Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape of Town Quarter 3 Port Performance Report January 2016

Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Click to edit Master title style

TNPA Port Consultative Committee (PCC)

Port of Port Cape of Town

Quarter 3 Port Performance Report January 2016

Page 2: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

CONTENTS

1. Context Slides • Port Layout • MDS

2. Port Development Framework Plans • National Port Plan Methodology • Overarching Infrastructure Planning Principles • PDFP Process and Multi-Criteria Analysis • Port Strategy • PDFP Current, Short Term and Long Term Layouts • Port Development Initiatives – 7 year

3. Operations Performance • Marine Performance • TOPS Performance

4. Port Capital Plans (Current financial year) • CAPEX and Progress of Key Projects

2

Page 3: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PORT LAYOUT

3

Page 4: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

MARKET DEMAND STRATEGY OVERVIEW PORT OF CAPE TOWN

• Develop an integrated and responsive Human Resources strategy aligned to the MDS requirements thereby ensuring a value driven

and business partnering HR function.

HR Strategy

• Ensure availability of required skills sets to develop internal capability and capacity in order to address competency gaps.

• Retention of skilled workforce to deliver on prioritized areas and continue to strengthen the development initiatives for core, critical and scarce skills

as anchors and growth-enablers.

Organisation Strategy / Readiness

• Embed safety and

Health oversight

in port.

• Implement visible

felt leadership to

create a safety

Culture in port.

Safety

• Implement

Financial turnaround

strategy.

Financial sustainability

• Implement Tariff

Methodology and

Pricing Strategy with

Ports Regulator.

• Implement

agreements and

Licenses for all

Port services and

facilities.

• Create oversight

Capacity to drive

Port compliance.

Regulator and Key stakeholder

engagement

• Commercial plan

to grow and sustain

volumes for the Port

of Cape Town.

• Develop New

Business

Development

Strategy.

• Implement CRM

to improve

Customer

collaboration.

Target volumes and customer

satisfaction

• Take a systems

view of a port.

• Develop and

Implement

Operations

Management

Strategy.

• Establish operational

Efficiency targets

for all Terminals.

• Establish oversight

Teams to monitor

performance.

Operational effectiveness

and productivity

• Increase capacity

and capability to

deliver on the Port

of Cape Town

R 1.36 Bn 7 Year

Capex plan.

• Re-organise Port

Engineer to track

capital projects and

project schedule

deviations.

• Debottleneck

procurement to

reduce cycle times

(Dashboard)

Capital planning and execution

4

Page 5: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Click to edit Master title style

Port Development Framework Plans

5

Page 6: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Port Development Framework Plans

• TNPA draws its mandatory functions from the National Ports Act 2005, one of which being to prepare and periodically update the port development framework plans for each port.

• The port plans have been fully revised over the past year to re-establish government and industry requirements; confirm and amend infrastructure use and capacity and identify capacity creation in the ports’ system.

• The PDFPs form part of the TNPA National Ports Plan which co-ordinates the port system.

• The annual update of these plans are published every year on the following website: http://www.transnetnationalportsauthority.net

6

Page 7: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

National Ports Plan Methodology

7

Page 8: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Overarching Infrastructure Planning Principles

The Transnet Freight Demand Model forecast is the basis of demand planning

Fit with global; regional and national policies.

Integrate and align port, rail and road capacity planning

Optimise capital investment across all ports (ensuring ports are complementary) to ensure capacity meets demand

Port specialisation through planned complementarity

Ensure a sustainable response to environmental opportunities and constraints

Utilize available port space to maximise freight capacity

Improve infrastructural and operational efficiencies and reduce transport and logistics costs

Ensure world class freight handling services in terms of reliability, safety, cost-effectiveness

Maintain flexibility in order to respond to changing technological and economic conditions

Minimize the disruption to existing port activities

Ensure adequate provision for non-freight services and facilities

Align with the requirements of stakeholders

PDF Plans are annually updated 8

Page 9: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PDFP Process and Multi-Criteria Analysis

The primary driver of port development is demand in the region or hinterland of that port. If the volume forecast exceeds capacity in a certain port then the following multi-criteria analysis were used to determine how best to plan port development. The multi-criteria analysis is especially important for ‘regional ports’ such as Ngqura and PE, Richards Bay and Durban, and Cape Town and Saldanha Bay where ports share a similar hinterland/demand.

Criteria group Details

Technical Port Planning: Flexibility, Expansion potential, Back of quay Maritime Engineering: Navigation, Vessel size increase, Geotech, Ease of construction, Disruption Transportation: Port Access, Staging/parking, Road connectivity, Rail connectivity, Pipe connectivity.

Environmental Biophysical Impacts: Terrestrial habitat destruction, Marine habitat destruction (port), Marine habitat destruction (offshore), Marine water and sediment quality, Shoreline stability, Surface and ground water.

Social Impacts: Air quality, Visual, Recreational use access, Heritage Resources, Green Economy, Job creation.

Economic Phasing: Option lends itself to phasing?

Capital Costs: Land acquisition, Construction , Services infrastructure, Environmental offset.

Operating Costs: Maintenance, Transportation, Congestion, and Environmental management.

Socio-economic benefit

Legal/Statutory/Regulatory Land acquisition

Permit approvals

Land use Metropolitan Issues: Meshes with Vision of the City, Extent of Port boundary extensions, In line with SDF and City urban regeneration.

Back of port integration: Portside land uses are compatible with land uses in adjoining, Municipal precincts, Urban Renewal initiatives, Promotion of City and Port integration, interface, Heritage and cultural issues into account,7 Year capital projects between Port and Municipality.

9

Page 10: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PORT OF CAPE TOWN– MDS

IMPLEMENTATION

To be a sustainable port by growing volumes and placing focus on continuous container growth, cruise industry, sub- Saharan transhipment trade and increased growth in the oil and gas industry. Constantly improving performance and delivering superior service. Ensure safe reliable transport logistics by integrating and maximizing our assets, continuously driving costs down and demonstrate concerns for sustainability on an on-going basis Ensure skilled staff to continuously improve port efficiencies Provide world class facilities and capacity ahead of demand Endeavour to expose our communities to the Port environment and port related activities and invest in their development .

Vision

TO BE A PREMIUM PORT BY BEING CUSTOMER CENTRIC AND DELIVERING SUPERIOR SERVICE, GROWING THE LOCAL HINTERLAND AND WEST AFRICAN TRADE. A CATALYST FOR ECONOMIC GROWTH IN THE WESTERN CAPE REGION

Stay in tune with our customer’s needs and a dynamic global economy as we are positioned to reflect optimal efficiency, competiveness and reliability. The local hinterland our customer base, has enormous potential for growth and we plan to provide them with the timeous capacity and logistics efficiency that they require to be competitive on the global frontier. The world trend of increased vessel sizes, will require the port to plan and provide infrastructure that caters for such maritime dynamics. Ideally situated as a hub port for the West African Coast, the Port will be handle larger vessels and stimulate sub-Saharan transhipment trade of cargo from Europe and the Americas, and explore potential off-shore oil activities in West Africa

Driven by a 3 tier strategy

Vision

10

Page 11: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PDFP Port of Cape Town

Current Layout

11

Page 12: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PDFP Port of Cape Town

Short Term Layout

12

Page 13: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

PDFP Port of Cape Town

Port Development Initiatives – 7 Year

1. Expansion of Container Terminal

2. Conversion of Eastern Mole for Liquid Bulk

3. Develop land and basic services for port expansion – Culemborg

4. Refurbishment of Ship Repair Facilities

5. Rehabilitation of the Main Breakwater

6. Stabilization of Long Quay

7. Upgrade of Port Infrastructure in Port Nolloth

13

Page 14: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Port of Cape Town

Medium Term Layout

14

Page 15: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Port of Cape Town

Long Term Layout

15

Page 16: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Click to edit Master title style

Operations Performance

16

Page 17: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

OPERATIONAL PERFORMANCE VOLUMES

17

Comments

Containers: Reefer and grape season started near the end of November 2015, resulting an increase in volumes.

Dry Bulk: Handled, fertiliser, wheat, barley, agricultural products and maize imports. Drought conditions have impacted positively on maize import volumes. Maize imports are still on-going in order to boost local supplies that have been negatively impacted by drought conditions.

Breakbulk: Handled fruit, cement , general cargo, woodchips and fish. However, only general cargo was handled in November 2015.

Liquid Bulk: Handled, MFO, LPG, diesel and Jet fuel . Increase in volumes for December 2015 due terminal catching up on vessels that were delayed in Durban.

80.881 +24,27%

2,20%

+21,5%

79.104 65.086 Containers (TEUs)

Liquid Bulk (Kilolitres)

116.704 +23,93%

+53,82%

-19,43%

75.871 94.170

+997,13%

58.314 +24,00%

-88,70%

5.315

47.026

130.181 134.570

+44,92%

188.654 -28,67%

-3,26%

Oct. , Nov. and Dec. 2015 PERFORMANCE YTD PERFORMANCE

Dry Bulk (Tons)

Break Bulk (Tons)

+9,90%

+1,46%

665.357 720.702

655.767

1.047.832 +259,84%

+170,48%

1.393.977

387.391

463.235 +19,58%

+10,12%

426.608 387.391

+26,71%

19,83% 1.754.870 1.384.926 1.727.434

17

Page 18: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

OPERATIONAL PERFORMANCE SHIP TURNAROUND TIME

Budget

Actual

29 29 29 29 29 29 29 29 29 25 25 25

22 23 23 21 24 23

0

20

40

Apr May June Jul Aug Sep Oct Nov Dec

Ship Turnaround Time (hrs) - Containers

Budget

Actual

71 71 71 71 71 71 71 71 71

42

73 73 69 66

93

67 58

69

0

50

100

Apr May June Jul Aug Sep Oct Nov Dec

Ship Turnaround Time (hrs) – Dry Bulk

Budget

Actual

75 75 75 75 75 75 75 75 75 72

55

80 79

43

83

35

46

77

0

50

100

Apr May June Jul Aug Sep Oct Nov Dec

Ship Turnaround Time (hrs) – Break Bulk

Budget

Actual

85 85 85 85 85 85 85 85 85 84

72

56 61

76 68

88

61

77

0

50

100

Apr May June Jul Aug Sep Oct Nov Dec

Ship Turnaround Time (hrs) – Liquid Bulk

Budget

Actual

18

Page 19: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

OPERATIONAL PERFORMANCE MARINE

11

21

15

4 6

5

0

5

10

15

20

25

Oct Nov Dec

Vessels movements (arrivals) DRYBULK (Mn)

14

16 17

14 14

11

0

2

4

6

8

10

12

14

16

18

Oct Nov Dec

Vessels movements (arrivals) LIQUID BULK

Budget

Actual

76 73 64

59 60 57

0

20

40

60

80

Oct Nov Dec

Vessels movements (arrivals) CONTAINERS

511 473

502

423

523

447

0

100

200

300

400

500

600

Oct Nov Dec

Number of Vessels (Oct – Dec) Q3

19

Page 20: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

OPERATIONAL PERFORMANCE MARINE

0

5

10

15

20

25

30

Oct Nov Dec

Vessels movements (arrivals) BREAKBULK & OTHER BULK

Budget

Actual

0

0.2

0.4

0.6

0.8

1

Oct Nov Dec

Vessels movements (arrivals) AUTOMOTIVE

21.4

21.6

21.8

22

22.2

22.4

22.6

22.8

23

23.2

Oct Nov Dec

Tug Utilization %

70

72

74

76

78

80

82

84

86

Oct Nov Dec

Tug Availability %

The port does not handle Automotive vessels.

20

Page 21: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE JOINT BUNKERING SERVICES

21

Page 22: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CAPE TOWN BULK STORAGE

22

Page 23: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CAPE TOWN BULK STORAGE

23

Page 24: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CHEVRON

24

Page 25: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE FFS REFINERS

25

Page 26: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE FFS REFINERS

26

Page 27: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE FPT PORT LEASING

27

Page 28: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE FPT PORT LEASING

28

Page 29: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE FPT PORT LEASING

29

Page 30: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE GRINROD

30

Page 31: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE GRINROD

31

Page 32: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CTCT

32

Page 33: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CTCT

33

Page 34: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE MPT

34

Page 35: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE MPT

35

Page 36: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CROSSBERTH

36

Page 37: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

TOPS PERFORMANCE CROSSBERTH

37

Page 38: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

MOPS

38

Page 39: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

Click to edit Master title style

Approved Capital Program 2015/16

39

Page 40: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

APPROVED CAPITAL FUNDING

2015/16

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Budget 5.6 9.1 12.6 15.3 16.6 12.7 16.5 16.5 12.2 14.2 17.1 20.3

Actual 5.6 9.1 5.9 5.2 6.1 11.4 25.4 28 14.7

-

5.0

10.0

15.0

20.0

25.0

30.0

CAPITAL SPENDING 2015/16

40

Page 41: Click to edit Master title style - WordPress.com › 2019 › 07 › cpt-quarter-3-pcc... · Click to edit Master title style TNPA Port Consultative Committee (PCC) Port of Port Cape

CAPITAL PROGRAMME 2015/16 – YEAR 1

Name of project Description Progress To-date

1.Fire Fighting Equipment at Tanker Basin FEL 4

Upgrade and Installation of New Fire Fighting Equipment at Tanker Basin

68.2 %

2. Replacement of Mechanical Equipment FEL 4

Replacement of Mechanical Equipment (Plant) 2 %

3. Rehabilitation of Breakwater FEL 3

Rehabilitation of the Main Breakwater 100 %

4. Stabilization of Long Quay FEL 3

Stabilizing the Long Quay 83 %

5. Upgrade of Port Infrastructure in Port Nolloth

Rehabilitation of the Jetty Structure and revetment (FEL 4) 5 %

6. Replacement of the MV Cables - FEL 4

Electrical Infrastructure Network Upgrade 35 %

7. Replacement of the Cranes for Ship Repair Facilities

Replacement of the Cranes for Ship Repair Facilities 3 %

8. Refurbishment of Ship Repair Facilities (SDD,RDD and syncrolift) FEL 1 & 2

Refurbishment of Ship Repair Facilities 90 %

41