Concrete Construction

Embed Size (px)

DESCRIPTION

One Way Slab2 Way SlabElevated Slab Systen

Citation preview

  • 5/21/2018 Concrete Construction

    1/155

    CentreforAdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Cast-in-Place Concrete

  • 5/21/2018 Concrete Construction

    2/155

    CentreforAdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Concrete Construction - Options

    Cast off Site (Precast) Construct components prior to installation

    Transport components to the project (if cast off site)

    Assemble / Erect the concrete elements

    Cast on Site (Site Cast) Labor, Material, & Equip. brought to the site, and

    Concrete elements constructed in-place

    Combination

  • 5/21/2018 Concrete Construction

    3/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Types of Concrete Elements That Must

    be Cast on Site

    Caissons & Pile Caps

    Footings (Spread& Strip)

    Slab-on-Grade Slab Toppings

    Elements too large or heavy to Transport

    Irregular or Special Elements (typically)

    Structures Requiring Full Structural

    Continuity

  • 5/21/2018 Concrete Construction

    4/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Concrete Frame Construction

    Major Cost Components (Labor, Material, &Equipment)

    Formwork, Reinforcing, Concrete

  • 5/21/2018 Concrete Construction

    5/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Types of Concrete Elements

    Slab-on-Grade

    Columns

    Walls

    Floors & Roofs

    Other (stairs, panels, etc.)

  • 5/21/2018 Concrete Construction

    6/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Slab-on-Grade (SOG)

    Level surface of concrete supported on the ground

  • 5/21/2018 Concrete Construction

    7/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Slab-on-Grade (SOG)

    Loading; Carries little or no structural stress except,

    Transmission of superimposed loads

    Thickness & Reinforcing determined by: Capacity & consistency of the soil

    Loads imposed(People, cars, airplanes, equipment, etc.??)

    Thickness; 75 mm to 450 mm +

    Reinforcing Options; none, WWF, rebar

  • 5/21/2018 Concrete Construction

    8/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG

    Strip Topsoil

    Cut/Fill/Compact Subsoil (Subgrade)

    Install Underground Utilities (if reqd)

  • 5/21/2018 Concrete Construction

    9/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Installation of Crushed Stone

    SOG inside of Buildings - typical

    Sidewalks (rarely)

    Paving (depends)

    Primary Purpose:

    Drainage

    Structural Fill

  • 5/21/2018 Concrete Construction

    10/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Install Formwork

    Edge Forms

    Construction Joints

    Formed Control Joints

    Expansion joints

  • 5/21/2018 Concrete Construction

    11/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Expansion Joint

  • 5/21/2018 Concrete Construction

    12/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Apply termite protection

    Install moisture barrier

  • 5/21/2018 Concrete Construction

    13/155

    Centrefor

    AdvancedBu

    ildingTechnologies

    BLDG2101 Construction Science 1Foundations and StructuresPlacing Termite Protection

  • 5/21/2018 Concrete Construction

    14/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Install Reinforcing

    Lightly loaded - Light gauge WWF

    Heavily loaded - heavy gauge or

    reinforcing

    i f i ki f

  • 5/21/2018 Concrete Construction

    15/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Reinforcing Purpose - Prevent cracking from

    Shrinkage,

    Temperature stresses

    Concentrated loads,

    Frost heaving

    Ground Settlement

    Slab-on-Grade with Vapor Barrier & WWF

    (Note lapping of WWF)

  • 5/21/2018 Concrete Construction

    16/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Place Concrete

    Chute, Wheelbarrows & Buggies

    Concrete Bucket, Conveyor Belt, Pump

  • 5/21/2018 Concrete Construction

    17/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Placement with a Pump

  • 5/21/2018 Concrete Construction

    18/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Laser-screedOften used for superflat floors

  • 5/21/2018 Concrete Construction

    19/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Consolidate & Finish

    Straightedge (Strike off)

    Float Finish

    Hard Trowel Finish

    Broom Finish

  • 5/21/2018 Concrete Construction

    20/155

    Centrefor

    AdvancedBu

    ildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    FinishingRotary Power Trowel

    (Rider - Double Blade)

    Finishing

    Rotary Power Trowel(Walk behind)

  • 5/21/2018 Concrete Construction

    21/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Application of Curing Compound

  • 5/21/2018 Concrete Construction

    22/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a SOG (cont.)

    Control Joint

    (tooled)

    Control Joint

    (sawed)

    Joints

    Note the Broom Finish

  • 5/21/2018 Concrete Construction

    23/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Wall

    Footing (Wall Support)

    Size determined by Engineer

    Keyways

    A grove-often formed by 2x lumber

    Forms a mechanical connection

    Waterstop (depends)

    Reinforcing Dowels Structural connection

    Transfers stresses to Foundation

  • 5/21/2018 Concrete Construction

    24/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Footingexcavated and reinforced

  • 5/21/2018 Concrete Construction

    25/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Waterstop, Keyway, & Wall Reinforcing Dowels

  • 5/21/2018 Concrete Construction

    26/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete WallFormwork Components

    Form FacingMaterialSpans between Support System

    Provides Surface/ Appearance

    Can be faced w/ Liner

    Form Support SystemIntermediate Supports (Studs)

    Primary Supports (Walers)

    Form TiesHold the 2 faces together

    Bracing(Positions/Aligns Form)

  • 5/21/2018 Concrete Construction

    27/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Wall

    Support System Spanning Horizontal

  • 5/21/2018 Concrete Construction

    28/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Wall

    Materials Stick Built of Lumber & Plywood

    Standardized prefabricated panels

    Prefabricated steel, fiberglass

    Insulated Concrete Forms

    Choice Depends on:

    Number of uses, Irregularity of wall Wall finish & tie spacing,

    Availability & Cost

  • 5/21/2018 Concrete Construction

    29/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Stick Built Formwork

    Built in-Place

    From Stock Matl

    Panelized sections

    Materials: (often)

    Plywood2x Lumber

    Light tie

    Tie Spacing

    Close - regular

    Uses

    Limited Reuses

    Smaller projects

    Irregular shapes

  • 5/21/2018 Concrete Construction

    30/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Panelized Systems

    Built in-Place with:

    Panelized Sections

    Multiple Sizes

    Rent or Buy

    Materials: (often)Higher Quality Facing Matl

    Metal support system

    Ties appropriate for the

    system

    Tie Spacing

    Spaced @ or > Stick built

    Uses

    Multiple Reuses, Regular

    shapes

  • 5/21/2018 Concrete Construction

    31/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Panelized System with its Own TiresPanelized System

  • 5/21/2018 Concrete Construction

    32/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Metal & Fiberglass

    Often Built:

    Specifically for a project

    Examples:

    Multi-level Shear Walls

    Exposed /ArchitecturalMaterials: (often)

    High Quality Facing Matl

    Higher quality / strength Ties

    Tie Spacing

    Larger spacing

    Uses

    Multiple Reuses

    Irregular or Regular shapes

  • 5/21/2018 Concrete Construction

    33/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Gang Forms

    Assemble formwork into large sectionsStick built, Panels, or any other system

    Minimizes labor, increases equipment requirements,

    Increases speed of construction

    Generally used only for large, similar & repeated wallelements

  • 5/21/2018 Concrete Construction

    34/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Gang Forms

  • 5/21/2018 Concrete Construction

    35/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Gang Forms

  • 5/21/2018 Concrete Construction

    36/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Insulating Concrete Forms

  • 5/21/2018 Concrete Construction

    37/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting A Concrete Wall

    Layout, Install one side, anchor, & brace

    Coat w/ Form Release

  • 5/21/2018 Concrete Construction

    38/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Wall Braced

    Reinforcing Installed

  • 5/21/2018 Concrete Construction

    39/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Reinforcing Installed

  • 5/21/2018 Concrete Construction

    40/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and StructuresReinforcing Installed

  • 5/21/2018 Concrete Construction

    41/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting A Concrete Wall

    Install Form Ties Small diameter metal rods which hold the forms

    together (generally remain in the wall)

    Snap Tie

  • 5/21/2018 Concrete Construction

    42/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

  • 5/21/2018 Concrete Construction

    43/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting A Concrete Wall

    Install Embedments (if required)

    Install Bulkheads

    Inspect

    Erect second side

    Plumb& Brace

    Establish Pour Height

  • 5/21/2018 Concrete Construction

    44/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting A Concrete Wall

    Pour Wall (Place, consolidate,

    smooth/level top of wall)

    Cure (including after stripping)

    Strip, break ties, point & patch if

    required

    R l i hi B

  • 5/21/2018 Concrete Construction

    45/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Relationship BetweenFormwork Design and Concrete Placement Rate

    Faster Pour Rate = Higher Stress on the Formwork

    Facing material

    Form support system

    Form Ties Hydration Process starts:

    Upon initial mixing of ingredients

    Tall Walls

    Poured in lifts Take advantage of set

    Minimize form design loads

    Liquid

    Head

  • 5/21/2018 Concrete Construction

    46/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Form

    Buckled

  • 5/21/2018 Concrete Construction

    47/155

    Centrefor

    AdvancedBuildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and StructuresFormwork Failure

  • 5/21/2018 Concrete Construction

    48/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and StructuresFormwork Failure

  • 5/21/2018 Concrete Construction

    49/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Column

    Column Footing

    Usually not a strip footing

    Column footing, pile cap, or caisson

  • 5/21/2018 Concrete Construction

    50/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Column

    Layout /Establish

    Column Location

    Fabricate &

    Install Reinforcing

  • 5/21/2018 Concrete Construction

    51/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Reinforcing for a Round Column

  • 5/21/2018 Concrete Construction

    52/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Offset Reinforcing at the Top

  • 5/21/2018 Concrete Construction

    53/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Casting a Concrete Column

    Install column form, plumb & brace

    Place & Cure Concrete (similar to

    wall)

    Strip (& cure)

  • 5/21/2018 Concrete Construction

    54/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Pouring a Concrete Column

    (Workers Tied off)

  • 5/21/2018 Concrete Construction

    55/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Column Forms

    Material

    Wood

    Field fabricated or

    Standardized panels

    Steel

    Plastic or Fiberglass

    Waxed cardboard

    Typically - Ties not required

    (Column Clamps)

  • 5/21/2018 Concrete Construction

    56/155

    Centrefor

    AdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Column Form Materials

  • 5/21/2018 Concrete Construction

    57/155

    CentreforAdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Panelized Formwork

    Formed and Braced

  • 5/21/2018 Concrete Construction

    58/155

    CentreforAdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Formed and Braced

  • 5/21/2018 Concrete Construction

    59/155

    CentreforAdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    SonotubeWaxed Cardboard

    Column Form Material

  • 5/21/2018 Concrete Construction

    60/155

    CentreforAdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Stripped ColumnNote the spiral formwork markings

  • 5/21/2018 Concrete Construction

    61/155

    CentreforAdvancedB

    uildingTechn

    ologies

    BLDG2101 Construction Science 1Foundations and Structures

    Elevated Framing Systems

    One-Way System

    Spans across parallellines of support

    furnished by wallsand/or beams

    Two-Way SystemSpans supports running

    in both directions

  • 5/21/2018 Concrete Construction

    62/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    One Way Elevated Framing Systems

    One-Way Flat-Slab

    Limited Depth

    Limited Spans

    Shorter Story

    Heights

    Underside oftenexposed

  • 5/21/2018 Concrete Construction

    63/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    One Way Elevated Framing Systems

    One-Way Joist System

    Span Greater Distances, Less Dead Load

    Spaced ribs or joists w/ a thin top slab

    Utilizes pans (metal, plastic, fiberglass)

  • 5/21/2018 Concrete Construction

    64/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    One Way Elevated Framing Systems

    Wide-Module or Skip-Joist System

    One-Way Slab & Beam

  • 5/21/2018 Concrete Construction

    65/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    y

    One-Way Slab & Beam

  • 5/21/2018 Concrete Construction

    66/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    y

  • 5/21/2018 Concrete Construction

    67/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Elevated Framing Systems

    Two-Way Framing Systems

    Often more economical than One-Way if:

    Bay spacing (columns) square

    Can be accomplished with a flat slab,

    joists, beams, etc.

    Often associated with higher loadings

  • 5/21/2018 Concrete Construction

    68/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Two-Way Flat Slab

    Flat slab w/ reinforcing beams

    With, or w/o Capitals or drop panels

    Drop Panel

    Drop Panel w/

    Capital

    Flat

    Plate

  • 5/21/2018 Concrete Construction

    69/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Two-Way Waffle Slab

  • 5/21/2018 Concrete Construction

    70/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101Construction Science 1Foundations and Structures

    Elevated Framing Systems

    Factors to Consider

    Bay Spacing - Square or Irregular

    Span Length

    Loading

    Ceiling Treatment

    Lateral Stability

  • 5/21/2018 Concrete Construction

    71/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Preparation

    Prior to Formwork Construction

    Prepare, submit, & approve EngineeredShop Drawings

    FRPS supporting walls/columns

  • 5/21/2018 Concrete Construction

    72/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence

    Set Beam Bottoms (if required)

    Erect Beam Sides

    Form Slab

  • 5/21/2018 Concrete Construction

    73/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Beam Formwork

    Form Beam Bottoms & Sides

  • 5/21/2018 Concrete Construction

    74/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence

    Install Deck formwork

    Install MPE sleeves, block outs, Cast in

    electrical rough-in

    Clean Deck &

    Apply form release

  • 5/21/2018 Concrete Construction

    75/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence (cont.)

    Place Reinforcing

    Beam reinforcing

    Slab bottom &

    Then top reinforcing

    Elevated Slab Sequence (cont )

  • 5/21/2018 Concrete Construction

    76/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence (cont.)

    Place, Consolidate, & Finish

    and Cure

    Elevated Slab Sequence

  • 5/21/2018 Concrete Construction

    77/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence

    (cont.)

    Allow Concrete to Achieve Stripping

    Strength

    Often 75% of design strength

    Often use high-early cementTime of the

    essence

    Verify reqd strength prior to stripping

    Test to destruction one or more test cylinders

    Elevated Slab Sequence

  • 5/21/2018 Concrete Construction

    78/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence

    (cont.)

    Strip Formwork & Re-shore

    Re-shore(May Extend 3-4 FloorsBelow)

    Re-shore Purpose -Support

    Construction Load

    Weight of the next Floor

    El d Sl b S

  • 5/21/2018 Concrete Construction

    79/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Elevated Slab Sequence

    The following group of photos shows

    the sequence for installation of a one-

    way elevated slab.

    (Slab & Beam with Reinforcing & Post-

    Tensioning)

    Columns Placed & Form Support (Scaffolding) Being Erected

  • 5/21/2018 Concrete Construction

    80/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Form Support (Scaffolding) Being Erected

  • 5/21/2018 Concrete Construction

    81/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Decking Support Beams Being Erected

  • 5/21/2018 Concrete Construction

    82/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Plywood Decking Being Erected

  • 5/21/2018 Concrete Construction

    83/155

    CentreforAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    Plywood Decking and Beam Sides Being Erected

  • 5/21/2018 Concrete Construction

    84/155

    Centrefo

    rAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Plywood Decking and Beam Sides Being Erected

  • 5/21/2018 Concrete Construction

    85/155

    Centrefo

    rAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Plywood Decking & Beam Sides Erected

  • 5/21/2018 Concrete Construction

    86/155

    Centrefo

    rAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Plywood Decking and Beam Sides Erected on a Portion

  • 5/21/2018 Concrete Construction

    87/155

    Centrefo

    rAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

  • 5/21/2018 Concrete Construction

    88/155

    Centrefo

    rAdvancedB

    uildingTechnologies

    BLDG2101

    Construction Science 1Foundations and StructuresDeck Support System (Scaffolding)

    s

    Beam Reinforcing Installation

  • 5/21/2018 Concrete Construction

    89/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Beam Reinforcing Installation

  • 5/21/2018 Concrete Construction

    90/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Beam Reinforcing Installation

  • 5/21/2018 Concrete Construction

    91/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Beam Reinforcing Installed

  • 5/21/2018 Concrete Construction

    92/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Beam & Deck Reinforcing Installed

  • 5/21/2018 Concrete Construction

    93/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Post-Tensioning Installation

  • 5/21/2018 Concrete Construction

    94/155

    Centrefo

    rAdvancedB

    uildingTech

    nologies

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Post-Tensioning Installation

  • 5/21/2018 Concrete Construction

    95/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Post-Tensioning Installed

  • 5/21/2018 Concrete Construction

    96/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    s

    Post-Tensioning Complete and MPE Sleeves Installed

  • 5/21/2018 Concrete Construction

    97/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    es

    Slab Poured & Cured

    S i i & P Sh

  • 5/21/2018 Concrete Construction

    98/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Stripping & Post Shores

    es

    Stripping formwork

  • 5/21/2018 Concrete Construction

    99/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    es

    Stripping formwork

  • 5/21/2018 Concrete Construction

    100/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    es

    Formwork Stripped and Reshores Installed

  • 5/21/2018 Concrete Construction

    101/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    es Site Cast Post-tensioning

  • 5/21/2018 Concrete Construction

    102/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Systems

    Can be used with any framing system

    Reduce member size and/or

    Extend span capacity

    es Innovations in Site Cast Concrete

  • 5/21/2018 Concrete Construction

    103/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Innovations in Site Cast Concrete

    Lightweight Concrete and Admixtures

    Formwork Materials & Methods

    Lift-Slab

    Flying Formwork, Gang forms

    Slip Forms

    Tilt-Up

    Shotcrete

    es Lift-Slab

  • 5/21/2018 Concrete Construction

    104/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Lift-Slab

    Cast slabs on the ground (Stacked) &Jack into Place, and Anchored

    es Lift-slab

  • 5/21/2018 Concrete Construction

    105/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    (Note the slab supports at the columns)

    es

    Flying Formwork

  • 5/21/2018 Concrete Construction

    106/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Floor Tables stacked and

    ready for installation

    es

    Flying Sequence

    Jack to Remove the Table Table being slid out

  • 5/21/2018 Concrete Construction

    107/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Jack to Remove the Table

    Table placed on the next levelTable being flown to next level

    Table being slid out

    es Slip Forms

  • 5/21/2018 Concrete Construction

    108/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Slip Forms

    USES:

    Tall, Repetitive, Walls

    ShaftsStairwells

    Silos

    Ring of formwork steadily pulled upward by jacking offthe vertical reinforcing

    es Tilt-Up

  • 5/21/2018 Concrete Construction

    109/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    Tilt Up

    Walls cast Horizontally & Tilted into Place

    Commonly used in Warehouse, Distribution, Retail

    es

  • 5/21/2018 Concrete Construction

    110/155

    Centrefo

    rAdvancedB

    uildingTech

    nologie

    BLDG2101

    Construction Science 1Foundations and Structures

    The following group of photos shows the tilt-up

    sequence used for construction of a Home Depot

    es

  • 5/21/2018 Concrete Construction

    111/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Slab-on-Grade Placed

    es

  • 5/21/2018 Concrete Construction

    112/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Formwork for Panels

    es

  • 5/21/2018 Concrete Construction

    113/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Edge form & reinforcing installedSlab-on-Grade Placed

    ies

  • 5/21/2018 Concrete Construction

    114/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Opening Installed

    ies

  • 5/21/2018 Concrete Construction

    115/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Panels formed and reinforced

    ies

  • 5/21/2018 Concrete Construction

    116/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Panels Formed and Reinforced

    (Note the Inserts)

    ies Weld Plate for Joist AttachmentInsert for Brace

  • 5/21/2018 Concrete Construction

    117/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Inserts forPanel Braces,

    Steel Framing Anchorage,

    & Panel Lifting

    Insert for Lifting Bracket

    ies

  • 5/21/2018 Concrete Construction

    118/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Panels Poured

    ies

  • 5/21/2018 Concrete Construction

    119/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101

    Construction Science 1Foundations and Structures

    Lifting Inserts Stripped

    ies

  • 5/21/2018 Concrete Construction

    120/155

    Centrefo

    rAdvancedB

    uildingTech

    nologi

    BLDG2101Construction Science 1Foundations and Structures

    Placement of Exterior Footing

    Panels

    SOG

    ies

  • 5/21/2018 Concrete Construction

    121/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Crane for Panel Installation

    iesBraces Installed Prior to tilting-up the panels

  • 5/21/2018 Concrete Construction

    122/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    gies

  • 5/21/2018 Concrete Construction

    123/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Attachment of Lifting Bracket

    gies

  • 5/21/2018 Concrete Construction

    124/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panel being lifted (tilted into place)

    gies

  • 5/21/2018 Concrete Construction

    125/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panel being lifted (tilted into place)

    gies

  • 5/21/2018 Concrete Construction

    126/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panel being lifted (tilted into place)

    gies

  • 5/21/2018 Concrete Construction

    127/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panel being lifted (tilted into place)

    gies

    Panel being placed on shims set to proper elevation

  • 5/21/2018 Concrete Construction

    128/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    gies

  • 5/21/2018 Concrete Construction

    129/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panels being braced

    gies

  • 5/21/2018 Concrete Construction

    130/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panels braced

    gies

  • 5/21/2018 Concrete Construction

    131/155

    Centrefo

    rAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panel grouted between footing & panel

    gies

  • 5/21/2018 Concrete Construction

    132/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Roof support structure anchored to panels

    gies

  • 5/21/2018 Concrete Construction

    133/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Subgrade prepared for panel structural connection to Slab-on-Grade

    gies

  • 5/21/2018 Concrete Construction

    134/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Slab-on-Grade perimeter poured

    to anchor the panel bottom.

    gies

  • 5/21/2018 Concrete Construction

    135/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Panels erected

    gies Architectural Concrete

  • 5/21/2018 Concrete Construction

    136/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    Concrete that is left exposed as finishedinterior or exterior surfaces.

    gies

  • 5/21/2018 Concrete Construction

    137/155

    CentreforAdvancedBuildingTech

    nolog

    BLDG2101Construction Science 1Foundations and Structures

    gies

  • 5/21/2018 Concrete Construction

    138/155

    CentreforAdvancedBuildingTechnolog

    BLDG2101Construction Science 1Foundations and Structures

    Exposed Architectural Concrete at the

    University of Iowa

    gies

  • 5/21/2018 Concrete Construction

    139/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Exposed Architectural Concrete at the

    University of Iowa

    gies

  • 5/21/2018 Concrete Construction

    140/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Exposed Architectural Concrete

    (Note the rough finish )

    ogies Architectural Concrete Finishes

  • 5/21/2018 Concrete Construction

    141/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Exposed Aggregate

    clean off paste

    & expose aggregate

    Key

    Aggregate choice

    Mix Placement

    ogies

  • 5/21/2018 Concrete Construction

    142/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    ogies Architectural Concrete Finishes

  • 5/21/2018 Concrete Construction

    143/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Mechanically remove

    the paste

    Sand BlastBushhammer

    ogies Architectural Concrete Finishes

  • 5/21/2018 Concrete Construction

    144/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Liners & Form

    materials

    Multiple # of

    Finishes

    Form Liner &

    Bush-hammer

    ogies

  • 5/21/2018 Concrete Construction

    145/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Architectural Concrete with Bushhammered Finish

    ogies

  • 5/21/2018 Concrete Construction

    146/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Architectural Concrete with Bushhammered Finish

    ogies Simulated Stone Form Liner

  • 5/21/2018 Concrete Construction

    147/155

    CentreforAdvancedBuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    ogies Considerations / Challenges

  • 5/21/2018 Concrete Construction

    148/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Rustication Location

    Form Tie Location

    ogies Considerations / Challenges

  • 5/21/2018 Concrete Construction

    149/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Formwork Joint

    Formwork Blemishes

    ogies

    Considerations / Challenges

  • 5/21/2018 Concrete Construction

    150/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Form Tie Holes

    ogies Considerations/ Challenges

  • 5/21/2018 Concrete Construction

    151/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Rusted Bar Supports

    ogies Considerations / Challenges

  • 5/21/2018 Concrete Construction

    152/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Patching

    ogies Designing Economically

  • 5/21/2018 Concrete Construction

    153/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Of three elements - conc., reinf., formworkFormwork is generally the most expensive

    element

    Formwork - high % of labor

    Economies - simplification &standardization

    Identical bay spacing

    Flat plate - when possible

    Standardize column & beam sizes

    ogies Site Cast Concrete & Building Codes

  • 5/21/2018 Concrete Construction

    154/155

    CentreforAdvanced

    BuildingTechnolo

    BLDG2101Construction Science 1Foundations and Structures

    Fire resistant

    Assuming adequate re-steel coverage

    Most uses - Unlimited Height & Area

    Resistance to lateral loading

    Rigid joints

    ogies QuestionsDiscussions