©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved 2020 IAEA General Conference, Side Event Fukushima Daiichi Decontamination and Decommissioning -From 3.11 toward the future- September 21, 2020 Akira ONO Chief Decommissioning Officer President of Fukushima Daiichi Decontamination and Decommissioning Engineering Company, Tokyo Electric Power Company Holdings, Inc.

Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

2020 IAEA General Conference, Side Event

Fukushima Daiichi Decontamination and Decommissioning

-From 3.11 toward the future-

September 21, 2020

Akira ONO Chief Decommissioning Officer

President of Fukushima Daiichi Decontamination and Decommissioning Engineering Company,

Tokyo Electric Power Company Holdings, Inc.

Page 2: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved1

The New Norm at Fukushima Daiichi

No face-to-face sittingat Cafeteria

Thermographic measurementat entrance

All employees wearing masks

Page 3: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

T H E F U K U S H I M A F O R U M I V • M A R C H 1 5 - 1 8 , 2 0 1 6 • T O K Y O , J A P A N

1. Fuel Removal from Spent Fuel Pools

2. Toward Fuel Debris Retrieval

3. Striking a Balance betweenReconstruction & Decommissioning

Agenda

Page 4: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

Dismantlement of Exhaust Stack for Units 1&2

▼Ground Level+120m

Before Dismantlement (July 2019)

▼Ground Level+59m

After Dismantlement (May 2020)

3

Page 5: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

1. Fuel Removal from Spent Fuel Pools

Page 6: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved 5

Removal of rubble & Decontamination etc.

Installation of fuel removal facility Fuel removal

Units 1 & 2 Unit 3 Unit 4

Storage & Transportation

Unit 1 Unit 2 Unit 3

Jun. 2011 Sep. 2011Sep. 2011

Feb. 2019Dec. 2019 Aug. 2019

Overview of tasks toward fuel removal

Frontchamber

Feb. 2019

Removal tostart in

FY2027 to 2028

Removal tostart in

FY2024 to 2026Removal started

in Apr. 2019

Page 7: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved 6

Method of fuel removal at Units 1 & 2

Crane

As the return of local residents and reconstruction efforts make progress, we put premium on their safety and peace of mind by preventing radioactive dust from scattering.

As the return of local residents and reconstruction efforts make progress, we put premium on their safety and peace of mind by preventing radioactive dust from scattering.

<Unit 1>

Reactor Building

Front Chamber

Gantry

Fuel Handling Machine

<Unit 2>

Cover

Page 8: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

T H E F U K U S H I M A F O R U M I V • M A R C H 1 5 - 1 8 , 2 0 1 6 • T O K Y O , J A P A N

2. Toward Fuel Debris Retrieval

IRID has contributed to some work shown here

Page 9: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

Assumed distribution of fuel debris

8

Mar. 2017 Jul. 2017

Feb. 2017Jan. 2018

Unit 2 Unit 2Unit 1構台

Feb. 2019

Jan. 2018 Feb. 2019

PCV

RPV Core

Unit 3

Robotic explorationAnalysis of

accident progression

Muon Survey

Experimental retrieval to start at Unit 2 in 2021

Page 10: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved 9

Step by step approach to be taken for fuel retrieval at Unit 2

Step by step approach will be implemented, first with experimental retrieval followed by its review, then with stepwise expansion of the retrieval scale.Step by step approach will be implemented, first with experimental retrieval followed by its review, then with stepwise expansion of the retrieval scale.

Experimental retrieval in 2021 Stepwise expansion of the scale

Metal brush Vacuum container

Robot arm Collection equipment

Gripper tool Drilling retrieval tool

②Enclosure

X-6 penetration hole

①Robot armPCV

③Connection pipe Whole Picture

Robot arm Collection equipment

Page 11: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

T H E F U K U S H I M A F O R U M I V • M A R C H 1 5 - 1 8 , 2 0 1 6 • T O K Y O , J A P A N

3. Striking a Balance betweenReconstruction & Decommissioning

Page 12: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

Mid-and-Long-Term Roadmap and TEPCO’s Action Plan

Phase 1 Phase 2 Phase 3Period until start of fuel removal (in 2 years)

Period until start of fuel debris retrieval (in 10 years)

Dec. 2011cold shutdownannouncement

Nov. 2013(start of Unit 4 spent fuel removal)Apr. 2019(start of Unit 3 spent fuel removal)

Dec. 2021 30~40 years aftercold shutdownannouncement

Period until completion of decommissioning (in 30 to 40 years)

Phase 3-(1)

End of 2031

Show Major work processes for each activity until 2031• Complete stagnant water treatment except for Unit 1 to 3 reactor bldgs. etc. in 2020• Complete fuel removal from pools at all Units (Units 1 to 6) by 2031 • Start fuel debris retrieval from Unit 2 in 2021. Expand the scale of retrieval in stages• Eliminate temporary waste storage in FY2028

“Mid-and-Long-Term Decommissioning Action Plan 2020”

https://www.tepco.co.jp/en/hd/decommission/information/dap/index-e.html

11

Proceed with tasks safely steadily, and efficiently, looking to the future

<The Locals><TEPCO>・Understand future work

in a concrete manner ・Join the decommissioning

work proactively

Page 13: Chief Decommissioning Officer President of Fukushima ......Jun. 2011 Sep. 2011 Sep. 2011 Dec. 2019 Feb. 2019 Aug. 2019 Overview of tasks toward fuel removal Front chamber Removal to

T H E F U K U S H I M A F O R U M I V • M A R C H 1 5 - 1 8 , 2 0 1 6 • T O K Y O , J A P A N©Tokyo Electric Power Company Holdings, Inc. All Rights Reserved

Thank you for your kind attentionThank you for your kind attention