Work Site:
Location:
Date:
D.D. (g/cm3) M.C. (%) M.D.D. (g/cm3) O.M.C. (%)
01 2.470 7.42 2.112 8.2 116.94
02 2.408 7.86 2.112 8.2 114.01
02 2.476 7.17 2.112 8.2 117.24
03 2.394 7.12 2.112 8.2 113.34
Test No.
01
02
02
03
Name: Name:
Signature: Signature:
Date: Date:
Test No.
Wednesday, September 04, 2013
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
COMPACTION TEST RESULT
Water Tower Costruction Site
Quarry Dust, 7th Layer (at 10.125 MSL)
Field Values Laboratory ValuesDegree of
Compaction (%)
Location of Tested piont
Center of the base of the tower
6.5m from the centre to South-East
3m from the centre to South-West
5m from the center to North
Tested & Computed by:
……………………………….
……………………………….
……………………………….
Approved by :
……………………………….
……………………………….
……………………………….
Test No.01
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 16264 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 11442 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3577 g
Volume of the pit (V2 = m8/ d1) 2289.4 cm3
Mass of the soil removed from the pit (m9) 6074 g
Bulk density of soil (d2 = m9 / v2) 2.6531 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 436 g
Mass of evaporation Dish + dry soil (m11) 417 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.42 %
Dry Density of soil (d = d2 / (1+ W/100) 2.470 g/cm3
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Tested & Computed by: Approved by :
Date:………………………………. Date:……………………………….
Signature:………………………………. Signature:……………………………….
Name:………………………………. Name:……………………………….
Test No.02
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 14523 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 10081 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3197 g
Volume of the pit (V2 = m8/ d1) 2046.2 cm3
Mass of the soil removed from the pit (m9) 5314 g
Bulk density of soil (d2 = m9 / v2) 2.597 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 463 g
Mass of evaporation Dish + dry soil (m11) 441 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.86 %
Dry Density of soil (d = d2 / (1+ W/100) 2.408 g/cm3
Signature:………………………………. Signature:……………………………….
Date:………………………………. Date:……………………………….
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Tested & Computed by: Approved by :
Name:………………………………. Name:……………………………….
Test No.03
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 15190 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 10510 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3435 g
Volume of the pit (V2 = m8/ d1) 2198.5 cm3
Mass of the soil removed from the pit (m9) 5834 g
Bulk density of soil (d2 = m9 / v2) 2.6536 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 475 g
Mass of evaporation Dish + dry soil (m11) 454 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.17 %
Dry Density of soil (d = d2 / (1+ W/100) 2.476 g/cm3
Signature:………………………………. Signature:……………………………….
Date:………………………………. Date:……………………………….
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Tested & Computed by: Approved by :
Name:………………………………. Name:……………………………….
Test No.04
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 15982 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 11424 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3313 g
Volume of the pit (V2 = m8/ d1) 2120.5 cm3
Mass of the soil removed from the pit (m9) 5437 g
Bulk density of soil (d2 = m9 / v2) 2.5641 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 462 g
Mass of evaporation Dish + dry soil (m11) 442 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.12 %
Dry Density of soil (d = d2 / (1+ W/100) 2.394 g/cm3
Signature:………………………………. Signature:……………………………….
Date:………………………………. Date:……………………………….
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Tested & Computed by: Approved by :
Name:………………………………. Name:……………………………….
Test No.01
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 16264 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 11442 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3577 g
Volume of the pit (V2 = m8/ d1) 2289.4 cm3
Mass of the soil removed from the pit (m9) 6074 g
Bulk density of soil (d2 = m9 / v2) 2.6531 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 436 g
Mass of evaporation Dish + dry soil (m11) 417 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.42 %
Dry Density of soil (d = d2 / (1+ W/100) 2.470 g/cm3
INSITU DENSITY (SAND REPLACEMENT METHOD)
MATERIALS LABOROTARY
ISURU INGINEERING (PTE) LTD.
Test No.02
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 14523 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 10081 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3197 g
Volume of the pit (V2 = m8/ d1) 2046.2 cm3
Mass of the soil removed from the pit (m9) 5314 g
Bulk density of soil (d2 = m9 / v2) 2.597 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 463 g
Mass of evaporation Dish + dry soil (m11) 441 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.86 %
Dry Density of soil (d = d2 / (1+ W/100) 2.408 g/cm3
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Test No.03
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 15190 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 10510 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3435 g
Volume of the pit (V2 = m8/ d1) 2198.5 cm3
Mass of the soil removed from the pit (m9) 5834 g
Bulk density of soil (d2 = m9 / v2) 2.6536 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 475 g
Mass of evaporation Dish + dry soil (m11) 454 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.17 %
Dry Density of soil (d = d2 / (1+ W/100) 2.476 g/cm3
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)
Test No.04
Determination of Dry Density of sand
Mass of calibration Mould (m1) 2343 g
Mass of calibration Mould (m1) + Sand (m2) 7188 g
Volume of mould (v1) 3101 cm3
Dry Density of Sand (d1 = (m2-m1) / V1) 1.562 g/cm3
Calibration of sand
Mass of Mould + Cone + Sand before pouring into the cone (m3) 5701 g
Mass of Mould + Cone + Sand after pouring into the cone (m4) 6946 g
Mass of the Sand poured into the cone (m5 = m4-m3) 1245 g
Result from the Field
Determination of the volume of the pit
Mass of Mould + Cone + Sand before pouring into the pit (m6) 15982 g
Mass of Mould + Cone + Sand after pouring into the pit (m7) 11424 g
Mass of the Sand poured into the pit (m8 = m6-m7-m5) 3313 g
Volume of the pit (V2 = m8/ d1) 2120.5 cm3
Mass of the soil removed from the pit (m9) 5437 g
Bulk density of soil (d2 = m9 / v2) 2.5641 g/cm3
Determination of Moisture Content of Soil
Mass of evaporation Dish + wet soil (m10) 462 g
Mass of evaporation Dish + dry soil (m11) 442 g
Mass of evaporation Dish (m12) 161 g
moisture Content of soil (W = (m10-m11/ m11-m12)*100% 7.12 %
Dry Density of soil (d = d2 / (1+ W/100) 2.394 g/cm3
ISURU INGINEERING (PTE) LTD.
MATERIALS LABOROTARY
INSITU DENSITY (SAND REPLACEMENT METHOD)