Upload
duane-blankenship
View
222
Download
0
Embed Size (px)
DESCRIPTION
CITL concept presented to Faculty : o Joint Faculty Board meeting with CMR of St Jean and RMC of Canada. Overwhelming support. Too many volunteers. Large multidisciplinary committees at RMC CITL Committee 3
Citation preview
Class of 1965Centre for Innovation in
Teaching and Learning (CITL)
Update Presentation22 October 2015
1
• RMC needs to expand its activities that enhance education:o Teaching beyond:
Technological & Pedagogical Innovations in Education.
o Student success beyond: Writing Centre, Math Assist Programme.
• We need to look at teaching and student success in the broadest possible way.
CITL
2
• CITL concept presented to Faculty 04-2015:o Joint Faculty Board meeting with CMR of St
Jean and RMC of Canada.• Overwhelming support.• Too many volunteers.• Large multidisciplinary committees at
RMC
CITL Committee
3
• 18 members:o All faculties represented,o One TEA winner and two runners-up,o Reps from three colleges,o Students:
2 cadets, 2 graduate students.
o Other stakeholders: Library, Division of Continuing Studies, Training Wing, Language Centre, CDA.
CITL Committee
4
• Group has met 6 times:o 9 meetings due to difficulties getting together.
• CITL Committee:o reviewed concept 15 June (entire group),o developed list of required data 24 June (entire
group),o developed questionnaires over summer
27 July, 10 Sept, 16 Sept (sub-committee),o Reviewed questionnaires 29 Sept (entire group).
CITL Committee
5
• We need to survey the following:o ALL students,
What do they want and need.o ALL instructors,
What do they want and need.o Subject matter experts (SME) at other
universities, What is new and what works.
• Conduct an inventory of teaching and learning tools/programmes at our colleges.
Required information
6
• Survey all students and instructors.• Survey has 4 parts (11-14 questions).o Tombstone information,o Information on teaching,o Information on student services,o Open-ended comments.
• Delivered using ClassClimate® software,o Tool we use for course evaluations.
Required information – Surveys
7
• Where are we now?o Questions fully developed,o Consulted with the Faculty Association,o Translation to French will be completed 23 Oct,o Research Ethics Board review underway,o ClassClimate survey set-up 50% completed.
• Test surveys on instructors and students.• Survey delivery slated for early November.• Analysis in December-January.
Required information – Surveys
8
• Subject matter expert (SME) survey:o Telephone/visit with SME at (tentatively):
Queen’s, Ottawa, Trent, Moncton, Laurentien
o Questions being developed by sub-committee.
o SME survey to be conducted in November.
Required information – Surveys
9
• Inventory of existing teaching/learning/services at RMC of Canada completed by Dr. Scoppio.
• Document being updated by CMR St. Jean and CFC.
Required information – Inventory
10
• Deliver survey to (Nov):o Students,o Instructors,o SME .
• Analysis of data (Dec-Jan).• Present results to CITL group (Jan).• CITL develops plan and sets priorities.
Next steps
11