 C 0.389 0.200 0.300 - - - 88.90 88.90%
V.Satisfactory
L.A. Clamor Construction 26413 Const. of MPB @ Brgy. Buenavista West 1st/Final XI 0.669 C 0.389 0.300 0.300 - - - 98.90 98.90%
Outstanding
L.C. Ting Construction 23666
Conc. of Surigao-Davao Coastal Road Hinatuan-Bislig (Tagasaka Section) (Sta.1438+673.577-Sta.1439+415.61)
1st/Final IV-A 9.369 O 0.389 0.300 0.100 0.018 0.042 0.067 91.60 -
L.C. Ting Construction 23666
Conc. of Surigao-Davao Coastal Road Hinatuan-Bislig (Tagasaka Section) (Sta.1438+673.577-Sta.1439+415.61)
1st XIII 9.365 C 0.254 0.300 0.300 - - - 85.40 89.12% V.Satisfactory
L.C. Ting Construction 23666 Const. of Matho Bridge and Approaches Final XIII 14.369 O 0.306 0.258 0.100 0.023 0.032 0.100 81.90 -
L.C. Ting Construction 23666 Rehab. of Amontay Bailey Bridge 1st XIII 5.765 C 0.225 0.300 0.300 - - - 82.50 82.50 V.Satisfactory
L.C. Ting Construction 23666 Rehab. of Libertad Bridge along Butuan City-Misamis Oriental Rd. 1st/Final XIII 10.857 O 0.304 0.300 0.100 0.030 0.070 0.100 90.40 -
L.C. Ting Construction 23666 Rehab./Const.of Mamkas River Control @ Sitio Siringan Kitcharao 1st XIII 9.534 O 0.230 0.111 0.100 0.030 0.035 0.200 70.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 88
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
L.C. Ting Construction 23666 Rehab./Const.of Mamkas River Control @ Sitio Siringan Kitcharao 1st XIII 9.534 C 0.345 0.300 0.300 - - - 94.50 80.16%
V.Satisfactory
L.G. Lasacar Construction 11960 Const. of Cross-Country Road at Catarman-Mambajao Section Final XIII 9.293 C 0.280 0.300 0.300 - - - 88.00 72.22%
Satisfactory
L.G. Lasacar Construction 11960Const./Improvement of Cross Country Road, Catarman-Mambajao Section
Final X 4.533 O 0.400 0.300 0.100 0.022 0.044 0.100 96.60 -
L.G. Lasacar Construction 11960Const./Improvement of Cross Country Road, Catarman-Mambajao Section
1st X 4.368 C 0.349 0.008 0.300 - - - 65.70 84.24% V.Satisfactory
L.N. Salvador Construction 16661 Const. of Drainage System at
Malayas-Poblacion Final X 4.642 O 0.301 0.200 0.100 0.030 0.040 0.200 87.10 -
L.N. Salvador Construction 16661 Const. of Drainage System at
Malayas-Poblacion 2nd IV-B 4.642 C 0.337 0.221 0.300 - - - 85.80 86.13% V.Satisfactory
L.P.O. Enterprises 20730 Consst. of MPB at Market Area Final IV-B 1.920 C 0.316 0.200 0.300 - - - 81.60 81.60% V.Satisfactory
L.P.O. Enterprises 20730 Const. of 2 Storey 4 Cl Sch. Bldg. @ San Isidro NHS 1st/Final IV-A 5.549 O 0.356 0.297 0.100 0.030 0.027 0.100 91.00 -
L.P.O. Enterprises 20730 Const. of 2 Storey 4 Cl Sch. Bldg. @ San Isidro NHS 1st/Final IV-A 5.547 C 0.389 0.228 0.300 - - - 91.70 91.21%
Outstanding
L.P.O. Enterprises 20730 Const. of FMR @ Brgy. Gatid Final IV-A 0.955 C 0.361 0.295 0.300 - - - 95.60 95.60% Outstanding
L.P.O. Enterprises 20730 Const. of River Control in Brgy. Dela Paz 1st/Final IV-A 0.477 O 264.000 240.000 0.100 0.030 0.016 0.100 75.00 -
L.P.O. Enterprises 20730 Const./Rehab. of School Bldg. @ Los Banos Community NHS 1st IV-A 1.915 O 0.300 0.300 0.100 0.030 0.027 0.100 85.70 -
L.R. Tiqui Builders, Inc. 13810 Impv't. / Widening of Manila North Road (MNR) Package III Km.44+00-Km.51+330 with exception,
1st IV-A 89.250 O 0.385 0.300 0.100 0.030 0.035 0.100 95.00 -
L.R. Tiqui Builders, Inc. 13810 Impv't. / Widening of Manila North Road (MNR) Package III Km.44+00-Km.51+330 with exception,
1st III 91.249 C 0.397 0.300 0.300 - - - 99.70 96.85% Outstanding
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Const. of Plaridel By Pass including
connecting Roads Final III 28.425 O 0.323 0.300 0.100 0.030 0.038 0.100 89.10 -
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Const. of Plaridel By Pass including
connecting Roads 1st III 28.425 C 0.284 0.300 0.300 - - - 88.40 88.28% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 89
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
L.S.D. Construction & Supplies 8980 Const. of 1 Cl Sch. Bldg @ Balibago
II E/S Final III 0.377 O 0.320 0.254 0.100 0.030 0.029 0.100 83.30 -
L.V. Capule Construction 15578 Completion 0f Conc. of Road & Drainage @ Fausta 1st III 2.838 O 0.354 0.300 0.100 0.015 0.028 0.100 89.70 -
LA Milagrosa Enterprises 17404 Conc. of Yumbing Road 1st III 0.926 C 0.288 0.217 0.300 - - - 80.50 80.50% V.Satisfactory
Labb Construction 13524 Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road 1st/Final X 8.680 O 0.352 0.241 0.100 0.030 0.035 0.100 85.80 -
Lady of Assumption Enterprises 25360 Cagnitoan CIS and Extension 1st VII 3.998 C 0.370 0.180 0.300 - - - 85.00 85.00%
V.Satisfactory
Lady of Assumption Enterprises 25360 Const. of Brgy. Road 1st/Final NIA 0.467 C 0.318 0.200 0.300 - - - 81.80 81.80%
V.Satisfactory
Lambayong Construction and Supply 20800 Rehabilitation of Manin Canal (Sta.
16+626-21+714) 1st/Final VIII 12.594 C 0.250 0.300 0.300 - - - 85.00 84.87%
Lanao Builder and Enterprises 15982 Conc. of Bacolod-Pagayawan-Munai-
Tangkal Road Final NIA Region I 4.645 O 0.351 0.250 0.100 0.015 0.047 0.100 86.30 -
Lanao Builder and Enterprises 15982 Conc. of San Manuel Road 1st X 0.139 C 0.367 0.300 0.300 - - - 96.70 96.70%
OutstandingLanao Builder and
Enterprises 15982 Conc./Impvt. of Tubod-Ganassi Road 1st/Final X 13.785 O 0.296 0.300 0.100 0.030 0.037 0.100 86.30 -
Lanao Builder and Enterprises 15982 Const. of MPB @ Brgy. Lower Sta.
Cruz 1st X 0.189 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
Lanao Builder and Enterprises 15982 Const./Impv't. of Bacolod-
Pagayawan-Munai-Tangkad Road 1st/Final X 11.988 C 0.361 0.300 0.300 - - - 96.10 86.14% V.Satisfactory
Lanao Builder and Enterprises 15982 Impvt. of Iligan-Aurora Road (Raw-
an-Magpaytao-Lanipao-Abaga Sect.) Final X 9.389 O 0.286 0.300 0.100 0.030 0.027 0.100 84.30 -
Lanao Builder and Enterprises 15982 Impvt./Const. of Maranding Drainage
along Nat'l Highway 1st X 4.692 C 0.362 0.200 0.300 - - - 86.20 85.54% V.Satisfactory
Landmark Builders 7400 Concreting of Madang Road Final X 9.446 O 0.329 0.235 0.070 0.023 0.043 0.100 80.00 -
Landmark Builders 7400 Concreting of Madang Road 2nd XI 9.446 C 0.356 0.200 0.300 - - - 85.60 87.49% V.Satisfactory
Landmark Builders 7400 Const. of MPB (Gymnasium) Final XI 2.800 O 0.317 0.244 0.000 0.015 0.023 0.067 66.60 -
Landmark Builders 7400 Const./Completion of Manolo Fortich Municipal Hall Bldg. (P-IX) 1st XI 7.590 O 0.351 0.300 0.100 0.030 0.013 0.100 89.40 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 90
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Landmark Builders 7400 Const./Completion of Manolo Fortich Municipal Hall Bldg. (P-IX) 2nd X 7.590 C 0.380 0.300 0.300 - - - 98.00 93.73%
Outstanding
Landmark Builders 7400 Package 11, Const. of Multi-Purpose Bldg. (Gymnasium) Final X 3.766 C 0.361 0.241 0.300 - - - 90.20 73.68%
Satisfactory
Landmark Builders 7400 Repair/Const. of Don Mariano E/S (H.E.) Bldg. Final XI 0.289 O 0.379 0.300 0.100 0.030 0.012 0.100 92.10 -
Landmark Builders 7400 Repair/Const. of Don Mariano E/S (H.E.) Bldg. 1st XI 0.289 C 0.358 0.067 0.300 - - - 72.50 86.22%
V.Satisfactory
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building Final XI 2.407 O 0.287 0.195 0.100 0.020 0.058 0.100 76.00 -
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building 1st IV-A 2.407 O 0.388 0.300 0.000 0.030 0.047 0.067 83.20 -
LB Builders Center 14115 Conc. Paving of Calubian-San Isidro Road 2nd IV-A 2.844 O 0.307 0.163 0.100 0.030 0.027 0.100 72.70 -
Leadtek Construction Inc. 25978Const. of (1) Classroom (1) Unit School Building D. Moises E/S, Malingawan
1st VIII 0.382 C 0.361 0.000 0.300 - - - 66.10 59.55% Poor
Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS Final XII 0.595 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -
Legacy Construction 22465 Widening/Impvt. of Bacolod South Kabankalan Road (Tangub Sect.) 1st X 7.870 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -
Legazpi Premium Development Corporation 20701 Road Conc./Impvt. of Magallang-
Mararag Road 1st VI 14.387 C 0.340 0.200 0.300 - - - 84.00 84.00% V.Satisfactory
Leymarc Construction 22094 Conc. of Roads (Brgy. Cansaging) 1st/Final V 0.414 C 0.351 0.300 0.300 - - - 95.10 95.10% Outstanding
Leymarc Construction 22094 Const. of 1 unit 1 Cl Sch. Bldg. @ Sta. Catalina North C/S 1st/Final VII 0.701 C 0.386 0.100 0.300 - - - 78.60 78.60%
SatisfactoryLGC Trucking and
Construction 14464 Const. of Lugom Bridge along Circumferential Road 1st/Final VII 9.223 C 0.231 0.199 0.300 - - - 73.00 73.48%
Satisfactory
Librius Construction and Suppply Corporation 23580 Const. of 2 Storey RGR Type School
Building @ Batangas NHS Final XIII 8.596 C 0.385 0.200 0.300 - - - 88.50 86.05% V.Satisfactory
Librius Construction Suppply Corporation 23580 Const. of 2 Storey RGR Type School
Building @ Batangas NHS Final IV-A 8.596 O 0.354 0.240 0.100 0.015 0.022 0.100 83.10 -
Ligao Sto. Niño 9279 Rehabilitation of Canal Network (package 1) 2nd IV-A 10.323 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -
Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour 1st NIA
Region V 19.200 O 0.322 0.240 0.100 0.015 0.027 0.067 77.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 91
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour 1st V 19.200 O 0.388 0.157 0.100 0.015 0.035 0.067 76.20 -
Lim General Contractor 8482 Const. of Luya Bridge 2nd V 15.827 C 0.341 0.300 0.300 - - - 94.10 89.18% V.Satisfactory
Lim General Contractor 8482 Const. of San Fernando South Road, Batuan Section Final V 11.250 O 0.325 0.181 0.100 0.023 0.043 0.100 77.20 -
Lim General Contractor 8482 Preventive Maintenance of Masbate-Cataingan Road 1st V 9.496 O 0.400 0.300 0.100 0.008 0.027 0.000 83.50 -
Lim General Contractor 8482 Preventive Maintenance of Masbate-Cataingan Road 1st V 9.496 C 0.377 0.100 0.300 - - - 77.70 81.18%
V.Satisfactory
Limar Construction 10203 Const. of Manlumay Bridge Final V 3.807 O 0.327 0.300 0.100 0.022 0.047 0.100 89.60 -
Limar Construction 10203 Const. of Manlumay Bridge 1st VIII 3.807 C 0.300 0.300 0.300 - - - 90.00 89.76% V.Satisfactory
Limestone Construction and Development
Corporation4453
Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-San Bernabe Sect.
Final VIII 8.200 O 0.335 0.300 0.050 0.020 0.033 0.067 80.50 -
Limestone Construction and Development
Corporation4453
Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-San Bernabe Sect.
1st II 8.200 C 0.256 0.300 0.300 - - - 85.60 82.54% V.Satisfactory
Linear Construction Corporation 3575 NBP Resettlement Project, Phase IV Final II 148.890 O 0.320 0.300 0.100 0.020 0.028 0.100 86.80 -
Liong-Co Construction & Construction Supply 28361 Conc. of FMR at Purok Gampis 1st/Final NHA NCR 0.951 C 0.344 0.285 0.300 - - - 92.90 92.90%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const. of Multi Purpose Day Care 1st/Final IX 0.550 C 0.304 0.300 0.300 - - - 90.40 90.40%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const./Completion of Multi-Purpose
Building (Perimeter Fence) 1st/Final IX 0.089 C 0.302 0.300 0.300 - - - 90.20 90.20% Outstanding
Liong-Co Construction & Construction Supply 28361 Const./Rehab. of Various School
Building Project (Clustered) 1st/Final IX 0.277 C 0.399 0.200 0.300 - - - 89.90 89.90% V.Satisfactory
Liong-Co Construction & Construction Supply 28361 Const./Rehab. of Various School
Building Project Clustered) 1st/Final IX 4.265 C 0.399 0.200 0.300 - - - 89.90 96.05% Outstanding
Lisa Construction 24134 Asphalt Overlay along Cabanatuan Circumferential Road Final IX 0.952 C 0.362 0.300 0.300 - - - 96.20 96.20%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 92
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Lisa Construction 24134 Const. of Flood Control at San Vicente 1st/Final III 2.835 C 0.369 0.300 0.300 - - - 96.90 96.90%
Outstanding
LJPM Builders & Construction Supply 29981 Repair of Multi-Purpose Building,
DTI Compound 1st/Final III 0.961 C 0.377 0.200 0.300 - - - 87.70 88.47% V.Satisfactory
Llaban Construction & Trucking 29504 Const. of Hanging Bridge Final VIII 1.309 C 0.340 0.300 0.300 - - - 94.00 79.12%
Satisfactory
LLM Concrete Products 14235 Const. of 1 CL Academic Bldg. @ Kapoc Final XII 0.322 C 0.332 0.300 0.300 - - - 93.20 93.34%
Outstanding
LLM Concrete Products 14235 Const. of Multi-Purpose (Brgy Hall) Bato Final XI 0.755 C 0.378 0.300 0.300 - - - 97.80 92.90%
Outstanding
LLM Concrete Products 14235 Const. of Tagum Drainage along Agusan-Davao Road Final XI 2.830 C 0.230 0.300 0.300 - - - 83.00 83.00%
V.Satisfactory
LM Construction and General Marketing 9213 Const. of CY 2004 School Building
Projects 1st/Final XI 0.818 O 0.373 0.244 0.100 0.020 0.013 0.100 85.00 -
LM Construction and General Marketing 9213 Const. of CY 2004 School Building
Projects 1st XIII 0.818 O 0.350 0.200 0.100 0.030 0.041 0.100 82.10 -
LMD Construction 9410 Impvt./Conc. Paving of Kagawasan-Pitogo Road (Kagawasan Section) 2nd XIII 4.535 O 0.209 0.148 0.100 0.022 0.008 0.067 55.40 -
Lo-Tone Construction & Supply 23385 Const. of Multi-Purpose Hall-Phase
II 1st IX 1.851 C 0.346 0.300 0.300 - - - 94.60 85.92% V.Satisfactory
Lo-Tone Construction & Supply 23385
Rehab. Works Including Removal of Slides along Catanduanes Circumferential Road
Final V 12.167 C 0.378 0.288 0.300 - - - 96.60 93.30% Outstanding
Lo-Tone Construction & Supply 23385 Road Impv't./Widening of Integrated
Bus Terminal Final V 4.640 O 0.400 0.300 0.100 0.020 0.038 0.100 95.80 -
Lo-Tone Construction & Supply 23385 Road Impv't./Widening of Integrated
Bus Terminal 1st IX 4.640 C 0.232 0.000 0.300 - - - 53.20 78.76% Satisfactory
Lo-Tone Construction & Supply 23385
Road Rehab./Impv't. of Bato, Bula, Minabalac (Excl. acquisition of Roads/Traffic Signs & Safety Devices
Final IX 9.407 C 0.258 0.300 0.300 - - - 85.80 86.64% V.Satisfactory
Lotrim Construction Inc. 12273 Const. of Banaybanay Public Market Final V 2.504 C 0.372 0.300 0.300 - - - 97.20 92.93% Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Flores Subd. Final XI 0.752 C 0.379 0.226 0.300 - - - 90.50 90.50% Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Rizal E/S 1st/Final XI 0.657 C 0.367 0.300 0.300 - - - 96.70 96.70% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 93
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Lubo Construction & Development 30508 Const. of MPB @ Calamagui 1st 1st/Final XI 0.921 O 0.356 0.214 0.100 0.022 0.035 0.100 82.70 -
Lubo Construction & Development 30508 Const./Rehab. of Ilagan North
Central School 1st II 1.192 C 0.336 0.200 0.300 - - - 83.64 78.21% Satisfactory
Lubo Construction & Development 30508 Rehab. of Ilagan North Central
School Final II 1.192 O 0.293 0.212 0.100 0.030 0.012 0.100 74.70 -
Lucky Armn's Construction &
Enterprises23434 Conc. of Shoulder at Picas San Jose
DZR Airport Road 1st II 1.898 C 0.300 0.200 0.300 - - - 80.00 80.00% Satisfactory
Lumel Glenn Construction 26817 Conc. of Sitio Tabtabong Road 1st/Final VIII 1.413 C 0.209 0.300 0.300 - - - 80.90 80.90%
V.Satisfactory
Lumel Glenn Construction 26817 Const. of Drainage Canal @ Don
Pedro 1st/Final IV-B 1.875 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -
LVRO Construction & Supply 18116 Concreting of Brgy. 3, Bliss Road 1st IV-B 2.786 C 0.384 0.300 0.000 - - - 68.40 80.76%
V.Satisfactory
LVRO Construction and Supply 18116 Const. of 1 Cl Sch. Bldg. @ Tinago
E/S Final XIII 0.385 C 0.386 0.200 0.300 - - - 88.60 88.60% V.Satisfactory
LVRO Construction and Supply 18116 Const. of Concepcion-Mt. Zion FMR 1st/Final XIII 4.552 O 0.334 0.000 0.100 0.030 0.025 0.100 58.90 -
M F Construction 22192 Completion of Multi-Purpose Building @ Tigbawan, Phase 2 1st XIII 1.882 O 0.314 0.300 0.100 0.030 0.035 0.100 87.90 -
M F Construction 22192 Completion of Multi-Purpose Building @ Tigbawan, Phase 2 1st VII 1.882 C 0.267 0.300 0.300 - - - 86.70 87.54%
V.Satisfactory
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at Kipolot-
Palacapao Section Final VII 14.111 O 0.400 0.294 0.100 0.030 0.038 0.100 96.20 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at Kipolot-
Palacapao Section 1st X 14.101 O 0.383 0.300 0.100 0.030 0.045 0.100 95.80 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at Kipolot-
Palacapao Section 2nd X 14.101 C 0.378 0.300 0.300 - - - 97.80 96.72% Outstanding
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao Final X 9.375 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao 1st X 9.375 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Sayre National Highway 2nd X 33.060 O 0.319 0.300 0.100 0.030 0.042 0.100 89.10 -
M.C. Torio Construction 10534 Alibadabad Communal Pump Irrigation Project 1st X 2.193 O 0.360 0.119 0.100 0.018 0.030 0.200 82.70 -
M.C. Torio Construction 10534 Alibadabad CPIP 1st NIA 2.193 C 0.300 0.296 0.300 - - - 89.60 85.47%
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 94
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
M.C. Torio Construction 10534 Const. of MPB (Community Center) Final NIA Region II 0.283 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project 1st/Final II 8.030 O 0.351 0.084 0.100 0.024 0.058 0.200 81.30 -
M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project 2nd NIA 8.706 C 0.298 0.240 0.300 - - - 83.80 82.30%
M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project Final NIA
Region II 2.991 O 0.291 0.240 0.300 - - - 83.10 -
M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Brgy. Calangain Final NIA
Region II 0.948 C 0.308 0.300 0.300 - - - 90.80 90.80% Outstanding
M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building (Learning Center) 1st/Final III 0.750 O 0.357 0.061 0.100 0.015 0.027 0.100 66.00 -
M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building (Learning Center) 1st II 0.750 C 0.382 0.280 0.300 - - - 96.20 75.06%
SatisfactoryM.G. Salazar Const.
Corp./Candace Const. (JV)
JV-03-064Impv't./Conc. Paving of Basilan Circumferential Rd., Isabela-Maluso Rd.
Final II 36.385 O 0.296 0.300 0.050 0.030 0.051 0.100 82.70 -
M.G. Samidan Construction 16779 Const. of Bolinawen Flood Control 5th IX 1.051 C 0.300 0.300 0.300 - - - 90.00 90.00%
V.Satisfactory
M.G. Samidan Construction 16779 Const. of Kin-iway-Tambo-an Tribal
ARC, FMR 1st/Final CAR 21.993 C 0.345 0.300 0.300 - - - 94.50 94.50% Outstanding
M.G. Samidan Construction 16779
Improvement of Access Road to Tourism Hubs & Spokes as defined by DOT
1st/Final CAR 12.221 O 0.318 0.300 0.100 0.030 0.037 0.100 88.50 -
M.G. Samidan Construction 16779
Improvement of Access Road to Tourism Hubs & Spokes as defined by DOT
1st CAR 12.222 O 0.298 0.298 0.300 - - - 89.60 -
M.G. Samidan Construction 16779
Improvement of Benguet-Bontoc (Mt. Province)-Tinglayan (Kalinga) Road Mt. Data Bontoc Section
Final CAR 8.188 C 0.384 0.300 0.300 - - - 98.40 89.10% V.Satisfactory
M.G. Samidan Construction 16779
Impvt. of Benguet-Bontoc (Mr. Prov.)-Tinglayan-Lubuagan (Kalinga) Road At-Ato-Circle Section
Final CAR 7.286 C 0.374 0.300 0.300 - - - 97.40 92.33% Outstanding
M.H. Southern Construction 5841 Const. of Multi-Purpose Building Final CAR 0.370 C 0.362 0.300 0.300 - - - 96.20 96.20%
OutstandingM.H. Southern Construction 5841 Const. of Public Market @ Pob.
Malungon 1st/Final XII 9.102 C 0.370 0.224 0.300 - - - 89.40 71.96% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 95
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
M.J. Apin Builders 12179 Const. of 1-Cl School Building @ Bacolod National High School Final XII 0.378 C 0.300 0.000 0.300 - - - 60.00 56.01%
Poor
M.J. Apin Builders 12179 Const. of Sch. Bldg. Patong E/S Final V 0.468 C 0.291 0.200 0.300 - - - 79.10 79.10% Satisfactory
M.R. Oribiana Gravel & Sand Dealer & Construction
26070 Conc. of Critical Portion of FTMR 1st/Final V 0.470 C 0.245 0.300 0.300 - - - 84.50 84.50% V.Satisfactory
M.R. Santiago Construction 27329 Conc. of Road, Brgy. Maguinao 1st/Final IVA 0.947 C 0.377 0.200 0.300 - - - 87.70 87.70%
V.Satisfactory
M.R. Santiago Construction 27329 Const. of MPB @ San Roque E/S 1st/Final III 0.950 C 0.332 0.300 0.300 - - - 93.20 93.20%
Outstanding
M.S. Ramos Construction 31684Const. of two (2) Storey, 4CL School Bldg., @ Heritage Homes Brgy. Loma de Gato
1st/Final III 3.283 O 0.346 0.263 0.100 0.015 0.025 0.100 84.90 -
M.S. Ramos Construction 31684Const. of two (2) Storey, 4CL School Bldg., @ Heritage Homes Brgy. Loma de Gato
1st III 3.283 C 0.378 0.200 0.300 - - - 87.80 85.77% V.Satisfactory
M.S. Ramos Construction 31684 Impvt./Rehab of Mac Arthur Highway including drainage Final III 9.425 O 0.383 0.225 0.100 0.030 0.052 0.100 89.00 -
M.V. Caldo Engineering Construction and
Supplies16938 Concreting with Drainage
Improvement of Hondradez St. 1st NCR 1.781 C 0.371 - 0.500 - - - 87.10 87.10% V. Satisfacroty
M.V. Caldo Engineering Construction and
Supplies16938 Const.Rehab. of Shallow
Well/Artesian Well @ Zone 13-24 1st NCR 0.465 O 0.333 0.250 0.100 0.015 0.018 0.100 81.60 -
M.V. Caldo Engineering Construction and
Supplies16938 Const.Rehab. of Shallow
Well/Artesian Well @ Zone 13-24 1st NCR 0.932 C 0.222 0.300 0.300 82.20 81.84% V.Satisfactory
M.Y. Reyes Builders & Development Corporation 26386 Const. of 3-Storey School Building Final NCR 16.409 O 0.394 0.300 0.100 0.030 0.059 0.100 98.30 -
M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covred
Court 1st NHA Region III 4.698 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -
M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covred
Court 1st NHA NCR II 4.711 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 96
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
M2R Construction 13431Asphalt Overlay along Olongapo-Bugallon Road, Phase 3, Panan Section
1st NHA NCR II 0.979 C 0.356 0.300 0.300 - - - 95.60 95.60%
Outstanding
M2R Construction 13431 Const. of Multi-Purpose Building @ Palauig C/S 1st/Final III 1.061 C 0.481 - 0.500 - - - 98.10 88.23%
V.Satisfactory
M2R Construction 13431 Improvement/Rehab. of Water Supply Final III 0.935 O 0.400 0.022 0.100 0.020 0.025 0.100 66.70 -
M2R Construction 13431 Various Water System 1st III 1.955 C 0.302 - 0.500 - - - 80.20 80.20% V.Satisfactory
Ma. Gina M. Pador Construction 25600 Conc. of Concepcion Sur Nat'l Road 1st III 0.933 C 0.256 0.300 0.300 - - - 85.60 85.60%
V.Satisfactory
Ma. Gina M. Pador Construction 25600
Repair/Maint. of Ferrol-Odiongan Road (Tubigon Section) Km. 120+800
1st/Final IV-B 0.139 C 0.337 0.200 0.300 - - - 83.70 85.20% V.Satisfactory
Ma-an Construction Corporation 28751 Repair/Rehab. of Wright-Taft Road Final IV-B 2.614 C 0.375 - 0.500 - - - 87.50 87.50%
V.Satisfactory
MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge
(Completion) 1st/Final VIII 58.313 O 0.293 0.300 0.100 0.030 0.030 0.067 82.00 -
Mac-Morales General Merchandise &
Construction Supply2287 Conc. of FMR in Brgy. San Isidro
Ibaba 1st VIII 0.471 C 0.296 0.218 0.300 - - - 81.40 81.40% V.Satisfactory
Madyaw Construction & Dev't. Corp. 29598 Const. of San-Isidro-Hinimbangan
FMR 1st/Final IV-A 19.238 O 0.307 0.020 0.100 0.030 0.033 0.100 59.00 -
Maer Summit Konstruck Co. 25262 Const. of MPB (Legislative Bldg.,
Phase II) 1st XIII 1.887 C 0.388 0.300 0.300 - - - 98.80 94.53% Outstanding
Maer Summit Konstruck Co. 25262 Impvt. of Manikling-Lavugan Road
(Lavigan-Talisay Sect.) Final XI 14.464 O 0.294 0.220 0.100 0.030 0.060 0.100 80.40 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of DOSCST Nursing Blsg.,
Guang-Guang 1st XI 2.359 O 0.377 0.225 0.100 0.030 0.045 0.100 87.70 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of DOSCST Nursing Blsg.,
Guang-Guang 1st XI 2.359 C 0.386 0.200 0.300 - - - 88.60 87.97% V.Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of MPB (Covered Court) Final XI 1.251 O 0.294 0.250 0.100 0.015 0.023 0.100 78.20 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 97
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Improvement of CDC - Poblacion
FMR (ARSIP II) 1st XI 11.869 C 0.310 0.011 0.300 - - - 62.10 74.97% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Impv't./Rehab. of Don Enrique Lopez-
Don Salvador Lopez FMR Final XI 7.364 C 0.384 - 0.500 - - - 88.40 88.40% V. Satisfactory
Mafil Enterprises 27226 Provision of Line Canal @ Km. 1546, 450-Km.1546.73 1st XI 0.280 C 0.411 - 0.500 - - - 91.10 91.10%
Outstanding
Maghuyop Construction 21641 Const. of 4 Cl Sch. Bldg. at Pondol E/S 1st X 1.435 C 0.333 0.300 0.300 - - - 93.30 93.30%
Outstanding
Magscon Construction 25362 Const. of Multi-Purpose Building @ Brgy. Padu Grande 1st/Final VII 0.189 C 0.368 0.300 0.300 - - - 96.80 96.80%
Outstanding
Mainbest Enterprise 26127 Completion of Multi-Purpose Building (Gymnasium), Gamis 1st/Final I 1.283 C 0.305 0.200 0.300 - - - 80.50 80.50%
V.Satisfactory
Makapa Corporation 30029 Const. of Multi-Purpose Building 1st/Final II 1.380 C 0.391 0.300 0.300 - - - 99.10 83.77% V.Satisfactory
Makapa Corporation 30029 Const./Impvt. of Cawayan River Control Final V 9.452 O 0.333 0.133 0.100 0.023 0.025 0.200 81.40 -
Makapa Corporation 30029 Const./Impvt. of Cawayan River Control 1st/Final V 9.452 O 0.341 0.148 0.100 0.023 0.032 0.200 84.40 -
Makapa Corporation 30029 Rehab./Impvt. of Cawayan River Control 2nd V 4.728 C 0.306 0.300 0.300 - - - 90.60 90.60%
OutstandingMakati Development
Corporation 2313 Const. of 10th & 11th Aveneus of Bonifacio Triangle Project 1st/Final V 52.800 O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 -
Makati Development Corporation 2313 Const. of 10th and 11th Avenues of
Bonifacio Triangle 1st BCDA 52.800 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -
Makati Development Corporation 2313
Const. of 34.5 KVA UPDS along 26th St., 32nd St. & McKinley Parkway, Phase 3
2nd BCDA 12.084 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -
Makati Development Corporation 2313
Construction of 10th & 11th Aveneus of Bonifacio Triangle Project
1st BCDA 52.800 O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 88.28% V.Satisfactory
Mak-Well Enterprises 25003 Const. of MPB at Brgy. Pansol 1st BCDA 2.674 C 0.423 - 0.500 - - - 92.30 92.30% Outstanding
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. @ Los Banos Park 1st IV-A 1.049 C 0.325 0.200 0.300 - - - 82.50 82.50%
V.Satisfactory
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. Barangay Batong Malake 1st/Final IV-A 0.955 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 98
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Malihan Enterprises 6963 Concreting of Road, Brgy. San Antonio 1st/Final IV-A 0.954 C 0.467 - 0.500 - - - 96.70 96.70%
OutstandingMAM Construction &
Trading 19915 Const. of Three 3-CL Building @ Bucanan Elem. School 1st/Final IV-A 1.410 O 0.400 0.300 0.100 0.020 0.018 0.100 93.80 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Cluster B 2004: Const. of Various 2004 School Bldg. (Opol NSTS.)under the 2nd Congressional District, Misamis Oriental
1st III 9.049 O 0.308 0.300 0.100 0.030 0.032 0.100 87.00 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Cluster B 2004: Const. of Various
2004 School Building 1st X 9.049 O 0.400 0.300 0.100 0.020 0.000 0.100 92.00 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &
Approaches 1st X 15.583 O 0.350 0.300 0.100 0.023 0.050 0.100 92.30 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &
Approaches 1st X 15.583 O 0.350 0.300 0.000 0.023 0.065 0.067 80.50 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &
Approaches 3rd X 16.484 O 0.292 0.200 0.050 0.030 0.037 0.000 60.90 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Brdige I along Ma. Cristina-Misamis Oriental Rd., Brgy. San Roque-Hinaplanon
4th X 13.667 O 0.396 0.300 0.100 0.024 0.055 0.100 97.50 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis Oriental Rd., Brgy. San Roque-Hinaplanon
1st X 18.663 O 0.393 0.300 0.070 0.015 0.049 0.100 92.70 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis Oriental Rd., Brgy. San Roque-Hinaplanon
1st X 13.667 O 0.347 0.300 0.100 0.030 0.065 0.100 94.20 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis Oriental Rd., Brgy. San Roque-Hinaplanon
2nd X 13.667 O 0.376 0.300 0.100 0.023 0.054 0.100 95.30 -
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis Oriental Rd., Brgy. San Roque-Hinaplanon
3rd X 10.711 C 0.381 - 0.500 - - - 88.10 87.02% V.Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Nunucan Bridge
Phase III, Brgy. Suarez Final X 7.608 C 0.425 - 0.500 - - - 92.50 88.96% V. Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 99
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Mamsar Enterprises Agro-Industrial Corporation 15885 Const. of Mambu-ao Bridge &
Approaches Final X 22.230 O 0.367 0.300 0.000 0.023 0.053 0.067 81.00 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Const.of Iligan-Bukidnon Road
(Digkila-an-Rogongon Sect.) 2nd X 7.769 C 0.276 - 0.500 - - - 77.60 77.48% Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Iligan-Bukidnon Road Brgy.
San Roque Final X 8.037 C 0.444 - 0.500 - - - 94.40 93.86% Outstanding
Maningo Enterprises 13330 Const. of 4-Cl, 2-Storey S/B @ Bangkal NHS Final X 1.962 C 0.218 0.230 0.300 - - - 74.80 74.80%
Satisfactory
Maningo Enterprises 13330 Road Asphalting/Conc. @ Brgy. Malubog Final VII 0.478 C 0.307 0.300 0.300 - - - 90.70 90.70%
OustandingManuel A. Dela Torre Jr.
Builders 31024 Conc. of Road, Brgy Maasin 1st/Final VII 0.379 C 0.380 0.286 0.300 - - - 96.60 96.70% Outstanding
Mar Castillo Const. Supply Gravel & Sand 21073 Const. of Lined Canal @ Sta. Maria 1st/Final III 0.283 C 0.431 - 0.500 - - - 93.10 93.10%
Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Marianito Villegas E/S 1st IV-A 0.680 C 0.381 0.300 0.300 - - - 98.10 98.10%
Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS 1st/Final XII 0.783 C 0.381 0.300 0.300 - - - 98.10 98.10% Outstanding
Marbel Dynamic Builders 6150Const. of Ladol flood Control Protecting Sarangani-Davao del Sur Coastal Road
1st/Final XII 1.234 O 0.323 0.200 0.000 0.010 0.021 0.133 68.70 -
Marbel Dynamic Builders 6150 Const. of MPB @ Brgy. Assumption 1st XII 0.190 C 0.360 0.200 0.300 - - - 86.00 86.00% V.Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg. @ Brgy. Liberty 1st/Final XII 0.759 C 0.276 0.216 0.300 - - - 79.20 79.20%
Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg., Brgy. Lake Seloton 1st/Final XII 0.760 O 0.270 0.300 0.100 0.030 0.047 0.100 84.70 -
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg., Brgy. Lake Seloton 1st XII 0.760 C 0.330 0.200 0.300 - - - 83.00 84.19%
V.Satisfactory
Marcons Builder 8044 Const. of U.P. College Baguio Multi-Purpose Bldg. Final XII 1.448 C 0.350 - 0.500 - - - 85.00 65.61%
Fair
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road Final CAR 12.369 O 0.266 0.032 0.070 0.022 0.035 0.067 49.20 -
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road 2nd CAR 12.369 O 0.390 0.285 0.050 0.022 0.035 0.067 84.90 -
Marcons Builder 8044 Rehab./Impvt./Const. of DPWH Building (Phase III) 3rd CAR 14.475 O 0.380 0.274 0.100 0.030 0.035 0.100 91.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 100
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Marcphil Construction 10949 Conc. of Dangay Port Road 1st CAR 0.937 C 0.417 - 0.500 - - - 91.70 84.38% V. Satisfactory
Marcphil Construction 10949 Conceting of San Jose-Kaligtasan Road Final IV-B 0.945 C 0.398 - 0.500 - - - 89.80 89.80%
V. Satisfactory
Marcphil Construction 10949 Impvt./Repair of San Mariano-Tauga Road 1st IV-B 1.860 C 0.170 0.276 0.300 - - - 74.60 74.60%
Satisfactory
Marcus Construction 12601 Const. of Multi-Purpose Bldg. (ABC Hall) Phase I 1st/Final IV-B 0.932 C 0.470 - 0.500 - - - 97.00 76.49%
Satisfactory
Marcus Construction 12601Const. of Multi-Purpose Bldg., (DSWD Crisis Intervention Bldg.) Brgy. Pob. (Realigned to Singao)
Final XII 0.909 C 0.372 0.300 0.300 - - - 97.20 97.20% Outstanding
Marcus Construction 12601 Const. of Multi-Purpose Building @ Brgy. Capiton 1st/Final XII 1.906 C 0.350 0.300 0.300 - - - 95.00 83.24%
V.Satisfactory
Marcus Construction 12601Proposed Impv't./Conc. of Labason-Gutalac Nat'l. Rd., Antonio-Labason River Sect.
Final XII 3.913 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Marcus Construction 12601 Reblocking/Conc. Along Cotabato-Davao Road, Sadaan Sect. Final IX 4.625 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -
Marcus Construction 12601Rehab./Impvt. of Banisilan-Guiling-Alamada-Libungan Road, (Kapayawe-Grebona Section)
1st XII 4.742 C 0.332 0.300 0.300 - - - 93.20 93.20% Outstanding
Mar-Deb Construciton & Development 6715 Completion of 2-Storey Multi-
Purpose Building (Phase IV) 1st/Final XII 0.936 O 0.342 0.240 0.100 0.015 0.032 0.100 82.90 -
Mar-Deb Construciton & Development 6715 Completion of 2-Storey Multi-
Purpose Building (Phase IV) 2nd II 0.936 C 0.306 0.300 0.300 - - - 90.60 86.12% V.Satisfactory
Mar-Deb Construciton & Development 6715 Concreting of PNP Regional
Training Center Road, Minante I Final II 0.561 C 0.341 - 0.500 - - - 84.10 84.10% V. Satisfactory
Mar-Deb Construciton & Development 6715 Const. of Angad Bridge &
Approaches Angad 1st II 7.906 C 0.459 - 0.500 - - - 95.90 86.72% V.Satisfactory
Mar-Deb Construciton & Development 6715 Gravelling of FMR Final II 0.470 C 0.354 - 0.500 - - - 85.40 85.40%
V. Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 101
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Mar-Deb Construciton & Development 6715
Impv't./Gravelling/Concreting along CDMA Boundary and its related Roads
1st II 3.396 C 0.312 - 0.500 - - - 81.20 71.42% Satisfactory
Mar-Deb Construciton & Development 6715
Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-Km.372+649)
Final II 9.573 O 0.354 0.239 0.070 0.020 0.037 0.067 78.70 -
Mar-Deb Construciton & Development 6715
Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-Km.372+649)
1st II 9.573 O 0.366 0.295 0.100 0.030 0.035 0.100 92.60 -
Mar-Deb Construciton & Development 6715 Widening/Regravelling of FMR
Munoz East 2nd II 0.940 C 0.367 - 0.500 - - - 86.70 84.60% V. Satisfactory
Mar-deb Construction & Development 6715 Const. of 2 Cl Sch. Bldg. @ Reina
Mercedes Vocational School Final II 0.817 C 0.390 0.178 0.300 - - - 86.80 86.80% V.Satisfactory
Mar-Deb Construction & Development 6715 Const. of Bank Protection Works,
Phase III 1st/Final II 16.225 C 0.375 - 0.500 - - - 87.50 91.10% Oustanding
Mar-deb Construction & Development 6715 Const. of Bintacan Bridge &
Approaches Final II 24.964 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -
Mar-Deb Construction & Development 6715 Const. of Centro Multi-Purpose
Building 1st II 0.090 C 0.321 0.236 0.300 - - - 85.70 85.70% V.Satisfactory
Mar-deb Construction & Development 6715 Const. of MPB (Phase II) @ Cauayan
City C/S 1st/Final II 0.941 C 0.331 0.074 0.300 - - - 70.50 66.23% Fair
Mar-deb Construction & Development 6715 Impvt./Rehab. of Jct. Cauayan-
Cabatuan Road Final II 0.937 C 0.291 0.017 0.300 - - - 60.80 60..80% Fair
Mar-Deb Construction & Development 6715
Reblocking of Concrete Pavement along Jct. Cauayan-Cabatuan Road (Intermittent Section)
1st/Final II 0.623 C 0.317 - 0.500 - - - 81.70 81.70% V.Satisfactory
Margarita Construction 20201 Const. of 3-Cl School Building (FFHNAS) 1st/Final II 1.415 C 0.479 - 0.500 - - - 97.90 94.68%
Outstanding
Margarita Construction 20201 Upgrading of Banga Road Final III 2.838 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
Marigold Development Corporation 4707 Const. of Multi-Purpose Building @
Brgy. New Era 1st III 1.432 C 0.394 0.300 0.300 - - - 99.40 99.40% Outstanding
Marilag Construction 22813 Const. of Multi-Purpose @ Talangka E/S 1st/Final NCR 0.240 C 0.339 0.300 0.300 - - - 93.90 93.90%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 102
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Marilag Construction 22813 Const. of Multi-Purpose Bldg., @ San Jose 1st/Final IV-A 0.287 C 0.398 0.224 0.300 - - - 92.20 92.20%
Outstanding
Marknest Construction 16818 Concreting of Barangay Road 1st / Final IV-A 0.475 C 0.263 0.300 0.300 - - - 86.30 86.30% V.Satisfactory
Marknest Construction 16818 Const. of 2-Storey Bldg. with 12 Rooms Sindalan E/S 1st/Final III 1.418 C 0.427 - 0.500 - - - 92.70 87.94%
V.Satisfactory
Marknest Construction 16818 Const./Repair/Completion of Water Supply Final III 0.954 C 0.381 0.258 0.300 - - - 93.90 93.90%
OutstandingMarquin Construction 13332 Proposed Const. of Line Canal 1st/Final III 0.963 O 0.316 0.200 0.100 0.022 0.025 0.200 86.30 -
Marquin Construction 13332 Road Conc. @ St. James Poblacion 1st VII 0.461 C 0.390 0.100 0.300 - - - 79.00 79.00% Satisfactory
Mar-Vel Construction 23722 Completion of Multi-Purpose Building (LSPC) 1st/Final VII 0.475 C 0.383 0.150 0.300 - - - 83.30 83.30%
V.Satisfactory
Mar-Vel Construction 23722 Conc./Rehab. of Barangay Road 1st/Final IV-A 3.848 C 0.194 - 0.500 - - - 69.40 69.40% Fair
Mar-vel Construction 23722 Const. Impv't. of Water Supply System 1st/Final IV-A 2.464 C 0.386 0.283 0.300 - - - 96.90 96.90%
Outstanding
Mar-vel Construction 23722Const./Impvt. of Flood Control and Drainage @ Brgy. Tulo-Makiling Maharlika Highway
1st/Final IV-A 0.286 C 0.359 0.200 0.300 - - - 85.90 85.90% V.Satisfactory
Mar-vel Construction 23722 Impv't. of Calauan-Nagcarlan Road 1st/Final IV-A 4.674 C 0.380 0.200 0.300 - - - 88.00 88.00% V.Satisfactory
Masbate-Iloilo Const. & Trading Corporation 26579 Const. of Multi-Purposee Building @
Cabatuan H/S 1st/Final IV-A 1.446 C 0.398 0.200 0.300 - - - 89.80 89.80% V.Satisfactory
Mash Construction 20806 Const. of 1 CL at Plaridel Elem. School 1st/Final VI 0.333 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
Masulot Construction 10716 Widening of Cotabato-Allah-Gen. Santos Road including sidewalk 1st IV-A 3.107 C 0.395 - 0.500 - - - 89.50 81.88%
V.Satisfactory
Matco Builders 12929 Const./Repair/Rehab. of Brgy. Rds. @ Brgy. Balibago & Ninoy Package II Final XII 3.768 C 0.411 - 0.500 - - - 91.10 91.10%
Outstanding
MBB Construction 11363 Concreting of Manila North Road Km. 343+000 - Km.344+000 1st III 9.597 O 0.303 0.252 0.100 0.022 0.030 0.100 80.70 -
MBB Construction 11363 Concreting of Manila North Road Km. 343+000 - Km.344+000 1st I 9.597 C 0.371 0.200 0.300 - - - 87.10 83.26%
V.Satisfactory
MBB Construction 11363 Const. of MPB Final I 9.462 O 0.216 0.099 0.000 0.023 0.025 0.067 43.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 103
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
MBB Construction 11363 Const. of Victory Bridge 1st I 9.357 C 0.303 - 0.500 - - - 80.30 75.92% Satisfactory
MBB Construction 11363 Package III-Completion of Multi-Purpose Bldg., @ ISPSC Final I 0.946 C 0.352 - 0.500 - - - 85.20 85.20%
V.Satisfactory
MBB Construction 11363 Renovation of Narvacan Municipal Bldg. 1st I 0.946 C 0.450 - 0.500 - - - 95.00 95.00%
OutstandingMBD General
Const./Duragold Trading & Const. (JV)
JV-05-013 Const. of Sagayon Bridge & Approaches 1st I 24.015 O 0.382 0.204 0.070 0.030 0.065 0.067 81.80 -
MBD General Const./Duragold Trading
& Const. (JV)JV-05-014 Const. of Sagayon Bridge &
Approaches 1st X 24.015 O 0.388 0.300 0.070 0.030 0.048 0.067 90.30 -
MBD General Construction 9991
Const. /Cementing of Circumferential Rd., from Purok Brgy. Mobod to Brgy. Villaflor
3rd X 0.811 C 0.294 0.300 0.300 - - - 89.40 85.38% V.Satisfactory
MBD General Construction 9991
Const. of Dalacon Bridge & Approaches along Oroquieta-Calamba Mt. Rd.
Final X 15.544 O 0.362 0.300 0.100 0.030 0.054 0.100 94.60 -
MBF Construction 9803 Concreting of Municipal Street, Siaton, Negros Oriental 1st X 2.027 C 0.299 - 0.500 - - - 79.90 73.12%
Satisfactory
MBF Construction 9803 Repair/Rehab./Impv't. of FMR, Licoan Final VII 0.486 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
MC Torio Construction 10534 Construction of Canal and Canal Structures (LMC-ARIP-01-06) 1st VII 4.070 C 0.400 0.300 - - - - 70.00 70.00%
Fair
MCB Construction & Supply 12128 Conc. of FMR @ Doyong 1st/Final NIA
Region II 4.723 C 0.300 0.300 0.300 - - - 90.00 90.00% V.Satisfactory
Mcguire Industrial Development Co. 31302 Concreting of FMR 1st/Final I 0.467 C 0.355 0.200 0.300 - - - 85.50 85.50%
V.Satisfactory
MCL Construction / RND Const. (JV) JV-03-116 Impv't./Conc. of Sitio Malasin FMR
San Macario Sur ARC 1st/Final IV-A 7.749 C 0.284 - 0.500 - - - 78.40 72.58% Satisfactory
Meditech Trade & Development 16545 Impv't./Rehab./Const. of MSR-
Pagbilao Sect. Final I 4.728 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding
Meditech Trade & Development 16545
Repair/Rehab. & Installation of Reflectorized Pavm't Stud along Malicboy-P. Burgos-Unisan-Pototanin Rd. & Mulanay San Narciso Rd.
1st IV-A 9.643 C 0.373 0.300 0.300 - - - 97.30 97.30% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 104
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Meditech Trade & Development 16545 Repair/Rehab. of Dinagat-Loreto
Road 1st/Final IV-A 4.489 C 0.331 - 0.500 - - - 83.10 83.10% V.Satisfactory
Mega M Builders 20515 Const. of Farm-to-Market Road 1st/Final XIII 0.373 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding
Mega M Builders 20515 Const. of Multi-Purpose Hall @ Del Remedio (DPWH-Compound) 1st/Final IV-A 0.704 C 0.439 - 0.500 - - - 93.90 84.59%
V.Satisfactory
Mega Plus Construction 28322 Const. of Multi-Purpose Building @ Brgy. Quiot Final IV-A 0.958 O 0.322 0.240 0.100 0.010 0.041 0.100 81.30 -
Mega Plus Construction 28322 Const. of Multi-Purpose Building @ Brgy. Quiot 1st VII 0.958 C 0.358 0.300 0.300 - - - 95.80 85.65%
V.Satisfactory
Mega Plus Construction 28322 Rehab./ of Multi-Purpose Bldg., @ Sitio Opra, Brgy. Kalunasan Final VII 0.767 C 0.403 - 0.500 - - - 90.30 9.30%
Outstanding
Megila Const. & Development Supply 19262 Completion of MPB at Brgy. 18-B 1st VII 0.468 C 0.390 0.146 0.300 - - - 83.60 83.60%
V.Satisfactory
Megila Const. & Development Supply 19262
Const / Rehab. / Replacement / Completion & Repair of E/S Bldg. @ Kapitan Tomas Monteverde E/S
1st/Final XI 0.883 C 0.358 0.300 0.300 - - - 95.80 95.80% Outstanding
Megila Const. & Development Supply 19262 Const. of 2CL, 2 Storey Bldg., @
Matina Aplaya E/S, Matina 1st/Final XI 1.414 O 0.248 0.000 0.100 0.020 0.045 0.100 51.30 -
Megila Const. & Development Supply 19262 Const. of 2CL, 2 Storey Bldg., @
Matina Aplaya E/S, Matina 1st XI 1.440 O 0.382 0.300 0.100 0.030 0.064 0.100 97.60 -
Mel-Jean Const. Corp./ C.S. Rayos Const. &
General ServicesJV-04-004 Const. impv't. of Ternate-Nasugbu
Road, Papaya-Hamilo Section 2nd XI 28.923 C 0.381 0.200 0.300 - - - 88.10 88.40% V.Satisfactory
Mel-Jean Construction Corp. (Formerly: Mel-Jean
Enterprises)16344 Const. of Balintawak Barangay Hall Final IV-A 1.432 C 0.435 - 0.500 - - - 93.50 93.50%
Outstanding
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Juan Pastor Memorial National H/S, Brgy. Talaibon
1st/Final IVA 8.596 O 0.356 0.205 0.100 0.030 0.023 0.067 78.10 -
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Leon Memorial National H/S, Brgy. Mabalanoy
1st IV-A 8.506 O 0.364 0.235 0.100 0.030 0.023 0.067 81.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 105
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Mel-Jean Construction Corporation 16344 Rehab. of Rosario-San Juan Road 1st IV-A 9.618 O 0.344 0.240 0.100 0.015 0.029 0.100 82.80 -
Melrobe Builders & Const. Supplies 29752
Const. of 1 Cl. Mod. FFCCCII Type Bldg. SB-06 Banaybanay, Dinagsaan E/S
1st IV-A 0.385 C 0.378 0.300 0.300 - - - 97.80 97.80% Outstanding
Melrobe Builders & Const. Supplies 29752 Const. of San Isidro MPB (Phase II) 1st/Final XI 1.889 O 0.337 0.240 0.100 0.020 0.038 0.100 83.50 -
Melrobe Builders & Const. Supply 29752 Package IV, Const. of MPB, Brgy.
Corporacion 1st XI 0.924 C 0.348 0.238 0.100 0.015 0.023 0.100 82.40 -
Melrobe Builders & Const. Supply 29752 Package IV, Const. of MPB, Brgy.
Corporacion 1st XI 2.786 C 0.396 0.231 0.300 - - - 92.70 85.49% V.Satisfactory
Melrobe Builders Construction Supplies 29752 Const. of Caganganan Multi-
Purpose Building Final XI 1.605 C 0.375 0.300 0.300 - - - 97.50 94.35% Outstanding
MEP Construction 18759 Completion of Baguio Health Center Final XI 1.904 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
Mercado Concrete Products 4898 Const. of Lilingayon Elementary
School 1st/Final CAR 0.422 C 0.377 0.235 0.300 - - - 91.20 91.20% Outstanding
Mercado Concrete Products 4898 Const. of Multi-Purpose Building 1st/Final X 0.471 C 0.355 - 0.500 - - - 85.50 85.50%
V.Satisfactory
Mercedita Benasas General Mdse. 31745
Completion/Conc. of Capt. Cario Road with Slope Protection & Lined Canal
1st/Final X 0.956 C 0.353 0.200 0.300 - - - 85.30 85.30% V.Satisfactory
Mercedita Benasas General Mdse. 31745 Concreting Brgy. Crlo Brgy. Road 1st/Final IV-B 1.862 O 0.344 0.200 0.100 0.030 0.022 0.100 79.60 -
Mercedita Benasas General Mdse. 31745 Repair / Reconst. of Pinamanaan
Flood Control 1st IV-B 7.719 C 0.288 0.285 0.300 - - - 87.30 82.38% V.Satisfactory
Mesgo Construction 30677 Const. of Flood Control & Access Road Land Fill Final IV-B 0.944 C 0.341 0.300 0.300 - - - 94.10 88.82%
V.Satisfactory
Meta Construction 28882 Repair/Rehab. of Ipil Bridge @ Daang Maharlika Final X 0.725 C 0.284 0.123 0.300 - - - 70.70 70.70%
Satisfactory
Meta Construction 28882 Repair/Rehab. of Sch. Bldg. @ Baptists E/S 1st/Final II 0.287 C 0.265 0.200 0.300 - - - 76.50 76.50%
Satisfactory
Meta Construction 28882Repair/Rehab. of Scoured Shoulders along Jct.Ipil-Panang-Quirino Bdry. Road, Dappig
1st/Final II 0.257 C 0.214 0.223 0.300 - - - 73.70 73.70% Satisfactory
Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. 1st/Final II 2.357 C 0.413 - 0.500 - - - 91.30 79.12%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 106
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
MGBJ Rising Construction & Land
Developer18656 Conc. of Brgy. Road @ Brgy.
Poblacion Final NCR 1.228 C 0.308 0.190 0.300 - - - 79.80 79.80% Satisfactory
MGBJ Rising Construction & Land
Developer18656
Concreting of Additional 2 Lanes along Marbel-Tupi-Makar Rd. Upper Tupi Sect.
1st/Final XII 2.320 C 0.452 - 0.500 - - - 95.20 95.20% Outstanding
MGBJ Rising Construction & Land
Developer18656 Const. of Lined Canal Bololmala 1st XII 0.912 C 0.473 - 0.500 - - - 97.30 47.30%
Poor
MGBJ Rising Construction & Land
Developer18656 Impv't. of Drainage along Digos-
Makar Road, Lagao Section 1st XII 0.695 C 0.313 0.207 0.300 - - - 82.00 84.94% V.Satisfactory
MGDJ Construction 29352 Const. of Multi-Purpose Bldg. At Brgy. 1 Final XII 0.957 C 0.451 - 0.500 - - - 95.10 95.10%
Outstanding
MGDJ Construction 29352 Const. of Multi-Purpose Building 1st IV-A 1.340 C 0.372 0.200 0.300 - - - 87.20 87.20% V.Satisfactory
MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 1st/Final IV-A 0.191 C 0.367 0.300 0.300 - - - 96.70 96.70% Outstanding
Micah Construction and Supply 26625 Const. of Multi-Purpose Bldg., at
Brgy. Sasa 1st/Final IV-A 0.942 C 0.393 - 0.500 - - - 89.30 89.34% V. Satisfactory
Micah Construction and Supply 26625 Package IV-Const. of 2-Cl, 2-Cl SB @
Tugbok SPED Final XI 0.617 O 0.381 0.253 0.100 0.030 0.042 0.100 90.60 -
Michelle Const. Corp. 22204 Bobon, Seawall 1st XI 0.609 C 0.333 - 0.500 - - - 83.30 83.30% V.Satisfactory
Midnorth Luzon Construction and
Development Corp.31783 Const. of 2 Cl @ Maba-ay NHS Bldg.
(Lesseb Annex) 1st VIII 0.716 C 0.347 0.300 0.300 - - - 94.70 94.70% Outstanding
Min Construction 14656 Conc. Const. of Gil Sanchez Lumbuyan FMR 1st/Final CAR 1.854 C 0.354 - 0.500 - - - 85.40 75.44%
Satisfactory
Min Construction 14656Const. of Drainage System along Labason Seawall including Impv't. of existing Canal
Final IX 0.776 C 0.402 - 0.500 - - - 90.20 89.30% V. Satisfactory
Min Construction 14656 Const. of MPB (Tribal Hall) Final IX 0.925 C 0.268 0.182 0.300 - - - 75.00 80.46% V.Satisfactory
Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road Final IX 9.628 C 0.333 0.300 0.300 - - - 93.30 93.30% Outstanding
Min Construction 14656Proposed Concreting of Liloy-Labason Road (Malintuboan Section)
1st/Final IX 4.631 C 0.481 - 0.500 - - - 98.10 89.58% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 107
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Mindanao Rock 23479 Completion of Farmers Training Center (ABC Gym Phase X) Final IX 0.959 C 0.408 - 0.500 - - - 90.80 91.64%
Outstanding
Mindanao Rock 23479 Const. of Flood Control Taguima Final X 0.479 C 0.404 - 0.500 - - - 90.40 89.50% V. Satisfactory
Mindanao Rock 23479Const. of Multi-Purpose Hall (Jimenez Socio-Cultural Auditorium, Phase XII)
Final X 1.873 C 0.333 - 0.500 - - - 83.30 76.65% Satisfactory
Mindanao Rock 23479 Const. of Phase III Multi-Purpose Building Final X 1.423 O 0.323 0.300 0.070 0.030 0.038 0.067 82.80 -
Mindanao Rock 23479 Const. of Phase III Multi-Purpose Building 1st X 1.423 C 0.286 0.300 0.000 - - - 58.60 75.54%
Satisfactory
Minrock Multi-Builders 15845Const. of College School Building Cotabato City State Polytechnic College (CCSPC)
Final X 1.904 O 0.285 0.300 0.100 0.022 0.035 0.100 84.20 -
Minrock Multi-Builders 15845Const. of College School Building Cotabato City State Polytechnic College (CCSPC)
1st XII 1.904 C 0.313 0.274 0.300 - - - 88.70 85.55% V.Satisfactory
Miracle Builders 28502 Repair/Rehab. of H.E. Bldg. & Comfort Room @ E. Rodriguez E/S Final XII 0.475 C 0.330 0.235 0.300 - - - 86.50 86.50%
V.Satisfactory
Mivico Builders and Developers 20551 Const. of Gymnasium (Multi-
Purpose Hall) 1st/Final NCR 1.058 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding
MJB Const. & Trading Corp. 15059 Const. of Drainage System Brgy.
Ninoy Aquino 1st III 1.652 C 0.390 - 0.500 - - - 89.00 89.00% V.Satisfactory
MJB Const. & Trading Corp. 15059
CP-II Const./Repair/Rehab. of Brgy. Road @ Various Brgy. In San Francisco
1st III 0.473 C 0.388 - 0.500 - - - 88.80 88.80% V.Satisfactory
MJF Neulid Enterprises 29107 Concreting of Shoulder, Manlurip-McArthur Road 1st III 1.771 C 0.455 - 0.500 - - - 95.50 95.50%
Outstanding
MJR Construction 18794 Const. of Road, Barangay Poblacion 1st VIII 0.948 O 0.350 0.240 0.100 0.010 0.037 0.100 83.70 -
MJR Construction 18794 Const. of Road, Barangay Poblacion 1st II 0.948 C 0.347 0.300 0.300 - - - 94.70 88.10% V.Satisfactory
ML Patawaran Trading & Const. 28869 Rehab. of Barangay Road Final II 0.475 C 0.385 - 0.500 - - - 88.50 88.50%
V.Satisfactory
MN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao 1st III 0.947 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding
MN Revelo Construction 24789 Rehab. of Roads (5 Clustered Roads) 1st IX 4.099 O 0.400 0.300 0.100 0.022 0.037 0.100 95.90 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 108
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
MNG Builders & Dev't. Corporation (Formerly
MNG Builders)16098 Const. of Doña Carmen Denia NHS
Multi-Purpose Hall 1st IX 2.023 C 0.394 - 0.500 - - - 89.40 89.96% V.Satisfactory
Molte Aries Construction & Industries 3684 Const. of 2Cl School Building Final XI 0.671 C 0.341 - 0.500 - - - 84.10 84.10%
V.Satisfactory
Molte Aries Construction & Industries 3684 Const. of Multi-Purpose Building at
Barangay Sevilla 1st/Final I 1.316 O 0.379 0.285 0.100 0.030 0.029 0.100 92.30 -
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery, Installation and Comissioning of Rubber Dam (Cabilogan-San Juan CIP)
1st I 46.981 C 0.390 0.180 0.300 - - - 87.00 87.00% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery, Installation and Comissioning of Rubber Dam (South Quinale CIS)
1st/Final NIA 68.027 0.389 0.200 0.070 0.030 0.047 0.067 80.30 80.30% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733 South Quinale Communal Irrigation
System 1st NIA 68.027 C 0.375 0.263 0.300 - - - 93.80 85.70%
Monro Construction & Supply Corp. 14084 Conc. Paving of Shoulder along
National Rd., @ Brgy. Guilijungan Final NIA Region V 0.915 C 0.444 - 0.500 - - - 94.40 91.16%
Outstanding
Montaño Construction & Development Corporation 19473 Completion of Multi-Purpose
Building (Phase V) Final VI 3.734 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Montaño Construction & Development Corporation 19473 Const. of Dilawa Bridge &
Approaches 1st/Final IX 17.394 O 0.337 0.096 0.100 0.024 0.051 0.100 70.80 -
Montaño Construction & Development Corporation 19473 Const. of Dilawa Bridge &
Approaches 1st IX 17.394 C 0.293 0.283 0.300 - - - 87.60 85.47% V.Satisfactory
Montaño Construction & Development Corporation 19473
Impv't. & Const. of Roadside Protection Structure along Dipolog-Punta-Dansullan
Final IX 3.945 C 0.369 - 0.500 - - - 86.90 83.00% V. Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 109
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Monte Construction & Supply 19474
Conc. of Danguilan St., @ Brgy. Osmeña Solano, Nueva Vizcaya Brgy. Osmeña
Final IX 0.270 C 0.459 - 0.500 - - - 95.90 95.90% Outstanding
Monte Construction & Supply 19474
Rehab. of Maddiangat Bridge Piers and Bank Protection, along Bambang-Kasibu-Quezon-Solano Road
1st II 4.765 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory
Monterey Builders 11103 Const. of Seawall with Wave Deflector, Brgy. Melgar A 1st/Final II 0.948 C 0.333 - 0.500 - - - 83.30 74.72%
Satisfactory
Montphil Construction Corporation 24285 Concrete Paving of Dipolog-Polanco-
Macleodes National Road Final IV-B 0.915 C 0.381 0.300 0.300 - - - 98.10 98.10% Outstanding
Montphil Construction Corporation 24285 Concreting of Brgy. Dionum FMR 1st/Final IX 0.458 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
Montphil Construction Corporation 24285 Const. of MPB @ Brgy. Silano 1st IX 0.070 C 0.270 0.201 0.300 - - - 77.10 77.10%
Satisfactory
Montphil Construction Corporation 24285
Const. of Slope Protection Structure along Dipolog-Potanco-Pinan Jct. Oroquieta Road (Guinles Section)
1st/Final IX 0.940 C 0.311 0.300 0.300 - - - 91.10 91.10% Outstanding
Montphil Construction Corporation 24285 Const./Completion of Multi-Purpose
Bldg., (Mun. Hall Phase III) 1st/Final IX 0.973 C 0.479 - 0.500 - - - 97.90 92.79% Outstanding
Montphil Construction Corporation 24285 Const./Extension of MPB (Municipal
Bldg.) Final IX 0.279 C 0.356 0.145 0.300 - - - 80.10 80.10% V.Satisfactory
Morning Coffee Builders 29027 Const. of Multi-Purpose Building covered Court Lian Central School 1st/Final IX 0.948 C 0.434 - 0.500 - - - 93.40 93.40%
Outstanding
Morning Steel Construction 30698 Completion of Multi-Purpose Bldg.,
Sitio Diaboyo 1st IV-A 0.281 C 0.290 0.300 0.300 - - - 89.00 89.00% V.Satisfactory
Morning Steel Construction 30698 Const. of Flood Control 1st/Final III 0.846 C 0.417 - 0.500 - - - 91.70 91.70%
OutstandingMountaineers
Engineering & Const. Services
6154 Const. of Benguet SPED Center La Trinidad, Benguet 1st/Final III 0.522 C 0.364 - 0.500 - - - 86.40 86.40%
V.Satisfactory
Mountaineers Engineering & Const.
Services6154 Const. of BSU Multi-Purpose
Building (IPA Building) 1st/Final CAR 0.949 C 0.354 - 0.500 - - - 85.40 85.40% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 110
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Mountaineers Engineering & Const.
Services6154 Const. of Maslog-Kabilisan FMR 1st/Final CAR 1.972 C 0.174 - 0.500 - - - 67.40 67.40%
Fair
Mountaineers Engineering & Const.
Services6154 Const. of Various School Building
(Labino-Aquiso E/S) 1st CAR 0.671 C 0.324 - 0.500 - - - 82.40 82.89% V.Satisfactory
MR. Santiago Constraction 27239 Rehabilitation of Lateral G Canal
(Sta. 2+380-6+637) Final CAR 5.617 C 0.250 0.300 0.300 - - - 85.00 85.19%
MRP Merchandising 13656 Concreting of Barangay Road Final NIA Region I 0.459 C 0.378 - 0.500 - - - 87.80 87.80%
V.Satisfactory
MRP Merchandising 13656 Concreting of Brgy. Road at Calagbangan to Bocol, Sipocot 1st/Final V 0.917 C 0.382 - 0.500 - - - 88.20 85.14%
V.Satisfactory
MSF Construction 25307 Concreting of Various Barangay Road 2nd V 0.471 C 0.333 - 0.500 - - - 83.30 83.30%
V.Satisfactory
MSF Construction 25307 Const. of Multi-Purpose Building Phase I 1st/Final I 2.385 O 0.381 0.216 0.100 0.010 0.029 0.100 83.60 -
MSF Construction 25307 Const. of Multi-Purpose Building Phase I 1st I 2.385 C 0.308 0.200 0.300 - - - 80.80 82.76%
V.Satisfactory
Mt. Guiting-Guiting Construction 17412 Repair/Maintenance of Agnipa River
Control Final I 0.277 C 0.373 0.200 0.300 - - - 87.30 87.30% V.Satisfactory
Muaña Construction 9354 Const. of Multi-Purpose Bldg., U.P.-Cebu High School Dept. 1st/Final IV-B 1.904 C 0.447 - 0.500 - - - 94.70 87.63%
V.Satisfactory
Mulaña Construction 30708 Const. of Foot Bridge @ Sitio Napo, Sapangdaku Final VII 0.956 C 0.410 - 0.500 - - - 91.00 83.62%
V.Satisfactory
Mulaña Construction 30708 Const. of Multi-Purpose Bldg. @ Poblacion Final VII 0.472 C 0.293 0.300 0.300 - - - 89.30 84.19%
V.Satisfactory
Mulaña Construction 30708 Const. of Multi-Purpose Bldg., Labangon-Bliss Final VII 0.669 C 0.316 - 0.500 - - - 81.60 79.08%
Satisfactory
Must Enterprises 13336 Const. of MPB at Brgy. Rajahmuda Final VII 0.285 C 0.321 0.200 0.300 - - - 82.10 82.10% V.Satisfactory
MVVK Construction and Trading 25721 Const. of Multi-Purpose Bldg. Brgy.
Tuyom 1st/Final XII 0.470 C 0.395 - 0.500 - - - 89.50 89.50% V. Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 111
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
MWJ Construction 14882 Concrete Paving of La-Paz-Burauen Rd., Brgy. Sta. Elena 1st VI 2.848 C 0.415 - 0.500 - - - 91.50 87.00%
V. Satisfactory
MWJ Construction 14882 Rehab./Impvt. of National Arterial & Secondary Roads Public Infra Final VIII 0.979 C 0.327 0.200 0.300 - - - 82.70 82.70%
V.Satisfactory
MWJ Construction 14882 Road Concreting of Burauen-La Paz Road 1st/Final VIII 0.939 C 0.308 0.300 0.300 - - - 90.80 90.80%
Outstanding
MWJ Construction 14882 Road Concreting of Burauen-La Paz Road 1st/Final VIII 1.859 C 0.372 0.300 0.300 - - - 97.20 84.96%
V.Satisfactory
MY Builders and Construction 22687 Const. of Multi-Purpose Bldg., @
Canaoay E/S Final VIII 1.407 C 0.342 - 0.500 - - - 84.20 75.03% Satisfactory
N & N Construction Corporation 30716 Const. of Geotextile Soil
Reinforcement and Repair/Rehab Final I 6.450 C 0.384 - 0.500 - - - 88.40 88.40% V. Satisfactory
N.B. Avila Construction 13751 Concreting of Pantihan Rd., & Const. of Multi-Purpose Pavement 1st IV-A 2.293 C 0.404 - 0.500 - - - 90.40 90.40%
Outstanding
N.B. Avila Construction 13751 Const. of One Classroom School Building, Bulihan E/S 1st IV-A 0.475 C 0.396 - 0.500 - - - 89.60 89.60%
V.Satisfactory
N.B. Garcia Construction 30983 Concreting of Poblacion Magsaysay FMR 1st/Final IV-A 0.478 C 0.414 - 0.500 - - - 91.40 91.40%
Outstanding
N.B. Garcia Construction 30983Rehab. of Various Brgy. Rd., San Jose Area, Package IV (Conc. of Baula Brgy. Rd.) Pag-asa
1st IV-B 0.283 C 0.347 0.300 0.300 - - - 94.70 84.98% V.Satisfactory
N.B. Salvo Construction 6091 Conc. of Golden Shower St. Final IV-B 0.942 C 0.359 0.200 0.300 - - - 85.90 85.90% V.Satisfactory
N.B. Salvo Construction 6901 Const. of Poblacion El Salvador Flood Control 1stFinal X 9.462 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -
N.F. Yamat Construction 5401 Rehab. of MPB @ Brgy. 72, Zone 6 1st X 0.420 C 0.299 0.300 0.300 - - - 89.90 80.73% V.Satisfactory
N.K. Enterprise 29292Concreting of Various Road Segments along Anini-y-T Fornier-Hamtic Road Section
Final NCR 0.964 C 0.293 0.132 0.300 - - - 72.50 74.36% Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders)
11505 Const. of 1 Cl @ Pamantasang Bayan, PUP Final VI 0.383 C 0.342 0.268 0.300 - - - 91.00 91.00%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 112
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders)
11505 Const. of One (1) Classroom School Bldg. Atimonan Nat'l, H/S 1st/Final IV-A 0.377 C 0.448 - 0.500 - - - 94.80 94.80%
Outstanding
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders)
11505 Const./Impv't. of FTMR, Brgy. Duhat 1st IV-A 0.941 C 0.362 - 0.500 - - - 86.20 86.20% V.Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders)
11505Repair/Const. of Multi-Purpose Pavemnet @ Purok Ilaya Brgy. Tagbakin
1st/Final IVA 0.940 C 0.386 0.200 0.300 - - - 88.60 88.60% V.Satisfactory
N.M.E. Construction 22984a)Rep./Rehab. of H.E.Bldg. @ E.Delos Santos E/S b) Const. of Add'l. CL @ AA Quezon E/S
1st/Final IV-A 2.419 C 0.375 - 0.500 - - - 87.50 77.04% Satisfactory
N.M.E. Construction 22984 Const. of Multi-Purpose Gymnasium Final NCR 2.387 C 0.452 - 0.500 - - - 95.20 95.20% Outstanding
N.M.E. Construction 22984 Rehab. of Jct. Layac-Balanga-Mariveles Port Road (Pilar Sect.) 1st IV-A 2.880 C 0.329 0.211 0.300 - - - 84.00 84.00%
V.Satisfactory
N.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 1st/Final III 1.419 O 0.310 0.300 0.100 0.030 0.053 0.100 89.30 -
N.P. Uy Builders 16551 Const. of Malajog Shoreline Protection (Phase I) Bry. Malajog 1st NCR 1.420 C 0.395 - 0.500 - - - 89.50 89.50%
V.Satisfactory
N.P. Uy Builders 16551 Const. of Malajog Shoreline Protection (Phase I) Bry. Malajog 1st VIII 2.822 C 0.379 - 0.500 - - - 87.90 92.70%
Outstanding
N.S. Construction and Supply 23203 Const. of Slope Protection along
Naguilian Bridge, Dallipaoen Final VIII 1.927 C 0.274 0.226 0.300 - - - 80.00 71.63% Satisfactory
N.V. Balbuena Construction 12055 Const. of Gabon-Hacienda FMR Final I 2.805 C 0.330 - 0.500 - - - 83.00 61.10%
FairN-22 Construction &
Trading 25254 Const./Impv't. of Amedo Dike Slope Protection San Simon Final III 0.950 C 0.477 0.500 - - - 97.70 97.70%
Outstanding
N-22 Construction & Trading 25254 Const./Rehab./Completion of
Sampaloc Brgy. Road 1st III 0.477 C 0.348 - 0.500 - - - 84.80 84.80% V.Satisfactory
N-22 Construction & Trading 25254 Impvt. of Minalin-Sto. Tomas Road 1st III 4.744 C 0.342 0.300 0.300 - - - 94.20 94.20%
Outstanding
Naga E.S. Construction and Supply 6593 Const. of Multi-Purpose Bldg., Brgy.
Poblacion 1st/Final III 0.936 C 0.384 - 0.500 - - - 88.40 88.40% V.Satisfactory
Naga E.S. Construction and Supply 6593 Const. of Multi-Purpose Building 1st V 0.938 C 0.362 0.300 0.300 - - - 96.20 93.61%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 113
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Nale Construction 18552 Repair/Rehab./Widening/Regravelling of FMR, Cantabon-Luzong Final V 0.697 C 0.400 0.100 0.300 - - - 80.00 85.88%
V.Satisfactory
NBL Construction 30396 Conc. of FMR @ Brgy. Dao Final VII 1.888 C 0.325 0.200 0.300 - - - 82.50 82.50% V.Satisfactory
Nescon Builders 24751 Const. of Multi-Purpose Building (Const. of Veterans Bldg.) 1st/Final IV-A 1.443 O 0.286 0.240 0.070 0.030 0.018 0.067 71.10 -
Nescon Builders 24751 Const. of Multi-Purpose Building (Const. of Veterans Bldg.) 1st VI 1.443 C 0.308 0.279 0.000 - - - 58.70 67.38%
Fair
Nessan Builders 25142 Const. of 2 Cl Bldg. @ Navaling P/S Final VI 0.536 C 0.282 0.300 0.300 - - - 88.20 88.20% V.Satisfactory
Nessan Builders 25142 Const./Repair/Rehab/ of Brgy/ Roads, Brgy. Dau 1st/Final III 1.877 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Nessan Builders 25142 Package XIV-Const.of Multi-Purpose Covered Court 1st III 1.403 C 0.222 - 0.500 - - - 72.20 72.20%
Satisfactory
Nes-san Builders 25142 Asphalt Overlay along Arayat-Magalang-Mabalacat Road 1st III 4.763 C 0.366 0.300 0.300 - - - 96.60 96.60%
Outstanding
Nestor D. Mercado Construction 18658 Conc./Repair Calanipawan Rd. 1st/Final III 1.873 C 0.350 - 0.500 - - - 85.00 85.00%
V.Satisfactory
New Arcond Builders Inc. (Formerly Arcond
Builders)9614
Concrete Blocking along Edsa, Quezon City (Km. 10+687-Km. 16+417)
1st VIII 9.555 C 0.403 - 0.500 - - - 90.30 90.30% Outstanding
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Impv't./Rehab. of Quezon Avenue 1st/Final NCR 4.642 C 0.356 - 0.500 - - - 85.60 85.60%
V. Statisfactory
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Proposed Pedestrian Overpass
Crossing Roxas Blvd. 1st NCR 8.212 O 0.293 0.163 0.100 0.030 0.030 0.100 71.60 -
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Proposed Pedestrian Overpass
Crossing Roxas Blvd. 1st NCR 9.314 O 0.334 0.267 0.100 0.000 0.000 0.000 70.10 -
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Proposed Pedestrian Overpass
Crossing Roxas Blvd. 2nd NCR 8.437 C 0.382 0.300 0.300 - - - 98.20 81.79% V.Statisfactory
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Rehab./Improvement of Reparo
Road Final NCR 9.434 O 0.372 0.300 0.100 0.024 0.039 0.100 93.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 114
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
New Arcond Builders Inc. (Formerly Arcond
Builders)9614 Rehab./Improvement of Reparo
Road 1st NCR 9.434 C 0.350 0.300 0.300 - - - 95.00 94.10% Outstanding
New Kanlaon Const., Inc/Markbilt Const./JV
896 / 12522
Water Impounding/Earth Dam with Spillway (Dauin Dam) Final NCR 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -
New Kanlaon Const., Inc/Markbilt Const./JV
896 / 12522
Water Impounding/Earth Dam with Spillway (Dauin Dam) 1st NIA 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 88.38%
V.Satisfactory
New Rich Gen. Contractor Services & Trading Co.
Inc.27629 Concreting of Road @ Brgy.
Bubukal 1st NIA 0.475 C 0.382 - 0.500 - - - 88.20 88.20% V.Satisfactory
New San Fabian Builders & Supplies 16348 Const. of Multi-Purpose Bldg., Brgy.
Dianawan 1st IV-A 0.663 C 0.396 0.250 0.300 - - - 94.60 94.60% Outstanding
New TBP Construction & Development Corp. 29155
Const. of Multi-Purpose Building (Covered Court @ Haven for Woman) Phase I
1st/Final III 11.547 O 0.319 0.300 0.100 0.030 0.049 0.100 89.80 -
New TBP Construction & Development Corp. 29155
Const. of Multi-Purpose Building (Covered Court @ Haven for Woman) Phase I
1st NCR 11.546 C 0.352 0.300 0.300 - - - 95.20 91.42% Outstanding
Newadis Construction 23806 Completion of Lumang Bayan Water System Final NCR 0.955 O 0.353 0.300 0.100 0.020 0.013 0.100 88.60 -
Newadis Construction 23806 Completion of the Conc. of Magsaysay-San Jose Road 1st IV-B 9.619 O 0.280 0.220 0.100 0.030 0.035 0.100 76.50 -
Newadis Construction 23806 Const. of Pagbahan Flood Control (Phase II) 1st IV-B 2.294 C 0.298 0.300 0.300 - - - 89.80 89.50%
V.Satisfactory
NFH Construction & Supply 16055 Const. of Adiangao Bridge # 2 &
Approaches (Phase 1), Final IV-B 8.396 C 0.392 0.300 0.000 - - - 69.20 76.82% Satisfactory
NFH Construction & Supply 16055 Const. of Nagas Bridge &
Approaches Final V 16.745 O 0.331 0.100 0.100 0.030 0.041 0.100 70.20 -
NFL Builders 12524 Const. of Drainage Canal @ Barangay 17 1st V 0.474 O 0.253 0.200 0.100 0.015 0.000 0.200 76.80 -
N-Four General Contractor and Supply 19475 Concreting of San Isidro-Iraya Brgy.
Road 1st X 0.275 C 0.394 - 0.500 - - - 89.40 89.40% V.Satisfactory
N-Four General Contractor and Supply 19475 Const. of 2Cl School Bldg. @
Tanagan E/S 1st/Final V 0.945 C 0.307 0.259 0.300 - - - 86.60 86.60% V.Satisfactory
N-Four General Contractor and Supply 19475 Impv't./Rehab. of Tanawan River
Control (Part of Cluster I) 1st/Final V 0.459 O 0.233 0.287 0.100 0.015 0.028 0.100 76.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 115
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Nippon Steel Corp./Toa Corp. (JV)
SL2-SN/000598/FC-04-
001
Second Magsaysay Bridge & Butuan City By Pass Road 1st V 2,158.802 C 0.366 0.300 0.300 - - - 96.60 94.86%
Outstanding
Nippon Steel/Toa Corporation (JV)
FC-04-001/SLI-
SN-004628
Second Magsaysay Bridge & Butuan City Bypass Road Project Final PJHL 1,962.547 O 0.321 0.300 0.100 0.030 0.070 0.100 92.10 -
Nippon Steel/Toa Corporation (JV)
SL2-SN/000598/FC-04-
001
Second Magsaysay Bridge & Butuan City Bypass Road Project 4th PJHL 2,158.802 O 0.376 0.300 0.100 0.030 0.070 0.100 97.60 -
Nirvana Construction and Supplies 18691 Const. of 2 Cl @ KNCHS 6th PJHL 0.694 O 0.382 0.180 0.100 0.030 0.038 0.100 83.00 -
Nishimatsu Construction Company Limited
SLZ-SN-00053/FC-
02-036
KAMANAVA Area Flood Control & Drainage System Improvement Project
1st XII 3.479 O 0.299 0.183 0.100 0.030 0.061 0.200 87.30 -
Nishimatsu Construction Company Limited
SLN-SN-000579/FC-02-036
KAMANAVA Area Flood Control & Drainage System Improvement Project
1st NCR 3,479.584 O 0.390 0.200 0.070 0.030 0.070 0.200 96.00 -
NMJ Construction & Trading 31017 Gravelling of Brgy. Del Pilar Road 3rd NCR 0.285 C 0.432 - 0.500 - - - 93.20 93.20%
Outstanding
Norsatek Engineering and Construction Supply 26627 Multi-Purpose Pavement under
Cluster CARP-04-D2-01 1st IX 0.093 C 0.356 0.244 0.300 - - - 90.00 90.00% V.Satisfactory
Northern Builders 8789Completion of Ternate-Nasugbu Road, Looc-Pingkian-Papaya-Hamilo Section
1st/Final VIII 23.990 O 0.347 0.300 0.100 0.030 0.022 0.100 89.90 -
Northern Builders 8789Completion of Ternate-Nasugbu Road, Looc-Pingkian-Papaya-Hamilo Section
1st IV-A 24.124 C 0.296 0.300 0.300 - - - 89.60 89.78% V.Satisfactory
Northern Builders 8789 Const. of 6-Cl (2-Storey Bldg.) @ Sta. Maria E/S Final IV-A 3.525 C 0.444 - 0.500 - - - 94.40 85.65%
V.Satisfactory
Northern Builders 8789 Const. of Water Supply System Final III 9.335 C 0.489 - 0.500 - - - 98.90 94.35% Outstanding
Northern Builders 8789 Const./Repair/Rehab. of Brgy. Road Brgy. Ninoy Aquino Final III 1.880 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 116
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Northern Builders 8789
Impv't./Widening of Manila North Road (MNR) Package V, Km.118+700 to Km.119+338.40; Km.124+680 to Km.124+940; Km.129+390 to Km.132+500; (Tarlac Section)
1st III 47.288 C 0.386 0.300 0.300 - - - 98.60 89.54% V.Satisfactory
Northern Builders 8789 Pangasinan-Nueva Vizcaya Rd. Final III 31.182 C 0.445 - 0.500 - - - 94.50 94.50% Outstanding
Northern Builders 8789 Rehab./Reconst. of Villa Cerveza Flood Mitigation Project 1st I 55.231 O 0.328 0.160 0.100 0.030 0.032 0.200 85.00 -
Northern Builders 8789 Repair/Strengthening of Insular Bilibid Prison Bridge 1st IV-B 6.049 C 0.171 0.300 0.300 - - - 77.10 77.10%
Satisfactory
Northern Builders/Hanjin (JV)
FC-06-007
Completion/Const. of Subic-Cawag-Balaybay Road, Phase II (Segment 4) 1st/Final NCR 119.113 C 0.211 0.200 0.300 - - - 71.10 71.10%
Satisfactory
Northern Cotabato Construction and Supply 15515
Conc. of Kidapawan-Calunasan-M'lang Road Magsaysay-Maligaya Sect.
1st/Final III 5.290 C 0.454 - 0.500 - - - 95.40 92.88% Outstanding
Northern Cotabato Construction and Supply 15515
Rehabilitation of Grebona Bridge along Banisilan-Guiling-Alamada-Libungan Road
Final XII 13.633 C 0.386 0.300 0.300 - - - 98.60 88.34% V.Satisfactory
Northern Negros Construction & Dev't. 17962 Concreting of Leon Kilat Street Final XII 1.484 C 0.370 - 0.500 - - - 87.00 67.44%
Fair
Northern Negros Construction & Dev't. 17962 Const. of Calo River Control Final VII 0.876 C 0.397 - 0.500 - - - 89.70 88.74%
V.Satisfactory
Northpoint Development Corp. 29573 Const. of Footbridge with Drainage
System Final VII 1.490 C 0.372 - 0.500 - - - 87.20 85.46% V.Satisfactory
Novanne Ventures Construction 22107 Const. of FMR Brgy. Lumpatan-
Lapak-Sumaray Rd. Final VII 2.886 C 0.378 - 0.500 - - - 87.80 87.80% V.Satisfactory
Novanne Ventures Construction 22107 Cont. of MPB at Brgy. Singcang 1st VI 2.794 O 0.400 0.220 0.100 0.023 0.028 0.100 87.10 -
Nueva Ecija Construction Company, Inc. 135 Const. of School Building, Cavite
State University 1st VI 1.914 C 0.416 - 0.500 - - - 91.60 91.74% Outstanding
Nulas Builders 32172 Const. of 1 CL Bldg. @ Pulong Bulo PS 2nd IV-A 0.379 C 0.331 0.300 0.300 - - - 93.10 89.60%
V.Satisfactory
NVF Construction 13941 Const. of Ponong River Wharf Final III 0.655 C 0.392 0.165 0.300 - - - 85.70 85.70% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 117
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
O R C Construction & Supply 17337
Rehab./Impvt. of Road Protection along Daang Maharlika (Bontal Section)
1st/Final V 0.932 C 0.239 0.225 0.300 - - - 76.40 76.40% Satisfactory
O.L. De Leon Construction 16194 Concreting of Daet-Mercedes Road 1st/Final II 0.942 C 0.354 - 0.500 - - - 85.40 86.24%
V.Satisfactory
O.L. De Leon Construction 16194 Const. of 2 CL S/B P. Ponayo H/S
Brgy. Mambelite 2nd V 0.719 C 0.351 - 0.500 - - - 85.10 85.10% V.Satisfactory
O.L. De Leon Construction 16194 Road Opening of Matango-Singi
Barangay Road 1st V 4.604 O 0.323 0.230 0.100 0.010 0.028 0.100 79.10 -
O.R. Sarmiento Construction 1411 Const. of Spillway - Phase I, Talibon
Small Reservoir Irrigation Project 1st V 8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 -
O.R. Sarmiento Construction 1411 Const. of Spillway - Phase I, Talibon
Small Reservoir Irrigation Project 1st NIA Region VII 8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 86.50%
V.Satisfactory
O.R. Sarmiento Construction 1411 Naga-Toledo Road Project; Jct. Pajo
to Brgy. Ibo to Boundary 1st NIA Region VII 18.733 C 0.394 - 0.500 - - - 89.40 88.14%
V.Satisfactory
Octant Builders & Development Corp. 23668 Const. of Health Center at Saniboy
Health Center Final R-VII 0.959 C 0.327 - 0.500 - - - 82.70 82.70% V.Satisfactory
OIC Construction & Supply 23727 Const. of Water Works System 1st NCR 2.406 C 0.343 0.200 0.300 - - - 84.30 84.30%
V.Satisfactory
Omengan Construction and Development
Corporation5119 Const. of Bagu Bridge &
Approaches 1st/Final IV-A 6.938 C 0.348 0.134 0.300 - - - 78.20 82.94% V.Satisfactory
Omengan Construction and Development
Corporation5119 Const. of Saltan Bridge &
Approaches Final CAR 76.227 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -
Omengan Construction and Development
Corporation5119 Const. of Tuga Bridge & its
Approaches 1st CAR 11.158 O 0.288 0.225 0.100 0.015 0.028 0.100 75.60 -
Omengan Construction and Development
Corporation5119 Const. of Tuga Bridge & its
Approaches 1st CAR 12.262 C 0.327 0.035 0.300 - - - 66.20 71.84% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 118
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Omengan Construction and Development
Corporation5119
Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan Road, Pingaan-Dalimuno Section
Final CAR 14.329 O 0.362 0.200 0.100 0.030 0.035 0.100 82.70 -
Omicron Construction 9575Const. of Multi-Purpose Bldg. at San Matias Realigned to Const. of MPB at San Jose
1st CAR 0.949 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Omicron Construction 9575 Repair/Rehab. of Dike/Banks Clearing Sapang Maragul 1st III 9.490 C 0.357 - 0.500 - - - 85.70 85.70%
V.Satisfactory
Omnicon Builders 22816 Concreting of Brgy Roads at Habay I, Molino I Proj. 18 & Niog II 1st III 0.959 C 0.267 - 0.500 - - - 76.70 76.70%
Satisfactory
Omnicon Builders 22816 Const. of 2 Cl Sch. Bldg. @ Pinagturilan NHS 1st IV-A 1.339 O 0.249 0.132 0.100 0.030 0.029 0.100 64.00 -
Omnicon Builders 22816 Partial Const. of 2CL S/B at Julian Felipe E/S 1st IV-B 0.767 C 0.447 - 0.500 - - - 94.70 94.70%
Outstanding
Omnicon Builders 22816 Rehab./Impvt. of Punta-Looc-Odiongan-Anahao Road 1st IV-A 9.577 C 0.179 0.200 0.300 - - - 67.90 74.50%
Satisfactory
OQC Construction 22690 Completion of Multi-Purpose Building @ San Andres E/S Final IV-B 0.522 C 0.322 0.300 0.300 - - - 92.20 91.64%
Outstanding
OQC Construction 22690 Const. of MPB (Phase II) @ Cagayan NHS Final II 4.749 C 0.350 0.000 0.000 - - - 35.00 35.00%
PoorOQC Construction 22690 Const. of MPB @ Brgy. 9 1st/Final II 1.924 O 0.385 0.177 0.100 0.020 0.023 0.100 80.50 -
OQC Construction 22690 Const. of Multi-Purpose Building (Gymnasium) 1st II 4.821 O 0.304 0.300 0.100 0.015 0.035 0.100 85.40 -
OQC Construction 22690 Const. of Multi-Purpose Building @ Cagayan National High School 3rd II 4.821 O 0.389 0.236 0.050 0.030 0.030 0.067 80.20 -
OQC Construction 22690 Seal Widening along Daang Maharlika km. 324+000-Km.327+700 1st II 9.543 O 0.378 0.300 0.100 0.020 0.051 0.100 94.90 -
OQC Construction 22690 Seal Widening along Daang Maharlika km. 324+000-Km.327+700 1st II 9.543 O 0.347 0.300 0.100 0.030 0.050 0.100 92.70 -
OQC Construction 22690 Seal Widening along Daang Maharlika km. 324+000-Km.327+700 2nd II 9.543 C 0.294 0.000 0.300 - - - 59.40 76.64%
Satisfactory
OQC Construction 22690Seal Widening of intersection at Daang Maharlika & Jct. Ipil-Panang-Quirino Bdry Road
Final II 4.775 C 0.291 0.200 0.300 - - - 79.10 79.10% Satisfactory
Orani Builders Supply 5349 Cluster CY 2004 DepEd School Building Program 1st/Final II 4.560 C 0.478 - 0.500 - - - 97.80 95.00%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 119
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Orani Builders Supply 5349 Const. of Multi-Purpose Building San Vicente Final III 2.814 C 0.456 - 0.500 - - - 95.60 89.02%
V.Satisfactory
Orani Builders Supply 5349 Repair/Rehab. of Multi-Purpose Building Final III 0.472 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -
Orguer Trading & Construction 17111 Concreting of Road at Brgy.
Concepcion 1st VII 0.286 C 0.346 - 0.500 - - - 84.60 84.60% V.Satisfactory
Orguer Trading & Construction 17111 Const. of Multi-Purpose Building 1st IV-A 0.950 C 0.351 - 0.500 - - - 85.10 85.10%
V.Satisfactory
Orguer Trading & Construction 17111 Const. of Multi-Purpose Building @
Brgy. Poblacion 1st/Final IV-A 0.477 C 0.289 0.300 0.300 - - - 88.90 88.90% V.Satisfactory
Orguer Trading & Construction 17111 Repair of Hanging Bridge 1st/Final IV-A 0.190 C 0.083 - 0.500 - - - 58.30 58.30%
PoorOriental Sales Center &
Contractor 3816 Const. of Bridge (Phase I) 1st/Final IV-A 0.958 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -
Oriental Sales Center & Contractor 3816 Const. of MPB at Sabangan E/S,
Bonuan-Guesset (Phase I) 1st I 1.431 C 0.323 0.300 0.300 - - - 92.30 92.30% Outstanding
Orzan Builders Enterprises 13382 Concreting of Ariman-Bulusan Lake
Road 1st/Final I 2.750 C 0.321 - 0.500 - - - 82.10 89.66% V.Satisfactory
P.B. Obial Construction 16784 Const. of Multi-Purpose Building Final V 0.289 C 0.355 0.300 0.300 - - - 95.50 94.31% Outstanding
P.B. Obial Construction 16784 Const. of Pedestrian Overpass Final VII 3.678 O 0.312 0.240 0.100 0.010 0.044 0.100 80.60 -
P.B. Obial Construction 16784 Const. of Pedestrian Overpass 1st VII 3.678 O 0.308 0.240 0.100 0.030 0.040 0.100 81.80 -
P.B. Obial Construction 16784 Const./Rehab. of Sch. Bldg. @ Mandaue City School for the Arts 2nd VII 1.446 C 0.377 0.100 0.300 - - - 77.70 77.70%
Satisfactory
P.J. Cruz Construction & Trading 14223 Const. of Additional Classroom
(Sampaloc Site II E/S) 1st/Final VII 1.420 C 0.343 - 0.500 - - - 84.30 78.70% Satisfactory
P.J. Cruz Construction & Trading 14223
Const. Partial of Two (2) Storey, Four (4) Cl School Bldg. @ Unit 1, Baclaran E/S
Final NCR 2.861 O 0.386 0.248 0.100 0.030 0.058 0.100 92.20 -
P.J. Cruz Construction & Trading 14223
Const. Partial of Two (2) Storey, Four (4) Cl School Bldg. @ Unit 1, Baclaran E/S
1st NCR 2.861 C 0.335 0.300 0.300 - - - 93.50 78.70% Satisfactory
P.J. Cruz Construction & Trading 14223 Repair/Rehab. of Guardrails/Railings
along Nat'l Roads anng Bridges Final NCR 2.963 C 0.261 0.150 0.300 - - - 71.10 71.10% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 120
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
P.J. San Pedro Const. Supply 14994
Const. / Rehab. / Completion & Repair of Secondary Sch. Bldg. @ Sta. Ana NHS
1st/Final NCR 1.323 C 0.376 0.300 0.300 - - - 97.60 97.60% Outstanding
P.J. San Pedro Const. Supply 14994 Const. of MPB @ Km. 6, Brgy.
Buhangin Proper 1st/Final XI 1.692 C 0.380 0.300 0.300 - - - 98.00 98.00% Outstanding
P.L. Sebastian Construction 1076 Const. of Bit-os Lat. Canal "D",
Sta.0+920-6+032 (new station) 1st/Final XI 72.059 O 0.345 0.151 - 0.030 0.070 0.200 81.15 -
P.L. Sebastian Construction 1076 Const. of Bit-os Main Canal &
Regulating Pond 2nd NIA 247.675 C 0.299 0.300 0.300 - - - 85.47 88.47% V.Satisfactory
P.L. Sebastian Construction 1076 Const. of Diversion Works, Right
and Left Main Canal, Road System Final NIA 224.599 O 0.343 0.160 0.100 0.020 0.030 0.200 85.33 -
P.L. Sebastian Construction 1076
Const. of Limpapa-Sibuco Road, Lintangan-Pasilnahut Sect., Phase II along Zamboanga West Coast Road
1st NIA 30.212 O 0.332 0.273 0.100 0.030 0.042 0.100 87.70 -
P.L. Sebastian Construction 1076
Const. of Limpapa-Sibuco Road, Lintangan-Pasilnahut Sect., Phase II along Zamboanga West Coast Road
2nd IX 32.526 C 0.389 0.300 0.300 - - - 98.90 92.42% Outstanding
P.L. Sebastian Construction 1076 Const./Impv't. of Contract Package
XI-A Liboton-Tupas Rd. Final IX 101.877 C 0.337 0.300 0.070 0.030 0.037 0.067 84.10 -
P.L. Sebastian Construction 1076 Const./Impv't. of Contract Package
XI-A Liboton-Tupas Rd. 1st XI 89.986 O 0.360 0.300 0.100 0.030 0.045 0.100 93.50 -
P.L. Sebastian Construction 1076
Widening of Cotabato-Allah-General Santos National Rd. Poblacion Shariff Aguak Sect.
3rd XI 6.170 C 0.436 - 0.500 - - - 93.60 82.98% V.Satisfactory
P.T. Adhi Karya (Per Sero)/Vicente T. Lao
Const. (J.V.)7040
C.P. I-A: Replacement/Repair /Retrofitting of Thirteen Bridges Iligan-Cagayan de Oro-Butuan Rd.
Final XII 190.137 O 0.365 0.286 0.100 0.030 0.061 0.100 94.20 -
P.T. Adhi Karya (Per Sero)/Vicente T. Lao
Const. (J.V.)7040
C.P. I-A: Replacement/Repair /Retrofitting of Thirteen Bridges Iligan-Cagayan de Oro-Butuan Rd.
3rd X 190.137 O 0.372 0.289 0.100 0.030 0.055 0.100 94.60 -
P.T. Diamond Merchandise & Construction
15451 Rehab./Slope Protection of Calaoaan, Tamurong FMR, Calaoaan 4th X 0.474 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -
P.T. Diamond Merchandise & Construction
15451 Replacement of Sapilang Bridge along MNR 1st I 12.993 O 0.347 0.279 0.100 0.015 0.038 0.067 84.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 121
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Pablo S. Labasbas Construction 6302 Concreting of Guiuan-Sulangan
Road 1st I 4.778 O 0.373 0.222 0.050 0.022 0.027 0.067 76.10 -
Pablo S. Labasbas Construction 6302 Concreting of Guiuan-Sulangan
Road 1st VIII 4.778 C 0.281 0.300 0.300 - - - 88.10 84.56% V.Satisfactory
Pablo S. Labasbas Construction 6302 Rehab./Impvt. Along Tablas
Circumferential Road Final VIII 9.643 O 0.217 0.200 0.070 0.030 0.032 0.067 61.60 -
Pablo S. Labasbas Construction 6302 Rehabilitation of Cabacungan-
Panoypoy Farm-to-Market Road 1st IVB 0.954 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
Pacer Construction & Development Corporation 4839 Const. of Kabadiangan Bridge (UK-
Phase III) 1st/Final VIII 4.605 O 0.316 0.240 0.100 0.022 0.023 0.100 80.10 -
Pacific Construction 15800 Completion of the Rehab. of Pan-Phil. Hi-Way (Agas-Agas Sect.) 1st VIII 14.092 C 0.388 0.300 0.300 - - - 98.80 85.61%
V.Satisfactory
Pacific Star Erectors 14224 Completion of Conner Multi-Purpose Building Final VIII 0.962 C 0.322 - 0.500 - - - 82.20 86.05%
V.Satisfactory
Pacific Star Erectors 14224 Const. of Apayao Science H/S Phase IV Final CAR 1.591 O 0.338 0.300 0.100 0.022 0.012 0.100 87.20 -
Pacific Star Erectors 14224 Const. of Apayao Science H/S Phase IV 2nd CAR 1.591 C 0.314 0.300 0.300 - - - 91.40 86.89%
V.Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College Multi-Purpose Bldg Final CAR 1.395 C 0.464 - 0.500 - - - 96.40 92.27%
Outstanding
Pacific Star Erectors 14224 Const. of Poblacion-Bulo-Waga FMR Final CAR 0.919 O 0.400 0.300 0.100 0.020 0.020 0.100 94.00 -
Pacific Star Erectors 14224 Const. of San Carlos Bridge & Approaches 1st CAR 10.903 O 0.396 0.300 0.000 0.030 0.037 0.067 83.00 -
Pacific Star Erectors 14224 Const. of Tammang Bridge (Pier 2 and 3) 1st II 9.254 C 0.343 0.300 0.000 - - - 64.30 75.07%
Satisfactory
Pacific Star Erectors 14224 Maintenance/Rehab. & Impv't. of National Arterial Roads & Bridges Final CAR 2.825 O 0.311 0.257 0.070 0.015 0.016 0.067 73.60 -
Pacific Star Erectors 14224 Replacement of Capagu Bridge along MNR 3rd II 12.913 O 0.243 0.288 0.100 0.030 0.035 0.100 79.60 -
Pacific Star Erectors 14224 Replacement of Capagu Bridge along MNR 2nd II 12.913 C 0.381 0.200 0.300 - - - 88.10 83.78%
V.Satisfactory
Pader Construction and Supply 20213 Conc. of Road @ Brgy. Ulamian Final II 0.468 C 0.368 0.200 0.300 - - - 86.80 86.80%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 122
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Palafox Construction 18424 Const. of FTMR @ Cacandungan 1st/Final XII 0.480 C 0.286 - 0.500 - - - 78.60 78.60% Satisfactory
Palmares General Merchandise 24657 Const. of Gymnasium Bldg. @ Brgy.
Mayo 1st I 0.964 C 0.247 0.200 0.300 - - - 74.70 74.70% Satisfactory
Palmares General Merchandise 24657 Const. of Multi-Purpose Bldg. (Mini-
Gym) Poblacion Uno 1st/Final XII 1.419 C 0.384 0.300 0.300 - - - 98.40 87.41% V.Satisfactory
Palmares General Merchandise 24657 Const. of Sch. Bldg. @ Sultan
Kudarat Polytechnic State College Final XI 0.921 C 0.396 0.200 0.300 - - - 89.60 89.60% V.Satisfactory
Pangasinan New Wilson Lumber and Construction 8313 Const. of Multi-Purpose Bldg. for
Boy Scout 1st/Final XII 0.944 C 0.298 - 0.500 - - - 79.80 79.80% Satisfactory
Paradox Construction 18557 Concreting of FTMR @ Palina East-Awed 1st/Final I 0.479 C 0.389 - 0.500 - - - 88.90 88.90%
V. Satisfactory
Paradox Construction 18557 Const. of Farm-to-Market Road 1st I 0.479 C 0.334 - 0.500 - - - 83.40 83.40% V.Satisfactory
Paradox Construction 18557 Const. of Farm-to-Market Road Brgy. Cabaruan 1st/Final I 0.479 C 0.262 - 0.500 - - - 76.20 76.20%
Satisfactory
Paris Construction & Marketing 14306 Completion/Const. of Multi-Purpose
Building 1st I 0.669 C 0.385 0.300 0.300 - - - 98.50 84.36% V.Satisfactory
Parojinog & Sons Construction Company 18694 Rehab. of Guingona-Trigos Road Final XII 2.328 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
Partido Construction and Supply 20631 Concreting of Brgy. Road Mabca 1st/Final X 0.183 C 0.401 - 0.500 - - - 90.10 90.10%
OutstandingPartido Construction and
Supply 20631 Const. of 1 Cl School Buildings @ San Miguel 1st V 0.337 C 0.373 0.200 0.300 - - - 87.30 93.67%
OutstandingPartido Construction and
Supply 20631 Const. of 1 Cl RM Sch. Bldg. @ Ipil E/S Final V 0.380 C 0.315 0.168 0.300 - - - 78.30 78.30%
SatisfactoryPartido Construction and
Supply 20631 Const. of Flood Control San Roque 1st/Final V 0.453 C 0.233 - 0.500 - - - 73.30 73.30% Satisfactory
Partido Construction and Supply 20631 Const. of Multi-Purpose Bldg. Goa
Central School 1st V 1.088 F 0.434 - 0.500 - - - 93.40 94.38% Outstanding
Partido Construction and Supply 20631
Const. of Various School Buildings @ 3rd District Congressional District of Camarines Sur
Final V 0.337 O 0.393 0.300 0.100 0.030 0.041 0.100 96.40 -
Partido Construction and Supply 20631 Re-decking of 2nd Span & Repair of
Bridge approaches Agos Bridge 1st V 1.418 O 0.390 0.300 0.100 0.008 0.040 0.100 93.80 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 123
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Partido Construction and Supply 20631 Re-decking of 2nd Span & Repair of
Bridge approaches Agos Bridge 1st V 1.418 C 0.299 0.137 0.300 - - - 73.60 85.72% V.Satisfactory
Partido Construction and Supply/Jeff Const. (JV) JV-05-051 Const. of Gipangpang Bridge &
Approaches (Phase I) Final V 14.550 O 0.347 0.213 0.100 0.015 0.040 0.100 81.50 -
Partido Construction and Supply/Jeff Const. (JV) JV-05-051 Const. of Gipangpang Bridge &
Approaches (Phase I) 2nd V 14.550 O 0.361 0.240 0.100 0.015 0.040 0.100 85.60 -
Pastrana Construction 17340 Const./Rehab. of Havana-Bugnay Road 3rd V 1.910 C 0.312 0.269 0.300 - - - 88.10 84.86%
V.Satisfactory
Patricia Builders 28745 Concreting of Farm-to-Market Road Final VI 0.467 C 0.325 - 0.500 - - - 82.50 82.50% V.Satisfactory
Patricia Builders 28745 Impvt. of Brgy. San Jose FMR 1st/Final IV-A 0.467 C 0.383 0.200 0.300 - - - 88.30 88.30% V.Satisfactory
Patrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III 1st/Final IV-A 10.494 O 0.338 0.300 0.100 0.023 0.070 0.100 93.10 -
Paula Mae Buhong Construction 26128 Impvt/ along Banawe-Mayoyao-
Aguinaldo-Isabela Bdry. Road 1st VI 1.435 C 0.384 0.300 0.300 - - - 98.40 93.90% Outstanding
Payunan Builders 16824Impv't. of Sarangani-Davao del Sur Coastal Road (Jct. Alabel-Glan Boundary) Sarangani-Davao del Sur
Final CAR 13.433 C 0.307 0.289 0.000 - - - 59.60 65.14% Fair
PBO Construction 18403 Const. of Lawig-Pieza Bridge Final XII 9.090 O 0.330 0.233 0.100 0.018 0.028 0.100 80.90 -PBO Construction 18403 Const. of Lawig-Pieza Bridge 2nd CAR 9.027 O 0.317 0.300 0.070 0.030 0.043 0.100 86.00 -
PBO Construction 18403 Const. of Lawig-Pieza Bridge 3rd CAR 9.027 C 0.317 0.300 0.300 - - - 91.70 85.36% V.Satisfactory
PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) Final CAR 19.315 O 0.340 0.300 0.100 0.030 0.055 0.100 92.50 -
PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) 3rd CAR 19.315 O 0.357 0.300 0.100 0.030 0.045 0.100 93.20 -
PBO Construction 18403 Contruction of Habbang Bridge, Km. 362+303-Km. 302+460 4th CAR 20.145 C 0.389 0.300 0.300 - - - 98.90 98.90%
Outstanding
PBO Construction 18403 Rehab. of Balawag - Malin-awa FMR 1st & Final CAR 19.315 O 0.360 0.190 0.100 0.023 0.054 0.100 82.70 -
PC Builders and Supply 19191 Impvt./ Repair of Shore Protection along side NHA-Seabreeze Homes 1st CAR 2.871 C 0.388 - 0.500 - - - 88.80 88.80%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 124
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Pentagon Industrial Development & Const.
Co., Inc12796 Improvement/Widening of Manila
North Road (MNR) Package II 1st V 87.050 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -
Performance Builders & Dev't. Corp. 5303 Const. of Calatrava Seawall 1st III 0.462 C 0.440 0.500 94.00 94.00%
Outstanding
Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II Final IV-B 21.239 O 0.366 0.300 0.100 0.024 0.060 0.067 91.70 -
Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II 1st IV-B 21.239 O 0.255 0.284 0.070 0.006 0.038 0.033 68.60 -
Performance Builders & Dev't. Corp. 5303 Desilting of Dubduban River 2nd IV-B 0.281 O 0.267 0.200 0.033 0.067 0.250 81.70 -
Persan Const. Inc. (Formerly: Persan
Construction)2852 Replacement of Loboc Bailey Bridge 1st IV-B 11.564 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -
Persan Construction, Inc. 2852Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-Bayasong Section)
1st VII 40.123 O 0.396 0.300 0.100 0.030 0.035 0.100 96.10 -
Persan Construction, Inc. 2852Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-Bayasong Section)
1st V 40.123 C 0.397 210.000 0.300 - - - 90.70 93.94% Outstanding
Persan Construction, Inc. 2852 Improvement/Asphalting of Panglao Island Circumferential Road Final V 38.069 O 0.384 0.300 0.030 0.023 0.045 0.067 84.90 -
Persan Construction, Inc. 2852 Improvement/Asphalting of Panglao Island Circumferential Road 1st VII 38.360 O 0.366 0.300 0.050 0.023 0.025 0.067 83.10 -
Persan Construction, Inc. 2852 Improvement/asphalting of Panglao Island Circumferential Road 2nd VII 38.360 O 0.341 0.127 0.000 0.030 0.056 0.067 62.10 -
Persan Construction, Inc. 2852 Improvement/asphalting of Panglao Island Circumferential Road 3rd VII 38.360 C 0.330 0.287 0.000 - - - 61.70 70.70%
Satisfactory
Persan Construction, Inc. 2852Improvement/Const. of Bridge along Panabo Coastal Road (Arieta Section)
Final VII 28.905 O 0.400 0.279 0.100 0.030 0.051 0.100 96.00 -
Persan Construction, Inc. 2852Improvement/Const. of Bridge along Panabo Coastal Road (Arieta Section)
1st XI 28.918 C 0.348 0.300 0.300 - - - 94.80 96.00% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 125
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Persan Construction, Inc. 2852Improvement/Const. of Bridge along Panabo Coastal Road (Arieta Section)
Final XI 28.764 C 0.436 - 0.500 - - - 93.60 91.56% Outstanding
Persan Construction, Inc. 2852 Impvt. (Conc. Paving) along Carmen-Sagbayan-Bacane Nat'l Road Final XI 14.255 O 0.375 0.240 0.000 0.030 0.058 0.067 77.00 -
Persan Construction, Inc. 2852 Impvt. (Conc. Paving) along Carmen-Sagbayan-Bacane Nat'l Road 1st VII 14.256 O 0.279 0.036 0.000 0.030 0.065 0.067 47.70 -
Persan Construction, Inc. 2852 Impvt. of Panabo Coastal Road, Arieta-Puyod Section 2nd VII 28.285 O 0.301 0.300 0.100 0.030 0.046 0.100 87.70 -
Persan Construction, Inc. 2852 Impvt. of Panabo Coastal Road, Arieta-Puyod Section 1st XI 28.257 C 0.380 0.300 0.300 - - - 98.00 91.82%
Outstanding
Persan Construction, Inc. 2852Rehab. Old Daang Maharlika Road (Cagayan Valley Road), San Rafael to San Ildefonso
Final XI 28.640 O 0.395 0.225 0.100 0.030 0.035 0.100 88.50 -
Persan Construction/ A.L. Salazar Const., Inc. (JV) 2852/3899 Asphalt Overlay of Daang Maharlika
(MSR) 1st III 41.038 C 0.450 - 0.500 - - - 95.00 93.62% Outstanding
Peter Construction and Aggregate Supply 17343 Const. of MPB (Covered Court) @
Estaka E/S Final V 2.036 C 0.330 0.173 0.300 - - - 80.30 80.30% V.Satisfactory
Peter Construction and Aggregate Supply 17343 Const./Extension of River Control
Structure 1st/Final IX 2.762 O 0.280 0.200 0.100 0.023 0.023 0.200 82.60 -
Peter Construction and Aggregate Supply 17343 Const./Extension of River Control
Structure 1st IX 2.762 C 0.285 0.217 0.300 - - - 80.20 81.64% V.Satisfactory
Peter Construction and Aggregate Supply 17343
Road Improvement/Const. of Drainage Canal Jct. Polo-Dapitan Park Nat'l. Rd.
Final IX 1.847 C 0.490 - 0.500 - - - 99.00 93.87% Outstanding
Peter G. Chua Builders 25367 Completion of Multi-Purpose Building at Brgy. West Rembo Final X 0.480 C 0.366 - 0.500 - - - 86.60 86.60%
V.Satisfactory
Peter G. Chua Builders 25367 Improvement/Concreting of Merville-Moonwalk Access Road 1st NCR 0.961 C 0.278 0.200 0.300 77.80 77.02%
Satisfactory
Petrina Grocers Marketing 29695 Const. of 2-Cl School Building @ Cugman ES Final NCR 0.839 O 0.377 0.300 0.100 0.020 0.006 0.100 90.30 -
Petrina Grocers Marketing 29695 Const. of MPB (Phase II) @ Brgy. Poblacion 1st X 0.565 O 0.361 0.300 0.100 0.015 0.013 0.100 88.90 -
Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS 1st X 1.401 O 0.352 0.209 0.100 0.030 0.035 0.100 82.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 126
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Barangay Hall Capinonan 1st X 0.925 C 0.355 - 0.500 - - - 85.50 73.04%
Satisfactory
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Building (Phase I) Final X 0.942 O 0.359 0.240 0.100 0.030 0.025 0.100 85.40 -
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Building (Phase I) 1st X 0.942 C 0.376 0.212 0.300 - - - 88.80 86.42%
V.Satisfactory
Pett Builders 26825 Completion of Multi-Purpose Building @ JEM Subdivision Final X 1.428 C 0.369 0.300 0.300 - - - 96.90 96.90%
Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building at
Sitio Maligay 1st/Final NCR 0.927 C 0.421 - 0.500 - - - 92.10 92.10% Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building at
Sta. Cruz-Sta. Isabel 1st/Final V 0.851 C 0.389 0.200 0.300 - - - 88.90 88.90% V.Satisfactory
Philippine Chemsteel Industries Inc. 16965 Const. of Water System 1st/Final V 3.271 C 0.330 0.200 0.300 - - - 83.00 83.00%
V.Satisfactory
Philippine Chemsteel Industries Inc. 16965 Repair/Rehab. Along National Roads
@ CDO-Lumbia Airport-Uguiban Rd. 1st/Final XI 4.709 C 0.320 0.300 0.300 - - - 92.00 92.00% Outstanding
Philippines Chemsteel Industries Inc. 16965
Const. of Round Abouts Traffic Signal Lights & Road Signs and Pavement Markings
1st/Final X 4.625 C 0.395 0.262 0.300 - - - 95.70 95.70% Outstanding
Philippines Chemsteel Industries, Inc. 16965
Repair/Rehab./Impvt. of Nat'l Roads along Calbiga Road-Jct. Dolongan-Basey Road
1st/Final V 9.625 C 0.197 0.300 0.300 - - - 79.70 79.70% Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.)
32103 Const. of Arimbay Bridge, Detour & Approaches 1st/Final VIII 18.504 O 0.386 0.300 0.100 0.023 0.060 0.100 96.90 -
Philworks Construction & Supply (Formerly: Philworks Const.)
32103 Const. of Arimbay Bridge, Detour & Approaches 1st V 18.785 O 0.326 0.300 0.100 0.023 0.028 0.100 87.70 -
Philworks Construction & Supply (Formerly: Philworks Const.)
10181 Const. of Basud Bridge & Approaches, Phase II-B 2nd V 55.604 C 0.405 - 0.500 - - - 90.50 88.94%
V.Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.)
10181 Const. of Panagan Bridge and Approaches (Phase II) Final V 12.497 O 0.316 0.259 0.100 0.020 0.028 0.100 82.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 127
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Philworks Construction & Supply (Formerly: Philworks Const.)
10181Slope Protection of Various Slipped Sect. along Tigaon Mayon-Rd, Sibaguan
1st V 4.506 C 0.333 - 0.500 - - - 83.30 90.26% Outstanding
Philworks Construction and Supply 10181 Const. of Arimbay Bridge, Detour &
Approaches Final V 18.785 C 0.386 0.100 0.300 - - - 78.60 86.82% V.Satisfactory
Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and
Approaches (Phase 1) Final V 18.848 O 0.315 0.200 0.000 0.015 0.040 0.100 67.00 -
Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and
Approaches (Phase 1) 1st V 17.749 O 0.366 0.240 0.100 0.015 0.050 0.100 87.10 -
Phranaret Construction 16878 Ban-May-Agui-A. Lista Isabela Brgy. Road 2nd V 3.195 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -
Phranaret Construction 16878Impvt. Along Banawe-Mayoyao-Aguinaldo-Alfonso-Lista-Isabela Bdry. Road, Kinakin Section
3rd CAR 3.195 O 0.339 0.300 0.000 0.000 0.019 0.050 70.80 -
Phranaret Construction 16878Repair/Rehab. of Lamut River Control, (Upstream of Lamut Bay) Pob. West
4th CAR 0.947 O 0.253 0.040 0.100 0.008 0.028 0.200 62.90 -
Phranaret Construction 16878Repair/Rehab. of Lamut River Control, (Upstream of Lamut Bay) Pob. West
1st CAR 0.925 C 0.313 0.300 0.300 - - - 91.30 74.26% Satisfactory
PIBS Trading & Construction 14734 Const. of Multi-Purpose Bldg.
Isabela West E/S Final CAR 0.459 C 0.397 - 0.500 - - - 89.70 89.70% V. Satisfactory
Pins Construction 13630 Rehab. of Drainage System San Pedro District 1st IX 0.929 C 0.375 - 0.500 - - - 87.50 88.94%
V.Satisfactory
PJ San Pedro Const. Supply 14994 Const. of Roads Brgy. 18-B Final IX 0.414 C 0.397 - 0.500 - - - 89.70 89.70%
V.Satisfactory
PJ San Pedro Const. Supply 14994 Rehabilitation of Road @ Purok 5-
Panalum Proper 1st XI 0.365 O 0.373 0.000 0.100 0.030 0.033 0.100 63.60 -
PLD Construction 1859 Asphalting of Brgy. Road 1: Dungoan, 2 San Isidro and 3 Tacdog 1st XI 1.646 C 0.437 - 0.500 - - - 93.70 93.70%
Outstanding
PLD Construction 1859 Const. of Multi-Purpose Bldg. (Phase III) 1st VII 1.929 C 0.494 - 0.500 - - - 99.40 99.40%
Outstanding
PLD Construction 1859 Rehab. of Processional Rd. Including Const. of Bridge 1st VII 1.274 O 0.325 0.300 0.100 0.030 0.040 0.100 89.50 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 128
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
PMC Construction Corporation 1630 Const. of Covered Basketball Court
& Renovation of Viewdeck at BLC 1st VII 5.657Mutual
Termination
0.371 0.300 0.300 - - - 97.10 98.57 Outstanding
Polangui Construction 8660 Repair/Rehab. of Unpaved Shoulder with Reblocking San Jose Final NHA 0.360 C 0.368 - 0.500 - - - 86.80 86.80%
V. Satisfactory
Polangui Construction 8660 Road Const./Rehab. @ Bongoran 1st V 0.377 C 0.360 0.200 0.300 - - - 86.00 86.00% V.Satisfactory
Polymer-vic Construction 6157 Const. of 2 CL School Bldg. @ Luakan NHS 1st/Final V 0.865 C 0.293 0.090 0.300 - - - 68.30 86.43%
V.Satisfactory
Postema Construction & Development 15283 Concreting of Sitio Ilang-Ilang Brgy.
Batas FMR Final III 0.952 C 0.306 - 0.500 - - - 80.60 83.42% V.Satisfactory
Postema Construction & Development 15283 Const. of Brgy. Hall at Medina Final IV-A 0.665 C 0.432 - 0.500 - - - 93.20 93.20%
Outstanding
Postema Construction & Development 15283 Const. of Multi-Purpose Building 1st IV-A 2.121 C 0.399 0.300 0.300 - - - 99.90 99.90%
Outstanding
Postema Construction & Development 15283 Const. of Pooc Bridge 1st/Final IV-A 5.703 O 0.400 0.188 0.100 0.030 0.038 0.100 85.60 -
Postema Construction & Development 15283
Repair of Flood Control & Drainage System @ Timala River Brgy. Cabuco (Baquero Br.)
1st IV-A 0.630 O 0.306 0.200 0.300 - - - 80.60 -
Power Move Builders & Construction Supply 22894 MBC CY 2004 Dumaguete Airport
Road & DSR, DPR, DNR, BKR 1st/Final IV-A 2.710 C 0.443 - 0.000 - - - 44.30 58.10% Poor
PRC Construction 16631 Const. of 1-CL Acad Bldg., at Sanchez Mira C/S Final VII 0.359 C 0.319 - 0.500 - - - 81.90 81.90%
V.Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-02-06) 1st II 4.804 C 0.389 0.200 0.000 0.015 0.028 0.200 83.19 83.19%
V.Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-05-06) 1st NIA
Region II 3.008 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
PRC Construction 16631 Lapogan Communal Pump Irrigation Project Final NIA
Region II 5.542 O 0.348 0.131 0.050 0.023 0.064 0.200 81.40 -
PRC Construction 16631 Lapogan Communal Pump Irrigation Project 2nd NIA 5.541 C 0.261 0.240 0.300 - - - 80.10 80.80%
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 129
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
PRC Construction 16631 Repair/Rehab of CIS of Aglipay , Quirino Final NIA
Region II 3.384 C 0.307 0.186 0.300 - - - 79.30 79.30% V.Satisfactory
Prime Edge Construction & Concrete Products 7902 Concreting of Road, Salud Mitra
Brgy. 1st CAR 0.573 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
Prime Edge Construction & Concrete Products 7902
Const. of Road at Sto. Tomas Brgy. Sto. Tomas Proper leading to Adiwang E/S
Final CAR 1.233 C 0.389 0.300 0.300 - - - 98.90 92.66% Outstanding
Prime Edge Construction & Concrete Products 7902
Const./ Rehab. of Health Facilities, Campo Filipino Health Center Campo Pilipino Health District
1st CAR 1.924 O 0.372 0.236 0.100 0.010 0.043 0.100 86.10 -
Prime Edge Construction & Concrete Products 7902
Const./ Rehab. of Health Facilities, Campo Filipino Health Center Campo Pilipino Health District
Final CAR 1.924 C 0.376 0.178 0.300 - - - 85.40 85.89% V.Satisfactory
Primitivo P. Eslabon Construction and
Hardware21904 Const. of Sta. Marcela Hall & Pudtol
Mun. Hall Final CAR 1.405 C 0.444 - 0.500 - - - 94.40 76.67% Satisfactory
Progressive Design & Construction 11826 Conc. of Camestizoan FMR 1st/Final I 0.190 C 0.328 0.300 0.300 - - - 92.80 92.80%
Outstanding
Progressive Design & Construction 11826
Const. of FMR, Poblacion East Leading to Brgy. Sagneb, Arnap & Belen
1st I 0.474 C 0.200 - 0.500 - - - 70.00 70.00% Fair
Progressive Design & Construction 11826 Const. of Multi-Purpose Building @
University of Northern Phils. 1st I 0.569 O 0.393 0.204 0.100 0.020 0.018 0.100 83.50 -
Pulsar Construction 24422 Conc. of Nabannaga West New Orlins-Cabatacan East Rd. Final II 11.984 C 0.386 - 0.500 - - - 88.60 83.20%
V. Satisfactory
Pulsar Construction 24422 Concrete Paving of JLLGR (Gabun Sect) at Lasam Final II 4.100 C 0.415 - 0.500 - - - 91.50 90.36%
Outstanding
Pulsar Construction 24422 River Control along Cagayan River Basin 2nd II 8.680 O 0.265 0.200 0.050 0.030 0.035 0.133 71.30 -
Pulsar Construction 24422 River Control along Cagayan River Basin Final II 8.611 C 0.347 0.300 0.300 - - - 94.70 85.46%
V.Satisfactory
QM Builders 30743 Concreting of Dungo-an-Bolinawan Rd (Cluster C) 1st VII 1.404 C 0.424 - 0.500 - - - 92.40 92.40%
Outstanding
QM Builders 30743 Const. of Multi-Purpose Building 1st VII 1.056 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 130
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
QM Builders 30743 Impv't./Concreting of Kang-Actol Brgy. Rd. Final VII 1.088 C 0.429 - 0.500 - - - 92.90 83.96%
V.Satisfactory
QM Builders 30743 Repair/Rehab. of Sibunga-Dumanjug Rd. (km. 51+950 - km. 53+298) 1st/Final VII 9.645 C 0.311 0.300 0.300 - - - 91.10 91.10%
Outstanding
Quality Builder Corporation 17790 Const. of Two Classroom School
Bldg 1st VII 1.350 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
Queen City Builders 21535 Concreting of Road @ Sitio Habitat Coronon 1st XI 0.611 C 0.361 - 0.500 - - - 86.10 86.10%
V. Satisfactory
Quezon Victory General Contractor 6631 Completion of Multi-Purpose Bldg at
Brgy. 3 Poblacion 1st IV-A 0.235 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631 Conc. of Bonliw FMR 1st/Final IVB 0.287 C 0.326 0.203 0.300 - - - 82.90 82.90%
V.Satisfactory
Quezon Victory General Contractor 6631 Conc. of Brgy. Road @ Tanada St.
Brgy. San Vicente 1st/Final IV-A 0.283 C 0.397 0.000 0.300 - - - 69.70 69.70% Fair
Quezon Victory General Contractor 6631 Conc. Reblocking along MSR
Diversion Road 1st/Final IV-A 0.288 C 0.267 0.200 0.300 - - - 76.70 76.70% Satisfactory
Quezon Victory General Contractor 6631 Concreting of Brgy. Road, Brgy.
Villa Padua 1st IV-A 0.283 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631 Const. of Drainage System at Brgy.
Cotta 1st/Final IV-A 0.755 C 0.473 - 0.500 - - - 97.30 97.30% Outstanding
Quezon Victory General Contractor 6631 Const. of Multi-Purpose Hall @
Brgy. San Joaquin 1st/Final IV-A 0.862 C 0.283 0.300 0.300 - - - 88.30 88.30% V.Satisfactory
Quezon Victory General Contractor 6631 Impvt. of Water Supply System @
Brgy. Pacabit 1st/Final IV-A 0.964 C 0.377 0.300 0.300 - - - 97.70 97.70% Outstanding
R. A. De Leon Construction 18078 Concreting of Binubusan Brgy.
Road 1st IV-A 0.945 C 0.389 - 0.500 - - - 88.90 88.90% V. Satisfactory
R. Allosa Construction 12964 Concrete Paving Tabango-San IsidroRd 1st VIII 3.893 C 0.421 - 0.500 - - - 92.10 92.10%
Outstanding
R. Anin Jr. Construction 14888 Const. of Cabacao Flood Control 1st/Final IV-B 1.926 C 0.333 0.300 0.300 - - - 93.30 93.30% Outstanding
R. Anin Jr. Construction 14888Resurfacing of Bulalacao-San Jose Jct. Mapaya Road, Paclolo Section, Km.222+000-Km.225+500
1st/Final IV-B 0.573 C 0.332 0.300 0.300 - - - 93.20 93.20% Outstanding
R. B. Ombao Const. 17042 Replacement of Cabcaben Bridge Cabcaben Final III 4.709 C 0.393 - 0.500 - - - 89.30 73.34%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 131
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R. Calingasan Construction 8173 Conc/ Widening of Road Brgy. 1st/Final IV-A 0.188 C 0.373 0.200 0.300 - - - 87.30 87.30%
V.Satisfactory
R. D. Ramos Const. & Enterprises 18771 Concreting of Road at Brgy. Pook ni
Kapitan 1st IV-A 0.284 C 0.394 - 0.500 - - - 89.40 89.40% V. Satisfactory
R. G. Diaz Builders & Trading 23814
Const./Repair/Rehab. of Multi-Purpose School Bldg., @ Angeles City
1st IV-B 0.748 C 0.488 - 0.500 - - - 98.80 98.00% Outstanding
R. G. Roque Const. & Trading 21788 Rehab. of School Premises @
Mexico National H/S San Carlos 1st III 0.952 C 0.468 - 0.500 - - - 96.80 96.80% Outstanding
R. K. Engineering & Construction 12534
Conc. of Critical Section along National Circumferential (Salawad-Pawikan-Baso Section)
1st VIII 4.755 O 0.354 0.241 0.100 0.030 0.051 0.100 87.60 -
R. K. Engineering & Construction 12534 Const. of Biliran NAHS 2 Cl Bldg. 1st/Final VIII 0.830 C 0.340 0.101 0.300 - - - 74.10 74.10%
Satisfactory
R. Ochea Construction & Supplies 15775 Concreting of Toledo-Tabuelan-San
Remegio Road, Mangga Sect. Final VII 4.675 C 0.385 0.200 0.300 - - - 88.50 89.88% V.Satisfactory
R. Ochea Construction & Supplies 15575 Const. of Multi-Purpose Building Final VII 4.748 C 0.399 0.100 0.300 - - - 79.90 85.61%
V.Satisfactory
R. Ochea Construction & Supplies 15775 Const. of Multi-Purpose Building at
Poblacion Tuburan 1st VII 4.748 O 0.373 0.240 0.100 0.015 0.027 0.100 85.50 -
R. Ochea Construction & Supplies 15775 Const. of Multi-Purpose Building at
Poblacion Tuburan 2nd VII 4.748 O 0.346 0.300 0.100 0.030 0.030 0.100 90.60 -
R. R. Seismundo Construction and Supply 10961 Const. of 1 CL School Bldg., at
Montevista NHS, DNAS 1st XI 0.469 C 0.335 0.000 0.100 0.020 0.032 0.100 58.72 60.40% Fair
R. Semilla Construction and Marketing 9263 Const. of Multi-Purpose Bldg.,
Lapulabao Final XI 0.939 C 0.404 - 0.500 - - - 90.40 59.74% Poor
R.A. Abaño Construction 11828 Const. of Farm-to-Market Road 1st/Final IV-A 0.653 C 0.347 - 0.500 - - - 84.70 84.70% V.Satisfactory
R.A. Abaño Construction 11828 Const. of Multi-Purpose Bldg. At Brgy. Malinao-Ilaya 1st IV-A 0.236 C 0.464 - 0.500 - - - 96.40 96.40%
OutstandingR.A. Del Rosario
Construction 4636 Const. of Two (2), Four (4)Cl School Building Final IV-A 2.857 C 0.367 0.300 0.300 - - - 96.70 70.17%
SatisfactoryR.A. Matias Const. &
Developer 26346 Concreting of FTMR @ Poblacion East 1st I 0.480 C 0.259 - 0.500 - - - 75.90 75.90%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 132
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.A. Matias Const. & Developer 26346 Const. of Multi-Purpose San Vicente
Brgy. Hall Brgy. San Vicente 1st I 0.336 C 0.390 - 0.500 - - - 89.00 89.00% V.Satisfactory
R.A. Montejo Construction 21718 Renovation of Research Bldg. @
Leyte Normal University 1st/Final VIII 0.945 C 0.393 0.300 0.300 - - - 99.30 99.30% Outstanding
R.A. Yolangco Construction 15602 Const. of Farm-to-Market Road 1st/Final IV-A 0.962 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
R.B. Candare Construction 8819 Conc. of Bay-ang-Calamba Prov.
Road 1st/Final XIII 1.896 C 0.354 0.200 0.300 - - - 85.40 85.40% V.Satisfactory
R.C. Miranda Construction & Supplies 9036 Conc. of Sta. Ines-Matalapitap Road
Phase II Final III 5.795 C 0.325 - 0.500 - - - 82.50 80.88% V.Satisfactory
R.C. Tagala Construction 11597 Completion of Multi-Purpose Building Final VI 2.854 C 0.319 0.147 0.300 - - - 76.60 83.81%
V.Satisfactory
R.C. Tagala Construction 11597 Concreting of Calategas-Aramaywan Rd., Sect. 1st IV-B 2.154 C 0.390 - 0.500 - - - 89.00 89.00%
V.Satisfactory
R.C. Tagala Construction 11597 Concreting of Parian-Cabuluan Road Section Final IV-B 3.749 C 0.424 - 0.500 - - - 92.40 93.88%
V.Satisfactory
R.C. Tagala Construction 11597 Concreting of Tugdan-Alcantara Looc Road 1st IV-B 2.209 O 0.320 0.240 0.100 0.030 0.047 0.100 83.70 -
R.C. Tagala Construction 11597 Concreting of Tugdan-Alcantara-Looc Road 2nd IV-B 2.209 O 0.356 0.000 0.100 0.030 0.033 0.100 61.90 -
R.C. Tagala Construction 11597 Const. of Boac River Control Final IV-B 3.981 C 0.282 - 0.500 - - - 78.20 75.50% Satisfactory
R.C. Tagala Construction 11597 Const. of Manggamnan Bridge Approach 1st IV-B 1.672 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -
R.C. Tagala Construction 11597 Const. of Pagbahan Flood Control (Phase I) 1st IVB 13.920 O 0.340 0.200 0.100 0.015 0.028 0.200 88.30 -
R.C. Tagala Construction 11597 Const. of Pagbahan Flood Control (Phase I) 2nd IV-B 13.920 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -
R.C. Tagala Construction 11597 Const. of Taritien Bridge 1st IV-B 14.253 O 0.313 0.267 0.100 0.030 0.025 0.067 80.20 -
R.C. Tagala Construction 11597 Const. of Various School Bldg. (Tagumpay E/S) Final IV-B 9.043 C 0.393 - 0.500 - - - 89.30 80.34%
V.Satisfactory
R.C. Tagala Construction 11597 Reblocking of Jct. MWCR-San Jose Airport Rd.-Jct. Bubog Road 2nd IV-B 9.607 O 0.314 0.300 0.100 0.015 0.027 0.100 85.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 133
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.C. Tagala Construction 11597 Reblocking of Jct. MWCR-San Jose Airport Rd.-Jct. Bubog Road Final IV-B 9.607 C 0.324 0.171 0.300 - - - 79.50 71.58%
Satisfactory
R.C. Tagala Construction 11597 Rehab. of Existing Asphalt and Const. of Lined Canal Final IV-B 5.491 C 0.376 - 0.500 - - - 87.60 49.54%
Poor
R.C. Tagala Construction 11597 Repair/Rehab. of FMR 1st VII 0.465 O 0.200 0.300 0.100 0.000 0.022 0.100 72.20 -
R.C. Tagala Construction 11597 Repair/Rehab. of FMR Final VII 0.464 C 0.293 0.300 0.300 - - - 89.30 79.04% Satisfactory
R.D. Cobacha Construction 20833 Const. of ABC Hall 1st VIII 1.280 O 0.328 0.108 0.100 0.015 0.018 0.100 66.90 -
R.D. Cobacha Construction 20833 Const. of ABC Hall Final VIII 1.280 C 0.350 0.196 0.300 - - - 84.60 72.21%
Satisfactory
R.D. Interior Junior Const./J.H. Pajara Const.
Corp. (J.V.)
SL2-SN-000366/JV
02-019
Const./Impv't. (PCCP) of C.P.B.: Sultan Gumander-Dobliston Jct. Road
3rd KFAED 383.448 O 0.381 0.300 0.100 0.030 0.056 0.100 96.70 -
R.D. Interior Junior Construction 6483 Const. of Runruno Bridge &
Approaches Final II 7.803 C 0.480 - 0.500 - - - 98.00 97.46% Outstanding
R.D. Interior Junior Construction 6483 Const. of Sinippil Bridge and
Approaches Final II 13.688 C 0.335 0.277 0.300 - - - 91.20 86.90% V.Satisfactory
R.D. Interior Junior Construction 6483 Const./Asphalting of Guinalbin Brgy.
Road 1st/Final II 0.932 C 0.356 0.200 0.300 - - - 85.60 85.60% V.Satisfactory
R.D. Interior Junior Construction 6483 Repair/Maint. of Nat'l Road along
Santiago-Tuguegarao Road 1st/Final II 4.975 C 0.304 0.200 0.300 - - - 80.40 80.40% V.Satisfactory
R.D. Policarpio & Co. Inc. 4414Const. of Overpasses Project in the Provinces of Bataan, Pampanga and Tarlac
1st BCDA 208.033 O 0.384 0.300 0.070 0.030 0.035 0.033 85.20 -
R.D. Policarpio & Co. Inc. 4414Construction of Overpasses Project in the Provinces of Bataan, Pampanga and Tarlac
1st BCDA 208.033 O 0.384 0.300 0.070 0.030 0.035 0.033 85.20 85.23% V.Satisfactory
R.D. Policarpio & Company, Inc. / Pumyang Construction Company,
Ltd. (JV)
REF# 1890
ADB Sixth Road Impv't. Project CP 6MI-15 3rd IX 740.582 O 0.360 0.300 0.000 0.024 0.037 0.067 78.80 -
R.D. Policarpio Company, Inc. 4414
Contract Package "N": Replacement/Retrofitting of Three (3) Bridges
2nd ADB 67.207 O 0.335 0.300 0.000 0.030 0.042 0.000 70.70 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 134
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.D. Policarpio Company, Inc. 4414 Sixth Road Project Component CP 4
Gen. Santos-Cotabato City Road 1st XII 170.852 O 0.301 0.298 0.000 0.030 0.061 0.067 75.70 -
R.D. Sadsad Const. & Trading 19240 Package 16: Const./Rehab./Impv't. of
FMR Porac, Sta. Rita & Guagua 1st III 0.944 C 0.311 - 0.500 - - - 81.10 81.10% V. Satisfactory
R.D. Sadsad Const. & Trading 19240 Rehab. of Canal @ Brgy. San Pablo
II Road 1st/Final III 0.949 C 0.267 0.300 0.300 - - - 86.70 86.70% V.Satisfactory
R.D. Sadsad Const. & Trading 19240 Upgrading/Impvt. of San Fernando-
Lubao Road (Sto. Tomas Section) 1st/Final III 4.730 C 0.337 0.300 0.300 - - - 93.70 93.70% Outstanding
R.F. Diaz Construction 3398 Const. of School Building at University of Rizal System Final IV-A 9.609 C 0.155 0.300 0.300 - - - 75.50 69.83%
Fair
R.F. Diaz Construction 3998 Impvt./Completion of Calalay Bldg. @ Sto. Cristo E/S 1st NCR 2.631 O 0.367 0.255 0.100 0.030 0.051 0.100 90.30 -
R.F. Diaz Construction 3998 Impvt./Completion of Calalay Bldg. @ Sto. Cristo E/S Final NCR 2.631 C 0.326 0.300 0.300 - - - 92.60 90.99%
Outstanding
R.F.G. Construction 13188 Completion of MPB @ Brgy. Dayano 1st XIII 0.555 O 0.333 0.021 0.100 0.030 0.013 0.100 59.70 -
R.F.G. Construction 13188 Completion of MPB @ Brgy. Dayano Final XIII 0.555 C 0.377 0.221 0.300 - - - 89.80 68.73%
Fair
R.F.G. Construction 13188 Concreting of Shoulder along Surigao Wharf Road Final XIII 7.274 C 0.393 - 0.500 - - - 89.30 83.72%
V.Satisfactory
R.F.G. Construction 13188 Concreting of Surigao-San Juan Lipata Coastal Rd. Final XIII 1.548 C 0.411 - 0.500 - - - 91.10 84.74%
V.Satisfactory
R.F.G. Construction 13188 Const. of Banahaw Bridge, Phase IV Final XIII 9.904 C 0.367 0.300 0.300 - - - 96.70 91.30% Outstanding
R.F.G. Construction 13188 Const. of Municipal Public Market, Phase III Final XIII 1.795 C 0.311 0.300 0.300 - - - 91.10 81.86%
V.Satisfactory
R.F.G. Construction 13188 Const. of Sabang Bridge III Phase V Final XIII 9.167 C 0.364 0.300 0.300 - - - 96.40 90.14% Outstanding
R.F.G. Construction 13188 Const. of Sabang Bridge III, Phase IV Final XIII 4.583 C 0.328 - 0.500 - - - 82.80 79.38% Satisfactory
R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB 1st XIII 0.927 O 0.375 0.240 0.000 0.015 0.013 0.100 74.30 -
R.F.G. Construction 13188 Const.Completion of Tayaga Disaster Evacuation Center Final XIII 0.463 C 0.384 0.224 0.300 - - - 90.80 90.80%
Outstanding
R.G. Diaz Builders & Trading 23814
Package XIV-Const. of Multi-Purpose Bldg. (Covered Court) @ San Nicolas E/S
1st/Final III 0.937 C 0.381 0.300 0.300 - - - 98.10 98.10% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 135
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.G. Erillo Construction, Incorporated 932 Widening/Impv't. of Bacolod South-
Kabankalan Rd. Final VI 9.623 C 0.396 - 0.500 - - - 89.60 90.68% Outstanding
R.G. Florentino Construction & Trading 18301 Concreting of Upper Jun Carlo FMR Final IV-B 0.462 C 0.344 0.084 0.300 - - - 72.80 72.80%
Satisfactory
R.G. Florentino Construction & Trading 18301 Const. of Brgy. Multi-Purpose Bldg.
Poblacion 1st IV-B 0.268 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory
R.G. Florentino Construction & Trading 18301 Rep./Maintain of Colis RCDG Bridge
Approach Km.019+342 Final IV-B 0.189 C 0.433 0.500 - - - 93.30 93.30% Outstanding
R.J. Ibarra Construction 23538 Asphalt Overlay & Conc. Reblocking along Olongapo-Bugallon Rd. Final III 4.670 C 0.333 0.300 0.000 - - - 63.30 77.34%
Satisfactory
R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal 1st III 0.930 O 0.278 0.300 0.100 0.030 0.044 0.067 81.90 -
R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal Final III 0.930 C 0.272 0.300 0.300 - - - 87.20 83.49% V.Satisfactory
R.J. Ibarra Construction 23538 Repair/Rehab. of 3-Cl, 1-Storey S/B Bangal E/S Final III 0.281 C 0.473 - 0.500 - - - 97.30 81.87%
V.Satisfactory
R.K.X. Odiamar Construction 16107 Const. of MPB @ Penfrancia 1st/Final V 1.498 C 0.365 0.200 0.300 - - - 86.50 86.50%
V.Satisfactory
R.M. Padillo Builders 31205 Const. of Reinforced Concrete Box Culvert (RCBC) Final VIII 2.830 C 0.358 0.300 0.300 - - - 95.80 70.36%
Satisfactory
R.M. Pingol Const. & Dev't. Corporation 11163
CP IV-A, Jct. Maharlika Highway-Jaen-San Isidro Rd.(Km.98+453.0 to Km.105+256.275) w/ exception
2nd III 34.837 O 0.372 0.300 0.000 0.012 0.025 0.033 74.20 -
R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road 1st III 4.026 C 0.361 - 0.500 - - - 86.10 86.10% V.Satisfactory
R.M. Vitug Construction 9227 Const./Impvt. of San Jose Road 1st/Final III 5.703 C 0.328 0.200 0.300 - - - 82.80 82.80% V.Satisfactory
R.M. Vitug Construction 9227 Const./Repair/Rehab. of Various Road Brgy. Cutcut 1st III 3.380 C 0.416 - 0.500 - - - 91.60 91.60%
Outstanding
R.M. Vitug Construction 9227 Improvement of Multi-Purpose Building Final III 0.187 C 0.437 - 0.500 - - - 93.70 90.34%
Outstanding
R.M. Vitug Construction 9227 Repair/Rehab. of Retaining Wall and Drainage Out Fall 1st/Final III 0.468 C 0.310 0.300 0.300 - - - 91.00 91.00%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 136
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.M. Vitug Construction 9227 Riprapping of Balimbing River, Country Homes, 1st/Final NCR 0.958 C 0.350 - 0.500 - - - 85.00 85.00%
V.Satisfactory
R.M.A.J. Construction 18623 Conc. of Manburao-Paluan Rd. (Tayamaan Sect.) Final IV-B 1.433 C 0.327 - 0.500 - - - 82.70 65.24%
Fair
R.M.A.J. Construction 18623 Concreting of Paclolo FMR 1st IV-B 0.937 C 0.409 - 0.500 - - - 90.90 90.90% Outstanding
R.M.A.J. Construction 18623 Rehab. of Abut. B of Mompong Bridge Approach "B" 1st/Final IV-B 2.894 C 0.317 0.300 0.300 - - - 91.70 91.70%
Outstanding
R.N.G.M. Construction 20281 Water Supply Project @ Brgy. 3 & 4 Final III 2.353 C 0.311 0.300 0.300 - - - 91.10 85.50% V.Satisfactory
R.O. Builders & Dev. Corp. 22393
Conc. of Aritao-Dupax-Kasibu-Quirino Road, Mangagyang-Banganan Section
1st II 6.677 O 0.400 0.300 0.100 0.020 0.011 0.100 93.10 -
R.O. Builders & Dev. Corp. 22393 Const. of Banganan Flood Control,
Upstream of Mangayang Bridge 1st II 2.853 O 0.240 0.150 0.100 0.023 0.014 0.100 62.70 -
R.O. Builders & Dev. Corp. 22393 Const. of Banganan Flood Control,
Upstream of Mangayang Bridge Final II 2.853 C 0.380 0.300 0.300 - - - 98.00 76.82% Satisfactory
R.O. Builders & Dev. Corp. 22393 Const. of Inaban Bridge and
Approaches 1st II 7.939 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase
IV, Banganan 1st II 14.449 C 0.392 0.299 0.100 0.030 0.039 0.067 92.70 -
R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase
IV, Banganan Final II 14.449 C 0.466 - 0.500 - - - 96.60 94.26% Outstanding
R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase
V Final II 14.266 C 0.321 - 0.500 - - - 82.10 78.26% Satisfactory
R.O. Builders & Dev. Corp. 22393 Const. of Namamparan Bridge &
Approaches 3rd II 13.528 O 0.262 0.253 0.070 0.030 0.028 0.067 71.00 -
R.O. Builders & Dev. Corp. 22393 Repair/Maint./Rehab. & Impv't. of
Daang Maharlika Final II 4.180 C 0.286 - 0.500 - - - 78.60 80.64% V.Satisfactory
R.R. A. Requillas Construction & Supply 20217 Const. of Revetment 1st V 1.425 O 0.257 0.133 0.100 0.010 0.019 0.200 71.90 -
R.R. A. Requillas Construction & Supply 20217 Const. of Revetment Final V 1.425 C 0.335 0.200 0.300 - - - 83.50 76.54%
Satisfactory
R.R. Ricafort Construction 14402 Conc. of FMR @ Brgy. Balayang 1st/Final III 0.614 C 0.213 0.200 0.300 - - - 71.30 71.30%
SatisfactoryR.R. Ricafort Construction 14402 Const. of 1 CL School Bldg. @
Carangian E/S 1st III 0.376 O 0.356 0.262 0.100 0.030 0.029 0.100 87.70 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 137
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.R. Ricafort Construction 14402 Const. of North Central E/S 1st/Final III 0.373 C 0.322 0.300 0.300 - - - 92.20 92.20%
Outstanding
R.R. Seismundo Construction & Supply 10961
Const. of Add'l Two (2) Lanes @ Nabunturan-Mainit Park Rd. Pob. Nabunturan Sect.
Final XI 3.557 C 0.207 - 0.500 - - - 70.70 77.78% Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) Cl School Bldg. in
New Allegria ES Final XI 0.384 C 0.367 0.209 0.300 - - - 87.60 84.80% V.Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) CL School Bldg.,
at Montevista NHS, DNAS 1st XI 0.469 O 0.352 0.000 0.100 0.020 0.032 0.100 60.40 -
R.R. Seismundo Construction & Supply 10961 Const. of Two (2) CL Bldg., @
Mawab Nat'l. High School 1st XI 0.723 C 0.475 - 0.500 - - - 97.50 97.50% Outstanding
R.T. Lim Construction and Supply 17045 Improvement of Roads Including
Drainage, Ozamis-Oroquieta Road 1st/Final X 0.803 C 0.381 - 0.500 - - - 88.10 88.10% V.Satisfactory
R.T. Morabe Construction 11377 Completion of UP Tacloban Multi-Purpose Bldg. 1st/Final VIII 0.921 C 0.462 - 0.500 - - - 96.20 96.20%
Outstanding
R.T. Morabe Construction 11377 Conc. of Municipal Road 1st/Final VIII 4.720 C 0.321 0.200 0.300 - - - 82.10 82.10% V.Satisfactory
R.T. Morabe Construction 11377 Const. of Oras-Concepcion-Jipapad Rd Final VIII 11.428 C 0.385 - 0.500 - - - 88.50 83.46%
V.Satisfactory
R.T. Morabe Construction 11377 Impvt. of ABC Hall 1st/Final VIII 0.192 C 0.371 0.200 0.300 - - - 87.10 87.10% V.Satisfactory
R.T.Y. Construction 10341 Conc. of Bachao-Ibaba FMR 1st/Final IVB 0.285 C 0.313 0.283 0.300 - - - 89.60 89.60% V.Satisfactory
R.T.Y. Construction 10341Conc. of Boac-Mogpog Circumferential Road (Murallon-Tampos Section)
1st IV-B 6.645 O 0.341 0.300 0.100 0.023 0.022 0.100 88.60 -
R.T.Y. Construction 10341 Conc./Impvt. of Boac-Gasan Nat'l Road 1st IVB 10.803 O 0.174 0.197 0.100 0.008 0.022 0.100 60.10 -
R.T.Y. Construction 10341 Conc./Impvt. of Boac-Gasan Nat'l Road Final IVB 10.803 C 0.343 0.219 0.300 - - - 86.20 70.54%
Satisfactory
R.T.Y. Construction 10341 Concreting of Sumangga-Magapua-Malusak Section 1st/Final IVB 2.004 C 0.415 - 0.500 - - - 91.50 91.50%
Outstanding
R.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge 1st IVA 4.773 O 0.363 0.240 0.070 0.030 0.033 0.067 80.30 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 138
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge Final IVA 4.773 C 0.357 0.200 0.300 - - - 85.70 82.46% V.Satisfactory
R.T.Y. Construction 10341Const. of 2 Classroom 2 Storey School bldg., Lusacan National High School
1st/Final IV-A 1.435 C 0.369 0.200 0.300 - - - 86.90 86.90% V.Satisfactory
R.T.Y. Construction 10341 Const. of 2 Storey 2 CL School Bldg., @ Luis Palad National H/S 1st IV-A 1.439 C 0.396 0.217 0.100 0.030 0.015 0.100 85.80 85.80%
V.Satisfactory
R.T.Y. Construction 10341 Const. of 2-Cl, 2-Storey S/B @ Talao-Talao E/S 1st/Final IVA 1.405 C 0.447 - 0.500 - - - 94.70 94.70%
Outstanding
R.T.Y. Construction 10341 Const. of Flood Control at Brgy. Muliguin 1st/Final IVA 2.892 C 0.386 0.300 0.300 - - - 98.60 98.60%
Outstanding
R.T.Y. Construction 10341 Const. of Multi-Purpose Bldg. (Covered Court) at South E/S 1st IV-A 1.137 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
R.T.Y. Construction 10341 Const. of Prov. Hospital (Dr. Damian Reyes Memorial Hospital 1st IV-B 6.930 O 0.354 0.225 0.100 0.020 0.013 0.100 81.20 -
R.T.Y. Construction 10341 Const. of Prov. Hospital (Dr. Damian Reyes Memorial Hospital Final IV-B 6.972 C 0.277 0.240 0.300 - - - 81.70 80.55%
V.Satisfactory
R.T.Y. Construction 10341 Const. of Various FMR (Caganhao B/R) Final IV-B 5.720 C 0.417 - 0.500 - - - 91.70 82.82%
V.Satisfactory
R.T.Y. Construction 10341Const./Impv't. of Multi-Purpose Bldg. @ Don Gregorio C. Yumul Sr. E/S
1st/Final IV-A 0.473 C 0.476 - 0.500 - - - 97.60 97.60% Outstanding
R.T.Y. Construction 10341 Const./Impv't. of Spillway Bridge 1st/Final IV-A 0.472 C 0.369 0.233 0.300 - - - 90.20 90.20% Outstanding
R.V. Construction 6110 Const. of 1 Cl School Bldg. @ Brgy. Cag-Olango E/S 1st/Final VIII 0.477 C 0.275 0.300 0.300 - - - 87.50 87.50%
V.Satisfactory
R.V. Construction 6110 Const. of Covered Court 1st VIII 1.392 O 0.320 0.200 0.100 0.020 0.032 0.100 77.20 -R.V. Construction 6110 Const. of Covered Court 3rd VIII 1.392 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -
R.V. Construction 6110 Const. of Gandara-Matuguinao Road 1st/Final VIII 0.952 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding
R.V. Construction 6110Impvt./Rehab. of Flood Control Structure along Calbayog-Catarman Road, Brgy. Oquendo Road Section
1st VIII 4.820 O 0.320 0.200 0.100 0.015 0.013 0.200 84.80 -
R.V. Construction 6110 Rehabilitation of Gadgaran-Limarayon Brgy. Road 1st/Final VIII 0.952 C 0.307 0.300 0.300 - - - 90.70 90.70%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 139
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R.V. Gaitan Merchandising 7075 Const. of MPB @ Guimaras State
College 1st/Final VI 1.283 C 0.314 0.200 0.300 - - - 81.40 81.40% V.Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB @ Sta. Teresa E/S 1st VI 0.398 O 0.334 0.189 0.100 0.030 0.023 0.100 77.60 -
R.V. Gaitan Merchandising 7075 Const. of MPB @ Sta. Teresa E/S Final VI 0.419 C 0.370 0.200 0.300 - - - 87.00 80.42%
V.Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB, San Miguel 1st VI 0.236 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
R.V. Laborte Builders 20459 Concreting of Tiaong By-Pass Road 1st/Final IV-A 9.435 C 0.362 0.200 0.300 - - - 86.20 86.20% V.Satisfactory
R.V. Laborte Builders 20459 Concreting of Torrijos-Buenavista National Road (Phase I) Final IVB 2.869 C 0.422 - 0.500 - - - 92.20 91.00%
Outstanding
R.V. Laborte Builders 20459
Concreting of Torrijos-Buenavista Road with exception Km.78+034-Km.78+463 (Marilao Sect.) and Km.72+300-Km.73+367, Banocboc Section
Final IV-B 8.687 C 0.314 0.300 0.300 - - - 91.40 90.14% Outstanding
R.V. Laborte Builders 20459 Const. of 1-Cl School Building 1st/Final IV-A 0.376 C 0.295 0.300 0.300 - - - 89.50 89.50% V.Satisfactory
R.V. Laborte Builders 20459 Const. of 1-Cl School Building 2nd/Final IV-A 0.376 C 0.303 0.160 0.300 - - - 76.30 72.59% Satisfactory
R.V. Laborte Builders 20459 Const. of 1-Cl School Building @ Jongo E/S 1st/Final IV-A 0.376 C 0.154 0.300 0.300 - - - 75.40 75.40%
Satisfactory
R.V. Laborte Builders 20459 Const. of 2-Storey, 2-Cl S/B @ Gumaca 1 CS 1st/Final IVA 1.320 C 0.392 - 0.500 - - - 89.20 89.20%
V.Satisfactory
R.V. Laborte Builders 20459 Const. of MPB @ Maasin Norte E/S 1st/Final IV-A 1.052 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
R.V. Laborte Builders 20459 Impv't./Concreting of Various Municipal Roads Final IV-B 10.625 C 0.275 - 0.500 - - - 77.50 74.92%
SatisfactoryR.V. Rieta Trading & Gen.
Construction 28671 Concreting of Roads at San Rafael III 1st/Final IV-A 0.288 C 0.320 0.300 0.300 - - - 92.00 92.00%
Outstanding
R2K Builders Construction and Trading 29708 Const. of Sch. Bldg. at Brgy. High
School Poblacion 1st/Final III 1.896 C 0.366 0.269 0.300 - - - 93.50 93.50% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 140
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Rabbit Construction & Development Corporation 8545
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment (Sinoropan-Vitali Section)
1st IX 32.120 O 0.297 0.300 0.100 0.030 0.051 0.100 87.80 -
Racso Construction 14601 Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road 1st CAR 1.184 C 0.369 - 0.500 - - - 86.90 82.16%
V.Satisfactory
Racso Construction 14601 Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road Final CAR 1.196 C 0.415 - 0.500 - - - 91.50 82.92%
V.Satisfactory
Racso Construction 14601 Impv't. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Rd. Final CAR 0.985 C 0.373 - 0.500 - - - 87.30
85.86% V.
Satisfactory
Raf General Construction 6699 Const. of Flood Control 1st/Final X 4.787 C 0.239 0.300 0.300 - - - 83.90 83.90% V.Satisfactory
Raf General Construction 6699 Const. of MPB @ Upper Jasaan 1st/Final X 1.445 C 0.362 0.259 0.300 - - - 92.10 92.10% Outstanding
Ramar Enterprises 8092Const. of Iriga Flood Control and Drainage Structure PNR, San Francisco-San Roque
Final V 4.618 C 0.434 - 0.500 - - - 93.40 90.10% Outstanding
Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road Final V 4.738 C 0.371 0.300 0.300 - - - 97.10 91.46% Outstanding
Ramconstrack Dev't Services & Supplies 22821 Rehab. of Old Hospital Building,
Malasin Final II 1.904 C 0.297 0.200 0.300 - - - 79.70 55.97% Poor
Ramises Construction 17351 Const. of Lake Mainit Circumferential Road Final XIII 6.219 C 0.454 - 0.500 - - - 95.40 95.40%
OutstandingRamona Construction &
Enterprises 14661 Const. of Multi-Purpose Bldg Final VII 0.865 C 0.396 - 0.500 - - - 89.60 71.89% Satisfactory
Ramona Construction & Enterprises 14661 Repair/Rahab./Impv't. of FMR at Olo 1st VII 0.372 C 0.413 - 0.500 - - - 91.30 91.30%
Outstanding
Ramona Construction and Enterprises 14661
Concreting of Siquijor Circumferential Road Sta. 0+000-Sta.0+130
2nd VII 1.867 O 0.357 0.300 0.100 0.030 0.056 0.100 94.30 -
Ramona Construction and Enterprises 14661
Concreting of Siquijor Circumferential Road Sta. 0+000-Sta.0+130
Final VII 1.867 C 0.341 0.300 0.300 - - - 94.10 92.06% Outstanding
Ramona Construction and Enterprises 14661 Const. of 2 CL School Bldg. @
Payao NHS 1st IX 0.871 O 0.287 0.134 0.100 0.030 0.026 0.100 67.70 -
Ramona Construction and Enterprises 14661 Const. of MPB Phase 1 1st IX 4.600 O 0.272 0.210 0.100 0.015 0.032 0.100 72.90 -
Ramona Construction and Enterprises 14661 Const. of MPB Phase 1 Final IX 4.600 C 0.285 0.169 0.300 - - - 75.40 73.65%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 141
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Ramona Construction and Enterprises 14661 Const. of Multi-Purpose Building 1st VII 4.714 O 0.322 0.300 0.100 0.030 0.035 0.100 88.70 -
Ramona Construction and Enterprises 14661 Const. of Multi-Purpose Building Final VII 4.722 C 0.378 0.168 0.300 - - - 84.60 87.47%
V.Satisfactory
Ramsa Construction 25580 Completion of Home Economics Bldg., Pug-os E/S 1st I 0.283 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
Ramsa Construction 25580 Conc. of MNR Solot-Solot Road 1st/Final I 0.608 C 0.340 0.200 0.300 - - - 84.00 84.00% V.Satisfactory
Ramsa Construction 25580 Const. of Tagudin Bridge 1st/Final I 0.758 C 0.305 - 0.500 - - - 80.50 80.50% V.Satisfactory
Ramsa Construction 25580 Improvement/Concreting of FMR Bayubay Sur 1st I 0.473 C 0.375 - 0.500 - - - 87.50 87.50%
V. Satisfactory
Ramsa Construction 25580 Impv't./Concreting of Farm-to-Market Road, Brgy. Nanerma 1st I 0.472 C 0.285 - 0.500 - - - 78.50 78.50%
Satisfactory
Rano's Construction 11433 Const. of Public Market Final XII 1.366 C 0.358 0.300 0.300 - - - 95.80 62.62% Fair
Rano's Construction 11433 Repair/Rehab. & Impv't. of Cabidianan-Mainit Sect. 1st XI 4.815 C 0.300 - 0.500 - - - 80.00 80.00%
SatisfactoryRasec Builders & General
Merchandise 13866 Const. of MPB @ Brgy. Caduawan 1st/Final VII 0.186 C 0.335 0.300 0.300 - - - 93.50 93.50% Outstanding
Raykin Construction and Supply 14404 Const. of School Bldg., @ Tagum
National High School Final XI 0.944 C 0.437 - 0.500 - - - 93.70 88.94% V.Satisfactory
Raykin Construction and Supply 14404 Improvement of National Road along
Cateel-Baganga Section 1st/Final XI 9.434 C 0.358 0.200 0.300 - - - 85.80 85.80% V.Satisfactory
Raykin Construction and Supply 14404 Impv't. of Roads along Caraga Sect. Final XI 4.704 C 0.384 - 0.500 - - - 88.40 88.82%
V.Satisfactory
Raykin Construction and Supply 14404 Impvt./Rehab. of Lumao-San
Antonio Section 1st XI 9.209 O 0.316 0.244 0.100 0.030 0.045 0.100 83.50 -
Raymundo H. Tecson Const. 21681 Impv't./Concreting of Baguio-
Cadalian Road Final XI 4.091 C 0.447 - 0.500 - - - 94.70 71.48% Satisfactory
Raymundo H. Tecson Construction 21681 Const. of Bridge @ Purok 2 1st/Final XI 1.354 C 0.302 - 0.500 - - - 80.20 80.20%
V.Satisfactory
RBM Construction 5961 Const. of Multi-Purpose Bldg. Brgy. Gen. Luna Final III 0.468 C 0.451 - 0.500 - - - 95.10 73.82%
Satisfactory
RBM Construction 5961 Const. of Salian Concrete Revetment Brgy. Salian 1st/Final III 0.470 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 142
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
RBT Construction 15290 Impv't. of Multi-Purpose Bldg., @ Brgy. Nangkaan 1st/Final IV-A 0.191 C 0.388 0.200 0.300 - - - 88.80 88.80%
V.Satisfactory
RCD Gen. Contractor & Construction Supply 21616 Rehab. of Don Andres, Valdez &
Ferdinand Road 1st I 2.143 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
RCD General Contractor & Construction Supply 21616 Completion of Banna Multi-Purpose
Hall 1st I 2.850 O 0.333 0.253 0.100 0.030 0.032 0.100 84.80 -
RCD General Contractor & Construction Supply 21616 Completion of Banna Multi-Purpose
Hall Final I 2.850 C 0.386 0.200 0.300 - - - 88.60 85.94% V.Satisfactory
RCD General Contractor & Construction Supply 21616 Const. of MPB (Phase I) at Brgy.
Madamba 1st/Final I 0.379 C 0.194 0.300 0.300 - - - 79.40 79.40% Satisfactory
RCDG Construction Corp. 5063
Impv't./Widening of Z.C. West Coast Road (Caragasan-Maasin Sect.) & Const. of 1 Barrel RCBC with exception of Maasin Bridge
3rd IX 11.560 O 0.382 0.239 0.100 0.030 0.058 0.100 90.90 -
RCDG Construction Corp. 5063Widening of Zamboanga City West Coast Road, Const. of Three (3) Barrels RCBC
1st IX 4.678 O 0.349 0.240 0.100 0.030 0.059 0.100 87.80 -
RCDG Construction Corporation 5063
Impv't./Widening of Z.C. West Coast Road (Caragasan-Maasin Sect.) & Const. of 1 Barrel RCBC with exception of Maasin Bridge
Final IX 11.560 C 0.348 0.226 0.300 - - - 87.40 88.68% V.Satisfactory
R'Cel General Contractor & General Merch. 13385 Concreting of Mabunga-San Isidro
Brgy. Road 1st IV-A 0.471 C 0.398 - 0.500 - - - 89.80 89.80% V.Satisfactory
R'Cel General Contractor & General Merch. 13385 Concreting of Road at Hugo St.
Brgy. San Antonio 1st IV-A 0.476 C 0.415 - 0.500 - - - 91.50 91.50% Outstanding
R'Cel General Contractor & General Merch. 13385 Const. of FTM Road @ Nagcarlan-
Calauan Road 1st/Final IV-A 2.336 C 0.451 - 0.500 - - - 95.10 95.10% Outstanding
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sta. Ana 1st/Final IV-A 0.955 C 0.393 0.200 0.300 - - - 89.30 89.30%
V.Satisfactory
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sto. Angel
Sur 1st/Final IV-A 0.955 C 0.372 0.200 0.300 - - - 87.20 87.20% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 143
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
R'Cel General Contractor & General Merchandise 13385 Const. of Atingay Suspension
Bridge (Phase II) 1st/Final IV-A 2.192 C 0.308 0.278 0.300 - - - 88.60 88.60% V.Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Three (3) Storey, Six (6)
Classroom 1st IV-A 4.776 O 0.397 0.180 0.100 0.023 0.053 0.067 82.00 -
R'Cel General Contractor & General Merchandise 13385 Const./Completion of Limao-Perez
Bridge 1st IV-A 14.250 O 0.396 0.300 0.050 0.023 0.027 0.033 82.90 -
RD Pimentel Construction 19487 Completion of Multi-Purpose Building 1st/Final CAR 0.282 C 0.451 - 0.500 - - - 95.10 95.10%
Outstanding
RDF Construction and Supply 12843 Const. of Barangay Hall @ Tubod Final XI 0.561 C 0.357 - 0.500 - - - 85.70 81.22%
V. Satisfactory
RDF Construction and Supply 12843 Const. of MPB @ F. Bustamante E/S Final XI 0.809 C 0.367 0.300 0.300 - - - 96.70 88.72%
V.Satisfactory
RDG Construction & Supply (Formerly: RDG
Construction)19488 Const. of Multi Purpose Pavement @
Bastida E/S Science Park 1st XI 1.180 O 0.377 0.255 0.100 0.030 0.058 0.100 92.00 -
Readycon Trading & Const. Corp. 15452 Repair/Rehab. of MSR Old Route 1st/Final IV-A 14.401 C 0.274 0.200 0.300 - - - 77.40 77.40%
Satisfactory
Rebsons Construction 17118 Const. of Mambalili-Sitio Bong FMR Final XIII 7.545 C 0.400 0.200 0.300 - - - 90.00 88.26% V.Satisfactory
Red Mole Construction 15710 Const. of Uyugan Diversion Road 1st II 1.922 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding
Red Scorpion Construction & Supply 32046 Completion of San Roque E/S 1st/Final NCR 0.812 C 0.355 0.300 0.300 - - - 95.50 95.50%
Outstanding
Redcar Trading & Construction 27368 Const. of Multi-Purpose Hall at
Topland 1st NCR 1.878 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
REE Construction 10342 Conc. of FMR @ Brgy. Luna 1st/Final IVA 0.374 C 0.397 - 0.500 - - - 89.70 89.70% V.Satisfactory
Regenterprises Const. *Fabrication* Supplies &
Gen. Services17177 Const. of Abatan E/S School Bldg. Final II 0.442 C 0.328 0.137 0.300 - - - 76.50 71.32%
Satisfactory
Regenterprises Const. *Fabrication* Supplies &
Gen. Services17177 Const. of Drainage along Daang
Maharlika 1st II 4.649 O 0.310 0.157 0.100 0.030 0.044 0.200 84.10 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 144
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Regional Infrastructure Development Corporation 26373 Conc. of Zillovia Road Section along
Talacogon San Luis Road 1st XIII 2.342 O 0.384 0.300 0.100 0.030 0.043 0.100 95.70 -
Regional Infrastructure Development Corporation 26373 Conc. of Zillovia Road Section along
Talacogon San Luis Road Final XIII 2.342 C 0.388 0.200 0.300 - - - 88.80 92.94% Outstanding
Regional Infrastructure Development Corporation 26373 Concreting of Brgy. Marbon along
Secondary Road 1st XIII 1.885 O 0.389 0.225 0.100 0.030 0.042 0.100 88.60 -
Regional Infrastructure Development Corporation 26373 Concreting of Brgy. Marbon along
Secondary Road Final XIII 1.885 C 0.299 0.300 0.300 - - - 89.90 89.12% V.Satisfactory
Regional Infrastructure Development Corporation 26373 Concreting of Osmeña-
Magkiangkang Road 1st XIII 2.780 O 0.356 0.300 0.100 0.030 0.051 0.100 93.70 -
Regional Infrastructure Development Corporation 26373 Concreting of Osmeña-
Magkiangkang Road Final XIII 2.780 C 0.234 0.300 0.300 - - - 83.40 89.58% V.Satisfactory
Regional Infrastructure Development Corporation 26373 Concreting of Talacogon-DPWH
Road Section 1st/Final XIII 2.330 C 0.365 0.200 0.300 - - - 86.50 86.50% V.Satisfactory
Regional Infrastructure Development Corporation 26373 Const. of Mas-Omot Road,
Prosperidad ARC Final XIII 24.656 C 0.339 0.300 0.300 - - - 93.90 91.34% Outstanding
Regional Infrastructure Development Corporation 26373
Restoration of Andanan Bank Protection & Installation of Spur Dike along Agusan-Davao Road
1st XIII 10.792 O 0.393 0.200 0.100 0.030 0.042 0.200 96.50 -
Regional Infrastructure Development Corporation 26373
Restoration of Andanan Bank Protection & Installation of Spur Dike along Agusan-Davao Road
2nd XIII 10.792 O 0.300 0.200 0.100 0.030 0.050 0.200 88.00 -
Regional Infrastructure Development Corporation 26373 Restoration of Shore Protection,
Afga Slip Agusan-Davao Road 1st XIII 7.493 O 0.313 0.300 0.100 0.022 0.023 0.100 85.80 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 145
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Rely Construction & Supply 10433 Conc. of Bislig-Trento Road 1st XIII 18.950 O 0.258 0.233 0.100 0.012 0.025 0.100 72.80 -
Rely Construction & Supply 10433 Const. of Bigaan Bridge 1st XIII 14.386 O 0.400 0.240 0.100 0.023 0.043 0.100 90.60 -
Rely Construction & Supply 10433 Const. of Bigaan Bridge 2nd XIII 14.386 O 0.307 0.300 0.100 0.022 0.050 0.100 87.90 -
Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon 1st XI 1.886 C 0.319 0.225 0.100 0.010 0.030 0.100 78.40 -
Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon Final XI 1.886 C 0.379 0.060 0.300 - - - 73.90 76.60%
Satisfactory
Rely Construction & Supply 10433
Const. of Pinagsapawan Bridge & Approaches, Tibanban-Lavigan Road
1st XI 10.792 O 0.229 0.234 0.070 0.030 0.055 0.100 71.80 -
Rely Construction & Supply 10433 Impvt. of Cadalian-Baguio Road 1st XI 14.164 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -
Rely Construction & Supply 10433 Impvt./Rehab. of Dapnan-Lambajon
Section 1st XI 9.607 O 0.300 0.300 0.100 0.023 0.042 0.100 86.50 -
Rely Construction & Supply 10433 Impvt./Rehab. of Dapnan-Lambajon
Section Final XI 9.607 C 0.336 0.200 0.300 - - - 83.60 85.34% V.Satisfactory
Rely Construction & Supply 10433 Rehab./Repair of Butuan City-Masao
Port Road 1st/Final XIII 4.469 C 0.400 0.200 0.300 - - - 90.00 90.00% V.Satisfactory
Remigio General Construction 2298
Conc. Over Renolith Roads, MMSU-Bakukang Rd. Cangrunaan Rd. & Mabaleng Rd
Final I 2.856 C 0.447 - 0.500 - - - 94.70 93.08% Outstanding
Remp Enterprises 25916 Const. of Drainage System @ Mercury St. 1st III 0.465 O 0.310 0.175 0.100 0.030 0.029 0.200 84.40 -
Rene T. Bayawa Construction & Hauling
Services20740 Const. of 1 Unit 2 CL School Bldg. @
Balok E/S 1st/Final IX 0.757 C 0.275 0.214 0.300 - - - 78.90 78.90% Satisfactory
RENZ Const. & Trading 25605 Completion of Itbud Diversion Road 1st II 0.479 C 0.458 - 0.500 - - - 95.80 95.80% Outstanding
Revere Construction & Supply 17426 Const. of Multi-Purpose Bldg., @
Bilibinwang 1st/Final IV-A 0.336 C 0.364 0.207 0.300 - - - 87.10 87.10% V.Satisfactory
Revere Construction and Supply 17426 Asphalt Overlay of Brgy. Poblacion 1st/Final IV-A 1.147 C 0.490 - 0.500 - - - 99.00 99.00%
Outstanding
Revere Construction and Supply 17426 Const. of 2 Cl @ Quiling E/S 1st/Final IV-A 0.770 C 0.265 0.300 0.300 - - - 86.50 86.50%
V.Satisfactory
Revere Construction and Supply 17426 Repair/Improvement of Lipa City
Museum & Library 1st IV-A 1.843 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 146
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Rex E. Morales Construction 17427 Const. of Multi-Purpose Pavement 1st/Final VIII 0.944 C 0.418 - 0.500 - - - 91.80 91.80%
Outstanding
Reydan Builders 13059 Const. of MPB @ Carpenter Hill 1st/Final XII 0.770 C 0.397 0.200 0.300 - - - 89.70 89.70% V.Satisfactory
Reydan Builders 13059 Const. of Multi-Purpose Bldg., Open Warehouse (Mini-Gym) Final XI 1.218 C 0.446 - 0.500 - - - 94.60 62.12%
Fair
Reydan Builders 13059 Const. of Multi-Purpose Building (Mini Gym) Final XI 1.418 C 0.394 0.251 0.300 - - - 94.50 82.95%
V.Satisfactory
Reydan Builders 13059 Const. of Multi-Purpose Building (Mini Gym) Palili Final XI 1.422 C 0.369 0.300 0.300 - - - 96.90 92.98%
Outstanding
Reydan Builders 13059 Const. of Multi-Purpose Building @ Polomolok 1st/Final XII 0.460 C 0.394 - 0.500 - - - 89.40 89.40%
V.Satisfactory
Reydan Builders 13059 Const. of Pedestrian Overpass 1st XI 4.718 O 0.389 0.300 0.100 0.030 0.050 0.100 96.90 -
Reydan Builders 13059 Const. of Shadol I Bridge Final XII 4.308 C 0.381 0.293 0.300 - - - 97.40 88.91% V.Satisfactory
Reyrose Construction 20748 Conc. of Various Municipal and Brgy. Roads 1st II 1.149 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -
RFN Construction and Development Corporation 8722 Const. of Special Education Bldg.,
(Additional 2Cl) 1st NCR 1.444 C 0.290 - 0.500 - - - 79.00 82.90% V.Satisfactory
RGP Builders 20680 Concreting of Malvar-Punta FMR 1st IV-A 1.875 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding
RGP Builders 20680 Concreting of Unisan Seawall (Extension) 1st IV-A 0.749 C 0.392 - 0.500 - - - 89.20 89.20%
V.Satisfactory
RGP Builders 20680 Const. of 3 Units School Building with CRs 1st IV-A 1.347 O 0.383 0.300 0.100 0.030 0.022 0.100 93.50 -
RGP Builders 20680 Const. of Water Works System 1st/Final III 0.288 C 0.428 - 0.500 - - - 92.80 92.80% Outstanding
RGP Builders 20680 Repair/Rehab. of Drainage System along Gen. Luna-Catanauan Road 1st/Final III 1.155 C 0.422 - 0.500 - - - 92.20 92.20%
Outstanding
RGS Construction 14095 Const. of Various Multi-Purpose Building 1st/Final IX 0.314 C 0.366 0.200 0.300 - - - 86.60 86.60%
V.Satisfactory
RGS Construction 14095 Concreting of Purok 4, FMR 1st IX 0.180 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 147
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
RGS Construction 14095 Concreting/Widening of Dipolog-Aurora Road Sinaman 1st IX 3.138 C 0.378 - 0.500 - - - 87.80 87.80%
V. Satisfactory
RGS Construction 14095 Const. of Two (2) Storey Bldg. @ Jose Rizal Memorial State College Final IX 1.368 C 0.399 0.200 0.300 - - - 89.90 93.33%
Outstanding
RHH Construction 11467 Conc. of Burgos-General Aguinaldo National Road 1st II 18.329 O 0.349 0.300 0.100 0.030 0.037 0.100 91.60 -
RHH Construction 11467 Conc. of Jct. National Potia Road 1st/Final II 10.697 C 0.381 0.200 0.300 - - - 88.10 88.10% V.Satisfactory
RHH Construction 11467Const. of Dalibubon Bridge (Remaining Works) and Approaches (Partial Const.)
1st II 11.337 O 0.228 0.299 0.100 0.018 0.040 0.100 78.50 -
Rhodamay Construction Supply 25989 Const. of Multi-Purpose Bldg. Sitio
Tina Brgy. Tagusao 1st IV-B 0.188 C 0.414 - 0.500 - - - 91.40 91.40% Outstanding
Rhodamay Construction Supply 25989 Const. of Multi-Purpose Building,
Brgy. Poblacion Final IV-B 0.466 C 0.393 0.136 0.300 - - - 82.90 87.52% V.Satisfactory
Rhodamay Construction Supply 25989 Const. of Panacan River Control 1st IV-B 0.922 C 0.375 - 0.500 - - - 87.50 87.50%
V.Satisfactory
Rhodamay Construction Supply 25989 Const., of E/S Building Brgy.
Taritien Final IV-B 0.282 C 0.230 0.079 0.300 - - - 60.90 63.21% Fair
Rhodwill Parts and Hardware 18871 Const. of Manikling Multi-Purpose
Building Final XI 1.606 C 0.361 0.300 0.300 - - - 96.10 92.18% Outstanding
Rhodwill Parts and Hardware 18871 Improvement of National Road along
Baganga-Cateel Section 1st/Final XI 9.443 C 0.376 0.200 0.300 - - - 87.60 87.60% V.Satisfactory
Rhodwill Parts and Hardware 18871 Impvt./Rehab. of Manhoc-Ban-ao
Section 1st XI 9.605 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -
Rhodwill Parts and Hardware 18871 Impvt./Rehab. of Manhoc-Ban-ao
Section 2nd XI 9.605 O 0.333 0.253 0.100 0.030 0.050 0.100 86.60 -
Richmar Construction 18797 Conc./Impvt. of Polangui Upland Rd. (Cepres-Itaran Section) 1st/Final V 9.595 C 0.346 0.189 0.300 - - - 83.50 83.50%
V.Satisfactory
Richmar Construction 18797 Concreting of Irosin-Bulusan Asphalt Road 1st/Final V 3.276 C 0.344 0.208 0.300 - - - 85.20 85.20%
V.Satisfactory
Richmar Construction 18797Construction of Checkgate, Canal with Lining & Canal Structures (Muladbucad Grande CIP)
1st/Final NIA 3.903 C 0.358 0.087 0.300 - - - 74.50 74.40% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 148
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Richmark Construction 14227 Completion of Antiao Bridge Approaches Final VIII 3.209 C 0.461 - 0.500 - - - 96.10 70.06%
Satisfactory
Richpil Builders 30923 Widening/Concreting of Binangonan Diversion Rd. 1st IV-A 1.909 C 0.407 - 0.500 - - - 90.70 90.70%
OutstandingRicomar Construction 31606 Sch. Bldg. Project (C.P.G. H/S) 1st VII 0.437 O 0.389 0.300 0.000 0.030 0.035 0.067 82.10 -
R-II Builders / J.M. Luciano/310 Construction
(JV)JV-01-041
Rehab of Surigao-Davao Coastal Road, CW-RU-1.4C, Manay-Mati Section
1st IBRD 555.077 O 0.312 0.284 0.050 0.030 0.051 0.033 76.00 -
R-II Builders / J.M. Luciano/310 Construction
(JV)JV-01-041
Rehab of Surigao-Davao Coastal Road, CW-RU-1.4C, Manay-Mati Section
3rd XI 555.077 O 0.354 0.300 0.000 0.030 0.070 0.100 85.40 -
R-II Builders Inc. 11235Development of 50-Hectare Reserved Area, NBP Compound, Ph. I
1st NHA NCR 155.771 O 0.380 0.300 0.100 0.024 0.047 0.100 95.10 -
R-II Builders, Inc./J.M. Luciano Const./310
Const. (JV)JV-01-041 Rehab. of Surigao-Davao Coastal
Road (Manay-Mati Section) 4th IBRD 555.077 O 0.363 0.300 0.100 0.030 0.065 0.100 95.80 -
R-II Builders,Inc./Bauer Int'l Phil./PhilEco Sys
Corp/Supermax Phils.,Inc.
Consortium
Comp. of Remaining Land Dev. Works,Garbage Disposal,Const of STPs and Repair of Permanent Housing
1st NHA 217.993 D 0.374 0.300 0.000 0.018 0.019 0.000 71.10 71.10% Satisfactory
Rim Construction 15938 Conc. of Bulanao-Paracelis Road 2nd CAR 3.199 C 0.393 - 0.500 - - - 89.30 87.98% V.Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Concreting to Tangub-Polao Road Final X 1.250 C 0.425 - 0.500 - - - 92.50 95.02%
Outstanding
Ritche-Nathalie Builders and General Merchandise 27501 Const. of Seawall/Shore Protection
Northern Poblacion 1st X 0.385 C 0.315 - 0.500 - - - 81.50 81.50% V.Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Rehab./Impvt. of Bonifacio-Don
Victoriano National Road 1st X 2.861 O 0.307 0.046 0.100 0.030 0.035 0.067 58.50 -
Ritche-Nathalie Builders and General Merchandise 27501 Repair/Rehab. of Multi-Purpose
Bldg. Final X 0.475 C 0.381 0.300 0.300 - - - 98.10 85.10% V.Satisfactory
Ritz Commercial 19132 Concreting of Dapdap East Brgy. Road 1st IV-A 4.752 O 0.356 0.300 0.050 0.030 0.028 0.067 83.10 -
Riva Construction 23820 Cluster I- Const. of Various School Bldg. Final VII 10.280 C 0.363 - 0.500 - - - 86.30 87.98%
V. Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 149
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
River of Life Engineering Construction &
Aggregates30516 Const. of 2 Storey 4 Cl Sch. Bldg. @
Benguet NHS 1st/Final CAR 1.640 C 0.302 0.231 0.300 - - - 83.30 83.30% V.Satisfactory
River of Life Engineering Construction &
Aggregates30516 Impvt. Along Acop-Kapangan-
Kibungan Road 1st/Final CAR 4.775 C 0.335 0.202 0.300 - - - 83.70 83.70% V.Satisfactory
RKX Odiamar Construction 16107 Const. of Seawall at Kinahulugan 1st V 0.183 C 4.160 - 0.500 - - - 466.00 91.60%
OutstandingRLK Construction and
Builders 32194 Const. of Sch. Bldg. @ Bakit-Bakit E/S 1st/Final I 0.385 C 0.365 0.300 0.300 - - - 96.50 96.50%
Outstanding
RMAJ Construction 18623 Const. of Mompong Flood Control 1st/Final IV-B 0.954 C 0.309 0.205 0.300 - - - 81.40 81.40% V.Satisfactory
RMS Builder and Supply 19490 Rehab. of Farm-to-Market Road @ Cangmohao 1st VII 0.932 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
RNV Construction 12570 Const. of Odiongan Multi-Purpose Bldg. 1st IV-B 0.456 C 0.377 - 0.500 - - - 87.70 87.70%
V.Satisfactory
RNV Construction 12570 Rehab. of Boliganay FMR 1st IV-B 0.901 C 0.352 - 0.500 - - - 85.20 85.20% V.Satisfactory
Roadtech Construction 17580 Conc.of Brgy. La Paz Road 1st I 1.927 O 0.309 0.183 0.100 0.024 0.037 0.100 75.30 -
Roadtech Construction 17580 Conc.of Brgy. La Paz Road Final I 1.927 C 0.232 0.300 0.300 - - - 83.20 78.46% Satisfactory
Roadtech Construction 17580 Const. of School bldg., at San Jacinto E/S Final I 4.699 C 0.498 - 0.500 - - - 99.80 94.62%
Outstanding
Roadtech Construction 17580 Repair/Rehab. of Sinucalan Bridge along Urd. Jct.-Dagupan Rd Final I 2.704 C 0.375 - 0.500 - - - 87.50 92.48%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175
Concreting of Jct. Kapaya Section along Dukay-Sen. Ninoy Aquino-Lebak Road
Final XII 7.199 O 0.392 - 0.500 - - - 89.20 -
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Const. of 3-Cl School Building 1st XII 1.146 O 0.318 0.300 0.100 0.030 0.018 0.100 86.60 -
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Const. of Multi Purpose Bldg. 1st/Final XII 0.954 C 0.304 0.300 0.300 - - - 90.40 90.40%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Const. of Multi Purpose Bldg. at
Brgy. Dansuli 1st/Final XII 0.458 C 0.362 0.200 0.300 - - - 86.20 86.20% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 150
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Robitan Construction 10553 Concreting of Brgy. Rd., Brgy. Sapaan 1st IV-A 0.471 C 0.366 - 0.500 - - - 86.60 86.60%
V. Satisfactory
Rocali Construction & Trading 18779 Const./Rehab./Impv't. of Road
Drainage 1st NCR 0.932 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Rockstone Construction Services and Supply 22702 Const. of MPB at Simsiman 1st XII 0.767 O 0.357 0.216 0.100 0.030 0.025 0.100 82.80 -
Rockworld Industries 7582 Const. of Drainage Sytem @ Daan Maharlika, Picas-Apitong Road 1st VIII 1.887 O 0.400 0.169 0.100 0.015 0.028 0.200 91.20 -
Rockworld Indutries 7582 Const. of Drainage Sytem @ Daan Maharlika, Picas-Apitong Road Final VIII 1.930 C 0.280 0.300 0.300 - - - 88.00 89.92%
V.Satisfactory
Rockworld Indutries 7582 Road Conc.at Brgy. Lapay 1st/Final VIII 0.193 C 0.326 0.200 0.300 - - - 82.60 82.60% V.Satisfactory
Roda Construction & Gen. Supply 19674 Completion of Multi-Purpose
Building 1st/Final V 1.418 C 0.362 0.300 0.300 - - - 96.20 96.20% Outstanding
Roda Construction & Gen. Supply 19674 Completion of Multi-Purpose
Building 1st/Final V 0.236 C 0.303 0.232 0.300 - - - 83.50 83.50% V.Satisfactory
Roda Construction & Gen. Supply 19674 Concreting of San Isidro FMR Final V 0.461 C 0.341 - 0.500 - - - 84.10 87.22%
V.Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Allanosa National High
School Bldg. San Pedro Final V 1.375 C 0.437 - 0.500 - - - 93.70 77.60% Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Ariman Seawall, Brgy.
Ariman 1st V 0.183 C 0.433 - 0.500 - - - 93.30 93.30% Outstanding
Roda Construction & Gen. Supply 19674 Repair of Marok-Barok Spillway 1st/Final V 0.327 C 0.333 0.300 0.300 - - - 93.30 93.30%
Outstanding
Roda Construction and General Supply 19674 Completion of Public Market 1st/Final V 0.477 C 0.400 0.200 0.300 - - - 90.00 90.00%
V.Satisfactory
Roda Construction and General Supply 19674 Repair/Rehab. of Brgy. J.P. Laurel
going to Inararan FMR Final V 0.945 C 0.395 0.300 0.300 - - - 99.50 70.16% Satisfactory
Roim Builders & Construction Supply 20226 Concreting along Patin-ay-La
Caridad Road 2nd XIII 1.846 O 0.366 0.300 0.070 0.015 0.032 0.067 85.00 -
Roim Builders & Construction Supply 20226 Concreting along Patin-ay-La
Caridad Road Final XIII 1.846 C 0.192 0.300 0.300 - - - 79.20 79.86% Satisfactory
Roim Builders & Construction Supply 20226 Concreting of BAHBAH Road (Road
Network) 2nd XIII 1.823 O 0.381 0.300 0.000 0.030 0.061 0.100 87.20 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 151
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Roim Builders & Construction Supply 20226 Concreting of BAHBAH Road (Road
Network) Final XIII 1.823 C 0.199 0.300 0.300 - - - 79.90 85.54% V.Satisfactory
Roim Builders & Construction Supply 20226 Concreting of Barangay 1 Municipal
Street 1st XIII 1.864 O 0.353 0.300 0.070 0.015 0.025 0.067 83.00 -
Roim Builders & Construction Supply 20226 Concreting of Barangay 1 Municipal
Street Final XIII 1.864 C 0.268 0.300 0.000 - - - 56.80 72.52% Satisfactory
Roim Builders and Construction Supply 20226 Gravelling of Bitan-Agan-Das-Agan
Road Final XIII 1.832 C 0.400 0.200 0.300 - - - 90.00 84.06% V.Satisfactory
Rol-Mar Developer and Enterprises 26151 Const. of Multi-Purpose Bldg.,
Youth Council Bldg. 2nd X 0.943 O 0.306 0.275 0.000 0.023 0.025 0.067 69.60 -
Rol-Mar Developer and Enterprises 26151 Const. of Multi-Purpose Bldg.,
Youth Council Bldg. Final X 0.943 C 0.333 0.300 0.000 - - - 63.30 69.60% Fair
Romina Construction 24985 Const. of MPB at G. Perfecto H/S 1st NCR 2.989 O 0.361 0.180 0.100 0.015 0.032 0.100 78.80 -
Ronwood Const. Supply 25311 Const. of River Protection @ Mambayaan Bridge II (Phase I) 1st X 4.720 O 0.367 0.160 0.100 0.015 0.042 0.200 88.40 -
Ronwood Const. Supply 25311 Slope Protection along Jct. Osmeña-Pilar Road 1st XIII 5.447 O 0.376 0.299 0.100 0.030 0.035 0.100 94.00 -
Ronwood Const. Supply 25311 Slope Protection along Jct. Osmeña-Pilar Road Final XIII 5.447 C 0.343 0.300 0.000 - - - 64.30 82.12%
V.Satisfactory
Ronwood Construction & Supply 25311 Cluster EQ: Rehabilitation of FMR
Pook, 1st/Final X 0.951 C 0.321 0.300 0.300 - - - 92.10 92.10% Outstanding
Ronwood Construction & Supply 25311 Clustered Conc. of Municipal Streets 1st XIII 1.130 C 0.474 - 0.500 - - - 97.40 97.40%
Outstanding
Ronwood Construction & Supply 25311 Conc.of FMR Brgy. Del Carmen 1st XIII 0.944 C 0.478 - 0.500 - - - 97.80 97.80%
Outstanding
Ronwood Construction & Supply 25311
Concreting of Dapa-Sayak-Cancohoy Road, Sta. Fe. Lobongon Sect.
Final XIII 6.112 C 0.404 - 0.500 - - - 90.40 89.86% V.Satisfactory
Ronwood Construction & Supply 25311 Const./Regravelling of Rd. 1st XIII 0.940 C 0.427 - 0.500 - - - 92.70 92.70%
Outstanding
Ronwood Construction and Supply 25311 Improvement of Dapa-Del Carmen
Road (Slope Protection) 1st/Final XIII 1.373 O 0.367 0.200 0.300 - - - 86.70 -
Roprim Construction 8546 Const. of Cuartero Bridge, Phase II 1st VI 8.881 O 0.400 0.240 0.100 0.030 0.030 0.100 90.00 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 152
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Roprim Construction 8546 Const. of Cuartero Bridge, Phase II Final VI 8.881 C 0.350 0.300 0.300 - - - 95.00 92.00% Outstanding
Roprim Construction 8546 Const. of Janiuay-Badiangan Road, Km.36+320-Km.37+620 1st VI 13.886 O 0.369 0.300 0.070 0.030 0.059 0.067 89.50 -
Roprim Construction 8546 Const. of Janiuay-Badiangan Road, Km.36+320-Km.37+620 Final VI 13.886 C 0.295 0.200 0.000 - - - 49.50 69.72%
Fair
Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) 1st VI 9.861 O 0.377 0.240 0.100 0.023 0.043 0.100 88.30 -
Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) 2nd VI 9.861 O 0.244 0.228 0.100 0.023 0.045 0.100 74.00 -
Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) Final VI 1.430 C 0.357 0.208 0.000 - - - 56.50 71.29%
Satisfactory
Rosand Builders 15781 Beautification of K-H Park, Brgy. West Kamias 1st NCR 0.700 C 0.392 - 0.500 - - - 89.20 89.20%
V.Satisfactory
Rosand Builders 15781 Const. of Sch. Bldg. @ UP College of Music 1st/Final NCR 0.946 C 0.390 0.300 0.300 - - - 99.00 99.00%
Outstanding
Rosvar Enterprises and General Contractor 17998 Const. of Farm-to-Market Road 1st/Final IV-A 0.570 C 0.266 - 0.500 - - - 76.60 76.60%
Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Flood Control & Drainage 1st/Final IV-A 0.467 C 0.393 0.200 0.300 - - - 89.30 89.30%
V.Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Flood Control/Drainage
System 1st/Final IV-A 2.866 C 0.366 0.200 0.300 - - - 86.60 86.60% V.Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of FMR @ Municipalty of
Victoria 1st IV-A 0.934 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding
Rosvar Enterprises and General Contractor 17998 Const. of Multi-Purpose Hall 1st/Final IV-A 0.938 C 0.449 - 0.500 - - - 94.90 94.90%
Outstanding
Rovilla Construction 19514 Const. of 2-CL S/B (Part of Cluster A) 1st/Final VII 0.491 C 0.380 - 0.500 - - - 88.00 88.00%
V.Satisfactory
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Farm-to-Market Road
Buenlag Final III 1.544 C 0.384 0.200 0.300 - - - 88.40 88.10% V.Satisfactory
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Rizal-Caramutan-
Dumarais Road 1st/Final III 1.850 C 0.335 0.287 0.300 - - - 92.20 92.20% Outstanding
Royal Sea Bees Construction 30099
Widening/Regravelling incl. slope protection & drainag of Bontoc-Lubuagan-Tabuk Road
Final CAR 4.787 C 0.326 0.237 0.300 - - - 86.30 81.50% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 153
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
RPBJ Trading & Construction 30006 Const. of Drainage System along
Nulatula 1st VIII 2.046 C 0.354 - 0.500 - - - 85.40 85.40% V.Satisfactory
RPBJ Trading & Construction 30006
Const. of Multi-Purpose Bldg., (Covered Court) at Brgy. 82 (Phase II)
Final VIII 0.950 C 0.398 - 0.500 - - - 89.80 51.93% Poor
RPBJ Trading & Construction 30006 Road Conc. of Brgy. Dagami-
Pastrana Road 1st/Final VIII 0.937 C 0.329 0.300 0.300 - - - 92.90 92.90% Outstanding
RREncabo Constructors & Traders 14716 Fort Santiago Linear Park Project 1st PRRC 13.595 O 0.349 0.300 0.100 0.030 0.050 0.100 92.90 -
RRN Construction 20228Const. of Concrete Lined Ditch along Jct. A. H. Aglayan-Kibangay Rd. Poblacion Lantapan Sect.
Final X 0.321 C 0.470 - 0.500 - - - 97.00 95.44% Outstanding
RSP Enterprises Inc. 16795 Concreting of Road at Brgy. Tagakpan Final XI 0.940 C 0.333 - 0.500 - - - 83.30 81.02%
V.Satisfactory
RSP Enterprises Inc. 16795 Const. of Multi Purpose Pavement at Brgy. 7A 1st XI 0.661 O 0.267 0.300 0.100 0.030 0.052 0.100 84.90 -
RSP Enterprises, Inc. 16795 Const. of 1-Cl, School Bldg. @ Elias Lopez Memorial H/S Final XI 0.330 C 0.309 - 0.500 - - - 80.90 87.20%
V.Satisfactory
RTY Construction 10341 Concreting of Balanacan FMR Balanacan 1st/Final IV-B 0.239 C 0.013 0.300 0.300 - - - 61.30 61.30%
Fair
Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay 1st III 4.606 O 0.334 0.225 0.100 0.030 0.016 0.100 80.50 -
Ruby Lim Const. & Supplies 11685 Conc. of Cudamos Brgy. Road New
Dagupan 1st IV-B 0.366 C 0.449 - 0.500 - - - 94.90 94.90% Outstanding
Ruby Lim Const. & Supplies 11685 Const. of Multi-Purpose Pavement 1st/Final V 0.364 C 0.332 0.100 0.300 - - - 73.20 73.20%
Satisfactory
Rumil Construction 13484 Const. of S/B @ Barobo NHS (Main), Package 1 1st XIII 1.156 O 0.400 0.213 0.100 0.030 0.018 0.100 86.10 -
Rumil Construction 13484 Const. of S/B @ Barobo NHS (Main), Package 1 Final XIII 1.156 C 0.369 0.200 0.300 - - - 86.90 86.34%
V.Satisfactory
Rusmen Builders & Development Corporation 10674 Rehab. of Banay-banay-Cuenca
Road (San Jose Section) 1st/Final IV-A 4.798 C 0.366 0.300 0.300 - - - 96.60 96.60% Outstanding
Rusmen Builders & Development Corporation
(Formerly: Rusmen Corporation)
10674 Const. of Multi-Purpose Building 1st IV-A 4.769 O 0.369 0.200 0.100 0.030 0.043 0.100 84.20 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 154
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Rusmen Builders & Dev't. Corp. 10674 Const of San Jose Market Brgy.
Taysan 1st IV-A 8.595 O 0.400 0.217 0.100 0.030 0.020 0.100 86.70 -
Rusmen Builders & Dev't. Corp. 10674 Impv't. of Manila-Batangas By Pass
Road Phase I 1st IV-A 9.562 C 0.456 - 0.500 - - - 95.60 95.60% Outstanding
S & G Construction 11773 Const. of Tacurong Drainage Canal Final XII 6.624 C 0.323 - 0.500 - - - 82.30 88.98% V.Satisfactory
S & G Dconstruction and Supply 11773 Rehabilitation of Manin Canal (Sta.
21+714-26+526) Final NIA Region I 7.304 C 0.250 0.300 0.300 - - - 85.00 84.87%
S & K Builders, Inc. 24039 Const. of 5-CL School Building @ Quezon NHS Final X 1.406 C 0.347 0.000 0.500 0.000 0.000 0.000 84.70 77.91%
Satisfactory
S.A. Gomez Construction 6265 Const. of Malasag Eco-Tourism Facilities 1st PTA
Region X 11.167 O 0.373 0.300 0.070 0.015 0.039 0.067 86.43 -
S.J. Yu Construction 17048 Rehabilitation of Various Building @ CL Montelibano Regional Hospital 2nd VI 4.725 O 0.373 0.273 0.100 0.022 0.035 0.100 90.30 -
S.J. Yu Construction 17048Rehabilitation of Various Buildings @ C.L. Montelibano Regional Hospital
Final VI 4.090 O 0.361 0.195 0.000 - - - 55.60 -
S.M. Castro Management & Construction Services 18216 Const. of Capinahan Bridge Final VIII 3.931 C 0.452 - 0.500 - - - 95.20 93.28%
Outstanding
S.R. Baldon Construction & Supply 15405 Concreting of Cabid-an Road
(Seabreeze), Cabid-an 1st/ Final V 0.920 C 0.268 0.000 0.500 0.000 0.000 0.000 76.80 76.80% Satisfactory
S.R. Baldon Construction & Supply 15405 Const. of Multi-Purpose Building,
Madlawan 1st/ Final V 0.240 C 0.372 0.000 0.500 0.000 0.000 0.000 87.20 87.20% V.Satisfactory
Sabutan Construction 5520 Road Widening of Canggumantong-Poo-Lazi Interior Road 1st VII 1.391 O 0.400 0.294 0.100 0.008 0.028 0.067 89.70 -
Sabutan Construction 5520 Road Widening of Canggumantong-Poo-Lazi Interior Road Final VII 1.391 C 0.400 0.193 0.300 - - - 89.30 89.54%
V.Satisfactory
Salidummay Gen. Construction 21403 Completion of Multi-Purpose
Building 1st/Final CAR 0.476 C 0.384 0.250 0.300 - - - 93.40 93.40% Outstanding
Salidummay Gen. Construction 21403 Const. of Multi-Purpose Building,
Pinsao-Pilot Brgy. Final CAR 1.620 C 0.398 0.000 0.500 0.000 0.000 0.000 89.80 63.34% Fair
Samjan Builders 27855 Completion of Multi Purpose Bldg. At Campo Filipino Brgy. 1st/Final CAR 0.953 C 0.345 0.300 0.300 - - - 94.50 94.50%
Outstanding
Samjan Builders 27855 Rehabilitation along Pico-Lamtang Road Final CAR 2.173 C 0.383 0.000 0.500 0.000 0.000 0.000 88.30 86.74%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 155
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Samurai Construction 32214 Const. of Multi Purpose Pavement @ Brgy. Sarong 1st/Final IVB 0.208 C 0.173 0.000 0.300 - - - 47.30 47.30%
Poor
San Fernando Builders 21295 Const. of Multi-Purpose Bldg. 1st/Final I 2.846 C 0.349 0.300 0.300 - - - 94.90 94.90% Outstanding
San Fernando Builders 21295 Const. of Multi-Purpose Bldg. Final I 1.428 C 0.322 0.300 0.300 - - - 92.20 84.85% V.Satisfactory
San Fernando Builders 21295 Const. of Multi-Purpose Structure at Brgy. Sili 1st / Final I 0.187 C 0.303 0.000 0.500 0.000 0.000 0.000 80.30 80.30%
V.Satisfactory
Sandstorm Construction 23411 Const. of Flood Control System @ Brgy. Zone 13 1st / Final IV-A 0.471 C 0.374 0.300 0.300 - - - 97.40 66.71%
Fair
Sandstorm Construction 23411 Const. of Multi-Purpose Building at Brgy. Sta. Elena 1st IV-A 0.477 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
Sanlahi Group of Builders, Inc. 11874 Concreting of Baco-Puerto Galera
Road (Phase II) Final IV-B 9.500 C 0.314 0.300 0.300 - - - 91.40 81.50% V.Satisfactory
Sanlahi Group of Builders, Inc. 11874 Concreting of Brgy. Panikian Road,
Naujan Final IV-B 1.894 C 0.198 0.000 0.500 0.000 0.000 0.000 69.80 71.96% Satisfactory
Sanlahi Group of Builders, Inc. 11874 Const. of Drainage System (w/cover)
Brgy. Tawiran-Sta. Isabel, Final IV-B 4.035 C 0.356 0.000 0.500 0.000 0.000 0.000 85.60 85.60% V.Satisfactory
Sanlahi Group of Builders, Inc. 11874 Const./Repair of Multi-Purpose
Building, Masipit 2nd IV-B 0.947 C 0.391 0.000 0.500 0.000 0.000 0.000 89.10 89.10% V.Satisfactory
Sanlahi Group of Builders, Inc. 11874 Widening of Libis-Lumangbayan-
Sta. Isabel Road Final IV-B 6.441 C 0.378 0.300 0.300 - - - 97.80 94.32% Outstanding
Santech Builders 16797 Concreting of Molimono-Pili Road, Cawayan (Phase VII) Final XIII 4.587 C 0.369 0.200 0.300 - - - 86.90 84.86%
V.Satisfactory
Santech Builders 16797 Const. of Magtangale-Macopa Road, San Francisco Final XIII 2.651 C 0.366 0.000 0.500 0.000 0.000 0.000 86.60 86.42%
V. Satsifactory
Santech Builders 16797 Const. of Multi-Purpose Building 1st XIII 4.652 O 0.309 0.253 0.100 0.015 0.033 0.100 81.00 -
Santech Builders 16797 Const. of Multi-Purpose Building Final XIII 4.652 C 0.274 0.300 0.300 - - - 87.40 82.92% V.Satisfactory
Santech Builders 16797 Const. of Rosita Bridge III, PSCG (Type IV-B) 1st XIII 4.607 O 0.375 0.240 0.050 0.030 0.043 0.067 80.50 -
Santech Builders 16797 Const. of Rosita Bridge III, PSCG (Type IV-B) Final XIII 4.608 C 0.377 0.300 0.300 - - - 97.70 87..38%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 156
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Sapdoy Enterprises 21995 Completion of MPB @ BGH Compound 1st/Final CAR 0.952 O 0.301 0.300 0.100 0.023 0.032 0.100 85.60 -
Sarangani Rockmixer 6549 Completion/Concreting of Crossing Rubber-Tampakan Road Final XII 5.583 C 0.465 - 0.500 - - - 96.50 96.44%
Outstanding
Sarangani Rockmixer 6549 Const. of GSC Circumferential Road, San Isidro Section, Brgy. San Isidro 1st/ Final XII 4.698 C 0.435 0.000 0.500 0.000 0.000 0.000 93.50 93.50%
Outstanding
Sarangani Rockmixer 6549 Widening of Maka-Tupi-Marbel Road (Labangal-Apopong Section) 1st XII 7.150 O 0.392 0.233 0.070 0.015 0.032 0.033 77.50 -
Sards Construction 15408 Conc. (Concrete Reblocking) of 1,220 lm Nat'l Road 1st VI 9.411 O 0.340 0.220 0.070 0.008 0.028 0.067 73.30 -
Sarex Builders 23734 Completion of Gutalac Public Market, Gutalac Final IX 0.739 C 0.482 0.000 0.500 0.000 0.000 0.000 98.20 88.20%
V.Satisfactory
Sarex Builders 23734 Concreting of Road at Molave Street, Poblacion Carmen 1st/ Final XII 1.878 C 0.345 0.000 0.500 0.000 0.000 0.000 84.50 84.50%
V.Satisfactory
Sarex Builders 23734 Const. of MPB @ Brgy Ilbocean 1st/Final XII 0.330 C 0.330 0.300 0.300 - - - 93.00 93.00% Outstanding
Sarex Builders 23734 Const. of Multi-Purpose Bldg. @ Brgy. Gen. Luna 1st / Final XII 0.235 C 0.432 0.000 0.500 0.000 0.000 0.000 93.20 93.2%
Outstanding
Sarex Builders 23734 Const. of Water Supply / Spring Development Brgy. Malitubog Final XII 0.462 C 0.336 0.000 0.300 - - - 63.60 79.56%
Satisfactory
Sarex Builders 23734 Proposed Const. of Seawall Manil Leon Postigo 1st / Final IX 0.779 C 0.416 0.000 0.500 0.000 0.000 0.000 91.60 91.60%
Outstanding
Sargasso Construction and Development Corp. 6587 Const. of Manggamnan Bridge 1st IV-B 13.332 O 0.267 0.240 0.000 0.023 0.035 0.067 63.20 -
Sargasso Construction and Dev't. Corp. 6587 Const./ Replacement of
Manggamnan Bridge 2nd IV-B 13.347 O 0.289 0.237 0.100 0.030 0.047 0.100 80.30 -
Satrap Construction Company, Inc. 2526 Asphalting of Shoulder along MNR
San Ildefonso Final I 1.256 C 0.317 - 0.500 - - - 81.70 81.76% V.Satisfactory
SBB Construction and Supply 31238 Concreting of Road @ Dama de
Noche Final XI 0.462 C 0.303 - 0.500 - - - 80.30 85.70% V.Satisfactory
SBB Construction and Supply 31238 Const. of 1CL 1 Storey S/B at Mintal
E/S 1st/Final XI 0.425 C 0.378 0.176 0.300 - - - 85.40 85.40% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 157
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
SCP Construction 8797 Const. of Barangay Cuarenta-Luna Road 4th XIII 12.884 O 0.317 0.300 0.000 0.024 0.042 0.100 78.30 -
SCP Construction 8797 Const. of Brgy. Cuarenta-Luna Road, San Jose 5th XIII 13.026 O 0.309 0.300 0.000 0.023 0.025 0.033 69.00 -
SCP Construction 8797 Const. of Brgy. Cuarenta-Luna Road, San Jose Final XIII 13.026 C 0.383 0.300 0.000 - - - 68.30 72.98%
SatisfactorySCP Construction /
Persan Construction / G & P Builders, Incorporated
(JV)
JV-99-175Const./ Impv't. of Bulua (Jct. ICB Road)P.N. Road-Lumbia (Jct. Airport Road)
2nd X 121.472 C 0.342 0.300 0.050 0.030 0.055 0.067 84.40 84.40% V.Satisfactory
SCP Construction / Persan Construction / G & P Builders, Incorporated
(JV)
JV-99-175Const./ Impv't. of Bulua (Jct. ICB Road)P.N. Road-Lumbia (Jct. Airport Road)
Final X 121.472 C 0.367 0.300 0.300 - - - 96.70 93.19% Outstanding
SCV Construction 14523 Const. of Multi-Purpose Building 1st X 0.933 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -
Segal Construction 17243 Const. of Drainage System, New Lucban Brgy. 1st CAR 0.959 C 0.399 - 0.500 - - - 89.90 89.90%
V.Satisfactory
Serra Ty Construction 7373 Concreting of Road from Airport to Brgy. Awasian 1st/ Final XIII 1.353 C 0.357 0.000 0.500 0.000 0.000 0.000 85.70 85.70%
V.Satisfactory
Serra Ty Construction 7373 Rehab./Impvt. of Gamut-Unaban Section, along SCDR 1st XIII 9.605 O 0.263 0.265 0.100 0.022 0.020 0.067 73.70 -
Settlers Builder 21643 Const. of Libonan Bridge 1st VI 7.199 O 0.311 0.300 0.100 0.030 0.030 0.100 87.10 -
Settlers Builder 21643 Const. of Libonan Bridge Final VI 7.199 C 0.400 0.200 0.300 - - - 90.00 88.26% V.Satisfactory
Seven Digit Construction & Supplies 25471 Raising of Grade of Puerto Princesa-
Roxas, Taytay-El Nido Road Final IV-B 3.642 C 0.283 0.300 0.300 - - - 88.30 89.62% V.Satisfactory
Seven Digit Construction & Supplies 25471 Rehab./Improvement of San Vicente
Airport Runway Final IV-B 9.139 C 0.280 0.300 0.300 - - - 88.00 83.86% V.Satisfactory
Seven Digits Construction & Supplies 25471 Rehabilitation of San Jose-Port
Barton Road Final IV-B 4.102 C 0.389 0.209 0.300 - - - 89.80 85.66% V.Satisfactory
Seven Digits Construction & Supplies 25471 Repair/Rehab. & Const. of Bagiong
Bayan Bebeladan FMR Final IV-B 2.660 C 0.387 0.500 88.70 85.76% V.Satisfactory
Seven Digits Construction & Supply 25471 Const. of Flood Control at Barangay
Sowangan 1st/ Final IV-B 0.947 C 0.389 0.000 0.500 0.000 0.000 0.000 88.90 88.90% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 158
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
SGB Concrete Products & General Merchandise 20745 Rehab./Impv't. of Antipolo-Tukulan
Road Final IVA 1.917 C 0.359 - 0.500 - - - 85.90 91.00% Outstanding
SGL Trading 27767 Concreting of Agtangao-Manila Road, Benguet 1st / Final CAR 0.452 C 0.344 0.000 0.500 0.000 0.000 0.000 84.40 84.40%
V.Satisfactory
SGSS Construction 27502 Const. of Multi-Purpose Building 1st/Final IVA 0.287 C 0.401 - 0.500 - - - 90.10 90.10% Outstanding
Sheen-Sheen Construction 29015 Concreting of Soro-Soro Road 1st X 0.917 O 0.322 0.283 0.100 0.030 0.055 0.100 89.00 -
Sheen-Sheen Construction 29015 Concreting of Soro-Soro Road Final X 0.917 C 0.341 0.300 0.300 - - - 94.10 91.04%
OutstandingSheen-Sheen Construction 29015 Const. of Agoho Multi-Purpose
Building 1st X 1.395 O 0.365 0.300 0.100 0.030 0.038 0.100 93.30 -
Sheen-Sheen Construction 29015 Const./Conc. of Sitio Vulcan Brgy.
Naasag Road 1st X 0.921 O 0.348 0.200 0.100 0.000 0.032 0.100 78.00 -
Sheen-Sheen Construction 29015 Const./Conc. of Sitio Vulcan Brgy.
Naasag Road Final X 0.921 C 0.343 0.200 0.300 - - - 84.30 80.52% V.Satisfactory
Shinsung Eng'g. & Construction Corp. Co.
Ltd.
SL2-SN-000402
Contract Package 3, Monkayo Tagum Section Compostella Valley 8th PJHL 1,508.838 O 0.356 0.300 0.100 0.030 0.050 0.100 93.60 -
Shinsung Eng'g. & Construction Corp. Co.
Ltd.
SL2-SN-000402
Contract Package 3, Monkayo-Tagum Section Compostella Valley 4th PJHL 1,480.326 O 0.394 0.300 0.070 0.030 0.070 0.067 93.10 -
Shinsung Eng'g. & Construction Corp. Co.
Ltd.
SL2-SN-000402
Contract Package 3, Monkayo-Tagum Section Compostella Valley 5th PJHL 1,480.326 O 0.398 0.300 0.070 0.030 0.061 0.100 95.90 -
Silk & Steel Construction 25314 Const. of 1-Unit, 2-Cl RM School Building @ Brgy. Pinggan 1st/Final VIII 0.856 C 0.272 0.279 0.300 - - - 85.10 85.10%
V.Satisfactory
Silliman Avenue Construction & Supply 22759 Completion of MPB 1st VII 0.870 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -
Silliman Avenue Construction & Supply 22759 Const. of Provincial Road-Purok 2
Sulop Cemetery 1st XI 0.469 C 0.345 0.250 0.070 0.023 0.023 0.067 77.80 -
Silliman Avenue Construction & Supply 22759 Const. of Provincial Road-Purok 2
Sulop Cemetery Final XI 0.469 C 0.324 0.000 0.500 0.000 0.000 0.000 82.40 79.64% Satisfactory
Silliman Avenue Construction & Supply 22759 Const./Completion of San Jose
Public Market (Phase II) 1st/Final XIII 2.595 C 0.383 - 0.500 - - - 88.30 88.30% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 159
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Simplified Builders 20747 Const. of 2 CL School Building @ Solana North C/S 1st/Final II 0.951 C 0.329 0.190 0.300 - - - 81.90 81.90%
V.Satisfactory
Sixteen Enterprises 18187Conc. of Calapan South (Himpaparay-San Antonio Section), Mansalay
Final IV-B 4.020 C 0.396 0.000 0.500 0.000 0.000 0.000 89.60 89.60% V.Satisfactory
Sixteen Enterprises 18187 Const. of Bucayao River Control, Calapan City Final IV-B 4.749 C 0.442 0.000 0.500 0.000 0.000 0.000 94.20 94.20%
OutstandingSixteen Enterprises -
Calapan Branch 18187 Conc. of Pinamalayan Airport Road 1st/Final IV-B 9.464 O 0.308 0.256 0.100 0.023 0.043 0.100 83.00 -
Sixteen Enterprises - Calapan Branch 18187 Conc. of Pinamalayan Airport Road Final IV-B 9.464 C 0.290 0.292 0.300 - - - 88.20 85.08%
V.Satisfactory
Sixteen Enterprises - Calapan Branch 18187
Const. of Bucayao-Magasawang Tubig River Flood Control Mitigation Projects
Final IV-B 4.038 C 0.417 0.000 0.500 0.000 0.000 0.000 91.70 89.60% V.Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Const. of San Rafael Road Roxas 1st/ Final IV-B 1.897 C 0.431 0.000 0.500 0.000 0.000 0.000 93.10 93.10%
Oustanding
SKI Const. Group, Inc. (Formerly: Summa
Kumagai, Inc.)3381
NAIA Expressway and its Related Roads Project, Phase I, Package I, Sales Interchange Components
5th URPO 179.970 O 0.392 0.300 0.000 0.030 0.037 0.033 79.20 -
SNR Builder 14539 Const. of MPB @ Brgy. Ramos West Final II 0.956 C 0.493 0.000 0.000 0.000 0.000 0.000 49.30 74.33% Satisfactory
So Construction 17714 Const. of Multi-Purpose Bldg., Brgy. Wenceslao 1st/Final III 0.185 C 0.373 0.300 0.300 - - - 97.30 97.30%
OutstandingSo Construction 17714 Rehab. of MPB at Baler C/S 1st III 0.927 O 0.282 0.300 0.070 0.030 0.022 0.100 80.40 -
So Construction 17714 Rehab./Conc. of Road leading to Municipal Hall Final III 4.634 C 0.431 - 0.500 - - - 93.10 85.96%
V.Satisfactory
Socor Construction Corporation 8020
Impvt./Rehab. of Iligan-Cagayan de Oro-Butuan Road (Initao-Lugait Section)
1st/Final X 14.305 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
Socor Construction Corporation 8020 Rehab./Impvt. of Asphalt Pavement
along Sulat-Borongan Road Section 1st/Final VIII 9.461 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
Socor Construction Corporation 8020 Repair/Rehab. of P. del Rosario St.
(Sta. 2+007-Sta. 2+505) 1st/Final VII 6.269 C 0.327 0.274 0.300 - - - 90.10 90.10% Outstanding
Socorro Villamor Enterprises 1529 Conc. of E. Rodriguez Ave. & Impvt.
of Drainage 1st/Final IVA 4.166 C 0.289 0.300 0.300 - - - 88.90 88.90% V.Satisfactory
Socorro Villamor Enterprises 1529 Improvement of San Vicente Port,
Ivana Final II 0.942 C 0.433 0.000 0.500 0.000 0.000 0.000 93.30 93.30% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 160
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Solfio P. Jacinto Construction 17799 Concreting of Road in Brgy
Valdefuente 1st III 3.260 O 0.356 0.300 0.100 0.030 0.022 0.100 90.80 -
Solid Merchandising 31609 Const. of 3 Cl Sch. Bldg. @ Colong Colong NHS 1st VI 1.085 O 0.333 0.272 0.100 0.030 0.029 0.100 86.40 -
Solid North Construction and Development
Corporation8204 Rehab. of Various Farm-to-Market
Roads 1st/Final I 0.473 C 0.364 - 0.500 - - - 86.40 86.40% V.Satisfactory
Solid Rock Construction 8958 Concreting of Brgy. Road St. Anthony 1st IV-A 1.910 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Solid Rock Construction 8958 Const. of Congressional Avenue Extension, Phase V Final NCR 8.114 C 0.338 0.200 0.300 - - - 83.80 91.18%
Outstanding
Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica 1st NCR 1.439 O 0.377 0.300 0.100 0.030 0.032 0.100 93.90 -
Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica Final NCR 1.439 C 0.342 0.300 0.300 - - - 94.20 93.99% Outstanding
Solid Square Construction 28566 Const. of Multi-Purpose Building @
Dugayong Final II 0.476 C 0.397 0.300 0.000 - - - 69.70 47.90% Poor
Solid Square Construction 28566 Repainting of Ipil Bridge along
Daang Maharlika 1st/Final II 0.268 C 0.311 0.300 0.300 - - - 91.10 91.10% Outstanding
South Builders and Construction Supplies 20238 Const. of FTM Road at Brgy. Laguan 1st IV-A 0.653 C 0.472 - 0.500 - - - 97.20 97.20%
Outstanding
South Pacific Builders Center, Inc. 24594
Iloilo Flood Control Proj., Ph II, Package III (Road Network) Sooc, Mandurriao
Final VI 29.561 C 0.466 0.000 0.500 0.000 0.000 0.000 96.60 93.00% Outstanding
Southern Dawn Development Company 12294 Concreting of Barangay Road 1st/Final IVA 0.471 C 0.375 - 0.500 - - - 87.50 87.50%
V.Satisfactory
Southern Dawn Development Company 12294 Const. of Multi-Purpose Building
(Covered Court) 1st/ Final IV-A 1.420 C 0.454 0.000 0.500 0.000 0.000 0.000 95.40 95.40% Outstanding
Soy Eng Construction 15533
Completion/Repair of Widening/Slope Protection along Rizal Shrine-Rizal Town Coastal Loop Road
Final IX 2.788 C 0.359 0.300 0.300 - - - 95.90 94.16% Outstanding
Soy Eng Construction 15533Conc. Paving of Rizal Shrine-Rizal Town Coastal Loop Road, Banbanan-Guimputian Sect.
1stFinal IX 1.782 O 0.283 0.236 0.100 0.020 0.042 0.100 78.10 -
Soy Eng Construction 15533Conc. Paving of Rizal Shrine-Rizal Town Coastal Loop Road, Banbanan-Guimputian Sect.
Final IX 1.782 C 0.311 0.256 0.300 - - - 86.70 81.54% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 161
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Soy Eng Construction 15533 Concrete Paving of Canlucani-Tag-Ulo Road, Canlucani Section 1st/ Final IX 1.681 C 0.435 0.000 0.500 0.000 0.000 0.000 93.50 93.5%
Oustanding
Soy Eng Construction 15533Concreting of Rizal Shrine-Rizal Town Coastal Loop Road (Talisay-Taguilon Section)
Final IX 2.788 C 0.377 0.230 0.300 - - - 90.70 90.58% Outstanding
Soy Eng Construction 15533 Const. of Multi-Purpose Building Brgy. Liyang E/S Final IX 0.929 C 0.490 0.000 0.500 0.000 0.000 0.000 99.00 90.60%
Oustanding
Soy Eng Construction 15533Const./Completion of Multipurpose Bldg. (Subanen Tribe), Jose Rizal Memorial State College
1stFinal IX 0.462 C 0.334 0.221 0.300 - - - 85.50 85.50% V.Satisfactory
Soy Eng Construction 15533Const./Completion of Multipurpose Bldg., Jose Rizal Memorial State College
1stFinal IX 0.703 C 0.345 0.194 0.300 - - - 83.90 83.90% V.Satisfactory
Spam Engineering Enterprise 14205
Impvt of NRJ Agusan-Misamis-R. Calo-Agusan Pequeno, Butuan City (Phase II)
2nd XIII 6.260 C 0.444 - 0.500 - - - 94.40 87.32% V.Satisfactory
Spectrum Builders 8124Impvt./Rehab. of Cuna-Sitio Magkailaw Road Sitio Makailaw Cuna
Final X 2.245 C 0.323 0.242 0.100 0.030 0.048 0.100 84.30 -
Speed Movers Construction 19206 Completion of Del Rosario Bridge
Approach (Tiaong Side) 1st/ Final IV-A 2.046 C 0.392 0.000 0.500 0.000 0.000 0.000 89.20 89.20% V.Satisfactory
SPNR Builders 31329 Completion of Concreting of Road & Drainage Canal @ Guinhawa 1st III 3.796 O 0.235 0.300 0.100 0.022 0.044 0.067 76.80 -
SPNR Builders 31329 Rehab. of Roman Expressway (Bilolo Section) 1st/Final III 2.880 C 0.347 0.300 0.300 - - - 94.70 94.70%
Outstanding
Spring Star Construction and Supply 20240 Const. of S.B. Sen. Rene Cayetano
Science & Technology Memorial H/S 1st/Final NCR 2.865 C 0.372 0.300 0.300 - - - 97.20 97.20% Outstanding
Springfield Construction 14097 Const. of Multi-Purpose Bldg., (Public Market) Final III 0.473 C 0.368 0.263 0.300 - - - 93.10 88.06%
V.Satisfactory
Springfield Construction 14097 Const. of Sto. Niño Public Market 1st/Final IV-B 1.800 C 0.344 0.300 0.300 - - - 94.40 94.40% Outstanding
Square Cube Trading Division and Consruction
Division25120 Completion of MPB @ del Carmen
Este Final VII 0.093 C 0.276 0.100 0.300 - - - 67.60 36.94% Poor
Square Cube Trading Division and Consruction
Division25120 Conceting/Improvement of Loay and
Carmen Final VII 14.155 C 0.384 0.239 0.000 - - - 62.30 71.66% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 162
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Square Cube Trading Division and Construction
Division 25120
Const. of Farm-to-Market Road (Sta. 0+000-Sta. 3+820) Brgy. Capt. Claudio
2nd VII 9.439 O 0.311 0.024 0.100 0.010 0.013 0.100 55.80 -
St. Bernard Construction 28368 Concreting of Brgy. Road, Brgy. Rebbron to Brgy. Lupi 1st/ Final V 0.926 C 0.384 0.000 0.500 0.000 0.000 0.000 88.40 88.40%
V.Satisfactory
St. Bernardine Construction 18474 Conc. of Barangay Road Brgy. San
Jose-Alanao, Lupi 1st/ Final V 0.458 C 0.194 0.000 0.500 0.000 0.000 0.000 69.40 69.40% Fair
St. Bernardine Construction 18474 Concreting of Sta. Lucia-Magarao
Road, Sta. Lucia 1st/ Final V 0.461 C 0.373 0.000 0.500 0.000 0.000 0.000 87.30 87.30% V.Satisfactory
St. Bernardine Construction 18474 Const. of MPB at Brgy. Colacling 1st/Final V 0.468 C 0.385 0.100 0.300 - - - 78.50 78.50%
Satisfactory
Sta. Cruz Construction 9301 Concreting of Barangay Road, Brgy. Grijalvo, San Fernando 1st/ Final V 0.459 C 0.246 0.000 0.500 0.000 0.000 0.000 74.60 74.60%
Satisfactory
Sta. Isabel Construction Corporation 26774 Const. of Drainage System @ Brgy.
Poblacion 1st/Final IV-B 1.637 C 0.391 0.222 0.300 - - - 91.30 91.30% Outstanding
Sta. Isabel Construction Corporation 26774 Const. of Multi-Purpose Building 1st IV-B 0.472 O 0.365 0.211 0.100 0.010 0.013 0.100 79.90 -
Stars & Stripes Construction 23484
Const. of 1 Unit - 2 CL School Bldg. @ Maras National High School, Maras
Final IX 0.627 C 0.397 0.000 0.500 0.000 0.000 0.000 89.70 89.70% V.Satisfactory
Stars & Stripes Construction 23484 Repair of 3 CL School Building
Miputak East Central School 1st/ Final IX 0.730 C 0.418 0.000 0.500 0.000 0.000 0.000 91.80 91.80% Outstanding
Stay Construction 23323 Const. of Buiguias NHS, Bot-oan Extension 2nd CAR 2.740 O 0.396 0.300 0.070 0.030 0.047 0.050 89.30 -
Stay Construction 23323 Const. of Buiguias NHS, Bot-oan Extension Final CAR 2.633 C 0.343 0.032 0.300 - - - 67.50 71.25%
SatisfactorySteel City Fabricators
Corporation 27035 Const. of 1-CL Steeltek School Building @ Laguindingan CES 1st / Final X 8.445 C 0.466 0.000 0.500 0.000 0.000 0.000 96.60 96.6%
Outstanding
Steel City Fabricators Corporation 27035 Const. of Various S/B (1-Cl S/B)
Brgy. Garcia, Tagoloan Final X 0.312 C 0.319 0.000 0.500 0.000 0.000 0.000 81.90 88.76% V.Satisfactory
Steven Construction and Supply 21987 Const. of 2 Storey MPB (Phase I) @
Brgy. GRS Final V 0.940 C 0.396 0.100 0.300 - - - 79.60 77.78% Satisfactory
Steven Construction and Supply 21987 Repair/Impv't. of DPWH Bldg., Albay
Engineering District 1st/Final V 0.919 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
Sto. Cristo Construction 26096 Const. of Two (2) Cl Sch. Bldg. at San Vicente-San Francisco NHS 1st/Final III 0.822 C 0.287 0.300 0.300 - - - 88.70 88.70%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 163
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Sto. Cristo Construction 26096 Const./Repair/Completion of Sto. Domingo Brgy. Road Final III 0.475 C 0.391 - 0.500 - - - 89.10 88.44%
V.Satisfactory
Sto. Niño Construction 4867 Conc. of Provincial Road Jct. Lower Dimaya-Pob. 2nd IX 10.264 O 0.368 0.238 0.100 0.030 0.047 0.100 88.30 -
Sto. Niño Construction 4867Conc. of Provincial Road Jct. Lower Dimaya-Pob. Dinas Zamboanga Del Sur
Final IX 10.264 C 0.202 0.188 0.300 - - - 69.00 69.96% Fair
Sto. Niño Construction 4867 Const. of MPB @ Brgy. 24 1st/Final X 0.943 C 0.386 0.200 0.300 - - - 88.60 88.60% V.Satisfactory
Sto. Niño Construction 4867 Const. of Multi-Purpose Building 1st/Final IX 0.484 C 0.365 0.249 0.300 - - - 91.40 91.40% Outstanding
Sto. Niño Construction 4867 Const. of River Control at Maclob Bridge 1st/Final IX 1.667 C 0.223 0.200 0.300 - - - 72.30 72.30%
Satisfactory
Sto. Niño Construction 4867 Impvt./Conc. Paving along Jct. Kagawasan-Tabina Rd. 1st IX 4.759 O 0.293 0.187 0.100 0.008 0.042 0.100 73.00 -
Sto. Niño Construction 4867 Impvt./Conc. Paving along Jct. Kagawasan-Tabina Rd. Final IX 4.759 C 0.214 0.285 0.300 - - - 79.90 77.86%
Satisfactory
Sto. Niño Construction 4867 Rehab. of Bawang-Silupa Roads 1st/Final IX 0.954 C 0.186 0.300 0.300 - - - 78.60 78.60% Satisfactory
Sto. Niño Construction 4867 Repair/Rehab. of Brgy. Kauswagan, Diplahan, Zamboanga Sibugay 1st/Final IX 0.941 C 0.460 - 0.500 - - - 96.00 96.00%
Outstanding
Sto. Niño Construction 4867 Repair/Rehab. of Farm-to-Market Road, Diplo-Sanlagmanok Road Final IX 4.520 C 0.477 - 0.500 - - - 97.70 95.60%
Outstanding
Stocon Construction Service 26111 Concreting of Cugman By Pass
Road Final X 1.412 C 0.359 0.273 0.300 - - - 93.20 81.50% V.Satisfactory
Stoneline Construction 13132Conc. of Western Circumferential Roads (Purok Balas-Purok Sagingan Sect.)
1st XII 1.901 O 0.270 0.300 0.000 0.030 0.041 0.067 70.80 -
Stoneline Construction 13132Conc. of Western Circumferential Roads (Purok Balas-Purok Sagingan Sect.)
Final XII 1.901 C 0.343 0.200 0.300 - - - 84.30 76.20% Satisfactory
Stoneline Construction 13132 Concrete Reblocking of Cotabato-Alla-Marbel National Road 1st XII 4.761 O 0.372 0.200 0.100 0.030 0.028 0.100 83.00 -
Stoneline Construction 13132 Const. of Road at Esteros Rosario heights 9 1st XII 1.380 O 0.267 0.300 0.100 0.030 0.031 0.100 82.80 -
Stoneline Construction 13132 Const. of Road at Esteros Rosario heights 9 Final XII 1.380 C 0.200 0.200 0.300 - - - 70.00 77.68%
Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 164
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Concreting of SKC Lugay-Lugay
Road 1st XII 3.717 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -
Struktura Teknika Services Company 16646 Const. of 2 Storey RGR Type Sch.
Bldg. Phase II 1st IVA 5.752 O 0.363 0.257 0.100 0.030 0.022 0.100 87.20 -
Struktura Teknika Services Company 16646 Const. of 2 Storey RGR Type Sch.
Bldg. Phase II Final IVA 5.752 C 0.398 0.200 0.300 - - - 89.80 87.98% V.Satisfactory
Struktura Teknika Services Company 16646 Const. of MPB @ M. Naval St. Final NCR 5.682 C 0.399 0.300 0.300 - - - 99.90 87.58%
V.Satisfactory
STX Enterprises 21547 Const. / Improvement of MWCR, Balansay Section 2nd IV-B 1.412 C 0.335 - 0.500 - - - 83.50 80.92%
V.Satisfactory
Subcon Corporation 25079 Concreting of E-25th St. and 26th St. (Elicano St.,-Dead End) East Final III 1.302 C 0.377 0.200 0.300 - - - 87.70 82.90%
V.Satisfactory
Sui Generis Construction 28174 Const. of Lasti-Tadloc Riverside Road (Phase I) 1st IVB 3.819 O 0.318 0.300 0.100 0.023 0.028 0.100 86.90 -
Sui Generis Construction 28174Const. of Molino Blvd., Niog-Mambog-Molino Section, Sta. 0+510 -Sta. 7+770.29 (Intermittent Section)
2nd IV-A 43.393 O 0.324 0.243 0.050 0.030 0.059 0.100 80.60 -
Summa Kumagai, Incorporated 3381
NAIA Expressway & Its related Proj., Phase I, Package I, Sales Interchange Component
1st URPO 164.128 O 0.348 0.300 0.100 0.030 0.043 0.100 92.10 -
Summa Kumagai, Incorporated 3381
NAIA Expressway and its Related Roads Project, Phase I, Package I, Sales Interchange Components
3rd URPO 164.128 O 0.320 0.300 0.100 0.030 0.065 0.100 91.50 -
Summercap Const. and Allied Services 30787 Completion of Lengey MPB 1st CAR 2.279 O 0.353 0.226 0.100 0.008 0.019 0.100 80.60 -
Summercap Const. and Allied Services 30787 Completion of Lengey MPB Final CAR 2.279 C 0.334 0.219 0.000 - - - 55.30 73.01%
SatisfactorySummercap Const. and
Allied Services 30787 Const. of Poblacion-Bulo-Magabta FMR 1st/Final CAR 1.331 C 0.370 0.300 0.300 - - - 97.00 97.00%
Outstanding
Sunstone Construction 11122 Conc. of Road @ Brgy. Central Katingawan Final XII 0.826 C 0.351 0.300 0.300 - - - 95.10 75.06%
Satisfactory
Sunstone Construction 11122 Const. of FTMR @ Barangiran 1st XII 0.428 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 165
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Sunwest Construction & Development Corporation 15906 Lamoa Port Expansion Project 1st PPA 98.213 O 0.383 0.300 0.030 0.030 0.060 0.033 83.60 -
Sunwest Construction & Development Corporation 15906 Proposed Davao Port Expansion 1st PPA 396.089 O 0.400 0.300 0.100 0.024 0.065 0.100 98.90 -
Sunwest Construction and Development
Corporation15906 Const. of Bahi Seawall, Rock
Causeway & Access Road Final V 14.193 C 0.373 0.091 0.300 - - - 76.40 88.28% V.Satisfactory
Sunwest Construction and Development
Corporation15906 Const. of Bahi Seawall, Rock
Causeway & Access Road Final V 47.945 C 0.450 0.500 - - - 95.00 95.12% Outstanding
Sunwest Construction and Development
Corporation15906
Repair/Impvt./Asphalt Overlay of Shoulders of Calayucay-Sula-Mosboron Road
1st/Final V 11.415 C 0.389 0.200 0.300 - - - 88.90 88.90% V.Satisfactory
Sunwest Construction and Development
Corporation15906 Widening / Improvement of National
Road, Bagamanoc-Pandan Road Final V 14.195 C 0.387 0.293 0.300 - - - 98.00 96.62% Oustanding
Superpower Construction 17149 Const. of Pahinga Norte-Malabanban Sur Spillway 1st/ Final IV-A 1.893 C 0.335 0.000 0.500 0.000 0.000 0.000 83.50 83.50%
V.Satisfactory
SY Construction 12333 Rehabilitation/Restoration of Farm-to-Market Road Final IV-A 1.924 C 0.389 0.300 0.000 - - - 68.90 81.80%
V.Satisfactory
Sydglen Builders and Enterprises 28848 Const. of 1 Cl Sch. Bldg. @ Alang-
alang I C/S 1st/Final VIII 0.507 C 0.359 0.300 0.300 - - - 95.90 95.90% Outstanding
Sysmic Enterprises & Construction 29697 Const. of Hernani Seawall, Hernani 1st / Final VIII 0.914 C 0.312 0.000 0.500 0.000 0.000 0.000 81.20 81.20%
V.Satisfactory
System One Builders 26480Proposed Partial Const. of Zobel Roxas Extension Alabastro to Onyx St.
Final NCR 4.719 C 0.414 0.000 0.500 0.000 0.000 0.000 91.40 81.14% V.Satisfactory
T R Construction 11697 Concreting of EM's Barrio Brgy. Road 1st/ Final V 0.226 C 0.452 0.000 0.500 0.000 0.000 0.000 95.20 95.20%
Oustanding
T. Solomon Construction 10046 Const. of Road @ Brgy. Banjo East 1st/Final IV-A 0.963 C 0.298 0.300 0.300 - - - 89.80 89.80% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 166
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
T.A.D. Construction 14098 Const. of Brgy. Road at Brgy. San Roque 1st/Final IVA 0.381 C 0.370 0.300 0.300 - - - 97.00 97.00%
Outstanding
T.A.D. Construction 14098 Const. of MPB @ Quezon National Agricultural 1st/Final IVA 1.929 C 0.327 0.300 0.300 - - - 92.70 92.70%
Outstanding
T.A.D. Construction 14098 Const. of Multi-Purpose Bldg. (BSP) @ Tayabas East (E/S) 1st/Final IVA 4.810 C 0.454 - 0.500 - - - 95.40 95.40%
Outstanding
T.A.D. Construction 14098Repair/Maintenance of Lined Canal along Lucena Bdry.-Tayabas-LucbanRoad
1st/Final IVA 0.289 C 0.232 0.300 0.300 - - - 83.20 83.20% V.Satisfactory
T.J. Velasco Construction and Supply 10560 Const. of 14 Core Housing Units Final NHA
Region I 3.023 C 0.394 0.300 0.300 - - - 99.40 85.40%
T.J. Velasco Construction and Supply 10560 Const. of 14 Core Housing Units,
San Carlos S/S Project 1st NHA 3.133 D 0.398 0.300 0.000 0.020 0.009 0.067 79.40
T.N.J. Buhong Construction 19687 Impvt. along Ban-Hung-Benguet
Bdry. Road Alimit-Hiwang Sect. 1st/ Final CAR 2.455 C 0.366 - 0.500 - - - 86.60 86.60% V.Satisfactory
T.N.J. Buhong Construction 19687 Impvt. Along Jct. Potia-Mt. Province
Bdry. Road, Pob. Section Final CAR 1.580 C 0.341 0.300 0.300 - - - 94.10 81.44% V.Satisfactory
T.N.J. Buhong Construction 19687
Impvt. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Road, Km. 297+000-Km. 300+000
1st / Final CAR 0.488 C 0.390 - 0.500 - - - 89.00 89.00% V.Satisfactory
Tabs Construction & Construction Supplies 10495
Replacement of Deteriorated Macadam Road to PCCP along Davao-Cotabato Road (NORCIT-KPES Sect.)
Final XII 5.217 C 0.472 - 0.500 - - - 97.20 90.18% Outstanding
Tacolod Enterprises 10721 Const. of One (1) Unit, 1-CL School Bdlg. @ Andulawan NHS Final VI 0.357 C 0.462 - 0.500 - - - 96.20 88.92%
V.Satisfactory
Taisei Philippine Construction
Incorporated / Marubeni (JV)
SL2-SN-000432
Const. of Cebu South Coastal Road Project-Segment 3B-1, offshorre Ramps Section
3rd MCDP 695.488 O 0.352 0.300 0.100 0.030 0.065 0.100 94.70 -
Tango Romeo General Construction 18926 Conc./Widening of La Chesa @
Brgy. Upper Tadiangan 1st/Final CAR 2.782 C 0.298 0.300 0.300 - - - 89.80 89.80% V.Satisfactory
Tango Romeo General Construction 18926 Concreting/Widening of Road,
Trancoville Brgy. 1st/ Final CAR 1.142 C 0.390 - 0.500 - - - 89.00 89.00% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 167
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Tantuco Const. and Trading Corp. 7255 Rehab./Impvt. of Road at Purok
Pinag-isa, Brgy. Cotta Final IV-A 0.329 C 0.375 - 0.500 - - - 87.50 87.50% V.Satisfactory
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.
Supply)
7255 Const. of Elevated Water Tank with Pipelines 1st/Final IV-A 0.944 C 0.352 0.300 0.300 - - - 95.20 95.20%
Outstanding
TCAT Construction 20822 Const. of Municipal Hall Final VIII 0.961 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding
TDR Construction & Supply 8560 Conc. of Brgy. Road @ Brgy. Kawit 1st/Final IVA 0.470 C 0.275 0.300 0.300 - - - 87.50 87.50%
V.Satisfactory
Teddie Construction Development, Inc. 6313 Const. of Bangayan Bridge and
Approaches Final IX 6.054 C 0.376 0.201 0.300 - - - 87.70 84.46% V.Satisfactory
Teddie Construction Development, Inc. 6313 Impvt./Road Widening of Sangali
Nat'l Road 1st IX 9.134 O 0.328 0.200 0.100 0.020 0.023 0.100 77.10 -
Teddie Construction Development, Inc. 6313 Impvt./Road Widening of Sangali
Nat'l Road 2nd IX 9.134 O 0.273 0.217 0.100 0.022 0.035 0.100 74.70 -
Tessa Construction & Trading 26437 Concrete Paving of Brgy. Muñoz
West Road 1st/Final II 0.944 C 0.259 - 0.500 - - - 75.90 75.90% Satisfactory
Tessa Construction & Trading 26437 Const. of Multi-Purpose Building 2nd II 1.889 O 0.365 0.300 0.070 0.015 0.027 0.067 84.40 -
Tessa Construction & Trading 26437 Rehab./Const. of Road 1st II 1.889 O 0.330 0.294 0.100 0.030 0.055 0.100 90.90 -
Tessa Construction & Trading 26437 Repair/Rehab. of Multi-Purpose
Building with CR, Brgy. Marulas 1st / Final NCR 0.444 C 0.333 - 0.500 - - - 83.30 83.30% V.Satisfactory
The Steadfast Builders 8176 Const. of Drainage System at Sto. Simona, Brgy. San Isidro 1st/ Final IV-A 0.955 C 0.451 - 0.500 - - - 95.10 95.10%
Outstanding
The Steadfast Builders 8176 Const. of Multi-Purpose Building (Dialysis) 1st / Final NCR 2.812 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
The Steadfast Builders 8176 Const. of Two (2) Storey, Six (6) Classroom Final IV-A 4.662 C 0.382 0.300 0.300 - - - 98.10 60.75%
Fair
The Steadfast Builders 8176Maintenance by Contract Package I, CY-2003 R-10, Tayuman, Zaragosa, Moriones and Juan Luna
Final NCR 5,279 C 0.408 - 0.500 - - - 90.80 83.30% V.Satisfactory
The Steadfast Builders 8176 Rehab./Const. of MPB @ Zone 25, 26, 29, 32, & 33 Final NCR 1.827 C 0.384 0.300 0.300 - - - 98.40 94.20%
Outstanding
The Steadfast Builders 8176 Upgrading/Concreting with Drainage Impv't. of Brgy. 118, Zone 9 1st/Final NCR 2.052 C 0.380 0.200 0.300 - - - 88.00 88.00%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 168
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Thel Construction & Supplies 17671 Const. of 1-Cl School Building 1st/Final XII 0.375 C 0.325 - 0.500 - - - 82.50 82.50%
V.Satisfactory
Thel Construction & Supplies 17671 Const. of MPB @ Brgy. Sta. Cruz 1st/Final XII 0.282 C 0.320 0.300 0.300 - - - 92.00 92.00%
Outstanding
Three W Builders, Incorporated 10722
Completion (conc.) of Ternate-Nasugbu Road, Balaytigue-Calayo-Looc Section
2nd IV-A 23.988 O 0.367 0.295 0.100 0.030 0.033 0.100 92.50 -
Three W Builders, Incorporated 10722
Completion (conc.) of Ternate-Nasugbu Road, Balaytigue-Calayo-Looc Section
Final IV-A 23.988 C 0.342 0.300 0.300 - - - 94.20 91.17% Outstanding
Three W Builders, Incorporated 10722 Const. of 2- Storey, 4-CL School
Building Final IV-A 2.784 C 0.393 - 0.500 - - - 89.30 86.78% V.Satisfactory
Thrivelight Enterprises & Construction 26842 Const. of MPS @ Brgy.
Ambangonan, Rosaario 1st/ Final I 0.930 C 0.331 - 0.500 - - - 83.10 83.10% V.Satisfactory
Thunder Construction 17247 Rehabilitation of FMR @ Villa Mercedes Final CAR 0.468 C 0.284 0.200 0.300 - - - 78.40 74.08%
Satisfactory
Thunderheads Construction Corporation 22420 Const. of Paclasan Seawall Final IV-B 0.875 C 0.396 - 0.500 - - - 89.60 89.60%
V.Satisfactory
Tibaraw Construction 22710 Const. of Multi-Purpose Building 1st VIII 0.878 O 0.308 0.247 0.000 0.015 0.027 0.067 66.40 -
Tibaraw Construction 22710 Const. of Multi-Purpose Building Final VIII 0.878 C 0.214 0.200 0.000 - - - 41.40 58.90% Poor
Tibaraw Construction 22710 Const. of Multi-Purpose Building Final VIII 1.702 C 0.370 0.200 0.300 - - - 87.00 85.71% V.Satisfactory
Tibaraw Construction 22710 Const./Rehab. of FMR, Bagacay-Concord Road Final VIII 1.789 C 0.000 - 0.500 - - - 50.00 40.00%
Poor
Titanium Builders Inc. 24921 Concreting of Barangay Road, Brgy. Poblacion Final X 0.964 C 0.337 0.300 0.300 - - - 93.70 88.18%
V.Satisfactory
Titanium Builders, Inc. 24921 Conc. of Purok Mutya-Brgy. Katipunan Road, Villanueva 1st/ Final X 0.955 C 0.422 - 0.500 - - - 92.20 92.20%
Outstanding
Titanium Builders, Inc. 24921 Const. of Brgy Maputi Flood Control, Naawan 1st / Final X 0.239 C 0.445 - 0.000 - - - 44.50 44.50%
PoorTKS Builders and
Supplies 23415 Concreting of Roads at Sitio Batulosa Bangkas Heights 1st XI 1.407 C 0.456 - 0.500 - - - 95.60 95.60%
OutstandingTKS Builders and
Supplies 23415 Const. of MPB at Camanchiles 1st XI 1.575 O 0.351 0.282 0.100 0.030 0.035 0.100 89.80 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 169
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
TM Abad Construction 9302 Completion/Conc. of Road @ Panorama Hills, Etn. Brgy. Cupang 1st/Final IV-A 0.431 C 0.290 0.244 0.300 - - - 83.40 83.40%
V.Satisfactory
TM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S Final NCR 2.894 C 0.383 0.300 0.300 - - - 98.30 89.20% V.Satisfactory
TM Abad Construction 9302 Riprapping of Putting Kahoy Creek 1st/Final IV-A 1.050 C 0.375 - 0.500 - - - 87.50 87.50% V.Satisfactory
Toa Construction
FC-01-054/SLI-
SN-004426
Const. of the Agno River Control Project, Phase II, Package I 2nd MFCDP-II 708.981 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -
Tokwing Construction 9650 Repair/Rehab. of Ayala Bridge 1st NCR 42.322 O 0.400 0.230 0.100 0.015 0.041 0.100 88.60 -
Tokwing Construction/ZM Construction (JV) JV-05-006
Const. of Maculcul Bridge & Approaches along Iba-South Road (Phase III)
1st III 93.730 O 0.377 0.300 0.100 0.030 0.037 0.100 94.40 -
Tokwing Construction/ZM Construction (JV)
SL1-SN-004749 Const. of Maculcul Bridge (Phase II) 1st III 47.664 O 0.356 0.300 0.100 0.030 0.040 0.100 92.60 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3, Skyway Ramps
3rd URPO 414.099 O 0.355 0.256 0.100 0.030 0.065 0.100 90.60 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3, Skyway Ramps
5th URPO 457.260 O 0.336 0.240 0.000 0.023 0.055 0.067 72.10 -
Toledo Construction Corporation 6349 Sct. Ranger Housing Project, Phase
II 1st NHA 51.242 O 0.400 0.300 0.100 0.030 0.046 0.100 97.60 -
Tonka Construction 4064 Upgrading/Asphalting of Manila North Road (Mabalacat Section) 1st/ Final III 4.697 C 0.470 - 0.500 - - - 97.00 97.00%
Outstanding
Tonn Builders (Phils.) Const., Inc. 5815 Const. of Lepote Bridge &
Approaches (Phase I & II) 1st IVA 22.899 O 0.366 0.237 0.100 0.022 0.033 0.100 85.80 -
Top Most Development and Marketing Corporation
13361 Concreting of Lambunao-Pototan National Road 1st VI 2.879 O 0.346 0.300 0.100 0.030 0.048 0.100 92.40 -
Top Most Development and Marketing Corporation
13361 Concreting of Lambunao-Pototan National Road Final VI 2.879 C 0.269 0.200 0.300 - - - 76.90 86.20%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 170
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Top Most Development and Marketing Corporation
13361 Concreting of Lambunao-Pototan Road (Lambunao Poblacion Portion) Final VI 2.595 C 0.431 - 0.000 - - - 43.10 71.45%
Satisfactory
Top Most Development and Marketing Corporation
13361 Const. of Nato Bridge Final VI 3.304 C 0.434 - 0.500 - - - 93.40 72.70% Satisfactory
Top Tech Trading & Construction 25522 Asphalt Overlay/Rehab. of Palico-
Balayan-Batangas Road 1st/Final IVA 4.995 C 0.366 0.300 0.300 - - - 96.60 96.60% Outstanding
Top Tech Trading & Construction 25522 Conc. of Barangay Road @ Brgy.
Gulod 1st/Final IVA 0.470 C 0.343 0.300 0.300 - - - 94.30 94.30% Outstanding
Top Tech Trading & Construction 25522 Concreting of FMR, Brgy. Dita 1st/ Final IV-A 0.473 C 0.433 - 0.500 - - - 93.30 93.3%
Oustanding
Top Tech Trading & Construction 25522
Const. of Drainage along Palico-Balayan-Batangas Road, Lemery Section
1st/Final IVA 1.102 C 0.413 - 0.500 - - - 91.30 91.30% Outstanding
Toreja's Construction Supply Corporation 15453 Conc. of Road @ Brgy. Simlog 1st/Final IVA 4.744 C 0.333 0.281 0.300 - - - 91.40 91.40%
Oustanding
Toreja's Construction Supply Corporation 15453 Const. of Open Canal 1st/Final IVA 0.475 C 0.400 - 0.500 - - - 90.00 90.00%
V.Satisfactory
Toreja's Construction Supply Corporation 15453 Impvt./Rehab. of Lipa-Rosario Road 1st/Final IVA 4.817 C 0.340 0.200 0.300 - - - 84.00 84.00%
V.Satisfactory
Toyo Construction Co. Ltd.
SL1-SN-004893
Rehab./Enhancement of Ormoc Flood Mitigation Structures 1st MFCDP-II 121.513 O 0.380 0.200 0.100 0.030 0.070 0.200 98.00 -
Toyo Construction Co., LTD
SL1-SN-004890
Const. of Super Diversion Canal(Sta. 26+600 to Sta. 29+240) 1st NIA
Region III 506.085 O 0.373 0.200 0.100 0.024 0.047 0.200 94.40 -
Toyo-Tobishima (JV) FC-06-034
Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Borbocolan Bridge)
1st IVB 23.577 O 0.281 0.241 0.100 0.030 0.051 0.100 80.30 -
Toyo-Tobishima (JV) FC-06-034
Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Langgang Bridge)
1st IVB 14.949 O 0.367 0.286 0.100 0.030 0.047 0.100 93.00 -
Tracsom Builders Inc. 5935 Const. of School Building @ Highway Hills E/S 1st NCR 9.542 O 0.400 0.204 0.100 0.030 0.035 0.100 86.9 -
Traffic Supplies and Construction Corp. 19584
Improvement of Midsayap-Dulawan-Marbel Road (Sta. Km. 1776-Sta. Km. 1793+000)
1st/ Final XII 0.946 C 0.375 0.000 0.500 0.000 0.000 0.000 87.50 87.50% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 171
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Trans-Aurora Construction 11388 Impvt./Conc. of Nat'l Road SLMAC
Road, Wenceslao Section 1st III 7.177 O 0.342 0.265 0.100 0.024 0.030 0.100 86.10 -
Trans-Aurora Construction 11388 Impvt./Conc. of Nat'l Road SLMAC
Road, Wenceslao Section 2nd III 7.177 O 0.370 0.287 0.070 0.015 0.023 0.100 86.50 -
Trinnadel Const. & Supply 15801 Asphalting of Access Road, Poblacion 1st/Final III 4.681 C 0.200 0.300 0.300 - - - 80.00 80.00%
Satisfactory
Trinnadel Const. & Supply 15801 Const. of Multi-Purpose Building 1st III 2.794 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -
Triparco Development Corporation 23327 Const. of Sangay-San Isidro FMR,
Kitcharo 1st/ Final XIII 1.804 C 0.310 0.000 0.500 0.000 0.000 0.000 81.00 81.00% V. Satsifactory
Triple 8 Construction & Supply 10684 Concreting/Upgrading of
Bustamante/M.H. del Pilar St. Final NCR 4,030 C 0.429 - 0.500 - - - 92.90 85.64% V.Satisfactory
Triple 8 Construction & Supply 10684 Repair/Impvt. of Manila North Road 1st III 14.798 O 0.339 0.246 0.100 0.015 0.018 0.050 76.80 -
Triple 8 Construction & Supply 10684 Widening of Ortigas Ave. Phase II 1st NCR 9.544 O 0.394 0.295 0.100 0.030 0.032 0.067 91.80 -
Triple 8 Construction & Supply 10684 Widening of Ortigas Ave. Phase II Final NCR 9.544 C 0.314 0.300 0.300 - - - 91.40 91.64%
Outstanding
Triple 8 Construction & Supply 10684 Widening/Concreting with Drainage
Improvement along M.H. Del Pilar St. 1st/Final NCR 3.778 C 0.389 - 0.500 - - - 88.90 88.90% V.Satisfactory
Triple P Construction 31616 Const. of District IV MPB (Reservist Phase II) 1st/Final II 0.747 C 0.400 0.240 0.300 - - - 94.00 94.00%
Outstanding
Triple P Construction 31616 Const. of Mabulso MPB 1st/Final II 0.469 C 0.341 0.300 0.300 - - - 94.10 94.10% Outstanding
Tri-sons Construction and Supply 16890 Const. of Gymnasium Bldg. @ Brgy.
Paitan Final XII 0.963 C 0.371 0.300 0.000 - - - 67.10 62.20% Fair
Triumph Builders and Steel Inc. 2272 Const. of 12-classroom, 3-storey
School Building, Package 1 1st NHA 16.402 O 0.336 0.300 0.100 0.006 0.010 0.030 78.20 -
TRM Construction & Dev't. Corp. 30713
Package IV-Concreting & Drainage Rehab. of Sorsogon St., Brgy. Nayong Kanluran & East Riverside/Aragon St.,
1st/Final NCR 1.914 C 0.426 - 0.500 - - - 92.60 92.60% Outstanding
TRPL Construction 14236 Const. of Pagduque-Rosario Road Final VI 2.376 C 0.354 - 0.500 - - - 85.40 70.04% Satisfactory
TSD Builders Construction and Supply 22129
Conc./Repair/Rehab. of Tangub Bridge I, along Bacolod-South Kabankalan Road
Final VI 1.569 C 0.291 0.300 0.300 - - - 89.10 88.26% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 172
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
TSD Builders Construction and Supply 22129 Widening of Bacolod-South
Kabankalan Road 1st/Final VI 1.294 C 0.294 0.300 0.300 - - - 89.40 89.40% V.Satisfactory
T-Square Builders 14268Completion of Big Margus RCDG Bridge along Sarangani-Davao del Sur Coastal Road
1st XII 4.716 O 0.347 0.225 0.050 0.010 0.006 0.067 70.50 -
T-Square Builders 14268 Conc. of Additional 2-lanes along Digos Junction Road 1st XI 2.581 O 0.354 0.300 0.100 0.030 0.055 0.100 93.90 -
T-Square Builders 14268 Const. MPB @ Brgy. Poblacion (Municipal Hall) Final XII 4.751 C 0.361 0.300 - - - - 66.10 77.09%
Satisfactory
T-Square Builders 14268 Const. of 1-Cl at Malibago E/S Sitio Cassava 1st/Final VII 183.115 C 0.414 - 0.500 - - - 91.40 91.40%
Outstanding
T-Square Builders 14268 Const./Widening of Digos Junction Road 2nd XI 9.424 O 0.289 0.300 0.100 0.008 0.054 0.100 85.10 -
T-Square Builders 14268 Const./Widening of Digos Junction Road Final XI 9.424 C 0.318 0.200 0.300 - - - 81.80 86.18%
V.Satisfactory
T-Square Builders 14268Package I-Concreting of Various Road with Lined Canal Brgy. San Isidro
1st/ Final XII 1.439 C 0.366 - 0.500 - - - 86.60 86.60% V.Satisfactory
TTK Construction Corporation 31907 Cluster II: Const. of Mu;ti-Purpose
Bldg. Final CAR 0.940 C 0.373 0.117 0.300 - - - 79.00 87.26% V.Satisfactory
Tuchar Construction 13644 Completion of Multi-Purpose Building at Strip 70 1st / Final NCR 0.609 C 0.435 - 0.500 - - - 93.50 93.50%
Outstanding
Tuchar Construction 13644 Repair/Rehabilitation A. Bonifacio Avenue 1st/Final NCR 4.869 C 0.346 0.200 0.300 - - - 84.60 84.60%
V.Satisfactory
Turquoise Construction 21801 Upgrading of National Road San Fernando - Lagundi Final III 4.771 C 0.385 - 0.500 - - - 88.50 88.50%
V.Satisfactory
Twin Dragon Construction 11392 Const. of Panique-Trangkalan Farm
to Market Road 1st/ Final IV-B 0.908 C 0.374 - 0.500 - - - 87.40 87.40% V.Satisfactory
Twin Dragon Construction 11392 Lining Ditches along Looc-Ferrol
Rd., Km. 114+450 - 114+600 Final IV-B 0.283 C 0.444 0.500 - - - 94.40 94.40% Outstanding
Twin Dragon Construction 11392 Rep./Maint. of Bangon River Control 1st IV-B 0.656 O 0.376 0.000 0.100 0.015 0.019 0.200 71.00 -
Twin Dragon Construction 11392 Rep./Maint. of Bangon River Control 1st/Final IV-B 0.282 C 0.289 0.073 0.300 - - - 66.20 66.20%
Fair
Twin Dragon Construction 11392 Repair of Odiongan Public Market 1st/Final IV-B 1.888 C 0.352 0.184 0.300 - - - 83.60 83.60%
V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 173
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Twina Builders and Supply 23897 Const. of Water Supply Brgy. Luna,
Kapalong Final XI 0.754 C 0.350 - 0.500 - - - 85.00 89.08% V.Satisfactory
Twina Builders and Supply 23897 Rehab. of MPB (Cons. of Fire Station
Bldg. Phase V) 1st XI 4.714 O 0.364 0.245 0.100 0.030 0.056 0.100 89.50 -
Twina Builders and Supply 23897 Repair/Rehab. of MPB (Phase IV) @
Brgy. New Pandan 1st XI 1.880 O 0.340 0.240 0.100 0.020 0.041 0.100 84.10 -
Twintech Builders & Developers, Inc. 23511 Const. of Multi-Purpose Building,
Dolores Final CAR 3.680 C 0.421 - 0.500 - - - 92.10 75.72% Satisfactory
Twintech Builders & Developers, Inc. 23511 Const. of Sinalang River Irrigation
Flume Final CAR 3.749 C 0.397 - 0.500 - - - 89.70 90.81% Outstanding
Two Aces Construction and Supplies 15413 Conc. of Lapucon Cemetery Road 1st/Final XIII 3.749 C 0.358 0.300 0.300 - - - 95.80 95.80%
Outstanding
Two Aces Construction and Supplies 15413 Const. of Poblacion Drainage Canal,
Kitcharo Final XIII 0.453 C 0.319 - 0.500 - - - 81.90 77.22% Satisfactory
U & N Engineering Services 16743 Concreting of Municipal Streets,
Malabuyoc 1st/ Final VII 1.893 C 0.386 - 0.500 - - - 88.60 86.90% V.Satisfactory
UGM Construction 22047 Const. of Secondary Sch. Bldg. (3 Cl) 1st/Final IVB 1.184 C 0.367 0.300 0.300 - - - 96.70 96.70%
Outstanding
UKC Builders, Inc. 10759 Const. of Cagayan de Oro City 3rd Bridge & Approaches Phase II Final X 63.689 C 0.390 0.300 0.300 - - - 99.00 92.64%
Outstanding
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan Road.
1st XI 9.342 O 0.318 0.255 0.100 0.023 0.048 0.100 84.40 -
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan Road.
2nd XI 9.342 O 0.395 0.300 0.100 0.030 0.048 0.100 97.30 -
Ulticon Builders, Inc. 17267 Const. of Tubay-La Fraternidad-Binuangan FMR Final XIII 2.746 C 0.397 0.295 0.300 - - - 99.20 97.42%
Outstanding
Ulticon Builders, Inc. 17267 Impvt. of Mawab-Sawangan-Maco Alternate Road, Phase II Final XI 9.400 C 0.422 - 0.500 - - - 92.20 92.53%
Outstanding
Ulticon Builders, Inc. 17267 Rehabilitation & Improvement of Davao-Cotabato Road 1st XI 18.869 O 0.399 0.300 0.000 0.008 0.043 0.067 81.70 -
Ulticon Builders, Inc. 17267 Rehabilitation & Improvement of Davao-Cotabato Road Final XI 18.869 C 0.330 0.205 0.300 - - - 83.50 82.42%
V.Satisfactory
Ultron Construction Corporation 14313 Const. of San Antonio II Flood
Control Final IV-A 0.960 C 0.150 - 0.500 - - - 65.00 75.86% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 174
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Uni Construction 13198 Concreting of Brgy. Road, Sitio Paitan Final V 0.916 C 0.337 0.220 0.300 - - - 85.70 86.78%
V.Satisfactory
Unitec Builder, Inc. 4803 Const. of Labason Bridge and Approaches Final IX 14.626 C 0.343 0.200 0.000 - - - 54.30 74.31%
Satisfactory
Unitec Builders, Inc. 4803Completion of Road Widening (Gap Section) @ San Bernardino Bridge, Maria Clara Lobregat Highway
1st IX 6.200 O 0.349 0.000 0.070 0.020 0.037 0.067 54.30 -
Unitec Builders, Inc. 4803Completion of Road Widening (Gap Section) @ San Bernardino Bridge, Maria Clara Lobregat Highway
2nd IX 6.200 O 0.351 0.226 0.100 0.030 0.040 0.100 84.70 -
Unitec Builders, Inc. 4803 Const. of MPB at San Roque 1st/Final VIII 0.946 C 0.319 0.200 0.300 - - - 81.90 81.90% V.Satisfactory
Unitec Builders, Inc. 4803
Impv't./Widening of Z.C. West Road (Caragasan Section) including the Const. of 1 Barrel RCBC w/ except of Caragasan Bridge
Final IX 12.112 C 0.336 0.200 0.300 - - - 83.60 87.04% V.Satisfactory
Urban Infrastructures Incorporated 16144 Cluster III-Const. of School Building
Projects-(E.B. Magalona NHS) Final VI 0.410 C 0.365 0.099 0.300 - - - 76.40 81.51% V.Satisfactory
Uy Construction and Development 12558 Asphalting of Valencia-Baconf Road 1st/Final VII 1.163 C 0.415 - 0.500 - - - 91.50 91.50%
Outstanding
Uy Construction and Development 12336 Concreting of Jct. S.H.- Banglud -
Mailog-By Pass Road, Mailag Final X 4.439 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Uy Construction and Development 12558 Const. of Canturing River Control
(Bogo Section) 1st/Final VIII 3.762 C 0.373 0.122 0.300 - - - 79.50 79.50% Satisfactory
Uy Construction and Development 12336 Const. of Weighbridge Station along
DNR Final VII 2.793 C 0.400 - 0.500 - - - 90.00 89.68% V.Satisfactory
Uy Construction and Development 12336 Const./Repair/Rehab. of School
Bldg. @ Buenavista E/S Final VIII 0.378 C 0.346 0.300 0.300 - - - 94.60 86.97% V.Satisfactory
Uy Construction and Development 12336 Rehab./Impvt. of Pob. NRJ-Ninoy
Aquino FMR Final X 11.846 C 0.352 0.281 0.300 - - - 93.30 77.10% Satisfactory
Uy Construction and Development 12336
Widening/Asphalting-Overlay of BaisKabankalan Road including ReConst. of (2) Bridges-Cang-abok & Canlumbong
Final VII 22.315 C 0.384 0.300 0.300 - - - 98.40 94.98% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 175
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
V N Grande Builders & Supply 32238 Const. of Road, Poblacion Ilaya to
Maravilla St. 1st/Final VI 0.941 C 0.322 0.300 0.300 - - - 92.20 92.20% Outstanding
V.C. Bautista Construction 21114 Concreting of Barangay Lebueg
Road, Laoac 1st/ Final I 0.480 C 0.295 - 0.500 - - - 79.50 79.50% Satisfactory
V.C.P. Concrete Products 7713 Concreting of Bislig-Surigao Road Final XIII 4.651 C 0.189 0.277 0.000 - - - 46.60 71.98% Satisfactory
V.E. Solis Construction 30751 Const. of 1 CL @ Cabubugan E/S (Spacial Plan) 1st VI 0.479 O 0.362 0.262 0.100 0.030 0.023 0.100 87.70 -
V.E. Solis Construction 30751 Const. of 1 CL @ Cabubugan E/S (Spacial Plan) Final VI 0.479 C 0.367 0.200 0.300 - - - 86.70 87.40%
V.Satisfactory
V.F. Construction 10048 Completion of Road, Barangay Salian, Abucay 1st/ Final III 1.440 C 0.442 - 0.500 - - - 94.20 94.20%
Outstanding
V.F. Construction 10048 Const. of FMR, Barangay Sta. Isabel 1st / Final III 0.468 C 0.282 - 0.500 - - - 78.20 78.2% Satisfactory
V.F. Construction 10048 Const. of Gabon-Decena Road 1st/Final III 1.871 C 0.356 0.164 0.300 - - - 82.00 82.00% V.Satisfactory
V.F. Construction 10048 Const. of Salian Farm-to-Market Road Final III 1.868 C 0.300 - 0.500 - - - 80.00 48.20%
Poor
V.R. Duque Construction 22233 Const. of 2-Classroom School Building @ Mabuhay E/S 1st IVB 0.953 C 0.268 0.300 0.100 0.008 0.033 0.100 80.90 -
V.R. Duque Construction 22233 Const. of 2-Classroom School Building @ Mabuhay E/S Final IV-B 0.953 C 0.283 0.300 0.300 - - - 88.30 83.12%
V.Satisfactory
V.R. Duque Construction 22233 Const. of MPB @ Ilaya 1st/Final IV-B 0.475 C 0.234 0.242 0.300 - - - 77.60 77.60% Satisfactory
V.R. Duque Construction 22233 Rehabilitation of Multi-Purpose Bldg., Brgy. Ilaya 1st IV-B 0.474 O 0.315 0.300 0.100 0.030 0.035 0.100 88.00 -
V.R. Duque Construction 22233 Rehabilitation of Multi-Purpose Bldg., Brgy. Ilaya Final IV-B 0.474 C 0.331 0.300 0.300 - - - 93.10 89.53%
V.Satisfactory
V.R. Patron Builders & Developers 13487 Improvement of Quilo-Quilo Road,
Padre Garcia Integrated ARC 2nd IVA 6.550 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -
V.R. Patron Builders & Developers 13487 Improvement of Quilo-Quilo Road,
Padre Garcia Integrated ARC 3rd IV-A 6.550 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -
V.R. Patron Builders & Developers 13487 Impvt./Rehab. of Banay-banay
Mojon Jct. Road 1st/Final IV-A 3.816 C 0.328 0.300 0.300 - - - 92.80 92.80% Outstanding
V.R. Patron Builders & Developers 13487 Repair/Rehab. of Municipal Hall Final IV-A 0.955 C 0.412 - 0.500 - - - 91.20 91.20%
OutstandingV.R. Patron Builders &
Developers 13487 Road Conc. @ Brgy. Dalipit East 1st/Final IV-A 0.191 C 0.365 0.300 0.300 - - - 96.50 96.50% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 176
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
V.R.D.J. Construction 19837 Repair/Rehab. of Pilitan E/S Bldg. 1st/Final II 0.094 C 0.400 0.200 0.300 - - - 90.00 90.00% V.Satisfactory
V.R.P. Builders Construction and Supply 25056 Concreting of FTM Road at Brgy.
Malaya 1st IV-A 0.764 C 0.447 - 0.500 - - - 94.70 94.70% Oustanding
V.R.P. Builders Construction and Supply 25056 Const. of Two (2) School Building at
Pinagtung-Ulan NHS Pinagtung-Ulan 1st/ Final IV-A 0.955 C 0.477 - 0.500 - - - 97.70 97.70% Outstanding
V4M Construction 3211 Const.of Canal @ Maloma 1st/Final III 0.477 C 0.267 0.300 0.300 - - - 86.70 86.70% V.Satisfactory
Valley Construction & Aggregates 14315
Cluster I a) Conc. of Dantay-Sagada Rd., b) Conc. of Dantay-Sagada Rd.,Ambasing Suyo Balili Rd.
Final CAR 10.754 C 0.360 0.300 0.300 - - - 96.00 92.70% Outstanding
Valley Construction & Aggregates 14315 Completion of MPB @ New Lucban
Brgy. 1st/Final CAR 1.904 C 0.332 0.300 0.300 - - - 93.20 93.20% Outstanding
Vannie General Merchandise 27335 Completion of Public Market Final VI 1.924 C 0.390 0.257 0.300 - - - 94.70 90.15%
Outstanding
Vans Turf Construction Corporation 10813 Const. of Multi-Purpose Building 1st/ Final IV-A 2.708 C 0.439 - 0.500 - - - 93.90 93.90%
Outstanding
Vans Turf Construction Corporation 13778 Const. of Multi-Purpose Building @
Meycauayan 1st/ Final III 2.837 C 0.483 - 0.500 - - - 98.30 98.30% Outstanding
Vans Turf Construction Corporation 13778 Contruction of Multi-Purpose
Building 1st III 2.591 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Vanvi Construction 29387 Completion of MPB at Langub E/S 1st XI 0.752 O 0.393 0.300 0.100 0.020 0.045 0.100 95.80 -
Vanvi Construction 29387 Completion of MPB at Langub E/S Final XI 0.752 C 0.382 0.300 0.300 - - - 98.20 96.52% Outstanding
VAR Builders 20327 Sagay City Resettlement Project 1st/Final NHA 5.910 C 0.323 0.300 0.300 - - - 92.30 92.30% Outstanding
Various Construction 26640 Concreting of Upper Pinget Brgy. Road Final CAR 0.956 C 0.341 - 0.500 - - - 84.10 62.20%
Fair
VCD Construction 13949 Const. of Various Day Care Center 1st/Final I 0.329 C 0.291 - 0.500 - - - 79.10 79.10% Satisfactory
VCD Construction 13949 Rehabilitation of Ilocos Norte National High School 1st I 3.479 O 0.397 0.300 0.100 0.010 0.035 0.100 94.20 -
VCD Construction 13949 Rehabilitation of Ilocos Norte National School Final I 3.827 C 0.298 0.300 0.300 - - - 89.80 92.88%
Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 177
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
VCV Const. & Development Corp. 12575 Const. of MPB 1st/Final III 2.829 C 0.382 0.234 0.300 - - - 91.60 91.60%
Outstanding
VCV Const. & Development Corp. 12575 Const. of MPB @ Brgy. Pilar 1st/Final VIII 3.339 C 0.327 0.272 0.300 - - - 89.90 89.90%
V.Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB at Bgry. Alas-Asin 1st/Final III 3.310 C 0.381 0.215 0.300 - - - 89.60 89.60%
V.Satisfactory
Ven Ray Construction 18310 Concreting of P. Gicain St., Pasamanos, Dawis Norte 1st/Final VII 0.385 C 0.335 - 0.500 - - - 83.50 85.50%
V.Satisfactory
Ven Ray Construction 18310 Const. of 2-Storey, 4-Cl Science High School 1st/Final VII 4.469 C 0.388 0.240 0.300 - - - 92.80 92.80%
Outstanding
Ven Ray Construction 18310 Const. of Annex Bldg. of Bogo Public Market 1st/Final VII 1.868 C 0.383 - 0.500 - - - 88.30 88.30%
V.Satisfactory
Ven Ray Construction 18310 Rehab./Conc. of Roads at Barangay Poblacion Final VII 0.459 C 0.391 0.300 0.300 - - - 99.10 92.62%
Outstanding
Venus Engineering & Construction 18358 Const. of MP Hall Realigned to
Impvt. of MP Hall Brgy. Buenavista Final VIII 0.187 C 0.460 - 0.500 - - - 96.00 79.55% Satisfactory
Verca Const. Trading & Services 14477 Const. of Multi-Purpose Bldg. at
Tenejero E/S 1st/Final III 0.610 C 0.381 0.300 0.300 - - - 98.10 98.10% Outstanding
Vertical Builders 14029 Const. of 2 Cl @ FVR E/S 1st III 1.351 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -
Vertical Builders 14029 Datu Paglas Resttlement Project 1st NHA Region XII 5.925 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -
VF Construction 10048Const. of Drainge Canal from RBM Ent. To ER Venzon Plant Brgy. Panillao & Brgy. Sta. Rosa
1st/Final III 0.845 C 0.374 0.300 0.300 - - - 97.40 97.40% Outstanding
VF Construction 10048 Impvt. of Multi-Purpose Pavement @ Brgy. Pto. Rivas 1st/Final III 0.488 C 0.320 0.200 0.300 - - - 82.00 82.00%
V.Satisfactory
Vicente T. Lao Construction 7040 CP MN - D3 (Katipunan-Manukan
Road) 3rd ADB 462.152 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -
Vicente T. Lao Construction 7040 CP MN-D (3-1) Nipaan -Sindangan
Rd., Oroquieta-Sindangan Road 1st ADB 184.345 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -
Vicente T. Lao Construction 7040 Laguindingan Resttlement Project,
Phase II 1st NHA Region X 38.798 O 0.383 0.297 0.000 0.018 0.047 0.067 81.16 -
Vicente T. Lao Construction 7040
Rehab./Impvt. (Asphalt Overlay) of Sarangani-Davao del Sur Coastal Road, Gian Padidu Section
1st XII 14.456 O 0.389 0.225 0.070 0.023 0.050 0.067 82.40 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 178
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Vicente T. Lao Construction 7040 Rehab./Impvt. of National Road
Ozamis City-Oroquieta City Road 1st/Final X 14.366 C 0.200 0.300 0.300 - - - 80.00 80.00% Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Impvt./Rehab. Along Dipolog By Pass Road Ph II (Supply & Installation of Guardrail)
1st/Final IX 14.457 C 0.257 0.225 0.300 - - - 78.20 78.20% Satisfactory
Vicmar Construction Inc. 28997 Conc. of Brgy. Road @ Poblacion 1st IV-A 1.416 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -
Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion 1st IV-A 1.423 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -
Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa Final IV-A 0.476 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Victoria Trading 15717 Const. of Multi-Purpose Building @ Brgy. Calapacuan 1st/Final III 0.606 C 0.273 0.200 0.300 - - - 77.30 77.30%
Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Bldg.,
(Public Market) Final X 9.331 C 0.341 0.300 0.300 - - - 94.10 84.02% V.Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Building
(Phase I), Calamba Final X 1.445 C 0.439 - 0.500 - - - 93.90 85.5% V.Satisfactory
Victoriano C. Lim Construction 25318 Const. of Ozamiz City Coastal By
Pass Road @ Brgy.Malaubang 1st X 9.259 O 0.329 0.300 0.100 0.010 0.038 0.100 87.70 -
Victoriano C. Lim Construction 25318 Const. of Ozamiz City Coastal By
Pass Road @ Brgy.Malaubang Final X 9.260 C 0.251 0.228 0.300 - - - 77.90 78.41% Satisfactory
Victoriano C. Lim Construction 25318 Gravelling of Guimad-Guingona-
Trigos Road 1st/Final X 2.826 C 0.317 0.300 0.000 - - - 61.70 61.70% Fair
Victoriano C. Lim Construction 25318
Gravelling/Concreting of Pavement Ozamis By-Pass Circumferential- Bangkal Airport Road
Final X 2.020 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Victoriano C. Lim Construction 25318 Impvt./Rehab. of Lagbas Creek 1st X 9.546 O 0.228 0.200 0.100 0.030 0.027 0.200 78.50 -
Victoriano C. Lim Construction 25318 Regravelling of Litapan-Manaka-
Gala Road Final X 2.822 C 0.381 - 0.500 - - - 88.10 75.50% Satisfactory
Victoriano C. Lim Construction 25318 Rehabilitation of Manaca-Gala Road Final X 1.903 C 0.395 0.231 0.300 - - - 92.60 88.64%
V.Satisfactory
Victorino Baroña, Jr. Construction 15166 Const. of Sinalang Bridge &
Approaches Final CAR 10.890 C 0.352 0.212 0.300 - - - 86.40 85.80% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 179
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Victorino Baroña, Jr. Construction 15166 Impvt. of Abra-Kalinga Road, Baguio
Section, Baay-Licuan 1st / Final CAR 3.135 C 0.387 - 0.500 - - - 88.70 88.70% V.Satisfactory
Victorino Baroña, Jr. Construction 15166 Impvt. of Denden-Callao Road,
Villaviciosa ARC Final CAR 15.862 C 0.334 0.300 0.300 - - - 93.40 87.28 V.Satisfactory
Victorino Baroña, Jr. Construction 15166 Rehabilitation of Abra-Ilocos Norte
Road 1st/Final CAR 0.941 C 0.372 - 0.500 - - - 87.20 87.20% V.Satisfactory
Vicvera Builders, Inc. 13903 Const. of Three (3) Storey, 12 CL School Bldg. at Alabang E/S Final NCR 4.569 C 0.336 0.300 0.300 - - - 93.60 85.34%
V.Satisfactory
Vigan Fortune Construction 3887 Const. of Darapidap Seawall 1st I 3.775 C 0.309 0.300 0.300 - - - 90.90 90.90%
OutstandingVigan Fortune Construction 3887 Const. of Santa Seawall & Flood
Control 1st I 9.493 O 0.283 0.218 0.050 0.023 0.035 0.067 67.60 -
Vigan Fortune Construction 3887 Const. of Santa Seawall & Flood
Control Final I 9.493 C 0.320 0.300 0.300 - - - 92.00 77.36% Satisfactory
Vigan Fortune Construction 3887 Continuation of Const. of Candon
City Hospital 1st / Final I 4.744 C 0.358 - 0.500 - - - 85.80 74.10% Satisfactory
Vigan Fortune Construction 3887
Continuation of the Phil. Science High School Bldg. (PSHS) Ilocos Region Campus
Final I 7.952 C 0.296 - 0.500 - - - 79.60 72.53% Satisfactory
Vigan Fortune Construction 3887 Impv't. of Sta.Lucia-Salcedo Road Final I 4.002 C 0.272 - 0.500 - - - 77.20 58.12%
Poor
Vigan Fortune Construction 3887
Stone Masonry of Sabangan Seawall, Phase III, Sabangan, Santiago
1st/ Final I 1.207 C 0.293 - 0.500 - - - 79.30 79.30% Satisfactory
Viguz Construction Corporation 8178 Const. of Candi-is Bridge Final VIII 5.518 C 0.348 0.189 0.300 - - - 83.70 77.94%
SatisfactoryViguz Construction
Corporation 8178 Const. of Malirong Bridge 1st VIII 4.655 O 0.292 0.270 0.100 0.030 0.033 0.100 82.50 -
Viguz Construction Corporation 8178 Const. of Malirong Bridge Final VIII 4.655 C 0.381 0.180 0.300 - - - 86.10 83.94%
V.Satisfactory
Viguz Construction Corporation 8178 Road Widening of Carigara Wharf 1st/Final VIII 1.424 C 0.353 0.200 0.300 - - - 85.30 85.30%
V.Satisfactory
Vijisi Construction 26643 Impvt./Concrete Paving of Don Federico Sison St. 1st/Final I 0.617 C 0.355 0.300 0.300 - - - 95.50 95.50%
Outstanding
Viking Construction and Supplies 18129 Completion of Bigbiga Multi-
Purpose Building Final I 0.759 C 0.385 0.287 0.300 - - - 97.20 88.94% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 180
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Viking Construction and Supplies 18129 Repair/Rehab. of MPB 1st/Final I 0.189 C 0.318 0.300 0.300 - - - 91.80 91.80%
OutstandingVillaflor Construction and
Supplies 21631 Const. of Multi-Purpose Hall, Phase II 1st VI 2.753 O 0.364 0.300 0.070 0.015 0.038 0.100 88.70 -
Villaflor Construction and Supplies 21631 Const. of Multi-Purpose Hall, Phase
II Final VI 1.439 C 0.363 0.210 0.300 - - - 87.30 90.17% Outstanding
Virac NRC Construction 11396 Const. of Multi-Purpose Building (Phase I) 1st/Final V 0.944 C 0.391 - 0.500 - - - 89.10 89.10%
V.Satisfactory
Virginia Construction 12893 Concreting of Farm-to-Market Brgy. Saang Bago 1st / Final III 0.374 C 0.293 - 0.500 - - - 79.30 79.30%
Satisfactory
Virlo Construction 5765 Const/Rehab. of 4-CL, 2-Storey S/B @ Central Lilo-An E/S Poblacion Final VII 1.516 C 0.406 - 0.500 - - - 90.60 90.60%
Outstanding
Virlo Construction 5765 Repair/Impvt./Rehab. of Bonbon-Sinsin Road 1st/Final VII 9.996 C 0.212 0.200 0.300 - - - 71.20 71.20%
Satisfactory
Virlo Construction 5765 Repair/Rehab. of S. Osmena Blvd. Final VII 9.646 C 0.054 0.100 0.300 - - - 45.40 72.16% Satisfactory
Virlo Construction 5765Repair/Rehab. of S. Osmena Blvd. (Sta.4+737 - Sta.6+254 w/ exceptions)
1st VII 9.646 O 0.335 0.300 0.100 0.030 0.035 0.100 90.00 -
Vites Construction & Development Corporation 9444 Rehab./Const. of Multi-Purpose
Building @ Zone 38 (Brgy. 377) 1st NCR 5.035 O 0.390 0.300 0.100 0.030 0.019 0.067 90.60 -
Vites Construction & Development Corporation 9444 Rehab./Const. of Multi-Purpose
Building @ Zone 38 (Brgy. 377) Final NCR 5.035 C 0.328 0.300 0.300 - - - 92.80 91.26% Outstanding
VTJ Construction & Supply 11250 Const. of Multi-Purpose Building at
Brgy. Geronimo 1st/ Final IV-A 0.964 C 0.459 - 0.500 - - - 95.90 95.90% Outstanding
VUC Engineering 7918 Concreting of Dagupan-Palongkada Section Kabugay-Pudtol-Luna Road Final CAR 7.692 C 0.425 - 0.500 - - - 92.50 86.11%
V.Satisfactory
VUC Engineering 7918 Const. of Lanna Retaining Wall, Lanna 1st/Final CAR 0.873 C 0.352 0.300 0.300 - - - 95.20 95.20%
Outstanding
VUC Engineering 7918 Impvt./Conc. of Tabuk-Tinglayan Road (Bantay Section) 1st CAR 4.777 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -
VUC Engineering 7918 Rehabilitation & Concreting of Magsaysay-Mapaway Road 1st/Final CAR 7.615 C 0.353 - 0.500 - - - 85.30 85.30%
V.Satisfactory
VUC Engineering 7918 Road Impvt. of Dagupan-Palangkada Section, Luna 1st CAR 7.692 C 0.264 0.235 0.070 0.030 0.030 0.100 72.90
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 181
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
VUC Engineering 7918Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan Road (Banat-Gonogon Section)
1st CAR 9.510 O 0.334 0.200 0.100 0.030 0.030 0.100 79.40 -
Vulcan Development Construction 19080 Concreting of Jct. Milagros-Aroroy
Road 1st V 9.592 O 0.321 0.240 0.100 0.023 0.037 0.067 78.80 -
Vulcan Development Construction 19080 Const. of Circumferential Road @
Brgy. Ibingay 1st V 9.490 O 0.333 0.225 0.100 0.015 0.037 0.100 81.00 -
Vulcan Development Construction 19080 Const. of Circumferential Road @
Brgy. Ibingay Final V 9.490 C 0.360 0.200 0.300 - - - 86.00 83.00% V.Satisfactory
VVER Construction 14122 Completion of MPB (Day Care Center) @ Brgy. Batinguel 1st/Final VII 0.277 C 0.331 0.200 0.300 - - - 83.10 83.10%
V.Satisfactory
VVER Construction 14122 Const. of 1-Unit, 3-Cl School Building @ Olandao E/S 2nd VII 1.033 O 0.369 0.240 0.070 0.030 0.029 0.067 80.50 -
VVER Construction 14122 Const. of Cambagahan E/S 1st/Final VII 0.442 C 0.395 0.200 0.300 - - - 89.50 89.50% V.Satisfactory
VVER Construction 14122 Const. of MPB/Center at Cang-Alwang 1st VII 0.469 O 0.285 0.295 0.100 0.030 0.032 0.100 84.20 -
VVER Construction 14122 Continuation of MPB at Sibulan 1st VII 0.917 O 0.323 0.250 0.100 0.015 0.038 0.100 82.60 -
W. Palma Construction 11988Const. of 4 Storey 12 Cl Secondary Sch. Bldg. @ Roman Duterte Memorial NHS
1st/Final VII 6.895 C 0.376 0.100 0.300 - - - 77.60 77.60% Satisfactory
W. Rivera Construction & Equipment Rentals 31378 Const. of 2 Storey RGR Type Sch.
Bldg. @ Sta. Maria & San Pedro E/S Final IVA 9.546 C 0.376 0.246 0.300 - - - 92.20 91.57% Outstanding
W. Rivera Construction & Equipment Rentals
(Formerly: W. Rivera Const.)
31378 Const. of 2 Storey RGR Type Sch. Bldg. @ Sta. Maria & San Pedro E/S 1st IVA 9.546 O 0.356 0.300 0.100 0.030 0.027 0.100 91.30 -
W.S. Aniar Trading & Construction 20471 Const. of Multi Purpose Pavement @
Brgy. Sapa 1st/Final IV-B 0.208 C 0.244 0.000 0.300 - - - 54.40 54.40% Poor
Walter Ng Lao Construction 23739 Concreting of Oroqueta-Calamba Mt.
Rd., 2nd X 1.603 O 0.369 0.300 0.070 0.030 0.060 0.067 89.60 -
Walter Ng Lao Construction 23739 Concreting of Oroqueta-Calamba Mt.
Rd., Final X 1.603 O 0.351 0.300 0.000 - - - 65.10 -
Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) 1st CAR 1.601 O 0.337 0.284 0.100 0.030 0.025 0.100 87.60 -
Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) Final CAR 1.601 C 0.261 0.288 0.300 - - - 84.90 86.52% V.Satisfactory
Wangjo Construction 29924 Installation of Tupaya Bridge 1st CAR 0.946 O 0.322 0.300 0.100 0.030 0.025 0.100 87.70 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 182
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Wangjo Construction 29924 Installation of Tupaya Bridge Final CAR 0.946 C 0.335 0.300 0.300 - - - 93.50 90.02% Outstanding
WBX Construction 28370 Completion of 4 Cl 2 Storey Bldg. @ Bagbagin E/S 1st/Final III 1.520 C 0.250 0.291 0.300 - - - 84.10 84.10%
V.Satisfactory
WBX Construction 28370 Const. of Brgy. Multi-Purpose Bldg., Brgy. Andaya 1st III 0.424 O 0.392 0.225 0.100 0.015 0.031 0.100 86.30 -
WBX Construction 28370 Const. of Brgy. Multi-Purpose Bldg., Brgy. Andaya Final III 0.468 C 0.296 0.300 0.300 - - - 89.60 87.29%
V.Satisfactory
WBX Construction 28370 Road Rehabilitation Pulang Gubat 1st/Final III 0.376 C 0.370 0.200 0.300 - - - 87.00 87.00% V.Satisfactory
WCS Construction Inc. 6516 Const. of Multi-Purpose Hall-Phase II 1st/Final V 1.865 C 0.296 0.300 0.300 - - - 89.60 89.60%
V.Satisfactory
WCS Construction Inc. 6516 Development/Const. of Sula Seawall "A" and "B" and its Access Road 1st V 9.355 O 0.351 0.286 0.100 0.030 0.028 0.100 89.50 -
WCS Construction Inc. 6516 Development/Const. of Sula Seawall "A" and "B" and its Access Road Final V 9.355 C 0.254 0.252 0.300 - - - 80.60 85.94%
V.Satisfactory
WCS Construction Inc. 6516 Improvement of Lidong-Polangui Road 1st V 33.098 O 0.334 0.300 0.100 0.030 0.050 0.100 91.40 -
WCS Construction Inc. 6516 Improvement of Lidong-Polangui Road Final V 33.052 C 0.304 0.200 0.300 - - - 80.40 87.00%
V.Satisfactory
WCS Construction, Inc. 6516 Const. of MPB Covered Court (Phase I) 1st V 4.279 O 0.324 0.300 0.100 0.023 0.019 0.100 86.60 -
WCS Construction, Inc. 6516 Const. of MPB Covered Court (Phase I) 2nd V 4.279 O 0.356 0.240 0.100 0.030 0.032 0.100 85.80 -
WDM Construction & Supplies 18877 Cluster EM: Concreting of FMR
Agay-Ayan-Sitio Kulgao Rd. 1st/Final X 0.456 C 0.347 0.300 0.300 - - - 94.70 94.70% Outstanding
WDM Construction & Supplies 18877 Concreting of FMR, Barangay 24 1st/Final X 0.477 C 0.385 0.300 0.300 - - - 98.50 98.50%
OutstandingWDM Construction &
Supplies 18877 Const. of FMR, Odiongan-Malinao-Sio-an Rd. 1st/Final X 0.953 C 0.347 0.300 0.300 - - - 94.70 94.70%
OutstandingWDM Construction &
Supplies 18877 Const. of Multi-Purpose Building (Initial) Final X 1.908 C 0.367 0.300 0.300 - - - 96.70 91.31%
Outstanding
Wee Eng Construction, Inc. 16380
Const. of Reinforced Conc. Box Culvert along Macalelon-Mulanay Road
1st/Final IVA 0.816 C 0.373 0.300 0.300 - - - 97.30 97.30% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 183
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Wee Eng Construction, Inc. 16380
Const. of SCDR Marihatag-Barobo Section (Conc. of Amontay-Sto. Niño Section with Toril & Amontay Bridges)
1st XIII 122.015 O 0.289 0.300 0.070 0.024 0.025 0.067 77.50 -
Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project
(Rehab. of Taytay-El Nido Road) 5th SPIADP 898.994 O 0.390 0.300 0.100 0.030 0.051 0.100 97.10 -
Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project
(Rehab. of Taytay-El Nido Road) 6th SPIADP 898.994 O 0.323 0.300 0.100 0.030 0.050 0.100 90.30 -
Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project
(Rehab. of Taytay-El Nido Road) Final SPIADP 898.994 C 0.342 0.294 0.300 - - - 93.60 94.54% Outstanding
Werr Corporation (International) 14133 Const. of 2-Cl, 2-Storey S/B @
Bangoy NHS 2nd XI 0.683 O 0.189 0.250 0.000 0.015 0.018 0.033 50.50 -
Werr Corporation (International) 14133 Const. of 4-CL, 2-Storey S/B @
Eulogio Rodriguez, Jr. E/S 1st/Final IVA 5.550 C 0.368 0.300 0.300 - - - 96.80 96.80% Outstanding
Westan Construction and Supply 24331 Const. of Flood Control @ Brgy.
Parparoroc 1st I 4.689 O 0.354 0.106 0.100 0.023 0.030 0.133 74.60 -
Westmin Enterprises and Construction Services 20989
Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop Road, Tag-ulo-Guimputlan Sect.
1st/Final IX 2.747 C 0.354 0.220 0.300 - - - 87.40 87.40% V.Satisfactory
Westmin Enterprises and Construction Services 20989
Improvement/Concrete Paving along Rizal Shrine-Rizal Town Coastal Road, Guimputlan-Banbanan-Carang Road Section (Guimputlan-Banbanan Sect.)
Final IX 2.758 C 0.388 0.200 0.300 - - - 88.80 91.92% Outstanding
Westmin Enterprises and Construction Services 20989
Impv't./Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop Road
Final IX 2.743 C 0.361 0.300 0.300 - - - 96.10 90.34% Outstanding
Westmin Enterprises and Construction Services 20989 Rehab. of Banbanan-Carang Road 1st IX 1.831 O 0.304 0.190 0.100 0.020 0.037 0.100 75.10 -
Westmin Enterprises and Construction Services 20989 Rehab. of Banbanan-Carang Road Final IX 1.893 C 0.326 0.225 0.300 - - - 85.10 79.10%
Satisfactory
Whee Bon Construction & Supply 21731 Repair//Rehab. of Classroom @
Gumaca Nat'l. H/S 1st/Final IV-A 0.094 C 0.400 0.000 0.335 - - - 73.50 73.50% Satisfactory
Wilsam Construction & Dev. Corp. 27046 Continuation of Concreting of
Borongan Boulevard 1st VIII 9.162 O 0.346 0.000 0.100 0.030 0.032 0.100 60.80 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 184
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
Winley Tan Construction 22368 Completion of School Building with CR @ Siparok E/S 1st/Final IX 0.182 C 0.387 0.200 0.300 - - - 88.70 88.70%
V.Satisfactory
Winley Tan Construction 22368 Const. of 1-Unit, Two (2) CL School Bldg. @ Roxas E/S Final IX 0.719 C 0.379 0.200 0.300 - - - 87.90 93.36%
Outstanding
Winley Tan Construction 22368 Repair/Rehab. of Sch. Bldg. (ESP Bldg.) @ JRMSC 1st/Final IX 0.448 C 0.307 0.200 0.300 - - - 80.70 80.70%
V.Satisfactory
Wizard Enterprises 27504 Const. of Water Works System 1st/Final IV-A 0.964 C 0.343 0.300 0.300 - - - 94.30 94.30% Outstanding
Wizard Trading and Construction 21921 Const. of MPB @ Namulandayan E/S Final III 1.264 C 0.335 0.300 0.300 - - - 93.50 84.54%
V.Satisfactory
Worldwide Builders 31408 Const. of Multi-Purpose Building 1st VII 0.957 O 0.343 0.240 0.100 0.010 0.041 0.100 83.40 -
Worldwide Builders 31408 Const. of Multi-Purpose Building Final VII 0.957 C 0.365 0.300 0.300 - - - 96.50 87.33% V.Satisfactory
WSR Enterprises 17589 Rehabilitation of Caugahan Bridge I 1st/Final V 0.755 C 0.250 0.300 0.300 - - - 85.00 85.00% V.Satisfactory
WT Construction, Inc. 5490Const. of CP MN-D2, Oroquieta-Sindangan Rd., Barcelona-Katipunan Section
1st ADB 267.525 O 0.382 0.300 0.070 0.030 0.042 0.067 89.10 -
WT Construction, Inc. 5490 Const. of CP PY-C, Kalibo-Nabas Road Final VI 208.009 C 0.375 0.300 0.300 - - - 97.50 88.83%
V.Satisfactory
WTG Construction and Development Corporation 7494 Concrerting of Road @ Brgy.
Dacudao, Brgy. Dacudao Final XI 1.880 C 0.280 0.300 0.300 - - - 88.00 74.40% Satisfactory
WTG Construction and Development Corporation 7494 Const. of Asturias Bridge 1st/Final VII 7.899 C 0.365 0.300 0.300 - - - 96.50 96.50%
Outstanding
WTG Construction and Development Corporation 7494
Const. of Bango Bridge & Approaches, Compostela-Cateel Road
1st/Final XI 9.834 C 0.365 0.300 0.300 - - - 96.50 96.50% Outstanding
WTG Construction and Development Corporation 7494
Const. of Mambusao Bridge & Approaches, Compostela-Cateel Road
1st XI 6.670 O 0.349 0.300 0.100 0.023 0.047 0.100 91.90 -
WTG Construction and Development Corporation 7494
Const. of Mambusao Bridge & Approaches, Compostela-Cateel Road
Final XI 6.669 C 0.395 0.300 0.300 - - - 99.50 94.94% Outstanding
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 185
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
WTG Construction and Development Corporation 7494
Naga-Toledo Road Project, Jct. Proog to Jct. Sangi, Sta. 20+504-Sta.32+000
Final VII 91.674 C 0.285 0.261 0.300 - - - 84.60 88.80% V.Satisfactory
WTG Construction and Development Corporation 7494 Widening of Velez Bridge 1st/Final VII 12.301 O 0.369 0.100 0.100 0.030 0.048 0.100 74.70 -
WTG Construction and Development Corporation 7494 Widening of Velez Bridge Final VII 12.301 C 0.338 0.300 0.300 - - - 93.80 82.34%
V.Satisfactory
Y.S. Construction 11928 Const. of Sagbayan Multi-Purpose Building Final VII 0.891 C 0.367 0.300 0.300 - - - 96.70 92.36%
Outstanding
Yakal Construction 9685Conc. of Toledo-Pinamingajan-Aloguinsan-Mantalongon Road (Bojo Section)
1st VIII 9.470 O 0.291 0.229 0.100 0.030 0.064 0.100 81.40 -
Yakal Construction 9685 Const. of Balaquid Bridge Final VIII 3.649 C 0.360 0.300 0.300 - - - 96.00 80.76% V.Satisfactory
Yakal Construction 9685 Const. of Catbalogan Diversion Road (Phase VI) 1st VIII 28.949 O 0.400 0.283 0.030 0.022 0.043 0.033 81.10 -
Yakal Construction 9685Rehab. of Salog Bridge & Approaches along Tac-Ormoc-Baybay Road
1st VIII 6.085 O 0.320 0.225 0.100 0.030 0.040 0.100 81.50 -
Yakal Construction 9685Rehab. of Salog Bridge & Approaches along Tac-Ormoc-Baybay-Maasin Rd.
2nd VIII 6.085 O 0.341 0.240 0.100 0.030 0.070 0.100 88.10 -
Yakal Construction 9685 Rehab./Impv't. of Tagnipa-Batwan-Tomoy Tomoy FMR Final VIII 14.467 C 0.383 0.300 0.300 - - - 98.30 87.80%
V.Satisfactory
Yakal Construction 9685 Rehabilitation of Roxas City Roads Final VI 4.736 C 0.340 0.300 0.300 - - - 94.00 88.78% V.Satisfactory
Yap Mabuhay Enterprises, Inc. 15540 Completion of Multi-Purpose Bldg.,
Brgy. Benitez Final XII 0.943 C 0.376 0.300 0.300 - - - 97.60 90.32% Outstanding
Yap Mabuhay Enterprises, Incorporated 15540 Completion of Multi-Purpose Bldg.
@ Zone II 1st XII 0.864 O 0.359 0.224 0.100 0.023 0.028 0.100 83.40 -
YCT Builders Center Co. 23830 Const. of 1 Cl Standard Sch. Bldg. at Jimalalud NHS 1st VII 0.406 O 0.314 0.275 0.100 0.030 0.035 0.100 85.40 -
YCT Builders Center, Co. Inc. 23830 Const. of 2CL S/B @ Dungcan E/S Final VII 0.711 C 0.367 0.100 0.300 - - - 76.70 77.96%
Satisfactory
YCT Builders Center, Co. Inc. 23830
Impvt. of Nat'l Road (Missing Link) along Vallehermoso-La Castellana Road
1st/Final VII 2.454 C 0.330 0.149 0.300 - - - 77.90 77.90% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 186
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
YCT Builders Center, Co. Inc. (Formerly YCT
Builders Center Co.)23830 Impv't./Repair of DNR Sta. Cruz,
Tayasan Final VII 0.886 C 0.321 0.290 0.300 - - - 91.10 57.08% Poor
YL Trading General Merchandising 22543 Conc. of Iloilo-Antique Rd. along
Pob. Culasi Final VI 9.622 C 0.353 0.300 0.300 - - - 95.30 93.29% Outstanding
YL Trading General Merchandising 22543
Conc. of Iloilo-Antique Rd. along Poblacion Culasi, Antique National Road ( w/ exception)
1st VI 9.622 O 0.340 0.261 0.100 0.030 0.047 0.100 87.80 -
YL Trading General Merchandising 22543 Conc. of the Gap Portion of Iloilo-
Antique Road, Culasi Section 1st VI 4.814 O 0.365 0.225 0.100 0.023 0.037 0.100 85.00 -
YL Trading General Merchandising 22543 Concreting of 247.50 L.M. National
Road Final VI 2.886 C 0.345 0.115 0.300 - - - 76.00 78.10% Satisfactory
Yoyen Enterprises 15541 Completion of Multi Purpose Hall @ Brgy. Jaena 1st VIII 0.462 O 0.264 0.263 0.100 0.000 0.027 0.100 75.40 -
Yoyen Enterprises 15541 Const. of Divisoria-Libertad-AntipoloMabini-Liong-Nabangig Road 1st V 3.673 O 0.272 0.225 0.100 0.015 0.014 0.100 72.60 -
Yoyen Enterprises 15541 Const. of Farm-to-Market Road Final VIII 1.840 C 0.261 0.300 0.300 - - - 86.10 76.44% Satisfactory
Yoyen Enterprises 15541 Rehab./Deepening of Can-Untog River Control 1st/Final VIII 9.461 C 0.381 0.275 0.300 - - - 95.60 95.60%
Outstanding
Yoyen Enterprises 15541 Repair/Restoration of Buenavista Slope Protection 1st/Final VIII 0.248 C 0.331 0.300 0.300 - - - 93.10 93.10%
Outstanding
YS Construction 11928 Conc. of Sta. Fe-Magtangtang Road Leading to Francisco Dagohoy Cave 1st VII 0.947 O 0.301 0.153 0.070 0.020 0.045 0.067 65.60 -
YS Construction 11928 Const. of Drainage Project (Outfall), Tagbilaran City-San Jose St. 1st VII 9.380 O 0.298 0.192 0.100 0.030 0.042 0.200 86.20 -
YSL Builders 19516 Conc./Rehab. of Punta-Dansullan-Cogon-Sergio Osmena Road Final IX 2.706 C 0.251 0.193 0.300 - - - 74.40 83.70%
V.Satisfactory
YSL Builders 19516 Concreting of Liloy-Labason Road (Ganase-Patawag Sect.) Final IX 4.637 C 0.355 0.300 0.300 - - - 95.50 92.50%
Outstanding
YSL Builders 19516 Const. of MPB (Mini Gym) 1st/Final IX 1.079 C 0.383 0.000 0.300 - - - 68.30 68.30% Fair
YSL Builders 19516 Proposed Concreting of Liloy-Labason Road (Patawag Section) Final IX 4.632 C 0.392 0.295 0.300 - - - 98.70 96.78%
Outstanding
Yu Construction 10470 Concreting of Corella-Sikatuna Road 1st VII 9.187 O 0.342 0.247 0.100 0.030 0.037 0.100 85.60 -
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 187
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
YU Construction - ARN Builders joint venture JV-06-006
Const. of Dam Embankment - Phase III, Talibon Small Resrvior Irrigation Project
1st/Final NIA Region VII 14.799 O 0.293 0.300 0.300 - - - 89.30 -
YU Construction - ARN Builders joint venture JV-06-006
Const. of Dam Embankment - Phase III, Talibon Small Resrvior Irrigation Project
1st/Final NIA Region VII 14.799 O 0.293 0.300 0.300 - - - 89.30 89.30%
V.Satisfactory
Z & L Construction & Supplies 25322 Const. of Multi-Purpose Bldg. Final X 0.681 C 0.396 0.259 0.300 - - - 95.50 90.53%
Outstanding
Z.A.S. Construction 8971 Concreting of Critical Portion along Julita-Balaquid Road Section Final VIII 2.678 C 0.349 0.300 0.300 - - - 94.90 72.97%
Satisfactory
Z.A.S. Construction 8971 Const. of Multi-Purpose Building (Health Center) Final VIII 0.189 C 0.365 0.300 0.300 - - - 96.50 93.42%
Outstanding
Z.F. Construction 17676 Const. of 2-CL Building 1st/Final III 0.809 C 0.345 0.300 0.300 - - - 94.50 94.50% Outstanding
Zabu Engineering 31104 Completion of School Bldg., at SPED Center 1st/Final CAR 0.293 C 0.362 0.300 0.300 - - - 96.20 96.20%
Outstanding
Zabu Engineering 31104 Const./ Rehab./Impv't. of Angngalipan FMR Road Final CAR 0.960 C 0.267 0.300 0.300 - - - 86.70 90.48%
Outstanding
Zet Construction 12615Development of Babak Port, Reclamation and Reconstruction of RORO Ramp
1st PPA 46.636 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
Zillion Builders 15655 Completion of Marouy Multi-Purpose Building, DPWH Compound 1st IVA 4.810 O 0.369 0.240 0.100 0.030 0.055 0.100 89.40 -
Zion Construction (Formerly: Masterpiece
Const. & Supply14881 Const./Repair of Two (2) Storey
Industrial Building At Badian NHS 1st/Final VII 1.855 C 0.255 0.300 0.300 - - - 85.50 85.50% V.Satisfactory
ZM Construction 9052 Asphalt Overlay along Iba National Road Candelaria Section 1st/Final III 4.850 C 0.373 0.207 0.300 - - - 88.00 88.00%
V.Satisfactory
ZM Construction 9052 Concreting of Balacbac Brgy. Road Final III 0.933 C 0.479 - 0.500 - - - 97.90 81.90% V.Satisfactory
ZMS Construction 10471 Conc. of Imelda-Alicia Road, Guintolan Section Final IX 4.810 C 0.238 0.208 0.300 - - - 74.60 74.30%
Satisfactory
ZMS Construction 10471Const. of Demorok Bridge & Approaches, Phase II, Josefina-Sergio Osmena Nat'l Road
Final IX 4.499 C 0.155 0.300 0.300 - - - 75.50 79.76% Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 188
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from January 1, 2005 to December 31, 2007
WMS MTL TIME FAC ESH RDRNAME of CONSTRUCTOR LICENSE
NO. PROJECT NAMECONTRACT
AMOUNT (Php, M)
IMPL. AGENCY
NO. of VISIT
FINAL RATING/ QUALITATIVE DESCRIPTION0.40/0.50 0.300
STATUS CPES RATING0.10/0.5 0.030 0.070 0.100
ZMS Construction 10471Const. of Demorok Bridge & Approaches, Phase III, Josefina-Sergio Osmena Nat'l Road
2nd IX 7.199 O 0.214 0.300 0.100 0.020 0.042 0.100 77.60 -
ZMS Construction 10471Const. of Demorok Bridge & Approaches, Phase III, Josefina-Sergio Osmena Nat'l Road
3rd IX 7.199 O 0.275 0.225 0.070 0.015 0.035 0.067 68.70 -
ZMS Construction 10471
Impv't./Concrete Paving of Road Pagadian-Buug Road Section, Segment II, Phase I along Pagadian-Ipil Road
1st IX 23.264 O 0.334 0.300 0.100 0.030 0.041 0.100 90.50 -
ZMS Construction 10471
Impv't./Concrete Paving of Road Pagadian-Buug Road Section, Segment II, Phase I along Pagadian-Ipil Road
Final IX 23.264 C 0.367 0.225 0.300 - - - 89.20 89.98% V.Satisfactory
Zoniuq Enterprises 25223 Improvement of Roads, Salasad (Brgy. Lumot-Mahipon) 1st/Final IV-A 0.286 C 0.406 - 0.500 - - - 90.60 90.60%
Outstanding
Zota Trading and Construction 21424 Const. of Multi-Purpose Building @
Ceralde E/S 1st/Final I 0.479 C 0.366 0.206 0.300 - - - 87.20 87.20% V.Satisfactory
CPES Report January 1, 2005 - December 31, 2007.xls / Masterlist 6th CPES release Page 189