42
Capel Sound Foreshores COA STA L MA NA G EMENT P LA N 2 0 16

Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

Capel Sound Foreshores

COA STA L MA NA G EMENT P LA N

2 0 16

Page 2: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

1. ABOUT THIS DOCUMENT 3

ITS DEVELOPMENT 3

- Why it was developed 3

- How it was developed 4

HOW IT IS STRUCTURED 4

STAKEHOLDERS 5

COMMUNITY CONSULTATION 6

2. CAPEL SOUND FORESHORE TODAY 7

WHERE IT IS AND WHAT IT IS 7

- Climate 8

- Geology and Soil Types 8

- Vegetation 8

- Fauna 9

- Coastal Processes 9

HOW IT IS CURRENTLY MANAGED 9

PRECINCTS AND THEIR CURRENT USES (MANAGEMENT ZONES) 10

3. THE NEED FOR ITS ONGOING MANAGEMENT 12

MANAGEMENT RATIONALE ON-A-PAGE 12

RATIONALE EXPLAINED 13

4. STRATEGIES FOR THE FUTURE (STRATEGIC PLAN) 14

ENVIRONMENT STRATEGY ON-A-PAGE 14

ENVIRONMENT STRATEGY EXPLAINED 15

CAMPING STRATEGY ON-A-PAGE 16

CAMPING STRATEGY EXPLAINED 17

BOATSHED STRATEGY ON-A-PAGE 18

BOATSHEDS STRATEGY EXPLAINED 19

BOAT RAMP STRATEGY ON-A-PAGE 20

BOATING STRATEGY EXPLAINED 21

INFRASTRUCTURE STRATEGY ON-A-PAGE 22

INFRASTRUCTURE STRATEGY EXPLAINED 23

COMMUNITY ENGAGEMENT STRATEGY ON-A-PAGE 24

COMMUNITY ENGAGEMENT STRATEGY EXPLAINED 25

5. IMPLEMENTING THE STRATEGIES (BUSINESS PLAN) 26

OPERATIONS STRATEGY 26

CURRENT OPERATIONS 27

CHANGES TO WORK PRACTICES 27

FINANCE STRATEGY 28

CURRENT FINANCIAL POSITION 29

PROJECTED REVENUE AND EXPENDITURE 29

FUNDING THE INITIATIVES OF THIS COASTAL MANAGEMENT PLAN 29

FUTURE WORK PRACTICES 30

PRIORITIES FOR THE NEXT THREE YEARS 30

MEASURING AND REPORTING PROGRESS 31

6. GETTING INVOLVED 31

APPENDICES 32

Appendix A: Helping you read the Strategies-on-a page 32

Appendix B: Benefits, KPls and Measures 33

Appendix C: Business Plan Initiatives (3 years) 34

Page 3: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

3 Coastal Management Plan – Capel Sound Foreshore

1. ABOUT THIS DOCUMENT

ITS DEVELOPMENT

-­‐ Why it was developed The Capel Sound Foreshore is on crown land owned by the Victorian Government and the way it is

managed is specified in two Acts of Parliament:

Crown Land (Reserves) Act 1978

This specifies how all Victorian crown land will be managed. It allows the responsible Minister to

appoint a Committee of Management (CoM) to manage any piece of crown land and sets out the

responsibilities and powers of Committees of Management.

Capel Sound Foreshore is managed by a CoM appointed under this Act.

Coastal Management Act (1995)

This specifies how Victoria’s Coastal crown land will be managed. It requires:

o The appointment of a Victorian Coastal Council that will develop coastal strategies that protect

Victoria’s coastlines well into the future. The current strategy is the 2014 Victorian Coastal

Strategy and this directs all coastal management activities.

o The establishment of Regional Coastal Boards responsible for developing Coastal Action Plans

for their region. Working to the direction set in the 2014 Victorian Coastal Strategy the Central

Coastal Board released the draft Coastal Plan 2015-­­2020 in March 2015.

o That Committees of Management prepare Coastal Management Plans that include a 3-­­year

business plan.

The CoM of the Capel Sound Foreshore is therefore required to develop a Coastal Management Plan consistent with the Victorian Coastal Strategy 2014 and the draft Regional Coastal Plan 2015 – 2020.

Irrespective of these legislative requirements, the development of regular management plans is essential

to the ongoing health of the foreshore and its enjoyment by many thousands of people.

In 1998 the Victorian Government created the current Capel Sound Foreshores Inc1 when it amalgamated two

existing foreshores -­‐ the West Rosebud Foreshore and the Tootgarook Foreshore. As part of this

amalgamation the Capel Sound Foreshores Committee of Management (CoM) was created.

Since that time the CoM has developed two Coastal Management Plans. The first of these was designed

to drive the amalgamation of the two foreshores that had operated separately for some 50 years

previously. The second (in 2008) aimed to consolidate the way the foreshores were managed with a focus

on maintaining the foreshore’s natural values and providing sustainable recreational activities in a sound

economic environment.

This new plan has established a view of what needs to be done to ensure the long-­‐ term

protection and use of the foreshore.

It lays out a 10-­­year Strategic Plan for the foreshore, and

It provides a Business Plan to direct activities over the next 3 years.

The strategies of the Plan have been designed to deliver three benefits:

1. Restore and protect the coastal environment (45%)

2. Enable a healthy lifestyle for Victorians (40%), and

3. Support the economy of the southern peninsula (15%).

1 The legal name of the Crown Land precinct is the ‘Capel Sound Foreshores’ (plural form.) When established in 1998 it brought together what were then the foreshores of Tootgarook and Rosebud West. For simplicity, throughout this document the single form ‘Foreshore’ is used.

Page 4: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

4 Coastal Management Plan – Capel Sound Foreshore

D FORESHORES (CSF) Committee of Management

nagement Strategy

GIC MA P

NEED

The environme

qua lities of the

will ra pidly

deteriora te un

they a re a ctive l

properly ma na

55%

The unique

cha ra cter of th

provides va lua

lifes tyle

opportunities

ma ny Victori

fa milies a nd fri

40%

A n opportun

exis ts to increa s

re leva nce of t

peninsula a s

destina tion f

na tiona l a n

interna tional to

5%

BENEFIT STRA TEGIC

RESPO NSE

ORGA NISATIONAL

RESPONSE

ntal

CSF

less

y a nd

ged

4

5

Restoring and

protecting the

coasta l environment

45%

KPI 1 : i ndi g e nous fl or a KPI 2 : i ndig e nous fa una

KPI 3 : be a ch er os i on

KPI 4 : susta i na bl e ca mpi ng

Establish a long- Implement

a plan to term pr ogra m to 30 impr ove t he

qualit y of fl or a a nd

fa una 30 %

20 improve

the

environmen

tal quality

5

of

the

CSF

25

%

10 10 Under sta nd a nd

respond t o the li kel y

impact s of a

cha ngi ng cli mate 10 %

Identify and

utilise the

most

appropriat

e

10 resource

opport

unit ies

35%

15

e CSF

ble

Enabling a

10 healthy

lifestyle for

Victorians 5 3

0 to

a n

ends

40%

KPI 1 : ca mpe r s

KPI 2 : l oca l s KP I 3: vol unt e e r s

KPI 4 : boa t r a m p KPI 5 : ot he r s

15

Establi sh a pr ogra m

that will facilit ate broa d community

invol ve ment i n usi ng

and cari ng for t he for eshor e 2 0 %

M5 anage

the

potential

5 risks to the

CSF of a

changing

climate

5

10%

25

Build upon the 5

experienc

es that

CSF

provides

to

Victorians

and

tourists

5%

ity

e the

he

Supporting

10 the

econom y of

the southern

1

5

Ensure fa cilitie s are provi de d to ena ble

equitabl e access for

all pot ential users

40 %

a 5

or

peninsula

15% 5

facilit ie

s and

Specify an d

provide the d KPI 1 : ca m pe r s uris ts

KPI 2 : da y vi si t or s KPI 3 : t our i st s

20

infrastr

ucture

needed

on the

CSF

25% : Neville

Fuller

Version

no: 0.5

-­­ How it was developed This plan was developed by the Capel Sound Foreshore CoM over a period of 12 months. The starting

point was to physically walk through the entire 3.8 km of foreshore. The CoM did this over several

weekends. These walks provided a shared understanding of the foreshore to be managed and identified

opportunities and actions that might improve its health and use.

This was followed by eight two-­‐ hour discussions between the CoM, staff and other interested parties that

established why the CoM needs to exist, what benefits the foreshore is expected to provide to Victoria,

and the strategies that should be pursued to deliver the benefits.

The approach used to guide these discussions and develop the strategies was that defined in the Victorian

Government’s Investment Management Standard:

http://www.dtf.vic.gov.au/Investment-­‐ Planning-­‐ and-­‐ Evaluation/Understanding-­‐ investment-­‐ planning-­‐ and-­‐

review/What-­‐ is-­‐ the-­‐ investment-­‐ management-­‐ standard

HOW IT IS STRUCTURED The main substance of this plan is documented using a series of Investment Logic Maps (ILMs) that are

arranged as follows:

CAPEL SOUN

Coastal Ma

Need for

Management

INVEST MENT LO

Or g a ni sati on

Investor

Facilitator:

Terry Wright

Accredited

Facilitator: Yes

Init ial Worksh op:

21/05/2014

Last mo dified by: <firstname

surname dd/m m/y yyy >

Template version: 5.0

ENVIRONMENT

CAMPING

BOATSHEDS

BOATING INFRASTRUCTURE COMMUNITY ENGAGEMENT

Strategic Plan

OPERATIONS FINANCE

Business Plan

CAPEL SOUND FORESHORE (CSF)

CAMPING Strategy I NVE S T M E NT LOG I C M AP Program

CAPEL SOUND FORESHORE (CSF)

BOATSHED Strategy I NVE S T M E NT LOG I C M AP Program

PROBLEM BENEFIT STRATEGIC

RESPONSE SOLUTION

CHANGES ASSETS

PR O BLE M BE NEFIT S T RA T E GIC RE S PO NS E SOLUTION

CHANGES ASSETS

A ffor da bl e ca mpi ng

on t he for e shor e

pr ovi de s a wi de

ra ng e of r e cr e a 3 ona l

oppor t uni 3 e s a nd

Establish and enforce a camping

Document and provide

policy that i s

access to suite of pol icy sustainable and

transp

aren

t 5%

g e ner a t es a st r ong Enabli ng a he alt hy

and

procedur

es

Establish

means of

enforcing

policy

T he i coni c boa tshe ds

of Ca pe l S ound a r e a

po we r ful a Kr a c3 on

t o fa mil i es , fri e nds ,

vi sit or s a nd t our is t s

a nd ne e d t o be Enabli ng a he alt hy

Establish a history of

the boatsheds of CS F

Create interest gro up

and make this

and consolidate

openly avai lable

his torica l sources

5%

lifestyle for Vi ct ori ans se nse of com m unit y

lifestyle for Vi ct ori ans

75 % mai ntai ne d a nd

4 5 % Publish,

promote

and

maintain

informa3on

for ma n y Vi ct ori a n

fa milie s 75 % KP I 1: Ca mper s

KPI 2: Boat ra mp users KPI 3: Others

Provide

the

infrastruc

ture and

pr ot e ct e d

3 5 % faci li3es required to Iden3fy required inf rastruct

ure and support the

faci li3es changing needs of

KPI 1: Boatshed users

KPI 2: Ca mpers KPI 3: Local s

camper

s 35%

Establish

a policy Provide and maintain as

Inf rastructure and requi

red

facili

3es

I ncome de r i ve d fr om

for e shor e ca mpi ng i s e sse n3 al t o t he Re st ori ng a nd

that provides reasonable access to

boatsheds and Develop policy Beach access tracks

improve vegeta3on

Monito

r and

its

adop3o

n and

effec3v

eness

protec3o

n 30% Ensure the camping environment

provided is safe and Con duct cam per safety

A he al t hy bal a nce bet we e n boat she ds,

pr ote c3 ng t he coa stal risk

assessm

ent

Rest ori ng a nd

ong oi ng pr ot e c3 on

a nd ma i nt e na nce of

the Ca pel S ound

secu

re

publi c a cce ss a nd t he

environment 40%

15 %

pr ote c3 ng t he coast al coa sta l e nvir on me nt

Develop and

implement

must be est a bli she d

a response

plan

envir onment 40 %

For eshor e a nd ma i nt ai ne d

KPI 1: Flora Determine

how best 20 % KPI 2 : Fauna

KPI 3 : S ust ai n. ca mpi ng Plan for longZterm

55 % KPI 1 : Flora to increase boatshed

Understand exis3ng use

use to aid

beach paKerns

and usage sustai

nable develop me nt of

Iden3fy things cri3cal

to long term camping

camping on the

co m m unity and

s3mul i

increase

beach

safety

30%

fores

hore

15%

sustainabil

ity

Develop

and

implement

a camping

sustainabili

ty plan

Develop and

implement program

T he a vai la bi lit y of S uppor 3 ng t he

year round e conomy of t he

foreshore camping southern peninsula Promote CSF as a

T he r e ve nue r ai se d

fr om boa t she d fe e s Suppor3 ng the economy of t he

wi ll he l p a dva nce 10 % year

round

tourist

Develop and

implement

touris t

camping

ar e i mport a nt t o t he sout her n pe ni nsul a ma i nt e na nce of t he 1 5 %

CS F as we ll a s

pr ovi di ng r e venue t o KPI 1 : T ouri sts local government KPI 2 : Boat shed fe es

10% KPI 3: Council rates

Consolidate the program of longZ

term maintenance Es tablish standards and

t he Pe ni nsul a a s a des3na3on

strategy 5%

conduct inspec3ons to

and preserva3on of ensure

complianc

e

KPI 1: Ca mpers touri st de s3 na 3on KP I 2: Da y visit ors

the

boatsh

eds of

CSF

35%

5 % KPI 3: T ourists Take

appropriate

ac3on

where

standards

are not met Investor:

Adrian Atkins

Facili tator:

Terry Wright

Accredited Facili tator: Yes

Version no: 0.1

Ini3al Workshop:

13/08/2014

Last modified by:

<firstname surname

dd/mm /yyyy > Template

version: 5.0

Investor:

Neville Fuler

Facili tator:

Terry Wright

Accredited Facili tator: Yes

Version no: 0.2

Ini3al Workshop:

24/09/2014

Last modified by:

<firstname surname

dd/mm /yyyy > Template

version: 5.0

CA PEL S O UN D F O RES H ORE (C SF)

Environment Management Strategy I NVE S T M E NT LOG I C M AP

Program

PR O BLE M BENEFIT STRATEGIC

SOLUTION RE S PONS E

CHANGES ASSETS

We e d i nfe st a 3 on

a nd ve g et a 3 on

ove r gr o wt h i s

a cce le r a 3 ng t he

de cli ne of t he

e nvi r onme nt a ll y

uni que coa st al

e nvi r onme nt 5 5 %

agreed targets of the

the 2007 Vegeta&on

Implement the Update and priori3se

Vegeta&on Plan

Rep ort

55%

Imple

ment

priori

3es

Rest ori ng a nd

pr ote c3 ng t he coast al environment Implement the

Fera l a nima ls a re 75% agreed targets of the Update and priori3se Fauna Plan

the 2007 Fauna Report reducing the 10% i ndi g e nous fa una KP I 2 : F a una

prior

i3es

popul a3 on of KPI 1: Fl or a

Implement

KPI 3: Er osion a nd flor a

1 0 % Establish a good balance between

the needs of Develop a

vegeta3on

layout model for the

cam pers and coasta l

cam ping areas

campgrounds 15%

vegeta3o

n in the T he ong oi ng l oss of

ve g e ta 3 on wi t hi n

the ca mpi ng ar e as i s E na bl i ng a hea lt hy

Priori3s

e and

imple

ment

de gr a di ng t he ir li fe st yl e for Vi ct ori a ns Monitor

and

physical a nd 25% respond

to beach

a e st he 3 c

cha ract eris3cs KP I 1: Volunte ers

erosion across the Develop a risk

assessment and

25 % KPI 3 : Ca mper s KPI 2: Visitors

Capel Sound

response model

Fores

hore

10%

Monitor

and

respond

Establis

h

educa3o

nal and

Pot e n3 al i m pa ct s t o

t he for e shor e fr om a

cha ng i ng cl i ma t e

must be ma na g e d

1 0 %

awareness ac3vi3es Es tabl ish

and mana ge

that help peo ple

friends gro ups

appreciate

and care

for the

foreshore

10% Create environ mental

walks and signage

Signage

Investo

r:

Facili tator:

Terry Wright

Accredited

Facili tator: Yes

Version no: 0.3

Ini3al Workshop:

02/07/2014

Last modified by: <firstname

surname dd/mm/yyyy >

Template version: 5.0

CAPEL SOUND FORESHO RE (CSF)

BOATING Strategy

INVES TM E NT LOGI C M AP

Program

PROBLEM BENEFIT STRATEGIC

RES PONS E SOL UTI ON

CHANGES

ASSETS

Develop

policy on

boa t ra mp

usa g e a nd

its fina ncia l

via bility

E na bl i ng a he al t hy Ma inta in the

Secure o ng oing funding li fe st yl e for Vi ct or ia ns Tootgarook Boat to enable its con3nued

80% Ramp as the primary opera3on

access point for

KPI 1: Boat ramp uses vehicleXlaunched

Work with the boa3ng KPI 2: Boat Access Points craA 80% fraternity to establ ish

efficient

boa t ra mp use

Explore tra ffic

Being a bl e t o a cce ss the ba y on water

cra A i s ce ntra l

to t he life st yl e of

ma ny re si dent s a nd

vi sit or s t o t he Ca pel

Sound F ore shore 10 0 %

managemen

t solu3ons

with roads

authori3es

Develop a n d imple ment

pla ns to impro ve future

Precinct infra structure

use of precinct

Support

the

manual

launching

of small

craA along the Develop policy and

define physical length of the Capel

requirements

S uppor 3 ng t he So und

Foresh ore 20

% economy of the

souther n peni nsula

20%

KPI 1: Boat

ramp uses

Iden3fy

access

points A ccess tra cks Ena ble

ong oing

ma nua l

la unching

a ccess

Sig na

g e Prom ote

a wa renes

s of a ccess

points

Investor:

Da ryl Minter

Fa cilita tor:

Terry Wrig ht

A ccredited

Fa cilita tor: Yes

Vers ion n o:

0.1

Ini3al Workshop:

24/09/2014

Template version:

5.0

La st mo dified b y:

Terry Wrig ht 10/02/2016

CA PEL S O U ND F ORE SH O RE (C SF)

Infrastructure Strategy I NVES T M E NT LOG I C M AP

Program

PROBLEM BENEFIT STRATEGIC

SOLUTION RE S PONS E

CHANGES ASSETS

Ena bling a he althy lifest yl e for Vi ctoria ns

80% Ensure

exis3ng buildings are safe

Docu ment the condi3on KPI 1: Ca mpers

and fit for their

and purpose of exis3ng KPI 2 : Loca l s intended purpose infrastructure KPI 3: Volunteer s 70%

Provi ding valua ble KPI 4: Boat ra mp users

coastal e xperi ence s KP I 5: Ot hers

to la rg e numbe r s of

Vi ct ori a ns will onl y

be possi bl e i f t he

right infr a str uct ur e i s

pr ovi de d

8 5 %

Suppor3ng the Iden3fy and plan for

Determine

their value

to the

future use

and

protec3on

of foreshore

Priori3se for

inclusion

in

Masterpla

n

the

Infrastructure Implement

the

Infrastructure

Masterplan economy of the the infrastructure southern peninsula required to meet the

Develop new facili3es needed to enable future

10% future (and

use of foreshore KPI 1: Ca mpers changing

) needs KPI 2: Locals 20% Priori3se for

inclusion in

KPI 3: Vol unt eer s the Infra structure

Infra structure Ma sterpla n

KPI 4: Boat ramp users

KPI 5: Ot hers

Re stori ng a nd

natural processes on environment that will

iden3fy the

T he i mpa ct of pr ot e c3 ng t he coa st al Establish a

program the CSF coastline 10% impacts and provide Develop a risk

assessme

nt and must be monit or e d responses to natura l

response model a nd a ddr esse d KP I 1: Be a ch er osi on processes 10

% 15% KPI 2: Sustainable

camping? Monitor and

respond

Investor:

Adrian Atkins

Facilitator:

Terry Wright

Accredited Facilitator: Yes

Version no: 0.2

Ini3al Workshop:

16/07/2014

Last modified by:

<firstname surname

dd/mm/yyyy > Template

version: 5.0

CA PEL SO UND F O RESH ORE (CSF)

COMMUNITY ENGAGE MENT Strategy

I NVES T M E NT LOG I C M AP

Program

PROBLEM BENEFIT STRATEGIC

SOLUTION RES PONS E

CHA N GES

ASSETS

Iden3fy key

groups,

interests

and

ra3onale

for involvement

Imple ment ini3a3ves that wi ll

increase the use of Develop and implement

the foreshore by the plans for involvement

T he a c3 ve Re st ori ng a nd

local and

wider

co m m uni

ty 60%

invol ve ment of t he pr ot e c3 ng t he coa stal

local communi t y is e nvi ronme nt

cr ucial t o t he 40 % ong oi ng vit alit y a nd

hea lth of the Ca pel KPI 1: Flora

Sound Foreshore KPI 2: Fauna 7 0 %

Facilitate

and

monitor

ongoing

involveme

nt

Iden3fy strengths

and

weaknesses of

exis3ng Expand the current

involvement schools progra m so

more children will

Develop clear ra3onale

appreciate and

and subject ma[er for

be[er care for their

future involvement

environ me nt 20 %

Establish

and

monitor an

ongoing

program

Create

rela3onshi

ps with

co m m unity groups to obtain

Align priori3es

of Coastal Management their support to

Plan with local orgs. imple ment agreed

priori3es 10% Elicit

thei r

support

and

manage

ongoing rela3onships

The opport unit y E na bli ng a he alt hy e xi st s t o e ducat e a nd li fe st yl e for Vi ct oria ns Build upon exis3ng

inspire vis itors to the 60%

construc3ve

CSF so t he y ca n hel p

communica3on with Ensure messages focus on

longdterm

benefits

to susta in a pris3ne KPI 1: Volunteers

campers, boa3es, of caring for foreshore

coa stal environment KPI 2: Locals

30% KPI 3: Others

sheddie

s and

touris ts

5% Bui ld a natura l and social history of C SF

and it make Build history with local

natural and social available through

his torians

walking signs , etc 5% Develop and implement

program to Educa3onal walking

signs

communica

te history

Investor:

Neville Fuler

Facilitator: Terry Wright

Accredited Facilitator: Yes

Version no:

0.2 Ini3al

Workshop:

01/10/2014

Template

version: 5.0

Last modified by: <firstname surname

dd/mm/yyyy >

CA PEL SOUND FORESHORE (CSF)

FINANCE Strategy

I NVES T M E NT LOG I C M AP

Ini3a3ve

PROBLEM BENEFIT STRATEGIC

RES PONS E

SOL UTI ON

CHANGES

ASSETS

Annually

review the

suitability of

exis3ng

Enabling the Consolidate exis3ng streams

e nvi r onme nt a l he al t h revenue s trea ms

50% Iden3fy poten3ally new

and good use of CS F strea ms 60 %

T he ong oi ng

ma nagement of the KPI 1: Establish ment of foreshore needs revenue streams

Align CSF priori3es

with

KPI 2:

Bud get

alloca3on

available

grants predicta ble revenue process Build an ongoing

programs

str e a ms a nd sound fina nci al

ma nag e ment

6 0 %

stron g grant

management

Develop grants

capabi lity appl ica3ons for

priori3es 30%

Professionall

y manage

any grants

received

Under pinni ng a

stable orga nisa3 on 10 %

Operate formal process

KPI 1: Boo kkee ping of

alloca3ng annual

prac3ces Allocate

revenue to bu dget

KPI 2: Monthly budget most effec3ve

The implementa 3on KPI 3: Annual audit (budget)

repor3n g foreshore needs Establish financial

delega

3ons of t he 2 0 1 4 Coa st al 10%

Es ta blish process for

M a na g e me nt P la n

will r e quir e

a ddi 3 ona l r e ve nue

str e a ms

adbhoc

expendit

ures as

required Enabling 40 % ne w ini 3a3 ves

30% Ensure finances are

Apply

standard

book

keeping

prac3ces

ma naged to a professional Report on finances each

KPI 1:

Fundin g

for

priori3es

of CMP

KPI 2:

Financial

manageme

nt of new

funding

month

stand

ard

10%

Have

annual

financial

audit

undertake

n and

made

public Investor:

Neville Fuller

Version

no: 0.1 Facilitator:

Terry Wright

Accredited

Facilitator: Yes

Ini3al Workshop:

11/10/2014 Last modified by: <firstname surname dd/mm/yyyy >

Template version: 5.0

CA PEL SOUND FORESHORE (CSF)

OPERATIONS Strategy

I NVES T M E NT LOG I C M AP

Ini3a3ve

PR OBLE M BENEFIT ST RAT EGIC

RESPONSE SOLUTION

CHANGES

ASSETS

T he fut ur e he alt h a nd use of CS F i s

de pe nde nt upon a Ensure

the

Co M is

skil led,

balanced and

Take

ac3ons

that will

available

people

a Wra ct

the best sound ong oi ng D oi ng t he t hi ng s com miWe d

ma nag e me nt t hat ma We r most 30% str ucture and 4 0 %

compe t e nt st a ff 5 0 %

KPI 1:

Implementa3

on of CMP

priori3es

Ensure staff

structures

future

needs

are aligned with the

Ensure

the

on going

exis tence

of

appro pria

tely

skil led

and

capable

staff

30%

Recruit and

retain the

best

possible

team

Ensure

staff are

provided

training to

keep them

current

Succe ss i n

i mpl e me n3 ng t he

M a na g e me nt P la n

Drivi ng efficie nt wor k

Provide facili3es and

Buildings and facili3es

equipment that support

a healthy workplace

Plant and equipment pra c3 ces will r e quir e g ood 3 0 %

wor ki ng Iden3fy,

docu m ent rela 3onships with KPI 1: Spee d of respo nse and adopt the best

ma ny orga nisa3ons KPI 2: Cost

w ork prac3ces to

Iden3fy,

document

and adopt

best work

prac3ces

30%

manage the CSF

Technol

ogies 20%

Exploit the

use of

enabling

technologie

s

Iden3fy

required

Work with those

rela3onships and their

Crea 3ng a organisa3ons cri3ca l

ra3onale stable organisa3on to implemen3ng the

Management Plan Build and manage 30% 10%

key rela3onships

The diverse ra nge of KPI 1: Documenta3on poten3a l risks (Planning & Opera3ng) involved in ma nag ing KPI 2:

Stabili ty of Co M &

staff Document the risks and

the foreshore must KPI 2: Risk assessment

Address the risks thei r mi3ga3on

be understood a nd /mi3ga3on most likely to impact

strate

gies a ddr e sse d 2 0 %

the future of CSF

10% Carry out

strategies

and

con3nuall

y monitor

Investor:

Neville Fuller

Version

no: 0.2 Facilitator:

Terry Wright

Accredited

Facilitator: Yes

Ini3al Workshop:

31/10/2014 Last modified by: <firstname

surname dd/mm/yyyy >

Template version: 5.0

Be

ne

fits so

ugh

t

Page 5: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

5 Coastal Management Plan – Capel Sound Foreshore

Need for Management

The first level focuses on the need for the ongoing management of the foreshore. This comprises two

documents. The first is an Investment Logic Map (ILM) that describes why it needs to be managed and

what is the appropriate response. The second lays out the benefits that management needs to deliver and

how these will be measured -­‐ this is an important part of the plan as it will help to make sure that any

investments of effort or money are well focused to deliver real benefits and don’t just do the things that

seem like a good idea.

Strategies for the Future (Strategic Plan)

The second level comprises 6 strategies that describe what needs to be done to successfully manage the

Capel Sound Foreshore over the next 10 years.

Implementing the Strategies (Business Plan)

The third level is the Business Plan that describes how the CSF will operate over the next 3-­‐ year period.

The priorities over the 3-­‐ year period are specified in Part 3.

-­‐ How to read the ‘ Strategies On-­‐ A-­‐ Page’ While the strategies-­‐ on-­‐ a-­‐ page were intended to be easy to read and understand, some explanation is necessary.

The format used is known as an Investment Logic Map (ILM). This format is now in wide use across Australia

and New Zealand and is intended to tell the story in plain English of why something needs to be done and what

is the best way of doing it. Appendix A provides further explanation.

STAKEHOLDERS

While the appointment of a Committee of Management under the Crown Land (Reserves) Act 1978

promotes a legal basis for the overall management of the foreshore, there are numerous stakeholders that are

either users of the foreshore or play a key role in supporting its ongoing management. These include:

Users Local residents

Campers

Boatshed owners

Boat ramp users

Visitors

Schools

Management support Victorian Police

Emergency services (ambulance, CFA, etc)

VicRoads

Local service organisations

Local businesses

Department of Environment, Land, Water and Primary Industries (DELWP)

Mornington Peninsula Council

Page 6: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

6 Coastal Management Plan – Capel Sound Foreshore

COMMUNITY CONSULTATION

The draft Coastal Management Plan was put to public seeking their response from December 7, 2015 to January 15,

2016. During this period the draft could be downloaded from the Capel Sound Foreshore website or studied at the

Ranger’s Office. Posters in local businesses and an advertisement in the local newspaper invited comment. As the

consultation period spanned the peak camping season, campers were invited through the regular camping

newsletters to provide feedback. Key organisations and stakeholders were also invited to study the draft Plan and

submit a response. In addition, on January 12, 2016 a public meeting was held at the West Rosebud Bowls and

Croquet Club and was attended by more than 50 people.

Responses were to be provided through a set of questions that sought to identify the interest of the person

responding, find how they believe the Plan could be improved and understand whether they would be interested in

helping to implement the Plan. The normal form of response was an online survey but people without access to the

internet could respond manually at the Ranger’s Office.

During the consultation period 65 people completed surveys. The Plan was well regarded with 40% of respondees

rating the quality of the Plan as 5/5 with the overall rating given as 4/5. Pleasing was that half of the people who

responded advised they are wiling to assist in the implementation of the Plan. Many good ideas were received

relating to the implementation of the Plan and these will be used.

On the basis of the feedback received from the survey forms and at the public meeting, changes have now been

made to the Plan and the way it will be monitored and reported.

Page 7: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal
Page 8: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

7

2. CAPEL SOUND FORESHORE TODAY

WHERE IT IS AND WHAT IT IS

-­‐ Location From Chinaman’s Creek in the East to Shirlow Avenue, Rye in the West and is bordered by Point Nepean

Road and the southern shore of the Bay. The total area of the foreshore is around 9 hectares and its

width varies between 150 and 200 metres along its east-­‐ west length.

Coastal Management Plan – Capel Sound Foreshore

Page 9: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

8 Coastal Management Plan – Capel Sound Foreshore

-­‐ Climate

The Mornington Peninsula has a temperate climate with warm to hot summers, mild springs and autumns,

and cool winters. Being flanked by large bodies of water to the north, south and west the weather can

change rapidly at any time of the year. The proximity to water has a moderating effect on temperatures

throughout the year but is particularly marked in Summer when hot northerly winds are cooled as they

cross the 60km stretch of water of Port Phillip Bay. Average annual rainfall is around 700 ml which is

generally spread throughout the year with the wetter months being April to October.

Maximum monthly temperatures range from 12C in the winter to 25C in summer. Variations can see

temperatures in February or March in excess of 40C.

-­‐ Geology and Soil Types

The terrain of this linear reserve is predominantly primary Holocene dunes of unconsolidated sand and

swales behind the dunes, although some sections may feature underlying swamp deposits particularly

around Chinaman’s Creek. This is due to the presence inland of Tootgarook Swamp which would have

varied in its level of inundation over the past 12,000 years with changes in sea levels and the subsidence

of the Port Phillip Sunklands. The dunes have formed since that time. Chinaman’s Creek, the waterway

that drains the swamp, has followed different courses in the past even up to quite recently when the drain

was dug through Tootgarook Swamp, and the coastal strip would have been subject to varying ground

water levels. The seagrass beds along the intertidal flats thrive on the fresh water rising from this ground

water.

The reserve links two geological types. At the eastern end the siliceous sands of Rosebud predominates

whereas towards the western end the sands become more alkaline due to the influence of the dune

calcarenite, of which the southern part of the Nepean Peninsula largely consists.

This area has seen a regular seasonal human presence for thousands of years. It would have been a rich

source in the past, with the swamp on one side and the sea on the other. This is evident in the many

middens along the foreshore.

-­‐ Vegetation

Ecological Vegetation Classes (EVCs) are used to describe vegetation assemblages across Victoria. Capel

Sound Foreshore supports a number of EVCs, some of which overlap to form a mosaic, or are so

distributed they are hard to define. The 2007 Vegetation study (commissioned by the Capel Sound

Foreshore Committee of Management) identified six EVCs and rated their biological significance as

follows:

EVC 002 Coast Banksia Woodland Vulnerable

EVC 053 Swamp Scrub Endangered

EVC 160 Coastal Dune Scrub Least Concern

EVC 311 Berm Grassy Scrubland Endangered

EVC 858 Coastal Alkaline Scrub Depleted

EVC 879 Coastal Dune Grassland Endangered

All local species on the foreshore are considered to be significant due to the depletion of remnant coastal

vegetation on Port Phillip Bay and Coastal Alkaline Scrub within the state.

Page 10: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

9 Coastal Management Plan – Capel Sound Foreshore

-­‐ Fauna

An extensive study of fauna on the Capel Sound Foreshore was carried out in 2006/20072.

This study reported:

“Taxa detected in the study site includes; one species of Decapod Crustacean, six species of fish of which one

species is introduced, four species of Amphibians, eight species of Reptiles (of which all species are lizards), 49

species of Birds (of which four species are introduced) and 14 species of Mammals (of which four species are

introduced).

“The environs of the study site can be considered to be of regional significance, with the taxa throughout the

study site listed at local, regional, State and National levels. This is due to mass depletion of natural vegetation

and fauna populations on the Mornington Peninsula and loss of some significant species. Overall the significant

taxa includes four species of high local significance, 14 species of regional significance, five species of State

significance, one species of National significance and the remaining native species are of local significance based

upon large-­­scale depletion of habitat and fauna populations on the Peninsula.

“Weeds, vermin and human disturbance are the greatest causes of local extinction of habitat and fauna

populations on the Peninsula and within the environs of the study site. Ongoing weed control and eradication,

along with regeneration of the original vegetation communities (EVC’s) throughout the site, including possibly

carrying out controlled burns in some areas, is recommended as high priority. Introduced fauna can cause

unnecessary pressure on remaining native fauna and should be eradicated or controlled.”

-­‐ Coastal Processes The Capel Sound Foreshore sits within the large but somewhat protected Port Phillip Bay so is not subject

to the more severe impacts experienced by open coasts. Of particular significance is that, at its eastern

end, it sits on a bay bar that separates Port Phillip Bay from the Tootgarook Swamp immediately to its

south. As a result, fresh groundwater flows below the foreshore and feeds the seagrass in this area.

Being very low lying it is vulnerable to sea level rises and coastal inundation in circumstances where

severe storms coincide with high tides.

HOW IT IS CURRENTLY MANAGED

The CSF is currently managed by a Committee of Management (a skills-­‐ based committee) comprising 12

people who are appointed for a three-­‐ year term by the responsible Minister. The current committee

represents a mix of local residents, campers and boatshed owners who enjoy all that the foreshore offers and

care about its future health. The range of their skills and experiences provides a strong basis for the

effective management of the foreshore. The CoM then employs a small contracted staff comprising a

Manager, Ranger and administrative staff and engages specialist trades people as required.

2 Fauna Survey and Management Prescriptions for Capel Sound Foreshore Reserve, 2007 (Legg)

Note: This report is available on the Capel Sound Foreshore website

Page 11: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal
Page 12: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

10 Coastal Management Plan – Capel Sound Foreshore

PRECINCTS AND THEIR CURRENT USES (MANAGEMENT ZONES)

Management Zones have been defined to better understand the characteristics of the different

precincts on the Capel Sound Foreshore and to assist in its overall management. The borders of the

Zones are shown in the following diagram. The description of each zone is in the table that

follows.

Zone 1 Chinaman’s Creek

Nature Precinct

Wildlife corridor and ‘estuary’ of Tootgarook Wetlands into Port

Phillip Bay

Entrance provides important intertidal area for waterbirds

Home of rare Swamp Skink

Zone 2 Capel Village

Camp Ground

Location of Ranger’s Office and Camp Kitchen

The peninsula’s only year-­‐ round foreshore camping area

Straddled by Foreshore Conservation Area

High density colourful boatsheds along sandy beach

Adjacent to Capel Sound Shopping Village

Zone 3 Banksia Woodland One of few remaining intact examples of Banksia Woodland on

foreshore of Southern Peninsula

Transitioned by Bay Trail

Zone 4 Truemans Road

Day Precinct

Provides direct access from carpark to beach with wide panoramas

Picnic, BBQ facilities and amenity block

Highly popular with families

Zone 5 Tootgarook

Conservation Zone

Large clusters of Banksia and Teatree

Numerous orchid colonies

Site of middens

Zone 6 Tootgarook

Boat Ramp

Ramp for launching small boats

Requires annual dredging to become operational

Open from October to April (fee charged)

Zone 7 Tootgarook

Camp Ground

Camp sites with expansive views of the Port Phillip Bay coastline as

far as the Melbourne skyline

Small scale picnic area

Adjacent midden sites and orchid colonies

Page 13: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

11 Coastal Management Plan – Capel Sound Foreshore

Zone 9 Western

Conservation

Precinct

Supports a mosaic of vegetation classifications:

o Coast Banksia Woodland

o Coastal Alkaline Scrub

o Coastal Scrub

o Berm Grassy Scrubland

Orchid colonies exist

Many middens exist

No camping takes place in this precinct

Zone

10

Capel Sound

Beaches

Continuous beaches over 3.75 km length of reserve

Seagrass beds (particularly at eastern end) support large colonies of

waterbirds

Groynes and storm water drains exist

Beaches require maintenance in form of beach cleaning

Erosion monitoring and management required

Weeds prevalent particularly as beaches are generally accreting

(building) -­‐ particularly Marram Grass

Annual inspections of condition of boatsheds

Zone 8 Woodland

Camping and

Conservation Zone

Un-­‐ powered camping sites amongst Banksia Woodland

Site of middens

High quality ground-­‐ story vegetation remnants

Page 14: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

12 Coastal Management Plan – Capel Sound Foreshore

3. THE NEED FOR ITS ONGOING MANAGEMENT

MANAGEMENT RATIONALE ON-­‐ A-­‐ PAGE

CAPEL SOUND FORESHORES (CSF) CommiNee of Management

Coastal Management Strategy

INVESTMENT LOGIC MAP Organisa5on

NEED

BENEFIT

STRATEGIC RESPONSE

ORGANISATIONAL

RESPONSE

The environmental quali5es of the CSF

will rapidly deteriorate unless

they are ac5vely and properly managed

55%

The unique

character of the CSF provides valuable

lifestyle opportuni5es to many Victorian

families and friends 40%

Restoring and protec/ng the

coastal environment 45%

45

KPI 1: indigenous flora KPI 2: indigenous fauna KPI 3: beach erosion KPI 4: sustainable camping

Enabling a

10 healthy lifestyle for Victorians

40% 30

KPI 1: campers KPI 2: locals KPI 3: volunteers KPI 4: boat ramp KPI 5: others

Establish a long[ term program to

30 improve the quality of flora and fauna

30%

10 Understand and respond to the likely

impacts of a

changing climate

10%

5

Establish a program that will facilitate

15 broad community

involvement in using and caring for the foreshore 20%

Implement a plan to

improve the 20

environmental quality 5 of the CSF

25%

10

Iden5fy and u5lise the most appropriate

10 resource opportuni5es 35%

15

5Manage the poten5al

5 risks to the CSF of a changing climate

5 10%

An opportunity

exists to increase the relevance of the peninsula as a des5na5on for

Suppor/ng

10 the economy of the southern

peninsula 5

15%

25

Ensure facili5es are provided to enable

15 equitable access for all poten5al users

40%

Build upon the 5

experiences that CSF

provides to Victorians and tourists

5%

5 Specify and provide the facili5es and

na5onal and interna5onal tourists

5%

KPI 1: campers KPI 2: day visitors KPI 3: tourists

20 infrastructure needed on the CSF

25%

Investor: Neville Fuller Facilitator: Terry Wright

Accredited Facilitator: Yes

Version no: Ini5al Workshop: Last modified by: Template version:

0.5 21/05/2014 <firstname surname dd/mm/yyyy > 5.0

Page 15: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

13 Coastal Management Plan – Capel Sound Foreshore

Restoring and protecting the coastal

environment (45%) These are the benefits that will be provided to Victoria through the good

Supporting the economy of the

southern peninsula (15%)

Indicators (KPIs) that prove them have been delivered. These are detailed in

Appendix B (Benefits, KPIs and Measures).

RATIONALE EXPLAINED

NEED Evidence to support Need statement

The environmental qualities of the

CSF will rapidly deteriorate unless

they are actively and properly

managed (55%)

The nine hectares of the CSF contain six zones of different Ecological

Vegetation Classes (EVC) and provides habitat to many indigenous fauna

species. Being a north-­‐ facing sandy beach it is also loved by Victorians and is

at risk of being over-­‐ loved -­‐ particularly with the improved road access from

Melbourne. Experience has shown the environment can rapidly deteriorate

without adequate care.

An opportunity exists to increase the

relevance of the peninsula as a

destination for national and

international tourists (5%)

Over the past 6 years, year-­‐ round foreshore camping has been enabled on

the CSF. This has now established the peninsula and the CSF as a

destination for caravaners travelling the coastal route along south-­‐ eastern

Australia.

BENEFIT

Enabling a healthy lifestyle for

Victorians (40%)

management of the CSF. While at this level they may appear motherhood,

they cannot be considered to be delivered until the Key Performance

STRATEGIC RESPONSE Rationale for Strategic Response

Establish a long-­‐ term program to

improve the quality of flora and

fauna (30%)

A comprehensive vegetation study completed in 2007 established the special

nature of the foreshore vegetation and its health at that time. A program

must now be developed to protect remnant vegetation and rehabilitate substantial areas of weed infestation.

Establish a program that will

facilitate broad community

involvement in using and caring for

the foreshore (20%)

Proper care of the foreshore is a major undertaking that cannot be done by

the foreshore committee and staff alone. The local and broader community,

campers and visitors must be engaged, not just to use it, but to contribute to

its care.

ORGANISATIONAL RESPONSE

Implement a plan to improve the

environmental quality of the CSF

(25%)

Manage the potential risk to the CSF

of a changing climate (10%)

The Strategic Response above and the five thrusts of this Organisational

Response are used to direct the Strategic Plan that follows.

Specify and provide the facilities and

infrastructure needed on the CSF

(25%)

Build upon the experiences that CSF

provides to Victorians and tourists

(5%)

Identify and utilize the most

appropriate resource opportunities

(35%)

Ensure facilities are provided to

enable equitable access for all

potential users (40%)

The CSF is a valuable asset owned by all Victorians and available for the use

and enjoyment of everyone. Facilities must be provided to enable its full use

consistent with the protection of its natural assets.

Understand and respond to the likely impacts of a changing climate (10%)

Because of its location and nature, the CSF will be vulnerable to a changing climate and must be able to identify and respond to its impacts.

The unique character of the CSF

provides valuable lifestyle

opportunities to many Victorian

families and friends (40%)

The special appeal of the 3.8 km of foreshore, its 345 camping sites, 92 boat

sheds and boat ramp have provided special memories for many decades by

thousands of Victorian families, friends and visitors. It is highly valued by the

locals who use it throughout the year as part of their local environment.

Page 16: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal
Page 17: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

---

Page 18: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

14 Coastal Management Plan – Capel Sound Foreshore

BENEFIT STRATEGIC

4. STRATEGIES FOR THE FUTURE ( STRATEGIC PLAN)

ENVIRONMENT STRATEGY ON-­‐ A-­‐ PAGE

CAPEL SOUND FORESHORE (CSF)

ENVIRONMENT Strategy

INVESTMENT LOGIC MAP Program

PROBLEM

RESPONSE

SOLUTION

CHANGES

ASSETS

Weed infesta3on and vegeta3on overgrowth is

accelera3ng the decline of the

environmentally unique coastal

environment 55%

Implement the

agreed targets of the Vegeta&on Plan

55%

Update and priori3se the 2007 Vegeta&on

Report

Implement priori3es

Feral animals are reducing the popula3on of

indigenous fauna and flora

10%

The ongoing loss of

vegeta3on within the camping areas is

degrading their physical and

aesthe3c characteris3cs

25%

Restoring and protec3ng the coastal

environment 75%

KPI 1: Flora KPI 2: Fauna KPI 3: Erosion

Enabling a healthy

lifestyle for Victorians 25%

KPI 1: Volunteers KPI 2: Visitors KPI 3: Campers

Implement the

agreed targets of the Fauna Plan

10%

Establish a good balance between

the needs of campers and coastal

vegeta3on in the campgrounds 15%

Monitor and respond to beach erosion across the

Capel Sound Foreshore

10%

Update and priori3se

the 2007 Fauna Report

Implement priori3es

Develop a vegeta3on layout model for the

camping areas

Priori3se and implement

Develop a risk

assessment and response model

Monitor and respond

Poten3al impacts to the foreshore from a

changing climate must be managed

10%

Establish educa3onal and

awareness ac3vi3es that help people

appreciate and care for the foreshore

10%

Establish and manage

friends groups

Create environmental

walks and signage

Signage

Investor: Facilitator: Terry Wright

Accredited Facilitator: Yes

Version no: Ini3al Workshop: Last modified by: Template version:

0.3 02/07/2014 <firstname surname dd/mm/yyyy > 5.0

Page 19: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

15 Coastal Management Plan – Capel Sound Foreshore

Restoring and protecting the coastal

environment (75%)

Develop a risk assessment and

response model -­‐ monitor and

respond (10%)

ENVIRONMENT STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

Feral animals are reducing the

population of indigenous flora and

fauna (10%)

The 2007 Fauna study included a survey of the fauna population on the CSF.

This documented the prevalence of feral animals and the impact they are

having on the indigenous fauna and flora.

Potential impacts to the foreshore

from a changing climate must be

managed (10%)

As the CSF adjoins the Tootgarook Wetlands and is on the coast it is

vulnerable to sea level changes and storm surges.

BENEFIT

Enabling a healthy lifestyle for

Victorians (25%)

Evidence of the delivery of these benefits is provided through the relevant

Key Performance Indicators (KPIs). A complete list of the KPIs associated

with each Benefit is at Appendix B (Benefits, KPIs and Measures.).

The specific KPIs expected to be delivered by this strategy are identified in

the Strategy on-­‐ a-­‐ page directly above.

STRATEGIC RESPONSE Rationale for Strategic Response

Implement the agreed targets of the

Fauna Plan (10%)

As with the 2007 Vegetation Plan, the 2007 Fauna Plan should be updated

and used as the foundation for future action.

Monitor and respond to beach

erosion across the Capel Sound

Foreshore (10%)

Little is known of how the foreshore will be affected by a changing climate

and what the appropriate responses should be.

SOLUTION (Strategic

Actions)

Update and prioritise the 2007

Vegetation Report -­‐ implement (55%)

Develop a vegetation layout model

for the camping areas -­‐ prioritise and

implement (15%)

These are the strategic actions that will be prioritised and acted upon by the

CoM. A complete list of these Strategic Actions is at Appendix C.

Establish and manage friends groups.

Create environmental walks and signage (10%)

Update and prioritise the 2007 Fauna

Report -­‐ implement (10%)

Establish educational and awareness

activities that help people appreciate

and care for the foreshore (10%)

Unless those people who use the foreshore understand its value, believe in

its important place in the future, know how to care for it and are prepared to

do their bit…the task of preserving it well into the future will not be possible.

Establish a good balance between

the needs of campers and coastal

vegetation in the campgrounds (15%)

This will require balancing the needs of campers with an understanding of

the importance of the environment. This is essential both for the future

health of campers in a hotter environment and for the aesthetic attraction of

the foreshore to everyone who use it now and in the future.

Implement the agreed targets of the

Vegetation Plan (55%)

The 2007 Vegetation Plan provided a thorough and informed view of the

vegetation status at that time. This plan should be updated in 2015.

The ongoing loss of vegetation

within the camping areas is

degrading their physical and

aesthetic characteristics (25%)

A significant increase in camping site coverage as a result of larger ‘camping

rigs’ and more vehicles over the past 20 years has impacted adjoining

vegetation. This has been exacerbated by the removal of ageing trees (mainly Pine and Cyprus) and a failure to re-­‐ vegetate following their removal.

Weed infestation and vegetation

overgrowth is accelerating the

decline of the environmentally

unique coastal environment (55%)

The 2007 Vegetation study identified the six Ecological Vegetation Classes

(EVC) that exist within the CSF and documented their health as being

generally poor and in decline. Weed infestation exists across CSF but is most

prevalent in the western area.

Page 20: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

16 Coastal Management Plan – Capel Sound Foreshore

BENEFIT STRATEGIC

CAMPING STRATEGY ON-­‐ A-­‐ PAGE

CAPEL SOUND FORESHORE (CSF)

CAMPING Strategy

INVESTMENT LOGIC MAP Program

PROBLEM

RESPONSE

SOLUTION

CHANGES

ASSETS

Affordable camping on the foreshore provides a wide

range of recrea3onal opportuni3es and generates a strong

sense of community for many Victorian

families 75%

Enabling a healthy

lifestyle for Victorians 75%

KPI 1: Campers KPI 2: Boat ramp users KPI 3: Others

Establish, apply and enforce camping policies that are sustainable and

transparent 5%

Provide the infrastructure and

facili3es required to support the

changing needs of campers 35%

Document and provide access to suite of policy

and procedures

Establish means of

enforcing policy

Iden3fy required infrastructure and

facili3es

Provide and maintain as

required

Infrastructure and facili3es

Income derived from foreshore camping is

essen3al to the ongoing

maintenance and protec3on of the

Capel Sound Foreshore

20%

The availability of year round

foreshore camping will help advance the Peninsula as a tourist des3na3on

5%

Restoring and protec3ng the coastal

environment 15%

KPI 1: Flora KPI 2: Fauna KPI 3: Sustain. camping

Suppor3ng the economy of the

southern peninsula 10%

KPI 1: Campers KPI 2: Day visitors KPI 3: Tourists

Ensure the camping environment

provided is safe and secure

40%

Plan for long[term sustainable

development of camping on the

foreshore 15%

Promote CSF as a year round tourist

des3na3on

5%

Conduct camper safety risk assessment

Develop and implement

a response plan

Iden3fy things cri3cal

to long term camping sustainability

Develop and implement

a camping sustainability plan

Develop and implement

a tourist camping strategy

Investor:

Facilitator: Accredited Facilitator:

Adrian Atkins Terry Wright Yes

Version no: Ini3al Workshop: Last modified by: Template version:

0.2 13/08/2014 <firstname surname dd/mm/yyyy > 5.0

Page 21: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

17 Coastal Management Plan – Capel Sound Foreshore

CAMPING STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

Affordable camping on the foreshore

provides a wide range of recreational

opportunities and generates a strong sense

of community for many Victorian families

(75%)

For more than seventy years thousands of Victorian families and their

friends have spent their annual holidays together enjoying the many

simple pleasures that camping on the CSF offers. The role that the

CSF has played in building strong families and communities has been

extraordinary. In the peak season of 2014/15 FY 8,634 people were

registered as staying on CSF each averaging 13 night stays.

The availability of year round foreshore

camping will help advance the Peninsula as

a tourist destination (5%)

Since the introduction of year-­‐ round camping in 2008 the CSF has

become a noted destination in guides for touring the coastal route of

south-­‐ east Australia. In the 2014/15 FY off-­‐ season camping (Mar. to

Nov) increased 27% on the previous year.

BENEFIT

Restoring and protecting the coastal

environment (15%)

KPIs associated with each Benefit is at Appendix B (Benefits, KPIs and

Measures).

STRATEGIC RESPONSE Rationale for Strategic Response

Establish, apply and enforce camping

policies that are sustainable and transparent

(5%)

While the overall management of camping is now a mature and stable

process, policies and practices need to be better documented and

made available to all. There is also an ongoing need to review existing

policies to ensure their continued relevance.

Ensure the camping environment provided is

safe and secure (40%)

This must be an ongoing focus as the camping environment and

campers themselves change and legal obligations become more

stringent.

Promote CSF as a year round tourist

destination (5%)

Year round tourism is of growing importance to the foreshore

community, to its revenue and to the broader economy.

SOLUTION (Strategic Actions)

Identify required infrastructure and facilities

-­‐ provide and maintain (35%)

Identify things critical to long term camping

sustainability -­‐ implement plan (15%)

These are the strategic actions that will be prioritised and acted upon

by the CoM. A complete list of these Strategic Actions is at Appendix

C.

Develop

strategy

and

(5%)

implement a tourist camping

Document and provide access to suite of

policy and procedures -­‐ enforce (5%)

Plan for long-­‐ term sustainable development

of camping on the foreshore (15%)

A changing climate, environmental degradation, fire safety, tree safety

and the changing needs of campers are some of the factors that could

impact the future sustainability of camping on the Capel Sound Foreshore.

Provide the infrastructure and facilities

required to support the changing needs of

campers (35%)

Though much of the infrastructure supporting camping is ageing, to

this point it has been regularly maintained and upgraded. The

changing camping and caravan equipment and changing camper

expectations must be understood and addressed.

Supporting the economy of the future (10%) The specific KPIs expected to be delivered by this strategy are

identified in the Strategy on-­‐ a-­‐ page directly above.

Enabling a healthy lifestyle for Victorians

(75%)

Evidence of the delivery of these benefits is provided through the

relevant Key Performance Indicators (KPIs). A complete list of the

Income derived from foreshore camping is

essential to the ongoing maintenance and

protection of the Capel Sound Foreshore

(20%)

Although camping fees are kept low so they are affordable to families,

camping fees are the main contributor to the revenue of the CSF -­‐ in

the 2013/14 FY they totaled $775k or nearly 90% of total revenue. This

revenue enables year-­‐ round maintenance to the foreshore environment.

Conduct camper safety risk assessment -­‐

implement response plan (40%)

Page 22: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

18 Coastal Management Plan – Capel Sound Foreshore

BENEFIT STRATEGIC

BOATSHED STRATEGY ON-­‐ A-­‐ PAGE

CAPEL SOUND FORESHORE (CSF)

BOATSHED Strategy

INVESTMENT LOGIC MAP Program

PROBLEM

RESPONSE

SOLUTION

CHANGES

ASSETS

The iconic boatsheds of Capel Sound are a powerful aKrac3on to families, friends, visitors and tourists

and need to be maintained and

protected

35%

Enabling a healthy

lifestyle for Victorians 45%

KPI 1: Boatshed users

Establish a history of the boatsheds of CSF

and make this openly available

5%

Create interest group

and consolidate

historical sources

Publish, promote and maintain informa3on

A healthy balance between boatsheds,

public access and the coastal environment must be established

and maintained 55%

Restoring and protec3ng the coastal

environment 40%

KPI 1: Flora

Establish a policy that provides

reasonable access to boatsheds and

improve vegeta3on protec3on 30%

Determine how best to increase boatshed

Develop policy

Monitor its adop3on and effec3veness

Beach access tracks

use to aid beach Understand exis3ng use paKerns and usage

community and increase beach

safety 30%

s3muli

Develop and implement program

The revenue raised from boatshed fees are important to the maintenance of the

CSF as well as providing revenue to

local government 10%

Suppor3ng the economy of the

southern peninsula 15%

KPI 1: Tourists KPI 2: Boatshed fees KPI 3: Council rates

Consolidate the program of longZ

term maintenance and preserva3on of the boatsheds of CSF

35%

Establish standards and

conduct inspec3ons to

ensure compliance

Take appropriate ac3on

where standards are

not met

Investor: Facilitator:

Accredited Facilitator:

Neville Fuler Terry Wright Yes

Version no: Ini3al Workshop: Last modified by: Template version:

0.2 24/09/2014 <firstname surname dd/mm/yyyy > 5.0

Page 23: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

19 Coastal Management Plan – Capel Sound Foreshore

Enabling a healthy lifestyle for Victorians

(45%) Evidence of the delivery of these benefits is provided through the relevant Key

Performance Indicators (KPIs). A complete list of the KPIs associated with each

Supporting the economy of the future

(15%) Strategy on-­‐ a-­‐ page directly above.

BOATSHED STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

The iconic boatsheds of Capel Sound are a

powerful attraction to families, friends,

visitors, tourists and need to be maintained

and protected (35%)

Over the last decade the boatsheds of the Mornington Peninsula feature in much

travel promotion and have become synonymous with the peninsula itself. From a

community perspective, they enable generations of families and friends to spend

extended time on the beach creating a sense of beach community.

The revenue raised from boatshed fees are

important to the maintenance of the CSF

as well as providing revenue to local

government (10%)

In 2014 annual boatshed fees contributed a total of $48.5k (or 5.6%) to CSF

revenue. This supports the management and maintenance of the foreshore.

(Note: In addition, it is understood that boatshed owners paid a further $50k to

the Mornington Peninsula Shire Council in rates for the year).

BENEFIT

Restoring and protecting the coastal

environment (40%)

Benefit is at Appendix B (Benefits, KPIs and Measures).

The specific KPIs expected to be delivered by this strategy are identified in the

STRATEGIC RESPONSE Rationale for Strategic Response

Establish a history of the boatsheds of CSF

and make this openly available (5%)

While the establishment of the CSF boatsheds is historically rich it is not well

recorded and therefore not widely understood or appreciated.

Determine how best to increase boatshed

use to aid beach community and increase

beach safety (30%)

Many boatsheds are never or seldom used. The reasons for this need to be

understood and policies explored that might increase boatshed use.

SOLUTION (Strategic Actions)

Create interest group and consolidate

historical sources -­‐ publish, promote,

maintain (5%)

Understand existing boatshed used

patterns and stimuli -­‐ implement program

(30%)

These are the strategic actions that will be prioritised and acted upon by the CoM.

A complete list of these Strategic Actions is at Appendix C.

Ensure standards and conduct inspections

to ensure compliance – enforce (35%)

Consolidate the program of long-­‐ term

maintenance and preservation of the

boatsheds of CSF (35%)

The existing program of conducting regular observation of boatsheds and providing

annual condition reports to owners must be maintained.

Establish a policy that provides reasonable

access to boatsheds and improves

vegetation protection (30%)

Without clear policies, boatsheds can become un-­‐ useable and ultimately derelict

and vegetation can be unnecessarily destroyed. This can encourage vandalism and

impact a safe beach community.

A healthy balance between boatsheds,

public access and the coastal environment

must be established and maintained (55%)

The challenge is to enable the full use of the 92 boatsheds in a way that respects

the natural coastal environment and does not inhibit access to, and use of, the

beach by other beach users.

Develop boatshed access policy -­‐ monitor

adoption and effectiveness (30%)

Page 24: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

20 Coastal Management Plan – Capel Sound Foreshore

BOATING STRATEGY ON-­‐ A-­‐ PAGE

Page 25: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

21 Coastal Management Plan – Capel Sound Foreshore

Develop policy for manual launched craft

along foreshore

Identify and develop launching access

points

BOATING STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

The CSF boat ramp has enabled generations of families to launch their small fishing

boats and recreational craft to fully enjoy the Bay. There were 1,418 recorded

Being able to access the bay on water craft

is central to the lifestyle of many residents

and visitors to the Capel Sound Foreshore

(100%)

launches from the ramp in 2014/15 FY. The nearest alternative boat ramp in the

west is at Rye which caters for larger craft, or in the east at Dromana which is

similar in size to the CSF ramp.

In addition many people manually launch their craft into the Bay – yachts,

rowboats, kayaks, paddle boards and the like – at many points along the foreshore

and these need to be supported and encouraged.

BENEFIT Enabling a healthy lifestyle for Victorians

(80%)

Evidence of the delivery of these benefits is provided through the relevant Key

Performance Indicators (KPIs). A complete list of the KPIs associated with each

Benefit is at Appendix B. (Benefits, KPIs and Measures.).

The specific KPIs expected to be delivered by this strategy are identified in the

Strategy on-­‐ a-­‐ page directly above.

Supporting the economy of the Southern

Peninsula (20%)

STRATEGIC RESPONSE Rationale for Strategic Response

The existing boat ramp is a well used and valuable asset not just to the Capel Maintain the Tootgarook Boat Ramp as the

primary access point for vehicle-­‐ launched

craft (80%)

Sound Foreshore but to the whole of the Southern Peninsula. Challenges exist that

must be understood and managed. These include its financial viability, traffic

management and dredging practices.

SOLUTION (Strategic Actions) Develop Policy on ramp usage

Ensure financial viability

Improve efficiency of ramp and traffic

management

Develop plans for future of precinct

These are the strategic actions that will be prioritised and acted upon by the CoM.

A complete list of these Strategic Actions is at Appendix C.

Support the manual launching of small craft

along the length of the Capel Sound

Foreshore (20%)

This will improve the attraction, use and appreciation of the pristine waters of the

bay which is ultimately important to its ongoing protection.

Page 26: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

22 Coastal Management Plan – Capel Sound Foreshore

BENEFIT STRATEGIC

INFRASTRUCTURE STRATEGY ON-­‐ A-­‐ PAGE

CAPEL SOUND FORESHORE (CSF)

INFRASTRUCTURE Strategy

INVESTMENT LOGIC MAP Program

PROBLEM

RESPONSE

SOLUTION

CHANGES

ASSETS

Providing valuable coastal experiences to large numbers of Victorians will only be possible if the

right infrastructure is provided

85%

Enabling a healthy lifestyle for Victorians

80% KPI 1: Campers KPI 2: Locals KPI 3: Volunteers KPI 4: Boat ramp uses KPI 5: Others

Suppor3ng the economy of the

southern peninsula 10%

KPI 1: Campers KPI 2: Locals KPI 3: Volunteers KPI 4: Boat ramp uses KPI 5: Others

Ensure exis3ng buildings are safe

and fit for their intended purpose

70%

Iden3fy and plan for the infrastructure

required to meet the future (and

changing) needs 20%

Document the condi3on and purpose of exis3ng

infrastructure

Determine their value to

the future use and protec3on of foreshore

Priori3se for inclusion in

the Infrastructure Masterplan

Implement the Infrastructure Masterplan

Develop new facili3es needed to enable future

use of foreshore

Priori3se for inclusion in

the Infrastructure Masterplan

Infrastructure

The impact of natural processes on

the CSF coastline

must be monitored and addressed

15%

Restoring and protec3ng the coastal

environment 10%

KPI 1: Beach erosion KPI 2: Sustainable camping

Establish a program that will iden3fy the impacts and provide responses to natural

processes 10%

Develop a risk assessment and response model

Monitor and respond

Investor:

Facilitator: Accredited Facilitator:

Adrian Atkins Terry Wright Yes

Version no: Ini3al Workshop: Last modified by: Template version:

0.2 16/07/2014 <firstname surname dd/mm/yyyy > 5.0

Page 27: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

23 Coastal Management Plan – Capel Sound Foreshore

Restoring and protecting the coastal

environment (10%)

Develop new facilities needed to

enable future use of foreshore (25%)

INFRASTRUCTURE STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

Providing valuable coastal experiences to

large numbers of Victorians will only be

possible if the right infrastructure is

provided (85%)

In 2014/15 11,380 people were recorded as camping on the foreshore and in

total spent over 100,000 ‘bed nights’. In addition many thousands of visitors

and locals also used the foreshore. The infrastructure required to support this

level of use is substantial and includes 8 amenity blocks, a camp kitchen,

power, water, fencing, paths, roads and much more.

BENEFIT

Enabling a healthy lifestyle for

Victorians (80%) Evidence of the delivery of these benefits is provided through the relevant Key Performance Indicators (KPIs). A complete list of the KPIs associated

with each Benefit is at Appendix B. (Benefits, KPIs and Measures.). The specific KPIs expected to be delivered by this strategy are identified in

Supporting the economy of the future the Strategy on-­‐ a-­‐ page directly above. (10%)

STRATEGIC RESPONSE Rationale for Strategic Response

Identify and plan the infrastructure

required to meet the future (and

changing) needs (20%)

The ongoing improvement to modern camping outfits is changing the needs

within campgrounds. Also changing are the expectations of people, safety

standards and the level of legal responsibility.

SOLUTION (Strategic Actions) Document the condition and purpose

of existing infrastructure, determine

their ongoing value, prioritise and

include in Infrastructure Master Plan

(70%)

These are the strategic actions that will be prioritised and acted upon by the

CoM. A complete list of these Strategic Actions is at Appendix C.

Develop a risk assessment and

response model (10%)

Establish a program that will identify

the impacts and provide responses to

natural processes (10%)

Being located on the coast this has always been a basic response but is

heightened by the expected impact of a changing climate.

Ensure existing buildings are safe and fit for their intended purpose (70%)

The existing ageing buildings must be continually maintained and improved to ensure they serve their intended purpose

The impact of natural processes on the

CSF coastline must be monitored and

addressed (15%)

As its location fronts the coastline to the north and is connected by

Chinaman’s Creek to the Tootgarook Wetlands in the south, the CSF is

vulnerable to storm surges, sea level rises and other extremes associated

with a changing climate.

Page 28: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

24 Coastal Management Plan – Capel Sound Foreshore

COMMUNITY ENGAGEMENT STRATEGY ON-­‐ A-­‐ PAGE

Page 29: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

25 Coastal Management Plan – Capel Sound Foreshore

Align priorities of Plan with local

organization priorities and elicit their

support to implement (10%)

COMMUNITY ENGAGEMENT STRATEGY EXPLAINED

PROBLEM Evidence to support Problem statement

The active involvement of the local

community is crucial to the ongoing

vitality and health of the Capel Sound

Foreshore (70%)

The CSF CoM and its small staff cannot properly care for the CSF alone.

Within 400m of the foreshore along its 3.8km southern boundary there

are well over 1,000 residences -­‐ probably two-­‐ thirds permanent locals and

one-­‐ third holiday homes. While many of these locals are regular users of

the foreshore they currently have little involvement in its care and

maintenance.

BENEFIT Enabling a healthy lifestyle for

Victorians (60%)

Evidence of the delivery of these benefits is provided through the

relevant Key Performance Indicators (KPIs). A complete list of the KPIs

STRATEGIC RESPONSE Rationale for Strategic Response

Implement initiatives that will increase

the use and care of CSF by the local

and wider community (60%)

Relatively few locals take year-­‐ round advantage of the lifestyle benefits of

living close to the foreshore and very few are currently involved in its

care.

Create relationships with community

groups to obtain their support to

implement agreed priorities (10%)

The mission and interests of many community groups are naturally aligned

with the increased use of the coastal environment. Synergies need to be

explored and partnerships promoted.

Build a natural and social history of

CSF and make it available through A well documented and widely known history will provide a foundation

for appreciating and preserving the CSF by the people who use it. walking signs, etc (5%)

SOLUTION (Strategic Actions)

Evaluate existing educational program,

develop future rationale, establish and

monitor ongoing program (20%)

Ensure communication with existing

foreshore users focuses on long-­‐ term

care and enjoyment of foreshore (5%)

These are the strategic actions that will be prioritised and acted upon by

the CoM. A complete list of these Strategic Actions is at Appendix C.

Work with local historians to construct

and communicate natural and social

history (5%)

Identify key groups, plan and facilitate

ongoing involvement (60%)

Build upon existing constructive

communication with campers, boaties,

boat shed owners and tourists (5%)

Communications with these groups is generally well established. The

messages relevant in implementing the Coastal Management Plan will

need to be communicated.

Expand the current schools program so

more children will appreciate and

better care for their environment (20%)

The future preservation of the foreshore is dependent on today’s children

and youth understanding what they have, why it’s important and how to

care for it.

Restoring and protecting the coastal

environment (40%)

associated with each Benefit is at Appendix B. (Benefits, KPIs and

Measures.).

The specific KPIs expected to be delivered by this strategy are identified

in the Strategy on-­‐ a-­‐ page directly above.

The opportunity exists to educate and

inspire visitors to CSF so they can help

to sustain a pristine coastal environment (30%)

The many users of the foreshore clearly appreciate what it offers them.

However there is little evidence that many contribute to its ongoing care

and sustainability….or know how they could.

Page 30: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

...

r

- I'

.,

., •

..

-

j

Page 31: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal
Page 32: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

26 Coastal Management Plan – Capel Sound Foreshore

5. IMPLEMENTING THE STRATEGIES (BUSINESS PLAN)

OPERATIONS STRATEGY

CAPEL SOUND FORESHORE (CSF)

OPERATIONS Strategy

INVESTMENT LOGIC MAP Ini3a3ve

PROBLEM

BENEFIT

STRATEGIC RESPONSE

CHANGES

SOLUTION

ASSETS

The future health and use of CSF is

dependent upon a sound ongoing management structure and

competent staff 50%

Success in

implemen3ng the Management Plan

will require good

working rela3onships with

many organisa3ons 30%

Doing the things that maWer most

40%

KPI 1: Implementa3on of CMP priori3es

Driving efficient work

prac3ces 30%

KPI 1: Speed of response KPI 2: Cost

Ensure the CoM is skilled,

balanced and

commiWed

30%

Ensure the ongoing

existence of

appropriately skilled

and capable staff

30%

Iden3fy, document

and adopt the best

work prac3ces to

manage the CSF

20%

Take ac3ons that will

aWract the best available people

Ensure staff structures

are aligned with the future needs

Recruit and retain the

best possible team

Ensure staff are

provided training to keep them current

Provide facili3es and equipment that support

a healthy workplace

Iden3fy, document and

adopt best work prac3ces

Exploit the use of

enabling technologies

Buildings and facili3es

Plant and equipment

Technologies

The diverse range of poten3al risks

involved in managing the foreshore must be understood and

addressed 20%

Crea3ng a

stable organisa3on 30%

KPI 1: Documenta3on (Planning & Opera3ng) KPI 2: Stability of CoM & staff KPI 2: Risk assessment /mi3ga3on

Work with those

organisa3ons cri3cal

to implemen3ng the

Management Plan

10%

Address the risks most likely to impact

the future of CSF

10%

Iden3fy required rela3onships and their

ra3onale

Build and manage key rela3onships

Document the risks and

their mi3ga3on strategies

Carry out strategies and

con3nually monitor

Con3nually review the fire management plan

for CSF

Investor: Neville Fuller Facilitator: Terry Wright

Accredited Facilitator: Yes

Version no: Ini3al Workshop: Last modified by: Template version:

0.3 31/10/2014 <firstname surname dd/mm/yyyy > 5.0

Page 33: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

27 Coastal Management Plan – Capel Sound Foreshore

CURRENT OPERATIONS

The purpose of the Operations strategy is to give effect to the six central strategies of the Coastal Management

Plan, these being:

1. Environment

2. Camping

3. Boatsheds

4. Boat Ramp

5. Infrastructure, and

6. Community Engagement

The activities to implement these are depicted in the Operations Strategy ILM on the previous page. These involve

five strategic actions:

Skills and Balance of the Committee of Management (CoM)

A Committee of 12 people was appointed in May 2015 for a three-­‐ year period. These people provide a spread of

capabilities and each has a special interest in the long-­‐ term health and use of the foreshore -­‐ they are local

residents, campers, boatshed owners, boat ramp users and environmentalists.

Skilled and Capable Staff

The Committee of Management recently increased the number of staff from 2 to 3 to implement this Plan. These

comprise the Foreshore Manager, Ranger and Foreshore Officer. Casual staff are engaged as required throughout

the year and in force during the December to February peak holiday season. Ongoing training is provided to staff so

they are equipped to manage the broad spread of duties they undertake.

Best Work Practices

As society changes so does the way Victorians and visitors want to use the foreshore. At the same time the climate

is changing in ways we don’t yet understand. As such the way the foreshore is managed is continually evolving.

Enabling technologies will be adopted and new work practices identified and documented.

Working with Stakeholders

The foreshore has many diverse ‘users’ -­‐ local residents, campers, boaties, boat-­‐ shed owners, school groups,

environmentalists, visitors and tourists. To successfully respond to the needs of these people and implement the

strategies of the Coastal Management Plan it is critically important to build and retain strong working relationships

with many groups -­‐ emergency service organisations, government authorities, trades-­‐ people, local service

organisations, etc will be required. Developing and maintaining these relationships is critical to the successful

management of the foreshore.

Risk Identification and Mitigation

With such high public use of the foreshore reserve, the identification and mitigation of potential risks is ongoing and

forever changing. This is, and needs to remain, a structured and well-­‐ documented activity.

CHANGES TO WORK PRACTICES The following changes to working practices of the Foreshore Office are either underway or planned during the term

of this Business Plan:

Improvements to the working environment of the Foreshore Office

Building a grants management and contract management capability

Ongoing adoption of enabling technologies

Establishing a transparent policy framework

Renewal and continued improvement to the CSF Website

Strengthening the role of the Ranger

Outsourcing the cleaning function of the amenity blocks

Stengthening relationships with key organisations

Page 34: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

28 Coastal Management Plan – Capel Sound Foreshore

FINANCE STRATEGY CAPEL SOUND FORESHORE (CSF)

FINANCE Strategy

INVESTMENT LOGIC MAP Ini3a3ve

PROBLEM

BENEFIT

STRATEGIC RESPONSE

CHANGES

SOLUTION

ASSETS

The ongoing

management of the foreshore needs

predictable revenue streams and sound

financial management

60%

The implementa3on of the 2014 Coastal Management Plan

will require addi3onal revenue

streams 40%

Enabling the environmental health and good use of CSF

60%

KPI 1: Establishment of

revenue streams KPI 2: Budget alloca3on

process

Underpinning a

stable organisa3on 10%

KPI 1: Bookkeeping prac3ces

KPI 2: Monthly budget repor3ng

KPI 3: Annual audit

Enabling new ini3a3ves

30%

KPI 1: Funding for priori3es of CMP

KPI 2: Financial

management of new

funding

Consolidate exis3ng revenue streams

50%

Build an ongoing

strong grant management

capability 30%

Allocate revenue to most effec3ve

foreshore needs (budget)

10%

Ensure finances are managed to a professional

standard 10%

Annually review the suitability of exis3ng

streams

Iden3fy poten3ally new streams

Align CSF priori3es with

available grants programs

Develop grants applica3ons for

priori3es

Professionally manage any grants received

Operate formal process of alloca3ng annual

budget

Establish financial delega3ons

Establish process for adbhoc expenditures as

required

Apply standard book keeping prac3ces

Report on finances each

month

Have annual financial audit undertaken and

made public

Investor: Neville Fuller

Version no:

0.1 Facilitator:

Accredited Facilitator: Terry Wright Yes

Ini3al Workshop: Last modified by:

Template version:

11/10/2014 <firstname surname dd/mm/yyyy > 5.0

Page 35: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

29 Coastal Management Plan – Capel Sound Foreshore

CURRENT FINANCIAL POSITION

As a direct result of the sound financial planning and management practiced in the preceding years, in

2015 the Capel Sound Foreshore is in a strong financial position.

The primary sources of income available to the Committee are camping fees (both seasonal and off-­‐

season) and annual fees from the 92 boatsheds located along the length of the foreshore reserve. While

the operation of the Tootgarook boat ramp provides some income, the revenue raised from ramp fees is

generally offset by the costs required in its maintenance.

The income received from all sources in the 2014/15 financial year was $795,000.00. While the cost of

providing basic services continues to increase the annual expenditure was able to be held at $675,000.00.

Surpluses have now been achieved over each of the past three financial years and have enabled major

projects to be completed that improve existing facilities, infrastructure and environmental features. These

surpluses have also enabled the accumulation of funds that can be used to implement the priorities of this

Coastal Management Plan.

PROJECTED REVENUE AND EXPENDITURE

No new revenue streams are expected to become available during the 3-­‐ year period of this Business Plan.

While fee structures for camping, boatsheds and the use of the boat-­‐ ramp are reviewed annually, any

increases would likely reflect prevailing economic conditions and would probably align with the Consumer

Price Index. As such the existing revenue available to manage the foreshore can be considered to be static.

The most likely possible source of increased revenue is from off-­‐ season camping (April to November) which

has been steadily increasing year-­‐ on-­‐ year.

As a result of the budgetary controls that are in place, increases in general expenditure (services, charges,

salaries, etc) are expected to be incremental in nature and will be covered through normal processes.

Items that will require special consideration are infrastructure renewal, tree safety remediation and the

impacts of coastal processes.

FUNDING THE INITIATIVES OF THIS COASTAL MANAGEMENT PLAN

The new initiatives to be undertaken over the 3 - year period of this Business Plan are detailed at Appendix

C. In total they will require funding of $300k as follows:

Year 1

($1,000s)

Year 2

($1,000s)

Years

2&3

($1,000s)

Year 3

($1,000s)

Asset Management System (GIS) 5 Grant Management 15 Vegetation Management 35 35 35

Leonard Street Precinct (planning) 20+grant Boat Ramp Precinct (planning) 20+grant Trueman’s Road Precinct (planning) 15+grant Education Centre 15+grant Schools Program 10 Local Resident Engagement 5 Amenity Block 3 Upgrade 30 Beach Erosion 40+grant Signage 20

$150k $35k $80k $35k

Total $300,000

Page 36: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

30 Coastal Management Plan – Capel Sound Foreshore

Note: The word ‘planning’ included in the initiative name indicates grants will be required to enable their completion.

At the end of the 2014/15 financial year the CSF has $200,000 available to fund these initiatives. This

takes account of funds currently committed for emergency contingency, the vehicle replacement program and

office refurbishment. Consistent with recent years budgeting it is expected that small surpluses can be

achieved over the period of this Business Plan.

It should be noted that additional funds and resources will be required to properly achieve the outcomes

sought by many of these initiatives. Particularly in relation to the major infrastructure items, the funds

allocated here are for planning only. Sources of these funds or resources could be from Federal, State of

Local government grants, private sector programs or from community groups or service organisations.

FUTURE WORK PRACTICES

The activity required to manage the finances of the Capel Sound Foreshore are depicted in the Financial

Strategy ILM (previous page). These involve four primary strategic activities:

Consolidate revenue streams

This is a standard practice undertaken annually by the Committee of Management.

Grant management capability

The future environmental health of the Capel Sound Foreshore and its role in helping to build healthy

communities is directly linked to the ability to obtain funding to implement the 10-­‐ year strategy. As a high priority

grants management skills will therefore be developed and retained.

Budget allocation process

More rigor will be built into the budget allocation process and this will involve the clarification of financial

delegations to support efficient financial administration.

Financial management

Detailed financial reports are provided each month to the Committee of Management and addressed in

Committee. In addition the annual audit provides the basis for sound management of foreshore finances.

PRIORITIES FOR THE NEXT THREE YEARS The eight strategies that need to be implemented over a 10-­‐ year period are contained in Parts 4 and 5 of this

Plan. Each strategy contains a description of the changes required for their successful

implementation. The challenge is to decide the order in which these changes should be undertaken. The

criteria used to prioritise and sequence these changes were:

Relative importance of each change

The benefits they would be expected to deliver

Cost of each

Risk of failure to successfully implement

Any unintended adverse consequences that could result, and

Likelihood of funding being available

As a result, the initiatives that will be undertaken over the 3-­‐ year period of this Business Plan are at

Appendix C.

Page 37: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

31 Coastal Management Plan – Capel Sound Foreshore

MEASURING AND REPORTING PROGRESS

Irrespective of how good the Plan might be it has little chance of success unless processes are in place to

drive and monitor its implementation and ultimately to measure its success. As such, three processes are

required:

1. A management structure to drive the implementation of the individual projects

2. A process to monitor and report on projects against their target dates, and

3. A way to measure whether the benefits expected of the projects were actually delivered.

Re Point 1 (Management Structure), the Committee of Management are currently deciding which structure and

arrangements will work best in our environment. This structure will also address any changes required to the Plan as

circumstances change or we obtain new knowledge.

Re Point 2 (Project Monitoring and Reporting)

At quarterly intervals (Feb/May/Aug/Nov) the Committee of Management will review the progress of each

project

Each 6 months (May and Nov) a report of progress will be placed on the Capel Sound Foreshore website.

Point 3 (Benefit Measurement) is a long-­‐ term exercise that can be difficult to achieve and is often omitted. As a

starting point in the development of this Plan the Benefits, KPIs and Measures were identified and used to shape

strategies and identify priorities (Appendix B). It is now necessary to develop ‘baselines’ for these measures and

validate whether our investments are delivering the benefits and to the extent we had expected. Being able to

understand which projects deliver maximum benefits will become critically important in developing priorities over

the subsequent years of this 10-­‐ year strategy.

6. GETTING INVOLVED

The 2016 Coastal Management Plan for the Capel Sound Foreshore is long-­‐ sighted and ambitious. It is built upon a

set of strategies that address the long-­‐ term health of the foreshore and its full enjoyment by future generations.

To successfully implement these strategies we will need help from those people in the wider community who also

care about the foreshore and its place in the future. The other crucial element in implementing this plan is our

ability to obtain financial support through grants or other channels.

If you are able to help through involvement in regular working bees, participation in working groups, providing some

professional or trade support or assisting to obtain grants or financial support we would be pleased to hear from

you.

If you’re not able to be involved in this way please just enjoy your time on the Capel Sound Foreshore and help us to

care for it into the distant future.

Page 38: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

32 Coastal Management Plan – Capel Sound Foreshore

APPENDICES

Appendix A: Helping you read the Strategies- on- a page

THEIR FORMAT While it should be easy to read and understand each strategy-­‐ on-­‐ a-­‐ page, some explanation is necessary. The

format used is known as an Investment Logic Map (ILM). This format is now in wide use across Australia and New

Zealand and is intended to tell the story in plain English of why something needs to be done. It follows a stream of

logic as follows:

Problem/Need

This is basically the ‘call to action’. Why do anything at all? This could be a problem, an identified lost

opportunity, or a basic need.

Benefits

The benefits that will result if the Problem is successfully addressed. The KPIs (Key Performance

Indicators) are those things that will provide the evidence that the benefits have been delivered.

Strategic Response

This will be one or a number of strategic actions that will be taken to respond to the Problem and deliver

the Benefits.

Solution

This describes the changes that need to be made to implement the Strategic Response. In some cases,

infrastructure will also be required.

WHAT DO THE % MEAN?

The percentages (%) are used to indicate the relative importance of one Problem compared to the other Problems or

one Benefit or Strategic action to the others. All of the %s in the Problem column should add to 100% as should the

Benefits or Strategic Response column. What they mean is that the Problem/Benefit/etc with the highest % is the

one that is the most important to be addressed or the most important action to take.

BENEFITS, KPIs AND MEASURES

To be able to understand the storyline of each strategy it is not necessary to understand the table of ‘Benefits, KPIs

and Measures’ at Appendix B -­‐ each ILM should be understandable as they stand.

It is one thing to claim we are going to deliver a benefit but another to provide real evidence that the benefit has

been delivered. Appendix B is the way we can measure whether a claimed Benefit has actually been delivered. As

an example, when we talk about improving the Flora on the foreshore, the indicators of how well we have done this

in a particular area will be:

Coverage of indigenous flora

Weed coverage

Diversity of indigenous flora.

The problem is that often we don’t have a baseline from which to compare the ‘before’ and ‘after’ but hopefully this

will be established over time.

Page 39: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

33 Coastal Management Plan – Capel Sound Foreshore

Appendix B: Benefits, KPIs and Measures

Benefit 1: Restoring and protecting the coastal environment (45%)

1. Flora 1.1 Coverage of indigenous flora

1.2 Weed coverage

1.3 Diversity of indigenous flora

2. Fauna 2.1 Diversity of indigenous species

2.2 Number of indigenous fauna

2.3 Diversity of feral species

2.4 Number of feral fauna

3. Beach erosion 3.1 Coverage of beach erosion

4. Sustainable camping 4.1 Waste recycling efficiency

4.2 Power efficiency

4.3 Water efficiency

Benefit 2: Enabling a healthy lifestyle for Victorians (40%)

1. Campers 1.1 Camp site days

1.2 Number of people

2. Locals 2.1 Measure

3. Volunteers 3.1 Number of school children

3.2 Number of school visits

3.4 Volunteer hours worked

5. Others 5.1 Day visitors

5.3 Beach users

Benefit 3: Supporting the economy of the southern peninsula (15%)

1. Campers 1.1 Camp site days

3. Tourists 3.1 Camp site days

Note: This is a first attempt to identify & track the measures that will tell us whether the strategies of the Coastal Management Plan have been successful.

3.2 Number of people

5.2 Boatshed users

3.3 Number of w/bee participants

KPI Measure NOW (baseline) THEN (target)

4.1 Boat ramp users 4. Boat ramp

5.4 Boat Ramp traffic

2.1 Measure 2. Day visitors

Page 40: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

34 Coastal Management Plan – Capel Sound Foreshore

Appendix C: Business Plan Initiatives (3 years)

Strategy Initiative Rationale Budget

Allocation

($1,000s)

Start

Date

(Year)

End

Date

(Year)

Operations Consolidate

Policies

Formalise, document and ensure the

policies of the Capel Sound Foreshore

are fair, consistent and available to

the public.

Inhouse 1 3

Asset

Management

(GIS)

Adoption of a GIS as a core

component of foreshore management.

This will provide enormous

efficiencies in the mapping and

management of infrastructure,

facilities, camp sites, boat sheds and

vegetation.

5 1 1

Grants As progress towards the 10 year

Management strategy is dependent on obtaining

external funding from grants and

other means, grants management

expertise will be developed.

15 1 3

Environment Vegetation

Management

Allocation to cover works associated

with the maintenance of vegetation

across the entire foreshore. This will

include the re-­‐ vegetation of the

camping areas. It will be targeted to

undertake the priorities identified in

the updated Vegetation Report.

105 1 3

+Grants

Infrastructure Leonard

Street

Precinct

This area previously supported a small

boat launching ramp but is now

unstructured and used as car parking

particularly during the Summer.

Working with relevant groups and

residents, plans will be developed to

make best use of this precinct.

Implementing the plans would be

dependent upon external funding and

community support.

20

+Grants

1 2

Boat Ramp

Precinct

The Tootgarook boat ramp needs little

done in terms of the road structures

or the ramp itself. However, there are

opportunities to improve it as a

fascinating and safe beach/boat

watching area that supplements the

coastal experience. This funding

allocation is to develop plans for the

upgrade of the precinct with any

subsequent works being dependent

upon external funding and support.

20 2 3

+Grants

Truemans

Road

Precinct

This is a large rambling area with an

amenity block and BBQ facility. It is

well used throughout the year as it

provides good car parking access and

great access to the sandy beach with

wide beach panoramas. There are

major opportunities to improve the

way the available space is used

consistent with the protection of the

natural environment. This funding

15

+Grants

2 4

Page 41: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

35 Coastal Management Plan – Capel Sound Foreshore

Infrastruct.

(cont’d.) allocation is only for the development

of precinct plans. Their

implementation would be dependent

upon external funding and support.

Education The future use of the Education 15 Centre Centre must first be resolved (see ‘Community Engagement/Schools Program’ below). This will question the need for a schools program and whether this facility will be needed to support the education program. If it is not needed, a decision must be made as to its future. Amenity This is a high-­‐ use amenity block and is 30 1 1

Block 3 the only block yet to be upgraded. Beach There are currently areas of beach 40 1 1

erosion erosion that need early rectification and more are inevitable with the

timing dictated by the weather

conditions. Regular safety inspections

and beach works will be undertaken

to mitigate coastal degradation to

ensure ongoing public safety and

access.

Boatsheds Stimulating

the beach

community

Boatsheds are an integral part of the

visual attraction of Capel Sound

beaches and of beach life. A policy

will be developed to clarify access to

boatsheds consistent with the

protection of foreshore vegetation

with the aim of ensuring they remain

functional, in good condition and

used.

In-­‐ house 2 2

Local

residents

Critical to the success of the 10-­‐ year

strategy is the ability to engage with

local residents so they are aware of

the foreshore and its management &

5 1 3

want to become involved in its care.

Note: The implementation of each of these initiatives is dependent upon the identified funding source being available and the assumptions upon which the selection was made proving to be valid.

Signage A consistent approach to signage will

be developed and implemented across

the entire Capel Sound Foreshore.

This will address three issues:

20 1 2

(Directional,

Informational

and

Educational)

the need to improve access

by the public to the foreshore

and beaches

protection of the vegetation

from inappropriate access

tracks, and

the provision of education to

help people understand the

coastal foreshore and be

motivated to assist in its care.

Community

Engagement

Schools

program

Working with local schools the

current schools program will be

reviewed and, if there is an identified

need, a schools education program

will developed, implemented and

managed.

10 1 On-­‐ (Program going

only)

Page 42: Coastal Management Plan Formatted - Marine and coasts€¦ · Coastal Board released the draft Coastal Plan 2015-2020 in March 2015. o That Committees of Management prepare Coastal

- - - - - -

- - -