42
ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Embed Size (px)

Citation preview

Page 1: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

ConferenzaGNL - ROMA 10/04/2014

LNG carriers and bunkering vessels

M.E.S.MARINE ENGINEERING SERVICES

PRESENTATION

Page 2: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

SUMMARYCOMPANY PROFILE

History

PRODUCTS / SERVICES Extract from “Reference list” Details

LNG Bunkering vessels / Ship design Tanks design (double/single wall) Fuel plant design (up to GVU) + Bunkering station Assistance (Hazid/Hazop/Risk Assessment) Thermal stress analysis

CO-OPERATIONS FOR LNG SYSTEMS FINCANTIERI (STQ) WARTSILA

KEY POINTS

INTRODUCTION SUMMARY

Company Profile

Products/Services

LNG

Co-operation (LNG)

Key points

SUMMARY

Page 3: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

M.E.S. – Marine Engineering Services S.r.l.

Established on 1986 by Ing Giorgio La Valle (40

years experience in gas carriers design)

Specialized in gas carriers, chemical tankers and

bitumen carriers

Almost 100 ships built with MES design

Market: worldwide

Headquarters: Trieste (Italy)

INTRODUCTION ESTABLISHMENT

1986

SPECIALIZED

Gas CarriersChemical TankersBitumen Carriers

MARKET

ItalyTurkeyVietnamChinaKoreaIndonesiaPolandThe NetherlandsFinland

Introduction

Page 4: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Head office

COMPANY PROFILE

See VIDEOSee some Picture

HEAD OFFICE

HEAD OFFICE

Trieste (ITALY)

• 500 m2• Abt. 30

workstations

Head Office – TRIESTE500 m2 – abt. 30 workstations

Page 5: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Activity

ACTIVITY

DESIGN

SURVEY DURING SHIP CONSTRUCTION

CONSULTANCY

SPECIALISTIC CALCULATIONS

LOADING COMPUTER

OTHERS…

ACTIVITY

ACTIVITY

Design:

• Concept Design

• Basic Design• Detailed

Engineering• Specialistic

Calculation

Survey:

• On-site (up to 18 surveyors at full capacity)

Page 6: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

KEY POINTS

• HIGH PERFORMANCE

• QUALITY

• CONTINUOUS FEEDBACK

• EXPERIENCE

Key points

KEY POINTS

HIGH PERFORMANCES speed-power ratio (low consumptions, up to 25÷30%less than

competitors) main dimensions optimization (reduce total ship cost)

QUALITY Drawings / Documentation Details Support / Assistance ISO9001

CONTINUOUS FEEDBACK Production (Shipyard) Production (Survey activity) During ship’s life (Shipowners) G&H production Assistance for equipment tenders (Shipyard/Shipowner)

EXPERIENCE 40 years in ship design Gas carriers Management Survey Innovation

KEY POINTS

Page 7: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Products

PRODUCTS

see the complete REFERENCE LIST on our web page:

www.mes.it

PRODUCTS

PRODUCTS

• Gas carriers• Chemical

tankers• Bitumen

carriers• Ro-Ro• Ferry• Various

Page 8: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Products

PRODUCTS

see the complete REFERENCE LIST on our web page:www.mes.it

Chemical tankers:

from 5500 dwt up to 40000 dwt

Gas carriers:

from 2500 cbm up to 12000 cbm

40000 cbm

Bitumen carriers:

from 6000 dwt up to 7000 dwt

LNG bunkering vessels

PRODUCTS

PRODUCTS

• Gas carriers• Chemical

tankers• Bitumen

carriers• Ro-Ro• Ferry• Various

Page 9: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Products

PRODUCTS

see the complete LIST of PRODUCTS on our web page: www.mes.it

PRODUCTS

PRODUCTS

• conceptual & basic design

• LNG propulsion

• room general arrangement

• scantling plans

• classification drawings

• outfitting drawings

• systems schematics

• ventilation documents

• electrical drawings

• tender & purchase technical specification

• delivery documents

• manuals• chartering

documents• other

Page 10: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Products

PRODUCTS

see the complete LIST of PRODUCTS on www.mes.it

conceptual & basic designLNG propulsionRisk Assessment Assistance Hazid / Hazop Assistancescantling plans (ship’s structure)classification drawingsoutfitting drawingssystems schematics / P&IDventilation documentselectrical drawings (not carried out in house)tender & purchase technical specificationF.E.M analysis (structure & temperature distribution & vibrations)loading computer (active system – interface with ship’s automation system)ship’s delivery documentsmanualschartering documentsroom general arrangement

PRODUCTS

PRODUCTS

• conceptual & basic design

• LNG propulsion

• room general arrangement

• scantling plans

• classification drawings

• outfitting drawings

• systems schematics

• ventilation documents

• electrical drawings

• tender & purchase technical specification

• delivery documents

• manuals• chartering

documents• other

Page 11: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG

LNG

Page 12: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG

CLIENT NEEDS

LNG carriage in small quantity (abt. 6000m3)

Bunkering vessels (ca. 600÷900m3)

Floating Storage Regasification Unit (30.000m3)

Feasibility studies for application of DUAL FUEL

propulsion on new and existing ships: Gas carriers

Oil/product tankers

Chemical tankers

Ferry

Ro-Ro

START

REQUIREMENTS

• LNG carriage• Dual Fuel

propulsion

Page 13: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG

CLIENT NEEDS

LNG carriage in small quantity (abt. 6000m3)

Bunkering vessels (ca. 600÷900m3)

Floating Storage Regasification Unit (30.000m3)

Feasibility studies for application of DUAL FUEL

propulsion on new and existing ships: Gas carriers

Oil/product tankers

Chemical tankers

Ferry

Ro-Ro

START

REQUIREMENTS

• LNG carriage• Dual Fuel

propulsion

Page 14: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG

CLIENT NEEDS

LNG carriage in small quantity (abt. 6000m3)

Bunkering vessels (ca. 600÷900m3)

Floating Storage Regasification Unit (30.000m3)

Feasibility studies for application of DUAL FUEL

propulsion on new and existing ships: Gas carriers

Oil/product tankers

Chemical tankers

Ferry

Ro-Ro

START

REQUIREMENTS

• LNG carriage• Dual Fuel

propulsion

Page 15: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG

CLIENT NEEDS

LNG carriage in small quantity (abt. 6000m3)

Bunkering vessels (ca. 600÷900m3)

Floating Storage Regasification Unit (30.000m3)

Feasibility studies for application of DUAL FUEL

propulsion on new and existing ships: Gas carriers

Oil/product tankers

Chemical tankers

Ferry

Ro-Ro

START

REQUIREMENTS

• LNG carriage• Dual Fuel

propulsion• Profitability

comparison• LNG capacity

optimization

Page 16: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG Requirements

DUAL FUEL PROPULSION

ONBOARD ARRANGEMENT

TEMPERATURE DISTRIBUTIONS / HULL STEEL

PROPERTIES SELECTION

BOIL-OFF

BUNKERING

LNG SYSTEM LOGISTIC

SUPPLY CHAIN

PROBLEMS

BUNKERING

SUPPLY CHAIN

Page 17: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

LNG RequirementsSupply chain

Super Green Ship40,000 m3 LNG

LO

AD

ING

UN

LO

AD

ING

BU

NK

ER

ING

SUPER GREEN SHIP

Production Bigger unitsShip2Shiptransfer

Off-Shore Plants

On-ShorePlants

On-ShorePlants

Off-ShorePlants

Bunkering vesselsby Ship2Ship

transfer

DUAL FUELPropulsion Vessels

Trucks Bunkeringvessels

Page 18: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

MEDIUM SIZE

WORLDWIDE NAVIGATION

HARBOURS WITH LIMITATIONS (max dimensions;

low draft; etc..)

USE: Gas distribution door2door

Terminal on-shore

FSRU

SUPER GREEN SHIPPresented during the Green Shipping Summit, on November the 29th and 30th 2012, during the Port&Shipping Tech 2012 (Brochure) and the Seatec Compotec innovation, conferences and design on February the 6th 2013.

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

Page 19: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Super Green Ship40,000 m3 LNG

Page 20: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

• Bilobe tanks• 9% Nickel• Insulation:

poliurethane • Onboard

regasification plant unit

Page 21: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

• Bilobe tanks• 9% Nickel• Insulation:

poliurethane • Onboard

regasification plant unit

Page 22: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

• Bilobe tanks• 9% Nickel• Insulation:

poliurethane • Onboard

regasification plant unit

• Twin screw / twin skeg

• Higher safety

• Low draft• Slow

steaming• Low

consumption• Dual Fuel

Page 23: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Main Dimensions

Lenght overall : abt. 189.68 m Lenght between perpendiculars: abt. 179.68 mBreadth : abt. 30.00 mDepth : abt. 15.60 mDepth on canopy deck : abt. 21.00 mDesign Draft : abt. 8.50 m

Service Speed : abt. 16.0 knots

Installed Power: 6900 kW

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

• Bilobe tanks• 9% Nickel• Insulation:

poliurethane • Onboard

regasification plant unit

Page 24: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

MAIN CHARACTERISTICS

Bilobe Tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit

Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel

Super Green Ship40,000 m3 LNG

MAIN CHARACTER.

• Bilobe tanks• 9% Nickel• Insulation:

poliurethane • Onboard

regasification plant unit

• Twin screw / twin skeg

• Higher safety

• Low draft• Slow

steaming• Low

consumption• Dual Fuel

Page 25: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Super Green Ship

DUAL FUEL PROPULSION

ONBOARD ARRANGEMENT

TEMPERATURE DISTRIBUTIONS / HULL STEEL

PROPERTIES SELECTION

BOIL-OFF

BUNKERING

LNG SYSTEM LOGISTIC

SUPPLY CHAIN

PROBLEMS

THERMAL ANALISYSF.E.M.

Page 26: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

CO-OPERATIONS

MAIN CO-OPERATION WITH:

WARTSILA FINCANTIERI

CO-OPERATIONS

WARTSILA

FINCANTIERI

Page 27: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

WARTSILA

CO-OPERATION WITH WARTSILA

LNG tanks design:

single wall double wall (vacuum insulation + M.L.I. or Perlite) cooling down calculation and FEM process simulations (Transient thermal analysis) thermal stress analysis

CO-OPERATION WITH WARTSILA

LNG TANKS

Page 28: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

WARTSILA

CO-OPERATION WITH WARTSILA

LNG bunkering system preliminary general arrangement LNG bunker station preliminary venting and hazardous zones LNG bunkering station preliminary lay-out LNG system plot plan LNG system operation diagrams LNG vaporizers skid Heating water system skid Preliminary guidelines for LNG piping - scope of supplyPreliminary Technical Specification of Main LNG fuel system

CO-OPERATION WITH WARTSILA

LNG SYSTEM

Page 29: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

FINCANTIERI

RO-RO FERRY - FINCANTIERI

MAIN DIMENSIONS

Lenght overall : abt. 130.00 m Lenght between perpendiculars : abt. 22.40 mBreadth : abt. 22.40 mService Speed : abt. 20.0 knotsInstalled Power : 20,000 kWNo. max passengers : 800No. CEU (car equivalent units) : 180Crew : 35Ice Class : 1AS FS

STQ QUEBEC FINCANTIERI

MAINCHARACTER.

• Dual fuel Propulsion

• Transport of passengers

• Transport of cars/trucks

Page 30: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

FINCANTIERI

RO-RO FERRY - FINCANTIERI

SCOPE OF SUPPLY

• Scantling plans (Ship structure)• Sistem schematics (P&ID)• Ventilation• Outfitting• Bunkering station

• Assistance & consultancy• Hazid/Hazop assistance

• LNG tanks design + Temperature Distribution Analysis (Wartsila)

STQ QUEBEC FINCANTIERI

SCOPE OF SUPPLY

Page 31: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

FINCANTIERI

RO-RO FERRY - FINCANTIERI

LNG TANKS

Capacity : 2 x 280 m3 Indipendent type IMO C Support cradles Max Pression : 9 bar Double Wall Insulation by vacuum in combination with M.L.I.

Double wall pipes

STQ QUEBEC FINCANTIERI

MAINCHARACTER.

• Dual fuel propulsion

• Transport of passengers

• Transport of cars/trucks

Page 32: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

FINCANTIERI

RO-RO FERRY - FINCANTIERI

BUNKER STATION

• Bunkering by trucks• Semi-enclosed space• Mechanical ventilation• OCIMF Regulations• Gas detection• Dry Powder• Airlock• Hazardous Area

STQ QUEBEC FINCANTIERI

MAINCHARACTER.

• Dual fuel propulsion

• Transport of passengers

• Transport of cars/trucks

Page 33: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

FINCANTIERI

RO-RO FERRY - FINCANTIERI

LNG TANKS

Capacity : 2 x 280 m3 Indipendent type IMO C Support cradles Max Pression : 9 bar

STQ QUEBEC FINCANTIERI

F.E.M. thermal calculations

Page 34: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

US bunkering vessel

3000 m3 LNG bunkering vessel for U.S. market

MAIN DIMENSIONS

Lenght overall : abt. 90.0 m Lenght between perpendiculars : abt. 85.0 mBreadth : abt. 15.0 mInstalled Power : 2700 kWService Speed : 14.3 knots @ 1570 kW

3000 m3 LNGBunkering Vessel

MAINCHARACTER.

• LNG (-163°C) at 5 bars

Page 35: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

US bunkering vessel

3000 m3 LNG bunkering vessel for U.S. market

3000 m3 LNGBunkering Vessel

MAINCHARACTER.

• steel grade selection

• insulation• twin screw

twin skeg• US Flag

Page 36: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

US bunkering vessel

3000 m3 LNG bunkering vessel for U.S. market

F.M.G.

MARITIME GROUP

3000 m3 LNGBunkering Vessel

• FMG Prime Contractor and Builder

• G&H Cargo equipment Supplier

• MES Designer

Page 37: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

US bunkering vessel

3000 m3 LNG bunkering vessel for U.S. market

3000 m3 LNGBunkering Vessel

REFERENCES

• 8 sisterships already built (3300 cbm LPG)

Page 38: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Press review

PRESS REVIEW

PRESS REVIEW

Page 39: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Press review

PRESS REVIEW

PRESS REVIEW

Page 40: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

Press review

SIGNIFICANT SHIPS

2003 : COSMO2005 : OTTOMANA2006 : MEROPE STAR2007 : SARACENA

PRESS REVIEW

Page 41: ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION

CONCLUSION

CONCLUSION

Gas handling needs specialistic knowledge: thermodynamics safety concepts /Rules …. materials / metallurgy / special welding technological limits assembly

Designer to give specialistic assistance to the Client: HAZID (design) / HAZOP (operative risks) transfer / bunkering gas freeing / gassing-up / cooling down

CONCLUSION