VTT TECHNICAL RESEARCH CENTRE OF FINLAND1
CHP plants based onadvanced biomass gasification
- EU BiGPower project 2005 - 2008
Esa KurkelaVTT – Technical Research Centre of Finland
January, 2006
[email protected] 24.1.2006
VTT TECHNICAL RESEARCH CENTRE OF FINLAND2
CHP plants based on biomass gasification- most potential gasification technologies
Smallest size range: < 500 kWe + 1 MWheatdowndraft gasifiers and gas engines (naturally aspirating)new types of downdrafr gasifier?
Medium size range: 0.5 – 15 MWe + 1 – 15 MWheatDifferent gasification systems available: Modified updrafts, fluidised-bed, staged procesesTurbo-charged gas enginesGas cleaning is most critical process stepFuel cell plants or small gas turbines also possible in futureCompetition with fluidised-bed combustion with steam turbine cycle at > 3-5 MWe
Large-scale biomass power plants: 15–150 MWe + 15-150 MWheatPressurised fluidised-bed gasification with hot filtrationCombined Gas and Steam Turbine Cycle or engine-steam turbine cycle?Competition with CFB and BFB boilers with steam cycles
Co-firing in coal or natural gas power plants, gasifiers > 50 MWfuelFluidised-bed gasificationNo gas cleaning with clean biomass in PC boilersFiltration and chlorine removal with waste fuels
[email protected] 24.1.2006
VTT TECHNICAL RESEARCH CENTRE OF FINLAND3
GE Jenbacher, Itävalta
VTT:n kaasutustutkimus v. 2006aihe: Korkean hyötysuhteen CHP-tekniikat
EU-BiGpower – Advanced Biomass Gasification for High-Efficiency Power
– VTT:n koordinoima EU/Tekes-projekti 1.10.2005 – 30.9.2008– 13 partneria, Suomesta VTT, TKK, Carbona ja Condens– VTT:n volyymi v. 2006 noin 330 k€– kaasutukseeen perustuvat moottorivoimalat, polttokennovoimalat ja kombivoimalat – kaasun puhdistus em. käyttökohteisiin (katalyytit ja suodatus)– koetoimintaa: Otaniemen prosessikoesali, Kokemäki, UCG-PDU– kaasutus CHP:n systeemitarkastelut
CATDEMO- Katalyyttisen kaasunpuhdituksen tuotteistaminen ja demonstrointi
– Volyymi v. 2006 noin 300-400 k€ – Kokemäen demonstraatioprojekti ja tutkimusasema– Skiven demonstraatiohanke– Katalyyttivalmistuksen tuotteistaminen ja IPR:n vahvistaminen
MTU FCS, Saksa
[email protected] 24.1.2006
VTT TECHNICAL RESEARCH CENTRE OF FINLAND4
Requirements for real success stories in medium-to-large-scale gasification
• Fuel flexibility with respect to particle size, ash composition and moisture content
• Elimination of tars without waste water problems
• Effective final gas cleaning to protect gas engines, turbines or other downstream equipment
• Automatic operation, good reliability and low service costs
• High power production efficiency of 30 – 50 % in order to be competitive with boilers and steam cycles
VTT TECHNICAL RESEARCH CENTRE OF FINLAND5
UPDRAFT GASIFIER“BIONEER”- developed in 1980’s, 10 plants- for boilers and kilns, 5 MW scale- tar containing gas- high carbon conversion- robust, flexible, fully automated
5 MW district heating plant, Jalasjärvi, Finland, in operation since 1987; 145 000 operating hours
Fuel silo
Gas boiler
Hot gas -
District heating -
Electricity
Ash
VTT TECHNICAL RESEARCH CENTRE OF FINLAND6
Novel – an improved updraft gasifier
humidifier
gasification air
cooling
FORCED FUEL FEEDING
- use of low density fuelspossible
TWO-STAGE OPERATION- counter-current bottom bed- tars decomposed above the bed by additional air feeding
OXIDISING ZONE- complete carbon conversionand fully oxidised bottom ash
PRODUCT GAS-high temperature & low tars-700-850 oC, 1-4 g/m3n tars
VTT TECHNICAL RESEARCH CENTRE OF FINLAND7
Novel power plant: 1.8 MWe + 3.3 MW heat- Kokemäki, Finland- plant under comissioning- total investment 4.8 M€- electric efficiency 30 %
Optimal plant:- biomass moisture 50 %- drying to 15 % by waste heat- power efficiency up to 35 %- suitable to 0.5 - 5 MWe- power production cost < 5 c/kWh
Tarreformer
Scrubber
Novelgasifier
Gas coolerand Filter
3 Gas engines
VTT TECHNICAL RESEARCH CENTRE OF FINLAND8
Time table of the Kokemäki Novel CHP plantConstruction work: completed in April 2005Commissioning and Testing periods
Gasifier and the gas boiler: April - MayGas cleaning and heat recovery: May – AugustStart-up with one JMS 316 engine (520 kW): NovemberOperation with one gas engine and gas boiler: 2006
performance and emission measurementstests with different fuels & plant optimisation
2nd and 3rd gas engines: 1.8 MWe: end 2006 Further R&D activities
EC BiGPower: slip stream testing of 2nd generation catalytic gas clean-up and scrubbing water recycling (Oct. 2005 … Sept 2008)Testing with waste-derived fuels and agrobiofuels within other projects
SKIVE PROJECT, DENMARK
GASIFIER
PRODUCT GAS FILTERGAS COOLER
PRODUCT GAS COOLING(Heat Recovery)
GAS ENGINES
TAR CRACKER
BIOMASS
AIR
ASH
FLY ASH
BOILER
TO STACK
WATER TREATMENT
PRODUCT GAS SCRUBBING(Heat Recovery)
PRODUCT GASBUFFER TANK
STEAM
DISTRICT HEATING11.5 MWth
FLUE GASHEAT RECOVERY
POWER5.4 MWe
(by Carbona Oy, Salo, Patel & Horvath)
BiomassBiomass--CHPCHP--PlantPlant--GüssingGüssing
CHPCHP--PPlantlant GGüssingüssingStart upStart up in November 2001in November 2001
• Fuel Wood chips• Fuel Power 8 MW• Electrical Power 2 MW• Thermal Power 4,5 MW• Electrical Efficiency 25 %• Total Efficiency 80 %
• Investment 9 Mill. EURO• Optimisation 1 Mill. EURO
VTT TECHNICAL RESEARCH CENTRE OF FINLAND12
Large-scale Power with Integrated Gasification Combined-Cycle - IGCC
Fluidised-Bed Gasification at 20 bar, 800-950 oCGas filtration at 400 - 600 oCCombined Gas Turbine and Steam Turbine Process
Biomass IGCCDemonstration Plant,Värnamo, Sweden
• Developed and demonstrated in 1990’s• Electric efficiency 40 - 50 %• Requires large-scale > 15 MWe
• Best global potential for CO2 reduction• New R&D activities 2005 ->• New demonstration projects will come
– when and by which [email protected] 17.1.2006
Biomass – IGCC power plant design(by Carbona Oy; K.Salo & A.Horvath)
Small CHP plant• Power production: 7.4 MWe• District heat: 8.5 MJ/s• Electric efficiency: 40 %
Large IGCC power plant• Power production: 116 MWe• Electric efficiency: 50 %
VTT TECHNICAL RESEARCH CENTRE OF FINLAND14
500 kW PRESSURIZED FLUIDIZED BED GASIFIER (UCG-PDU)
Pressure control valve
Fuel feedingequipment
Bedmaterial
Additive
PFB GASIFIER
FILTER
Gascooler
CATR
Bed removal
Ash removal
Heating elements Heating
elementsFurnace
Air
Nitrogen
Steam
Oxygen
To slip stream testing facilities
VTT TECHNICAL RESEARCH CENTRE OF FINLAND15
New R&Dactivities
New R&DactivitiesBioneer
gasifierR&D
BioneergasifierR&D
Dual FluidBed Gasifier
R&D in Austria
Dual FluidBed Gasifier
R&D in Austria
Gas cleaning R&DNovel gasifier
Press. FB gasifierR&D in Finland
Gas cleaning R&DNovel gasifier
Press. FB gasifierR&D in Finland
- Advanced catalyticgas cleaning- New Filters
- 2nd generationgasifiers
- Improved gasengines
- MCFC concepts
BIG-MCFC Plants- efficiency 40-50 %
- size range 0.5-5 MWe
2nd generation engine plants- power efficiency 35-40 %
- size range 1 - 15 MWe
2nd generation BIGCC Plants- efficiency 45-50 %
- size range 15-100 MWe
Bioneergasifier
(heating appl.)
Bioneergasifier
(heating appl.)
Gas enginedemonstrationsKokemäki, Skive
Gussing
Gas enginedemonstrationsKokemäki, Skive
Gussing
Pressurisedgasificationpilot/demoVärnamo
& Tampere
Pressurisedgasificationpilot/demoVärnamo
& Tampere
2nd generation engine plant demos
2nd generation engine plant demos
Agrofuels & waste demonstration
Agrofuels & waste demonstration
MCFCpilot/demonstration
MCFCpilot/demonstration
gas turbine developmentactivities
gas turbine developmentactivities
MCFC HotModule development fornatural gas applications
MCFC HotModule development fornatural gas applications
- Advanced catalyticgas cleaning- New Filters
- 2nd generationgasifiers
- Improved gasengines
- MCFC concepts
1995 2005 EU-BiGPower 2010 20151985 2020 2025
[email protected] 17.1.2006
VTT TECHNICAL RESEARCH CENTRE OF FINLAND16
Technology Present status Elect.Eff. Specif.Invest. % €/kWe
Target 2010 - 2015 Elect.Eff. Specif.Invest. % €/kWe
Target 2015 - 2020 Elect.Eff. Specif.Invest. % €/kWe
Gasifier-engine (1-15 MWe)
20-30 3500-6000 30-35 2500-4000 35-40 2000-3000
Gasifier-MCFC (0.5-5 MWe)
na (> 10 000) 35-40 < 10 000 45-50 2500-3000
Biomass IGCC (15-100 MWe)
35-40 3000-4500 40-45 2000-3500 45-50 1500-2000
Combustion and steam turbine
1-5 MWe
10-50 MWe
Elect.Eff. Specif.Invest. % €/kWe
17 - 25 3000-4000 only very limited development potential
25 - 37 2000-3500 (mature technology, thermodynamic limitations) na = not available yet
Advanced Biomass Gasification for high-Efficiency PowerBiGPower – project no. 019761
Targets for the gasification power plants
[email protected] 17.1.2006