HPC Venezuela C.A. Oct 2008 HPC Venezuela C.A. Oct 2008 Company Profile of HPC Venezuela C.A. (VHPC) Company Profile of HPC Venezuela C.A. (VHPC)

Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

  • Upload
    vukien

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

HPC Venezuela C.A.

Oct 2008

HPC Venezuela C.A.

Oct 2008

Company Profile of

HPC Venezuela C.A. (VHPC)

Company Profile of

HPC Venezuela C.A. (VHPC)

Page 2: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

2

Company Profile of VHPC (1) Company Profile of VHPC (1)

Hitachi Ltd. (Japan)

Hitachi Plant Technologies, Ltd (Japan) (HPT)

HPC Venezuela C.A. (VHPC)

68%: Shareholder

100%: Shareholder

Page 3: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

3

Company Profile of VHPC (2)Company Profile of VHPC (2)

Affiliate company of Hitachi Plant Technologies Ltd, Japan (HPT):100% shareholder Project Execution Experience from 1978 (as HPT, Japan)

Establishment date of VHPC: January 1988Execution Experience:

- Hydroelectric Power(Guri, Macagua, Caruachi)- Thermal Power (CADAFE,TACOA, ELEVAL)- Direct Reduction plant(OPCO, ORINOCO IRON)- Pellet Plant (FMO)- Railway Project-DEPOT (IAFE)

Page 4: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

4

Company Profile of VHPC (3)Company Profile of VHPC (3)

Paid-in capital: 240,000,000 BolivarsTotal Sales (from 1979 to present) : more than 600 MUS$

Main Bank: The bank of Tokyo Mitsubishi UFJ ltd / Banco Provincial Venezuela

“Accumulated Local Management Know-how”

“Advanced Technology Transferred from HPT Japan”

Page 5: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

5

History of VHPCHistory of VHPC

HPC Venezuela, C.A. was established in January 1988

1978 1988

Guri Dam Macagua Dam

Hitachi Plant Technologies ,Ltd(Former: Hitachi Plant Engineering and ConstructionCo., Ltd)

HPC Venezuela, C.A

Page 6: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

6

Location: Venezuela, Puerto OrdazLocation: Venezuela, Puerto Ordaz

VHPC is located in Puerto Ordaz, Bolivar State of Venezuela

Puerto Ordaz

Caracas

Page 7: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

7

Fabrication &

Manufacturing

Business Area of HPTBusiness Area of HPT

Public and municipal/

industrial Systems

Mechatronics

Industrial Plant

Systems

Air conditioning

Systems

Energy systemsBusinessBusiness

DomainDomain

● Large-size pumps

● Water treatment systems and equipment

● Compressor

● Converters

● LC transport systems

● LC

manufacturing

● Printed board printer

● Cranes

equipment

● Chemical/Pharmaceutical plants

● Food Plants

● Chemical equipment

● Enviromental

Preservation systems

● Air conditioning/clean room

● Air conditioning for building

for industrial factory

● Nuclear power plant

● Thermal power plant

● Dust collection system

ConstructionConstructionDesign

EngineeringR&D

● Hydropower plant

Page 8: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

8

Business Area – Construction businessBusiness Area – Construction business

Installation work of Mechanical equipmentPiping work Electrical workInstrumentation workInsulation work, Panting, Ducting workSupply of auxiliary equipmentSupply of materials (e.g. piping, cable, tray, conduit)Inland transportation and unloading workFoundation work (civil work)Supply of Steel FabricationMaintenance work etc

Page 9: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

9

CanadianHitachi Plant(Saskatchewan)

HPC Venezuela C.A.(Estado Bolivar)

Egypt Branch(Alexandria)

Head OfficeTokyo

HPC Thailand(Bangkok)

PHPC Co.Ltd.Inc.(Manila)

HPC Australia Pty.Ltd.(Brisbane)

Indonesia Rep.Office(Jakarta)

Singapore BranchAsia Middle East Branch Office

HPC Engineering(M)(Kuala Lumpur)

GuatemalaHitachi Plant

HPT China(Shanghai)(Suzhou)(Shenzhen)

HPTNew York Office(New York)

UAE. Office(Dubai)(Abu Dhabi)

Vietnam Office(Ho Chi Minh)

: Head Office: Branch Office: Project Office: Subsidiary

Global Network: Offices & SitesGlobal Network: Offices & Sites

UK Branch(London)

Sri Lanka Office

IndiaOffice

TaiwanBranch.

Qatar Office

Page 10: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

10

VHPC’s Human ResourcesVHPC’s Human Resources

As of 2008 Peak time

Japanese (permanent): 5 p. 5 p.

Japanese (for construction) : 5 p. 50 P.

Management staff : 10 p. 50 P.

Engineers: 20 p. 50 P.

Supervisory staffs: 50 p. 100 P.

Workers: 200 p. 3,000 P

Total: 290 p. 3,255 P

*The number of personnel depends on construction volume

Page 11: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

11

VHPC

Guri Hydro

Macagua Hydro

Caruachi Hydro

ELEVAL / CADAFE

Thermal Power

Caracas IAFE Railway DEPOT

Project Site Location MapProject Site Location Map

OPCO / Orinoco Iron / FMO Plants

Tacoa Thermal Power

Tocoma Hydro

Page 12: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

12

CADAFE Thermal PlantCADAFE Thermal Plant

1978– 1984

PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit 5

Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE)

Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and Associated equipment for 400 MW generating Units No 3 & 4, AFE including erection of Steel Structures of the Boilers.

Unit 5: Installation of 1,400 Ton/Hour

boiler for 400 MW generation unit.

Page 13: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

13

Guri II Hydro Power (1)Guri II Hydro Power (1)

1978 - 1986

GURI HYDRO ELECTRIC POWER STATION STAGE II

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Installation of 10 units of 730 MW water turbine and 805 MVA ACgenerators including associated utility system. Supply and/or installation of auxiliary equipment which included 42 transformers, 9 overhead cranes, 38 vertical pumps, 10 sets of insulated phase bus ducts, 5 units of 765 KV SF-6 gas insulated bus duct, 6 elevators, 3 diesel engine generators, structure bridge for discharge canel, complete set of electrical panels, instrumentation, piping, cabling, illumination and painting work.

Page 14: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

14

Guri II Hydro Power (2)Guri II Hydro Power (2)

Total generating capacity 10,300MW Guri,Venezuela

Page 15: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

15

OPCO HBI plantOPCO HBI plant

1987 - 1989

“OPCO” HOT BRIQUETTED IRON PLANT

Owner: OPERACIONES AL SURDEL

ORINOCO (OPCO)

Installation of 800,00 Ton/Year

Hot Briquetted Iron Plant.

Work involved dismantling, removal and refurbishing the (OPCO) old plant and constructing a new plant system. Erection in all phase of mechanical, electrical and instrumentation work wereundertaken.

Page 16: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

16

Macagua Hydro Power (1)Macagua Hydro Power (1)

1988 - 1998

MACAGUA II AND III HYDRO ELECTRIC POWER STATIONS

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

MACAGUA II: Installation of 12 units of 216 MW FRANCIS type water turbines and 250 MVA generators.

MACAGUA III: Installation of 2 units of 86 MW KAPLAN type turbine and 102 MVA generators.

Page 17: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

17

Macagua Hydro Power (2)Macagua Hydro Power (2)

MACAGUAMACAGUA

ⅡⅡ Hydropower StationHydropower Station((Venezuela)Venezuela)

Page 18: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

18

Orinoco Iron HBI plant (1)Orinoco Iron HBI plant (1)

1998 - 2000

HOT BRIQUETTED IRON PLANT (FINMET PROCESS)

Owner : ORINOCO IRON, C.A.

Hot Briquetted Iron Plant. The work was the complete Mechanical Installation of the Core Plant which consisted of the Process Plant (Reactor and Briquetting), Gas Generation Plant, Structure Buildings, Pipe Racks, Pipings, Utilities, Insulation, Refractory, Painting and all Main and Auxiliary Equipment related there do.In Addition Pipe Rack Fabrication and Partial Piping Pre-Fabrication was carried out. The Total Weight Installation was 46,000 Tons.

Page 19: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

19

Orinoco Iron HBI plant (2)Orinoco Iron HBI plant (2)

Page 20: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

20

Guri II Hydro Power: 5 units First stageGuri II Hydro Power: 5 units First stage

Construction period: 2002 - 2005

Project name: GURI No.2 HYDRO ELECTRIC POWER STATION STAGE I – 5 units

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: GE Hydro (NORCAN)

HPT & VHPC’s scope

- Disassembly, Refurbishment

and Reassembly work

Page 21: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

21

Caruachi Hydro Power (1)Caruachi Hydro Power (1)

Construction period: 2000 - 2006

Project Name: CARUACHI HYDRO ELECTRIC POWER STATION 281MW x 12 units

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: GE Hydro (KENSA)

HPT & VHPC Scope

- Installation and Testing of KAPLAN Type Water Turbines and Generators.

- Installation and Testing of the excitation systems, Transformers (7 Units) and Power House Bridge Cranes (3 Units)

Page 22: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

22

Caruachi Hydro Power (2)Caruachi Hydro Power (2)

Page 23: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

23

Tacoa DCS Thermal Power plant (1)Tacoa DCS Thermal Power plant (1)

Construction period: 2004-2005

Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed digital controls) project

Owner: La Electricidad de Caracas (EDC)

Client: Toshiba Corporation (Mitsui & Co., ltd)

Site: Caracas

HPT & VHPC’s scope

- Installation and electrical works

- Supply of cables & materials

Page 24: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

24

Tacoa DCS Thermal Power plant (2)Tacoa DCS Thermal Power plant (2)

Page 25: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

25

ELEVAL H25 Power plant (1)ELEVAL H25 Power plant (1)

Construction period: 2005-2006

Project name: ELEVAL H25 GTG x 1 units

Owner : ELEVAL

Client: Hitachi Ltd (Mitsui & Co., ltd)

Site: VALENCIA, Venezuela

HPT & VHPC’s scope

- Installation and electrical works

- Foundation work

- Inland transportation and material supply

Page 26: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

26

ELEVAL H25 Power plant (2)ELEVAL H25 Power plant (2)

Page 27: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

27

Caracas Railway: DEPOT facilityCaracas Railway: DEPOT facility

Construction period: 2006-2007Project name: Caracas Railway project / DEPOTOwner : IAFEClient: Kawasaki Plant systemsSite: CharallaveHPT & VHPC’s scope

- Installation of DEPOT Equipment

Page 28: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

28

FMO Pellet plant Expansion FMO Pellet plant Expansion

Construction period: 2006-2007

Owner : CVG FERROMINERA ORINOCO, C.A. (FMO)

Client: Kobe Steel, Ltd Japan / Venezuela

Site: Matanzas Industrial Area

HPT & VHPC’s scope

- Installation and electrical works

Page 29: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

29

Guri II Hydro Power: No.15 GeneratorGuri II Hydro Power: No.15 Generator

Construction period: 2006 - 2007

Project name: GURI HYDRO ELECTRIC POWER STATION STAGE II – Rehabilitation work of No.15 generator

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: ALSTOM Hydro Venezuela S.A.

VHPC’s scope

- Rehabilitation of site work

Page 30: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

30

Guri Hydro Power: Overhead CraneGuri Hydro Power: Overhead Crane

Construction period: 2006 - 2009

Project name: GURI No.2 HYDRO ELECTRIC POWER STATION–Renovation of overhead crane

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: ALSTOM Hydro Venezuela S.A.

VHPC’s scope

- Renovation of site work

Under Construction

Page 31: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

31

Guri Hydro No.1 Power 4units RehabilitationGuri Hydro No.1 Power 4units Rehabilitation

Construction period: 2007 - 2010

Project name: GURI HYDRO ELECTRIC No.1 POWER STATION Unit #7- #10 (4units) Renovation project

Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: ALSTOM Hydro Venezuela S.A.

HPT & VHPC’s scope

- Site field work

- Material supply Under Construction

Page 32: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

32

Guri No.1 &2 Control system RenovationGuri No.1 &2 Control system Renovation

Construction period: 2008 - 2010

Project name: GURI HYDRO ELECTRIC No.1 &2 POWER STATION, Control system renovation

Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: Asea Brown Boveri (ABB) Venezuela S.A.

HPT & VHPC’s scope

- Site field work

Under Construction

Page 33: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

33

Tocoma Hydropower projectTocoma Hydropower project

Construction period: 2008 - 2014

Project name: Tocoma Hydropower project (216MW x 10 units)

Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: IMPSA

HPT& VHPC’s scope

- Site field work

- Material supply

- Warehouse, temporary facility

Under Construction

Page 34: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

34

Guri II Hydro Power: 5 units Second stageGuri II Hydro Power: 5 units Second stage

Construction period: 2008 - 2012

Project name: GURI No.2 HYDRO ELECTRIC POWER STATION STAGE II – 5 units

Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)

Client: Consorcio EURO-BRAS Guri (VA tech & Voith-siemens)

HPT & VHPC’s scope

- Disassembly, Refurbishment

and Reassembly work

Under Construction

Page 35: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

35

Pre-Engineering : Benefits to ClientPre-Engineering : Benefits to Client

Realization of EffectiveConstruction ScheduleReduction of Total Project Costby minimizing Erection CostReduction of DocumentationCostSmoothing Site work

Suggestion of Design foroptimizing Erection Work &Construction ScheduleIntroduction of AdvancedErection TechnologyAssistance of makingDocumentation forconstruction planningAdvice of site workconditions

Clinet: Engineering & Main Equipment SupplyClinet: Engineering &

Main Equipment Supply

VHPC: Pre-Engineering

Service

VHPC: ConstructionVHPC: Construction

VHPC: Feed-BackVHPC: Feed-Back

Benefits to Client

Page 36: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

36

Our Advantages: Benefits to ClientOur Advantages: Benefits to Client

Wide Range of Work Scope Accumulated Project Knowledge & ExperienceAdvanced Construction Technology Global NetworksSkillful Human RecoursesPre-engineering Service

Advanced Project ManagementSystematic Schedule ManagementInterface management with Other Parties

MinimumCost

MinimumCost

On Time On Time

Long-term ExperienceSound financial backgroundQA/QC, Safety Policy

Total SatisfactionTotal Satisfaction

Our Advantages Benefits to ClientCost

Schedule

Reliability

Page 37: Company Profile of HPC Venezuela C.A. (VHPC) VHPC Presentation... · 12 cadafe thermal plant ¾ 1978– 1984 ¾ planta centro thermal power station units 3 & 4, and unit 5 ¾ owner:

37

ContactContact

UD-502 Calle Arboleda, Zona Industrial Matanzas, Puerto Ordaz Edo. Bolivar, Venezuela, Apdo. Postal #690

Tel:<58>(286)941174

Fax:<58>(286)942055

RIF: J-00262933-9

Webpage: http://www.vhpc.com.ve/