32
Complete Water Solutions from source to source

Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Embed Size (px)

Citation preview

Page 1: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Complete Water Solutions from source to source

Page 2: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Water is the prime resource essential for survival of human life on earth. All ecosystems and habitats owe their existence to water. Fresh water is available only 2.7% though the surface of the planet earth is geographically covered with more than 70% with water. Sustainable water management in India is fast becoming a necessity with the looming crisis over water resources threatening the security and livelihood of the population and environment.

Water. The Essence of Life

Managing our water resources better – the only solution

Page 3: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Established in 1981, SPML Infra Limited (BSE: 500402 / NSE: SPMLINFRA) is a leading publicly listed infrastructure developer that has managed and implemented over 400 projects across India on an EPC (Engineering, Procurement and Construction), PPP (Public Private Partnership) and BOOT (Build-Own- Operate-Transfer) basis.

SPML has over three decades of multidisciplinary experience in executing world class infrastructure for water treatment and transmission, waste water handling treatment & recycling, solid waste management, power transmission & distribution & civil infrastructure development.

An ISO – 9001: 2008 certified company, SPML has established proven leadership in the high technology construction of India's vital urban infrastructure.

Making human life comfortable with world class infrastructure

Page 4: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML has been promoting sustainable water management for over three decades – a task that is increasingly becoming important and complex as natural supplies deplete and demand rises. Whether it's water supply or wastewater treatment, SPML makes an important contribution towards conserving the precious resource across the nation by reducing wastage, losses and pilferages.

SPML-Water Solutions for Life

Rajiv Gandhi Lift Canal Project, Rajasthan

Page 5: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Engineering to the Core

International Alliances

In-house Research & Development

Quality, Delivery & Safety

SPML has integrated its strength in basic & in-depth engineering, process technology, project management, procurement, fabrication & erection, construction and commissioning to offer distinct responsibility under strict delivery agendas. Many of the engineering and construction projects executed by SPML have set new benchmarks in terms of scale, sophistication and speed.

Strategic alliances with offshore technology-domain leaders enable SPML access technical know-how and execute projects to continue its endeavor in giving the best. This includes Insituform Technologies of USA, a pioneer in the field of trenchless sewer pipe rehabilitation and Aqualyng of Norway, a global leader in reverse osmosis desalination among others. In addition, specific technology tie-ups are carried out on a case to case basis matching global level execution.

SPML has in-house engineering capabilities for both project design and construction. SPML provides an integrated team, designing and building the project to meet customer's requirements. Its design & engineering IT enabled facilities include the modern CAD centre using various design and project management software.

SPML is committed to sustainable water management through effectively managing capital, life cycle costs and regulatory requirements. It actively strives for excellence and delivers projects within prescribed time periods as per agreed quality assurance procedures with clients. As a corporate commitment, SPML gives due importance to safety compliances in design, execution, installation & operations and closely monitors all activities adequately backed by appropriate training and client understanding.

Filter house of Honsur water supply scheme Activated Carbon Filter, CETP Naraina 3000mm dia twin MS pipeline, Wazirabad

14 MLD Water Treatment Plant at Honsur

Page 6: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Scope of services

• Potable/Industrial Water Supply

• Intake Structures

• Transmission Mains

• Pumping Stations

• Storage Reservoirs(Elevated/Ground Level)

• Water Treatment Plants

• Distribution Mains

• Wastewater/ Sewage Treatment Plants

• Refurbishment of Pipelines

• Sewerage Schemes/Pipelines

• Storm Water Drainage

• Pumping Stations

• PLC, SCADA

• Instrumentation

• O & M of Water Supply Schemes

SPML is a leading player in the Indian water scenario and has over three decades of experience in executing turnkey EPC projects through innovative technologies and by providing sterling service from design to commissioning - including construction.

Its capabilities include treatment of all types of water and wastewater - raw water, drinking water, sewage, industrial effluent, brackish water and sea water desalination across industrial, municipal and infrastructure segments.

Engineering, Procurement & Construction (EPC)

35 MLD Bawana Effluent Treatment Plant

Page 7: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Water Supply Transmission Water Supply SchemesMains/PipelinesSPML is a specialized player in mainline cross-country and possesses the necessary expertise to schedule, manage, and construct pipelines of any size and length in all terrains.

Client: Public Health Engineering Dept, RajasthanClient: Delhi Jal Board Scope of Work: Scope of Work: The project has been undertaken with a view to improve the raw water supply arrangement for the treatment plant at Wazirabad and to fulfill the water requirement through laying & commissioning of MS Raw Water Gravity Main, MS Pipeline - 9.11 km of 2440 mm to 3100 mm dia and associated civil works.

Client: Public Health Engineering Directorate, West BengalScope of Work:

Client: Public Health Engineering Dept, RajasthanScope of Work:

Integrated Ramganjmandi Pachpahar Water Supply Haiderpur – Wazirabad Water

Lakshmanpur Water Supply SchemeJawai Palli Water Supply Project

Saurashtra Pipeline Transmission

Jaipur Bisalpur Package -2 Water Supply

Client: Public Health Engineering Dept, RajasthanScope of Work: The project meets the increased demand of water by converting the conveyance system from present open canal to closed conduit – a pipeline system. The project has been undertaken to resolve the water crisis of Pali city; benefiting 531 villages, 10 towns with over 8 Lac of population by overcoming leakages of the existing canal system through laying and commissioning of pipeline: MS-21.45 km of 2000 mm dia, DI-19.6 km of 200 to 500 mm dia, GRP - 68 km of 1100 to 1500 mm dia.

The project aims to reduce the city's dependence on existing ground water resources and includes complementary provision for supplying water to other areas through commissioning of pipelines - MS of 46.75 km with 500mm to 1400 mm dia, DI of 27.25 km with 100 mm to 450mm dia.

SPML has established itself as an ideal partner for utilities for their water supply schemes that include intake systems, treatment of raw water, storage and supply of potable water to homes.

Design, engineering, construction, supply, erection, testing & commissioning of intake channel, intake pumping station, 19.5 MLD Water Treatment Plant, 1400 KL Clear Water Reservoir along with laying of pipelines - MS of 6.4 km with 700 mm dia; DI of 71 km with 400 mm to 600 mm dia.

Funded by Govt. of West Bengal & Federal Republic of Germany, the EPC contract includes supply and installation of raw water intake systems with pumping station, 11 MLD water treatment plant, 300 m elevated service reservoir and laying of raw and clear water transmission mains - DI of 44.6 km with 80 mm to 600 mm dia.

Client: Gujarat Water Supply & Sewerage BoardScope of Work: The main objective of the project was to transfer the excess water from the southern region of Gujarat to the drought prone areas of Saurashtra particularly to 8215 villages and 135 towns & cities of Saurashtra and Kutch, North Gujarat and Panchamal Districts.This involves raw water intake systems with pumping stations, laying of 52 km long MS Cross Country pipeline of 2050 mm dia and 38 km long MS gravity main of 1250 mm to 1650 mm dia.

Haiderpur - Wazirabad water transmission pipeline

Signature DBO Projects

Page 8: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Pokhran Falsoond Balotra Siwana Lift Project

Reorganization of Water Supply Scheme, Khanpur

Client: PHED, Govt. of Rajasthan Scope of Work: The project aims to provide sustainable source of potable water supply to a total of 580 villages together with 3 towns of Pokaran, Balotra and Siwana. Work areas include survey, geotechnical investigation & design work, 80 km of 1500 mm dia MS pipeline, raw water reservoir, three raw water pumping stations, three water treatment plants, clear water reservoir, grid sub station and allied civil works.

Client: PHED, Govt. of Rajasthan Scope of Work: The project involves construction of intake pumping station, rapid gravity 3.32 MLD water treatment plant, 450 KL clear water reservoir, 330 KL overhead service reservoir, laying & commissioning – 18.60 km of 150-300 mm dia DI pipeline, 15.92 km of 150-300 mm dia AC pipeline, 13.60 km of 90-225 MDPE PN distribution line and raw water rising mains of 399 m with 250 mm dia.

Jaipur Bisalpur water transmission line

Rural Water Supply Schemes

Regional Rural Water Supply Scheme for Shirbhavi and 81 villages at Solapur

Rural Water Supply Scheme, Langharpur

1500 Mini Water Supply Schemes, Bihar

SPML assists local communities to resolve drinking water problem in rural habitations under the Rajiv Gandhi National Drinking Water Mission.

Client: Maharashtra Jeevan Pradhikaran Scope of Work:

Client: Maharashtra Jeevan Pradhikaran Scope of Work:

Client: PHED, BiharScope of Work: Design, drawing & construction of 1500 mini water supply schemes in 29 drought-affected districts of Bihar to cater to the drinking water demands of people through provision of tube wells, submersible motor & pumps, 1.5 km long distribution line of GI pipes of 40, 65 and 80mm dia and other civil and electrical works.

Design, engineering, construction, supply, erection, testing & commissioning of head works & pumping station, 22 MLD water treatment

3 3 plant, Service Reservoirs from 25 m to 1500 m , pipelines - MS of 177 km with 219 mm to 559 mm dia, PVC of 368 km with 63 mm to 200 mm dia; GI of 18.55 km with 100 mm dia.

The project undertaken for Langharpur & other 57 villages comprises intake well, jack well, pumping station with substation, 8.5 MLD water treatment plants, reservoirs, pipelines of DI, PVC & CI pipes totalling 297 kms along with associated electrical work and instrumentation.

1500 Mini Water Supply Schemes, Bihar

Page 9: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Pumping Stations

Bisalpur Jaipur Water Supply (Package # 04)

SPML has proven capabilities to set energy efficient up pumping stations by magnadrive both for raw water and wastewater of any magnitude and scale.

Part of the water supply distribution system in the city of Jaipur includes setting up of reservoir cum clear water pumping stations at Jawahar

3/Circle (4 main pumps of 5450 M /Hr, @ 57mwc with 31210 KW) & Mansarovar (3 main pumps of 1500 M /Hr, @

46 mwc with 310 KW) and inline booster pumping 3station at Central Park (4 main pumps of 2750 M /Hr, @

41 mwc with 175 KW), all with SCADA systems. The 7.5 MVA dry type transformers commissioned at Jawahar Circle are the largest capacity dry type transformers to be used in India.

Client: Public Health Engineering Department, RajasthanScope of Work:

25 MGD effluent recycling pumping plant, Rithala

Clear water pumping station, Jaipur

Effluent Recycling Pumping Plant, Rithala

Client: Delhi Jal BoardScope of Work: The Design, Build & Operate project of the 25 MGD Effluent Recycling Pumping Station at Rithala STP comprises twin transmission mains for carrying 33.34 MGD treated effluent from Rithala to Pragati Power Corporation's plant at Bawana. Eight horizontal split casing pumps of capacity 1577 cum/hr @ 48 MWC run the pumping station.

Page 10: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Integrated Sewerage SystemsSPML has capability to undertake gravity sewers for collection of sewage, replacement and renovation of all existing old sewers, construction of the main sewerage, pumping stations, sewage treatment plants and recycling of wastewater on EPC basis.

Client: Mira Bhayandar Municipal Corporation, Maharashtra

Scope of Work: The comprehensive underground sewerage facilities in the 24 sq. km area comprises of design, supply, laying and commissioning 113 km of sewer lines; 10 Pumping Stations and 10 Sewage Treatment Plants from 7 MLD to 17 MLD (total 117 MLD) with latest MBBR technology. It will also provide for the necessary pressurized ring mains for distribution and disposal of recycled water. The project is designed on completely decentralized system having 10 zones across Mira Bhayandar. The sewage system implies closure of existing septic tanks and drainage through storm water drains improving overall hygiene and living standards. The best global safety measures are followed in project execution due to location constraints.

Mira Bhayandar Underground Sewerage System

Kanpur Sewerage System

Client: UP Jal Nigam, Kanpur (UP)

Scope of Work: The project involves providing sewerage network and construction of sewage treatment plant for Kanpur city on turnkey basis. This includes 130 km sewerage network including branch, main and trunk sewers using R.C.C. pipes ranging from 150 to 1800 mm dia. Three pumping stations of 14 , 40 and 42 MLD and Sewage Treatment Plant of 42 MLD based on activated sludge process including power generation from biogas.

Gwalior Storm Water Drainage SystemClient: Gwalior Municipal CorporationScope of Work: Providing storm water drainage system consisting of civil works for water drains, RCC pipes and man holes, construction of storm water pumping station and related electrical and mechanical work.

Mira Bhayandar Sewer line

Representation of the plan of Mira Bhayandar. (For illustrative purpose only- not to scale)

Page 11: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML assist municipalities to provide access to a safe, clean potable water supply and treating waste water. SPML engineers solutions for the proper treatment and disposal of municipal wastewater and sewage to ensure that the resulting wastewater generated does not harm our delicate ecosystems and is recycled for future generations.

SPML meets industry specific water quality requirements to ensure consistent processes and production. SPML also helps industry meet the ever increasing industrial wastewater regulations, while improving efficiency and reducing waste disposal costs.

Water & Wastewater Treatment

Municipal Water & Wastewater Applications • Raw Water Treatment• Drinking Water Treatment• Sewage Treatment• Effluent Treatment• Water Reuse & Recycling

Industrial Water & Wastewater Applications • Process Water Treatment• Water Treatment for Cooling Systems• Water Treatment for Boilers• Water Treatment for Fire Protection Systems• Water Treatment for Industrial Cleaning• Drinking Water Treatment• Sludge Treatment• Water Reuse and Recycling• Desalination of Water

Water Treatment Plants at Latur

Page 12: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Water Treatment Plants

Bakreshwar Thermal Power Plant

Water Treatment Plant, Davanagere

Water Treatment Plant, Shimoga

Pokaran Water Treatment Plant

Integrated Ramganjmandi Pachpahar Water Treatment Plant

SPML has gained a strong foothold in the domain for manufacturing and supplying an assortment of water treatment plants.

The 72 MLD Water Treatment Plant that was designed and constructed for West Bengal Power Development Corporation comprises three clariflocculators of 24 MLD capacity each and a 60 MLD DM Plant.

SPML designed and constructed a 60 MLD water treatment plant and pure water sump in package-III for Karnataka Urban Water Supply & Drainage Board, Chitradurga division.

The 52 MLD water treatment plant was designed, constructed, installed, tested and commissioned at K.R. Water Works Shivamogga under augmentation of water supply scheme to Shivamogga City with Tunga Reservoir as source.

The Pokaran Falsoond Balotra Siwana Lift Project comprises of three Water Treatment Plants for PHED Jodhpur of 3.2, 3.1 and 119 MLD and will provide clear water to the downstream locations benefiting 55 villages and three towns of Pokaran, Balotra and Siwana.

The construction of rapid gravity water treatment plant of 19.50 MLD for raw water was awarded by PHED, Kota at Eklingpura Ka Ghata with allied inlet and distribution system, clariflocullator, raw water balancing tank, instrumentation and installation of PLC and SCADA systems.

Technologies Leveraged• Water Treatment• Pre-treatment• Softening • Demineralization • SAFF, MBR, MBBR & SBR• Reverse osmosis • Ultra filtration • Iron removal • Biological filtration • Membrane filtration

Water Reuse and Recycling• Filtration• RO Demineralization • Evaporation• Zero Liquid Discharge (ZLD)

Wastewater Treatment• Physical and Chemical Treatments• Dissolved Air Flotation (DAF)• Aerobic Biological Processes• Anaerobic Biological Processes• Membrane Biological Reactor (MBR)• Tertiary Treatments

Sludge Treatment• Thickening• Digestion• Mechanical Dewatering

- Filter press- Belt filter press- Centrifuge

• Thermal drying• Supercritical oxidation• Valuation

19.5 MLD Ramganjmandi, RajasthanWater Treatment Plant at

Page 13: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Chambal-Sawai Madhopur-Nadauti project

Water Supply Scheme, Lakshmanpur, Purulia

Chamrajnagar Water Supply Scheme, Karnataka

Hubli-Dharwad Water Supply, Karnataka

Bijapur Water Supply Scheme, Karnataka

Greater Lunglei Water Supply Scheme, Mizoram

The 146.75 MLD Water Treatment Plant has been hydraulically designed for an overload of 20% and would treat the raw water of Chambal river to specified quality standards.

The 11 MLD WTP for PHED, Bolpur-Raghunathpur Water Supply Circle is equipped with three phase back washing system and incorporates facilities for treating the water with Potassium permanganate and Powder activated carbon for removing phenol.

The 18 MLD Water Treatment Plant for Chamrajnagar Water Supply Scheme has been constructed for Karnataka Urban Water Supply & Drainage Board, Mysore.

The 68 MLD Water Treatment Plant has been constructed for Karnataka Urban Water Supply & Drainage Board for providing drinking water supply to Hubli – Dharwad twin city.

The 38 MLD Water Treatment Plant has been constructed for Karnataka Urban Water Supply & Drainage Board for improvement of the water supply scheme to Bijapur City with Krishna River as source.

The 7.5 MLD Water Treatment Plant for PHED, Govt of Mizoram aims at providing water to Lunglei City and is capable of yielding treated water with turbidity of less than 5 ppm.

Jorhat Water Supply Scheme, Assam

Goalpara Water Supply Scheme, Assam

Water Treatment Plants in Maharashtra

The 20 MLD Water Treatment Plant has been constructed for Assam Urban Water Supply & Sewerage Board capable of treating water with turbidity less than 5 ppm.

The 10 MLD Water Treatment Plant for Assam Urban Water Supply & Sewerage Board draws raw water from the river Brahmaputra. The plant is located on a hill top so that filtered water distribution can be discharged through gravity.

The Water Treatment plants constructed for Maharashtra Jeevan Pradhikaran include Shirbhavi (22 MLD), Langharpur (8.5 MLD), Hole (10.5 & 2 MLD), Lasalgaon (8.1 MLD), Vijaydurg (5 MLD), Amgaon (KH) Kholgarh (5.63 MLD).

Honsur Water Treatment Plant

Page 14: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Sewage Treatment PlantsSPML has adequate experience in providing turnkey solutions for Sewage Treatment Plants (STP) including design & engineering, construction & commissioning. STPs are designed based on suspended growth conventional activated sludge process with BOD removal from 200 ppm in the raw sewage to the level of less than 5 ppm and turbidity to 2-5 ppm in the treated water.

Capacity: 72 MLD Client: Delhi Jal Board

Scope of project: Design, Engineering, Construction, Supply & Erection of E&M Equipments, testing & commissioning and process/technology based on activated sludge process (ASP with Gas Mixing Technology).

Capacity: 240 MLD

Client: Ahmedabad Urban Development Authority

Scope of project: The STP is built in 4 Modules of 60 MLD each with each module having its own primary & secondary treatment section plus sludge thickening & digestion facilities. Common facilities exist for disinfection of biologically treated water, biogas collection & flaring, supernatant/filtrate collection & recirculation system, collection of digested sludge & digested sludge dewatering system along with common chemical preparation & dosing facilities. The treated discharge BOD & COD recorded by the STP is 14.1 mg/l & 61 mg/l as against influent levels of 91.6 mg/l & 271 mg/l respectively.

STP Okhla, Delhi

STP Vasna, Ahmedabad

Water Recycling at TTP Yelahanka, Bangalore

STP Nasik, Maharashtra

STP Mysore, Karnataka

STP Kanpur, Uttar Pradesh

Capacity: 70 MLD

Client: Nasik Municipal Corporation

Scope of project: Design, construction, supply, erection, testing, commissioning, start-up and performance run for the STP and sewage pumping station at Agar Takali, Nasik.

Capacity: 60 MLD

Client: Karnataka Urban Water Supply & Drainage Board

Scope of project: The STP for Drainage Districts “A & D” Mysore involves activated sludge process consisting of facultative aerated lagoons and sedimentation basins besides construction of pumping stations and rising mains. The treated discharge BOD & TSS recorded by the STP is 20 mg/l & 30 mg/l as against influent levels of 300 mg/l & 400 mg/l respectively.

Capacity: 42 MLD

Client: UP Jal Nigam

Scope of project: Design, construction, supply, erection, testing & commissioning for the STP at Sajari in Sewerage District - IV Kanpur based on activated sludge process with Gas & Electricity Generation. The project is a part of the Jawaharlal Nehru National Urban Renewal Mission.

Page 15: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

35 MLD CETP at Bawana Industrial Area, Delhi

Water Recycle & ReuseCapacity: 21.6 MLD SPML has provided municipal water reuse and

recycl ing solutions meeting the str ingent Client: Delhi State Industrial Infrastructure government regulations. Development Corporation Limited

Scope of project: Design, detailed engineering, supply, fabrication, erection, construction, testing and commissioning of the plant including equalization Capacity: 10 MLD tank, pump houses, holding tank, grit & screen

Client: Bangalore Water Supply & Sewerage Board channel, flash mixer, tube settler, flocculation tank, sludge thickener. Scope of project: The first of its kind Tertiary

Treatment Plant (TTP) in India for the reuse of municipal wastewater, the TTP treats the city sewage and recycles wastewater in the neighboring industrial

Capacity: 35 MLD units for cooling, washing and fire fighting. Client: Delhi State Industrial Infrastructure The TTP has three stage treatment systems – primary, Development Corporation Limited secondary and tertiary. Scope of project: The largest CETP in Delhi will serve more than 20,000 industrial units in Bawana with the treated water reused in horticulture for the green belt and parks of Bawana. Based on three tier treatment SPML has executed Common Effluent Treatment (primary, secondary & tertiary), the CETP comprises Plants (CETP) at Okhla, Bawana, Naraina & Lawrence screen chambers, O&G removal tank, grit chambers, Road Industrial Area in Delhi from 12 to 35 MLD thus equalization tank, chemical treatment clarifiers, helping them considerably reduce their treatment aeration tanks, tube settlers, rapid sand gravity tilts costs and protect the environment. and centrifuge.

Capacity: 24 MLD

Client: Delhi State Industrial Infrastructure Development Corporation Limited

Scope of project: The project envisaged effective treatment of the effluents disseminated at the Okhla Industrial area. The scope of work included design, detailed engineering, supply, fabrication, erection, construction, testing and commissioning of the plant including equalization tank, pump houses, holding tank, grit & screen channel, flash mixer, tube settler, flocculation tank, sludge thickener & CI Rising Main - 2.77 km long.

CETP Naraina, Delhi

TTP Yelahanka, Bangalore

CETP Bawana, Delhi

Common Effluent Treatment Plants

CETP Okhla, DelhiEnsuring discharge quality

pH 7-7.5 7-7.5 5.5-9

TSS, mg/l 1150-1750 38-70 100

COD, mg/l 700-900 80-120 2500BOD (3 days at 27 ) mg/l 150-300 18-26 30

Parameter Influent Treated EPA Standards ofDischarge treated effluent

Page 16: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Process Water

Water Distribution System

Cooling Water

Fresh WaterSea Water Desalination

Water Reuse Recycled water is used for a variety of purposes such as irrigation

SeparationPretreatment

MUNICIPAL WATER TREATMENT

Filtration

Disinfection

ESR

Marine and offshore seawaterelectrochlorination / Desalination

Treated water is returned to the ocean, lake, river or stream

Water & Wastewater Asset MapSPML manages complete water cycles with a focus on saving water and protecting resources.This includes raw water intake through rivers/canals/sea, water treatment, pumping and water distribution & transmission to cities and industries for potable, service and process water needs. And at the end, treating sewage and effluent for disposing treated water back into the source or recycling for further usage.

Page 17: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Process Water Industrial

Waste Water

Industry

City

Primary Treatment

Final TreatmentUV /Chlorine Disinfection

Biosolids RecyclingBiosolids to Land Applications

Process ControlLaboratory

Secondary Treatment

Secondary Treatment

Tertiary /Advanced TreatmentFiltration Solids Dewatering

Belt Presses

Treated water is returned to the ocean, lake, river or stream

Solids Thickening

Digestion

Metering

Bar Screening

Pumping System

Wastewater Sewage Collection System

MUNICIPAL WATER TREATMENT

Applications LegendMeteringDisinfectionFiltration

Page 18: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML undertakes operational management within the framework of service contracts. The long term association and trust with the client comes through implementation of cost effective operation & maintenance (O&M) activities which is carried out after the project is handed over.

Extensive expertise and recognized competence in the area of water-related operational management, has led to a large number of its client base to opt for SPML's full service capabilities. During the complete plant life cycle, SPML's services contribute to the optimum use of resources with long term sustainability by providing

• Synergic operational plan in line with client needs• Asset management through predictive & preventive maintenance• Ensuring continuous safe operations with full time deployment of

professional team• System improvements through reliability analysis, operational audit,

training of personnel & technological innovations• Process quality control and adherence to client laid norms• Optimization of material resources while ensuring quality

performance• Coordination with OEM/supplier and external supports service for

trouble free operations• Compliance to safety & environmental norms• Site performance indexing through MIS/documentation & operational logging

In the long-term, this results in considerable cost advantages for the respective owner.

operative management of the highest standard in line with customer needs.

Scope of Services

Operation & Maintenance

SPML Engagements

• 34 operating sites across the country• Serving industrial, urban

and rural needs• Comprehensive/BOOT operations• Sewage Treatment Plant,

Effluent Water Treatment Plant, Water Treatment Plant, Urban & rural water distribution system

O & M Contracts (indicative list only)Project Client Scope of work Period of O & M

Bawana CETP DSIIDC, Delhi Designing, detailed engineering, supply, fabrication, erection, construction, testing and commissioning of 35 MLD CETP and 3 pumping stations and rising main.

3 years

RGLC-Phase-II Water Supply

Scheme

PHED, RGLC Circle-1, Jodhpur

Design, Engineering, Supply, Erection, Testing & Commissioning of Rajiv Gandhi Lift Canal (Modified Phase II) Water Supply Project including Canal Works, 16.6 Km Pipeline – 800 mm to 1700 mm dia, Valves ( Kinetic Air Valves, Air cushion Valves, scour valves etc.), Surge Protection Device ( 1600 NB Zero Velocity Valve)

5 years

5 yearsRamganj Mandi Integrated Water Supply Scheme

PHED, Jhalawar Rajasthan

Intake channel and Intake well pump house, 6.916 Km Raw Water Rising Main – 600 mm/700 mm dia MS pipeline, 19.5 MLD water treatment plant, 42.53 Km Clear Water Gravity Main – 600/500/450 mm DI/MS pipeline along with associated valves and fittings; O&M of the Plant through PLC/ SCADA and Voice Communication System

2 yearsJBIC II PHED, Jaipur, Rajasthan

Construction of western and southern transfers main comprising supplying, laying, testing and commissioning of various diameters of DI and MS pipes with associated works.

2 yearsJBIC IV PHED, Jaipur, Rajasthan

Design, supply of equipment, construction, testing and commissioning of 3 pumping stations comprising of civil, mechanical, electrical and instrumentation work.

5 yearsPali PHED, Jodhpur, Rajasthan

Supply of Water from Jawai & Hemawas Dams (Pali District) to Pali Town, water treatment plants viz. P,L&J of MS/GRP pipeline and related works between Jawai and Hemawas Dams and Pali town with civil, mechanical, electrical and instrumentation works

6 yearsRithala STP and Effluent Pumping

Station

Delhi Jal Board 8 Pumps of capacity 1577m3/hr, 13 Km long 900 mm diameter DI twin transmission mains, 200 KVA and 400 KVA transformers, HT/LT cabling, lighting and earthing works etc.

Page 19: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML has a joint venture with Aqualyng of Norway to offer energy efficient and low life-cycle cost reverse osmosis desalination systems. With Aqualyng's technology, SPML will offer its customers cost effective desalinated water lower than competition. SPML through the JV will take on desalination turnkey projects largely on a BOOT basis to devise and implement customized solutions based on consumption parameters.

Aqualyng's own patented energy-efficiency device – the TMRECUPERATOR allows recycling as much as 98.5% of the

energy involved in the desalination process. In addition to being environment friendly, it has a huge impact on operating costs.

Recuperator' Technology – The competitive edge

Desalination - Meeting Long-term Water Supply Needs

Fast Water - Modular desalination solutionsFast Water is a series of modular water treatment plants employing Reverse Osmosis (RO) technology for temporary water supply needs. The units are designed to produce potable water at flow rates ranging from

3 3250m /day to 1000m /day. Easy to transport, install and operate, Fast Water energy saving and ready assembled standard modules reduces costly time spent on assembly and commissioning.

Power, Construction, Oil & Gas, Petrochemicals, Agriculture, Chemicals, Mining & Minerals, Metal Processing, Food & Beverage and Water Bottling Industries.

Applications

Page 20: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Cured-in-place-Pipe - Trenchless Technology

Sewer Rehabilitation Projects

Cured-in-place Pipe (CIPP) is a trenchless rehabilitation technology developed in 1971 by INSITUFORM providing a joint less, seamless, pipe-within-a-pipe that protects against spills, breaks and pipeline leakage. SPML infra and INSITUFORM joint venture - Insituform Pipeline Rehabilitation Private Limited has revolutionized the sewer rehabilitation process in India. Prior to rehabilitation, jetting cum suction machines and silt loaders are used to remove silt and other obstructions and CCTV surveys are carried out to identify defects and inspections. Robotic controlled cutting device is used to restore service laterals.

SPML has carried out sewer rehabilitation in Delhi Jal Board at Jail Road, West Delhi, Kalkaji covering a maximum length of 7 kms upto 1828mm dia pipes. In addition, New Delhi Municipal Council and Delhi Metro Rail Corporation entrusted their sewer rehabilitation at Ashoka Road and Jangpura respectively.

Advantages• Faster, affordable, reliable & non-

disruptive solutions for sewer pipe rehabilitation

• Significantly reduces infiltration of water through cracks, holes & joint failures

• Restores structural integrity to damaged sewer pipes

• Absence of joints or seams increases flow capacity

• Lengthens the life of existing pipelines by another 50 to 100 years

Often the biggest challenge that municipalities & ULBs face is how to rehabilitate the system. It is not always easy to dig & replace the entire sewerage system without disrupting daily life. Rehabilitation work encounters multiple challenges like reverse gradients, collapsed pipes, hidden manholes and even houses constructed over manholes.

Sewer Rehabilitation & Trenchless Project

Deformed sewer pipeline before rehabilitation

Sewer pipeline post rehabilitation

Liner being inverted into the manhole

CCTV used to identify deformity of pipes

De-silting through supersucker machines

Sewer Rehabilitation Pipeline Network

Project Executed Client Dia of Pipe Length

Jail Road Delhi Jal Board 1422mm, 1676mm & 1828mm 6.7 kms

West Delhi Delhi Jal Board 1676mm 7 kms

Kalkaji Delhi Jal Board 600mm, 750mm, 900mm, 1050mm & 1350mm 3.6 kms

Ashoka Road New Delhi Municipal Council 940 x 1370mm 1.3 kms

Jangpura Delhi Metro Rail Corporation 1600mm 800 m

Allahabad UP Jal Nigam 1100 x 1300mm, 1000mm, 990mm, 700mm & 500mm 5.4 kms

Page 21: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Trenchless Pipe Laying Technology

Trenchless Pipe Laying Process

Trenchless pipe laying technology involving laying of pipeline without making open cut excavation has achieved a degree of importance in utilities specifically for projects beneath railway tracks, waterways or roads as it is faster, causes no impact on residents & traffic and eliminates construction noise.

• An entry pit is excavated upto bed level of the pipe• PCC in bedding and thrust blocks with shoring is

made over which rails are laid• Pipe is kept on the rails and pushed by mechanical

hydraulic jacks after excavating soil from the bore horizontally without disturbing top cushion of pipe

• Boring & pushing are done in small lengthsconsecutively till crossing length is pushed

• Finally the pipe is exposed by exit pit excavation

SPML has been carrying out laying of twin MS pipe line of 156 meters with 2420 mm dia and 20 mm thickness at its Haiderpur-Wazirabad raw water transmission project by trenchless technology using laser guided micro tunneling method. Additionally, a total length of 204 m of MS pipeline is being laid with 2420 mm dia and 20 mm thickness by trenchless technology using Jack pushing method in this project.

Trenchless technology is also being used for sewage transportation at the Preet Vihar sewage pumping station using SDPE pipes of 1200 mm dia in various lengths for a total pipeline length of 7200 m and at Yamuna Vihar with MS pipe of 168 m with 1578 mm dia and 14mm thickness.

Besides, MS trenchless clear water pipes of 1200 mm dia &14 mm thickness of a total length of 240 m and 900 mm dia & 12 mm thickness of a total length of 120 m is being executed at Jal Vihar.

Page 22: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML - Water to Power PlantsSPML has the core capability and competency as a preferred, trusted and reliable partner for large power plants in the areas of start-to-end balance-of-plant equipments, materials and solutions such as intake water, water treatment plants including DM plants, cooling water systems, station piping, civil including complete structural, mechanical & electrical works.

Cooling water system for Neyveli Thermal Power Station

Cooling Water/auxiliary Cooling Water

• Cooling tower• Cooling water system• Auxiliary cooling water system• Service water system• DM water storage tank

Key AreasWater Treatment

• Raw water intake systemirrespective of intake from canal, river or sea

• Cross country pipeline• Raw water reservoir• Raw water pumping system• Pre-treatment plant• Demineralization plant• Effluent treatment plant• Sewage treatment plant• Reverse osmosis plant

Page 23: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Neyveli Thermal Power Station (2x250 MW)Signature Projects

Bakreshwar Thermal Power Plant (3x210 MW)

Simhadri Super Thermal Power (2x500 MW)

Santaldih Thermal Power Station (2x250 MW)

Barh Super Thermal Power Project (3x660 MW) 160 MW Gas Based CCPP Stage-III at Ramgarh

Client: Neyveli Lignite Corporation Limited Scope of Work:

Client: West Bengal Power Development Corp. Ltd. (WPPDCIL)Scope of Work: Water intake a n d P l a n t w a t e r s y s t e m package - Pre-treatment, filtration; demineralization & waste water management; intake pump house, twin MS cross country pipelines - 38 km

long of 900 mm dia; 72 MLD raw water treatment plant, 60 MLD DM Plant and other civil & electromechanical works along with O&M. Client: National Thermal Power Corporation Limited

S c o p e o f W o r k : D e s i g n , Client: West Bengal Power engineering, manufacturing, Development Corp. Ltd. s u p p l y , i n s p e c t i o n , Scope of Work: The scope of erection/laying, station Piping work included circulating water systems, effluent disposal and system comprising of CW open sweet water lines, effluent and channel from Cooling Tower to cooling water blow lines. The 86 CW pump house, CW pump km of piping in various systems includes raw water,

house with forebay, maintenance bay, CW piping, fire sea water, sweet water, drinking water and service protection, piping of hydrant and spray water system water. Besides the DM and Boiler fill system, the with all associated civil, electrical and allied system. project includes effluent disposal and Sludge disposal.

Client: National Thermal Power Corporation Limited Client: Rajasthan Rajya Vidyut Utpadan Nigam Ltd.Scope of Work: Scope of Work: The balance of plant (BOP) scope

includes total plant water system to meet potable, service & process water needs of the Power Plant stage III. The project includes two raw water reservoirs (total

3capacity of 6.87 lac m ), pre-treatment plant with two 3clarifiers of 320 m /hr capacity each, clarified water

storage tank, chlorination plant for raw water & 3cooling water systems, 35 m /hr DM plant and 154

3m /hr Effluent Treatment Plant.

Design, supply and build complete Circulating Water system comprising of open channel from Natural draught Cooling Tower to CW pump house, 5 nos of WPIL VT pumps of 1800 KW, Fire water pumps of

125 KW, Diesel operated FW pumps as stand by in CW pump house with fore bay, maintenance bay, Cooling water piping 2840 Dia from pump house to condenser and hot water piping from condenser to cooling tower, ventilation, fire protection, piping of hydrant and spray water system.

Design, engineering, procurement, supply, erection & commissioning of ash water recirculation system comprising pump house with water intake system, 4 no ash water re-circulation pumps of 1,100 m3/hr, 8.5 km clear water pipeline of 800 mm dia.

SPML- Providing Water Solutions to Power Plants

Page 24: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Agriculture provides primary livelihood to almost two thirds of the work force in the country and hence heavily dependent on irrigation. SPML plays a contributing role in India's green revolution by provides services in a number of areas including construction of dams, canals, lift irrigation schemes and micro irrigation.

Irrigation

Gosikhurd DamSPML in association with Om Metals has designed & installed Spillway Radial Crest Gates, Spillway Stoplog Gates and Gantry Cranes at the Gosikhurd Dam at Wahi in Maharashtra.

Objectives• Provide 1200 M Cft of water to Kali Sindh

Thermal Power Project• Drinking water facility to Jhalawar and

adjoining area• Irrigation facility (IInd Stage) in the

command of RMC & Harish Chand Sagar Pickup Weir

Scope of Work• Spillway radial gates with overflow hoods

& flow breakers • Hydraulic hoist cylinders with independent

power pack • Construction Sluice for diversion of river

waters• Head Regulator Gates• Microprocessor based remote control

system for operation of spillway radial, intake & head regulator gates

• Maintenance of mandatory spares• Traveling Gantry for Bulk Gate operated by

electrically operated crane • Automatic lifting beams for handling stop

log section• Electrical equipment & associated

instrumentation

DamsSPML possesses the know-how of constructing dams in the water supply and irrigation sector including constructing diversion tunnels, intake and de-silting, electro mechanical works and associated civil works such as the powerhouse, power tunnels, power intake and spillway.

Kalisindh Gravity DamLocated at Jhalawar district, Rajasthan, the Kalisindh Gravity Dam project for Rajasthan Rajya Vidyut Utpadan Nigam Ltd would be constructed across river Kalisindh involving civil, hydro-mechanical & electrical works.

Gosikhurd Dam

Page 25: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Canals

Rajeev Gandhi Lift Canal Water Supply – Ph II

Flood Flow Canal, Andhra Pradesh

SPML has designed and executed canals, thus providing water resources to the rural areas for agricultural purposes. SPML handles the excavation of canals, unearthing to lay foundations and building support structures.

Client: Public Health Engineering Dept, RajasthanScope of Work: The scope of work for the Design, Build & Operate project involved strengthening, lining, raising, excavation for widening and benching of canal banks to accommodate additional flow raising the canal capacity to a total length of 176 km.

Irrigation & CAD Department, Andhra PradeshThe project involved earthwork

excavation, underwater excavation, forming embankment and construction of CM & CD works of the Flood Flow Canal from 70 km to 86 km at Rampur (V) Karimnagar District.

Client: Scope of work:

Lift Irrigation

Sonthi Lift Irrigation Scheme, Karnataka

Nanjapura Lift Irrigation Scheme, Mysore

Kathora Lift Irrigation Scheme

SPML has constructed a number of lift irrigation schemes with the goal of providing increased irrigation benefits to small and marginal farmers.

Client: Krishna Bhagya Jala Nigam Limited Scope of Work: The main aim of the project was to irrigate 16,000 hectares of land near Kollur village, Gulburga District in Karnataka. The scope of work includes rising mains of a length of MS pipeline of a length of 4320 m, dia 2.2 m with a water discharge of 15 cumecs and installation of VT pumps with a capacity of 8868 cum/hr – 1945 HP and total discharge of 8 cumecs.

Client: Scope of Work:

Client: Narmada Valley Development Authority, Madhya PradeshScope of Work: Supplying, laying, testing and commissioning of MS Pipe line with guniting ( 1500 mm dia 6.8 Km, 1200 mm dia 8.5 Km, 1000 mm dia 5.12 km and 1100 mm dia 3.285 km).

Cauvery Neeravari Nigam Limited The project was proposed with River

Cauvery as the source of water for delivering water to the Turugunur Branch canal near Nanjapur village for agricultural needs – 119 cusecs of water at a head of 58.00 meters to irrigate up to 10,000 acres of Kharif Paddy for Malavalli and T. Narsipura.

Honganur Hirekere Lift Irrigation, Karnataka

Rajiv Gandhi Lift Canal, Rajasthan

Page 26: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Ubrani Lift Irrigation Scheme, Karnataka

Singatalur Lift Irrigation Scheme

Ubrani Lift Irrigation Scheme

Client: Karnataka Neeravari Nigam LimitedScope of Work: Design, supply, installation, testing and commissioning Lift Irrigation System comprising rising mains including construction of intake arrangements, transition sump, jack well cum pump house, delivery chamber and other associated civil works.

Client: Karnataka Neeravari Nigam Limited, UTP Zone, Shimoga, KarnatakaScope of Work: The project comprises construction of diversion weir, intake arrangements, transition, sump/jack well cum pump houses, delivery chambers, rising main, MS manifold and other associated civil works.

Singatalur Lift Irrigation Scheme

Micro Irrigation S P M L a d d r e s s e s t h e irrigation problems of farmers living in water and energy scarce regions by using considerably less water and increasing yields.

Based on careful study of factors including land topography, soil, water, crop and agro-climatic conditions, SPML selects the most suitable and scientific micro irrigation system which ensures saving in water, and a bountiful harvest.

Other Lift Irrigation Schemes Executed• Satara Lift Irrigation, Maharashtra• Adikebommanahalli Lift Irrigation, Karnataka• Kattepura Lift Irrigation Scheme, Karnataka• Honganur Hirekere Lift Irrigation, Karnataka• Gokak Taluk, Lift Irrigation, Belgaum, Karnataka• Taraka Lift Irrigation Scheme, Mysore• Bennihalla Lift Irrigation Scheme, Naragund,

Karnataka• Chevella Lift Irrigation Scheme, Andhra Pradesh• Bannahallihundi Lift Irrigation Scheme

Client: Maharashtra Krishna Valley DevelopmentCorporationScope of Work: The project is aimed at utilising water of

3Krishna Basin (about 599,000 m ) for irrigation in the command area (more than 250 Ha).The five stage project for lifting of water from Krishna is being executed through SPML and M & P Joint Venture.

Tembhu Lift Irrigation Scheme

Tunneling in Lift Irrigation

Being an established leader in the infrastructure space in India, SPML possesses the required expertise to carry out Tunneling in Lift Irrigation, a specialized activity requiring understanding of different technologies that are effective in different kinds of rock and ground conditions. The JIHE Kathapur Lift Irrigation Scheme comprises creation of two tunnels of 3.75 km and 14.5 km. The project aimed at providing much needed water for irrigation from river Krishna of Maharashtra Krishna Valley Development Corporation is being executed in joint venture with B.T. Patil & Sons.

Page 27: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPML Utilities Limited (SUL), a wholly owned Performance assessmentssubsidiary of SPML Infra Limited, has been established SUL conducts performance analysis of water utilities to oversee the PPP and BOOT businesses of the SPML and setting up tariffs. Strategies for monitoring and group in the water supply and waste management targeting inefficiencies help in improving the overall sectors. SUL helps ULBs provide their citizens access efficiency of service deliveries. to safe and reliable water supply and services and to

Water utility managementmanage the water cycle in an environmentally SUL optimizes systems to reduce costs, avoid sustainable way. regulatory compliance issues to maximize utility's value & contribution to the community. Desalination & reuse projects

Metering Services SUL can carry out investments in production of potable/industrial water supply from desalination SUL follows modern metering techniques helping in and water reuse projects.fraud detection, accurate billing based on actual data,

meter reading in inaccessible areas, data collection & Water conveyanceoptimized network management. SUL can deliver potable water through a dedicated Non-revenue water reduction fleet of tankers in localities where no piped water

connection is available or areas that suffer from short By employing a cost effective maintenance and supply of water due to breakdowns/outages.management plan for pipeline assets, SUL identifies

and eliminates several causes such as leaks, theft or Modern technology usagemetering inaccuracies that lead to non-revenue SUL uses Integrated Management Information water. Systems including SCADA that helps in better Water source development & customer management, effectively manage water transmission networks distribution resulting in increased efficiency of the

utilities. SUL is capable of developing new water sources and t h e a s s o c i a t e d t r a n s m i s s i o n s y s t e m s f o r augmentation of existing water supply in urban and rural areas by combining the in-house technical, financial and legal capabilities to structure bankable projects. Asset managementSUL maintains the performance of the drinking water network, the quality of distributed water, and effectively manage, protect & preserve the water assets.

Scope of services

Metering for accurate billing

Latur water supply- India’s first integrated water supply scheme

Public Private Partnership

Page 28: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Latur Water Supply Scheme Bhiwandi Water Supply Management

Integrated Water supply, Aurangabad

Bhiwandi Water Supply Infra

India's first integrated source to tap project for The project awarded in 2008-09 for a concession Maharashtra Jeevan Pradhikaran primarily involves period of 30 years for Bhiwandi Nizampur Municipal taking over the existing assets from source to tap and Corporation, Maharashtra envisages providing 24 x 7 providing continuous pressurized water supply water supply through integrated information system, system on daily basis with augmentation to 24x7 in operation & maintenance, demand management and future and rehabilitating, operation and maintenance network asset management system, conduct of the assets for a period 10 years until 2018. hydraulic modeling, install meters with data loggers,

undertake customer surveys & relation programs and The scope of work includes implementing modern evolve rehabilitation plan. distribution management and reducing lost revenue,

increase piped water supply coverage through new Additionally, the scope of work includes setting up connections and adding up of newly developed customer care centre, billing & collection systems, areas, implementation of state-of-the-art information monitoring & maintaining the quality of water and technology including SCADA, management managing a consumer base of approx 2.25 lac meters.reporting and audit process, effective utility management, cost benefits and sustainable methodologies.

SPML would be providing integrated water supply to The project awarded in 2008 has already resulted in over 12 lac residents of Aurangabad for Aurangabad increasing the frequency of water supplies to 3 days Municipal Corporation. The project will be executed a week in 2010 which was earlier once a week. by a SPML consortium comprising SPML, VA Tech and

National Water & Sewerage Corporation of Uganda.The complete scope of work includes construction of new parallel water pipeline from Jaikwadi Dam to Nakshtrawadi master balancing reservoir, new head

benefit 11 lakh works, new master balancing/elevated service people with equitable water supply. reservoir, water treatment plant, approach bridge,

transmission mains, pumping machinery & electrical The scope of work under Source 1 installation, rehabilitation of existing water assets and supply potable grade water (as per CPHEEO norms) to Aurangabad. The main focus of the contract are to achieve operational efficiencies through Non Revenue Water (NRW) reduction, metering, computerized billing and collection and installing SCADA systems along with GIS and network modelling for the concession period of 20 years (including 3 years of construction & 17 years of O&M).

The project awarded in 2008-09 for a concession period of 30 Years by Bhiwandi Nizampur Municipal Corporation, Maharashtra is slated to

(Atkhipilli, Kanwadi river) includes construction of KT Weirs and head work, laying of 13 km of raw water transmission mains, revamping the existing WTP at Padgaon and construction of MBR. The Source 2 (Warna River) work includes construction of dams at Warna Nalla, construction of Hydraulic Power Plant & Water Treatment Plant, laying of 18 kms of pure water transmission main and construction of MBR.

Page 29: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

SPMLAQUA is a simple yet powerful enterprise management system designed to meet the day to day operations of water distribution utilities. Developed on robust Microsoft technologies platform and Oracle Spatial Database, the system seamlessly manages the entire gamut of services such as Billing and CIS, Finance Management, Asset Management, Operations and Maintenance, GIS, Asset Network Management, Network Management for Water and Sewer and Demand Management. SPMLAQUA is the only Enterprise Solution for utilities that has an inbuilt CRM and Revenue Management System.

It connects the entire organization with customers, suppliers, partners, contractors and employees. The system improves the efficiency of all operations and eventually enables the water distribution utilities to take real-time and informed decisions on time facilitating decision making.

SPMLAQUA – Enterprise Management System Glimpses of the System

Finance Management

• General Ledger• Accounts Payable• Accounts Receivable• Bank Management

Billing

• Billing Engine• Tariff Management• Rules Engine• Printing Engine• Offline data Management

Customer Information System

• Commercial Database• Customer Services• Consumer Portal• Complaint Management

Demand Management

• Town Planning• NRW Analysis• Demand Analysis & Forecasting• Capital PlanAsset Management• Asset Creation• Asset Movement & Tracking• Depreciation models

Operations & Maintenance

• Preventive Maintenance• Breakdown Maintenance

GIS & Network Analysis

• NA for Water & Sewer• Network Designing• Simulation• Schematics• Digital Terrain Modeling

Materials Management

• Spares Master• Spares procurement,

receipt & issue

Human Resource Management (Employee Framework)

• Employee Master• Organization Structure• Roles & Responsibilities• Employee Skills

Managing complete operations of the water distribution utility

Page 30: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

To meet the growing demand of water supply and irrigation sector, SPML manufactures pipes at its state-of-the-art facilities at Gangapur City (Rajasthan) and Mysore (Karnataka) as per ISO and BIS standards. Pipes are manufactured using the latest technologies including Ultrasonic & Radiography for welding fusion and are subjected to various tests like hydrostatic pressure testing, bend test & tensile test, three-edge bearing test and face & root test. SPML's in-house capability of manufacturing pipelines provides the added assurance of quality of its projects.

• Pre - Stressed Concrete (PSC) Pipes as per IS 784 (up to 1800 mm dia)

• Mild Steel (M.S) Pipes as per IS 3589 (up to 3000 mm dia)• Hume Steel Pipes as per IS 1916 (up to 2500 mm dia)• Pipe Specials as per IS 7322• Cement Mortar lining of Steel Pipes & Fittings• RCC Poles as per IS 785 • PCC Poles as per IS 1678

PSC Pipes: 400 to 1500 mm diaPCCP Pipes: 400 to 1500 mm diaRCC Pipes: 150 to 2000 mm diaSteel Pipes: 400 to 4000 mm dia

Product Portfolio

Manufacturing Range

Pipe Manufacturing - The mark of reliability

Applications• For drinking water, irrigation &

sea water for desalination• Sewer force mains• Conveyance of any liquid not

corrosive to concrete• Storm & waste water• Pipe culverts• All pumping & gravity mains• Re-circulation & cooling water

pipelines • Industrial wastewater/sewage

disposal pipes

Page 31: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

Water is a resource used by every human being on this planet. That makes it the responsibility of every individual to do their bit to conserve water. Generating awareness, mandatory environment education and everyone concerned with development and management of water resources from government sector, corporate world and civil society should come together and work in tandem to prevent mismanagement of water.

Preserving the Elixir of Life

SPML has the environment in mind. You should too

Page 32: Complete Water Solutions from source to source - SPML€¦ · SPML has in-house engineering capabilities for both project design and construction. ... elevated service reservoir and

We help breathe new life to India's water resourceThe Millennium Development Goals (MDGs) of the United Nations have set us on a common course to push back poverty, inequality, hunger and illness. The world has pledged to reduce by half, proportion of people without sustainable access to safe drinking water and basic sanitation. We have now entered into the International Decade for Action: Water for Life (2005–2015).

SPML Infra Limited

Corporate office: SPML House, Plot No. 65, Sector-32, Institutional Area Gurgaon - 122001, Haryana

[email protected], www.spml.co.in

Water Group

Tel: +91-124-3944555 Fax: +91-124-3983201

Offices in Bangalore, Chennai, Kolkata, Mumbai