les.robertson@cern,ch 1 LCG Commissionin g Schedule 2006 2007 2008 SC4 – becomes initial service when reliability and performance goals met 01jul07 - service commissioned - full 2007 capacity, performance first physics (well, collisions, at least) (twixt summat & somet’ing) Continued testing of computing models, basic services Testing DAQTier-0 (??) & integrating into DAQTier- 0Tier-1 data flow Building up end-user analysis support Exercising the computing systems, ramping up job rates, data management performance, …. Initial service commissioning – increase performance, reliability, capacity to target levels, experience in monitoring, 24 x 7 operation, …. Introduce residual services Full FTS services; 3D; SRM v2.2; VOMS roles

Commissioning Schedule

  • Upload
    acton

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

2006. 2007. 2008. Commissioning Schedule. SC4 – becomes initial service when reliability and performance goals met. Introduce residual services Full FTS services; 3D; SRM v2.2; VOMS roles. Continued testing of computing models, basic services - PowerPoint PPT Presentation

Citation preview

Page 1: Commissioning Schedule

les.robertson@cern,ch 1

LCG

Commissioning

Schedule2006

2007

2008

SC4 – becomes initial service whenreliability and performance goals met

01jul07 - service commissioned - full 2007 capacity, performance

first physics

(well, collisions, at least)

(twixt summat & somet’ing)

Continued testing of computing models, basic services

Testing DAQTier-0 (??) & integrating into DAQTier-0Tier-1data flow

Building up end-user analysis support

Exercising the computing systems, ramping up job rates, data management performance, ….

Initial service commissioning – increase performance, reliability, capacity to target levels, experiencein monitoring, 24 x 7 operation, ….

Introduce residual services Full FTS services; 3D; SRM v2.2; VOMS roles