60
1/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1 st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected] No./CSIDC/MKD/ PS- II/04/ 13-14/ Raipur, Dated : SCHEDULE “C” LIST OF PARALLEL RATE CONTRACT FOR ITEM- UPS SYSTEM (Santosh Bhagat) Chief General Manager S.No. Name of Tenderers Valid Up to Rate Contract No. 1. M/S Power Generation Shop-C-68 Jaganath Temple, Gayitri Nagar, Raipur (C.G.) Mo. No. 9425205059 Ph. No. 0771-6461111 25.01.2014 to 24.01.2015 Rate Contract No. CSIDC/MKD/ PS- II/87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 2. M/S Uniline Energy Systems (P)L. Uniline House 198/23 Ramesh Market, East of kailash New,Delhi Ph. No.-011-46661111, 011-26469031, 011-26469108. Fax No.-011-26481469 29.01.2014 to 24. 01.2015 Rate Contract No. CSIDC/MKD/PS- IX/87/386/13-14/ST/UESPL/ 4954 Dated: 29.01.2014 3. M/S Novateur Electrical & Digital System Pvt. Ltd Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210 12.06.2014 to 24.01.2015 Rate Contract No. CSIDC/MKD/ PS- IX/87/386/1314/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 4. M/S R.S. Power System A-42 Jai Ambey Nagar, Tonk Road, Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860 19.06.2014 to 24.01.2015 Rate Contract No. CSIDC/MKD/PS- IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19.06.2014

Chhattisgarh State Industrial Development Corporation …csidc.in/RC/14 UPS System.pdfYours faithfully, (Santosh Bhagat ) ... Main file of Item- “UPS System” (Santosh Bhagat )

  • Upload
    vodat

  • View
    243

  • Download
    0

Embed Size (px)

Citation preview

1/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected]

No./CSIDC/MKD/ PS- II/04/ 13-14/ Raipur, Dated :

SCHEDULE “C” LIST OF PARALLEL RATE CONTRACT FOR ITEM- UPS SYSTEM

(Santosh Bhagat) Chief General Manager

S.No. Name of Tenderers Valid Up to Rate Contract No.

1. M/S Power Generation Shop-C-68 Jaganath Temple, Gayitri Nagar, Raipur (C.G.) Mo. No. 9425205059 Ph. No. 0771-6461111

25.01.2014 to

24.01.2015

Rate Contract No. CSIDC/MKD/ PS-II/87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

2. M/S Uniline Energy Systems (P)L. Uniline House 198/23 Ramesh Market, East of kailash New,Delhi Ph. No.-011-46661111, 011-26469031, 011-26469108. Fax No.-011-26481469

29.01.2014 to

24. 01.2015

Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/ST/UESPL/ 4954 Dated: 29.01.2014

3. M/S Novateur Electrical & Digital System Pvt. Ltd Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

12.06.2014 to

24.01.2015

Rate Contract No. CSIDC/MKD/ PS-IX/87/386/1314/UPSS/NE&DSPL/5009 Dated: 12-06-.2014

4. M/S R.S. Power System A-42 Jai Ambey Nagar, Tonk Road, Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

19.06.2014 to

24.01.2015

Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19.06.2014

2/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected]

No./CSIDC/MKD/ PS- II/04/ 13-14/ Raipur, Dated :

Registered A/D Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 To,

M/S Power Generation Shop-C-68 Jaganath Temple, Gayitri Nagar, Raipur (C.G.) Mo. No. 9425205059 Ph. No. 0771-6461111

Sub :- Rate Contract for the supply of UPS System (Valid From dated 25.01.2014 to 24.01.2015) Ref :- (I) This Office Tender Enquiry No. CSIDC/MKD/ PS-II/87/386/13-14

(II) Bid No. 7017 Dated /19.07.2013 (III) Your Offer acceptance along with undertaking submitted on dated 17-01-2014

Dear Sir, You are hereby informed that your above referred tender read with subsequent letters mentioned above for the Stores specified in the Schedules annexed has been accepted. This Rate Contract will be governed by the terms and conditions brought in CSIDC Form No.1 & 2. The Rate Contract and the Schedules annexed hereto shall be the sole repository of this Rate Contract / Transaction. You are required to show the original INK-SIGNED subject Rate Contract to the satisfaction of Direct Demanding Officer who will place the supply order as per instructions contained in CSIDC form No. 2 and also to the Quality Assurance Officer for inspection purpose and to the Paying Authority at the time of getting the payment . SCHEDULES ANNEXED: 1. Schedule “A” Description of Stores, Prices, Duties/Taxes. 2. Annexure -“B” Technical Particulars of Item UPS System 3. Schedule “B” Special conditions of contract (if any). 4. Schedule “C” Information to DDOs about parallel rate contracts. 5. Schedule “D” Format for Drawal Report. Encl. 15 pages

Yours faithfully,

(Santosh Bhagat )

Chief General Manager For and on behalf of the purchaser

named in CSIDC Form No.2

3/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 Copy to, 1. The Secretary, Chhattisgarh Vidhan Sabha ,Raipur .

2. The Registrar, Honourable High court Chhattisgarh, Bilaspur .

3. The Accountant General Chhattisgarh State, Raipur.

4. All HODs of Chhattisgarh Govt. with a request to circulate the copy of R/C to all Direct Demanding Officers of your institution against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, also acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel.

5. All The Collectors ,Chhattisgarh State against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel

6. The Director Treasury, Chhattisgarh Govt., Raipur with a request to circulate copy of R/C to all branches under your control .

7. (i) The Director Education Department (DPI) Pension Wada, Raipur. (ii) The Commissioner Tribal Welfare Department Pt. R.S.U. Campus Raipur

(iii) The Commissioner Nagar Palika Nigam Raipur (C.G.) (iv) The Director, Directorate of Sports and Youth Welfare Chhattisgarh Raipur (C.G.)

Sr. No. 1 to 7 above are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like E.D. Registration, Tax Registration etc. before taking action i.e. release of supply order, inspection of stores, payment of bill whichever is applicable, as the responsibility rests with the concerned authority .

8. (i) ADG (Q & A) , DGS&D, Jeewan Tara Building 5 Parliament Street New Delhi 110001 (ii) Manager (Operation) Indian Register of Shipping, Senior MIG-2, Secter A, 1st Floor, Infront

of Bank of India Indrapuri Bhopal. (iii) Chief Engineer, PDIL, 4th floor, 4/2 Karaya Road, 67 Shekespeare Sarani, Kolkata (W.B.) (iv) General Manager (Inspection) RITES Ltd., Churchgate Station Road, Second Floor, M.K.

Road, Mumbai-400020 (v) Operations Manager SGS India Pvt, Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal (MP)-

462011. Above (i) to (v) are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like Validity of Registration, BIS Registration etc. before taking action i,e. inspection of stores, as the responsibility rests with the concerned authority. For information and necessary action against Authorized Inspection Agency accorded by CSIDC for inspection of stores.

9. Manager (Tender), Marketing Div., CSIDC Ltd., Raipur. He is requested to maintain a master file of Rate Contract.

10. Computer cell, CSIDC Ltd., Raipur to release Rate Contract on CSIDC website.

11. Main file of Item- “UPS System”

(Santosh Bhagat ) Chief General Manager

For and on behalf of the purchaser Named in CSIDC Form No.2

4/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

SCHEDULE “A” Description of Stores, Prices, Duties/Taxes

For the supply of Item- UPS System as per Annexure’A’ enclosed.

1. (a) NAME AND FULL ADDRESS OF :- M/S Power Generation THE FIRM Shop-C-68 Jaganath Temple, Gayitri Nagar,

Raipur (C.G.) Mo. No. 9425205059

Ph. No. 0771-6461111

(b) NAME AND FULL ADDRESS OF :- M/S Power Generation MANUFACTURER Ring Road No.-1,

Raipur (C.G.) Mo. No. 9425205059

Ph. No. 0771-6461111 2. VALIDITY OF RATE CONTRACT :- From 25.01.2014 to 24.01.2015 3. DESCRIPTION OF ITEM- UPS System SPECIFICATION, UNIT RATE AS BELOW

Note :- Technical particulars as per Annexure A enclosed

(Santosh Bhagat ) Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4

Schedule-1 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Three Phase AC Output, Floor Mounted Type UPS27001002 10 KVA 60 Minutes 184889.00

UPS27001004 15 KVA 30 Minutes 205467.00 UPS27001005 15 KVA 60 Minutes 257419.00

UPS27001006 15 KVA 120 Minutes 381494.00 UPS27001007 20 KVA 30 Minutes 251205.00 UPS27001008 20 KVA 60 Minutes 337075.00 UPS27001009 20 KVA 120 Minutes 515042.00 UPS27001010 30 KVA 30 Minutes 321086.00 UPS27001011 30 KVA 60 Minutes 416434.00 UPS27001012 30 KVA 120 Minutes 709813.00

Schedule-2 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Single Phase AC Output, Floor Mounted Type

UPS27001013 10 KVA 30 Minutes 118166.00 UPS27001014 10 KVA 60 Minutes 154256.00 UPS27001015 10 KVA 120 Minutes 215755.00 UPS27001016 15 KVA 30 Minutes 164923.00 UPS27001017 15 KVA 60 Minutes 201794.00 UPS27001018 15 KVA 120 Minutes 318214.00 UPS27001019 20 KVA 30 Minutes 182343.00 UPS27001020 20 KVA 60 Minutes 276774.00 UPS27001021 20 KVA 120 Minutes 439049.00 UPS27001022 30 KVA 30 Minutes 250288.00 UPS27001023 30 KVA 60 Minutes 397487.00 UPS27001024 30 KVA 120 Minutes 616095.00

5/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 4. TERMS OF DELIVERY : F. O. R Destination ( Any where in C.G.State ) 5. EXCISE DUTY : Not Applicable 6. SALES TAX /VAT : Extra, if applicable

TIN No. 22761601616 Address:-

M/S Power Generation Shop-C-68 Jaganath Temple, Gayitri Nagar,

Raipur (C.G.) Mo. No. 9425205059

Ph. No. 0771-6461111 DELIVERY PERIOD : 45 Days 8. a. ANNUAL TURN OVER/ : 2011-12 . 10250000.00 2012-13 . 12000000.00 b. MONETARY LIMIT : NM c. INSTALLED CAPACITY : (As per DTIC EM Part-2 Registration Certificate Issued By

DTIC- Raipur, C.G.) Description Capacity/Annum

Online UPS Line Interactive UPS Invertor 2000 Nos. Solar Power Invertor Electronic Chok

9. SLAB DISCOUNT (IF ANY) : Nil 10. PRICES : Prices are Firm and Final

(Santosh Bhagat )

Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4

Schedule-4 Online UPS With Isolations Transformer Suitable for Single Phase AC Input & Single Phase AC Output, Floor Mounted Type

UPS27001043 5.0 KVA 30 Minutes 62576.00 UPS27001044 5.0 KVA 60 Minutes 79966.00 UPS27001045 5.0 KVA 120 Minutes 121171.00 UPS27001046 6.0 KVA 30 Minutes 63667.00 UPS27001049 7.5 KVA 30 Minutes 70390.00 UPS27001052 10 KVA 30 Minutes 88115.00

6/60 Rate Contract No. CSIDC/MKD/PS-II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 11. MINIMUM QUANTITY IN : Not Mentioned. SINGLE SUPPLY ORDER 12. STATUS OF RC HOLDING : Manufacturer

FIRM 13. REGISTRATION STATUS : Manufacturer is Registered with DTIC- Raipur, vide E.M. Part-2

Registration No. 220111100888 Dated 22.05.2009 14 BIS LICENSE : Not Applicable 15. PAYING AUTHORITY : As Mentioned in supply order to be issued by Direct Demanding

Officers (DDOs). 16. PAYMENT TERMS : The payment of full 100% of prices of the stores of each

consignment there-of will be made after receipt and acceptance of the stores by the consignee/interim consignee in full and good condition within 20 days as per SPR rule No.11, if the bills are in order. In case of delay in payment without any reason the department will be liable to pay interest as per prevailing bank rate. Bills are to be submitted in the prescribed form of the paying authority of purchaser / indenter and are to be supported with inspection note issued by the inspector and consignee’s Receipt Certificate .

17 INSPECTION AUTHORITY : Accorded by CSIDC Ltd. While receipt of copy of purchase Order(Indent) in Favour of authorized pre Dispatch Inspection Agency enlisted in the CSIDC panel prior to submission of application from the Rate Contract Holders.

18 QUALITY ASSURANCE: a)Accorded by CSIDC Ltd. While receipt of copy of purchase Order (Indent) in Favour of authorized pre Dispatch Inspection Agency enlisted in the CSIDC panel prior to submission of application from the Rate Contract Holders.

b)Post-dispatch inspection by the committee constituted by the Direct Demanding Officers /Purchase Department .

OR Post Dispatch Inspection of Stores carried by the Inspection

Agency enlisted in the CSIDC prior to receiving of proposal from the end user/Purchase Department.

19. PLACE WHERE THE STORES At Manufacturer’s Factory at ARE TO BE OFFERED FOR M/S Power Generation INSPECTION Ring Road No.-1,

Raipur (C.G.) Mo. No. 9425205059

Ph. No. 0771-6461111 20 INSPECTION CHARGES : Inspection charges 0.60%+ Service Tax As applicable to be

paid extra at the time of inspection to Quality Assurance Officer which will be billed by the unit along with bill of the material and will be reimbursed by the paying authority of DDO.

21. SECURITY DEPOSIT : As per General conditions of contract , CSIDC Form No. 1, Clause 7,the Purchaser/DDOs may require the contractor to furnish a security deposit which shall be made after issue of the acceptance of the supply order within the period specified by the purchaser / DDOs. Such security deposit shall not ordinarily exceed 3% . The security shall be in form of Demand Drafts issued by any of the Scheduled Commercial Banks. No other form of security is to be accepted. The security deposit amount is to be refunded after successful completion of the supply.

(Santosh Bhagat )

Chief General Manager

7/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

22. Special Note

1. Purchasing Departments /end user will ensure to sanding the copy of every order to this office for approval of Inspection Agency against inspection of stores. 2. Purchasing Departments/ end user will ensure per dispatch inspection of stores against approval of Inspection Agency enlisted in the CSIDC panel. 3. Purchasing Departments/ end user will be responsible for ensuring the Quality of accepted stores. 4. Purchasing Department/end user shall be ensure to execute the Integrity Pact between BUYER and BIDDER/SUPPLIER in accordance with the letter vide No.799/eq-l-@2013 New Raipur Dated 10.07.2013 and 243/fo-@fu-@pkj@2013 New Raipur Dated 06.07.2013 issued by the Chief Secretary. Govt. of Chhattisgarh.

(Santosh Bhagat ) Chief General Manager

8/60 Rate Contract No. CSIDC/MKD/PS- II/87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

Annexure –B TECHNICAL SPECIFICATION OF UPS SYSTEM

CSIDC/MKD/TECH/2013-14/28

Technical Particulars For On-Line UPS For IT Applications & TSC 12-07-2013

Schedule 1 On-Line UPS with isolation transformer suitable for Three Phase AC Input

and Three Phase AC Output, Floor Mounted Type

Unit : NOS. Rating of UPS Indicative Back-Up time 2 10 KVA 60 minutes 4 15 KVA 30 minutes 5 15 KVA 60 minutes 6 15 KVA 120 minutes 7 20 KVA 30 minutes 8 20 KVA 60 minutes 9 20 KVA 120 minutes 10 30 KVA 30 minutes 11 30 KVA 60 minutes 12 30 KVA 120 minutes Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

and Single Phase AC Output, Floor Mounted Type Unit : NOS. Rating of UPS Indicative Back-Up time

1 10 KVA 30 minutes 2 10 KVA 60 minutes 3 10 KVA 120 minutes 4 15 KVA 30 minutes 5 15 KVA 60 minutes 6 15 KVA 120 minutes 7 20 KVA 30 minutes 8 20 KVA 60 minutes 9 20 KVA 120 minutes 10 30 KVA 30 minutes 11 30 KVA 60 minutes 12 30 KVA 120 minutes Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type

(P.S. Dhakate) PS-II

9/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 Unit : NOS Rating of UPS Indicative Back-up time

1 5.0 KVA 30 Minutes 2 5.0 KVA 60Minutes 3 5.0 KVA 120 Minutes 4 6.0 KVA 30 Minutes 7 7.5 KVA 30 Minutes 10 10 KVA 30 Minutes NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. Detailed Specification Schedule 1 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Three Phase AC Output,Floor Mounted Type

Specification :- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three phase AC input voltage 300V to 450V, 50+/-1.5 Hz and three phase AC output voltage 400V +/-1%V, 50 +/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Single Phase AC Output,Floor Mounted Type

Specification:- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three-phase AC input voltage 300V to 450V, 50 +/-1.5 Hz and single phase AC output voltage 230 +/-1%V,50+/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type Specification:- On-line UPS with isolation transformer & with PWM Technology,Floor mounted type suitable for single phase AC input voltage 160V to 260V,50+/-1.5Hz and single phase AC output voltage 230+/-1%V, 50+/-0.5Hz. It shall be housed in a rugged enclosure made of M.S Sheet 1.2 mm( minimum ) thick ,aesthetically finished, duly pretreated and powder coated .

(P.S. Dhakate) PS-II

10/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 General Technical requirement For RC Holder : 1. General a. UPS shall be free from workmanship defects, sharp edges, nicks, scratches,burs, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional. b. UPS Enclosure's Degree of Protection shall be IP2L1 as per apendix C of IS13947 (part 1)/1993 (reaffirmed 2004). c. By-pass facility shall be provided for maintenance of UPS. d. UPS shall supply output power and charging current at the same time. e. Switching device shall be MOSFET or IGBT and the same shall be confirmed in the offer. f. Switching frequency shall be above 10 KHz and shall be declared in the offer. g. KW rating of the UPS shall be 0.8 times the KVA rating. 2. Input (as applicable) a. 160V-260V, 50 +/-3% Hz single phase AC or b. 300V-450V, 50 +/-3%Hz three phase AC c. Input power factor shall be 0.95 3. Output (as applicable) a. 230V +/-1% (with alternative setting for 220V +/-1%) 50 +/-0.5Hz, single phase. b. 400V +/-1% (with alternative setting for 380V +/-1%) 50 +/-0.5Hz three phase. Voltage regulation from no load to full load shall be within +/-1% in both the cases. UPS shall also have facility for operation in synchronous mode in which output frequency shall be same as that of mains frequency. 4. Total harmonics distortion at output : 2% maximum for UPS up to 5KVA and 3% maximum for UPS above 5 KVA on resistive load ,the total input harmonics are less than or equal to 10%. 5. Efficiency (at rated output KVA Rating, rated Pf ,rated voltage and frequency) a. Overall efficiency (minimum) : 90% at min. input voltage and with full charging current at C-10 rate or higher. 6. UPS power factor at rated load : better than 0.95 lagging at input side . 7. Over load : UPS shall withstand 20% overload for 10 minutes and 50% over load for one minute. 8. Protections : Following protection shall be provided in UPS: a. Over voltage, short circuit, and overload at UPS output terminal. b. Under voltage at battery terminal. c. Over shoot and under shoot shall not be greater than 4% of rated voltage for duration of 40m sec. (maximum).Shall be conducted as part of acceptance tests on one sample each of all ratings offered for inspection.(over shoot is the abrupt increase of out put voltage when the out put load is changed from full-load to noload. Similarly under shoot is the abrupt decrease of out put voltage when the out put load is changed from no-load to full load ). 9. Indicators and meters a. Following indicators shall be provided:- (i) Mains presence. (ii) Battery charging and discharging (iii) Output overload (iv) Low battery voltage. b. Digital meter shall be provided for monitoring the following parameters in UPS(not applicable for rack mounting): (i) Input AC voltage. (ii) Output AC Voltage, current and frequency

(P.S. Dhakate) PS-II

11/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 (iii) Battery voltage and current. 10. Battery bank: a. UPS shall be supplied with SMF VRLA battery type tested from Govt. lab as per JISC:8702 only.Number of samples for type testing shall be as per IS:7372/1995 with all the amendments up to date. b. Tenderers shall declare battery AH capacity, battery voltage, number of batteries of each rating, make and model of batteries offered with each item of UPS. c. Batteries for UPS shall be duly type tested to JISC 8702 from government lab . d. The UPS shall be complete with Trolley for battery bank,Cables and connectors etc. and the firms shall also connect the batteries with UPS and do commissioning of the same. e. Minimum VAH rating of battery bank for different duration of back up time shall be as detailed below: UPS rating Min.VAH Min. VAH Min VAH Min. VAH in KVA 30 minute 60 minute 120 minute 240 minute back up back up back up back up 0.5 KVA 400 800 1600 3200 1 KVA 800 1600 3200 6400 2 KVA 1600 3200 6400 12800 3 KVA 2400 4800 9600 19200 5 KVA 4000 8000 16000 32000 6 KVA 4800 9600 19200 38400 7.5 KVA 6000 12000 24000 48000 10 KVA 8000 16000 32000 64000 15 KVA 12000 24000 48000 96000 20 KVA 16000 32000 64000 128000 30 KVA 24000 48000 96000 192000 11. Testing requirement for UPS: a. Type Tests : Following shall constitute type test and at least one sample shall be type tested for each rating with maximum backup time. Type testing shall be conducted at a govt. lab (i) Visual examination. (ii) Verification of output power and frequency. (iii) Verification of voltage regulation. (iv) Verification of efficiency. (v) Verification of total harmonics distortion. (vi) Verification of overshoot, undershoot limits and over voltage protection. (vii) Test for insulation resistance, leakage current high voltage as per IS:616/86 (reaffirmed in 2010. Insulation resistance should not be less than 100 mega ohms. (viii) Verification of VAH as per Rate Contract. (ix)Test for IP-Protection (x) Environmental tests: Following environmental tests shall be carried out on each rating with highest VAH rating. Tests at SL. No. i to iii above shall be repeated during the last half an hour of each environmental condition.Tests at Sl. No. i to vi shall be repeated after completing the environmental tests sequence of the three conditions and recovery period of 1 to 2 hours.There shall be no deterioration in any of these parameters when compared to the test results obtained before environmental tests.

(P.S. Dhakate) PS-II

12/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 (A) Dry Heat Test : shall be carried out in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2004) at 55 degree C for 16 hrs. (B) Damp Heat : shall be carried out at upper Temperature of 40 degree C,two cycles of (12+12 hours)each in accordance with IS:9000 (part 5/sec.2)1981 (reaffirmed 2004). (C) Cold Test : shall be carried out in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2004) at -10 degree C for 4 hrs. b.(1) Acceptance Tests : Tests listed at Sl. No.i to viii shall be conducted as part of acceptance tests on 10% samples on all the items offered for inspection. (2)Verification of parameters as per GTR on one sample except for environmental tests and battery type testing on one sample each of the rating offered for inspection. (3)Dimension and marking ,Capacity test and High rate discharge test on battery offered.Number of samples shall be as per IS:7372 latest. (4)Temperature-rise test on one rating at rated KVA,rated pf and minimum of input operating voltage range. Quality Assurance Procedure 1) The firm shall furnish schemetic diagram of UPS for each rating as and when they are offered first time for inspection against the rate contract . 2)All the UPS shall be supplied with 1:1 isolation transformer at out put side.Isolation transformer can be internal or external to UPS. Detail of isolation transformer shall be furnished by the firm when the product is offered for first inspection for each rating and the same shall be recorded in the inspection report after due verification by the QA Officer. If the isolation transformer is eternal to the UPS same shall be indicated.The efficiency of UPS shall be measured along with isolation transformer. 3) When the product is offered for first time for inspection the UPS shall be operated at full rated current as per its rated KVA rating , at the rated power factor and at minimum of input voltage range and with full C-10 rate min. charging current, along with isolation transformer, for the temperature rise test and to evaluate its performance at rated current corresponding to KVA rating . After the evaluation of its performance the weight of the transformer shall be taken to compare with the weight furnished by the firm vide the questionnaire attached in the rate contract. After the completion of the temperature rise test, the UPS efficiency and input power factor shall be tested to assess its consistency with regards to temperature and continuous application of the rated KVA load. The temperature rise test shall not be terminated before 8 hours of continuous operation. 4) During each visit at least one rating of the UPS offered for inspection shall be tested for the verification of its capacity rating by conducting temprature rise test on rated KVA load. Selection of rating shall be such that it coveres all ratings on R/C during currency of R/C. This is over and above the requirement of the clause as above when each rating is subjected for temperature rise test when UPS is offered first time. Machine should be subjected to 8 hours continuous operation for capacity verification . 5) Weight of the transformer shall be recorded in the inspection note for the verification by the consignee/user for the purpose of reference. 6) The firm shall have necesssary facilities to test batteries for high rate discharge and for capacity rating tests as per JISC:8702,so that batteries can be verified for HRD & capacity verification test during each inspection. Method for the HRD and capacity rating is as per JIS C 8702.Sampling shall be done as per IS: 7372 7) weight of the batteries, its brand, its voltage rating AH rating and no of batteries fitted with UPS shall be indicated in the inspection note for the verification by the consignee.

(P.S. Dhakate) PS-II

13/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 8) Firm shall furnish copy of the invoices and details of the serial no. of the batteries at the time of inspection for the corelation and records purpose of the QA Office. 9)Battery supplier/manufacturer who supplies battery to UPS supplier shall be registered with DGS&D/NSIC(based on capacity report from DGS&D).Only registered battery shall be supplied against the R/C. SPECIAL NOTES TO TENDERERS: 1. As per CVC Circular No.03/01/12 dated 13.1.2012, a) In a tender, either the Indian agent on behalf of the Principal/OEM or Principal/OEM itself can bid but both cannot bid simultaneously for the same item/product in the same tender. b) If an agent submits bid on behalf of the Principal/OEM, the same agent shall not submit a bid on behalf of another Principal/OEM in the same tender for UPS. c) UPS and battery from separate OEMs can be quoted as these are entirely different items. 2.Uniterruptible Power Supply consists of electronic hardware plus battery and hence in this tender UPS with battery is a product/item.Suppliers shall quote for UPS and battery .Otherwise tender will be treated as unresponsive.Tenderers shall indicate rate for UPS without battery against shcdules 1,2 &4. 3a. Firms registered with DGS&D or seeking registration/capacity assessment in the category of:(a) Indian agent of Indian Manufacturer ; the registration and inspection shall be carried out at Indian Manufacturer's works. (b)Battry manufacturer/supplier who supplies battery to UPS supplier shall be registered and only battery from manufacturer/supplier registered with DGS&D /NSIC(based on capacity report from DGS&D)shall be quoted and offered along with UPS. c)UPS manufacturer/supplier need not get registered for battery. 4a. Firms must submit their application to concerned QA Office for fresh or renewal of registration/capacity assessment/special capacity assessment PRIOR to at least 30 days before the scheduled date of tender opening, failing which application may NOT be able to be fully processed.Tenderers will only be responsible for same. b. Tenderers shall be registered with DGS&D or NSIC(based on capacity report of DGS&D) to become eligible to quote against the T/E. 5. Registration for all scheduled items including add on items and in lieu items are required on the date of tender opening ,if not specified otherwise elsewhere. It means all the items/models quoted against all schedules by tenderer have to be registered on the date of tender opening if not specified otherwise elsewhere. 6. The relevant guidelines mentioned in paras 13.20.1, 13.20.5(a), 13.21.6(b) and 13.22.2 of DGS&D Manual will be the basis for registration of items, i.e., spares and accessories , add-on items and in-lieu items , provided the firm are registered for the main equipment , for which the above items are required for functioning of main equipment .No separate agreement , documents like test reports etc. are required for these items if they are being registered for the main equipment for which above items are required for proper functioning. 7.UPS suppliers who are registered for the highest ratings of each of the schedules will be eligible to quote against the corresponding schedules of T/E.They will be considered for award of R/C only on production of registration certificate indicating registration of individual ratings of different schedules of T/E. NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. ELIGIBLITY CRITERIA The following essential facilities shall be available with the manufacturer:-

(P.S. Dhakate) PS-II

14/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014 1.Dust free environment for assembly of PCBs 2.Component lead forming machine/fixture 3.Temperature controlled wave soldering machine with auto fluxing facility. 4.Dry heat test chamber to burn in PCBs before its use to avoid infant mortality. 5.Functional testing facility for PCBs 6.Electrostatic dischage protection in line with IS:10087/81 work procedure. 7.Power analyser to measeure voltage,current,frequency,power factor,power,harmonic distortion(separate instrument will also be acceptable.) 8.Multi channel temperature recorder 9.Storage oscilloscope etc. Eligibility Criteria 1 Essential in-house manufacturing and testing facilities as per the

governing specification shall be available with the RC Holder are as follows.

2 a. Dust free environment for the assembly of PCBs. b. Component lead forming machine/ fixture. c. Temperature controlled wave- soldering machine with auto-fluxing facility. d. Dry heat test chamber for burn in of PCBs before calibration . e. Functional testing of PCBs. f. Electrostatic discharge protection in line with IS: 10087/1981 work procedure.. g. Power analyzer for measurement of voltage, current, frequency, power factor, power, harmonic distortion (separate instruments will also be acceptable) h. Multi-channel temperature recorder. i. Storage oscilloscope.

NOTE TO INDENTORS: Typical power consumption of PC is 160 VA, of PC with inkjet printer is 300-400 VA and for PC with laser printer is 700-800 VA. The back up time as available for each item can be calculated on this basis by the indentor before ordering the item.

Recommended by Technical Specification Committee Dated 12-07-2013

(P.S. Dhakate) PS-II

15/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

SCHEDULE ‘B’

(SPECIAL CONDITION OF CONTRACT)

NA

(Santosh Bhagat ) Chief General Manager

16/60 Rate Contract No. CSIDC/MKD/PS- II /87/386/13-14/ST/PG/4953 Dated: 25.01 .2014

SCHEDULE – “D”

FORMAT FOR QUATERLY DRAWAL REPORT Name of the Firm __________________ I- Jan-Mar Report No. __________________ II- Apr-June Rate Contract No. __________________ III- July-Sept. Date of Submission __________________ IV- Oct - Dec Total Position of Order against Rate Contract till the submission of Report. S.No. Name of

Department Quantity and Value of Orders Received (Rs.)

Quantity and Value of Orders Executed (Rs.)

Balance Quantity and Value to be Supplied (Rs.)

Reasons

Foot 1. Value indicate should be a) Value of orders received during the quarter-Rs.

Total value inclusive of all Taxes duties and incidental b) Value of orders supplied during the quarter-Rs. Charges

2. Nil report should also be Submitted.

(Santosh Bhagat ) Chief General Manager

17/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected]

No./CSIDC/MKD/ PS- II/02/ 13-14/ Raipur, Dated : Registered A/D Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 To,

M/S Uniline Energy Systems (P) Ltd. Uniline House 198/23 Ramesh Market, East of kailash New,Delhi Ph. No.-011-46661111, 011-26469031, 011-26469108. Fax No.-011-26481469

Sub :- Rate Contract for the supply of UPS System (Valid From dated 29.01.2014 to 24.01.2015) Ref :- (I) This Office Tender Enquiry No. CSIDC/MKD/ PS-IX/87/386/13-14

(III) Bid No. 7014 Dated 20.08.2013 (III) Your Offer acceptance along with undertaking submitted on dated 20-01-2014

Dear Sir, You are hereby informed that your above referred tender read with subsequent letters mentioned above for the Stores specified in the Schedules annexed has been accepted. This Rate Contract will be governed by the terms and conditions brought in CSIDC Form No.1 & 2. The Rate Contract and the Schedules annexed hereto shall be the sole repository of this Rate Contract / Transaction. You are required to show the original INK-SIGNED subject Rate Contract to the satisfaction of Direct Demanding Officer who will place the supply order as per instructions contained in CSIDC form No. 2 and also to the Quality Assurance Officer for inspection purpose and to the Paying Authority at the time of getting the payment . SCHEDULES ANNEXED: 1. Schedule “A” Description of Stores, Prices, Duties/Taxes. 2. Annexure -“B” Technical Particulars of Item UPS System 3. Schedule “B” Special conditions of contract (if any). 4. Schedule “C” Information to DDOs about parallel rate contracts. 5. Schedule “D” Format for Drawal Report. Encl. 15 pages

Yours faithfully,

(Santosh Bhagat ) Chief General Manager

For and on behalf of the purchaser named in CSIDC Form No.2

18/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 Copy to, 1. The Secretary, Chhattisgarh Vidhan Sabha ,Raipur .

2. The Registrar, Honourable High court Chhattisgarh, Bilaspur .

3. The Accountant General Chhattisgarh State, Raipur.

4. All HODs of Chhattisgarh Govt. with a request to circulate the copy of R/C to all Direct Demanding Officers of your institution against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, also acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel.

5. All The Collectors ,Chhattisgarh State against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel

6. The Director Treasury, Chhattisgarh Govt., Raipur with a request to circulate copy of R/C to all branches under your control .

7. (i) The Director Education Department (DPI) Pension Wada, Raipur. (ii) The Commissioner Tribal Welfare Department Pt. R.S.U. Campus Raipur

(iii) The Commissioner Nagar Palika Nigam Raipur (C.G.) (iv) The Director, Directorate of Sports and Youth Welfare Chhattisgarh Raipur (C.G.)

Sr. No. 1 to 7 above are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like E.D. Registration, Tax Registration etc. before taking action i.e. release of supply order, inspection of stores, payment of bill whichever is applicable, as the responsibility rests with the concerned authority .

8. (i) ADG (Q & A) , DGS&D, Jeewan Tara Building 5 Parliament Street New Delhi 110001 (ii) Manager (Operation) Indian Register of Shipping, Senior MIG-2, Secter A, 1st Floor, Infront

of Bank of India Indrapuri Bhopal. (iii) Chief Engineer, PDIL, 4th floor, 4/2 Karaya Road, 67 Shekespeare Sarani, Kolkata (W.B.) (iv) General Manager (Inspection) RITES Ltd., Churchgate Station Road, Second Floor, M.K.

Road, Mumbai-400020 (v) Operations Manager SGS India Pvt, Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal (MP)-

462011. Above (i) to (v) are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like Validity of Registration, BIS Registration etc. before taking action i,e. inspection of stores, as the responsibility rests with the concerned authority. For information and necessary action against Authorized Inspection Agency accorded by CSIDC for inspection of stores.

9. Manager (Tender), Marketing Div., CSIDC Ltd., Raipur. He is requested to maintain a master file of Rate Contract.

10. Computer cell, CSIDC Ltd., Raipur to release Rate Contract on CSIDC website.

12. Main file of Item- “UPS System”

(Santosh Bhagat )

Chief General Manager For and on behalf of the purchaser

Named in CSIDC Form No.2

19/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

SCHEDULE “A” Description of Stores, Prices, Duties/Taxes

For the supply of Item- UPS System as per Annexure’A’ enclosed. 1. (a) NAME AND FULL ADDRESS OF :- M/S Uniline Energy Systems (P) Ltd.

THE FIRM Uniline House 198/23 Ramesh Market, East of kailash New,Delhi Ph. No.-011-46661111,

011-26469031, 011-26469108.

Fax No.-011-26481469

(b) NAME AND FULL ADDRESS OF :- M/S Uniline Energy Systems (P) Ltd. MANUFACTURER Uniline House 198/23 Ramesh Market,

East of kailash New,Delhi Ph. No.-011-46661111,

011-26469031, 011-26469108.

Fax No.-011-26481469 2. VALIDITY OF RATE CONTRACT :- From 29.01.2014 to 24.01.2015 3. DESCRIPTION OF ITEM- UPS System SPECIFICATION, UNIT RATE AS BELOW

Note :- Technical particulars as per Annexure A enclosed

(Santosh Bhagat ) Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4

Schedule-1 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Three Phase AC Output, Floor Mounted Type UPS27001002 10 KVA 60 Minutes 184889.00

UPS27001004 15 KVA 30 Minutes 205467.00 UPS27001005 15 KVA 60 Minutes 257419.00

UPS27001006 15 KVA 120 Minutes 381494.00 UPS27001007 20 KVA 30 Minutes 251205.00 UPS27001008 20 KVA 60 Minutes 337075.00 UPS27001009 20 KVA 120 Minutes 515042.00 UPS27001010 30 KVA 30 Minutes 321086.00 UPS27001011 30 KVA 60 Minutes 416434.00 UPS27001012 30 KVA 120 Minutes 709813.00

Schedule-2 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Single Phase AC Output, Floor Mounted Type

UPS27001013 10 KVA 30 Minutes 118166.00 UPS27001014 10 KVA 60 Minutes 154256.00 UPS27001015 10 KVA 120 Minutes 215755.00

20/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 4.

TERMS OF DELIVERY : F. O. R Destination ( Any where in C.G.State ) 5. EXCISE DUTY : Extra, if Applicable Central Excise Registration Certificate Number AAACK0443NXM002 Addressed M/S Uniline Energy Systems (P) Ltd.

Computer Complex, 5,6,15,16,17 DSIDC, OKHLA Industrial Area, Phase-II Okhla Ind Estate, South Delhi, Delhi-110020 Rate Contract Holder have to Submit Quarterly Report to the

Central Excise Department Mandatorily. 6. SALES TAX /VAT : Extra, if applicable

TIN No. 07110142177 Address:-

M/S Uniline Energy Systems (P) Ltd. Uniline House 198/23 Ramesh Market,

East of kailash New,Delhi Ph. No.-011-46661111,

011-26469031, 011-26469108.

Fax No.-011-26481469

(Santosh Bhagat )

Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4 5 UPS27001016 15 KVA 30 Minutes 164923.00

UPS27001017 15 KVA 60 Minutes 201794.00

UPS27001018 15 KVA 120 Minutes 318214.00

UPS27001019 20 KVA 30 Minutes 182343.00

UPS27001020 20 KVA 60 Minutes 276774.00

UPS27001021 20 KVA 120 Minutes 439049.00

UPS27001022 30 KVA 30 Minutes 250288.00

UPS27001023 30 KVA 60 Minutes 397487.00

UPS27001024 30 KVA 120 Minutes 616095.00 Schedule-3 Optional Items for Online UPS

UPS27001025 RS 232 Serial Port with Software for Computer

Interface.

RS 232 Serial Port with Software for Computer

Interface.

225.00

UPS27001026 USB Port with Software for Computer Interface.

USB Port with Software for Computer Interface.

225.00

Schedule-4 Online UPS With Isolations Transformer Suitable for Single Phase AC Input & Single Phase AC Output, Floor Mounted Type

UPS27001043 5.0 KVA 30 Minutes 62576.00 UPS27001044 5.0 KVA 60 Minutes 79966.00 UPS27001045 5.0 KVA 120 Minutes 121171.00 UPS27001046 6.0 KVA 30 Minutes 63667.00 UPS27001049 7.5 KVA 30 Minutes 70390.00 UPS27001052 10 KVA 30 Minutes 88115.00

21/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

DELIVERY PERIOD : 45 Days 8. a. ANNUAL TURN OVER/ : 2009-10 . 832164400.00 2010-11 . 906361370.00 2011-12 . 846234965.00 b. MONETARY LIMIT : NM c. INSTALLED CAPACITY : (As per NSIC Registration Certificate Issued By NSIC-

New,Delhi Description Capacity/Annum

UPS System upto 10 KVA 3 1200 Nos. Phase Single Phase UPS Online 0.5 KVA to 100 KVA 1200 Nos. UPS Online 0.5 KVA to 200 KVA 2280 Nos.

9. SLAB DISCOUNT (IF ANY) : Nil 10. PRICES : Prices are Firm and Final 11. MINIMUM QUANTITY IN : Not Mentioned. SINGLE SUPPLY ORDER 12. STATUS OF RC HOLDING : Manufacturer

FIRM 13. REGISTRATION STATUS : Manufacturer is Registered with NSIC- New Delhi vide No. NSIC/BOD/GP/DELHI/01/2480 Dated 30.08.2012 14 BIS LICENSE : Not Applicable 15. PAYING AUTHORITY : As Mentioned in supply order to be issued by Direct Demanding

Officers (DDOs). 16. PAYMENT TERMS : The payment of full 100% of prices of the stores of each

consignment there-of will be made after receipt and acceptance of the stores by the consignee/interim consignee in full and good condition within 20 days as per SPR rule No.11, if the bills are in order. In case of delay in payment without any reason the department will be liable to pay interest as per prevailing bank rate. Bills are to be submitted in the prescribed form of the paying authority of purchaser / indenter and are to be supported with inspection note issued by the inspector and consignee’s Receipt Certificate .

17 INSPECTION AUTHORITY : Accorded by CSIDC Ltd. While receipt of copy of purchase Order(Indent) in Favour of authorized pre Dispatch Inspection Agency enlisted in the CSIDC panel prior to submission of application from the Rate Contract Holders.

18 QUALITY ASSURANCE: a)Accorded by CSIDC Ltd. While receipt of copy of purchase Order (Indent) in Favour of authorized pre Dispatch Inspection Agency enlisted in the CSIDC panel prior to submission of application from the Rate Contract Holders.

b)Post-dispatch inspection by the committee constituted by the Direct Demanding Officers /Purchase Department .

OR Post Dispatch Inspection of Stores carried by the Inspection

Agency enlisted in the CSIDC prior to receiving of proposal from the end user/Purchase Department.

(Santosh Bhagat) Chief General Manager

22/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

19. PLACE WHERE THE STORES At Manufacturer’s Factory at

ARE TO BE OFFERED FOR M/S Uniline Energy Systems (P) Ltd. INSPECTION Uniline House 198/23 Ramesh Market,

East of kailash New,Delhi Ph. No.-011-46661111,

011-26469031, 011-26469108.

Fax No.-011-26481469

20 INSPECTION CHARGES : Inspection charges 0.60%+ Service Tax As applicable to be paid extra at the time of inspection to Quality Assurance Officer which will be billed by the unit along with bill of the material and will be reimbursed by the paying authority of DDO.

21. SECURITY DEPOSIT : As per General conditions of contract , CSIDC Form No. 1, Clause 7,the Purchaser/DDOs may require the contractor to furnish a security deposit which shall be made after issue of the acceptance of the supply order within the period specified by the purchaser / DDOs. Such security deposit shall not ordinarily exceed 3% . The security shall be in form of Demand Drafts issued by any of the Scheduled Commercial Banks. No other form of security is to be accepted. The security deposit amount is to be refunded after successful completion of the supply.

22. Special Note 1. Purchasing Departments /end user will ensure to sanding the copy of every order to this office for approval of Inspection Agency against inspection of stores. 2. Purchasing Departments/ end user will ensure per dispatch inspection of stores against approval of Inspection Agency enlisted in the CSIDC panel. 3. Purchasing Departments/ end user will be responsible for ensuring the Quality of accepted stores. 4. Purchasing Department/end user shall be ensure to execute the Integrity Pact between BUYER and BIDDER/SUPPLIER in accordance with the letter vide No.799/eq-l-@2013 New Raipur Dated 10.07.2013 and 243/fo-@fu-@pkj@2013 New Raipur Dated 06.07.2013 issued by the Chief Secretary. Govt. of Chhattisgarh.

(Santosh Bhagat ) Chief General Manager

23/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

Annexure –B

CSIDC/MKD/TECH/2013-14/28 Technical Particulars For On-Line UPS For IT Applications &

TSC 12-07-2013

Schedule 1 On-Line UPS with isolation transformer suitable for Three Phase AC Input and Three Phase AC Output, Floor Mounted Type

Unit : NOS. Rating of UPS Indicative Back-Up time 2 10 KVA 60 minutes 4 15 KVA 30 minutes 5 15 KVA 60 minutes 6 15 KVA 120minutes 7 20 KVA 30 minutes 8 20 KVA 60 minutes 9 20 KVA 120 minutes 10 30 KVA 30 minutes 11 30 KVA 60 minutes 12 30 KVA 120 minutes Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

and Single Phase AC Output, Floor Mounted Type Unit : NOS. Rating of UPS Indicative Back-Up time

1 10 KVA 30 minutes 2 10 KVA 60 minutes 3 10 KVA 120 minutes 4 15 KVA 30 minutes 5 15 KVA 60 minutes 6 15 KVA 120 minutes 7 20 KVA 30 minutes 8 20 KVA 60 minutes 9 20 KVA 120 minutes 10 30 KVA 30 minutes 11 30 KVA 60 minutes 12 30 KVA 120 minutes Schedule 3 Optional Items for On-Line UPS Unit : NOS Type

1 RS 232 Serial Port with Software for Computer Interface. 2 USB Port with Software for Computer Interface.

(P.S.Dhakate)

Incharge PS-IX

24/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type Unit : NOS Rating of UPS Indicative Back-up time

1 5.0 KVA 30 Minutes 2 5.0 KVA 60 Minutes 3 5.0 KVA 120 Minutes 4 6.0 KVA 30 Minutes 7 7.5 KVA 30 Minutes 10 10 KVA 30 Minutes NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. Detailed Specification Schedule 1 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Three Phase AC Output,Floor Mounted Type Specification :- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three phase AC input voltage 300V to 450V, 50+/-1.5 Hz and three phase AC output voltage 400V +/-1%V, 50 +/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Single Phase AC Output,Floor Mounted Type Specification:- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three-phase AC input voltage 300V to 450V, 50 +/-1.5 Hz and single phase AC output voltage 230 +/-1%V,50+/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 3 Optional Items for On-Line UPS Specification:- UPS shall be provided with serial communication port RS232/USB for computer interface for data exchange of electrical parameters of UPS like voltage, current frequency, charging status, mode of operation etc.Specification for SMF BATTERY Batteries shall be SMF (valve regulated) type, 12V conforming to Japanese Industrial Standards JISC:8702/1998 (Part 1, 2 and 3) and of the ratings as per schedule and Rated capacity at 20 hr discharge rate (AH) Inspection and Testing 1. Supplier shall furnish complete and satisfactory type test certificate as per the above specification for each item at the time of inspection. The type test certificate shall be from any government laboratory. Number of samples for type testing shall be as per IS:7372/1995 (with all amendments up to date). 2. Acceptance test shall be as under. Sampling plan and acceptance criterion shall be as per IS:7372/1995. a) Dimension and marking as per JISC:8702 (Part 2)/98. b) Capacity test as per Clause 5.1 and 7.1 of JISC:8702 (Part 1)/1988. c) High discharge characteristics as per clause 5.2 and clause 7.2 of JISC:8702 (Part 1/1998).

(P.S.Dhakate)

Incharge PS-IX

25/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type Specification:- On-line UPS with isolation transformer & with PWM Technology,Floor mounted type suitable for single phase AC input voltage 160V to 260V,50+/-1.5Hz and single phase AC output voltage 230+/-1%V, 50+/-0.5Hz. It shall be housed in a rugged enclosure made of M.S Sheet 1.2 mm( minimum ) thick ,aesthetically finished, duly pretreated and powder coated . General Technical requirement For RC Holder : 1. General a. UPS shall be free from workmanship defects, sharp edges, nicks, scratches,burs, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional. b. UPS Enclosure's Degree of Protection shall be IP2L1 as per apendix C of IS13947 (part 1)/1993 (reaffirmed 2004). c. By-pass facility shall be provided for maintenance of UPS. d. UPS shall supply output power and charging current at the same time. e. Switching device shall be MOSFET or IGBT and the same shall be confirmed in the offer. f. Switching frequency shall be above 10 KHz and shall be declared in the offer. g. KW rating of the UPS shall be 0.8 times the KVA rating. 2. Input (as applicable) a. 160V-260V, 50 +/-3% Hz single phase AC or b. 300V-450V, 50 +/-3%Hz three phase AC c. Input power factor shall be 0.95 3. Output (as applicable) a. 230V +/-1% (with alternative setting for 220V +/-1%) 50 +/-0.5Hz, single phase. b. 400V +/-1% (with alternative setting for 380V +/-1%) 50 +/-0.5Hz three phase. Voltage regulation from no load to full load shall be within +/-1% in both the cases. UPS shall also have facility for operation in synchronous mode in which output frequency shall be same as that of mains frequency. 4. Total harmonics distortion at output : 2% maximum for UPS up to 5KVA and 3% maximum for UPS above 5 KVA on resistive load ,the total input harmonics are less than or equal to 10%. 5. Efficiency (at rated output KVA Rating, rated Pf ,rated voltage and frequency) a. Overall efficiency (minimum) : 90% at min. input voltage and with full charging current at C-10 rate or higher. 6. UPS power factor at rated load : better than 0.95 lagging at input side . 7. Over load : UPS shall withstand 20% overload for 10 minutes and 50% over load for one minute. 8. Protections : Following protection shall be provided in UPS: a. Over voltage, short circuit, and overload at UPS output terminal. b. Under voltage at battery terminal. c. Over shoot and under shoot shall not be greater than 4% of rated voltage for duration of 40m sec. (maximum).Shall be conducted as part of acceptance tests on one sample each of all ratings offered for inspection.(over shoot is the abrupt increase of out put voltage when the out put load is changed from full-load to noload. Similarly under shoot is the abrupt decrease of out put voltage when the out put load is changed from no-load to full load ). 9. Indicators and meters a. Following indicators shall be provided:- (i) Mains presence. (ii) Battery charging and discharging (iii) Output overload (iv) Low battery voltage. b. Digital meter shall be provided for monitoring the following parameters in UPS(not applicable for rack mounting): (i) Input AC voltage. (ii) Output AC Voltage, current and frequency

(P.S.Dhakate) Incharge PS-IX

26/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 (iii) Battery voltage and current. 10. Battery bank: a. UPS shall be supplied with SMF VRLA battery type tested from Govt. lab as per JISC:8702 only.Number of samples for type testing shall be as per IS:7372/1995 with all the amendments up to date. b. Tenderers shall declare battery AH capacity, battery voltage, number of batteries of each rating, make and model of batteries offered with each item of UPS. c. Batteries for UPS shall be duly type tested to JISC 8702 from government lab . d. The UPS shall be complete with Trolley for battery bank,Cables and connectors etc. and the firms shall also connect the batteries with UPS and do commissioning of the same. e. Minimum VAH rating of battery bank for different duration of back up time shall be as detailed below: UPS rating Min.VAH Min. VAH Min VAH Min. VAH in KVA 30 minute 60 minute 120 minute 240 minute back up back up back up back up 0.5 KVA 400 800 1600 3200 1 KVA 800 1600 3200 6400 2 KVA 1600 3200 6400 12800 3 KVA 2400 4800 9600 19200 5 KVA 4000 8000 16000 32000 6 KVA 4800 9600 19200 38400 7.5 KVA 6000 12000 24000 48000 10 KVA 8000 16000 32000 64000 15 KVA 12000 24000 48000 96000 20 KVA 16000 32000 64000 128000 30 KVA 24000 48000 96000 192000 11. Testing requirement for UPS: a. Type Tests : Following shall constitute type test and at least one sample shall be type tested for each rating with maximum backup time. Type testing shall be conducted at a govt. lab (i) Visual examination. (ii) Verification of output power and frequency. (iii) Verification of voltage regulation. (iv) Verification of efficiency. (v) Verification of total harmonics distortion. (vi) Verification of overshoot, undershoot limits and over voltage protection. (vii) Test for insulation resistance, leakage current high voltage as per IS:616/86 (reaffirmed in 2010. Insulation resistance should not be less than 100 mega ohms. (viii) Verification of VAH as per Rate Contract. (ix)Test for IP-Protection (x) Environmental tests: Following environmental tests shall be carried out on each rating with highest VAH rating. Tests at SL. No. i to iii above shall be repeated during the last half an hour of each environmental condition.Tests at Sl. No. i to vi shall be repeated after completing the environmental tests sequence of the three conditions and recovery period of 1 to 2 hours.There shall be no deterioration in any of these parameters when compared to the test results obtained before environmental tests.

(P.S. Dhakate) PS-II

27/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 (A) Dry Heat Test : shall be carried out in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2004) at 55 degree C for 16 hrs. (B) Damp Heat : shall be carried out at upper Temperature of 40 degree C,two cycles of (12+12 hours)each in accordance with IS:9000 (part 5/sec.2)1981 (reaffirmed 2004). (C) Cold Test : shall be carried out in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2004) at -10 degree C for 4 hrs. b.(1) Acceptance Tests : Tests listed at Sl. No.i to viii shall be conducted as part of acceptance tests on 10% samples on all the items offered for inspection. (2)Verification of parameters as per GTR on one sample except for environmental tests and battery type testing on one sample each of the rating offered for inspection. (3)Dimension and marking ,Capacity test and High rate discharge test on battery offered.Number of samples shall be as per IS:7372 latest. (4)Temperature-rise test on one rating at rated KVA,rated pf and minimum of input operating voltage range. Quality Assurance Procedure 1) The firm shall furnish schemetic diagram of UPS for each rating as and when they are offered first time for inspection against the rate contract . 2)All the UPS shall be supplied with 1:1 isolation transformer at out put side.Isolation transformer can be internal or external to UPS. Detail of isolation transformer shall be furnished by the firm when the product is offered for first inspection for each rating and the same shall be recorded in the inspection report after due verification by the QA Officer. If the isolation transformer is eternal to the UPS same shall be indicated.The efficiency of UPS shall be measured along with isolation transformer. 3) When the product is offered for first time for inspection the UPS shall be operated at full rated current as per its rated KVA rating , at the rated power factor and at minimum of input voltage range and with full C-10 rate min. charging current, along with isolation transformer, for the temperature rise test and to evaluate its performance at rated current corresponding to KVA rating . After the evaluation of its performance the weight of the transformer shall be taken to compare with the weight furnished by the firm vide the questionnaire attached in the rate contract. After the completion of the temperature rise test, the UPS efficiency and input power factor shall be tested to assess its consistency with regards to temperature and continuous application of the rated KVA load. The temperature rise test shall not be terminated before 8 hours of continuous operation. 4) During each visit at least one rating of the UPS offered for inspection shall be tested for the verification of its capacity rating by conducting temprature rise test on rated KVA load. Selection of rating shall be such that it coveres all ratings on R/C during currency of R/C. This is over and above the requirement of the clause as above when each rating is subjected for temperature rise test when UPS is offered first time. Machine should be subjected to 8 hours continuous operation for capacity verification . 5) Weight of the transformer shall be recorded in the inspection note for the verification by the consignee/user for the purpose of reference. 6) The firm shall have necesssary facilities to test batteries for high rate discharge and for capacity rating tests as per JISC:8702,so that batteries can be verified for HRD & capacity verification test during each inspection. Method for the HRD and capacity rating is as per JIS C 8702.Sampling shall be done as per IS: 7372 7) weight of the batteries, its brand, its voltage rating AH rating and no of batteries fitted with UPS shall be indicated in the inspection note for the verification by the consignee.

(P.S. Dhakate) PS-II

28/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 8) Firm shall furnish copy of the invoices and details of the serial no. of the batteries at the time of inspection for the corelation and records purpose of the QA Office. 9)Battery supplier/manufacturer who supplies battery to UPS supplier shall be registered with DGS&D/NSIC(based on capacity report from DGS&D).Only registered battery shall be supplied against the R/C. SPECIAL NOTES TO TENDERERS: 1. As per CVC Circular No.03/01/12 dated 13.1.2012, a) In a tender, either the Indian agent on behalf of the Principal/OEM or Principal/OEM itself can bid but both cannot bid simultaneously for the same item/product in the same tender. b) If an agent submits bid on behalf of the Principal/OEM, the same agent shall not submit a bid on behalf of another Principal/OEM in the same tender for UPS. c) UPS and battery from separate OEMs can be quoted as these are entirely different items. 2.Uniterruptible Power Supply consists of electronic hardware plus battery and hence in this tender UPS with battery is a product/item.Suppliers shall quote for UPS and battery .Otherwise tender will be treated as unresponsive.Tenderers shall indicate rate for UPS without battery against shcdules 1,2 &4. 3a. Firms registered with DGS&D or seeking registration/capacity assessment in the category of:(a) Indian agent of Indian Manufacturer ; the registration and inspection shall be carried out at Indian Manufacturer's works. (b)Battry manufacturer/supplier who supplies battery to UPS supplier shall be registered and only battery from manufacturer/supplier registered with DGS&D /NSIC(based on capacity report from DGS&D)shall be quoted and offered along with UPS. c)UPS manufacturer/supplier need not get registered for battery. 4a. Firms must submit their application to concerned QA Office for fresh or renewal of registration/capacity assessment/special capacity assessment PRIOR to at least 30 days before the scheduled date of tender opening, failing which application may NOT be able to be fully processed.Tenderers will only be responsible for same. b. Tenderers shall be registered with DGS&D or NSIC(based on capacity report of DGS&D) to become eligible to quote against the T/E. 5. Registration for all scheduled items including add on items and in lieu items are required on the date of tender opening ,if not specified otherwise elsewhere. It means all the items/models quoted against all schedules by tenderer have to be registered on the date of tender opening if not specified otherwise elsewhere. 6. The relevant guidelines mentioned in paras 13.20.1, 13.20.5(a), 13.21.6(b) and 13.22.2 of DGS&D Manual will be the basis for registration of items, i.e., spares and accessories , add-on items and in-lieu items , provided the firm are registered for the main equipment , for which the above items are required for functioning of main equipment .No separate agreement , documents like test reports etc. are required for these items if they are being registered for the main equipment for which above items are required for proper functioning. 7.UPS suppliers who are registered for the highest ratings of each of the schedules will be eligible to quote against the corresponding schedules of T/E.They will be considered for award of R/C only on production of registration certificate indicating registration of individual ratings of different schedules of T/E. NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. ELIGIBLITY CRITERIA The following essential facilities shall be available with the manufacturer:-

(P.S. Dhakate) PS-II

29/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014 1.Dust free environment for assembly of PCBs 2.Component lead forming machine/fixture 3.Temperature controlled wave soldering machine with auto fluxing facility. 4.Dry heat test chamber to burn in PCBs before its use to avoid infant mortality. 5.Functional testing facility for PCBs 6.Electrostatic dischage protection in line with IS:10087/81 work procedure. 7.Power analyser to measeure voltage,current,frequency,power factor,power,harmonic distortion(separate instrument will also be acceptable.) 8.Multi channel temperature recorder 9.Storage oscilloscope etc. Eligibility Criteria 1 Essential in-house manufacturing and testing facilities as per the

governing specification shall be available with the RC Holder are as follows.

2 a. Dust free environment for the assembly of PCBs. b. Component lead forming machine/ fixture. c. Temperature controlled wave- soldering machine with auto-fluxing facility. d. Dry heat test chamber for burn in of PCBs before calibration . e. Functional testing of PCBs. f. Electrostatic discharge protection in line with IS: 10087/1981 work procedure.. g. Power analyzer for measurement of voltage, current, frequency, power factor, power, harmonic distortion (separate instruments will also be acceptable) h. Multi-channel temperature recorder. i. Storage oscilloscope.

NOTE TO INDENTORS: Typical power consumption of PC is 160 VA, of PC with inkjet printer is 300-400 VA and for PC with laser printer is 700-800 VA. The back up time as available for each item can be calculated on this basis by the indentor before ordering the item.

Recommended by Technical Specification Committee Dated 12-07-2013

(P.S. Dhakate) PS-II

30/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

SCHEDULE ‘B’ (SPECIAL CONDITION OF CONTRACT)

NA

(Santosh Bhagat ) Chief General Manager

31/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/ST/UESPL/4954 Dated: 29.01.2014

SCHEDULE – “D”

FORMAT FOR QUATERLY DRAWAL REPORT

Name of the Firm __________________ I- Jan-Mar Report No. __________________ II- Apr-June Rate Contract No. __________________ III- July-Sept. Date of Submission __________________ IV- Oct - Dec Total Position of Order against Rate Contract till the submission of Report. S.No. Name of

Department Quantity and Value of Orders Received (Rs.)

Quantity and Value of Orders Executed (Rs.)

Balance Quantity and Value to be Supplied (Rs.)

Reasons

Foot 1. Value indicate should be a) Value of orders received during the quarter-Rs.

Total value inclusive of all Taxes duties and incidental b) Value of orders supplied during the quarter-Rs. Charges

2. Nil report should also be Submitted.

(Santosh Bhagat ) Chief General Manager

32/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected]

No./CSIDC/MKD/ PS- IX/03/ 13-14/ Raipur, Dated : Registered A/D Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 To,

M/S Novateur Electrical & Digital System Pvt. Ltd. Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore Chennai (Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

Sub :- Rate Contract for the supply of UPS System (Valid From dated 12-06-2014 to 24-01-2015) Ref :- (I) This Office Tender Enquiry No. CSIDC/MKD/ PS-IX/87/386/13-14

(IV) Bid No. 7121 Dated 17.08.2013 (III) Your Offer acceptance along with undertaking submitted on dated 20-02-2014

Dear Sir, You are hereby informed that your above referred tender read with subsequent letters mentioned above for the Stores specified in the Schedules annexed has been accepted. This Rate Contract will be governed by the terms and conditions brought in CSIDC Form No.1 & 2. The Rate Contract and the Schedules annexed hereto shall be the sole repository of this Rate Contract / Transaction. You are required to show the original INK-SIGNED subject Rate Contract to the satisfaction of Direct Demanding Officer who will place the supply order as per instructions contained in CSIDC form No. 2 and also to the Quality Assurance Officer for inspection purpose and to the Paying Authority at the time of getting the payment . SCHEDULES ANNEXED: 1. Schedule “A” Description of Stores, Prices, Duties/Taxes. 2. Annexure -“A” Technical Particulars of Item UPS System 3. Schedule “B” Special conditions of contract (if any). 4. Schedule “C” Information to DDOs about parallel rate contracts. 5. Schedule “D” Format for Drawal Report. Encl. 14 pages

Yours faithfully,

(Santosh Bhagat) Chief General Manager

For and on behalf of the purchaser Named in CSIDC Form No.2

33/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 Copy to, 1. The Secretary, Chhattisgarh Vidhan Sabha ,Raipur .

2. The Registrar, Honourable High court Chhattisgarh, Bilaspur.

3. The Accountant General Chhattisgarh State, Raipur.

4. All HODs of Chhattisgarh Govt. with a request to circulate the copy of R/C to all Direct Demanding Officers of your institution against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, also acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel.

5. All The Collectors, Chhattisgarh State against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel

6. The Director Treasury, Chhattisgarh Govt., Raipur with a request to circulate copy of R/C to all branches under your control.

7. (i) The Director Education Department (DPI) Pension Wada, Raipur. (ii) The Commissioner Tribal Welfare Department Pt. R.S.U. Campus Raipur

(iii) The Commissioner Nagar Palika Nigam Raipur (C.G.) (iv) The Director, Directorate of Sports and Youth Welfare Chhattisgarh Raipur (C.G.)

Sr. No. 1 to 7 above are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like E.D. Registration, Tax Registration etc. before taking action i.e. release of supply order, inspection of stores, payment of bill whichever is applicable, as the responsibility rests with the concerned authority .

8. (i) ADG (Q & A) , DGS&D, Jeewan Tara Building 5 Parliament Street New Delhi 110001 (ii) Manager (Operation) Indian Register of Shipping, Senior MIG-2, Secter A, 1st Floor, Infront

of Bank of India Indrapuri Bhopal. (iii) Chief Engineer, PDIL, 4th floor, 4/2 Karaya Road, 67 Shekespeare Sarani, Kolkata (W.B.) (iv) General Manager (Inspection) RITES Ltd., Churchgate Station Road, Second Floor, M.K.

Road, Mumbai-400020 (v) Operations Manager SGS India Pvt, Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal (MP)-

462011. Above (i) to (v) are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like Validity of Registration, BIS Registration etc. before taking action i,e. inspection of stores, as the responsibility rests with the concerned authority.For information and necessary action against Authorized Inspection Agency accorded by CSIDC for inspection of stores.

9. Manager (Tender), Marketing Div., CSIDC Ltd., Raipur. He is requested to maintain a master file of Rate Contract.

10. Computer cell, CSIDC Ltd., Raipur to release Rate Contract on CSIDC website.

13. Main file of Item- “UPS System”

(Santosh Bhagat)

Chief General Manager For and on behalf of the purchaser

Named in CSIDC Form No.2

34/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014

SCHEDULE “A” Description of Stores, Prices, Duties/Taxes

For the supply of Item- UPS System as per Annexure’A’ enclosed.

1. (a) NAME AND FULL ADDRESS OF :- M/S Novateur Electrical & Digital System Pvt. Ltd THE FIRM Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore

Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

(b) NAME AND FULL ADDRESS OF :- M/S Novateur Electrical & Digital System Pvt. Ltd MANUFACTURER Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore

Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

2. VALIDITY OF RATE CONTRACT :- From 12-06-2014 to 24-01-2015 3. DESCRIPTION OF ITEM- UPS System SPECIFICATION, UNIT RATE AS BELOW

Note :- Technical particulars as per Annexure A enclosed (Santosh Bhagat )

Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4

Schedule-2 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Single Phase AC Output, Floor Mounted Type 1 UPS27001013 10 KVA 30 Minutes 118166.00 2 UPS27001014 10 KVA 60 Minutes 154256.00

Schedule-4 Online UPS With Isolations Transformer Suitable for Single Phase AC Input & Single Phase AC Output, Floor Mounted Type 25 UPS27001043 5.0 KVA 30 Minutes 62576.00

35/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 4. TERMS OF DELIVERY : F. O. R Destination (Any where in C.G.State) 5. EXCISE DUTY : Extra if Applicable Central Excise Registration Certificate Number AACCE4671NEM009 M/S Novateur Electrical & Digital System Pvt. Ltd 122/1, OLD Mahabalipuram Road, Semmancherry Village Kanchip, Chennai, Tamil Nadu. 6. SALES TAX /VAT : Extra, if applicable

TIN No. 34540016753 Address:-

M/S Novateur Electrical & Digital System Pvt. Ltd Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore

Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

DELIVERY PERIOD : 45 Days 8. a. ANNUAL TURN OVER/ : 2009-10 . 4378280264.00 2010-11 . 4857860981.00 2011-12 . 5346421473.00 b. MONETARY LIMIT : NM c. INSTALLED CAPACITY : (As per DGS&D Registration Certificate Issued By DGS&D-

Chennai,(Tamilnadu) Description Capacity/Annum

1. Online UPS With isolation Transformer suitable for Three Phase AC input and Three phase AC Output, Floor Mounted Type. Rating of UPS (KVA) : 10, 15, 20, 30 Indicative Back up time (Minutes) : 120 Min. 2. Online UPS with isolation crane former suitable for Three Phase AC Input and Single Phase AC Output, Floor Mounted Type Rating of UPS (KVA): 10,15,20,30 Indicative Back up time (Minutes): 120 Min. 3. Online UPS with isolation transformer

suitable for single phase AC input & single phase AC output, Floor Mounted Type Rating of UPS (KVA) : 5,6,7,5,10

4. Indicative Back up time (Minutes) : 120 Min.

5. Online UPS with isolation transformer Suitable for single phase AC input & single phase AC output, Floor Mounted Type.

12000 Nos.

(Santosh Bhagat) Chief General Manager

36/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 9. SLAB DISCOUNT (IF ANY) : Nil 10. PRICES : Prices are Firm and Final 11. MINIMUM QUANTITY IN : Not Mentioned. SINGLE SUPPLY ORDER 12. STATUS OF RC HOLDING : Manufacturer

FIRM 13. REGISTRATION STATUS : Manufacturer is Registered with DGS&D-Chennai,(Tamilnadu)

vide DGS&D Registration No. DGS&D/Regn/MUM/L-3869/12/ 06312Dated 27.09.2012

14 BIS LICENSE : Not Applicable 15. PAYING AUTHORITY : As Mentioned in supply order to be issued by Direct Demanding

Officers (DDOs). 16. PAYMENT TERMS : The payment of full 100% of prices of the stores of each

consignment there-of will be made after receipt and acceptance of the stores by the consignee/interim consignee in full and good condition within 20 days as per SPR rule No.11, if the bills are in order. In case of delay in payment without any reason the department will be liable to pay interest as per prevailing bank rate. Bills are to be submitted in the prescribed form of the paying authority of purchaser / indenter and are to be supported with inspection note issued by the inspector and consignee’s Receipt Certificate.

17 INSPECTION AUTHORITY : Dy. Director (Q&A), DGS&D, Bhilai (C.G.) OR Manager (Operation) Indian Register of Shipping Senior MIG-2,

Secter A, 1St Floor, in front of Bank of India Indrapuri Bhopal, (M.P.) OR Chief Engineer, Project & Development India Ltd. 4st floor, 4/2 Karaya Road, 67 Shekespeare Sarani Kolkata (W.B.) OR General Manager (Inspection) RITES Ltd. Churchgate Station Road, Second Floor, M.K. Road, Mumbai-400020 (Mah) OR Manager (Operations) SGS India Pvt. Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal-462011. (M.P.) OR CSIDC (DEPARTMENTAL TECHNICAL WING)

18 QUALITY ASSURANCE: Dy. Director (Q&A), DGS&D, Bhilai (C.G.) OR Manager (Operation) Indian Register of Shipping Senior MIG-2,

Secter A, 1St Floor, in front of Bank of India Indrapuri Bhopal, (M.P.)

OR Chief Engineer, Project & Development India Ltd. 4st floor, 4/2 Karaya Road, 67 Shekespeare Sarani Kolkata (W.B.) OR General Manager (Inspection) RITES Ltd. Churchgate Station Road, Second Floor, M.K. Road, Mumbai-400020 (Mah) OR Manager (Operations) SGS India Pvt. Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal-462011. (M.P.) OR CSIDC (DEPARTMENTAL TECHNICAL WING)

(Santosh Bhagat )

Chief General Manager

37/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 19. PLACE WHERE THE STORES At Manufacturer’s Factory at

ARE TO BE OFFERED FOR M/S Novateur Electrical & Digital System Pvt. Ltd INSPECTION Numeric House No.-5, Sir P.S. Sivasamy Salai Mylapore

Chennai,(Tamilnadu) Ph. No.- 044-24993266 Fax - 044-24998210

20 INSPECTION CHARGES : Inspection charges 0.60%+ Service Tax As applicable to be paid extra at the time of inspection to Quality Assurance Officer which will be billed by the unit along with bill of the material and will be reimbursed by the paying authority of DDO.

21. SECURITY DEPOSIT : As per General conditions of contract, CSIDC Form No. 1, Clause 7, the Purchaser/DDOs may require the contractor to furnish a security deposit which shall be made after issue of the acceptance of the supply order within the period specified by the purchaser / DDOs. Such security deposit shall not ordinarily exceed 3%. The security shall be in form of Demand Drafts issued by any of the Scheduled Commercial Banks. No other form of security is to be accepted. The security deposit amount is to be refunded after successful completion of the supply.

22. Special Note 1. Purchasing Departments /end user will ensure to sanding the copy of every order to this office for approval of Inspection Agency against inspection of stores. 2. Purchasing Departments/ end user will ensure per dispatch inspection of stores against approval of Inspection Agency enlisted in the CSIDC panel. 3. Purchasing Departments/ end user will be responsible for ensuring the Quality of accepted stores. 4. Purchasing Department/end user shall be ensure to execute the Integrity Pact between BUYER and BIDDER/SUPPLIER in accordance with the letter vide No.799/eq-l-@2013 New Raipur Dated 10.07.2013 and 243/fo-@fu-@pkj@2013 New Raipur Dated 06.07.2013 issued by the Chief Secretary. Govt. of Chhattisgarh.

(Santosh Bhagat ) Chief General Manager

38/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014

Annexure –B TECHNICAL SPECIFICATION OF UPS SYSTEM

CSIDC/MKD/TECH/2013-14/28

Technical Particulars For On-Line UPS For IT Applications & TSC 12-07-2013

Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

and Single Phase AC Output, Floor Mounted Type Unit : NOS. Rating of UPS Indicative Back-Up time

1 10 KVA 30 minutes 2 10 KVA 60 minutes Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type

Unit : NOS Rating of UPS Indicative Back-up time

1 5.0 KVA 30 Minutes NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. Detailed Specification Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Single Phase AC Output,Floor Mounted Type

Specification:- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three-phase AC input voltage 300V to 450V, 50 +/-1.5 Hz and single phase AC output voltage 230 +/-1%V,50+/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type Specification:- On-line UPS with isolation transformer & with PWM Technology,Floor mounted type suitable for single phase AC input voltage 160V to 260V,50+/-1.5Hz and single phase AC output voltage 230+/-1%V, 50+/-0.5Hz. It shall be housed in a rugged enclosure made of M.S Sheet 1.2 mm( minimum ) thick ,aesthetically finished, duly pretreated and powder coated .

(P.S. Dhakate) PS-II

39/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 General Technical requirement For RC Holder : 1. General a. UPS shall be free from workmanship defects, sharp edges, nicks, scratches,burs, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional. b. UPS Enclosure's Degree of Protection shall be IP2L1 as per apendix C of IS13947 (part 1)/1993 (reaffirmed 2004). c. By-pass facility shall be provided for maintenance of UPS. d. UPS shall supply output power and charging current at the same time. e. Switching device shall be MOSFET or IGBT and the same shall be confirmed in the offer. f. Switching frequency shall be above 10 KHz and shall be declared in the offer. g. KW rating of the UPS shall be 0.8 times the KVA rating. 2. Input (as applicable) a. 160V-260V, 50 +/-3% Hz single phase AC or b. 300V-450V, 50 +/-3%Hz three phase AC c. Input power factor shall be 0.95 3. Output (as applicable) a. 230V +/-1% (with alternative setting for 220V +/-1%) 50 +/-0.5Hz, single phase. b. 400V +/-1% (with alternative setting for 380V +/-1%) 50 +/-0.5Hz three phase. Voltage regulation from no load to full load shall be within +/-1% in both the cases. UPS shall also have facility for operation in synchronous mode in which output frequency shall be same as that of mains frequency. 4. Total harmonics distortion at output : 2% maximum for UPS up to 5KVA and 3% maximum for UPS above 5 KVA on resistive load ,the total input harmonics are less than or equal to 10%. 5. Efficiency (at rated output KVA Rating, rated Pf ,rated voltage and frequency) a. Overall efficiency (minimum) : 90% at min. input voltage and with full charging current at C-10 rate or higher. 6. UPS power factor at rated load : better than 0.95 lagging at input side . 7. Over load : UPS shall withstand 20% overload for 10 minutes and 50% over load for one minute. 8. Protections : Following protection shall be provided in UPS: a. Over voltage, short circuit, and overload at UPS output terminal. b. Under voltage at battery terminal. c. Over shoot and under shoot shall not be greater than 4% of rated voltage for duration of 40m sec. (maximum).Shall be conducted as part of acceptance tests on one sample each of all ratings offered for inspection.(over shoot is the abrupt increase of out put voltage when the out put load is changed from full-load to noload. Similarly under shoot is the abrupt decrease of out put voltage when the out put load is changed from no-load to full load ). 9. Indicators and meters a. Following indicators shall be provided:- (i) Mains presence. (ii) Battery charging and discharging (iii) Output overload (iv) Low battery voltage. b. Digital meter shall be provided for monitoring the following parameters in UPS(not applicable for rack mounting): (i) Input AC voltage. (ii) Output AC Voltage, current and frequency

(P.S. Dhakate) PS-II

40/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 (iii) Battery voltage and current. 10. Battery bank: a. UPS shall be supplied with SMF VRLA battery type tested from Govt. lab as per JISC:8702 only.Number of samples for type testing shall be as per IS:7372/1995 with all the amendments up to date. b. Tenderers shall declare battery AH capacity, battery voltage, number of batteries of each rating, make and model of batteries offered with each item of UPS. c. Batteries for UPS shall be duly type tested to JISC 8702 from government lab . d. The UPS shall be complete with Trolley for battery bank,Cables and connectors etc. and the firms shall also connect the batteries with UPS and do commissioning of the same. e. Minimum VAH rating of battery bank for different duration of back up time shall be as detailed below: UPS rating Min.VAH Min. VAH Min VAH Min. VAH in KVA 30 minute 60 minute 120 minute 240 minute back up back up back up back up 0.5 KVA 400 800 1600 3200 1 KVA 800 1600 3200 6400 2 KVA 1600 3200 6400 12800 3 KVA 2400 4800 9600 19200 5 KVA 4000 8000 16000 32000 6 KVA 4800 9600 19200 38400 7.5 KVA 6000 12000 24000 48000 10 KVA 8000 16000 32000 64000 15 KVA 12000 24000 48000 96000 20 KVA 16000 32000 64000 128000 30 KVA 24000 48000 96000 192000 11. Testing requirement for UPS: a. Type Tests : Following shall constitute type test and at least one sample shall be type tested for each rating with maximum backup time. Type testing shall be conducted at a govt. lab (i) Visual examination. (ii) Verification of output power and frequency. (iii) Verification of voltage regulation. (iv) Verification of efficiency. (v) Verification of total harmonics distortion. (vi) Verification of overshoot, undershoot limits and over voltage protection. (vii) Test for insulation resistance, leakage current high voltage as per IS:616/86 (reaffirmed in 2010. Insulation resistance should not be less than 100 mega ohms. (viii) Verification of VAH as per Rate Contract. (ix)Test for IP-Protection (x) Environmental tests: Following environmental tests shall be carried out on each rating with highest VAH rating. Tests at SL. No. i to iii above shall be repeated during the last half an hour of each environmental condition.Tests at Sl. No. i to vi shall be repeated after completing the environmental tests sequence of the three conditions and recovery period of 1 to 2 hours.There shall be no deterioration in any of these parameters when compared to the test results obtained before environmental tests.

(P.S. Dhakate) PS-II

41/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 (A) Dry Heat Test : shall be carried out in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2004) at 55 degree C for 16 hrs. (B) Damp Heat : shall be carried out at upper Temperature of 40 degree C,two cycles of (12+12 hours)each in accordance with IS:9000 (part 5/sec.2)1981 (reaffirmed 2004). (C) Cold Test : shall be carried out in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2004) at -10 degree C for 4 hrs. b.(1) Acceptance Tests : Tests listed at Sl. No.i to viii shall be conducted as part of acceptance tests on 10% samples on all the items offered for inspection. (2)Verification of parameters as per GTR on one sample except for environmental tests and battery type testing on one sample each of the rating offered for inspection. (3)Dimension and marking ,Capacity test and High rate discharge test on battery offered.Number of samples shall be as per IS:7372 latest. (4)Temperature-rise test on one rating at rated KVA,rated pf and minimum of input operating voltage range. Quality Assurance Procedure 1) The firm shall furnish schemetic diagram of UPS for each rating as and when they are offered first time for inspection against the rate contract . 2)All the UPS shall be supplied with 1:1 isolation transformer at out put side.Isolation transformer can be internal or external to UPS. Detail of isolation transformer shall be furnished by the firm when the product is offered for first inspection for each rating and the same shall be recorded in the inspection report after due verification by the QA Officer. If the isolation transformer is eternal to the UPS same shall be indicated.The efficiency of UPS shall be measured along with isolation transformer. 3) When the product is offered for first time for inspection the UPS shall be operated at full rated current as per its rated KVA rating , at the rated power factor and at minimum of input voltage range and with full C-10 rate min. charging current, along with isolation transformer, for the temperature rise test and to evaluate its performance at rated current corresponding to KVA rating . After the evaluation of its performance the weight of the transformer shall be taken to compare with the weight furnished by the firm vide the questionnaire attached in the rate contract. After the completion of the temperature rise test, the UPS efficiency and input power factor shall be tested to assess its consistency with regards to temperature and continuous application of the rated KVA load. The temperature rise test shall not be terminated before 8 hours of continuous operation. 4) During each visit at least one rating of the UPS offered for inspection shall be tested for the verification of its capacity rating by conducting temprature rise test on rated KVA load. Selection of rating shall be such that it coveres all ratings on R/C during currency of R/C. This is over and above the requirement of the clause as above when each rating is subjected for temperature rise test when UPS is offered first time. Machine should be subjected to 8 hours continuous operation for capacity verification . 5) Weight of the transformer shall be recorded in the inspection note for the verification by the consignee/user for the purpose of reference. 6) The firm shall have necesssary facilities to test batteries for high rate discharge and for capacity rating tests as per JISC:8702,so that batteries can be verified for HRD & capacity verification test during each inspection. Method for the HRD and capacity rating is as per JIS C 8702.Sampling shall be done as per IS: 7372 7) weight of the batteries, its brand, its voltage rating AH rating and no of batteries fitted with UPS shall be indicated in the inspection note for the verification by the consignee.

(P.S. Dhakate) PS-II

42/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 8) Firm shall furnish copy of the invoices and details of the serial no. of the batteries at the time of inspection for the corelation and records purpose of the QA Office. 9)Battery supplier/manufacturer who supplies battery to UPS supplier shall be registered with DGS&D/NSIC(based on capacity report from DGS&D).Only registered battery shall be supplied against the R/C. SPECIAL NOTES TO TENDERERS: 1. As per CVC Circular No.03/01/12 dated 13.1.2012, a) In a tender, either the Indian agent on behalf of the Principal/OEM or Principal/OEM itself can bid but both cannot bid simultaneously for the same item/product in the same tender. b) If an agent submits bid on behalf of the Principal/OEM, the same agent shall not submit a bid on behalf of another Principal/OEM in the same tender for UPS. c) UPS and battery from separate OEMs can be quoted as these are entirely different items. 2.Uniterruptible Power Supply consists of electronic hardware plus battery and hence in this tender UPS with battery is a product/item.Suppliers shall quote for UPS and battery .Otherwise tender will be treated as unresponsive.Tenderers shall indicate rate for UPS without battery against shcdules 1,2 &4. 3a. Firms registered with DGS&D or seeking registration/capacity assessment in the category of:(a) Indian agent of Indian Manufacturer ; the registration and inspection shall be carried out at Indian Manufacturer's works. (b)Battry manufacturer/supplier who supplies battery to UPS supplier shall be registered and only battery from manufacturer/supplier registered with DGS&D /NSIC(based on capacity report from DGS&D)shall be quoted and offered along with UPS. c)UPS manufacturer/supplier need not get registered for battery. 4a. Firms must submit their application to concerned QA Office for fresh or renewal of registration/capacity assessment/special capacity assessment PRIOR to at least 30 days before the scheduled date of tender opening, failing which application may NOT be able to be fully processed.Tenderers will only be responsible for same. b. Tenderers shall be registered with DGS&D or NSIC(based on capacity report of DGS&D) to become eligible to quote against the T/E. 5. Registration for all scheduled items including add on items and in lieu items are required on the date of tender opening ,if not specified otherwise elsewhere. It means all the items/models quoted against all schedules by tenderer have to be registered on the date of tender opening if not specified otherwise elsewhere. 6. The relevant guidelines mentioned in paras 13.20.1, 13.20.5(a), 13.21.6(b) and 13.22.2 of DGS&D Manual will be the basis for registration of items, i.e., spares and accessories , add-on items and in-lieu items , provided the firm are registered for the main equipment , for which the above items are required for functioning of main equipment .No separate agreement , documents like test reports etc. are required for these items if they are being registered for the main equipment for which above items are required for proper functioning. 7.UPS suppliers who are registered for the highest ratings of each of the schedules will be eligible to quote against the corresponding schedules of T/E.They will be considered for award of R/C only on production of registration certificate indicating registration of individual ratings of different schedules of T/E. NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. ELIGIBLITY CRITERIA The following essential facilities shall be available with the manufacturer:-

(P.S. Dhakate) PS-II

43/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014 1.Dust free environment for assembly of PCBs 2.Component lead forming machine/fixture 3.Temperature controlled wave soldering machine with auto fluxing facility. 4.Dry heat test chamber to burn in PCBs before its use to avoid infant mortality. 5.Functional testing facility for PCBs 6.Electrostatic dischage protection in line with IS:10087/81 work procedure. 7.Power analyser to measeure voltage,current,frequency,power factor,power,harmonic distortion(separate instrument will also be acceptable.) 8.Multi channel temperature recorder 9.Storage oscilloscope etc. Eligibility Criteria 1 Essential in-house manufacturing and testing facilities as per the

governing specification shall be available with the RC Holder are as follows.

2 a. Dust free environment for the assembly of PCBs. b. Component lead forming machine/ fixture. c. Temperature controlled wave- soldering machine with auto-fluxing facility. d. Dry heat test chamber for burn in of PCBs before calibration . e. Functional testing of PCBs. f. Electrostatic discharge protection in line with IS: 10087/1981 work procedure.. g. Power analyzer for measurement of voltage, current, frequency, power factor, power, harmonic distortion (separate instruments will also be acceptable) h. Multi-channel temperature recorder. i. Storage oscilloscope.

NOTE TO INDENTORS: Typical power consumption of PC is 160 VA, of PC with inkjet printer is 300-400 VA and for PC with laser printer is 700-800 VA. The back up time as available for each item can be calculated on this basis by the indentor before ordering the item.

Recommended by Technical Specification Committee Dated 12-07-2013

(P.S. Dhakate) PS-II

44/60

Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014

SCHEDULE ‘B’ (SPECIAL CONDITION OF CONTRACT)

NA

(Santosh Bhagat ) Chief General Manager

45/60 Rate Contract No. CSIDC/MKD/PS- IX /87/386/13-14/UPSS/NE&DSPL/5009 Dated: 12-06-.2014

SCHEDULE – “D”

FORMAT FOR QUATERLY DRAWAL REPORT

Name of the Firm __________________ I- Jan-Mar Report No. __________________ II- Apr-June Rate Contract No. __________________ III- July-Sept. Date of Submission __________________ IV- Oct - Dec Total Position of Order against Rate Contract till the submission of Report. S.No. Name of

Department Quantity and Value of Orders Received (Rs.)

Quantity and Value of Orders Executed (Rs.)

Balance Quantity and Value to be Supplied (Rs.)

Reasons

Foot 1. Value indicate should be a) Value of orders received during the quarter-Rs.

Total value inclusive of all Taxes duties and incidental b) Value of orders supplied during the quarter-Rs. Charges

2. Nil report should also be Submitted.

(Santosh Bhagat) Chief General Manager

46/60 Chhattisgarh State Industrial Development Corporation Limited (A Government of Chhattisgarh Undertaking) 1st Floor Udhyog Bhawan Ring Road No. -1, Telibhanadha Raipur 492006 (C.G) EPABX No.-0771-6002071-73, Tele Fax : 0771-4057624 Website: www. csidc.in, Email : [email protected], [email protected]

No./CSIDC/MKD/ PS-IX/05/ 13-14/ Raipur, Dated : Registered A/D Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014 To,

M/S R.S. Power System A-42 Jai Ambey Nagar, Tonk Road, Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

Sub :- Rate Contract for the supply of UPS System (Valid From dated 19-06-2014 to 24-01.2015) Ref :- (I) This Office Tender Enquiry No. CSIDC/MKD/PS-IX/87/386/13-14

(V) Bid No. 7021 Dated 16.08.2013 (III) Your Offer acceptance along with undertaking submitted on dated 24-01-2014

Dear Sir, You are hereby informed that your above referred tender read with subsequent letters mentioned above for the Stores specified in the Schedules annexed has been accepted. This Rate Contract will be governed by the terms and conditions brought in CSIDC Form No.1 & 2. The Rate Contract and the Schedules annexed hereto shall be the sole repository of this Rate Contract / Transaction. You are required to show the original INK-SIGNED subject Rate Contract to the satisfaction of Direct Demanding Officer who will place the supply order as per instructions contained in CSIDC form No. 2 and also to the Quality Assurance Officer for inspection purpose and to the Paying Authority at the time of getting the payment . SCHEDULES ANNEXED: 1. Schedule “A” Description of Stores, Prices, Duties/Taxes. 2. Annexure -“A” Technical Particulars of Item UPS System 3. Schedule “B” Special conditions of contract (if any). 4. Schedule “C” Information to DDOs about parallel rate contracts. 5. Schedule “D” Format for Drawal Report. Encl. 15 pages

Yours faithfully,

(Santosh Bhagat) Chief General Manager

For and on behalf of the purchaser Named in CSIDC Form No.2

47/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014 Copy to, 1. The Secretary, Chhattisgarh Vidhan Sabha ,Raipur .

2. The Registrar, Honourable High court Chhattisgarh, Bilaspur .

3. The Accountant General Chhattisgarh State, Raipur.

4. All HODs of Chhattisgarh Govt. with a request to circulate the copy of R/C to all Direct Demanding Officers of your institution against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, also acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel.

5. All The Collectors ,Chhattisgarh State against issue of purchase order (Indent) in Favour of Rate Contract Holders of CSIDC, pre dispatched inspection of stores, acceptance of store and ensure to endorse the copy of purchase order (Indent) to the CSIDC Ltd., for further approval of authorized pre dispatch Inspection Agency enlisted in the CSIDC panel

6. The Director Treasury, Chhattisgarh Govt., Raipur with a request to circulate copy of R/C to all branches under your control .

7. (i) The Director Education Department (DPI) Pension Wada, Raipur. (ii) The Commissioner Tribal Welfare Department Pt. R.S.U. Campus Raipur

(iii) The Commissioner Nagar Palika Nigam Raipur (C.G.) (iv) The Director, Directorate of Sports and Youth Welfare Chhattisgarh Raipur (C.G.)

Sr. No. 1 to 7 above are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like E.D. Registration, Tax Registration etc. before taking action i.e. release of supply order, inspection of stores, payment of bill whichever is applicable, as the responsibility rests with the concerned authority .

8. (i) ADG (Q & A) , DGS&D, Jeewan Tara Building 5 Parliament Street New Delhi 110001 (ii) Manager (Operation) Indian Register of Shipping, Senior MIG-2, Secter A, 1st Floor, Infront

of Bank of India Indrapuri Bhopal. (iii) Chief Engineer, PDIL, 4th floor, 4/2 Karaya Road, 67 Shekespeare Sarani, Kolkata (W.B.) (iv) General Manager (Inspection) RITES Ltd., Churchgate Station Road, Second Floor, M.K.

Road, Mumbai-400020 (v) Operations Manager SGS India Pvt, Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal (MP)-

462011. Above (i) to (v) are requested to call for original INK-SIGNED Rate Contract for verification to their full satisfaction including validity of various documents like Validity of Registration, BIS Registration etc. before taking action i,e. inspection of stores, as the responsibility rests with the concerned authority. For information and necessary action against Authorized Inspection Agency accorded by CSIDC for inspection of stores.

9. Manager (Tender), Marketing Div., CSIDC Ltd., Raipur. He is requested to maintain a master file of Rate Contract.

10. Computer cell, CSIDC Ltd., Raipur to release Rate Contract on CSIDC website.

14. Main file of Item- “UPS System”

(Santosh Bhagat) Chief General Manager

For and on behalf of the purchaser Named in CSIDC Form No.2

48/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

SCHEDULE “A” Description of Stores, Prices, Duties/Taxes

For the supply of Item- UPS System as per Annexure’A’ enclosed.

1. (a) NAME AND FULL ADDRESS OF :- M/S R.S. Power System THE FIRM A-42 Jai Ambey Nagar, Tonk Road,

Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

(b) NAME AND FULL ADDRESS OF :- M/S R.S. Power System MANUFACTURER A-42 Jai Ambey Nagar, Tonk Road,

Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

2. VALIDITY OF RATE CONTRACT :- From 19-06-2014 to 24.01.2015 3. DESCRIPTION OF ITEM- UPS System SPECIFICATION, UNIT RATE AS BELOW

Note :- Technical particulars as per Annexure A enclosed

(Santosh Bhagat) Chief General Manager

S.N.

Item Code Number Item Description Rate ( ) F.O.R. Dest.

E.D. & VAT Extra As Applicable

Rate Per Unit 1 2 3 4

Schedule-2 Online UPS With Isolations Transformer Suitable for Three Phase AC Input and Single Phase AC Output, Floor Mounted Type 1 UPS27001013 10 KVA 30 Minutes 118166.00 2 UPS27001014 10 KVA 60 Minutes 154256.00 3 UPS27001015 10 KVA 120 Minutes 215755.00 4 UPS27001016 15 KVA 30 Minutes 164923.00 5 UPS27001017 15 KVA 60 Minutes 201794.00 6 UPS27001018 15 KVA 120 Minutes 318214.00 7 UPS27001019 20 KVA 30 Minutes 182343.00 8 UPS27001020 20 KVA 60 Minutes 276774.00 9 UPS27001021 20 KVA 120 Minutes 439049.00

10 UPS27001022 30 KVA 30 Minutes 250288.00 11 UPS27001023 30 KVA 60 Minutes 397487.00 12 UPS27001024 30 KVA 120 Minutes 616095.00 Schedule-3 Optional Items for Online UPS 13 UPS27001025 RS 232 Serial Port with

Software for Computer Interface.

RS 232 Serial Port with Software for Computer

Interface.

225.00

Schedule-4 Online UPS With Isolations Transformer Suitable for Single Phase AC Input & Single Phase AC Output, Floor Mounted Type 14 UPS27001043 5.0 KVA 30 Minutes 62576.00 15 UPS27001044 5.0 KVA 60 Minutes 79966.00 16 UPS27001045 5.0 KVA 120 Minutes 121171.00 17 UPS27001046 6.0 KVA 30 Minutes 63667.00 18 UPS27001049 7.5 KVA 30 Minutes 70390.00 19 UPS27001052 10 KVA 30 Minutes 88115.00

49/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014 4. TERMS OF DELIVERY : F. O. R Destination ( Any where in C.G.State ) 5. EXCISE DUTY : Not Applicable 6. SALES TAX /VAT : Extra, if applicable

TIN No. 08191606089 Address:-

M/S R.S. Power System A-42 Jai Ambey Nagar, Tonk Road,

Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

DELIVERY PERIOD : 45 Days 8. a. ANNUAL TURN OVER/ : 2009-10 . 100101691.00 2010-11 . 108386128.00 2011-12 . 156396898.00 b. MONETARY LIMIT : NM c. INSTALLED CAPACITY : (As per NSIC Registration Certificate Issued By NSIC- Jaipur (Raj) Description Capacity/Annum

Furniture 1. Online UPS Up to 40 KVA

(i) Single Phase Input & Single Phase Output (ii) Three Phase Input & Single Phase Output (iii) Three Phase Input & Three Phase Output

2. Line Interactive UPS Single up to3 KVA

Single Phase Input & Single Phase Output 3. Online UPS up to 100.0 KVA Single phase input & Single phase Output

4. Output Line Interactive UPS up to 3.0 KVA

Single phase input & Single phase Output

300 Nos.

800 Nos.

750 Nos.

1000 Nos.

9. SLAB DISCOUNT (IF ANY) : Nil 10. PRICES : Prices are Firm and Final 11. MINIMUM QUANTITY IN : Not Mentioned. SINGLE SUPPLY ORDER 12. STATUS OF RC HOLDING : Manufacturer

FIRM 13. REGISTRATION STATUS : Manufacturer is Registered with NSIC-Jaipur, vide Registration

No. NSIC & NO-NSIC/GP/RS/RAJ/1(1331) Dated 21-05-2013 & DGS&D & No.DGS&D/Regn/DEL/S-4803/13/03295

Dated 12-04-2013 (Santosh Bhagat)

Chief General Manager

50/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014 14 BIS LICENSE : Not Applicable 15. PAYING AUTHORITY : As Mentioned in supply order to be issued by Direct Demanding

Officers (DDOs). 16. PAYMENT TERMS : The payment of full 100% of prices of the stores of each

consignment there-of will be made after receipt and acceptance of the stores by the consignee/interim consignee in full and good condition within 20 days as per SPR rule No.11, if the bills are in order. In case of delay in payment without any reason the department will be liable to pay interest as per prevailing bank rate. Bills are to be submitted in the prescribed form of the paying authority of purchaser / indenter and are to be supported with inspection note issued by the inspector and consignee’s Receipt Certificate .

17 INSPECTION AUTHORITY : Dy. Director (Q&A), DGS&D, Bhilai (C.G.) OR Manager (Operation) Indian Register of Shipping Senior MIG-2,

Secter A, 1St Floor, in front of Bank of India Indrapuri Bhopal, (M.P.) OR Chief Engineer, Project & Development India Ltd. 4st floor, 4/2 Karaya Road, 67 Shekespeare Sarani Kolkata (W.B.) OR General Manager (Inspection) RITES Ltd. Churchgate Station Road, Second Floor, M.K. Road, Mumbai-400020 (Mah) OR Manager (Operations) SGS India Pvt. Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal-462011. (M.P.) OR CSIDC (DEPARTMENTAL TECHNICAL WING)

18 QUALITY ASSURANCE: Dy. Director (Q&A), DGS&D, Bhilai (C.G.) OR Manager (Operation) Indian Register of Shipping Senior MIG-2,

Secter A, 1St Floor, in front of Bank of India Indrapuri Bhopal, (M.P.)

OR Chief Engineer, Project & Development India Ltd. 4st floor, 4/2 Karaya Road, 67 Shekespeare Sarani Kolkata (W.B.) OR General Manager (Inspection) RITES Ltd. Churchgate Station Road, Second Floor, M.K. Road, Mumbai-400020 (Mah) OR Manager (Operations) SGS India Pvt. Ltd. 43, RR Arcade, Zone-2, MP Nagar, Bhopal-462011. (M.P.) OR CSIDC (DEPARTMENTAL TECHNICAL WING)

(Santosh Bhagat)

Chief General Manager

51/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

19. PLACE WHERE THE STORES At Manufacturer’s Factory at

ARE TO BE OFFERED FOR M/S R.S. Power System INSPECTION A-42 Jai Ambey Nagar, Tonk Road,

Jaipur (Raj) Ph. No. 0141-2396550 Fax No.- 0141-2395860

20 INSPECTION CHARGES : Inspection charges 0.60%+ Service Tax As applicable to be paid extra at the time of inspection to Quality Assurance Officer which will be billed by the unit along with bill of the material and will be reimbursed by the paying authority of DDO.

21. SECURITY DEPOSIT : As per General conditions of contract , CSIDC Form No. 1, Clause 7,the Purchaser/DDOs may require the contractor to furnish a security deposit which shall be made after issue of the acceptance of the supply order within the period specified by the purchaser / DDOs. Such security deposit shall not ordinarily exceed 3% . The security shall be in form of Demand Drafts issued by any of the Scheduled Commercial Banks. No other form of security is to be accepted. The security deposit amount is to be refunded after successful completion of the supply.

22. Special Note 1. Purchasing Departments /end user will ensure to sanding the copy of every order to this office for approval of Inspection Agency against inspection of stores. 2. Purchasing Departments/ end user will ensure per dispatch inspection of stores against approval of Inspection Agency enlisted in the CSIDC panel. 3. Purchasing Departments/ end user will be responsible for ensuring the Quality of accepted stores. 4. Purchasing Department/end user shall be ensure to execute the Integrity Pact between BUYER and BIDDER/SUPPLIER in accordance with the letter vide No.799/eq-l-@2013 New Raipur Dated 10.07.2013 and 243/fo-@fu-@pkj@2013 New Raipur Dated 06.07.2013 issued by the Chief Secretary. Govt. of Chhattisgarh.

(Santosh Bhagat) Chief General Manager

52/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

Annexure –B TECHNICAL SPECIFICATION OF UPS SYSTEM

CSIDC/MKD/TECH/2013-14/28

Technical Particulars For On-Line UPS For IT Applications & TSC 12-07-2013

Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

and Single Phase AC Output, Floor Mounted Type Unit : NOS. Rating of UPS Indicative Back-Up time

1 10 KVA 30 minutes 2 10 KVA 60 minutes 3 10 KVA 120 minutes 4 15 KVA 30 minutes 5 15 KVA 60 minutes 6 15 KVA 120 minutes 7 20 KVA 30 minutes 8 20 KVA 60 minutes 9 20 KVA 120 minutes 10 30 KVA 30 minutes 11 30 KVA 60 minutes 12 30 KVA 120 minutes Schedule 3 Optional Items for On-Line UPS Unit : NOS Type

1 RS 232 Serial Port with Software for Computer Interface. Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input

& single phase AC output, Floor Mounted Type Unit : NOS Rating of UPS Indicative Back-up time

1 5.0 KVA 30 Minutes 2 5.0 KVA 60Minutes 3 5.0 KVA 120 Minutes 4 6.0 KVA 30 Minutes 7 7.5 KVA 30 Minutes 10 10 KVA 30 Minutes NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C.

(P.S. Dhakate) PS-II

53/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

Detailed Specification Schedule 2 On-Line UPS with isolation transformer suitable for Three Phase AC Input

And Single Phase AC Output,Floor Mounted Type

Specification:- On-line UPS with isolation transformer & with PWM technology,floor mounted type suitable for three-phase AC input voltage 300V to 450V, 50 +/-1.5 Hz and single phase AC output voltage 230 +/-1%V,50+/-0.5Hz. It shall be housed in rugged enclosure made of M.S sheet 1.2 mm (minimum) thick, aesthetically finished, duly pretreated and powder coated. Schedule 3 Optional Items for On-Line UPS Specification:- UPS shall be provided with serial communication port RS232/USB for computer interface for data exchange of electrical parameters of UPS like voltage, current frequency, charging status, mode of operation etc.Specification for SMF BATTERY Batteries shall be SMF (valve regulated) type, 12V conforming to Japanese Industrial Standards JISC:8702/1998 (Part 1, 2 and 3) and of the ratings as per schedule and Rated capacity at 20 hr discharge rate (AH) Inspection and Testing 1. Supplier shall furnish complete and satisfactory type test certificate as per the above specification for each item at the time of inspection. The type test certificate shall be from any government laboratory. Number of samples for type testing shall be as per IS:7372/1995 (with all amendments up to date). 2. Acceptance test shall be as under. Sampling plan and acceptance criterion shall be as per IS:7372/1995. a) Dimension and marking as per JISC:8702 (Part 2)/98. b) Capacity test as per Clause 5.1 and 7.1 of JISC:8702 (Part 1)/1988. c) High discharge characteristics as per clause 5.2 and clause 7.2 of JISC:8702 (Part 1/1998).

Schedule 4 On-Line UPS with isolation transformer suitable for single phase AC input & single phase AC output, Floor Mounted Type

Specification:- On-line UPS with isolation transformer & with PWM Technology,Floor mounted type suitable for single phase AC input voltage 160V to 260V,50+/-1.5Hz and single phase AC output voltage 230+/-1%V, 50+/-0.5Hz. It shall be housed in a rugged enclosure made of M.S Sheet 1.2 mm( minimum ) thick ,aesthetically finished, duly pretreated and powder coated .

(P.S. Dhakate) PS-II

54/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

General Technical requirement For RC Holder : 1. General a. UPS shall be free from workmanship defects, sharp edges, nicks, scratches,burs, etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional. b. UPS Enclosure's Degree of Protection shall be IP2L1 as per apendix C of IS13947 (part 1)/1993 (reaffirmed 2004). c. By-pass facility shall be provided for maintenance of UPS. d. UPS shall supply output power and charging current at the same time. e. Switching device shall be MOSFET or IGBT and the same shall be confirmed in the offer. f. Switching frequency shall be above 10 KHz and shall be declared in the offer. g. KW rating of the UPS shall be 0.8 times the KVA rating. 2. Input (as applicable) a. 160V-260V, 50 +/-3% Hz single phase AC or b. 300V-450V, 50 +/-3%Hz three phase AC c. Input power factor shall be 0.95 3. Output (as applicable) a. 230V +/-1% (with alternative setting for 220V +/-1%) 50 +/-0.5Hz, single phase. b. 400V +/-1% (with alternative setting for 380V +/-1%) 50 +/-0.5Hz three phase. Voltage regulation from no load to full load shall be within +/-1% in both the cases. UPS shall also have facility for operation in synchronous mode in which output frequency shall be same as that of mains frequency. 4. Total harmonics distortion at output : 2% maximum for UPS up to 5KVA and 3% maximum for UPS above 5 KVA on resistive load ,the total input harmonics are less than or equal to 10%. 5. Efficiency (at rated output KVA Rating, rated Pf ,rated voltage and frequency) a. Overall efficiency (minimum) : 90% at min. input voltage and with full charging current at C-10 rate or higher. 6. UPS power factor at rated load : better than 0.95 lagging at input side . 7. Over load : UPS shall withstand 20% overload for 10 minutes and 50% over load for one minute. 8. Protections : Following protection shall be provided in UPS: a. Over voltage, short circuit, and overload at UPS output terminal. b. Under voltage at battery terminal. c. Over shoot and under shoot shall not be greater than 4% of rated voltage for duration of 40m sec. (maximum).Shall be conducted as part of acceptance tests on one sample each of all ratings offered for inspection.(over shoot is the abrupt increase of out put voltage when the out put load is changed from full-load to noload. Similarly under shoot is the abrupt decrease of out put voltage when the out put load is changed from no-load to full load ). 9. Indicators and meters a. Following indicators shall be provided:- (i) Mains presence. (ii) Battery charging and discharging (iii) Output overload (iv) Low battery voltage. b. Digital meter shall be provided for monitoring the following parameters in UPS(not applicable for rack mounting): (i) Input AC voltage. (ii) Output AC Voltage, current and frequency

(P.S. Dhakate) PS-II

55/60

Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

(iii) Battery voltage and current. 10. Battery bank: a. UPS shall be supplied with SMF VRLA battery type tested from Govt. lab as per JISC:8702 only.Number of samples for type testing shall be as per IS:7372/1995 with all the amendments up to date. b. Tenderers shall declare battery AH capacity, battery voltage, number of batteries of each rating, make and model of batteries offered with each item of UPS. c. Batteries for UPS shall be duly type tested to JISC 8702 from government lab . d. The UPS shall be complete with Trolley for battery bank,Cables and connectors etc. and the firms shall also connect the batteries with UPS and do commissioning of the same. e. Minimum VAH rating of battery bank for different duration of back up time shall be as detailed below: UPS rating Min.VAH Min. VAH Min VAH Min. VAH in KVA 30 minute 60 minute 120 minute 240 minute back up back up back up back up 0.5 KVA 400 800 1600 3200 1 KVA 800 1600 3200 6400 2 KVA 1600 3200 6400 12800 3 KVA 2400 4800 9600 19200 5 KVA 4000 8000 16000 32000 6 KVA 4800 9600 19200 38400 7.5 KVA 6000 12000 24000 48000 10 KVA 8000 16000 32000 64000 15 KVA 12000 24000 48000 96000 20 KVA 16000 32000 64000 128000 30 KVA 24000 48000 96000 192000 11. Testing requirement for UPS: a. Type Tests : Following shall constitute type test and at least one sample shall be type tested for each rating with maximum backup time. Type testing shall be conducted at a govt. lab (i) Visual examination. (ii) Verification of output power and frequency. (iii) Verification of voltage regulation. (iv) Verification of efficiency. (v) Verification of total harmonics distortion. (vi) Verification of overshoot, undershoot limits and over voltage protection. (vii) Test for insulation resistance, leakage current high voltage as per IS:616/86 (reaffirmed in 2010. Insulation resistance should not be less than 100 mega ohms. (viii) Verification of VAH as per Rate Contract. (ix)Test for IP-Protection (x) Environmental tests: Following environmental tests shall be carried out on each rating with highest VAH rating. Tests at SL. No. i to iii above shall be repeated during the last half an hour of each environmental condition.Tests at Sl. No. i to vi shall be repeated after completing the environmental tests sequence of the three conditions and recovery period of 1 to 2 hours.There shall be no deterioration in any of these parameters when compared to the test results obtained before environmental tests.

(P.S. Dhakate) PS-II

56/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

(A) Dry Heat Test : shall be carried out in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2004) at 55 degree C for 16 hrs. (B) Damp Heat : shall be carried out at upper Temperature of 40 degree C,two cycles of (12+12 hours)each in accordance with IS:9000 (part 5/sec.2)1981 (reaffirmed 2004). (C) Cold Test : shall be carried out in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2004) at -10 degree C for 4 hrs. b.(1) Acceptance Tests : Tests listed at Sl. No.i to viii shall be conducted as part of acceptance tests on 10% samples on all the items offered for inspection. (2)Verification of parameters as per GTR on one sample except for environmental tests and battery type testing on one sample each of the rating offered for inspection. (3)Dimension and marking ,Capacity test and High rate discharge test on battery offered.Number of samples shall be as per IS:7372 latest. (4)Temperature-rise test on one rating at rated KVA,rated pf and minimum of input operating voltage range. Quality Assurance Procedure 1) The firm shall furnish schemetic diagram of UPS for each rating as and when they are offered first time for inspection against the rate contract . 2)All the UPS shall be supplied with 1:1 isolation transformer at out put side.Isolation transformer can be internal or external to UPS. Detail of isolation transformer shall be furnished by the firm when the product is offered for first inspection for each rating and the same shall be recorded in the inspection report after due verification by the QA Officer. If the isolation transformer is eternal to the UPS same shall be indicated.The efficiency of UPS shall be measured along with isolation transformer. 3) When the product is offered for first time for inspection the UPS shall be operated at full rated current as per its rated KVA rating , at the rated power factor and at minimum of input voltage range and with full C-10 rate min. charging current, along with isolation transformer, for the temperature rise test and to evaluate its performance at rated current corresponding to KVA rating . After the evaluation of its performance the weight of the transformer shall be taken to compare with the weight furnished by the firm vide the questionnaire attached in the rate contract. After the completion of the temperature rise test, the UPS efficiency and input power factor shall be tested to assess its consistency with regards to temperature and continuous application of the rated KVA load. The temperature rise test shall not be terminated before 8 hours of continuous operation. 4) During each visit at least one rating of the UPS offered for inspection shall be tested for the verification of its capacity rating by conducting temprature rise test on rated KVA load. Selection of rating shall be such that it coveres all ratings on R/C during currency of R/C. This is over and above the requirement of the clause as above when each rating is subjected for temperature rise test when UPS is offered first time. Machine should be subjected to 8 hours continuous operation for capacity verification . 5) Weight of the transformer shall be recorded in the inspection note for the verification by the consignee/user for the purpose of reference. 6) The firm shall have necesssary facilities to test batteries for high rate discharge and for capacity rating tests as per JISC:8702,so that batteries can be verified for HRD & capacity verification test during each inspection. Method for the HRD and capacity rating is as per JIS C 8702.Sampling shall be done as per IS: 7372 7) weight of the batteries, its brand, its voltage rating AH rating and no of batteries fitted with UPS shall be indicated in the inspection note for the verification by the consignee.

(P.S. Dhakate) PS-II

57/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

8) Firm shall furnish copy of the invoices and details of the serial no. of the batteries at the time of inspection for the corelation and records purpose of the QA Office. 9)Battery supplier/manufacturer who supplies battery to UPS supplier shall be registered with DGS&D/NSIC(based on capacity report from DGS&D).Only registered battery shall be supplied against the R/C. SPECIAL NOTES TO TENDERERS: 1. As per CVC Circular No.03/01/12 dated 13.1.2012, a) In a tender, either the Indian agent on behalf of the Principal/OEM or Principal/OEM itself can bid but both cannot bid simultaneously for the same item/product in the same tender. b) If an agent submits bid on behalf of the Principal/OEM, the same agent shall not submit a bid on behalf of another Principal/OEM in the same tender for UPS. c) UPS and battery from separate OEMs can be quoted as these are entirely different items. 2.Uniterruptible Power Supply consists of electronic hardware plus battery and hence in this tender UPS with battery is a product/item.Suppliers shall quote for UPS and battery .Otherwise tender will be treated as unresponsive.Tenderers shall indicate rate for UPS without battery against shcdules 1,2 &4. 3a. Firms registered with DGS&D or seeking registration/capacity assessment in the category of:(a) Indian agent of Indian Manufacturer ; the registration and inspection shall be carried out at Indian Manufacturer's works. (b)Battry manufacturer/supplier who supplies battery to UPS supplier shall be registered and only battery from manufacturer/supplier registered with DGS&D /NSIC(based on capacity report from DGS&D)shall be quoted and offered along with UPS. c)UPS manufacturer/supplier need not get registered for battery. 4a. Firms must submit their application to concerned QA Office for fresh or renewal of registration/capacity assessment/special capacity assessment PRIOR to at least 30 days before the scheduled date of tender opening, failing which application may NOT be able to be fully processed.Tenderers will only be responsible for same. b. Tenderers shall be registered with DGS&D or NSIC(based on capacity report of DGS&D) to become eligible to quote against the T/E. 5. Registration for all scheduled items including add on items and in lieu items are required on the date of tender opening ,if not specified otherwise elsewhere. It means all the items/models quoted against all schedules by tenderer have to be registered on the date of tender opening if not specified otherwise elsewhere. 6. The relevant guidelines mentioned in paras 13.20.1, 13.20.5(a), 13.21.6(b) and 13.22.2 of DGS&D Manual will be the basis for registration of items, i.e., spares and accessories , add-on items and in-lieu items , provided the firm are registered for the main equipment , for which the above items are required for functioning of main equipment .No separate agreement , documents like test reports etc. are required for these items if they are being registered for the main equipment for which above items are required for proper functioning. 7.UPS suppliers who are registered for the highest ratings of each of the schedules will be eligible to quote against the corresponding schedules of T/E.They will be considered for award of R/C only on production of registration certificate indicating registration of individual ratings of different schedules of T/E. NOTE TO PURCHASER:- Battery VAH & other details as per questionnaire offered by the firms must be specified in the resultant R/C. ELIGIBLITY CRITERIA The following essential facilities shall be available with the manufacturer:-

(P.S. Dhakate) PS-II

58/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

1.Dust free environment for assembly of PCBs 2.Component lead forming machine/fixture 3.Temperature controlled wave soldering machine with auto fluxing facility. 4.Dry heat test chamber to burn in PCBs before its use to avoid infant mortality. 5.Functional testing facility for PCBs 6.Electrostatic dischage protection in line with IS:10087/81 work procedure. 7.Power analyser to measeure voltage,current,frequency,power factor,power,harmonic distortion(separate instrument will also be acceptable.) 8.Multi channel temperature recorder 9.Storage oscilloscope etc. Eligibility Criteria 1 Essential in-house manufacturing and testing facilities as per the

governing specification shall be available with the RC Holder are as follows.

2 a. Dust free environment for the assembly of PCBs. b. Component lead forming machine/ fixture. c. Temperature controlled wave- soldering machine with auto-fluxing facility. d. Dry heat test chamber for burn in of PCBs before calibration . e. Functional testing of PCBs. f. Electrostatic discharge protection in line with IS: 10087/1981 work procedure.. g. Power analyzer for measurement of voltage, current, frequency, power factor, power, harmonic distortion (separate instruments will also be acceptable) h. Multi-channel temperature recorder. i. Storage oscilloscope.

NOTE TO INDENTORS: Typical power consumption of PC is 160 VA, of PC with inkjet printer is 300-400 VA and for PC with laser printer is 700-800 VA. The back up time as available for each item can be calculated on this basis by the indentor before ordering the item.

Recommended by Technical Specification Committee Dated 12-07-2013

(P.S. Dhakate) PS-II

59/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

SCHEDULE ‘B’ (SPECIAL CONDITION OF CONTRACT)

Rate Contract Will be governed by the Terms & Conditions laid down in the CSIDC FORM NO. 1 & 2

(Santosh Bhagat) Chief General Manager

60/60 Rate Contract No. CSIDC/MKD/PS-IX/87/386/13-14/UPS/R.S.PS/5106 Dated: 19-06-2014

SCHEDULE – “D”

FORMAT FOR QUATERLY DRAWAL REPORT

Name of the Firm __________________ I- Jan-Mar Report No. __________________ II- Apr-June Rate Contract No. __________________ III- July-Sept. Date of Submission __________________ IV- Oct - Dec Total Position of Order against Rate Contract till the submission of Report. S.No. Name of

Department Quantity and Value of Orders Received (Rs.)

Quantity and Value of Orders Executed (Rs.)

Balance Quantity and Value to be Supplied (Rs.)

Reasons

Foot 1. Value indicate should be a) Value of orders received during the quarter-Rs.

Total value inclusive of all Taxes duties and incidental b) Value of orders supplied during the quarter-Rs. Charges

2. Nil report should also be Submitted.

(Santosh Bhagat)

Chief General Manager