8/3/2019 Compiled Data
1/16
DIVISION: Electro Mechanical Division, Ziro.
Energy
Generation
during the
Month
No. of hrs
run (Hrs)
Energy
Generation
during the
Month
No. of hrs
run (Hrs)
Energy
Generation
during the
Month
No. of hrs
run (Hrs)
Energy
Generation
during the
Month
No. of hrs
run (Hrs)
1 2 3 4 5 6 7 8 9 10 11
1 TAGO (3x1500 KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
2 SIPPI(2x2000KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
3 MAI PH-I(4X500KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
4 MARO(1X30KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
5 TALI (1X30 KW) 847 216.00 0.00 0.00 0.00 0.00 0.00 0.00 847.
6 KOYE (150 KW) 830.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00 830.
7 CHAMBANG (130KW) 893.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00 893.Total 2570.00 648.00 0.00 0.00 0.00 0.00 0.00 0.00 2570
Assistant Engineer (EM)
EM Sub-Division, Ziro.
Total genera
the mont
Executive Eng
EM Division, D
FORMAT NO. I A
MONTHLY GENERATION REPORT
MONTH: J
Sl.
No.Name of Hydel Station
UNIT-I (KWH) UNIT-II (KWH) UNIT-III (KWH) UNIT-IV (KWH)
8/3/2019 Compiled Data
2/16
DIVISION: Electro Mechanical Division, Ziro.
Energy
Generation
during 2011-12
No. of hrs
run (Hrs)
Energy
Generation
during 2011-12
No. of hrs
run (Hrs)
Energy
Generation
during 2011-12
No. of hrs
run (Hrs)
Energy
Generation
during 2011-12
No. of hrs
run (Hrs)
1 2 3 4 5 6 7 8 9 10
1 TAGO (3x1500 KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 SIPPI(2x2000KW) 650700.00 647.00 129300.00 106.00 0.00 0.00 0.00 0.00 78
3 MAI PH-I (4X500KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 MARO (1X30KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 TALI (1x 30 KW) 2530.00 642.00 0.00 0.00 0.00 0.00 0.00 0.00 2
6 KOYE (150 KW) 1650.00 432.00 0.00 0.00 0.00 0.00 0.00 0.00 1
7 CHAMBANG (130KW) 893.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 650700.00 647.00 129300.00 106.00 0.00 0.00 0.00 0.00 78
Assistant Engineer (EM)
EM Sub-Division, Ziro.
Total gen
the y
Executive
EM Divisio
FORMAT NO. I B
CUMULATIVE GENERATION REPORT
MONT
Sl.
No.Name of Hydel Station
UNIT-I (KWH) UNIT-II (KWH) UNIT-III (KWH) UNIT-IV (KWH)
8/3/2019 Compiled Data
3/16
DIVISION: Electro Mechanical Division, Ziro.
Turbine Oil
(Ltrs)
Grease
(Kg)
Other
Items
1 2 3 4 5 6 7 8 9 10 11 12 13
1 TAGO 1993 3x1500 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00
2 SIPPI 2008 2x2000 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 MAI PH-I 1978 4x500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 MARO 2004 1x30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 TALI 2003 1x30 1 847.00 16.94 830.06 0.00 0.00
fuse wire
30 ampere
250 gm
8 kw on
22.06.2011 at
18 hrs
2.5 kw o
27.06.2011
11:00 hr
6 KOYE 2010 1x50 1 830.00 16.60 813.40 0.00 0.00 0.00
5kw on
16.06.2011 at
17 hrs
2 kw on
18.06.2011
15 hrs
7 CHAMBANG 2010 1x30 1 893.00 17.86 875.14 0.00 0.00 0.00
6KW on
15.06.2011 at
17 hrs
5kw on
17.06.2011
16 hrs
Total 3 2570.00 51.40 2518.60 0.00 2.00
Assistant Engineer (EM)
EM Sub-Division, DHPD, Ziro.
Executive Engineer(EM)
EM Division, DHPD, Ziro
Maximum
Demand Date
and times of
occurance
Minimum
demand d
and times
occuranc
Total
generation
during the
Month
(KWH)
Auxiliary
consumptio
n during the
Month
(KWH)
MONTH: JUNE' 20
FORMAT NO. II
AUXILIARY CONSUMPTION AND ENERGY AVAILABLE FOR SALE
Sl. No.
Name of the
Hydel
Station
Year of
Installation
Installed
Capacity
(KW)
No of sets
in working
condition
Total Energy
available for
sale (KWH)
POL Consumption
8/3/2019 Compiled Data
4/16
8/3/2019 Compiled Data
5/16
DIVISION: Electro Mechanical Division, Ziro.
Name of Hydel
Station
UnitsDuration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
1 2 3 4 5 6 7 8 9 10 11 12
i UNIT-I 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut do
panel. R
ii UNIT-II 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00
Shut dow
set & Ste
iii UNIT-III 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut dow
is being
2. SIPPI (2x2000KW)
i
UNIT-I 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut do
Repair w
iiUNIT-II 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00
Thrust
Repair w
FORMAT NO. III A
FORCED OUTAGE
1. TAGO (3x1500 KW)
Outage due to
Electro Mechanical
Equipments during
the Month
Total Outages during
the MonthSl.
No.
Outage due to Civil
Components during
the Month
Outage due to Grid/ T &
D lines during the
month
Outage due to other
reasons during the
Month
8/3/2019 Compiled Data
6/16
1 2 3 4 5 6 7 8 9 10 11 12
3.MAI PH-I (4x500KW)
i UNIT-I 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00 R&M w
ii UNIT-II 0 0.00 720.00 0.00 0.00 0.00 0.00 0.00 720 0.00
iii UNIT-III 0 0.00 720.00 0.00 0.00 0.00 0.00 0.00 720 0.00
iv UNIT-IV 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00R&M w
4. MARO (1x30kW)
UNIT-I 0.00 0.00 0.00 0.00 720.00 0.00 0.00 0.00 720.00 0.00Power
from G
standb
5. TALI (1x30kW)
UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 504.00 50.00 504.00 50.00
6. KOYE (1x50kW)
UNIT-I 504.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 504.00 45.00
7. CHAMBANG (1x30kW)
UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 504.00 0.00 504.00 0.00 Utility
Assistant Engineer (EM)
EM Sub-Division, DHPD, Ziro.
The U
work i
E&M Division, D
Executive Engin
8/3/2019 Compiled Data
7/16
8/3/2019 Compiled Data
8/16
8/3/2019 Compiled Data
9/16
DIVISION: Electro Mechanical Division, Ziro.
Name of Hydel
Station
UnitsDuration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
1 2 3 4 5 6 7 8 9 10 11 12 1
1 UNIT-I 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00
2 UNIT-II 720 0.00 0.00 0.00 0.00 0.00 1464.00 2.00 2184.00 2.00
3 UNIT-III 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00
2. SIPPI (2x2000KW)
i UNIT-I 1363.00 13.00 0.00 0.00 174.00 25.00 0.00 0.00 1537.00 38.00
ii UNIT-II 1764.00 16.00 180.00 1.00 134.00 25.00 0.00 0.00 2078.00 42.00
3.MAI PH-I (4x500KW)
i UNIT-I 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00
ii UNIT-II 0 0.00 2184.00 1.00 0.00 0.00 0.00 0.00 2184.00 1.00
iii UNIT-III 0 0.00 2184.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00
iv UNIT-IV 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00
0.00 0.00 0.00 0.00 1440.00 18.00 744.00 1.00 2184.00 19.00
1 UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 1542.00 145.00 1542.00 145.00
1 UNIT-I 1752.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 1752.00 90.00
1 UNIT-I 0 0.00 0.00 0.00 0.00 0.00 1968.00 0.00 1968.00 0.00
Assistant Engineer (EM) Executive Engineer(EM)
EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Ziro
Outage due to Grid/
T & D lines during2011-12
5.TALI (1x30KW)
6.KOYE (150 KW)
FORMAT NO. III B
CUMULATIVE FORCED OUTAGEMONT
4. MARO (1x30 KW)
UNIT-I
Outage due to other
reasons during 2011-12
Total Outages during 2011-
12Rem
1. TAGO (3x1500 KW)
Sl.
No.
Outage due to Electro
Mechanical
Equipments during
2011-12
Outage due to Civil
Components during2011-12
7.CHAMBANG (130KW)
8/3/2019 Compiled Data
10/16
8/3/2019 Compiled Data
11/16
DIVISION: Electro Mechanical Division, Ziro.
Name of Hydel Station
UnitsDuration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
1 2 3 4 5 6 7 8 9 10 11 12
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. Sippi (2x2000KW)
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.Mai Ph-I (4x500KW)
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Outage due to other
reasons during the
Month
Total Outages
during the MonthRe
FORMAT NO. IV A
PLANNED OUTAGE
MO
1. Tago (3x1500 KW)
Sl.
No.
Outage due to
Electro Mechanical
Equipments during
the Month
Outage due to Civil
Components during
the Month
Outage due to Grid/
T & D lines during
the Month
8/3/2019 Compiled Data
12/16
1 2 3 4 5 6 7 8 9 10 11 12
4. Maro (1x30kW)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.Koye (1x50kW)
UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.Chambang (1x30kW)
UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Assistant Engineer (EM) Executive En
EM Sub-Division, DHPD, Ziro. E&M Divisio
5.Tali (1X30 KW)
8/3/2019 Compiled Data
13/16
8/3/2019 Compiled Data
14/16
DIVISION: Electro Mechanical Division, Ziro.
Name of Hydel
Station
UnitsDuration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
Duration
(Hrs)Nos
1 2 3 4 5 6 7 8 9 10 11 12
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. SIPPI (2x2000KW)
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3. MAI PH-I (4x500KW)
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. MARO (1x30kW)
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Assistant Engineer (EM) Executive Engineer(EM
EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Z
6. KOYE (150 KW)
7. CHAMBANG (130KW)
FORMAT NO. IV B
CUMULATIVE PLANNED OUTAGEMONT
1. TAGO (3x1500 KW)
Sl.
No.
Outage due to
Electro Mechanical
Equipments during
2011-12
Outage due to Civil
Components during
2011-12
Outage due to Grid/
T & D lines during
2011-12
5. TALI (1x 30 KW)
Outage due to other
reasons during 2011-12
Total Outages during
2011-12Re
8/3/2019 Compiled Data
15/16
DIVISION: Electro Mechanical Division, Ziro. MONTH: JUNE' 2011
HSD Oil
(Ltrs)
Lubricant
(Ltrs)
1 2 3 4 5 6 7 8 9 10
1 Tago(3x1500 KW) 1 Nos 32 KW 1990 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0!
2 Sippi(2x2000KW)
2 NOS ,100
KVA and
65KVA
2008 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0!
Total 0.00 0.00 0.00 0.00
EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Z
Running hrs
during the
month
POL ConsumptionGeneration
(KWH)
Assistant Engineer (EM) Executive Engineer(EM
Consumption
of HSD Oil
(Per Hr)
FORMAT NO. V
POL CONSUMPTION OF DG SET
Sl.
No.Name of Hydel Station
Nos and
capacity of DG
set
Year of
Installation
Consumption
of HSD (Per
Unit)
R
8/3/2019 Compiled Data
16/16
Running
Hrs
Forced
Outage in
Hrs
Planned
Outage in
hrs.
Total
1 2 3 4 5 6 7 8
1 Tago(3x1.5MW)
UNIT-I 0.00 0.00 2184.00 0.00 2184.00
UNIT-II 0.00 0.00 2184.00 0.00 2184.00
UNIT-III 0.00 0.00 2184.00 0.00 2184.00
2 Sippi(2x2MW)
UNIT-I 650700.00 647.00 1537.00 0.00 2184.00
UNIT-II 129300.00 106.00 2078.00 0.00 2184.00
3 Mai PH-I(4x0.5MW)
UNIT-I 0.00 0.00 2184.00 0.00 2184.00
UNIT-II 0.00 0.00 2184.00 0.00 2184.00
UNIT-III 0.00 0.00 2184.00 0.00 2184.00
UNIT-IV 0.00 0.00 2184.00 0.00 2184.00
4 Maro(1x30kW) 0.00 0.00 2184.00 0.00 2184.00
5 Tali(1x30kW) 2530.00 642.00 1542.00 0.00 2184.00
6 Koye (1x50kW) 830.00 432.00 1752.00 0.00 2184.00
7 Chambang (1x30kW) 893.00 216.00 1968.00 0.00 2184.00
784253.00
CUMULATIVE GENERATION AND OUTAGES
Outages
S.NName of Hydel
Station
Generation
in KWHRemarks