CLEX day 2006 Introduction. G.Geschonke CERN. CTF3 programme. 2005. 2004. Thermionic gun. DL. Linac. CR. 2006. CLEX 2007-2009 building in 2006. Photo injector / laser tests from 2006. TL2 2007. 30 GHz production (PETS line) and test stand. On schedule so far. - PowerPoint PPT Presentation

Citation preview

Page 1: CLEX day 2006 Introduction

1 CTF3 CLEX day July 2006

CLEX day 2006Introduction

G.GeschonkeCERN

Page 2: CLEX day 2006 Introduction

2 CTF3 CLEX day July 2006

DL

CLEX 2007-2009building in 2006

20042005

CTF3 programme

2006

Thermionic gun

CR

Linac

TL2 2007

30 GHz production(PETS line)and test stand

Photo injector / lasertests from 2006

On schedule so far

Page 3: CLEX day 2006 Introduction

3 CTF3 CLEX day July 2006

Delay Loop latest news

one of three buncher cavities

Page 4: CLEX day 2006 Introduction

4 CTF3 CLEX day July 2006

30 GHz work

CTF3 linac

PETs branch

High-gradient test stand, CTF2

High-power transfer line

Two-beam 30 GHz power production in CTF3

70 80 90 100 110 120 130 140 15010

-7

10-6

10-5

10-4

10-3

10-2

10-1

100

Bre

akd

ow

n p

rob

abil

ity

Peak gradient

Mo 80 ns

Mo 60 ns

Mo 40 nsCu 70 ns 30 GHz

Cu 40 ns 30 GHz

CLIC GOALrecent Cu structure

presently CLIC parameters are reviewed,probably frequency and acc. gradient change

Page 5: CLEX day 2006 Introduction

5 CTF3 CLEX day July 2006

Next steps: 2006

• Fully commission Delay Loop

• Separate Linac from rest of machine

• 30 GHz power testing

• Construction of CLEX building

• Install and commission Combiner Ring

Combiner Ring and TL1:Optics: INFN Magnets: BINP/CERN/Lure/CIEMAT/

INFN Power supplies: CERN RF deflectors: INFN Septa: CIEMAT Kicker: CIEMAT/CERN pulser: CIEMAT/CERN 3 GHz source: CERN Controls: CERN BPM electronics: LAPP / CERN Vacuum chamber + BPM: INFN

In spite of some difficulties, we expect the Combiner Ring to be finished in 2006

Page 6: CLEX day 2006 Introduction

6 CTF3 CLEX day July 2006

J an Feb Mar

Wk 1 2 3 4 5 6 7 8 9 10 11 12 13

Mo 2 9 16 23 30 6 13 20 27 6 13 20 27

Tu

We

Th

Fr

Sa

Su

Apr May J un

Wk 14 15 16 17 18 19 20 21 22 23 24 25 26

Mo 3 10 17 24 1 8 15 22 29 5 12 19 26

Tu

We

Th

Fr

Sa

Su

J ul Aug Sep

Wk 27 28 29 30 31 32 33 34 35 36 37 38 39

Mo 3 10 17 24 31 7 14 21 28 4 11 18 25

Tu

We

Th

Fr

Sa

Su

Oct Nov Dec

Wk 40 41 42 43 44 45 46 47 48 49 50 51 52

Mo 2 9 16 23 30 6 13 20 27 4 11 18 25

Tu

We

Th

Fr

Sa

Su

CTF3 SHUTDOWNSee planning EDMS

2006 - CTF 3 - Schedule

CTF3 under access control for HV and RF

conditionning

Shut downCTF3

with beamCTF3 closed with

keys for Hardware tests

CTF3

SHUTDOWN

CTF3 CR installationBeam in PETS

10 May 2006

Tests BDI

CCC ready

G. Frid

Eastr May

Ascen

Whit.

J eune G.

CTF3 stop

Commissioning of C.R.+ Beam in PETS

Start conditioning and setting-upTests CO + PO

D.L.(+ PETS)

Installation C.R.

Beam in PETS only

Beam in PETS only

Tests PO Tests BDI

D.L.

Installation C.R.

Linac Conf.

EPAC

Start MKS in diode

POSIPOL

Start CLEXCivil Engineering

Machine open

CTF2 open water stations tests in Linac

Page 7: CLEX day 2006 Introduction

7 CTF3 CLEX day July 2006

Next steps: 2007

Optics India ?Magnets: CERN, Celsius, CIEMAT, Vacuum system: India ? 50 m alu chamber, shielded bellows + pump ports,BPM pick-ups and screens: CERN

Vacuum pumps and control CERNPower supplies: CERNBPM electronics : LAPP ?

TL2 (2007) TL2 * 2007

CERN ?

Page 8: CLEX day 2006 Introduction

8 CTF3 CLEX day July 2006

CLEX building

8 m wide, 40 m longpartly covered by klystron gallery

Status: Building layout definedconstruction started 2006

Hans Braun

DF DF DFDF DF DF DF DFDF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF

LIL-ACSLIL-ACS FD DF LIL-ACSLIL-ACS FD DFFD DFDFD

DFD

DFD

DFD

DF DFDUMP

8 m8 m2m2m

D F DD F D

FFDD

FFDDFFDD

D F DD F DDUMPD F DD F D

DUMP

40 m40 m

D F DD F D

1m wide passage all around

TBL

30 GHz Teststand Probe beam injectorDUMP

DUMP

Very tentative layout for CLEX floor space

DUMP

D F DD F D

F

FD

F

FD

D F DD F DDUMP Instrumentation Testbeam

3m3m

6 m

6 m

13 m13 m15 m

D F DD F DD F DD F D

Construction during 2006installation of equipment from 2007 - 2009

Page 9: CLEX day 2006 Introduction

9 CTF3 CLEX day July 2006

CLEX

3.5.2006

24.5.2006

10.7.2006

Page 10: CLEX day 2006 Introduction

10 CTF3 CLEX day July 2006

Project status CLEX

2-Beam Test Stand:

Beam dynamics, Magnets, vacuum, Beam Diagnostics; Uppsala University

DUT + RF equipment: CERN

Probe BeamDapnia / LAPP / LALCERN

Instrumentation Test Beam(not presently in base-line project)Great Britain ?

Building: CERN

TBLDesign: CERNBenchmarking experiments : CERN Magnets and magnet movers: CIEMAT Power supplies: CERN Beam Diagnostics: Spain ? NW University IllinoisVacuum system CERNPETS: Prototype CIEMAT, Series ?

DF DF DFDF DF DF DF DF

LIL-ACSLIL-ACS FD DFDFD

DFD

DFDUMP

8

m

6

m

2m

DFD

FD

FDFD

DFDDUMPDFD

DUMPDFD

1m wide passage all around

TBL

30 GHz Test stand

Probe beam injectorDUMPDUMP

DUMP

DFD

F

FD

DFDDUMPInstrumentation

Test beam

DF DF DFDF DF DF DF DFDF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF

LIL-ACSLIL-ACS FD DF LIL-ACSLIL-ACS FD DFFD DFDFD

DFD

DFD

DFD

DFDFDUMP

8

m 8

m

6

m6

m

2m2m

DFDDFD

FFDD

FFDDFFDD

DFDDFDDUMPDFDDFD

DUMPDFDDFD

1m wide passage all around

TBL

30 GHz Test stand

Probe beam injectorDUMPDUMP

DUMP

DFDDFD

F

FD

F

FD

DFDDFDDUMPInstrumentation

Test beam

Installations should be able to be operated by the operations/commissioning team !

Page 11: CLEX day 2006 Introduction

11 CTF3 CLEX day July 2006

Accelerating Structure

Tank

Directional couplers

Faraday Cup

RF Power from PETS

Variable Power Splitter

Ion Pump

Cooling Water

RF Loads

‘Typical’ 30 GHz high-power test stand

Pets Accelerating structure

Page 12: CLEX day 2006 Introduction

12 CTF3 CLEX day July 2006

Tests with 2-beam test stand

a) condition and operate a PETS structure up to the nominal output power (640 MW, 70 ns). The test structure will have the same geometry as a CLIC PETS but only be longer to be able to generate the same power levels with a lower current beam - 30 A rather than 160 A

b) operate CLIC accelerating structure at nominal parameters

c) acceleration with probe beam (single or few bunches); verify fields, power

d) measure the effect of rf breakdown on the drive and probe beams. The measurements are crucial for determining the required breakdown rate for CLIC components.

e) demonstrate operation of a CLIC module which consists of four accelerating structures driven by a PETS.

Page 13: CLEX day 2006 Introduction

13 CTF3 CLEX day July 2006

Page 14: CLEX day 2006 Introduction

14 CTF3 CLEX day July 2006

Photo Injector

Status:RAL laser advancing LAL RF gun cavity advancingCERN photo cathode activities on schedule.

Photo-Injector installation

2004 – end of 2006 Photo-injector in the former

CTF2 Laser-room in the former

CTF2 laser-roomPosition stability not guaranteed

CTF 2

5 m

Optical table1.5 x 3.5 m

6 electr. racks

RF test stand

Clim. Clim.

1.5x

1.5 m

Dum

p

Dum

p

Dum

p

Dum

p

Laser-room

Removableblocs

CLEX

CTF3Laser

RF compressor

30 GHz RF production

e- beam

CTF 3

CTF 2

5 m

RF test standPhoto-injector

Clim. Clim.

Dum

p

MPC

TC

Dum

p

e- beam Light towards the streak camera 30 GHz RF production

Laser beam

30 GHz RF pulse compressor

Dum

p

From 2007 Photo-injector in the place of

the CTF3 thermionicgun Laser-room in the first part of

the CTF2

CTF3 Collaboration meeting 23-25/11 /2004

Solenoid

RF inputPhotocathode

85 MV/m acc. field5 MeV

Phase 1:Test in CTF2: From 2007 onwardsLaser in “old” laser room above CTF2

Phase 2:Gun in CTF3: earliest spring 2008Laser in CTF2

Page 15: CLEX day 2006 Introduction

15 CTF3 CLEX day July 2006

Planning summary:

CLEX: building ready: end 2006 ready to install equipment: Mid June 2007

Klystron gallery: building ready: March 2007 ready to install equipment: Mid June 2007

TL2: Install 2. half 2007 TL2*: Install end 2007

CR install: fall 2006CR Commissioning: 2007

Two-Beam test stand : First beam as early as possible: April 2008

TBL : goal first tests in 2008

Goals for 2008: PETS power / operate accelerating structure / Probe beam commissioned

Probe Beam

Klystron/modulator : ?Laser In “old" laser room above CTF2: from mid 2006 In CTF3 earliest beginning 2008Califes installation ?Commissioning in parallel with TBTS and PETS tests (2008)

Beam in CLEX : from March 2008 onwards

Page 16: CLEX day 2006 Introduction

16 CTF3 CLEX day July 2006

Expected this evening

Definition of:

Who does what from where to whereinterfaces, engineering details, infrastructureintegration

Planning updated or confirmed

BPM strategy, read-out electronics ?

Page 17: CLEX day 2006 Introduction

17 CTF3 CLEX day July 2006

Recent Results

0 50 100 150 200 250 30050

100

150

200

Pulse Length (ns)

Pea

k G

rad

ien

t (M

V/m

)

CTF3 MoCTF2 Mo

G ~ (-1/6)

NLC CuCTF3 CuReached nominal CLIC values :

150 MV/m 70 ns