    DIVISION: Electro Mechanical Division, Ziro.

    Energy

    Generation

    during the

    Month

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during the

    Month

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during the

    Month

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during the

    Month

    No. of hrs

    run (Hrs)

    1 2 3 4 5 6 7 8 9 10 11

    1 TAGO (3x1500 KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

    2 SIPPI(2x2000KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

    3 MAI PH-I(4X500KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

    4 MARO(1X30KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

    5 TALI (1X30 KW) 847 216.00 0.00 0.00 0.00 0.00 0.00 0.00 847.

    6 KOYE (150 KW) 830.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00 830.

    7 CHAMBANG (130KW) 893.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00 893.Total 2570.00 648.00 0.00 0.00 0.00 0.00 0.00 0.00 2570

    Assistant Engineer (EM)

    EM Sub-Division, Ziro.

    Total genera

    the mont

    Executive Eng

    EM Division, D

    FORMAT NO. I A

    MONTHLY GENERATION REPORT

    MONTH: J

    Sl.

    No.Name of Hydel Station

    UNIT-I (KWH) UNIT-II (KWH) UNIT-III (KWH) UNIT-IV (KWH)

  • 8/3/2019 Compiled Data

    2/16

    DIVISION: Electro Mechanical Division, Ziro.

    Energy

    Generation

    during 2011-12

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during 2011-12

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during 2011-12

    No. of hrs

    run (Hrs)

    Energy

    Generation

    during 2011-12

    No. of hrs

    run (Hrs)

    1 2 3 4 5 6 7 8 9 10

    1 TAGO (3x1500 KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    2 SIPPI(2x2000KW) 650700.00 647.00 129300.00 106.00 0.00 0.00 0.00 0.00 78

    3 MAI PH-I (4X500KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    4 MARO (1X30KW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    5 TALI (1x 30 KW) 2530.00 642.00 0.00 0.00 0.00 0.00 0.00 0.00 2

    6 KOYE (150 KW) 1650.00 432.00 0.00 0.00 0.00 0.00 0.00 0.00 1

    7 CHAMBANG (130KW) 893.00 216.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 650700.00 647.00 129300.00 106.00 0.00 0.00 0.00 0.00 78

    Assistant Engineer (EM)

    EM Sub-Division, Ziro.

    Total gen

    the y

    Executive

    EM Divisio

    FORMAT NO. I B

    CUMULATIVE GENERATION REPORT

    MONT

    Sl.

    No.Name of Hydel Station

    UNIT-I (KWH) UNIT-II (KWH) UNIT-III (KWH) UNIT-IV (KWH)

  • 8/3/2019 Compiled Data

    3/16

    DIVISION: Electro Mechanical Division, Ziro.

    Turbine Oil

    (Ltrs)

    Grease

    (Kg)

    Other

    Items

    1 2 3 4 5 6 7 8 9 10 11 12 13

    1 TAGO 1993 3x1500 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00

    2 SIPPI 2008 2x2000 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    3 MAI PH-I 1978 4x500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    4 MARO 2004 1x30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    5 TALI 2003 1x30 1 847.00 16.94 830.06 0.00 0.00

    fuse wire

    30 ampere

    250 gm

    8 kw on

    22.06.2011 at

    18 hrs

    2.5 kw o

    27.06.2011

    11:00 hr

    6 KOYE 2010 1x50 1 830.00 16.60 813.40 0.00 0.00 0.00

    5kw on

    16.06.2011 at

    17 hrs

    2 kw on

    18.06.2011

    15 hrs

    7 CHAMBANG 2010 1x30 1 893.00 17.86 875.14 0.00 0.00 0.00

    6KW on

    15.06.2011 at

    17 hrs

    5kw on

    17.06.2011

    16 hrs

    Total 3 2570.00 51.40 2518.60 0.00 2.00

    Assistant Engineer (EM)

    EM Sub-Division, DHPD, Ziro.

    Executive Engineer(EM)

    EM Division, DHPD, Ziro

    Maximum

    Demand Date

    and times of

    occurance

    Minimum

    demand d

    and times

    occuranc

    Total

    generation

    during the

    Month

    (KWH)

    Auxiliary

    consumptio

    n during the

    Month

    (KWH)

    MONTH: JUNE' 20

    FORMAT NO. II

    AUXILIARY CONSUMPTION AND ENERGY AVAILABLE FOR SALE

    Sl. No.

    Name of the

    Hydel

    Station

    Year of

    Installation

    Installed

    Capacity

    (KW)

    No of sets

    in working

    condition

    Total Energy

    available for

    sale (KWH)

    POL Consumption

  • 8/3/2019 Compiled Data

    4/16

  • 8/3/2019 Compiled Data

    5/16

    DIVISION: Electro Mechanical Division, Ziro.

    Name of Hydel

    Station

    UnitsDuration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    1 2 3 4 5 6 7 8 9 10 11 12

    i UNIT-I 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut do

    panel. R

    ii UNIT-II 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00

    Shut dow

    set & Ste

    iii UNIT-III 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut dow

    is being

    2. SIPPI (2x2000KW)

    i

    UNIT-I 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00Shut do

    Repair w

    iiUNIT-II 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00

    Thrust

    Repair w

    FORMAT NO. III A

    FORCED OUTAGE

    1. TAGO (3x1500 KW)

    Outage due to

    Electro Mechanical

    Equipments during

    the Month

    Total Outages during

    the MonthSl.

    No.

    Outage due to Civil

    Components during

    the Month

    Outage due to Grid/ T &

    D lines during the

    month

    Outage due to other

    reasons during the

    Month

  • 8/3/2019 Compiled Data

    6/16

    1 2 3 4 5 6 7 8 9 10 11 12

    3.MAI PH-I (4x500KW)

    i UNIT-I 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00 R&M w

    ii UNIT-II 0 0.00 720.00 0.00 0.00 0.00 0.00 0.00 720 0.00

    iii UNIT-III 0 0.00 720.00 0.00 0.00 0.00 0.00 0.00 720 0.00

    iv UNIT-IV 720 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720 0.00R&M w

    4. MARO (1x30kW)

    UNIT-I 0.00 0.00 0.00 0.00 720.00 0.00 0.00 0.00 720.00 0.00Power

    from G

    standb

    5. TALI (1x30kW)

    UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 504.00 50.00 504.00 50.00

    6. KOYE (1x50kW)

    UNIT-I 504.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 504.00 45.00

    7. CHAMBANG (1x30kW)

    UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 504.00 0.00 504.00 0.00 Utility

    Assistant Engineer (EM)

    EM Sub-Division, DHPD, Ziro.

    The U

    work i

    E&M Division, D

    Executive Engin

  • 8/3/2019 Compiled Data

    7/16

  • 8/3/2019 Compiled Data

    8/16

  • 8/3/2019 Compiled Data

    9/16

    DIVISION: Electro Mechanical Division, Ziro.

    Name of Hydel

    Station

    UnitsDuration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    1 2 3 4 5 6 7 8 9 10 11 12 1

    1 UNIT-I 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00

    2 UNIT-II 720 0.00 0.00 0.00 0.00 0.00 1464.00 2.00 2184.00 2.00

    3 UNIT-III 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00

    2. SIPPI (2x2000KW)

    i UNIT-I 1363.00 13.00 0.00 0.00 174.00 25.00 0.00 0.00 1537.00 38.00

    ii UNIT-II 1764.00 16.00 180.00 1.00 134.00 25.00 0.00 0.00 2078.00 42.00

    3.MAI PH-I (4x500KW)

    i UNIT-I 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00

    ii UNIT-II 0 0.00 2184.00 1.00 0.00 0.00 0.00 0.00 2184.00 1.00

    iii UNIT-III 0 0.00 2184.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00

    iv UNIT-IV 2184 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2184.00 0.00

    0.00 0.00 0.00 0.00 1440.00 18.00 744.00 1.00 2184.00 19.00

    1 UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 1542.00 145.00 1542.00 145.00

    1 UNIT-I 1752.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 1752.00 90.00

    1 UNIT-I 0 0.00 0.00 0.00 0.00 0.00 1968.00 0.00 1968.00 0.00

    Assistant Engineer (EM) Executive Engineer(EM)

    EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Ziro

    Outage due to Grid/

    T & D lines during2011-12

    5.TALI (1x30KW)

    6.KOYE (150 KW)

    FORMAT NO. III B

    CUMULATIVE FORCED OUTAGEMONT

    4. MARO (1x30 KW)

    UNIT-I

    Outage due to other

    reasons during 2011-12

    Total Outages during 2011-

    12Rem

    1. TAGO (3x1500 KW)

    Sl.

    No.

    Outage due to Electro

    Mechanical

    Equipments during

    2011-12

    Outage due to Civil

    Components during2011-12

    7.CHAMBANG (130KW)

  • 8/3/2019 Compiled Data

    10/16

  • 8/3/2019 Compiled Data

    11/16

    DIVISION: Electro Mechanical Division, Ziro.

    Name of Hydel Station

    UnitsDuration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    1 2 3 4 5 6 7 8 9 10 11 12

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    2. Sippi (2x2000KW)

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    3.Mai Ph-I (4x500KW)

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iv UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Outage due to other

    reasons during the

    Month

    Total Outages

    during the MonthRe

    FORMAT NO. IV A

    PLANNED OUTAGE

    MO

    1. Tago (3x1500 KW)

    Sl.

    No.

    Outage due to

    Electro Mechanical

    Equipments during

    the Month

    Outage due to Civil

    Components during

    the Month

    Outage due to Grid/

    T & D lines during

    the Month

  • 8/3/2019 Compiled Data

    12/16

    1 2 3 4 5 6 7 8 9 10 11 12

    4. Maro (1x30kW)

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    1 UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    6.Koye (1x50kW)

    UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    7.Chambang (1x30kW)

    UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Assistant Engineer (EM) Executive En

    EM Sub-Division, DHPD, Ziro. E&M Divisio

    5.Tali (1X30 KW)

  • 8/3/2019 Compiled Data

    13/16

  • 8/3/2019 Compiled Data

    14/16

    DIVISION: Electro Mechanical Division, Ziro.

    Name of Hydel

    Station

    UnitsDuration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    Duration

    (Hrs)Nos

    1 2 3 4 5 6 7 8 9 10 11 12

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    2. SIPPI (2x2000KW)

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    3. MAI PH-I (4x500KW)

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    ii UNIT-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iii UNIT-III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    iv UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    4. MARO (1x30kW)

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    i UNIT-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Assistant Engineer (EM) Executive Engineer(EM

    EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Z

    6. KOYE (150 KW)

    7. CHAMBANG (130KW)

    FORMAT NO. IV B

    CUMULATIVE PLANNED OUTAGEMONT

    1. TAGO (3x1500 KW)

    Sl.

    No.

    Outage due to

    Electro Mechanical

    Equipments during

    2011-12

    Outage due to Civil

    Components during

    2011-12

    Outage due to Grid/

    T & D lines during

    2011-12

    5. TALI (1x 30 KW)

    Outage due to other

    reasons during 2011-12

    Total Outages during

    2011-12Re

  • 8/3/2019 Compiled Data

    15/16

    DIVISION: Electro Mechanical Division, Ziro. MONTH: JUNE' 2011

    HSD Oil

    (Ltrs)

    Lubricant

    (Ltrs)

    1 2 3 4 5 6 7 8 9 10

    1 Tago(3x1500 KW) 1 Nos 32 KW 1990 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0!

    2 Sippi(2x2000KW)

    2 NOS ,100

    KVA and

    65KVA

    2008 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0!

    Total 0.00 0.00 0.00 0.00

    EM Sub-Division, DHPD, Ziro. E&M Division, DHPD, Z

    Running hrs

    during the

    month

    POL ConsumptionGeneration

    (KWH)

    Assistant Engineer (EM) Executive Engineer(EM

    Consumption

    of HSD Oil

    (Per Hr)

    FORMAT NO. V

    POL CONSUMPTION OF DG SET

    Sl.

    No.Name of Hydel Station

    Nos and

    capacity of DG

    set

    Year of

    Installation

    Consumption

    of HSD (Per

    Unit)

    R

  • 8/3/2019 Compiled Data

    16/16

    Running

    Hrs

    Forced

    Outage in

    Hrs

    Planned

    Outage in

    hrs.

    Total

    1 2 3 4 5 6 7 8

    1 Tago(3x1.5MW)

    UNIT-I 0.00 0.00 2184.00 0.00 2184.00

    UNIT-II 0.00 0.00 2184.00 0.00 2184.00

    UNIT-III 0.00 0.00 2184.00 0.00 2184.00

    2 Sippi(2x2MW)

    UNIT-I 650700.00 647.00 1537.00 0.00 2184.00

    UNIT-II 129300.00 106.00 2078.00 0.00 2184.00

    3 Mai PH-I(4x0.5MW)

    UNIT-I 0.00 0.00 2184.00 0.00 2184.00

    UNIT-II 0.00 0.00 2184.00 0.00 2184.00

    UNIT-III 0.00 0.00 2184.00 0.00 2184.00

    UNIT-IV 0.00 0.00 2184.00 0.00 2184.00

    4 Maro(1x30kW) 0.00 0.00 2184.00 0.00 2184.00

    5 Tali(1x30kW) 2530.00 642.00 1542.00 0.00 2184.00

    6 Koye (1x50kW) 830.00 432.00 1752.00 0.00 2184.00

    7 Chambang (1x30kW) 893.00 216.00 1968.00 0.00 2184.00

    784253.00

    CUMULATIVE GENERATION AND OUTAGES

    Outages

    S.NName of Hydel

    Station

    Generation

    in KWHRemarks