US Army Corps of Engineers BUILDING STRONG ® Colonel Rich Pratt Tulsa District U.S. Army Corps of Engineers 27 August 2015

Colonel Rich Pratt Tulsa District U.S. Army Corps of ... - rrva.org Engineer District Update.pdf · US Army Corps of Engineers BUILDING STRONG ® Colonel Rich Pratt Tulsa District

  • Upload
    vonhan

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

US Army Corps of Engineers

BUILDING STRONG®

Colonel Rich Pratt

Tulsa District

U.S. Army Corps of Engineers

27 August 2015

BUILDING STRONG®

“The only way to recover from

a drought is with a flood.”- Greg Estep, Chief Hydrologist,

Tulsa District, USACE

“Your real concern should be

what is going to happen at

Lake Texoma.”- Bill Chatron, Hydrologist,

Tulsa District, USACE

BUILDING STRONG®

27MAY2105 Pine Creek Reservoir releases over the

auxiliary spillway for the very first time.

BUILDING STRONG®

Canton1602.0- 19% Cons Pool

(water supply for OKC only)

Waurika933.2– 30% Cons Pool

(water supply)

Texoma611.5 – 71% Cons Pool

(water supply/hydro)

Skiatook697.5 - 54% Cons Pool

(water supply/water quality)

Heyburn759.7 - 64% Cons Pool

(water supply)

Tulsa District Reservoir Drought Update – 18 December 2014

BUILDING STRONG®All Lakes are at Drought Level I and above 75% full unless noted otherwise.

Canton1604.1- 29% Cons Pool

(water supply for OKC only)

Waurika932.0– 28% Cons Pool

(water supply)

Skiatook697.1 - 53% Cons Pool

(water supply/water quality)

Tulsa District Reservoir Drought Update – 6 May 2015

BUILDING STRONG®

Legend

- 0 to 25% full

- 26% to 75% full

- 76% to 100% full

- Over 100% full

All Lakes are below 50% full unless noted otherwise.

Tulsa District Reservoir Flood Update – 27 May 2015

HugoCurrent elev: 439.7 - 110%

Top of FP: 437.5

Release: 59,112 cfs

Status: Falling

SardisCurrent elev: 610.47 - 150%

Top of FP: 607.0

Release: 4,000 cfs

Status: Falling

TexomaCurrent elev: 643.35 – 120%

Top of FP: 640.0

Release: 83,712 cfs

Status: Rising

EufaulaCurrent elev: 599.49 - 127%

Top of FP: 597.0

Release: 171,000 cfs

Status: Falling

Pat MayseCurrent elev: 460.81 - 103%

Top of FP: 460.5

Release: 786 cfs

Status: Rising Slowly

Broken BowCurrent elev: 627.45 – 99.8%

Top of FP: 627.5

Release: 11,640 cfs

Status: Falling

WisterCurrent elev: 507.72 – 137.7%

Top of FP: 502.5

Release: 20,500 cfs

Status: Falling

KeystoneCurrent elev: 747.34– 70.6%

Top of FP: 754.0

Release: 9,000 cfs

Status: Rising

John RedmondCurrent elev: 1064.3 – 78.2%

Top of FP: 1068.0

Release: 709 cfs

Status: Rising

TorontoCurrent elev: 928.48 – 86.24%

Top of FP: 931.0

Release: 3,627 cfs

Status: Rising

Pine CreekCurrent elev: 480.26 – 100.2%

Top of FP: 480.0

Release: 3,752 cfs

Status: Rising

OologahCurrent elev: 653.9 – 60.6%

Top of FP: 661.0

Release: 0 cfs

Status: Rising

KawCurrent elev: 1036.64 – 67.8%

Top of FP: 1044.5

Release: 40 cfs

Status: Rising

Fort GibsonCurrent elev: 577.27 – 75.6%

Top of FP: 582.0

Release: 0 cfs

Status: Rising

HudsonCurrent elev: 631.75 – 69.6%

Top of FP: 636.0

Release: 25,920 cfs

Status: Rising

PensacolaCurrent elev: 751.7 – 66.7%

Top of FP: 755.0

Release: 29,730 cfs

Status: Rising

BUILDING STRONG®

Legend

- 0 to 25% full

- 26% to 75% full

- 76% to 100% full

- Over 100% full

All Lakes are on daily surveillance or 24 hour watch.

Tulsa District Emergency Management and Reservoir COP – 1 June 2015 @ 0900

HugoCurrent elev: 437.19 – 98.6%

Top of FP: 437.5

Release: 17,675 cfs

Status: Falling

SardisCurrent elev: 610.58 – 152%

Top of FP: 607.0

Release: 4,040 cfs

Status: Falling

TexomaCurrent elev: 645.6 – 137.5%

Top of FP: 640.0

Release: 139,000 cfs

Status: Steady

Cumberland Levee

EufaulaCurrent elev: 596.92 – 97.4%

Top of FP: 597.0

Release: 67,000 cfs

Status: Falling

Pat MayseCurrent elev: 461.09 – 107.2%

Top of FP: 460.5

Release: 792 cfs

Status: Falling

Broken BowCurrent elev: 626.73 – 96.6%

Top of FP: 627.5

Release: 3,200 cfs

Status: Falling

WisterCurrent elev: 505.30 – 119.1%

Top of FP: 502.5

Release: 7,800 cfs

Status: Falling

Glendale Dike

KeystoneCurrent elev: 752.15– 91.4%

Top of FP: 754.0

Release: 30,000 cfs

Status: Falling

Cleveland Levee

Tulsa West Tulsa

John RedmondCurrent elev: 1067.51 – 96.9%

Top of FP: 1068.0

Release: 8,343 cfs

Status: Falling

Hartford Levee

TorontoCurrent elev: 930.1 – 94.9%

Top of FP: 931.0

Release: 6,100 cfs

Status: Falling

Pine CreekCurrent elev: 480.0 – 101.6%

Top of FP: 480.0

Release: 4,590 cfs

Status:Falling

OologahCurrent elev: 658.38 – 85.2%

Top of FP: 661.0

Release: 0 cfs

Status: Rising

KawCurrent elev: 1042.4 – 90.9%

Top of FP: 1044.5

Release: 4,200 cfs

Status: Rising

Fort GibsonCurrent elev: 581.04 – 94.8%

Top of FP: 582.0

Release: 118,000 cfs

Status: Falling

Dike 10 - Wagoner

HudsonCurrent elev: 634.23 – 86.8%

Top of FP: 636.0

Release: 98,700cfs

Status: Falling

PensacolaCurrent elev: 754.19 – 91.35%

Top of FP: 755.0

Release: 89,900 cfs

Status: Falling

Ordinance Levee

MKARNSStage: 33.32 Ft

Flow Rate: 367,000.

Status: Falling

Situation: All Counties in OK are in a

State of Declared Emergency. KS is in

a Declared Emergency. Federal

Declaration for Public Assistance has

been requested. Damage

Assessment continuing by State of OK

and KS.

USACE Actions: PL84-99 actions in

OK and KS include Levee

assessments, flood prevention,

technical assistance, flood response,

technical assistance to Tribal Nations.

PAO highly active in Social Media

Plan. FCCE funds to date 140K.

NEXT 24-72 Hrs: Prevent further flood

damages. Assess damages. Provide

technical assistance. Work with Levee

Owners on potential Levee Repair

Projects. Implement sand bag hub

with use of NWK sand bag machine.

TenkillerCurrent elev: 660.37 – 77.4%

Top of FP: 667.0

Release: 15 cfs

Status: Rising

Fall RiverCurrent elev: 980.20 – 70.2%

Top of FP: 987.5

Release: 5 cfs

Status: Steady

BUILDING STRONG®

BUILDING STRONG®

Fulton Gage

DeKalb Gage

Horatio Gage

Arthur City

Gage

BUILDING STRONG®

BUILDING STRONG®

Tulsa District Overview

Holding as much water as we can to provide flood risk across the region

All projects are operating as designed

Eight flood control projects operating in “Surcharge”► Lake Texoma

► Hugo Lake

► Sardis Lake

► Broken Bow

Hydraulics & Hydrology Branch operating 24/7

Twelve projects are operating in “24/7 Observation” (Park Rangers/Hydropower

Specialists) where required

Engineering & Construction and Dam Safety Production Center engineers deployed

Weeks/Months not days to return projects to “normal operations”

► Pine Creek

► Pat Mayse

► Lake Eufaula

► Wister Lake

27 May 2015 Briefing to Governor Fallin

BUILDING STRONG®

Red River Overview

Seven Pools of Record

- Arbuckle (147%) *

- Lake Thunderbird (137%) *

- Broken Bow (105%)

- Hugo Lake (108%)

- Lake Texoma (125%)

- Pine Creek Lake (102%)

- Wister Lake (124%)

• 21JUNE2015: As of 14 August 2015, Red River Estimated damages $

14.5M

* Bureau of Reclamation

BUILDING STRONG®

Factors & Impacts

Red River

► Flood Risk Management

► Commercial Navigation

► Hydropower

► Recreation

(Fed/State/Private)

► Localized Flooding

► Bridge Closures

► Water Supply @ Broken

Bow (Repaired)

Arkansas River

► Flood Risk Management

► Commercial Navigation

► Hydropower

► Recreation

(Fed/State/Private)

► Localized Flooding

► Inflow from Kansas –

Grand River / Verdigris /

Arkansas

Broken Bow Pumping Station

27 May 2015 Briefing to Governor Fallin

BUILDING STRONG®

Communications

Daily Report

Support to Oklahoma EOC as requested

Tulsa District USACE Official Website

Tulsa District USACE Facebook Page

Responding to Stakeholder Inquiries

Responding to Media Requests

27 May 2015 Briefing to Governor Fallin

BUILDING STRONG®

Communications

BUILDING STRONG®

Contacts

- Congressional Offices

- State Emergency Action Centers

- County Commissioners / City Mayors

BUILDING STRONG®

Flood Response

Federal assistance IAW Public Law 84-99

► Issue Sandbags (76K so far)

► Geospatial Support to Oklahoma EOC

► Technical Assistance as requested (Lake Lawtonka)

Coordination with EM Coordinators established

during annual “Tabletop Exercises”

27 May 2015 Briefing to Governor Fallin

BUILDING STRONG®

PL84-99 Activities Provided Liaison Officer to State EOC to assist with prioritizing work of Civil Air

Patrol, GIS and mapping.

Liaison with State Response Director and Mitigation Director as members of the State

Hazard Mitigation Team to identify future flood mitigation projects.

Technical Assistance to Lawton OK with OWRB and State EOC to assist with Lake

Lawtonka.

Provided inundation Mapping to State EOC and downstream communities for Lake

Eufaula, Keystone and Texoma.

Public Affairs coordination with State EOC PAO.

Issued over 76,000 sandbags 16 Counties and the Chickasaw Tribe.

Coordinated flooding impacts with State and Tribal Nations.

Coordinating Flood Support teams with local communities answering questions and

assisting Emergency Managers.

Coordination with Levee Owners in assessing potential Levee Damages to provide

projects for Emergency Levee Repair projects through USACE.

Developing partnerships for recovery planning to identify additional areas where flood

risk management projects may be warranted.

As of 15 June

BUILDING STRONG®

31MAY2015: PL 84-99 Sandbag Operations over 75K sandbags

distributed. Sandbags were distributed to locations including

Wagoner, OK and Gainesville, TX.

BUILDING STRONG®

BUILDING STRONG®

Lake Texoma

BUILDING STRONG®

Lake Texoma Auxiliary Spillway 3June2015

Release 124,000 CFS,

Elevation 644.84,131.6%

BUILDING STRONG®

Highway 91, Shawnee Creek, Auxiliary Spillway

•This picture from Lake Texoma was posted on media outlets in France, Ireland, Great Britain, Russia and Japan

•Total reach of Tulsa District Facebook page exceeded 42M views during flood event.

BUILDING STRONG®

With the focus

on the flood

fight, this guy

managed to

sneak thru

security at the

Denison Office

late yesterday

afternoon.

He left without

making a big

stink about it!

BUILDING STRONG®

Cumberland Levee

BUILDING STRONG®

Cumberland Levee

May 2015

Rainfall leads to widespread

flooding throughout SWT

5-28-15

North Levee Windrowed at lowest areas

6-1-15 Levee holds

Texoma Pool and Washita River begin receding

6-17-15

Remnants of Tropical Storm Bill Creates additional

flooding

6-20-2015

Overtopping of North Levee

begins

6-21-2015

Levee Fails

Crest on 5-29-15

Washita River at Dickson

Crest on 06-19-15

BUILDING STRONG®

Transmission Tower

Access Road

Main Breach

Near BreachWindrow Breach

Inundation Area

South Levee Breach

As of 22JUN2015

1

23

4

Initial Overtopping

5

Cumberland Levee

BUILDING STRONG®

Cumberland Levee

Initial Damage & Cleanup

As of 22JUN2015

BUILDING STRONG®

Channel 12 NewsTISHOMINGO, Okla. -- One Oklahoma river is rising to unprecedented levels and others are experiencing major flooding following

a torrent of rain from TD Bill.

The National Weather Service predicts the Washita River near Dickson will crest Thursday night at an all-time high of just over 47

feet.

That's more than 20 feet above flood stage.

The river is projected to rise about 27 feet over a 24-hour period.

The service issued a flood warning for the area saying "catastrophic flood depths are expected to wreak havoc in the Washita River

valley."

More than 10,000 acres of farmland has been flooded and transportation to homes in the area could be cut off for days.

Original Staff Gage

291630MAY2105 Lake Texoma Park Rangers install a new staff gage to measure the height of the Washita River on the North Cumberland Levee

201100June2015, Highway 377 Bridge on Washita River

BUILDING STRONG®

201000June2105 North Cumberland Levee

BUILDING STRONG®

201000June2105 North Cumberland Levee

BUILDING STRONG®

201000June2105 North Cumberland Levee

BUILDING STRONG®

201000June2105 North Cumberland Levee

BUILDING STRONG®

Hugo Lake

BUILDING STRONG®

Hugo Lake 23MAY2015 Release 44,000 CFS,

Elevation 84%

BUILDING STRONG®

Hugo Lake 26MAY2015 Release 59,000 CFS,

Elevation 110%

BUILDING STRONG®

Hugo Lake 27MAY2015 Release 59,000 CFS,

Elevation 110%

BUILDING STRONG®

Hugo Lake 27MAY2015 Release 59,000 CFS,

Elevation 110%

BUILDING STRONG®

Broken Bow

BUILDING STRONG®

MAY2105 Highway 259 below Broken Bow Reservoir.

BUILDING STRONG®

MAY2105 The Tulsa District repairs tainter gate motors at

Broken Bow Reservoir.

261530MAY2105 The Tulsa District repairs tainter gate motors at Broken Bow Reservoir.

261530MAY2105 High releases have permanently changed the trout fishery below the Broken Bow Reservoir.

261530MAY2105 High releases have permanently changed the trout fishery below the Broken Bow Reservoir.

261530MAY2105 High releases have permanently changed the trout fishery below the Broken Bow Reservoir.

BUILDING STRONG®

DeKalb Gage

BUILDING STRONG®

DeKalb stream gage on 1June2105

BUILDING STRONG®

Actions around SWT

USACE personnel make daily/hourly checks of the infrastructure at projects in accordance with the project control manual.

Northern Area Operations Project Manager Allen Ryan checks the gate settings at Oologah Lake.

242000MAY2015 Emergency contract actions repair extensive erosion at lake Eufaula, protecting critical infrastructure.

301530MAY2105 The City of Wagoner, OK pumps local runoff over Dike 10 into the Fort Gibson Reservoir. Mayor AJ Jones was on site.

Mayor Jones

Flooding upstream of Dike 10

311330MAY2105 LTC Dan Young and Navigation Systems Operations Manager Bob Steiner inspect the releases at RS Kerr Lock and Dam, where peak releases were 388K cfs.

1June2015 Meeting with City of Miami Mayor at Rotary Park.

26MAY2015 Lake Eufaula releases as much as 172,000 cubic ft per second (twice the rate of water going over Niagara Falls.)

26May2015: WD Mayo Lock & Dam (MKARNS) under water. High flows limited Commercial navigation on the MKARNS from mid-May until mid-June. Navigation is still being impacted due to shoaling from sediment

Questions?

BUILDING STRONG®

Backup Slides

BUILDING STRONG®

BUILDING STRONG®

Fulton Gage

DeKalb Gage

Horatio Gage

Arthur City

Gage

BUILDING STRONG®

Control Points:

Dekalb

44,534 cfs vs.

107,773 cfs

Arthur City

84,446 vs.

71,237 cfs

Muddy Boggy / Unger

15,307 cfs vs.

41,727 cfs

http://www.swt-wc.usace.army.mil/lowerred.html

BUILDING STRONG®

BUILDING STRONG®

This is the limiting factor for the combined

releases from Denison, Hugo & Pat Mayse

projects when not operating in surcharge

operations – DeKalb at 42K cfs

BUILDING STRONG®

BUILDING STRONG®

By the water control manual, we are

regulated to the 25’ stage or 100K cfs unless

there is no downstream flooding, then it is

25’ or whatever the flows support.

BUILDING STRONG®

BUILDING STRONG®

BUILDING STRONG®

Conservation Pools on Red

River

Upper Red

River

Lower Red

River

BUILDING STRONG®

Flood Pools on Red River

Upper Red

River

Lower Red

River

26MAY2015: MKARNS Navigation System. As 0f 14 August, estimated damages of $2.2M

BUILDING STRONG®

Overview

• 700 people

• Arkansas River and Red River Basins in

Oklahoma, Southern Kansas and Northern Texas

• Major Missions of the Corps of Engineers

• War Fighting

• Navigation

• Flood Control (Flood Risk Management)

• Military Construction

• Regulatory/Environmental

• Homeland Security

Mike Abate in Iraq

BUILDING STRONG®

• Engineering

Control Tower

Vance AFB

Air Defense Artillery School

Fort Sill

Medical Facility

Tinker AFB

• Environmental Management

• Construction • Installation Support

Vance AFB

Tinker AFB

Altus AFB

Fort Sill

McAlester

Sheppard AFB

KC 46A Program

Altus AFB

ENJPT Training Facility

Sheppard AFB

Reserve Center

McAlester Army

Ammunition Plant

Military Mission

Pantex

BUILDING STRONG®

Military Update

Fort Sill

- Reception Complex

- Terminal High Altitude Area Defense

- Fitness Center

- Chapel

Altus AFB

- KC-46A Pegasus Construction Project

Vance AFB

- Control Tower

- Repair Outside Runway and Taxiway

Tinker AFB

- Land Acquisition for KC46A Construction

McAlester AAP

- Employee Changing /Decontamination Facility

Sheppard AFB

- Medical/Dental Replacement Clinic

BUILDING STRONG®

Grand Lake

Webbers Falls Turbine

Tenkiller Lake

Inland Navigation

(MKARNS)

• 5 locks & dams

• 3 major ports

Hydroelectric Power

• 8 power plants

produce 585,000 kw

capacity

• Generates power to 8

million customers

Water Supply

Environmental Stewardship

Recreation

• 267 recreation

areas at 33 projects

• 23 million visitors

in 2014

Flood Risk Management

• 38 Corps dams + 12 others

• 15,950,000 acre feet of

flood storage

• Arkansas River Basin:

$11,144B in cumulative

flood damage reductions

• Red River Basin:

$1,936B in cumulative

flood damage reductions

• 60% of Corps water supply contracts

• 18 lakes, 131 water supply customers

• 2.2 million people served

• Enhances municipal, industrial,

irrigation usage

• Protects endangered species

• Improves degraded streams

Water Quality

Red River Chloride, Area VI

• Tenkiller Low Flow Pipe

• Supersaturated Dissolved

Oxygen System (SDOX)

Civil Works Mission

Current Situation

Concerns Way Ahead

Lower Bois d'Arc Creek Reservoir

North Texas Municipal Water District (NTMWD) proposes a

16,400 surface acre water supply lake in Fannin County

Near-term water supply for the growing urban population

north and east of Dallas-Fort Worth metroplex

Clean Water Act Section 404 permit required from the

USACE for construction of the dam

Due to scope and magnitude of potential impacts, an

Environmental Impact Statement (EIS) is being required

Highly cooperative and responsive applicant

Public Notice and Scoping Meetings generated numerous

comments from the affected public and Federal and State

agencies in opposition to the project

Identified concerns are evaluation of alternatives, demand

projections vs conservation/reuse, socio-economic impacts,

terrestrial and aquatic wildlife and resources impacts,

historic/cultural properties, and aquatic resource mitigation

Draft EIS released February 2015 generated similar comments

EPA rated the Draft EIS as a “3 – Inadequate” in June 2015

Evaluate comments, re-examine alternatives and

potential impacts, and revise EIS, in accordance with

procedures in Nat’l Environmental Policy Act (NEPA)

Complete functional assessment of wooded wetlands

Refine the Aquatic Resources Mitigation Plan

- NTMWD has proposed aquatic ecological restoration

as mitigation on portions of 15,000 ac ranch at Bois d’Arc

Creek confluence with Red River

Culminate with publication of a Final EIS

.

BUILDING STRONG®

Pine Creek Dam Safety

Current Situation

• Dam Safety Modification Study completed and

approved by Headquarters USACE and concurred

by ASA (CW) Darcy for construction in FY15

• Cutoff Wall is near completion and should be

complete by 1 September.

•Steel pipe liner has been delayed until summer

2016 to take advantage of the low flows during

summer months.

Concerns

• Void around the conduit

• Loss of material through the conduit joints

• Loss of material at the downstream exit face

• Hydraulic fracture within the embankment

Way Ahead

• Construct downstream filter and chimney filter.

• Construct the steel pipe liner Summer 2016.

• Interim Risk Assessment will begin in Sep 2016

• Reassess dam with modifications in

place (June 2017)

PICTURE

BUILDING STRONG®

Waurika DredgingCurrent Situation

A water supply intake channel was constructed

during initial construction of the water supply intake

Over time, the water supply intake channel has

Become filled with sediment necessitating the need

for maintenance dredging of the intake channel

Dredging the intake channel would significantly increase

the dependable water yield to the conveyance system

and

improve water quality

Way AheadStrategic Alliances and Sponsor: Waurika Lake

Master Conservancy District

Actions/Funding Requirements:

FY2015: $50,000

The Waurika Lake Master Conservancy District (WLMCD)

requested Section 408 authorization to restore Lake Waurika’s

dependable water volume yield of the conservation pool and

improve raw water quality in April 2015

After District agency technical review, the WLMCD’s request was

approved pursuant to Section 14 of the Rivers and Harbors Act

of 1899, 33 USC 408 on 14 July 2015. This authorization was

imperative for significantly increasing the dependable water yield

to the conveyance system and improving the water quality for

community members serviced by the WLMCD

BUILDING STRONG®

Daily Briefings

Media Interviews