Christchurch Northern Corridor SH1 - Chaneys on-ramp PROJECT UPDATE 20 OCTOBER 2020 The Christchurch Northern Corridor (CNC) Alliance team is closing the Chaneys on-ramp for good from Tuesday 27 October. To connect the new CNC motorway to SH1 some changes are needed. The existing Chaneys on-ramp will be removed to make way for the CNC northbound lanes. Traffic Impact Closing the Chaneys on-ramp means there is no access to SH1 at this point. People on Marshland Road wanting to access SH1 can either use QEII Drive, Prestons Road, Radcliffe Road or Belfast Road to access Main North Road and then SH1. These roads all have traffic signals to make safe turns onto Main North Road. Belfast Road signals will be activated in the next few weeks. People can also continue on Marshland Road and Main North Road to enter SH1 from Ohoka Road. Why are we doing this? The CNC project will unlock space for all travel modes and the transport solutions the community want to see like improved public transport, improve safety, reduce congestion, and more walking and cycling options. An efficient and reliable transport network into, out of and across Greater Christchurch is important to the social, economic and environmental future of the City and the South Island. Efficient transport links to Lyttelton Port are also critical for supporting New Zealand trade. More information is available online: www.nzta.govt.nz/cnc REDUCED COMMUTER TRAVEL TIME REDUCED CONGESTION IMPROVE SAFETY IMPROVE WALKING AND CYCLING SUPPORT ECONOMIC GROWTH CHANEYS ON-RAMP TO BE CLOSED PERMANENTLY CNC SH1 Christchurch Northern Corridor CHANEYS ON-RAMP CNC

Christchurch Northern Corridor SH1 - Chaneys on-ramp · 2020. 10. 20. · The Christchurch Northern Corridor (CNC) Alliance team is closing the Chaneys on-ramp for good from Tuesday

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Christchurch Northern Corridor SH1 - Chaneys on-ramp · 2020. 10. 20. · The Christchurch Northern Corridor (CNC) Alliance team is closing the Chaneys on-ramp for good from Tuesday

Christchurch Northern Corridor SH1 - Chaneys on-rampPROJECT UPDATE 20 OCTOBER 2020

The Christchurch Northern Corridor (CNC) Alliance team is closing the Chaneys on-ramp for good from Tuesday 27 October. To connect the new CNC motorway to SH1 some changes are needed. The existing Chaneys on-ramp will be removed to make way for the CNC northbound lanes.

Traffic ImpactClosing the Chaneys on-ramp means there is no access to SH1 at this point. People on Marshland Road wanting to access SH1 can either use QEII Drive, Prestons Road, Radcliffe Road or Belfast Road to access Main North Road and then SH1. These roads all have traffic signals to make safe turns onto Main North Road. Belfast Road signals will be activated in the next few weeks.

People can also continue on Marshland Road and Main North Road to enter SH1 from Ohoka Road.

Why are we doing this?The CNC project will unlock space for all travel modes and the transport solutions the community want to see like improved public transport, improve safety, reduce congestion, and more walking and cycling options.An efficient and reliable transport network into, out of and across Greater Christchurch is important to the social, economic and environmental future of the City and the South Island. Efficient transport links to Lyttelton Port are also critical for supporting New Zealand trade.More information is available online: www.nzta.govt.nz/cnc

REDUCED COMMUTER TRAVEL TIME

REDUCED CONGESTION

IMPROVE SAFETY

IMPROVE WALKING AND CYCLING

SUPPORT ECONOMIC GROWTH

CHANEYS ON-RAMP TO BE CLOSED PERMANENTLY

CNC

SH1

Christchurch Northern Corridor

CHANEYS ON-RAMP

CNC

Page 2: Christchurch Northern Corridor SH1 - Chaneys on-ramp · 2020. 10. 20. · The Christchurch Northern Corridor (CNC) Alliance team is closing the Chaneys on-ramp for good from Tuesday

WHAT YOU NEED TO KNOW › Our regular working hours are Monday to

Saturday between 7am and 7pm. Night work usually happens between 7pm and 7am.

› There will be noise and vibrations associated with the work. We will do what we can to lessen this.

› Keep yourself, your children and pets at a safe distance from the work sites. Please stay behind the construction fences at all times.

› All work sites are subject to weather and other unforeseen conditions.

You can call us on 0800 262 200, email at [email protected] or sign up for e-newsletters on the project website: www.nzta.govt.nz/cnc

On the project website in the video section you can watch an animation that shows how the Christchurch Northern Corridor shared use path will operate, we also just published our new aerial fly over. Go to www.nzta.govt.nz/cnc

BridgesSubwayPapanui Parallelcycle pathCNC Motorway

REDWOOD

NORTHCOTE

CLARKVILLE

KAIAPOI

MAIREHAU

SHIRLEY

BURWOOD

BOTTLE LAKE FOREST PARK

WAIMAKARIRI RIVER

EDGEWARE

ST ALBANS

MERIVALE

CHANEYS

STYXBELFAST

CHANEYS OFF RAMP

CRANFORD ST ROUNDABOUT

BELFAST RD INTERCHANGE

SH1/74 SHARED USE CYCLING PATH MAP

MAP LEGENDShared Use Path

State Highways+ main roadsRailway

QUEEN ELIZABETH llDRIVE INTERCHANGE

INNES RD ROUND ABOUT

OWENMITCHELL

PARK

Styx

Riv

er

Kā P

ūtah

i Cre

ek

Hills Rd

The shared use path will run along the CNC motorway from Cranford Street in St Albans to the Tram Road and Main North Road intersection north of the Waimakariri Bridge. The shared cycleway route north of this intersection through to Kaiapoi runs along the western side of Main North Road. The Waimakariri District Council is starting the construction for this tomorrow.