Kaduna City Drive Test Report
ETISALAT DRIVE TEST REPORT
Kaduna City
SIGN:
DATE:.
Huawei Technologies Co., Ltd.
OCTOBER 2010
All rights reserved
2010-10-20 Kaduna City DT Report Page 1, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
2/10
Kaduna City Drive Test Report
Contents
1. Summary of drive test.................................................................................3
2. Drive Test......................................................................................................3
2.1 Summary of Drive Test................................................................................................3
3. Conclusion.................................................................................................10
2010-10-20 Kaduna City DT Report Page 2, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
3/10
Kaduna City Drive Test Report
1. Summary of drive test
Tools of Drive Test:
Test Hardware Sony Ericsson Z750i, USB GPS76, Laptop
Test Software TEMS Investigation 9.1
Dial Configuration (Long Call) Duration(s): Long Call
Interval(s): 10
Test Engineer: Uko Akaninyene
Test Date: 18/10/2010 & 19/10/2010
Drive test Analyst: Uko Akaninyene
Log data name: Kaduna_20101018_01.log ~ Kaduna_20101019_19.log
2. Drive Test
2.1 Summary of Drive Test
The figures below show the Data Mode, Coding Scheme and Throughput of Kaduna City.
2010-10-20 Kaduna City DT Report Page 3, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
4/10
Kaduna City Drive Test Report
Figure 2.1.1 Site Distribution in Kaduna City
2010-10-20 Kaduna City DT Report Page 4, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
5/10
Kaduna City Drive Test Report
Figure 2.1.2 Data Mode Map
2010-10-20 Kaduna City DT Report Page 5, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
6/10
Kaduna City Drive Test Report
Figure 2.1.3 Rx Lev Coverage Map
2010-10-20 Kaduna City DT Report Page 6, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
7/10
Kaduna City Drive Test Report
Figure 2.1.4 RLC Throughput DL
Figure 2.1.5 Throughput Chart
2010-10-20 Kaduna City DT Report Page 7, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
8/10
Kaduna City Drive Test Report
Figure 2.1.6 Coding Scheme DL
Figure 2.1.7 Coding Scheme Statistic Chart
2010-10-20 Kaduna City DT Report Page 8, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
9/10
Kaduna City Drive Test Report
Figure 2.1.8 Number of Used Timeslots DL
Figure 2.1.9 Number of Used Timeslots DL
2010-10-20 Kaduna City DT Report Page 9, Total 10 Pages
7/28/2019 Cluster Drive Test for Kaduna (Ftp)
10/10
Kaduna City Drive Test Report
3. Conclusion
According to the above analysis, the percentage of the number of used timeslots
that is allocated 4 ts is about 78%. The coding scheme is also averagely high. The radio
environment is also good (good C/I) from the test logfile. It can be concluded that the
FTP service in Kaduna city is very good.
2010-10-20 Kaduna City DT Report Page 10, Total 10 Pages