13
1 CO2 Transport and Storage A Flexible Low Carbon Infrastructure 4 th December 2019, Madrid +32 476661983 [email protected] @Bellona_EU

CO2 Transport and Storage A Flexible Low Carbon

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CO2 Transport and Storage A Flexible Low Carbon

1

CO2 Transport and Storage

A Flexible Low Carbon

Infrastructure 4th December 2019, Madrid

+32 476661983

[email protected]

@Bellona_EU

Page 2: CO2 Transport and Storage A Flexible Low Carbon

12/6/2019 2

Rapid Emissions Reductions required

Carbon Dioxide Removal (CDR) is limited. Cutting

emissions is a must –CDR is no substitute

for mitigation

Page 3: CO2 Transport and Storage A Flexible Low Carbon

INDUSTRIAL EMISSIONS REQUIRE DEEP REDUCTIONS

Cement

Steel

Chemicals

Fertilisers

Waste Incineration

12/6/2019 3

Page 4: CO2 Transport and Storage A Flexible Low Carbon

ACTION NOW REQUIRES INFRASTRUCTURE

Renewables Grids

12/6/2019 4

Hydrogen

Networks

CO2

Transport and

Storage

Networks

Page 5: CO2 Transport and Storage A Flexible Low Carbon

A SHARED CO2 SHIPPING NETWORK FOR NORWAY & SCANDINAVIA

Norcem Cement

12/6/2019 5

Fortum

Waste IncineratorOffshore Storage

Sweden seeks to become

carbon neutral by 2045 and

may choose to cooperate with

Norway on CCS for its own

industry.

Page 6: CO2 Transport and Storage A Flexible Low Carbon

ROTTERDAM SHARED CO2 PIPELINE

12/6/2019 6

Page 7: CO2 Transport and Storage A Flexible Low Carbon

NETWORKS ALLOW RAPID FOLLOW ON DECARBONISATION PROJECTS

New Cities and Industrial regions link up to existing CO2 transport and storage networks

Increased speed of decarbonisation

12/6/2019 7

Page 8: CO2 Transport and Storage A Flexible Low Carbon

CO2 NETWORK AS A PUBLIC GOODIn the early 19th century, London planned to expand its sewage system, yet facedwidespread public opposition. Particularly wealthier people, living uphill, did notsee why a general sewage system was needed and hence did not want to pay toimprove the property of private individuals ‘downhill’. In fact, sewage was not seenas a public good, and so the government initially considered it improper to usepublic money. It took several cholera epidemics, thousands of deaths, and the ‘GreatStink’ of 1858 for London to finally modernize and upgrade its sewage system, atlast stopping the unchecked dumping of human waste into the city and the riverThames.

8

“[The principle] was of diverting the cause of the

mischief to a locality where it can do no mischief.”

Sir Joseph Bazalgette, Civil Engineer

12/6/2019

Page 9: CO2 Transport and Storage A Flexible Low Carbon

SHARING MEANS SAVING MONEY

12/6/2019 9L. Buit, W. Mallon, P. Schulze, S. S. Foto and G. Stienstra, "CO2 Transport Infrastructure in Germany - Necessity

and Boundary Conditions up to 2050," DNV-GL; IZ Klima, Groningen; Berlin, 2014.

Shared CO2 networks reduce costs

Increase participation

Reduce complexity for new projects

Network can be expanded to more industries

Page 10: CO2 Transport and Storage A Flexible Low Carbon

INDUSTRIAL REGIONS REQUIRE CO2 NETWORKS

Provides a path for industry to deeply decarbonise, protects investments and existing assets.

Is as a corner stone of a Just Transition for industry, labour unions ensure that jobs remain in Europe. It safeguards the welfare of Europe’s workers.

Allows governments at a local and national level to fulfil their obligations under bindinginternational targets and towards their constituents by protecting their health, their jobs,and the environment and climate.

Helps civil society to ensure that no industry emissions are ‘unavoidable’ and forcesindustry to deeply decarbonise. With no excuses left, industry decarbonisation will notbe delayed further.

12/6/2019 10

Page 11: CO2 Transport and Storage A Flexible Low Carbon

FIRST PROJECTS TO PUT IN PLACE EXPANDABLE CO2 INFRASTRUCTURE

A CO2 network will not simply appear, we need PROJECTS & FINANCE

Cooperation

Among Industry partners, Unions, Policy-Makers (local, national, regional)

Develop and Deploy Projects

Industry-scale demo projects need clear, detailed plans (location, size, costs)

Think Strategic

Develop Projects where they can set you up for the long term

Fair pricing & access

Develop comercial regulations for CO2 trasnport and storage «Regulated Asset»

12/6/2019 SUSTAINABLE BIOMASS FOR NEGATIVE EMISSIONS 11

Page 12: CO2 Transport and Storage A Flexible Low Carbon

INDUSTRY IN A CHANGING CLIMATE

12/6/2019 12

Page 13: CO2 Transport and Storage A Flexible Low Carbon

12/6/2019 SUSTAINABLE BIOMASS FOR NEGATIVE EMISSIONS 13

+32 476661983

[email protected]

@Bellona_EU