August 28, 2013 La Plata Archuleta Water District c/o Harris Water Engineering Mr. Brett Sherman, P.E. 954 East 2 nd Avenue, Suite 202 Durango, Colorado 81301 [email protected] PN: 53225GE Subject: Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 1E 12” Main Water Line Durango, Colorado Mr. Sherman, This letter presents our test bore logs from our field exploration for the LAPLAWD Phase 1E 12” Main Water Line along the east and north side of County Road 510 between the intersections of La Plata County Road 513 and La Plata County Road 225A . The figure below shows the approximate locations of our test borings, and where potential shallow formational material may be encountered during the water line trench excavation. The logs of our test borings are attached to this letter. We encountered formational material in Test Borings Three, Five, Eight, and Nine in Phase 1E at depths that ranged from one (1) to two and one-half (2 1/2) feet below the existing ground surface. The formational material encountered in Test Boring Three was consisted of hard claystone material. The formational material encountered in Test Boring Eight and Nine consisted of very hard sandstone material. We encountered extremely weathered claystone material in Test Boring Five at one (1) foot below the ground surface. In addition to the test borings, we observed formational material adjacent to the roadway and the proposed waterline alignment in locations depicted on the attached figure. In the remaining test borings, we encountered sandy clay soil with few gravels and cobbles to the bottom of the test borings at depths that ranged from four (4) to eight (8) feet. We anticipate that the weathered formational material can be excavated with conventional excavation equipment, but may require substantial effort in some areas or where competent formational material is encountered. Please contact us if you have any questions, or if we may be of additional service. Respectfully, TRAUTNER GEOTECH Tom R. Harrison, P.E.

c/o Harris Water Engineering

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

August 28, 2013

La Plata Archuleta Water District

c/o Harris Water Engineering

Mr. Brett Sherman, P.E.

954 East 2nd Avenue, Suite 202

Durango, Colorado 81301

[email protected]

PN: 53225GE

Subject: Geotechnical Engineering Subsurface Exploration

The Proposed LAPLAWD Phase 1E 12” Main Water Line

Durango, Colorado

Mr. Sherman,

This letter presents our test bore logs from our field exploration for the LAPLAWD Phase 1E 12” Main

Water Line along the east and north side of County Road 510 between the intersections of La Plata

County Road 513 and La Plata County Road 225A . The figure below shows the approximate locations

of our test borings, and where potential shallow formational material may be encountered during the

water line trench excavation. The logs of our test borings are attached to this letter.

We encountered formational material in Test Borings Three, Five, Eight, and Nine in Phase 1E at depths

that ranged from one (1) to two and one-half (2 1/2) feet below the existing ground surface. The

formational material encountered in Test Boring Three was consisted of hard claystone material. The

formational material encountered in Test Boring Eight and Nine consisted of very hard sandstone

material. We encountered extremely weathered claystone material in Test Boring Five at one (1) foot

below the ground surface. In addition to the test borings, we observed formational material adjacent to

the roadway and the proposed waterline alignment in locations depicted on the attached figure.

In the remaining test borings, we encountered sandy clay soil with few gravels and cobbles to the bottom

of the test borings at depths that ranged from four (4) to eight (8) feet.

We anticipate that the weathered formational material can be excavated with conventional excavation

equipment, but may require substantial effort in some areas or where competent formational material is

encountered.

Please contact us if you have any questions, or if we may be of additional service.

Respectfully,

TRAUTNER GEOTECH

Tom R. Harrison, P.E.

PN:53225GE

August 28, 2013

Page 2

Potential Shallow Formational Material and Test Boring Location Map for LAPLAWD PHASE 1E.

TB-5

TB-3

TB-1

TB-2

LEGEND

Potential Shallow

Formational Material

Test Boring Location

TB-6

TB-7

TB-4

TB-8

TB-9

TB-10

08-29-2013 T:\Current GE\53143GE, LAPLAWD Phase 1D\Logs of Test Borings\LAPLAWD Phase 1D TB-1.bor

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

LOG OF BORING TB-1

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at four (4) feet

USCS

CL

GRAPHIC

Samples

Blow Count

Water Level

REMARKS

08-29-2013 T:\Current GE\53143GE, LAPLAWD Phase 1D\Logs of Test Borings\LAPLAWD Phase 1D TB-1.bor

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

LOG OF BORING TB-2

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at four (4) feet

USCS

CL

GRAPHIC

Samples

Blow Count

Water Level

REMARKS

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-10

.bo

r

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4.5 feet

Location : See Figure in Letter

LOG OF BORING TB-3

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

US

CS

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Formational material, claystone, hard, slightly moist, tan

Bottom of test boring at four and one-half (4.5) feet

CL

32/6

50/6

08-29-2013 T:\Current GE\53143GE, LAPLAWD Phase 1D\Logs of Test Borings\LAPLAWD Phase 1D TB-1.bor

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

LOG OF BORING TB-4

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at four (4) feet

USCS

CL

GRAPHIC

Samples

Blow Count

Water Level

REMARKS

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-3.b

or

LOG OF BORING TB-5

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Weathered Formational material, clay and claystone, hard, slightly moist, tan

Bottom of test boring at four (4) feet

US

CS

CL

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-6.b

or

LOG OF BORING TB-6

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

6

7

8

9

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at eight (8) feet

US

CS

CL

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 8 feet

Location : See Figure in Letter

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-7.b

or

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

LOG OF BORING TB-7

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at four (4) feet

US

CS

CL

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-3.b

or

LOG OF BORING TB-8

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

US

CS

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

50/3

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Formational material, sandstone, very hard, slightly moist, tan

Bottom of test boring at four (4) feet

CL

SS

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-3.b

or

LOG OF BORING TB-9

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

US

CS

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Formational material, sandstone, very hard, slightly moist, tan

Bottom of test boring at four (4) feet

CL

SS

50/2

08

-29

-20

13

T

:\C

urr

en

t G

E\5

32

25

PE

, L

AP

LA

WD

Ph

ase

1E

\Lo

gs o

f T

est B

ori

ng

s\L

AP

LA

WD

Ph

ase

1E

TB

-7.b

or

Field Engineer : T. Harrison

Hole Diameter : 4" Solid

Drilling Method : Continuous Flight Auger

Sampling Method : Standard Split Spoon

Date Drilled : 8/26/13

Total Depth (approx.) : 4 feet

Location : See Figure in Letter

LOG OF BORING TB-10

PN:53225GE

Durango, CO Harris Water Engineering

Mr. Brett ShermanLAPLAWD Phase 1E

Depth

in

feet

0

1

2

3

4

5

DESCRIPTION

Sample Type

Mod. California Sampler

Bag Sample

Standard Split Spoon

Water Level

Water Level During Drilling

Water Level After Drilling

CLAY, sandy, few gravels, few cobbles, stiff, slightly moist to moist, brown

Bottom of test boring at four (4) feet

US

CS

CL

GR

AP

HIC

Sa

mp

les

Blo

w C

ou

nt

Wa

ter

Le

ve

l

REMARKS