2
IDHAYA ENGINEERING COLLEGE FOR WOMEN CHINNASALEM – 606 201. Reg. No.: CIAT –I CS6403/ Software Engineering (Common to B.E CSE & B.Tech I.T) Year/Sem: II/IV Maximum: 60 marks Date : 29. 01. 2015 Time : 1 hour 40 mins PART A – (6 x 2 = 12 marks) Answer ANY 6 Questions 1. Define software engineering. 2. What are the various categories of software? 3. What are the prescriptive and specialized process models? 4. What are the merits of incremental model? 5. What is COCOMO model? 6. What is the difference between the “Known Risks” and Predictable Risks” ? 7. What is EVA? 8. What is RMMM? 9. How is the risk exposure RE computed? 10. What are the umbrella activities of a software process? PART B – (3 x 16 = 48 marks) Answer ALL Questions 1. a Explain about the evolutionary process model (16) (or) b. Explain the iterative waterfall and the incremental model for software life cycle and various activities in each phase (16) 2. a Explain project scheduling and scheduling process. (or) b Brief about calculating Earned Value Measures. (16) 3. a. Describe LOC and function point analysis with neat example (16) (or)

CIAT -I QP

Embed Size (px)

Citation preview

IDHAYA ENGINEERING COLLEGE FOR WOMEN

CHINNASALEM 606 201.

Reg. No.:

CIAT I CS6403/ Software Engineering(Common to B.E CSE & B.Tech I.T) Year/Sem: II/IV

Maximum: 60 marks Date : 29. 01. 2015

Time : 1 hour 40 minsPART A (6 x 2 = 12 marks)Answer ANY 6 Questions

1. Define software engineering.

2. What are the various categories of software?

3. What are the prescriptive and specialized process models?

4. What are the merits of incremental model?

5. What is COCOMO model?

6. What is the difference between the Known Risks and Predictable Risks ?

7. What is EVA?

8. What is RMMM?

9. How is the risk exposure RE computed?

10. What are the umbrella activities of a software process?

PART B (3 x 16 = 48 marks)Answer ALL Questions1. a Explain about the evolutionary process model (16) (or) b. Explain the iterative waterfall and the incremental model for software life cycle

and various activities in each phase (16)2. a Explain project scheduling and scheduling process.

(or) b Brief about calculating Earned Value Measures.(16)

3. a. Describe LOC and function point analysis with neat example (16) (or)b. What are the categories of software risks? Give an overview about risk management.(16)Prepared by

Approved by

PRINCIPAL

( Dr.R.Vasanthi ASP/CSE) (H.O.D/CSE)