Waste To EnergyMSW waste ,Biomass, Medical waste , Toxic Waste

1

Page 2: Cmtsfeniksstart

How would we further develop the proposition into a viable project ?

ia a very disciplined stage-wise approach, evaluating all relevant aspects, committing more resources and reaching more accuracy at every stage

2

Economics & Technology studyReady .Willing. Able.

Technical Optimization Study

Secure Financing Engineering Construction

Formal points of evaluation and decision making before moving into the next phase

Final investmentdecision

1) Is the politic ready 2) Is the Politic and Recipient Willing3) Is the Politic able

Page 3: Cmtsfeniksstart

Economics & Technology StudyThe initial phase in the project is:

2) Is the politic Recipient Ready

3) Is the Politic/Recipient Willing

4) Is the Politic /Recipient able

5. Construct economic business case

6. Gate Fee /Recycling products/Electric price and Infrastructure.

7. Optimize technologies based on feedstock secured

3

Page 4: Cmtsfeniksstart

Economics & Technology Study

Study deliverables

Economic viability model

Waste To Energy validation presentation

Budget study 300.000 Euro*

*Budget is based on a study concerning a city of not more than 500.000 citizens

4

Technology concept & economic evaluation

Technical aspects ( Plant, Process, Design & Selection)

Feasibility of process on headline, raw data sheet feedstock. Investment cost plus/minus 30%

Local and Site aspects Impression of the local site area

Contract analysis Feedstock, licenses, grid connections

Economic business case Scenario’s for financing structure. Return on investment sheet