The project receives grants from the European H2020 research and innovation programme,
ECSEL Joint Undertaking, and National Funding Authorities from the involved countries under
grant agreement no. GAP-737459 - 999978918.
Consortium Conference 1
Royal Olympic Hotel, Athens, 07.03.2018
Agenda of the Day
General Assembly
Lighthouse Session
Photo Session
Demonstrations / Interaction
Networking Cocktail and Dinner
Thomas
Education: nuclear physics
Semiconductor production Munich, Villach, Regensburg
Single process development
Automation of single process (APC)
Automation of thin wafer handling
Project Management
Development of IGBT Modules for Traction
Funding for traction (Effektra)
General Assembly
Management Topics
Productive 4.0Page 2
Time 1 month
Te
mp
era
ture
of
ch
am
be
r
Consortium Conference 1
Morning Session Agenda
Productive4.0Page 3
from till Topic Owner
1 9:00 9:15 Welcome Knut
2 9:15 9:35 Management topicsThomas, Alfred,
Minira
3 9:35 10:30 WP1 - WP9 (5min each) WP Leader
4 10:30 11:00 Coffee
5 11:00 11:05 Lighthouse session introduction Knut
6 11:05 11:20 Lighthouse session EXCEL Berta
7 11:20 11:40 a) I-MECH George
8 11:40 12:00 b) Semi 40 Cristina
9 12:00 12:20 c) FarEdge John
10 12:20 12:35 d) Productive 4.0 Thomas
11 12:35 13:00 Interaction session All
Overview of Productive4.0 project
Productive 4.0 <Partner name>Page 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2017 2018
Today P
C A
thens
MS1:
Requirements
And
Specifications
MS2:
Preliminary
Architectures
1st
revie
w M
unic
h
requirements 1st and innovation cyclesarchitecture 1st innovation cycles
Section 3.2.3.5, Technical Annex
Innovation and Technology Advisory Board (ITAB)
Composition: Project Coordinator and experts, PMT members
Chair: Project Coordinator,
Proposed experts: Pal Varga, Olli Venta(agreed by email on Feb. 27), Knut Hufeld
ITAB activities:
Monitoring the project achievements
Monitoring dissemination activities
Identification of potential additional risks
Proposing scientific and technical adjustments and actions in accordance with the industry needs and
external developments within the scope of Productive4.0
Checking the consistency of the work, the interdependency with other EU program and the possibilities
to benefit from external developments and other projects
General Assembly
Management Topics
Productive4.0Page 5
Project status
Deliverables
MS1“Requirements and
Specification“ due in m8:
Achieved with the
delivery of D6.1
General Assembly
Management Topics
Productive4.0Page 6
Deliver
able
number
Deliverable name
Work
package
number
Short name
of lead
participant
Deliverable
responsible
person (name)
Type
Dissemi
nation
level
Delivery
date
D1.1First generation of Platform framework
requirements and technology gap analysisWP1 17D HIOF Oystein Haugen R CO M3
D1.2
Second generation of Platform framework
requirements and plans for interaction to other
WP’s
WP1 17D HIOF Oystein Haugen R CO M8
D2.2 State of the art for complex workflow generation WP2 05E TU/e Mike Holanderski R PU M9
D4.1Detailed list and timeline on interaction activities
with other work packagesWP4 01Y KIT Marion Rimmele R CO M3
D4.2 Description of physical system structure WP401ZC UoC
SCMPHorst Tempelmeier R CO M6
D4.3 Description of the demand WP4 01Y KIT Thomas Setzer R CO M6
D4.4 Unified database WP4 01I BOSCH Georg Laipple R CO M8
D4.5
Report on characteristics and structure of complex
digital production and supply chain systems with
products in different stages of their lifecycle
WP4 01Y KIT Marion Rimmele R CO M9
D6.1 Standards Guide, version 1 WP6 02H AIT Erwin Schoitsch R PU M8
D9.1Status on the Product Uses Cases (requirements and
specification)WP9 07I MGEP Miren Illarramendi R CO M9
D10.1 Kick-off meeting WP10 01A IFAGAlfred Hoess,
Minira ProsserR CO M1
D10.2Document server available, dissemination material
available and public website onlineWP10 01A IFAG
Alfred Hoess,
Minira ProsserWeb PU M2
D10.3Project handbook describing responsibilities,
processes as well as quality and risk managementWP10 01A IFAG
Alfred Hoess,
Minira ProsserR CO M3
D10.4 Interim report 1 WP10 01A IFAG
Alfred Hoess,
Minira Prosser,
Thomas Gutt
R CO M7
Upcoming tasks (m11, m12)
Deliverables
MS2“Preliminary architectures“
due in m12
General Assembly
Management Topics
Productive4.0Page 7
Deliver
able
number
Deliverable name
Work
package
number
Short name
of lead
participant
Deliverable
responsible
person (name)
Type
Dissemi
nation
level
Delivery
date
D1.3First generation of demonstration with feedback on
platform feasibility to use casesWP1 13A AITIA Pal Varga DEM CO M12
D3.1Report on the requirements of the hardware
including the link with WP1, WP2 and the use casesWP3 01A IFAG R CO M11
D3.4 Requirements of IoT enabling software WP3 01ZA TUBS R CO M11
D3.7Requirements for integration and modelling of IIoT
enabling componentsWP3 01Z OFFIS R CO M11
D4.6Definition of the requirements for modelling
products, equipment and processesWP4 11B UoL ERC Cathal Heavey R CO M12
D5.1
System analysis of production network with all
supply chain stage interfaces covering all necessary
production parameters and their correlation and
influence to each other
WP5 01I BOSCH Georg Laipple R CO M12
D7.1 Exploitation plan: version 1 WP719A
INTRASOFTR CO M12
D7.4Requirement list for an open next generation
business application platformWP7 01A IFAG R CO M12
D7.5
Design Principles, definition and specification for
cross-organizational sharing of product lifecycles
and product genealogies
WP7 01A IFAG R CO M12
D8.1OEM use cases: Construction elements for the PLM
demonstrator environmentWP8 01D BMW
Thomas
IrrenhauserR CO M12
D8.4
Tier 1 use cases: Establishment of service-oriented
infrastructure in industrial test and production
environment
WP8 02A AVL R CO M12
D8.8
Tier 2 use cases: Design & specification document of
“Industry 4.0 Global & Real-time MES solution
concept”
WP8 01G IFD R CO M12
D10.5 Report 1 on dissemination activities WP10 01A IFAGGeorge
DimitrakopoulosR CO M12
D10.6Exploitation plan at project level and per participant
(preliminary version)WP10 01A IFAG
Alfred Hoess,
Minira Prosser,
Thomas Gutt
R CO M12
Webpage:
News section: Please provide contributions on the basis of templates
Publications: Please send the final presentation material and photo to Alfred and Minira
please provide a short text for the webpage and indicate, whether the material can be made available
for download or not
Dissemination: requests to partners
Productive4.0Page 8
General licence for 10 photos from Productive4.0 website is available („Press“ section;
(email to [email protected] on Jan 13, 2018)
Social Media:
LinkedIn: https://www.linkedin.com/groups/8633818
Twitter: https://twitter.com/Productive40
If not yet done, please join both channels!
Dissemination material and requests to partners
Productive4.0Page 9
Productive 4.0 Video:
Trailer 1: teaser
Trailer 2: includes results of the project
video clips provided by partners
will be integrated
Dissemination material and promotion for partners
Productive4.0Page 10