21
Date: 29th to 31st August 2018 | Presented By: Sanjeev Karki Cognizant

Cognizant PowerPoint Template … · Cognizant Overview Cognizant is a global leader in providing solution for IT , consulting, digital, technology and business process outsourcing

  • Upload
    others

  • View
    58

  • Download
    0

Embed Size (px)

Citation preview

Date: 29th to 31st August 2018 | Presented By: Sanjeev Karki

Cognizant

Cognizant Overview

Cognizant is a global leader in providing solution for IT , consulting, digital, technology and business process outsourcing services, dedicated to helping the world's leading companies build stronger businesses.

Headquartered in Teaneck, New Jersey, United States. Cognizant is included in the NASDAQ-100, S&P 500 indices, Forbes Global 2000 and became Fortune 200 company in year 2017. Cognizant is ranked among the top performing and fastest growing companies in the world.

The company has more than 260,000 employees globally, of which over 180,000 are in India across 10 locations with a plurality in Chennai.

US$ 14.81 billion in revenues for FY 2017.@2018 Cognizant2

Cognizant's Delivery Network

• 75+ delivery and operations centers globally and spread across 38 countries• Occupy 24 million+ built up area and 13.6 million Sq.ft. of Own Facility• Majority of these operations are in hot and humid climate and significant percentage

support 24X7 operations• More than 80% of the space is air-conditioned• Our data centers alone constitute more than 15% of the total energy consumption

@2018 Cognizant3

© 2018 Cognizant4

Type of building Leased, Multi-tenant

Occupied Sq.

foot2,37,938

Seating Capacity 2,807 nos.

No. of associates

as on date2,242 nos.

UPS Capacity4x 176 KVA

(Conventional UPS)

Building

Occupancy

Occupied 2 floors

during 2012

HYD-Raheja Mindspace Bld 20 Overview

© 2018 Cognizant5

Description 2014 2015 2016 2017

% Reduction

in 2015 Vs

2014

% Reduction

in 2016 Vs

2014-15

% Reduction

in 2017 Vs

2016

EPI: KWH/Sq. ft. /Month 0.96 0.92 0.89 0.82 4.17 3.26 7.87

Average Headcount 1828 1878 1904 1764 -2.7 -1.38 7.35

KWH/Person/Month 124.36 117.13 110.65 110.54 5.81 5.53 0.1

Energy Consumption in KWH 2728065 2639750 2528163 2340021 3.24 4.23 7.44

Energy Savings in KWH 88315 111587 188142

Energy Savings Cost in INR 626153 833555 1435523Unit Cost in INR 7.09 7.47 7.63

Reduction in EPI in last 3 years is 14%Reduction in KWH/Person/Month in last 3 years is 11%

Energy Efficient Summary, HYD-MDH Hyderabad

© 2018 Cognizant6

Energy Consumption Trend -2014 to 2017 (In KWH)

0

100000

200000

300000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Energy Consumption Trend

Year -2014 Year -2015 Year -2016 Year -2017

Consumpti

on DetailsJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Year -2014 192932 223070 220310 223569 222027 226751 271061 236005 236153 227781 243201 205205

Year -2015 204558 227649 220417 219889 227988 210835 219870 229964 237281 194221 209994 197357

Year -2016 182192 198560 206976 202498 210379 201365 230077 220865 249293 211527 215546 181987

Year -2017 158649 166050 167601 161875 184860 169150 210258 211810 180628 185381 199086 174130

© 2018 Cognizant7

Comparison with Benchmark Data- BEE

Benchmark Data- BEE for Buildings where Air-Conditioned area is more than

50% of Carpet area Bandwidth for Office Buildings for 3 climate zones

EPI in Kwhr./Sq. M. / Year

Star RatingWarm and

HumidComposite Hot and Dry

1 Star 200-175 190-165 180-155

2 Star 175-150 165-140 155-130

3 Star 150-125 140-115 130-105

4 Star 125-100 115-90 105-80

5 Star Below 100 Below 90 Below 80

Cognizant Raheja Building 20 EPI

Description 2014 2015 2016 2017

EPI: Kwh/SqM/Annum 123.4 119.4 114.4 105.86

© 2018 Cognizant8

Road Map for Raheja Facility as 4 Star Rated Building Reference to BEE Benchmark

Investment Initiatives

Hyderabad is defined under Hot Semi Arid Climate zone as per BEE- Energy

Conservation Building Code. CTS Facility is 6 years old and presently matches to BEE

standards of Three-Star rated building with more than 80% of the space is air-

conditioned.

Objective

• To achieve Specific Energy Consumption equivalent to 4 Star Rated Building

by year 2019

Road map to 4 Star Rated Building

To achieve set objective in coming years, we have planned various Energy

Conservation projects like retrofit of conventional UPS to modular UPS and LED

lightings.

© 2018 Cognizant9

Installation of pull cord switches for 750 fixtures of 4x14w T5 light fitting

with approx. annual energy saving of 33,750 KWH.

Pull cord cost was INR 50 each with total amount of INR 80,000 (1600

nos)

Weekend load reduction by switching of water dispensers, coffee

machines, toilet exhaust, kitchen equipment's and

Strictly maintaining workspace temperature in the range of 24-26 Deg

together annual saving of energy 54,500 KWH.

Energy conservation projects implemented in 2015-2016

© 2018 Cognizant10

Installation of pull cord switches during 2015 - 16

Installation of pull cord switches

• Installation of pull cord switches for 1577 nos of 4x14w T5 light fittings.

BEFORE AFTER

© 2018 Cognizant11

Installation of pull cord switches for total of 1577 fixtures of 4x14w T5

light fitting with approx. annual energy saving of 70,963 KWH.

Energy conservation projects implemented in 2016-2017

© 2018 Cognizant12

Modify 4x14 watt Lamps with 3x14 watt for 1260nos. Annual

saving of energy was approx. 58,021 KWH.

Energy conservation projects implemented in 2017-2018

© 2018 Cognizant13

Energy conservation projects implemented in 2017-2018

BEFORE AFTER

• Remove 1x14 watt Light in 4x14 watt at Workstation area

© 2018 Cognizant14

Strategic Path

EMP Energy Team

• As per EMP – Energy

Team is formed under

Corporate Workplace

Service Head which

includes different

department members.

EHS lead and BEE

certified Energy Auditor

Account

Management

• Yearly Energy

Conservation Plan

• Identifying

opportunities

• Process

improvements

• Implementation

• Periodic Review

•Site specific tailor

made Energy

Management Plan

rolled out for the

period of year

2011-2019

Strategic Path

© 2018 Cognizant15

In-House Energy MonitoringDaily

•Energy consumption updating in FMS Portal

•Top energy profile review (UPS ,Lighting, Cafeteria, Utilities)

Weekly

• Weekly energy call

• Energy Coordinators meeting

Monthly

• MMR

• EPI Review

• Energy profile analyze

0%

47%44%

6%

3%

Computing (UPS)

split ac, Lighting &Raw Power

Ventillation (AHU &HRW)

Cafeteria

Effective Monitoring and Control Methodology

© 2018 Cognizant16

Activity Frequency Responsible Accountable Consulted Informed

Daily Energy

DashboardDaily Facilities Team

CWS Location

ManagerCWS Energy POC CWS Ops lead

Facility Management

System (FMS System)Daily Facilities Team

CWS Location

ManagerCWS Energy POC CWS Ops lead

Energy Review Monthly Facilities Team Energy LocationCWS Energy city

lead

CWS Location

Manager

City review QuarterlyCWS Energy City

lead

CWS India Energy

Manager

CWS Energy India

lead

Sustainability

Team

Update to CWS

Operation LeadQuarterly

CWS Location

Head

Energy India lead

/Sustainability

Team

CWS Ops lead

Update to Energy

CommitteeQuarterly

Sustainability

TeamHead-Sustainability

Energy India lead /

Energy Manager

Dashboard on

Equipment’s & AMCYearly

CWS Energy

City lead

CWS India Energy

ManagerEnergy India lead CWS Ops lead

© 2018 Cognizant17

“Awareness is the greatest agent for Change”

Employees Awareness through

• Various Signage and Posters Competition/

Campaigns.

• Innovations Awareness Campaigns

• Energy and Environment

Awareness Mailers

Employee Awareness

© 2018 Cognizant18

Induction Training

Training

conducted on

basic OHSAS &

EMS Knowledge

for new joiner.

Earth Hour Celebration

• One hour for our Earth as

One Humanity…

Could make a huge

difference…

Vendor & OEM Training

Vendor & OEM

training are based on

job requirement

Best Practices - Training

© 2018 Cognizant19

Achievements & Certifications

OHSAS 18001:2007 Certification

© 2018 Cognizant20

Way forward (2018-2019)

Installation of LED

lights

Modular UPS Installation Installation of LED lights

UPS Retrofit in 2019 :Removing Existing Conventional UPS 176 KVA X 4 No’s and Install the

150KVA x 2 No’s Modular UPS

• Estimated Annual Electrical Savings (Kwh/Year) is 53000

Lighting retrofit in 2019: LED lights are considered in place of existing lights.

• Estimated Annual Electrical Savings (Kwh/Year) is 41442

To initiate battery operated cars in 2019.

Thank you