Deciding which process/thread should use a Resource
(CPU, disc, etc.)
SPRING 2011 - 102
2
8/2/2019 Chapter 5 102 II
3/25
SPRING 2011 - 1023
8/2/2019 Chapter 5 102 II
4/25
A priority number (integer) is associated with each process
The CPU is allocated to the process with the highest priority (smallest
integer highest priority)
A priority scheduling algorithm can be preemptive or non preemptive.
NonPreemptive
Pre-emptive
A Non preemptive
priority schedulingalgorithm will simply
put the new process
at the tail of the
Ready Queue.
A Preemptive priority
scheduling algorithm will
preempt the CPU if thepriority of the newly arrived
process is higher than the
priority of the currently
running process..
SPRING 2011 - 102
4
8/2/2019 Chapter 5 102 II
5/25
SPRING 2011 - 102
5
SJF is a priority scheduling where priority is the predicted next CPU burst
time.
Problem Starvation
low priority processes may never execute
Solution Aging
as time progresses increase the priority of the process
8/2/2019 Chapter 5 102 II
6/25
SPRING 2011 - 102
6
8/2/2019 Chapter 5 102 II
7/25
SPRING 2011 - 102
7
8/2/2019 Chapter 5 102 II
8/25SPRING 2011 - 1028
8/2/2019 Chapter 5 102 II
9/25
Round-robin scheduling
Pre emptive
Based on FIFO
time slice or quantum
Processes run only for a limited amount of time . After this time has
elapsed, the process is preempted and added to the end of the readyqueue
If there are n processes in the ready queue and the time quantum is
q, then each process gets 1/n of the CPU time in chunks of at most q
time units at once. No process waits more than (n-1)q time units.
SPRING 2011 - 102
9
8/2/2019 Chapter 5 102 II
10/25
Process Burst Time
P1 53
P2
17
P3 68
P4 24
The Gantt chart is:
Typically, higher average turnaround than SJF, but better response
P1 P2 P3 P4 P1 P3 P4 P1 P3 P3
0 20 37 57 77 97 117 121 134 154 162
Time Quantum = 20
SPRING 2011 - 102
10
8/2/2019 Chapter 5 102 II
11/25
19 APRIL 2011 COPYRIGHT VIRTUAL UNIVERSITY OF PAKISTAN
Process Burst TimeP1
53 33 13P2
17
P3 68
48
28
8P4
24 4
The Gantt chart with quantum 20 is:
P1 P2 P3 P4 P1 P3 P4 P1 P3 P3
0 20 37 57 77 97 117 121 134 154 162
8/2/2019 Chapter 5 102 II
12/25
19 APRIL 2011
Process Turnaround Time Waiting Time
P1 134 134
53 = 81P2
37 37 17 = 20
P3
162 162 68 = 94
P4
121 121 24 = 97
Average waiting time = 73
8/2/2019 Chapter 5 102 II
13/25
SPRING 2011 - 102
13
8/2/2019 Chapter 5 102 II
14/25
SPRING 2011 - 102
14
8/2/2019 Chapter 5 102 II
15/25
Very large quantum size
Processes run for long periods
Degenerates to FIFO
Very small quantum size
System spends more timecontext switching than runningprocesses
Quantum size
SPRING 2011 - 102
15
8/2/2019 Chapter 5 102 II
16/25
Quantum size
Best quantum time size
Depends on system
Interactive: response time key factor
Batch: turnaround time key factor
SPRING 2011 - 102
16
8/2/2019 Chapter 5 102 II
17/25
SPRING 2011 - 10217
8/2/2019 Chapter 5 102 II
18/25
Ready queue is partitioned into separate queues:
foreground (interactive)
background (batch)
Each queue has its own scheduling algorithm
foreground RR
background FCFS
Scheduling must be done between the queues
Fixed priority scheduling; (i.e., serve all from foreground then from background).Possibility of starvation.
Time slice each queue gets a certain amount of CPU time which it can scheduleamongst its processes; i.e., 80% to foreground in RR 20% to background in FCFS
8/2/2019 Chapter 5 102 II
19/25
8/2/2019 Chapter 5 102 II
20/25
SPRING 2011 - 10220
8/2/2019 Chapter 5 102 II
21/25
Different processes have different needs
Short I/O-bound interactive processes should generallyrun before processor-bound batch processes
Multilevel feedback queues
Arriving processes enter the highest-level queue andexecute with higher priority than processes in lowerqueues
Long processes repeatedly descend into lower levels
Gives short processes and I/O-bound processes higherpriority
Long processes will run when short and I/O-boundprocesses terminate
Processes in each queue are serviced using round-robin
Process entering a higher-level queue preempt running
processes
8/2/2019 Chapter 5 102 II
22/25
Similarly Aging can be done to prevent starvation i.e. the processes that
waits too long in the lower priority queue are moved to a higher priority
queue
Multilevel-feedback-queue scheduler defined by the following parameters:
number of queues
scheduling algorithms for each queue
method used to determine when to upgrade a process
method used to determine when to demote a process
method used to determine which queue a process will enter when that
process needs service
8/2/2019 Chapter 5 102 II
23/25
Three queues:
Q0 RR with time quantum 8 milliseconds
Q1
RR time quantum 16 milliseconds Q2 FCFS
Scheduling
A new job enters queue Q0 which is served FCFS. When it gains CPU, job
receives 8 milliseconds. If it does not finish in 8 milliseconds, job ismoved to queue Q1.
At Q1job is again served FCFS and receives 16 additional milliseconds. Ifit still does not complete, it is preempted and moved to queue Q2.