14
Page 1 Of 14 Bill Of Quantities Excavation, Shoring Piles And Anchorage Sl. # Description Unit Quantity Rate

chmmnmmm

Embed Size (px)

DESCRIPTION

asas

Citation preview

Page 1: chmmnmmm

Page 1 Of 14

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Sl. # Description Unit Quantity Rate

Page 2: chmmnmmm

Page 2 Of 14

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Sl. # Description Unit Quantity Rate

Total

Page 3: chmmnmmm

Page 3 Of 14

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Amount

Page 4: chmmnmmm

Page 4 Of 14

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Amount

Page 5: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Sl. # Description Unit Quantity1 Development Works:

1.1 Earthworks M3 1,3001.2 Approach Road M2 51,5521.3 Approach Road (3+3 Lane) including Fencing & Signage M2 01.4 Overhead Water Reservoir (100,000 Gallon) Each 21.5 Street Lights 150 Watt LED Each 1101.6 Flood Lights 100 Watt LED Each 1351.7 Bridge M2 4,4601.8 Parking Area (Tuff Pavers Min. 7000 psl) M2 220,6001.9 Retaining wall for road M 370

1.10 Boundary Wall M 4,4251.11 Toll Both (Pre Fab u PVC) Each 121.12 Toll Canopy M2 1,4641.13 Secondary Inspection Canopy M2 1,1301.14 Cargo Immigration Canopy M2 01.15 Quarantine Shed M2 1,2001.16 Surface Drainage Works M2 220,6001.17

Watt 80,0001.18 Power Supply Network M2 220,6001.19 External gas pipeline network for connection to each block Job 11.20

Job 11.21

Job 12 Buildings:

2.1 Central Administration System M2 2,0552.2 Seized Goods Warehouse M2 5,2502.3 Commercial Warehouse M2 10,4802.4 Small Offices M2 3002.5 Customs Laboratory M2 4002.6 Paasenger Terminal Building M2 2,1002.7 Service Area (Pray Area, Café, Maintenance Shop) M2 2,3002.8 Services M2 1,2002.9 Watch Tower M2 400

2.10 Security Gates M2 92.11 Business Centre M2 1,9502.12 Accomodation M2 1,2002.13 Payment M2 1,6002.14 Approach Road (2 Lane) Km 0.5

Total

Solar Power System including Panels, Investers and deep cycle batteries (Decentralized System for each block/ area)

External sewerage pipeline network connecting all block with main seweage drainExternal pipeline network for water supply connecting each block to main source (reservoir)

Page 6: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Rate Amount

Page 7: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Sl. # Description Unit Quantity RateHard Security Infrastructure and Equipment

S.1 Perimeter and Traffic Lane fencing and segregation ft. 10,000.00S.2 M 5,000S.3 Hesco Bags around walls and traffic entry and exit lanes and booths No. 656S.4 Perimeter and tasj lighting LED based Solar Lights No. 50S.5 Standby Power arrangement No. 1S.6 Marking Lanes to get Trafic lane segregation No. 4S.7 Hydaulic entry and exit traffic lane barriers No. 8S.8 Sniffer Dogs and Kennels No. 6S.9 Preparing New Standard Operating Procedures (SOPs) No. 22

S.10 Practicing New SOPs No. 22S.11 Emergency Operating SOPs No. 1S.12 Terorist Event SOPs No. 1S.13 Natural Disaster Policies, Plans and SOPs No. 1S.14 Helipad Training and Certification No. 1S.15 Electronic Vehicle Queuing Training and SOPs No. 4S.16 WCO SAFE and AEO Training and SOPs No. 1S.17 Single Window System inter-agency SOPs and TrainingS.18 Telecom System, PABX and Digital two way radios

i) PABX VHF Base No. 1ii) VHF Base Handled Radios No. 32

S.19 Intrusion Detection System No. 1S.20 Biometric Access Control Mechanism No. 3S.21 Emergency Alarm system No. 1S.22 Public Address System (PA) No. 1S.23 Hand Held Metal Detectors No. 16S.24 Wak-through scanning gates No. 16S.25 Smoke Detectors No. 50S.26 Firefighting Equipment No. 7S.27

No. 8S.28 Vehicle Number Plate Scanning Equipment No. 8S.29 Hand-held explosive and narcotics Vapor Tracing Equipment No. 16S.30 Bio-data reading and collevtion equipment No. 16S.31 Pedestrain luggage scanning equipment No. 16S.32 Document and currency scanning equipment No. 16S.33 Explosive detection equipment No. 16S.34 Vehicle and cargo backscatter and color X-Ray scanning equipment No. 2S.35 Mobile Vehicle X-Ray Scanner No. 1S.36 Vehicle wighing and dimension check machine No. 4S.37 RFID readers and tags No. 4S.38 Helipad Equipment No. 1S.39 Electronic Vehicle Queuing Equipment No. 4S.40 RFID Tracking Equipment Training and SOPs No. 4S.41 Under Vehicle Scanners No. 8

Soft Security (Short Term)SS.1

No. 1

Concrete Coils on perimeter fencing and segregation of restricted

Chemical, Biological, Radioactive and Nuclear (CBRN) vehicle scanning equipment

Training to operate new detection equipment using vendor trainers and manuals

Page 8: chmmnmmm

SS.2 Preparing New Standard Operating Procedures (SOPs) No. 22SS.3 Practicing New SOPs No. 22SS.4 Emergency Operating SOPs No. 1SS.5 Terorist Event SOPs No. 1SS.6 Natural Disaster Policies, Plans and SOPs No. 2

Soft Security (Long Term)SS.1 RFID Tracking Equipment Training and SOPs No. 4SS.2 Helipad Training and Certification No. 1SS.3 Electronic Vehicle Queuing Training and SOPs No. 1SS.4 WCO SAFE and AEO Training and SOPs No. 1

Total

Page 9: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Amount

Page 10: chmmnmmm
Page 11: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Sl. # Description Unit Quantity RateT.1 Data / LAN Cabling Cat-6 Category Per Node 60

T.1.A Data / LAN Cabling Cat-6 Category Per R/Foot 120T.2 ICT Equipment integration, configuration and commision No. 1T.3 Input/Output Panel for 10kVA (Main Building) No. 1T.4 Input/Output Panel for 6kVA (ICT Rack) No. 1T.5 Input/Output Panel for 6kVA (Other Buildings) No. 4

T.5.A Input/Output Panel for 6kVA (Small Buildings) No. 4T.6 User End Power Outlet Box (1*Flat Pin, 1*Round Pin) No. 60T.7 User end UPS Output Power Cabling Per Node 60T.8 UPSs Electrical Input Cabling/Ducting Per Meter 10T.9 Earthing Per Pit 2

T.10 Earthing for Gensets Per Pit 4T.11 Gensets Cabling (2*95mm - 4 Core) Per Meter 50T.12 Access Control Device No. 1T.13 Campus Fiber Optic Cabling 10 G Standard. Installation No. 1T.14 Campus Fiber Optic Cabling 10 G Standard. Cabling No. 1T.15 Input/Output Panel with Cabling / Earthing for 20kVA UPSs No. 1T.16 Input/Output Panel for 10kVA UPSs No. 4T.17 Input/Output Panel for 6kVA UPSs No. 14T.18 Input/Output Panel for 3kVA UPSs No. 2T.19 Access Control Device No. 20T.20 WeBOC Enhancements for SWS (Complete Module) No. 1T.21 Inventory Management System No. 1T.22 Laptop Computer No. 5T.23 Desktop Computers No. 50T.24 Tablets/ PDAs No. 5T.25 Application Server No. 1T.26 Printers No. 10T.27 Desktop Scanners No. 10T.28 Wi-Fi Outdoor No. 4T.29 Wi-Fi Indoor No. 10

T.29.AData Racks (Branded) No. 1T.30 Racks PDUs No. 2T.31 24 Port 1G Layer 2 Devices Aggregation Ethernet Switch No. 1T.32 24 Port 1G Layer 2 User Access Ethernet Switch No. 3T.33 24 Port 1G Layer 2 User Access Ethernet Switch No. 4T.34 UTM Firewall; No. 1T.35 Anti-Virus for Users No. 50T.36 Anti-Virus for Server No. 1T.37 E-Queue Management System No. 1T.38 IP PBX (30 users) No. 1T.39 Environment Monitoring System No. 1T.40 IP Based Surveillance System (CCTV) No. 1T.41 UPSs 6KVA with ExtBattery Backup No. 1T.42 UPSs 10 KVA with Ext Battery Backup No. 1T.43 UPSs 6KVA with ExtBattery Backup No. 4

T.43.AUPSs 3 kVA with Ext Battery Backup No. 4T.44 ICT Equipment integration, configuration and commision No. 1T.45 Gensets - 100KVA No. 2T.46 Layer 3 Core Switch No. 2T.47 Layer 2 Ethernet Switch 48 Ports No. 3

Page 12: chmmnmmm

T.48 Layer 2 Ethernet Switch 24 Ports No. 18T.49 UTM Firewall No. 1T.50 2 * 20 kVA UPS (N+1) with Ext Backup and Parallel Main. Bypass No. 1T.51 10 kVA UPS No. 4T.52 6 kVA UPS No. 14T.53 3 kVA UPS No. 2T.54 IP PBX (150 users) No. 1T.55 Environment Monitoring System No. 2T.56 IP Based Surveillance System (CCTV) with Control Room No. 1T.57 Network / Device Monitoring System with LCD Display (NMS) No. 1T.58 Procurement or Development of ICT Software No. 1

T.58.ATrade Faciitation LS 1

Total

Page 13: chmmnmmm

Bill Of Quantities Excavation, Shoring Piles And Anchorage

Amount

Page 14: chmmnmmm