Abst.Eastern Coalfields LimitedEstimate No. - 1 Date: 19-03-2015 (A Subsidiary of Coal India Ltd.) ECL (Civil) 102Colliery: Khottadih OCP ABSTRACT OF COST FOR ORIGINAL ESTIMATEName of Work: Cleaning of garbage, industrial wastes and mud within HEMM workshop under Khottadih OCP.Item No.Sub heads and Item of workQuantityUnitReference in SORUpdatedRateAmount in Rs.1Cleaning & removing conservancy garbege mixed with rubbish and other fifthy materials from road side drain & compound including loading unloading by mathor labour and removing the same to any distance8096.25Cum.PWD- 2012,P-516,I-4957.88468610.95468610.95Add Service Tax 14.00% of 40%26242.21Total494853.16

DetailsCleaning of garbage, industrial wastes and mud within HEMM workshop under Khottadih OCP.(1 April '2015 to 15th Aug' 2015) 30+31+30+31+31+30+15=198 days.Sl. No.Description of Items.No.Length.Breadth.Height.Factor.Quantity.Unit(M)(M)(M)1Cleaning & removing conservancy garbege mixed with rubbish and other fifthy materials from road side drain & compound including loading unloading by mathor labour and removing the same to any distanceDays up to 15 Aug '2015'15100.00085.0000.0506375.00Cum.1560.00025.5000.0751721.25Cum.Total:-8096.25Cum.Total days198.00Nos. of head10.001st June'2014 to 31st March' 2015 total days1980.00Rate of unskiled per day222.00439560.00Add Over head &contractor profit12%52747.20All Total:-492307.20

AnalysisUP DATE ANALYSISLabour weightage from CPWD 20072.2 :Clearing of coal from Railway Track sides and side drain macking (not exceeding 1.5m inwidth or 10 sqm on plan) including dressing of sides and lift up to 1.5m, including getting outthe coal and disposal of surplus excavated coal as directed with in a lead 50m.2.2.1All kinds of Coal (Loose)CodeDescriptionUnitQuantityRateAmountDetails of cost for 10 cum.Labour-114BeldarsDay5.9115CooliesDay3.6101BhishtiDay0.4TOTALCompacted9.9Loose50%4.95165816.75Add 1 % for water charges8.17TOTAL824.92Add 10% for contractors profit and overheads82.49Cost of 10 cum.907.41Cost of 1 cum.90.74Say90.00For Coalless1/'10-9.0081.00