46
CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEY www.akongrup.com.tr

CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEY

www.akongrup.com.tr

Page 2: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

ABOUT US

Founded in 2009, AKON executes turn key construction and installation of:

• Petrochemical Plants

• Mine Beneficiation Plants

• Power Plants

• Cement Factories

• Water Treatment / Desalination Plants

• Steel Smelters

• Pipelines

• Buildings, Shopping Centers

www.akongrup.com.tr

Page 3: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

Our mission is to use our experience in the construction industry for unconditional customer satisfaction and highest quality, while respecting human health and environment at every stage of our operation.

Our vision is to successfully finish each Akon Grup Project with the power of our professional experience and commitment.

www.akongrup.com.tr

MISSION and VISION

Page 4: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

2009

• AKON Yapı Ltd. founded in Ankara, Turkey

• Princess Noura University Family and Consumer Sciences Building Project civil works contract signed

• King Saud University Agricultural Faculty Building Project civil works contract signed

2010

• Aksut Milk Production Facility Project civil works contract signed

2011

• AKON International LLC founded in Jeddah, Kingdom of Saudi Arabia

• AKON Yapı Ltd. reestablished as AKON Grup Uluslararası İnşaat A.Ş.

• King Khalid University Project civil works contract signed

• Jabal Omar Project H8 and H9 Towers Project civil works contract signed

• Haramain Railway Station Project platform civil works contract signed

2012

• Jabal Omar Project - Phase II civil works contract signed

• Petrorabigh NPB Project civil and electromechanical works contract signed

www.akongrup.com.tr

MILESTONES

Page 5: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

2013

• AKON International OOO founded in Moscow, Russian Federation

• Enerjisa Bandırma HEPP Project EPC works contract signed

• In Moscow, various fit-out project contracts signed

• In Algeria, Jadida-Safi Highway Project civil works contract signed

2014

• AKON Grup Erbil Branch founded in Erbil, Iraq

• ISO 9001:2008 Quality Management System Certificate obtained

• ISO 14001:2004 Environmental Management System Certificate obtained

• OHSAS 18001:2007 Occupational Health and Safety Management System Certificateobtained

• Khabat Thermal Power Plant Project civil works contract signed

2015

• Petrorabigh II – Initial Start Up Team Accommodation Project civil works contract signed

• Petrorabigh II – Blast Proof Manufacturing Buildings Project civil and electromechanical works contract signed

• Yanbu Power and Desalination Plant Project Aeration Basin and Building civil works contract signed

• East Dammam Aramco Housing Projects civil, architectural, electrical and mechanical works contract signed

www.akongrup.com.tr

MILESTONES

Page 6: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

2016

• Lapseki Gold Beneficiation Plant Project civil and mechanical works contract signed

• Rabigh II Refining and Petrochemical Project Naphtha and Aromatics Package (RP2) - Area R410 & R420 Project civil works contract signed

• Safety Achievement Award for 3,000,000 Manhours without Lost time Injury received from Petrorabigh

2017

• Petrorabigh Clean Fuel Project/ Sulphur Recovery Unit Project civil and building works contract signed

• ISO 9001:2008 Quality Management System certificate renewed to ISO 9001:2015

• ISO 14001:2004 Environmental Management System Certificate renewed to ISO 14001:2015

• AKON payroll reached to 2107 direct personnel and 513 indirect personnel, all time high

2018

• İvrindi Gold Beneficiation Plant project civil and mechanical works contract signed

• Metito KAEC SOLAR Water Desalination Plant Project civil and building works contract signed

2019

• Metito Dhuba Water Desalination Plant Project civil and building works contract signed

www.akongrup.com.tr

MILESTONES

Page 7: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KINGDOM OF SAUDI ARABIA

AKON INTERNATIONAL LLC

Al Ruwais Dist. Qadat Al Fekr StreetP.O Box: 55795, - 21544 Jeddah / Kingdom of Saudi ArabiaT: + 966 2 664 76 41

RUSSIAN FEDERATION

AKON INTERNATIONAL OOO

Leninsky Avenue 111/1 No.414Moscow / Russian FederationT: +7 901 711 67 82

IRAQ

AKON GRUP ULUSLARARASI A.Ş. Erbil Branch

Mantkawa, Nzek Filka ZiraaArbil / IraqT: +964 750 395 31 92

www.akongrup.com.tr

TURKEY

AKON GRUP ULUSLARARASI A.Ş.

Cinnah Cad.78/7Ankara / TurkeyT: + 90 312 426 85 60

OFFICES

Page 8: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

AKON GRUP

Head Office Organization Chart

Account

Department

Personnel

Department

Administration

Department

Business Development

Department

Country Office

Projects

Assistant G. Manager

Saudi Arabia

Account

Department

Personnel

Department

Administration

Department

Business Development

Department

Country Office

Projects

Assistant G. Manager

Domestic and Branch Offices

Proposal

Department

Budget and Planning

Department

Technical Manager QHSE Manager

Account

Department

Personnel and Admin

Department

Auditing Services

Procurement

Department

Assistant G. Manager

Finance

Legal Councel

General Manager

ORGANIZATION CHART

Page 9: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

Intercorporate Quality Control system established to provide and maintain high quality services for our customers

www.akongrup.com.tr

QUALITY MANAGEMENT

Page 10: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

HSE practices at highest standards are adopted and exercised in our job site to reduce occupational risks

www.akongrup.com.tr

HEALTH AND SAFETY MANAGEMENT

Page 11: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

MANHOUR

Page 12: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

TURNOVER (USD)

Page 13: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

131

116

KSD023 DSD024

16

13

557

9

20

Management Site Engineers Site Supervisors HSE Officers

QA/QC Finance&Admin Support

DIRECT PERSONNEL INDIRECT PERSONNEL

Direct Indirect Total

KSD023 131 40 171

DSD024 116 35 151

TOTALS 247 75 322

Direct Indirect Total

Turkish 121 27 148

Pakistani 31 10 41

Indian 26 7 33

Bangladesh 41 14 55

Others 28 17 45

TOTALS 247 75 322

www.akongrup.com.tr

PERSONNEL

Page 14: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

ONGOING PROJECTS

www.akongrup.com.tr

Page 15: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

DHUBA WATER DESALINATION PLANT

Turnkey civil and architectural works for the Dhuba Water Desalination Plant Project.

Works included Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake PumpStation, Product Water Storage, Neutralization Tank and Guard House, total area of 45,468 m2.

Scope included o17,558 m3 Concrete, 2,016 ton Reinforcing Bar work.

Project No: DSD024

Client: Metito Saudi Limited

Location: Dhuba, KSA

Project Start: Feb 2019

Project Duration: 12 Months

Expected Completion: Jan 2020

Peak Manpower: 153 people

Average Manpower: 109 people

Contract Value: 11,066,667 USD

www.akongrup.com.tr

ONGOING PROJECTS

Page 16: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KAEC SOLAR WATER DESALINATION PLANT

Turnkey civil and architectural works for King Abdullah Economic City sea water RO Project.

Works included General Site Works, Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank and Guard House, total area of 68,400 m2.

Scope included 15,227 m3 Concrete, 1,531 ton Reinforcing Bar work.

Project No: KSD023

Client: Metito Saudi Limited

Location: Jeddah, KSA

Project Start: Dec 2019

Project Duration: 12 Months

Expected Completion: Dec 2019

Peak Manpower: 197 people

Average Manpower: 141 people

Contract Value: 9,466,607 USD

www.akongrup.com.tr

ONGOING PROJECTS

Page 17: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

COMPLETED PROJECTS

www.akongrup.com.tr

Page 18: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

IVRINDI GOLD BENEFICIATION PLANT

Turnkey fabrication and construction works for the İvrindi Gold Beneficiation Plant Project.

Works included Crushing, Screening, HPGR, Storage units and conveyors.

Scope included 20,000 m3 concrete, 3,400 ton structural steel, 1380 ton platework, 2917 ton equipment erection, 800 ton piping and 4,800 m conveyor works.

Project No: IGM022

Client: TÜMAD Madencilik A.Ş.

Location: Balıkesir, TURKEY

Project Start: Jan 2018

Project Duration: 15 Months

Date of Completion: June 2019

Peak Manpower: 326 people

Average Manpower: 233 people

Contract Value: 44,100,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 19: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PETRORABIGH CLEAN FUEL / SULPHUR RECOVERY UNIT

Turnkey construction works for the PETRO RABIGH CFP/ SRU project.

Works included R225 - CFP (Clean Fuel Unit), R311 - SRU 3 (Sulphur Recovery Unit), SS27 (Electrical substation) and PIB27 (Process Interface Room) packages.

Scope included 22,000 m3 structural concrete, 3 km U/G FRP Piping Works and 3 buildings works.

Project No: PCF021

Client: Kinetics Technology

Location: Rabigh, KSA

Project Start: July 2017

Project Duration: 21 months

Date of Completion: May 2019

Peak Manpower: 240 people

Average Manpower: 120 people

Contract Value: 14,425,788 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 20: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PETRORABIGH II BLAST PROOF MANUFACTURING BDG.S PROJECT

Works included construction of blast proof buildings, including all work civil, structural, MEP works and external utilities tie-ins.

Scope included Polymer Satellite Maintenance Office Building (828 m2), U&OM Satellite Maintenance Office Building (828 m2), Refinery Satellite Maintenance Office Building (828 m2) and Monomer Satellite Maintenance Office Building (996 m2).

Project No: PRB008B

Client: Saudi ARAMCO / SUMITOMO

Location: Rabigh, KSA

Project Start: Oct 2015

Project Duration:546 days

Date of Completion: May 2019

Peak Manpower: 216 people

Average Manpower: 83 people

Contract Value: 20,000,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 21: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

LAPSEKİ GOLD BENEFICIATION PLANT

Turnkey construction works for the Lapseki Gold Beneficiation Plant Project.

Works included Crushing and Screening, Fine Ore Storage, Grinding, Thickening, CIP Leach, Chemical Preparation, Filtration units and conveyors.

Scope included 13,708 m3 concrete, 2,500 ton structural steel, 151 ton tank fabrication, 488.8 ton platework, 120 ton piping, 1,800 ton equipment erection and 800 m conveyor works.

Project No: LGM020

Client: TÜMAD Madencilik A.Ş.

Location: Çanakkale, TURKEY

Project Start: Nov 2016

Project Duration: 240 days

Date of Completion : Jan 2018

Peak Manpower: 450 people

Average Manpower: 80 people

Contract Value: 18,500,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 22: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PETRORABIGH II NON-PROCESS BDG.S CONSTRUCTION PROJECT

Turnkey construction and facility maintenance works for the Petrorabigh II Non Process Buildings facilities, total OF 76,000 m2

Scope included supply and construction of Administration Building, Product Warehouse Building, client camp and catering facilities for further construction of Petrorabigh II, client offices, additional buildings for maintenance, laboratory and canteen buildings inside the existing PRB facilities, renovation of main mess hall facilities for Petrorabigh, operation and maintenance of all facilities for 1500 days.

Project No: PRB008

Client: Saudi ARAMCO / SUMITOMO

Location: Rabigh , KSA

Project Start: Jan 2012

Project Duration: 1500 days

Date of Completion : Dec 2018

Peak Manpower: 1300 people

Average Manpower: 800 people

Contract Value: 79,000,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 23: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

RABIGH II REFINING AND PETROCHEMICAL PROJECT - NAPHTHA AND AROMATICS PACKAGE (RP2) - AREA R410 & R420

Miscellaneous excavation, backfilling, reinforced concrete, steel, equipment installation, process piping and instrumentation works.

Scope included 10.000 m3 excavation, 985 m³ concrete, 12 ton chequered plate cover, 12.570 m2 protective coating works.

Project No: SNA019

Client: Saudi ARAMCO / SAIPEM

Location: Rabigh, KSA

Project Start: Sep 2016

Project Duration: 6 months

Date of Completion : Mar 2017

Peak Manpower: 104 people

Average Manpower: 80 people

Contract Value: 2,786,787 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 24: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

EAST DAMMAM ARAMCO HOUSING PROJECT

Lump sum MEP, Finishing and Landscaping Works of 218 premium villas for Saudi Aramco management personnel.

Scope included 104,000 m2 closed area.

Project No: DMH018

Client: Saudi ARAMCO

Location: Dammam, KSA

Project Start: Nov 2015

Project Duration: 400 days

Date of Completion: Mar 2017

Peak Manpower: 750 people

Average Manpower: 400 people

Contract Value: 64,575,817 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 25: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

YANBU POWER AND DESALINATION PLANT

Civil works for Aeration Basin, Mixing Basin, Bypass Basin, Discharge Basin, pipe racks and buildings.

Scope included 350,000 m3 excavation, 93,000 m3 concrete, 10,000 ton rebar work.

Project No: YPR016

Client: Samsung Engineering

Location: Yanbu, KSA

Project Start: May 2015

Project Duration: 505 days

Date of Completion : Sep 2016

Peak Manpower: 760 people

Average Manpower: 580 people

Contract Value: 27,055,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 26: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KHABAT THERMAL POWER PLANT PROJECT

Civil and buildings works packages of 2x150 MW Thermal Power Plant.

Works included civil works of turbine building, steam turbine foundation, boiler, electrostatic precipitator, cooling tower, auxiliary boiler, absorber, steam converter, f.o. heater, ash silo, unit auxiliary transformer, transformer, limestone unloading, electrical building, and control building.

Scope included 40,000 m3 concrete and 5,100 ton rebar works.

Project No: KHB015

Client: GAMA Power / POSCO

Project Start: May 2014

Location: Erbil, Iraq

Project Duration: 365 days

Date of Completion : Dec 2015

Peak Manpower:350 people

Average Manpower: 120 people

Contract Value: 16,138,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 27: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

ENERJISA BANDIRMA HEPP PROJECT

EPC works for Bandırma HEPP Project, in a consortium with GEPPERT AG.

Scope included installation of a new 3.5 MW hydro power turbine feeding from the cooling water discharge line of the 900MWCombined Cycle Power Plant in the area, modification of the existing cooling water discharge line .The project was designed as a green energy project and got an innovation award within client’s group of companies.

Project No: BHP010

Client: Enerjisa

Location: Bandırma, TURKEY

Project Start: Jun 2013

Project Duration: 13 months

Peak Manpower: 120 people

Average Manpower: 80 people

Date of Completion : 30.06.2014

Contract Value: 6,687,200 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 28: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

AUTOROUTE DU MAROC JADIDA-SAFI HIGHWAY

Civil works for 41 bridges, 2 flyovers and 39 underpasses on the route.

Project No: FOT009

Client: Nurol İnşaat A.Ş.

Location: Jadida-Safi, Morocco

Project Start: Jun 2013

Project Duration:20 months

Date of Completion : Feb 2015

Peak Manpower: 400 people

Average Manpower: 230 people

Contract Value: 3,350,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 29: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

HARAMAIN RAIL LINK PHASE 1 PACKAGE 2 MADINAH STATION STRUCTURAL WORKS

Civil works of the Madinah Station of the Haramain High Speed Railway.

Scope included 120,000 m3 concrete, 11,300 tons reinforcement,, 169,300 m2 formworks works with supply.

Project No: HHR006

Client: Saudi Railways / Yapı Merkezi

Location: Madinah, KSA.

Project Start: Dec 2011

Project Duration: 1 year

Date of Completion : Dec 2012

Peak Manpower: 450 people

Average Manpower: 250 people

Contract Value: 10,130,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 30: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PETRORABIGH II INITIAL START-UP TEAM ACCOMODATION PROJECT

Construction of Camp Facilities, 200 Bachelor Accommodation Units and 48 Family Residence Units, including all MEP utilities and infrastructure works, total of 108,000 m2 covered area.

Scope included structural, mechanical, electrical, plumbing works and landscaping.

Project No: PRB008A

Client: Saudi ARAMCO / SUMITOMO

Location: Rabigh, KSA

Project Start: July 2015

Project Duration:243 days

Date of Completion: Mar 2017

Peak Manpower: 343 people

Average Manpower: 200 people

Contract Value: 26,666,667 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 31: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KING SAUD UNIVERSITY AGRICULTURAL ENG. FACULTY BUILDING

Civil works of the 3 floors, 12,000 m2 faculty building.

Scope included 2,700 m3 concrete and 400 tons reinforcement works.

Project No: KSU002

Client: Renaissance Construction KSA

Location: Riyad, KSA

Project Start: Mar 2011

Project Duration: 6 months

Peak Manpower: 150 people

Average Manpower: 75 people

Date of Completion: 30.09.2010

Contract Value: 1,200,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 32: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

JABAL OMAR H12, H13A, H13B and H13C TOWERS PROJECT

Civil works of the 34 floors, 58,000 m2 hotel towers in Jabal Omar Project.

Scope included 36,000 m3 concrete and 5,200 tons reinforcement work.

Project No: JOD003

Client: Jabal Omar Development Co.

Location: Makkah, KSA

Project Start: Feb 2011

Project Duration: 26 months

Peak Manpower: 450 people

Average Manpower: 300 people

Date of Completion : 30.03.2012

Contract Value: 14,133,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 33: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KING KHALID UNIVERSITY CONFERENCE HALL BUILDING

Civil works of the 28,000 m3 conference hall building in King Khalid University Project, Phase 3 Works.

Scope included 10,700 m3 concrete and 1,200 tons reinforcement works.

Project No: KKU004

Client: Ministry of Education / Baytur

Location: Abha, KSA

Project Start: Apr 2012

Peak Manpower: 130 people

Average Manpower: 100 people

Date of Completion : 15.08.2013

Contract Value: 2,800,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 34: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

KING KHALID UNIVERSITY GENERAL ADMINISTRATION BUILDING

Civil works of the 32,000 m2 General Administration Building in King Khalid University Project, Phase 3 Works.

Scope included 15,300 m3 concrete, 1,700 tons reinforcement and precast slabs installation works.

Project No: KKU004

Client: Ministry of Education / Baytur

Location: Abha, KSA

Project Start: Apr 2012

Project Duration: 26 months

Peak Manpower: 100 people

Average Manpower: 70 people

Date of Completion : 15.08.2013

Contract Value: 2,800,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 35: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PRINCESS NOURA UNIVERSITY FAMILY and CONSUMER SCIENCES FACULTY BUILDING

Civil works of the 80,000 m2 faculty building.

Project No: PNU001

Client: Renaissance Construction KSA

Location: Riyad, KSA

Project Start: Jul 2010

Project Duration: 7 months

Peak Manpower: 400 people

Average Manpower: 150 people

Date of Completion : 30.09.2010

Contract Value: 3,533,000 USD

www.akongrup.com.tr

COMPLETED PROJECTS

Page 36: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

PRODUCTION AND FABRICATION CAPABILITIES

www.akongrup.com.tr

Page 37: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

CONSTRUCTION EQUIPMENT

Page 38: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

ON SITE CONCRETE PRODUCTION FACILITY

On-site ready mix concrete production facility with a capacity of 150 tons/hr with necessary transport and pumping equipment. Laboratory facilities are established according to international requirements.

Page 39: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

STRUCTURAL STEEL FABRICATION FACILITY

800 tons/month structural steel fabrication capacity through our exclusive partner Matris Çelik ve Makina Sanayi ve Ticaret A.Ş.

2000 m2 closed, 4000 m2 open fabrication yard Sand blasting and painting facilities Plasma cutting, bending, directional drilling and automated welding equipment Production according to international standards with fully Qualified welders and adequate QA/QC coverage

Page 40: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

CERTIFICATES and AWARDS

www.akongrup.com.tr

Page 41: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

CERTIFICATES and AWARDS

Page 42: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

VENDOR APPROVAL

www.akongrup.com.tr

Page 43: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

S.N ABBREVIATION ABBREVIATION CERTIFIER COMPANY TITLE

VENDOR CODEof

AKON INTERNATIONAL CO. LTD.

1 MA'ADEN SAUDI ARABIAN MINING COMPANY 12893

2 ARAMCO SAUDI ARAMCO 10054797

3 SABIC SAUDI BASIC INDUTRIES CORPORATION 507721

4 RCJY ROYAL COMMISSION FOR JUBAIL AND YANBU RCY000107

5 KAEC KING ABDULLAH ECONOMIC CITY 4331

6 SEC SAUDI ELECTRICITY CO. VD006816 & 5005096

7 PETRORABIGH PETRORABIGH - RABIGH REFINING & PETHROCHEMICAL COMPANY 103093

8 EnerjiSA Enerjisa Enerji A.Ş. 37420

www.akongrup.com.tr

AKON VENDOR APPROVAL NUMBERS

Page 44: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

OUR CLIENTS

www.akongrup.com.tr

Page 45: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

www.akongrup.com.tr

OUR CLIENTS

Page 46: CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEYakongrup.com.tr/wp-content/uploads/presentation/AKON-Presentatio… · • Petrorabigh II –Blast Proof Manufacturing Buildings

THANK YOU

www.akongrup.com.tr