    CHARLES L DUNNE CV 2012 PAGE 1

    PERSONAL INFORMATION

    Name: DUNNE, Charles L

    Position: Drilling Manager

    Nationality: British

    Home Address: Spain

    CAREER SUMMARY

    A Drilling Manager or Superintendent with considerable offshore experience and anunderstanding of broader industry development issues and project management. 27 years ofoilfield experience

    PROFESSIONAL EXPERIENCEAug 2002 - Present: Dri ll ing Manager

    Premier Oil Natuna and Premier VietnamResponsible for the Operational Management of a two well explorationprogramme in Natuna Sea with a semi-submersible. Responsible forthe project management of multiple well programmes offshore Vietnamwith both jack ups and semi-submersibles new country entry forPremier Oil. Managed pressure drilling, development extended reachdrilling and intelligent completions, semi-submersibles 300 m + waterdepth.

    Oct 2001 - June2002:

    Drilling SuperintendentSeconded to Kufpec IndonesiaSeconded to Kufpec Indonesia as Drilling Superintendent for landdrilling and workover operations on Seram Island, Eastern Indonesiausing an underbalanced drilling system in a fractured subnormallypressured limestone reservoir. A development well re-entry requireda medium radius build of 26 deg/100 ft whilst utilising anunderbalanced drilling spread with crude oil and nitrogen injection.Over 170 people were required to be accommodated on site with allthe attendant logistical and HSE implications to be controlled.

    June 2000 Oct2001:

    Well Engineering Group ManagerPremier Oil

    Responsible for the Functional management of the Well EngineeringGroup of Premier Oil including: Resourcing for Worldwide OperationsTechnical and Functional approval of Design and Procedures foroperations in Pakistan, UK Central North Sea , West Afr ica andIndonesia ensuring compliance with Well Engineering GroupStandards and Procedures. Audit of Business Units and proactiverecommendations for improvement Technical Assistance for NewVentures - Malaysia, Myanmar , Albania , West Afr ica, India.Maintain and develop technical standards and procedures to improve

    performance in Premiers Global Well Engineering and Operations.

  • 7/29/2019 Charles Dunne (Dm - Dsupt) Cv 2012

    2/4

    CHARLES L DUNNE CV 2012 PAGE 2

    July 1998 June2000:

    Drilling ManagerPremier Oil Natuna Sea IndonesiaDrilling Manager based in Jakarta responsible for the overall controland direction of all Premier Oil Indonesia drilling and testingoperations. Operational activity was extremely diverse including jack-up exploration and appraisal drilling in Natuna Sea and OffshoreEast Java, platform workovers and development wells including highangle and horizontal wells, and subsea well workover, drilling andcompletion.

    Sept 1997 June1998:

    Drilling Superintendent

    British Gas International Indonesia

    Drilling Superintendent based in Jakarta for drilling operations in MuturiIrian Jaya and South Java. Initially assigned to drilling one well with aswamp barge, and latterly with overseeing the reactivation of a drill shipin Singapore and drilling wells in Irian Jaya and South Java.

    Oct 1995 Aug1997:

    Drilling Co-ordinatorBrit ish Gas E & P UKArmada Drilling Co-ordinator responsible for all drilling input to themanagement of the Armada gas condensate development whichrequired tieback of pre-drilled wells to a platform using a tender assistharsh environment jack-up. The position demanded direct action ondiverse items including scheduling and resourcing of all workscope,tieback and completion design and procurement, functional internalaudit responsibility, and review of detailed operational procedures.Additional responsibilities included jack - up to platform engineeringinterfaces, preparation of combined operation legislative requirements,and drill cuttings seabed clearance using a DSV.

    Feb 1995 Oct1995:

    Drilling SupervisorBrit ish Gas E & P LtdDrilling Supervisor on the Armada template pre-drilling with a semi-submersible rig drilling extended reach wells to over 20,000 ft.

    Aug 1992 Feb1995:

    Senior Drilling EngineerBrit ish Gas E & P LtdSenior Drilling Engineer for the concept and detailed design of anextended reach drilling project consisting of the two phases of pre-

    drilling with a semi-submersible and tieback of the wells to the platformusing an harsh environment rig. Responsible for a major portion of thewell planning and design, procurement of equipment and services andtechnical and legislative documentation. Additionally responsible for thedrilling interface with the platform design required for tender assistoperations.

    Oct 1991 Aug1992:

    Senior Drilling EngineerBrit ish Gas E & P LtdSenior Drilling Engineer for the planning of a HPHT well in the CentralNorth Sea. Responsible for all aspects of the well design, equipment

    specification and procurement, legislative documentation, preparation ofdetailed operational procedures, Well Control documentation andtraining requirements. Night Drilling Supervisor on the Semi-submersible Benreoch.

  • 7/29/2019 Charles Dunne (Dm - Dsupt) Cv 2012

    3/4

    CHARLES L DUNNE CV 2012 PAGE 3

    Apri l 1991 Aug1991:

    Senior Drilling EngineerInternational Petroleum LimitedSenior Drilling Engineer with IPL on a single string exploration well onthe East coast of India. Based initially in Singapore to prepare the drillingprocedures and other documentation and to assist with the mobilisationof the Jack-up drilling rig and load out of drilling equipment for the entirewell programme onto a warebarge anchored in Singapore. Located inMadras, India, as the operations Drilling Engineer, reporting to theOperations Manager.

    March 1991 April1991:

    Night Drilling SupervisorMurphy OilNight Drilling Supervisor working on the Transocean 6 jack-up in theSouthern North Sea

    Mar 1990 Mar1991:

    Drilling EngineerConoco UK Ltd

    Drilling Engineer onshore based, offshore when required. Responsiblefor the detailed operational procedures and engineering support forexploration and appraisal well drilling and testing of vertical anddirectional wells in the Northern, Central and Southern North Sea.Generation of drilling costs for Subsea development projects in theNorthern North Sea. Weekend duty Drilling Engineer for platform jack-up, semi-submersible drilling, workover and completion operations.

    Aug 1989 Mar1990:

    Project EngineerInternational Drilling & Downhole Technology CentreProject Engineer for well planning, rig evaluation and selection, and sitelayout for this drilling research, development and training centre.

    Nov 1988 Aug1989:

    Drilling EngineerBP Exploration LimitedDrilling Engineer for the Forties Field, developing technicaldocumentation for gas lift completions, electric submersible pumpcompletions, and workover operations. Offshore Drilling Engineer forworkover operations on the Forties Field.

    Aug 1988 Nov1988:

    Offshore Drilling EngineerBritoilOffshore Drilling Engineer working on semi-submersible and jack-up rigsin the Northern and Southern North Sea. Experience of High Pressure

    Zechstein in the Southern North Sea.

    Jan 1988 Aug1988:

    Design Course InstructorProdrill LtdWell Design, procurement of rig, services and equipment, andpreparation of drilling procedures for UK land wells. Preparation of aProdrill Casing Design Manual and Casing Design Course Instructor.

    Mar 1987 Dec1987:

    Operations EngineerShell Expro AberdeenOperations Engineer responsible for the performance reviews of alldrilling and workover operations in the Northern and Central North Sea,providing management with technical recommendations for improvingperformance in these operations.

  • 7/29/2019 Charles Dunne (Dm - Dsupt) Cv 2012

    4/4

    CHARLES L DUNNE CV 2012 PAGE 4

    Aug 1986 Mar1987:

    Well Operations EngineerShell International - New ZealandWell Operations Engineer responsible for preparation of procedures andfield supervision of wellsite operations in the Maui and Kapuni gas fieldsincluding workovers, PLT and pressure transient testing. Wellsiteoperations engineer for exploration well drilling with the JFP11 Jack-uprig.

    Mar 1985 Mar1986:

    Wellsi te operations engineerShell Expro AberdeenWellsite operations engineer assisting the supervision of well drilling,completion and workover programmes on the North Cormorant platformin the Northern North Sea with some experience on semi-submersibles.

    Oct 1983 Mar 1985: Petroleum engineerTexaco North Sea UKPetroleum engineer - six months wellsite experience on the Tartan

    platform in a wide range of production operations, well testing andinterpretation. Petroleum engineer for the Tartan field and joint venturerepresentation.

    QUALIFICATION:

    1982 - LEEDS UNIVERSITY, BSc (Hons) Mineral Engineering (1st Class)

    1983 - HERIOT - WATT UNIVERSITY, M.Eng in Petroleum Engineering

    LANGUAGES:

    Basic French, Spanish, German, and Bahasa Indonesia.

    COMPUTER LITERATE

    Computer literate with a personal computer for use of word processing, spreadsheet, drawingand engineering applications.

    MEMBERSHIPMember of the Society of Petroleum Engineers, Technical Author 1997 SPE/IADC Conference.

    Co Chairman SPE /IADC Jakarta 2002, Panel Discussion - Drilling Risk Management , The

    Way Forward.

    Associate Member of the Institute of Mining and Metallurgy

    REFERENCES

    Provided upon request.