CHAPTER 6 PROCESS SELECTION AND FACILITY LAYOUT Teaching Notes Facility Layout involves physical placement of departments and/or arrangement of equipment within a plant or a service facility. A good layout will possibly lead to smooth flow of material, reduction of inventories, and effective utilization of space. The material in this chapter can be divided into four areas: 1. 1. Process types, process selection and automation. 2. 2. Classification of production systems and (corresponding) types of layouts. 3. 3. Line balancing. 4. 4. Designing process layouts. This chapter provides a good lead-in for the following chapter on design of work systems because it introduces some of the problems that can be associated with work systems. It also describes group technology, cellular manufacturing, and flexible manufacturing systems. Answers to Discussion and Review Questions 1. Process selection refers to the ways organizations choose to produce or provide their goods and services. It involves choice of technology, type of processing, and so on. These choices have important implications for capacity planning, layout of facilities, equipment choices, and the design of work systems. 2. There are five basic process types: a. Job-shop: Job-shop is used when a low volume and a large variety of goods or services are needed. Job-shop involves intermittent processing, high flexibility, skilled workers, relatively large work-in-process inventories and general- purpose machinery. An example is a tool and die shop that is able to produce a wide variety of tools. b. Batch: Batch processing is used when a moderate volume of goods and services is demanded. It is designed to handle a moderate variety in products. The processing is intermittent. The flexibility of the process to produce a variety of goods, the skill of the workers, amount of work-in-process

CHAPTER 6 Outline Answers

  • Upload
    sarah

  • View
    198

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CHAPTER 6 Outline Answers

CHAPTER 6PROCESS SELECTION AND FACILITY LAYOUT

Teaching Notes

Facility Layout involves physical placement of departments and/or arrangement of equipment within a plant or a service facility. A good layout will possibly lead to smooth flow of material, reduction of inventories, and effective utilization of space.  

The material in this chapter can be divided into four areas:

1. 1.         Process types, process selection and automation.

2. 2.         Classification of production systems and (corresponding) types of layouts.

3. 3.         Line balancing.

4. 4.         Designing process layouts.

This chapter provides a good lead-in for the following chapter on design of work systems because it introduces some of the problems that can be associated with work systems. It also describes group technology, cellular manufacturing, and flexible manufacturing systems.

 

Answers to Discussion and Review Questions1.         Process selection refers to the ways organizations choose to produce or provide their goods and

services. It involves choice of technology, type of processing, and so on. These choices have important implications for capacity planning, layout of facilities, equipment choices, and the design of work systems.

2.         There are five basic process types:

a.   Job-shop: Job-shop is used when a low volume and a large variety of goods or services are needed. Job-shop involves intermittent processing, high flexibility, skilled workers, relatively large work-in-process inventories and general-purpose machinery. An example is a tool and die shop that is able to produce a wide variety of tools.

b.   Batch: Batch processing is used when a moderate volume of goods and services is demanded. It is designed to handle a moderate variety in products. The processing is intermittent. The flexibility of the process to produce a variety of goods, the skill of the workers, amount of work-in-process inventories are all less than job shop. A typical example of batch processing is paint manufacturing.

c.   Repetitive: This type of a process involves higher volumes of more standardized goods or services. The flexibility of the process to produce a variety of goods, the skill of the workers, amount of work-in-process inventories are all less than batch process. Typical examples for this type of process include appliances and automobiles.

d.   Continuous: This type of a process involves very high volume of highly standardized goods or services. These systems have no flexibility in output or equipment. Workers are generally low skilled and there is no work-in-process inventory. The machines are dedicated to perform specified tasks. Typical examples include petroleum products, steel and sugar manufacturing.

e.   Project: Projects are designed to be used with non-routine, unusual tasks or activities. These activities are generally not repeated. Equipment flexibility, level of worker skills and work-in-process inventory can range from very low to very high. Examples include construction of a dam or a bridge, conversion of the production system from job-shop to group technology, installing and implementing a new inventory and bar coding system.

Page 2: CHAPTER 6 Outline Answers

3.         Advantages: Highly uniform output, boredom and fatigue are not factors, machines don’t go out on strike, etc.

4.         Numerically controlled (N/C) machines are programmed to follow a set of processing instructions based on mathematical relationships. Robots have movable arms that enable them to handle a wide variety of tasks such as welding, assembly, loading and unloading machines, painting, and testing.

            Flexible manufacturing systems (FMS) are groups of machines that have a supervisory computer, automatic material handling, and automatic processing. Systems usually range from 3 machines to a dozen. They are designed to handle a variety of processing requirements (similar to intermittent systems) with some of the benefits of automation.

            Computer-integrated manufacturing (CIM) is a system for linking manufacturing activities through an integrated computer. These include engineering design, flexible manufacturing systems, and production planning and control.

5.         (See question #4 above for description.)

6.         Process selection decisions often include aspects that require highly technical knowledge. Many managers do not possess such expertise. However, if those decisions are delegated to engineers or others who do have the expertise, there is the danger that managerial issues will suffer. The solution is for managers to increase their knowledge of technological advances. In the meantime, managers must be prepared to ask questions and impress upon technical experts their goals and objectives.

7.         Managers sometimes view flexible systems as a hedge; hence, they opt for such systems without having complete understanding of future needs, reasoning that their lack of knowledge is offset by the flexible nature of the system. However, such systems are more expensive to install and maintain. Moreover, the flexibility provided by such systems may not be needed, or it may be of the wrong type. In many cases, a dedicated, or focused system, would be a better choice.

8.         The trade-offs between product layout and process layout include the following:

a.   Process layout has more equipment flexibility.

b.   Process layout generally has higher skilled workers.

c.   Product layout involves higher volume manufacturing.

d.   Process layout benefits from high flexibility to be able to produce a  variety of products, while product layout benefits from large volume manufacturing at low cost. 

e.   The major goal of process layout is to minimize the transportation and material handling costs while the primary objective of the product layout is to minimize idle time and maximize efficiency of the process.

f.    The utilization of process layout generally results in higher levels of work-in-process inventory than the product layout.

g.   For a product layout, the flow of work is straight, while for process layout, the flow of work is mixed depending on the product produced.

h.   There is more dependency between workstations for product layout than for a process layout.

i.    The preventive maintenance and machine reliability are more important in a product layout than process layout because equipment breakdown may involve shutting down a work station which may in turn result in shutting down downstream work stations.

j.    Routing and scheduling is much less complicated for processes with product layout than processes with process layout. 

9.         The most common reasons for redesign of layouts include:

a.   Inefficient operations.

Page 3: CHAPTER 6 Outline Answers

b.   Accidents or safety hazards.

c.   Changes in the design of products or services.

d.   Introduction of new products or services.

e.   Changes in the volume of output or mix of outputs.

f.    Changes in methods or equipment.

g.   Changes in environmental or other legal requirements.

h.   Morale problems

10.        Product layouts are generally characterized by specialized labor and equipment designed for continuous processing. The layout is often arranged on the basis of processing sequence. Process layouts are more general in nature, in terms of labor, processing equipment and material handling equipment. Process layouts often feature machine groups or departments. Items processed in process layouts tend to follow differing paths through the system. Fixed position layouts are used to facilitate processing of a single (usually large) job, such as construction of a large building or a hydro-electric power plant. Labor, equipment and materials are typically brought to the job site (i.e., to the “product”) rather than the other way around. Fixed position layouts are commonly found in farming, road building, home remodeling and mining.

11.        The main advantages of product layouts include:

a.   A potentially high rate of output.

b.   Low unit costs.

c.   Low training costs and wide span of supervision due to specialization.

d.   Low unit cost for material handling.

e.   High utilization of labor and equipment.

f.    Routing and scheduling are built into the design.

g.   Accounting, purchasing and inventory control are fairly routine.

            The main disadvantages of product layouts include:

a.   Specialization can mean dull, repetitive jobs with little opportunity for personal satisfaction or creativity.

b.   Workers may have little interest in maintaining equipment or in the quality of output.

c.   The system is not particularly adaptable to changes in process design or changes in the volume of output.

d.   The system is highly susceptible to shutdowns caused by equipment failure or excessive absenteeism.

e.   Preventive maintenance costs and the capacity for quick repairs are necessary to ensure high utilization.

f.    Incentive plans tied to individual output are impractical.

12.        The main advantages of process layouts are:

a.   They can handle a variety of processing requirements.

b.   The system is less vulnerable to equipment failures than product layouts.

c.   The general purpose equipment used is often less costly than the specialized equipment used in product layouts. It is also usually easier and less costly to maintain and repair.

d.   Individual incentive systems are possible.

            The main disadvantages of process layouts are:

a.   In-process inventory costs can be high (manufacturing).

b.   Routing and scheduling must be done for each new job.

Page 4: CHAPTER 6 Outline Answers

c.   Equipment utilization rates are usually low.

d.   Material handling is slower, less efficient, and more costly per unit than with a product layout.

e.   There is often a lower span of supervision compared to a product layout.

f.    Unit costs tend to be higher than comparable output produced with a product layout.

g.   Accounting, inventory control and purchasing are generally more involved than with a product layout.

13.        The main goal of line balancing is to achieve a set of task groupings at work stations in the line that have equal time requirements in order to get a high utilization of labor and equipment. Unbalanced lines have bottlenecks at some work stations and idle time at others. The resulting output is lower than it would be if the line were balanced.

14.        Routing and scheduling are continual problems in a process layout because a variety of jobs pass through the system, and they tend to differ in terms of routing and schedule requirements. In contrast, product layouts typically handle items with little or no variety—all have the same or similar routing and scheduling requirements.

15.        With a product layout, equipment breakdown has serious implications because the separate pieces of equipment are closely tied together. If one piece of equipment fails, the line will quickly come to a halt. Consequently, preventive maintenance to reduce the failure rate is advisable. In contrast, a process layout often contains duplicative equipment so that if one particular piece of equipment fails, the work can usually be shifted to another piece of equipment. Consequently, there is less need for preventive maintenance, and less need for repair of equipment when it does break down. Moreover, process layouts utilize more skilled workers who tend to take better care of the equipment than their lower skilled counterparts in a product layout system.

16.        Job sequence usually determines the arrangement of equipment in a product layout. In a process layout, job sequences vary, so there is much less influence on equipment arrangement. Because of differences in job requirements, sequencing is a continual task in a process layout.

17.        The subway system is essentially a fixed-path arrangement—a product layout. Its advantages are often low operating cost, more efficient handling, and low cost per unit moved. On the other hand, a bus system is more flexible in terms of varying routes. This can be desirable if there are shifts in which potential riders are coming from and going to. For example, a new bus route could easily be established to service a new shopping area, a new apartment complex, or a large industrial facility. Other considerations are initial cost (high for subway and relatively low for bus), severity of difficulties that would arise from a breakdown (high for subway, low for bus), the possibility of alternative uses (none for subway, private groups, etc., for bus during off times), and possible disruptions caused by weather (higher risk for bus than subway—e.g., snowstorms stall highway traffic).

18.        Fixed-path material handling equipment in supermarkets includes the belts at the checkouts which move items up to the cashier, the roller conveyors which transport boxes of groceries outside to pickup areas, conveyors in the meat department to move carcasses from storage to cutting tables, roller conveyors to off-load goods from trucks and move them to storage. Variable-path material handling equipment includes grocery carts, “trucks” and “jeeps” used to transport baked goods from storage to display shelves, and movable racks to transport baked goods from ovens or from deliveries to the bakery counter.

19.        Heuristic approaches are rules designed to guide decision-makers to satisfactory decisions by reducing the number of alternatives that must be considered. They do not necessarily yield optimal solutions. They are usually employed when there is a problem involving an exceedingly large number of potential solutions and an optimizing algorithm is not available.

Page 5: CHAPTER 6 Outline Answers

20.        Nonmanufacturing environments do not usually lend themselves to product layouts because they tend to involve more processing variety than many manufacturing environments.

21.        The original car was probably one of a large number of similar cars produced on an assembly line, which was set up to speed the flow of work. That is, inventories of parts were on hand, specialized machinery, workers and material handling equipment were arranged specifically for the job. As a result of this continuous processing, the unit cost of the car was relatively low. In contrast, constructing a car from “scratch” is essentially a cross between intermittent processing and a project, with none of the economies of continuous processing. A list of the parts must be assembled. Some might be available locally, but others would have to be shipped individually from suppliers. The parts would have to be held until all were on hand. Workers would not be highly familiar with this particular car, even though they were experienced in this sort of work. Consequently, the work would progress at a fairly slow rate, and probably with a certain amount of back-tracking. Obviously, construction of a replacement would be considerably more costly than initial, continuous production.

22.        Layout can lead to high productivity if it contributes to a smooth flow of work with high utilization of labor and equipment. This requires careful consideration of future work requirements to determine what will be needed and a certain amount of effort to obtain an optimal (or satisfactory) layout. A poor layout will hinder productivity with bottlenecks, lower utilization of labor and equipment than is necessary, and require more handling or movement between work stations than is necessary (particularly in process layouts).

23.        In cellular manufacturing, machines are grouped into cells. The basis for grouping can be operations needed to process a group of similar items or part families. Advantages of such systems include relatively short throughput time, reduced material handling, less work-in-process inventory, and reduced setup time.

24.        Group technology involves items that have similar design or processing requirements and grouping them into part families for cellular manufacturing. It also includes a coding system for items.

25.               Although we treated the task completion times as fixed in balancing assembly lines, it is more realistic to assume variable task times whenever humans are involved. The lower the level of automation, the higher the variability of tasks. If the assembly line consists of tasks with variable completion times, it will be more difficult to balance the line. In order to deal with variability of task times, we can require a minimum amount of slack to be available at each workstation. As the variability of task times increase we can increase the minimum slack available at each workstation. In addition, workstation slack time can also be used for slower or less experienced workers who take longer than normal to complete a task.

 

Taking Stock1.                   The three major trade-offs in process selection are:

a.       Flexibility vs. efficiency in facilities layout. Product layout is designed to provide efficient operations, while process layout is designed to provide a variety of products, thus offering a flexible system.

b.       Level of automation (high vs. low) High level of automaton has the potential advantage of providing faster production or service, the ability to quickly switch from product to product resulting in higher flexibility. On the other hand, high level of automation involves higher cost and the potential risk that it may involve costly implementation problems.

c.       The expected volume of output can either be high or low. If it is high, we can take advantage of the economies of scale and reduce costs and improve efficiency. However, if we make a commitment to high volume production and the demand is consistently low, we may be faced

Page 6: CHAPTER 6 Outline Answers

with the potential problem of low efficiency and low utilization of the machines and idle resources. On the other hand, if the expected volume is low, then we probably have decided to compete as a job-shop, emphasizing flexibility. If there is a capacity-demand mismatch, we will either have too few resources allocated for production or we will have a capacity constraint on resources.

2.         If we rebalance the assembly line too frequently, then the cost of making the adjustments becomes too costly. On the other hand, if we do not rebalance it as frequently as necessary, then the assembly line will experience too much inefficiency resulting in a less efficient line. 

3.             In process selection, we must make sure that manufacturing group(s), maintenance, engineering, technical support, marketing, process design specialists, quality, finance (especially if we need capital to support the facility layout, new equipment or new machinery) are involved. Of course we also need to make sure that there is a representative from top management to ensure that we stay consistent with the overall goals and objectives of the firm.

4.             In layout design, we must make sure that manufacturing group(s), maintenance, engineering, technical support, process design specialists, quality, finance (especially if we need capital to support the facility layout, new equipment or new machinery) are involved.

5.                   Technology has tremendous impact on process selection due to changes in computer related technology. The level of automation continues to change in companies affecting the layout decisions. For example, the newer machinery are smaller, therefore the size of the machinery affects the work area size and ultimately the layout of the facility.   

 

Critical Thinking Exercises1.                   Factors that must exist in order to make automation feasible are:

a.       The level of demand: The demand must be forecasted. Generally, we need high volume of output to justify the high cost associated with automation.

b.       The degree of variability required in the manufacturing or the service system: The higher the degree of variability required, the less the chance of success for automation.

c.       Strategic fit with the overall goals and objectives of the company: If the type of automation does not lend itself to flexible manufacturing, but the objectives and goals of the company involve low volume large variety of products, we could have significant capacity-demand mismatch problems due to this misalignment.

2.                   Factories—type of machines, skill level of the employees, level of automation, inventories, safety.

Supermarkets—maximizing sales potential, minimizing inventory investment, level of automation, type of automation, number of cashier lines, proximity and location of various departments within the supermarket.

            Department store—maximizing sales potential, minimizing inventory investment, level of automation, type of automation, proximity—distance and location of various departments within the department store, capacity and convenience of the parking lot.

 

Memo Writing Exercises (included on the DVD)

5. 1.         In most cases it is not feasible to perfectly balance a production line.  First, there are technological constraints dealing with precedence and incompatibility issues.  In other words, certain tasks have to be performed before others (precedence) and two tasks may not be performed at the same station due to their incompatibility (space and nature of operation considerations). Secondly, there are output constraints. Since most task times vary, output constraint determines whether an otherwise eligible task will fit at a workstation because sum of

Page 7: CHAPTER 6 Outline Answers

the task times assigned to a station cannot exceed the cycle time. As a result of both technological and output constraints, it is extremely difficult to achieve a perfectly balanced production line. The larger the number of tasks, the more difficult it is to achieve perfect balance. 

6. 2.         Producing two products on the same assembly line allows the company to utilize the same workstations to produce the common parts. This results in synergy on the line.  If one of the products is new, the company can shorten the period of time from design to actual production, and reduce the cost of manufacturing in the long run.

7. 3.         Fixed automation is utilized in a continuous flow/mass production environment. It enables the firm to manufacture a single or a few products at high volume and low cost. However, it is not flexible enough to produce a variety of parts and it is very costly to make changes to the process. Flexible automation is utilized in a job shop (intermittent) environment, where a wide variety of products can be produced without significant changeover (setup) time/cost. Flexible machinery is not designed for high volume (mass) production.

Page 8: CHAPTER 6 Outline Answers

 

Solutions1.          OT = 450 minutes

             a.   Minimum cycle time = length of longest task, which is 2.4 minutes.

                   Maximum cycle time =  task times = 18 minutes.

             b.   Range of output:

                   

             c.   

             d.   

             e.   Potential output:

                   (1) 

                   (2) 

 

2.         

 

Page 9: CHAPTER 6 Outline Answers

 

 

 

 

 

 

 

 

 

 

             Desired output = 33.33 units per hour

             Operating time = 60 minutes per hour

Solutions (continued)

            a.  Task Number of following tasks Positional Weight

A 7 6

B 6 4.6

C 2 1.6

D 2 2.2

E 2 2.3

F 1 1.0

G 1 1.5

H 0 0.5

Assembly Line Balancing Table  (CT = 1.8)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I A 1.4 0.4 –

II B 0.5 1.3 C, D, E

E 0.8 0.5 –

III D 0.7 1.1 C

C 0.6 0.5 F

F 0.5 0 –

IV G 1.0 0.8 H

H 0.5 0.3 –

b.                       Assembly Line Balancing Table  (CT = 1.8)

Page 10: CHAPTER 6 Outline Answers

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I A 1.4 0.4 –

II B 0.5 1.3 C, D, E

E 0.8 0.5 –

III D 0.7 1.1 C

C 0.6 0.5 F

F 0.5 0 –

IV G 1.0 0.8 H

H 0.5 0.3 –

 

Solutions (continued)

            c.   

3.        

 

 

 

 

 

 

 

 

 

Page 11: CHAPTER 6 Outline Answers

 

 

 

 

 

            Desired output = 4

            Operating time = 56 minutes

            

 

Task # of Following tasks Positional Weight

A 4 23

B 3 20

C 2 18

D 3 25

E 2 18

F 4 29

G 3 24

H 1 14

I 0 5

 

 

 

 

Page 12: CHAPTER 6 Outline Answers

 Solutions (continued)

a.   First rule: most followers. Second rule: largest positional weight.

                                      Assembly Line Balancing Table  (CT = 14)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I F 5 9 A,D,G

A 3 6 B,G

G 6 – –

II D 7 7 B, E

B 2 5 C

C 4 1 –

III E 4 10 H

H 9 1 –

IV I 5 9 –

 

b.   First rule: Largest positional weight.Assembly Line Balancing Table  (CT = 14)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I F 5 9 A,D,G

D 7 2 –

II G 6 8 A, E

A 3 5 B,E

B 2 3 –

III C 4 10 E

E 4 6 –

IV H 9 5 I

I 5 –  

 

Page 13: CHAPTER 6 Outline Answers

c.   

Solutions (continued)

4.         a, b            a.   l. 

      

                  2.   Minimum Ct = 1.3 minutes

  Task Following tasks

  a 4

  b 3

  c 3

  d 2

  e 3

  f 2

  g 1

  h 0 

Work Station Eligible Assign Time Remaining Idle Time

I a A 1.1  

b,c,e, (tie) B 0.7  

  C 0.4  

  E 0.3 0.3

II d D 0.0 0.0

III f,g F 0.5  

Page 14: CHAPTER 6 Outline Answers

  G 0.2 0.2

IV h H 0.1 0.1

      0.6 

                  3.   

                  4.   

Page 15: CHAPTER 6 Outline Answers

 Solutions (continued)

                  b.   1.   

                        2.   Assign a, b, c, d, and e to station 1: 2.3 minutes [no idle time]

                              Assign f, g, and h to station 2: 2.3 minutes

                        3.   

                        4.   

5.         a.

 

 

 

 

 

 

                 

            b.   The minimum cycle time = maximum task time =1.2 minutes

      The maximum cycle time = .2 +.4 +.2 +.4 +1.2 +1.2 + 1.0 = 4.6 minutes  

      

c.   

            d.Task Number of following tasks

A 4

B 3

C 2

Page 16: CHAPTER 6 Outline Answers

D 2

E 1

F 1

G 0

 

 

Page 17: CHAPTER 6 Outline Answers

 Solutions (continued)

Assembly Line Balancing Table  (CT = 2 minutes)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I

 

A 0.2 1.8 B,D

B 0.4 1.4 C, D

D 0.4 1.0 C

C 0.2 0.8 –

II E 1.2 0.8 –

III F 1.2 0.8 –

IV G 1.0 1.0 –

            e.           

                                   

6.         a.        

                 (1,2)

 

 

 

 

Page 18: CHAPTER 6 Outline Answers

 

 

 

 Positional weightsin parentheses

 

 

Page 19: CHAPTER 6 Outline Answers

 Solutions (continued)

6.                    b.   Using both the greatest positional weight and the greatest number of following tasks rules result in the following balance.

Assembly Line Balancing Table  (CT = 1.5 minutes)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I A 0.1 1.4 B

B 0.2 1.2 C

C 0.9 0.3 E

E 0.1 0.2 –

II D 0.6 0.9 F

F 0.2 0.7 G

G 0.4 0.3 H

H 0.1 0.2 I

I 0.2 – –

III J 0.7 0.8 K

K 0.3 0.5 L

L 0.2 0.3 –

                   Total idle time = 0.2 + 0 + 0.3 = 0.5

            c.   For positional weights and greatest number of following tasks

                                                            

Page 20: CHAPTER 6 Outline Answers

                                                                         

7.         a.  

Page 21: CHAPTER 6 Outline Answers

 Solutions (continued)

            b.    .84 minutes = 50.4 seconds (maximum cycle time)

                  Minimum cycle time = maximum task time = 45 seconds  (results in 560 units of production)

            c.   

            d.        

Task Number of followers *PW

A 6 106

B 5 61

C 4 50

D 4 106

E 3 56

F 2 30

G 2 31

H 2 29

I 1 19

J 0 10

*Positional weight

CT = 50 seconds

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I A 45 5 –

III D 50 – –

III B 11 39 C, E

E 26 13 C, F

C 9 4 –

IV G 12 38 H, F

F 11 27 H

H 10 17 I

I 9 8 –

Page 22: CHAPTER 6 Outline Answers

V J 10 40 –

Page 23: CHAPTER 6 Outline Answers

 

Solutions (continued)

e.   

8.

 

 

 

 

 

 

            b.   

  Station Tasks Time Idle/Time

  1 a,b 1.9           .1

  2 c,d 1.9           .1

  3 e,f,i 2.0            0

  4 g,h,j 1.5           .5

  5 k,m 1.2           .8

                1.5

 

Page 24: CHAPTER 6 Outline Answers

  c.Tasks

Positional Weight

  a 8.5

  b 4.6

  c 4.4

  d 4.2

  e 3.2

  f 3.5

  g 1.9

  h 1.5

  i 2.5

  j 2.0

  k 1.2

  m .3

 

Page 25: CHAPTER 6 Outline Answers

 

Solutions (continued) 

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I a .5

1.5

b, c, d

b 1.4 .1 –

II c 1.2

.8

d, e

d .7 .1  

III f 1.0 1.0 e, i

e .5 .5 i, g

i .5

0

IV j .8 1.2 g

g .4

.8

h

h .3 .5 –

  k .9

1.1

m

m .3 .8 –

Total idle time = .1 + .1 + 0 + .5 + .8 = 1.5 minutes

 

            d.   Balance delay: part b and c 1.5/10 = 15% 

Page 26: CHAPTER 6 Outline Answers

9.

1 4 3

  2 5 6

       

11. 1 5 4

  3 8 7

  6 2  

 

Page 27: CHAPTER 6 Outline Answers

 

Solutions (continued) 

12. 3 1 4 8Or

5 1 4 8Or

5 1 4 6

  5 2 7 6 3 2 7 6 3 2 7 8

                     

  5 1 7 8Or

3 1 7 8Or

3 1 4 6

  3 2 4 6 5 2 4 6 5 2 7 8

                             

  3 1 7 6Or

5 1 7 6          

  5 2 4 8 3 2 4 8          

 

13. 3 1 8

  9 7 4

  5 2 6

       

8. 14.               First rank or arrange the number of trips from high to low.

9.   Department         Number of trips

10. 2-4                                                90

11. 1-4                                                80

12. 3-4                                                55

13. 2-3                                                40

14. From this we can see that departments 2 and 4 have the greatest interdepartmental work flow, so they should be close, perhaps locations C and B. Next, we can see that the work flows for 1 and 4, and 3 and 4 are high. Therefore department 4 has to be located at a central location (location B), while department 2 is in location C, department 1 is in location A, and department 3 is in location D.                             Distance * Number of trips matrix

Department 1 2 3 4

1 – (10 x 80) = 800 (20x 70) = 1400 (80 x 40) = 3200

2 – – (40 x 60) = 2400 (90 x 40) = 3600

3 – – – (55 x 50) = 2750

4 – – – –

Total cost = $14,150

Solutions (continued)

Page 28: CHAPTER 6 Outline Answers

 15. No. of trips

 (two way)  Order of

Assignment 

     

  1–2 10      

  1–3 5     A reasonable (intuitive) set of assignments is:

  1–4 90   11  

  1–5 370   1   A#1

B#5  

   

  1–6 135   6      

  1–7 125   7   C#7

D#4

E#3

   

  1–8 0          

  2–3 360   2   F#6

G#2

H#8

   

  2–4 120   8 (tie)      

  2–5 40      

  2–6 115   9 This set of assignments has a total cost of  $143,650 per day.  2–7 45    

  2–8 120   8 (tie)  

  3–4 350   3 Slight variations would also be reasonable, as long as departments 2, 4 and 8 are close to 3, 4 is close to 5, and 5 is close to 1.

  3–5 110   10

  3–6 40    

  3–7 20      

  3–8 200   4  

             No. of trips

 (two way)

  Order ofAssignment

 

     

  4–5 190   5 (tie)  

  4–6 70   12  

  4–7 50      

  4–8 190   5 (tie)  

  5–6 10      

  5–7 40      

  5–8 10      

  6–7 50      

  6–8 20      

  7–8 20      

 

Page 29: CHAPTER 6 Outline Answers

 

Solutions (continued)16.

No. of trips (two way)

 

 

 

     

  1–2 0      

  1–3 40     A reasonable (intuitive) assignment is:

  1–4 110     3–A, 5–B, 1–C, 4–D, 6–E, 2–F.

  1–5 80     An equivalent solution is the reverse order:

  1–6 50     2–F, 6–B, 4–C, 1–D, 5–E, 3–F.

  2–3 0      

  2–4 50      

  2–5 40      

  2–6 120      

  3–4 10      

  3–5 250      

  3–6 10      

  4–5 40      

  4–6 90      

  5–6 20      

  (Ignore Reception since all locations are the same distance from it.)

15.  

16. 17.        Two-way trips can not be used here because of the one-way route restriction. Consequently, students are forced to develop a heuristic that will yield reasonable assignments. One possible heuristic is the following:

17. Beginning with Department 1, identify the department which receives the greatest number of trips from that department (e.g., 40 to Department 2). Assign that department to the next location counter-clockwise.

18. For that department (e.g., 2) identify the department which receives the greatest number of trips (e.g., 5) and assign it to the next position.

19. Continue in this manner until all departments have been assigned.

20. The resulting set of assignments for this problem is: A–1, 2–B, 5–C, 4–D, 9–E, 8–F, 6–G, 10–H, 7–I, 3–J.

21. Students may raise the question about return trips to the original departments after delivery, which would seem to make all locations comparable. Three possible explanations are:

22. 1.   Return trips cost less because they are unloaded.

23. 2.   Unloaded trips may be permitted to move clockwise.

24. 3.   Material handlers (?) pick up new load at each new department and move it to the next department.

(The last explanation seems to appeal most to students.)

Page 30: CHAPTER 6 Outline Answers

Solutions (continued)

Work Station Task Task Time Time RemainingFeasible tasks

Remaining

I D 50 0.4 –

II A 45 5.4 –

III E 26 24 B ,F

  B 11 13 C, F

  F 11 2.4 –

IV C 9 41 G, H

G 12 29 H

H 10 19 I

I 9 10 J

J 10 0.4  

 

Reading: Designing SupermarketsThis reading provides the student with an example of how a supermarket is laid out and why the arrangement is done in a particular or specific way. It is a nice change of pace from the typical manufacturing layout article. 

Operations Tour: Morton Salt1.         Steps in salt production for Morton are:

a.   Inject water into salt caverns below the surface and let the salt deposits dissolve in the water.

b.   Pump the resulting brine to the surface.

c.   Boil the brine, let the liquid evaporate leaving salt crystals and residual moisture.

d.   Dry the salt to remove the residual moisture.

e.   Store the salt in silos.

f.    Move the salt to dedicated production areas.

g.   Produce the cans by forming a cylinder (two sheets of chip board are glued together) .

h.   Roll the cylinder into a continuous tube.

i.    Cut the tubes into can-size pieces.

j.    Assemble and glue the separate pieces constituting the can.

k.   Fill the cans with salt.

l.    Load the filled cans onto pallets and store them in inventory.

Page 31: CHAPTER 6 Outline Answers

 

2.         Quality is checked during different stages of the production process.

a.   Check salt for purity using chemical analysis.

b.   Assure appropriate crystal size by forcing the salt through a scraping screen.

c.   Remove the small pieces of metal by magnets at different stages of the process.

d.   Check the weight of the filled cans, attach the label sticker.

e.   Check to make sure that metal pour spouts are correctly attached.

3.         The company may not have updated its equipment because of the high cost of investment in new machinery.

4.         Salt production would be a low variety, high volume operation which would place it as a repetitive production or continuous flow in the product-process matrix.

5.         (3,800,000 cans per year) x (26 ounces of salt per can) = 98,800,000 ounces per year.

            (98,800,000 ounces per year) / (16 ounces per pound) = 6,175,000 pounds per year.

            (6,175,000 pounds per year) / (2000 pounds per ton) = 3,087.5 tons of salt per year.

6.         Suggested improvements include the following:

            a.   Application of Statistical Process Control (SPC) to reduce the cost of quality.

            b.   Develop a plan to overhaul the existing equipment and to purchase new equipment as a joint effort among finance, purchasing and manufacturing areas.

            c.   Synchronize production, distribution and capacity planning to make sure that there is sufficient capacity in the silos to handle the incoming salt from brine production.

 

Reading: Tour De Force1.         The Viper/Prowler assembly plant is much smaller than typical automobile assembly plants. The

plant covers 392,000 square feet of space as opposed to other typical auto assembly plants that cover from 2 million square feet to 5 million square feet of space.

            The production capacity of the Viper plant is much less than a typical automobile assembly line. The Viper plant’s daily production capacity is 13 Vipers and 20 Prowlers compared to large automobile assembly plants that can manufacture 1000 vehicles per day.

            While most large automobile plants require 2000 or more workers, the Viper plant employs only 260 employees.   

            The Viper plant employs skilled “craftsman” workers. Typical auto assembly plants use workers to do repetitive work with little skill required.

            There are no robots or automation in the Viper plant while most auto assembly plants have high levels of automation.

            The Viper plant uses early 20th century manual assembly techniques on two manual, parallel, relatively short (12 work stations and 720 feet long) assembly lines with generous idle time built in. Typical assembly lines usually involve the use of robots, large number of workstations and very little idle time.   

Page 32: CHAPTER 6 Outline Answers

 

2.         The reasons for not having robots or other high level automation include the following:

            Chrysler Corporation wants to portray a high quality image of two handcrafted automobile models that is generally more expensive and appealing to high-income individuals. The personal attention to the customers is part of the marketing package associated with both products. 

            The company also wants to draw attention to this facility and the two car models (Viper and Prowler) manufactured at this facility because it is an unusual and attractive automobile manufacturing facility. Chrysler Corporation is hoping that not only will it draw attention to the two hand-crafted automobile models produced within the facility but also possibly improve the general goodwill associated with the company. 

 

Reading: My Compliments to the Chef – er, Buyer1.         “Hours vs. Ours” refers to pre-made food companies advertising of their products. This

advertisement slogan simply suggests that if you decide to cook it yourself, it will take “hours” to prepare the meal. However, if you use “our” product, it will be ready to be served very quickly. 

2.         The main advantages of outsourcing for restaurants is reduction of food preparation cost, kitchen costs, and in most cases total cost of the dish served. Since the total cost of the dish is less, the restaurant can offer a lower price. In addition to reduction of cost, restaurants will be able to prepare the outsourced meal much quicker and consistently than if they were preparing it from scratch.

3.         The disadvantages of restaurant outsourcing include possible reduction in quality and implicit “from scratch” food preparation expectations of the customers. In other words, if the customers find out that the meal they just ate was a frozen pre-made package, they may be disappointed.

4.         Even though there may be an implied expectation of “from scratch” meal preparation in certain types of restaurants, as long as there is no explicit statement of fresh meal preparation, the restaurant outsourcing is not unethical. What counts is what the meal looks like and what it tastes like given the type of restaurant.

5.         In effect, outsourcing increases capacity by freeing up resources that would otherwise be engaged.

 

Enrichment Module: Process Design and Facility Layout ProblemJob-Shop layout problem

Donald Rice sold the building that housed the restaurant/lounge he owned and operated for the last 10 years and has recently purchased a larger building in a new location. Mr. Rice hopes to operate a new restaurant and expand his growing business. The building has four equal size rooms. Donald’s restaurant consists of four major departments (areas of his operation):

1.         Dining area   

2.         Lounge/Bar    

3.         Kitchen    

4.         Storage/Refrigeration/Loading area

Donald envisioned using the four rooms to occupy four areas of his operation. The distance matrix among the four rooms is as follows (all distance values are given in feet):

Page 33: CHAPTER 6 Outline Answers

 

Distance Matrix

Room 1 2 3 4

1 – 25 45 35

2   – 60 20

3     – 10

4       –

 

Based on his experience from his previous restaurant, he estimated the following number of trips per hour between departments:

Load Matrix

  Dining Lounge Kitchen Storage

Dining   60 80 10

Lounge     40 20

Kitchen       100

Storage        

 

a.         Donald is thinking about using the following departmental layout.

Room 1 Room 2 Room 3 Room 4

Dining Kitchen Lounge Storage

 

            Determine the (distance x trip) matrix for the above layout. What is the total distance?

b.         Determine a layout and the associated trip x distance matrix that will result in a lower total distance (Hint: Locate the departments that have a high traffic close to each other).

Solution of Problem 1

a.                                                                      Distance x Load Matrix

    To

    Dining Lounge Kitchen Storage

  Dining – *2,700 **2,000 ***350

From Lounge   – 2,400 200

  Kitchen     – 2,000

  Storage       –

* (45 x 60) = 2,700**(25 x 80) = 2,000***(35 x 10) = 350

Total distance = 2,700 + 2,000 + 350 + 2,400 + 200 + 2,000 = 9,650 feet

b.         The objective is to arrange the departments such that the departments with high interdepartment movements (# of trips) are close to one another.

Page 34: CHAPTER 6 Outline Answers

Since the number of trips between kitchen and storage is the highest and room 3 and room 4 (100) have the closest proximity (shortest distance of 10 feet), we will place kitchen and storage in rooms 3 and 4. However, at this point we have not decided which of the two departments will be placed in room 1 and room 2.

We can observe that the next highest number of trips is between dining and kitchen (80). In addition, the shortest distance from rooms 1 and 2 to rooms 3 and 4 is 20 feet (room 2 to room 4). Therefore, kitchen is placed in room 4, storage is placed in room 3, dining is placed in room 2 and the lounge is placed in room 1. The summary of the room assignments are given below:

Room 1—Lounge

Room 2—Dining

Room 3—Storage

Room 4—Kitchen

                           Updated (Distance) x (Load) Matrix

    To

    Dining Lounge Kitchen Storage

  Dining – *1,500 **1,600 ***600

From Lounge   – 1,400 900

  Kitchen     – 1,000

  Storage       –

* (45 x 60) = 2,700**(20 x 80) = 1,600***(60 x 10) = 600

Revised total distance = 1,500 + 1,600 + 600 + 1,400 + 900 + 1,000 = 7,000 feet

Reduction in total distance = 9,650 – 7,000 = 2,650 feet.

Page 35: CHAPTER 6 Outline Answers

1. Process selection involves making choices concerning the way an organization will produce its products or provide services to its customers. It has major implications for capacity planning, layout and work methods.

2. Managers can select from five different types of processes: job shop, batch, repetitive, continuous and projects. Job shops are used to produce a low volume of each of a large variety of products or services. Equipment flexibility must be high to handle the high variety of jobs. Batch processing involves less variety, less need for equipment flexibility, and higher volumes of each type of product. Repetitive processing has even less variety, less need for equipment flexibility, and higher volume. Continuous processing has the lowest variety, the lowest need for equipment flexibility, and the highest volume.

Job shops and batch processing are classified as intermittent systems, meaning that output frequently switches from one product or service to another. Repetitive and continuous systems are classified as continuous processing because there is little or no switching from one product to another. Projects are used for non-routine work that is intended to meet a given set of objectives in a limited time frame. Job variety is high, volume is usually low, and equipment flexibility needs can range from low to high.

3. Process selection may lead to automation or computer-aided manufacturing. [You should find it helpful to list the different types of computer-aided manufacturing, along with a brief description and advantages and limitations of each type.]

4. A key issue in process selection is the management of technology. See the discussion under the Operations Strategy section. Another key issue in process selection is flexibility.

5. There are three fundamental types of plant layout, respectively corresponding to the three different types of production operations situations.

a. A product layout implies that a single product or else a single type of product, for example, automobiles, is manufactured on an assembly line, with the production tasks assigned to workstations along the line.

b. A process layout involves the movement of batches of goods between departments via forklift truck, moving belt, or some other type of conveyance.

c. A fixed-position layout is appropriate for a large end item such as a house or airplane, where all material is assembled to a major structure or product at a specified site.

6. A product layout such as that associated with automobile factories is a good idea when it is justified by the volume. The advantages of product layout are that it involves continuous flow of the work in process, minimum work-in-process inventory, maximum specialization, low material handling costs, efficient utilization of labor and equipment, and systematized routing, purchasing, accounting and inventory control. The disadvantages are dull repetitive jobs, inflexibility and susceptibility to frequent shutdowns.

 

7. A process layout allocates floor space to work centers so as to sustain a logical flow of semi-finished goods, and minimize transportation and inventory costs. It is more flexible than product layout in the sense that a variety of products can be made without incurring extensive changeover costs. It also makes better use of the specialized skills of employees, so that incentive pay systems can be effective in enhancing productivity. Process layout is appropriate when each type of product or semi-finished goods has low volume, but there are potentially high costs for unused equipment, excess inventory, slow or irregular movement, and a need for extensive production control paperwork.

8. A fixed-position layout is appropriate for large construction projects or for assembly of very large products such as airplanes, which are difficult to move. An example of a fixed position service system is a subway, which is an economical way to move large masses of people.

Page 36: CHAPTER 6 Outline Answers

9. An assembly line is balanced to smooth the flow of semi-finished goods, and to achieve the best possible utilization of both the labor force and the plant. The work is subdivided into groups of tasks, and each group is performed at some specific location along the line called a workstation. A workstation might be a single employee, or possibly a small cluster of employees, if the services of more than one person are required for the tasks.

10. The cycle time is the span of time a unit of product is at a workstation. In balancing the line, we determine both the cycle time and the number of workstations, based on the number of units of product to be produced in a working day, the total of the times of the tasks needed to make one unit of the product, and the amount of effective clock time available in a day, after allowing for rest periods, breaks and planned shutdowns of the line.

11. There are several different meanings of the term "cycle." The minimum cycle time is the time required for the longest task. The maximum cycle time is the sum of the task times for a single unit of product. The actual cycle time is somewhere between these two extremes; it is the amount of time at the workstation with the largest sum of task times.

12. The minimum number of workstations in the product layout is the quotient of the sum of the task times for a single unit of product divided by the cycle time, rounded to the next highest integer. Assigning tasks to workstations is done with heuristics (rules of thumb):

a. Consider precedence; make sure that all jobs are done in a logical sequence.b. Try to keep all stations busy all of the time by filling up the cycle time with tasks. Do not assign

a station more tasks than it has time to perform.c. The greatest positional weight rule, one of several heuristics for assigning tasks to stations

assigns tasks according to the greatest sum of remaining task times to a free station. Other heuristics are: most following tasks, most preceding tasks, and greatest sum of task times for tasks that precede.

13. Measures of effectiveness guide decision makers to satisfactory, but not necessarily optimum decisions on process layouts. The simplest approach involves ranking of departments or work centers according to workflow (Distance x Number of loads carried), and assigning work center locations so as to minimize the total intraplant transportation costs.

14. The Muther grid is an alternative approach to process layout planning that allows for subjective opinions that consider multiple criteria on the closeness of work centers to one another. Work centers are rated in pairs on a six-point closeness scale from A (absolutely necessary) to X (undesirable). First the A's are paired, and then the X's are separated; then the E's (very important) are paired, etc., until all centers are accounted for.