49
8/19/2019 Chevron Refinery Pipe Rupture http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 1/49 CSB Investigation: Chevron Refinery Pipe Rupture and Fire Richmond, California Southern California Society For Risk Analysis 26th Annual Meeting May 30, 2013

Chevron Refinery Pipe Rupture

Embed Size (px)

Citation preview

Page 1: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 1/49

CSB Investigation:

Chevron Refinery Pipe Rupture and Fire

Richmond, California

Southern California Society For Risk Analysis

26th Annual Meeting

May 30, 2013

Page 2: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 2/49

Chevron Refinery Pipe Rupture and FireRichmond, California

Background

Incident Review

Sulfidation Corrosion

Review of Findings and Recommendations

2

Page 3: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 3/49

3

Chevron Richmond Refinery

Page 4: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 4/49

 Atmospheric

Crude Column

8-inch

“ 4-sidecut” line

Line Constructed

of Carbon Steel

Process Fluid is

Light Gas Oil

P = 55 psigT = 640 ⁰F

4

Page 5: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 5/49

5

Page 6: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 6/49

6

Page 7: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 7/49

7

Page 8: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 8/49

8

Page 9: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 9/49

9

Page 10: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 10/49

10

Page 11: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 11/49

11

Page 12: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 12/49

12

Page 13: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 13/49

13

Page 14: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 14/49

14

Page 15: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 15/49

15

Page 16: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 16/49

16

Page 17: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 17/49

17

Page 18: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 18/49

18

Page 19: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 19/49

19

Page 20: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 20/49

20

Page 21: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 21/49

21

Page 22: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 22/49

22

Page 23: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 23/49

23

Page 24: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 24/49

ccuMechanics of Sulfidation Corrosion

Occurs in high temperature process fluidSulfur Compounds React with Iron Contained in Steel

24

Page 25: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 25/49

Sulfidation Rates of Various Alloys

25Curves can be found in API RP 939-C

Page 26: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 26/49

Carbon Steel Corrosion Rate Variability

26Graph from API RP 939-C

Page 27: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 27/49

Low-SiliconCarbon Steel

>.1% Silicon

Carbon Steel9-Chrome Stainless Steel

INHERENTLY SAFER

90 % Wall Loss 65% Wall Loss 9% Wall Loss < 1% Wall Loss

Chevron 4-sidecut

Material of Construction

27

Inherently Safer Materials of ConstructionThinning resulting from 15 years of operation (Estimated)

Page 28: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 28/49

Corrosion Monitoring of Carbon Steel Piping

http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg

Measurement

Location

Straight-Run

Components

Elbow

Components

Generic Piping Configuration

28

Page 29: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 29/49

http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg

Generic Piping Configuration

http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg

Measurement

Location

Measurement

Location

Measurement

Location

Measurement

Location

MeasurementLocation

Measurement

Location

Measurement

Location

Measurement

Location

Measurement

Location

29

100 Percent Component Inspection Identifies

Low-Silicon Components

Page 30: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 30/49

Inherently Safer Metallurgy Reduces Hazard

http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg 30

Page 31: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 31/49

Low-Silicon 4-Sidecut Component Not

Monitored

Measurement

Location

WeldHigh-Silicon

Elbow Component

Low-SiliconPipe Component

31

Page 32: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 32/49

32

Low-Silicon 4-Sidecut Component Not

Monitored

Page 33: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 33/49

33

Page 34: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 34/49

34

Page 35: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 35/49

35

Page 36: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 36/49

36

Page 37: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 37/49

37

Page 38: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 38/49

Many Chevron Recommendations

to Inspect or Upgrade 4-Sidecut

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Pipe Ruptures

Recommendations to 100 Percent Inspect 4-Sidecut

Recommendations to Upgrade Metallurgy of 4-Sidecut

38

Page 39: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 39/49

Process Hazard Analysis

Process Hazard Analysis Required by OSHA PSM Program

 –  Enforceable by Cal/OSHA and City of Richmond

PHA team DID evaluate “leak or rupture” of 4-sidecut line

PHA team did not identify 4-sidecut Sulfidation vulnerabilities –  PHA team not knowledgeable of 4-sidecut corrosion hazards

 –  PHA team did not seek out additional corrosion expertise

No PHA recommendations to improve 4-sidecut safeguards

39

Page 40: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 40/49

Damage Mechanism Hazard Reviews

These hazard reviews:

 –  Analyze all process equipment failure mechanisms including:• Corrosion

• Cracking

 –  Identify potential safeguards to control or eliminate hazard

Not required by regulators or by current Chevron standards

May have prompted PHA team to recommend replacing 4-sidecut line

CSB recommended to Chevron and State of California to require

Damage Mechanism Hazard Reviews as part of PHA cycle

40

Page 41: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 41/49

 Adequacy of PHA Safeguards

Safeguard Evaluation Methodologies; accepted methods include:

 –  Quantitative, e.g., Quantitative Risk Analysis

 –  Semi-Quantitative, e.g., Layers of Protection Analysis, and

 –  Qualitative, e.g., NFPA Fire Codes

Chevron PHAs do not use these safeguard evaluation methodologies

 –  Reliability of safeguards were not adequately verified

 –  Rely on PHA team experiences, beliefs, and areas of expertise

CSB recommended to California Regulators to require a fullydocumented, rigorous analysis of safeguards using established

methods such as LOPA

41

Page 42: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 42/49

Implementation of Inherently Safer Systems

(ISS)

Contra Costa County process facilities are required consider inherently

safer design opportunities in PHAs and for new construction

But many more opportunities exist:

 –  Management of Change (MOCs)

 –  Process Unit Rebuilds

 –  Major Repairs

 –  Corrective actions from incident investigation recommendations

Chevron did not document the analysis of ISS alternatives.

CSB recommended more rigorous ISS requirements by:

 –  City of Richmond / Contra Costa County

 –  State of California

42

Page 43: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 43/49

Multi-Agency Regulatory Approach Needed

Program will improve public

accountability and process safety

performance

Sharing of data and operational

coordination will help regulators

prevent major incidents

Regulators have cited the need for

greater multi-agency cooperation

CSB recommended multi-agency

regulatory cooperation

Page 44: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 44/49

Transparency Drives Process Safety

Transparency is the public disclosure of process safety information

Minimal transparency exists

between refineries, regulators,

and the public

The CSB recommended that

the multi-agency group

establish procedures for

greater transparency betweenlocal officials, regulators, the

workforce, and the public.

Tawanda Kanhema/Richmond Confidential

Page 45: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 45/49

Many Factors Contributed to Incident

Immediate Causes

 –  Failure caused by sulfidationcorrosion in low-silicon carbon steel

 –  Chevron failed to shut down unit

when leak was found

Latent Causes

 –  Chevron never fully inspected or

replaced the 4-sidecut despite

many recommendations

 –  Chevron PHA process failed to

identify sulfidation corrosion hazard

45

Page 46: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 46/49

Many Factors Contributed to Incident

Regulations did not require rigorous

ISS implementation

Regulations did not require damage

mechanism hazard review

Regulations did not require evaluation

of safeguard effectiveness

Multi-agency cooperation andtransparency needed in California

46

Page 47: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 47/49

 Additional Items Still Under Investigation

California

 –  Refinery regulatory regime

Chevron

 –  Safety culture

 –  Management system

 –  Mechanical integrity systems

 –  Emergency planning,

notification, and response

 –  Process safety indicators

47

Page 48: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 48/49

48

Page 49: Chevron Refinery Pipe Rupture

8/19/2019 Chevron Refinery Pipe Rupture

http://slidepdf.com/reader/full/chevron-refinery-pipe-rupture 49/49

CSB Investigation:

Chevron Refinery Pipe Rupture and Fire

Richmond, California

Southern California Society For Risk Analysis

26th Annual Meeting

May 30, 2013