Comparative Analysis of the Life Comparative Analysis of the Life Cycle Costs of Geothermal Heat Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Pumps and Three Conventional HVAC Systems for an Elementary School Systems for an Elementary School in Lincoln, Nebraska in Lincoln, Nebraska John A. Shonder Michaela A. Martin Patrick J. Hughes Oak Ridge National Laboratory

Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Embed Size (px)

Citation preview

Page 1: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Comparative Analysis of the Life Cycle Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Costs of Geothermal Heat Pumps and Three

Conventional HVAC Systems for an Conventional HVAC Systems for an Elementary School Elementary School in Lincoln, Nebraskain Lincoln, Nebraska

John A. Shonder

Michaela A. Martin

Patrick J. Hughes

Oak Ridge National Laboratory

Page 2: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Project BackgroundProject Background

• Four new, identical 69,000 ft2 elementary schools were built in 1995 in Lincoln, Nebraska

• The decision to use geothermal heat pumps based on life cycle cost comparison using another school in the district

• Pre-construction estimates contain a great deal of uncertainty. Would actual performance would bear out the initial assumptions, and confirm the technology selection?

Page 3: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Objectives of the studyObjectives of the study

• Use site-monitored energy use data to develop a calibrated simulation model of one of the schools

• Implement GHPs and three alternative HVAC systems to determine annual energy and water use

• Use maintenance data from the school district to estimate annual maintenance cost for each alternative

• Develop estimates of installed costs for each alternative

• Determine life cycle cost of each alternative

Page 4: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Maxey Elementary SchoolMaxey Elementary School

Page 5: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Floorplan of the SchoolFloorplan of the School

Page 6: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

GHP System DesignGHP System Design

• Total of 54 GHP units

• 200 tons total nominal cooling capacity

• Peak block loads: 150 tons / 940,000 Btu/hr

• Two 15-ton units provide pre-conditioned OA (ASHRAE 16-1989) with HW coil for cold days

• Gymnasium, cafeteria also introduce OA (40-45%)

• Remaining units (1.4 - 4.5 tons) draw return air from corridors, and supply classrooms, offices, etc.

• Unit heaters in corridors with HW coils

• Four 333,000 BTU/hr gas-fired boilers; gas DHW

Page 7: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Borefield DetailsBorefield Details

• 120 vertical loops using 1 in. HDPE pipe• 12 by 10 pattern located under soccer field• 20 ft. center-to-center spacing between bores• Bore depth 240 feet (~140 ft/ton)• Backfilled with fine gravel, bentonite plug top 10 ft.• Designed for year-round occupation• 22% (by volume) propylene glycol solution• Variable speed pump

Page 8: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Extensive 10-min Interval Data Extensive 10-min Interval Data Were Available from EMS/UtilityWere Available from EMS/Utility

• Total building electrical use• HVAC electrical use• Compressor, reversing valve, and fan status for each

of the heat pumps• Flow rate, supply/return temperatures for borefield• Zone temperatures, outdoor air temperatures• Monthly natural gas use• All in varying stages of completeness

Page 9: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Maintenance Data AvailableMaintenance Data Available

• Lincoln school district provided access to complete

maintenance database (preventive and unplanned)• 18 schools selected (all with > 70% cooled floorspace)• 4 categories of heating/cooling plants

– 4 Geothermal heat pumps (GHP)– 2 Air-cooled chiller/gas-fired HW boiler (ACC/GHWB)– 12 Water-cooled chiller/gas-fired HW boiler (WCC/GHWB) of which

9 were VAV

• Ages of cooling plants: 3 to 32 years• Ages of heating plants: 3 to 70 years• Analysis of this data presented in two ASHRAE papers

Page 10: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Study is based on a calibrated Study is based on a calibrated simulationsimulation

• Developed simulation model beginning with as-built construction plans

• Estimated internal loads from occupancy, fixture counts

• Developed occupancy schedule based on school calendar

• “Tweaked” the model (adjusting infiltration) until performance matched site-monitored data (daily electrical use, monthly gas use)

Page 11: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Simulated and monitored daily Simulated and monitored daily HVAC electrical useHVAC electrical use

0

500

1000

1500

2000

2500

3000

-20 0 20 40 60 80 100

Average Daily Temperature (°F)

Da

ily H

VA

C E

lec

tric

al U

se

(k

Wh

)

DOE-2 Simulation

Measured

Page 12: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Simulated and monitored monthly Simulated and monitored monthly total natural gas usetotal natural gas use

0

500

1000

1500

2000

2500

3000

0 200 400 600 800 1000 1200 1400

Heating degree days (base 65°F) per month

Mo

nth

ly n

atu

ral

ga

s u

se

(th

erm

s)

Simulation

1996 Utility bill

Page 13: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Predicted and MonitoredPredicted and MonitoredMinimum Monthly EWTMinimum Monthly EWT

0

10

20

30

40

50

60

70

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Month (1996)

Min

imu

m E

WT

(°F

)

Measured

DOE-2

Page 14: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Predicted and MonitoredPredicted and MonitoredMaximum Monthly EWTMaximum Monthly EWT

0

10

20

30

40

50

60

70

80

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Month (1996)

Ma

xim

um

EW

T (

°F)

Measured

DOE-2

Page 15: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Alternative systems were dictated by Alternative systems were dictated by available maintenance dataavailable maintenance data

• Air-cooled chiller, VAV air handling system, gas-fired hot water boiler

• Water-cooled chiller, VAV air handling system, gas-fired hot water boiler

• Water-cooled chiller, constant volume air handling system, gas-fired hot water boiler (unlikely to be installed in a new school)

Page 16: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Comparison of total energy useComparison of total energy use

0

2000

4000

6000

8000

10000

12000

14000

16000

GHP ACC/VAV WCC/CV WCC/VAV

So

urc

e e

ne

rgy

us

e (

106

BT

U/y

r)

Natural gas

Electric

Page 17: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Comparison of HVAC energy useComparison of HVAC energy use

0

2000

4000

6000

8000

10000

12000

14000

16000

GHP ACC/VAV WCC/CV WCC/VAV

So

urc

e e

ne

rgy

us

e (

106

BT

U/y

r)

Natural gas

Electric

Page 18: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Estimating maintenance costs was Estimating maintenance costs was somewhat problematicsomewhat problematic

• Wanted to determine first-year maintenance cost and rate of cost increase for each alternative

• Only 18 systems in database (4 GHP, 2 ACC/VAV, 3 WCC/VAV, 9 WCC/CV)

• Not enough data to perform a statistically significant analysis

• Alternative sources generally unreliable

Page 19: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Data for most numerousData for most numeroussystem type (WCC/CV)system type (WCC/CV)

0

5

10

15

20

25

30

35

40

45

50

1 6 11 16 21 26 31 36

Year in which maintenance occurs

An

nu

al

ma

inte

na

nc

e c

os

t (¢

/co

ole

d f

t2) Can this data be fit to

a curve of the form

C = C0gn-1 ?

Page 20: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Values appeared reasonableValues appeared reasonable

0

5

10

15

20

25

30

35

40

45

50

1 6 11 16 21 26 31 36

Year in which maintenance occurs

An

nu

al

ma

inte

na

nc

e c

os

t (¢

/co

ole

d f

t2)

Curve fitData

First-year maintenance cost: 16.6 ¢/ft2 ($1.79/m2)

Annual rate of increase: 1.5%

Page 21: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

How maintenance costsHow maintenance costswere estimatedwere estimated

• Assumed maintenance costs for all systems rose by 1.5% per year

• Calculated initial year maintenance cost on this basis– GHP: 9.0 ¢/ft2

– ACC/VAV: 9.5 ¢/ft2

– WCC/CV: 16.6 ¢/ft2

– WCC/VAV: 9.7 ¢/ft2

Page 22: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Developed independent cost Developed independent cost estimates for each systemestimates for each system

• Capital costs were estimated for each system by staff estimators, without reference to actual installed cost

• Estimates then given a “reality check” by an experienced estimator familiar with school HVAC systems (including geothermal)

• Estimates also compared to published square foot cost estimating guides

Page 23: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Capital cost estimatesCapital cost estimatesfor the four systemsfor the four systems

System type Installed cost cost per ft2

GHP 1,021,257$ 14.66$ ACC/VAV 1,129,286$ 16.21$ WCC/CV 835,916$ 12.00$ WCC/VAV 1,164,268$ 16.71$

Page 24: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Things to note about the capital Things to note about the capital cost estimatescost estimates

• Based on published figures for schools, the estimates appear reasonable

• Excluding the constant volume system, geothermal has the lowest first cost

• A cost of $9.45 per square foot was published for the geothermal systems. We were unable to determine what was included in this estimate

• School district’s accounting system does not separate out the cost of HVAC from the entire school cost.

Page 25: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Inputs for the life cycle cost Inputs for the life cycle cost analysisanalysis

• Energy use for each system based on calibrated simulation models

• Local Lincoln, Nebraska rates (gas, electric and water) used to calculate utility costs

• Maintenance costs based on Lincoln School District database first year + annual escalation

• Capital costs of HVAC systems based on estimates performed by staff cost estimators

• Real discount rate of 3.1%, DOE energy cost projections, 20 year equipment life

Page 26: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Comparison of life cycle costsComparison of life cycle costs

Baseline Option 1 Option 2 Option 3Geothermal ACC/VAV WCC/CV WCC/VAV

Initial Cost $1,021,257 $1,129,286 $835,916 $1,164,268First year maintenance cost $7,383 $7,824 $13,651 $7,928First year electric cost $22,138 $23,037 $34,152 $19,448First year gas cost $3,533 $10,963 $23,944 $11,034Water cost $385 $385Total annual O&M costs $33,054 $41,824 $73,826 $38,795 Life Cycle Cost $1,498,835 $1,734,327 $1,912,297 $1,728,736

Page 27: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Results of the analysisResults of the analysis

• Lincoln school district made the correct decision in installing GHPs in these four schools

• Over 20 year life, GHPs have the lowest life cycle cost -- about $230,000 less than the next most economical technology

• First cost is the most important factor in the analysis, followed by energy costs and maintenance costs.

• Maintenance costs of GHPs in this district are marginally lower (about 6%) than the cost of maintaining VAV chiller/boiler systems.

Page 28: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

Results of the analysisResults of the analysis

• GHPs have the lowest annual operating costs• Of the system types commonly installed in schools,

GHPs also have the lowest first cost• Reduced energy use reduces emission of

greenhouse gases and other pollutants

Page 29: Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska

ConclusionsConclusions

• Obviously, these results apply only to the school examined

• They confirm that GHPs can cause significant reductions in energy use (17%) and energy costs (24%)

• They also counter some of the myths about GHPs:– No “cost premium” in this case. GHPs have lower

first cost– Maintenance costs comparable with other

common technologies