CITY OF SKOPJE CITY OF SKOPJE TRAFFIC & TRAFFIC & TRANSPORTATION PROJECTS TRANSPORTATION PROJECTS M.Sc. Jovan Hristoski M.Sc. Jovan Hristoski Traffic & Transportation Department Traffic & Transportation Department City of Skopje City of Skopje SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

CITY OF SKOPJE TRAFFIC & TRANSPORTATION … oš Make do nsk aB riga d Bos na i Herc ego vi na B u le va rA le ks an dr M a ke do n ski Legend: Tramway No 1 (offered version) Tramway

  • Upload
    vudat

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

CITY OF SKOPJECITY OF SKOPJE

TRAFFIC & TRAFFIC & TRANSPORTATION PROJECTSTRANSPORTATION PROJECTS

M.Sc. Jovan HristoskiM.Sc. Jovan HristoskiTraffic & Transportation DepartmentTraffic & Transportation Department

City of SkopjeCity of Skopje

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

�� Capital city, consists 10 administrative municipalities and the Capital city, consists 10 administrative municipalities and the Skopje Skopje City Government with equal authorities, except for traffic matteCity Government with equal authorities, except for traffic matters rs

�� 24 kilometers long, with urban building territory spread on 7 0024 kilometers long, with urban building territory spread on 7 000 0 hectares hectares

�� City road traffic network City road traffic network -- 211 kilometers of primary and secondary 211 kilometers of primary and secondary streets streets

�� 506 926 inhabitants in 2005506 926 inhabitants in 2005

�� 202 Passenger cars/1000 inhabitants202 Passenger cars/1000 inhabitants

�� Fast development after the earthquake in 1963Fast development after the earthquake in 1963

�� Until 2007only 49% of the total traffic network foreseen with thUntil 2007only 49% of the total traffic network foreseen with thee

Space Plan of City is being completedSpace Plan of City is being completed

�� 95 traffic lights equipped intersections within the urban95 traffic lights equipped intersections within the urban

traffic networktraffic network

CITY OF SKOPJE

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

�� The cityThe city’’s transportation model is established for the actual Space Plan s transportation model is established for the actual Space Plan needs, needs, according the 1998 traffic survey. No traffic survey data has beaccording the 1998 traffic survey. No traffic survey data has been made since then. en made since then. �� The current travel modal split is directed in an opposite direcThe current travel modal split is directed in an opposite direction from the goals totion from the goals toachieve sustainable urban transport development. The results of achieve sustainable urban transport development. The results of this are: traffic this are: traffic congestion and loss of time, lack of parking spaces, high level congestion and loss of time, lack of parking spaces, high level of pollution and noise of pollution and noise from the transport, high energy consumption.from the transport, high energy consumption.�� Public transport is organized and controlled by the City adminiPublic transport is organized and controlled by the City administration and they are stration and they are included one public and two private companies (with rate of 75/2included one public and two private companies (with rate of 75/25 % from all bus 5 % from all bus lines).lines).�� The problems that appear are in the quality of transport servicThe problems that appear are in the quality of transport service: very old buse: very old busvehicles fleet (public company with average of 17 years and privvehicles fleet (public company with average of 17 years and private companies with ate companies with average of 27 years old), small exploitation velocity (under 18 average of 27 years old), small exploitation velocity (under 18 km/h) and mutual km/h) and mutual competition. The number of passengers carried by the public trancompetition. The number of passengers carried by the public transport company from sport company from 150M passengers per year in 1989 has fallen to only 45M passenge150M passengers per year in 1989 has fallen to only 45M passengers per year in rs per year in 2007. But exact numbers of passengers from private companies are2007. But exact numbers of passengers from private companies are not available not available because they still use the old way of paying the ticket inside ibecause they still use the old way of paying the ticket inside in bus vehicle.n bus vehicle.�� Consider these problems it was decided to incorporate the alterConsider these problems it was decided to incorporate the alternative mode of native mode of transportation of passengerstransportation of passengers--light railway. light railway.

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

As a result, the following strategic objectives of the city of Skopje are:

� To provide transport system that will meet the travel needs of the citizens and the businesses;� To provide transport system that will enhance the quality of life in Skopje;� To reduce environmental and acoustic pollution;� To reduce energy consumption;� To promote environmentally friendly mode of transport (public transport, cycling, walking)� To encourage use of environmentally friendly fuels;� To reduce traffic congestion by implementation of travel demandmanagement, traffic management, integrated urban and transport planning etc.

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

The targeted objectives are:

� To develop are well defined policy and plan for development of sustainable urban transport system;� To promote the urban public transport mode (with railway systemas backbone);� To increase transport safety and security;� To develop transport management centre for increasing the traffic and transport capacity;� To develop and implement the city parking policy.

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

Content:Content:

1.1. TramwayTramway2.2. AVL + AVL + ““ SmartSmart ”” ticketing & Bus stations equipmentticketing & Bus stations equipment3.3. Zone parkingZone parking4.4. BoulevardsBoulevards5.5. Denivelaited intersectionsDenivelaited intersections6.6. RoundaboutsRoundabouts7.7. Bicycle paths networkBicycle paths network8.8. Traffic management centreTraffic management centre9.9. Bus lanes protection & BollardsBus lanes protection & Bollards

TRAFFIC & TRANSPORTATION PROJECTSTRAFFIC & TRANSPORTATION PROJECTS

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

1.1. PROJECT PROJECT ““ TRAMWAYTRAMWAY ””

-- Fresh impulse in the stagnated PT systemFresh impulse in the stagnated PT system-- Introduction of completely new versus the actual bu s PT Introduction of completely new versus the actual bu s PT

mode mode -- Improvement of PTImprovement of PT ’’s capacity, speed and regularitys capacity, speed and regularity-- Reanimation of an 1980Reanimation of an 1980 ’’s ideas idea-- Follows the basic directions from the General Maste r PlanFollows the basic directions from the General Maste r Plan

a) number of tramway linesa) number of tramway linesb) covering of main cityb) covering of main city ’’s spatial development directionss spatial development directions

-- Forming of financial construction according Forming of financial construction according the recent Feasibility Studythe recent Feasibility Study

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

???

????

??? ?

????

?? "?

????

???

???"

? ?? ? ? ? ? :

???? ??j??? ??? j? ??.1 (??????? ???? j????)

???? ??j??? ??? j? ??.1 (??????? ??? ??? ?j?)

???? ??j??? ??? j? ??.2 (????? ? ???)

???? ??j??? ??? j? ??.3 (????? ? ???)

???? ??j??? ??? j? ??.4

???

????

??? ?

????

?? "?

????

?"

? ???

??

?? ?

????

? ???

???

? ???

?

????

?? ??

???

????

Gjorce Petrov

Gjorce Petrov

Gjorce Petrov Bulevar Partizanski Odredi

Mitropoli t Teodosij Gologanov

Bulevar Partizanski Odredi

Bul

evar

Sv .

Kli

men

t Ohr

idsk

i

Dam

e Gruev

Bul

.VM

RO

Dimi trie Cupovski

11.Oktom

vri

Bul evar

Koco

Racin Bulevar K.J.Pitu

Bul evar K .J.Pitu Bulevar Jane Sandanski

Bulevar Jane Sandanski

Bulevar Vidoe Smilevski-Bato

Fevr

uars

ki P

ohod

Gar

age

depo

t

Bul

evar

Srb

ij a

Bulevar ASNOM

Dep

ot-R

epai

r sho

p

Raduška4.Juli

I saija Madžovski

Adolf Cibrovski

Nik

ola

Para

puno

v

Bulevar I linden

Bulevar Il inden

Bulevar Il inden

Bul evar Ili nden

Mos

kovs

ka

Mitropoli t Teodosij Gologanov

Bulevar Makedonij a

11.Oktom

vr i

Prvomajska

Prvomaj ska

Bul

evar

Krs

te M

isir

kov

Cve

tan

Dim

ov

Bu l

e var

Hri

sti j

an T

odor

ovsk

i Kar

p oš

Makedonska Brigada

Bosna i Hercegovina

BulevarAleksandr Makedonski

Legend:

Tramway No 1 (offered version)

Tramway No 1 (alternative version)

Tramway No 2 (second phase)

Tramway No 3 (third phase)

Tramway No 4

Project Project ““ TramwayTramway ”” –– Disposition of linesDisposition of lines

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

Project Project ““ TramwayTramway ”” –– Line 1 / Phase 1Line 1 / Phase 1

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

Project Project ““ TramwayTramway ”” –– Line 1 / Phase 1 and the DepotLine 1 / Phase 1 and the Depot

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

2.2. AVL + AVL + ““ SMARTSMART”” TICKETING & BUS STATIONS EQUIPMENTTICKETING & BUS STATIONS EQUIPMENT

-- Introduction of a new and integrated timetable mana ging and Introduction of a new and integrated timetable mana ging and tracking technology that can:tracking technology that can:

a) follow the exact position and movement dynamic o f a) follow the exact position and movement dynamic o f vehicles vehicles

b) enforce timetable control b) enforce timetable control c) introduce cashless fee paymentc) introduce cashless fee paymentd) inform passengers in reald) inform passengers in real --timetimee) alarm dispatcher in reale) alarm dispatcher in real --timetimef) quicken unpredicted onf) quicken unpredicted on --field interventions field interventions g) collect timeg) collect time --tables and planning datatables and planning data

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

AVL + AVL + ““ smartsmart ”” ticketingticketing

- Equipping of 300 vehiclesof the public PT company

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

Bus stations equipmentBus stations equipment

-Equipping of 330bus stations

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

3.3. ZONE PARKING PROJECTZONE PARKING PROJECT

-- Follows the recent trends in the regionFollows the recent trends in the region-- Improving of the cityImproving of the city ’’s parking policys parking policy-- Maximizing of the number of parking spots Maximizing of the number of parking spots

within the city areaswithin the city areas-- Better organization of parking sitesBetter organization of parking sites-- Introduction of time limited parkingIntroduction of time limited parking-- Unification of fee collection systemUnification of fee collection system-- Law enforcement strengthening Law enforcement strengthening

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

ULICA

MIR

E ACEV

KEJ 1 3 - NOEMVRI

BU

LEVA

R V

ASI

L G

LAVI

NOV

ULI CA DA ME GRUEV

ULIC

A 11 - OKT

O MV

RI

U LICA 1

1 - OK

TOM

VRI

UL . NAUM NAUMOVSKI BOR E

k ej DIM ITAR VL AHO V

KEJ 13 - NOEMVRI

UL ICA 11 - OK

T OM

VRI

Stoko vna Ku}a Mo st

BULEV AR KO^O R

ACIN

BULEV AR KO^O R

ACIN

BULEV AR KO^O R

AC IN

ULIC

A LE

NIN

GRA

DSKA

ULICA HRIST O BOTEV

UL

I CA

VO

DW

AN

SKA

BU

L EV

AR

SV

ETI

KLIM

EN

T O

HR

IDS

K I

BUL

. SV

. KL I

ME N

T O

HR

IDS

KI

BUL

. SV

. KLI

ME

NT

OH

RID

SK I

ULICA M AKSIM GORKI

ULICA DI MITRIJE ^UPOVSKI

ULICA D IMI TRI JE ^UPOVSKI

UL.

8 -

MA

U DA

RN

A B R

IGA

DA

ULIC

A DA

ME

GR

UEV

ULIC

A D

AM

E G

RU

EV

ULICA D

AME G RUEV

ULICA DAM E GRUEV

UL I

CA

MAK

EDO

NIJA

UL I

CA M

AK

EDO

NIJ

AULICA DIMIT RIJE ^UPOVSKI

BU

L EVA

R V

ASI L

GL

AVI N

OV

BULEVAR PARTIZ ANSKI ODREDI

BUL EVAR PART IZ ANSKI ODREDI

BUL EVAR PARTIZANSKI ODREDI

ULI

CA

LEN

INO

VA

ULI

CA

LE

NIN

OVA

BUL EVAR PARTIZANSKI ODREDI

BULEVAR PARTI ZANSKI ODREDI

BULEVAR PARTI ZANSKI O DREDI

UL

.23

- N

OEM

VRI

UL. 2

3 - N

OEM

VRI

BUL EVAR PARTIZANSKI ODREDI

U LIC

A F

RA N

KLI

N R

UZV

EL T

ULI

CA

F RA

NK

L IN

RU

ZVE L

T

b ul. M ITRO POLI T TEODOSIJ GOL OGANOV

UL ICA 2 9 - T I NOEMVRI

UL

ICA

LEN

INO

VA

BULEV AR ILINDEN

BULEVA R ILIN DEN

BULEV AR ILINDEN

BULE VA R ILINDEN

BULEV AR ILINDEN ULI

CA LEN

INOVA

BULEV AR ILINDEN

UL IC

A N

AUM

NAU

MOV

S KI B

OR^E

ULI

CA

NA U

M N

AUM

OVS

KI B

OR

E

BULEV AR ILINDEN

BUL EVA R ILINDEN

BULE VAR ILINDEN

UL ICA F

RAN

KL IN R

UZV

ELT

B ULE VA R ILINDEN

UL

ICA

9 -

T I M

AJ

ULIC

A PE

TRE

POP

ARS

OV

ULI

CA

HR

IST O

SM

I RN

ES K

I

BU LEVAR G OCE DEL^EV

BUL EVAR G OCE DEL^EV

UL

I CA

STIV

NA

UM

OV

UL

ICA

ST I

V N

AU

MO

V

UL I

CA

STI

V N

AUM

OV

ULI

CA

VASI

L A

XILA

RSK

I

ULICA VAS IL A

X ILARSKI

KEJ 13 - NOEMVRI

KEJ 1 3 - NO EMVRI

REKA VARAR REKA VARAR

MO

ST

NA

RE

VO

LUC

IJAT

A

PLO [TAD MAKEDO NI JA

U LICA ORCE NIKOLO

V

ULI CA M AKSI M G ORKI

ULICA NIKOLA VA PCAROV

BULEVAR G OCE DEL^EV

BULEVAR GO CE DEL^EV

ULICA IQ O VO

JVO DA

MO ST G OCE DEL ^EV

B ULE VA

R VAS

IL G

LAVI

NOV

UL. 8

- M

A RT

UL.

8 -

MAR

T

UL.

KO

LE N

ED E

LKO

V SKI

UL.

KO

LE N

EDE

LKO

VSK

I

UL.

PAJ

AK

UL. M

IHA

IL C

ONKO

V

b ul. M ITRO POLI T TEODOSIJ GOL OGANOV

b ul. M ITRO POLI T TEODOSIJ GOL OGANOVbu l. MI TROPOL IT TEO DO SIJ GO LO GANOV

bul. MITROPOL IT TEODOSI J GOL OG ANO V

ULICA NARODEN F RONT

UL ICA NARODEN FRONT

UL ICA NARO DEN FRONT

ULICA DI MITRIJE ^UPOVSKI

BU

LEV

AR

KR

STE

MIS

IRK

OV

BU

LEV

AR

KR

STE

MIS

IRK

OV

BU

LEV

AR

KR

STE

MIS

IRK

OV

ULI CA MITO HA XIV ASILE V JA SMIN

ULICA MITO HA XIV ASI LEV JA SMIN

ULICA MITO HAX IVA SILEV JASMIN

ULI CA MITO H AXI VASILEV JASMIN

ULI

CA

MA

KED

ON

I JA

UL I

CA

MAK

EDO

NIJ

A

ULI CA

11 - OK

TOM

VRI

k ej DIM ITAR VLAHOV

UL ICA DREZDENSKA

ULIC

A L EN

INOVA

ULI

CA L

ENINO

VA

ULICA ORCE N IKOLOV

ULICA ORCE NIKOLOV

ULIC

A F

RA N

KLIN

RUZ

VELT

ULI C

A F

RAN

K LIN

RU Z

VELT ULICA ORCE NIKOLOV

UL.

23

- N

OE

MV

RI

ULI CA I. MI LUTINOVI]

UL ICA I. MI LUTINOVI]

ULI

CA LEN

INO

VA

ULI C

A \. \ AKO

VI ]

UL IC

A \. \AK

OV I]

REK

A V

ARDA

R

RE

KA V

ARDA

R

REKA V

ARDAR

R EKA V ARDAR

REKA VARDAR

REKA VARDAR

U LICA SAMOIL OVA

U LICA PITU G ULI

UL ICA ORCE NIKO

LOV

ULICA MAKSIM GO RKI

ULIC A IQ O VOJ VODA

AVTO BUSKA STANICA

DAUT PA[ IN AMAM

MNT

UNIVERZITETSKA BIBLI OTEKA

O U. KIR IL I METO DIJ

GRADSKA BOL NICASOBR AN IE NA RM

DOM NA ARM

G RADSKI TRG OVSKI CENTAR

CRVEN KRST

TC MAVROVKA

STO KO VNA KU]A I LI ND EN

UL

ICA

B IT

OL

SKA

UL

I CA

SV

ET O

ZA

R M

AR

KOV I

]

ULI CA T ETOVSKA

UL I

CA

FR

AN

KLIN

RU

ZVE

L T

ULI

CA

FR

AN

K LI N

RU Z

V ELT

UNIVERZAL NA SALA

T. C. BU WAKOVEC

SOBO REN HRAM

BULEV AR KO^O RACIN

PARKING

ESM

PO[TA

SO BRANIE NA G RAD SKO PJE

FABRIKA TRESKA

FABRI KA TRESKA

FABRIKA TRESKA

NIP N OVA MAKEDO NI JA

KL UB NA PRATENI CI

STUDENTSKI CENTAR

STUDENTSKI CENTARK.J .PITU

K.J. PITU

G IMNAZIJ A J.B. TITO

TEATAR CENTAR

TRG OTEKSTIL

HOTEL HO LID EJ IN

SO BRANI E NA GRAD SKO PJ E

PRI ROD O- NAU^EN MUZEJ

ZO OL O[KA G RADI NA

MUZEJ N A GRAD SKOPJE

MUZEJ NA G RAD SKO PJE

MUZEJ NA G RAD SKO PJEMUZEJ NA GRAD SKOPJE

ZDRAVSTVEN DO M

PO[ TA

bul. MITROPOLIT TEO DO SIJ GOL OGANOV

b ul. MI TROPOL IT TEODOSIJ GOL OGANOV

TEATAR ZA DECA IMLADI NCI

PARK @ENA

PAR K @ENA

PARK @ENA

IN TEKS

PL AZA

PARKING 21 P.M. PARKING

29 P.M.

PARKING 17 P.M.

PARKING 6 P.M.

PARKING 13 P.M.

PARKING 36 P.M.

PARKING 19 P.M.

PARKING 31 P.M.

PARKING 58 P.M. PARKING

24 P.M.

PARKING 105 P.M.

PARKING 100 P.M.

PARKING 135 P.M.PARKING

25 P.M.

PARKING 6 P.M.

PARKING 48 P.M. PARKING

133 P.M.

PARKING 822 P.M.

PARKING 28 P.M.

PARKING 36 P.M.

PARKING 130 P.M.

PARKING 12 P.M.

PARKING 56 P.M.

PARKING 129 P.M.

PARKING 303 P.M.

PARKING 23 P.M.

PARKING 78 P.M.

PARKING 7 P.M.

PARKING 15 P.M.

PARKING 15 P.M.

PARKING 38 P.M.

PARKING 128 P.M.

PARKING 57 P.M.

PARKING 8 P.M.

PARKING 12 P.M.

PARKING 8 P.M.

PARKING 35 P.M.

PARKING 41 P.M.

PARKING 79 P.M.

PARKING 35 P.M.

PARKING 30 P.M.

PARKING 80 P.M.

PARKING 98 P.M.

PARKING 139 P.M.

PARKING 62 P.M. PARKING

94 P.M.

PARKING 83 P.M.

PARKING 62 P.M.

PARKING 50 P.M.

PARKING 225 P.M.

PARKING 109 P.M.

PARKING 56 P.M.

PARKING 34 P.M.

PARKING 18 P.M.

PARKING 17 P.M.

PARKING 12 P.M.

PARKING 28 P.M.

PARKING 21 P.M.

PARKING 9 P.M.

PARKING 9 P.M.

PARKING 46 P.M.

PARKING 10 P.M.

PDZEMEN PARKING 55 G.P.M.

PDZEMEN PARKING 62 G.P.M.

PDZEMEN PARKING 24 G.P.M.

PDZEMEN PARKING 22 G.P.M.

PDZEMEN PARKING 60 G.P.M.

PDZEMEN PARKING 87 G.P.M.

PDZEMEN PARKING 48 G.P.M.

PDZEMEN PARKING 20 G.P.M.

PDZEMEN PARKING 37 G.P.M.

PDZEMEN PARKING 27 G.P.M.

PDZEMEN PARKING 176 G.P.M.

PDZEMEN PARKING 321 G.P.M.

PDZEMEN PARKING 29 G.P.M.

PDZEMEN PARKING 655 G.P.M.

PDZEMEN PARKING 50 G.P.M.

PDZEMEN PARKING 28 G.P.M.

PDZEMEN PARKING 38 G.P.M.

PDZEMEN PARKING 29 G.P.M.

PDZEMEN PARKING 15 G.P.M.

Z3 C25 011

Z3 C23 019

Z3 C26 142 Z3 C28 020

Z3 C27 009

Z3 C29 086

Z3 C30 017

Z3 C31 017

Z3 C21 027

Z3 C22 028

Z3 C24 048

Z3 C20 195 Z3 C32 075

Z3 C01 324

Z3 C02 046

Z3 C03 060

Z3 C04 037

Z3 C05 009

Z3 C06 005

Z3 C09 007

Z3 C08 010

Z3 C10 010

Z3 C12 031

Z3 C19 011

Z3 C11 039

Z3 C13 199

Z3 C15 012

Z3 C14 007

Z3 C16 021 Z3 C17 007

Z3 C18 002

Z3 C07 005

Z1 A02 028

Z2 B03 083

Z2 B04 021

1

29

30

51

5 2

8 0

81

90

91

11 2

1 13

127

137

1 28

1 38

164

1 91

165

2 02

1 92

217

2 03

2 36

21 8

2 37

2 42

2 71

243

295

2 72

29 6

324

1

26

27

46

1

21

22

40

41

60

1

5

19

1

5

1 7

1 10

1

10

1 30

3 1 39

1

7

1

12

1

8

9

21

1 11

1

7

2

1

1

31

1

8 9 12

1 3

19

2 0

27

28

37

1

36

63

37

89

64

90

94

1 10

95

130

1 11

131

1 55

1 56

1 63

164

17 2

199

173

1

27

1

11

1 2

18

19

2 8

1

48

1

19

1 5

1 4

1

11

1

17

1

17

1

7

8

12

13

20

17

16

1

10

11

19

20

2 4

25

41

42

56

57

65

66

76

77

84

85

86

1

29

4 2

30

5843

70

59

91

71

13 0

92

1 42

1 31

165

143

17 6

1 66

177

181

1 82

195

1

44

45

69 7 0

77

78

87

1

9

88

1 42

1

2 1

1

42

43

83

Z2 B01 022

1

22

1

47

49

60

61

71

72

79

Z1 A01 079

Z2 B01 012

1

12

338

3 38

33 8

338

3 38

338

338

338

3 38

338

338

338

338

338

3 38

3 38

338

3 38

338

338

338338

3 38

338

338

3 38

338

338

338

3 38

3 38

3 38

33 8

338

338

338

338

3 38

338

338

33 8

338

33 8

338

338

338

338

3 38

338

3 38

338

3 38

338

338

338

3 38

3 38

338

3 38

3 38

33 8

3 38

338

306338

306

338

306

338

306

3 38

3 06

338

306

338

306

229

338

306

3 38

3 06

338

306

3 38

3 06

3 38

3 06

3 38

3 06

338

306

338

306

3 38

3 06

338

306

3 38

33 8

3 38

338

3 38

338

338

338

3 38

3 38

229

229

22 9

229

228

229

2 29

2 28

2 29

228

229

228

229

229

229

26 1

22 9

2292 29

228

229

2 28

2 29

2 29

229

2 29

228

2 28

2 29

228

229

22 8

228

3 38

338

3 38

228

2 28

228

228

336

336

336

30 6

306

306

306

306

30 6 3 06

306

2 29

228

2 29

22 8

228

306

338

22 9

3 06

33 8

2 28

228

2 28

228

306

306

306

306

261

261

261 338

338

3 38

338

338

3 38

33 8

Central city area(Parking zones I & II)

(Parking zone III)Old residental zones

Zone parking project Zone parking project –– street network encirclingstreet network encircling

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

4.4. BOULEVARDSBOULEVARDS

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

5.5. DENIVELATED INTERSECTIONSDENIVELATED INTERSECTIONS

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

6.6. ROUNDABOUTSROUNDABOUTS

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

7.7. BICYCLE PATHS NETWORKBICYCLE PATHS NETWORK

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

8.8. TRAFFIC MANAGMENT CENTERTRAFFIC MANAGMENT CENTER

- Equipping of 100 intersections

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”

9.9. BUS LANES PROTECTION & BOLLARDSBUS LANES PROTECTION & BOLLARDS

- 1200 m for bus lanes

- 4 hydraulic bollardsfor city center square

SUSTAINABLE AND HEALTHY URBAN TRANSPORT POLICIES “WORKING TOGETHER TO MAKE THINGS HAPPEN”