25
...connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

Embed Size (px)

Citation preview

Page 1: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds

Deutsches Netzwerk für EU INSPIRE DT

Data and Service Sharing

1. Treffen, 2006-01-12CeGI, Dortmund

Page 2: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 1 Begrüßung

TOP 2 INSPIRE Übersicht

TOP 3 Bericht vom DT Sharing Kickoff

TOP 4 DT Sharing ArbeitsplanAnforderungenModellierungEvaluationDerived Implementation RulesDeployment

erste Iteration bis Ende Mai 2006

Agenda (1)

Page 3: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

Agenda (2)

TOP 5 Unterstützungsbedarf und Mitwirkungsmöglichkeiten

TOP 6 Vorhandene Ansätze im dt. Raum (u.a. TF GDI Nutzungsbedingungen)

TOP 7 Diskussion

TOP 8 Organisation des Netzwerks

Page 4: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 1 Begrüßung

11:00 bis ca. 15:30 Uhr

Mittag?

Agenda?

Hr. Bilo und Hr. Siebold Mitglieder u.a. der deutschen Taskforce INSPIRE

Page 5: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.1. INSPIRE Übersicht

Anfrage: Wissenstand in der Runde

Übersicht 11th EC GI & GIS Conferencehttp://www.ec-gis.org/Workshops/11ec-gis/presentations/05dufourmont.pdf

Aktuelle Neuigkeiten (Hr. Bilo, Hr. Siebold,…)

Anfrage: Relevanz des INSPIRE Prozesses für heutige und baldige Entscheidungen?

Page 6: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.2. DT Data and Service Sharing TeamAslesen  Laila NO Norwegian Mapping and Cadastre

AuthorityNorwegian Mapping and

Cadastre Authority [email protected]

Bjorkhammar 

Stefan SE Lantmateriet, National Land Survey

Lantmateriet, National land Survey of Sweden 

[email protected] 

Hadley  Clare UK Ordnance Survey Ordnance Survey  [email protected] 

Holopainen Matti FI CEMR Association of Finnish Local Authorities 

[email protected] 

Menzel  Ulrike AT Federal Office of Metrology and Surveying (BEV)

Federal Office of Metrology and Surveying (BEV) 

[email protected] 

Wysocka Ewa PL Polish Association of Spatial Information

Institute of Geodesy and Cartography

[email protected]

Hollaender  Jens DK KMS National Survey and Cadastre, Denmark 

[email protected] 

Jackson Ian UK EGS British Geological Survey  [email protected] 

Janssen Katleen BE   ICRI - K.U.LEUVEN [email protected]

Leskinen  Lea FI EMI Finnish Meteorological Institute 

[email protected] 

Stacino Claire BE NGI (Nationaal Geografisch Insituut) IGN (Institut Géographique National)

IGN-Belgium [email protected] 

Vialle Romain FR CNIG-Conseil national de l'information géographique

IGN-France  [email protected] 

Wagner Roland DE OGC-SDIC Institut for Geoinformatics, University of Muenster 

[email protected] 

Page 7: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.3. EU Directive: Co-decision legislative process

“INSPIRE now entered into the Co-decision legislative process, where the Commission interacts with Council and European Parliament to discuss and further shape the proposal in its final form. This may eventually lead to an earlier or delayed adoption compared to an estimated date of entry into force at beginning 2007.”

“A three phased program of work is proposed with a

Preparatory (2005-2006),

Transposition (2007-2008) and

Implementation (2009-2013) phase. “

http://www.ec-gis.org/inspire/reports/rhd040705WP4A_v4.5.3_final-2.pdf, Page 8

Page 8: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.4. Working Documents

“Proposal for a

DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

establishing an infrastructure for spatial information in the Community (INSPIRE)”

Source: (CouncilPoliticalAgreement_st10553.en05.pdf)

Page 9: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.5. Citation of Directive (1)

Article 14

Member States shall ensure that:

“However, in cases where charges and/or licences are an essential precondition to maintain the spatial data sets and services or to fulfil requirements of already existing international spatial data infrastructure in a sustainable way, Member States may apply charges and/or licences either to the person providing the service to the public, or, where the service provider chooses, to the public itself. Data made available through the view services mentioned in Article 11(1)(b) may be in a form preventing their re-use for commercial purposes.”

Page 10: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.6. Citation of Directive (2)

„Where public authorities levy charges for the services referred to in Article 11(1)(b), (c) or (e), Member States shall ensure that e-commerce services are available. Such services may be covered by disclaimers, click-licenses or licenses.“

CHAPTER V, DATA-SHARING, Article 17

„The provisions of paragraph 2 do not prevent public authorities that supply spatial data sets and services from licensing them to, and requiring payment from, the public authorities or institutions and bodies of the Community that use these spatial data sets and services.“

Page 11: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.7. Citation of Directive (3)

Article 17, (8)

„Without prejudice to paragraph 3, Member States shall provide the institutions and bodies of the Community access to spatial data sets and services in accordance with harmonised conditions.“

Article 21, (2)

“No later than three years after the entry into force of this Directive, Member States shall send to the Commission a report including summary descriptions of:”…

“data-sharing agreements between public authorities;”

Page 12: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.8. Report: Data and Service Sharing DT

Expected Results for DT Sharing

“Implementing Rules on third parties use of the upload services

Implementing Rules governing access and rights of use to spatial data sets and services for Community institutions and bodies

Implementing Rules for the use of spatial data sets and services by third parties, by 2009”*

*) See: INSPIRE Work Programme Preparatory Phase 2005 – 2006, http://www.ec-gis.org/inspire/reports/rhd040705WP4A_v4.5.3_final-2.pdf

Page 13: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

2.9. Expected and needed SDI Functionalities

Authentication / Authorization

Click-Through Terms Of Use

Pricing & Ordering

Harmonized License Management

Need to defined business process related requirements to be able to design suitable technical specifications

Page 14: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

3.1. Report Kick-off DT Sharing

Termin 15. November 2005, Wien

Erstes wirkliches Zusammentreffen der Mitglieder

70 % Juristen

Sehr unterschiedliche Ausgangslage und Erfahrungslage

Sprach- und Verständnisprobleme

Direkte Unterstützung durch Eurostat (über Hans Dufortmont)

Basis Organisation

Page 15: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

4.1. Vorgehensweise mit Phasen

Phase Task

Phase 1 Requirements

Phase 2 Modelling of Scenarios

Phase 3 Evaluation of Scenarios

Phase 4 Derived Rules

Phase 5 Deployment/Tests

Induktiver Ansatz

Zunächst verstehen des Problems nötig

Eingrenzung des Probelms für heute für 2009 oder später schwierig

Page 16: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

4.2. Vorgehensweise mit Iteration und Zeiten

Phase Task Gruppen 1-3 Time

Phase 1 Requirements Nov.+Dec.

Phase 2 Modelling of Scenarios Jan.+ Feb.

Phase 3 Evaluation of Scenarios March

Phase 4 Derived Rules April

Phase 5 Deployment/Tests May

2-3 Iteration innerhalb der nächsten 18 Monate

Erste Iteration im Hinblick auf der 12 EC GI GIS

Überprüfung der Arbeitstechnik, Abgleich mit den anderen DTs

Page 17: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 5 Unterstützungsbedarf und Mitwirkungsmöglichkeiten

Für die Definition der Implementation Rules muss das Gesamtmodel INSPIRE SDI verstanden und definiert werden.

Vor allem im Bereich der Business Prozesse gibt es noch erhebliche Anzahl Unbekannter Punkte

Vereinfacht: Entwurf eines Rahmen-Geschäftsmodell nötig (General Bus)

Geschäftsmodel ist stark von Interessen/Möglichkeiten/Planungen abhängig

INSPIRE betrifft viele (dt.) Datenanbieter

Daher Mitwirkung nötig und möglich

Page 18: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 6: Vorhandene Ansätze

INSPIRE DT Sharing Aspekte bereits jetzt für viele Datenanbieter relevant

Einige Lösungsansätze sind bereits in der Diskussion

einige Projekte wurden realisiert und es gibt praktische Erfahrung

(Vorstellung der Ansätze durch die Runde)

Page 19: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 7 Diskussion

(Alle)

Page 20: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 8 Vorschläge und Planungen

Etablierung eines „Netzwerks“ auf bundesdeutscher Ebene, da

Kritische Masse: Z.Z. Überschaubare Anzahl von aktiven Playern

Kritische Masse: im Hinblick auf gemeinsame Entscheidungen (z.B. Spezifikationen)

Best Practice Input für EU und OGC

Page 21: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 8 Vorschläge und Planungen (2)

Strukturierung der Themen nötig, da Komplexität aber wenig Erfahrung vorhanden

Gesamtgruppe: Geschäftsprozesse

Untergruppe:

- Zugriffsschutz

- Nutzungsbedingungen

- Pricing & Ordering

- Lizenzierung

Page 22: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

TOP 8 Vorschläge und Planungen (3)

Produkte: Abgleich der Anforderungen und Erarbeitung des Rahmengeschäftsmodels analog zum DT Working Program

Produkte: Best Practice Input für INSPIRE

Produkte: Technische Spezifikationsvorschläge für OGC (a la AK Metadaten)

Frequenz?

Vorschlag Mitglieder, (Hinblick auf Untergruppen)

Vorschlag: Lose Organisation wie AK Metadaten im Zusammenhang mit INSPIRE, dt. Taskforce INSPIRE und OGC

Page 23: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

Kontakt

Dr. Roland M. Wagner

con terra GmbH

[email protected]

+49 251 7474 419

Page 24: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

Vorstellungsrunde

Sander, Wuppertal

-Security Erfahrung

-WPOS?

-ER-KOM, eher für klassische Data sets

-Laufende Aktivitäten für Web Applikationen und Services

-Arbeitsgruppe Erfahrungsaustausch

- Dreesmann: Geobroker Brandenburg

-WPOS ab 2002

-Eher für data sets

-Web Services seit Ende 2003

-2 Mio. Zugriffsgrenze letztens erreicht

Page 25: connecting worlds Deutsches Netzwerk für EU INSPIRE DT Data and Service Sharing 1. Treffen, 2006-01-12 CeGI, Dortmund

...connecting worlds WKS „Security in GDI“03. November 2005

- Dreesmann: Geobroker Brandenburg (2)

-WPOS ab 2002